Resettlement Plan (Draft)

October 2015

People’s Republic of : Qihe River Environmental Improvement and Ecological Conservation Project

Prepared by Qibin Government and Qibin District Project Management Office for the Asian Development Bank.

CURRENCY EQUIVALENTS (as of 7 October 2015)

Currency unit – yuan (CNY) CNY1.00 = $0.1573 $1.00 = CNY6.3580

ABBREVIATIONS

AAOV – Average Annual Output Value ADB – Asian Development Bank AH – Affected Households AP – Affected Person DMS – Detailed Measurement Survey FGD – Focus Group Discussion GRM – Grievance Redress Mechanism SES – Socio-economic Survey TA – Technical Assistance

WEIGHTS AND MEASUREMENTS

ha – hectare km – kilometer kg – kilogram m – meter

NOTES

(i) The fiscal year of the Government of the People’s Republic of China and its agencies ends on 31 December. (ii) In this report, “$” refers to US dollars.

This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Draft Resettlement Plan ______

September 2015

PRC: Henan Hebi Qihe River Environmental Improvement and Ecological Conservation Project

——Qibin District Wastewater and Solid Waste Management Subproject

Prepared by Qibin District Government (HDG) and Qibin District Project Management Office (PMO) for the Asian Development Bank (ADB) Financed Project

CURRENCY EQUIVALENTS Currency unit = Yuan (CNY) CNY 1 = $ 0.1613 $ 1 = CNY 6.2 1 hectare = 15 mu

ABBREVIATIONS

AAOV - Average Annual Output Value ADB - Asian Development Bank AH - Affected Households AP - Affected Person DMS - Detailed Measurement Survey FGD - Focus Group Discussion GRM - Grievance Redress Mechanism HD - House Demolition HCG - Hebi City Government HPRSAD - Hebi Project Resettlement and Social Affairs Department IOL - Inventory of Loss LA - Land Acquisition LO - Land Occupation LEF - Land Expropriated Farmer M & E - Monitoring and Evaluation MLS - Minimum Living Security MSW - Municipal Solid Waste PMO - Project Management Office QDG - Qibin District Government QDCAO - Qibin District City Administration Office QDLRMB - Qibin District Land Resource Management Bureau QDHC - Qibin District Housing Construction Bureau RRC - People’s Republic of China RIB - Resettlement Information Booklet ROW - Right-of-way RP - Resettlement Plan SES - Socio-economic Survey TA - Technical Assistance WEIGHTS AND MEASURES Km = kilometer Kg = kilogram Ha = hectare m = meter

DEFINITION OF TERMS

Affected persons -Those who are physically displaced (relocation, loss of residential land, Households or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas.

Cut-off date -It refers to the date when the results of the census and inventory of losses were for eligibility presented to the affected households. Any households who built after the Project’s cut-off date will not be eligible for assistance.

Entitlement -Refers to a range of measures comprising compensation, income restoration support, transfer assistance, income substitution, relocation support, etc. which are due to the AHs, depending on the type and severity of their losses, to restore their economic and social base.

Grievance redress mechanism- A mechanism to receive and facilitate the resolution of affected persons’ concerns redress and grievances about physical and economic displacement and other project mechanism impacts, paying particular attention to the impacts on vulnerable groups.

Income restoration- This is the re-establishment of sources of income and livelihood of the program affected households. It is a program designed with various activities that aim to support affected persons to recover their income / livelihood to pre-project levels. The program is designed to address the specific needs of the affected persons based on the socio-economic survey and training need assessment.

Meaningful consultation- A process that (i) begins early in the project preparation stage and is carried out on consultation an ongoing basis throughout the project cycle; (ii) provides timely disclosure of relevant and adequate information that is understandable and readily accessible to affected people; (iii) is undertaken in an atmosphere free of intimidation or coercion; (iv) is gender inclusive and responsive, and tailored to the needs of disadvantaged and vulnerable groups; and (v) enables the incorporation of all relevant views of affected people and other stakeholders into decision making, such as project design, mitigation measures, the sharing of development benefits and opportunities, and implementation issues.

Vulnerable groups- Individuals and groups who may be differentially or disproportionately affected by the project because of their disadvantaged or vulnerable status. Vulnerable groups are those below the poverty line, the landless, the elderly, women and children, and Indigenous Peoples, and those without legal title to land.

Executive Summary 1. Introduction to the Subproject The Henan Hebi Qihe River Environmental Improvement and Ecological Conservation Project consists of 8 components in 4 categories, which are (i) Qi River Upstream Ecological Protection, (ii) Qi River Wetland Reservation and Restoration, (iii) Qi River main stream Watercourse Improvement in Qi County, (iv) Four tributary watercourse improvement in Qi County, (v) Five Canal watercourse improvement in Qibin District, (vi) Qibin District wastewater and solid waste management, (vii) Qi County wastewater and solid waste management, (viii) institutional capacity building. The Project has a construction period of 5 years, from June 2016 to 2021. The Qibin District Wastewater and Solid Waste Management Subproject is the 6th subproject of the Project. The Subproject mainly includes the construction of rainwater and wastewater pipelines, including rainwater pipelines of 73.367km (DN400mm—DN1500mm) and wastewater pipelines of 83.293km (DN300mm—DN1000mm) as well as improvement to domestic solid waste management at 6 riverside villages along Upper Qihe River in Qibin District. HCG is the executing agency of the Subproject, and the Qibin District Government/Housing Construction Bureau is the implementing agency. The Subproject will be constructed from June 2016 to September 2020. The land temporary occupation, compensation and resettlement work of the Subproject will begin in March 2016 and be completed in June 2017.The estimated resettlement budget is 737,700 yuan (prices in July 2015). This RP will be updated based on the detailed design of the Subproject and the results of the detailed measurement survey (DMS), and the updated RP will be submitted to ADB for review and approval before the commencement of resettlement and prior to civil works contract awards. 2. Temporary land occupation Pipelines will be laid in three kind of areas under the Subproject, namely: 1) along with the existing roads and will involve temporary state-owned land occupation; 2) along with the newly planned roads which may involve collective land acquisition in future; 3) laid for the connection to the WWTP or WSP without relation to the new or existing roads and will involve temporary collective and/or state-owned land occupation. In term of the second one, the planned roads may be identified as the associated facilities of ADB financed pipelines. Since these new planned roads are still in the planning stage and have not completed their FSRs, no RP for these new roads is available to date. During the implementation stage, once the preliminary designs of these new roads are finished, Qibin District Government and Qibin PMO, with assistance of resettlement experts, will conduct DDR for those roads to identify whether LAR is involved and prepare the RPs if necessary. RPs for these associated roads shall be prepared to meet the requirements of relevant national laws, regulations of LA and HD. The RPs need to be submitted to ADB before the commencement of LAR and prior to the award of civil works contract to ensure all issues relating to LAR must be resolved prior to the commencement of the civil work for laying the pipes. As per the latest FSR, it’s estimated that 822.06 mu land will be occupied temporarily for the Subproject, including 605.28 mu state-owned land in Dalaidian Town, and 216.78 mu collective land in Wangxiawu, Xingzhuang, Lutun, Aizhuang, Fanzhuang, Huapitun, Zhouyuan and Niexiawu Villages, Juqiao Town, affecting 163 households with 650 persons. The Subproject affects no vulnerable population, and does not involve HD. These impacts will be updated after DMS which will be conducted in December 2015 on the basis of project design. See Table 1.

Table 1 Impacts of the Subproject. Rainwater Component Wastewater pipelines Total pipelines Temporarily occupied State-owned land 302.64 302.64 605.28 land (mu) Collective land 109.42 107.36 216.78 Total 412.06 410 822.06 Temporarily affected Temporary land HHs 83 80 163 population occupation Population 327 323 650

3. Policy framework and entitlements This RP is based on the Land Administration Law of the PRC (2004), Decision of the State Council on Deepening the Reform and Rigidly Enforcing Land Administration (SC [2004] No.28),

Guidelines on Improving Compensation and Resettlement Systems for Land Acquisition (MLR [2004] No.238), the applicable policies of Henan Province and Hebi City, and ADB’s Safeguard Policy Statement (2009). The subproject owner will pay compensation to proprietors affected by temporary land occupation according to the rates specified herein. The temporarily occupied collective farmland and woodland will be restored to the original condition by the contractor so as not to affect regular cultivation under the supervision of the Qibin PMO, owner, and district land and resources bureau together with the affected village collectives, village groups and representatives of the APs.

4. Resettlement strategy The compensation rates for temporarily occupied land are 2,400 yuan/mu per annum for irrigated land and 2,000 yuan/mu per annum for non-irrigated land. The occupation period will be one year. The affected special facilities will be reconstructed by the owner to the original size, standard and function, or by their proprietors after compensation. Other ground attachments will be compensated at replacement prices.

5. Organizational setup HCG is the executing agency of the Subproject, and the Qibin District Government/Housing Construction Bureau is the implementing agency. The Qibin PMO is responsible for the management and coordination of the Subproject. The Qibin District Land and Resources Bureau is responsible for RP implementation together with the affected town governments, and village/community committees.

6. Public participation and information disclosure All APs (with 50% being women) have been informed of the key points of this RP by various means and involved in the Subproject, such as meeting, interview, FGD, public participation meeting and community consultation, and their opinions have been well incorporated into this RP. The Resettlement Information Booklet (RIB) will be distributed to the APs or groups in August 2015, and the draft RP will be published on ADB’s website in August 2015.

7. Grievance redress An appeal procedure has been established to settle disputes over compensation and resettlement. The aim is to respond to appeals of the APs timely and transparently. Grievances about the Subproject may be from LA and HD. Correspondingly, the Hebi PMO, Hebi Project Resettlement and Social Affairs Department (HPRSAD), Qibin PMO, and the affected sub-district offices and village/community committees will coordinate and handle grievances and appeals arising from resettlement. The APs may file appeals about any aspect of resettlement, including compensation rates. All agencies will accept grievances and appeals from the APs for free, and costs so reasonably incurred will be disbursed from contingencies.

8. Resettlement budget All costs incurred during LA and resettlement will be included in the general budget of the Subproject. Based on prices in April 2015, the resettlement budget of the Subproject (rainwater and wastewater pipelines) is 737,700 yuan, including compensation for young crops and ground attachments of 616,100 yuan or 83.52% of the resettlement budget; other costs (including planning and design costs, training costs, LA taxes, supporting fund for vulnerable groups, etc.) of 23,000 yuan or 3.12% of the resettlement budget; and contingencies of 98,600 yuan or 13.37% of the resettlement budget.

9. Monitoring and evaluation (M&E) In order to ensure the successful implementation of this RP, resettlement implementation will be subject to internal and external monitoring. Internal monitoring will be conducted by the Hebi PMO, HPRSAD, Qibin PMO, and other district authorities (e.g., land and resources bureau, QDNCO, labor and social security bureau), and an internal monitoring report will be submitted to ADB semiannually. The Hebi PMO will appoint an independent agency to conduct external M&E and submit M&E reports semiannually, and M&E costs will be included in the resettlement budget.

10. Resettlement impacts and measures of the associated facility (Qishuiwan WWTP) An associated project is a project that is connected directly with the Subproject in function or benefit during its preparation and implementation, namely an extension of the Subproject not financed by ADB. After the completion of the Subproject, wastewater collection capacity will increase significantly, but the existing WWTP in the subproject area can hardly reach this capacity. Therefore, HCG plans to construct the new Qishuiwan WWTP to treat wastewater collected in the Subproject. The Qishuiwan WWTP will be financed entirely by domestic fund and is not a part of ADB financed project, hence it has been identified as an associated project. Part of pipelines will be laid along with the newly planned roads which may involve collective land acquisition in future. These planned roads may be identified as the associated facilities of ADB financed pipelines. Since these new planned roads are still in the planning stage and have not completed their FSRs, no RP for these new roads is available to date. During the implementation stage, once the preliminary designs of these new roads are finished, Qibin District Government and Qibin PMO, with assistance of resettlement experts, will conduct DDR for those roads to identify whether LAR is involved and prepare the RPs if necessary. RPs for these associated roads shall be prepared as per national laws, regulations relevant to LA and HD and local practices and need to be submitted to ADB to ensure all issues relating to LAR must be resolved prior to the award of civil works contract. The Qishuiwan WWTP will be located in Qiangongtang Village, Weixian Town, Junxian County, with a size of 40,020 m2, a land area of 60 mu and a design treatment capacity of 30,000 tons/day, and will be used to treat wastewater collected by the wastewater pipelines in Juqiao Town. According to the Feasibility Study Report of the Subproject, the wastewater pipelines in Juqiao Town will collect about 14,000 tons of wastewater per day after completion. Therefore, the treatment capacity of the Qishuiwan WWTP is sufficient. The Qishuiwan WWTP will be fully financed by the local government. 60 mu of collective land in Qiangongtang Village, Weixian Town, Junxian County will be acquired for the associated facility, all being irrigated land, affecting 47 households with 179 persons permanently. The associated facility will occupy 113.32 mu of state-owned land temporarily caused by the pipelines with a length of 16.3 km connected to the WWTP, and affect no vulnerable population. See Table 2.

