Public Document Pack

MEETING: CABINET MEMBER - TECHNICAL SERVICES

DATE: Wednesday 14 January 2009

TIME: 10.00 am

VENUE: Town Hall, (This meeting will also be video conferenced at Town Hall).

Councillor

DECISION MAKER: Fairclough SUBSTITUTE: Maher

SPOKESPERSONS: Ibbs Tonkiss

SUBSTITUTES: T Jones Sumner

COMMITTEE OFFICER: Paul Fraser Telephone: 0151 934 2068 Fax: 0151 934 2034 E-mail: [email protected]

The Cabinet is responsible for making what are known as Key Decisions, which will be notified on the Forward Plan. Items marked with an * on the agenda involve Key Decisions A key decision, as defined in the Council’s Constitution, is: - ● any Executive decision that is not in the Annual Revenue Budget and Capital Programme approved by the Council and which requires a gross budget expenditure, saving or virement of more than £100,000 or more than 2% of a Departmental budget, whichever is the greater ● any Executive decision where the outcome will have a significant impact on a significant number of people living or working in two or more Wards

If you have any special needs that may require arrangements to facilitate your attendance at this meeting, please contact the Committee Officer named above, who will endeavour to assist.

1

This page is intentionally left blank.

2 A G E N D A

Items marked with an * involve key decisions

Item Subject/Author(s) Wards Affected No.

1. Apologies for Absence

2. Declarations of Interest Members and Officers are requested to give notice of any personal or prejudicial interest and the nature of that interest, relating to any item on the agenda in accordance with the relevant Code of Conduct.

3. Minutes of the Meeting held on 3 December (Pages 5 - 2008 10)

* 4. Rural Development Programme for All Wards (Pages 11 - and Rural Economy Action Plan 24) Report of the Planning and Economic Regeneration Director

* 5. Southport Cycle Town Work Programme ; ; (Pages 25 - 2008/09 ; 30) ; ; ; ; Report of the Strategic Director of Regeneration and Environmental Services.

* 6. Local Transport Plan - Urban Safety All Wards (Pages 31 - Management, Local Safety, Speed 68) Management and Pedestrian Crossing Reviews Report of the Planning and Economic Regeneration Director

7. 2008/09 Local Transport Plan - Revised All Wards (Pages 69 - Technical Services Capital Programme 86) Report of the Strategic Director of Regeneration and Environmental Services.

8. Passageways at Bedford Road to Wadham (Pages 87 - Road Bootle - Proposed Stopping Up of 90) Public Highway - Section 116 of the Highways Act 1980 Report of the Planning and Economic 3 Regeneration Director

9. Footpath No. 8 - Temporary (Pages 91 - Footpath Closure 96) Report of the Planning and Economic Regeneration Director

10. Shellfield Road Southport, Woodville Meols; ; (Pages 97 - Avenue Crosby and Greenville Drive ; 104) Maghull - Request for Temporary Closures Report of the Planning and Economic Regeneration Director

4 Public Document Pack Agenda Item 3 THE “CALL IN” PERIOD FOR THIS SET OF MINUTES ENDS AT 12 NOON ON WEDNESDAY, 10 DECEMBER 2008. MINUTE NOS. 90, 91 AND 94 ARE NOT SUBJECT TO "CALL-IN"

CABINET MEMBER - TECHNICAL SERVICES

MEETING HELD AT THE TOWN HALL, BOOTLE ON WEDNESDAY 3 DECEMBER 2008

PRESENT: Councillor Fairclough

ALSO PRESENT: Councillors Ibbs and Tonkiss

87. APOLOGIES FOR ABSENCE

No apologies for absence were received.

88. DECLARATIONS OF INTEREST

No declarations of interest were received.

89. MINUTES OF THE MEETING HELD ON 19 NOVEMBER 2008

RESOLVED:

That the Minutes of the meeting of the Cabinet Member held on 19 November 2008 be confirmed as a correct record.

90. POWER SUPPLY AND REMEDIATION WORK - SOUTHPORT COMMERCE PARK

The Cabinet Member considered the report of the Planning and Economic Regeneration Director on progress regarding the power and remediation scheme at Southport Commerce Park; and seeking approval to commence the tendering exercise for the appointment of contractors.

The report indicated that currently, two significant barriers prevented further development of the Southport Commerce Park, namely the lack of electrical power supply and land contamination; detailed that the total cost of the works was £3.07 million; and that 100% of the costs would be met from the Regional Development Agency.

RESOLVED:

That Cabinet be requested to:

(1) waive the Contract Procedure Rules of the Constitution to allow for:

(i) non-contestable work to be carried by Scottish Power at a cost of £290,141.58;

(ii) the three power supply companies identified in the report to be invited to tender for the contestable work; and

Page44 5 Agenda Item 3 CABINET MEMBER - TECHNICAL SERVICES- WEDNESDAY 3 DECEMBER 2008

(iii) the appointment of UCE Ltd. as specialist external consultant to undertake the consultancy element of the works; and

(2) following the site investigation works, authorise the appropriate tendering exercise to be undertaken in relation to remediation works.

91. DECLARATION OF AIR QUALITY MANAGEMENT AREAS

The Cabinet Member considered the report of the Environmental Protection Director advising that he would be seeking approval to the formal declaration of three Air Quality Management Areas (AQMAs) in Sefton; and indicating that a decision on this matter was required as Local Authorities had a duty under Section 83(1) of the Environment Act 1995 to designate those areas where air quality objectives were unlikely to be met as AQMAs.

The report indicated that analysis of air pollution monitoring data undertaken at three sites concluded that:

• an AQMA for PM 10 must be declared at Millers Bridge • AQMAs for nitrogen dioxide must be declared at Millers Bridge and Princess Way; and • even though the PM 10 Objective was not exceeded in 2007 at Crosby Road North, an AQMA for PM 10 should be declared because future compliance with the objective could not be guaranteed and a sensitive receptor (Waterloo Primary School) was situated in the area;

and concluded by detailing the information and consultation process undertaken in connection with the AQMAs.

Attached as an annexe to the report was a copy of AQMA Numbers 1, 2 and 3 Order 2009.

The Cabinet Member - Environmental, Cabinet and Council would be recommended to approve the three AQMAs.

This was a Key Decision and was included in the Council's Forward Plan of Key Decisions.

RESOLVED:

That the report advising of the three Air Quality Management Areas to be declared in Sefton be noted.

Page45 6 Agenda Item 3 CABINET MEMBER - TECHNICAL SERVICES- WEDNESDAY 3 DECEMBER 2008

92. TECHNICAL SERVICES DEPARTMENTAL SERVICE PLAN MONITORING - QUARTER 2

The Cabinet Member considered the report of the Strategic Director of Regeneration and Environmental Services updating on the performance of the Technical Services Department for 2008/09 and with particular regard to the Service Delivery Plan; and indicating that a decision on this matter was required in order to comply with the Corporate Performance Management procedure.

The report indicated that it was a six monthly update for the department for the period April to September 2008; that the report encompassed the full range of services under the remit of the original department; but however, following the implementation of the Major Service Review and the transfer of services to either Capita Symonds, the Planning and Economic Regeneration Director or the Environmental Protection Director, the content of future performance reports was likely to change.

The report detailed service achievements relating to:

• improving waste management and reducing environmental pollution • improving the condition and safety of local roads and the rail network • ensuring services were accessible to all • safeguarding and enhancing Sefton's cultural, heritage and natural environment • positively responding to public health, food safety and pollution issues • reducing the potential harm from unsafe environments including the prevention of today's young people from becoming tomorrow's problem drug user; together with information relating to performance indicators, corporate and cross cutting issues, risk management and future issues.

Attached as Appendix A to the report was a copy of the Technical Services Departmental Service Plan Monitoring Quarter 2 2008/09, whilst Appendix B detailed a response from Technical Services to the allocation of the National Indicator set.

RESOLVED:

That the performance of the Technical Services Department against the targets set out in the Service Delivery Plan be noted.

93. PARKING SERVICES REVIEW - CHRISTMAS PROMOTIONS

Further to Minute No. 84 of 19 November 2008, the Cabinet Member considered the report of the Planning and Economic Regeneration Director seeking views on Christmas Parking provisions.

Page46 7 Agenda Item 3 CABINET MEMBER - TECHNICAL SERVICES- WEDNESDAY 3 DECEMBER 2008

The report indicated that during the formal consideration of the November 2008 Parking Service Review, the Cabinet and Overview and Scrutiny Committee (Regeneration and Environmental Services) raised the potential for parking promotions (i.e. free/reduced cost parking) to be provided in the run up to Christmas 2008, to support town centre economies at this difficult trading period; that the need for charging in the main centres for parking, both on and off street, was now recognised as an essential tool in managing available capacity, improving accessibility and promoting sustainable modes of transport; and that consequently, in considering Christmas Parking Promotions, the following needed to be taken into consideration:

• good widespread publicity and on site information would be required to ensure visitors were fully aware of the promotion and when an where it applied. Failure to do this could result in negative representations being received;

• any proposals needed to ensure they targeted visitors and shoppers to ensure the wider economic benefits justified the additional expenditure and budget implications;

• depending on the options considered (e.g. free all day parking/free parking after 4.00 p.m./free park and ride etc.), then the impacts on traffic management and ensuring shoppers were the main people to benefit from the offer needed full and careful detailed evaluation; and

• any proposals would undoubtedly require additional input from the Parking Services Team, i.e. administration (orders/notices) and practical measures (parking signs/bagging of machines etc.). This needed to be considered and built into work programmes.

The report concluded that to consider these issues and provide a successful promotion would require careful planning that needed to be developed in consultation with key stakeholders for the individual centres (Business Enterprise/Village groups, Chamber of Commerce etc.); that consequently, for Christmas 2008 this clearly could not be achieved; but however, for 2009 and future years timely further detailed consideration would be given, consultation with stakeholders progressed, and a further report to Cabinet Member - Technical Services submitted at the appropriate time.

RESOLVED: That

(1) the report on the Parking Services Review - Christmas Promotions be noted.

(2) the current difficult economic conditions be recognised and therefore, the Cabinet Member supports the use of promotions to help support local businesses; accordingly further detailed consideration of the options to provide Christmas/other Parking

Page47 8 Agenda Item 3 CABINET MEMBER - TECHNICAL SERVICES- WEDNESDAY 3 DECEMBER 2008

Promotions for 2009 be progressed in consultation with town centre stakeholders; and

(3) thereafter a further report be submitted to the Cabinet Member - Technical Services.

94. EXCLUSION OF PRESS AND PUBLIC

RESOLVED:

That, under Section 100A(4) of the Local Government Act 1972, the press and public be excluded from the meeting for the following item of business on the grounds that it would involve the likely disclosure of exempt information as defined in paragraph 3 of Part 1 of Schedule 12A to the Act. The Public Interest Test has been applied and favours exclusion of the information from the press and public.

95. ARBORICULTURAL WORKS TERM CONTRACT - RECEIPT OF TENDERS

The Cabinet Member considered the report of the Leisure Director on the receipt of tenders for the Arboricultural Tree Works term contact; and providing a brief analysis of the cost and quality of the submissions.

This was a Key Decision and was included in the Council's Forward Plan of Key Decisions.

RESOLVED: That

(1) the Cabinet be recommended to note that to maintain the same standard of arboricultural service will require the budget to increase by approximately 25%;

(2) Cabinet be requested to consider an increase in funding to maintain the same standard of service for arboricultural works as part of the 2009/2010 budget setting process; and

(3) the Finance and Information Services Director be requested to submit a report to future meetings on the use of Section 106 monies or alternative funding sources to help maintain the Council’s tree stock.

Page48 9 Agenda Item 3

This page is intentionally left blank

Page 10 Agenda Item 4

REPORT TO: Cabinet Member: Leisure and Tourism Cabinet Member: Technical Services Cabinet Member: Regeneration Cabinet DATE: 7th January 2009 14 th January 2009 21 st January 2009 5 th February 2009 SUBJECT: Rural Development Programme for England, and Merseyside Rural Economy Action Plan WARDS AFFECTED: All

REPORT OF: Andy Wallis, Planning & Economic Regeneration Director

CONTACT OFFICER: Mo Kundi 3447

EXEMPT/ No CONFIDENTIAL:

PURPOSE/SUMMARY: To inform Members of the development of the Rural Development Programme for England (RDPE), and the Merseyside Rural Economy Action Plan (MREAP), and to consider the implications for Sefton.

REASON WHY DECISION REQUIRED: To ensure that , and its partners are in a position to access support and funding from the RDPE, and MREAP either through collaborative programmes, or individual Sefton projects.

RECOMMENDATION(S): It is recommended that Members:- 1. Note the content of the report, and that Sefton’s contribution towards the Rural Economy Action Plan can be funded from within existing resources, and 2. Request further regular progress reports.

KEY DECISION: Yes

FORWARD PLAN: Yes

IMPLEMENTATION DATE: Immediately following the call-in period for the minutes of these meetings

Page 11 Agenda Item 4

ALTERNATIVE OPTIONS: The Rural Development Programme for England (RDPE), a successor programme to the Merseyside Objective 1 Programme (European Agricultural GG Fund measures), and the development of a Merseyside Rural Economy Action Plan, would enable the draw down of both European and Regional Development Agency funding either through collaborative programmes, or individual Sefton projects. Failure to pro-actively participate in the development and implementation of these new initiatives would jeopardise Sefton Council’s, its partners’ and the relevant local business’ ability to seek business and financial support.

IMPLICATIONS:

Budget/Policy Framework: The proposals support Sefton’s Corporate Plan and Community strategy objectives for economic development Financial: The development of a Merseyside Rural Economy Action Plan is expected to cost approximately £100,000 of which, £50,000 is being sought from the Regional Development Agency and St Helens Council, (the latter acting as the lead organisation for the sub-region). The balance of £50,000 is being sought from, TMP, Sefton, Knowsley, Wirral, and Liverpool. Sefton Council’s contribution is likely to be £10,000, equally split over financial years 2008/9 and 2009/10. This can be met from existing Economic Regeneration budgets. 2008/ 2009/ 2010/ 2011/ 2009 2010- 2011 2012 CAPITAL EXPENDITURE £ £ £ £ Gross Increase in Capital Expenditure Funded by: Sefton Capital Resources Specific Capital Resources REVENUE IMPLICATIONS Gross Increase in Revenue £5,000 £5,000 Expenditure Funded by: Sefton funded Resources £5,000 £5,000 Funded from External Resources Does the External Funding have an expiry When? date? Y/N How will the service be funded post expiry?

Legal: N/A

Page 12 Agenda Item 4

Risk Assessment: See alternative options above.

Asset Management: N/A

CONSULTATION UNDERTAKEN/VIEWS Finance Department, Leisure Services, Tourism Department, Technical Service.

CORPORATE OBJECTIVE MONITORING:

Corpora Positive Neutral Negative te Impact Impact Impact Objectiv e 1 Creating a Learning Community / 2 Creating Safe Communities / 3 Jobs and Prosperity / 4 Improving Health and Well-Being / 5 Environmental Sustainability / 6 Creating Inclusive Communities / 7 Improving the Quality of Council Services / and Strengthening local Democracy 8 Children and Young People /

LIST OF BACKGROUND PAPERS RELIED UPON IN THE PREPARATION OF THIS REPORT 1) The Rural Development Programme for England 2007-2013

Page 13 Agenda Item 4

1.0 Rural Development Programme for England

1.1. The Rural Development Programme for England (RDPE) is a jointly funded by the European Union, through the European Agricultural Fund for Rural Development and the national Government. The Rural Development Programme for England will have a budget of £3.9 billion. This is more than double the budget available for the previous programme, which ran from 2000-2006. Of the £3.9 billion budget, £3.3 billion will be allocated to agri-environment and other land management schemes. This funding is aimed at helping farmers to manage the land more sustainably, and deliver important outcomes on bio-diversity, landscape and access, water quality and climate change.

1.2. The balance of the money, some £600 million is being made available to make agriculture and forestry more competitive and sustainable in rural areas. The Northwest will receive approximately £374 million of the Rural Development Programme for England to invest in the region between 2008, and 2013. The total amount available for the Merseyside sub-region is approximately £2.2m

1.3. The available measures for funding have been divided between three main headings (or axis). There will also be a fourth, cross cutting (or implementation) axis under which the LEADER approach to bottom up locally led projects will be used to implement measures in other axes. The axes are:-

Axis 1- Improving the competitiveness of the farming and forestry sectors (to be delivered via North West Development Agency) • To encourage modernisation and diversification of farm and forestry businesses including adding value to primary produce. • To promote efficiency of resource use such as energy, water, and nutrients. • To develop new markets for products e.g. woodfuel/biomass.

Axes 2 – Improving the environment and countryside (to be delivered via Natural England and the Forestry Commission) • Conserve wildlife and biodiversity. • Maintain the historic environment and cultural heritage. • Promote public access and understanding of the countryside. • Protect natural resources. • Sustainable forest management and the creation of new woodland resources.

Axes 3 – Rural quality of life and diversification of the rural economy (to be delivered via North West Development Agency) • To encourage entrepreneurial and socio-economic activity. • To promote rural tourism, and access. • To develop micro-business, and support rural service provision.

Axes 4 – The LEADER approach which is a cross cutting method

Page 14 Agenda Item 4

• The main mechanism for the delivery of socio-economic priorities of the RDPE in the Northwest is the Leader approach, which is a bottom-up, community-led delivery method. Delivery is undertaken by Local Action Groups who will ensure that supported activities are within the context of the Sub-Regional Implementation Plans already agreed.

2.0 Management of RDPE

1) At National/Northwest Level

2.1 At a national level the RDPE programme will be managed by a Programme Monitoring Committee made up of representatives from DEFRA, Natural England, Regional Development Agencies, and the Forestry Commission. At a Northwest level, a steering group comprising NWDA, Natural England, the Forestry Commission, Government Office North West, and an independent third party chairperson will manage the RDPE programme. The steering group has the responsibility to:-

• Oversee programme delivery in the region. • Review performance and the Regional Implementation Plan. • Monitor cross-axis integration. • Report on performance, programme management issues (focusing on integration, partnership, and best practice) to The Regional Rural Strategic Group, Northwest Rural Affairs Forum, and the National Programme Monitoring Committee. • Capture best practices. • To ensure effective communications.

2) At Merseyside sub-regional level

2.2 At sub regional levels in the North West, the delivery of socio-economic priorities is via the Leader approach, which is a bottom-up, community led delivery method. Delivery is undertaken by Local Action Groups, and in the case of Merseyside the Integrated Countryside and Environment Plan (ICEP) team will manage this group, which is called the Mersey Rural Leader LAG. ICEP is a partnership of five local authorities in Merseyside and a wide range of private, public and environmental organisations, and was created to deliver the rural dimension of the previous Merseyside’s Objective 1 Programme and has proven highly successful in achieving its aims.

2.3 Under the previous Objective 1 Programme ICEP facilitated £6.5 million of EAGGF/DEFRA funding to over 200 businesses in Merseyside and supported over 50 major projects. This public funding levered in an additional £13 million of private sector investment into the region. Some of the projects that Sefton benefited from this funding are included as Annex A to this report.

2.4 The ICEP in partnership with Merseyside local authorities, and stakeholders submitted a bid to the Northwest Development Agency for it to act as a delivery vehicle for that element of the Rural Development Programme as far as it relates to this sub-region. The Annex B below shows the proposed delivery structure. I am pleased to report that in late November 2008, the RDA informed ICEP that its bid was successful. A copy of the full bid can be accessed from ICEP website,

Page 15 Agenda Item 4

www.icep.org.uk A copy of the plan showing the rural areas in Merseyside eligible for funding under this programme is attached as Annex C to this report.

