ueZnk fu;a=.k izkf/kdj.k Narmada Control Authority ueZnk dNkj esa ljnkj ljksoj cka/k LFky rd dk Okkf"kZd ty ys[kk ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO SARDAR SAROVAR DAM SITE Tky Ok"kZ 1 tqykbZ] 2014 & 30 twu] 2015 Water Year 1st July, 2014 - 30th June, 2015

BARNA BARGI KOLAR

Amarkantak

TAWA MATIYARI

INDIRA JOBAT MAN OMKARESHWAR SAGAR

G U SARDAR L SAROVAR F

O F

C SUKTA A Hkksiky] ebZ - 2016 M B A Y Bhopal, May - 2016 FOR OFFICIAL CIRCULATION ONLY

ueZnk fu;a=.k izkf/kdj.k Narmada Control Authority ueZnk dNkj esa ljnkj ljksoj cka/k LFky rd dk Okkf"kZd ty ys[kk

ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO SARDAR SAROVAR DAM SITE

Tky Ok"kZ 1 tqykbZ] 2014 & 30 twu] 2015 Water Year 1st July, 2014 - 30th June, 2015

Hkksiky] ebZZ - 2016 Bhopal, May - 2016 ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO SARDAR SAROVAR DAM SITE DURING THE WATER YEAR 2014-15 CONTENTS

SL No SUBJECT Page No.

1 NWDT Award stipulations on Water Accounting in Narmada River Basin 1 to 3 2 Methedology for assesment of utilizable flow in Narmada basin 4 3 Statement showing year wise water utilization in Narmada basin up to Sardar Sarovar/Garudeshwar at a Glance - Overview-I 5 4 Utilizable flow of Narmada river and water utilization by Party States - Graph 6 Statement showing State wise utilizable flow and allocated share in Namada Basin during the water year 2014-15 at a glance - Overview 5 7 – II 6 Statement showing State wise water withdrawals during the year 2014-15 at a glance - Overview - III (A) 8 7 Statement Showing utilizable flow at SSP to be shared amongst the party states, during water year 2014-15 - Overview-III(B) 9 8 State wise water utilization in MAF and category wise utilization by party States - Plate - I 10 9 Overview of Annual Water Account upto Sardar Sarovar Dam for the Water Year 2014-15 - Overview - IV 11 10 Zone wise utilizable flow at cardinal station - Plate - 2 12 11 Zone wise water utilization and utilization of utilizable flow in MAF - Plate - 3 13 12 Index map of Narmada Basin - Map - 1 14 ZONE – I ( NARMADA UP TO BARGI PROJECT) Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation 13 15 Schemes Zone – I (upto Bargi) - Map - 2 14 Summary of utilizable flow upto Bargi Reservoir 16 15 Break-up of sector wise water utilization from major, medium projects & minor schemes 17 16 Outflow from Power house and spillway from Bargi Reservoir. 18 17 Upstream utilization from Major & Medium Projects upto Bargi. 19 18 Water utilization from Major & Medium Irrigation Projects during Water Year 2014-15. ( i ) Bargi & Bargi Diversion Project 20 ( ii ) Matiyari Project 21 ( iii ) Jalgaon & Banjar Project 22 (iv) Bichhiya & Dhuandhar Project 23

(1) SL No SUBJECT Page No.

19 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 24 20 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 25 21 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 26 22 Season wise actual area irrigated and water utilization through Lift scheme during the Water Year 2014-15. 27 23 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects 28 ZONE –II (BARGI to BURMANGHAT) Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation 24 29 Schemes Zone-II (upto Burmanghat) - Map -3 25 Summary of utilizable flow upto Burmanghat. 30 26 Break-up of sector wise water utilization from major, medium projects & minor schemes 31 27 Observed flow at Burmanghat 32 28 Upstream utilization from Major & Medium Projects upto Burmanghat. 33 29 Water utilization from Major & Medium Projects during water year 2014-15. (i) Mehgaon Tola Tank & Pariat Tank 34 (ii) Barnoo & Bohribund Tank 35 ( iii ) Madai Tank 36 30 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 37 31 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 38 32 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 39 Season wise actual area irrigated and water utilization through Lift scheme (Irrigation & Water Supply Schemes) during the Water Year 33 40 2014-15. 34 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 41 ZONE –III ( BURMANGHAT to HOSHANGABAD) Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation 35 42 Schemes Zone-III (upto Hoshangabad) - Map -4 36 Summary of utilizable flow upto Hoshangabad. 43 37 Break-up of sector wise water utilization from major, medium projects & minor schemes 44 38 Observed flow at Hoshangabad. 45 39 Upstream utilization from Major & Medium Projects upto Hoshangabad 46 40 Water utilization from Major & Medium Projects during water year 2014-15.

(2) SL No SUBJECT Page No.

(i) Tawa Project & Barna Project 47 (ii) Dukrikheda Project & Sampna Tank 48 41 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 49 42 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 50 43 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 51 Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year 44 52 2014-15. 45 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 53 ZONE –IV ( HOSHANGABAD to INDIRA SAGAR PROJECT ) Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation 46 54 Schemes Zone-IV (upto Indira Sagar Project) - Map -5 47 Summary of utilizable flow upto Indira Sagar Project. 55 48 Break-up of sector wise water utilization from major, medium projects & minor schemes 56 49 Out flow from Power Houses & Spillway from Indira Sagar Reservoir. 57 50 Upstream utilization from Major & Medium Projects upto Indira Sagar Project. 58 51 Water utilization from Major & Medium Projects during water year 2014-15. ( i ) Kolar Project & ChandraKeshar Project. 59 (ii) Indira Sagar Project & Sukta (Bhagwant Sagar) Project. 60 52 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 61 53 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 62 54 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 63 Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year 55 64 2014-15. 56 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 65 ZONE –V ( INDIRA SAGAR PROJECT to ) Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation 57 66 Schemes Zone-V (upto Mandleshwar)-Map -6

(3) SL No SUBJECT Page No.

58 Summary of utilizable flow upto Mandleshwar. 67 59 Break-up of sector wise water utilization from major, medium projects & minor schemes 68 60 Observed flow at Omkareshwar 69 61 Upstream utilization from Major & Medium Projects upto Mandleshwar . 70 62 Water utilization from Major & Medium Projects during water year 2014-15. ( i ) Dejla Dewda Tank & Paras Tank 71 (ii ) Choral Nakheri Tank & Upper Beda Tank 72 (iii) Omkareshwar Sagar Project 73 63 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 74 64 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 75 65 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 76 Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year 66 77 2014-15. 67 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 78 ZONE –VI ( MANDLESHWAR to SARDAR SAROVAR PROJECT) Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation 68 79 Schemes Zone-VI (upto Sardar Sarovar Project)- Map -7 69 Summary of utilizable flow upto Sardar Sarover Project. 80 70 Break-up of sector wise water utilization from major, medium projects & minor schemes 81 71 Observed flow at Sardar Sarovar Project. 82 72 Upstream utilization from Major & Medium Projects upto Sardar Sarovar Project. 83 73 Water utilization from Major & Medium Projects during water year 2014-15. ( i ) Man Project & Jobat Project. 84 (ii) Sardar Sarovar Project. 85 (iii) Satak & Segwal Tank 86 (iv) Kunda & Sakalda Tank. 87

(4) SL No SUBJECT Page No.

74 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 88

75 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 89

76 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 90 Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year 77 91 2012-13. 78 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects 92 79 Ten Daily releases of Narmada Water from Narmada Main Canal to Rajasthan for the water year 2014-15. 93 80 Map showing location of GDS sites in Upper, Middle & Lower Zone in Narmada Basin Maps 8 – 10. 94-96

(5) NWDT AWARD STIPULATIONS ON WATER ACCOUNTING IN NARMADA RIVER BASIN

Clause II - Determination Of The Utilisable Quantum Of Narmada Water

The Tribunal hereby determines that the utilisable quantum of waters of the Narmada at Sardar Sarovar Dam Site on the basis of 75 per cent dependability should be assessed at 28 Million Acre Feet (34,537.44 M.cu.m.).

Clause III - Apportionment of the Utilizable Quantum of Narmada Water

(1) The Tribunal hereby orders that out of the utilisable quantum of Narmada water, (a) is entitled to a share of 18.25 Million Acre Feet (22,511.01 M.cu.m.), (b) Gujarat is entitled to a share of 9 Million Acre Feet (11,101.32 M.cu.m.), (c) Rajasthan is entitled to a share of 0.5 Million Acre Feet (616.74 M.cu.m.) and (d) Maharashtra is entitled to a share of 0.25 Million Acre Feet (308.37 M.cu.m.);

(2) Further, it is clarified that the apportionment relates to actual withdrawals and not consumptive use;

(3) Within its share of water, each party State is free to make such changes in the pattern of water use and in the areas to be benefited within or outside the Narmada basin in its territory as it may consider necessary.

Clause IV - Order With Regard To Excess Water and Sharing of Distress

(1) The utilisable flow of Narmada in excess of the 28 Million Acre Feet (34,537.44 M.cu.m.) of utilisable flow in any water year, i.e., from 1st of July to 30th of June of next calendar year is apportioned in the following ratios of allocation i.e., 73 for Madhya Pradesh, 36 for Gujarat, 1 for Maharashtra and 2 for Rajasthan;

(2) In the event of the available utilisable waters for allocation in any water year from 1st of July to 30th June of the next calendar year falling short of 28 Million Acre Feet (34,537.44 M.cu.m.), the shortage should be shared between the various States in the ratio of 73 for Madhya Pradesh, 36 for Gujarat, 1 for Maharashtra and 2 for Rajasthan.

3) The available utilisable waters in a water year will include the water carried over from the previous water year as assessed on the 1st of July on the basis of stored water available on that date:

(1)

(4) The available utilisable water on any date will be inclusive of return flows and exclusive of losses due to evaporation of the various reservoirs;

(5) It may be mentioned that in many years there will be surplus water in the filling period after meeting the storage requirements and withdrawals during the period. This will flow down to sea. Only a portion of it will be utilisable for generating power at Sardar Sarovar River-Bed Power-House and the rest will go waste. It is desirable that water which would go waste without even generating power at the last River-Bed Power-House, should be allowed to be utilised by the party States to the extent they can. Gujarat is, therefore, directed that whenever water starts going waste to sea without generating power, or based on the information received from upstream gauging stations, it anticipates that water would so go waste, it shall inform the Narmada Control Authority (hereinafter referred to as the Authority) and designated representatives of all the concerned States. Gujarat shall also inform them when such flows cease. During the period of such flows, the party States, whose reservoirs are spilling and the spill water cannot be stored elsewhere, may utilise such flows from the said reservoirs as they like and such utilisation by the party States will not count towards allotment of suppliers to them, but, use of such water will not establish any prescriptive rights.

Clause IX - Regulated Releases to be made by Madhya Pradesh for the Requirement of Sardar Sarovar Project

(vi) Utilisation in a water year by each party State shall be figured out on the basis of actual daily discharge at canal head on every major and medium project. For minor project, it shall be on the basis of area irrigated under different crops, the delta for each crop being approved by the Authority. For pumping schemes, drawing directly from the river, its tributaries or reservoirs, whether for irrigation, domestic or industrial use, water drawn shall be reckoned on the basis of the rated capacity of pumps and the number of hours they run. For a cross check, the seasonwise and cropwise area irrigated by each pumping scheme shall also be recorded, and if the figures of water drawn as worked out by the two aforesaid methods differ, the decision of the Authority as regards water drawn shall be final.

(vii) Withdrawals from Sardar Sarovar for Navagam Canal for Gujarat and Rajasthan shall be measured at the head of Navagam Canal. The supply to Rajasthan shall be measured at Gujarat-Rajasthan border. The loss in the canal in carrying the supply for Rajasthan shall be determined by the Authority after the canal has been constructed and shall reckon against the share of Rajasthan. Water let down into the river from Sardar Sarovar through power house turbines shall be measured on the basis of power generated by it and that escaped through the spillway by measurement at the spillway. Gujarat may let down water from Sardar Sarovar for its downstream use by making specific indent for it and such releases shall reckon against its share. Such releases for downstream use shall be made through the turbines and the power so generated shared between Madhya Pradesh, Maharashtra and Gujarat in the prescribed ratio. Water let down into the river from Sardar Sarovar except at the specific indent of Gujarat shall not reckon against the share of Gujarat. The water drawn from Sardar Sarovar for use in Madhya Pradesh and Maharashtra, as the case may be, shall reckon against the share of water of that State.

(2)

(viii) For major and medium projects, water account shall be kept by 10 daily period. The last 10 daily period of a month may have 11 days, 10 days or less, depending upon the number of days in the month. For minor schemes water accounts shall be kept by crop seasons, Kharif (July to October) Rabi (November to March) and hot weather (April to June). For pumping schemes and domestic and industrial uses it shall be monthly.

