Internal Circulation Only

ICT LIBRARY UPDATE

Bi-monthly January-February 2009 Vol. VII; No.1

Contents

- Articles - 1 - 4 (Subject wise alphabetically indexed)

- Addition of Books - 5 -6

- Reports - 7 - 12

Prepared by: Library Staff

Articles

Architect

1 A Symbolic Gateway; Rajiv Gandhi International Airport, Hyderabad (A+D; Vo. XXVI, No. 1, January 2009) 2 A Civic Symbol; Railway Station, Navi (A+D; Vo. XXVI, No. 1, January 2009) 3 Circular Geometry; Tamil Nadu Legislative Assembly Complex, Chennai (A+D; Vo. XXVI, No. 1, January 2009) 4 Choreography of ‘High-Rise Architecture’ Chicago (A+D; Vol. XXVI, No. 2, February 2009) 5 Climate Control Strategies…Lucknow (A+D; Vol. XXVI, No. 2, February 2009) 6 Monolithic Formation-Jaypee Institute of Information Technology, Noida (A+D; Vol. XXVI, No. 2, February 2009)` 7 Public Spaces in Lucknow- the influence of power (A+D; Vol. XXVI, No. 2, February 2009) 8 The Spiral & the Grid (A+D; Vo. XXVI, No. 1, January 2009)

Aviation 1 Aviation in 2008: Sector sees significant developments (Indian Infrastructure; January 2009) 2 Baggage handling system developments at Milan Malpensa: 1998-2008 (International Airport Review; Vol. 13, No. 1, 2009) 3 Elbit Systems reinforces its market leadership (Indian Aviation Civil & Military; Jan-Feb 2009) 4 Even Asia-Pacific now shows declining traffic volume for airfreight & passengers (AW&ST; Vol. 170, No. 7, February 2009) 5 First European mobile satellite service to begin land trials as initial satellite readies for launch (AW&ST; Vol. 170, No. 7, February 2009) 6 Indianpolis: Challenge & opportunity for airport authority (International Airport Review; Vol. 13, No. 1, 2009) 7 Phoenix: Preparing for the future, while exceeding expectations today (International Airport Review; Vol. 13, No. 1, 2009) 8 Recession may mean 2009 is one of the worst years for the aerospace industry & airlines (AWST; Vol. 170, No. 1, January 2009) 9 Runway friction measurement status (International Airport Review; Vol. 13, No. 1, 2009) 10 South Korea laying groundwork for a more independent combat aircraft capability (AW&ST; Vol. 170, No. 7, February 2009) 11 Snecma Services’ commitment to the Indian aviation industry 1 (Indian Aviation Civil & Military; Jan-Feb 2009)

Bridge

1 Analysis of the structural performance of network arch bridges (ICJ; Vol. 83, No.1, January 2009) 2 Design & Experimental Investigation of the Joints of Inclined Struts for the Widening of Bridge Deck Slabs (Structural Eng. International; No 4, 2008 3 Re-establishing the Functionality of Older Bridges: Two case studies, Italy (Structural Eng. International; No 4, 2008 4 Response of existing prestressed concrete bridge under Uttarakashi earthquake (JL. Of Structural Engineering; Vol. 35, No. 5, Dec 2008-Jan 2009) 5 Sustainability Leads to Durability in the New I-35w Bridge (Concrete International; Vol. 31, No. 2, February 2009) 6 Widening of Bridges Introduction (Structural Eng. International; No 4, 2008) 7 Widening of the Cable-Stayed Bridge over the Rande Strait, Spain (Structural Eng. International; No 4, 2008)

Building

1 Construction Materials For Green Buildings (CE&CR; Vol. 22, No. 1, January 2009) 2 Iconic Buildings (CJI; Vol.12, No. 1, January 2009) Seismic analysis of irregular buildings: ‘’ missing mass’’ effect 3 (JL. Of Structural Engineering; Vol. 35, No. 5, Dec 2008-Jan 2009) 4 Top 10 green buildings of the world (Terragreen; Vol. 1, No. 11, February 2009)

