(PREPARED UNDER RULES 41 & 42 AS AMENDED IN TAMILNADU MINOR MINERAL CONCESSION RULES, 1959)

(Lease period – Three years)

IN

LOCATION OF THE QUARRY LEASE APPLIED AREA

EXTENT : 2.26.5HA S.F.NO : 549/4(P) VILLAGE : CHETTIPATTI TALUK : KULATHUR DISTRICT : STATE :

FOR

APPLICANT

Thiru.A.Rajendran, S/o.Athimoolam, No.2/235, Therkkupatti, Keelaiyur, Kulavaipatti, , .

PREPARED BY

Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person

M/s. Geo Exploration and Mining Solutions, Regd.off.No.17, Advaitha Ashram Road, Alagapuram, Salem-636 004. Cell: 94433 56539 E-mail: [email protected] Website: www.gemssalem.com A.Rajendran, S/o.Athimoolam, No.2/235, Therkkupatti, Keelaiyur, Kulavaipatti, Alangudi Taluk, Pudukkottai District.

CONSENT LETTER FROM APPLICANT The Mining Plan in respect of Gravel Quarry in Survey field No.549/4(P) over an extent of 2.26.5Ha Patta Land in Chettipatti Village, , Pudukkottai District, Tamilnadu State has been prepared by

Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person I request the District Collector, Pudukkottai to make further correspondence regarding the modification of the Mining Plan with the said qualified person at his following address.

Dr.P.Thangaraju, M.Sc., Ph.D., Regd.off.No.17, Advaitha Ashram Road, Alagapuram, Salem- 636 004. Cell: 94433 56539. I hereby undertake that all the modifications, if any made in the mining plan by the qualified person may be deemed to have been made with my knowledge and consent and shall be acceptable to me and binding on me in all respects.

Signature of the Applicant

A.Rajendran Place: Pudukkottai Date: 16.05.2018

A.Rajendran, S/o.Athimoolam, No.2/235, Therkkupatti, Keelaiyur, Kulavaipatti, Alangudi Taluk, Pudukkottai District.

DECLARATION OF THE APPLICANT The Mining Plan in respect of Gravel Quarry in Survey field No.549/4(P) over an extent of 2.26.5Ha Patta Land in Chettipatti Village, Kulathur Taluk, Pudukkottai District, Tamilnadu State has been prepared in full consultation with me.

I have understood its contents and agree to implement the same in accordance with Laws, Rules and Act applicable to Quarry. Signature of the Applicant

A.Rajendran Place: Pudukkottai Date: 16.05.2018

Dr.P.Thangaraju, M.Sc., Ph.D., Regd.off.No.17, Advaitha Ashram Road, Alagapuram,Salem- 636 004. Cell: 94422 78601 & 94433 56539.

CERTIFICATE FROM THE QUALIFIED PERSON

This is to certify that the Provisions of under Rule 41 & 42 as Amended in Tamilnadu Minor Mineral Concession Rules, 1959 have been observed in the preparation of Mining Plan for Gravel Quarry in Survey field No.549/4(P) over an extent of 2.26.5Ha Patta Land in Chettipatti Village, Kulathur Taluk, Pudukkottai District, Tamilnadu State has been prepared for Thiru.A.Rajendran, S/o.Athimoolam, No.2/235, Therkkupatti, Keelaiyur, Kulavaipatti, Alangudi Taluk, Pudukkottai District. Whenever specific permissions/ exemptions/ relaxations and approvals are required, the applicant will approach the concerned authorities of the District Collectorate, Pudukkottai, Tamilnadu for such permissions/exemptions/relaxations and approvals. It is also certified that information furnished in the above Mining plan are true and correct to the best of my knowledge. Signature of the Qualified Person

Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person Place : Salem Date : 24.05.2018

LIST OF CONTENTS

S.No. Description Page No.

1.0 General Information 3

2.0 Location 4

PART-A

3.0 Geology and Mineral Reserves 5

4.0 Mining 6

5.0 Blasting 8

6.0 Mine Drainage 8

7.0 Other Permanent Structures 9

8.0 Employment Potential & Welfare Measures 11

PART-B

9.0 Environment Management Plan 12

10.0 Mine Closure Plan 17

11.0 Any Other Details Intend to Furnish by the Applicant 18

LIST OF ANNEXURES

S.No. Description Annx.no.

1. Copy of Precise area communication letter I

2. Copy of FMB II

3. Copy of Combined map III

4. Copy of Patta IV

5. Copy of Adangal V

6. Copy of A-Register VI

7. Copy of Consent Document VII

8. Copy of ID Proof VIII

9. Copy of Qualified person certificate IX

LIST OF PLATES

S.No Description Plate No

1. Location Plan I

2. Environmental Plan & Land use Land cover IA

3. Key Plan IB

4 Quarry lease & Surface Plan II

Topographical, Geological, Yearwise Plan and 5 III Sections

6 Conceptual plan and Sections IV

Mining Plan Chettipatti Gravel Quarry

MINING PLAN FOR CHETTIPATTI GRAVEL QUARRY

OVER AN EXTENT OF 2.26.5HA IN CHETTIPATTI VILLAGE,

KULATHUR TALUK, PUDUKKOTTAI DISTRICT, TAMILNADU.