(ix) The water use by minor and pumping schemes in any ten daily period may provisionally be taken to be the same as in the corresponding period in the previous year on the basis of average use during the crop period. For final water account, however, it will be determined as in (vi) above.

(x) Each State shall furnish to the Authority and make available to any party State desiring the same, such data and information as the Authority may require and ask for.

(xi) The Authority shall arrange the review of the ten day releases made by Madhya Pradesh at least once a month and oftener as considered necessary for directing any change in the releases. It may designate a person for doing so.

(xii) The Authority shall direct final adjustment to be made in the following water year of the use in excess of the authorized use, if any, by any State or States during the preceding water year by curtailing the share(s) of the State or States concerned which have used water in excess and make over the same to the State or States which have received short supplies. Water supplied to Rajasthan on any day in excess of 10 per cent over and above its indent shall reckon against use by Gujarat.

(xiii) The Authority shall furnish the annual water account for the water year to the Governments of the party States by the end of August of the next water year. Each State may make any observation on the account and/or point out corrections in it, if any, within one month of its receipt. After making the necessary modifications, the Authority shall furnish to each party State the final annual water account for the water year by 31st October. The Authority shall cause the annual water account to be published each year.

(3)

METHODOLOGY FOR ASSESSMENT OF UTILIZABLE FLOW IN NARMADA BASIN

The Narmada Water Dispute Tribunal assessed and apportioned utilizable quantum of Narmada water amongst party States, i.e. Madhya Pradesh, Gujarat, Maharashtra and Rajasthan as described in page 1. Accordingly, NCA has been publishing Annual Water Account (AWA) every year since 1980-81. The AWA till the water year 2005-06 was prepared on the basis of “A Manual on preparation of Annual Water Account of Narmada Basin” prepared by Regional Office, NCA in 2001 by following two major steps:

(a) Virgin flow at the terminal point over a water Year = Flow measured at d/s end of reach + Actual total withdrawal in the reach (irrigation use, domestic & industrial use and diversions outside basin) + Evaporation losses (10% of the storages created u/s of gauge site) – Regeneration from withdrawals (10% of irrigation use, 60% of domestic & industrial use) ± Change in storage between beginning and end of water Year.

(b) Utilizable flow in water Year available for allocation = Virgin flow (as calculated above) + Regeneration from withdrawals + Total live storage available at the beginning of water year in reach (carry over) – Evaporation losses from storages.

Since the above methodology was very cumbersome exercise , a review was carried out by SSRRC about the procedure of preparing AWA and the methodology for estimation of utilizable flow at any control point as per stipulations given in NWDT Award was modified in the 9th SSRRC meeting. The AWA from the water year 2006-07 onwards has been prepared as per the modified methodology represented as below: utilizable flow at any point = Observed flow at any point + u/s utilization ± change in storages ± carryover storage in u/s reservoirs CONTROL POINTS Keeping in view of the developments taken place in Narmada river , following six control points are finalized in the main river and one in the Narmada Main Canal. (i) RABLS (Bargi) Project (ii) Burmanghat (iii) Hoshangabad (iv) Indira Sagar Project (v) Maheshwar Project (Mandleshwar site till Maheshwar dam comes up) (vi) Sardar Sarovar Project (vii) Gujarat-Rajasthan border These control points will basically divide the Narmada river basin in 6 zones and Narmada Main Canal Command Area into 2 zones (Gujarat & Rajasthan). At present discharge at Gujarat- Rajasthan Border is being measure by GoG using Acoustic Doppler Current Profiler (ADCP) instrument installed at 1 Km upstream of the border, which is duly verified by GoR.

Amarkantak Burmanghat ISP SSP

Source Bargi Hoshangabad Maheshwar

Guj-Raj Border

(4)

OVERVIEW - I STATEMENT SHOWING YEARWISE WATER UTILIZATION IN NARMADA BASIN UP TO SARDAR SAROVAR /GARUDESHWAR AT A GLANCE Available live storage S.No. Water Year Area Irrigated Water use for Volume of virgin/utilizable Gross water use for Irrigation, as on 1st July in Created reservoir live storage irrigation flow at Garudeshwar/SSP Domestic & Industrial sector Major & Medium (Major & Medium Projects) Projects (M.Cum) ( Maf ) (Lakh Ha.) (M.Cum) ( Maf ) (M.Cum) ( Maf ) (M.Cum) (M.Cum)

1 1980 - 1981 39251.00 31.82 1.13 1,196.40 0.97 1254.00 1.02 788.92 2711.00 2 1981 - 1982 30622.00 24.83 1.16 1,224.49 0.99 1283.00 1.04 504.33 2711.00 3 1982 - 1983 22176.00 17.98 1.48 1,656.77 1.34 1714.00 1.39 1147.06 2716.00 4 1983 - 1984 42726.00 34.64 1.56 1,898.16 1.54 1963.00 1.59 376.31 2730.00 5 1984 - 1985 44550.00 36.12 1.97 2,344.24 1.90 2418.00 1.96 404.72 2730.00 6 1985 - 1986 25330.00 20.54 1.87 1,863.57 1.51 1979.00 1.60 652.69 2730.00 7 1986 - 1987 38677.00 31.36 2.47 2,261.41 1.83 2331.00 1.89 1450.63 2730.00 8 1987 - 1988 17027.00 13.80 2.11 1,960.42 1.59 2026.00 1.64 730.30 6226.00 9 1988 - 1989 37080.00 30.06 2.91 2,527.11 2.05 2619.00 2.12 795.16 6276.00 10 1989 - 1990 27972.00 22.68 2.67 2,565.55 2.08 2702.00 2.19 1509.32 6296.00 11 1990 1991 56012.00 45.41 3.17 3,063.94 2.48 3223.00 2.61 937.18 6314.00 12 1991 - 1992 29612.00 24.01 5.24 3,545.37 2.87 3738.00 3.03 588.04 6370.00 13 1992 - 1993 24326.00 19.72 3.79 2,837.16 2.30 2966.00 2.40 927.29 6370.00 14 1993 - 1994 42468.00 34.43 3.99 3,046.67 2.47 3264.00 2.65 2913.29 6370.00 15 1994 - 1995 73471.00 59.56 4.50 3,392.28 2.75 3597.00 2.92 1775.22 6370.00 16 1995 - 1996 27419.00 22.23 4.48 3,521.41 2.85 3725.00 3.02 805.90 6370.00 17 1996 - 1997 31751.00 25.74 5.14 3,892.50 3.16 4082.00 3.31 802.98 6370.00 18 1997 - 1998 39359.00 31.91 6.80 4,605.47 3.73 4807.00 3.90 1768.10 6370.00 19 1998 - 1999 26955.00 21.85 6.21 4,088.44 3.31 4306.00 3.49 1696.38 6370.00 20 1999 - 2000 51895.00 42.07 4.67 3,592.54 2.91 3812.00 3.09 991.30 6370.00 21 2000 - 2001 17025.00 13.80 3.97 2,547.53 2.07 3151.00 2.55 916.58 6370.00 22 2001 - 2002 28807.77 23.35 4.59 4,499.04 3.65 6000.86 4.86 1045.32 6370.43 23 2002 - 2003 28077.87 22.76 8.10 4,981.24 4.04 5640.52 4.57 1209.45 6370.43 24 2003 - 2004 41437.34 33.59 8.90 6,008.40 4.87 6415.28 5.20 969.25 6370.43 25 2004 - 2005 23131.35 18.75 9.34 5,298.93 4.30 5648.21 4.58 869.59 6370.43 26 2005 - 2006 46033.36 37.32 5.63 6,060.20 4.91 6556.85 5.32 655.23 22008.30 27 2006 - 2007 43465.01 35.25 4.81 4,321.45 3.50 5860.55 4.75 1768.47 22070.24 28 2007 2008 38045.97 30.84 7.83 6,677.72 5.41 7585.51 6.15 1152.40 22070.24 29 2008 - 2009 23577.57 19.11 8.93 9,522.47 7.72 10581.55 8.58 1146.36 22070.24 30 2009 - 2010 26799.50 21.72 3.6 10,090.07 8.18 11432.25 9.27 856.51 22070.24 31 2010 - 2011 28557.52 23.15 6.78 9,833.16 7.97 11180.81 9.06 1918.44 22070.24 32 2011 - 2012 43180.60 35.04 5.74 11425.87 9.26 13066.18 10.59 2357.03 22070.24 33 2012 - 2013 51509.77 41.75 12.11 13204.66 10.71 15394.39 12.48 1173.53 22070.24 34 2013 - 2014 76437.36 61.97 15.10 12787.85 10.37 14917.37 12.09 4077.44 22070.24 35 2014 - 2015 33467.27 27.13 13.68 15691.42 12.72 17528.05 14.21 1917.50 22451.35 Note: 1. Virgin Flow from 1980-81 to 2005-06 & utilizable flow 2006-07 to 2014-15 2. Utilizable quantum of water of the Narmada at Sardar Sarovar Dam site on the basis of 75 % dependability = 34.54 BM3 ( 28.00 Maf ) 3. Allocation of water to states as per N.W.D.T. Award : (a) Madhya Pradesh = 22.51 BM3 ( 18.25 Maf ) (b) Gujarat = 11.10 BM3 ( 9.00 Maf ) (c) Maharashtra = 0.31 BM3 ( 0.25 Maf ) (d) Rajasthan = 0.62 BM3 ( 0.50 Maf )

5 UTILIZABLE FLOW OF NARMADA RIVER & WATER UTILIZATION BY PARTY STATES Total water utilization Utilizable flow 80000

70000

60000

V O 50000 L U M 40000 E

I N 30000

M C 20000 M

10000

0

1980-81 1981-82 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 1988-89 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 WATER YEAR (JULY-JUNE)

6 OVERVIEW - II

STATEMENT SHOWING STATEWISE UTILIZABLE FLOW & ALLOCATED SHARE IN NARMADA BASIN DURING THE WATER YEAR 2014-15 AT A GLANCE

(1) Utilizable flow at 75 % dependability (As per NWDT Award) = 34.536 Bm3 (28.0 MAF) (2) Actual utilizable flow during the Water Year 2014-15 = 33.25 Bm3 (26.95 MAF) (3) Percentage excess/deficit w.r.t.(1) = 3.75 % (DEFICIT)

Allocated Share of utilizable flow among Party Share of Utilizable Flow among the Party States S. No. State states as per NWDT award for the water year 2014-15

MCM MAF MCM MAF

1 Madhya Pradesh 22511.00 18.25 21,670.84 17.57

2 Gujarat 11101.00 9.00 10,686.99 8.66

3 Maharashtra 308.00 0.25 296.87 0.24

4 Rajasthan 616.00 0.50 593.72 0.48

Total 34536.00 28.00 33248.41 26.95

7 OVERVIEW - III(A)

STATEMENT SHOWING STATEWISE WATER WITHDRAWALS DURING THE WATER YEAR 2014-15 AT A GLANCE

Share of Utilizable Flow among Withdrawals For Different Uses the party states for the water year S. No. State 2014-15 Irrigation Domestic Industrial Total

MCM MAF MCM MCM MCM MCM MAF

1 Madhya Pradesh 21,670.84 17.57 8466.67 295.47 13.99 8776.13 7.12

2 Gujarat 10,686.99 8.66 6772.90 1325.72 70.20 8168.82 6.62

3 Maharashtra 296.87 0.24 0.10 - - 0.10 0.00

4 Rajasthan 593.72 0.48 451.75 131.25 - 583.00 0.47

Total 33248.41 26.95 15691.42 1752.44 84.19 17528.05 14.21

8 OVERVIEW-III(B)

STATEMENT SHOWING UTILIZABLE FLOW AT SARDAR SAROVAR PROJECT TO BE SHARED AMONGST PARTY STATES DURING WATER YEAR 2014-15

SL No Description MCM MAF

1 Total Utilizable Flow assessed at Sardar Sarovar Project during the Water Year 2014-15 33467.27 27.13

Quantum of withdrawal made by GoG during spillover period towards maximisation of power through CHPH by invoking Cluase IV(5) of NWDT award, which is not tobe accounted 2 towards their share , included in total utilizable flow assessed at Sardar Sarovar Project. 218.86 0.18

Spill over quantity from Sardar Sarovar Project during the water year 2014-15, part of total 3 2975.97 2.41 utilizable flow assessed at Sardar Sarovar Project given in (1).