2.5 Annex D provides information on the eligible activities contained in Axis 1 and 3, and the outputs that need to be achieved. Given the limited amount of money available under these two Axis, officers are currently exploring potential projects that could attract some funding.

3.0 Merseyside Rural Economy Action Plan

3.1 Following on from work already undertaken in St Helens, and based on the premise that Merseyside’s rural areas collectively represent an undervalued and underexploited asset with significant economic development, the five Merseyside local authorities together with the Northwest Regional Development Agency (RDA), the Mersey Partnership (TMP) will be commissioning consultants to undertake a major two phase study relating to the Merseyside’s rural economy:-

• Phase 1 – the production of an over-arching Merseyside Rural Economy Strategy to be informed by economic baseline and SWOT analyses, and to include the determination of an integrated strategic governance structure.

• Phase 2 – the production of a detailed, intelligence-led, fully costed integrated Rural Economy Action Plan (REAP) and associated bids to draw down funding and deliver the defined strategy.

3.2 This work is therefore intended to help inform and support the ongoing development and implementation of the Merseyside Action Plan for the City Region (MAP), complement other relevant sub-regional economic development and enterprise related initiatives, and contribute to delivering the Northwest Regional Economic Strategy (RES).

3.-3 This is a major joint commission by the Merseyside local authorities, The Mersey Partnership, and the Regional Development Agency, and as the designated sub- regional lead for the rural economy, St.Helens Council will let and manage the associated contract.

3.4 The study area essentially comprises the green belt and other predominantly non- urban areas of the 5 non-Liverpool Merseyside Local Authorities, i.e. rural and mixed rural-urban wards. Some consideration would however, also be given to any relevant areas of Liverpool plus to demographic, commercial, employment, travel and other links/issues re adjoining parts of Cheshire, Lancashire, Greater Manchester. The precise geography and criteria will be agreed with the chosen consultants.

3.5 The indicative timescale is as follows:- • Send out brief to prospective consultants December 2008 • Deadline for receipt of proposals Monday 5 January 2009 • Consultant selection interviews week commencing 12 January 2009 • Phase 1 inception meeting week commencing 12 January 2009 • Phase 1 Interim report March

Page 16 Agenda Item 4

• Phase 1 draft final report April • Phase 1 completion end of April 2009 • Phase 2 inception May 2009 • Phase 2 completion August 2009

3.6 It is intended that further reports will be presented to Members at the conclusion of each phase.

4.0 Summary 4.1 The national and European funded Rural Development Programme for England would provide £3.9 billion to assist agri-environment and other land management schemes. This funding is aimed at helping farmers to manage the land more sustainably, and deliver important outcomes on bio-diversity, landscape and access, water quality and climate change. Of the £3.9 billon, some £74m is earmarked for the Northwest of England, with Merseyside being allocated some £2.2m. For the purpose of delivery, the Northwest element of the Programme is divided into four axis, with axis 1,3, and for being the responsibility of the Northwest Development Agency, and axis 2 the Forestry Commission.

4.2 The delivery of the Merseyside element of the socio-economic priorities is via the Leader concept, which is a bottom-up, community-led delivery method. Delivery is undertaken by Local Action Groups (LAG), and in the case of Merseyside the Integrated Countryside and Environment Plan (ICEP) team will manage this group, which is called the Mersey Rural Leader LAG. ICEP is a partnership of five local authorities in Merseyside and a wide range of private, public and environmental organisations. ICEP has been informed by the Regional Development Agency that its bid to manage the delivery through Local Actions Groups has been successful, the cost of which would be £399,747 for the period 2008 to 2013. An officer from Council’s Planning and Economic Regeneration Department would sit on the LAG Executive Board.

4.3 For a number of reasons rural areas in Merseyside have generally been undervalued and underexploited, and yet they have significant potential to grow and prosper and add value to the overall economic base of the region. Linked to this is the fact there are significant areas of deprivation in rural areas, which the government has recognised as need addressing. The development of a Merseyside Rural Economy Action Plan as set out in this report provides an opportunity to get a comprehensive picture of the rural economy and to identify actions required. The Regional Development Agency is part funding this study, and has indicated that projects emanating from this Action Plan would be eligible for grant funding from £2m already allocated from the Agency’s single pot budget for rural areas over the next two years.

Page 17 Agenda Item 4

ANNEX A

Previous ICEP facilitated EAGGF/DEFRA funded projects in Sefton

a) Sefton Coast and Countryside Service

Sefton Council's Coast and Countryside Service in conjunction with numerous partners has increased its efficiency and sustainability and provided training for vulnerable people thanks to new forestry equipment for its inclusion programme. The Woodmizer, Chipper, Sawbench and Radial Saw have enabled what may previously have been considered 'waste' timber to be crafted into picnic benches, gates, nest boxes, waymarkers and many other products for use throughout the Council's sites.

By harvesting wood efficiently, the need for imported timber has fallen, reducing transport expenditure, and furthering the Service's sustainability. The timber can also carry the Forest Stewardship Council (FSC) label after UKWAS certification was achieved, with support from The Mersey Forest through the Merseyside Objective One programme, for the area of the Sefton Coast Woodlands managed by the Coast and Countryside Service. The FSC logo provides independent assurance to customers that timber comes from sustainably managed woodlands, potentially increasing its market value. The main components were:- • £24,000 ICEP Mersey Forest grant

• £24,000 match funding

• 80% of timber now sourced inhouse

• 6 jobs created

• 7ha woodland improved

b) Sefton Coastal Footpath

Tourism development in the Sefton Coast area has been boosted through a project to re-route lost or vulnerable sections of the Sefton coastal path to restore a fully intact route to attract both residents and visitors. An ICEP Mersey Forest Grant has enabled the footpath to take a sustainable course, well away from areas affected by coastal erosion and sand dune movement, instead passing through the Sefton Coast woodlands with attractive vistas into the open dune landscape and the former asparagus fields.

The project complements the activities of the Sefton Coast Woodlands Forest Plan as improving access to the spinal route on the coast brings additional public benefit to the ongoing investment in sustainable woodland management. • £33,000 ICEP Mersey Forest Grant

• £67,000 match funding

• 4.75km access created

c) WRS Composting Page 18 Agenda Item 4

WRS Composting Ltd of , , recycles green waste into a soil conditioning compost, an environmentally friendly alternative to peat. With support and funding through ICEP and Business Link Northwest, the company has invested over £1 million in constructing a purpose built site on a farm rented from the Leverhulme Estate. This investment has enabled the company to handle up to 30,000 tonnes of green waste from local authorities and private businesses each year. This investment has lead to:- • 10 jobs safeguarded

• 6 jobs created

• 15,000 sq feet of work space created

• Over £600,000 of private investment

• £200,000 of EAGGF funding

Page 19 Agenda Item 4

Annex B Proposed Delivery Arrangements

Mersey Knowsley MBC Rural Accountable Leader body LAG

NWDA LAG Exec LAG Staff

Business Other Projects Link Support Partners

Flow of funding

Projects

LAG LAG EXEC KMBC Staff

Mersey Rural Leader

NWDA

Notes:-

Page 20 Agenda Item 4

1. Knowsley Council will act as the Accountable body for the ICEP bid. 2. LAG (Local Action Group Staff) will be same as those that worked on ICEP Programme 3. LAG Executive will comprise of a maximum of 15 members from the public, and the private sector. An officer from the Planning and Economic Regeneration sits on the Executive. 4. Merseyside Rural Leader LAG comprises of all stakeholders participating in the programme.

Page 21 Agenda Item 4

Annex C RDPE Eligible Rural Areas

Page 22 Agenda Item 4

Annex D AXIS 1

Code Measure Output Indicator Mersey Mersey RL RL Budget Target 114 Use of Advisory Number of Farmer/Forest 4 £65k Services holders supported 115 Setting up Number of newly set up 1 £65K management, relief management, relief or and advisory services advisory services 123 Adding value to Number of enterprises 3 agricultural and supported forestry products 123 Adding value to Total volume of investment £384,000 £130K agricultural and (£) forestry products 124 Cooperation for Number of cooperation 5 £65K development of new initiatives supported products, processes and technologies in the agriculture, food and forestry sectors

AXIS 3 code Measure Output Indicator Mersey Mersey RL RL Budget Target 311 Diversification into non Number of beneficiaries 14 agricultural activities 311 Diversification into non Total volume of £3.3 £600k agricultural activities investment (£m) 312 Business creation and Number of micro 22 £600k development businesses supported/created 313 Encouragement of tourism Number of new tourism 7 activities actions supported 313 Encouragement of tourism Total volume £1.02 £300k activities investment(£m)

Indicators Targets 2007- 2013 Increase in non-agricultural GVA in Businesses supported under RDPE show an supported businesses increase in GVA (as measured by growth in profitability) equal to or greater than in other similar businesses in England. Gross No of jobs created 282

Page 23 Agenda Item 4

Additional tourism overnight stays 3955 Additional tourism day visits 5763 Population in rural areas benefiting 2260 from improved services Number of participants that 80% of participants have applied or expect to successfully ended a training activity apply the acquired skills in practice. Increase in agricultural GVA in Farm/food/forestry enterprises supported supported farms under RDPE show an increase in GVA (as measured by growth in profitability) which is equal or greater than in other farm/food/forestry enterprises in England Number of holdings introducing new 95% of holdings or enterprises receiving products and or new techniques support under the relevant measures introduced new product and or technique. Area of woodland being managed To be confirmed under an approved management scheme For establishment of energy crops, 131.5 Ha (Merseyside) area under successful land management to climate change (hectares)

Page 24 Agenda Item 5

REPORT TO: Cabinet Member Technical Services Cabinet

DATE: 14 th January 2009 22 nd January 2009

SUBJECT: Southport Cycle Town Work Programme 2008/9

WARDS AFFECTED: Dukes, Kew, Birkdale, Cambridge, Meols, Ainsdale, Norwood

REPORT OF: Alan Moore Strategic Director and Deputy Chief Executive

CONTACT OFFICER: Dave Marrin, Traffic Services Manager 0151 934 4295

EXEMPT/ No CONFIDENTIAL:

PURPOSE/SUMMARY:

To seek entry of the Cycle Town Work Programme into the 2008/9 Capital Programme.

REASON WHY DECISION REQUIRED:

To approve the Cycle Town Work Programme which will facilitate delivery of capital projects in 2008/9

RECOMMENDATION(S):

It is recommended that:

Cabinet Member Technical Services:-

i) Recommend the Cabinet to approve the Cycle Town Work programme as part of the Capital programme for 2008/9:

ii) Note the commitment to Southport hosting a round of the 2009 Tour Series Cycle Race.

Cabinet:-

i) Approve the Cycle Town Work programme as part of the Capital programme for 2008/9:

KEY DECISION: Yes

FORWARD PLAN: No – Rule 15 Form completed by Chair of Overview & Scrutiny Committee IMPLEMENTATION DATE: Following the expiry of the ‘call in’ period for the minutes of the meeting

Page 25 Agenda Item 5

ALTERNATIVE OPTIONS:

None

IMPLICATIONS:

Budget/Policy Framework: The project will be funded through Department for Transport Grants, Local Transport Plan and revenue resources.

Financial:

2008/ 2009/ 2010/ 2011/ 2009 2010 2011 2012 CAPITAL EXPENDITURE £ £ £ £ Gross Increase in Capital Expenditure 258,000 Funded by: Sefton Capital Resources Specific Capital Resources 258,000 REVENUE IMPLICATIONS Gross Increase in Revenue Expenditure 42,000 Funded by: Sefton funded Resources Funded from External Resources 42,000 Does the External Funding have an expiry date? Y/N When? How will the service be funded post expiry?

Legal: N/A

Risk Assessment: N/A

Asset Management: N/A

CONSULTATION UNDERTAKEN/VIEWS - Finance

Page 26 Agenda Item 5

CORPORATE OBJECTIVE MONITORING:

Corporate Positive Neutral Negative Objective Impact Impact Impact 1 Creating a Learning Community  2 Creating Safe Communities  3 Jobs and Prosperity  4 Improving Health and Well-Being  5 Environmental Sustainability  6 Creating Inclusive Communities  7 Improving the Quality of Council Services and  Strengthening local Democracy 8 Children and Young People 

LIST OF BACKGROUND PAPERS RELIED UPON IN THE PREPARATION OF THIS REPORT

Report to Cabinet Member- Technical Services – 8 th October 2008 – Southport Cycle town – Working Programme 2008/9

Page 27 Agenda Item 5

Southport Cycle Town – Working Programme 2008/9

1.0 Introduction

1.1 A report was submitted to the Cabinet Member – Technical Services at his meeting of the 8 th October 2008 which outlined the whole of the Cycle Town Project and gave specific details of items to be submitted to Cycling England (CE) for inclusion in the Work Programme to be delivered during 2008/9.

1.2 The work programme has now been approved by CE, subject to some minor Amendments and the funding confirmed. This report seeks the inclusion of the Work Programme in the Capital Programme for 2008/9

2.0 Details of the Work Programme 2008/9

2.1 The work programme for 2008/9 is detailed in 2.2 below 2.2 Work Programme – Cycling England Contributions

Capital £’000

East West Link - Design Fees for the preliminary design and Public 20 Consultation to develop proposals for an east/ west link across the town.

Newlands – Provision of amenity cycling routes across the Country 100 Park and improved access arrangements.

Wennington Road - Design Fees for the preliminary design and Public 10 Consultation for a cycle route along Wennington Road

Marine Lake/ Prom - Develop Cycling Route around the Marine Lake 15

Cycle Parking - Provision of cycle parking and cycle lockers within the 23 town and district centres

Signing – Develop comprehensive route signing strategy with indicating 15 key destinations and travel times along key routes

Schools(Parking/ Infrastructure) - Improved cycle parking/ access 35 improvements to Secondary Schools

Upgrade Existing Infastructure – Upgrade existing cycle lane / 40 advanced stop markings and other cycle infrastructure

Total Capital 258

Page 28 Agenda Item 5

Revenue £’000

Cycle Training - Additional Adult Cycle Training Courses. 2

Schools Champion - Contribution to Schools Cycle Champion, Jan-Mar 5 2009

Marketing/ Publicity/ Events - Cycle Festival/ production of publicity/ 20 marketing material

Monitoring - Establishment of baseline cycle monitoring in conjunction 15 with Cycling England

Total Revenue 42

Total Work Programme 300

2.3 Match Funding - Cycling England will provide funding of £8 per head of population per annum over the 2 ½ year period. They expect the Council and its partners to match this level of funding over the period of the project (£1.8m), although not necessarily on a year by year basis. A breakdown of the match funding submitted to Cycling England for 2008/9 is detailed below. The Cycling England funded elements for 2008/9 from 2.2 above are included to illustrate the whole programme. Total Match Funding CE LTP Other Developer Grant £ 000’s £ 000’s £ 000’s £ 000’s Newlands 200 100 East West Link 20 Wennington Road 10 Marine Lake/ Prom 15 Cycle Parking 23 Signing 15 Upgrade Existing Infrastructure 40 Marine Drive 18 TPT Pontins Diversion 26 A565 Preston New Rd 190 Travelwise (Marketing/ Training) 50 Cycling & Health 30 Sefton PCT 50 CTC Champion 50 British Cycling 10 Sport & Physical Activities 7 Alliance Monitoring 6 15 School Travel Plans 20 35 Cycle Training 2 Schools Champion 5 Marketing/ Publicity/ Events 20 Total 340 117 200 300

Page 29 Agenda Item 5

2.4 The £657,000 funding detailed in 2.3 above is more than sufficient to match the Cycling England grant of £300,000 allocated for 2008/9 and the surplus may be rolled forward as match funding for the remainder of the programme.

3.0 Other Issues 3.1 The report to Cabinet Member of the 8 th October also reported a successful cycling festival which was held on 14 September in the Town Centre linked to the Tour of Britain, which passed through the Town Centre. Subsequently an offer was made by the organisers of the Tour for Southport to stage a round of the proposed Tour Series in 2009. 3.2 The Tour Series is a series of 10 televised Town/ City centre cycle races in May/ June 2009, promoted by the Tour of Britain organisers and supported by Cycling England. 3.3 On the basis of the success of the event held in September 2008 it is now intended to proceed with the organisation of the cycling festival for 2009 centred on a round of the Tour Series which will be hosted in Southport on the evening of Thursday the 11 th June 2009.

4.0 Recommendation

4.1 That the Cabinet Member Technical Services Recommends the Cabinet to approve the Cycle Town Work programme as part of the Capital programme for 2008/9 and notes the commitment to Southport hosting a round of the 2009 Tour Series Cycle Race. 4.2 That the Cabinet Approve the Cycle Town Work programme as part of the Capital programme for 2008/9:

Page 30 Agenda Item 6

REPORT TO: CABINET MEMBER – TECHNICAL SERVICES

DATE: 14 JANUARY 2009

LOCAL TRANSPORT PLAN – URBAN SAFETY SUBJECT: MANAGEMENT, LOCAL SAFETY, SPEED MANAGEMENT AND PEDESTRIAN CROSSING REVIEWS

WARDS AFFECTED: ALL

A.WALLIS REPORT OF: DIRECTOR OF PLANNING & ECONOMIC REGENERATION

CONTACT OFFICER: J.A.DWYER 0151 934 4394 S JOHNSTON 0151 934 4258 EXEMPT/ CONFIDENTIAL: NO

PURPOSE/SUMMARY:

To seek approval of the Road Safety Strategy and Action Plan 2008-11

To advise the Cabinet Member of the results of the reviews for Urban Safety Management, Speed Management, Local Safety Schemes and Pedestrian Crossings.

To seek approval for a programme of schemes for implementation and investigation in the financial year 2009/10 and beyond.

REASON WHY DECISION REQUIRED:

The Cabinet Member has delegated powers to approve strategies, action plans and specific programmes as part of the Local Transport Plan Capital Programme.

RECOMMENDATIONS:

It is recommended that:

1. The proposed Road Safety Strategy and Action Plan, outlined in this report, be approved.

2. The proposed Priority Programme of Urban Safety Management, Speed Management and Local Safety Schemes outlined in this report, be approved for implementation through the Local Transport Plan Capital Allocation.

3. The Programme of Local Safety Schemes outlined for investigation in 2009/10 referred to in this report be approved. The results of which will be reported to a future meeting of this Committee.

4. The proposed Priority Programmes for Urban Safety Management, Speed Management and Local Safety Schemes is circulated to all Area Committees for information.

KEY DECISION: Yes

FORWARD PLAN: Yes – Published on 8 December 2008

Page 31 Agenda Item 6

IMPLEMENTATION DATE: Following the expiry of the “call-in” period for the minutes of this meeting.

ALTERNATIVE OPTIONS:

There are no alternative options available.

IMPLICATIONS:

Budget/Policy Framework: None

Financial:

Funding for the progression of these Programmes will be subject to future reports to Cabinet.

2008/ 2009/ 2010/ 2012/ 2009 2010 2011 2013 CAPITAL EXPENDITURE £ £ £ £ Gross Increase in Capital Expenditure Funded by: Sefton Capital Resources Specific Capital Resources REVENUE IMPLICATIONS Gross Increase in Revenue Expenditure Funded by: Sefton funded Resources Funded from External Resources Does the External Funding have an expiry date? Y/N When? How will the service be funded post expiry?