Business Development

1 Business Process Outsourcing in the New Economy: A Paradigm Shift (Productivity News; Vol. 47, No. 1, Jan-Feb 2009) 2 Improving Profitability Through People & Organisational Excellence (Productivity News; Vol. 47, No. 1, Jan-Feb 2009) 3 Seize Advantage in a Downturn (HBR; February 2009) 4 The Quick Wins Paradox (HBR; January 2009)

Civil Engineering

1 CO2 Curing of Concrete Blocks; Research toward greener production (Concrete International; Vol. 31, No. 2, February 2009) 2 CRSI Detailing Corner; Reinforcing bars exceeding stock lengths (CI; Vol. 31, No. 1, January 2009) 3 Experimental investigation of single story non-integral infilled frames in hollow steel frame section 2 (JL. Of Structural Engineering; Vol. 35, No. 5, Dec 2008-Jan 2009) 4 Global Concrete Industry Sustainability; Tools for moving forward to cut carbon emissions (Concrete International; Vol. 31, No. 2, February 2009) 5 Mechanics of distributed fibre optic sensors for strain measurements on rods (JL. Of Structural Engineering; Vol. 35, No. 5, Dec 2008-Jan 2009) 6 Performance evaluation of prestressed concrete beams rehabilitated using GFRP bonding (JL. Of Structural Engineering; Vol. 35, No. 5, Dec 2008-Jan 2009) 7 Quantification of poisson’s effect in reinforced concrete panels under in-plane biaxial tension-compression (ICJ; Vol. 83, No.1, January 2009) 8 Use of Pond Ash As Fine Aggregate – Experimental Study (CE&CR; Vol. 22, No. 1, January 2009)

Environment 1 An approach to prepardness for Climate Chang Hazards (Consulting Ahead; January 2009) 2 Environmental Protection Through Flyash Utilization in Construction Industry (CE&CR; Vol. 22, No. 02, February 2009) 3 Hazardous Characteristics of Municipal Solid Waste: (EPCJ; Vol. 12, No. 2, January 2009) 4 Need for Environment Impact Assessment of Mining in Rajasthan: A Case Study (EPCJ; Vol. 12, No. 2, January 2009) 5 Reusing refuse: Benefiting from solid waste management (Indian Infrastructure; January 2009) 6 Vehicular Air Pollution with regards to Carbon Monoxide emission- A case study (EPCJ; Vol. 12, No. 2, January 2009)

Management

1 Dynamic Performance Management as part of Daily Execution (Productivity News; Vol. 47, No. 1, Jan-Feb 2009) 2 How to Thrive in Turbulent Markets (HBR; February 2009) 3 How GE Teachers Teams to Lead Change (HBR; January 2009) 4 How Not to Lose the Top Job (HBR; January 2009) 5 Journey from Strategic HR to Talent Management (Consulting Ahead; January 2009) 6 Moon Shots for Management (HBR; February 2009) 7 Three Keys to Team Building for Corporate Learning & Knowledge Investment (IJT&D; No. 4, Oct-Dec 2008) 8 Why Good Leaders Make Bad Decisions (HBR; February 2009)

3 Power 1 Infocus: Hydro Power (Power Line; January 2009) 2 Jindal Power: Integrated Business Model (Indian Infrastructure; February 2009) 3 Positive sign: BGR Energy & NTPC raise funds despite economic slowdown (Indian Infrastructure; January 2009)

Roads & Highways 1 Drainage Problems in Hill Roads & Their Remedial Measures – A case study (Indian Highways; Vol. 37, No. 2, February 2009) 2 Influence of Imperial Smelting Furnace Slag Aggregate on Properties of Bituminous Mixes (Indian Highways; Vol. 37, No. 2, February 2009) 3 IT Corridor: First phase operationalised after several delays approved outlay for roads; By state (Indian Infrastructure; January 2009) 4 Slow progress: Chattisgarh road network development (Indian Infrastructure; February 2009)