4 Net quantum of utilizable flow to be shared amongst party states (1) - (2). 33248.41 26.95

9 PLATE - 1

18.0 Industrial 16.0 Actual Utilization Share of utilizable Flow Domestic 14.0 Irrigation Total

12.0

10.0 8.0 17.57

6.0 7.12 8.66 4.0 6.62 7.12 2.0 0.24 6.87 6.62 0.48

0.0 8.0 5.49 Utilization (MAF) Utilization 0.00 6.0 0.47 4.0 0.00 0.47 0.24 1.07 2.0 0.00 0.36 0.01 0.00 0.06 0.11 0.0 0.00 0.00

STATE WISE WATER UTILIZATION AND UTILIZABLE FLOW CATEGORY WISE WATER UTILIZATION BY PARTY STATES

10 OVERVIEW - IV

OVERVIEW OF ANNUAL WATER ACCOUNT UPTO SARDAR SAROVAR DAM FOR THE WATER YEAR 2014-15

Distance Catchment Observed Upstream Change in Carryover Utilizable flow from area Upto flow /Outflow Utilizations Live Storage storage Sl No CARDINAL STATIONS Source Cardinal Stn. (Km) (Sq.Km) MCM MCM MCM MCM MCM MAF

1 BARGI 374 14556 5477.54 1398.86 212.97 458.88 7548.25 6.12

2 BARMANGHAT 526 26453 8809.83 2098.09 175.98 498.58 11582.48 9.39

3 HOSHANGABAD 676 44548 12427.07 4693.05 497.98 794.72 18412.82 14.93

4 INDIRA SAGAR PROJECT 845 61642 16529.71 6086.03 1009.50 1648.37 25273.61 20.49

5 MANDLESHWAR 940 72809 19177.87 7297.70 1086.07 1415.49 28977.13 23.49

6 SARDAR SAROVAR PROJECT 1164 87892 21452.85 17746.91 * 1320.67 1917.50 33467.27 27.13

7 GUJARAT - RAJASTHAN BORDER - - - 583.00 - - - -

* Inclusive of 8970.66 MCM of water released at HR of NMC for various uses by GoG & GoR and other losses , water let out through escapes and also 218.86 MCM released for maximisation of power generation through CHPH by GoG during spillover of SSP by invoking Clause IV(5) of NWDT Award.

11 PLATE-2

ZONE-WISE UTILIZABLE FLOW

Contribution from Zone Upstream Cumulative Utilizable Flow

30.00

3.64 25.00

3.00

20.00 5.56

15.00 5.54 23.49 20.49 10.00 3.27 14.93

5.00 9.39

Quantum of Water (MAF) Water of Quantum 6.12 6.12

0.00 RABLS (Bargi Barmanghat Hoshangabad Indira Sagar Mandleshwar Sardar Sarovar Project) Project Project CARDINAL STATIONS

12 PLATE-3

ZONE-WISE TOTAL UTILIZATION IN MAF UTILIZATION OF TOTAL UTILIZABLE FLOW

30.00 27.13

25.00 23.49 0.47 1.13 0.57 20.49 20.00 2.10 14.93 14.39 15.00

8.01 1.13 9.39 0.98 10.00 6.12 5.92 4.93 5.00 3.80 TOTAL UTILIZATION: 14.39 1.70 1.13 0.47 0.47

0.00 RABLS (Bargi Barmanghat Hoshangabad Indira Sagar Mandleshwar Sardar Gujarat- Project) Project Sarovar Rajasthan Project Border

RABLS (Bargi Project) Barmanghat Hoshangabad Indira Sagar Project

Mandleshwar Sardar Sarovar Project Gujarat- Rajasthan Border Utilization Utilizable Flow

13 o o o o o o o o o 73 74 75 76 77 78 79 80 81 MAP-1

o 24 24o

R A J A S T H A N M A D H Y A P R A D E S H DAMOH SAGAR

VIDISHA

SHAJAPUR RATLAM SHAHDOL BHOPAL RAISEN

G U J A R A T UJJAIN JABALPUR SEHORE 23o BARNA o DEWAS 23 BARGI NARSINGPUR KOLAR DINDORI

GODHRA Amarkantak HOSHANGABAD TAWA MANDLA

MATIYARI

INDIRA SAGAR JOBAT MAN OMKARESHWAR VADODARA ZONE-2 MAHESHWAR

BILASPUR 22o CHHINDWARA G 22o SEONI U SARDAR BETUL ZONE-3 L SAROVAR F P R A D E S H BALAGHAT M A D H Y A O BHARUCH ZONE-1 F ZONE-4 C SUKTA ZONE-6 A M B DURG A SURAT ZONE-5 BANDRA Y M A H A R A S H T R A NAGPUR RAJNANDGAON 21o JALGAON 21o

AMRAVATI DHULE LEGEND G U J A R A T BASIN BOUNDARY 10 0 20 30 40 60 70 KM SCALE : STATE BOUNDARY DISTRICT BOUNDARY NARMADA CONTROL AUTHORITY ZONE BOUNDARY NARMADA RIVER BASIN ROADS RIVERS INDEX MAP OF NARMADA BASIN

73o 74o 75o 76o 77o 78o 79o 80o 81o 14 ZONE - I

UPTO BARGI PROJECT

o o 80o 81 82 MAP-2 ZONE-1 (UP TO BARGI)

DISTANCE FROM SOURCE : 374 Km UMARIA CATCHMENT AREA : 14556 Sq Km WATER RESOURCES DIVISION, NIWAS

SHAHDOL JABALPUR MEHGON TOLA TANK WATER RESOURCES DIVISION, ANUPPUR 23o BARGI DAM 23o

PENDRA

LEGEND AMARKANTAK MANDLA BASIN BOUNDARY MATIYARI ZONE BOUNDARY BICHHIYA TANK RIVERS WATER RESOURCES DISTRICT HEAD QUARTERS DIVISION No-1, SEONI WATER RESOURCES DIVISION, DINDORI DHUANDHAR IMPORTANT TOWNS DAM SITE & SUBMERGENCE WATER RESOURCES JALGAON DIVISION, MANDLA TANK NARMADA CONTROL AUTHORITY NARMADA RIVER BASIN BANJAR RIVER PROJECT KAWARDHA DIVISION, BAIHAR BANJAR MAP SHOWING LOCATION OF EXISTING AND o 22o PROJECT ON GOING MAJOR & MEDIUM PROJECTS AND 22 WATER RESOURCES IRRIGATION DIVISION-WISE JURISDICTION FOR BALAGHAT DIVISION, KAWARDHA MINOR IRRIGATION SCHEMES- ZONE-I WATER RESOURCES DIVISION, CHHUIKHADAN

80o 81o 82o

15 SUMMARY

ZONE 1 - NARMADA UP TO BARGI RESERVOIR

Narmada Sl No Description Unit upto Bargi

I Observed Flow MCM 5477.54

II Upstream Utilizations II a. Major & Medium Projects MCM 669.70 II b. Minor Projects MCM 729.16 II c. Total MCM 1398.86

III Change (increase`+' / decrease`-') in Live Storage MCM 212.97

IV Carryover storage (Live Storage as on 01.07.2014) MCM 458.88

V Utilizable flow upto Bargi (I + IIc + III + IV ) MCM 7548.25 MAF 6.12

16 BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

Water Utilization S.No. Category of Projects Unit Irrigation Domestic Industrial Total

1 Major & Medium Projects MCM 667.76 - 1.94 669.70

2 Minor Projects Including MCM 728.17 0.99 - 729.16 Lift & Pumping Schemes

17 AWA - 1 A.I. OBSERVED FLOW (OUT FLOWS FROM POWER HOUSES & SPILLWAY )

Name of Project : BARGI (RANI AVANTI BAI LODHI SAGAR PROJECT)

Category : Major

Name of river / tributary : Narmada Reporting Officer : E.E.,R.A.B.L.S. Left Masonry Dam Dn, Barginagar, Jabalpur

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 52.91 24.21 0.00 77.12 August 2014 494.57 512.02 181.34 1,187.93 September 2014 492.33 543.11 158.99 1,194.43 October 2014 76.73 149.38 169.31 395.42 November 2014 127.93 118.77 129.29 375.99 December 2014 113.37 118.40 119.33 351.10 January 2015 119.82 95.26 97.12 312.20 February 2015 118.36 119.52 97.07 334.95 March 2015 119.37 137.27 147.48 404.12 April 2015 140.03 107.98 93.86 341.87 May 2015 113.57 119.58 110.84 343.99 June 2015 71.51 43.19 43.72 158.42

Total 2,040.50 2,088.69 1,348.35 5,477.54

18 AWA - 2 A.II. UPSTREAM UTILIZATIONS

(a) MAJOR & MEDIUM PROJECTS

Planned annual Actual Irrigation Actual Water Irrigation Utilization including domestic & S.No. Name of Project Reporting Officer Kharif Rabi Hotweather Total industrial use

(Ha.) (Ha.) (Ha.) (Ha.) (Ha.) (MCM) MAJOR PROJECTS

1 Bargi (Rani Avanti Bai E.E, Rani Avanti Bai Lodhi Sagar Lodhi Sagar) Project, Jabalpur 223250 14220 94818 5004 114042 419.40 2 Bargi Diversion Project E.E, Narmada Development Division, 7397 3167 41833 - 45000 178.30 Jabalpur. 3 Matiyari E.E, W.R.Dn., Mandla 13662 5448 6520 - 11968 49.56

Sub Total 244309 22835 143171 5004 171010 647.26

(A)MEDIUM PROJECT UNDER MADHYA PRADESH STATE 1 Jalgaon Tank E.E, Banjar River Project Dn., Baihar 538 210 136 - 346 2.03 2 Bichhiya tank E.E, W.R.Dn., Mandla 2348 400 1265 - 1665 10.53 3 Dhuandhar tank E.E, W.R.Dn., Mandla 1393 500 1100 - 1600 3.90 Sub Total(A) 4279 1110 2501 - 3611 16.46 (B)MEDIUM PROJECT UNDER CHATTISGARH STATE Banjar Project 1 E.E., W.R. Dn., Kawardha 2429 486 - - 486 5.98 (Bahera Khar) Sub Total(B) 2429 486 0.00 - 486 5.98 Sub Total(A+B) 6708 1596 2501 - 4097 22.44 Total ( Major & Medium Project) 251017 24431 145672 5004 175107 669.70

19 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head) Name of Project : Bargi (Rani Avanti Bai Lodhi Sagar Project) : Bargi Diversion Project

Category : Major : Major Name of river / tributary : Narmada : Narmada

Reporting Officer : C.E.,,R.A.B.L.S. Project, Bargi Hills,Jabalpur : C.E.,Upper Narmada Zone, Jablpur (M.P.)

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 11.21 0.00 0.00 11.21 0.00 0.00 0.00 0.00 August 2014 11.98 0.00 0.00 11.98 0.00 0.00 8.22 8.22 September 2014 53.13 5.70 12.35 71.18 13.97 11.74 16.80 42.51 October 2014 63.99 0.00 0.00 63.99 22.58 17.28 3.21 43.07 November 2014 7.68 0.00 6.10 13.78 0.00 5.56 7.50 13.06 December 2014 24.10 7.92 7.06 39.08 12.10 12.10 11.53 35.73 January 2015 9.95 3.76 3.85 17.56 4.39 3.16 5.44 12.99 February 2015 17.35 3.50 2.14 22.99 6.49 9.13 7.10 22.72 March 2015 6.79 4.57 14.30 25.66 0.00 0.00 0.00 0.00 April 2015 13.00 16.10 20.56 49.66 0.00 0.00 0.00 0.00 May 2015 19.16 13.50 21.73 54.39 0.00 0.00 0.00 0.00 June 2015 22.86 14.29 0.77 37.92 0.00 0.00 0.00 0.00

Total 261.20 69.34 88.86 419.40 59.53 58.97 59.80 178.30

20 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Matiyari Project

Category : Major

Name of river / tributary : Matiyari Project

Reporting Officer : E.E.,W.R.Dn., Mandla C.E.,Wainganga Basin,W.R.D. , Seoni

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 0.85 0.54 0.37 1.76 August 2014 0.34 0.37 0.87 1.58 September 2014 1.24 1.44 3.11 5.79 October 2014 1.54 2.80 1.51 5.85 November 2014 0.09 0.00 0.00 0.09 December 2014 0.53 1.37 1.16 3.06 January 2015 0.80 1.39 0.91 3.10 February 2015 0.71 1.08 1.58 3.37 March 2015 0.72 1.24 2.00 3.96 April 2015 2.07 2.07 2.28 6.42 May 2015 3.11 1.55 3.28 7.94 June 2015 3.45 2.15 1.04 6.64

Total 15.45 16.00 18.11 49.56

21 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Jalgaon Project : Banjar River Project ( Bahera Khar Medium Project)

Category : Medium : Medium

Name of river / tributary : Banjar Nalla : Banjar River/Kukurbahra Nalla

Reporting Officer : E.E., ,Banjar River Project Div., Baihar : E.E., Water Resources Division, Kawardha (C.G.) C.E.,Wainganga Basin,W.R.D., Seoni (Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.10 0.08 0.04 0.22 0.00 0.00 0.00 0.00 August 2014 0.35 0.12 0.11 0.58 0.36 0.36 0.40 1.12 September 2014 0.26 0.08 0.10 0.44 0.36 0.36 0.36 1.08 October 2014 0.00 0.00 0.00 0.00 0.36 0.36 0.40 1.12 November 2014 0.00 0.00 0.00 0.00 0.24 0.24 0.24 0.72 December 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 January 2015 0.13 0.12 0.10 0.35 0.00 0.00 0.00 0.00 February 2015 0.14 0.11 0.19 0.44 0.00 0.00 0.00 0.00 March 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 April 2015 0.00 0.00 0.00 0.00 0.00 0.24 0.24 0.48 May 2015 0.00 0.00 0.00 0.00 0.24 0.24 0.26 0.74 June 2015 0.00 0.00 0.00 0.00 0.24 0.24 0.24 0.72 Total 0.98 0.51 0.54 2.03 1.80 2.04 2.14 5.98 *

* Out of 5.98 Water Utilization, 4.04 MCM for Irrigation use & 1.94 for Industrial use.

