<<

NORTH CENTRAL RAILWAY

BAREILLY PARLIAMENTARY CONSTITUENCY , the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. (IR) plays a very General Manager North Central Railway important role in development of the state and provides connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between and . It has now been extended upto with effect from 01.04.2018 - a move that will boost tourism in region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to .

In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency.

It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN BAREILLY PARLIAMENTARY CONSTITUENCY

BAREILLY PARLIAMENTARY CONSTITUENCY

A. ASSEMBLY SEGMENTS Bhojipura, Bareilly Cantoment, Bareilly, Meerganj, Nawabganj.

B. WORKS COMPLETED IN LAST FOUR YEARS: 1. INFRASTRUCTURAL DEVELOPMENT: GBhojipura-- (66 km) Gauge Conversion at a cost of Rs.30,993 Lakh. GGauge Conversion of Bareilly- (107km) at a cost of Rs. 32,994 Lakh. GExtension of loop line at Rasuiya. GNI work of Rasuiya completed & commissioned. GReplacement of washable apron of Platform No. 3 at Bareilly.

2. IMPROVEMENTS IN PASSENGERS AMENITIES: G2nd Class waiting hall completed. GPlatform shelter at Pitamberpur, . GLED lights at Bhojipura, Sethal, , Bareilly, Bareilly city, & Dibnapur at a cost of Rs.50 Lakh. GTrain display boards at , Bhojipura, Izzatnagar, Bareilly City & Bareilly Jn. at a cost of Rs. 57.16 Lakh. GPassenger operated enquiry terminals (POET) provided at Izzatnagar & Bareilly City at a cost of Rs. 0.46 Lakh. GCCTV at Bareilly City at a cost of Rs. 50 Lakh. GReplacement of LED lights of non-AC coaches. GEnergy efficient LED lights. INPUTS BY RAILWAY IN BAREILLY PARLIAMENTARY CONSTITUENCY

BAREILLY PARLIAMENTARY CONSTITUENCY

Foot over bridge constructed at: GBareilly Jn.at a cost of Rs.158 Lakh. GSethal at a cost of Rs.128 Lakh. G Bijauria at a cost of Rs.122 Lakh.

Toilets constructed at: GBareilly City station at a cost of Rs. 10 Lakh. GBamiana station at a cost of Rs. 8.3 Lakh.

Platforms constructed at: GBhojipura station at a cost of Rs.72.8 Lakh. G Atamanda station at a cost of Rs. 58.8 Lakh. GDeorania station at a cost of Rs. 51.8 Lakh. G Road station at a cost of Rs.48.8 Lakh. G Baheri station at a cost of Rs. 59.8 Lakh. G Bareilly City station at a cost of Rs.78.8 Lakh. G Bareilly Jn. station at a cost of Rs.82.8 Lakh. G Bamiana station at a cost of Rs.48.8 Lakh. G Sethal station at a cost of Rs.52.8 Lakh. G Bijauria station at a cost of Rs.53.8 Lakh.

Waiting rooms provided at: GBareilly City station at a cost of Rs.35 Lakh. GBareilly Jn. at a cost of Rs. 33.5 Lakh. GBamiana at a cost of Rs. 10.5 Lakh. GSethal at a cost of Rs. 12.5 Lakh. GBijauria at a cost of Rs. 18.5 Lakh. INPUTS BY RAILWAY IN BAREILLY PARLIAMENTARY CONSTITUENCY

BAREILLY PARLIAMENTARY CONSTITUENCY

Ticket window provided at: GBareilly City at a cost of Rs. 8.5 Lakh. GBamiana at a cost of Rs. 6.5 Lakh. Circulating Area developed at: GDeoraina at a cost of Rs. 10 Lakh. GBaheri at a cost of Rs. 5.5 Lakh. GBareilly City at a cost of Rs. 10 Lakh.

