PHED SIVASAGAR DIVISION

Public Health Engineering Department, the Nodal Department of implementation of Water Supply and Sanitation programme in the rural area has been rendering very sincere service in the district since its inception i.e 1979 when the Sivasagar PHE Division was created.

Sivsagar PHE Division carries out aforementioned activities in rural areas of the District thorough -

 Two centrally sponsored flagship programmes namely (i) NRDWP (National Rural Drinking Water Programme) and (ii) Swachh Bharat Mission(Gramin) {SBM (G)}

 Externally Aided Programme like World Bank aided project.

Water Supply :

National Rural Drinking Water Programme (NRDWP)

The National Rural Drinking Water Programme (NRDWP) is a centrally sponsored Scheme aimed at providing every person in rural with adequate safe water for drinking, cooking and other domestic needs on a sustainable basis by pipe water supply scheme (PWSS) and spot sources such as Hand Tube wells, Tara Hand Pump, Singer hand pump etc. Safe water is to be readily and conveniently accessible at all times and in all situations and therefore , the scheme focuses on the creation of the infrastructure operating of drinking water supply schemes in rural areas. Piped Water Supply Scheme under Sivasagar PHE Division as on 20.07.2018:  Total Nos. of PWSS : 183 Nos.

 Completed Scheme : 159 Nos.

 Ongoing PWSS : 24 Nos.

 Functioning PWSS : 125 Nos.

 Defunct PWSS: 34 Nos.

 A/A received for restoration of defunct PWSS 23 Nos.

 Proposal for restoration of 11 Nos. of defunct scheme have already been sent to higher authority for necessary approval.

Activities : Availability of portable drinking water remains challenge in rural areas in several parts of the country. District Level Water Testing Laboratory (DLL) & Sub-Divisional Level Water Testing Laboratory (SDLL) do the water testing through Departmental source and Private source such as Hotels, Tea Gardens, Schools etc. Mobile Laboratory Van plays an important role in rural areas for water testing during flood. Mobile Water treatment Plant which helps in disaster management such as during flood by purifying the water and provide packeting safe Drinking water in the necessary areas.

Sanitation :

Swachh Bharat Mission (Gramin) (SBM)G

To accelerate the efforts to achieve universal sanitation coverage and to put focus on safe sanitation, the Prime Minister of India launched the Swachh Bharat Mission on 2nd October, 2014. The Mission aims to achieve a Swachh Bharat by 2nd October,2019 as a fitting tribute to Mahatma Gandhi on his 150th birth anniversary. Swachh Bharat shall mean improving the levels of cleanliness through Solid and Liquid Waste Management activities and making Gram Panchayats Open Defecation Free (ODF). The Swachh Bharat Mission (Gramin) is not only about constructing toilets but aims at behavior change of the masses to adopt better sanitation practices. Therefore, Information, Education and Communication (IEC) strategies, planning and their effective implementation is the key to the success of Swachh Bharat. The major function of SBM is to provide low cost individual household latrine (IHHL) in rural areas. To enable the provision of low cost financing to individual households for the construction of household latrines and to leverage the network of NGOs and SHGs identified by agencies and other financial institutions.

Sivasagar PHE Division Profile as on 20.07.2018: (Sanitation District)  Total Nos. of LACs : 4 Nos.

 Total Nos. of Blocks : 5 Nos.

 Total Nos. of GPs : 79 Nos.

 Total Nos. of Villages : 518 Nos.

 Total Nos. of Tea Gardens : 16 Nos.

 Total Rural Households : 128225 Nos.

 Total Rural Households identified as without toilet: 64400 Nos.

 Household Covered with sanitary toilet till date : 128225 Nos.

 Total Nos. of Community Sanitary Complexes (CSC) Constructed : Completed : 2 Nos. Ongoing : 2 Nos.

 Construction of Public Toilets under Mukhyamantri Anamay Achoni : 4 Nos. (All ongoing)

 Total Nos. of GPs achieved ODF status : 79 Nos.

 Total Nos. of Village achieved ODF status : 518 Nos.