Legal: None

Risk Assessment: Risk to be managed through the continuous review, co-ordination and programming of all schemes contained within the Transportation Capital Programme.

Asset Management: Not applicable

CONSULTATION UNDERTAKEN/VIEWS:

NONE

Page 32 Agenda Item 6

CORPORATE OBJECTIVE MONITORING:

Corporate Positive Neutral Negative Objective Impact Impact Impact 1 Creating a Learning Community √√√ 2 Creating Safe Communities √√√ 3 Jobs and Prosperity √√√ 4 Improving Health and Well-Being √√√ 5 Environmental Sustainability √√√ 6 Creating Inclusive Communities √√√ 7 Improving the Quality of Council Services √√√ and Strengthening local Democracy 8 Children and Young People √√√

LIST OF BACKGROUND PAPERS RELIED UPON IN THE PREPARATION OF THIS REPORT

Cabinet Member - Technical Services Report 6 th June 2007 – Local Transport Plan – Review of Road Safety Programmes

Cabinet Member – Technical Services, 18 June 2008 – Revised Provisional 2009/10 and 2010/11 Local Transport Plan – Technical Services Programmes

Cabinet Member – Technical Services, 22 October 2008 – Revised Technical Services Capital Programme

Page 33 Agenda Item 6

1.0 INTRODUCTION

1.1 As part of the Merseyside Local Transport Plan, each Merseyside District has been charged with preparing a series of strategy documents, covering specific travel modes and other strategic issues. The expectation of the partner authorities in the LTP partnership is that these strategies would be adopted at a district level and would also incorporate district based action/delivery plans.

1.2 One of these strategies relates to Road Safety and the following paragraphs describe how the strategy will be delivered and will identify the main elements of the action plan, covering the remaining period of LTP2.

2.0 SEFTON ROAD SAFETY STRATEGY AND ACTION PLAN

2.1 The Sefton Road Safety Strategy and Action Plan is based on the following themes:

• Partnership and commitment • Physical infrastructure • Promotion and publicity • Education and training • Monitoring, reporting and enforcement

2.2 The Action Plan will be reviewed annually to provide a detailed work programme for the following year and a progress report will be produced and reported to members and other key stakeholders annually each spring.

3.0 Partnership and Commitment

3.1 We want to develop and strengthen our existing partnerships, build new partnerships and establish a shared commitment and enthusiasm for the reduction of recorded injury collisions across the borough.

3.2 There is already a strong partnership ethos between the Merseyside LTP partners and within Sefton. Numerous well-established and effective partnerships have been built up in recent years and it will be important to maintain and develop those partnerships. In particular, the Council and the Primary Care Trust have a very strong record of collaboration on casualty reduction projects. Other key partnerships include:

• Merseyside LTP Partners via its Merseyside Road Safety Planning Group • Merseyside TravelWise • Merseytravel • Sefton’s Safer and Stronger Communities Partnership • Highways Agency • Higher Education colleges • Numerous individual schools •

Page 34 Agenda Item 6

3.3 The Council aims to maintain and develop its existing partnerships and will seek new opportunities for partnership and joint funding.

4.0 Physical Infrastructure

4.1 We want to identify locations on the highway network where remedial works or improvements can be carried out to reduce and prevent the number of recorded injury collisions and to develop and implement a programme of delivering those improvements.

4.2 Road traffic collision data is compiled by Merseyside Police and is made available to each of the Merseyside Local Authorities on a monthly basis. This enables us to use dedicated computer software to extract collision data and identify locations or routes with high numbers of recorded injury collisions.

4.3 The formulation of all collision remedial scheme programmes is based primarily on the number of recorded injury collisions occurring within the previous three year period. This is to ensure that all available funding is targeted at those areas with the largest collision problem, and to enable the greatest casualty reduction to be achieved.

4.4 Three separate casualty reduction programmes are developed each year:-

• Local Safety Schemes, which introduce casualty remedial measures at junctions with seven or more recorded injury collisions in a three year period. These are identified via an electronic search of the collision database. • Urban Safety Management programme (traffic calming), which introduces speed reducing features in residential areas. These are identified through the division of the Borough into 135 individual cells, each of which are residential areas bounded by main distributor roads. Collision data for each cell is extrapolated from the collision database, and then prioritised in terms of anticipated rate of return, i.e. the cost of the scheme divided by the anticipated reduction in collisions. • Speed Management programme, which identifies main distributor roads, which have high speeds, high collision rates and cause physical barriers to residents living either side who wish to access facilities on the opposite side of the corridor. Schemes are developed along a route, and routes are primarily identified via comments and complaints from the public or Elected Members. Prioritisation takes place using collision data and speed data, weighted by factors such as pedestrian usage, proximity to local services and difficulty in crossing the road.

4.5 In addition to the collation and analysis of collision data, Sefton also maintains a list of sites where requests have been received from residents and visitors for the provision of pedestrian crossing facilities. This list is utilised to identify sites for future facilities, which will assist pedestrians crossing roads and potentially prevent future collisions. All requested locations are reviewed on an annual basis and are prioritised using traffic and pedestrian flows. This primarily identifies sites where traffic signal controlled crossings (Pelican or

Page 35 Agenda Item 6

Puffins) are justified, but also identifies and prioritises locations where simpler pedestrian refuges would be more appropriate.

5.0 Promotion and Publicity

5.1 We want to provide information, raise awareness, give advice on appropriate behaviour and therefore change attitudes towards road safety issues and behaviour on the public highway.

5.2 Sefton has always been very active in road safety promotion and publicity. The Council participates actively in Merseyside initiatives, such as ‘Drink Drive’, seatbelt usage, child car seats and mobile phone usage. These are supported by all the LTP partners, via the Merseyside Road Safety Officers Group, and will often be tied in with the national Department for Transport THINK! Campaigns.

6.0 Education and Training

6.1 We want to carry out a co-ordinated programme of road safety education and training in schools and to the wider community in order to develop road safety skills and awareness which can be used to reduce the number of recorded injury collisions on Sefton’s road network.

6.2 Sefton Council carries out a co-ordinated programme of road safety in schools and to the wider community. Education is a broad based activity, which usually takes place in schools and other educational establishments. It is a gradual process, which may take place over a number of years. Each of the school year groups are targeted with a variety of different educational programmes, such as :-

• Nursery visits to teach basic concepts and vocabulary as well as vital safety advice to parents on parental responsibility and the importance of demonstrating safe behaviour. • In the early autumn a "Conspicuity" session makes Y5/6 pupils aware of the properties of different materials and their personal safety value on darker mornings and evenings.This specifically addresses the increase in pedestrian accidents which occur in the winter months. • To address the problems and difficulties faced by Y7 pupils making new and extended journeys to secondary schools a "transition" programme is offered to help negate the increased risk factors, which are often as a result of peer pressure. • A modular package of lessons is offered to Secondary Schools as a Senior Traffic Course with a view to preparing Key stage 3 pupils with pre driver skills and a positive and informed attitude to safe vehicle use. Core elements of the Course are as follows: - a) Speed and seatbelts b) Vulnerable road users - who is most at risk? c) Accident analysis Risk - who takes the most risks? -Teenagers? d) Alcohol and drug driving

Page 36 Agenda Item 6

e) Are you fit to drive? • Theatre in education (TIE) is an excellent way of teaching Road Safety Education to all ages. Productions are held in primary and secondary schools across the Authority, which are aimed at Key Stages 1, 2, 3 and 4. Research and anecdotal evidence suggests that TIE is an especially effective way of delivering difficult messages to the hard to reach Key stage 4 pupils. TIE teams will visit around 9 schools and deliver the message to around 1,000 pupils.

6.3 Training encompasses a number of different subjects such as:-

• Child pedestrian training which is aimed at year 1 & 2 pupils and is built around teaching the three skills of choosing safe places and routes; crossing safely at parked cars; and crossing safely near junctions. • Child cycle training, which is now delivered across Merseyside by a ‘not for profit’ company called Cycling Solutions. This initiative has recently received national recognition through the provision of additional funding from Cycling England to expand the programme. This has allowed a 33% increase in the number of children receiving cycle training in Sefton to approximately 2000 in 2006/7. During 2007/08 training has been offered to all Y5 children within Sefton. • Adult cycle training to three National Standards :- a) Beginner (Level 1). b) Introduction to on-road cycling (Level 2). c) Advanced training (Level 3). • Mini-bus driver training aimed at schools and colleges within Sefton. Health and safety legislation requires school transport providers and operators, to take all reasonable care to ensure the safety of children transported on school vehicles and journeys. The Road Traffic Act 1991 also makes it an offence to use, cause or permit to be used a vehicle when its condition or purpose for which its being used involves a danger of injury to anyone and as part of that driver assessment and training is essential. Well-trained drivers are safer drivers. Training increases driver awareness, knowledge and skill, reducing the risk to drivers, passengers and other road users. It increases the comfort of passengers and reassures parents that their children are in safe hands. The Travel Awareness and Safety Team currently manages the requirement that drivers (teachers) using a minibus undertake a training programme that consists of a tutor led theory session, followed by a practical driving assessment in a minibus with a qualified Advanced Driving Instructor.

7.0 Monitoring, Reporting and Enforcement

7.1 We want to track the levels of recorded injury collisions within Sefton, measure the rate of reduction to ensure compliance with published casualty reduction targets and report regularly to partners, Elected Members and the public.

7.2 The monitoring and reporting of road traffic collisions has formed a major part of the road safety strategy for many years. Information on recorded injury collisions is obtained on a monthly basis from Merseyside Police and is used

Page 37 Agenda Item 6

to populate a computerised database. Information from the database is used in a number of ways:-

• To identify collision ‘hot spots’, either at junctions or along a route, to form the basis of future casualty reduction programmes. • To measure success (or failure) in meeting casualty reduction targets (40% reduction in Killed or Serious Injuries (KSIs); 50% reduction in child KSIs and 10% reduction in all Slight injuries). These are formally reported as Best Value Performance Indicators 99a,99b,99c and more recently as National Indicator 47 (all KSIs), which is one of the Local Area Agreement targets. • To provide information to developers and colleagues in Sefton’s Development Control Team to assist in Traffic Impact Assessments and to identify any required changes to the highway to accommodate changes in traffic movements arising from proposed developments. • To feed collision data into Sefton’s ‘Breathing Space’ website to allow members of the public access to basic collision information. Certain elements of the data is with-held to maintain confidentiality, but there is enough detail to identify locations, severity and dates to inform residents of the level of collisions within their locality.

7.3 Casualty figures are reported in various ways and frequencies:-

• Every six weeks to the Merseyside Road Safety Planning Group. • Every quarter to Sefton’s Policy and Performance Team (BVPIs 99a,b,c & NI 47). • Every quarter to Sefton’s Safer and Stronger Communities Partnership (NI 47). • Every 12 months to the Local Transport Plan Support Unit to form part of the LTP Annual Progress Report. • Every 12 months to Cabinet Member – Technical Services as part of the annual review and formulation of casualty reduction programmes.

7.4 Enforcement is primarily the responsibility of Merseyside Police, but is co- ordinated via the Merseyside Road Safety Partnership (MRSP). This comprises representatives from each of the five Merseyside Local Authorities, Merseyside Police, Highways Agency and Merseyside Magistrates’ Courts. MRSP will utilise intelligence gained from the collision database and from local Police Basic Command Units to set Police enforcement targets within each Local Authority.

8.0 Conclusions

The Sefton Road Safety Strategy and Action Plan provides the framework for delivering Road Safety education, training and publicity programmes to reduce future road traffic collisions. It also provides a robust method of identifying casualty ‘hot spots’, based on recorded injury collision data, which is then used to formulate future casualty reduction programmes. Regular monitoring of the data will track progress in achieving national casualty reduction targets, and will assist in attracting Capital funding as part of the Local Transport Plan.

Page 38 Agenda Item 6

9.0 CASUALTY REDUCTION PROGRAMMES

9.1 The Cabinet Member has previously considered and approved reports relating to Urban Safety Management, Speed Management, Local Safety Schemes, (Single Sites and Route Action) and Pedestrian Crossings.

9.2 The latest report which was considered and approved at the meeting of this Committee on 6 June 2007, related to the Local Transport Plan - Safety, Speed & Pedestrian Crossing Reviews. Schemes that were identified in that report are complete or are nearing completion. The details contained within this report seeks to set out new programmes of work / investigations for the forthcoming financial year 2009/10 and for future years.

10.0 URBAN SAFETY MANAGEMENT PROGRAMME

10.1 Cabinet Member will be aware that the approved criteria used to develop a programme of traffic calming under the Urban Safety Management Programme involves the following process: -

§ Division of the entire road network within the Borough into “cells” bounded by main distributor roads and / or other natural features.

§ Interrogation of Sefton Council’s Accident Database to identify those cells with five or more recorded injury accidents in the latest three-year study period. Previous assessments have used cells with seven or more recorded injury accidents, however as the majority of residential areas with a poor accident record have already been treated it has been necessary to reduce this figure to five to highlight more cells for the review.

§ Examination of these cells to assess the nature and location of accidents, to permit an initial assessment of the type of traffic calming measures that might be appropriate.

§ Prioritisation of these cells based upon predicted First Year Economic Rate of Return (FYERR), in terms of accident savings. Only Urban Safety Management schemes with an FYERR in excess of 100% are usually considered, i.e. the estimated savings in accident costs is at least the same cost as the proposed remedial measures.

10.2 This process allows an efficient, systematic search of the road network within the Borough to be made, to identify those residential areas and local access roads with the highest and worst accident rates. These areas are then prioritised according to the potential for traffic calming schemes to reduce the accident rate within the available funding.

10.3 Because the schemes identified in previous years are now complete it is now necessary to undertake another review of the Urban Safety Management Programme to develop a three-year programme of traffic calming measures commencing in the next financial year of 2009/10 and up to 2011/12.

Page 39 Agenda Item 6

10.4 The results of the prioritisation process and brief description of accident types and the proposed scheme to address the accidents are shown in the Table contained in Annex A. As can be seen the top three cells yield a relatively high-predicted First Year Economic Rate of Return, these are:

1. Deyes Lane Area, Maghull 2. Portland Street Area, Southport 3. Southbank Road Area, Southport

10.5 Plans of the above three cells are also shown in Annex A

10.6 Members should note that two of the identified areas, namely Portland Street area and Southbank Road area encompass the proposed ‘East-West’ cycle route identified with the Southport Cycle Town Programme.

10.7 At this stage it is unclear which corridor will be chosen for the cycle route, and full consultation with residents will be required over forthcoming months.

10.8 It is therefore proposed that prioritisation of the three schemes will take place later in the current financial year to allow for integration with the proposed cycle route.

10.9 Should the Cabinet Member approve the programme set out above, the relevant Area Committees will be asked to endorse the programme to allow detailed designs to be prepared. Consultation with residents will then commence, with the results being reported back to the relevant Area Committee for final approval of the scheme design.

11.0 SPEED MANAGEMENT PROGRAMME.

11.1 At the meeting of the (then) Technical Services Ratification Committee on 27 March 2002 a three year programme of works to complete the Village Entry Programme was approved, and was as follows: -

2002/03 - Village - complete

2005/06 - Ince Blundell Village - complete

2007/08 - Sefton Village – approved and to be constructed this year.

11.2 At the meeting of the Cabinet Member - Technical Services on 5 January 2005, the Speed Management Programme for 2005/06, was set out as follows: -

§ Chesterfield Road / Brownmoor Lane / Stuart Road, Crosby.

§ Preston New Road, Southport.

Later examination of the accident data for Chesterfield Road, Brownmoor Lane and Stuart Road, Crosby revealed that the accident numbers had reduced considerably from the initial analysis to only four accidents along the route in the latest three-year study period at that time. This was reported to

Page 40 Agenda Item 6

Cabinet Member – Technical Services on 6 June 2007 and it was agreed to remove the route from the Speed Management Programme.

A scheme of Speed Management for Preston New Road, Southport was consulted upon in 2006 and was approved. The scheme was completed in 2008.

11.3 Since Preston New Road is now complete it is necessary to assess and identify new routes under the Speed Management Programme to progress in future years.

11.4 The Speed Management Programme is aimed at routes and incorporates an assessment process that reviews the effects inappropriate vehicle speeds may have on communities. This assessment, (Speed Management Review), considers the following:

• Numbers of total casualties • Numbers of killed or seriously injured • Numbers of slight casualties • Proportion of child casualties • Speed limit • The 85 percentile speed of traffic, (the speed at which 85% of the traffic is travelling at or less than) • The 99 percentile speed of traffic, (the speed at which 99% of the traffic is travelling at or less than) • Predicted impact of the scheme upon the community

11.5 Routes to be assessed are collated following interrogation of the Road Traffic Collisions database and from requests received from residents and Elected Members. The list of routes assessed is shown in Annex C.

11.6 Members should note that schemes identified from Annex C will fall into two separate programmes:-

• Speed Management Programme – routes which have a high collision record which can primarily be attributed to speeding and high 85%ile speeds, as discussed in paragraph 11.4, and • Route Action Programme – routes which have a high collision record but have a variety of different collision causation factors. These routes will require extensive accident analysis to identify dominant causation factors and suitable remedial measures to prevent re-occurrence.

11.7 Following detailed assessment of both accident numbers, predominant accident type and vehicle speeds along numerous routes the following three routes have been identified for inclusion in the Speed Management Programme for 2009/10 and future years:

1. Lambshear Lane/Kenyons Lane, Maghull 2. Spencer’s Lane / Lane, Melling 3. Bankfield Lane / Rufford Road, Southport

Page 41 Agenda Item 6

11.8 All of the other routes contained in Annex C failed to meet the criteria for Speed Management and have subsequently been assessed for detailed investigation for inclusion within future Local Safety Scheme (Route Action) programmes.

11.9 Lambshear / Kenyons Lane, Maghull

11.10 An automatic traffic count carried out in October 2005 for Lambshear Lane, Maghull revealed an 85 th percentile speed of 37 mph. A count undertaken on Kenyons Lane in September 2007 revealed 85 th percentile speeds of 35.9 mph westbound and 40.9 mph eastbound. Both roads are subject to a posted speed limit of 30 mph.

11.11 Two primary schools are located on Lambshear Lane and one primary school is located on Kenyons Lane. Accommodation for the elderly is situated near the bend at Aragon Close in Kenyons Lane, where several of the collisions have taken place. The proposed speed reduction measures would not only save accidents but would have a beneficial impact on the community due to the resultant lower vehicle speeds in the vicinity of the schools and elderly accommodation.

11.12 In addition, there have been many complaints over the years of excessive vehicle speeds and requests for traffic calming for Lambshear Lane have been reported to SEPAC in November 2006 and March 2007.

11.13 The accident record along the Lambshear Lane / Kenyons Lane route revealed the following:

• 14 recorded personal injury accidents of which two resulted in serious injury. • 10 of the 14 recorded personal injury accidents concerned drivers who had shunted into other vehicles or had lost control of their vehicles or were exceeding the speed limit. This figure accounted for 71.4% of the total number of accidents. • Skidding was recorded in 44% of the accidents • Three accidents involved casualties that were under the age of 15. • Three accidents involved pedal cyclists. • Six accidents were in the vicinity of the schools.

11.14 It is anticipated that engineering measures aimed at reducing vehicular speed would address approximately eight of the fourteen-recorded accidents and many of the alleged unrecorded accidents that have occurred at the bend of Kenyons Lane near Aragon Close. This equates to a saving of 2.66 personal injury accidents per year.

