MINUTES

Meeting: AREA BOARD Place: Malmesbury School Date: 15 September 2010 Start Time: 7.00 pm Finish Time: 9.00 pm

Please direct any enquiries on these minutes to:

Alexa Smith (Democratic Services Officer) Tel: 01249 706612/Email: alexa.smith@.gov.uk,Tel: 01249 706612 or (e-mail) [email protected]

Papers available on the Council’s website at www.wiltshire.gov.uk

In Attendance:

Wiltshire Councillors Cllr Simon Killane (Vice Chairman), Cllr Carole Soden, Cllr Toby Sturgis and Cllr John Thomson (Chairman)

Cllr Keith Humphries (Cabinet Representative – Health and Wellbeing)

Wiltshire Council Officers Miranda Gilmour (Community Area Manager), Adrian Hampton (Head of Local Highways and Streetscene), Nigel Hunt (Head of School Buildings and Places), Alexa Smith (Democratic Services Officer) and Jacqui White (Service Director, Shared Services and Customer Care)

Town and Parish Councillors Ashton Keynes Parish Council – Ian Woods Brinkworth – Rob Bailey Charlton – S Burne Crudwell - Terry Fraser* Hankerton – Terry Mockler* Lea and Cleverton - John Parmiter Luckinton and Alderton – George Lyneham* Malmesbury – Steve Cox and Ray Sanderson Minety – Graham Thorne* Norton and Foxley – Peter Campaigne* Sherston – Martin Rea* Page 1 of 14

St Paul Malmesbury Without – Roger Lee* * = Denotes nominated representative

Partners Wiltshire Fire & Rescue Service – Michael Franklin - Sergeant Martin Alvis and Inspector Steve Cox Malmesbury and the Villages Community Area Partnership – Alice Cross-Jones and Sid Jevons* and Sue Webb

Gazette and Herald - Joe Ware Malmesbury ABC – Sam Winstone Malmesbury and St Paul Without Residents Association – Roger Budgen Malmesbury School – C Morris Malmesbury River Valleys Trust – Frances Goldstone Wiltshire and Gloucestershire Standard - Tina Robins

Members of Public in Attendance: 36 Total in Attendance: 71

Page 2 of 14

Agenda Summary of Issues Discussed and Decision Action By Item No.

1. Chairman's Welcome and Introductions

The Chairman welcomed those present to the meeting, including a delegation of visitors from Cambridge who were interested in the work of the Area Board.

2. Apologies for Absence

Apologies of absence were received from John Cull (Lea and Cleverton Parish Council), Warren Hateley (Malmesbury Chamber of Commerce), Ted Palmer (Malmesbury Residents Association), Tony Pooley (Little Somerford Parish Council), and John Tremayne (Easton Grey Parish Council).

3. Minutes

The minutes of the meeting held on 7 July 2010 were approved and signed as a correct record.

4. Declarations of Interest

Councillor Killane declared a prejudicial interest in agenda item number fourteen, in the application from Malmesbury Town Council seeking funding from the Performance Reward Grant Scheme towards a multi-use games area at St Aldhelms Mead, as a Malmesbury Town Councillor. Councillor Killane did not speak or vote and left the meeting for this item of business.

5. Chairman's Announcements

The Chairman drew attention to the written announcements included in the agenda pack. Councillor Jane Scott, Leader of , would be attending the next Malmesbury Area Board meeting on Wednesday 10 November 2010. Please submit any questions to Councillor Scott in advance to Alexa Smith, Democratic Services Officer, on 01249 706612 or [email protected] by Wednesday 27 October.

6. Partner Updates

The Chairman noted the written updates from partners included with the agenda pack and invited partners to add any further information if appropriate.

a) The written update from Wiltshire Police was noted. It was underlined that the closure of the Wiltshire Camera Road

Page 3 of 14

Safety Unit would not change any of the processes around Community Speed Watch and the Community Area would still have the enforcement options of the Wiltshire Roads Policing Unit and Wiltshire Police Area Officers. There had been an outstanding Community Speed Watch scheme in Dauntsey. Over recent weeks five drivers were monitored on three separate occasions exceeding the speed limit. The vehicle details were passed to the Wiltshire Police Roads Policing Unit who targeted these drivers. This resulted in three individuals being caught speeding and issued with fines and penalty points on their driving licenses. . b) The written update from Wiltshire Fire and Rescue Service was noted. c) The written update from NHS Wiltshire was noted. d) Sid Jevons went through the written update from Malmesbury and the Villages Community Area Partnership. The Partnership had formed a team to lead a consultation on reduced street lighting. The first phase of consultation, identifying the parishes that would like to be involved, was nearly complete and the next phase would be to look into which street lights to affect. A speed bump survey for Malmesbury was being undertaken jointly by Malmesbury Town Council and the Partnership. Questionnaires were being distributed within the local area to be returned by 1 October. The Chairman expressed concern that the survey had not been received by a proportion of the meeting. Ray Sanderson commented that only those living in Malmesbury town had been targeted by the survey, however there were locations where people were able to collect a survey, including the health centre and the BP garage. In an amendment to the agenda papers, the next Community Safety Forum meeting would be held on 30 September at Sherston Village Hall at 7.00 pm for a 7.30 pm start.

Chairman’s Statement The partner updates at the meeting were followed by a Chairman’s statement regarding proposed development in Malmesbury. There had been a Malmesbury Town Council public meeting on 14 September. The Wiltshire 2026 consultation at the end of last year had identified a preferred housing option for Malmesbury of 200 dwellings located to the north of Malmesbury. Gleeson Strategic Land were promoting this site and intending to hold a public exhibition at the Town Hall in November. The public response from the Malmesbury Community Area to the Wiltshire 2026 consultation showed a mixed response to the level of growth for the town, although the majority did oppose growth. A key aspect of the opposition was that infrastructure in the town was currently at capacity. The abolition of the Regional Spatial Strategy and the

Page 4 of 14

advance of the Localism Bill potentially offered greater flexibility in plan making and the opportunity for Malmesbury Community Area to have more influence on future housing development in the town. Wiltshire Council would be seeking to bring forward housing as part of a plan led process in consultation with the local community, including the Town Council and Community Area Board. Whilst the site itself was well located to accommodate growth for Malmesbury, it was vital that the appropriate infrastructure and high quality design underpinned any development that came forward. A pragmatic approach would be to carefully phase development in Malmesbury and call for the development to be delayed until later in the planning period for Wiltshire. This would enable a thorough assessment of infrastructure requirements to be made and for the outcomes of this infrastructure assessment to be addressed in consultation with the local community.

7. Update on Malmesbury Schools

Nigel Hunt, Head of School Buildings and Places, gave a short update on school numbers in the Malmesbury Community Area. He explained a document provided at the meeting showing the number of children in the primary schools and the secondary school in each year group. This was derived from a census that was undertaken every term. Pupil numbers for primary school children in Malmesbury were very close to the physical capacity. Eight pupils were being transported in total from the town to village schools because of pressure in the town at primary school age.

This update was followed by a question and answer session which covered the following issues: • If preference patterns for the schools remain the same (some parents in the town always choose to send their children to village schools), there were sufficient places for children coming up to primary school age in town. • School provision was linked to the planning process in that the relevant department was consulted at a strategic level on an ongoing basis and again when a planning application was received. Contributions were also sought with new development for provision of school places. • Primary school places in the town had been filled quickly as the number of parents who chose to send their children to village schools from the town had reduced markedly in recent years. There had also been movement into the town in the last eighteen months of families with primary school age children. • It has been made clear that with future housing development, a child coming into the area could not be guaranteed a place in a Malmesbury primary school.

Page 5 of 14

• National Government policy was clear that if a parent chose to send their child to a school outside their catchment area, they were responsible for transport costs. If transport was required for a child travelling more than 2.5 miles to a school not of their choosing, the local authority was responsible for transport provision. • There was no capacity to extend Malmesbury Primary School. St Joseph’s school were investigating whether the school could be extended.

Decision Nigel Hunt would update on school numbers in the Malmesbury Community Area at a future Area Board meeting when results from the St Joseph’s school investigation into extending were available.

8. Leisure Facilities Review

Councillor Stuart Wheeler, Cabinet Representative for Leisure, Sport and Culture, gave a presentation on the future of leisure facilities in Wiltshire. There was an excellent facility in Malmesbury and Wiltshire Council was not proposing to change this in a great way. The Activity Zone would continue to be managed by DC Leisure and their contract had been extended to 2015 to allow for time for all Council-owned leisure facilities to be reviewed.

Wiltshire Council had inherited a form of financial responsibility for 23 facilities around the county, including many facilities which were out of date and inefficient. The situation was unsustainable, with £93 million required over the next 25 years to sustain the existing stock, excluding any investment to improve the buildings.

As such, proposals had been developed on the basis of £117 million investment over 25 years, to deliver a high quality, efficient and sustainable service. This would also go some way to meeting carbon reduction targets, with leisure facilities currently accounting for 21% of the Council’s carbon emissions.

The proposals would see four new facilities within campuses, with another two existing facilities being significantly enhanced and retained. The remaining facilities would also receive significant capital investment, before being made available for transfer to community management arrangements, as part of a robust process including support and identification of suitable business models, phased financial support resulting in independency and potentially the transfer of freehold. It was acknowledged that different mechanisms and solutions would suit different facilities, and so a report on options had been commissioned to give

Page 6 of 14

examples of arrangements which had been established in other areas.

It was noted that no decisions would be made by Wiltshire Council until consultation had been completed. Consultation on the proposals was taking place up to 29 October 2010, with details available on the Wiltshire Council website, at libraries, leisure facilities and offices. A report on the outcome of the consultation would be submitted to the Cabinet in December, and the Council would consider the results in February 2011.

The presentation was followed by a short question and answer session. This covered the following main points: • The Activity Zone was working well with local schools • Malmesbury Marlins expressed satisfaction with the Activity Zone pool, its management and its provision for disabled individuals • Free swimming for those aged 60+ would not continue after September 2010 as funding for this scheme was no longer available from central Government.

A question was also raised about the capacity of The Activity Zone. Although the relevant Officer did not have the information to hand, since the Area Board meeting, Wiltshire Council leisure representatives had discussed capacity levels with the operator DC Leisure Management Limited (DCL) and could report that the facility was operating within comfortable capacity limits and that there was sufficient spare capacity to cater for growth in all areas of the business. This translated as between approximately 20-25% growth in the fitness area, 25% growth in swimming and around 15% capacity left available for casual sports hall activities. In addition there was significant capacity in squash as this sport had seen a national decline in usage over the past few years. Wiltshire Council’s view was that in strategic planning terms this represented an acceptable level of usage as there was sufficient capacity for growth when considering future demographic fluctuations, but the figures also demonstrated how well used the facility was.