C. OTHER DEVELOPMENTS: New Trains introduced with stoppage over Bareilly Constituency: GTrain No.12583/12584 Jn. Anandvihar Term. Bi-weekly. GTrain No.15055/15056 Ramnagar - Agra Cantt. Weekly Express. GTrain No.15655/15656 Kamakhaya - Katra Weekly Express. GTrain No.55343/55344 Bareilly City - Kasganj Passenger. GTrain No.55345/55346 Bareilly City - Kasganj Passenger. GTrain No.22419/22420 Ghazipur City-Anandvihar (T) Tri-weekly Express. GTrain No.22551/22552 Darbhanga-Jalandhar City Weekly Express. GTrain No.22423/22424 Amiritsar- Express. GTrain No.11111/11112 -Gonda Weekly Express. GTrain No.15531/15532 Saharsa- Weekly Jansadharan Express. GTrain No.15043/15044 Lucknow jn.-Kathgodam Tri-Weekly Express. GTrain No.55369/55370 Bareilly-Pilibhit Passenger. GTrain No.55367/55368 Bareilly-Pilibhit Passenger. GTrain No.55365/55366 Bareilly-Pilibhit Passenger. GTrain No.55363/55364 Bareilly-Pilibhit Passenger. GTrain No.55361/55362 Bareilly-Pilibhit Passenger. INPUTS BY RAILWAY IN BAREILLY PARLIAMENTARY CONSTITUENCY

BAREILLY PARLIAMENTARY CONSTITUENCY Green Initiative: G265 Solar based LED street light installed at New Model Railway Colony at Izzatnagar at a cost of Rs. 82 Lakh. G10 KWp solar panel installed at DRM Office Izzatnagar & 4000 LPD solar water heater installed at a cost of Rs.59 Lakh.

D. ONGOING WORKS: Gauge Conversion work: GBhojipura- via Pilibhit (101.79 km) at cost of Rs. 45,754.07 Lakh. GKanpur-Kasganj- & Kasganj-Bareilly- including material modification for extension from Bareilly to Lalkuan and Mandhana to Brahmavart (552.9 km) at cost of Rs. 1,77,333.11 Lakh.

Construction of Road Over Bridge/Road under Bridge/Limited Height Subway in lieu of: GConstruction of Road Over Bridge at 3 level crossings. GLevel Crossing no 242-Special on Izzatnagar- Dohna section at cost of Rs. 2747.62 Lakh. GLevel Crossing No. 296 (M) in Bareilly-Kasganj section at cost of Rs. 229.65 Lakh. GUnmanned Level Crossing No.- 20/C at Km 22/8-9 between - Baheri station in Bareilly-Lucknow Section at cost of Rs. 248.40 Lakh. GUnmanned Level Crossing No. - 19/C at Km 20/8-9 between Deoranian- Baheri station in Bareilly-Lucknow Section at cost of Rs. 248.40 Lakh GUnmanned Level Crossing No. - 24/C at Km 28/7-8 between Deoranian- Baheri station in Bareilly-Lucknow Section at cost of Rs. 248.40 Lakh. INPUTS BY RAILWAY IN BAREILLY PARLIAMENTARY CONSTITUENCY

BAREILLY PARLIAMENTARY CONSTITUENCY

GManned Level Crossing No. -209, on Pilibhit Jn.-Bhojipura Jn. section at cost of Rs.249.83 Lakh. GManned Level Crossing No.-210, on Pilibhit Jn.-Bhojipura Jn. section at cost of Rs. 249.83 Lakh. GUnmanned Level Crossing No.-257/B Km- 333/5 - 6 between Bamiana - Makrandpur stations at cost of Rs. 249.18 Lakh.

Other works: GAugmentation & Improvement of Passenger amenities work at cost of Rs. 177.40 Lakh. GPrposed extension of existing Foot Over Bridge at Colony side,4 bay PP shelters alongwith electric & S&T work at cost of Rs. 172.38 Lakh. GFacade improvement of balance service building at Izzatnagar at cost of Rs. 19.75 Lakh. GIzzatnagar Division - 1-bay passenger platform shelter on various stations at cost of Rs. 492.86 Lakh. GD. clock, LED Display Board & Speakers in Waiting Room of 8 station & Auto announcement, Counter Comm. & POET at all D cate. station of Izzatnagar Division at cost of Rs. 87.88 Lakh. GLift and Escalators at Bareilly Station. GImprovement & extension of car parking, auto parking & improvement of approach road including proper entry & exit gate at cost of Rs. 223.55 Lakh. GTwo escalators at cost of Rs. 199.85 Lakh. GFacilities for differently abled persons on A-1, A, B, & D class stations at cost of Rs. 115.21 Lakh. Kachhala Rail bridge -Bareilly

ATVM at Izzatnagar station Second Entry at Bareilly City

New Station Building at Izzatnagar