11.15 The engineering measures proposed for the route may include:

• Traffic islands/hatching along entire route of Lambshear Lane and a pedestrian refuge outside the schools. • 20 mph School Zone signs on both approaches to the schools on Lambshear Lane. • Traffic islands / hatching for Kenyons Lane

Page 42 Agenda Item 6

• Improved signage and markings throughout the route, (both roads). • Surface treatment for Kenyons Lane on both approaches to the bend.

11.16 It is anticipated that the cost of the scheme would be approximately £110,000. The predicted First Year Economic Rate of Return (FYERR) on the introduction of the above scheme is 217%.

This is calculated as follows:

FYERR = A x B/C x 100% where:

A = Predicted number of accidents saved per annum + B = Average value of prevention per accident* (£89,820) C = Estimated cost of scheme

11.17 Bankfield Lane / Rufford Road, Southport

11.18 In recent years there have been numerous concerns raised by residents and a Ward Councillor regarding vehicles travelling at excessive speed as they approach the bend at the bottom of the bridge of Bankfield Lane.

11.19 In 2006 minor improvements were made to the existing signage and road markings. Signs warning of the bend were mounted on yellow backing boards and ‘Slow’ road markings were painted on the carriageway. However the council still received complaints of drivers losing control of their vehicles resulting in damage to property, this being the garden walls of residential properties and fencing to the factory.

11.20 The latest three-year accident record has revealed eight recorded personal injury accidents, two resulting in serious injuries. Of which:

• Four involved drivers losing control of their vehicles, three at the bottom of the bridge all travelling north. • One concerned a driver reversing from his driveway onto the main road colliding with an elderly pedestrian. • One concerned a driver reversing on the main road and colliding with an elderly pedestrian. • One concerned a motorist colliding with a motorcyclist as they approached the roundabout at Preston New Road both wanting to turn right. • One involved a motorist colliding with a cyclist who entered the road from the footway.

11.21 An automated traffic count located 120m south of the ‘Mallards’ which is at the bottom of the bridge revealed an 85 th percentile speed of 37.7 mph northbound and 35.6 mph southbound. It is in this area where the majority of the ‘damage only’ incidents have occurred. Both Bankfield Road and Rufford Road have a 30 mph posted speed limit.

Page 43 Agenda Item 6

11.22 The northbound speed recorded 120 metres south of the Mallards is approximately at the mid section of the bridge. It is considered that speeds may be even higher at the bottom of the bridge where drivers have lost control of their vehicles.

11.23 It is anticipated that engineering measures aimed at reducing vehicular speed would address approximately four of the eight-recorded accidents and many of the unrecorded accidents that have occurred at the bend at the bottom of the bridge of Bankfield Lane. This equates to a saving of 1.33 personal injury accidents per year.

11.24 The engineering measures proposed for the route may include the following:

• The provision of an advanced vehicle activated sign ‘flashing’ the right- hand bend symbol and the word ‘SLOW’ underneath. This will be positioned on the bridge in advance of the bend.

• Traffic islands / pedestrian refuges and road narrowing hatching spread out along the route between Botanic Road and north of bridge.

• Further improvements to signage and road markings to include the word SLOW adjacent to the vehicle-activated sign.

11.25 It is anticipated that the cost of the scheme would be approximately £70,000 The predicted First Year Economic Rate of Return (FYERR) on the introduction of the above scheme is 171 %.

11.26 Spencer’s Lane / Waddicar Lane, Melling

11.27 In 2003 speed cushions were introduced along the residential 30 mph section of Spencer’s Lane and Waddicar Lane, Melling as a condition of a new housing development in the area. In addition a mini roundabout was also introduced on Waddicar Lane at the junction with Hayes Drive.

11.28 The speed cushions along Waddicar Lane are having a positive effect in reducing vehicle speeds with an 85 th percentile speed of 28 mph recorded north of the mini-roundabout. However there is a cluster of five accidents at the mini-roundabout that suggests that this feature is not providing the desired reduction in accident numbers. In addition, the speed restriction for Spencer’s Lane was reduced from 60 mph to 40 mph due to allegations of excessive vehicle speeds and the number of accidents that were occurring. Improved signage on high visibility yellow backing boards and speed count down markers were introduced. Whilst these measures have reduced the number of recorded injury collisions, the current collision data would suggest a need for further speed reduction measures.

11.29 The latest three-year accident record has revealed twelve recorded personal injury accidents for Spencer’s Lane and Waddicar Lane, up to and including the mini-roundabout on Waddicar Lane at Hayes Drive. Two resulting in serious injuries and two resulting in fatal injuries. Of which:

Page 44 Agenda Item 6

• Four accidents involved drivers or riders losing control of their vehicles on Spencer’s Lane. Two resulted in serious injuries and two resulted in fatal injuries. Excessive speed was recorded as a causation factor in some of these accidents.

• Speed was also considered to be partly to blame for the other two accidents that occurred on Spencer’s Lane. One involved a young motor- cyclist pulling out of a side road into the path of a passing car and the other concerned a driver turning right into the path of a passing vehicle. Slower vehicle speed along the major road may have possibly prevented these two accidents.

• Four of the five accidents that occurred at the mini-roundabout on Waddicar Lane at Hayes Drive concerned car drivers pulling out into the path of cyclists or cyclists pulling out into the path of car drivers. Another accident concerned a driver losing control of his vehicle on the bend at the junction of Waddicar Lane and Spencer’s Lane and then ending up in a ditch. The last accident concerned a young pedestrian walking out into the path of a car overtaking a bus. This occurred 54 metres south of the mini roundabout.

11.30 It is anticipated that engineering measures aimed at reducing vehicular speed would address approximately six of the twelve-recorded accidents that have occurred in the latest three-year study period. This equates to a saving of 2.00 personal injury accidents per year.

11.31 The engineering measures that would address these accidents are as follows:

• Traffic islands and hatching along the whole length of Spencer’s Lane. • Vehicle activated signage warning of the bends advising road users to slow down on both approaches to the bend before and after the bridge over the M57 motorway. • Modification of the mini-roundabout junction at Hayes Drive. • Further improvements to signage and lining as necessary.

11.32 It is anticipated that the cost of the scheme would be approximately £100,000.

The predicted First Year Economic Rate of Return (FYERR) on the introduction of the above scheme is 180%.

12.0 LOCAL SAFETY SCHEME INVESTIGATIONS (SINGLE SITES & ROUTES)

Single Site Investigations

12.1 A list of single sites with seven or more recorded injury accidents in the three- year study period of 1 August 2005 to 31 July 2008 is included in Annex B. The following list is the recommended Programme of Investigations for 2009/10 for possible prioritisation under the Local Safety Scheme Programme: -

Page 45 Agenda Item 6

12.2 Single Site Programme of Investigations for 2009/10

1. Marsh Lane / Stanley Road Junction, Bootle 2. A59 Northway / Hall Lane, Maghull 3. Ormskirk Road / Lane junction, Aintree 4. A565 Formby Bypass / North End Lane, Hightown 5. Marine Drive / Marine Parade, Southport

12.3 Detailed investigations will be carried out for the sites listed above that have been identified from this latest review. Any resulting schemes will form the basis of the 2010/11 Programme of Works, subject to further reports to Cabinet Member – Technical Services.

13.0 SINGLE SITE PROGRAMME FOR 2009/10

13.1 Prescot Road / Bank Lane junction, Melling.

13.2 Cabinet Member may recall that at the meeting of SEPAC 19 th July 2007, Members supported the proposed junction improvement at Prescot Road / Bank Lane, Melling. This has now been included as part of the Local Transport Plan Capital Programme.

13.3 This report considered a number of options and it was recommended that a conventional roundabout be introduced. This would force road users to slow down to negotiate the roundabout and also ease congestion that was particularly problematic during peak times.

13.4 The latest three-year accident record has revealed 13 personal injury accidents within a 100m radius of the junction, one involved serious injury. However more recently there has been a fatal accident involving a collision between a car and a motorcyclist. This occurred outside the petrol station in October 2008.

13.5 Since the report, preliminary design work and acquisition of land has progressed and the works have been programmed to commence in 2009/10.

14.0 ROUTE ACTION INVESTIGATIONS

14.1 The locations of accidents were plotted using data for the latest three-year study period of 1 August 2005 to 31 July 2008. Those routes with a history of accidents spread along their length were identified. Particular attention was given to the number of killed or serious injury accidents (KSI), predominant accident type and the 85 th percentile speed, (the speed at which 85% of drivers are travelling at or below). A list of the sites is included in Annex C.

The routes identified are as follows: -

14.2 Route Action Programme of Investigations 2009/10

• Cemetery Road / Eastbourne Road, Southport. (28 accidents / 8 KSI) • Glovers Lane/ Fleetwoods Lane, Netherton. (27 accidents / 3 KSI) • / Norwood Road, Southport.

Page 46 Agenda Item 6

• Ash Street/Rose Hill/St. Luke’s Road, Southport. (22 accidents / 2KSI) • Linacre Lane, . (17 accidents / 3 KSI) • Park Lane, Netherton. (21 accidents / 2 KSI). • College Road, Crosby. (13 accidents / 1 KSI) • Hart Street, Southport. (17 accidents / 4 KSI)

14.3 Detailed investigations will be carried out at the eight routes listed above that were identified from the review. Any resulting schemes will form the basis of the 2010/11 Programme of Works, subject to further reports to Cabinet Member – Technical Services.

15.0 Route Action Programme for 2009/10

15.1 Three routes have been previously investigated and identified for progression in 2009/10, these are:

1. Southport Road / Bailey Drive, Netherton 2. Scarisbrick New Road, Southport. 3. Southport Road, .

15.2 With regard to Scarisbrick New Road, Southport a brief has been forwarded to the Capita Symonds. It is anticipated that work will start on site in the new financial year 2009/10.

15.3 Bailey Drive / Southport Road, Netherton was identified as a Local Safety Scheme - Route Action. Measures will include the provision of ‘Vehicle Activated Signs’ along the route. Work is programmed to start on site in the new financial year 2009/10.

15.4 Southport Road, Lydiate was identified as a Speed Management Scheme and consultation with residents and businesses along the route commenced in December 2008. Speed reduction measures include the introduction of mini- roundabouts at the junction with Moss Lane and Pilling Lane; traffic islands and pedestrian refuges along the route; a reduction in the speed limit from 60 mph to 40 mph near the Scotch Piper P.H.; and a number of ‘Vehicle Activated Signs’ along the route. Subject to a successful consultation and subsequent approval by Area Committee, it is anticipated that work will start on site after April 2009.

16.0 TRUNK ROAD ACCIDENT INVESTIGATIONS (SINGLE SITES & ROUTES)

16.1 Single Site Investigations

16.2 A list of trunk road sites with seven or more recorded injury accidents in the latest three-year study period is included in Annex D. It is recommended that the Highways Agency be made aware of the routes and request that they should investigate the following junctions in 2009/10 with a view of improving road safety at these junctions:

16.3 Trunk Roads - Recommended Single Site Programme of Investigations 2009/10

Page 47 Agenda Item 6

1. A5036 / A59 / M57 / M58 Switch Island / Ormskirk Road 2. A5036 Dunningsbridge Road / Copy Lane 3. A5036 Road / Hawthorne Road 4. A5036 Dunningsbridge Road / Park Lane West 5. A5036 Dunningsbridge Road / Netherton Way 6. A5036 Princessway / Church Road roundabout 7. A5036 Dunningsbridge Road / Heysham Road

16.4 Trunk Roads – Recommended Route Action Programme of Investigation 2009/10

1. A5036 (between Switch Island and A565 Crosby Road South), Seaforth.

Note: The A5036 is the only trunk road in the borough.

16.5 The Highways Agency will be contacted with a recommendation that casualty reduction for the A5036 is investigated in 2009/10.

16.6 It is worthy of note that the Highways Agency is currently undertaking a route signing strategy with Consultants A One + along the whole length of the A5036 and this should be completed in 2009.

17.0 PEDESTRIAN CROSSING REVIEW

17.1 The Pedestrian Crossing Review would normally be reported to Cabinet Member along with the Urban Safety Management Review, Local Safety Schemes – (Single Sites and Routes) and the Speed Management Review. However due to the demands on our automatic traffic counters that are used to gather the data necessary for calculating the PV 2 it has not been possible to progress the review and report the findings in time for this meeting. Therefore this will be reported to a future meeting of Cabinet Member – Technical Services.

18.0 CONCLUSION

18.1 It is therefore proposed that the following Schemes be progressed in priority order through the following programmes in coming financial years commencing in 2009/10, detailed programmes being dependant on Capital Allocation.

Urban Safety Management Programme

1. Deyes Lane Area, Maghull 2. Portland Street Area, Southport 3. Southbank Road Area, Southport

Speed Management Programme

1. Lambshear Lane/Kenyons Lane, Maghull (14 accidents / 2 KSI) 2. Spencer’s Lane/ Waddicar Lane up to and including roundabout at Hayes Drive, Melling. (12 accidents / 4 KSI) 3. Bankfield Lane/Rufford Road, Southport. (8 accidents / 2 KSI)

Page 48 Agenda Item 6

Local Safety Scheme Programme of Investigations (Single sites)

1. Marsh Lane / Stanley Road Junction, Bootle 2. A59 Northway / Hall Lane, Maghull 3. Ormskirk Road / Aintree Lane junction, Aintree 4. A565 Formby Bypass / North End Lane, Hightown 5. Marine Drive / Marine Parade, Southport

Local Safety Scheme Programme of Investigations (Route Action)

1. Cemetery Road / Eastbourne Road, Southport. (28 accidents / 8 KSI) 2. Glovers Lane/ Fleetwoods Lane, Netherton. (27 accidents / 3 KSI) 3. Meols Cop / Norwood Road, Southport 4. Ash Street/Rose Hill/St. Luke’s Road, Southport. (22 accidents / 2 KSI) 5. Linacre Lane, Litherland. (17 accidents / 3 KSI) 6. Park Lane, Netherton. (21 accidents / 2 KSI) 7. College Road, Crosby. (13 accidents / 1 KSI) 8.Hart Street, Southport. (17 accidents / 4 KSI)

19.0 FUNDING

19.1 In recent years funding allocations for these schemes has been of the following order:

• £220,000 – Urban Safety Management

• £300,000 – Local Safety Schemes – Single site and route action.

• £150,000 - Speed Management Programme

• £40,000 – Pedestrian Crossings

19.2 Similar allocations will be required in 2009/10 and future years to maintain progress towards Local Area Agreement targets for casualty reduction rates within the Borough, and block allocations for all Road Safety programmes currently equates to:-

2009/10 - £598,700 2010/11 - £653,000

Page 49 Agenda Item 6

Page 50 Agenda Item 6

ANNEX A Urban Safety Management Review 2009/10

Traffic Calming Priority List

Notes

In assessing each cell, (there are 135 cells in total for the whole of Sefton MBC), personal injury accident records are examined to determine the nature and location of each accident, and to identify those, which can be addressed by traffic calming techniques. Those areas where accidents are clustered at specific locations such as at junctions along a route can then also be highlighted for the progression of alternative, more cost effective measures such as the route action programme.

The predicted First Year Economic Rate of Return (FYERR) on the introduction of a scheme is used for initial prioritisation of the traffic calming cells. This is calculated as follows:

FYERR = A x B/C x 100% where:

A = Predicted number of accidents saved per annum + B = Average value of prevention per accident* (£89,820) C = Estimated cost of scheme

+ Predicted accident savings are based on those that have been achieved using similar measures elsewhere in the Borough.

* Average cost per injury accident including an allowance for damage only accidents for all roads / all hours. Source: Department for Transport 2007 Highways Economic Note No.1- currently costing £89,820 per accident.

The following table, Annex A is a summary of the assessment of each cell containing five or more recorded personal injury accidents in the three years 1 st August 2005 to 31 st July 2008.

The First Year Economic Rate of Return (FYERR) has been estimated on an assessment of the treatable accidents only.

In some cells it was determined that it was either not feasible to treat the type of accidents that have occurred, or it was found that the accidents were centred at junctions or along main distributor roads that formed the boundary of the cell. These accidents are better treated as a ‘single site’ or as a route action site.

Page 51 Agenda Item6 ANNEX A

(Urban Safety Management Review Priority List 2009/10)

Estimated Accident ‘treatable’ Estimated Brief details of proposed Priority Cell Area Numbers Accident Types accidents Cost of FYERR scheme and/or comments Listing (3 years) per Scheme annum Poor Manoeuvre (2) Hunts Road area is Pedestrians (4) previously traffic calmed Deyes Lane Failed to give way (2) Damfield Lane has high M6 Area, 14 Shunt (1) 2.33 speeds £100,000 209.3% 1 Maghull Pedal Cyclist (3) Junction improvements Failed to look properly (1) Speed humps / cushions Poor Manoeuvre (1) Pedestrian facilities (refuges) Shunts (3) Five accidents involved Page 52 Crossover (1) excessive speed and were Portland Junction overshoot (1) spread throughout the area. S18 Street Area, 14 1.66 £100,000 149.7% 2 Poor turning manoeuvres (4) Therefore mass action traffic Southport Pedestrians (2) Cyclist (2) calming to include humps Other (1) and speed tables Shunt (3) Cyclist (2) Loss of Control (1) Southbank Pedestrian (2) Mass action traffic calming to Road / Town Failed to give way (1) S31 10 1.66 include speed cushions and £110,000 135.5% 3 Lane Area Other (1) humps Southport Four accidents occurred at a junction. Six accidents considered to be partly caused by excessive speed. Shunt (1) Cell part traffic calmed. Pedestrian (3) Hatherley Traffic calming to include Loss of Control (1) C 12 Avenue 5 1.33 speed humps and cushions £90,000 133.1% 4 (3 occurred on Endbutt Lane) Area, Crosby and pedestrian refuges along 1 on Rosedale Avenue that is Endbutt Lane only already traffic calmed.