Table 2 Summary of Resettlement Impacts of the Associated Facility (Qishuiwan WWTP) Item Qishuiwan WWTP Permanent LA (mu) Collective land 60 1. Permanent Permanently affected Collective land HHs 47 impacts population acquisition Population 179 Temporarily occupied land State-owned land 111.321 2. Temporary (mu) impacts Temporarily affected Temporary land HHs 0 population occupation Population 0 total land use(mu) 171.32 3. Total impacts HHs 47 Population 179 Note: Qishuiwan WWTP will be financed entirely by domestic fund and is not a part of ADB financed project.

The compensation for the land permanently acquired for the associated project is based on location-based composite land price (excluding young crop compensation). In the area affected by the associated facility, the LA compensation rate for collective land is 31,500 yuan/mu, and the young crop compensation rate is 2,400 yuan/mu for irrigated land. Compensation will be paid directly to the AHs. In addition to cash compensation, the households affected by LA will be provided with diversified livelihood restoration measures, including agricultural development, employment, skills training and endowment insurance.

1 It’s caused by the pipelines with a length of 16.3 km connected to the WWTP under the domestic project.

The Government is the executing agency of the associated project (Qishuiwan WWTP), and the Xun County Housing Construction Bureau is the implementing agency. The associated facility will be financed by the local government, it is not included in the scope of the ADB-financed project, and its estimated resettlement budget is 4.9852 million yuan (prices in 2015).

TABLE OF CONTENTS

EXECUTIVE SUMMARY ...... 1

1 OVERVIEW OF THE SUBPROJECT ...... 1

1.1 BACKGROUND ...... 1

1.2 COMPONENTS AND RESETTLEMENT IMPACTS ...... 1

1.3 C. SUMMARY OF RESETTLEMENT IMPACTS ...... 6

1.4 D. MEASURES TO REDUCE RESETTLEMENT ...... 6 1.4.1 Design Stage ...... 6 1.4.2 Resettlement Implementation Stage ...... 7 1.4.3 Construction Stage ...... 7

1.5 IDENTIFICATION OF THE ASSOCIATED FACILITY ...... 7

2 IMPACTS OF THE SUBPROJECT ...... 9

2.1 RANGE OF IMPACT SURVEY ...... 9

2.2 IMPACTS OF TEMPORARY LAND OCCUPATION ...... 9

2.3 AFFECTED GROUND ATTACHMENTS ...... 10

2.4 AFFECTED POPULATION ...... 10

3 LEGAL FRAMEWORK AND POLICIES ...... 11

3.1 LAWS, REGULATIONS AND POLICIES APPLICABLE TO RESETTLEMENT ...... 11

3.2 CUT-OFF DATE ...... 11

3.3 COMPENSATION RATES ...... 11 3.3.1 Temporary Land Occupation ...... 11 3.3.2 Ground Attachments ...... 12

4 COMPENSATION AND RESTORATION MEASURES ...... 13

4.1 COMPENSATION AND RESTORATION PROGRAM FOR TEMPORARY LAND OCCUPATION ...... 13

4.2 COMPENSATION AND RESTORATION PROGRAM FOR GROUND ATTACHMENTS ...... 13

5 ORGANIZATIONAL STRUCTURE ...... 14

5.1 RESETTLEMENT IMPLEMENTATION AND MANAGEMENT AGENCIES ...... 14

5.2 STAFFING AND EQUIPMENT ...... 14 5.2.1 Staffing and Equipment...... 14 5.2.2 Equipment ...... 14

6 PUBLIC PARTICIPATION AND GRIEVANCE REDRESS ...... 15

6.1 PUBLIC PARTICIPATION ...... 15

6.2 GRIEVANCE REDRESS ...... 15

7 RESETTLEMENT BUDGET AND IMPLEMENTATION SCHEDULE ...... 17

7.1 RESETTLEMENT BUDGET ...... 17

7.2 RESETTLEMENT IMPLEMENTATION SCHEDULE ...... 18

8 MONITORING & EVALUATION ...... 20

8.1 INTERNAL MONITORING ...... 20

8.2 EXTERNAL MONITORING ...... 20 8.2.1 Scope and Methods ...... 20 8.2.2 Reporting ...... 20

8.3 POST-EVALUATION ...... 21

APPENDIX 1: DDR OF THE PLANNED ASSOCIATED FACILITY (QISHUIWAN WWTP)...... 22

APPENDIX 2: RIB ...... 34

List of Tables Table 1-2 Scope of the Subproject ...... 2 Table 1-1 Summary of Resettlement Impacts by Component under the overall Project ...... 4 Table 1-3 Scope of the Subproject ...... 6 Table 1-4 Summary of Resettlement Impacts ...... 6 Table 1-5 Comparison of Options ...... 6 Table 2-1 Range of the Subproject Area ...... 9 Table 2-2 Impacts of Temporary Land Occupation...... 9 Table 2-3 Affected Ground Attachments ...... 10 Table 2-4 Affected Population...... 10 Table 6-1 Staffing of Resettlement Agencies ...... 14 Table 6-2 Persons Chiefly Responsible of Resettlement Agencies ...... 14 Table 7-1 Public Participation Activities at the Preparation Stage ...... 15 Table 7-2 Public Participation Plan ...... 15 Table 7-3 Contact Information for Grievance Redress ...... 16 Table 8-1 Resettlement Budget ...... 17 Table 9-1 Resettlement Implementation Schedule ...... 18 Table 10-1 M&E Schedule ...... 20 Attached Table 1 Permanently Acquired Collective Land for associated WWTP...... 22 Attached Table 2 Land Losses in Qiangongtang Village ...... 22 Attached Table 3 Land Losses of AHs ...... 23 Attached Table 4 Family Income Losses of AHs ...... 23 Attached Table 5 Ground Attachments Affected by the Associated Facility ...... 23 Attached Table 6 Socioeconomic Profile of Xun County (2012) ...... 23 Attached Table 8 Statistics of the Sample Households ...... 24 Attached Table 7 Socioeconomic Profile of the Affected Town and Villages (2013) ...... 25 Attached Table 9 Household Income and Expenditure ...... 26 Attached Table 10 LA Compensation Rates ...... 28

Attached Table 11 Tax and Fee Rates on LA ...... 28 Attached Table 12 Entitlement Matrix ...... 29 Attached Table 13 Summary of LA Compensation Distribution Programs ...... 29 Attached Table 14 Employment Program of the Associated Project ...... 30 Attached Table 15 Summary of Local Training Programs ...... 30 Attached Table 16 Resettlement Budget ...... 31 Attached Table 17 Resettlement Investment Plan ...... 32 Attached Table 18 Contact Information for Grievance Redress ...... 33

1 Overview of the Subproject

1.1 Background 1. In order to fully rehabilitate the ecological environment and water quality of the Qihe River watershed, improve urban wastewater collection and treatment significantly, control water pollutants effectively, create a new economic development pattern with environmental protection in mind, and build a national wetland park and ecological demonstration base, HCG has applied for a loan of USD150 million with ADB for the Project. The Project has a construction period of 6 years, from 2016 to 2021. 2. The Project consists of 8 components in 4 categories, which are I) Qihe River watershed ecological conservation and rehabilitation: 1) upper Qihe River ecological conservation; 2) Qihe River Wetland Conservation and Rehabilitation ; II) integrated management of the main and branch streams of the Qihe River: 3) Qihe River Mainstream Watercourse Improvement in Qi County ; 4) Four Tributary Watercourse Improvement in Qi County ; 5) Five Canal Watercourse Improvement in Qibin District ; III) Qihe River watershed environmental improvement: 6) Qibin District Wastewater Management Subproject ; 7) Qi County Wastewater and Solid Waste Management; IV) Institutional capacity building: 8) institutional capacity building, investigation and training. Components 12 and 8 do not involve resettlement, and 6 RPs have been prepared for the other components pursuant to ADB’s Safeguard Policy Statement (2009). See Figure 1-1 and Table 1-1. 3. The gross investment in the Project is 2.025 billion yuan (326.57 million USD), including a construction investment of 1.706 billion yuan (275.13 million USD), financing Charges During Implementation of 52.266 million yuan (8.43 million USD)and contingencies of 266.672 million yuan (43.01 million USD), including an ADB loan of USD150 million, equivalent to 930 million yuan, while the balance of 1.095 billion yuan is to be raised by HCG. 4. Through preliminary identification, the Project belongs to Category A in involuntary resettlement. Therefore, HCG has prepared 6 RPs that comply with ADB’s Safeguard Policy Statement (2009), and the applicable laws, regulations and policies of the PRC, Henan Province and Hebi City with the assistance of the ADB technical assistance experts. 5. The Qibin District Wastewater and Solid Waste Management Subproject is the 6th subproject of the Project. HCG is the executing agency of the Subproject, and the Qibin District Government/ Housing Construction Bureau is the implementing agency. The Qibin PMO is responsible for the management and coordination of the Subproject.

1.2 Components and Resettlement Impacts 6. The Subproject is the 6th subproject of the Project, and consists of: 1) rainwater pipelines: construction of rainwater pipelines of 73.367km, including 7.76km in Dalaidian Town and 65.607km in Juqiao Town; 2) wastewater pipelines: construction of wastewater pipelines of 83.293km, including 21.481km in Dalaidian Town and 61.812km in Juqiao Town; 3) Solid waste management. See Table 1-2. 7. Pipelines will be laid in three kind of areas under the Subproject, namely: 1) along with the existing roads and will involve temporary state-owned land occupation; 2) along with the newly planned roads which may involve collective land acquisition in future; 3) laid for the connection to the WWTP or WSP without relation to the new or existing roads and will involve temporary collective and/or state-owned land occupation. In term of the second one, the planned roads may be identified as the associated facilities of ADB financed pipelines. Since these new planned roads are still in the planning stage and have not completed their FSRs, no RP for these new roads is available to date. During the implementation stage, once the preliminary designs of these new roads are finished,

2 The involved land for greening of barren hills are collective owned and partly contracted to households. Very low or even no income can be generated from these barren land. No land will be acquired and no natural resource will be additionally restricted to be used by households in project area.

1

Qibin District Government and Qibin PMO, with assistance of resettlement experts, will conduct DDR for those roads to identify whether LAR is involved and prepare the RPs if necessary. RPs for these associated roads shall be prepared to meet the requirements of relevant national laws, regulations of LA and HD. The RPs need to be submitted to ADB before the commencement of LAR and prior to the award of civil works contract. All issues relating to LAR must be resolved prior to the commencement of the civil work for laying the pipes. Table 1-2 Scope of the Subproject No. Component Scope of construction Resettlement impacts Document Construction of rainwater pipelines Occupying 412.08 mu of land temporarily, Rainwater of 73.367km, including 7.76km in including 109.42 mu of collective land and 1 pipelines Dalaidian Town and 65.607km in 302.64 mu of state-owned land, affecting Juqiao Town 83 households with 327 persons Construction of wastewater Occupying 410.02 mu of land temporarily, Wastewater pipelines of 83.293km, including including 107.36 mu of collective land and 2 pipelines 21.481km in Dalaidian Town and 302.64 mu state-owned land, affecting 80 61.812km in Juqiao Town households with 323 persons RP improvement to domestic solid waste management at 6 riverside villages along Upper Solid waste The trash bins will be set in public area. 3 Qihe River in Qibin District management No LAR impact. Solid waste collection and transferring, purchase trash bins and transferring cars

8. This RP has been prepared based on the latest feasibility study report, and will be updated based on the detailed design and DMS. The updated RP will be submitted to ADB for review and approval before the commencement of resettlement and award of civil works contracts. See Figure 1-2.