IEC Activities: 1. IPC Interpersonal Communication (House to House visit)

2. Awareness meeting

3. Cleanliness Drive

4. Plantation Drive 5. Sanitary Mela

6. Exhibition

7. Celebrating Global Hand Washing Day, World Toilet Day

8. Awareness During Flood

9. Convergence with ICDS, NRHM, SSA, Bazar Committee

10. IEC in Schools

11. Street Play

12. IEC through IEC van

13. Hoarding, Banner,Postering,distribution of leaflet, D.O. letter of D.C.

14. Cycle Rally, Bike Rally

 Externally Aided Programme like World Bank aided project. Neer Nirmal Pariyojana

NEER NIRMAL PARIYOJANA DPMU, SIVASAGAR

THE GREATER AND GAURISAGAR INTEGRATED WATER SUPPLY SCHEME

Over View of Project Area Map

INTRODUCTION:

• The Ministry of Drinking Water and Sanitation (MoDWS) and the World Bank have jointly developed the Neer Nirmal Pariyojana – Rural Water Supply and Sanitation Project for Low Income States (RWSS-LIS) with an objective to improve piped water supply and sanitation services for selected rural communities in the target states through decentralized service delivery systems. The RWSSP-LIS is being implemented in the four states namely , Bihar, Jharkhand, and Uttar Pradesh. In Assam Rural Water Supply & Sanitation Project for Low Income States has been taken in seven Districts of Assam in

two batches during the period 2014-2020. Fund sharing pattern:

• World Bank = 50.00% • Govt. of India (NRDWP) = 44.50%

• Govt. of Assam = 4.50% • Govt. of Assam = 4.50%

• Community Contribution = 1.00% (General: Rs. 450/- and SC/ST: Rs. 225/-)

Component wise share (as per PIP):

• Infrastructure: 91% • Project Management: 3% • Capacity Building and Sector Development: 6% INTRODUCTION:

Project Implementation Period:

• Construction Period = 3 Years. • O&M Period = 5 Years.

Date of Commencement of the Project:

• In the pre planning phase started from September /2016. • Batch I Districts: , Kamrup (M) and Hailakandi. • Batch II Districts: Sivasagar, , Morigaon and Sonitpur.

Design period: The project is designed for a period of 30 years BASIC OBJECTIVE OF

NEER NIRMAL PARIYOJANA

1. TO PROVIDE CLEAN AND SAFE DRINKING WATER TO EACH HOUSE HOLD AND INSTITUTES UNDER THE PROJECT AREA.

2. TO BRING AWARNESS AMONG THE PEOPLE,

REGARDING USE OF SAFE DRINKING WATER, PROPER DISPOSAL OF SOLID LIQUID WASTE AND SANITATION etc.

3. TO MAKE THE VILLAGEs CLEAN AND DISEASES FREE PROJECT PROFILE

NAME OF DISTRICT SIVASAGAR

SOURCE RIVER/INTAKE RIVER DIKHOW

Nos. OF DEV. BLOCK COVERED 2 Nos.

NAME OF THE DEV. AMGURI & GAURISAGAR BLOCKS

AMGURI = 10 Nos. Nos. OF GP COVERED GAURISAGAR = 15 Nos.

TOTAL = 25 Nos.

PROJECT PROFILE

NAME OF GPs UNDER AMGURI NAME OF GPs UNDER DEV. BLOCK GAURISAGAR DEV. BLOCK (10 Nos.) (15 Nos.)

AMGURI BORUAPUKHURI BHUYAN HAT CHARING BORAHIBARI DEORAJA BORBAM DIKHOWMUKH BORSILA DIKSU BORUAH ALI HAFALUTING LALIM CHAPORI HATIGHULI NAMTI ALI KAWOIMARI NAMTI DOL KHONAMUKH PENGERA MOGORAHAT

MOMAITAMULI

MORABAZAR

RONGPUR

RUDRASAGAR

SOLOGURI PROJECT PROFILE

Nos. OF VILLAGES TO BE COVERED

UNDER AMGURI DEV. BLOCK 60 Nos.

UNDER GAURISAGAR DEV. BLOCK 101 Nos.

TOTAL 161 Nos.