(Prepared under Rule 41 & 42 as Amended in Tamilnadu Minor Mineral Concession Rules, 1959) EXECUTIVE SUMMARY: The Mining plan and Environmental Management plan is prepared for Thiru.A.Rajendran, S/o.Athimoolam, No.2/235, Therkkupatti, Keelaiyur, Kulavaipatti, Alangudi Taluk, Pudukkottai District. The applicant applied to quarry Gravel in Patta Land, Survey field No.549/4 (P) over an extent of 2.26.5Ha in Chettipatti Village, Kulathur Taluk, Pudukkottai District for a period of Three years Rule 19 & 20 of Tamilnadu Minor Mineral Concession Rule 1959. The application was processed by the District Collector, Pudukkottai and passed a letter vide Rc.No.2553/2017 (G&M) Dated: 15.05.2018 to obtain an approved mining plan and Environmental Clearance from the District Level Environment Impact Assessment Authority, Pudukkottai, Tamilnadu. All the conditions stipulated in the precise area communication have been followed while for preparing this Mining Plan. a. Village Panchayat - Chettipatti b. Panchayat Union - Kulathur c. Geological Resources of Gravel = 45,300m3 d. Mineable Reserves of Gravel = 33,792m3 e. The proposed quantity of reserves (year wise production) for the Three years period to be mined = 33,792m3 of Gravel. f. Total extent of the area proposed for lease = 2.26.5Ha g. Proposed Period of mining = Three years h. Proposed Depth of mining = 2m (Avg) i. It is a fresh application. j. Method of mining (level of mechanization) Open-cast mechanized method is proposed without drilling and blasting. k. Type of machineries used in the quarry = Machineries like excavators and Tippers are proposed for quarrying Gravel.

1

Mining Plan Chettipatti Gravel Quarry l. Quantity of diesel consumption= 5,630Ltrs of HSD will be utilized for entire project life. m. No trees will be uprooted due to this quarrying operation. n. There is no proposal for Export of this Gravel. o. Topo sketch covering an 1km & 500m radius around the proposed area with markings of habitations, water bodies including streams, rivers, roads, major structure like bridges, Wells, Archeological importance, Places of worships is marked and enclosed as Plate No.IA. p. The area for lease is 2.26.5Ha which is bounded by five corners, the corners are designated as 1-5 numerical order from the North Western side of the area the Co– ordinates for all the boundaries are clearly marked in the plans enclosed as Plate No. II, III and IV. q. The plans of proposed mining area showing the dimensions of the pit, its proposed depth and maximum mining area of proposed quarrying are enclosed as Plate No.III. The area applied for lease is 10.0km away from the interstate boundary, protected area under wild life protection ACT 1972, critically polluted areas as identified by CPCB and notified Eco sensitive areas. r. There are no wastages anticipated during this quarrying operation. s. Around 7 employees are proposed to be deployed for the quarrying operation. t. The total cost of the project is about = Rs.23,53,277/-a period of Three years.

This mining plan and Environment Management plan is prepared by incorporating all the conditions stipulated in the precise area communication and by considering all the parameters required for the safe and systematic quarrying operations in order to excavate 33,792m3 of Gravel for a period of Three years. Gravel is composed of consolidated felsic compound Silica and Feldspar the Gravel is formed by the action of water due to erosion and transportation of Rocks. The end use of the Gravel is specifically utilized for public sector towards construction purpose and leveling of roads etc. Gravel is an important commercial product, with a number of applications. The applicant intends to use this Gravel only for Road projects and other infrastructure development work especially for leveling and filling of low lying areas.

2

Mining Plan Chettipatti Gravel Quarry 1.0 GENERAL INFORMATION 1.1 a) Name of the applicant Thiru.A.Rajendran, b) Address of the applicant Address : A.Rajendran, (with phone No. & S/o.Athimoolam, e-mail) No.2/235, Therkkupatti, Keelaiyur, Kulavaipatti, Alangudi Taluk, Pudukkottai District. Pin code : 622 502 Mobile No : 98659 84057 Aadhaar Number : c) Status of the applicant (Individual / Company / The applicant is an individual. Firm) 1.2 a) Mineral which the applicant The applicant intends to quarry Gravel only. intend to mine b) Precise area communication The District collector, Pudukkottai passed an order vide letter details received from Rc.No.2553/2017 (G&M) Dated: 15.05.2018 to obtain the Government an approved mining plan and Environmental Clearance from the District Level Environment Impact Assessment Authority, Pudukkottai, Tamil Nadu. c) Period of permission / lease The applicant applied for permission for the period of to be granted Three years/The District Collector considered grant of lease for a period of Three years.