2

Figure 1-1 Location Map of the Components

3

Figure 1-2 Planning Map of the Subproject

Table 1-1 Summary of Resettlement Impacts by Component under the overall Project 2.1 Qihe 3.1 Qibin 1.2 Qihe River 2.2 Four 2.3 Five District 3.2 Qi River Mainstrea Tributary Canal Wastewat County Wetland m Watercours Watercours er Wastewate Item Conservati Watercours e e Managem r and Solid Total on and e Improveme Improveme ent(the RP Waste Rehabilitati Improveme nt in Qi nt in Qibin for this Managem on nt in Qi County District subproject ent County ) Collectively-owne 1174.2 285.75 166.7 220.53 442.9 0 58.35 d land acquisition 3 1959.2 1959.2 Permanen Rural land transfer 0 0 0 0 0 1.Perm 8 8 t land use anent State-owned land 1299.5 (mu) 455.73 546.1 0 292.39 0 5.4 impact occupation 9 s 2700.7 Total 712.8 220.53 735.29 0 63.75 4433.1 3 House by ADB financed 5295.1 5295.1 0 0 0 0 0 demolitio project 2 2

3 The land has been acquired by a previous and domestic project in 2011 with 113 HHs and 500 persons affected.

4

n (m2) by a previous and 0 0 0 13233. 0 0 13233. domestic project4 05 05 0 0 0 18528. 0 0 18528 Total 17 .17 Collective- AHs 44 25 148 126 0 23 366 owned land acquisition APs 225 123 594 579 0 98 1619 Rural land AHs 364 0 0 0 0 0 364 transfer APs 1812 0 0 0 0 0 1812

State-owne AHs 113 0 0 0 0 0 113 d land APs 500 0 0 0 0 0 500 occupation House AHs 0 0 0 105 0 0 10 demolition by ADB APs 0 0 0 55 0 0 55 Permanent financed ly affected Project population House AHs 0 0 0 94 0 0 94 demolition by a previous APs 0 0 0 427 0 0 427 and domestic project

Both LA and AHs 0 0 0 1 0 0 1 house APs 0 0 0 5 0 0 5 demolition Sub-tota AHs 521 25 148 229 0 23 946 l APs 2537 123 594 1056 0 98 4408 Significantly AHs 13 1 18 107 0 20 159 6 affected APs 66 5 76 482 0 81 710

2. Collectively-owned Temporar 0 90.36 17.5 316 216.78 87.19 727.83 Temp land y land use orary State-owned land 0 0 0 0 605.28 224.57 829.85 (mu) impac Total 0 90.36 17.5 316 822.06 311.76 1557.6

4 Urban Village Reconstruction Project financed by domestic fund and stated in March 2013 prior to ADB financed project. 5 Residential houses for 8 HHs and 2 small enterprises will be demolished, in which one household will be affected by LA and HD at the same time. 6 Affected by HD or LA with income loss rate more than >10% (significance of impact is determined based on income loss instead of land loss because most Affected Households live in or around urban area and do not rely on land resources and agricultural incomes).

5

ts 8 Temporari Temporary AHs 0 64 32 40 163 216 515 ly affected land populatio occupation APs 0 278 130 175 650 1020 2253 n AHs 521 89 180 269 163 239 1461 3.Total Affected7 APs 2537 401 724 1231 650 1118 6661 Note: Component (i) Qi River Upstream Ecological Protection and (viii) institutional capacity building will not involve in LAR.

9. Through preliminary identification, the Subproject will involve temporary land occupation and affects some ground attachments. See Table 1-3. Table 1-3 Scope of the Subproject Resettlement Component Scope of construction Affected impacts 1) Construction of rainwater pipelines of 8 villages in Juqiao Temporary land Rainwater 73.367km, including 7.76km in Dalaidian Town and Dailaidian occupation, ground pipelines and 65.607km in Juqiao Town Towns attachments 2) Construction of wastewater pipelines of 8 villages in Juqiao Temporary land Wastewater 83.293km, including 21.481km in Dalaidian Town and Dailaidian occupation, ground pipelines and 61.812km in Juqiao Town Towns attachments improvement to domestic solid waste management at 6 riverside villages along The trash bins will be Solid waste Upper Qihe River in Qibin District none set in public area. No management Solid waste collection and transferring, purchase LAR impact. trash bins and transferring cars

1.3 C. Summary of Resettlement Impacts 10. The Subproject involves temporary land occupation and affects some ground attachments. As per the latest FSR, it’s estimated that 822.06 mu of land will be occupied temporarily for the Subproject, including 216.78 mu of collective land and 605.28 mu of state-owned land, affecting 163 households with 650 persons in Wangxiawu, Xingzhuang, Lutun, Aizhuang, Fanzhuang, Huapitun, Zhouyuan and Niexiawu Villages, Juqiao Town. These impacts will be updated after DMS which will be conducted in December 2015 on the basis of project design. See Table 1-4. Table 1-4 Summary of Resettlement Impacts Item The Subproject Cities 1 Towns 2 Villages 8 Temporarily occupied land (mu) General 216.78 HHs 163 Affected population Population 650

1.4 D. Measures to Reduce Resettlement 1.4.1 Design Stage 11. At the planning stage, local economic and social impacts were taken as a key factor for option optimization and comparison; the design was optimized to occupy wasteland and state-owned where possible, and minimize farmland occupation. See Table 1-5.

Table 1-5 Comparison of Options

7 No ethnic minorities will be affected by LAR.

6

Component Option 1 Option 2 Preferred Impacts avoided Wastewater Constructing wastewater pipelines Adding a pipeline on Avoiding the temporary pipelines in of 7.45km along existing roads, incl. both sides of roads to occupation of 13.5 mu of Option 1 Dalaidian Qishui Avenue, Lingshan Road, meet discharge farmland, and making full use Town Jinshan Road, and Taihang Road demand of existing state-owned land Constructing wastewater pipelines Adding a pipeline on Avoiding the temporary Wastewater of 7.42km along existing roads, incl. both sides of roads to occupation of 14.5 mu of pipelines in Option 1 Xiangjiang East Road, Lijiang Road, meet discharge farmland, and making full use Juqiao Town and Lijiang South Road demand of existing state-owned land

1.4.2 Resettlement Implementation Stage 12. When LA or HD is unavoidable, the following measures will be taken to reduce the local impacts of the Subproject: 1) Conduct public participation and consultation actively to collect comments and suggestions from the APs. 2) Strengthen internal and external monitoring, establish an efficient and unobstructed feedback mechanism and channel, and shorten the information processing cycle to ensure that issues arising from implementation are solved timely. 3) Local competent authorities will assist the APs in resettlement to reduce their burden and losses. 1.4.3 Construction Stage 13. During construction, the following measures will be taken to minimize impacts on the APs: 1) Construction will be completed as quickly as possible. The destruction of farmland, roads and houses will be avoided where possible. Warning signs will be set up as necessary to facilitate pedestrian and vehicular traffic. 2) Spoil excavated during construction will be removed timely.

1.5 Identification of the Associated Facility 14. An associated facility is a structure that is connected directly with the Subproject in function or benefit during its preparation and implementation, and is a separate project which is not part of ADB-financed project scope. At the design stage, the owner attached great importance to the identification of any associated facility through correlation analysis. 15. After the completion of the Subproject, wastewater collection capacity will increase significantly, but the existing WWTP in the subproject area can hardly reach this capacity. Therefore, HCG plans to construct the new Qishuiwan WWTP to treat wastewater collected in the Subproject. The Qishuiwan WWTP will be financed entirely by domestic fund and is not a part of ADB financed project, hence it has been identified as an associated project. 16. Part of pipelines will be laid along with the newly planned roads which may involve collective land acquisition in future. These planned roads may be identified as the associated facilities of ADB financed pipelines. Since these new planned roads are still in the planning stage and have not completed their FSRs, no RP for these new roads is available to date. During the implementation stage, once the preliminary designs of these new roads are finished, Qibin District Government and Qibin PMO, with assistance of resettlement experts, will conduct DDR for those roads to identify whether LAR is involved and prepare the RPs if necessary. RPs for these associated roads shall be prepared as per national laws, regulations relevant to LA and HD and local practices and need to be submitted to ADB to ensure all issues relating to LAR must be resolved prior to the award of civil works contract. 17. The Qishuiwan WWTP will be located in Qiangongtang Village, Weixian Town, Xun County, with a size of 40,020 m2, a floor area of 60 mu and a design treatment capacity of 30,000 tons/day, and will be used to treat wastewater collected by the wastewater pipelines in Juqiao Town. According to the Feasibility Study Report of the Subproject, the wastewater pipelines in Juqiao Town will collect about 14,000 tons of wastewater per day after completion. Therefore, the treatment capacity of the Qishuiwan WWTP is sufficient. The Qishuiwan WWTP will be fully

7 financed by the local government. 18. 60 mu of collective land in Qiangongtang Village, Weixian Town, Xun County will be acquired for the associated facility, all being irrigated land, affecting 47 households with 179 persons permanently. The associated facility will occupy 113.32 mu of state-owned land temporarily, and affect no vulnerable population. See Appendix 1 for details.

8

2 Impacts of the Subproject 2.1 Range of Impact Survey 19. Hohai University was appointed by the Hebi PMO to conduct a socioeconomic survey in the subproject area in January 2015, using the methods of literature study, key information interview, focus group discussion (FGD) and questionnaire survey, covering population, land resources, residential conditions, income and expenditure, expected resettlement modes, etc. 20. The Subproject will affect 163 households with 650 persons in Wangxiawu, Xingzhuang, Lutun, Aizhuang, Fanzhuang, Huapitun, Zhouyuan and Niexiawu Villages in Juqiao and Dailaidian Towns, Qibin District. See Table 2-1.

Table 2-1 Range of the Subproject Area Scope of City District Town Village Remarks construction Wangxiawu Xingzhuang Lutun Aizhuang Wastewater and Temporary land Juqiao Fanzhuang rainwater pipelines occupation Hebi Qibin Huapitun Zhouyuan Niexiawu Wastewater and Temporary occupation of Dalaidian / rainwater pipelines state-owned land

2.2 Impacts of Temporary Land Occupation 21. In the Subproject, temporary land occupation is caused by the construction of wastewater and rainwater pipelines, with an occupation width of 3.5m (work surface). Rainwater and wastewater pipelines are constructed on either side of roads, and involve simultaneous excavation and filling. The Subproject will occupy much land temporarily, but the period of construction is short, usually not more than 3 months. The construction of pipelines will impact the existing roads and/or the land along the sides of the roads, some ground attachments will be affected, see details in table 2-3. 22. The rainwater and wastewater pipelines under the Subproject will be laid in three kind of areas under the Subproject, namely: 1) along with the existing roads and will involve temporary state-owned land occupation; 2) along with the newly planned roads which may involve collective land acquisition in future; 3) laid for the connection to the WWTP or WSP without relation to the new or existing roads and will involve temporary collective and/or state-owned land occupation. The temporarily occupied land will be compensated for pursuant to the applicable provincial and City policies. 23. 822.06 mu of land will be occupied temporarily for the Subproject, affecting 163 households with 650 persons, including 216.78 mu of collective land and 605.28 mu of state-owned land. See Table 2-2.

Table 2-2 Impacts of Temporary Land Occupation Temporarily occupied land (mu) Affected Collective land State-owned Component Town Village Non- construction Subtotal HHs Population Irrigated Total irrigated land Wangxiawu 4.07 11.81 15.87 0 15.87 7 30 Xingzhuang 0 4.07 4.07 0 4.07 5 21 Wastewater Juqiao Lutun 5.59 8.7 14.3 0 14.3 10 49 pipelines Aizhuang 6.77 13.88 20.61 0 20.61 18 75 Fanzhuang 1.3 2.57 3.86 0 3.86 2 8

9

Huapitun 0 6.14 6.14 0 6.14 4 21 Zhouyuan 0 8.95 8.95 0 8.95 10 41 Niexiawu 0 33.58 33.58 0 33.58 24 78 / 225.92 225.92 0 0

Dalaidian / 0 0 0 76.72 76.72 0 0 Subtotal 17.72 89.68 107.36 302.64 410.02 80 323 Wangxiawu 4.07 11.81 15.87 0 15.87 8 31 Xingzhuang 0 4.07 4.07 0 4.07 5 22 Lutun 5.59 8.7 14.3 0 14.3 10 49 Aizhuang 6.77 13.88 20.61 0 20.61 18 76 Juqiao Fanzhuang 1.3 2.57 3.86 0 3.86 3 8 Rainwater Huapitun 0 6.14 6.14 0 6.14 4 21 pipelines Zhouyuan 0 11.01 11.01 0 11.01 10 42 Niexiawu 0 33.58 33.58 0 33.58 25 78 / 225.92 225.92

Dalaidian / 0 0 0 76.72 76.72 0 0 Subtotal 17.72 91.74 109.42 302.64 412.08 83 327 Total 35.44 181.41 216.78 605.28 822.1 163 650

2.3 Affected Ground Attachments 24. The Subproject will affect 409 telegraph poles and 1,328 scattered trees. See Table 2-3. Table 2-3 Affected Ground Attachments Telegraph poles (height) Scattered trees (diameter) Town Village 6-10 8-10m 11-15m Subtotal =<5 cm 11-15 cm 16-20 cm Subtotal cm Wangxiawu 23 10 33 12 44 34 5 96 Xingzhuang 5 4 9 4 12 2 13 30 Lutun 18 12 30 11 26 11 35 83 Aizhuang 16 26 42 4 10 22 78 114 Juqiao Fanzhuang 5 3 8 4 7 9 2 22 Huapitun 3 6 9 3 9 32 8 52 Zhouyuan 8 3 11 3 8 6 8 24 Niexiawu 13 30 43 14 38 11 13 76 Dalaidian / 61 163 224 18 750 36 27 831 Total / 152 257 409 74 904 163 188 1328

2.4 Affected Population 25. All population affected by the Subproject (163 households with 650 persons) is affected by the temporary occupation of collective land, excluding minority population. See Table 2-4. Table 2-4 Affected Population Type Town Village Area (mu) HHs Population Females Wangxiawu 31.74 15 61 28 Xingzhuang 8.13 10 43 20 Lutun 28.59 20 98 46 Temporary Aizhuang 41.21 36 151 71 land Juqiao Fanzhuang 7.72 5 16 7 occupation Huapitun 12.28 8 42 20 Zhouyuan 17.9 20 83 39 Niexiawu 67.5 49 156 73 Total 216.78 163 650 304

26. 304 females will be affected by the Subproject, accounting for 46.7% of the affected population. No household composed of a single female laborer arising from deprivation of spouse, divorce or abandonment has been identified among the AHs.