Nos. OF HABITATIONs TO BE COVERED

UNDER AMGURI DEV. BLOCK 283 Nos.

UNDER GAURISAGAR DEV. BLOCK 336 Nos.

TOTAL 619 Nos.

Nos. OF ARSENIC AFFECTED HABITATIONs UNDER AMGURI DEV. BLOCK 23 Nos.

UNDER GAURISAGAR DEV. BLOCK 8 Nos.

TOTAL 31 Nos.

INSTITUTIONAL ASPECT OF NEER NIRMAL

PARIYOJANA

Govt of India (Ministry of Drinking Water &

Sanitation District Project

Managemen t Unit

Govt. Of Assam ( Public Health Engineering

Department)

Gaon Panchayat Water &

State Project Management Unit Sanitation Committee

National Project

Management Unit 9

State Water & Sanitation Mission

Multi Village Water & Sanitation Committee Constitution of MVWSC & GPWSC Chairperson from project GP

MVWSC Members Members of AP

Chairperson Zilla Parishad President Members of ZP

GP Secretary Vice ZP, CEO/Administrator Selected Chairperson SHG/ Youth/ Citizen Group Members (2 )

Member EE (PHE) of Project Execution

Secretary Division

Secretary(s) of VWSC under the

Member GPWSC GPWSC

Member Secretary of respective GP Chairperson President of respective GP ASHA/Anganwadi Workers Vice Member

Chairperson Vice President of respective GP within the GP

Member Member Swachhata Doot of the GP

Sectional Officer (AE/JE) PHE

Secretary

President of Village Level

Member Health & Sanitation Committee

of NHM

Anchalik Panchayat Member of Member

the GP

Member All ward members of the GP

President(s) of VWSC under the Member

GPWSC BASELINE SURVEY

Baseline Survey Status Completed

Nos. of HH Survey 36,200 nos.

Nos. of Institutional Survey 1,320 nos. conducted

Population count 1,66,967 nos.

SC HH 3,316 nos.

ST HH 857 nos.

General HH 32,027 nos.

The Baseline Survey

The Baseline survey was proposed toundertake to commence the Neer Nirmal Pariyojana operations in the project areas.

The survey was undertaken using web- basedsoftware through Tablet (hand held computer). Pre-requisites for Baseline Survey

Prior start of – Baseline Survey:

 Identification of Enumerators   Collection of necessary documents and information from respective GPs   Orientation /training programme   Hand over of “Tablets”   Awareness Meeting with respective GP Presidents /GPWSC Members 

 Preparation of Micro-plan

During – Baseline Survey:

 Constant Monitoring and Guidance:   Refresher training and Reviews:   Block Coordinator and District Team Data Flow /Architecture

NPMU

/WB

Features & Advantages of Tab-Based Survey

 Android based application with UIs for Tablet and Smart phones.   For authorized users only   Geo tagging and time stamping of all the data collected   Feature for offline data collection and synchronization on availability of GPRS connectivity   Real time data capture   Real time Monitoring of data   Elimination of human errors   No scope of manipulation as GIS coordinates and time stamping is there   Performance analysis at each level of execution (Enumerator /GP /DPMU etc.)

Survey Entry Module (Tab-Based)

1. Click on the Icon Login Page

Home Page

2. Enter User name & Password and click Icon of the application “Login” button (Under the issues Tablet )

17 Survey Monitoring Module (Web-Based)

Login Page

Icon of the application (Under NNP Website)

18 Monitoring Module - Record View

INITIATIVES DURING BLS

• DISCUSSION WITH THE GP PRESIDENT, WARD MEMBERS, REGARDING Nos. OF HH AND POPULATION WITHIN THE GP • TALLY THE NNP SURVEY DATA WITH CENSUS, SMB, GPDP AND CIRCLE OFFICE DATA. • PUBLICITY AND SUPPORT SOUGHT FROM VARIOUS NAMGHAR, MASJID, CULTURAL CENTRE • DISCUSSION WITH THE MUNICIPAL OFFICE REGERDING Nos. OF HH TRANSFERRED TO MUNICIPAL AREA • RANDOM VISIT BY DPMU STAFF TO SOME REMOTE AREA HHs.

