INFRASTRUCTURE On the Highway to Progress Uttar Pradesh: Mumbai Industrial Corridor (DMIC) & Eastern Dedicated Freight Corridor (EDFC) Creating world class infrastructure with a vision of robust growth Delhi Mumbai Industrial Corridor (DMIC) nUP accounts for about 9.45 % of the total National Highway (NH) network n36,068 sq km (15%) of DMIC catchment area across 12 districts of UP n43 National Highways connect it with 9 neighboring states and other parts of India nImmense opportunities for development of an Industrial corridor along nLargest railway network in the country spanning over 8,763 KM the alignment of dedicated freight line n6 Domestic Airports at , , Gorakhpur, , Lucknow and Varanasi Shortlisted Projects and 1 international airport at Lucknow nDadri – Noida – Ghaziabad Investment Region nInvestment worth INR 23000 crore planned for 2500 km of state highway projects nMeerut – Muzaffarnagar Manufacturing Zone in Ph-II n6730 km identified as core network by World Bank , of which 2466 km has nMultimodal Logistic Hub at Dadri been developed by UPPWD nBoraki Integrated Transport Hub nConcession agreement signed for 4 roads of 463 km , costing INR 3867 crore nHigh tech Industrial Township nFeasibility study has been completed and proposals for VGF are being nHigh speed connectivity between Investment Region and New Delhi sent to GoI for 11 roads of 977 km , costing about INR 7129 crore n11 hi –tech townships and 31 integrated townships are being developed Eastern Dedicated Freight Corridor (EDFC) by private developers in major cities of the state. n1839 Km railway corridor between Ludhiana and , n165-km six-lane Yamuna Expressway was recently inaugurated. n Distance between New Delhi and Agra can be covered now in 55% or over 1049 km of EDFC falls in U.P. just 2.5 hours nExpected to facilitate uninterrupted transportation of goods to sea ports nBuddh International Circuit in Greater Noida with 5.14 Km length nGoUP envisages Industrial Estates & Logistic Hubs along EDFC spread across an area of 875 acres is India’s only circuit for ROAD TYPE ROAD LENGTH (KM) F1 motor racing Benefits to investors: National Highways 5570 nAirports on PPP model – near Agra in the vicinity of DMIC to nReduced congestion at terminals & junction stations provide facility of dry-cargo transport along with aircraft State Highways 8551 nHigher fuel efficiency due to seamless and unhindered movement & maintenance hub and at Kushinagar in eastern Uttar Pradesh reduced emmission of GHGs to promote industrial development and tourism Major District Roads 7345 nWith double stack containers, number of trains could be reduced to nOne National Manufacturing Investment Zone being planned Other District Roads 29179 nearly half for same throughput each in Jhansi and Auraiya nLine capacity on the existing corridors will be leading to more number Village Roads 82459 of and faster movement of passenger trains Source : UPSHA Uttar Pradesh: Delhi Mumbai Industrial Corridor (DMIC) & Eastern Dedicated Freight Corridor (EDFC) Creating world class infrastructure with a vision of robust growth Delhi Mumbai Industrial Corridor (DMIC) nUP accounts for about 9.45 % of the total National Highway (NH) network n36,068 sq km (15%) of DMIC catchment area across 12 districts of UP n43 National Highways connect it with 9 neighboring states and other parts of India nImmense opportunities for development of an Industrial corridor along nLargest railway network in the country spanning over 8,763 KM the alignment of dedicated freight line n6 Domestic Airports at Agra, Allahabad, Gorakhpur, Kanpur, Lucknow and Varanasi Shortlisted Projects and 1 international airport at Lucknow nDadri – Noida – Ghaziabad Investment Region nInvestment worth INR 23000 crore planned for 2500 km of state highway projects nMeerut – Muzaffarnagar Manufacturing Zone in Ph-II n6730 km identified as core network by World Bank , of which 2466 km has nMultimodal Logistic Hub at Dadri been developed by UPPWD nBoraki Integrated Transport Hub nConcession agreement signed for 4 roads of 463 km , costing INR 3867 crore nHigh tech Industrial Township nFeasibility study has been completed and proposals for VGF are being nHigh speed connectivity between Investment Region and New Delhi sent to GoI for 11 roads of 977 km , costing about INR 7129 crore n11 hi –tech townships and 31 integrated townships are being developed Eastern Dedicated Freight Corridor (EDFC) by private developers in major cities of the state. n1839 Km railway corridor between Ludhiana and Dankuni, Kolkata n165-km six-lane Yamuna Expressway was recently inaugurated. n Distance between New Delhi and Agra can be covered now in 55% or over 1049 km of EDFC falls in U.P. just 2.5 hours nExpected to facilitate uninterrupted transportation of goods to sea ports nBuddh International Circuit in Greater Noida with 5.14 Km length nGoUP envisages Industrial Estates & Logistic Hubs along EDFC spread across an area of 875 acres is India’s only circuit for ROAD TYPE ROAD LENGTH (KM) F1 motor racing Benefits to investors: National Highways 5570 nAirports on