Traffic & Transportation

1 Enabling transport systems: Unified Metropolitan Transport Authority (Indian Infrastructure; January 2009) 2 Road Traffic Accident Recording & Analysis Procedures in India (Indian Highways; Vol. 37, No. 2, February 2009)

Water

1 Expert views; PSP in urban water supply & waste management sector (Indian Infrastructure; February 2009) 2 JNNURM progress report; More action on projects, less on reforms (Indian Infrastructure; February 2009) 3 Overview; Quality needs to be higher priority (Indian Infrastructure; February 2009) 4 Water Treatment in Low Pressure Boilers (EPCJ; Vol. 12, No. 2, January 2009)

4

ADDITION OF BOOKS

1 Mega Projects in Concrete by B. Sivarama & S. Manohar

2 CBIP; Hydraulic Gates & Hoists in Water Resources Project, Workshop 6-8 June, 1995 Bangalore.

3 Concrete Dams: Publication No. 266 by Dr. H.D. Sharma

4 Earthen Dams: 18-20 December 1996 – Symposium Talwara Township (Punjab)

5 Railways Years Book – 2008 by Sumann Chopra

6 University Physics: Mechanics, Heat & Sound by Francis Weston Sears

7 World Bank: Final Emergency Work Report – Liberia Infrastructure Rehabilitation project

8 IRF: International Seminar on Highway Rehabilitation & Maintenance, New Delhi 12- 13, November 1999.

9 IRC: 69th Annual Session, 13-16th Dec. 2008 Kolkotta, West Bengal

10 IRC: SP: 77-2008; Manual for Design, Construction & Maintenance of gravel Roads

11 IS: 12094-2000: Planning & Design of River Embankments…..

12 IS: 8408 – 1994: Planning & Design of Groynesim Alluvial River…

13 IS: 12926: Construction & Maintenance of Guide Bouls in Alluvial River…

14 IS: 14262: 1995 – Planning & Design of Revetment Guidelines…

15 IS: 10751: 1994 – Planning Ganddest Gnot…

16 IS: 11532: 1995 – Construction & Maintenance of River Embankments….

17 IS: 8835 – 1978: Guidelines for Planning & Design of Surface Drains

18 IS: 4839 (Part 1,2,3): 1992 – Maintenance of Canals – Code of Practice

19 IS:15658: 2006 – Pre-cast Concrete Blocks for Paving - Specifications

20 IS: 7381: 1986 – Specification for Hand Operated Square Drive Socket…

21 BDP; ITC-HS Classifications on Import Item with Indian Import Tariff, 2008-09

22 IS/ISO 14001: 2004 – Environmental Management Systems …..

23 IS: 10987:1992 (Reaffirmed 2003) – Code of Practice for Design, Fabrication, Testing…

24 CBIP; River Behaviour Management & Training, 1989

25 Earth-Rock Dams, Engineering Problems of Design & Construction by James L. Sheard 5 26 Principles of Pavement Engineering by Nick Thom, 2008

27 CPWD Works Manual; Vol. II, 2007

6

REPORTS

Abu Dhabi Fund for Development; Improvement & Construction of Darul Aman Road in Kabul City, Afganisthan, Contract No. ADFD/IRA/KCR/I

1 FDPR; Geo-Technical Investigation Report, December 2007

2 FDPR; Vol.I, Main Report, December

3 FDPR; Vol.III: Cost Estimate (Governor's office to Jove Sheer Road) , December FDPR; Vol.III: Cost Estimate (Kote-Sanghi to Company Road) , April 4

FDPR; Vol.III: Cost Estimate (Karte-Mmureen (Charahi Polytechnique to Qargha Road) 5 December

FDPR; Vol.III: Cost Estimate (Karte-Mmureen (Charahi Polytechnique to Qargha Road) 6 December