• MID TERM ASSESMENT

Enumerator Review Meeting HH survey by Enumerator

Meeting at GP office regarding secondary data and CM Selection Field visit and onsite survey by M&E CAPACITY BUILDING

Nos. of Ward level meeting conducted :- 375 nos.

Nos. of Habitation/village level meeting conducted :- 1962 nos.

Nos. of GPWSC Training conducted :- 25 nos. Nos. of GPWSC meeting Conducted : - 200 Nos.

Nos. of Community Mobilizers :- 42 nos. Nos. of GPWSC Bank a/c opened :- 25 nos.

MID TERM IMPACT ASSESMENT REPORT (MTIA)

Particulars YES (%) NO (%)

Awareness on Benefits of the Project 83.14 14.59

Awareness on Community Contribution 85.61 13.20

Awareness on User Charges (OPEX) 82.02 15.77

Baseline Survey Conducted 98.96 1.04

104 Nos. of HH responded as Survey Not conducted out of 10,000 HH

MONTHLY REVIEW MEETING OF CM SLWM AWARNESS BY

HABITATION LEVEL AWARNESS CAMP

AWRNESS AMONG MOTHR GROUP

COMMUNITY CONTRIBUTION STATUS

Name of CC CC CC OT

District CC Target Collected PERCENTAGE updated

Sivasagar 1,53,51,075 15,38,847 10.02% 10,01,475

General HH @ Rs. 450/- per HH

SC/ST HH @ Rs. 225/- per HH STATUS OF CC COLLECTION

CC CC TARGET CC SL NO GP NAME COLLECTED PERCENTAGE (Rs.) (Rs.) (Rs.)

TARGET CC CC COLLECTED CC SL NO GP NAME PERCENTAGE (Rs.) (Rs.) (Rs.) 1 Amguri 8,81,325 85,950 9.75 2 Bhuyanhat 7,33,950 57,375 7.81 3 Borahibari 5,76,450 36,000 6.24 4 Borbam 3,95,100 1,10,700 28.01 5 Borsilla 9,32,625 46,575 4.99 6 Boruah Ali 6,74,775 31,950 4.73 7 Lalim Chapori 4,36,050 1,19,700 27.45 8 Namtiali 7,04,475 1,65,150 23.44 9 Namtidol 4,61,700 50,625 10.96 10 Pengera 5,46,975 1,02,600 18.75 STATUS OF CC COLLECTION

CC SL NO GP NAME TARGET CC CC COLLECTED

PERCENTAGE

SL NO GP NAME TARGET CC CC COLLECTED CC PERCENTAGE 1 Boruapukhuri 6,92,775 34,650 5.00 2 Charing 4,99,500 80,550 16.12 3 Deoraja 5,87,475 2,57,850 43.89 4 Dikhowmukh 4,93,200 55,800 11.31 5 Diksu 6,77,475 94,275 13.91 6 Hafaluting 3,21,075 45,450 14.15 7 Hatighuli 6,38,100 80,100 12.55 8 Kawaimari 7,93,575 1,94,850 24.55 9 Khonamukh 7,41,375 64,350 8.67 10 Mogorahat 3,64,050 74,475 20.45 11 Momaitamuli 4,66,425 76,950 16.49 12 Morabazar 4,99,050 69,525 13.93 13 Rongpur 8,31,600 1,15,875 13.93 14 Rudrasagar 4,95,675 1,10,700 22.33 15 Sologuri 9,06,300 99,000 10.92 SANITATION, SEGREGATION & SOLID LIQUID WASTE MANAGEMENT

 Awareness in GPs/Habitation/Ward  Training of Community Mobilizers  IPC individual household  Schools Awareness campaign for Proper Hand washing , Sanitation, Segregation of waste (Dry and Wet) and personal hygiene  GPWSC Meeting  CLTS activities  Event: Celebration of World Environment Day in Gaurisagar Development block and mass rally from Gaurisagar High School to Hawlating.