10

3 Legal Framework and Policies 3.1 Laws, Regulations and Policies Applicable to Resettlement 27. The resettlement policies of the Subproject have been developed in accordance with the laws and regulations of the PRC, and ADB’s policies, including: (1) ADB policies  Safeguard Policy Statement, June 2009  Safeguard Requirement 2: Involuntary Resettlement (2) Laws, regulations and policies of the PRC  Land Administration Law of the PRC (amended on August 28, 2004)  Rural Land Contracting Law of the PRC, effective from March 1, 2003  Regulations on the Implementation of the Land Administration Law of the PRC (Decree No.256 of the State Council), December 27, 1998  Decision of the State Council on Deepening the Reform and Rigidly Enforcing Land Administration (SC [2004] No.28)  Real Right Law of the PRC, effective from October 1, 2007  Regulations in Governmental Information Disclosure of the PRC, effective from May 1, 2008  Urgent Notice of the General Office of the Ministry of Land and Resources on Conducting Strict Management to Prevent Illegal Land Acquisition (MLR [2013] No.28)  Notice of the General Office of the Ministry of Land and Resources on Doing a Better Job in Disclosing City- and County-level Land Acquisition Information (MLRO [2014] No.29) (3) Regulations and policies of Henan Province  Notice of the Henan Provincial Water Resources Department on Issuing the Administrative Measures of Henan Province for the Construction of Water Resources Projects (HPWRD [2001] No.163)  Notice of the General Office of the Henan Provincial Government on Strengthening Land Control and Rigidly Enforcing Land Administration (HPGO [2007] No.33)  Notice of the Henan Provincial Government on Adjusting Location-based Composite Land Prices for Land Acquisition of Henan Province (HPG [2013] No.11) (4) Regulations and policies of Hebi City and Qibin District  Notice of the Hebi City Government on Adjusting Compensation Rates for Ground Attachments and Young Crops on Land Acquired for State Construction (HCG [2012] No.11)  Notice of the Qibin District Government on Issuing the Administrative Measures for Compensation for Demolished Ground Attachments on Collective Land for State Construction of Qibin District (QDG [2013] No.3)

3.2 Cut-off Date 28. The cut-off date for the eligibility for compensation is fixed preliminarily and disclosed to AHs at 15th March 2015 during the preliminary Inventory of Losses (IOL) survey and socioeconomic survey, and will be disclosed again upon release of the LA announcement expected in February 20168. Local governments will not issue any new permits for construction in the area affected by LA of the Project after the preliminary cut-off date. Any newly claimed land, newly built house or settlement in the project area by the APs after this date will not be entitled to compensation or subsidization. Any building constructed or tree planted purely for extra compensation will not be counted in.

3.3 Compensation Rates 3.3.1 Temporary Land Occupation 29. The compensation rates for young crops are based on to the Notice of the Hebi City Government on Adjusting Compensation Rates for Ground Attachments and Young Crops on Land

8 During the inventory of losses (IOL) survey, the cut-off date was preliminarily set and disclosed to affected villages and AHs; once the local government gets the LA approval file from Henan Province Government and issues the announcement of LA in project area, the finalized cut-off date will be set and disclosed again.

11

Acquired for State Construction (HCG [2012] No.11). See Table 3-1.

Table 3-1 Compensation Rates for Temporary Land Occupation Item Unit Compensation rate Compensation for temporary Irrigated land yuan/mu per annum 2400 occupation Non-irrigated land yuan/mu per annum 2000

3.3.2 Ground Attachments 30. The compensation rates for ground attachments are based on the Notice of the Hebi City Government on Adjusting Compensation Rates for Ground Attachments and Young Crops on Land Acquired for State Construction (HCG [2012] No.11). Local governments can opt for lump sum compensation at the rate of 7,000 yuan/mu for all the crops and ground attachment, or chose compensation on the basis of calculation for each item, which depends on the complexity of affected attachments and willingness of affected households. After receiving the compensation, the owner can hold the disposal right of affected ground attachments. Especially for trees (timber and fruit), they can transplant them to other land or sale to other households or entities at market prices. See Table 3-2.

Table 3-2 Compensation Rates for Ground Attachments Unit price Item Unit Remarks (yuan) =<5cm / 5 yuan (1)Poplars, willows, locusts, elms, etc. Scattered trees 6-10cm / 10 yuan (2)After receiving the compensation, the owner can transplant (diameter) 11-15cm / 25 yuan them to other land or sale to other households or entities at 16-20cm / 38 yuan market prices. 8-10m / 180 yuan Telegraph poles 11-15m / 260 yuan

D. Entitlement Matrix 31. The entitlement matrix has been established in accordance with the applicable policies in this chapter, as shown in Table 3-3.

Table 3-3 Entitlement Matrix Type of Degree of Compensation and resettlement APs Compensation rates impact impact policy 1) For temporarily occupied land, (1)Irrigated land: 163 households with compensation will be paid directly to 2,400 yuan/mu per 650 persons in proprietors based on the actual period of annum; non-irrigated Temporary Wangxiawu, occupation. land: 2,000 yuan/mu land Xingzhuang, Lutun, 2) Temporary land occupation will be 216.78 (2)The period of land occupation Aizhuang, notified in advance, and compensated mu occupation will not of collective Fanzhuang, for accordingly. more than 3 months. land Huapitun, Zhouyuan 3) Temporarily occupied land will be (3) Compensation will and Niexiawu restored by the contractor under the be paid prior to the Villages supervision of the affected village groups occupation of the land. and APs. 1) Affected special facilities will be Telegraph restored by proprietors after receiving Ground poles, compensation or by the contractor to the Proprietors See Table 4-3. attachments scattered original standard, size and function. trees 2) Ground attachments will be compensated at replacement cost.

12

4 Compensation and Restoration Measures 4.1 Compensation and Restoration Program for Temporary Land Occupation 32. 822.06 mu of land will be occupied temporarily for the Subproject, including 216.78 mu of collective land and 605.28 mu of state-owned land. For the collective land temporary occupation, the implementation agency of the Subproject will provide compensation directly to the AHs as per the rates specified in the table 4-1. Even if the period of temporary land occupation is less than one year, the owner will provide one year’s agriculture income loss (two crops) for the affected households. 33. The temporarily occupied land will be restored through consultation among the subproject owner, district land and resources bureau, affected village collectives, village groups and representatives of the APs. 34. In order to minimize impacts on agriculture activities and incomes of temporary land occupation, the main principles of restoration are as follows: 1) Temporary jobs generated during construction will be first made available to APs to increase their income and ensure the quality of land reclamation. 2) Strict measures will be taken during temporary land occupation to protect topsoil and avoid any irreversible impact. During excavation, topsoil (recommended thickness 30-50cm) will be collected and piled separately, and measures for water loss and soil erosion control will be taken. After construction, subsurface soil will be backfilled, then the topsoil will be overlaid evenly, and the site leveled to reduce the impact on farmland quality. Any land hardened temporarily by trampling or compaction during construction will be plowed immediately after construction to make it loose again. 3) Some wasteland and borrow areas may be turned into arable land to increase land resources. 35. The Hebi PMO and the subproject owner will restore the temporarily occupied land to the original condition in consultation with proprietors, and restoration costs will be included in the construction budget. 36. The temporarily occupied collective farmland and woodland will be restored to the original condition by the contractor so as not to affect regular cultivation under the supervision of the Qibin PMO, owner, and district land and resources bureau together with the affected village collectives, village groups and representatives of the APs.

4.2 Compensation and Restoration Program for Ground Attachments 37. Infrastructure affected during construction will be compensated for by the contractor and restored by proprietors or the contractor. For ground attachments, cash compensation will be paid directly to proprietors at the rates specified in table 3-2. 38. Restoration measures for demolished facilities must be planned in advance, and suited to local conditions so as to be safe, efficient, timely and accurate, with minimum adverse impact on nearby residents.

13

5 Organizational Structure 5.1 Resettlement Implementation and Management Agencies 39. To ensure successful resettlement as desired, a systematic organizational structure must be established during project implementation in order to plan, coordinate and monitor resettlement activities. Since resettlement is a very comprehensive task that requires the assistance and cooperation of different departments, the transport, land and resources, and finance bureaus, etc. will participate in and support resettlement implementation. Each affected township or village has one or two chief leaders responsible for resettlement. The agencies responsible for resettlement in the Subproject are:  Hebi Project Leading Group  Hebi PMO  HPRSAD  Qibin Subproject Leading Group  Qibin PMO  Qibin District Land and Resources Bureau  Qibin District Housing Construction Bureau  Town governments  Affected village committees and groups  Affected community committees  Design agency  External M&E agency  Other agencies concerned: land and resources bureau, women’s federation, labor and social security bureau 5.2 Staffing and Equipment 5.2.1 Staffing and Equipment 40. In order to ensure the successful implementation of the resettlement work, all resettlement agencies of the Subproject have been provided with full-time staff, and a smooth channel of communication has been established. See Tables 6-1 and 6-2.

Table 6-1 Staffing of Resettlement Agencies Workforce Agency Composition Male Female Hebi Project Leading Group 3 2 Civil servants Hebi PMO 2 2 Civil servants, technicians Qixian Subproject Leading Group 5 2 Civil servants, technicians Qibin PMO 2 1 Civil servants Qibin District Housing Construction Bureau 2 1 Civil servants HPRSAD 2 1 Civil servants, technicians Affected village/community committees 3 3 Officials, representatives of APs Design agency 2 1 Engineers External M&E agency Some Some Resettlement and social experts

Table 6-2 Persons Chiefly Responsible of Resettlement Agencies No. Agency Name Tel 1 Gong Shuangjun 03923261381 HPRSAD 2 Niu Aizhi 13783036995 3 Li Hui 13939237800 Qibin PMO 4 Yang Yang 15939298556

5.2.2 Equipment 41. All resettlement agencies of the Subproject have been provided basic office, transport and communication equipment, including desks and chairs, PCs, printers, telephones, facsimile machines and vehicles.

14

6 Public Participation and Grievance Redress 42. According to the policies and regulations of ADB, the PRC and Henan Province on resettlement, it is very necessary to conduct public participation at the preparation and implementation stages in order to protect the lawful rights and interests of the APs, reduce grievances and disputes, and realize the resettlement objectives properly by developing sound policies and implementation rules on resettlement, preparing an effective RP, and organizing implementation properly.

6.1 Public Participation 43. Since January 2015, the task force has conducted a series of socioeconomic survey and public consultation activities (with 30% of participants being women). At the preparation stage, the PMO, IA and design agency conducted extensive consultation on LA and resettlement. See Table 7-1.

Table 7-1 Public Participation Activities at the Preparation Stage # Date Organizer Participants Purpose Key points Measures Male Female Feasibility Introducing the background Optimizing the 2014. APs, village PMO, FS study, field and purpose of the design of the 6-201 officials, 14 6 agency investigation, Subproject, and minimizing Subproject 4.12 technicians DMS resettlement impacts Reps. of RP Assisting in the DMS, and Drafting preliminary 2015. PMO, APs and preparation, fixing compensation rates resettlement 1-201 16 9 NRCR government socioeconomic programs based on 5.2 agencies survey the survey

44. With the progress of project preparation and implementation, the IA will conduct further public participation. See Table 7-2.