Councillor Wheeler then invited those present to indicate their views about the development of the leisure service, by means of the electronic voting handsets provided.

9. Cabinet Representative

Councillor Keith Humphries, Cabinet Representative for Health and Wellbeing, provided a short overview of his responsibility. This included Health, Community Safety, Environmental Health, Trading Standards, Licensing and Emergency Planning in the Community

Page 7 of 14

Area.

Health and Wellbeing in general terms encompassed trying to keep the people of Wiltshire safe and protected largely by working with Wiltshire Council partners to deliver the best possible service. Last year Consumer Direct had received 82 reports of scam telephone callers from people in Wiltshire. Nearly all of these had been received by elderly and vulnerable people. Councillor Humphries asked for people to continue to report scam telephone calls. He also provided information about a new county wide initiative to prevent dog fouling, starting with a programme of education in schools.

Councillor Humphries could be contacted directly on 01985 218255 or [email protected]

10. Completed Highways Works List 2010

Adrian Hampton, Head of Local Highways and Streetscene, gave a short presentation on work undertaken by the Highways department in the Community Area since 1 April 2010, please find a list of completed works attached. The presentation included completed minor carriageway repair sites, programmed sites and repairs to be scheduled. The department was also working to improve communication with the back office and developing links with the Area Board to set local priorities.

11. Parish Council Involvement with Malmesbury Area Board

The Community Area Manager provided feedback from two successful ‘Tea and Talk’ meetings held with town/parish councils within the Community Area. She aimed to repeat these meetings on an annual basis. The Councillors were asked to consider eleven recommendations from the meetings, contained in the report.

Decision The Area Board would accept the following recommendations from the ‘Tea and Talk’ meetings:

Information about the community issues process and how issues are handled is sent to parish councils

Community issues are forwarded to parish/town councils to gauge whether they are collective/community issues or individual issue more appropriate as ward work for councillors

Parish councils be invited to ask their councillors to sign up individually to the Community Area Network to ensure the Page 8 of 14

speedy delivery of Malmesbury Area Board information

M&VCAP are encouraged to revitalise their contact with parishes/parish councils

M&VCAP are encouraged to re-present their Partner Update for the Area Board, to concentrate on punchy information about their current projects and inviting specific community involvement

The divisional highways team is requested to produce an annual plan for the Malmesbury Community Area of work to be carried out and provide email alerts to the parish clerk where it conflicts with the monthly plan already circulated to parish councils.

There was the need for further discussion regarding the remaining recommendations in the report. Sid Jevons thanked Miranda Gilmour for her work on improving parish involvement with Malmesbury Area Board. These would be discussed further by the Area Board.

NB Subsequent to the meeting, the Area Board decided that:

Community issues would be placed higher on the agenda when possible

The public would be reminded through the Community Area Network they can go online to submit and track their community issues

The Area Board would continue to arrange round table meetings with partners when appropriate, such as for the Local Transport Plan

The Area Board would consider issues from M&VCAP’s parish forum as items for future debate/consideration The Area Board would continue to work towards limiting the number of items on future agendas.

12. Wiltshire Council's New Approach to Providing Face to Face Customer Access to Council Services

This item was postponed and removed from the agenda.

13. Community Issues Update

The Community Area Manager introduced the report and invited Page 9 of 14

Councillors to agree the next steps for a number of issues.

Decision Issues 656 (St Joseph’s Primary School governors wished to renegotiate their School Travel Plans) and issues 1130 and 1134 (though speeding was not the issue, but people not stopping at the zebra crossing) would be kept open in amended form.

The Community Area Manager was awaiting responses from four town/parish councils with respects to participating in Community Speedwatch schemes.

Decision The Community Area Manager would close issues 748 and 749 (flooding related issues in Dauntsey that were being addressed through legal proceedings) and issue 1024 (a replacement finger post at Willesley T junction that was now in place).

Decision Issues 334 (safety at North End crossroads, Ashton Keynes), 562 (crossing needed on Tetbury Hill Road near Filands) and 620 (footpath required in Dauntsey) were referred to the Malmesbury Area Board Local Transport Plan Allocation Group.

Decision Issues 406 (residents parking in Malmesbury) and 655 (St Joseph’s seek parking permits for Cross Hayes) would be picked up at the November meeting when Councillor Tonge and parking officers would attend to provide information about Wiltshire Council’s parking strategy consultation.

Decision The results of the joint survey by Malmesbury Town Council and Malmesbury & Villages Community Area Partnership relating to the speed bumps in town, dropped kerbs and other highways issues would be presented at the January 2011 Area Board meeting. This would address issues 438 and 440.

The Community Area Manager felt that it would be helpful if people could inform her when an issue had been addressed, so that an accurate record could be kept, accepting that it was the responsibility of Officers and partners to keep her updated. Please contact Miranda Gilmour on 01672 515742 or miranda.gilmour@wiltshire .gov.uk .

Page 10 of 14

14. Community Area Grants Scheme

Consideration was given to the three funding allocations made to the Community Area Grants Scheme.

Decision Malmesbury Netball Club were awarded £1,000 to cover set up costs of establishing a netball club in Malmesbury serving the whole community.

Reason The application meets the 2010/11 grant criteria and the emerging ‘People, Places and Promises – Wiltshire Community Plan 2011-2026’ recognises the need for people to take responsibility for their own health through exercise and other factors.

Decision Crudwell Short Mat Bowls Club were awarded £802 to purchase bowls equipment suitable for older and less able players.

Reason The application meets the 2010/11 grant criteria and would help the club to expand membership further as well as retain current members. It would encourage older and less able members through the provision of lighter woods as well as some younger players who might also value using lighter equipment.

Decision Kings Day Nursey School were awarded £651 to purchase a range of equipment for use by children attending new breakfast and afterschool clubs at the nursery.

Reason The application meets the 2010/11 grant criteria and the application demonstrates links to the Malmesbury & Villages Community Plan 2009-2013, which refers to the need to support early years, toddler groups and pre-schools in villages.

15. Performance Reward Grants Scheme

The Area Board considered five applications to go forward under the Performance Reward Grant Scheme.

St Aldhelm’s Mead, Malmesbury Play Area Enhancement Scheme Malmesbury Town Council were seeking £73,656 to create a multi- Page 11 of 14

use games area, including an all weather sports pitch, at St Aldhelm’s Mead for use by mainly older children and adults. Councillors were supportive of the scheme, however expressed concern regarding the management and maintenance of the play area. They advised that the applicant contact the Community Area Manager to improve the application with regards to providing evidence that the application would meet certain Performance Reward Grant Scheme criteria.

Councillors suggested Malmesbury Town Council contributed some funding and suggested £30,000. Evidence needed to be provided to support the statements in their application. Questions were raised as to whether the facility was lockable and how it would be managed and maintained.

Decision To endorse the bid for Performance Reward Grant Scheme funding from Malmesbury Town Council for St Aldhelm’s Mead to go forward for consideration.

Malmesbury Boxing Club Malmesbury Amateur Boxing Club’s Headquarters were seeking £20,000 towards a £28,200 project to stop flood damage which results in club closures due to flooding damage. The project would raise their building by 1.3 metres in order to provide flooding protection and would replace/reinstall equipment and paint external walls. After the Malmesbury Area Board meeting on 7 July 2010, the Councillors visited the Malmesbury Amateur Boxing Club’s Headquarters. Councillor Soden commented that while the club was clearly doing good work, its facilities could be made more welcoming and inclusive, particularly to young females and disabled individuals looking to take up boxing.

Councillors suggested that if they were to be fully inclusive and encourage young women to join the club, that toilet and showering facilities needed to be improved and disabled access should be considered. Since the Town Council owned the property, Councillors suggested that the applicant should also contact the Town Council for funding.

Decision To endorse the bid for Performance Reward Grant Scheme funding from Malmesbury Amateur Boxing Club to go forward for consideration.

Eilmer Bridge Gloucester Road Community Group were seeking £58,580 to build a memorial bridge linking Brooky Lane with the Old Station Yard

Page 12 of 14

Car Park. This project would (primarily) provide easy access for local residents of the Westport area of Malmesbury to the available parking in the long stay car park in Old Station Yard so reducing the current car parking/congestion difficulties in the Westport area. The Area Board expressed concern about the relatively high cost of lighting for the project and its maintenance. The meeting was assured the preferred local contractor had a type of build that would meet the requirement from highways for the bridge to have a 125 year maintenance free period to be adopted by Wiltshire Council.

Councillors applauded the thoroughness of this community application. Concerns were expressed about the high costs of lighting and it was suggested that further discussion with the planning department might be helpful.

Decision To endorse the bid for Performance Reward Grant Scheme funding from Gloucester Road Community Group to go forward for consideration.

Wiltshire Is Saving Energy (WISE) Initiative Councillors were asked to consider an expression of interest received by all 18 Area Boards from the Wiltshire Climate Change Officer seeking £12,566 towards energy monitors available for free hire in all libraries across Wiltshire. The energy monitor allows the user to see clearly how much energy their appliances use and how their behaviour impacts on their energy use. The householder/user can then make simple changes to their behaviour to reduce their energy consumption. Reducing energy will save money off their energy bills and reduce their carbon footprint.

Decision To endorse the bid for Performance Reward Grant Scheme funding from the Wiltshire Climate Change Officer for the Wiltshire Is Saving Energy (WISE) initiative to go forward for consideration.

Wiltshire Voices Initiative Councillors were asked to approve a Wiltshire Voices initiative aiming to involve more of the hard to reach groups in the Malmesbury Area Board process. This was a county wide bid going to all 18 Area Boards.

Decision To endorse the bid for Performance Reward Grant Scheme funding for the Wiltshire Voices initiative.

Page 13 of 14

16. Evaluation and Close

The Chairman then invited those present to indicate their views about the meeting, by means of the electronic voting handsets provided. Overall the meeting was judged to be very good.