PPP model – near Agra in the vicinity of DMIC to nReduced congestion at terminals & junction stations provide facility of dry-cargo transport along with aircraft State Highways 8551 nHigher fuel efficiency due to seamless and unhindered movement & maintenance hub and at Kushinagar in eastern Uttar Pradesh reduced emmission of GHGs to promote industrial development and tourism Major District Roads 7345 nWith double stack containers, number of trains could be reduced to nOne National Manufacturing Investment Zone being planned Other District Roads 29179 nearly half for same throughput each in Jhansi and Auraiya nLine capacity on the existing corridors will be leading to more number Village Roads 82459 of and faster movement of passenger trains Source : UPSHA Attractive incentives under the new Infrastructure and Industrial Investment Policy 2012 Stamp duty concessions n100% stamp duty concessions to be given to: lNew IT, Bio-tech, BPO, Food processing, Food park, Alternative energy resources units lPrivate sector infrastructure development projects excluding PPP projects lIndustrial units in all sectors on purchase, lease or acquisition of land by industrial units in Eastern U.P., Central U.P. and Industrial infrastructure on offer to investors Bundelkhand region Industrial Park Product Location Facilities n75% stamp duty concession to new units on purchase of land from government agencies and 50% stamp duty concession on purchase of land from private sources in Western U.P Textile Park Apparel Ghaziabad Training Centre, Fashion Design Centre, Tool Room Textile & Hosiery Kanpur Centre, Quality Control Lab, CETP, etc nReimbursement of 25% of stamp duty, if a private developer completes development of industrial estate or area within 3 years after purchase of land and a minimum of 50% land is sold. Agro Park Agro & food processing Barabanki Multi Chamber and Controlled Atmospheric Cold & Varanasi Storages with Sorting, Grading and Cleaning facility and Investment Promotion Scheme Quality Control Labs nInterest-free loan quivalent to VAT and Central Sales Tax paid by industrial units or 10 percent of the annual urnover hichever is Leather Park Leather Banthar Unnao Training and Design Centre, Technological Support less will be provided for a period of 10 years repayable after 7 years from the date of first disbursement. (near Kanpur) Service, Quality Control for Saddlery and Export nWho is eligible: Management has been set up by NLDP supported International Institute for Saddlery and Export lIn Eastern U.P, Central U.P and Bundelkhand, new industrial units with total capital investment of INR 5 crore or more Management lIn Western U.P, new industrial units with total capital investment of INR 12.5 crore or more Export Promotion Greater Noida & Agra Provides the infrastructure facilities to the units to lIndustrial units undertaking expansion by minimum 25% of existing production capacity. Industrial Parks boost-up the export of various commodities and services (EPIP) Infrastructure interest subsidy scheme Growth Centres Promote industrialisation Bijoli, Jhansi, Shajahanpur, Basic infrastructure facilities such as power, water, nInterest on loan taken by industrial units for developing infrastructure facilities for self-use, such as- road, sewer, water of backward areas Dibiyapur and Jaunpur telecommunications and banking drainage, power line etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years Leather Mega Leather Kanpur , Agra, Hardoi Concept report under finalisation Cluster Capital interest subsidy scheme Plastic City Plastics Auraiya Land earmarked and concept plan under finalisation nInterest on loan taken for plant and machinery by new industrial units set up in Eastern U.P., Central U.P and Bundelkhand, will IT Park IT/ITeS Lucknow RFP floated for developer by Lucknow Industrial be reimbursed @ 5 percentage points with a ceiling of INR 50 lac/annum for a maximum period of 5 years Development Authority (LIDA) Industrial quality development subsidy scheme Integrated Dairy Lucknow Concept report under finalisation Dairy Plan nInterest on loan taken by industrial association, group of industrial units for establishing testing labs, quality certification lab, tool-rooms, etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years Mega Food Park Food Processing Jagdishpur Concept report under finalisation Special facilities for Mega Projects National Investment Multi-sector Dadri-Noida-Ghaziabad, Proposal for Auraiya and Jhansi submitted to & Manufacturing Auraiya, Jhansi Govt of India nMega projects with an investment of more than INR 200 crore and less than INR 500 crore will be provided with special Zone (NIMZ) concessions within schemes covered under this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet. nMega projects with an investment of more than INR 500 crore will be provided with additional incentives over and above those provided in this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet. Attractive incentives under the new Infrastructure and Industrial Investment Policy 2012 Stamp duty