ANNEX A

(Urban Safety Management Review Priority List 2009/10)

Estimated Accident ‘treatable’ Estimated Brief details of proposed Priority Cell Area Numbers Accident Types accidents Cost of FYERR scheme and/or comments Listing (3 years) per Scheme annum Cyclists Not prioritised Balmoral Mass action traffic calming to Shunts due to poor S6 Drive Area. 5 1.00 include speed humps and £110,000 81.7% Junction overshoot FYERR Southport tables Poor Turning Manoeuvres (Less than 100%) Rawson Road and Claremont Road traffic calmed in 1999 as part of Pedal Cyclist (2) Safer Routes to School Claremont Pedestrian (3) Scheme. Four of the eight

Page 53 Not prioritised Road / Failed to give way (1) accidents occurred on traffic due to poor C24 Rawson 8 Poor Manoeuvre (1) 0.66 £85,000 69.7% calmed roads FYERR Road area, Other (1) Of the other five other (Less than 100%) Waterloo Shunt (1) accidents it is considered

that only 2 were ‘treatable’ by traffic calming – speed humps Shunt (1) Cyclist (2) Cell part traffic calmed, e.g. Not prioritised Poor right turn (1) Stuart Road Road / Stuart due to poor C21 5 Reversing (1) 0.33 £40,000 74.1% Agenda Item6 Road Area FYERR Two accidents occurred on Humps/tables along Park Waterloo (Less than 100%) Stuart Road that is already Road and Hicks Road only traffic calmed. Speeding Junction improvements / Not prioritised Grange Road Poor right turn manoeuvres mass action traffic calming to due to poor S10 Area. 5 U-turn / Shunt 1.00 £125,000 71.9% include speed humps and FYERR Southport (Four accidents occurred at tables (Less than 100%) junctions)

Agenda Item6 ANNEX A

(Urban Safety Management Review Priority List 2009/10)

Accident Estimated Estimated Brief details of proposed Priority Cell Area Numbers Accident Types ‘treatable’ Cost of FYERR scheme and/or comments Listing (3 years) accidents Scheme Loss of control (1) Not prioritised - Extended ‘At Any Time’ Accident types waiting restrictions Alexandra Failing to give way at junction. and location not introduced to the junction in Not S14 Road Area, 7 (5 accidents occurred at the 0 Nil suitable for 2008. Improvements to Applicable Southport junction of Queens Rd and mass action signage / lining have also Alexandra Rd). traffic calming. been made Cyclist (1) Will monitor Three accidents were partly caused by poor road Not prioritised -

Page 54 markings at the junction. Fail to give way at a junction (5) Accident types Talbot Road One accident concerned an 3 accidents occurred at the Not and location not S17 Area, 5 0 unqualified driver. One Nil junction of Talbot Street and Applicable suitable for Southport concerned a young driver on Portland Street mass action a motorised bike travelling traffic calming. the wrong way down a one way street Shunt (1) Three occurred at the Not prioritised - Loss of Control - Stolen car (1) junction of Forrest Accident types Pilkington Pedestrian (1) Road/Chambres Road. and location not S32 Road Area, 7 Failed to give way (2) 0 Other four accidents were: N/a N/a suitable for Southport Impaired by drugs/alcohol (1) Impaired by alcohol / stolen mass action Masking (1) vehicle and two masking traffic calming. accidents Since 6 of the 8 accidents Excessive speed / loss of occurred along Lambshear control (1) Lane and it is known that this See Speed Lambshear Pedestrian (1) road has a speeding problem Management M1 Lane Area, 8 3 N/a N/a Shunt (3) this will be treated together Section of this Maghull Impaired by alcohol (1) with Kenyons Lane that also report Pedal Cyclist (1) has a speeding problem as a Speed Management Scheme

ANNEX A

ANNEX A, continued (Urban Safety Management Review Priority List 2009/10)

Estimated Accident Estimated ‘treatable’ Brief details of proposed Priority Cell Area Numbers Accident Types Cost of FYERR accidents scheme and/or Comments Listing (3 years) Scheme per annum In February 2003 speed Shunt (2) humps were introduced Cyclist (4) along Waddicar /Spencer’s Loss of Control (3) Lane. Before this there were Pedestrian (1) 15 accidents along the route. Already traffic Waddicar Poor Manoeuvre (1) Careful analysis of latest Not Not calmed - Page 55 M13 Lane Area 11 0 three-year accident record applicable applicable Will continue to Maghull (5 accidents have occurred at suggests that only 4 monitor route the roundabout with Hayes accidents were speed Drive, the remainder along related, therefore the scheme Spencer’s Lane and Waddicar is having a positive effect on Lane) accident reduction. Not prioritised. Study of the Youth jumping on ice cream accident types Moss Lane van (1) Area has already been traffic Not Not would not be B15 Area, 6 Shunt (1) 0 calmed with speed humps Applicable applicable addressed by Agenda Item6 Litherland Motorcyclist (2) further Poor turning manoeuvres (2) engineering measures

Agenda Item6

# # 2 2 # # 2 # 2 # # # #### # 2 Mos s Side 2 # # 2 #### 2 #### # 2 # ###2# # # # 2 # 2 2 2 2 2 2 2 # 2 Urban# Safety Management # # 2 ### # 2 2 # Cell M6 2 Mos s Side 2 Mos s Side 2 # # #2 # # Glenn Park Deyes Lane Area 2# 2 2 Maghull # # 2 # 2 2 2 #

Whinny # rain k Brook D 2 roo 2 y B inn Wh Page 56 2 D 9 ra i 2 n 2 T ra c k

D 2 Mast r # a i # n 2 2 2 # 2 2 # 2 # # 2 k 2 c ra 2 T # # # # 2 in Pond ra 2 2 D Mos s Nook Farm # 2 2 2 2 # # 2 # ## # ## # ## 2 # # 2 # 2 # 2# # # 2 # D r # a # i 2 2 n M O 2# S S N # O 2 2 Pond O in K

# # ra L Pond D A N E # ( ### # T # 2 R 2 A C K 2 ) # 8 # 5 M 2 # # 2 H ## R m 2 Pond 2 .2 1 2 # 2 2 2

Pond 2 # in Pond 2 ra D 2 f e L D # E A 2 T # H E S R R B E A V R A R E O W W S L A N E

ANNEX A 2 # # 2 # 2 2 2 2 # 2 2 # 2 2 2# # # ## 2 # # # # 2# 2 2 # 2 2 2 2 2 # # # # # SOUTHPORT # # 2 # 2 2 2 2 2 # # 2 2 # # # 2 # 2 2 # # 2 # 2# 2 2 2 2 2 2 # # # 2 2 # 2 # ## # 2 2 # # 2 # 2 2 2 2 # # # 2 2# # # # # 2 2 # 2 2 # 2 # # ### # 2 # 2 # 2 2 # 2 2 # ##### 2 # 2 2 # Southport 2 # 2 2 General Infirmary 2# # 2 # # 2 2 # 2 2 2 # # # 2 2 2 # # 2 # 2 2 # 2 ## 2 # 2 # # # 2 2 # 2 # 2 2 # # # Page 57 2 2 9 2 2 # 2 2# 2 # 2 # # 2 2 # 2 2 # 2 2 2 # 2 # 2 # # 2 # # 2 # # 2 2 2 # # # 2 # # 2 # # 2 # 2 2 # 2 2 # 2 # # 2# # 2 # 2 # 2 2 Cem etery 2 2## # # 2 # 2 # 2 2 # 2 2 # #

2 2 2 # # 2 # 2 # # 2 Urban Safety Management 2 # # 2 2 # Cell S18 Agenda Item6 # 2 2 2 2 # 2

# 2 # # 2# 2 # # Portland Street Area,2 2# 2 # # # # Southport #### # 2

2 # 2 2 2# 2 2 # 2 2 2 # # 2 2 # 2 2# # 2 2 2 2 # # 2# # 2 # 2 2

Agenda Item6 ANNEX A

D A O 2 St Philip's Church s R

S m CA l N # R E T I O E SB e # # Z E R h R IC D R K T A T N # U S 2 E 7.3mO D C W R N R 2 A O O T A S O F D E R E R 5. # S B E Urban Safety2 8m G M D A I FO H R R 2 D E C B S # # A T H O R T O R AD # 2 E Management T L N E O E T R Nurs i ng G T # S Hom e IN 5 K 2 . H 5m L S I A P #

D Cell S31 A 2 D A D O 7.6m R O A 2 R O 2 R R D N U O D A T O 2 S k e N O F P O S o s A M U o ro u L D L R A T u B o E A A Y H M t H H B h R B T A C et b O 7 O N h h . R T an M 2 3m K # u od A R rc i k T N O h st R S E A o E O Southbank RoadB / Town D a Z d W Southport # General Infirm ary R U 7 C Ve .3m D rn 2 2 A C on SC O A Lane Area, Southport ou R R r IS D t B 2 D R nd A I # CK Sta N O N # A R E L W D E R2 N O 7.0m R A AD # O L 6.4 m 2 M R T E E 2 B S U E M N # U E W V C A # 6 IG # 2 .7m A # H # D 2 A O 2 R P Y D 6.4m O R 2 A 2 R E 7 .6m T RO TL E D A M AN # N E T L D C E T S E U T # R R TR E S E S T T OU # T U κ THR # E N BO D N T E L AA A O R A N O U D7K κ T Page 58 L W 2 R S 2 A SN . C 6 D N T m N AR # S S LA IS Clov er T E K BR H T L IC Court R C E A K E # F Bowling Gree n N E EW T RE T T RO S E AD A T E O D 2 U R R T D 9 N S AR L ER A R EV W A D D OA T E 2 R E C D 2 E RAR # R E Cem etery T EV S T U AD N O D T R A S ND O # E LA 2 R H 7.3m 6.7m LK 6.4m # C T A Y E 2 F 2 2 R T 2E E T E R E T D E S A R S O M 2 F T R O R E S D C A U AR U SC T D R L A T VE R # U E H E W IS N C BR L B O ICK A A B O N # W N 6.4m R D 2 E K W O # 2 A R

R O # U V A O D G E A H N D T U O P W E O # 6.4 m N Y R A R T 2 V L E A E S N N D D 2 S T A U T # E L E E E R 2R Cem etery E E T A S A T V SHD R E O W A N N D U CL # E O S C E E AD RO EY XL L O LON SDA L E R # OAD Cem e tery D 2 ROA OK k RO o B ro # E'S B J AN s 2 5.5 m e' n a 2 # J e in F AD RO # T OK O RO W S B N NE Berwy n L J A A Court N E District General Hospital 2 # Playing Fields D U T K M E E E E R S A T T D S R O H E W C E Playing Fields IR T V B IE W DE EA 4.3m RM k 2 VE o o RI Br # ' s # ne ## Ja # ne # # Fi Play ground ##### E U N E Allotment Gardens V A E K U # D ##### Blowick M oss 24.3m

2009/10 Single Sites having seven or more accidents in the Three-year study period 1/8/05 to 31/7/08 (Non –Trunk Roads) ANNEX B

No. of Location Comments Accidents Unable to improve road safety of a six-arm very busy roundabout using low cost accident KEW ROUNDABOUT, SOUTHPORT – 100M RADIUS 15 remedial measures. Major transportation study of junction planned for 2010/11. Investigated in 2004. Changes cannot be made to phasing of signals due to capacity issues ROAD/MILLERS BRIDGE BOOTLE 15 Improvements to road surfacing (anti-skid) and improvements to signage have been made. FORMBY BY PASS/SOUTHPORT ROAD FORMBY 13 Investigated in 2005/06. Scheme to be progressed in 2010 /2011 Scheme currently being developed for construction in 2009/10 that will be subject to approval PRESCOT RD/BANKS LANE MELLING 13 by Members and funding being available. (Introduction of a roundabout) Scheme previously investigated in 2005/06 but not progressed due to lack of funding. A59 NORTHWAY/HALL LANE MAGHULL 12 Due to possible changes in traffic conditions the junction will be re-investigated in 2009/10 Page 59 Pedestrian and cycling facilities were introduced in July 2000 along the route. MARSH LANE/STANLEY RD BOOTLE 11 Junction to be investigated in 2009/10 Continue to monitor in 2009/10 – London Street/Hoghton Street Environmental improvements LORD ST/LONDON ST SOUTHPORT 10 introduced in 2008/9 BALLIOL RD/STANLEY RD BOOTLE 10 AIP Scheme introduced 1994/5 – 18 accidents before scheme.

ORMSKIRK ROAD/AINTREE LANE AINTREE 10 To be investigated 2009/10 CROSBY ROAD SOUTH/KNOWSLEY ROAD JUNCTION, 10 Part of A565 Route Management Strategy Study BOOTLE

Southport Road has been identified for route action, Scheme currently being developed for Agenda Item6 SOUTHPORT RD/NORTHFIELD RD BOOTLE 10 implementation in 2009/10. A59 NORTHWAY / DOVER RD MAGHULL 10 Investigated in 2005/06 - No dominant causation factors identified at that time. Edge Lane has been traffic calmed in 2005/06 and also forms part of the A565 Route EDGE LANE / MOOR LANE SEFTON 9 Management Strategy CROSBY RD NORTH / SOUTH RD JUNCTION 9 Part of A565 Route Management Strategy Study WATERLOO

Agenda Item6 ANNEX B

2009/10 Single Sites having seven or more accidents in the Three-year study period 1/8/05 to 31/7/08 (Non –Trunk Roads)

No. of Location Comments Accidents Scheme previously investigated in 2005/06 but not progressed due to lack of funding. FORMBY BYPASS/NORTH END LANE ALTCAR 9 Due to possible changes in traffic conditions the junction will be re-investigated in 2009/10

BREEZE HILL / SOUTHPORT ROAD 8 IMPROVEMENT SCHEME INTRODUCED IN 1999 – 40 ACCIDENTS BEFORE SCHEME .

MARINE DRIVE / MARINE PARADE SOUTHPORT 8 TO BE INVESTIGATED IN 2009/10

LORD STREET/CORONATION WALK SOUTHPORT 8 Lord Street Investigated in 2005/06 – Majority of accidents were untreatable. Page 60 AIP SCHEME INTRODUCED IN OCTOBER 2000. 10 ACCIDENTS IN 3 YEARS BEFORE THE SCHEME WAS LORD STREET / DUKE STREET SOUTHPORT 8 INTRODUCED .

COASTAL ROAD/ LIVERPOOL RD AINSDALE 8 IMPROVEMENT SCHEME INTRODUCED IN 2007/08

RIGHT –TURNING ACCIDENTS . UNTREATABLE DUE TO LAYOUT AND JUNCTION CAPACITY ISSUES . FORMBY BYPASS / ALTCAR ROAD FORMBY 8 (S IGNAL TIMINGS / CONGESTION )

HAWTHORNE ROAD / MARSH LANE BOOTLE 8 BOTH ROADS HAVE BEEN TRAFFIC CALMED

CROSBY ROAD SOUTH / CAMBRIDGE ROAD, 8 PART OF A565 ROUTE MANAGEMENT STRATEGY STUDY WATERLOO

QUARRY ROAD / INCE ROAD CROSBY 8 PART OF A565 ROUTE MANAGEMENT STRATEGY STUDY

MARSH LANE / WASHINGTON PARADE BOOTLE 7 CONTINUE TO MONITOR IN 2009/10

CAMBRIDGE ROAD / PARK CRESCENT SOUTHPORT 7 CONTINUE TO MONITOR IN 2009/10

GUILDFORD ROAD/STAMFORD ROAD BIRKDALE 7 CONTINUE TO MONITOR IN 2009/10

KINGSWAY/LIVERPOOL RD CROSBY 7 PART OF A565 ROUTE MANAGEMENT STRATEGY

ANNEX B

2009/10 Single Sites having seven or more accidents in the Three-year study period 1/8/05 to 31/7/08 (Non –Trunk Roads)

No. of Location Comments Accidents EASTBANK STREET SQUARE/LORD STREET, 7 INVESTIGATED IN 2005/06 – NO DOMINANT CAUSATION FACTORS IDENTIFIED SOUTHPORT

BUTTS LANE/NORWOOD ROAD SOUTHPORT 7 CONTINUE TO MONITOR IN 2009/10

LIVERPOOL ROAD/KENILWORTH ROAD AINSDALE, 7 CONTINUE TO MONITOR IN 2009/10

LORD STREET/BOLD ST SOUTHPORT 7 CONTINUE TO MONITOR IN 2009/10

STANLEY RD/MERTON RD, 7 CONTINUE TO MONITOR IN 2009/10 BOOTLE Page 61 DODDS LANE / NORTHWAY, 7 CONTINUE TO MONITOR IN 2009/10 MAGHULL CROSBY ROAD NORTH/BRAMHALL ROAD, 7 PART OF A565 ROUTE MANAGEMENT STRATEGY WATERLOO HOGHTON ST/ LONDON ST 7 LONDON STREET /H OGHTON STREET ENVIRONMENTAL IMPROVEMENTS 2008/9 SOUTHPORT AINTREE RD / SOUTHPORT RD SOUTHPORT ROAD IDENTIFIED FOR ROUTE ACTION , SCHEME CURRENTLY BEING DEVELOPED FOR 7 BOOTLE IMPLEMENTATION IN 2009/10. NORTHWAY/DAMFIELD LANE 7 CONTINUE TO MONITOR IN 2009/10 MAGHULL Agenda Item6 SCARISBRICK NEW ROAD / ASH STREET SOUTHPORT 7 CONTINUE TO MONITOR IN 2009/10

CEMETERY ROAD/WARWICK STREET SOUTHPORT 7 CONTINUE TO MONITOR IN 2009/10 HAWTHORNE ROAD/LINACRE LANE JUNCTION 7 SCHEME CURRENTLY BEING DEVELOPED IN CONJUNCTION WITH HMRI IMPROVEMENTS

Agenda Item6 Routes With Highest Accident / KSI Levels Three-year study period 1/8/05 to 31/7/08 (Non-Trunk Roads) ANNEX C

Route 85 th No. of No. of Location length %ile Comments Accidents KSI’s km speed 7 accidents on Lambshear Lane and 7 accidents on Kenyons Lane. Lambshear Lane / Kenyons 37 mph Numerous ‘loss of control’ incidents unrecorded on Kenyons Lane. High Lane, Maghull. 1.8km 14 2 41 mph speeds recorded on both roads.

Included within 2009/10 Speed Management Scheme.