7 FDPR; Vol.III: Cost Estimate (Deh Afghanan to Baraki & Nadira High School) December

8 FDPR; Vol.III: Cost Estimate (North-South Sides of Kabul River Road) , December

9 FDPR; Vol.III: Cost Estimate (Darul Aman road); April

10 FDPR; Vol.III: Cost Estimate (Ahmad Shah Mina Bagrami Road & Bridges); April

11 FDPR; Vol.III: Cost Estimate (Ahmad Shah Mina Bagrami Road & Bridges); April

12 FDPR; Vol. IV: Bridge Design Calculations (Part-2/2), December

ETHIOPIA (JT); Consultancy Services for Detailed Engineering Design and Construction Supervision of Jijiga-Togochale Road Upgrading Project

1 Monthly Progress Report; October 2008

2 Quarterly Progress report; October – December 2008

ETHIOPIA (JM); Consultancy Services for the Construction Supervision of Jimma- Mizan Road Upgradating Project Contract2: Bonga-Mizan Junction

1 Socio-Environmental Management & Monitoring report (Draft); No. 1, December 2008

2 Quarterly Progress report; No.2, October-December 2008

3 Monthly Progress Report; No. 5, November 2008

4 Interim Payment Certificate; No. 2, January 2009

ETHIOPIA (GW); Consultancy Services for the Construction Supervision of Woreta – Woldiya Road Upgradation Project Contract – 3, Gashena – Woldiya Road, Credit No. 39890 – ET.

1 Quarterly Progress Report; No. 8, July-September 2008 7 2 Monthly Progress Report; No. 28, December 2008

GT; Grand Trunk Road Improvement Project Consultancy Services for Road Safety (Public Education)

1 Final Evaluation report; December 2008 (Mumbai-Chennai)

Manesar; Construction of IT Park at CP-02, Sector-8, IMT Manesar, Gurgaon, Haryana.

1 Monthly Progress Report; November 2008

2 Monthly Progress Report; December 2008

3 Quarterly Progress report; October-December 2008

4 Monthly Progress Report; January 2009

Mongolia; Consulting Services for Regional Transport Infrastructure Development to improve Food Supply of Ulaanbaatar

1 Inception Report (Feasibility Report) December 2008

Madhya Pradesh Urban Services for the Poor Programme

1 Inception Report; January 2009

MP; 2154; Consulting Services for Construction Supervision of Package No. 2 (Civil Work Contract Package ADB –II / C-7, ADB-II/C-8 & ADB-II/C-9) of NH Sector-II Project on North-South Corridor in the State of MP under ADB Loan Assistance (Loan No. 2154-IND)

1 Monthly Progress Report; No. 23, September 2008

MP-2330; Bhopal Construction of ADB Assisted Thirteen Highway Corridors under Madhya Pradesh State Road Sector Project – II (Package 1 – Bhopal) under ADB Loan No. 2330 – IND.

1 Quarterly Progress Report; No. 5, October-December 2008

LRGP; Evaluation Study for the Scheme of Assistance for Large Revenue Generating Projects

1 Second Revised Report; January 2009

Tanroads (Tanzania); Consultancy Services for ENV & SIA, Detailed Engineering Design & Preparation of Tender Documents for Upgrading of Kaliua-Malagarasi River- Ilunde Road (156km) to Bitumen Standard

1 Draft Final Report (Revised); January 2009

Tata Steel; Road Infrastructure Improvement Plan for Kalinganagar

1 Final Report; December 2008

8

UPSRP; Advisory Consultancy Services for Quality & Quantity Assurance, Contract Management, Independent Checking & Technical audit of Major Maintenance Road Works (Consultancy Contract No.: UPSRP/ACS/08

1 Monthly Progress Report; August 2008

2 Monthly Progress Report; September 2008

3 Monthly Progress Report; November 2008

Uganda; (Busega-Mityana); Ministry of Works, Housing & Communications (MOWHC) Road Sector Institutional Support Technical Assistance Project (RSISTAP) IDA CREDIT No. 2987 - UG