d) Name and address of the Name : Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person preparing Qualified Person Address : Regd. off.No.17, the mining plan Advaitha Ashram Road, Alagapuram, Salem - 636 004. Reg.No : RQP/MAS/253/2013/A Valid Date : 27-08-2023 Phone No : 94433 56539 Tele Fax : 0427- 2431989 (Office)

3

Mining Plan Chettipatti Gravel Quarry 2.0 LOCATION a) Details of the area (with The lease applied area surrounded by following villages: location map) Alangudippatti - 1.5km - South East Sivakamipuram - 1.0km - South Suriyur - 2.0km - North West Chinnapaanduraarpatty - 1.5km - South West

i) District, Taluk and village Pudukkottai District, Kulathur Taluk and Chettipatti Village. ii) Survey Number 549/4 (P) iii) Extent (in hectares) 2.26.5Ha b) Classification of the area (Ryotwari/ Poramboke / It is a Patta land others) c) Ownership / Occupancy of the It is a Patta land, Registered in the Name of Karuppaiya, applied area (surface right) Sivakami, Samyayya, Kaliyaperumal, Manickam and Karuppaiya vide Patta No.1470. The applicant has been consent from Pattadhar. (Copy of Annexure IV & VII). d) Toposheet No. with latitude Topo sheet No - 58-J/14 and longitude Latitude between : 10°38'35.56"N to 10°38'42.83"N Longitude between : 78°48'01.02"E to 78°48'08.93"E e) Existence of public road / The approach metal road is situated on the South Railway line, if any nearby and side of the lease applied area which connects to the road approximate distance at the distance of 100m. The panchayat road is available to the quarry site to main road, no Patta land roads are encountered for the haulage of Gravel. The Nearest Railway line is Trichy – Karaikudi Railway line which is about 6.0km from the South western side of the area.

4

Mining Plan Chettipatti Gravel Quarry PART – A 3.0 GEOLOGY AND MINERAL RESERVES 3.1 Brief description of the The lease applied area exhibits almost plain Topography and general topography, having gentle slope towards South eastern side. Geology of the area (with The area is covered by the Gravel formation. Hence plans) the vegetation does not sustain due to the topography of the land. The altitude of the area is 109m (Maximum) from MSL. Please refer the Topography, Geological plan and sections (Plate No–III). 3.2 Details of exploration No exploration was carried out. The Gravel formation is already carried out if any clearly visible right from the surface. 3.3 Estimation of reserves The Geological plans demarcating the commercially viable Gravel body have been prepared in 1:1000 scales (Plate No.III). Totally Two sections have been drawn, one sections along the length wise of the area (X-Y) and another one section are width wise of the area (A-B) to cover the maximum area in the Horizontal 1:1000 and Vertical 1:100 (please refer Plate No- III). The cross sectional area for the proved depth persistence of 2m has been worked out for the section. The cross sectional area multiplied by its length of influence on the longer axis gives the volume (insitu) in the cross sectional area. The sum total of the insitu reserves available within the individual cross sectional area gives the geological reserves of the lease applied area. As the recoverable of Gravel in the terms of cubic meter. The Geological Resources, Mineable Reserves are given only in terms of Cubic meter. The Details of estimation of Geological Resources and Mineable Reserves with reference to Topography, Geological Plan and Section shown in (Plate No.III).

5

Mining Plan Chettipatti Gravel Quarry a) Geological reserves with Geological resources are calculated in area method. geological sections on a Total Extent of the area = 2.26.5Ha scale of 1:1000. Area in Sqm = 2.26.5X 10,000 = 22,650 Sqm Total Volume = Area in Sqm X Depth = 22, 50Sqm X 2m Depth = 45,300m3 Total Geological Resources of Gravel is 45,300m3. b) Mineable reserves The Mineable Reserves are calculated by deducting 7.5m safety distance to the adjacent Patta lands, 10m safety distance from Government land and bench loss. Mineable Reserves Table-1 (Please refer Plate No-III) MINEABLE RESERVES Mineable Reserves of Length Width Depth Section Bench Gravel in m in m in m Formation in m3 I 208 84 1 17472 XY-AB II 204 80 1 16320 GRAND TOTAL 33,792

Total Mineable Reserves are calculated upto 2m depth below the ground level = 33,792m3 Gravel proposed to excavate for the period of Three years.

4.0 MINING 4.1 Method of mining Opencast method of shallow mining is proposed, (opencast/ underground) Machineries like excavator are proposed for quarrying Gravel up to 2m depth below the ground level. No drilling or blasting is proposed for this type of Gravel quarrying, it is a conventional eco friendly quarrying operation. The Gravel will be loaded directly to the Tippers for transportation to the needy customer’s site for filling and leveling of low lying areas. 4.2 Mode of working It is a conventional opencast mechanized quarrying (mechanized, manual) operation without drilling and blasting.

