Project Factsheet – MTR Contract No. 907 – (East): Depot Site Formation and Piling

Project: MTR Contract No. 907 – South Island Line (East): Wong Chuk Hang Depot Site Formation and Piling Original Contract Sum: HK$ 325 million Contract Start Date: May 2011 Contract Completion Date: December 2012 Client: MTRC

Description: i) Site formation for Wong Chuk Hang Depot comprising excavation of soft and hard material, rock blasting, lateral support, earth retaining structures, slope stabilization (temporary and permanent) around the perimeter and slope reinstatement and strengthening works; ii) Piling works, comprising bored piles, demolition of remaining existing building foundations, demolition of abandoned underground services and various buildings acting as slope retaining structures, including removal of asbestos containing materials; iii) Demolition of existing Bus Terminus at Road; iv) Design, construction, operation and subsequent handover to others of barging point (land works) including tipping hall and associated works at Lee Nam Road (conveyor belt system is constructed by others); v) Associated reconstruction, modification and alignment of existing roads including carriageways, footpaths and open spaces;

Page 1 of 2 MTR Contract No. 907 – South Island Line (East): Wong Chuk Hang Depot Site Formation and Piling

Project Factsheet – MTR Contract No. 907 – South Island Line (East): Wong Chuk Hang Depot Site Formation and Piling vi) Reprovisioning and diversion of existing services, utilities and facilities including watermains; vii) Construction of Temporary Bus Terminus at junction of Nam Long Shan Road and Police School Road; viii) Tree felling and related works; ix) Major environmental mitigation measures; and Associated TTMS and ELS works to facilitate the Works.

Page 2 of 2 MTR Contract No. 907 – South Island Line (East): Wong Chuk Hang Depot Site Formation and Piling