Table 7-2 Public Participation Plan Purpose Mode Time Agencies Involved Topic Hebi PMO, HPRSAD, Distributing the RIB Village bulletin district housing RIB Sep. board, village construction bureau, All APs distribution 2015 meeting village/community committees Hebi PMO, HPRSAD, Disclosure of LA area, Land Village bulletin district housing compensation rates and Feb. occupation board, village construction bureau, All APs resettlement modes, etc. 2016 announcement meeting village/community committees Hebi PMO, HPRSAD, Finding out anything district housing omitted to determine the DMS results Field Dec. construction bureau, All APs final impacts; preparing verification investigation 2015 village/community sample agreements committees Hebi PMO, HPRSAD, Discussing final income Entering into May district housing restoration programs and agreements Village meeting 2016 – construction bureau, All APs the use of compensation and paying (many times) Dec. village/community fees compensation 2018 committees

6.2 Grievance Redress 45. Since public participation is encouraged during the preparation and implementation of the RP, no substantial dispute will arise. However, unforeseeable circumstances may arise during this

15 process. In order to address issues effectively, and ensure the successful implementation of project construction and land acquisition, a transparent and effective grievance redress mechanism has been established. The basic grievance redress system is as follows: Stage 1: If any right of any AP is infringed on in any aspect of LA, HD and resettlement, he/she may report this to village/community committee, which shall record such appeal and solve it together with the village committee or the AP within two weeks. Stage 2: If the appellant is dissatisfied with the disposition of Stage 1, he/she may file an appeal to the Qibin District Housing Construction Bureau after receiving such disposition, which shall make a disposition within two weeks. Stage 3: If the appellant is still dissatisfied with the disposition of Stage 2, he/she may file an appeal to the Qibin PMO after receiving such disposition, which shall make a disposition within two weeks. Stage 4: If the appellant is still dissatisfied with the disposition of Stage 3, he/she may file an appeal to the HPRSAD within one month after receiving such disposition, which shall make a disposition within 4 weeks. 46. At any stage, an AP may bring a suit in a civil court directly in accordance with the Administrative Procedure Law of the PRC. 47. Affected persons can also submit complaints to ADB which will first be handled by the project team. If an affected person is still not satisfied and believes he/she has been harmed due to non-compliance with ADB policy, s/he may submit a complaint to ADB’s Accountability Mechanism.9 48. All agencies will accept grievances and appeals from the APs for free, and costs so reasonably incurred will be disbursed from contingencies. During the whole construction period of the Subproject, these appeal procedures will remain effective to ensure that the APs can use them to address relevant issues. The above grievance redress system will be communicated to the APs at a meeting or through the RIB, so that the APs know their right of appeal. In addition, the appeal process will be published to affected population on mass media. See Table 7-3.

Table 7-3 Contact Information for Grievance Redress Agency Name Address Tel Hebi PMO Liu Jiabin No.235 Xinghe Street, Hebi City 13803923866 HPRSAD Gong Shuangjun No.235 Xinghe Street, Hebi City 18203928910 Jiuzhou Road West (former Jiuzhou Road Qibin PMO Li Hui 13939237800 Sub-district Office)

9 For further information, see: http://www.adb.org/Accountability-Mechanism/default.asp

16

7 Resettlement Budget and Implementation Schedule 7.1 Resettlement Budget 49. All costs incurred during LA and resettlement will be included in the general budget of the Subproject. Based on prices in July 2015, the resettlement budget of the Subproject is 737,700 yuan. The resettlement budget will be updated based on the detailed design and DMS results in December 2015. See Tables 8-1 and 8-2. The local government has committed to implement the RP by allocating adequate counterpart budget. All compensation will be paid prior to the implementation of LAR.

Table 8-1 Resettlement Budget Pipelines Percent No. Item Unit Rate (yuan) Amount Quantity (%) (0,000 yuan) 1 Basic resettlement costs 0,000 yuan \ \ 61.61 83.52% Compensation for 1.1 0,000 yuan \ \ 50.13 67.95% temporary land occupation 1.1.1 Irrigated land mu 2400 179.34 43.04 58.34% 1.1.2 Non-irrigated land mu 2000 35.44 7.09 9.61% 1.2 Ground attachments 0,000 yuan \ \ 11.48 15.56% 1.2.1 Telegraph poles 0,000 yuan \ 409 9.42 12.77% 1.2.1.1 8-10m high / 180 152 2.74 3.71% 1.2.1.2 11-15m high / 260 257 6.68 9.06% 1.2.2 Scattered trees 0,000 yuan \ \ 2.06 2.79% 1.2.2.1 Diameter =<5cm / 5 74 0.04 0.05% 1.2.2.2 Diameter 6-10cm / 10 904 0.9 1.22% 1.2.2.3 Diameter 11-15cm / 25 163 0.41 0.56% 1.2.2.4 Diameter 16-20cm / 38 188 0.71 0.96% 2% of basic 2 Planning and design costs \ \ 1.31 1.78% costs Management costs of 1.5% of basic 3 \ \ 0.99 1.34% temporarily occupied land costs 15% of basic 5 Contingencies \ \ 9.86 13.37% costs 6 Total \ 73.77 100.00% 7 Percent (%) \ 100.00% \ Note: External M&E costs have been included in the budget of the institutional capacity building component of the project management consultancy services.

50. All resettlement funds of the Subproject will be from local counterpart funds and domestic loans. Compensation fees for temporary land occupation will be paid directly to the APs; compensation fees for infrastructure and attachments will be paid to the affected entities or individuals. 51. To ensure that the resettlement funds are available timely and fully, and the APs’ production, livelihoods and income are restored, the following measures will be taken: (1) All costs related to resettlement will be included in the general budget of the Subproject; (2) Land compensation fees and resettlement subsidies will be paid up before LO so that all APs can be resettled properly; (3) In order to ensure the successful implementation of LO and resettlement, financial and supervisory agencies will be established at all levels to ensure that all funds are disbursed timely and fully. 52. The resettlement budget may be increased due to the change of the subproject area, the modification of the compensation rates and inflation, but the IA will ensure that compensation fees are fully paid. The budget will be modified as necessary in the updated RP.

17

7.2 Resettlement Implementation Schedule 53. The general resettlement schedule of the Subproject has been drafted based on the progress of project construction, LO and implementation. The exact implementation schedule may be adjusted due to deviations in overall project progress. See Table 9-1.

Table 9-1 Resettlement Implementation Schedule No. Task Target Agencies in charge Time Remarks 1 Information disclosure RIB 8 villages in 1.1 PMO, HPRSAD Sep. 2015 Juqiao Town 8 villages in 1.2 Disclosure of the RP on ADB’s PMO, HPRSAD Oct. 2015 website Juqiao Town 2 RP update and resettlement budget approval 2.1 DMS HPRSAD, Qibin PMO Dec. 2015 Updating the RP based on the 8 villages in 2.2 IA, Qibin PMO Jan. 2016 DMS Juqiao Town RP and budget approval HCG, Hebi PMO, 2.3 616,100 yuan Jan. 2016 (compensation rates) Qibin PMO 3 Land occupation announcement Disclosing the updated RP 8 villages in HCG, Hebi PMO, 3.1 Jan. 2016 Juqiao Town Qibin PMO Releasing the land occupation 8 villages in 3.2 QDG Feb. 2016 announcement Juqiao Town 4 Compensation agreement Entering into LO compensation 8 villages in IA, village/community Mar 2016 4.1 agreements and paying – Juqiao Town committees June 2017 compensation 5 Restoration measures Restoration of the collective land 8 villages in Oct. 2016 5.1 IA, Qibin PMO – to original situation Juqiao Town Oct. 2017 restoration of the telegraph poles 8 villages in Oct. 2016 5.2 IA, Qibin PMO – Juqiao Town Oct. 2017 Hiring APs under the Subproject Qibin PMO, labor and 8 villages in Jun. 2016 5.3 social security – Juqiao Town Sep. 2020 bureau, contractor 6 M&E Establishing an internal As per the 6.1 PMO, HPRSAD Jan. 2016 monitoring mechanism RP Internal monitoring reporting From Feb. 6.2 Semiannual PMO 2016 Appointing an external M&E 6.3 One PMO Jan. 2016 agency External monitoring reporting 1st report (incl. Jun. 2016 baseline survey) 6.4 Semiannual External M&E agency Dec. 2016 2nd report Jun. 2017 3rd report External evaluation reporting Jun. 2018 4rd report 6.5 Annual External M&E agency 5th report Jun. 2019 (post-evaluation) 6.6 Completion report PMO, IA Jun. 2020 7 Public consultation IA Ongoing 8 Grievance redress IA Ongoing 9 Disbursement of compensation fees 9.1 - Disbursement to the IA Initial funds QDG Feb. 2016 - Disbursement to town 9.2 Initial funds IA Mar. 2016 governments - Disbursement to AHs End of 9.3 Initial funds Town governments May. 2016

18

No. Task Target Agencies in charge Time Remarks 10 Commencement of civil construction Qibin District Wastewater and Solid Waste Qibin District Housing 10 Jun. 2016 Management Construction Bureau

19

8 Monitoring & Evaluation 54. In order to ensure the successful implementation of the RP and realize the objectives of resettlement properly, LA and resettlement activities of the Subproject will be subject to periodic M&E according to ADB’s resettlement policy, including internal and external monitoring.

8.1 Internal Monitoring 55. Internal monitoring will be conducted by the Hebi PMO, HPRSAD, Qibin PMO, and other district authorities concerned. The PMO will develop a detailed internal monitoring plan for LA and resettlement, including: 1) Investigation, coordination of and suggestion on key issues of the resettlement and implementing agencies during implementation; 2) Restoration of the collective land and public attachments; 3) Payment, use and availability of compensation fees; 4) Disbursement, use and availability of LO compensation fees; and 5) Establishment, staff training and working efficiency of resettlement management agencies. 56. The Hebi PMO will submit an internal monitoring report to ADB semiannually. Such report should indicate the statistics of the past 6 months in tables, and reflect the progress of LA, resettlement and use of compensation fees through comparison.

8.2 External Monitoring 57. According to ADB’s policies, the PMO will employ a qualified, independent and experienced resettlement agency as the independent resettlement monitoring agency. 58. The external M&E agency will conduct follow-up M&E of resettlement activities periodically, monitor resettlement progress, quality and funding, and give advice. It shall also conduct follow-up monitoring of the displaced persons’ production level and standard of living, and submit M&E reports to the PMO and ADB. 8.2.1 Scope and Methods 1) Periodic M&E 59. During the implementation of the RP, the external M&E agency will conduct periodic follow-up resettlement monitoring semiannually of the following activities by means of field observation, panel survey and random interview:  Payment and amount of compensation fees;  Restoration and rebuilding of infrastructure and special facilities;  Compensation for lost properties;  Timetables of the above activities (applicable at any time);  Resettlement organization;  If APs have benefited from the Subproject 2) Public consultation 60. The external M&E agency will attend public consultation meetings held during resettlement implementation to evaluate the effectiveness of public participation. 3) Grievance redress 61. The external M&E agency will visit the affected villages and groups periodically, and inquire the township resettlement offices and implementing agencies that accept grievances about how grievances have been handled. It will also meet complainants and propose corrective measures and advice for existing issues so as to make the resettlement process more effectively. 8.2.2 Reporting 62. The external M&E agency will submit a monitoring or evaluation report to ADB and the PMO semiannually. See Table 10-1.

Table 10-1 M&E Schedule Report Date Remarks 2 Monitoring report (No.1) Jun. 2016 3 Monitoring report (No.2) Dec. 2016

20

4 Monitoring report (No.3) Jun. 2017 5 Evaluation report (No.4) Jun. 2018 6 Evaluation report (No.5) Jun. 2019 Post-evaluation report

8.3 Post-evaluation 63. After project implementation, the resettlement activities will be subject to post-evaluation using the theory and methodology for post-evaluation on the basis of M&E. Successful experience and lessons of LO and restoration will be evaluated to provide experience that can be drawn on for future resettlement. The post-evaluation agency will prepare terms of reference for post-evaluation to establish a system of evaluation indicators, conduct socioeconomic analysis and survey, and prepare the Resettlement Post-evaluation Report for submission to the Hebi PMO and ADB. The post-evaluation report is expected to be completed in June 2019.

21

Appendix 1: DDR of the Planned Associated Facility (Qishuiwan WWTP) I. Introduction After the completion of the Subproject, wastewater collection capacity will increase significantly, but the existing WWTP in the subproject area can hardly reach this capacity. Therefore, HCG plans to construct the new Qishuiwan WWTP to treat wastewater collected in the Subproject. The Qishuiwan WWTP will be financed entirely by domestic fund and is not a part of ADB financed project, hence it has been identified as an associated project. Hence a DDR of this planned associated facility has been prepared to ensure its LAR can meet the requirements of relevant laws and regulations of PRC. The Qishuiwan WWTP will be located in Qiangongtang Village, Weixian Town, Xun County, with a size of 40,020 m2, a floor area of 60 mu and a design treatment capacity of 30,000 tons/day, and will be used to treat wastewater collected by the wastewater pipelines in Juqiao Town. According to the Feasibility Study Report of the Subproject, the wastewater pipelines in Juqiao Town will collect about 14,000 tons of wastewater per day after completion. Therefore, the treatment capacity of the Qishuiwan WWTP is sufficient. The Qishuiwan WWTP will be fully financed by the local government. The Xun County Housing Construction Bureau is the implementing agency of the associated facility. The associated facility will be financed by the local government other than ADB, and its estimated resettlement budget is 4.9852 million yuan (prices in 2015).

II. Resettlement impacts 1. Permanent LA 1) Acquired land area and affected population 60 mu of collective land will be acquired for the Qishuiwan WWTP, including 43.4 mu of irrigated land and 16.6 mu of non-irrigated land, affecting 47 households with 179 persons in Qiangongtang Village, Weixian Town, Xun County. See Attached Table 1.