6

Mining Plan Chettipatti Gravel Quarry 4.3 Proposed bench height & 1.0m height &1.0m Width width 4.4 Indicate the overburden/ There is no overburden, Gravel is to exploit to a depth of 2m mineral production below the ground level. expected pit wise as detailed below (composite plan and section showing pit layout, dumps, disposal of waste if any etc.) Year wise Production Table-2 YEAR WISE RESERVES Recoverable Length Width Depth Year Section Bench Reserves of Gravel in m in m in m formation in m3 I I 135 84 1 11340 TOTAL 11,340 II I 73 84 1 6132 XY-AB II 65 80 1 5200 III TOTAL 11,332 II 139 80 1 11120 TOTAL 11,120 GRAND TOTAL 33,792 The applicant intends to quarry 33,792m3 of Gravel for the period of Three years upto a depth of 2m below the ground level. 4.5 Machineries used a) For mining Excavator attached with bucket 110-150 of 0.90m3 capacity, Diesel Drive (Rental Basis). b) Loading equipment Excavator attached with bucket 110-150 of 0.90m3 capacity, Diesel Drive (Rental Basis). c) Transportation (includes Hired Tippers 10/20Ts capacity. Diesel Drive. (Only from within the mine and mine quarry to needy customers site) (Rental Basis). to destination 4.6 Disposal of overburden / There is no wastage is anticipated during the quarrying waste operation the entire Gravel will be directly loaded into tippers for filling and leveling of low lying areas for Road projects and other infrastructure development work and around the District.

7

Mining Plan Chettipatti Gravel Quarry 4.7 Brief note on conceptual Conceptual mining plan is prepared based upon mining plan for the entire Topography, Geological plan and section with an object of lease period base on the Three years of systematic development of lay outs, selection geological, mining and of ultimate pit limit etc., environmental The ultimate pit size is designed based on certain considerations practical parameters such as economical depth of quarrying & permissible area etc., The ultimate pit dimensions of the quarry are given below. Conceptual Table-3 Ultimate Pit Dimensions (Max) Description Length Width Depth in (m) in (m) in (m) Pit 208m 84m 2m It is a Conventional Eco friendly Quarrying operation without drilling and Blasting.

5.0 BLASTING 5.1 Blasting pattern 5.2 Type of explosives to be used 5.3 Measures proposed to minimize It is a Conventional Eco friendly quarrying proposed ground vibration due to blasting without drilling and blasting. 5.4 Storage and safety measures to be taken while blasting

6.0 MINE DRAINAGE 6.1 Depth of water table (based on In the private bore well the water table is measured nearby wells and water bodies) as 35m in summer and 30m in rainy season. Type Distance & Direction Location 10°38'30.56"N Borehole 480m South west 78°47'50.25"E Hence the ground water will not be affected in any manner due to the quarrying operation during the entire life period. 6.2 Arrangements and places where There is no such type of activities anticipated in this the mine water is finally quarrying operation. proposed to be discharged

8

Mining Plan Chettipatti Gravel Quarry 7.0 OTHER PERMANENT STRUCTURES (also shown in the map) 7.1 Habitations / village natham There is no habitation within the radius of 300m. 7.2 Power lines (HT/ LT) There is no HT/LT Line within 50m radius of the lease area. 7.3 Water bodies (river, Pond, lake, Tank is situated within 500m radius from the lease odai, channel etc.) applied area. 7.4 Archaeological / historical There is no Archaeological/ historical monuments monuments within 500m radius from the area. 7.5 Road (NH, SH others) The Nearest National Highway (NH-67) Trichy- Nagappattinam which is about 11.0km on the North eastern side of the area. The State Highway (SH-26) Trichy– Pudukkottai is about 5.5km on the South western side of the area. 7.6 Places of worship There is no place of worships within the Radius of 500m. 7.7 Reserved forest / Forest / wild There is no Reserved forest/ forest/ Wild life sanctuary life sanctuary etc. within the radius of 500m.

9

Mining Plan Chettipatti Gravel Quarry SALIENT FUTURES AROUND THE SITE S. Salient Futures Prescribed Actual Distance from the site No Present around site safety distance 1. Railways, 50m Railway line – 6.0km (Trichy - Karaikudi) south Highways, western side. Reservoirs or The Nearest National Highway (NH-67) Trichy- Canal Nagappattinam which is about 11.0km on the North eastern side of the area. Reservoir – No reservoir within 10.0km radius. Canal – There is no canal within 1.0km radius. 2. Village Road 10m Village road is located 100m from the South side. 3. Habitation / 300m There is no habitation within the radius of 300m. Approximate Distance & Village S. No Name of the village Direction 1. Alangudippatti 1.5km - South East 2. Sivakamipuram 1.0km - South 3. Suriyur 2.0km - North West 4. Chinna paanduraarpatty 1.5km - South west

4. Adjacent Patta 7.5m North - S.F.No.549/3 East - S.F.No.549/4 (P) Land West - S.F.No.549/4 (P) 7.5m safety distance has been maintained from the patta land. 5. Housing area, EB 50m There is no habitation within the radius of 300m. line LT Line – No LT line within the radius of 100m. (HT & LT Line) 6. Boundaries of the 7.5m & The boundaries of the permitted areas is as follows permitted area 10m Direction S.F.No Classification Safety distance North 549/3 Patta Land 7.5m East 549/4 (P) Patta Land 7.5m South No.58 Govt Land 10m Metturpatti West 549/4 (P) Patta Land 7.5m

7. Reserve forest 10km There is no other Reserved forest within the radius of 10.0km. 8. Eco sensitive area/ 10km There is no Eco sensitive area/ Wild life sanctuary wild life sanctuary within the radius of 10.0km. etc.