Spencer’s Lane / Waddicar From Canal up to and including roundabout at Hayes Drive. 1.4 km 12 4 45 mph Lane, Melling Included within 2009/10 Speed Management Scheme. High number of unrecorded ‘damage only’ loss of control accidents Bankfield Lane / Rufford Road, Six accidents occurred between end of Bankfield Road and Pool Street, a Page 62 2.0km 8 2 38 mph . distance of 682m. Included within 2009/10 Speed Management Scheme. A565 Crosby Rd North, Seaforth 4.9 km 107 7 38 mph All of the A565 Route Strategy Management Scheme – Under investigation flyover to Green Lane, Thornton A565 Derby Road /Rimrose Road Surface treated, signal and signage improvements have been undertaken. 3.0 km 48 3 44 mph Bootle High traffic volumes. A59 Northway, Maghull 4.0 km 47 4 30 mph Majority of accidents are at junctions. Treated as single sites Bailey Drive / Southport Road, 2.9 km 45 3 44 mph Scheme to be progressed in 2009/10 – Route Action Programme Bootle Includes major junctions. Analysis in 2005/06 revealed that the majority of Lord Street, Southport 1.1 km 35 4 31 mph accidents involved pedestrians which were very difficult to treat without introducing extensive guard railing. Cemetery Road / Eastbourne Majority of accidents are not speed related- 1.6 km 28 8 32 mph Road, Southport. Route Action Programme Investigation Scarisbrick New Road, Southport 2.2 km 27 2 32 mph Scheme progressed to be progressed in 2009/10 – Route Action Programme Glovers Lane / Fleetwoods 20 Pedestrian accidents 1.2 km 27 3 - Lane, Netherton – Route Action Programme Investigation

Page No. 32

ANNEX C

Route 85 th No. of No. of Location length %ile Accidents KSI’s Comments Km speed Meols Cop Road / Norwood Kew roundabout to Roe Lane. Shunts / loss of control / pedestrians 2.0 km 26 1 35 mph Road, Southport. Route Action Programme Investigation Sefton Road / Gorsey Lane, Traffic calming scheme including speed cameras implemented in 2003/04 - 2.0 km 26 5 32 mph Litherland (46 accidents before scheme was introduced). Ash Street / Rose Hill / St Majority of accidents at junctions. 1.1 km 22 2 32 mph Lukes Road, Southport Route Action Programme Investigation Spread out along route. 9 speed related accidents Park Lane, Netherton 1.2 km 21 2 30 mph Route Action Programme Investigation 5 at junction with Hawthorne Rd. accidents Linacre Lane, Litherland 1.1 km 17 3 33 mph Route Action Programme Investigation At junctions, majority ‘failed to give way’ – not speed related Hart Street, Southport 1.0 km 17 4 33 mph Route Action Programme Investigation Liverpool Road, Southport 2.1 km 16 0 30 mph

Page 63 Waterloo Road, Southport 2.2 km 16 0 35 mph 5 at jct with Sandon Rd.- poor turn manoeuvres. Edge Lane, Thornton 2.7 km 15 2 - Traffic calmed in 2005/06 Preston New Road, Southport 2.1 km 14 3 38 mph Scheme introduced in 2008 21 Pedestrian accidents/masking due to parked cars College Road, Crosby 1.1 km 13 1 32 mph Route Action Programme Investigation Cambridge Road, Southport 1.6 km 13 1 37 mph Five pedal cyclist accidents/ 4 shunts. shunts / 4 loss of control – Pegasus crossing introduced in 2006/07.Would Melling Road, Melling 1.6 km 12 2 43 mph need to liaise with Liverpool City Council - 5 at jct with Seeds Lane Linacre Road / Stanley Road, Bridge Rd to Knowsley Rd -Scheme implemented in 2005/06. 1.3 km 11 2 34 mph Bootle – 29 accidents before scheme was introduced. Agenda Item6 Albert Road, Southport 1.0 km 11 2 39 mph 7 accidents at the junction with Park Road – not speed related Roe Lane, Southport 1.5 km 11 0 35 mph South Road, Waterloo 0.5 km 11 0 - Traffic calmed in 2004/05 – No dominant causation factors Southport Road / Mairscough 1.6km 11 2 40 mph Scheme to be progressed in 2009/10 – Route Action Programme Lane, Southport Promenade, Southport 1.9 km 10 2 32 mph Kingsway to Fairway Aintree Lane/School Lane/ 1.8 km 9 4 31 mph Traffic calmed in 2005/06 Bullbridge Lane, Aintree

Page No. 33

Agenda Item6 ANNEX C

Route 85 th No. of No. of Location length %ile Accidents KSI’s Comments km speed Liverpool Road / Avenue, 1.9 km 9 0 35 mph Southport Park Lane West, Netherton 0.9 km 9 2 30 mph Merton Road 0.8 km 8 0 37 mph Excludes Stanley Road Junction Stanley Road, Bootle 0.5 km 8 2 - Balliol Road to Liverpool Boundary – Future HRMI scheme Bispham Road, Southport 0.8 km 8 0 - Liverpool Road Sth, Maghull 1.5 km 8 1 36 mph Northern Perimeter Road, 2.4 km 8 0 - Netherton Coastal Road, Southport 2.5 km 8 0 49 mph Shore Road to A565 – Investigated, Majority of accidents are untreatable North End Lane, Hightown 1.2 km 7 1 - Identified for surface treatment –proposed after April 2009 Guildford Road, Birkdale 0.8 km 7 1 35 mph Carr Lane to Benthams Way

Page 64 Liverpool Road, Southport 1.4 km 7 0 - Station Road to Waterloo Road Bridle Road, Netherton 1.2 km 7 1 40 mph Shore Road, Ainsdale 1.4 km 7 1 39 mph 4 accidents are at the roundabout with the Coastal Rd Orrell Road, Bootle 1.6 km 7 1 31 mph Church Road, Formby 1.4 km 6 0 - Manchester Road, Southport 1.0 km 6 0 29 mph Wango Lane, Aintree 0.9 km 6 0 32 mph Traffic calmed in 2005/06 Boundary Road / Sefton Moss 1.1 km 6 1 - Lane, Netherton Hesketh Road, Southport 1.5 km 6 1 - Lulworth Road / Lord Street West 1.7 km 6 2 32 mph Southport Buckley Hill Lane, Netherton 0.7 km 5 1 36 mph Moss Lane, Hightown 3.1 km 5 1 - Some sections were surface treated in 2008 Marine Drive, Southport 1.2 km 5 1 31 mph Marine Drive, Southport Westway, Maghull 0.3 km 5 0 27 mph Westway, Maghull Duke Street, Formby 0.7 km 5 0 29 mph

Page No. 34

ANNEX C

Route 85 th No. of No. of Location length %ile Accidents KSI’s Comments km speed Marshside Road, Southport 1.4 km 5 0 - Mersey Road, Crosby 0.5 km 5 1 - Fleetwood Road, Southport 2.1 km 4 0 35 mph Road, Formby 1.5 km 4 0 37 mph Moss Lane, Lydiate 1.9 km 4 0 43 mph Lane, Formby 1.0 km 4 0 - St. Johns Road, Waterloo 0.5 km 4 0 - Brownmoor Lane/Chesterfield 2.0 km 3 0 33 mph Road, Crosby Crescent Road, Seaforth 0.6 km 3 0 - Guildford Road/Heathfield Road, 1.2 km 3 0 31 mph Carr Lane to Mill Road Southport Hawthorne Road, Bootle 0.5 km 3 0 - Balliol Road to boundary with Liverpool Page 65 Fylde Road, Southport 1.4 km 3 1 36 mph Hatton Hill Road Litherland 1.2 km 3 0 - 3 loss of control accidents – intoxicated / stolen vehicle The Northern Road/South 1.2 km 2 0 - Parade, Crosby Kenilworth Road, Southport 2.0 km 2 1 41 mph Balmoral Drive, Southport 1.1 km 2 0 36 mph Sterrix Lane, Netherton 1.0 km 2 0 - Kirklake Road, Formby 1.4 km 2 0 - Green Lane, Maghull 0.6 km 1 0 -

Heathfield Road, Southport 1.7 km 1 0 - Agenda Item6 Altcar Road, Formby 0.8 km 1 0 37 mph Burbo Bank Road / Burbo Bank 1.5 km 1 1 42 mph High speeds Road North, Altway, Aintree 1.4 km 1 0 34 mph Traffic calmed in 2005/06 Harris Drive, Bootle 1.1 km 1 0 32 mph Poverty Lane, Maghull 2.0 km 0 0 27 mph Liverpool Road, Lydiate 1.6 km 0 0 42 mph Victoria Road, Formby 2.0 km 0 0 -

Page No. 35

ANNEX C Agenda Item6

Route 85 th No. of No. of Location length %ile Accidents KSI’s Comments km speed Foxhouse Lane, Maghull 1.1 km 0 0 - Southport Road, Formby 1.0 km 0 0 38 mph Southport Road, Formby Banks Road, Crossens 0.8 km 0 0 40 mph Banks Road, Crossens Kirkstone Road Sth, Bootle 0.9 km 0 0 - Traffic calmed

Page 66

Page No. 36

2009/10 Single Sites having seven or more accidents in the Three-year study period 1/8/05 to 31/7/08 (Trunk Roads) ANNEX D

Location District No. of Comments Accidents PHASE 1 COMPLETED 1998 – PHASE 2 COMPLETED 2006 – TWO A5036 / A59 / M57 / M58 SWITCH ISLAND / ORMSKIRK ROAD NETHERTON 25 CLUSTERS ON A 59 ORMSKIRK ROAD (S WITCH ISLAND )

A5036 DUNNINGSBRIDGE ROAD / COPY LANE NETHERTON 19 PEDESTRIAN PHASES ADDED 1992/1993

A5036 CHURCH ROAD / HAWTHORNE ROAD LITHERLAND 15

A5036 DUNNINGSBRIDGE ROAD / PARK LANE WEST NETHERTON 15 SCHEME INTRODUCED 1995/96

A5036 DUNNINGS BRIDGE ROAD / NETHERTON WAY NETHERTON 12 SIGNABOUT INTRODUCED 1992/93

A5036 PRINCESS WAY / CHURCH ROAD ROUNDABOUT SEAFORTH 10 Page 67 A5036 DUNNINGS BRIDGE ROAD / HEYSHAM ROAD NETHERTON 8

It is recommended that the Highways Agency are made aware of the accident record of the above sites and request that they carry out investigations in 2009/10:

Agenda Item6

Page No. 37

This page is intentionally left blank

Page 68 Agenda Item 7

REPORT TO: CABINET MEMBER – TECHNICAL SERVICES

DATE: 14 January 2009

SUBJECT: 2008/09 Local Transport Plan – Revised Technical Services Capital Programme

WARDS AFFECTED: All Wards

REPORT OF: A R Moore – Strategic Director of Regeneration and Deputy Chief Executive CONTACT OFFICER: R S Waldron, Assistant Technical Services Director 0151 934 4235 K. Davies, Principal Officer LTP Co-ordination 0151 934 4260 EXEMPT/CONFIDENTIAL: No

PURPOSE/SUMMARY: To seek approval to revise the funding allocations for individual schemes within the approved 2008/09 Technical Services Capital Programme. The amended funding allocations will reflect the current financial and programme position for the 2008/09 Technical Services Capital Programme.

REASON WHY DECISION REQUIRED: Cabinet Member has delegated powers to review and amend the Technical Services Capital Programme. The detail and funding profile of the programme has changed, due to changes to scheme cost estimates and project delivery.

RECOMMENDATION(S): It is recommended that: i) The revised 2008/09 Technical Services Capital Programme be approved

KEY DECISION: No

FORWARD PLAN: No

IMPLEMENTATION DATE: i.e. None

ALTERNATIVE OPTIONS:

There are no alternative options available. IMPLICATIONS:

Budget/Policy Framework: i.e. None

Financial: The programmes of expenditure identified within this report will be contained within the Local Transport Plan Technical Services Capital allocation for 2008/09 as approved by Cabinet on the 28 February 2008.

Page 69 Agenda Item 7

2006/ 2007/ 2008/ 2009/ 2007 2008 2009 2010 CAPITAL EXPENDITURE £ £ £ £

Gross Increase in Capital Expenditure Funded by: Sefton Capital Resources Specific Capital Resources REVENUE IMPLICATIONS Gross Increase in Revenue Expenditure Funded by: Sefton funded Resources Funded from External Resources Does the External Funding have an expiry date? Y/N When? How will the service be funded post expiry?

Legal: None.

Risk Assessment: i.e. N/A

Asset Management: N/A

CONSULTATION UNDERTAKEN/VIEWS

• Officers of the Technical Services and Finance Departments.

CORPORATE OBJECTIVE MONITORING:

Corporate Positive Neutral Negative Objective Impact Impact Impact 1 Creating a Learning Community √ 2 Creating Safe Communities √ 3 Jobs and Prosperity √ 4 Improving Health and Well-Being √ 5 Environmental Sustainability √ 6 Creating Inclusive Communities √ 7 Improving the Quality of Council Services and √ Strengthening local Democracy 8 Children and Young People √

Page 70 Agenda Item 7

LIST OF BACKGROUND PAPERS RELIED UPON IN THE PREPARATION OF THIS REPORT

Report to Cabinet of 24 th January 2008 – Medium Term Financial Plan Capital Programme 2008/2009 – 20010/2011 Report to Cabinet of 28 th February 2008 – 2008/2009 – 20010/2011 Capital Programme Report to Cabinet Member – Technical Services of 12 th March 2008 - 2008/09 Local Transport Plan – Technical Services Capital Programme Report to Cabinet Member of 22 nd October - 2008/09 Local Transport Plan – Revised Technical Services Capital Programme

Page 71 Agenda Item 7

1.0 Introduction

1.1 The original 2008/09 Local Transport Plan (LTP) Technical Services Capital Programme had a degree of overprogramming, to accommodate the management of the programme and to ensure a full spend was achieved. On 22 October, Cabinet Member – Technical Services approved amended funding allocations for individual schemes within the 2008/09 Technical Services Capital Programme. These amended funding allocations reflected the financial and programme position of the Programme at that time.

1.2 This report aims to clarify the current financial position of the 2008/09 Technical Services Capital Programme and proposes amendments that will ensure that the Programme is balanced and on target to achieve the Single Capital Pot and direct grant allocations.

1.3 The Chapel Street Pedestrianisation Scheme is now complete and the issue in respect to a claim for additional payments by the contractor involved has now been resolved thus allowing the final account for the scheme to be settled in this financial year.

1.4 The new Park & Ride at Kew in Southport is also complete and payments will be made in 2008/09 to a level in accordance with contract management procedures. However, the final account has yet to be settled due to the ongoing consideration of a claim for additional payments by the contractor involved. An assessment of the progress of discussions with the contractor would indicate that a resolution of the claim and hence settlement of the final account for the scheme is now likely to occur in 2008/09. However, there is a potential for this situation to result in a slippage in expenditure of £104,830 into 2009/10. This situation will be closely monitored and future reports will advise Cabinet Member – Technical Services of the up to date situation in respect to progress in settling the final account for this scheme.

1.5 As reported to Cabinet Member – Technical Services on 22 October 2008, the planned footway and carriageway improvements on Hawthorne Road between Church Road and the Railway Bridge are now unlikely to be carried out until early in 2009/10 resulting in a potential slippage in expenditure of the available funds for the Hawthorne Road Maintenance Project in 2008/09 with an estimated £258,225 being carried forward into 2009/10 and later years. In addition, the planned footway and carriageway improvements on Hawthorne Road between the Railway Bridge and Harris Drive are not now programmed to commence until February 2009, which will result in the works not being completed until April 2009. This will result in an increase in the previously reported potential slippage in the expenditure of the available funds for the Hawthorne Road Maintenance Project in 2008/09 with an estimated further £141,300 being carried forward into 2009/10. This equates to a total of £399,525 potentially being carried forward into 2009/10 and 2010/11.

1.6 All expenditure in 2008/09 will be contained within the 2008/09 LTP Transportation Capital Programme.

Page 72 Agenda Item 7

2.0 2008/09 Transportation Capital Programme Allocation

2.1 Approval is sought for a revised 2008/09 Local Transport Plan Capital Programme based on approved funding:-

Approved Approved Approved Total Funding for Funding for Funding for 2008/09 2009/10 2010/11

£ £ £ Integrated Transport Block Allocation 2,840,000 2,840,000 Transferred to Hawthorne -460,860 -460,860 Road 2007/08 – carried forward 8,000 8,000

SubTotal 2,387,140 0 2,387,140

Maintenance Carriageways 1,083,725 1,083,725 Maintenance – Detrunked 1,265,410 1,265,410 A59 and A565 Drainage Improvement 100,000 100,000 Bridges – Base 653,795 653,795 Bridges – PRN 215,000 215,000 Supplementary Bridges (07/08) – carried 106,610 106,610 forward Street Lighting 76,480 76,480 SubTotal 3,501,020 0 3,501,020

Hawthorne Rd Prudential Borrowing – 300,000 1,000,000 1,300,000 approved by Cabinet 24/1/08 but now required in future years Reallocated from the 2008/09 460,860 460,860 Integrated Transport Block 2007/08 – carried forward 35,140 35,140 Approved but likely to be -399,525 + 256,776 + 142,749 carried forward to 2009/10 and later years SubTotal 396,475 256,776 £1,142,749 1,796,000

TOTAL 6,284,635 256,776 £1,142,749 7,684,160

Page 73 Agenda Item 7

3.0 Hawthorne Road Supplementary Allocation

3.1 The current programme of spend for the Hawthorne Road scheme based on work programmes and the latest cost estimates is:

05/06 Actual Expenditure £ Railway Bridge Improvements 236,800 Sub Total 236,800

06/07 Actual Expenditure Railway Bridge Improvements 636,190 Sub Total 636,190

07/08 Programme Marsh Lane – Merton Road and Balliol Road to Borough 281,150 Boundary (footway/carriageway maintenance) Sub Total 281,150

08/09 Programme Contribution to Canal Cycling Project 218,000 Railway Bridge – Harris Drive (footway/carriageway 178,475 maintenance) Sub Total 396,475

09/10 Programme Railway Bridge – Harris Drive (footway/carriageway 141,300 maintenance) – completion of works Church Road to Railway Bridge 115,476 Sub Total 256,776

10/11 Programme Harris Drive to Linacre Lane 1,238,268 Linacre Lane to Marsh Lane 306,781 Sub Total 1,545,049

TOTAL £3,352,440

3.2 At the meeting of 24 January 2008 Cabinet approved the release of £300,000 in 2008/09 and £1m in 2009/10 to the programme from prudential borrowing for the Hawthorne Road scheme. However, further progress in future years will be dependent on the replacement from the Maintenance Block of £150k from the Hawthorne Road Supplementary Allocation utilised for highway drainage in 2005/06. The scope for utilising Section 106 funding to support the Hawthorne Road project is also being explored. Any additional funding required to complete

Page 74 Agenda Item 7

the overall project will need to be met from Transportation Capital Programme allocations in future years.

3.3 Whilst the intention has always been to implement footway and carriageway improvements in respect to the section of Hawthorne Road between Church Road to the Railway Bridge as soon as possible, these works have to be co- ordinated with the works planned to be carried out by Tesco along the same section of highway as part of the development of their new store. These works are now unlikely to be carried out until early in 2009/10. As a result, this situation will result in a potential slippage in expenditure of the available funds for the Hawthorne Road Maintenance project in 2008/09 with an estimated £258,225 being carried forward into 2009/10 and later years. In addition, the planned footway and carriageway improvements on Hawthorne Road between the Railway Bridge and Harris Drive are now not programmed to commence until February 2009, which will result in these works not now being completed until April 2009. This will result in an additional increase of £141,300 to the already identified potential slippage of the available funding for the overall Hawthorne Road project being carried forward into 2009/10. This results in the total potential slippage in expenditure in 2008/09 of the available funds for the Hawthorne Road project now being £399,525 and equates to an estimated total of £256,776 being carried forward into 2009/10 and £142,749 being carried forward into 2010/11.

3.4 Available funding to progress the Hawthorne Road Supplementary scheme from 2008/09 onwards is as shown below:

Hawthorne Road Approved by Approved by Subject to Total Supplementary Cabinet for Cabinet for future 2008/09 2009/10 and reallocation 28.02.08 2010/11 24.01.08 Reallocated from the 2008/09 218,000 Integrated Transport Block Reallocated from the 2008/09 242,860 Integrated Transport Block Drainage Allocation for 150,000 2005/06 – (subject to reallocation from the Maintenance Block in future years) Hawthorne Rd 300,000 1,000,000 Supplementary Scheme – approved by Cabinet 24/1/08 Reallocated funding from the 252,300 Integrated Transport Block and Section 106 Contributions in future years 2007/08 – carried forward 35,140 Approved but likely to be -399,525 +399,525

Page 75 Agenda Item 7

carried forward to 2009/10 Total 396,475 1,399,525 402,300 2,198,300

4.0 Thornton to Switch Island Link Scheme

4.1 The Thornton to Switch Island Link received Programme Entry as a major scheme in the Local Transport Plan process on 15 th September 2008. As a result, the scheme is now being progressed with completion on site programmed to be November 2012. Details of the next steps in the development of the project were reported to Cabinet on 2 nd October 2008. A further report to Cabinet Member – Technical Services early in 2009 will seek approval for a detailed spend profile for the scheme for the financial years 2008/09 and 2009/10.

5.0 Integrated Transport Programme

5.1 The proposed revised 2008/09 Integrated Transport Programme is detailed in the table in Annex A. The various block allocations are highlighted together with any revised scheme costs. Explanations in respect to proposed changes to the Programme as approved by Cabinet Member – Technical Services on 22 October 2008 are alphabetically referenced and listed below.

Scheme Explanations

A Mount Pleasant/Oxford Road, Waterloo It is proposed to increase the 2008/09 allocation for the scheme from £143k to £144.34k to reflect the latest cost estimates.