concessions n100% stamp duty concessions to be given to: lNew IT, Bio-tech, BPO, Food processing, Food park, Alternative energy resources units lPrivate sector infrastructure development projects excluding PPP projects lIndustrial units in all sectors on purchase, lease or acquisition of land by industrial units in Eastern U.P., Central U.P. and Industrial infrastructure on offer to investors Bundelkhand region Industrial Park Product Location Facilities n75% stamp duty concession to new units on purchase of land from government agencies and 50% stamp duty concession on purchase of land from private sources in Western U.P Textile Park Apparel Ghaziabad Training Centre, Fashion Design Centre, Tool Room Textile & Hosiery Kanpur Centre, Quality Control Lab, CETP, etc nReimbursement of 25% of stamp duty, if a private developer completes development of industrial estate or area within 3 years after purchase of land and a minimum of 50% land is sold. Agro Park Agro & food processing Barabanki Multi Chamber and Controlled Atmospheric Cold & Varanasi Storages with Sorting, Grading and Cleaning facility and Investment Promotion Scheme Quality Control Labs nInterest-free loan quivalent to VAT and Central Sales Tax paid by industrial units or 10 percent of the annual urnover hichever is Leather Park Leather Banthar Unnao Training and Design Centre, Technological Support less will be provided for a period of 10 years repayable after 7 years from the date of first disbursement. (near Kanpur) Service, Quality Control for Saddlery and Export nWho is eligible: Management has been set up by NLDP supported International Institute for Saddlery and Export lIn Eastern U.P, Central U.P and Bundelkhand, new industrial units with total capital investment of INR 5 crore or more Management lIn Western U.P, new industrial units with total capital investment of INR 12.5 crore or more Export Promotion Greater Noida & Agra Provides the infrastructure facilities to the units to lIndustrial units undertaking expansion by minimum 25% of existing production capacity. Industrial Parks boost-up the export of various commodities and services (EPIP) Infrastructure interest subsidy scheme Growth Centres Promote industrialisation Bijoli, Jhansi, Shajahanpur, Basic infrastructure facilities such as power, water, nInterest on loan taken by industrial units for developing infrastructure facilities for self-use, such as- road, sewer, water of backward areas Dibiyapur and Jaunpur telecommunications and banking drainage, power line etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years Leather Mega Leather Kanpur , Agra, Hardoi Concept report under finalisation Cluster Capital interest subsidy scheme Plastic City Plastics Auraiya Land earmarked and concept plan under finalisation nInterest on loan taken for plant and machinery by new industrial units set up in Eastern U.P., Central U.P and Bundelkhand, will IT Park IT/ITeS Lucknow RFP floated for developer by Lucknow Industrial be reimbursed @ 5 percentage points with a ceiling of INR 50 lac/annum for a maximum period of 5 years Development Authority (LIDA) Industrial quality development subsidy scheme Integrated Dairy Lucknow Concept report under finalisation Dairy Plan nInterest on loan taken by industrial association, group of industrial units for establishing testing labs, quality certification lab, tool-rooms, etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years Mega Food Park Food Processing Jagdishpur Concept report under finalisation Special facilities for Mega Projects National Investment Multi-sector Dadri-Noida-Ghaziabad, Proposal for Auraiya and Jhansi submitted to & Manufacturing Auraiya, Jhansi Govt of India nMega projects with an investment of more than INR 200 crore and less than INR 500 crore will be provided with special Zone (NIMZ) concessions within schemes covered under this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet. nMega projects with an investment of more than INR 500 crore will be provided with additional incentives over and above those provided in this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet. Uttar Pradesh State Highways Authority (UPSHA) Uttar Pradesh State Industrial Development U.P. State Highways Authority is constituted for the development, maintenance and management of state highways . It also develops models for bringing in private & institutional (including international ) funding to the road sector and to raise Corporation (UPSIDC) institutional resources for undertaking the maintenance & upgradation of these highways. UPSIDC is the premier industrial promotion and infrastructure development undertaking of the state government. It has so far developed over 150 industrial areas . More than 11300 units have been set up with an estimated investment of over INR 20375 crore in UPSIDC estates. Major State Highway upgradation projects in progress by UPSHA Major UPSIDC Industrial Infrastructure Projects S.No. Name of Road SH No. Length Project Cost Concessionaire Expected Date (km) (INR crore) of Completion Project Description 1. Delhi-Saharanpur- 