 Distribution of dust bin in Gaurisagar weekly market area. One Day Non Residential Training Of Community Mobilizers on Sanitation and SLWM

SURVEY ON SOLID LIQUID WASTE MANAGEMENT

• Name of Village: Miri Chutia Gaon and Baghjan Grant • Habitation: 8 • Name of GP: Borbam • Name of Block: Amguri • Total no. of HH: 898nos. • Only Solid portion was covered. • Total quantity of wet (food) waste generate per day: 34 kg/ day • Total quantity of dry waste ( recyclable) waste per day: 175kg/day

Borbam GP Map

SLWM Survey Photographs

Expected Outcome

• Behavioural change • Used of toilet • Proper hygiene and Environment clean • Segregation of waste (dry and wet) in individual household • Used of dust bin • Dry waste can sell to Kawariwala • Wet waste can turn into compost/ vermi compost

TOPOGRAPHICAL SURVEY

• TROPOGRAPHICAL SURVEY CONDUCTED IN ALL THE PROJECT GPs.

• TOTAL LENGTH FOUND: 1025.78 km.

LAND DETAILS

• LAND FOR WTP IS ALREADY HANDED OVER TO THE PHED, SIVASAGAR • LAND FOR THE ESRs ARE FINALISED. • SOCIAL SCREENING OF THE WTP LAND, INTAKE POINT AND THE ESR LOCATIONs COMPLETED.

LAND FOR ESRs

PROPOSED Nos. OF ESRs 42 Nos.

Nos. OF ESRs FINALISED 32 Nos.

OUT OF THE TOTAL Nos. OF ESRs FINALISED

GOVT. LAND 12 Nos.

DEPARTMENTAL LAND 20 Nos. Govt. Land (14 nos.) Total SN Name of GP land Land Type Purpose of land Location Required (Govt/ Pvt) (in Ha) ZONAL ELEVATED Govt. land AT VILLAGE 1 BORSILA RESERVOIR AT 900 THIPUK CHAH Pahari Line BORSILA (Revenue) BAGISHA ZONAL ELEVATED Govt. land AT VILLAGE RESERVOIR AT 900 Bharaluwa 2 DIKHOWMUKH BHARALUWA DIKHOWMUKH (Revenue) Near ZONAL ELEVATED Govt. land AT VILLAGE Janajati 3 KAWOIMARI RESERVOIR AT 900 DECIAL DULIA High School KAWOIMARI (Revenue) GAON at Nakatani , Kalugaon Govt. land AT VILLAGE Near GP 900 RUDRASAGAR RUPAHI BILL office 4 ZONAL ELEVATED (Revenue) RESERVOIR AT Near Govt. land AT VILLAGE RUDRASAGAR 900 Bongaon RUDRASAGAR RUPAHI PATHAR 5 (Revenue) High School

ZONAL ELEVATED AT VILLAGE Govt. land Khula RESERVOIR AT 900 NO.1 KHULA 6 HATHIGHULI Grazing HATIGHULI (Revenue) GRAZING ZONAL ELEVATED AT VILLAGE Govt. land CHALIHA RESERVOIR AT 900 CHALIHA 7 CHARING KAKOTI CHARING (Revenue) KAKOTI

Govt. Land (14nos.) SN Name of GP Total land Land Type Purpose of land Required Location (in Ha) (Govt/ Pvt) ZONAL ELEVATED Govt. land AT VILLAGE MORABAZAR RESERVOIR AT 900 KHATUAL 8 KHATUAL MORABAZAR (Revenue) ZONAL ELEVATED AT VILLAGE Govt. land BOSASAYAK BORAHIBARI RESERVOIR AT 900 BOSASAYAK 9 DIBRUAL BORAHIBARI (Revenue) DIBRUAL ZONAL ELEVATED BARUAH Govt. land AT VILLAGE RESERVOIR AT 900 ABHOIPURIA 10 ABHOIPURIA PUKHRI BARUAH PIKHURI (Revenue) ZONAL ELEVATED Govt. land AT VILLAGE KURULA RONGPUR RESERVOIR AT 900 11 KURULA KOTIA KOTIA MUMAI RONGPUR (Revenue) ZONAL ELEVATED Govt. land AT VILLAGE MUMAITAMULI RESERVOIR AT 900 BOGAGOHAIN 12 BOGAGUHAIN MUMAI TAMULI (Revenue) WATER TREATMENT Govt. land AT VILLAGE 13 MUMAITAMULI 37500 BOGAGOHAIN PLANT AT (Revenue) BOGAGUHAIN MUMAI TAMULI Govt. land Namdongia NAMDONGIA 14 Kawaimari Intake Point (Revenue) Bongali Gaon BONGALI