B Preston New Road – Speed Management and Cycling It is proposed to increase the 2008/09 allocation for the scheme from £250k to £253k to reflect the latest cost estimates.

C Sefton Village – Speed Management It is proposed to increase the 2008/09 allocation for the scheme from £90k to £93.44k to reflect the latest cost estimates

D Crosby 6 – Dibbs Lane ROW It is proposed to allocate £5k to complete the design in respect to proposed improvements to this Public Right of Way in preparation for the potential delivery of works in future years.

E Trans Pennine Trail – Pontins Diversion It is proposed to increase the 2008/09 allocation for this cycling scheme from £26k to £30k to reflect the latest cost estimates.

Page 76 Agenda Item 7

F School Travel Plans It is proposed to increase the allocation for School Travel Plans from £60k to £63k in order to provide additional cycle storage at Formby High School.

G Kew Park and Ride The new car park at Kew was completed in 2007 and is now fully operational. However, the final account has yet to be settled due to the ongoing consideration of a claim for additional payments by the contractor involved. As identified in paragraph 1.4, there is a potential for a slippage in expenditure of £104,830 into 2009/10. However, the latest assessment of progress in respect to discussions with the contractor indicates that a resolution of the claim and hence settlement of the final account for the scheme is still likely to occur in 2008/09. All expenditure in 2008/09 will be contained within the 2008/09 LTP Transportation Capital Programme and future years programmes will take account of any additional funding requirements for settling the final account for the scheme.

H Kew Park and Ride Bus Service Improvements It is proposed to allocate £39k in this financial year in order to part fund improvements to the Kew Park and Ride Bus Service as approved by the Southport Area Committee on 3 December 2008. These improvements will enable the Kew P&R bus service to operate along Scarisbrick New Road in both directions and serve the Southport Hospital and sites from 4 th January 2009. The LTP funding will be used to install an addition automatic bollard system at the Kew car park site. Other improvements in the form of new bus stops situated close to the hospital and college sites will be funded by developer contributions.

I Chapel Street Pedestrianisation The Chapel Street Pedestrianisation Scheme is now complete and the issue in respect to a claim for additional payments by the contractor involved has now been resolved thus allowing the final account for the scheme to be settled in this financial year. On the basis of this settlement it is proposed to reduce the allocation for the scheme in 2008/09 from £450k to £261.91k. This takes account of the ERDF Objective 1 funding currently available for the scheme.

J Advanced Design and LTP Co-ordination It is proposed to reduce the overall allocation for Advanced Design and LTP Co-ordination Forward Planning in 2008/09 from £117k to £101k consisting of £40k for LTP Co-ordination and £61k for advanced design. The Advanced Design and LTP Co-ordination Planning Block no longer includes an allocation for Kew Park and Ride Bus Service Improvements scheme as this is now identified separately in the Forward Planning programme.

K A565 Route Management Study It is proposed to increase the allocation for the development of the strategy £10k to £20k in this financial year to fund required feasibility work.

Page 77 Agenda Item 7

The proposed revisions to the allocations for the schemes identified will reduce the overall Integrated Transport Programme from £3,012,760 to £2,877,450. As in previous years, it is proposed to retain a degree of overprogramming (£29,450) in order to assist in the management of the budget although all spend will be contained within the 2008/09 Transportation Capital Programme. Progress will be closely monitored on a monthly basis and any further adjustments will be reported for approval during the rest of the financial year.

6.0 Highway Maintenance and Street Lighting Programmes

6.1 The 2008/09 Highway Maintenance and Street Lighting Programmes were approved by Cabinet Member – Technical Services on 26 March 2008. On 22 October 2008, Cabinet Member – Technical Services approved amended funding allocations for individual schemes within the 2008/09 Highway Maintenance and Street Lighting Programmes.

6.2 The proposed revised 2008/09 Highway Maintenance and Street Lighting Programmes are submitted for approval. The programmes are set out in detail in Annex A. A degree of over-programming (£12,455) has been retained to assist with the management of the budget. However, all spend will be contained within the 2008/09 Transportation Capital Programme.

7.0 Highway Structures Maintenance Programme

7.1 The 2008/09 Highway Structures Maintenance Programme was approved by Cabinet Member – Technical Services on 12 March 2008. On 22 October 2008, Cabinet Member – Technical Services approved amended funding allocations for individual schemes within the 2008/09 Highway Structures Maintenance Programme.

7.2 The reduced scope of works in the case of Dunnings Centre resulting in the reduction of the PRN total allocation for 2008/09 from £275k to £235k was reported to Cabinet Member – Technical Services on 22 October 2008. Updated cost estimates for Dunnings Centre and Waterloo Railways (5 Lamps) will result in a further reduction of the total PRN allocation for 2008/09 from £235k to £215k.

7.3 A proposed revised 2008/09 Highway Structures Maintenance Programme is set out in detail in Annex A and submitted for approval. The revised programme is under-programmed by £12,685 and all spend will be contained within the 2008/09 Transportation Capital Programme.

Page 78 Agenda Item 7

8.0 Drainage Programme

8.1 The LTP Drainage Programme was approved by Cabinet Member – Technical Services on 12 March 2008. No changes are currently proposed in respect to the Programme. However, the Programme is subject to change if higher priorities are identified following inspections. Approval will be sought from Cabinet Member for any future amendments to the programme

9.0 Conclusion

9.1 The revised programmes identified for Integrated Transport, Highway Maintenance, Highway Structures Maintenance, and Drainage in addition to those reported separately for Highway Maintenance and Street Lighting can be accommodated within the overall approved 2008/09 LTP Transportation Capital Programme.

9.2 The final position for the 2008/09 LTP Transportation Capital Programme will be confirmed in a further report to Cabinet Member as soon as the final accounts for 2008/09 are available.

9.3 The approval of the allocation of funding within the 2008/09 LTP Transportation Capital Programme and the approval of schemes to be progressed within the Integrated Transport, Highway Maintenance, Highway Structures Maintenance and Drainage Blocks will ensure that the overall programme is on target to meet the Single Capital Pot Allocations.

9.4 All spend will be contained within the 2008/09 LTP Transportation Capital Programme.

Page 79 Agenda Item 7

2008/2009 LOCAL TRANSPORT PLAN ANNEX A CAPITAL PROGRAMME

INTEGRATED TRANSPORT BLOCK

2008/09 2008/09 Notes Project Description Revised Revised Comments Allocation Allocation Oct 2008 Jan 2009 £000's £000's

Previous Years

Completing Schemes/Retentions 10.00 10.00 Total 10.00 10.00

Safety Programme 2008/09 Programme A Mount Pleasant/Oxford Rd, 143.00 144.34 Waterloo B Preston New Road – Speed 250.00 253.00 Management and Cycling C Sefton Village – Speed 90.00 93.44 Management Pear Tree Junction 50.00 50.00 Southport Rd/Bailey Drive, Bootle 5.00 5.00 Southport Rd, Lydiate 5.00 5.00 Scarisbrick New Rd, Southport 5.00 5.00

Prior Years Netherton Way/Orrell Lane, 2.00 2.00 Completing scheme Netherton

Safety Programme Total 550.00 557.78

Pedestrian & Access Programme Pedestrian Crossing Review Prog: Bridge Rd/Devonshire Rd, Waterloo 51.00 51.00

Dropped Crossings Prog (Access 30.00 30.00 GRP) Pedestrian Crossing Upgrades 1.00 1.00 TransPennine Trail Formby 44 20.00 20.00 Waddicar to Holmes Bridge 1.00 1.00 Formby Bridleway No 2 1.00 1.00 D Crosby 6 – Dibbs Lane 0.00 5.00

Pedestrian & Access Programme 104.00 109.00 Total

Cycling Marine Drive 18.00 18.00

Page 80 Agenda Item 7

E Trans Pennine Trail – Pontins 26.00 30.00 Diversion Wennington Road 1.00 1.00 Fernhill Road 1.00 1.00

Prior Years Schemes Coastal Path (Hall Lane to 0.00 0.00 Completing scheme (final section Hightown) to be funded by Sustrans)

Cycling Block Total 46.00 50.00

Travel Awareness & Education

Contribution to Merseyside 30.00 30.00 Contribution Programme Bike It Initiative (contribution) 10.00 10.00 Travel Awareness 16.00 16.00 Cycling and Health 30.00 30.00 Education and Promotion 10.00 10.00 Walking Initiatives 12.00 12.00 F School Travel Plans 60.00 63.00

Travel Awareness & Education 168.00 171.00 Total

Southport

G Kew Park and Ride 404.00 404.00 Plus £95.80k contribution from Merseytravel H Kew Park & Ride Bus Service 0.00 39.00 Originally included in Advanced Improvements Design I Chapel Street Pedestrianisation 450.00 261.91 Plus estimated £86.28k ERDF contribution Tulketh Street Public Ream 48.00 48.00 October 2008 allocation of £48k Improvements originally included in Forward Planning Block Town Centre to Seafront Linkages 22.50 22.50 Retentions Neville Street Lord St (contribution) 100.00 100.00 London St/Hoghton St 150.00 150.00 Plus contributions of £174.447k from Merseytravel and £175.426k ERDF Southport Parking Signage 80.00 80.00 Southport Pedestrian Signage 20.00 20.00 Plus contributions of estimated £41.361k ERDF, £47.043k Section 106 agreements, £10.5k from Sefton Council Tourism Southport Commerce Park Bus Link 150.00 150.00 Plus £150k contribution from Merseytravel and £120k from NWDA

Total 1424.50 1275.41

Page 81 Agenda Item 7

Bootle

Hawthorne Road Area Traffic 1.00 1.00 Completing scheme Management

Total 1.00 1.00

Forward Planning

Monitoring/LTP 18.00 18.00 Plus Contribution of £2.32k from Development/Research Merseytravel for LTP monitoring Transport Innovation Fund 22.00 22.00 Contribution (Planning for the Future) AIP Investigations 10.00 10.00 Demand Management – TRO 17.00 17.00 March 2008 allocation of £10k Mapping originally included under Advanced Design J Advanced Design and LTP Co- 117.00 101.00 Programme co-ordination and ordination advanced design of schemes Southport Strategy Development 2.00 2.00 Bootle Strategy Development 2.00 2.00 K A565 Route Management Study 10.00 20.00 Switch Island/Thornton Link Study 2.00 2.00 Community Transport (contribution) 20.00 20.00 Contribution Liverpool City Region Model 28.40 28.40 Contribution Development

Forward Planning Total 248.40 242.40

TOTAL INTEGRATED TRANSPORT PROGRAMME 2551.90 2416.59 Figures shown in £ 000’s 2008/09

Integrated Transport Block Funding: 2008/09 LTP Block Allocation 2840.00 2840.00 Transferred to Hawthorne Road -460.860 -460.860 2007/08 Carried forward 8.00 8.00 Total 2387.140 2387.140

BRIDGES PROGRAMME

2008/09 2008/09 Project Description Revised Revised Comments Allocation Allocation Oct 2008 Jan 2009 £000's £000's Assessment & Inspections

Assessment of Structure 20.00 20.00 Principal Bridge Inspections 40.00 60.00

Page 82 Agenda Item 7

Structural Maintenance & Strengthening

Network Rail Structures 50.00 75.00 Parapet Strengthening 25.00 25.00 Kenilworth Road 2.00 0.00 Bedford Road 51.00 67.95 Plus estimated ERDF contribution of £49.21k Everton View 82.36 83.77 Plus estimated ERDF contribution of £60.66k A565 Crosby Road Flyover 5.00 3.5 Retention Mersey Road 90.00 90.00 South Road 85.00 110.00 Waterloo Railway (5 lamps) 185.00 150.00 PRN Supplementary Allocation Scheme Bull Bridge 20.00 23.00 Dunnings Centre 50.00 65.00 PRN Supplementary Allocation Scheme 2.00 2.00 Canal Bridge Painting Scheme 125.00 16.00 Hillside Station Bridge Painting 140.00 88.00 Poverty Lane 75.00 20.00 Washington Parade 0.00 1.00 Retention A565 Sign Gantry, Crosby Road 0.00 2.00 Retention Netherton Way 0.00 0.50 Retention

Forward Planning and Co- Ordination

Forward Planning & Co-ordination 60.00 60.00

TOTAL BRIDGES PROGRAMME 1107.36 962.72 Figures shown in £ 000’s 2008/09 Bridges Block Funding: 2008/09 LTP Base Allocation 653.795 653.795 2008/09 LTP Supplementary 235.00 215.00 2007/08 carried forward 106.610 106.610 Total 995.405 975.405

MAINTENANCE PROGRAMME 2008/09 2008/09 Project Description Revised Revised Comments Allocation Allocation Oct 2008 Jan 2009 £000's £000’s Carriageway Resurfacing/Overlay) Boundary Street, Southport 58.00 58.00 Mostyn Ave, Maghull 68.07 68.07 Kirklake Road, Formby 44.00 44.00 Asland Gardens, Southport 25.00 22.00

Page 83 Agenda Item 7

Rathbone Road, Hightown 16.00 14.00 Balliol Road, Bootle 136.00 123.00 Peach Grove, Melling 16.00 14.00 Kilburn Street, Bootle 47.00 45.00 Liverpool Road North, Maghull 90.00 108.00 Brasenose Road, Bootle 39.00 41.00 Trinity Road, Bootle 59.00 59.00 Liverpool Road South, Maghull 98.50 86.00 Oxford Road, Waterloo 85.00 81.00 Back Dover Road, Maghull 18.00 26.00 Downside Close, Netherton 18.00 26.00 Kendal Drive, Aintree 77.00 77.00 Southport Road, Northbound Bootle 72.00 84.00 Southport Road, Southbound 129.00 140.00 Bootle

Street Lighting Park Crescent 78.00 78.00

De Trunked A565 Detrunked – Derby Road 0.00 34.00 A565 Crosby Road South, Seaforth 96.00 101.00 A565 Water Lane, Southport 78.00 70.00 A59 Northway, Maghull Ph 1 to 4 261.00 261.00 A565 Liverpool Road, Crosby 178.00 155.00 A565 The Bypass, Crosby 62.00 76.00 A565 Crosby Road North, Crosby 240.00 221.00 A565 Rimrose Road, Seaforth 85.00 106.00 A565 Formby Bypass, Tesco 42.00 45.00 A565 Scaffold Lane/Northern 87.00 90.00 Lane/Lady Green Lane A565 Rimrose Road/St Joan of 85.00 85.00 Arc/Marsh Lane A565 Crosby Road South/Princess 50.00 0.00 Way/Cambridge Road

Figures shown in £ 000’s CARRIAGEWAY MAINTENANCE 2437.57 2438.07 PROGRAMME 2008/09

DRAINAGE PROGRAMME 2008/09

2008/09 2008/09 Project Description Revised Revised Comments Allocation Allocation Oct 2008 Jan 2009 £000's £000's

Scarisbrick New Road 50.00 50.00 Drainage improvements Investigations 50.00 50.00 Including sites programmed for highway improvement works Page 84 Agenda Item 7

DRAINAGE PROGRAMME 100.00 100.00 Figures shown in £ 000’s 2008/09

TOTAL CARRIAGEWAY MAINTENANCE PROGRAMME 2537.572 2538.07 Figures shown in £ 000’s 2008/09

Total Carriageway Maintenance 884

Block Funding: Carriageways 1083.725 1083.725 Street Lighting 76.480 76.480 A565 A565 Detrunked 1265.410 1265.410 Drainage 100.00 100.00 Total 2525.615 2525.615

Other Thornton Switch Island Link 830.00 830.00 Supplementary – Hawthorne Road 537.775 396.475

Page 85 This page is intentionally left blank

Page 86 Agenda Item 8

REPORT TO: CABINET MEMBER – TECHNICAL SERVICES

DATE: 14 JANUARY 2009

SUBJECT: SECTION 116 HIGHWAYS ACT 1980 – PROPOSED STOPPING UP OF PUBLIC HIGHWAY – PASSAGEWAYS BEDFORD ROAD TO WADHAM ROAD, BOOTLE.. WARDS AFFECTED: LINACRE

REPORT OF: R S WALDRON – ASSISTANT TECHNICAL SERVICES DIRECTOR CONTACT OFFICER: D. MARRIN – TRAFFIC SERVICES MANAGER – Ext. 4295 M. HUNTER – HIGHWAYS DEVELOPMENT CONTROL – Ext. 4240 EXEMPT/CONFIDENTIAL: No

PURPOSE/SUMMARY:

To seek approval for the Legal Director in conjunction with the Director of Planning and Economic Regeneration to make an application to the Magistrates Court for the stopping-up of passageways of part of Bedford Road and Wadham Road, under the provisions of Section 116 of the Highways Act, 1980 following an application from Cosmopolitan Housing Association, Cosmopolitan House, 2 Marybone, Liverpool, L3 2BY under section 117 of the Highways Act 1980.

REASON WHY DECISION REQUIRED:

Cabinet Member authorisation is required before seeking an Order from the Magistrates Court. The application will enable the redevelopment of the area.

RECOMMENDATION(S):

That : -

The Cabinet Member authorises the Legal Director to request the Magistrates Court to make an Order under section 116 of the Highways Act 1980, for the stopping-up of passageways of part of Bedford Road and Wadham Road as detailed in the report and shown upon the plan number DC0234, subject to the applicant bearing all costs associated with the application.

KEY DECISION: No

FORWARD PLAN: No

IMPLEMENTATION DATE: Following the expiry of the ‘call in ‘period for the minutes of the meeting.

ALTERNATIVE OPTIONS:

There are no alternative options.

IMPLICATIONS:

Budget/Policy Framework: None

Financial: The applicant will meet the legal and administrative cost of the closure.

Page1 87 Agenda Item 8

2008/ 2009/ 2010/ 2011/ 2009 2010 2011 2012 CAPITAL EXPENDITURE £ £ £ £ Gross Increase in Capital Expenditure N/A Funded by: Sefton Capital Resources Specific Capital Resources

REVENUE EXPENDITURE

Gross Increase in Revenue Expenditure

Funded by:

Sefton funded Resources No

Funded from External Sources Yes

Does external funding have an expiry No date? Y/N

How will the service be funded post expiry

Legal:

Risk Assessment: None

Asset Management: None

CONSULTATION UNDERTAKEN/VIEWS

None

CORPORATE OBJECTIVE MONITORING:

Corporate Positive Neutral Negative Objective Impact Impact Impact 1 Creating a Learning Community ü 2 Creating Safe Communities ü 3 Jobs and Prosperity ü 4 Improving Health and Well-Being ü 5 Environmental Sustainability ü 6 Creating Inclusive Communities ü 7 Improving the Quality of Council Services and ü Strengthening local Democracy 8 Children and Young People ü

Page2 88 Agenda Item 8

SECTION 116 HIGHWAYS ACT 1980 - STOPPING UP OF HIGHWAY

1.0 Information / Background

1.1 An application has been received from Cosmopolitan Housing Association, Cosmopolitan House, 2 Marybone, Liverpool, L3 2BY for the stopping-up of a area of highway within the Borough, as shown upon the attached plan numbered DC0234

1.2 The stopping-up application relates to an area of highway which is considered unnecessary and would be expedient for the Council to make an application to the Magistrate Court on the basis that there are at present or will be, a reasonable suitable alternative in place.

1.3 The application details and justification/reasons for making the application to the Magistrates Court is as follows.

1.4 Plan No DC0234 – Bedford Road and Wadham Road, Bootle – The stopping-up of the passageways in question will facilitate the redevelopment of the area to enable the construction of a new housing layout as part of the HMRI programme within Sefton.