Page 14 of 14

Minute Item 7

Page 1 This page is intentionally left blank

Page 2 Carrriageway Minor Works 2010

LOCATION ADDITIONAL INFORMATION DESCRIPTION OF WORK DEFECT DESCRIPTION THE STREET/PERRY GREEN (C80 TO B4040, JUNCTION OF VICARAGE REPAIR SIGN ACCIDENT REBED SIGN ON THE 30MPH LIMIT) CHARLTON LANE DAMAGE DIRECTIONAL SIGN SWINDON ROAD (B4042 NORTH TO NR B4042 JUNCTION, SWINDON REPAIR SIGN ACCIDENT SIGN POST PUSHED OVER CRESSWELL LANE) CLEVERTON RD, CLEVERTON DAMAGE CALLOW HILL (B4042 XRDS SOUTH CALLOW HILL BRINKWORTH. RE-ALIGN SIGN THE JUNCTION SIGN HAS BEEN TO 30 MPH) CALLOW HILL HIT BY A LORRY THE STREET (SWINDON ROAD B4042 JUNCTION B4042 / LEA REPAIR SIGN ACCIDENT REBED GIVE WAY SIGN TO 30 MPH) LEA DAMAGE FOSSE ROAD (30 MPH BROKENBOROUGH PARISH CLEAR BLOCKAGE OF GULLY CLEARING GULLY BROKENBOROUGH WEST TO GRIP ETC COUNTY BOUNDARY) BROKENBOROUGH BREMILHAM RISE (MALMESBURY) BREMILHAM RISE, MALMESBURY AD HOC GULLY EMPTIER GULLY TANKER TO CLEAR DRAINS THROUGHOUT KEMBLES CLOSE (MALMESBURY) KEMBLES CLOSE, MALMESBURY AD HOC GULLY EMPTIER BLOCKED GULLIES/PIPE WORK

HIGH STREET (SOUTH TO NORTH) SHERSTON PARISH SWAN PARISH STEWARD CLEARING BLOCKED GULLEY

Page 3 SHERSTON BARTON OXFORD STREET (HIGH STREET TO MALMESBURY, OXFORD STREET AD HOC GULLY EMPTIER GULLY TANKER TO JET PIT'S CROSS HAYES) MALMESBURY AND PIPE WORK IN SECTION NORTON ROAD (C68 CROSSROADS OPPOSITE EAST LODGE, AD HOC GULLY EMPTIER BLOCKED GULLY TO B4040) EASTON GREY NORTON RD, EASTON GREY SHERSTON ROAD (HULLAVINGTON SHERSTON RD/CHURCH LANE AD HOC GULLY EMPTIER BLOCKED GULLIES ROAD TO JUNCTION TO PIG LANE) JUNCTION, NORTON NORTON TOP STREET/PARK LANE (WEST TOP STREET, GREAT AD HOC GULLY EMPTIER BLOCKED GULLIES

STREET TO 30 MPH) GREAT SOMERFORD Minute Item10 SOMERFORD SOPWORTH ROAD (C87 SOPWORTH ROAD, SHERSTON CLEAR BLOCKAGE OF GULLY CLEARING GULLY AND GRIP CROSSROADS SOPWORTH EAST TO NR BRIDGE GRIP ETC 30 MPH) SHERSTON NOBLE STREET/TANNERS HILL BUSTLERS HILL SHERSTON SEE AD HOC GULLY EMPTIER BLOCKED GULLIES (CHURCH STREET SOUTH TO 30 MPH) PLAN SHERSTON DAUNTSEY ROAD (SEAGRY ROAD DAUNTSEY RD, GREAT AD HOC GULLY EMPTIER BLOCKED GULLIES CROSSROADS EAST TO 30MPH) SOMERFORD GREAT SOMERFORD FIVE LANES (30MPH TO THE STREET CHARLTON PARISH THE STREET PARISH STEWARD RODDED RAT HOLES B4040) CHARLTON

Page 1 of 19 Carrriageway Minor Works 2010

THE STREET (PEMBROOK GREEN TO 1 THE CHESTNUTS, THE STREET, AD HOC GULLY EMPTIER BLOCKED GULLIES ST GILES CLOSE) LEA LEA CULKERTON ROAD (COUNTY X ROADS SOUTH OF KEMBLE AD HOC GULLY EMPTIER GULLY TANKER TO JET PIT AND BOUNDARY EAST TO A429) KEMBLE FACTORY A429 PIPE WORK ON SIDE ROAD

ASHLEY ROAD (COUNTY BOUNDARY CHEDGLOW, MAIN ROAD IN VACTOR VACTOR TO ATTEND TO SITE TO TO CRUDWELL LANE) CHEDGLOW VILLAGE INVESTIGATE SYSTEM

LITTLETON ROAD (AREA 1/2 LUCKINGTON PARISH ALDERTON PARISH STEWARD DIGGING GRIPS BOUNDARY TO RAIL BRIDGE) TO LITTLE ALDERTON LITTLETON ROAD (RAIL BRIDGE TO ALDERTON TO LITTLETON DREW AD HOC GULLY EMPTIER BLOCKED GULLY AND OUTLET ALDERTON CROSSROADS) ROAD ALDERTON LITTLETON ROAD (RAIL BRIDGE TO LUCKINGTON PARISH LITTLE CLEAR BLOCKAGE OF GULLY CLEARING GULLIES ALDERTON CROSSROADS) DREW RD ALDERTON GRIP ETC ALDERTON MARKET LANE (MALMESBURY) MILL LANE, MALMESBURY NEAR CYCLIC GANG REPAIR DAMAGE BOLLARD

Page 4 TOWN HALL BASE, WELDING NEEDED MAIN ROAD (30 MPH NORTH TO 30 ROSE COTTAGE, MAIN ROAD, CYCLIC GANG DAMAGED NON-LIT WOODEN MPH) CORSTON CORSTON BOLLARD THE STREET/THE AVENUE 2 MANOR FARM COTTAGES CYCLIC GANG POSSIBLE COLLAPSE PIPE (ALDERTON) ALDERTON UNDER ROAD TO BE REPAIRED RUTHALL (LUCKINGTON) LUCKINGTON PARISH B4040 + PARISH STEWARD STRAIGHTENING OUT OF NEXT TO PO POSITION 'GIVE WAY' SIGNS SHERSTON ROAD (C87 TO 30MPH LUCKINGTON PARISH B4040 PARISH STEWARD REBEDDING ' SHERSTON ROAD' LIMIT) LUCKINGTON NEAR SHIP INN SIGN PARK ROAD (BACK BRIDGE TO MALMESBURY PARISH, PARK PARISH STEWARD DIG OUT MOVE 30MPH SIGN DIG 30MPH) MALMESBURY LANE ROAD OUT HOLE AND CONCRETE POST IN PLACE BROKENBOROUGH ROAD (30MPH TO NR THE OLD BAKE HOUSE IN REPAIR PHYSICAL CONDITION CLEARED VEGETATION AND B4014) BROKENBOROUGH BROKENBOROUGH OF POST/FITTING STRAIGHTENED SIGN EIGHTY ACRES (WORTHY HILL FARM OAK FARM X-RDS - BRAYDON REPAIR/REPLACE DEFECTIVE REPLACE 2 GIVE WAY SIGNS TO RAVENROOST ROAD) CHARLTON SIGN PLATE

COUNTY BOUNDARY EAST TO C87 C68/C87 JUNCTION SOPWORTH REPAIR WOODEN FINGER POST REPLACE EXISTING FINGERPOST CROSSROADS (SOPWORTH) THE STREET WITH NEW

Page 2 of 19 Carrriageway Minor Works 2010

OLD BREWERY LANE (INCLUDES OLD BREWERY LANE, MASONRY GANG THREE CRACKED AND LOOSE MARKET CROSS AREA) MALMESBURY MALMESBURY SLABS OPPOSITE 8 B BREWERY LANE MALMESBURY

FLISTERIDGE ROAD (BRADENBROOK UPPER MINETY PARISH REPAIR DAMAGED PEDESTRIAN FLISTERIDGE ROAD GOAT ACRE FARM TO HANKERTON ROAD) UPPER FLISTERIDGE ROAD GUARD RAILS FARM MINETY THE STREET (30 MPH TO PEMBROOK THE STREET FROM ORCHARD REPAIR CARRIAGEWAY REINSTATE VERGE MARKER GREEN) LEA HOUSE, LEA DEPRESSION POSTS AND FILL X2 DEPRESSIONS SOMERFORD COMMON LANE (40 MPH SOMERFORD COMMON LANE REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO BLACKBERRY LANE) BRINKWORTH DEPRESSION DEPRESSION BRINKWORTH ASHTON KEYNES ROAD (ENTRANCE MINETY PARISH ASHTON ROAD PARISH STEWARD FINISH UNDERCOAT ON FIELD FARM TO B4696) ASHTON RAILINGS KEYNES ASHTON KEYNES ROAD (ENTRANCE MINETY PARISH ASHTON ROAD PARISH STEWARD TOP COAT RAILINGS FIELD FARM TO B4696) ASHTON

Page 5 KEYNES ASHTON KEYNES ROAD (ENTRANCE MINETY PARISH ASHTON ROAD PARISH STEWARD PAINT TOPCOAT ON RAILINGS FIELD FARM TO B4696) ASHTON KEYNES LEVEL CROSSING ROAD (C/L RAIL MINETY PARISH CROSSING LANE PARISH STEWARD UNDER COAT RAILINGS BRIDGE TO C99 LEVEL COOLES BARN CROSSROADS) MINETY FLISTERIDGE ROAD (BRADENBROOK MINETY PARISH FLISTERIDGE PARISH STEWARD UNDERCOAT RAILINGS ON FARM TO HANKERTON ROAD) UPPER ROAD BRIDGE MINETY FLISTERIDGE ROAD (BRADENBROOK MINETY PARISH FLISTERIDGE PARISH STEWARD PAINT TOPCOAT ON RAILINGS FARM TO HANKERTON ROAD) UPPER ROAD MINETY FLISTERIDGE ROAD (BRADENBROOK UPPER MINETY PARISH PARISH STEWARD TOP COAT BRIDGE RAILINGS FARM TO HANKERTON ROAD) UPPER FLISTERIDGE ROAD MINETY WOOD LANE C127 TO HIGH GATE BRINKWORTH PARISH WOOD PARISH STEWARD PAINT TOP COAT ON RAILINGS CROSS ROADS B4042 (CALLOW HILL) LANE

WOOD LANE C127 TO HIGH GATE BRINKWORTH PARISH WOOD PARISH STEWARD TOP COAT BRIDGE RAILINGS CROSS ROADS B4042 (CALLOW HILL) LANE WOOD BRIDGE