10

Mining Plan Chettipatti Gravel Quarry 8.0 EMPLOYMENT POTENTIAL & WELFARE MEASURES 8.1 Employment potential The following man power is proposed for the Gravel (skilled, semi skilled, quarrying to carry out the day-to-day quarrying activities, unskilled) aimed at the proposed production target and also to comply with the statutory provisions of the Government norms. Skilled : Mines foreman/Mate : 1 Supervisors : 1 Total : 2 Nos Semi-skilled: Excavators Operators : 1 Total : 1 No Un -Skilled: Watchman : 1 Unskilled – helpers : 3 Total : 4 Nos Grand Total : 7 Nos Allowing for 10% absenteeism, the No. of men of roll will be around 6. The above manpower is adequate to meet out the production schedule and the machinery strength envisaged in the mining plan and to comply with the statutory provisions of the Mines Safety Regulations. It is been ensured that the labor will not be deployed less than 18 years, no child labor will engaged or entertained for any kind of quarrying operations. All the labors engaged for quarrying operations will be insured during the quarry lease period. 8.2 Welfare measures a) Drinking water Packaged Drinking water will be brought from the authorized water suppliers in the Chinna Paanduraarpatty which is about 1.5km on the south west side of the area. b) Sanitary facilities Hygienic Sanitary facilities will be constructed with in the safety area as permanent structure.

11

Mining Plan Chettipatti Gravel Quarry c) First Aid facility First aid kits are kept in Mines office room if any accident happens first aid will be given at site and the injured person will be taken to the hospital immediately, Hospital are available at Keeranur which is about 8.0km on the South Western side of the area. The competent statutory foreman will be in charge of first aid. d) Labors Health In the conventional Eco friendly opencast quarrying operation no drilling or blasting was involved only excavator are used, hence labors health not affected in any manner however periodically medical checkup will be conducted to all the workers in applicant own cost. e) Precautionary All the quarry workers will be provided with safety safety measures to the helmets, Mine Goggles, Ear plugs, ear muffs, Dust mask, labourers reflector jackets and Safety Shoes as personal protective device as per the specification of Director of Mine Safety. Besides also conducting periodically medical checkup for all workers for any mine health related problems, proper training and induction will be given to quarrying personal to create awareness of conventional Eco friendly quarrying operations. PART – B 9.0 ENVIRONMENT MANAGEMENT PLAN 9.1 Existing land use pattern It is a dry barren land, covered with Gravel; the area does not fit for vegetation/ cultivation due to the Gravel formation. 9.2 Water Regime Ground water is about 35m depth below ground level. The quarrying is restricted up to 2m below the ground level, hence the quarry operation will not be affected the ground water. 9.3 Flora and fauna The main trees are Julia Flora, Neem, etc., No flora of botanical interest or fauna of zoological interest noticed. 9.4 Climatic conditions Both the North East occurs here and the summers are hot and winter is cool. During April and May the temperature may shoot upto 36°C and during winter the temperature does not fall below 23°C. The average annual rainfall is around 820mm.

12

Mining Plan Chettipatti Gravel Quarry 9.5 Human settlement There are few villages located in 5km radius from the lease applied area the details of the areas are given below: TABLE-4 Approximate distance & Approximate S. No Name of the Village Direction from lease population applied area 1. Alangudippatti 1.5km - South East 200 2. Sivakamipuram 1.0km - South 400 3. Suriyur 2.0km - North West 450 4. Chinna Paanduraarpatty 1.5km -South west 400

9.6 Plan for air, dust In this conventional Eco friendly quarrying operation suppression only Excavator are proposed without drilling and blasting, hence the air quality will not affect due to the quarrying operation, water will be sprinkled in the haul roads periodically to suppress dust Ambient Air Quality monitoring will be carried out to check the Quality of Air in and around the Quarry. Water for dust suppression will be extract from the nearby existing borehole owned by the applicant. 9.7 Plan for noise level This Conventional Eco Friendly quarrying operation control does not involve any blasting and drilling methods, hence noise will be minimal and this is only due to the movement of Excavators and Tippers. Periodically Noise level monitoring will be carried out to check the Noise level in and around the Quarry. The drivers will be strictly instructed to move the vehicle during the transportation not exceed 40km per hour. Sentries with flags & whistle will posted in village junction and populated area to control and regulate traffic. 9.8 Environmental impact The life span of the quarry is proposed for the period of assessment statement Three years, the Proposed quarrying for a small production of describing impact of Gravel does not involve any drilling and blasting. Such limited mining on the next mining activity is not likely to cause any impact adversely on Three years environment as far as pollution of air, water and noise is concerned.