1 Design Report; Vol. 1, Main Report, September 2005

Nepal (H339); Consulting Services for Regional Transport Infrastructure Development to improve Food Supply of Ulaanbaatar

1 Monthly Progress Report; No. 7, December 2008

2 Trimester Project Management Report; September-December 2008

NH – 02 (U.P) (GTRIP); 4 LANING AND STRENGTHENING OF EXISTING 2 LANE FROM KM.199.66 – 400 SECTION OF NH – 2, AGRA-BHOGNIPUR, World Bank: Loan No. 4522 – OIN, (GTRIP/SC/1)

1 Engineering Report; No. 77, December 2008 2 Quarterly progress Report; October-December 2008

NH-4(SK); Independent Engineer for Four –Laning of Satara – Kolhapur to State Border Section of NH-4 (Km592/240 to Km 725/000) on BOT Basis.

1 Monthly Progress Report; November 2008 2 Quarterly Progress Report; December 2008 NH – 6(WB); CONSULTANCY SUPERVISION for DANKUNI TO KHARAGPUR IN THE STATE OF WEST BENGAL (GOLDEN QUADRILATERAL)

1 Monthly Progress Report; December 2008 2 Monthly Progress Report; January 2009

NH-7(AP-7); Independent Consultant Services for 4 laning of Islam Nagar-Kadtal from Km. 230 to 278 of Nagpur-Hyderabad Section on NH-7, in the State of Andhra Pradesh, on North-South Corridor (Project No. NS2/1C/AP-7)

1 Monthly Progress Report; No. 10, November 2008 2 Quarterly Progress Report; October-December 2008

NH – 7(T.N.); Independent Consultancy Services for 4/6 laning of NH-7 from Start of Proposed Flyover at Namakkal (Km 248.625) to start of Karur Bypass (Km 292.600) in the state of Tamil Nadu on North-South corridor under Phase – II Programme of NHDP – Package No. NS-2/BOT/TN-3

9 1 Monthly Progress Report; No. 32, December 2008 2 Quarterly Progress Report; No.9, December2008

NH – 7; (A.P.) Independent Consultant for Four Laning of Jadcherla-Kotakatta Section of NH-7, Andhra Pradesh, on North-south Corridor (Project No. NS2/IC/AP-4)

1 Monthly Progress Report; No. 10, December 2008 2 Monthly Progress Report; No. 10, January 2009

NH-10; Independent Engineering Services for 4/6 Laning of Delhi/Haryana Border to Rohatak Section on NH-10, in the State of Haryana, on BOT basis under NHDP Phase- III (A) 1 Quarterly Progress Report; December 2008 2 Monthly Progress Report; December 2008

NH- 11; Independent Consultant for 4 Lane of Jaipur-Mahua BOT Project of NH-11 in the state of Rajasthan Package No. IC/PHIIIA/NH11/RJ/002

1 O&M Report; No. 9, December 2008 2 Quarterly Progress Report; No. 11, December 2008 3 O&M Report; No. 10, January 2009

NH- 17; Consultancy Services for Feasibility Study and DPR for 4/6 lane Divided Carriageway of NH-17 Kannur to Kuttipuram (Kerala) Pack. No. NHDP-III/D15/13

1 Monthly Progress Report; December 2008 2 Monthly Progress Report; January 2009

NH-21; Independent Consultancy Services for 4- Laning of Kurali – Kiratpur Section of NH-21 on BOT basis under NHDP III A in the State of Punjab (Pack. No. IC/BOT-II/NH- 21/PB/001)

1 Safety Audit of Construction Zone (Report); February 2009

NH-22; Independent Consultancy Services for 4/6 Laning of Zirakpur-Parwanoo Section of NH-22 including Pinjore-Kalka-Bypass on BOT basi under under NHDP III A in the State of Punjab

