NOTES: OVERALL PLAN 1 Mixture of large to small granite paving with subtle yorkstone banding and 12 Proposed terracing. linear form to highlight and compliment historical setting. 13 Footways in natural yorkstone and granite flags to maintain historical context.

2 Refurbishment of water feature to enable water to return to the fountain. 14 Subtle central ‘feature’ pathway using contrasting paving to frontage surfacing.

3 Hostile Vehicle Mitigation (HVM) with fixed bollards. 15 Existing trees - will be pruned sympathetically to reduce canopy size and

4 Proposed trees. increase light levels.

5 Opportunity for public art and new wayfinding. 16 Flush kerb to be introduced between Bennett’s Hill and Temple Street.

6 Opportunity for Spill out seating from cafes and restaurants. 17 New Cycle stands.

7 Space provided for loading. 18 Footway / frontage surfacing in granite flags; detail in yorkstone to tie with

8 surrounding areas. HVM proposed Existing staircase to be refurbished. 9 Flush surface on Colmore Row and Waterloo Street to extend Victoria Square.

11 10 Tree to be removed as in decline and replaced with a new tree in a nearby

HVM proposed location.

11 Hostile Vehicle Mitigation (HVM) with moving bollards provided for access. HVM proposed HVM proposed 3

11 11

Centrick

1

HVM proposed The Colmore Fumo The Ivy Temple Row Coffee HVM proposed 11 11 Java Lounge Dirty San Carlo Council House HVM proposed Martini 5 6 Chung Ying HVM proposed Birmingham Sydney 11 Museum & Art Central Mitchell The Cosy Club 13 Las Iguanas Gallery LLP Brook Street 11 Theatrix BS Social Care The Head of Steam Existing yorkstone paving skirt around The Lost and Access to car park Purecraft 1 the Council House to be maintained 9 Found 6 maintained Bar & and cleaned 1 Kitchen The Briar Rose 6 HVM proposed Flight Club 10 Access to car park HVM proposed 5 Adam’s 12 < 1 maintained 11 3 Paradise Development William The Sun on 8 18 HVM proposed Hill the Hill HVM proposed 2 Bodega The Botanist 11 Queen Evans Cycles 11 17 3 Victoria 8 Statue 4 1 Nandos 7 HVM proposed Town Hall 3

Blue Arrow Ask Italian 7 Proposed scheme by Metro 17 7 Cashino 15 18 Moss Bros Tesco Victoria Square 18 7 14 Metro House Post Office Vaults Byron 16 Muji Jack HVM proposed Wills 7 17 Lloyds HVM as proposed 7 17 Bank Vodafone by Metro 6 Superdrug 6 15 Tim Hortons 11 HVM as proposed < Metro Route > Clarks Starbucks 14 by Metro Coffee Watches of 18 Britannia Hotel 12 Switzerland 11 3 Apple 7 Min. 1.5m clearance from the facade The Burlington Store provided in the spill-out areas Hotel HVM proposed 7 HSBC HVM proposed 7 H&M Caffe Nero Ladbrokes TSB 11 14 JD 15 HVM proposed 18 Odeon Cinema 7

Flush kerb as existing Royal Bank of Scotland

Carphone Warhouse

Interface with Bull Ring external area

Materials Palette Victoria Square New Street Temple Street HVM bollards

Proposed extension of Traffic Regulation Order with respect to loading, parking and hours of access. Planned improvements to public realm, to take place following 2022 Commonwealth Games. N

5 15 35m Granite paving buff colour Granite kerb in a Natural Yorkstone Granite paving buff colour Granite kerb in a Natural Yorkstone Granite kerb in a Hostile Vehicle Mitigation (HVM) with moving contrasting colour contrasting colour contrasting colour bollards for access.