Page 3 of 19 Carrriageway Minor Works 2010

SOMERFORD COMMON LANE (40 MPH BRINKWORTH PARISH PARISH STEWARD SANDOWN RAILINGS START TO BLACKBERRY LANE) STOPPERS HILL UNDERCOATING BRINKWORTH SOMERFORD COMMON LANE (40 MPH BRINKWORTH PARISH PARISH STEWARD UNDERCOAT RAILWAY TO BLACKBERRY LANE) STOPPERS HILL BRINKWORTH SOMERFORD COMMON LANE (40 MPH BRINKWORTH PARISH PARISH STEWARD UNDERCOAT RAILINGS TO BLACKBERRY LANE) STOPPERS HILL BRINKWORTH SOMERFORD COMMON LANE BRINKWORTH PARISH PARISH STEWARD UNDERCOAT RAILINGS (BLACKBERRY LANE TO QUEEN SOMERFORD COMMON STREET) BRINKWORTH SOMERFORD COMMON LANE BRINKWORTH PARISH PARISH STEWARD UNDERCOAT RAILINGS ON (BLACKBERRY LANE TO QUEEN SOMERFORD COMMON BRIDGE STREET) BRINKWORTH WHYCHURCH ROUNDABOUT TO FIVE WHYCHURCH ROUNDABOUT TO REPAIR EDGE DETERIORATION REPAIR EDGE DETERIORATION LANES CROSSROADS (MALMESBURY) FIVE LANES MALMESBURY

Page 6 WHEELBARROW LODGE ROAD TO WHEELBARROW LODGE TO REPAIR EDGE DETERIORATION REPAIR EDGE DETERIORATION FOSS WAY CROSSROADS (EASTON FOSSEWAY CROSSROADS GREY) FOSS WAY CROSSROADS TO C86 FOSSE LODGE REPAIR EDGE DETERIORATION POTHOLES AND EDGES VARIOUS TWATLEY FARM (EASTON GREY) CROSSROADS - SHERSTON SIZES BRINKWORTH ROAD (DAUNTSEY) BRINKWORTH ROAD DAUNTSEY REPAIR EDGE DETERIORATION REPAIR EDGE DETERIORATION

THE GREEN (30 MPH TO CHURCH ON DAUNTSEY GREEN FILL OVERRUN WITH STONE POTHOLE, 1 METRE LONG, LANE) DAUNTSEY GREEN COVER WITH SOIL TOWARDS EDGE OF R GARSDON MILL ROAD NORTH TO RD FROM GARSDON X-ROADS REPAIR EDGE DETERIORATION FILLED X2 OVER RUNS CHARLTON ROAD (CHARLTON) TO NOAH'S ARK, LEA 30MPH NORTH STARTLEY TO MALMESBURY PARISH GRANGE REPAIR EDGE DETERIORATION OVERRUN 10X400MMX100MM RODBOURNE ROAD (RODBOURNE) LANE RODBOURNE ROAD MENDER PATCHING GANG

HILLSIDE (LEIGH) HILLSIDE LEIGH ON PARKING CORRECT VERTICAL CORRECT VERTICAL BAY PROJECTION OF KERB PROJECTION OF KERB GRANGE LANE (RODBOURNE ROAD GRANGE LANE, MALMESBURY PARISH STEWARD REMOVE BRANCH FROM NORTH TO A429) SOUTH OF WO OVERHANGING ROAD AND CUT MALMESBURY UP MAIN ROAD (30 MPH NORTH TO 30 2 MAIN RD, CORSTON OBSERVATION FOR CLIENT CRACKED WESSEX WATER MPH) CORSTON ATTENTION COVER

Page 4 of 19 Carrriageway Minor Works 2010

HIGH STREET (ST DENNIS ROAD TO HIGH ST, MALMESBURY REPAIR CRACKED OR BROKEN BROKEN DRAINAGE GRATING OXFORD STREET) MALMESBURY COVERS OXFAM SHOP HIGH STREET MALMESBURY KEMBLES CLOSE (MALMESBURY) OPPOSITE 1, KEMBLES CLOSE, RAISE LEVEL OF GULLY COVER UNDER ROAD MALMESBURY COVERS/GRATINGS/FRAMES SURFACE GASTON LANE (SHERSTON) GASTON LANE SHERSTON OS MASONRY GANG ROCKING LOOSE KERB WITHY WELL PARKLANDS (B4040 TO OLD 20 PARKLANDS, MALMESBURY MASONRY GANG REPLACE 4X KERBS WITH NEW ALEXANDER ROAD) MALMESBURY (KERBS DAMAGED) BURNHAM ROAD (MALMESBURY) 38/36 BURNHAM RD RE-BED EXISTING KERBS LOOSE AND ROCKING KERBSTONE THE STREET/THE AVENUE THE STREET ALDERTON REPAIR LOSS OF MATERIAL CLAYING PUSHING THROUGH (ALDERTON) ROAD SURFACE CAUSING LOSS OF MATERIAL 1M X 1M BRINKWORTH ROAD (DAUNTSEY) NR CREWS COTTAGE, PATCHING IN CARRIAGEWAY PATCH REQUIRED 4000X1000X50 BRINKWORTH RD, DAUNTSEY SOMERFORD COMMON LANE (40 MPH SOMERFORD COMMON LANE, PATCHING IN CARRIAGEWAY EDGE DEFORMATION/CRACKING TO BLACKBERRY LANE) BRINKWORTH 5000X1000X50

Page 7 BRINKWORTH DAIRY FARM (ASHTON KEYNES) ASHTON KEYNES, ON CORNER MASONRY GANG REPLACE 4X GRANITE SETS IN OF DAIRY FARM KERB LINE FOSSE ROAD (FROM C89 AT THE OLD BROKEN BOROUGH, NEAR CYCLIC GANG REPLACE 30MPH REPEATER BAKERY W 30 MPH) GREEN TRIANGLE SIGN ON POST THAT IS PRESENT BROKENBOROUGH SHIPTON MOYNE ROAD EAST TO 30MPH/NSL B4040 SHERSTON RD REPLACE MISSING SIGN REPLACE MISSING 30MPH & 30MPH LIMIT (MALMESBURY) MALMESBURY NATIONAL SPEED LIMIT SIGNS 600MM ASHBRIDGE PIKE LANE (B4040 TO ASHBRIDGE PIKE LANE REPLACE MISSING SIGN MISSING CROSSROADS SIGN LITTLETON ROAD CROSSROADS) ALDERTON ALDERTON BREMILHAM RISE (MALMESBURY) BREMILHAM RISE, MALMESBURY NEW GRIT BIN TO BE PLACED INSTALLING GRIT BIN AND FILLING TROW LANE (HUNTERS HALL SOUTH NR HUNTERS HALL AND TROW CLEAR OBSTRUCTING CUT VEGETATION FROM EAST TO BOWDS LANE) LANE, DAUNTSEY VEGETATION AROUND SIGNS BRINKWORTH WOOD LANE C127 TO HIGH GATE WOOD LAND PURTON BRAYDON CLEAR OBSTRUCTING STRIMMED AROUND SIGNS CROSS ROADS B4042 (CALLOW HILL) VEGETATION REFLECTOR POSTS

Page 5 of 19 Carrriageway Minor Works 2010

ASHBRIDGE PIKE LANE (B4040 TO B4040 FROM ALDERTON CLEAR OBSTRUCTING CUTTING VEGETATION FROM LITTLETON ROAD CROSSROADS) LUCKINGTON VEGETATION AROUND CROSSROADS SIGN ALDERTON WIDLEYS ROAD (RAT HOLE NORTH RATHOLE - JUNCTION TO CLEAR OBSTRUCTING CLEARED VEGETATION FROM TO FORD ROAD CROSSROADS) ALDERTON LUCKINTON VEGETATION FINGERPOST AND CLEANING SHERSTON MALMESBURY ROAD (SEAGRY ROAD MALMESBURY PARISH A429 PARISH STEWARD REMOVING ILLEGAL SIGNS N TO 1ST JUNCTION C1 BY AROUND HULLAVINGTON AERODROME) HULLAVINGTON ENTRANCE CARRIERS FARM TO SHERSTON PARISH B4040 PARISH STEWARD CUTTING VEGETATION AROUND 30MPH (SHERSTON) BROOKHILL ROAD SIGN ST DENNIS LANE/CROSS HAYES HOLLOWAY HILL, MALMESBURY CYCLIC GANG RAISE KERBS LANE/HOLLOWAY/WHITCHURCH HILL BRICK BUILDING (MALMESBURY) SNOW HILL (COCKROOST FARM TO CHARLTON PARISH COCKROOST PARISH STEWARD NEW POST 2M ABOVE GROUND POND LANE) CHARLTON FARM POST WIDTH 76MM SIGN IS OKAY STILL ON SITE SODOM LANE (C120 TO ENTRANCE BRINKWORTH PARISH HUNTERS PARISH STEWARD INSTALL S BEND WARNING SIGN

Page 8 STRANGES FARM) BRINKWORTH HALL WOOD LANE (BRINKWORTH) PURTON PARISH WOOD LANE INSTALL/REPLACE VERGE PARISH STONE PUT BACK IN JUNCTION PARK VI MARKER POST PLACE. DIG OUT HOLE WAS LEAD ON FLAT VERGE. THE STREET (40 MPH TO THE HILL) LITTLE SOMERFORD PARISH PARISH STEWARD OVERRUNS X2 LITTLE SOMERFORD FLISTERIDGE ROAD (BRADENBROOK MINETY PARISH PARISH STEWARD STRAIGHTEN POST ON BRIDGE FARM TO HANKERTON ROAD) UPPER MINETY RAVENSROOST ROAD BRAYDON PARISH OAK FARM PARISH STEWARD REMOVE AND REPLACE BOTH (RAVENSBROOK FARM TO JUNCTION CROSS ROADS GIVE WAY SIGNS CLEANED SIGN QUEEN STREET) BRINKWORTH POST.