Departmental Land SN Name of GP Total land Land Type Purpose of land Required Location (in Ha) (Govt/ Pvt) Departmental SOMDAR SOMDAR 900 1 NAMTI ALI ZONAL ELEVATED Land GAON P.W.S.S. RESERVOIR AT NAMTI Departmental LUNPURIA LUNPURIA ALI 900 2 NAMTI ALI Land GAON P.W.S.S ZONAL ELEVATED Departmental AT VILLAGE Namtidole RESERVOIR AT NAMTI 900 3 NAMTIDOLE P.W.S.S DOL Land BAILUNG

ZONAL ELEVATED Departmental AT VILLAGE KARCHUWA 4 BARUAH ALI RESERVOIR AT 900 BALIMARA BARUAH ALI Land BALIMARA P.W,S.S

ZONAL ELEVATED AT VILLAGE Departmental BORSILA RESERVOIR AT 900 BORSILA 5 BORSILA Land P.W.S.S BORSILA GRANT AT VILLAGE ZONAL ELEVATED Departmental BAGJHAN RESERVOIR AT 900 BAGJHAN GRANT 6 BORBAM Land BORBAM GRANT P.W.S.S AT VILLAGE ZONAL ELEVATED Departmental DULIA RESERVOIR AT 900 DULIA CHARAL 7 PENGERA Land PENGERA CHARAL P.W.S.S AT VILLAGE ZONAL ELEVATED Departmental DHUNIA RESERVOIR AT 900 BHUYAN BHUYAN 8 BHUYANHAT Land BHUYAN HAT GAON P.W.S.S

DEPARTMENTAL LAND SN Name of GP Total land Land Type Purpose of land Required Location (in Ha) (Govt/ Pvt) Departmental AT VILLAGE DHUNIA 9 BHUYANHAT ZONAL 900 BHUYAN BHUYAN ELEVATED Land GAON P.W.S.S RESERVOIR AT Departmental CHAWDANG CHOWDANG 10 BHUYANHAT BHUYAN HAT 900 Land GAON P.W.S.S. ZONAL ELEVATED Departmental AT VILLAGE RATANPURIA DEORAJA 900 11 RESERVOIR AT Land RATANPURIA P.W.S.S DEORAJA ZONAL AT VILLAGE ELEVATED Departmental MOGARAHAT 900 GAR 12 MOGORAHAT RESERVOIR AT P.W.S.S Land KAKHARIA MOGARAHAT ZONAL AT VILLAGE ELEVATED Departmental Bamu Moran 900 BAMUN 13 HATHIGHULI RESERVOIR AT P.W.S.S. Land MORAN HATIGULI AT VILLAGE MOUT GHAR 14 KHONAMUKH Departmental NO.1MOUT ZONAL 900 PHOLIA GHAR ELEVATED Land P.W.S.S PHOLIA RESERVOIR AT AT VILLAGE 15 KHONAMUKH KHONAMUKH Departmental BHITARUAL 900 BHITARUAL P.W.S.S Land NORA GAON Departmental land

SN Name of GP Total land Land Type Purpose of land Required Location (in Ha) (Govt/ Pvt) ZONAL ELEVATED Departmental Salaguri SALAGURI 16 HOLOGURI RESERVOIR AT 900 HOLOGURI Land village P.W.S.S. RANG ZONAL ELEVATED Departmental NA ALI GHAR 17 RONGPUR RESERVOIR AT 900 RONGPUR Land CHRISTIAN CHARIALI P.W.S.S. MOUT ZONAL ELEVATED Departmental AT VILLAGE RESERVOIR AT 900 GAON 18 DIKHSU Land MOUT DIKHSU P.W.S.S AT VILLAGE LALIM ZONAL ELEVATED Departmental RESERVOIR AT LALIM 900 LALIMCHIGA CHAPORI 19 LALIMCHAPORI Land CHAPORI CHAPORI P.W.S.S ZONAL ELEVATED Departmental AT VILLAGE CHARINGIA 20 HAFOLUTING RESERVOIR AT 900 HAFOLUTING Land TEPOR P.W.S.S HALUATING ZONAL ELEVATED Departmental HALUATING RESERVOIR AT 900 GRANT 21 AMGURI Land GRANT AMGURI P.W.S.S