22 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head) Name of Project : Bichhiya Tank : Dhuandhar Tank

Category : Medium : Medium

Name of river / tributary : Kolar Nalla/Banjar : Dhundhar Nalla

Reporting Officer : E.E.,W.R.Dn., Mandla : E.E.,W.R.Dn., Mandla C.E.,Wainganga Basin,W.R.D , Seoni C.E.,Wainganga Basin,W.R.D. , Seoni

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.29 0.00 0.29 0.00 0.00 0.00 0.00 August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 September 2014 0.51 0.52 0.53 1.56 0.54 0.55 0.55 1.64 October 2014 1.05 0.80 0.65 2.50 0.79 0.03 0.04 0.86 November 2014 1.03 0.95 0.30 2.28 0.05 0.04 0.05 0.14 December 2014 0.33 0.32 0.33 0.98 0.30 0.31 0.09 0.70 January 2015 0.00 0.00 0.11 0.11 0.24 0.24 0.00 0.48 February 2015 1.01 0.52 0.49 2.02 0.00 0.00 0.02 0.02 March 2015 0.27 0.31 0.21 0.79 0.02 0.02 0.02 0.06 April 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 May 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 June 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 4.20 3.71 2.62 10.53 1.94 1.19 0.77 3.90

23 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Category CCA (Ha) Cropwise actual / planned irrigated area during Kharif season (Ha) Total Project Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Bargi (Rani Avanti Bai - Lodhi Sagar ) Major 157000 14220 ------14220 24790 4750 26650 13220 69410 2 Bargi Diversion Project Major 44315 3167 ------5162 3263 55 3318

3 5648 ------Matiyari Project Major 10120 3806 8096 8096

4 Jalgaon Tank Medium 546 210 20 538 ------538

5 Banjar Project Medium 2567 486 502 2024 ------2024

6 400 Bichhiya Tank Medium 2797 606 1992 ------1992

7 Dhuandhar Tank Medium 1410 500 800 1191 ------1191

24 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. ) Project Category Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot (HYV) (ORD) & others Rabi others Weather 1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

1 Bargi (Rani Avanti Bai Major - 38834 33883 13230 - - 8871 94818 - - - - 5004 Lodhi Sagar ) 53300 3500 67500 9710 134010 12600 4090 1570 1570 19830

2 Bargi Diversion Project Major 19144 12606 6173 3910 - - - 41833 - - - - 2990 274 544 109 162 4079 3 Matiyari Project Major 6520 6520 ------5566 5566

4 Jalgaon Tank Medium - 136 - - - - - 136 - - - - -

5 Banjar Project Medium ------405 405

6 Bichhiya Tank Medium 1265 - 1265 ------356 356

7 Dhuandhar Tank Medium 1100 1100 202 ------202 - - - - -

25 AWA - 5

A.II. UPSTREAM UTILIZATION

(b) MINOR PROJECTS (i) MINOR SURFACE GRAVITY SCHEMES

Planned Actual Area Irrigated (Ha) Water Utilization (MCM) No of CCA annual S.No. Cardinal Site Water Resources Division Hot Peren Schmes (Ha) Irrigation Kharif Rabi Total Kharif Rabi Total (Ha) weather nial 1 2 3 4 5 6 7 8 9 10 11 12 13 14 (A)MINOR SURFACE GRAVITY SCHEMES UNDER MADHYA PRADESH STATE. 1 BARGI ( i ) W.R.Dn. Anuppur 5 1598 778 21 622 0.00 - 643 0.08 1.87 1.95 ( ii ) Banjar River Project Dn., Baihar 39 15202 10101 4322 1398 0.00 - 5720 25.42 8.22 33.64 (iii ) W.R.Dn.No.1, Seoni 18 4219 3741 0.00 3280 0.00 - 3280 0.00 15.75 15.75 ( iv ) W.R.Dn., Dindori 64 14731 7902 0.00 8827 0.00 - 8827 0.00 49.50 49.50 ( v ) W.R.Dn. Mandla 24 5110 4280 4433 1900 0.00 - 6333 4.90 21.45 26.35

Sub Total(A) 150 40860 26802 8776 16027 0.00 - 24803 30.40 96.79 127.19 (B)MINOR SURFACE GRAVITY SCHEMES UNDER CHATTISGARH STATE ( i ) W.R.Dn., Chhuikhadan 4 768 331 55.00 0.00 0.00 - 55 0.22 0.00 0.22 ( ii ) W.R.Dn., Kawardha 6 1618 - 271.00 0.00 0.00 - 271 1.91 0.00 1.91 Sub Total(B) 10 2386 331 326 0.00 0.00 - 326 2.13 0.00 2.13 Sub Total (A+B) 194 43246 27133 9102 16027 0.00 - 25129 32.53 96.79 129.32

26 AWA - 5 A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

No of C C A Planned Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM) Sr No Water Resources Division Schemes (Ha) annual Irrigation (Ha.) Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 E.E, W.R.Dn., Mandla 3 824 860 - - - - - 1825 - - 0.28 - 0.28 *

2 E.E, W.R.Dn., No. 1., Seoni. 3 335 229 ------

3 E.E, Banjar River Project Dn., ------Baihar, Distt. Balaghat.

4 Schemes of PHED & Local 4 ------8985 - - 0.71 - 0.71 administration - 5 Private Pumping Scheme under 9925 ------598.85 - - 598.85 * Agriculture Department of Mandla, Dindori & Balaghat Reported by NVDA.

Sub Total 9935 1159 1089 0.00 0.00 0.00 0.00 0.00 10810 0.00 598.85 0.99 0.00 599.84

TOTAL 10129 44405 28222 9102 16027 0.00 0.00 0.00 10810 0.00 728.17 0.99 0.00 729.16

* Data not received , last year data is repeated.

27 AWA - 6

CARRYOVER LIVE STORAGE & CHANGE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

Change in Gross Dead Live Live storage as Live storage C.C.A. Live Storage Storage Storage Storage on 1.7.2014 as on 1.7.2015 (Col. 10-9) Name of river / S.No. Reporting Officer Name of Project tributary (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM)

1 2 3 4 5 6 7 8 9 10 11

MAJOR PROJECTS 1 E.E, RABLS, Jabalpur Rani Avanti Bai Narmada 3920.00 740.00 3180.00 157000 427.50 657.75 230.25 Lodhi Sagar 2 E.E, W.R.Dn., Mandla Matiyari Matiyari 56.80 5.68 51.12 10120 20.98 5.57 -15.41

Sub - Total 3976.80 745.68 3231.12 167120 448.48 663.32 214.84

(A) MEDIUM PROJECTS UNDER MADHYA PRADESH STATE. 1 E.E, Banjar River Project Jalgaon Tank Banjar 2.34 0.17 2.17 546 0.86 0.41 -0.09 Dn., Baihar 2 E.E, W.R.Dn., Mandla Bichhiya tank Kolar nalla / 7.87 0.64 7.23 2797 2.92 0.72 -2.20 Banjar Dhuandhar tank Dhuandhar 5.26 0.15 5.11 1410 0.39 0.00 -0.39 Sub - Total (A) 15.47 0.96 14.51 4753 4.17 1.13 -2.68 (B)MEDIUM PROJECTS UNDER CHATTISGARH STATE 1 E.E., W.R. Dn., Kawardha Banjar Project Banjar 14.76 1.05 13.71 2567 6.23 7.04 0.81 Sub - Total (B) 14.76 1.05 13.71 2567 6.23 7.04 0.81 Sub Total (A+B) 30.23 2.01 28.22 7320 10.40 8.17 -1.87

Total ( Major & Medium Project ) 4007.03 747.69 3259.34 174440 458.88 671.49 212.97

28 ZONE - II

RABLS (BARGI) PROJECT TO BARMANGHAT

o 78o 79o 80 MAP-3 ZONE-II (BARGI TO BARMANGHAT) DAMOH WATER RESOURCES DIVISION, KATNI

DISTANCE FROM SOURCE : 526 Km BOHRIBUND WATER RESOURCES CATCHMENT AREA : 26453 Sq Km DIVISION, DAMOH

BARNOO MADAI PARIAT TANK TANK TANK

MEHGON TOLA TANK BARMANGHAT o o 23 BARGI 23

NARSINGPUR WATER RESOURCES DIVISION, JABALPUR

WATER RESOURCES DIVISION No-1, SEONI

LEGEND WATER RESOURCES DIVISION, NARSINGPUR BASIN BOUNDARY CHHINDAWARA NARMADA CONTROL AUTHORITY 22o 22o ZONE BOUNDARY NARMADA RIVER BASIN RIVERS MAP SHOWING LOCATION OF EXISTING AND DISTRICT HEAD QUARTERS ON GOING MAJOR & MEDIUM PROJECTS AND IMPORTANT TOWNS IRRIGATION DIVISION-WISE JURISDICTION FOR DAM SITE & SUBMERGENCE MINOR IRRIGATION SCHEMES- ZONE-II

o 78o 79o 80 81o 29 SUMMARY ZONE 2 - NARMADA UP TO BURMANGHAT

Bargi to Narmada upto Sl No Description Unit Upto Bargi Barmanghat Barmanghat

I Observed flow MCM 5477.54 8809.83

II Upstream Utilizations II a. Major & Medium Projects MCM 669.70 62.20 731.90 II b. Minor Projects MCM 729.16 637.03 1366.19 II c. Total MCM 1398.86 699.23 2098.09

III Change (increase`+' / decrease`-') in Live Storage MCM 212.97 -36.99 175.98

IV Carryover storage (Live Storage as on 01.07.2014) MCM 458.88 39.70 498.58

V Utilizable flow (I + IIc + III + IV ) MCM 7548.25 11582.48 MAF 6.12 9.39

30 BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

Water Utilization S.No. Category of Projects Unit Irrigation Domestic Industrial Total

1 Major & Medium Projects MCM 42.26 19.94 - 62.20

Minor Projects Including 2 MCM 563.05 73.98 - 637.03 Lift & Pumping Schemes

31 AWA - 1

A.I. OBSERVED FLOW

Name of Gauge site : BARMANGHAT

Category : GDS

Name of river / tributary : Narmada Reporting Officer : E.E. Narmada Division C.W.C. Bhopal

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 86.56 86.57 476.19 649.32 August 2014 1349.85 736.86 293.49 2380.20 September 2014 896.94 836.75 258.80 1992.49 October 2014 156.90 235.06 239.16 631.12 November 2014 175.48 139.10 146.19 460.77 December 2014 138.67 134.52 148.18 421.37 January 2015 139.97 121.65 119.49 381.11 February 2015 132.88 142.04 125.80 400.72 March 2015 150.24 169.95 177.47 497.66 April 2015 146.45 145.84 104.88 397.17 May 2015 127.34 140.66 122.86 390.86 June 2015 100.94 56.28 49.82 207.04 Total 3,602.22 2,945.28 2,262.33 8,809.83

32 AWA - 2

A.II. UPSTREAM UTILIZATIONS

(a) MAJOR & MEDIUM PROJECTS

Planned annual Actual Irrigation Actual Water Irrigation Utilization including S.No. Name of Project Reporting Officer Kharif Rabi Hotweather Total domestic & industrial (Ha.) (Ha.) (Ha.) (Ha.) (Ha.) (MCM)

1 Mehgaon Tola Tank E.E, Hiran W.R.Dn., Jabalpur 1680 35 1790 - 1825 10.00

2 Barnoo Tank E.E, Hiran W.R.Dn., Jabalpur 2125 787 1450 - 2237 6.31

3 Madai Tank E.E, Hiran W.R.Dn., Jabalpur 2330 340 1295 - 1635 5.73

4 Bohribund Tank E.E.,W.R.Dn. Katni 6495 3000 1450 - 4450 20.22 Commissioner. Municipal 5 Pariat Tank - - - - - 19.94 Corporation. Jabalpur Total ( Medium Project) 12630 4162 5985 - 10147 62.20

33 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Mehgaon Tola Tank : Pariat Tank

Category : Medium : Medium

Name of river / tributary : Bidri Nalla/Gour : Pariat Reporting Officer : E.E.,Hiran W.R.Dn. Jabalpur : Commissioner. Municipal Corporation. Jabalpur C.E.,,Wainganga Basin, WRD, Seoni..