13

Mining Plan Chettipatti Gravel Quarry 9.9 Proposal for waste There are no wastages anticipated during the quarrying management operation. The entire Gravel will be transported to the needy customer’s site. 9.10 Proposal for reclamation The quarry operation is restricted up to a depth of 2m, of land affected during after removing the Gravel there is no proposal for backfilling mining activities and at or reclamation. The land will be leveled and used for the end of mining agriculture purpose, the fencing cost would be around (refilling/ fencing etc.) Rs.50,000/- 9.11 Program of afforestation After the completion of the quarrying operation, the (indicate extend, number, land will be leveled and used for agriculture purpose. 10m name of species to be Safety barrier and Nearest panchayat roads Nearly 2,200Sqm afforested) area is proposed to use under afforestation by planting 450No.s of neem/Casuarina trees every year with an anticipated survival rate of 80%. (Please refer Plate No.III).The estimated budget for plantation and maintenance of Green belt development would be around Rs.50,000/- for the period of Three years. 9.12 Proposed financial The proposed financial estimate budget for EMP is estimate/ budget for around Rs.1,50,000/- for the period of Three years. (EMP) environment management:

14

Mining Plan Chettipatti Gravel Quarry A. Project Cost / Investment i) Land cost The land value as per the Government Guidelines value is about 2.26.5Ha X Rs.5,93,500/Ha = Rs.13,44,277/- (source : https://tnreginet.gov.in/portal/) 3 ii) Machinery to be The excavators of 0.90m bucket capacity and used tippers of 10/20Ts capacity will be used. The quantity of Diesel consumption is based on the working hours of Excavators (Filling Factor and loading Cycling), in the open cast quarry project Excavators are proposed to quarry Gravel. Average Diesel consumption of Hitachi Excavator model EX 110-150 is 10Ltrs/ Hr. Total number of Excavator used for quarrying Gravel = 1No

Average Diesel consumption

Tata Hitachi (Model Ex-110-150) = 10Ltr/Hr

Diesel Prize around = Rs. 60 (At present scenario) Total Excavator running hours for the project 3 One excavator will excavate 60m /Hour 3 3 = 33,792m /60m = 563 Excavator hours One Excavator will consume 10Ltrs/ hour Hence 563X10 = 5,630 Ltrs of HSD will be utilized for the entire project life. The hired vehicle charges per hour inclusive of diesel around Rupees 1000/hour

Total running hours = 563hours = 563hours x Rs.1,000 = Rs 5,63,000/- for the entire project life. Excavation cost = Rs.5,63,000/- = Rs.5,63,000/-

15

Mining Plan Chettipatti Gravel Quarry iii) Refilling / The land will be fenced with barbed wire Fencing fencing before the execution of lease deed the cost would be around = Rs.50,000/- iv) Laborers shed Labor sheds will be constructed as permanent structure. The cost would be around = Rs.50,000/- v) Sanitary facility Adequate latrine and urinal accommodation

shall be provided at conveniently accessible = Rs.40,000/- places the cost would be around vi) Others items Leveling after quarrying = Rs.30,000/- vii) Drinking water Packaged drinking water will be provided to

facility for the all labors in applicant own cost, the cost would

laborers be around Rs.1,000/- per month. The total cost = Rs.36,000/- would be around viii) Sanitary The latrine and urinal will keep clean and

arrangement sanitary condition. The maintenance cost = Rs.20,000/- would be around ix) Safety kits All the Safety kits such as Helmet, Earmuffs,

Goggles, Reflector Jackets, Safety shoes etc.,

will be provided by the applicant own cost the = Rs.20,000/- cost would be around Total Project Cost = Rs.21,53,277/-

16

Mining Plan Chettipatti Gravel Quarry B. EMP Cost i) Water Water will be sprinkled in the haul roads by = Rs. 1,00,000/- sprinkling water sprinklers the cost would be around ii) Afforestation Afforestation program will be carried out in the = Rs. 50,000/- etc. boundary barrier the cost would be around Total EMP Cost = Rs.1,50,000/- A+B = A. Project Cost = Rs 21,53,277/- B. EMP Cost = Rs. 1,50,000/- Total Project Cost (A+B) = Rs. 23,03,277/- The applicant ensures to involve corporate environmental responsibilities (CER) like providing note books to nearby school, providing drinking water facilities to the nearby villages etc., at around 2.0% from the total project cost the cost would be around Rs.50,000/- Total Project cost = Rs. 23,03,277/- CER Cost (2.0%) = Rs. 50,000/- Total cost = Rs. 23,53,277/- (The Total cost of the project including EMP Cost is Rupees Twenty three Lakhs and Fifty three Thousand and Two Hundred and Seventy seven only). 10.0 MINE CLOSURE PLAN 10.1 Steps proposed for phased There is no proposal for back filling, reclamation and restoration, reclamation of rehabilitation. The quarried land will be leveled and already mined out areas used for agriculture. 10.2 Measures to be under taken on This conventional Eco – Friendly quarrying for a depth mine closure as per Act & of 2m below the ground level not require any backfill, Rules Reclamation and Rehabilitation, the quarried out lands will be leveled and used for agriculture purpose. 10.3 Mitigation measure to be undertaken for safety and This is a fresh Gravel quarry. restoration/ reclamation of the already mined out area