POSTING AND VACANCY POSITIONS OF O/O THE EXECUTIVE ENGINEER (PHE), SIVASAGAR DIVISION AS ON 25.10.2019 POSTING AND VACANCY POSITIONS OF O/O THE EXECUTIVE ENGINEER (PHE), SIVASAGAR DIVISION (i) Posting Position :

Sl. Designation Name of the Incumbent No.

1 Executive Engineer Sri Sanjib Kumar Bordoloi (i/c)

2 Assistant Executive Engineer Sri Sanjib Kumar Bordoloi Sri Kumud Ranjan Hazarika Sri Dilip Kumar Shyam (T/C)

3 Assistant Engineer Sri Jayanta Kataky Md. Ahmadur Rahman Sri Dilip Kumar Sri Rajib Kumar Borpuzari

4 Accounts Officer Md. Gazibar Rahman Mandal

5 Deputy Accounts Officer Sri Zakiur Rahman Sri Sanjay Hazarika

6 Assistant Accounts Officer Nil

7 Junior Engineer Sri Indra Kanta Nath Sri Chumi Priya Sri Bibhuti Kumar Chetia Sri Alokesh Kakoty Sri Walson Bennet Sri Dilip Kumar Gogoi Sri Kalyan Chandra Borah Sri Debajyoti Gogoi Sri Nitu Borah Sri Nabajit Dutta 8 Senior Assistant Nawab Miftahuz Zaman Smti Monideepa Gogoi Smti Lina Sri Boikuntha Deka Baruah

9 Junior assistant Sri Jawahar Jyoti Changkakoti Smti Rashmi Rekha Hazarika

10 Section Assistant Sri Trailukya Borah Sri Jiban Konwar Sri Tultul Kakoty

11 Driver Sri Moni Kanta Konwar Sri Khirud Buragohain

12 Chowkidar Sri Ajit Hazarika Sri Tepuram Handique Sri Nandeswar Rajbonshi

13 Peon Sri Bipul Kumar Gogoi Sri Ranjit Kol Sri Porag Protim

(ii) Present Posting Position : As on 25.10.2019

# POST NAME PERMANENT TEMPORARY

Sanction Sanctioned Strength Vacancy Strength Vacancy ed

1 EXECUTIVE ENGINEER (PHE) 1 0 1 0 0 0

2 ASSISTANT EXECUTIVE 2 2 0 0 0 0 ENGINEER

3 ASSISTANT EXECUTIVE 1 1 0 0 0 0 ENGINEER (PHE)(T.C)

4 ASSISTANT ENGINEER 5 4 1 0 0 0

5 JUNIOR ENGINEER 16 10 6 0 0 0

7 ACCOUNTS OFFICER 1 1 0 0 0 0

8 DEPUTY ACCOUNTS OFFICER 1 1 0 1 1 0

9 ASSISTANT ACCOUNTS OFFICER 1 0 1 1 0 1

10 SUB. ENGINEER GRADE-I 1 0 1 0 0 0

11 SENIOR ASSISTANT 4 4 0 0 0 0

12 JUNIOR ASSISTANT 6 2 4 0 0 0

13 SECTION ASSISTANT 6 2 4 5 5 0

14 TRACER 1 0 1 0 0 0

15 CHOWKIDAR 3 3 0 0 0 0

16 DRIVER 3 1 2 1 1 0

17 ELECTRICIAN 0 0 0 1 1 0

18 KHALASI 13 1 12 117 117 0 19 PEON 6 3 3 0 0 0

20 PLUMBER 2 0 2 0 0 0

21 PUMP OPERATOR 7 1 6 12 12 0

TOTAL 80 36 44 138 137 1