Attached Table 1 Permanently Acquired Collective Land for associated WWTP Permanently acquired Affected collective land (mu) Project County Town Village Group Irrigated Vegetable Subtotal HHs Population land land 1 11.4 2.6 14 10 38 2 11.5 4.5 16 13 50 Qishuiwan Weixian 5 10.1 6.9 15 12 45 Xun Qiangongtang WWTP Town 6 10.4 2.6 15 12 46 Total 43.4 16.6 60 47 179 Percent 72.33% 27.67% / / /

The associated project affects no minority population and does not involve HD. 2) Impact analysis Only Qiangongtang Village, Weixian Town will be affected by LA for the associated project. 60 mu will be acquired, affecting 47 households with 179 persons. Village level In Qiangongtang Village, the AHs account for 6.60% of all households, the APs account for 4.97% ᬅof gross population, and overall land loss rate is 1.72%. See Attached Table 2.

Attached Table 2 Land Losses in Qiangongtang Village Before LA LA impacts Land loss rate Per capita Per capita Percent Percent of Land Town Village Cultivated Cultivated cultivated HHs Population cultivated AHs APs of HHs population loss area (mu) area (mu) area After area (mu) (%) (%) rate (%) LA (mu) Weixi Qiango 712 3600 3493.3 0.97 47 179 60 0.95 6.60 4.97 1.72 an ngtang

Household level

ᬆ 22

The average land loss rate of the 47 AHs is 26.03%. Among them, 6 have land loss rates of less than 10%, accounting for 12.77; 10 have land loss rates of 10%-20%, accounting for 21.28%; 21 have land loss rates of 20%-40%, accounting for 44.68%; and 10 have land loss rates of 40%-60%, accounting for 21.28%%. It can be seen that the AHs are not affected seriously by LA in general. See Attached Table 3.

Attached Table 3 Land Losses of AHs Land loss rate Town Village <10% 10%-20% 20%-40% 40%-60% HHs Population HHs Population HHs Population HHs Population Qiangongtang 6 17 10 38 21 70 10 54 Weixian Town Percent 12.77% 9.50% 21.28% 21.23% 44.68% 39.11% 21.28% 30.17%

Income losses Among the 47 AHs, 17 have income loss rates of 10%, accounting for 36.17%%; 14 have incomeᬇ loss rates of 10%-20%, accounting for 29.79%%; 13 have income loss rates of 20%-30%, accounting for 27.66%%; and 3 have income loss rates of 30%-40%, accounting for 6.38%. See Attached Table 4.

Attached Table 4 Family Income Losses of AHs Family Income loss rate Village <10% 10%-20% 20%-30% 30%-40% Total HHs Population HHs Population HHs Population HHs Population HHs Population 17 73 14 51 13 43 3 12 47 179 Qiangongtang 36.17% 40.78% 29.79% 28.49% 27.66% 24.02% 6.38% 6.70% 100% 100%

2. Temporary land occupation Pipeline excavation with a length of 16.3km in the associated facility will occupy 111.32 mu of state-owned land temporarily.

3. Affected Ground Attachments 35 trees and 16 telegraph poles will be affected by the associated facility. See Attached Table 5.

Attached Table 5 Ground Attachments Affected by the Associated Facility Telegraph poles Scattered trees (diameter) Village Group (height) =<5 cm 6-10 cm 11-15 cm 16-20 cm 8-10m 11-15m 1 4 5 0 3 1 3 2 2 0 3 5 2 2 Qiangongtang 5 0 3 2 5 2 2 6 0 0 0 3 0 5 Total 6 8 5 16 5 11

III. Socioeconomic profile 1. Xun County Xun County is affiliated to Hebi City and located in northern Henan Province, governing one Xiang, 6 towns, 4 sub-districts, 452 villages and 12 communities, with a population of 665,000, a land area of 966 km2 and a cultivated area of 1.076 million mu. The county boasts fertile land and a moderate climate, and abounds with wheat, corn, soybean, peanut, red date, apple, vegetables, livestock and poultry. The county is a major county of food crops and animal products. Xun Industry Cluster Zone, with a built-up area of 8.5 km2, 96 enterprises and a gross investment of 13 billion yuan, is one of the top 10 industry cluster zones in the province.

Attached Table 6 Socioeconomic Profile of Xun County (2012) No. Item Unit Xun County 1 Land area km2 966

23

2 Cultivated area 0,000 mu 107.6 3 Population 0,000 72.64 4 Agricultural population 0,000 65.3 5 Nonagricultural population 0,000 7.34 6 GDP 00 billion yuan 121.21 7 Primary industries 0,000 yuan 29.11 8 Secondary industries 0,000 yuan 65.34 9 Tertiary industries 0,000 yuan 26.76 10 Per capita GDP Yuan 5.9 11 Per capita disposable income of urban residents yuan 19284 12 Per capita net income of rural residents yuan 9388

2. Affected town and village Weixian Town has a land area of 81.1 km2 and a population of 59,000, and governs 48 villages, being a major agricultural county that boasts fertile land, rich water resources and a moderate climate. In recent years, commercial crop cultivation has developed rapidly in the town. See Attached Table 7. 3. Socioeconomic profile of the affected population The task force conducted a questionnaire survey on 25 households with 105 persons affected by the associated facility, accounting for 58% of all AHs, in January and February 2015. 1) Gender analysis Among the 105 samples, there are 58 males, accounting for 55.24%, and 47 females, accounting for 44.76%. 2) Age structure Among the 105 samples, 12 are aged below 18 years, accounting for 11.43%; 26 aged 18-30 years, accounting for 24.76%; 55 aged 31-60 years, accounting for 52.38%; and 12 aged above 60 years, accounting for 11.43%. See Attached Table 8.

Attached Table 8 Statistics of the Sample Households Male Female Total Item N Percent N Percent N Percent Age ≤16 years 6 10.34% 5 10.64% 12 11.43% 17-39 years 16 27.59% 11 23.40% 26 24.76% 40-59 years 30 51.72% 23 48.94% 55 52.38% ≥60 years 6 10.34% 8 17.02% 12 11.43% Subtotal 58 100.00% 47 100.00% 105 100.00% Educational level (adults) Primary school or below 11 18.97% 11 23.40% 20 19.05% Junior high school 42 72.41% 41 87.23% 75 71.43% Senior high school / secondary 5 8.62% 7 14.89% 10 9.52% technical school Junior college or above 58 100.00% 47 100.00% 105 100.00% Subtotal 65 100.00% 56 100.00% 121 100.00%

24

Attached Table 7 Socioeconomic Profile of the Affected Town and Villages (2013)

Rural economic income income economic Rural Where Labor output Population

(3) Construction Construction (3) (0,000 yuan) (0,000 yuan) (5) Commerce Commerce (5) (4) Transport Transport (4) Crop cultivation Crop cultivation Fr Stockbreeding Stockbreeding (2) Industry Industry (2)

(6) Service Service (6) Per Aquaculture Aquaculture (7) Other Other (7) uit cultivation uit cultivation Population Population

Sidelines Sidelines capita Subtotal Subtotal Income Town, village Labor net Labor (0,000 HHs force income yuan) force (yuan)

Weixian 15808 64101 41829 105200 41950 24900 6500 9750 400 400 40250 19000 1000 2000 500 500 20000 20000 10800 Qiangongtang 712 3600 2210 1200 600 350 50 60 10 130 600 50 20 10 3 10 200 280 4200

25

3) Educational level Among the 105 samples, 20 have received primary school or below education, accounting for 19.05%; 75 have received high school education, accounting for 71.43%; and 10 have received junior college or above education, accounting for 9.52%. 4) Household properties 91% of the sample households have an air-conditioner, 89% have a bicycle, almost all have a fan and a refrigerator, all have a TV set, 59% have a PC, 68% have a motorcycle, 34% have a car, and all have City water supply. 20% of the sample households live in multi-storied buildings and 80% in single-storied buildings. 5) Traffic modes 78% of the samples usually travel by electric bicycle or motorcycle, 12% by bus, and 10% by foot. 6) Land resources The sample households have a per capita cultivated area of 1.62 mu, and the main crops are wheat and corn. 7) Household income and expenditure The per capita annual income of the sample households is 7,738.79 yuan. The income level of the sample households is much higher than the national rural poverty line (2,300 yuan in 2011). See Attached Table 9.

Attached Table 9 Household Income and Expenditure Average per Per capita Item Percent (%) household (yuan) (yuan) Cultivation income 9260.72 2057.94 19.38% Forestry income 1519.5 337.67 3.18% Operating income 4810.26 1068.95 10.07% Household Stockbreeding income 8605.83 1912.41 18.01% income Labor output income 22921.98 5093.77 47.98% Property income 656.78 145.95 1.37% Subtotal (A) 47775.07 10616.68 100.00% Agricultural productive expenditure (B) 7799.24 1733.16 23.80% Nonagricultural productive expenditure 5151.29 1144.73 15.72% (C) Nonproductive expenditure (D) 13510.58 3002.35 41.23% Household Daily expenses 4568.92 1015.32 13.94% expenditure Item Educational expenses 1509.39 335.42 4.61% Medical expenses 7432.28 1651.62 22.68% Social security expenses (E) 1489.96 331.10 4.55% Other expenses (F) 4815.28 1070.06 14.70% Subtotal 32766.35 7281.41 100.00% Per capita net income 7738.79 \

IV. Legal framework and policies 1. Applicable laws and policies The resettlement policies of the associated facility have been developed in accordance with the laws and regulations of the PRC, including: 1) Laws, regulations and policies of the PRC  Land Administration Law of the PRC (amended on August 28, 2004)  Rural Land Contracting Law of the PRC, effective from March 1, 2003  Regulations on the Implementation of the Land Administration Law of the PRC (Decree No.256 of the State Council), December 27, 1998  Decision of the State Council on Deepening the Reform and Rigidly Enforcing Land Administration (SC [2004] No.28)  Guidelines on Improving Compensation and Resettlement Systems for Land Acquisition (MLR [2004] No.238)  Notice of the General Office of the State Council on Doing a Good Job in the Employment Training and Social Security of Land-expropriated Farmers (SCO [2006] No.29)

26

 Notice of the Ministry of Labor and Social Security, and the Ministry of Land and Resources on Doing Well in the Social Security of Land-expropriated Farmers Practically (MLSS [2007] No.14)  Real Right Law of the PRC, effective from October 1, 2007  Interim Regulations on Farmland Occupation Tax of the PRC, effective from January 1, 2008  Regulations of the PRC on the Disclosure of Government Information, effective from May 1, 2008  Urgent Notice of the General Office of the State Council on Further Regulating the Management of Land Acquisition and House Demolition, and Protecting People’s Lawful Rights and Interests Practically (SCO [2010] No.15)  Notice of the Ministry of Land and Resources on Further Improving the Management of Land Acquisition, June 26, 2010  Urgent Notice of the General Office of the Ministry of Land and Resources on Conducting Strict Management to Prevent Illegal Land Acquisition (MLR [2013] No.28)  Notice of the General Office of the Ministry of Land and Resources on Doing a Better Job in Disclosing City- and County-level Land Acquisition Information (MLRO [2014] No.29) 2) Regulations and policies of Henan Province  Notice of the Henan Provincial Water Resources Department on Issuing the Administrative Measures of Henan Province for the Construction of Water Resources Projects (HPWRD [2001] No.163)  Notice of the General Office of the Henan Provincial Government on Strengthening Land Control and Rigidly Enforcing Land Administration (HCGO [2007] No.33)  Opinions of the Henan Provincial Labor and Social Security Department, Land and Resources Department, and Finance Department on Doing Well in the Employment Training and Social Security of Land-expropriated Farmers (HPLSS [2008] No.19)  Opinions of the Henan Provincial Government on Trials on Social Endowment Insurance for Urban and Rural Residents (HPG [2011] No.58)  Notice of the Henan Provincial Labor and Social Security Department, and Finance Department on Further Strengthening the Management of Special Employment Funds (YCS [2011] No.293)  Notice of the Henan Provincial Labor and Social Security Department, and Finance Department on Issuing the Administrative Measures for Employment and Business Startup of Henan Province (YRSJY [2012] No.25)  Notice of the Henan Provincial Government on Adjusting Location-based Composite Land Prices for Land Acquisition of Henan Province (HPG [2013] No.11)  Notice of the General Office of the Henan Provincial Government on Issuing the Special Corrective Plan for Land Acquisition and House Demolition (HCGO [2014] No.110) 3) Regulations and policies of Hebi City  Notice of the Hebi City Government on Adjusting Compensation Rates for Ground Attachments and Young Crops on Land Acquired for State Construction (HCG [2012] No.11)  Notice of the Hebi City Government on Issuing the Measures for the Implementation of Basic Endowment Insurance for Urban and Rural Residents of Hebi City (HCG [2014] No.34) 2. Resettlement policies and compensation rates 1) Resettlement policies In acquiring land, compensation should be made according to the original purposes of the land acquired. Compensation fees for land acquired include land compensation fees, resettlement fees and compensation for attachments to or green crops on the land. The land compensation fees shall be 6-10 times the average output value of the three years preceding the acquisition of the cultivated land. The resettlement fee shall be calculated according to the number of agricultural population to be resettled. The number of agricultural population to be resettled shall be calculated by dividing the amount of cultivated land acquired by the per capital land occupied of the unit whose land is acquired. The resettlement fees for each agricultural person to be resettled shall be 4-6 times the average annual output value of the three years preceding the acquisition of the cultivated land. But the maximum resettlement fee per hectare of land acquired shall not exceed 15 times of the