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 1.03 August 2014 0.00 0.00 0.00 0.00 1.03 September 2014 0.00 0.00 0.00 0.00 1.01 October 2014 0.00 0.00 0.00 0.00 1.96 November 2014 0.17 0.15 0.62 0.94 2.74 December 2014 1.03 3.63 0.67 5.33 2.50 January 2015 1.11 0.00 0.00 1.11 1.53 February 2015 0.00 0.00 2.62 2.62 2.09 March 2015 0.00 0.00 0.00 0.00 1.25 April 2015 0.00 0.00 0.00 0.00 1.14 May 2015 0.00 0.00 0.00 0.00 1.49 June 2015 0.00 0.00 0.00 0.00 2.17

Total 2.31 3.78 3.91 10.00 19.94 * . * Data not received on Ten Daily Basis.

34 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Barnoo Tank : Bohribund Tank Category : Medium : Medium Name of river / tributary : Barnoo Nalla : Bhutia Nalla/Hiran Reporting Officer : E.E.,Hiran W.R.Dn. Jabalpur : E.E.,W.R.Dn. Katni C.E.,,Wainganga Basin, WRD, Seoni.. C.E.,Wain Ganga Basin.WRD, Seoni

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 0.25 0.38 0.22 0.00 August 2014 0.00 0.00 0.78 0.78 0.00 0.00 0.00 0.00 September 2014 0.21 0.22 0.84 1.27 1.91 2.07 0.97 4.95 October 2014 1.00 0.20 0.00 1.20 2.88 2.00 0.38 5.26 November 2014 0.02 0.09 0.53 0.64 1.05 1.60 1.43 4.08 December 2014 0.62 0.11 0.28 1.01 1.13 1.09 1.01 3.23 January 2015 0.00 0.00 0.14 0.14 0.00 0.00 0.00 0.00 February 2015 0.23 0.51 0.53 1.27 0.13 0.17 0.22 0.52 March 2015 0.00 0.00 0.00 0.00 0.23 0.33 0.40 0.96 April 2015 0.00 0.00 0.00 0.00 0.12 0.14 0.11 0.37 May 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 June 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 2.08 1.13 3.10 6.31 7.70 7.78 4.74 20.22

35 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Madai Tank Category : Medium Name of river / tributary : Madai Nalla Reporting Officer : E.E.,Hiran W.R.Dn. Jabalpur C.E.,Wainganga Basin,W.R.D , Seoni

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 August 2014 0.00 0.00 0.77 0.77 September 2014 0.00 0.20 0.64 0.84 October 2014 0.66 0.15 0.11 0.92 November 2014 0.11 0.13 0.81 1.05 December 2014 0.46 0.08 0.17 0.71 January 2015 0.02 0.05 0.10 0.17 February 2015 0.32 0.44 0.51 1.27 March 2015 0.00 0.00 0.00 0.00 April 2015 0.00 0.00 0.00 0.00 May 2015 0.00 0.00 0.00 0.00 June 2015 0.00 0.00 0.00 0.00

Total 1.57 1.05 3.11 5.73

36 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Category CCA (Ha) Cropwise actual / planned irrigated area during Kharif season (Ha) Total Project Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Mehgaontola Tank Medium 2094 35 ------35 769 769 2 Bohribund tank Medium 5423 3000 3000 2428 ------2428

3 Barnoo Tank Medium 2030 787 787 1532 ------1532

4 Madai Tank Medium 2564 340 340 1258 ------1258

37 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. ) Project Category Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot (HYV) (ORD) & others Rabi others Weather 1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

1 Mehgaontola Tank Medium 1790 1790 - - - - - 911 911 2 Bohribund tank Medium 1450 ------1450 - - - - - 4047 4047

3 Barnoo Tank Medium 1295 ------1295 ------607 607

4 Madai Tank Medium - 4705 - - - - - 4705 - - - - 1073 1073

38 AWA - 5

A.II. UPSTREAM UTILIZATION

(b) MINOR PROJECTS (i) MINOR SURFACE GRAVITY SCHEMES

Planned Actual Area Irrigated Water Utilization (MCM) No of annual S.No. Cardinal Site Water Resources Division CCA Hot Peren Schmes Irrigation Kharif Rabi Total Kharif Rabi Total (Ha) weather nial 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 BARMANGHAT

( i ) E.E, Hiran W.R.Dn., Jabalpur 80 9877 7434 1047 7487 - - 8534 3.19 16.91 20.10

( ii ) E.E, W.R.Dn., Katni 35 8445 5917 1514 2649 - - 4163 6.51 14.83 21.34

Sub TotaL 115 18322 13351 2561 10136 - - 12697 9.70 31.74 41.44

39 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

No of C C A Planned Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM) Sr No Water Resources Division Schemes (Ha) annual Irrigation Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 E.E, Hiran W.R.Dn., Katni 1 1282 1195 ------

2 E.E, Hiran W.R.Dn., Jabalpur 7 409 409 ------

4 Schemes of PHED & Local 7 ------71.38 - 71.38 administration except Pariat Tank 5 Divisional Railway Manager, (Works), Jabalpur 1 0 0 - - - - - 4072 - - 2.60 - 2.60

6 Private Pumping Scheme under Agriculture Department of Jabalpur, Katni, Seoni & 7066 ------521.61 - - 521.61 Narsingpur Distt. reported by NVDA. .

Sub Total 7082 1691 1604 0.00 0.00 0.00 - - 4072 - 521.61 73.98 - 595.59

TOTAL 7197 20013 14955 2561 10136 0.00 - - 4072 - 563.05 73.98 - 637.03 * Data are not received , last year data is repeated.

40 AWA - 6

CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

Live Live Name of river / Gross Dead Live Change in S.No. Reporting Officer Name of Project C.C.A. storage as storage as tributary Storage Storage Storage live storage on 1.7.2014 on 1.7.2015 (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM) 1 2 3 4 5 6 7 8 9 10 11

MEDIUM PROJECTS 1 E.E, Hiran W.R.Dn., Jabalpur Mehgaon Tola Tank Bidri Nalla/Gour 11.62 1.11 10.51 2098 2.47 1.43 -1.04

2 E.E, Hiran W.R.Dn., Jabalpur Barnoo Tank Barnoo Nalla 10.32 1.36 8.96 2030 4.09 0.68 -3.41

3 E.E, Hiran W.R.Dn., Jabalpur Madai Tank Madia Nalla 8.70 0.31 8.39 2564 2.83 0.11 -2.72

4 E.E, W.R.Dn., Katni Bohribund Tank Bhuta Nalla/Hiran 36.93 2.46 34.47 5423 10.01 0.05 -9.96 Commissioner, Municipal Pariat Tank Pariat Nalla 5 20.30 1.83 18.47 - 20.30 0.44 -19.86 Corporation, Jabalpur Total ( Medium Project ) 87.87 7.07 80.80 12115 39.70 2.71 -36.99

41 ZONE - III

BARMANGHAT TO HOSHANGABAD o 77 78o 79o MAP- 4 SAGAR DAMOH

VIDISHA ZONE-III (BARMANGHAT TO HOSHANGABAD)

DISTANCE FROM SOURCE : 676 Km CATCHMENT AREA : 44548 Sq Km BHOPAL RAISEN

WATER RESOURCES DIVISION, RAISEN WATER RESOURCES BARMANGHAT DIVISION, SAGAR 23o BARNA 23o

NARSINGPUR

DUKRIKHEDA

HOSHANGABAD TAWA

PACHMARHI

WATER RESOURCES DIVISION, CHHINDWARA CHHINDAWARA 22o 22o NARMADA CONTROL AUTHORITY LEGEND BETUL NARMADA RIVER BASIN BASIN BOUNDARY SAMPNA MAP SHOWING LOCATION OF EXISTING AND ZONE BOUNDARY ON GOING MAJOR & MEDIUM PROJECTS AND RIVERS IRRIGATION DIVISION-WISE JURISDICTION FOR WATER RESOURCES DISTRICT HEAD QUARTERS MINOR IRRIGATION SCHEMES- DIVISION, BETUL ZONE-III IMPORTANT TOWNS

DAM SITE & SUBMERGENCE

o 77 78o 79o

42 SUMMARY

ZONE 3 - NARMADA UP TO HOSHANGABAD

Upto Barmanghat to Narmada upto Sl No Description Unit Barmanghat Hoshangabad Hoshangabad

I Observed flow MCM 8809.83 12427.07

II Upstream Utilizations II a. Major & Medium Projects MCM 731.90 1839.08 2570.98 II b. Minor Projects MCM 1366.19 755.88 2122.07 II c. Total MCM 2098.09 2594.96 4693.05

III Change (increase`+' / decrease`-') in Live Storage MCM 175.98 322.00 497.98

IV Carryover storage (Live Storage as on 01.07.2014) MCM 498.58 296.14 794.72

V Utilizable flow (I + IIc + III + IV ) MCM 11582.48 18412.82 MAF 9.39 14.93

43 BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

Water Utilization S.No. Category of Projects Unit Irrigation Domestic Industrial Total 1 Major & Medium Projects MCM 1829.63 - 9.45 1839.08

2 Minor Projects Including Lift MCM 755.48 0.40 - 755.88 & Pumping Schemes

44 AWA - 1 A.I. OBSERVED FLOW

Name of Gauge site : HOSHANGABAD

Category : GDS

Name of river / tributary : Narmada

Reporting Officer : E.E. Narmada Division C.W.C. Bhopal

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 104.46 213.26 1,061.35 1379.07 August 2014 1,753.53 993.16 442.89 3189.58 September 2014 1,256.64 1,416.01 447.79 3120.44 October 2014 256.41 259.24 284.35 800.00 November 2014 218.31 178.85 168.44 565.60 December 2014 173.67 164.23 189.85 527.75 January 2015 176.15 158.81 155.25 490.21 February 2015 149.58 170.52 146.13 466.23 March 2015 159.11 182.65 215.07 556.83 April 2015 153.35 173.41 155.03 481.79 May 2015 145.50 176.48 154.99 476.97 June 2015 146.85 114.03 111.72 372.60

Total 4,693.56 4,200.65 3,532.86 12,427.07

45 AWA - 2

A.II. UPSTREAM UTILIZATIONS

(a) MAJOR & MEDIUM PROJECTS

Planned annual Actual Irrigation Actual Water Utilization Irrigation including domestic & S.No. Name of Project Reporting Officer Kharif Rabi Hotweather Total industrial use (Ha.) (Ha.) (Ha.) (Ha.) (Ha.) (MCM)

MAJOR PROJECTS 1 Tawa Project S.E, Tawa Project Circle, 332783 - 254312 - 254312 1415.75 Hoshangabad 2 Barna Project E.E., Barna Left Bank Canal Dn. Bari 62000 24432 63523 - 87955 404.54

Sub Total 394783 24432 317835 - 342267 1820.29

MEDIUM PROJECT - 1 Dukrikheda Project E.E, W.R.Dn., Hoshangabad 2672 2702 - 2702 4.48

2 Sampna Tank E.E, W.R.Dn., No.II, Betul 3846 - 3660 - 3660 14.31

Sub Total 6518 - 6362 - 6362 18.79 Total ( Medium Project) 401301 24432 324197 - 348629 1839.08

46 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Barna Project : Tawa Project Category : Major : Major

Name of river / tributary : Barna : Tawa Reporting Officer : E.E.,Barna Left Bank Dn, Bari : S.E., Tawa Project Circle Hoshangabad S.E. Kolar Project Circle. Bhopal C.E.,O &M Circle, Bhopal

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 8.97 8.97 0.00 0.00 0.00 0.00 August 2014 5.10 14.00 31.08 50.18 0.00 0.00 0.00 0.00 September 2014 25.04 18.59 25.82 69.45 0.00 0.00 0.00 0.00 October 2014 33.47 28.07 0.00 61.54 0.00 7.58 74.15 81.73 November 2014 0.00 7.64 23.77 31.41 104.99 118.95 115.64 339.58 December 2014 29.49 14.28 13.25 57.02 111.91 102.36 119.02 333.29 January 2015 1.47 19.85 26.65 47.97 31.47 111.82 120.30 263.59 February 2015 20.58 27.14 28.28 76.00 120.97 123.77 94.77 339.51 March 2015 2.00 0.00 0.00 2.00 2.57 0.00 0.00 2.57 April 2015 0.00 0.00 0.00 0.00 0.49 9.96 8.88 19.33 May 2015 0.00 0.00 0.00 0.00 10.01 9.50 8.62 28.13 June 2015 0.00 0.00 0.00 0.00 8.02 0.00 0.00 8.02

Total 117.15 129.57 157.82 404.54 390.43 483.94 541.38 1,415.75

*Out of total 1415.75 MCM,1406.30 MCM used for Irrign.through from LBC & RBC & 9.45 MCM for Industrial use (Ordinance factory, Itarsi).