ASHBRIDGE PIKE LANE (B4040 TO LUCKINGTON PARISH RD FROM PARISH STEWARD CLEARING GRIPS LITTLETON ROAD CROSSROADS) ALDERTON TO B4 ALDERTON BROKENBOROUGH ROAD (30MPH TO BROKENBOROUGH PARISH NR PARISH STEWARD CLEARED GRIP AND GULLY B4014) BROKENBOROUGH B4014 JUNCTION THE STREET/PERRY GREEN (C80 TO THE STREET, CHARLTON CUT OVERGROWN HEDGE CUT HEDGE AROUND BT POLES 30MPH LIMIT) CHARLTON TRIMMED BACK HEDGE OVERHANGING FOOTWAY

Page 6 of 19 Carrriageway Minor Works 2010

THE STREET (SWINDON ROAD B4042 LEA TOP JUNCTION PARISH LEA CUT OVERGROWN HEDGE TRIM HEDGE BACK BY JUNCTION TO 30 MPH) LEA OAKLEAZE (MINETY) OAKLEAZE MINETY OAK LEAZE REPAIR FOOTWAY POTHOLE REPAIR FOOTWAY POTHOLE HOUSE HILLSIDE (LEIGH) 16 HILLSIDE, LEIGH REPAIR FOOTWAY POTHOLE REPAIR POTHOLE 1.0M*1.2M*25MM DEEP CHERRY ORCHARD LANE (30 MPH LUCKINGTON PARISH CHERRY PARISH STEWARD FILLING POTHOLES LUCKINGTON WEST TO COUNTY ORCHARD LANE BOUNDARY) LUCKINGTON CHURCH ROAD (30 MPH LUCKINGTON LUCKINGTON PARISH TOP OF PARISH STEWARD FILLING LARGE POTHOLE EAST TO C94) LUCKINGTON RAT HOLE

FROM COUNTY BOUNDARY TO C27 FROM COUNTY BOUNDARY TO REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY LINK ROAD (WILLESLEY) C27 WILLESLEY POTHOLE POTHOLE GASTONS ROAD (MALMESBURY) 37 GASTON'S ROAD, REPAIR CARRIAGEWAY REPAIR POTHOLE 300*300*60MM MALMESBURY POTHOLE DEEP OLD ALEXANDER ROAD ADJACENT JUBILEE GARDENS, REPAIR CARRIAGEWAY 2 X POTHOLES AT EDGE OF (MALMESBURY) MIDDLE OF CARRIAGEWAY POTHOLE TRENCH 50MM DEEP, AREA 700 X

Page 9 350 PARKLANDS (SPINE SOUTH WEST TO PARKLANDS MALMESBURY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY H/H T JUNCTION) MALMESBURY POTHOLE POTHOLE PARKLANDS (SPINE SOUTH WEST TO PARKLANDS MALMESBURY ON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY H/H T JUNCTION) MALMESBURY JUNCTION POTHOLE POTHOLE WHITE LION PARK (PARKLANDS 9 WHITE LION PARK REPAIR FOOTWAY POTHOLE REPAIR FOOTWAY POTHOLE NORTH AND EAST TO END) MALMESBURY MALMESBURY WHITE LION PARK (PARKLANDS 7 WHITE LION PARK REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY NORTH AND EAST TO END) MALMESBURY POTHOLE POTHOLE MALMESBURY WHITE LION PARK (2ND SPUR RIGHT) 51 WHITE LION PARK REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY MALMESBURY MALMESBURY POTHOLE POTHOLE ESTATE ROAD (OFF B4014) 1 REEDS FARM ROAD, REPAIR CARRIAGEWAY REPAIR POTHOLE 300*500*40MM MALMESBURY MALMESBURY POTHOLE DEEP HEATH ROAD (STARTLEY) HEATH ROAD STARTLEY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY POTHOLE POTHOLE MILBOURNE PARK (MILBOURNE) MILBOURNE PARK MILBOURNE REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ON JUNCTION POTHOLE POTHOLE MILBOURNE PARK (MILBOURNE) 5 MILBOURNE PARK MILBOURNE REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY POTHOLE POTHOLE

Page 7 of 19 Carrriageway Minor Works 2010

SOUTHFIELD LANE (MILBOURNE) SOUTHFIELD LANE MILBOURNE REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY BY WATER STATION POTHOLE POTHOLE TUNERS LANE (A429 NORTH TO 30 TUNERS LANE, CRUDWELL REPAIR FOOTWAY POTHOLE FILL IN FOOTWAY POTHOLE MPH) CRUDWELL HOLLOW STREET (TOP STREET HOLLOW STREET GREAT REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY WEST TO 30 MPH) GREAT SOMERFORD POTHOLE POTHOLE SOMERFORD KINGSMEAD/MILL LANE (LITTLE LITTLE SOMERFORD PARISH PARISH STEWARD FILL DEPRESSION ACROSS SOMERFORD) CARRIAGEWAY PLUS POT HOLES X2 KINGSMEAD/MILL LANE (LITTLE LITTLE SOMERFORD PARISH PARISH STEWARD POT HOLES X3 SOMERFORD) MILL LANE PARK STREET (CHARLTON) PARK STREET, CHARLTON, REPAIR CARRIAGEWAY REPAIR POTHOLE 4X MALMESBURY. POTHOLE 300*300*40MM DEEP VALE LEAZE (SPUR LEFT) LITTLE LITTLE SOMERFORD PARISH PARISH STEWARD POT HOLE SOMERFORD CLAY STREET BULLOCKS HORN LANE (CHARLTON) BULLOCKS HORN, CHARLTON REPAIR CARRIAGEWAY REPAIR POTHOLE INSECTION 3X

Page 10 POTHOLE 300*300*45MM DEEP MALMESBURY ROAD (C1 KINGSWAY MALMESBURY ROAD CORSTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY BRIDGE NORTH EAST TO 30 MPH) 150 YARDS FROM 3 POTHOLE POTHOLE CORSTON MAIN ROAD (30 MPH NORTH TO 30 CORSHAM PARISH THINGLEY PARISH STEWARD FILLING POTHOLES WITH ROY MPH) CORSTON LANE PACKER CHIPPENHAM ROAD (40 MPH SOUTH BROOKLYN, CHIPPENHAM ROAD REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY OF BURTON HILL TO 30 MPH) MALMESBURY POTHOLE POTHOLE MALMESBURY CHIPPENHAM ROAD (40 MPH SOUTH "AVALON", CHIPPENHAM RD, ROAD MENDER POTHOLE (DEFECTED PATCH) OF BURTON HILL TO 30 MPH) MALMESBURY 3000X1000X50 MALMESBURY GLOUCESTERSHIRE/COUNTY COUNTY BOUNDARY TO SUNSET REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY BOUNDARY S E TO C89 SUNSET HILL HILL BROKENBOROUGH POTHOLE POTHOLE (BROKENBOROUGH) COUNTY BOUNDARY NORTH EAST TO COUNTY BOUNDARY TO REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ASHBRIDGE PIKE LANE (ALDERTON) ASHBRIDGE PIKE LANE POTHOLE POTHOLE

COUNTY BOUNDARY NORTH EAST TO COUNTY BOUNDARY TO REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ASHBRIDGE PIKE LANE (ALDERTON) ASHBRIDGE PIKE LANE POTHOLE POTHOLE

Page 8 of 19 Carrriageway Minor Works 2010

COUNTY BOUNDARY NORTH EAST TO COUNTY BOUNDARY TO REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ASHBRIDGE PIKE LANE (ALDERTON) ASHBRIDGE PIKE LANE POTHOLE POTHOLE

CHURCH STREET/EASTON TOWN HOCKERELL COTTAGE REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY (HIGH STREET NORTH EAST TO SHERSTON POTHOLE POTHOLE 30/40MPH) SHERSTON WHEELBARROW LODGE ROAD TO SLIP ROAD FROM VILLAGE TO REPAIR CARRIAGEWAY FILLED POTHOLES ON BOTH FOSS WAY CROSSROADS (EASTON B4040 POTHOLE ENDS OF SLIP ROADS GREY) FOSS WAY CROSSROADS TO FOSSEWAY CROSSROADS TO REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TWATLEY FARM (EASTON GREY) TWATLEY FARM POTHOLE POTHOLE FOSS WAY CROSSROADS TO FOSSEWAY CROSSROADS TO REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TWATLEY FARM (EASTON GREY) TWATLEY FARM POTHOLE POTHOLE TWATLEY FARM TO SHIPTON MOYNE TWATLEY FARM TO SHIPTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ROAD (BROKENBOROUGH) MOYNE RD BROKENBOROUGH POTHOLE POTHOLE SHERSTON ROAD/BRISTOL STREET MALMESBURY, BRISTOL STREET, PARISH STEWARD REPAIR POTHOLE 300*400*60MM (30MPH EAST TO GLOUCESTER 66 DEEP ROAD) MALMESBURY

Page 11 SHERSTON ROAD/BRISTOL STREET 46 BRISTOL STREET, REPAIR CARRIAGEWAY REPAIR POTHOLE 400*400*40MM (30MPH EAST TO GLOUCESTER MALMESBURY. POTHOLE DEEP ROAD) MALMESBURY ST DENNIS LANE/CROSS HAYES HOLLOWAY MALMESBURY BY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY LANE/HOLLOWAY/WHITCHURCH HILL LAMPPOST 22 POTHOLE POTHOLE (MALMESBURY) ST DENNIS LANE/CROSS HAYES MALMESBURY PARISH, PARISH STEWARD FILLING POT HOLES LANE/HOLLOWAY/WHITCHURCH HILL WHITCHURCH HILL (MALMESBURY) CHARLTON ROAD (ENTRANCE MALMESBURY PARISH B4040 NR PARISH STEWARD FILLING POT HOLES CHARLTON PARK TO C81) CHARLTON BRIDGE ON SHARP BEND

MALMESBURY ROAD (40/50 SPEED MALMESBURY ROAD LEIGH BY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY LIMIT NORTH EAST TO C70 BM MAGNETICS POTHOLE POTHOLE CROSSROADS (LEIGH) HIGH STREET (B4040 DENNIS ROAD HIGH STREET MALMESBURY ON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO BURTON HILL ROUNDABOUT BRIDGE POTHOLE POTHOLE A429) MALMESBURY HIGH STREET (B4040 DENNIS ROAD HIGH STREET MALMESBURY ON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO BURTON HILL ROUNDABOUT BRIDGE AND BY POTHOLE POTHOLE A429) MALMESBURY