57 206.09 1718.35 M/s SEW-PRASAD 16-09-2014 Moradabad Special Economic Zone l467 acres of land, 160 km from New Delhi Yamunotri Road Consortium, Hyderabad lInfrastructure facilities in accordance with GoI SEZ norms 2. Bareilly- Almora 37 54.00 354.07 M/s PNC Infratech 18-08-2015 Road(up to Limited, Agra Tronica City , Ghaziabad lIndustrial township over 1975 acres, 2.5 km from Delhi border uttarakhand border) lPresently 750 medium size industries are operational in the area 3. Varanasi- Shaktinagar 5A 115 1211.96 M/s Apco-Chetak-Patel 18-09-2015 EPIP at Greater Noida and Agra l200 acres at Gautam Buddh Nagar and 100 acre at Agra Road (up to Hathinala Consortium, Lucknow lDeveloped to promote exports junction) l 4. Meerut-Karnal road 82 87.16 583.23 M/s Abhijeet Roads 01-04-2015 High quality infrastructure facilities like concrete road, earth station etc. Ltd., Nagpur Apparel Parks Tronica and Rooma lLocated at Tronica city and Rooma , Kanpur Total 462.25 3867.61 lTextile training centre set up by ATDC operational at both parks Growth Centres l385 acres at Jhansi , 300 acres at Jainpur and 330 acres at Shahjahnpur lSelf sustainable integrated townships for industrial development Road projects by UPSHA currently in pipeline Leather Technology Park l232 acres of land at Banthar Unnao on NH 25 l S.No. Name of Road SH No. Length Project Cost Stage CETP in operation on PPP (km) (INR crore) lInstitute for Saddlery and Footwear Training operational in the area 1. Shahjahanpur-Hardoi-Lucknow Road 25 162.4 1288.6 RFQ 2. Basti-Mehndawal-Kaptanganj- 64 166.12 328.49 RFQ 3. Akbarpur-Jaunpur-Mirzapur-Dudhi Road 5 207.47 1865 RFQ Upcoming UPSIDC Projects 4. Gorakhpur-Maharajganj road 81 53.16 586.91 RFQ Project Description 5. Balrampur-Gonda-Jarwal Road 1A 88 765 RFQ Mandhna-Bhaunti Integrated l960 acre Integrated industrial township in Kanpur on NH 24 Township 6. Aligarh- Road 80 38.96 424.39 RFQ Leather Park , Agra l283 acre located 17 km from Agra 7. Etah-Tundla Road 31 57.16 186.61 RFQ lDedicated STP proposed in the scheme 8. Etah-Sikohabad Road 85 51.42 358.21 RFQ Greater Mathura Knowledge City l453 acre located at Agra-Delhi National Highway near Kosi 9. Varanasi-Bhadohi-Gopiganj Road 87 60.12 362.70 RFQ lEngineering & medical colleges , IT education centre planned 10. Tarighat-Bara Road 99 39.2 188.93 RFQ Plastic City , Dibiyapur(Auraiya) l100 acre at Auraiya district 11. Muzaffarnagar-Saharanpur via Deoband Road 59 52.7 773.8 RFQ lFirst Plastic City project of UP , to be developed in PPP model 12. Bahraich-Gonda- Faizabad Road (may be extended 30 190 2100 Feasibility lMoU signed with GAIL for smooth supply of raw material up to Ambedkarnagar) l200 MW power plant being built adjacent to the site 13. Bareilly-Badaun-Kasganj-Hathras Road (may be extended 33 232 2552 Feasibility Trans Ganga Hi-tech City , Kanpur l1151 acre located on bank of river Ganga on other side of Kanpur city up to Rajasthan Border Via Mathura) lIT, electronics and software industries will be priority sectors 14. Bharwari-Manjhanpur-Chitrakoot Road 94 &MDR-26B 78 858 Feasibility lAutomobile hub planned with modern Auto expo mart 15. Sitapur-Lakhimpur Kheri road (may 21 45 495 Feasibility be extended upto Palia and Dudhwa) 16. Pilibhit-Farukhabad-Bewar Road 29 214 2354 Feasibility 17. Windhamganj-Kon-Kota-Chopan Road ODR 59.3 416 Feasibility Total 1795.01 15,903.64 Uttar Pradesh State Highways Authority (UPSHA) Uttar Pradesh State Industrial Development U.P. State Highways Authority is constituted for the development, maintenance and management of state highways . It also develops models for bringing in private & institutional (including international ) funding to the road sector and to raise Corporation (UPSIDC) institutional resources for undertaking the maintenance & upgradation of these highways. UPSIDC is the premier industrial promotion and infrastructure development undertaking of the state government. It has so far developed over 150 industrial areas . More than 11300 units have been set up with an estimated investment of over INR 20375 crore in UPSIDC estates. Major State Highway upgradation projects in progress by UPSHA Major UPSIDC Industrial Infrastructure Projects S.No. Name of Road SH No. Length Project Cost Concessionaire Expected Date (km) (INR crore) of Completion Project Description 1. Delhi-Saharanpur- 57 206.09 1718.35 M/s SEW-PRASAD 16-09-2014 Moradabad Special Economic Zone l467 acres of land, 160 km from New Delhi Yamunotri Road Consortium, Hyderabad lInfrastructure facilities in accordance with GoI SEZ norms 2. Bareilly- Almora 37 54.00 354.07 M/s PNC Infratech 18-08-2015 Road(up to Limited, Agra Tronica City , Ghaziabad lIndustrial township over 1975 acres, 2.5 km from Delhi border uttarakhand border) lPresently 750 medium size industries are operational in the area 3. Varanasi- Shaktinagar 5A 115 1211.96 M/s Apco-Chetak-Patel 18-09-2015 EPIP at Greater Noida and Agra l200 acres at Gautam Buddh Nagar and 100 acre at Agra Road (up to Hathinala Consortium, Lucknow lDeveloped to promote exports junction) l 4. Meerut-Karnal road 