May, 2017 Ⅰ. Company Introduction
Ⅱ. Water Supply Project at Dodoma Town in Tanzania
Founded in 1967, 1-20 Byeolyang-dong, Gwacheon-si, Kyeonggi-do, KOREA
Total 1,058 employees (Engineer 91.5%, Admin. 8.5%)
Professional Engineers / Ph.D. 18.9% Senior/Junior Engineers Admin. Staffs 72.6% 8.5%
3 Gaining competitive strength through constant growth
(Unit: MIL $)
140 100.4 100.6 120 114.0 113.3 103.3
100
80 93.1 89.9 61.2 60 86.7 69.0
40 20.9 23.4 16.6 39.2 31.6 Water Resources / Hydropower
Highway & Airport Civil Structures Urban Planning
Railroad & Subway
Water Supply & Sewerage
5 Harbor & Coast Geo-Technical Marine Energy Landscape Architecture & Foundation
Environment
Traffic Planning
6 7 SAMAN Corporation has executed several Projects Worldwide especially in the Water Supply and Sewerage Sector, and has accumulated plenty of technical skills and expertise. Indeed, SAMAN Corporation has been involved in more than 25 projects related to the Water Supply and Sewerage, some of which are still on-going.
Country1 Project Name Engineering Field Client
PMC for Master Plan of Water Supply and Sewerage System at Water Supply KOICA Bangladesh Chittagong in Bangladesh and Sewerage Feasibility Study for Water Supply System of Bandal Juri in Bangladesh Water Supply KOEXIM BANK PMC for Proposed Construction of Pulau Muara Besar Bridge, Road and Water Supply Brunei BEDB Utilities and Sewerage The Technical Assistance Preparing for Investment PMU-Lao Cai Water Supply WORLD BANK Subproject and Sewerage Vietnam Uong Bi Water Supply System Expansion Sub-project, Quang Ninh Water Supply WORLD BANK Province East Asia Basic Survey for Water Sector of Climate Partnership in East Asia Sewerage KOICA Consultancy Service for Design Review and Construction Supervision Sri Lanka Water Supply KOEXIM BANK Deduru Oya Water Supply Project
8
10 11 Made MOU Performed Project loan Selected between Ministry of Feasibility Study was approved the Consultant Environment in by EXIM BANK and made a contract Korea and Ministry in Korea with the Consultant of Water in Tanzania
Performed the Selected the Commenced Completion of detailed design construction company the construction construction works and and made a contract preparation of bid for the construction documents
12 13 To ensure a stable supply of water to the whole of Dodoma Town, an indirect water supply system was proposed, in which water was to be supplied from isolated distribution reservoirs to the respective consumer areas by gravity.
Item Detail • Re-using : 7 nos. • Rehabilitation : 3 nos. Borehole • New : 3 nos. • Production Capacity : 61,500 m3/d Pumping • Rehabilitation : 2 nos. Station • New : 2 nos. • Rehabilitation : 3 nos. Storage Tank • New : 2 nos. Transmission • New : DN400 ~ 800, L=46.14km Mains Distribution • New : DN100 ~ 600, L=31.58km Network Control Centre and • 1 nos. Laboratory
14 15 16 17 18