Page 9 of 19 Carrriageway Minor Works 2010

HIGHGATE (WOOD LANE B4042 EASTBOUND, ENT TO REPAIR CARRIAGEWAY POTHOLE/DEPRESSION CROSSROADS TO ENTRANCE LYDIARD TRAGUS POTHOLE 1000X600X180 HIGHGATE FARM) BRINKWORTH HIGHGATE ENTRANCE HIGHGATE B4042 BRINKWORTH BY LAY-BY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY FARM TO LYDIARD PLAIN POTHOLE POTHOLE (BRINKWORTH) EASTON GREY ROAD (SHERSTON EASTON GRAY ROAD SHERSTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ROAD JUNCTION IN NORTON-PLAIN ON BEND BY BYWAY POTHOLE POTHOLE FARM X-ROADS) SHERSTON EASTON GREY ROAD (SHERSTON ROAD SOUTH OF EASTON GREY REPAIR CARRIAGEWAY POTHOLES FILLED AND GRIPS ROAD JUNCTION IN NORTON-PLAIN TO NORTON POTHOLE CLEARED FARM X-ROADS) SHERSTON EASTON GREY ROAD (SHERSTON NORTON PARISH RD FROM PARISH STEWARD FILLING POT HOLES ROAD JUNCTION IN NORTON-PLAIN NORTON TO EASTON GREY FARM X-ROADS) SHERSTON ASHTON KEYNES ROAD (ENTRANCE MINETY PARISH ASHTON ROAD PARISH STEWARD FILL IN POT HOLE FIELD FARM TO B4696) ASHTON

Page 12 KEYNES LEVEL CROSSING ROAD (C90 MINETY LEVEL CROSSING LANE MINETY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO C/L RAIL BRIDGE) MINETY POTHOLE POTHOLE

LEVEL CROSSING ROAD (C90 MINETY LEVEL CROSSING LANE MINETY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO C/L RAIL BRIDGE) MINETY POTHOLE POTHOLE

LEVEL CROSSING ROAD (C90 MINETY FROXFIELD, LEVEL CROSSING REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO C/L RAIL BRIDGE) MINETY LANE MINETY POTHOLE POTHOLE

PINK LANE (CHARLTON) PINK LANE CHARLTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY POTHOLE POTHOLE PINK LANE (CHARLTON) CHARLTON PARISH PINK LANE PARISH STEWARD FILLING IN POTHOLES X14 PINK LANE (CHARLTON) CHARLTON PARISH PINK LANE PARISH STEWARD FILL IN POT HOLES X4 PINK LANE (C105 TO C67 (EAST)) SAW MILLS,PINK LANE REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY CHARLTON CHARLTON POTHOLE POTHOLE POND LANE (ENTRANCE POND FARM POND LANE CHARLTON ON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO B4040) CHARLTON BEND BY WATER TOWER POTHOLE POTHOLE ENTRANCE WHITES FARM WEST TO MANOR FARM, BRINKWORTH PARISH STEWARD POT HOLES X 2 SCHOOL HILL (BRINKWORTH) PARISH SHIPTON MOYNE ROAD (COUNTY TO B4040 TO SHIPTON MOYNE NR REPAIR CARRIAGEWAY FILLING POTHOLES B4040) MALMESBURY FOSSE FARM POTHOLE

Page 10 of 19 Carrriageway Minor Works 2010

SHIPTON MOYNE ROAD (COUNTY TO ROAD TOWARDS SHIPTON REPAIR CARRIAGEWAY FILLED X2 POTHOLES B4040) MALMESBURY MOYNE FROM B4040 POTHOLE TETBURY ROAD (B4040 NORTH TO TETBURY ROAD SHERSTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY 30MPH) SHERSTON OUTSIDE FOURWAYS ON POTHOLE POTHOLE JUNCTION TETBURY ROAD (30MPH NORTH TO TETBURY ROAD WILLESLEY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY PINKNEY COURT FARM ROAD) POTHOLE POTHOLE WILLESLEY TETBURY ROAD (30MPH NORTH TO TETBURY ROAD WILLESLEY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY PINKNEY COURT FARM ROAD) POTHOLE POTHOLE WILLESLEY TETBURY ROAD (30MPH NORTH TO TETBURY ROAD WILLESLEY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY PINKNEY COURT FARM ROAD) POTHOLE POTHOLE WILLESLEY TETBURY ROAD (30MPH NORTH TO TETBURY ROAD WILLESLEY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY PINKNEY COURT FARM ROAD) POTHOLE POTHOLE WILLESLEY THE HILL (B4042 TO THE STREET) THE HILL LITTLE SOMERFORD REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY

Page 13 LITTLE SOMERFORD OUTSIDE PAIR TREE POTHOLE POTHOLE THE GREEN (30 MPH TO CHURCH OUTSIDE MIDDLE GREEN, THE REPAIR CARRIAGEWAY CARRIAGEWAY POTHOLE LANE) DAUNTSEY GREEN GREEN, DAUNTSEY POTHOLE 500X1000X50 CLAY STREET (THE HILL NORTH EAST LITTLE SOMERFORD PARISH PARISH STEWARD POTHOLES X3 TO 30 MPH) LITTLE SOMERFORD VALELEAZE

CLAY STREET (30 MPH NORTH TO 1 DOVER LANE, LITTLE PARISH STEWARD POT HOLES B4042) LITTLE SOMERFORD SOMERFORD SWINDON ROAD (CRESSWELL LANE SWINDON ROAD CLEVERTON 60 REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO WOODBRIDGE ROAD) YARDS FROM JUN POTHOLE POTHOLE CLEVERTON BUSTLERS HILL/FOXLEY ROAD (30 BUSTLERS HILL SHERSTON BY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY MPH SOUTH EAST+EAST TO C27 SHERSTON NAME POTHOLE POTHOLE CROSSROADS) SHERSTON FOXLEY ROAD (C27 CROSSROADS FOXLEY ROAD FOXLEY BY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY EASTWARDS TO C1 CROSSROADS) JUNCTION POTHOLE POTHOLE FOXLEY SHERSTON ROAD (C1 CROSSROADS NORTON PARISH FOXLEY PARISH STEWARD FILLING POTHOLES AND GULLEY EAST TO HONEY LANE) FOXLEY

Page 11 of 19 Carrriageway Minor Works 2010

FOXLEY ROAD (HALCOMBE LANE FOXLEY ROAD, MALMESBURY ROAD MENDER 3 X CARRIAGEWAY POTHOLES NORTH EAST TO BRISTOL STREET) MALMESBURY WATERHAY WEST TO 30 MPH (ASTON WATERHAY BY PICNIC AREA REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY KEYNES) ASHTON KEYNES POTHOLE POTHOLE EASTCOURT ROAD (30 MPH EAST TO EASTCOURT ROAD EASTCOURT REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY 30 MPH) EASTCOURT POTHOLE POTHOLE EASTCOURT ROAD (30 MPH EAST TO EASTCOURT VILLAGE CRUD REPAIR CARRIAGEWAY X4 ROAD EDGE POTHOLES 30 MPH) EASTCOURT WELL POTHOLE FLISTERIDGE ROAD (30 MPH TO FLISTERIDGE ROAD EASTCORT REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY BRADENBROOK FARM) EASTCOURT OUTSIDE BRAYDON BR POTHOLE POTHOLE

FLISTERIDGE ROAD (30 MPH TO EASTCOURT TO FLISTERIDGE REPAIR CARRIAGEWAY X4 ROAD EDGE POTHOLES BRADENBROOK FARM) EASTCOURT ROAD CRUDWELL POTHOLE FILLED

CALLOW HILL (30 MPH CALLOW HILL CALLOW HILL HOOKERS GATE 40 REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY SOUTH TO WHITEHILL LANE) YARDS FROM BEND POTHOLE POTHOLE

Page 14 HOOKERS GATE DAUNTSEY ROAD (SEAGRY ROAD DAUNTSEY ROAD JUNCTION REPAIR FOOTWAY POTHOLE 1 POTHOLE 740 X 280 X 50 CROSSROADS EAST TO 30MPH) PARISH DAUNTSEY GREAT SOMERFORD DAUNTSEY ROAD (30MPH GREAT DAUNTSEY ROAD DAUNTSEY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY SOMERFORD TO RIVER AVON) POTHOLE POTHOLE DAUNTSEY CHURCH LANE (RIVER AVON TO CHURCH LANE DAUNTSEY BY REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY CHESTNUT FARM ENTRANCE) GLEBE FARM POTHOLE POTHOLE DAUNTSEY CHURCH LANE (RIVER AVON TO DAUNTSEY PARISH CHURCH PARISH STEWARD 1 POT HOLE CHESTNUT FARM ENTRANCE) LANE NR CRICKET GREEN DAUNTSEY KNOCKDOWN ROAD (30MPH TO KNOCKDOWN ROAD SHERSTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY BOUNDARY) SHERSTON POTHOLE POTHOLE KNOCKDOWN ROAD (30MPH TO KNOCKDOWN ROAD SHERSTON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY BOUNDARY) SHERSTON HALFWAY BUSH FARM POTHOLE POTHOLE

BISHOPER (COUNTY BOUNDARY TO BISHOPER CRUDWELL REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY ENTRANCE MARSH FARM) POTHOLE POTHOLE CRUDWELL

Page 12 of 19 Carrriageway Minor Works 2010

BISHOPER (ENTRANCE MARSH FARM BISHOPER CRUDWELL 30 REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO ENTRANCE BISHOPER FARM) YARDS BEFORE BEND POTHOLE POTHOLE CRUDWELL BISHOPER (ENTRANCE MARSH FARM BISHOPER CRUDWELL ON BEND REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO ENTRANCE BISHOPER FARM) POTHOLE POTHOLE CRUDWELL BISHOPER (BISHOPER FARM TO FIVE BISHOPER CRUDWELL REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY LANES CROSSROADS A429) POTHOLE POTHOLE CRUDWELL FIVE LANES (A429 TO TETBURY LANE) FIVE LANES HANKERTON 20 REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY HANKERTON YARDS FROM JUNCTION POTHOLE POTHOLE FIVE LANES (TETBURY LANE TETBURY LANE, CHARLTON REPAIR CARRIAGEWAY POTHOLE 900X300X50 HANKERTON TO 30MPH) CHARLTON POTHOLE THE STREET (SWINDON ROAD B4042 THE STREET LEA 40 YARDS REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO 30 MPH) LEA FROM 30 MPH SIGN POTHOLE POTHOLE THE STREET (PEMBROOK GREEN TO THE STREET, LEA JUST PAST REPAIR CARRIAGEWAY FILLED POTHOLE ST GILES CLOSE) LEA THE PUB POTHOLE 30MPH NORTH STARTLEY TO MALMESBURY PARISH GRANGE PARISH STEWARD FILLED POTHOLE