82 87.16 583.23 M/s Abhijeet Roads 01-04-2015 High quality infrastructure facilities like concrete road, earth station etc. Ltd., Nagpur Apparel Parks Tronica and Rooma lLocated at Tronica city and Rooma , Kanpur Total 462.25 3867.61 lTextile training centre set up by ATDC operational at both parks Growth Centres l385 acres at Jhansi , 300 acres at Jainpur and 330 acres at Shahjahnpur lSelf sustainable integrated townships for industrial development Road projects by UPSHA currently in pipeline Leather Technology Park l232 acres of land at Banthar Unnao on NH 25 l S.No. Name of Road SH No. Length Project Cost Stage CETP in operation on PPP (km) (INR crore) lInstitute for Saddlery and Footwear Training operational in the area 1. Shahjahanpur-Hardoi-Lucknow Road 25 162.4 1288.6 RFQ 2. Basti-Mehndawal-Kaptanganj- 64 166.12 328.49 RFQ 3. Akbarpur-Jaunpur-Mirzapur-Dudhi Road 5 207.47 1865 RFQ Upcoming UPSIDC Projects 4. Gorakhpur-Maharajganj road 81 53.16 586.91 RFQ Project Description 5. Balrampur-Gonda-Jarwal Road 1A 88 765 RFQ Mandhna-Bhaunti Integrated l960 acre Integrated industrial township in Kanpur on NH 24 Township 6. Aligarh-Mathura Road 80 38.96 424.39 RFQ Leather Park , Agra l283 acre located 17 km from Agra 7. Etah-Tundla Road 31 57.16 186.61 RFQ lDedicated STP proposed in the scheme 8. Etah-Sikohabad Road 85 51.42 358.21 RFQ Greater Mathura Knowledge City l453 acre located at Agra-Delhi National Highway near Kosi 9. Varanasi-Bhadohi-Gopiganj Road 87 60.12 362.70 RFQ lEngineering & medical colleges , IT education centre planned 10. Tarighat-Bara Road 99 39.2 188.93 RFQ Plastic City , Dibiyapur(Auraiya) l100 acre at Auraiya district 11. Muzaffarnagar-Saharanpur via Deoband Road 59 52.7 773.8 RFQ lFirst Plastic City project of UP , to be developed in PPP model 12. Bahraich-Gonda- Faizabad Road (may be extended 30 190 2100 Feasibility lMoU signed with GAIL for smooth supply of raw material up to Ambedkarnagar) l200 MW power plant being built adjacent to the site 13. Bareilly-Badaun-Kasganj-Hathras Road (may be extended 33 232 2552 Feasibility Trans Ganga Hi-tech City , Kanpur l1151 acre located on bank of river Ganga on other side of Kanpur city up to Rajasthan Border Via Mathura) lIT, electronics and software industries will be priority sectors 14. Bharwari-Manjhanpur-Chitrakoot Road 94 &MDR-26B 78 858 Feasibility lAutomobile hub planned with modern Auto expo mart 15. Sitapur-Lakhimpur Kheri road (may 21 45 495 Feasibility be extended upto Palia and Dudhwa) 16. Pilibhit-Farukhabad-Bewar Road 29 214 2354 Feasibility 17. Windhamganj-Kon-Kota-Chopan Road ODR 59.3 416 Feasibility Total 1795.01 15,903.64 Uttar Pradesh Expressways Industrial Greater Noida Industrial Development Authority (GNIDA) GNIDA is responsible for developing international-standard infrastructure in Greater Noida. Greater Noida is strategically located close Development Authority (UPEIDA) to four important industrial hubs: Noida ,Ghaziabad , (35 kms away) and Meerut (75 kms). This region boasts of the single largest direct investment by transnational companies. UPEIDA has been set up by the state government under UP Industrial Area Development Act 1976.It is engaged in the development of Green Field Expressway Infrastructure Projects on PPP mode. lGreater Noida city is located at the intersection of the Western and Eastern Dedicated Freight Corridors. It is also the gateway to theDelhi-Mumbai Industrial Corridor (DMIC). lImportant expressways originate from this city, namely the Yamuna Expressway from Greater Noida to Agra Agra to Lucknow Access Controlled lAn eight-lane, 25 km-long expressway connects Greater Noida directly to Delhi lGreater Noida is the only city in North India with privatized power distribution, which ensures efficient power supply. Expressway Project lEastern Peripheral Expressway, under development, will take off at Kundli and will join NH2 at Faridabad via Ghaziabad and Greater Noida. The Howrah-Delhi main railway line passes through the area. lUPEIDA has been nominated as the nodal agency for development of this project Industry Hub lThe expressway will start from proposed Agra Ring Road and end at proposed lWith a large number of automobile and automobile component manufacturers located here, Greater Noida is increasingly being Lucknow Ring Road referred to as he Detroit of India lConcept report has been prepared and RFQ/RFP will be floated by middle of 2013 lIndustrial majors such as Asian Paints, Bharat Petroleum, Delphi Automotive Systems, Yamaha Motors, Honda Siel, LG Electronics, New Holland Tractors, Pepsi, Hindustan Times and Moser Baer India have all chosen Greater Noida as their preferred industrial an lIt will reduce the distance between Lucknow and Agra to 270 km from the current operational base. 335 km lThe expressway is proposed to be linked through Link expressways from existing Medical University and potential commercial/agricultural hubs such as Firozabad, Shikohabad, lA Medical University is proposed to be developed with state-of-the-art facilities near Gautam Budh University in a total area of 50 Etawah, Kannauj & Malihabad acres lEstimated cost of construction of this multi-pecialityhospital is INR 939 crore lMedical University is proposed to offer facilities for courses in MBBS, BDS, MD and MDS

