Church Avenue Sidewalks and NeckDowns from Avenue to and Intersection of Church Avenue and McDonald Avenue

Coney Island Avenue to Flatbush Avenue Project # HWKP2027

Community Impacts: The NYC Dept. of Design and Construction (DDC) During construction hours, you can expect the continue work operations for the Church Avenue following: Reconstruction Project HWKP2027 on Church Avenue from Coney Island Avenue to Flatbush Avenue. The Increased levels of dust, noise and heavy project is scheduled for completion in Fall 2018. equipment. Vehicular travel lane closures will be Work operations for this project include the: required, as well as detours. Warning signs will be Installation of: posted in advance. Pedestrian Wayfinding Signage; Water Parking and driveway/loading dock Mains, Catch Basins, Manholes. restrictions, signs will be posted within the affected Planting of New Trees. areas. Replacement of Sidewalks and Curb Emergency vehicle access and pedestrian Milling and Paving of Roadway access to sidewalk and buildings will be maintained at all times. Work In Progress – installation of: McDonald Avenue and Church Avenue Intersection: Test pits Within Project Limits: Catch Basins and Chute Connections Water mains Sidewalk and Curbs Incidental work

Water Service Interruptions During the course of the project there will be service interruptions. To allow water main replacement, the existing water service must be shut off by closing the valves at either end of the section. Advance notice will be given for all planned interruptions. Water service will be restored at the end the work day. Curb Instllation on Church Avenue between Ocean Special Needs Avenue and 21st Street. The DDC staff will work specifically with individuals that have special needs who may be uniquely impacted Community Construction Liaison (CCL) by the project. Please reach out to the project’s The DDC has assigned Ahmed Oun, as the Community Community Construction Liaison, as soon as possible, Construction Liaison (CCL) for this project. Please to make them aware of your situation. DDC will work contact Ahmed for any project related with you to attempt to minimize the inconvenience as inquiries/concerns you may have: much as possible. Phone: 718-282-5303 Email: [email protected] Property Damage Field Office: 15 Westminster Road. Basement, You are advised to inform the DDC or the Contractor of , NY 11218 any of your property damage that you may have. If the contractor fails to respond within 10 days, you should Newsletter Distribution inform the DDC Borough Director in writing. If you Construction Newsletters for this project are intend to file a claim you must do so within 90 days of distributed regularly within the project area and to the occurrence with the New York. Community Board#14 - Brooklyn

Bill de Blasio DDC Website Mayor www.nyc.gov/ddc Ana Barrio DDC Video Acting Commissioner www.nyc.gov/webuild

Brooklyn First Quarter 2018

Bill de Blasio DDC Website Mayor www.nyc.gov/ddc Ana Barrio DDC Video Acting Commissioner www.nyc.gov/webuild