Annexure – I DETAILS OF THE PROJECT 1 Name & Location Details of the Project Kabir S Sy. No. 73/1A/1 (Govt. Gayarana Land) Dhupdal Village Taluk, 2 Name & Address of the Owner Kabir S Kabbur S/o. Sri. Sultansab Mahantesh Nagar, Dhupdal/ Gokak Taluk, Belagavi District. 3 Status of Organization: Individual/ Individual Partnership Firm/ Private Company (Enclose requisite Copy) 4 Project Status: New Project or Renewal of Renewal (QL. No. 1378) Lease w.e.f. 17/01/2007 for 5 Years 5 Documents Submitted: Application in prescribed Form – I √ Pre-feasibility report in prescribed √ format Mining plan approved by Mines & √ Geology Dept. Land Documents √ Notification /Mining Lease Order √ Status Clearances/ NOC if any √ Survey of Topo-sheet duly √ marking the Project Site 6 Nature of the terrain: Flat/ Undulated/ Hilly Hilly/ Coastal 7 Land use within 500 m from the lease area Dry barren land. No prime agricultural land 8 Surface drainage pattern (within or Garland drain will be provided along the quarry outside the lease area) and the excess water will be allowed to pass through the natural drainage system 9 Details of surrounding water bodies with Lake -1.5 Km towards NW distance from the project Ghataprabha River - 2 Km towards S Markandeya River -6 Km towards S-SE Dodda Halla – 9.8 Km towards W Kanvi Halla – 13.5 Km towards E 10 Total Investment (including Land/ Rs. 5 Lakhs Machinery/ Infrastructure) in Rs. Lakhs 11 Green Belt Plan (implemented or Proposed to plant locally suitable species in proposed) vacant area, wherever possible 12 RTC Copy of the survey numbers Sy. No. 73/1A/1 (Govt. Gayarana Land) Dhupdal Village Gokak Taluk, Belagavi District 13 NOC obtained from Deputy NA Commissioner? 14 Whether Non Agricultural Conversion - Page 1 of 3

Obtained (in case of private lands 15 National Parks/ wildlife Sanctuary/ Mailmate R-F -7 Km towards S Archaeological importance sites/ R-F -12 Km towards S-SW interstate boundary within 10 km radius? Kanashgeri R F – 12 Km towards S R F – 12 Km towards S 16 Nearest Educational Institutions & Gokak – 10 Km Hospitals with distance in km (if any) 17 Extent of Project Site in Hectares 0.6070 Hectares (1-20 Acres) 18 Present Land Use of the lease area Building Stone Quarry 19 Location Plan (Map) of the lease area and Enclosed surrounding area 20 Estimated Reserves Total : 73,600 Tons Proved : 40,600 Tons 21 Production details of the last 5 years 1,349 Tons 22 Present Capacity of Quarry/ Mine Year Saleable in (T) Rejects in (T) (Production/annum) First 7,714 406 Second 7,714 406 Third 7,714 406 Fourth 7,714 406 Fifth 7,714 406 Total 38,570 2,030 Average 7,714 406 23 Stripping Ratio & Solid Waste Disposal As in above 22 Method 24 Quarrying/ Mining Plan Status & Validity Operating (QL. No. 1378) Period w.e.f. 17/01/2007 for 5 Years 25 Ownership of Land: Patta/ Revenue/ Govt. Gayarana Land Forest (Please give details 26 Nearest Forest Boundary (as per - Karnataka Forest Rules) 27 Consent of land owner (if applicable) Not Applicable 28 Drilling & Blasting: Yes or No Yes, Controlled Blasting 29 Is Wire Saw Cutting practiced to avoid No blasting? 30 Vehicular Traffic density Additional Traffic density from the proposed quarry site : 1 PCU/Day 31 Solid Waste Quantity & Quality Expected quantity of about 638 Tons/annum, which will be stored and sold periodically. 32 Environmental Protective measures taken Ø Started dialogue with local Forest Dept. For (if any) at present getting saplings for plantation Ø Water tanker will be hired for water sprinkling along haulage roads 33 Average annual Rainfall & ground water Average Annual Rainfall of 738 mm potential of the area Belagavi District Average Annual Rainfall of 451 mm Gokak Taluk

Page 2 of 3

Depth of Ground Water <80 mts. 34 Details of water conservation measures Ø No water will be used for quarrying including rain water harvesting Ø Garland drains will be provided all along the periphery of the quarry Ø Natural drainage system will be maintained 35 Whether Environmental Protection Fee Yes paid. paid to the State Govt.? 36 Occupational & Community Health, These aspects are covered as part of Safety & Hygiene details Environmental Management Plan 37 Reports of Health Status of workers Will be submitted after the quarrying activity starts. 38 Nearest Human Settlement & Population/ Dhupdal Village : 2 km towards SW Households No. of households: 2,175 Total Population: 10,762 (as per 2011 census) 39 Socio economic packages planned, if any Proposed to spend Rs. 50,000 for the period of 5 Years. 40 Endemic health problems in the area due No endemic problems reported until now. to waste/ air borne diseases 41 Risk Assessment & Disaster Management Enclosed as part of Environmental Management (if applicable) Plan

Note: Other details to be sent in a CD. No papers containing civil drawings, copies of sale deed etc to be sent with the document.

Place: Belagavi Kabir S Kabbur Signature of the applicant With Name and full address (Project Proponent/ Authorized Signatory)

Page 3 of 3