Heliport Salient Features lA heliport is proposed to be developed in Greater Noida which will provide a vertical gateway to New Delhi, Agra and Total Length 269.68 Km Night Safari Project Cost INR 13087 Crore lCovering an area of about 222.36 hectare, Greater Noida's proposed Night Safari is the fourth such project of its kind in the world, Design Speed 120 kmph after Thailand, China and Singapore. Width 110 metres Boraki Railway Station Carriageway 6 lane lThe state-of-the-art Boraki railway station is to serve the Noida-Greater Noida-Sikandrabad-Bulandshahar hinterland Growth Centres 4 lIt is projected to cost INR 132.49 crore of which INR 26.12 crore is to be borne by Indian Railways on railway infrastructure, and the balance INR 106.37 crore by the Greater Noida Industrial Development Authority, including land cost of INR 24.60 crore at prevailing rates Uttar Pradesh Expressways Industrial Greater Noida Industrial Development Authority (GNIDA) GNIDA is responsible for developing international-standard infrastructure in Greater Noida. Greater Noida is strategically located close Development Authority (UPEIDA) to four important industrial hubs: Noida ,Ghaziabad , Faridabad (35 kms away) and Meerut (75 kms). This region boasts of the single largest direct investment by transnational companies. UPEIDA has been set up by the state government under UP Industrial Area Development Act 1976.It is engaged in the development of Green Field Expressway Infrastructure Projects on PPP mode. lGreater Noida city is located at the intersection of the Western and Eastern Dedicated Freight Corridors. It is also the gateway to theDelhi-Mumbai Industrial Corridor (DMIC). lImportant expressways originate from this city, namely the Yamuna Expressway from Greater Noida to Agra Agra to Lucknow Access Controlled lAn eight-lane, 25 km-long expressway connects Greater Noida directly to Delhi lGreater Noida is the only city in North India with privatized power distribution, which ensures efficient power supply. Expressway Project lEastern Peripheral Expressway, under development, will take off at Kundli and will join NH2 at Faridabad via Ghaziabad and Greater Noida. The Howrah-Delhi main railway line passes through the area. lUPEIDA has been nominated as the nodal agency for development of this project Industry Hub lThe expressway will start from proposed Agra Ring Road and end at proposed lWith a large number of automobile and automobile component manufacturers located here, Greater Noida is increasingly being Lucknow Ring Road referred to as he Detroit of India lConcept report has been prepared and RFQ/RFP will be floated by middle of 2013 lIndustrial majors such as Asian Paints, Bharat Petroleum, Delphi Automotive Systems, Yamaha Motors, Honda Siel, LG Electronics, New Holland Tractors, Pepsi, Hindustan Times and Moser Baer India have all chosen Greater Noida as their preferred industrial an lIt will reduce the distance between Lucknow and Agra to 270 km from the current operational base. 335 km lThe expressway is proposed to be linked through Link expressways from existing Medical University and potential commercial/agricultural hubs such as Firozabad, Shikohabad, lA Medical University is proposed to be developed with state-of-the-art facilities near Gautam Budh University in a total area of 50 Etawah, Kannauj & Malihabad acres lEstimated cost of construction of this multi-pecialityhospital is INR 939 crore lMedical University is proposed to offer facilities for courses in MBBS, BDS, MD and MDS

Heliport Salient Features lA heliport is proposed to be developed in Greater Noida which will provide a vertical gateway to New Delhi, Agra and Jaipur Total Length 269.68 Km Night Safari Project Cost INR 13087 Crore lCovering an area of about 222.36 hectare, Greater Noida's proposed Night Safari is the fourth such project of its kind in the world, Design Speed 120 kmph after Thailand, China and Singapore. Width 110 metres Boraki Railway Station Carriageway 6 lane lThe state-of-the-art Boraki railway station is to serve the Noida-Greater Noida-Sikandrabad-Bulandshahar hinterland Growth Centres 4 lIt is projected to cost INR 132.49 crore of which INR 26.12 crore is to be borne by Indian Railways on railway infrastructure, and the balance INR 106.37 crore by the Greater Noida Industrial Development Authority, including land cost of INR 24.60 crore at prevailing rates New Okhla Industrial Development Authority (NOIDA) Success Stories Created by the UP Industrial Area Development Act 1976 on 17th April 1976, NOIDA has succeeded in creating a 21st century landmark in urban development . It is a planned, integrated industrial city well connected to Delhi. All this is supported by a reliable power supply , abundant ground water with Gangajal,outstanding residential, educational and medical facilities and presence of highly skilled and semi-skilled manpower.

