Public Document Pack
Planning and Transportation Committee
PRESENTATION
Date: TUESDAY, 29 JANUARY 2019 Time: 10.00 am Venue: LIVERY HALL - GUILDHALL
Any drawings and details of materials submitted for approval will be available for inspection by Members in the Livery Hall from Approximately 9:30 a.m. This page is intentionally left blank Planning & Transportation Committee Page 1 Page 29th January 2019 Agenda Annex 1-2 Broadgate
THE BROADGATE ‘CAMPUS’ TOWER HAMLETS N
CITY OF LONDON Existing context EXCHANGE SQUARE HACKNEY
BISHOPSGATE LIVERPOOL STREET STATION
5 BROADGATE Page 2 Page
BROADGATE CIRCLE 100 LIVERPOOL STREET 3 2-3 FINSBURY AVENUE LIVERPOOL STREET FINSBURY AVE SQUARE
1+2 BROADGATE CROSSRAIL
1 FINSBURY AVENUE
ISLINGTON WILSON STREET
BLOMFIELD STREET
ELDON STREET
CITY OF LONDON FINSBURY CIRCUS 1-2 Broadgate
1-2 BROADGATE – THE EXISTING BUILDING Page 3 Page
ELDON STREET 1-2 Broadgate
1-2 BROADGATE – THE EXISTING BUILDING Page 4 Page
FINSBURY AVENUE SQUARE 1-2 Broadgate
THE BROADGATE ‘CAMPUS’ TOWER HAMLETS N
CITY OF LONDON Future context EXCHANGE SQUARE HACKNEY
BISHOPSGATE LIVERPOOL STREET STATION
5 BROADGATE Page 5 Page
BROADGATE CIRCLE 100 LIVERPOOL STREET 3 2-3 FINSBURY AVENUE LIVERPOOL STREET FINSBURY AVE SQUARE
1+2 BROADGATE CROSSRAIL
1 FINSBURY AVENUE
ISLINGTON WILSON STREET
BLOMFIELD STREET
ELDON STREET
CITY OF LONDON FINSBURY CIRCUS 1-2 Broadgate
EXISTING + CONSENTED GROUND FLOOR CUTAWAY
BROADGATE CIRCLE
FINSBURY CROSSRAIL AVENUE SQUARE Page 6 Page
FINSBURY CIRCUS 1-2 Broadgate
A PERMEABLE GROUND FLOOR WITH ACTIVE FRONTAGES
BROADGATE CIRCLE
FINSBURY CROSSRAIL AVENUE SQUARE Page 7 Page
FINSBURY CIRCUS 1-2 Broadgate
PROPOSED LOWER GROUND FLOOR
2+3 BROADGATE
5 BROADGATE
FINSBURY AVENUE SQUARE
1 FINSBURY AVENUE
Page 8 Page WILSON STREET WILSON
BROADGATE CIRCLE FINSBURY AVENUE FINSBURY
1-2 BROADGATE
100 LIVERPOOL STREET LIVERPOOL STREET STATION
ELDON STREET
LIVERPOOL STREET 1-2 Broadgate
PROPOSED UPPER GROUND FLOOR Page 9 Page 1-2 Broadgate
PROPOSED FIRST FLOOR Page 10 Page 1-2 Broadgate
PROPOSED TYPICAL FLOOR Page 11 Page 1-2 Broadgate
PROPOSED SEVENTH FLOOR Page 12 Page 1-2 Broadgate
PROPOSED ELEVENTH FLOOR Page 13 Page 1-2 Broadgate
STAGE 2 DESIGN – WEST CORE ENTRANCE
R 12 11 10 09 Page 14 Page 08 07 Restaurant (A3) 06 05 Office (B1) 04 03
02
01 Retail + Leisure (A1/A3/A4/D2/SG)
UG Retail LG (A1/A3/A4) B1 Leisure Use (D2/SG)
B2 FULCRUM 100 LIVERPOOL STREET
FINSBURY 1-2 BROADGATE AVENUE 1-2 Broadgate
45,000 sqft OF EXTERNAL AMENITY
TERRACE WIDTHS
3m
9 1 8 3-6m 0 1 2 6 1 1 6-9m Page 15 Page
>9m 9
7 5
1 1 2 1 9 1 0 8 7 6 1-2 Broadgate
10TH FLOOR OFFICE TERRACE Page 16 Page 1-2 Broadgate
JUNCTION OF ELDON STREET + FINSBURY AVENUE Page 17 Page 1-2 Broadgate
OFFICE ENTRANCE, FINSBURY AVENUE Page 18 Page 1-2 Broadgate
JUNCTION OF ELDON STREET + BLOMFIELD STREET Page 19 Page 1-2 Broadgate
FINSBURY AVENUE SQUARE Page 20 Page 1-2 Broadgate
FROM LIVERPOOL STREET Page 21 Page 1-2 Broadgate
FROM 5 BROADGATE Page 22 Page 1-2 Broadgate
OVERVIEW Page 23 Page Page 24 Stonecutter Court Page 25 Page
Site location plan Stonecutter Court Page 26 Page
Existing buildings Stonecutter Court Page 27 Page
Existing buildings Stonecutter Court Page 28 Page
Proposed North Elevation (Stonecutter Street) Stonecutter Court Page 29 Page
Proposed East Elevation (Farringdon Street) Stonecutter Court Page 30 Page
Proposed streetscape elevation - Farringdon Street) Stonecutter Court Page 31 Page
Proposed South Elevation (Harp Alley) Stonecutter Court Page 32 Page
Proposed Southwest Elevation (St Bride Street) Stonecutter Court Page 33 Page
Proposed East-West Section Stonecutter Court Page 34 Page
Proposed North-South Section Stonecutter Court Page 35 Page
Open Space Stonecutter Court Page 36 Page
View from Farringdon Street Stonecutter Court Page 37 Page
View from Farringdon Street Page 38 Trees at former Richard Cloudesley School Page 39 Page
Site location plan Trees at former Richard Cloudesley School Page 40 Page
Trees to be removed and retained Trees at former Richard Cloudesley School Page 41 Page
Replacement trees Page 42 Planning & Transportation Next Committee Page 43 Page 18th February 2019 This page is intentionally left blank
Page 44