47 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Dukrikheda Project : Sampna Tank Category : Medium : Medium Name of river / tributary : Ghogra Nalla/ Sukhri : Sampna Reporting Officer : E.E. W.R. Dn. Hoshangabad : E.E., W.R.Dn. No. II Betul C.E. (O & M) WRD Bhopal C.E. (O & M) WRD Bhopal

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 September 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 October 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 November 2014 0.80 0.80 0.90 2.50 0.00 1.28 2.67 3.95 December 2014 0.40 0.40 0.50 1.30 1.34 0.00 0.44 1.78 January 2015 0.60 0.08 0.00 0.68 0.00 0.00 0.00 0.00 February 2015 0.00 0.00 0.00 0.00 2.43 0.65 1.05 4.13 March 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 April 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 May 2015 0.00 0.00 0.00 0.00 0.00 1.51 2.45 3.96 June 2015 0.00 0.00 0.00 0.00 0.49 0.00 0.00 0.49

Total 1.80 1.28 1.40 4.48 4.26 3.44 6.61 14.31

48 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Category CCA (Ha) Cropwise actual / planned irrigated area during Kharif season (Ha) Total Project Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Tawa Project Major 246864 ------74060 9308 12343 37030 12343 2469 4939 7446 159938

2 Barna Project Major 57904 24432 ------24432 9000 9000

3 Dukrikheda Project Medium 7625 ------

4 Sampna Project Medium 4710 ------

49 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. ) Project Category Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perenial Pulses Vegetables Fodder & Total Hot (HYV) (ORD) & others Rabi others Weather 1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

1 Tawa Project Major 242084 6683 4634 - - - 911 254312 - - - - - 74060 61717 17280 2469 4937 4937 160463 3723 1862 1862 7447

2 Barna Project Major - 50010 11716 - 259 - 1538 63523 - - - - - 39000 - - - - 39000

3 Dukrikheda Project Medium ------2702 - - - - - 2672 - 2672

4 Sampna Project Medium 3660 ------3660 ------3644 3644

50 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (i) MINOR SURFACE GRAVITY SCHEME

Planned Actual Area Irrigated (Ha) Water Utilization (MCM) No of CCA annual S.No. Cardinal Site Water Resources Division Hot Peren Schmes (Ha) Irrigation Kharif Rabi weather nial Total Kharif Rabi Total (Ha) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 HOSHANGABAD ( i ) E.E, W.R.Dn., Damoh 3 2359 2340 - 2602 - - 2602 - 13.04 13.04 ( ii ) E.E, W.R.Dn., Chhindwara 18 8142 9286 - 5601 - - 5601 - 33.61 33.61 (iii ) S.E, Tawa, Hoshangabad. 18 5070 4648 - 4132 - - 4132 - 18.53 18.53 (iv) E.E, W.R.Dn., Raisen 52 1492 17745 - 14985 - - 14985 4.82 83.25 88.07 (v) E.E, W.R.Dn. No. 2, Betul. 50 17845 13642 - 13177 - - 13177 - 64.97 64.97

Sub Total 141 34908 47661 - 40497 - - 40497 4.82 213.40 218.22

51 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

No of C C A Planned Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM) Sr No Water Resources Division Schemes (Ha) annual Irrigation Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 E.E, W.R.Dn., Damoh ------

2 E.E, W.R.Dn., Chhindwara 4 604 724 ------

3 E.E, W.R.Dn., Hoshangabad. 3 307 360 - 80 - - 699 - - 0.52 - - 0.52

4 E.E, W.R.Dn., Raisen 4 3514 3514 ------0.00 - - 0.00

5 E.E, W.R.Dn. No. 2, Betul. 8 877 748 ------

6 Schemes of PHED & Local 3 ------2555 - - 0.40 - 0.40 administration 7 Private Pumping Schemes under 12388 ------536.74 - - 536.74 * Agriculture Department of Hoshangabad (50%) reported by NVDA.

- - - Sub Total 12410 5302 5346 80 - 699 2555 - 537.26 0.40 537.66

- - TOTAl 12551 41007 53007 40577 - - 699 2555 - 755.48 0.40 755.88

* Data not received, last year data is repeated.

52 AWA - 6

CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

Change in Gross Dead Live Live storage Live storage Name of river / C.C.A. live storage S.No. Reporting Officer Name of Project Storage Storage Storage as on 1.7.2014 as on 1.7.2015 tributary (Col. 10-9) (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM) 1 2 3 4 5 6 7 8 9 10 11 MAJOR PROJECTS 1 E.E., Barna Left Bank Canal Barna Project Barna 539.04 83.26 455.78 57904 148.76 100.96 -47.80 Dn. Bari. 2 S.E, Tawa Project Circle, Tawa Project Tawa 2310.00 260.00 2050.00 246864 146.29 516.70 370.41 Hoshangabad Total ( Major Project ) 2849.04 343.26 2505.78 304768 295.05 617.66 322.61

MEDIUM PROJECTS 1 E.E, W.R.Dn., Hoshangabad Dukrikheda Project Ghogra Nalla / 12.25 0.75 11.50 7625 1.09 BLSL -1.09 Sukhri

2 E.E, W.R.Dn., No.II, Betul Sampna Tank Sampna 16.92 2.60 14.32 7486 0.00 0.48 0.48

Total ( Medium Project ) 29.17 3.35 25.82 15111 1.09 0.48 -0.61 Total ( Major & Medium Project ) 2878.21 346.61 2531.60 319879 296.14 618.14 322.00

53 ZONE - IV

HOSHANGABAD TO INDIRA SAGAR PROJECT

o 77 78o 79o MAP-5 ZONE-IV (HOSHANGABAD TO INDIRA SAGAR PROJECT)

WATER RESOURCES BHOPAL DIVISION, SEHORE DISTANCE FROM SOURCE : 845 Km SEHORE WATER RESOURCES CATCHMENT AREA : 61642 Sq Km DIVISION, BHOPAL

o o 23 WATER RESOURCES 23 DIVISION, DEWAS

KOLAR

HOSHANGABAD CHANDRAKESHAR

LEGEND INDIRA SAGAR BASIN BOUNDARY ZONE BOUNDARY RIVERS DISTRICT HEAD QUARTERS

22o IMPORTANT TOWNS 22o DAM SITE & SUBMERGENCE

BETUL NARMADA CONTROL AUTHORITY NARMADA RIVER BASIN

WATER RESOURCES MAP SHOWING LOCATION OF EXISTING AND DIVISION, KHANDWA ON GOING MAJOR & MEDIUM PROJECTS AND IRRIGATION DIVISION-WISE JURISDICTION FOR MINOR IRRIGATION SCHEMES- ZONE-IV

o 77 78o 79o

54 SUMMARY

ZONE 4 - NARMADA UP TO INDIRA SAGAR PROJECT

Upto Hoshangabad Narmada Sl No Description Unit Hoshangabad to ISP upto ISP

I Observed flow MCM 12427.07 16529.71

II Upstream Utilizations II a. Major & Medium Projects MCM 2570.98 827.00 3397.98 II b. Minor Projects MCM 2122.07 565.98 2688.05 II c. Total MCM 4693.05 1392.98 6086.03

III Change (increase`+' / decrease`-') in Live Storage MCM 497.98 511.52 1009.50

IV Carryover storage (Live Storage as on 01.07.2014) MCM 794.72 853.65 1648.37

V Utilizable flow (I + IIc + III + IV ) MCM 18412.82 25273.61

MAF 14.93 20.49

55 BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

Water Utilization Domestic S.No. Category of Projects Unit Irrigation Out of Narmada Industrial Total In Narmada basin basin 1 2 3 4 5 6 7 8

1 Major & Medium Projects MCM 757.26 9.20 60.54 - 827.00

2 Minor Projects Including MCM 512.32 51.06 - 2.60 565.98 Lift & Pumping Schemes

56 AWA - 1 A.I. OBSERVED FLOW (OUTFLOWS FROM POWER HOUSES & SPILLWAY)

Name of Gauge site : INDIRA SAGAR PROJECT

Category : Major

Name of river / tributary : Narmada

Reporting Officer : General Manager, NHDC, .

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 114.39 24.10 339.11 477.60 August 2014 243.73 468.97 585.61 1298.31 September 2014 395.46 1,872.90 1,106.19 3374.55 October 2014 394.06 246.94 410.05 1051.05 November 2014 624.58 377.97 562.37 1564.92 December 2014 504.39 420.01 542.68 1467.08 January 2015 482.89 711.94 670.64 1865.47 Feburary 2015 540.43 444.81 376.71 1361.95 March 2015 447.80 386.03 548.22 1382.05 April 2015 471.06 366.34 333.58 1170.98 May 2015 311.98 469.73 292.80 1074.51 June 2015 142.31 135.21 163.72 441.24

Total 4,673.08 5,924.95 5,931.68 16,529.71

57 AWA - 2

A.II. UPSTREAM UTILIZATIONS

(a) MAJOR & MEDIUM PROJECTS

Planned annual Actual Irrigation Actual Water Irrigation Utilization including S.No. Name of Project Reporting Officer Kharif Rabi Hotweather Total domestic & industrial use (Ha.) (Ha.) (Ha.) (Ha.) (Ha.) (MCM)

MAJOR PROJECTS 1 Indira Sagar project CE (Canals), ISP, NVDA, 78000 16100.00 72800 - 88900 595.31 EE, ND Dn. 25, Narmada Nagar. 2 Sukta (Bhagwant Sagar Project) E.E, W.R.Dn., Khandwa 14200 - 12860 12860 56.19

3 KolarProject E.E., Kolar Canal Dn. Nasrullaganj. 60867 - 36050 - 33500 163.57

Sub Total 153067 7100.00 121710 - 135260 815.07

MEDIUM PROJECT 1 Chandrakeshar tank E.E, W.R.Dn., Dewas 6060 - 4971 - 4971 11.93

Sub Total 6060 - 4971 - 4971 11.93 Total ( Major & Medium Project) 159127 7100.00 126681 - 140231 827.00

58 AWA - 3 WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Kolar Project : Chandrakeshar tank Category : Major : Medium

Name of river / tributary : Kolar : Chandrakeshar

Reporting Officer : E.E., Kolar Canal Dn. Nasrullaganj. : EE, WR Dn, Dewas S.E. Kolar Project Circle. Bhopal C.E., N/T Basin, WRD, Indore.

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 1.68 1.68 1.85 5.21 0.00 0.00 0.00 0.00 August 2014 1.68 1.68 1.68 5.04 0.00 0.00 0.00 0.00 September 2014 1.68 1.68 1.68 5.04 0.00 0.00 0.00 0.00 October 2014 1.68 1.68 2.07 5.43 0.00 0.00 0.96 0.96 November 2014 16.34 15.01 10.65 42.00 3.53 2.90 2.90 9.33 December 2014 15.30 9.21 11.64 36.15 0.32 0.05 1.27 1.64 January 2015 7.92 8.28 22.11 38.31 0.00 0.00 0.00 0.00 February 2015 2.91 1.68 1.24 5.83 0.00 0.00 0.00 0.00 March 2015 1.68 1.68 1.65 5.01 0.00 0.00 0.00 0.00 April 2015 1.66 1.68 1.68 5.02 0.00 0.00 0.00 0.00 May 2015 1.71 1.83 2.04 5.58 0.00 0.00 0.00 0.00 June 2015 1.75 1.67 1.53 4.95 0.00 0.00 0.00 0.00

Total 55.99 47.76 59.82 163.57 3.85 2.95 5.13 11.93

* Out of total releases 163.57 MCM, 103.03 MCM released for irrigation and 60.54 MCM released for domestic use.

59 AWA - 3 WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Indira Sagar Project Sukta (Bhagwant Sagar Project)

Category : Major Major

Name of river / tributary : Narmada Sukta

Reporting Officer : EE., N.D. Dn., No.25, Narmada Nagar. EE, WR Dn, Khandwa C.E., N/T Basin, WRD, Indore.

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 0.58 0.00 0.00 0.58 August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 September 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 October 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 November 2014 5.06 21.10 26.90 53.06 0.31 0.83 4.71 5.85 December 2014 36.83 36.51 52.11 125.45 7.17 4.29 5.57 17.03 January 2015 42.83 42.08 45.20 130.11 0.41 3.48 2.76 6.65 February 2015 40.26 39.72 31.24 111.22 2.51 3.91 3.51 9.93 March 2015 32.16 29.81 27.25 89.22 4.58 1.13 0.56 6.27 April 2015 0.00 0.00 0.00 0.00 2.18 0.00 1.68 3.86 May 2015 0.00 11.54 25.53 37.07 1.25 1.84 0.57 3.66 June 2015 34.21 14.97 0.00 49.18 2.03 0.33 0.00 2.36

Total 191.35 195.73 208.23 595.31 21.02 15.81 19.36 56.19 *

* Out of total 56.19 MCM, 9.20 MCM for domestic use & 46.99 MCM for Irrigation use.