Industry Hub lIndustrial giants such as BHEL , Panasonic, Samsung, BPL-Sanyo, Eveready, Honda, GAIL, IOC, NTPC, Pawan Hans, FDDI, IBP, KRIBHCO, HUDCO,FCI,ICMR, Mothersons,Minda, Flex and Phoenix have established a major base here

IT/ITeS Destination lTheNasscom region is home to many prestigious companies such as IBM, TCS, Adobe International, HCL,, Birlasoft, Wipro, Polaris, Cadence, Convergys, ST Microelectronics, Moser Baer,Xansa etc. lBesides there are dozens of special economic zones and software technology parks spread over an area of more than 1000 acres lThe annual exports have exceeded INR 20000 crore and growing steadily

Film Production lHost to a large number of studios and news channels including ZEE TV, Aajtak, Times Now, E-24, IBN 7 , CNN IBN, India TV , Eagle Films, Marwah Studios and T-series

Medicine lDistrict hospital being developed and upgraded in Sector 39 About lAn integrated pediatric institute is coming up with 24 departments dedicated to different childhood diseases lMultispeciality hospitals like Fortis, Max, Apollo, Kailash, Metro Heart Institute, Noida Medicare Centre also present Udyog Bandhu Metro Rail 'Udyog Bandhu' is an IS/ISO 9001:2008 certified agency of Government of Uttar Pradesh to facilitate industrial and infrastructure investment in the State. lExcellent connectivity with Delhi lNew metro line from botanical garden will provide excellent connectivity with Indira Gandhi International Airport It works as a bridge between the entrepreneurs and government by providing advisory services to entrepreneurs desirous of investing in Uttar l6 km metro line will connect Greater Noida west with Delhi via Noida Pradesh. 'Udyog Bandhu' is a proactive contributor in policy formulation for creating congenial business environment leading to industrial growth. It helps different industry related departments to simplify and deregulate their processes of clearance. To ensure effective and timely resolution of issues of entrepreneurs, 'Udyog Bandhu' organises Tripartite Meetings involving entrepreneurs and Progress of PPP projects under Housing government departments concerned. It works at three tiers of district, division and State to redress the grievances of industries. State level Udyog Bandhu is headed by Hon'ble Chief Minister and an Empowered Committee has been constituted under the Chairmanship of and Urban Planning Department Chief Secretary to decide on policy matters and coordination of interdepartmental issues for facilitating the investment in the State. 'Udyog Bandhu' has implemented 'Nivesh Mitra' - a web-based seamless interface to facilitate investment in Uttar Pradesh. 'Nivesh Mitra' is an Project Name Description online single window clearance facility available 24x7 to investors willing to apply for setting up industry or enterprise in the State. Development of International lLucknow Development Authority is the nodal agency for implementing this project Application through 'Nivesh Mitra' is mandatory for establishing all kinds of enterprises except for micro enterprises. Facility of online payment Standard Cricket lEstimated project cost is Rs 400 crore of relevant fee is also available through this web portal. 'Nivesh Mitra' is currently providing services of 12 departments concerned with industries, it works as a single point mechanism for timely issuance of approvals and clearances required for setting up enterprise anywhere in l M/s Innovest Advisory services has been selected as the new consultant for remodelling and bid process the State. management lTargeted completion date is June 2015 lStadium cum Sports Complex in Lucknow Development of Northern lGhaziabad Development Authority is the nodal agency to develop this project Peripheral Road in Ghaziabad lFeedback infrastructure and Services Pvt. Ltd. has been selected as consultant for this project lThe expected project cost is INR 450 Crore and approximate length is 20 km lTargeted completion date is June 2015 Development of Inner lAgra Development Authority is the nodal agency for implementation of this project Ring Road in Agra lEstimated project cost is INR 1100 crore and length is approximately 24.5 km . lCasta Engineers has been appointed as the consultant for remodelling developer selection lTargeted completion date is Dec 2015 New Okhla Industrial Development Authority (NOIDA) Success Stories Created by the UP Industrial Area Development Act 1976 on 17th April 1976, NOIDA has succeeded in creating a 21st century landmark in urban development . It is a planned, integrated industrial city well connected to Delhi. All this is supported by a reliable power supply , abundant ground water with Gangajal,outstanding residential, educational and medical facilities and presence of highly skilled and semi-skilled manpower.

