Arun achal Pradesh Priority List 2011-12

Estimated Sl. Concept Name of the Projects Cost No. note (Rs. in Cr.) A Roads & Bridges 1 Construction of road from Yemsing to Mirem (Phase-I; 33.00 Received 30 KM) 2 Construction of Road from Darak to Boru Raksap 15.67 Received Village 3 Construction of Namsang - Khela Road (45.30 KM) in 19.00 Received including bridge over Bari river

4 Co nstruction of road from Kaima i to Kheia Vill age with 19.00 Received Bridges and Culvets (10 KM) 5 Construction of Road from Kaying - Gaseng Gate road 34.50 Received in West (70 KM) [Phase-I: 15 KM]

6 Construction of Road from Sangram to Parsipario via 36.00 Received Byasi, Rowa, Pating, Hatem and Cheki Dera (40.00 KM), Phase-I (20 KM)

Estimated Sl. Concept Name of the Projects Cost No. note (Rs. in Cr.) 7 Construction of Road from point Tinali to Diban in 16.00 Received 8 Construction of Road from Taramori to Sibi 10.00 Received 9 Co nstruction of Wak-Lino moba road (Phase-II) 32.40 Received

10 Construction of Road from Murge Bridge point to Rho 29.00 Received village 11 Construction of Road from 39.00 KM point Kudung - 29.11 Received NELIYA BRO road to Doble Gompa via Thrillam village 12 Construction of Road from Ngopok to Bizari (17 KM) 17.76 Receive

13 Construction of Motorable Suspension Bridge over 15.00 Received Yargyap Chu at Singbir village of 14 Construction of Road from 42 KM point on Kalaktang- 20.00 Received Shikaridanga road to Rowta via Yolongripam & Demachang village (35 KM), Ph-I (15 KM)

15 Construction of Tamen Tali road from 49 KM to 60 KM 22.02 Received (Phase-II) 16 Construction of Road from Kanubari to Bogapani via 20.00 Received Ranglua & Lawnu Co HQ (41 KM) (Ph-I)

17 Construction of Road from Magopam to Bichom via 26.00 Received Namfri, Ditching, Sacheda, Ramu-Sotu and Lichini, (Ph-II) 18 Co nstruction of Road to Lo ngboo vill age in T irap 11.90 Received District 19 Construction of Road Bana to Richukhrong (30 km) 36.00 Received

20 Construction of Road from Pine grove to Kardo (20 20.00 Received km) 21 Construction of Road from Sumhak to Shelom via 36.28 Received Upper Chinhan in Tirap district 22 Construction of -Hukanjuri Road (30Km) 30.00 Received 23 Co nstruction of Road from Neelam to Pis ta ne (40 km) 39.86 Received

24 Inter-District road connection for Chayangtajo of East 40.00 Received Kameng District to Passang CO Circle of Kurunng Kumey district 25 Construction of Road at Longding township to connect 25.00 Received various new settlement areas (12Km). 26 Construction of Nyodu-Sibe Siru Road (23 KM) in 19.31 Received 27 Strength ening & I mprovement of Chang lang to 10.00 Received Khimyang Road (Phase-II) B Education 1 Development of Rangfrah Govt. Degree College, 13.50 Received Lumbusung,

Estimated Sl. Concept Name of the Projects Cost No. note (Rs. in Cr.) 2 Infrastructure Development of Government Higher 26.00 Received Secondary School, Hawai () 3 Infratructure Development of Teachers' Training 3.42 Received College (B.Ed) at , West Siang District

4 Infrastructure Development of Government Higher 8.50 Received Secondary School, Koloriang 5 Establishment of VKV (Girls Residential School) at 10.00 Received Chayangtajo, East Kameng dist. 6 Infrastructure Development of Govt. Sec. School, 8.00 Not Loiliang Receive 7 C/o Boys & Girls Ho stel for Gan ga Seconda ry Sc ho ol, 8. 00 Received 8 Infrastructure Development of Mayu Secondary 4.94 Not School Receive 9 Infrastructure Development of Govt. Hr. Sec. School, 5.24 Not (RCC Class room, RCC 40 Boarders Boys & Receive Girls Hostel, Security / Compound Wall & Protection Wall and CC Drain for Play ground C He alth 1 Infrastructure Development of CHC Kimin 5.00 Received 2 C/o In-Patient Department for District Hospital at 19.25 Received , 3 C/o a well equiped 50 bedded hospital at 16.51 Not Receive 4 Infrastructure Development of Health Centres under 20.00 Not Chowkhem Constituency Receive D Power 1 Installation of 50,000 nos. of Electronic Domestic 30.00 Received Energy Meters in Seven (7) Districts including State Capital E Water Supp ly 1 Providing Water Supply at Pakke Kessang And. 7.00 Received Centre (for 1 mid) 2 Augmentation of Water Supply for Changiang 27.99 Received Township 3 Augmentation of Water Supply for Aalo Township 35.00 Received

4 Augmentation of Water Supply at , East 25.00 Not Siang District Receive F Urban Development 1 Street lighting for 8 model road at Itanagar 25.00 Received 2 C/o Working/Un-Employed Women Hostel at Itanagar 26.00 Received in Paum pare district 3 C/o Fo ot Ov er Bridg es (FOB) at various locations of 6. 25 Received State Capital at Itanagar &

G Spo rts & Youth Aff ai rs

Estimated Sl. Concept Name of the Projects Cost No. note (Rs. in Cr.) 1 C/o Outdoor and Indoor Stadium at Aalo, West Siang 5.00 Received district H Home 1 Infrastructu re De velopm ent for Armed Polic e Force in 30.44 Received Arunachal Pradesh I Tou rism 1 Golf Tourism at Menchuka, West Siang district 11.51 Received

Total 1040. 36