60 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Category CCA (Ha) Cropwise actual / planned irrigated area during Kharif season (Ha) Total Project Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Kolar Project Major 45087 ------2254 9018 451 902 11272 23897

2 Indira Sagar Project Major 123000 ------16100

Sukta (Bhagwant Sagar 3 Major 17643 Project) ------3000 1000 4000 8000 4 Chandrakeshar Project Medium 7605 ------1212 1212

61 AWA - 4

AREA IRRIGATED BY NARMADA WATER BY MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. ) Project Category Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot (HYV) (ORD) & others Rabi others Weather 1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

1 Kolar Project Major ------36050 ------27953 9017 36970

2 Indira Sagar Project Major ------53000 - - - - -

Sukta (Bhagwant 3 Major 4069 8790 1 - - - - 12860 - - - - - Sagar Project) 4640 1160 5800 400 400

Chandrakeshar Medium 3169 1319 - - - - 483 4971 - - - - 4 Project 3636 1212 - 4848

62 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (i) MINOR SURFACE GRAVITY SCHEMES

Planned Actual Area Irrigated (Ha) Water Utilization (MCM) No of CCA annual S.No. Cardinal Site Water Resources Division Hot Peren Schmes (Ha) Irrigation Kharif Rabi weather nial Total Kharif Rabi Total (Ha) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 INDIRA SAGAR PROJECT

( i ) WR Dn Sehore 100 11574 11633 - 11223 - - 11223 - 33.67 33.67

Sub Total 100 11574 11633 - 11223 - - 11223 - 33.67 33.67

63 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

No of C C A Planned Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM) Sr No Water Resources Division Schemes (Ha) annual Irrigation Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total 1 2 3 4 5 6 7 8 8 10 11 12 13 14 15 16

1 W.R. Dn., Sehore 3 589 589 ------0.00 - - 0.00

2 N.D.Dn., 25, Punasa 1 - - - 13100 - - - - - 110.02 - - 110.02

3 Schemes of PHED & Local 1 ------8760 - - 50.80 - 50.80 Administration 4 Pumping Schemes of Local 3 ------7165 - - 0.26 2.60 2.86 Administration & Security Paper Mill, Hoshangabad. 5 Private Pumping Schemes under 6905 ------368.63 - - 368.63 * Agriculture Department of Hoshangabad (50%), Sehore, Raisen & Betul reported by NVDA.

Sub Total 6913 589 589 - 13100 - - - 7165 - 478.65 51.06 2.60 532.31 TOTAL 6989 9211 9270 - 24323 - - - 7165 - 512.32 51.06 2.60 565.98

* Data not received , last year data is repeated.

64 AWA - 6

CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

Gross Dead Live Live storage as Live storage as Difference Name of river / C.C.A. S.No. Reporting Officer Name of Project Storage Storage Storage on 1.7.2014 on 1.7.2015 (Col. 10-9) tributary (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM) 1 2 3 4 5 6 7 8 9 10 11

E.E., Kolar Canal Dn. Kolar Project 1 Nasrullaganj. Kolar 270.00 5.00 265.00 45087 79.64 14.83 -64.81

General Manager, NHDC, ISP 2 Narmada Nagar. Narmada 12220.00 2470.00 9750.00 123000 744.00 1322.00 578.00 Sukta (Bhagwant 3 E.E., W.R. Dn., Khandwa Sukta 89.30 11.30 78.00 17643 29.73 26.51 -3.22 Sagar Project)

Total ( Major Project ) 12579.30 2486.30 10093.00 185730 853.37 1363.34 509.97

MEDIUM PROJECTS

1 E.E, W.R.Dn., Dewas Chandrakeshar tank Chandrakeshar 31.65 1.59 30.06 7605 0.28 1.83 1.55

Total ( Medium Project ) 31.65 1.59 30.06 7605 0.28 1.83 1.55 Total ( Major & Medium Project ) 12610.95 2487.89 10123.06 193335 853.65 1365.17 511.52

65 ZONE - V

INDIRA SAGAR PROJECT TO MANDLESHWAR o o 74 75o 76o 77

ZONE-V MAP - 6 (INDIRA SAGAR PROJECT TO MANDLESHWAR) INDORE

WATER RESOURCES DIVISION, DEWAS PARAS TANK DISTANCE FROM SOURCE : 940 Km

CHORAL CATCHMENT AREA : 72809 Sq Km NAKHERI

OMKARESHWAR INDIRA SAGAR WATER RESOURCES MAHESHWAR PUNASA DIVISION, INDORE

THIKRI MANDALESHWAR 23o 23o

DEJLA DEWADA KHANDWA

LEGEND KHARGONE BASIN BOUNDARY ZONE BOUNDARY RIVERS DISTRICT HEAD QUARTERS IMPORTANT TOWNS DAM SITE & SUBMERGENCE

WATER RESOURCES WATER RESOURCES DIVISION, KHARGONE DIVISION, MANDLESHWAR NARMADA CONTROL AUTHORITY 22o 22o NARMADA RIVER BASIN MAP SHOWING LOCATION OF EXISTING AND ON GOING MAJOR & MEDIUM PROJECTS AND IRRIGATION DIVISION-WISE JURISDICTION FOR MINOR IRRIGATION SCHEMES- ZONE-V

o o o 74 75 76 77o 66 SUMMARY

ZONE 5 - NARMADA UP TO MANDLESHWAR

ISP to Upto Sl No Description Unit Upto ISP Mandleshwar Mandleshwar

I Observed flow (Measured at OSP) MCM 16529.71 19177.87

II Upstream Utilizations II a. Major & Medium Projects MCM 3397.98 352.07 3750.05 II b. Minor Projects MCM 2688.05 859.60 3547.65 II c. Total MCM 6086.03 1211.67 7297.70

III Change (increase`+' / decrease`-') in Live Storage MCM 1009.50 76.57 1086.07

IV Carryover storage (Live Storage as on 01.07.2014) MCM 1648.37 -232.88 1415.49

V Utilizable flow (I + IIc + III + IV ) MCM 25273.61 28977.13

MAF 20.49 23.49

67 BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

Water Utilization S.No. Category of Projects Domestic Unit Irrigation Out of Narmada Industrial Total In Narmada basin basin

1 Major & Medium Projects MCM 342.72 9.35 - - 352.07

Minor Projects Including Lift & 2 MCM 792.57 - 67.03 - 859.60 Pumping Schemes

68 AWA - 1 A.I. OBSERVED FLOW (OUTFLOWS FROM POWER HOUSE & SPILLWAY)

Name of Gauge site : Omkareshwar Sagar Project (OSP)

Category : Project Station

Name of river / tributary : Narmada

Reporting Officer : General Manager, NHDC Ltd,Siddhwarkoot Omkareshwar.

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 136.25 45.49 541.81 723.55 August 2014 325.47 526.00 666.92 1518.39 September 2014 629.94 1956.86 1162.51 3749.31 October 2014 428.11 268.27 433.04 1129.42 November 2014 681.87 425.26 637.11 1744.24 December 2014 564.45 480.90 610.50 1655.85 January 2015 608.26 800.84 777.60 2186.70 Feburary 2015 622.51 525.57 465.52 1613.60 March 2015 537.93 472.00 641.17 1651.10 April 2015 539.83 350.96 403.32 1294.11 May 2015 372.21 557.28 349.40 1278.89 June 2015 161.40 209.09 262.22 632.71 Total 5608.23 6618.52 6951.12 19177.87

69 AWA - 2

A.II. UPSTREAM UTILIZATIONS

(a) MAJOR & MEDIUM PROJECTS

Planned annual Actual Irrigation Actual Water Irrigation Utilization including S.No. Name of Project Reporting Officer Kharif Rabi Hotweather Total domestic & industrial use (Ha.) (Ha.) (Ha.) (Ha.) (Ha.) (MCM)

MAJOR PROJECT

1 Omkareshwar Sagar Project CE, Lower Narmada Projects, Indore 283324 4346 - - 4346 276.37

MEDIUM PROJECT 1 Paras Tank E.E, W.R.Dn., Dewas 1394 - 1500 - 1500 2.82 2 i. Choral Nakheri (Choral) 5036 - 3720 - 3720 17.11 E.E, W.R.Dn., Indore ii. Choral Nakheri (Nakheri) Feeder dam 3 Dejla Dewada Tank E.E, W.R.Dn., Khargone 18180 - 9501 - 9501 42.77 4 Upper Beda Tank EE., ND., Dn., No. 19, NVDA - - 3500 - 3500 13.00 Sub Total 307934 4346 18221 - 18221 75.70 Total (Major & Medium Project) 307934 4346 18221 - 22567 352.07

70 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Dejla Dewada tank : Paras tank

Category : Medium : Medium

Name of river / tributary : Kunda : Paras

Reporting Officer : E.E, W.R.Dn., Khargone : E.E, W.R.Dn., Dewas C.E., N/T Basin, WRD, Indore. C.E., N/T Basin, WRD, Indore. (Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 August 2014 0.00 0.00 0.00 0.00 September 2014 0.00 0.00 0.00 0.00 October 2014 0.00 0.00 0.00 0.00 November 2014 0.00 0.00 0.00 0.00 December 2014 2.59 4.80 3.40 10.79 January 2015 1.57 6.11 1.77 9.45 February 2015 6.91 4.52 1.90 13.33 March 2015 2.30 1.60 0.00 3.90 April 2015 0.00 0.00 0.00 0.00 May 2015 0.00 0.00 2.50 2.50 June 2015 2.80 0.00 0.00 2.80

Total 16.17 17.03 9.57 42.77 2.82 #

*Out of total releases 42.77 MCM,33.42 MCM released for irrgn. & 9.35 MCM released for domestic use. # Data not received on Ten Daily Basis.

71 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Choral-Nakheri (Nakheri) : Upper Beda Tank

Category : Medium : Medium

Name of river / tributary : Choral : Beda

Reporting Officer : E.E, W.R.Dn., Indore : E.E, ND Dn. No. 19, NVDA C.E., N/T Basin, WRD, Indore.

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 September 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 October 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 November 2014 0.00 2.00 2.00 4.00 3.00 1.00 0.00 4.00 December 2014 2.00 1.50 1.50 5.00 2.00 1.00 0.00 3.00 January 2015 1.50 1.00 1.50 4.00 2.00 1.00 0.00 3.00 February 2015 1.00 1.00 1.00 3.00 2.00 1.00 0.00 3.00 March 2015 0.50 0.30 0.00 0.80 0.00 0.00 0.00 0.00 April 2015 0.31 0.00 0.00 0.31 0.00 0.00 0.00 0.00 May 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 June 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 5.31 5.80 6.00 17.11 9.00 4.00 0.00 13.00

72 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Omkareshwar Sagar Project

Category : Major

Name of river / tributary : Narmada

Reporting Officer : E.E, Dn. No. 32 NVDA, Badwaha C.E., Lower Narmada , NVDA, Indore.

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 3.06 0.92 0.00 3.98 August 2014 0.00 0.00 0.00 0.00 September 2014 0.00 0.00 0.41 0.41 October 2014 1.38 0.68 0.46 2.52 November 2014 1.18 0.32 3.51 5.01 December 2014 13.03 8.47 11.59 33.09 January 2015 15.64 15.64 17.20 48.48 February 2015 15.64 15.64 12.51 43.79 March 2015 15.64 15.64 17.20 48.48 April 2015 15.64 16.13 3.46 35.23 May 2015 2.70 4.51 17.83 25.04 June 2015 15.42 12.21 2.71 30.34

Total 99.33 90.16 86.88 276.37 *

* Inclusive 10.94 MCM water releases to Shipra Link Project.