17

Mining Plan Chettipatti Gravel Quarry 11.0 ANY OTHER DETAILS INTEND TO FURNISH BY THE APPLICANT This conventional Eco Friendly quarrying operation does not involve any drilling and Blasting. Only Excavators are proposed to excavate the Gravel for a period of Three years, care will be taken in all steps to prevent any adverse eventualities. This is the B2 category quarry proposed for a period of Three years. STATUTORY PROVISIONS The mining plan for Gravel is prepared as per the Rules 41 & 42 as Amended in Tamilnadu Minor Mineral Concession Rules, 1959. The provisions of the Mines Act, Rules and Regulations and orders made there under shall be complied with, so that the safety of the mine, machinery and person will be protected. Permission, relaxation or exemption wherever required for the safe and scientific quarrying of the deposit will be obtained from the Consent Departments. Any violation pointed out by the inspecting authorities shall be rectified as per the guidelines of the Department.

Prepared by

Dr.P.Thangaraju, M.Sc., Ph.D., Qualified Person Place : Salem Date : 24.05.2018

18

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT ƒ ( ƒ ( ƒ ( ƒ ( ƒ ( ƒ (

ƒ 1ƒ ( ƒ 1 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

ƒ 1

ƒ 1 ƒ 1

ƒ 1 ƒ 1 2.#6'01Ä+ DATE OF SURVEY : 21.05.2018

#22.+%#06 Thiru. A. RAJENDRAN, S/o. ATHIMOOLAM, NO.2/235, THERKKUPATTI,

ƒ 1 ƒ 1 KEELAIYUR,KULAVAIPATTI, ALANGUDI TALUK, PUDUKKOTTAI DISTRICT.

.1%#6+101(3.#22.+'&#4'#

S.F.No : 549/4(P) . EXTENT : 2.26.5 Ha VILLAGE : CHETTIPATTI,

ƒ ( TALUK : KULATHUR, ƒ ( ƒ 1 ƒ 1 DISTRICT : PUDUKKOTTAI, STATE : TAMIL NADU.

+0&':

Q.L. APPLIED AREA:

TOPO SHEET NO : 58 / J - 14 ƒ 1 ƒ 1 LATITUDE : ƒ 1 toƒ 1 LONGITUDE : ƒ ( to ƒ (

.1%#6+102.#0

SCALE: 1 : 24,00,000

ƒ 1 ƒ 1 24'2#4'&$; ƒ ( ƒ ( ƒ ( ƒ ( ƒ ( ƒ ( ƒ (

ƒ 1 ƒ 1 ƒ 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL AUTODESK AN BY PRODUCED PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

2.#6'01Ä+Ä# DATE OF SURVEY : 21.05.2018

ž0 b b b #22.+%#06 Thiru. A. RAJENDRAN, S/o. ATHIMOOLAM, NO.2/235, THERKKUPATTI, KEELAIYUR,KULAVAIPATTI, ALANGUDI TALUK, PUDUKKOTTAI DISTRICT.

.1%#6+101(3.#22.+'&#4'#

ž0 S.F.No : 549/4(P) . EXTENT : 2.26.5 Ha VILLAGE : CHETTIPATTI, TALUK : KULATHUR, DISTRICT : PUDUKKOTTAI, STATE : TAMIL NADU.

+0&':

Q.L. APPLIED AREA

1 Km RADIUS

500m RADIUS ž' ž' PANCHAYAT ROAD ž'

ž' APPROACH ROAD

TREES

6QYCTFU

b b

bb b -GGTCPWT WIND DIRECTION b

SEASONAL AGRICULTURE LAND

BARREN LAND

HABITATION ž0 TANK

6QYCTFU #NCPIWFKRRCVVK

5%#.'Ä

5KXCMCOKRWTCO 6QYCTFU

b

b 24'2#4'&$; b ž0

.#0&75'2#66'40 &'5%4+26+10 2'4%'06#)' +0&': 64''5  TOPO SHEET NO : 58 / J - 14 5'#510#.#)4+%7.674'.#0&  41#&5  LATITUDE : to ƒ 1 ƒ 1 *#$+6#6+10  LONGITUDE : ƒ ( to ƒ ( $#44'0.#0&   6#0-   616#. 