27

average annual output value of the three years prior to the acquisition. (Article 47 of the Land Administration Law of the PRC) County-level and above local governments shall take specific measures to guarantee long-term livelihoods of farmers affected by land acquisition. For projects with a stable income, farmers may become a shareholder using the right to use of land used for construction approved pursuant to law. Within the urban planning area, local governments shall bring farmers who lose all land due to land acquisition into the urban employment system, and establish a social security system; out of the urban planning area, in acquiring land collectively owned by farmers, local governments shall reserve necessary arable land or arrange appropriate jobs for farmers affected by land acquisition within the same administrative area; farmers without land who do not have the basic living and production conditions shall be subject to non-local resettlement. (Article 13 of the Decision of the State Council on Deepening the Reform and Rigidly Enforcing Land Administration) LEFs may choose the following modes of resettlement: 1) agricultural resettlement; 2) reemployment; 3) dividend distribution; and 4) non-local resettlement. LEFs’ production and livelihoods shall be secured in multiple resettlement modes, mainly including 1) Agricultural resettlement: In rural areas with increased farmland through land consolidation or much reserved collective land, such land shall be allocated to LEFs upon land acquisition in order to maintain their basic production conditions and income resources; 2) Resettlement with reserved land: This mode may be applied to urban construction land acquired within the master land utilization plan; reserved land shall be developed in compliance with the urban construction plan and utilized scientifically under strict government regulation; and 3) Social security funds for LEFs shall be made available under the unified leadership of local governments. (Notice of the Ministry of Land and Resources on Further Improving the Management of Land Acquisition, June 26, 2010) 2) Compensation rates for permanently acquired collective land According to the Notice of the Hebi City Government on Adjusting Compensation Rates for Ground Attachments and Young Crops on Land Acquired for State Construction (HCG [2012] No.11), the location-based composite land price for LA in the associated project is 31,500 yuan/mu. See Attached Table 10.

Attached Table 10 LA Compensation Rates Location-based land price Range (yuan/mu) County Town Village 31500 Xun Weixian Qiangongtang

3) Tax and fee rates

Attached Table 11 Tax and Fee Rates on LA No. Item Rate Basis Notice of the General Office of the Henan Provincial Government 9333 1 Land reclamation costs on Strengthening Land Control and Rigidly Enforcing Land yuan/mu Administration (HCGO2007] No.33) Measures of Henan Province for the Implementation of the 14667 2 Farmland occupation tax Interim Regulations on Farmland Occupation Tax of the PRC yuan/mu (Decree [2009] No.124 of the Henan Provincial Government) 2.8% of 3 LA management costs / LA costs Notice of the Ministry of Finance, the Ministry of Land and Compensation fees for 10667 Resources, an 4 using additional d the People’s Bank of China on Adjusting the yuan/mu Policy on Fees for Compensated Use of New Construction Land construction land (CZ [2006] No.48) Notice of the Henan Provincial Labor and Social Security 7,150 5 LEFs Department on Disclosing Location-based Composite Land yuan/mu Prices for Land Acquisition (HPLSS [2008] No.72)

3. Entitlement Matrix The entitlement matrix has been established in accordance with the applicable policies in this chapter, as shown in Attached Table 12.

28

Attached Table 12 Entitlement Matrix Type of Degree of Compensation APs Compensation and resettlement policy impact impact rates 60 mu, incl. 47 1) Cash compensation: as per location-based 43.4 mu of households composite land price Acquisition irrigated land with 179 2) Employment: offering employment services, See Attached of collective (72.33%) and persons in and public welfare jobs, and jobs generated by Table 10. land 16.6 mu of Qiangongtang the associated project non-irrigated Village, 3) Free skills training will be offered to the APs. land (27.67%) Weixian Town 4) Other Measures 1) Affected special facilities will be restored by proprietors after receiving compensation or by Telegraph Ground the contractor to the original standard, size and See Table poles, trees, Proprietors attachments function. 3-10. tombs 2) Ground attachments will be compensated for as stipulated.

V. Resettlement and income restoration 1. Restoration program for permanent LA All AHs support the associated facility, because it will further improve wastewater treatment capacity, improve the quality of the local water environment, and increase local residents’ income. All of them request cash compensation for LA, and expect to solve their future livelihood problems through various measures. Through consultation with the affected village committees and AHs during the socioeconomic survey, restoration programs have been developed based on degree of impact, land availability and their expectations. The livelihood and income restoration programs under the associated facility are as follows: 1) Cash compensation and distribution The location-based composite land price for LA in Weixian Town is 31,500 yuan/mu, and the young crop compensation rate is 2,400 yuan/mu. Distribution programs of LA compensation fees will be developed through adequate consultation, and submitted to sub-district offices for approval. Since the affected villages/communities have experienced LA in other City projects, traditional distribution practices have been established, which will be followed in the associated facility. See Attached Table 13.

Attached Table 13 Summary of LA Compensation Distribution Programs Town Village Distribution program LA compensation (including land compensation and resettlement subsidy), Weixian Qiangongtang and young crop compensation will be paid directly to the AHs without land reallocation and without being withheld by the collective.

2) Employment 107 laborers (57 males and 50 females) will be affected by LA for the associated facility, averaging 2.28 per household. Their livelihood restoration will be promoted by offering more job opportunities.  Employment services According to the Opinions of the Henan Provincial Labor and Social Security Department, Land and Resources Department, and Finance Department on Doing Well in the Employment Training and Social Security of Land-expropriated Farmers (HPLSS [2008] No.19), public employment service agencies should offer free employment consultation, guidance, training and referral services to LEFs for free before and after LA to promote their employment.  Social employment The Weixian Town Government will conduct a human resources investigation and employment matching for LEFs, and organize job fairs regularly. It is estimated that about 100 public welfare jobs will be offered to LEFs annually.  Employment under the associated project About 87 jobs will be generated at the construction (temporary construction jobs mainly) and operation (cleaners and security guards mainly) stages of the associated project. See Attached Table 14.

29

Attached Table 14 Employment Program of the Associated Project Affected Item Introduction Jobs offered Income level population Over 10 jobs per 2,900 Social employment Forestry, stockbreeding, etc. annum yuan/month 10 skilled jobs and 49 100 yuan/day, Employment at the Land leveling, excavation, unskilled jobs, 60 days 6,000 yuan in 107 laborers construction stage roadbed construction, etc. on average total Employment after 1,740 Cleaner, security guard, etc. About 18 jobs completion yuan/month

The township labor and social security office will collect employment information and distribute it in the affected villages, so that APs may choose suitable jobs themselves. During employment, employers will enter into labor contracts with employees, offer necessary safety and pre-job training, and grant pays that are not less the prevailing minimum wage standard of Hebi City (1,100 yuan/month or 10.4 yuan/hour for full-time laborers after July 1, 2014). During employment, the principle of equal pay for equal work will be applied, but the use of child labor is prohibited. 3) Social security In 2012, new-type rural social endowment insurance merged with social endowment insurance for urban residents into social endowment insurance for urban and rural residents. In 2014, HCG issued the Notice of the Hebi City Government on Issuing the Measures for the Implementation of Basic Endowment Insurance for Urban and Rural Residents of Hebi City (HCG [2014] No.34), stipulating that: Coverage: Urban and rural residents having attained 16 years (excluding active students), other than workers of state organs and public institutions, and not covered by basic endowment insurance for employees may cover basic endowment insurance for urban and rural residents. Fundraising: 1) Individual contribution: The insured will pay premiums at one of the 16 levels (100, 200, 300, 400, 500, 600, 700, 800, 900, 1,000, 1,500, 2,000, 2,500, 3,000, 4,000 and 5,000 yuan per annum) voluntarily. 2) Government subsidy: Those choosing levels 100-400 yuan will receive a subsidy of 30 yuan per capita per annum, including 20 yuan from provincial finance and 10 yuan from City finance; those choosing levels 500 yuan and above will receive a subsidy of 60 yuan per capita per annum, including 40 yuan from provincial finance and 20 yuan from City finance. Pension: 1) Basic pension: basic pension fixed by the central government, plus a subsidy of 3 yuan per capita per month from provincial and City finance, and a subsidy of not less than 5 yuan from county/district finance; and 2) Monthly individual account pension: balance of the individual account divided by 139. Eligibility for receiving pension: Individuals having covered basic endowment insurance for urban and rural residents having attained 60 years, having paid premiums for 15 years and not receiving basic pension may receive a pension monthly. 4) Skills training To realize the successful employment of the APs, improving their labor skills through skills training is an important means, which is organized by the Xun County Labor and Social Security Bureau mainly. See Attached Table 15.

Attached Table 15 Summary of Local Training Programs Training Person-times Venue Scope Duration Remarks Bricklaying 30 Construction 2016-2017 Housekeeping Housekeeping 50 County 2016-2017 services labor and Special Rural Sunshine Tractor driving, 40 social 2016-2017 government Project etc. security funds Floriculture, bureau Special LEF training 40 cultivation, 2016-2017 housekeeping

VI. Resettlement budget and schedule

30

1. Resettlement budget All costs incurred during LA and resettlement will be included in the general budget of the associated project. Based on prices in February 2015, the resettlement budget of the associated project is 4.9852 million yuan. The resettlement budget will be updated based on the detailed design and DMS results in December 2015. See Attached Table 16.

Attached Table 16 Resettlement Budget Qishuiwan WWTP Total (0,000 yuan) Percent No. Item Unit Rate (yuan) Amount Amount Qty. Qty. (%) (0,000 yuan) (0,000 yuan) 1 Basic resettlement costs 0,000 yuan \ \ 203.86 \ 203.86 40.89% Compensation for acquired 1.1 0,000 yuan \ \ 203.4 \ 203.4 40.80% collective land 1.1.1 Irrigated land mu 31500 60 189 60 189 37.91% 1.1.3 Young crop compensation mu 2400 60 14.4 60 14.4 2.89% Compensation for 1.2 0,000 yuan \ \ 0 0 0.00% temporary land occupation 1.2.1 Irrigated land mu 2400 \ 0 0 0 0.00% 1.2.2 Non-irrigated land mu 2000 \ 0 0 0 0.00% 1.3 Ground attachments 0,000 yuan \ \ 0.46 \ 0.46 0.09% 1.3.1 Telegraph poles 0,000 yuan \ 16 0.38 16 0.38 0.08% 1.3.1.1 8-10m high / 180 5 0.09 5 0.09 0.02% 1.3.1.2 11-15m high / 260 11 0.29 11 0.29 0.06% 1.3.2 Scattered trees 0,000 yuan \ 35 0.08 \ 0.08 0.02% 1.3.2.1 Diameter =<5cm / 5 6 0.00 6 0.00 0.00% 1.3.2.2 Diameter 6-10cm / 10 8 0.01 8 0.01 0.00% 1.3.2.3 Diameter 11-15cm / 25 5 0.01 5 0.01 0.00% 1.3.2.4 Diameter 16-20cm / 38 16 0.06 16 0.06 0.01% 2% of basic 2 Planning and design costs \ \ 4.11 \ 4.11 0.82% costs 1.5% of 3 Training costs \ \ 3.08 \ 3.08 0.62% basic costs 4 Taxes on LA \ \ \ 256.65 \ 256.65 51.48% 2.8% of basic 4.1 LA management costs \ \ 5.75 \ 5.75 1.15% costs 14667 4.2 Farmland occupation tax mu 60 88 60 88 17.65% yuan/mu 9333 4.3 Land reclamation costs mu 60 56 60 56 11.23% yuan/mu Fees for additional 10667 4.4 mu 60 64 60 64 12.84% construction land yuan/mu 7150 4.5 Social security costs for LEFs mu 60 42.9 60 42.9 8.61% yuan/mu 15% of basic 5 Contingencies \ \ 30.82 \ 30.82 6.18% costs 6 Total 498.52 \ 498.52 100.00% 7 Percent (%) \ 100.00% \

2. Investment plan and funding source The resettlement budget of the associated project is 5.0015 million yuan. All resettlement funds of the associated project are from local counterpart funds. Before or during project construction, the investment plan will be implemented in stages in order not to affect the production and livelihoods of the AHs. See Attached Table 17.