Page 15 RODBOURNE ROAD (RODBOURNE) LANE RODBOURNE GRANGE LANE (RODBOURNE ROAD GRANGE LANE JUNCTION A429 REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY NORTH TO A429) SOUTH OF MALMESBURY POTHOLE POTHOLE MALMESBURY HARE LANE (30 MPH NE TO HARE LANE EASTCOURT 50 REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY FLISTERIDGE ROAD) EASTCOURT YARDS FROM 30 MPH POTHOLE POTHOLE FLINTHAM HILL (30 MPH NORTH EAST FLINTHAM HILL OAKSEY JUST REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY TO 30 MPH) OAKSEY PASSED 30 MPH POTHOLE POTHOLE ALDERTON ROAD (THE AVENUE TO LUCKINGTON PARISH RD FROM PARISH STEWARD FILLING POTHOLES BACK LANE) ALDERTON FOSSE LODGE CULKERTON ROAD (COUNTY CULKERTON ROAD KEMBLE REPAIR CARRIAGEWAY FILLING POTHOLES WITH VIAFIX BOUNDARY EAST TO A429) KEMBLE POTHOLE

CULKERTON ROAD (COUNTY CULKERTON ROAD KEMBLE REPAIR CARRIAGEWAY FILLING POTHOLES WITH VIAFIX BOUNDARY EAST TO A429) KEMBLE MORGANS TYNINGS POTHOLE

A429 KEMBLE SOUTH EAST TO A429 KEMBLE TO CHELWORTH REPAIR CARRIAGEWAY FILLING POTHOLES WITH VIAFIX CHELWORTH ROAD (CHELWORTH) ROAD CHELWORTH POTHOLE SOMERFORD KEYNES ROAD (C/L RAIL SOMERFORD KEYNES ROAD REPAIR CARRIAGEWAY FILLING POTHOLES WITH VIAFIX BRIDGE TO BOUNDARY) OAKSEY OAKSEY POTHOLE

Page 13 of 19 Carrriageway Minor Works 2010

SOMERFORD COMMON LANE SOMERFORD COMMON LANE REPAIR CARRIAGEWAY FILLING POTHOLES WITH VIAFIX (BLACKBERRY LANE TO QUEEN BRINKWORTH POTHOLE STREET) BRINKWORTH BROKENBOROUGH ROAD (30MPH TO B4014 TO 30MPH REPAIR CARRIAGEWAY FILLING POTHOLES WITH VIAFIX B4014) BROKENBOROUGH BROKENBOROUGH POTHOLE WICK LANE (THE STREET TO 30MPH) WICK LANE OAKSEY ON REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY OAKSEY JUNCTION POTHOLE POTHOLE WICK LANE (30 MPH TO OAKWELL WICK LANE OAKSEY 30 YARDS REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY FARM LANE) OAKSEY FROM JUNCTION POTHOLE POTHOLE CHELWORTH MANOR FARM ROAD TO CHELWORTH MANOR FARM RD REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY C85 DEVILS COPSE (CHELWORTH) ON BEND POTHOLE POTHOLE

CHELWORTH MANOR FARM ROAD TO CHELWORTH MANOR FARM RD REPAIR CARRIAGEWAY REPAIR CARRIAGEWAY C85 DEVILS COPSE (CHELWORTH) ON JUNCTION THE POTHOLE POTHOLE

ANTHONY CLOSE (OFF GREEN LANE) SHERSTON PARISH ANTHONY REFILL GRIT BIN FILLING SALT BIN SHERSTON CLOSE

Page 16 MILL LANE (MALMESBURY) MILL LANE, MALMESBURY REFILL GRIT BIN FILLED GRIT BINS POOL GARSTONS ROAD OUTSIDE 1/2 THE ROWANS, PARISH STEWARD FOOTWAY EXCAVATION TO (MALMESBURY) POOL GASTON GAUGE MATERIAL AND TREE ROOTS UNDERNEATH AND REMOVE EXCESS MATERIAL TO LEVEL FOOTWAY OLD BREWERY LANE (INCLUDES MALMESBURY, AT THE MARKET RE-SET LOOSE PAVIORS REBED ROCKING SLAB 25MM MARKET CROSS AREA) MALMESBURY CROSS MONUMENT UPSTAND

HIGH STREET (ST DENNIS ROAD TO HIGH STREET, MALMESBURY MASONRY GANG LOOSE SLAB OUTSIDE OXFORD STREET) MALMESBURY "MALMESBURY ROCK" HIGH ST, MALMESBURY DERRY PARK (MINETY) DERRY PARK MINETY OUTSIDE 4 REPAIR TRIP HAZARD IN REPAIR TRIP HAZARD IN BITUMINOUS FOOTWAY BITUMINOUS FOOTWAY GASTONS ROAD (MALMESBURY) 0/S 15 GASTON ROAD, MASONRY GANG REBED 4X SLAB, REPLACE 1X MALMESBURY SLAB 800*600 , RAISE 2X KERBS

GORZEY LEAZE (FROM HONEY LANE COMMON HILL STEEPLE ASHTON PARISH STEWARD GRASS CUTTING FOR VISIBILITY SOUTH TO FORD POND) FOXLEY

WATERHAY (B4040 TO UC LOWER JUNCTION REPLACE GIVEWAY MARKING REFRESH WORN ROAD WATERHAY) LEIGH WATERHAY/MALMESBURY RD MARKINGS CRICKLADE

Page 14 of 19 Carrriageway Minor Works 2010

BOWDS LANE (DAUNTSEY GREEN) LYNEHAM PARISH BOWDS LANE PARISH STEWARD CUT BACK HEDGE TO VISIBILITY

EASTFIELD (ASHTON KEYNES) ASHTON KEYNES PARISH PARISH STEWARD CLEAR VEGETATION AROUND EASTFIELD DRAINAGE DITCH. EASTFIELD (ASHTON KEYNES) EASTFIELD (NOT COMPLETED PARISH STEWARD CLEAR VEGETATION ON BANKS ADDRESS) OF DRAINAGE DITCH CLIFF ROAD (C68 TO SILVER STREET) SHERSTON PARISH COURT ST PARISH STEWARD STRIMMING WEEDS ALONG SHERSTON CLIFF ROAD JUNCTION WALL THEN WEED SPRAY WALL

GASTON LANE (SHERSTON) SHERSTON PARISH THE PARISH STEWARD WEED SPRAYING TARTERS ESTATE MANOR CLOSE (EAST OFF SHERSTON PARISH PARISH STEWARD WEED SPRAYING KNOCKDOWN ROAD) SHERSTON KNOCKDOWN ROAD BREMILHAM RISE (MALMESBURY) BREMHILHAM RISE, CLEAR OVERGROWN WEED SPRAYING ALONG KERB MALMESBURY VEGETATION ON FOOTWAY LINE ARCHES LANE (MALMESBURY) ARCHES LANE, MALMESBURY CLEAR OVERGROWN WEED SPRAYING VEGETATION ON FOOTWAY OLD RAILWAY CLOSE (WEBBS WAY MALMESBURY PARISH REEDS PARISH STEWARD WEED SPRAYING ESTATE

Page 17 WEST TO STOP END) MALMESBURY FARM ESTATE UNFINISHED

ORWELL CLOSE (MALMESBURY) MALMESBURY PARISH, REEDS PARISH STEWARD WEED SPRAYING FARM ESTATE KEMBLES CLOSE (MALMESBURY) COWBRIDGE CRESCENT AND CLEAR OVERGROWN WEED SPRAYING KEMBLES CLOSE VEGETATION ON FOOTWAY PEMBROKE GREEN (LEA) PEMBROOK GREEN, LEA CLEAR OVERGROWN WEED SPRAYING FOOTPATH VEGETATION ON FOOTWAY PEMBROKE GREEN (LEA) PEMBROOK GREEN UP TO NO11, CLEAR OVERGROWN WEED SPRAYING LEA VEGETATION ON FOOTWAY TETBURY LANE (HANKERTON) HANKERTON PARISH LOVERS PARISH STEWARD WORKING WITH UNIMOG CUT LANE BACK HEDGE BOTH SIDES OF ROAD ON BANKS SINGLE TRACK ROAD MANOR PARK (GREAT SOMERFORD) MANOR PARK GREAT CLEAR OVERGROWN WEED SPRAYING AT MANOR SOMERFORD VEGETATION ON FOOTWAY PARK GREAT SOMERFORD MAIN ROAD (30 MPH NORTH TO 30 MALMESBURY W/O A429 30MPH PARISH STEWARD STRIMMING VERGE AND MPH) CORSTON NORTH CORSTON CUTTING BACK HEDGE WITH JOHN BERKLEY CHIPPENHAM ROAD (40 MPH SOUTH A429 MALMESBURY TO GRANGE CLEAR OVERGROWN WEED SPRAYING OF BURTON HILL TO 30 MPH) LANE JUN VEGETATION ON FOOTWAY MALMESBURY

Page 15 of 19 Carrriageway Minor Works 2010

CHIPPENHAM ROAD (40 MPH SOUTH MALMESBURY W/O PARISH A429 PARISH STEWARD STRIMMING AND CUTTING BACK OF BURTON HILL TO 30 MPH) BURTON SCHOOL FOOTPATH MALMESBURY FILANDS (TETBURY HILL EAST TO MALMESBURY PARISH FILANDS PARISH STEWARD WEED SPRAYING A429 MALMESBURY BYPASS) MALMESBURY THE STREET/PERRY GREEN (C80 TO THE STREET CHARLTON UNIMOG ASSISTED UNIMOG CUTTING 30MPH LIMIT) CHARLTON BACK HEDGE PERRY GREEN/THE MOOR (30MPH CHARLTON PARISH B4040 UNIMOG ASSIST UNIMOG HEDGE LIMIT CHARLTON EAST TO MOOR PERRY GREEN CUTTING LANE) CHARLTON SNOW HILL (ENTRANCE OLD PARK CHARLTON PARISH B4040 PARISH STEWARD CUT BACK HEDGE AROUND SIGN FARM TO COCKROOST FARM) STONE HILL CHARLTON SWINDON ROAD (BURTON HILL RBT PRIORITY R/ABT MALMESBURY CLEAR OVERGROWN WEED SPRAYED ON X4 ISLANDS A429 TO 40MPH LIMIT COW BRIDGE) X4 ISLANDS VEGETATION ON FOOTWAY SWINDON ROAD (BURTON HILL RBT B4042 PRIORY R/ABT TO CLEAR OVERGROWN WEED SPRAYING