Industry Hub lIndustrial giants such as BHEL , Panasonic, Samsung, BPL-Sanyo, Eveready, Honda, GAIL, IOC, NTPC, Pawan Hans, FDDI, IBP, KRIBHCO, HUDCO,FCI,ICMR, Mothersons,Minda, Flex and Phoenix have established a major base here

IT/ITeS Destination lTheNasscom region is home to many prestigious companies such as IBM, TCS, Adobe International, HCL,, Birlasoft, Wipro, Polaris, Cadence, Convergys, ST Microelectronics, Moser Baer,Xansa etc. lBesides there are dozens of special economic zones and software technology parks spread over an area of more than 1000 acres lThe annual exports have exceeded INR 20000 crore and growing steadily

Film Production lHost to a large number of studios and news channels including ZEE TV, Aajtak, Times Now, E-24, IBN 7 , CNN IBN, India TV , Eagle Films, Marwah Studios and T-series

Medicine lDistrict hospital being developed and upgraded in Sector 39 About lAn integrated pediatric institute is coming up with 24 departments dedicated to different childhood diseases lMultispeciality hospitals like Fortis, Max, Apollo, Kailash, Metro Heart Institute, Noida Medicare Centre also present Udyog Bandhu Metro Rail 'Udyog Bandhu' is an IS/ISO 9001:2008 certified agency of Government of Uttar Pradesh to facilitate industrial and infrastructure investment in the State. lExcellent connectivity with Delhi lNew metro line from botanical garden will provide excellent connectivity with Indira Gandhi International Airport It works as a bridge between the entrepreneurs and government by providing advisory services to entrepreneurs desirous of investing in Uttar l6 km metro line will connect Greater Noida west with Delhi via Noida Pradesh. 'Udyog Bandhu' is a proactive contributor in policy formulation for creating congenial business environment leading to industrial growth. It helps different industry related departments to simplify and deregulate their processes of clearance. To ensure effective and timely resolution of issues of entrepreneurs, 'Udyog Bandhu' organises Tripartite Meetings involving entrepreneurs and Progress of PPP projects under Housing government departments concerned. It works at three tiers of district, division and State to redress the grievances of industries. State level Udyog Bandhu is headed by Hon'ble Chief Minister and an Empowered Committee has been constituted under the Chairmanship of and Urban Planning Department Chief Secretary to decide on policy matters and coordination of interdepartmental issues for facilitating the investment in the State. 'Udyog Bandhu' has implemented 'Nivesh Mitra' - a web-based seamless interface to facilitate investment in Uttar Pradesh. 'Nivesh Mitra' is an Project Name Description online single window clearance facility available 24x7 to investors willing to apply for setting up industry or enterprise in the State. Development of International lLucknow Development Authority is the nodal agency for implementing this project Application through 'Nivesh Mitra' is mandatory for establishing all kinds of enterprises except for micro enterprises. Facility of online payment Standard Cricket lEstimated project cost is Rs 400 crore of relevant fee is also available through this web portal. 'Nivesh Mitra' is currently providing services of 12 departments concerned with industries, it works as a single point mechanism for timely issuance of approvals and clearances required for setting up enterprise anywhere in l M/s Innovest Advisory services has been selected as the new consultant for remodelling and bid process the State. management lTargeted completion date is June 2015 lStadium cum Sports Complex in Lucknow Development of Northern lGhaziabad Development Authority is the nodal agency to develop this project Peripheral Road in Ghaziabad lFeedback infrastructure and Services Pvt. Ltd. has been selected as consultant for this project lThe expected project cost is INR 450 Crore and approximate length is 20 km lTargeted completion date is June 2015 Development of Inner lAgra Development Authority is the nodal agency for implementation of this project Ring Road in Agra lEstimated project cost is INR 1100 crore and length is approximately 24.5 km . lCasta Engineers has been appointed as the consultant for remodelling developer selection lTargeted completion date is Dec 2015 Knowledge Partner

Udyog Bandhu

An ISO 9001-2008 Certified Organisation

Contacts Udyog Bandhu Chief Executive Officer Executive Director, Udyog Bandhu, UP State Highway Authority 12 C Mall Avenue, Lucknow-226001 4th Floor, Mandi Bhawan Government of Uttar Pradesh Vibhuti Khand, Gomti Nagar, Lucknow (U.P.) India Phone :91-522-2238283 Fax:91-522-2238255 Tel: 0522-4150377 Email: [email protected] Fax: 0522-4150377 Website: www.udyogbandhu.com E-mail: [email protected]