31

Attached Table 17 Resettlement Investment Plan Year 2016 2017 Total Investment (0,000 yuan) 274.19 224.33 498.52 Percent 55 45 100

3. Schedule The general resettlement schedule of the associated facility has been drafted based on the progress of project construction, LA and implementation. The exact implementation schedule may be adjusted due to deviations in overall project progress. See Attached Table 18. Attached Table 18 Resettlement Implementation Schedule No. Task Target Agencies in charge Time Remarks 1 Information disclosure 1.1 RIB Qiangongtang PMO, HPRSAD, Sep. 2015 3 LA announcement 3.1 Disclosing the updated RP Qiangongtang HCG, Jan. 2016 Releasing the LA 3.2 Qiangongtang XCG Feb. 2016 announcement 4 Compensation agreement Entering into LA compensation IA, Mar 2016 4.1 agreements and paying Qiangongtang village/community – June 2017 compensation committees 5 Restoration measures Payment of compensation for Qiangongtang Xun County /Xun 5.1 young crops and attachments County Housing May. 2016 Construction Bureau Implementation of restoration Qiangongtang Xun County /Xun Mar. 2016 – 5.2 programs County Housing Dec. 2018 Construction Bureau Implementation of training Qiangongtang Labor and social Mar. 2016 – 5.3 program security bureau Dec. 2018 Implementing supporting Qiangongtang Civil affairs bureau, Mar. 2016 – 5.4 measures for vulnerable Xun PMO Dec. 2018 groups Hiring APs under the Qiangongtang PMO, labor and Mar. 2016 – 5.5 Subproject social security Sep. 2020 bureau, contractor 6 M&E Establishing an internal 6.1 As per the RP PMO, HPRSAD Jan. 2016 monitoring mechanism Internal monitoring reporting From Feb. 6.2 Semiannual PMO 2016 Appointing an external M&E 6.3 One PMO Jan. 2016 agency External monitoring reporting 1st report (incl. Jun. 2016 External M&E baseline survey) 6.4 Semiannual agency Dec. 2016 2nd report Jun. 2017 3rd report External evaluation reporting Jun. 2018 4rd report External M&E 6.5 Annual 5th report agency Jun. 2019 (post-evaluation) 6.6 Completion report PMO, IA Jun. 2020 7 Public consultation IA Ongoing 8 Grievance redress IA Ongoing 9 Disbursement of compensation fees 9.1 - Disbursement to the IA Initial funds XCG Feb. 2016 - Disbursement to town 9.2 Initial funds IA Mar. 2016 governments 9.3 - Disbursement to AHs Initial funds Town governments End of

32

No. Task Target Agencies in charge Time Remarks May. 2016 10 Commencement of civil construction 10 Qishuiwan WWTP XCG Jun. 2016

VII. Grievance redress and M&E 1. Grievance redress mechanism The basic grievance redress system is as follows: Stage 1: If any right of any AP is infringed on in any aspect of LA, HD and resettlement, he/she may report this to village/community committee, which shall record such appeal and solve it together with the village committee or the AP within two weeks. Stage 2: If the appellant is dissatisfied with the disposition of Stage 1, he/she may file an appeal to the Xun County Housing Construction Bureau after receiving such disposition, which shall make a disposition within two weeks. Stage 3: If the appellant is still dissatisfied with the disposition of Stage 2, he/she may file an appeal to the Xun PMO after receiving such disposition, which shall make a disposition within two weeks. Stage 4: If the appellant is still dissatisfied with the disposition of Stage 3, he/she may file an appeal to the HPRSAD within one month after receiving such disposition, which shall make a disposition within 4 weeks. At any stage, an AP may bring a suit in a civil court directly in accordance with the Administrative Procedure Law of the PRC. 2. Contact information for grievance redress

Attached Table 18 Contact Information for Grievance Redress Agency Name Address Tel Weixian Town Government Zhang Zhijun, Qiu Hong Weixian Town (0392) 5677303

3. M&E The M&E of the associated facility will be included in that of the Subproject. See Chapter 9 for details.

33

Appendix 2: RIB

1. Basic information HCG has applied for a loan of USD150 million with ADB for the Project, which consists of 8 components in 4 categories, which are Qihe River watershed ecological conservation and rehabilitation, integrated management of the main and branch streams of the Qihe River, Qihe River watershed environmental improvement, institutional capacity building. The Subproject is the 6th subproject of the Project, and consists of: 1) rainwater pipelines: construction of rainwater pipelines of 73.367km, including 7.76km in Dalaidian Town and 65.607km in Juqiao Town; 2) wastewater pipelines: construction of wastewater pipelines of 83.293km, including 21.481km in Dalaidian Town and 61.812km in Juqiao Town. 2. Resettlement agencies The agencies responsible for resettlement in the Subproject are:  Hebi Project Leading Group  Hebi PMO  HPRSAD  Qibin Subproject Leading Group  Qibin PMO  Qibin District Land and Resources Bureau  Qibin District Housing Construction Bureau  Town governments  Affected village committees and groups  Affected community committees  Design agency  External M&E agency  Other agencies concerned: land and resources bureau, women’s federation, etc. 3. Legal framework and compensation rates 1) Key laws, regulations and policies  Land Administration Law of the PRC (amended on August 28, 2004)  Rural Land Contracting Law of the PRC, effective from March 1, 2003  Regulations on the Implementation of the Land Administration Law of the PRC (Decree No.256 of the State Council), December 27, 1998  Decision of the State Council on Deepening the Reform and Rigidly Enforcing Land Administration (SC [2004] No.28)  Real Right Law of the PRC, effective from October 1, 2007  Regulations in Governmental Information Disclosure of the PRC, effective from May 1, 2008  Urgent Notice of the General Office of the Ministry of Land and Resources on Conducting Strict Management to Prevent Illegal Land Acquisition (MLR [2013] No.28)  Notice of the General Office of the Ministry of Land and Resources on Doing a Better Job in Disclosing City- and County-level Land Acquisition Information (MLRO [2014] No.29)  Notice of the Henan Provincial Water Resources Department on Issuing the Administrative Measures of Henan Province for the Construction of Water Resources Projects (HPWRD [2001] No.163)  Notice of the General Office of the Henan Provincial Government on Strengthening Land Control and Rigidly Enforcing Land Administration (HCGO [2007] No.33)  Notice of the Henan Provincial Government on Adjusting Location-based Composite Land Prices for Land Acquisition of Henan Province (HPG [2013] No.11)  Notice of the Hebi City Government on Adjusting Compensation Rates for Ground Attachments and Young Crops on Land Acquired for State Construction (HCG [2012] No.11)  Notice of the Qibin District Government on Issuing the Administrative Measures for Compensation for Demolished Ground Attachments on Collective Land for State Construction of Qibin District (QDG [2013] No.3) 2) Entitlement matrix The entitlement matrix has been established in accordance with the applicable policies in this chapter, as shown in Table 1.

34

Table 1 Entitlement Matrix Type of Degree of APs Compensation and resettlement policy Compensation rates impact impact 1) For temporarily occupied land, (1)Irrigated land: compensation will be paid directly to 2,400 yuan/mu per proprietors based on the actual period of annum; non-irrigated Temporary occupation. land: 2,000 yuan/mu land 163 households 2) Temporary land occupation will be 216.78 (2)The period of land occupation with 650 persons notified in advance, and compensated for mu occupation will not of Collective in 8 villages accordingly. more than 3 months. Land 3) Temporarily occupied land will be (3) Compensation will restored by the contractor under the be paid prior to the supervision of the affected village groups occupation of the land. and APs. 1) Affected special facilities will be restored Telegraph by proprietors after receiving compensation Ground poles, or by the contractor to the original standard, Proprietors See Table 3-2. attachments scattered size and function. trees 2) Ground attachments will be compensated for as stipulated.

4. Grievance redress Since public participation is encouraged during the preparation and implementation of the RP, no substantial dispute will arise. However, unforeseeable circumstances may arise during this process. In order to address issues effectively, and ensure the successful implementation of project construction and land acquisition, a transparent and effective grievance redress mechanism has been established. The basic grievance redress system is as follows: Stage 1: If any right of any AP is infringed on in any aspect of LA, HD and resettlement, he/she may report this to village/community committee, which shall record such appeal and solve it together with the village committee or the AP within two weeks. Stage 2: If the appellant is dissatisfied with the disposition of Stage 1, he/she may file an appeal to the Qibin District Housing Construction Bureau after receiving such disposition, which shall make a disposition within two weeks. Stage 3: If the appellant is still dissatisfied with the disposition of Stage 2, he/she may file an appeal to the Qibin PMO after receiving such disposition, which shall make a disposition within two weeks. Stage 4: If the appellant is still dissatisfied with the disposition of Stage 3, he/she may file an appeal to the HPRSAD within one month after receiving such disposition, which shall make a disposition within 4 weeks. At any stage, an AP may bring a suit in a civil court directly in accordance with the Administrative Procedure Law of the PRC. Affected persons can also submit complaints to ADB which will first be handled by the project team. If an affected person is still not satisfied and believes he/she has been harmed due to non-compliance with ADB policy, s/he may submit a complaint to ADB’s Accountability Mechanism.10 All agencies will accept grievances and appeals from the APs for free, and costs so reasonably incurred will be disbursed from contingencies. During the whole construction period of the Subproject, these appeal procedures will remain effective to ensure that the APs can use them to address relevant issues. The above grievance redress system will be communicated to the APs at a meeting or through the RIB, so that the APs know their right of appeal. In addition, the appeal process will be published to affected population on mass media. See Table 7-3.

Table 2 Contact Information for Grievance Redress Agency Name Address Tel Hebi PMO Liu Jiabin No.235 Xinghe Street, Hebi City 13803923866 HPRSAD Gong Shuangjun No.235 Xinghe Street, Hebi City 18203928910

10 For further information, see: http://www.adb.org/Accountability-Mechanism/default.asp

35

Jiuzhou Road West (former Jiuzhou Road Qibin PMO Li Hui 13939237800 Sub-district Office)

5. Resettlement implementation schedule The general resettlement schedule of the Subproject has been drafted based on the progress of project construction, LA and implementation. The exact implementation schedule may be adjusted due to deviations in overall project progress.

Table 3 Resettlement Implementation Schedule No. Task Target Agencies in charge Time Remarks 1 Information disclosure RIB 8 villages in 1.1 PMO, HPRSAD Sep. 2015 Juqiao Town 8 villages in 1.2 Disclosure of the RP on ADB’s PMO, HPRSAD Oct. 2015 website Juqiao Town 2 RP update and resettlement budget approval 2.1 DMS HPRSAD, Qibin PMO Dec. 2015 Updating the RP based on the 8 villages in 2.2 IA, Qibin PMO Jan. 2016 DMS Juqiao Town RP and budget approval HCG, Hebi PMO, 2.3 616,100 yuan Jan. 2016 (compensation rates) Qibin PMO 3 Land occupation announcement Disclosing the updated RP 8 villages in HCG, Hebi PMO, 3.1 Jan. 2016 Juqiao Town Qibin PMO Releasing the land occupation 8 villages in 3.2 QDG Feb. 2016 announcement Juqiao Town 4 Compensation agreement Entering into LO compensation 8 villages in IA, village/community Mar 2016 4.1 agreements and paying – Juqiao Town committees June 2017 compensation 5 Restoration measures Restoration of the collective land 8 villages in Oct. 2016 5.1 IA, Qibin PMO – to original situation Juqiao Town Oct. 2017 restoration of the telegraph poles 8 villages in Oct. 2016 5.2 IA, Qibin PMO – Juqiao Town Oct. 2017 Hiring APs under the Subproject Qibin PMO, labor and 8 villages in Jun. 2016 5.3 social security – Juqiao Town Sep. 2020 bureau, contractor 6 M&E Establishing an internal As per the 6.1 PMO, HPRSAD Jan. 2016 monitoring mechanism RP Internal monitoring reporting From Feb. 6.2 Semiannual PMO 2016 Appointing an external M&E 6.3 One PMO Jan. 2016 agency External monitoring reporting 1st report (incl. Jun. 2016 baseline survey) 6.4 Semiannual External M&E agency Dec. 2016 2nd report Jun. 2017 3rd report External evaluation reporting Jun. 2018 4rd report 6.5 Annual External M&E agency 5th report Jun. 2019 (post-evaluation) 6.6 Completion report PMO, IA Jun. 2020 7 Public consultation IA Ongoing 8 Grievance redress IA Ongoing 9 Disbursement of compensation fees 9.1 - Disbursement to the IA Initial funds QDG Feb. 2016 9.2 - Disbursement to town Initial funds IA Mar. 2016

36

No. Task Target Agencies in charge Time Remarks governments - Disbursement to AHs End of 9.3 Initial funds Town governments May. 2016 10 Commencement of civil construction Qibin District Wastewater and Solid Waste Qibin District Housing 10 Jun. 2016 Management Construction Bureau

6. Power of interpretation The Qibin PMO has the power to interpret this RIB. Qibin PMO September 2015

37

Appendix 3: Fieldwork Photos

State-owned land occupied temporarily for pipelines in Dalaidian Town

Door-to-door questionnaire survey