Page 18 A429 TO 40MPH LIMIT COW BRIDGE) COWBRIDGE VEGETATION ON FOOTWAY SWINDON ROAD (BURTON HILL RBT MALMESBURY B4042 FROM PARISH STEWARD STRIMMING AND CUT BACK A429 TO 40MPH LIMIT COW BRIDGE) COWBRIDGE HEDGE GROWING OVER FOOTPATH 40/50 MPH LIMIT CALLOW CROSS- BRINKWORTH PARISH CALLOW PARISH STEWARD TRIM HEDGE ROUND SIGNS, AND WOOD LANE CROSSROADS HILL CROSSROAD JUNCTION, CUT UP LIMB OFF (BRINKWORTH) TREE. C/L RAIL BRIDGE TO LEIGH (B4040) B4696 100M FROM RAILWAY PARISH STEWARD CUT BACK HEDGE AROUND SIGN CROSSROADS (LEIGH) BRIDGE LEIGH CROSSROADS TO SWAN LANE LEIGH PARISH B4696 CROSS PARISH STEWARD CUT BACK HEDGE AROUND (LEIGH) ROADS SIGNS NORTON ROAD (C68 CROSSROADS EASTON GREY VILLAGE CLEAR OVERGROWN WEED SPRAYED KERB LINE AND TO B4040) EASTON GREY VEGETATION ON FOOTWAY ALONG STONE WALL IN VILLAGE

ASHTON KEYNES ROAD (C99 LOWER MINETY PARISH ASHTON ROAD PARISH STEWARD ASSIST UNIMOG - HEDGE/VERGE MOOR TO ENTRANCE FIELD FARM) GIBBS FARM CUTTING MINETY SODOM LANE (C45 DAUNTSEY DAUNTSEY PARISH SODOM PARISH STEWARD REPLACE GIVE WAY SIGN GREEN TO EVERGREEN FARM) LANE JUNCTION DAUNTSEY SODOM LANE NORTH TO ENTRANCE BRINKWORTH PARISH PARISH STEWARD REPLACE GIVE WAY SIGN AND WHITES FARM (GRITTENHAM) GRITTLEHAM CUTBACK HEDGE

Page 16 of 19 Carrriageway Minor Works 2010

THE STREET (30 MPH GREAT THE STREET, GREAT TO LITTLE UNIMOG OVERGROWN VERGES SOMERFORD TO 40 MPH) LITTLE SOMERFORD SOMERFORD THE STREET (40 MPH TO THE HILL) LITTLE SOMERFORD PARISH PARISH STEWARD INSPECT VERGE, FW DAMAGE LITTLE SOMERFORD THE STREET TAKE PICTURES COURT STREET (30 MPH TO CHURCH SHERSTON PARISH, COURT PARISH STEWARD WEED SPRAYING STREET) SHERSTON STREET COURT STREET (30 MPH TO CHURCH SHERSTON PARISH CHURCH PARISH STEWARD WEED SPRAYING STREET) SHERSTON STREET, COURT STREET COURT STREET (30 MPH TO CHURCH COURT STREET SHERSTON CLEAR OVERGROWN CLEARING WEEDS ALONG PARK STREET) SHERSTON VEGETATION ON FOOTWAY WALL SHERSTON ROAD (C1 CROSSROADS SHERSTON PARISH GASTON PARISH STEWARD STRIMMED WEEDS AND EAST TO HONEY LANE) FOXLEY LANE CUTTING BACK OVERHANGING HEDGE WITH JOHN BERKLEY FOXLEY ROAD (HALCOMBE LANE MALMESBURY PARISH FOXLEY PARISH STEWARD WEED SPRAYING NORTH EAST TO BRISTOL STREET) ROAD MALMESBURY RIXON GATE (30MPH TO FRIDAY HAM ASHTON KEYNES PARISH PARISH STEWARD ASSIST UNIMOG HEDGE - VERGE

Page 19 LANE) ASHTON KEYNES FRIDAY HAM LANE CUTTING FLISTERIDGE ROAD (30 MPH TO CRUDWELL PARISH PARISH STEWARD ASSIST UNIMOG GRASS BRADENBROOK FARM) EASTCOURT FLISTERIDGE CUTTING STRIMMING BARRIER

FLISTERIDGE ROAD (BRADENBROOK UPPER MINETY PARISH PARISH STEWARD STRIMMED OFF BRIDGE FARM TO HANKERTON ROAD) UPPER FLISTERIDGE ROAD GOA RAILINGS RUB DOWN MINETY UNDERCOAT RAILINGS THE COMMON (B4040 TO 30 MPH) MINETY PARISH TURN PIKE PARISH STEWARD ASSIST UNIMOG HEDGE/VERGE MINETY CROSS ROADS B404 CUTTING WOOD LANE C127 TO HIGH GATE BRINKWORTH PARISH WOOD PARISH STEWARD CUT BACK HEDGES AROUND XRDS B4042 (CALLOW HILL) LANE WOODBRIDGE BRIDGE RAILINGS RUB DOWN RAILINGS UNDER COAT RAILINGS WOOD LANE C127 TO HIGH GATE BRINKWORTH PARISH WOOD PARISH STEWARD CUT BACK VEGETATION ROUND XRDS B4042 (CALLOW HILL) LANE BRIDGE, SAND DOWN THEN UNDERCOAT RAILINGS DAUNTSEY ROAD (SEAGRY ROAD WAR MEMORIAL - TO DAUNTSEY CLEAR OVERGROWN WEED SPRAYING CROSSROADS EAST TO 30MPH) ROAD JUNCTION VEGETATION ON FOOTWAY GREAT SOMERFORD KNOCKDOWN ROAD (30MPH TO SHERSTON PARISH PARISH STEWARD CUTTING VEGETATION AROUND BOUNDARY) SHERSTON KNOCKDOWN ROAD ROAD SIGN

Page 17 of 19 Carrriageway Minor Works 2010

FIVE LANES (TETBURY LANE TETBURY LANE CLEAR OVERGROWN CUT BACK SIGNS AROUND HANKERTON TO 30MPH) CHARLTON VEGETATION ON FOOTWAY HEDGES AND SIGNS THE STREET (30 MPH TO PEMBROOK THE STREET FROM VILLA VIEW , CLEAR OVERGROWN WEED SPRAYING GREEN) LEA LEA VEGETATION ON FOOTWAY THE STREET (PEMBROOK GREEN TO THE STREET FROM CHURCH CLEAR OVERGROWN WEED SPRAY AY AND ROAD ST GILES CLOSE) LEA CORNER TO BADMINTON VEGETATION ON FOOTWAY EDGES ST GILES CLOSE NORTH EAST TO 30 BADMINTON LANE TO SCHOOL CLEAR OVERGROWN WEED SPRAYING MPH (LEA) LANE, LEA VEGETATION ON FOOTWAY GARSDON MILL ROAD NORTH TO CHARLTON PARISH NOAH'S ARK PARISH STEWARD CUT UP TREE LIMB TIDY UP CHARLTON ROAD (CHARLTON) ROAD 30MPH NORTH STARTLEY TO GRANGE LANE RODBOURNE, CLEAR OVERGROWN WEED SPRAYING RODBOURNE ROAD (RODBOURNE) BROOK BRIDGE VEGETATION ON FOOTWAY GRANGE LANE (RODBOURNE ROAD BROOKSIDE & BRIDGE NR CLEAR OVERGROWN WEED SPRAYING NORTH TO A429) SOUTH OF JUNCTION, HULLAVINGTON VEGETATION ON FOOTWAY MALMESBURY SOMERFORD KEYNES ROAD ASHTON KEYNES PARISH SPINE PARISH STEWARD INSPECTION OF FALLEN TREE (BOUNDARY TO NORTH END ROAD-WEST LIMB TREE LIMB SAFE ON VERGE

Page 20 JUNCTION) ASHTON KEYNES SOMERFORD KEYNES ROAD ASHTON KEYNES PARISH SPINE PARISH STEWARD CUT UP TREE LIMB TIDY UP/PUT (BOUNDARY TO NORTH END ROAD WEST ON VERGE JUNCTION) ASHTON KEYNES THE STREET (SOPWORTH SOPWORTH PARISH OUTSIDE PARISH STEWARD CLEARING GULLIES AND WEEDS CROSSROADS NORTH TO CHURCH MANOR FARM LANE) SOPWORTH SOPWORTH VILLAGE (CHURCH LANE SOPWORTH NEXT ENTRANCE PARISH STEWARD STRIMMING WEEDS AND WEED NORTH TO BOUNDARY) SOPWORTH OF NORTH END FARM SPRAYING

SOMERFORD COMMON LANE BRINKWORTH PARISH PARISH STEWARD CUT BACK VEGETATION AND (BLACKBERRY LANE TO QUEEN SOMERFORD COMMON C. 88 SAND RAILS READY FOR STREET) BRINKWORTH PAINTING SOMERFORD COMMON LANE BRINKWORTH PARISH C88 PARISH STEWARD CUT BACK BRAMBLES AROUND (BLACKBERRY LANE TO QUEEN SOMERFORD COMMON RAILINGS RUB DOWN RAILINGS STREET) BRINKWORTH PARK LANE (B4040 TO JUNCTION MALMESBURY PARISH WHITE PARISH STEWARD STRIMMING BACK FOOTWAY BACK BRIDGE) MALMESBURY LION PARK PARK ROAD (BACK BRIDGE TO MALMESBURY PARISH, PARISH STEWARD WEED SPRAYING FOOTPATH 30MPH) MALMESBURY HOLLOWAY HILL CLOATLEY ROAD (ENTRANCE MANOR HANKERTON PARISH CLOATLEY PARISH STEWARD ASSIST UNIMOG CUT BACK FARM TO CLOATLEY FARM) ROAD HEDGE ON BRIDGE RAILINGS HANKERTON

Page 18 of 19 Carrriageway Minor Works 2010

COMMON ROAD (30 MPH TO FOXLEY MALMESBURY W/O PARISH PARISH STEWARD STRIMMING GRASS VERGE AND ROAD C68) MALMESBURY COMMON RD FOXLEY R CLEARING GULLIES WITH JOHN BERKLEY VICARAGE LANE (30 MPH CHARLTON HANKERTON PARISH PARISH STEWARD CUT BACK HEDGE ON BENDS TO CLOATLEY ROAD) HANKERTON HANKERTON LANE AND VERGE ASSIST UNIMOG

FO 23 TO FO 27 BREMILHAM RISE MALMESBURY PARISH PARISH STEWARD WEED SPRAYED KERB LINE IN (MALMESBURY) BREMILHAM RISE ESTATE GULLIES PUT ON LIST FOR GULLY TANK. LOOSE GRAVEL PUT ON LIST FOR SWEEPER Page 21

Page 19 of 19 This page is intentionally left blank

Page 22