1.5 The Ward Councillors have been notified in respective of the application and have made no comment to-date.

2.0 s116 Highways Act 1980 Procedure and Magistrates Court Hearing

2.1 Under Section 117 of the Highways Act 1980, a person desiring a highway to be stopped-up may request the Highway Authority (in this case the Council) to make an application to the Magistrates Court for a stopping-up Order. If the request is granted the Council may as a condition, require the person to pay such costs, as it deems reasonable in connection with the application.

2.2 The Council must give 28 days notice of the Court Hearing specifically to adjoining owners/occupiers and statutory undertakers and in addition, must publish notices in a local newspaper, the London Gazette and also display a site notice.

2.3 Any person who receives the notice referred to above, or uses the highway or who would be aggrieved by the stopping-up, has a right to be heard at the Court Hearing of the application.

2.4 The Court may make the stopping-up Order if it appears that the highways are unnecessary for the public for the sort of lawful purposes for which the public could be reasonably expected to use that particular way. If there is evidence of such use the Court will need to be satisfied that the public are, or are going to be, provided with a reasonably suitable alternative way. If the Court makes the Order, its effect is to end the right of the public to use it as a highway.

2.5 It is considered in the case of the application contained within this report, that it is appropriate for the stopping-Up Order to be requested from the Magistrates Court under s116 of the Highways Act 1980, as the highway is in essence redundant and unnecessary together with there being reasonable suitable alternative in place within the existing highway network.

Andy Wallis Director of Planning and Economic Regeneration

Page3 89 Agenda Item 8

Page4 90 Agenda Item 9

REPORT TO: Cabinet Member – Technical Services

DATE: 14 th January 2009

SUBJECT: Temporary Footpath Closure – Maghull Footpath No.8 WARDS AFFECTED: Sudell REPORT OF: Andy Wallis, Director of Planning & Economic Regeneration

CONTACT OFFICER: Dave Marrin – Traffic Services Manager – Ext. 4295 Angela Bottomley – Traffic Management – Ext 4683

EXEMPT/CONFIDENTIAL: No

PURPOSE/SUMMARY: To seek approval for the closure, in the interests of public safety, of the footpath known as Maghull Footpath No.8, to enable structural repair works to be carried out.

REASON WHY DECISION REQUIRED:

Cabinet Member has delegated powers to approve a temporary footpath closure

RECOMMENDATION(S):

1. It is recommended that Cabinet Member authorise the closure of Maghull Footpath No.8 to enable the works to be carried out

2. Authorisation be given to execute the necessary legal procedures, including those of consultation and objection and to advertise the Council’s intention.

KEY DECISION: No

FORWARD PLAN: No

IMPLEMENTATION DATE: Following the expiry of the ‘call in ‘period for the minutes of the meeting.

ALTERNATIVE OPTIONS:

None

IMPLICATIONS:

Budget/Policy Framework: None

Page 91 Agenda Item 9

Financial: 2008/ 2009/ 2010/ 2011/ 2009 2010£ 2011 2012 CAPITAL EXPENDITURE £ £ £ Gross Increase in Capital N/A Expenditure Funded by: Sefton Capital Resources Specific Capital Resources

REVENUE EXPENDITURE

Gross Increase in Revenue Expenditure

Funded by:

Sefton funded Resources

Funded from Eternal Sources 600-00

Does external funding have an N/A expiry date? Y/N How will the service be funded post expiry

Legal:

Risk Assessment: None

Asset Management: None

CONSULTATION UNDERTAKEN/VIEWS -

Page 92 Agenda Item 9

CORPORATE OBJECTIVE MONITORING:

Corpor Positive Neutral Negativ ate Impact Impact e Objecti Impact ve 1 Creating a Learning Community  2 Creating Safe Communities  3 Jobs and Prosperity  4 Improving Health and Well-Being  5 Environmental Sustainability  6 Creating Inclusive Communities  7 Improving the Quality of Council  Services and Strengthening local Democracy 8 Children and Young People 

LIST OF BACKGROUND PAPERS RELIED UPON IN THE PREPARATION OF THIS REPORT None

Page 93 Agenda Item 9

1.0 BACKGROUND

1.1 During construction works to lay foundations for an extension to their property, the owners of no.42 Mersey Avenue, Maghull have encroached onto Maghull Footpath No.8. The extension will form a boundary to the footpath and as a result the foundations are immediately adjacent to the footpath.

1.2 The foundations of the footpath have been affected by the adjacent construction works, which has resulted in sections of the footpath being under-mined, and the surface has lifted and cracked.

1.3 The footpath provides a link from Deyes Lane to Mersey Avenue. It runs along the western boundary of no.42 Mersey Avenue, and has a width of approximately 2.6 metres. The footpath is well used as a link to the residential area to the north of Deyes Lane

1.4 In view of the location of the adjacent excavation works at no.42 Mersey Avenue, the limited width of the footpath, the already evident damage to the footpath, and the extent of pedestrian traffic it is necessary to temporarily close the footpath to all users in the interests of public safety.

1.5 An Emergency Temporary Closure Order has already been issued to close the footpath to all users. This only allows a period of 21 days for a closure, which is why Cabinet Member is being asked to approve the six month closure.

1.6 Officers have agreed that the footpath should remain closed to enable the excavation works to be completed and the footpath repaired.

2.0 RECOMMENDATION

2.1 It is recommended that Maghull Footpath No.8 be closed to all users in the interests of public safety, to enable the excavation and constructions works at no.42 Mersey Avenue to be completed, and the necessary structural works and repairs to be carried out on the footpath. The closure is required from 14 th January 2008 for a maximum period of six months, or until the works have been completed, whichever is the earlier.

2.2 The diversion route for pedestrians is via Moss Lane and Douglas Drive

Andy Wallis Director of Planning & Economic Regeneration

Page 94 Agenda Item 9

Page 95 This page is intentionally left blank

Page 96 Agenda Item 10

REPORT TO: CABINET MEMBER – TECHNICAL SERVICES

DATE: 14 JANUARY 2009

SUBJECT: REQUEST FOR TEMPORARY CLOSURES – SHELLFIELD ROAD, SOUTHPORT, WOODVILLE AVENUE, CROSBY & GREENVILLE DRIVE, MAGHULL

WARDS AFFECTED: MEOLS, VICTORIA & PARK

REPORT OF: ANDY WALLIS – DIRECTOR OF PLANNING & ECONOMIC REGENERATION CONTACT OFFICER: R.L.LEWIS 0151-934-4234

EXEMPT/ CONFIDENTIAL: No

PURPOSE/SUMMARY:

To seek approval for a temporary closure of Shellfield Road, Woodville Avenue & Greenville Drive to vehicular traffic, to enable works to be carried out in connection with the reconstruction of footways and carriageway resurfacing and flood relief schemes.

REASON WHY DECISION REQUIRED:

Cabinet Member has delegated powers to approve a temporary road closure.

RECOMMENDATION(S):

It is recommended that:-

(i) the Cabinet member approve the temporary closure of Shellfield Road, Woodville Avenue & Greenville Drive to vehicular traffic.

(ii) the Director of Planning & Economic Regeneration be authorised to execute the necessary legal procedures, including those of consultation and objection and to advertise the Council’s intention

KEY DECISION: No

FORWARD PLAN: Not appropriate

IMPLEMENTATION DATE: Monday 2 February 2009

Page 97 Agenda Item 10

ALTERNATIVE OPTIONS: None available

IMPLICATIONS:

Budget/Policy Framework:

Financial:

2006/ 2007/ 2008/ 2009/ 2007 2008 2009 2010 CAPITAL EXPENDITURE £ £ £ £ Gross Increase in Capital Expenditure Funded by: Sefton Capital Resources Specific Capital Resources REVENUE IMPLICATIONS Gross Increase in Revenue Expenditure 1800 Funded by: Sefton funded Resources 1200 Funded from External Resources 600 Does the External Funding have an expiry date? Y/N When? How will the service be funded post expiry?

Legal:

Risk Assessment: N/A

Asset Management: N/A

CONSULTATION UNDERTAKEN/VIEWS

Page 98 Agenda Item 10

CORPORATE OBJECTIVE MONITORING:

Corporat Positive Neutral Negative e Impact Impact Impact Objective 1 Creating a Learning Community √√√ 2 Creating Safe Communities √√√ 3 Jobs and Prosperity √√√ 4 Improving Health and Well-Being √√√ 5 Environmental Sustainability √√√ 6 Creating Inclusive Communities √√√ 7 Improving the Quality of Council Services and √√√ Strengthening local Democracy 8 Children and Young People √√√

LIST OF BACKGROUND PAPERS RELIED UPON IN THE PREPARATION OF THIS REPORT

Page 99 Agenda Item 10

1.0 INTRODUCTION

1.1 Work on the reconstruction of the carriageway, including resurfacing, in Shellfield Road, Southport, between Kirkham Road and Larkfield Lane, is due to commence on 2 March 2009.

1.2 Work on the reconstruction of the footways, and carriageway resurfacing, in Woodville Avenue, Crosby, is due to commence on 2 February 2009.

1.3 Following advice from the Health & Safety Executive, mechanical plant needs to be utilised for handling kerbstone and associated products. This requirement takes place with immediate effect. It follows that, in order to place this plant on specified roads, in connection with the renewal of kerbstones etc., road closures will be required in order to provide a safe working area. The closures will normally extend for the full lengths of those roads but, where possible, such closures will be in place in phases, to permit access.

1.4 The anticipated start date for the closure of Shellfield Road will be Monday 2 March 2009 and the closure will be required for up to 13 weeks.

1.5 The anticipated start date for the closure of Woodville Road will be Monday 2 February 2009 and the closure will be required for up to 10 weeks.

1.6 Work on the Green Lane Flood Relief Scheme, in Greenville Drive, Maghull, is due to commence in January 2009.

1.7 As part of the scheme, it will be necessary to close Greenvillle Drive, between its junctions with Green Lane and the Holmefield Grove/Greenvillle Drive junction. The scheme will also include works on Green Lane, which will be carried out under temporary traffic signals, and as part of those works, it will also be necessary to close the service road at Greenville Drive, for a three week period.

1.8 The anticipated start date for the closure of Greenville Drive will be Monday 2 February 2009 and the closure will be required for up to 13 weeks.

1.9 Access to all roads will be maintained for the emergency services and , where possible, for residents.

1.10 Plans showing the proposed location of the temporary closures are shown in Annex A.

2.0 RECOMMENDATION

2.1 It is recommended that :

2.1.1 The proposed temporary closures of Shellfield Road, Woodville Avenue & Greenville Drive, to vehicular traffic, be approved.

2.1.2 The Director of Planning & Economic Regeneration be authorised to execute the necessary legal procedures, including those of consultation and objection and to advertise the Council’s intention.

Page 100

Y 9 T

8 1 H

21 A

D 1

A 8

M RO 8

DE L

L R

Y Y F 8 8 O T H

7 A 55

16 A D 2

7 8 M D 2 4.9m A R 7 21 O 5 R 4 O M 233 A 1 A TH

D LY

1

7 6 133

L 9

Y 21 1

4 T 4 9 H 3 19 3 A 1

M 1 13 4 7a

4 R sts

2 O o 1 P 6 # 2 7 # 3 A 1

L 79 1 1

F D

C B Y o 4

o l g u 2 t T t b e W a e b H g l e 7

o l 5 e 1

o ll

A d 1 C 5 la 0 o M n t

t

d a

s

g 1

R 4 5.2m e 6 O 3 3 A A 1 N D S 143

D

13

1 3 3 E 4 L 1 L 12 1 G 13

R

O # # Posts

1 0

V 2 E 2 2 129a# 107a 129

7

10 1

5 3 10 8

5 113

1 3 0 1 0 1 1 5.2m

1 a 0 2 03 a 1 101 D 101 3a OA 10 D R 103 IEL 9 LLF 9 SHE

97

1

3 2 9 6

9 5.2m 8 2

9 1

2 6

0

7 a

9 9 dy 6 9

B 2

9 1 rd 4 a a

W

R 9 E

TCB C 4

A2D5.2m N 1

# 2

A 6 O 3 1 7

0 8 4

R 2 L

M 1 1 0

A 8

1 D

H 0

T 6 L 9 LY 8 E 7 5.2m I F K

Page 101 2 R

0 A

1

9 L

6 a

9

1 6

9 a

2 K 71

I 3 5

7 1 2 R 0 4 a 1 K 1 H a A 71

M KEY

8 2 R

O

1

2 A

1 D a 4 St Recreation Ground

H b

b u

a S

2 7

l 6 l

l E

1 a 0 8 4 b 2

2 EXTENT OF CLOSURE 8 0

#

0

3 1 5.5m 1 61 b 55 57 A2D

5a O

5 R 1 0

8

0 D 3 4 L b 3 FIE

LL

E 6 H 8 55 S

3 2 ANNEXEA

3a 5 6

3 6 Agenda Item10

5 6

6 4 5.2m 2

2

5 1

8 0

a E 4 1

3

6 U

4 N 6

6

a E

5 V

6

5

a

6 A

6 3 2 a 1 S Y E

L 5 4 E

V

5 E 2

a L

5 3

2 C 9

9

0

5 5

2 7 6 4 1 SHELLFIELD ROAD, SOUTHPORTG Drawn PMcC METROPOLITAN BOROUGH OF SEFTON LA 1 M TRMPORARY CLOSURE FOR CARRIAGEWAY RECONSTRUCTION AND RESURFACING Scale NTS

Date N

5 R 9 4 E 2 20

G 4 N

Agenda Item10

2 5 E 59 E N 1 T V LB

6 R A O # κ Y AD E L RLEY DRIVE R KIMBE

E 2 3 B

M 9

I 7 3

5 2 K 5 2

1

6 2 3 10.1m 1

2 8 5

AD 6

O 2

R 1

ON 1 ATI 5 RON CO 1 Garage 9

dy

B 4 2 9 ta t 1 3 S s

b n u 8 l S o 7

E C 4 8

o 4 r 8 Eo B 7 U 3 Stanfield 5

N 4 (Merchant Taylor's E 3

8 V 48

A Preparatory School b

S

E 4

I 2

8 2 for Girls)

R G a E E N T E 31

S S

R 2

I A 3 O

1 C 2 O L L

33 C a C

E E

C H

O H

0 T

4 R 3

5 3 T a O 2 0 LB N 3 1 A 3d 2 1 T

# IO

2 E N

c Depot E A DR 2 I

U R VE 33 35

4 L 37a d N '

S 2 E C 3 37 39 41 V L A O K SE IC 8 3

1 4 W 4

6

2

R 4

5 2

1 A 0

4

4 2

5

W a 2

1 5

4 5

5 7

6 b 2 4 6 5

6 4a 6 15 1 5 4

76

E 4

U 2 1 N

1 2 E

5 PO V

0 3 1 2 3 A a E Page 102 8 14 L 1 L 6 3 I 6

4 V

8 1 1

0 D

7 5 5 5

6a O 4 6 1 14 T O 1 H 44 4 E W

6 S 34 30 1 P 5 U KINGS

R WOOD DRIVE

4

4

1 1

5 1

1 3

8

9 3

1

3 3 4

3

1

3

0

23 4

4

3

4

KEY 2 8

1 3 8

2 6

Rossett Park 9

9.8m 1

Marine Association 3 4

5 1 3 2 6

EXTENT2 OF CLOSURE Football Club 2 3 2

4

3

4 1 4

K 2 0 2 6 1 6 I

1 M N

1 6 G 1 to 4 A S S R t W a 5 E L n 6 3 U B d 2 O N O O

C E R 9

5 V D

2 o 3 O

1 l A 3

le 1 U D D 2

g G R

1 L

2 e ANNEXEA 2 I

E H V

1 G I

F 2 E

9.8m r 4 3 R e 1 1 K

e 1 1 1 O

n 2 O 1 O A

2 3 R D

t

o B

1

3 2 6 The 6 C 1

Edinburgh 1 8

3 O E

4 1 Inn 4 L U L T TCB N U E # 3 E 14 G 2 V D 1

2 O

t E A 0 2

o 2

4

R a R R

4 4 Welbeck O 2 E

2 R

Lodge A 1 T 2

1

9.8m S 1 O

5 D A 1 A 2 C 6 D 9 N D 2 A 8 O 2 A R L 1

1 7

E 5 1 E 1

IL

B 2 U 7 S 53 J El

ta A 49 1 PMcC

S WOODVILLE AVENUE, CROSBY Drawn METROPOLITAN bBOROUGH OF SEFTON 4 X 1 u 1 TEMPORARY CLOSURE FOR FOOTPATH RECONSTRUCTION AND CARRIAGEWAY Scale NTS RESURFACING

Date N

2 7 3

4

S 2 TO

1 O

5 κ ORE

U D M 3 3 1 R

T O

4 AFF

H T 1 Bank S

M 1 4 # # E 17.4m # # A # # # 1 Posts # #

D 2 # Posts 2 Youth E Centre

L

I 1 V

5 E

5 R

2 9 4 3

P Library Tennis

O ο 7

3 O Courts 11 11 13 L

2 1

R 6 9 O

G 2 A ο

0 5 R 1 3 D

E

N

1

3 2 E 1 1

1 O

1 3

9 1 E

9.8m N V Shelter

O R 1 1 2 GR V D κ IEL T E I KF

OS L R H

κ L ο 2 A

C L P E 0 1 S 2 U E HO GP

OR #

N D MA κ 2 2 1 R

0 8

1 I 3

V 3 2

E

12 κ 2

G

R

E 1 2 4

E

2

2 0 N 11

L 2

A 3 L

N e

E 1 e 1 d 16.8m 8 9.8m s 2 VE

O

2 3 R G a 2

D 4 8 L

FIE n 2

2 E ο M 3 L d Sorting

O T H 1 # o LB Office w L

i i

n v 1 2 4 g e 1 3

P r 6 p a a t o h #

o TCB ο

42 l 2 C Red Lion 1 a

6

n Shopping

2 a 2 5 5 l Centre E 5 DRIV

ILLE 4 V 3

N 7  t 1 EE R o 4 G

15 1

16 2

1

4 9 Page 103 5

9 E 1 LOS FB 1 2 N C 0 IO ED L R  Red Lion 2 El Sub Sta Bridge 18.6m 221 KEY # FB 0

213 14.6m  2 

2 10.4m EXTENT OF CLOSURE 3 2

6 6 D

4 3

2 A

2 M

3

1

a 0 Club F 9 6 20 I 9 E 20 12.8m 2 L D

The Maghull Homes 2 L

A

2 9 H 8 Bartlett Home UT N

SO 8 E

D 2

9 8 OA a

L R 2

O 9 PO 6 ER V ANNEXEA LI B A Agenda Item10

L

2 2 M

11.6m 9

0 O

2 R

5

8

2 2

6

6 A 1

0 0 L 97 1 R O 94 A F

D R

A

8

10 H

2

4 W

11.0m 0

2

3 191 8

2 R

E

9 2 2 18 3 η 6 10 El 1 D FB Sub Sta N D A OA X M R E

HA L

A

G 7 GRENVILLE DRIVE, MAGHULLIN 5 Drawn PMcC METROPOLITAN BOROUGH OF SEFTON CK TEMPORARY CLOSURE BETWEEN GREEN LANE AND GREENVILLE DRIVE / HOLMFIELD GROVE Scale NTS

Date N