1 Safety Audit of Construction Zone (Report); January 2009

NH-25/26; Jhansi – Lalitpur in the State of Uttar Pradesh NS1/IC/UP-2

1 Monthly Progress Report; November 2008

NH-31C; Feasibility Study & DPR for EW Corridor (Phase III), Assam – West Bengal Border to Gairkatta, Section (Km 741.00) on NH-31 to Salsalabari on NH-31C (KM 228.00) (Contract Package No. C-III/9)

1 Final Feasibility Report (Revised); Vol. I, Main Report, October 2007

10 2 Vol. III; Cost Estimate; October 2007

3 Vol. IV; Environment Screening Report, October 2007

4 Vol.V; Social Screening & Preliminary Social Assessment, October 2007

5 Vol. VII, Plan for Relocation of Utilities (Electrical Poles & Transformers) October 2007

6 Vol. VII, Plan for Relocation of Utilities (Telephone Poles & Lines) October 2007

7 Vol. VII, Plan for Relocation of Utilities (Optical Fibre Cable) October 2007

NH – 45(T.N.); 4 Laning of the Existing 2 Lane Section from km. 121 (near Tindivanam) to km. 192. 25 (near Ulundurpet) on NH – 45 in the State of Tamilnadu on Build, Operate, Transfer (BOT) Basis

1 Quarterly Progress Report; December 2008

2 Monthly Progress Report; December 2008

3 Monthly Progress Report; January 2009

NH – 47; CONSULTANCY SERVICES FOR FEASIBILITY STUDY and D.P.R. FOR 4/6 LANE DIVIDED CARRIAGEWAY OF NH-47, CHERTHALAL TO THIRUVANANTHAPURAM IN THE STATE OF KERALA, PACKAGE NO. NHPD-III/DL4/22

1 Monthly Progress Report; December 2008 2 Monthly Progress Report; November 2008

3 Monthly Progress Report; January 2009

NH-47(KL); 4/6 Laning of National Highway from Thrissur to Edapally Section of NH- 47, Kerala,on North-South Corridor (Project No. NS2/BOT/KL-1) on BOT Basis

1 Monthly Progress Report; November 2008 2 Monthly Progress Report; January 2009

NH-54; SILCHAR TO UDARBAND TO HARANGAJO of NH – 54 {Pack. – EW – II (AS- 1)}.NH – 54 C. PACK. No. EW – II (AS – 1 & AS – 14) (SUPERVISION CONSULTATION PACK. No. CS – II / A – 1)

1 Monthly Progress Report; December 2008 2 Quarterly Progress Report; December 2008 3 Monthly Progress Report; January 2009

NH – 54(E), Phase II, Km. 126 + 450 to 190 – 587, Contract No. EW – IIB (SC – I)

1 Quarterly Progress Report; December 2008 2 Monthly Progress Report; No. 28, January 2009

11 NH – 76 (Raj); (RJ – 1) & (RJ –8): Rehabilitation & Upgrading of Swaroopganj – Pindwara Sect. (Km. 264.000 to Km. 249.700) of NH –14 & Pindwara-Bekaria…

1 Monthly Progress Report; No. 37, December 2008 2 Quarterly Progress Report; No. 12, December 2008 3 Monthly Progress Report; No. 38, January 2009

NH-83; (Bihar) Consultancy Services for Feasibility cum Preliminary Design for 4/6 Laning of Patna- Gaya Dobhi Section of NH-83 (Pack. NHAI/DBFO II/DPR/03)

1 Monthly Progress Report; December 2008 2 Monthly Progress Report; January 2009

NH-200 & 203 Orissa; Group ‘C’ Chandikhol- Dubri, Dubri-Talcher (NH-200) Bhubaneswar- Puri NH-203, Consultancy Services for feasibility Study and Detailed Project Report for 4/6- laning of selected stretches/ Corridors of National Highways Under NHDP Phase-III Programme on BOT Basis-Lot V.

1 Monthly Progress Report; December 2008 2 Monthly Progress Report; January 2009