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL AUTODESK AN BY PRODUCED PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

%140'4.#6+67&' .10)+67&'

 ž0 ž' PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT  ž0 ž'  ž0 ž'  ž0 ž'  ž0 ž'

549/4(P)

2.#6'01Ä++ DATE OF SURVEY : 21.05.2018

#22.+%#06 Thiru. A. RAJENDRAN, 549/3 S/o. ATHIMOOLAM, NO.2/235, THERKKUPATTI, KEELAIYUR,KULAVAIPATTI, ALANGUDI TALUK, 4.O PUDUKKOTTAI DISTRICT.

.1%#6+101(3.#22.+'&#4'#

S.F.No : 549/4(P) . 549/4(P) EXTENT : 2.26.5 Ha VILLAGE : CHETTIPATTI, TALUK : KULATHUR, DISTRICT : PUDUKKOTTAI, STATE : TAMIL NADU.

+0&':

Q.L. APPLIED AREA BOUNDARY

7.5m & 10m SAFETY DISTANCE

Village No - 58.METTUPPATTI 4.O TEMPORARY BENCH MARK

GRAVEL

CONTOUR

549/4(P) APPROACH ROAD

QUARRY ROAD

SHRUBS

37#44;.'#5' 574(#%'2.#0

SCALE 1 : 1000 24'2#4'&$;

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL AUTODESK AN BY PRODUCED PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

%140'4.#6+67&' .10)+67&'

 ž0 ž' PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT  ž0 ž'  ž0 ž'  ž0 ž'  ž0 ž'

549/4(P)

:

# 549/3

4.O 549/4(P)

2.#6'01Ä+++ $ DATE OF SURVEY : 21.05.2018 #22.+%#06 Thiru. A. RAJENDRAN, Village No - 58.METTUPPATTI 4.O S/o. ATHIMOOLAM, NO.2/235, THERKKUPATTI, KEELAIYUR,KULAVAIPATTI, ALANGUDI TALUK, ; PUDUKKOTTAI DISTRICT. 549/4(P) .1%#6+101(3.#22.+'&#4'#

S.F.No : 549/4(P) . EXTENT : 2.26.5 Ha VILLAGE : CHETTIPATTI, TALUK : KULATHUR, DISTRICT : PUDUKKOTTAI , STATE : TAMIL NADU. +0&': 5+6'5'48+%'5 Q.L. APPLIED AREA BOUNDARY

7.5m & 10m SAFETY DISTANCE

TEMPORARY BENCH MARK

GRAVEL

CONTOUR

APPROACH ROAD

+Ä[T2TQRQUGFCTGCVQDG3WCTTKGF 135m 73m QUARRY ROAD ++Ä[T2TQRQUGFCTGCVQDG3WCTTKGF 139m 65m SHRUBS +++Ä[T2TQRQUGFCTGCVQDG3WCTTKGF &1' 224m DEPTH OF ESTIMATION &1' +Ä[T2TQRQUGFCTGCVQDG2NCPVGF 6121)4#2*;)'1.1)+%#.2.#0 ++Ä[T2TQRQUGFCTGCVQDG2NCPVGF ;'#49+5'&'8'.12/'06 +++Ä[T2TQRQUGFCTGCVQDG2NCPVGF 241&7%6+102.#0 5'%6+105 .#0&75'2#66'40 SCALE : PLAN- 1 : 1000 SECTION- HOR 1 : 1000, VER 1: 100

84m 24'2#4'&$;

80m

&1'

102m PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL AUTODESK AN BY PRODUCED PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT %140'4.#6+67&' .10)+67&'

 ž0 ž'  ž0 ž'  ž0 ž'  ž0 ž'  ž0 ž'

549/4(P)

:

# 549/3

4.O 549/4(P)

2.#6'01Ä+8 DATE OF SURVEY : 21.05.2018 #22.+%#06 $ Thiru. A. RAJENDRAN, S/o. ATHIMOOLAM, NO.2/235, THERKKUPATTI, Village No - 58.METTUPPATTI 4.O KEELAIYUR,KULAVAIPATTI, ALANGUDI TALUK, PUDUKKOTTAI DISTRICT.

; .1%#6+101(3.#22.+'&#4'# 549/4(P) S.F.No : 549/4(P) . EXTENT : 2.26.5 Ha VILLAGE : CHETTIPATTI, TALUK : KULATHUR, DISTRICT : PUDUKKOTTAI, STATE : TAMIL NADU.

+0&':

Q.L. APPLIED AREA BOUNDARY 5+6'5'48+%'5 7.5m & 10m SAFETY DISTANCE

TEMPORARY BENCH MARK

GRAVEL

CONTOUR

APPROACH ROAD

QUARRY ROAD

SHRUBS 208m QUARRY PIT +Ä+++[T2TQRQUGFCTGCVQDG2NCPVGF 204m &1' DEPTH OF ESTIMATION &1' 7NVKOCVG2KVNKOKV OCZ 209m  O:O:O F %10%'267#.2.#0 5'%6+105 SCALE : PLAN- 1 : 1000 SECTION- HOR 1 : 1000, VER 1: 100

24'2#4'&$;

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 84m

80m

&1'

85m PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL AUTODESK AN BY PRODUCED