73 AWA - 4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Category CCA (Ha) Cropwise actual / planned irrigated area during Kharif season (Ha) Total Project Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Omkareshwar Major 146800 ------Sagar Project

2 Paras tank Medium 1507 ------162 202 364

3 Choral-Nakheri Medium 3900 ------(Choral Project) 117 780 78 858 1833

4 Dejla Dewada Tank Medium 9000 ------2700 900 1350 900 180 6030

5 Upper Beda Tank Medium ------

74 AWA - 4

AREA IRRIGATED BY NARMADA WATER BY MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. ) Project Category Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot (HYV) (ORD) & others Rabi others Weather 1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

1 Omkareshwar Major ------4346* - - - - - Sagar Project

2 Paras tank Medium ------1500 - - - - - 505 121 404 1030

3 Choral-Nakheri Medium 1994 - 1632 - 94 - - 3720 - - - - - (Nakheri Project) 1365 785 234 78 78 585 3125 78 78

4 Dejla Dewada Tank Medium 9000 - 501 - - - - 9501 - - - - - 6030 4500 900 90 180 11700 450 450

5 Upper Beda Medium ------3500 ------

*Data not received, last year data repeated

75 AWA - 5

A.II. UPSTREAM UTILIZATION

(b) MINOR PROJECTS (i) MINOR SURFACE GRAVITY SCHEMES

Planned Actual Area Irrigated (Ha) Water Utilization (MCM) No of CCA annual S.No. Cardinal Site Water Resources Division Hot Peren Schmes (Ha) Irrigation Kharif Rabi weather nial Total Kharif Rabi Total (Ha) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 MANDLESHWAR ( i ) E.E, W.R.Dn., Indore 18 3468 3063 - 2405 - - 2405 - 13.5 13.5 (ii) E.E, W.R.Dn., Dewas 12 3029 2335 - 1790 - - 1790 - 4.74 4.74 (iii) E.E, W.R.Dn., Khandwa 49 8147 7689 - 7475 - - 7475 - 37.37 37.37 (Iv) E.E, W.R.Dn., Khargone (part) 136 31428 27588 - 35877 - - 35877 - 158.92 158.92

Sub Total 215 46072 46287 - 47547 - - 47547 0.00 214.53 214.53

* Data not received, last year data repeated.

76 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

No of C C A Planned Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM) Sr No Water Resources Division Schemes (Ha) annual Irrigation (Ha.) Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 E.E, W.R.Dn., Dewas 2 460 460 ------

2 E.E, W.R.Dn., Khandwa 5 705 598 ------0.00 - - 0.00

3 E.E, W.R.Dn., Khargone (part) 5 660 640 ------

4 EE,.ND Dn., No.19, 1 - - - 5100 - - - - - 10.38 - - 10.38 *

6 Schemes of PHED & Local 15 ------41944 - - 67.03 - 67.03 administration 7 Private Pumping Schemes under 9557 ------567.66 - - 567.66 * Agriculture Department of Dewas, Khandwa, Indore & Khargone Distt. (40%) reported by NVDA.

Sub Total 9585 1825 1698 - 5100 - - - 41944 - 578.04 67.03 - 645.07

TOTAL 9800 47897 47985 - 52647 - - - 41944 - 792.57 67.03 - 859.60

* Data not received , last year data is repeated.

77 AWA - 6

CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

Gross Dead Live Live storage Live storage Difference Name of river / C.C.A. S.No. Reporting Officer Name of Project Storage Storage Storage as on 1.7.2014 as on 1.7.2015 (Col. 10-9) tributary (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM) 1 2 3 4 5 6 7 8 9 10 11 MAJOR PROJECTS

1 C.E., NHDC Ltd. Omkareshwar Sagar Project Narmada 987 688 299 146800 -258.99 -174.62 84.37 MEDIUM PROJECTS

2 E.E, W.R.Dn., Dewas Paras Tank Paras 7.53 1.43 6.10 1507 1.65 0.73 -0.92

i. Choral Nakheri (Nakheri) Choral Feeder Tank 3 E.E, W.R.Dn., Indore ii. Choral Nakheri (Choral) Choral 23.92 4.69 19.23 3900 BLSL 6.13 6.13

4 E.E, W.R.Dn., Khargone Dejla Dewada Tank Kunda 56.35 6.06 50.29 9000 5.46 11.45 5.99

5 EE, ND Dn., No. 19, NVDA Upper Beda Tank Beda 91.82 15.58 76.24 9900 19.00 Nil -19.00

Total ( Medium Project ) 1166.62 715.76 450.86 171107 26.11 -156.31 -7.80 Total ( Major & Medium Project ) 1166.62 715.76 450.86 171107 -232.88 -156.31 76.57

78 ZONE - VI

MANDLESHWAR TO SARDAR SAROVAR PROJECT

o o 73 74 75o 76o MAP - 7 ZONE-VI (MANDLESHWAR TO SARDAR SAROVAR PROJECT)

DISTANCE FROM SOURCE : 1164 Km WATER RESOURCES DIVISION, DHAR CATCHMENT AREA : 87892 Sq Km

WATER RESOURCES DIVISION, JAMBUGHODA WATER RESOURCES VADODARA JOBAT MAN DAM DIVISION, DHAR ALIRAJPUR KUNDA

S S N N L, DABOI SAKALDA GUJARAT MANAWAR MANDALESHWAR SEGWAL 23o 23o SARDAR TANK SATAK SAROVAR BARWANI TANK DAM

GARUDESHWAR DHADGAON BHARUCH

ANKALESHWAR KHARGONE

WATER RESOURCES DIVISION, BARWANI

NANDURBAR WATER RESOURCES WATER RESOURCES SURAT DIVISION, DIVISION, GOGAON

GHATGHAR HYDRO NASIK IRRIGATION LEGEND ELECTRIC PROJECT CIRCLE, NARMADA CONTROL AUTHORITY CIRCLE, NASIK NASIK BASIN BOUNDARY 22o 22o NARMADA RIVER BASIN ZONE BOUNDARY RIVERS MAP SHOWING LOCATION OF EXISTING AND ON GOING MAJOR & MEDIUM PROJECTS AND DISTRICT HEAD QUARTERS IRRIGATION DIVISION-WISE JURISDICTION FOR IMPORTANT TOWNS MINOR IRRIGATION SCHEMES- DAM SITE & SUBMERGENCE ZONE-VI

o 73 74o 75o 79 SUMMARY

ZONE 6 - NARMADA UP TO SARDAR SAROVAR PROJECT

Upto Mandleshwar Narmada Sl No Description Unit Mandleshwar to SSP upto SSP

I Observed flow MCM 19177.87 21452.85

II Upstream Utilizations II a. Major & Medium Projects MCM 3750.05 9338.73 13088.78 Quantum of utilised water from NMC of SSP by Gujarat & Rajasthan, which is already included in the observed flow MCM - -8970.66 -8970.66

II b. Minor Projects MCM 3547.65 1110.48 4658.13 II c. Total Water utilization (to be considered ) MCM 7297.70 1478.55 8776.25

III Change (increase`+' / decrease`-') in Live Storage MCM 1086.07 234.60 1320.67

IV Carryover storage (Live Storage as on 01.07.2014) MCM 1415.49 502.01 1917.50

V Utilizable flow (I + IIc + III + IV ) MCM 28977.13 33467.27

MAF 23.49 27.13

80 BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

Water Utilization Irrigation S.No. Category of Projects Unit Domestic Industrial Total In the command of In the command of other Narmada basin basin

1 Major & Medium Projects MCM 3612.87 4329.96 1325.70 70.20 9338.73 2 Minor Projects Including MCM 1107.48 - 3.00 - 1110.48 Lift & Pumping Schemes

81 AWA - 1

A.I. OBSERVED FLOW (OUTFLOWS FROM SPILLWAY & POWER HOUSES)

Name of Gauge site : SARDAR SAROVAR PROJECT

Category : Major

Name of river / tributary : Narmada

Reporting Officer : General Manager, SSNNL, Gandhinagar

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 215.03 106.56 434.58 756.17 August 2014 572.51 461.22 868.98 1902.71 September 2014 2,105.01 2,864.02 1,568.62 6537.65 October 2014 798.57 324.46 344.64 1467.67 November 2014 574.25 410.41 429.25 1413.91 December 2014 550.76 392.12 585.61 1528.49 January 2015 416.02 666.14 801.74 1883.90 February 2015 577.27 415.67 404.79 1397.73 March 2015 498.08 425.48 521.00 1444.56 April 2015 424.51 287.94 182.21 894.66 May 2015 240.63 429.70 562.76 1233.09 June 2015 191.92 332.78 467.61 992.31

Total 7,164.56 7,116.50 7,171.79 21,452.85

82 AWA - 2

A.II. UPSTREAM UTILIZATIONS (a) MAJOR & MEDIUM PROJECTS

Planned annual Actual Irrigation Actual Water Utilization Irrigation including domestic & S.No. Name of Project Reporting Officer Kharif Rabi Hotweather Total industrial use (Ha.) (Ha.) (Ha.) (Ha.) (Ha.) (MCM) MAJOR PROJECTS 1 Man C.E., Lower Narmada Projects, 19200 705 16356 1094 18155 198.91 Indore 2 Jobat C. E. Lower Narmada Zone, Indore 9848 505 11174 646 12325 127.93 3 Sardar Sarovar Dam General Manager, SSNNL, 322301 63534 190438 - 253972 8387.66 * Gandhinagar Gujarat-Rajasthan Border - 47700 156285 - 203985 583.00 Total ( Major Project) 351349 112444 374253 1740 488437 9297.50 MEDIUM PROJECT 1 Satak Tank E.E, W.R.Dn., Mandleshwar 1457 - 3699 - 3699 12.33 2 Segwal Tank E.E, W.R.Dn., Barwani 1813 - 1012 - 1012 8.12 3 Kunda Tank E.E, W.R.Dn., No 1, Dhar 1658 - 1250 - 1250 8.10 4 Sakalda Tank E.E, W.R.Dn., Manawar 1672 - 2536 - 2536 12.68 Sub Total 6600 - 8497 - 8497 41.23 Total ( Major & Medium Project) 357949 112444 382750 1740 496934 9338.73

* Out of this total 8387.66 MCM of water released through HR of NMC,3244.80MCM water utilized for irrigation in Narmada Command,664.20MCM water utilized for irrigation in other command,1325.70MCM water for domestic use,70.20 MCM water for Industrial Use, 417.20 MCM water released through escapes/river, 2446.70 MCM for losses,storages in pool ,testing and other uses & 218.86 MCM of water drawn by GoG during spillage period of SSP by invoking clause IV(5) towards maximization of power generation through CHPH will not be counted towards their share .

83 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Man Project : Jobat tank

Category : Major : Major

Name of river / tributary : Man : Hathni

Reporting Officer : E.E, Man Project Division, Indore : C.E., Lower narmada Projects, NVDA, Indore. C.E., Lower Narmada Projects, NVDA, Indore.

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 September 2014 9.07 9.07 9.07 27.21 6.04 6.04 6.05 18.13 October 2014 9.49 9.50 9.49 28.48 6.25 6.25 6.25 18.75 November 2014 9.07 9.07 9.07 27.21 6.05 6.04 6.05 18.14 December 2014 9.36 9.37 9.38 28.11 4.95 4.95 4.96 14.86 January 2015 9.36 9.37 9.38 28.11 6.05 6.04 6.05 18.14 February 2015 8.52 8.42 8.41 25.35 5.64 5.64 5.65 16.93 March 2015 9.37 9.37 9.37 28.11 6.25 6.25 6.25 18.75 April 2015 6.33 0.00 0.00 6.33 4.23 0.00 0.00 4.23 May 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 June 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 70.57 64.17 64.17 198.91 45.46 41.21 41.26 127.93

84 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Sardar Sarovar Project Category : Major

Name of river / tributary : Narmada

Reporting Officer : General Manager, SSNNL, Gandhinagar

(Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 192.99 97.61 88.77 379.37 August 2014 108.47 145.64 281.68 535.79 September 2014 241.97 334.45 305.13 881.55 October 2014 289.76 303.94 314.93 908.63 November 2014 300.46 374.09 401.76 1,076.31 December 2014 344.44 366.00 374.66 1,085.10 January 2015 356.90 332.09 344.93 1,033.92 February 2015 332.37 335.62 264.52 932.51 March 2015 293.76 232.81 284.03 810.60 April 2015 174.88 172.31 169.62 516.81 May 2015 151.15 130.87 130.90 412.92 June 2015 112.45 150.69 134.01 397.15 18.36 Total 2,899.60 2,976.12 3,094.94 8,970.66 *

*Out of this total 8970.66 MCM of water released through HR of NMC,3244.80MCM water utilized for irrigation in Narmada Command,664.20MCM water utilized for irrigation in other command,1325.70MCM water for domestic use,70.20 MCM water for Industrial Use, 417.20 MCM water released through escapes/river, 2446.70 MCM for losses,storages in pool ,testing and other uses, 583.00 MCM for use of Rajasthan & 218.86 MCM of water drawn by GoG during spillage period of SSP by invoking clause IV(5) towards maximization of power generation through CHPH will not be counted towards their share .Hence the effective Share will be 8751.80 MCM .

85 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Satak Tank : Segwal tank

Category : Medium : Medium

Name of river / tributary : Satak : Sozar Nala

Reporting Officer : E.E, W.R.Dn., Khargone : E.E, W.R.Dn., Barwani C.E., N/T Basin, WRD, Indore. C.E., N/T Basin, WRD, Indore.

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 - - - - 0.00 0.00 0.00 0.00 August 2014 - - - - 0.00 0.00 0.00 0.00 September 2014 - - - - 0.00 0.00 0.00 0.00 October 2014 - - - - 0.00 0.00 0.00 0.00 November 2014 - - - - 0.00 0.00 0.00 0.00 December 2014 - - - - 1.25 1.25 1.00 3.50 January 2015 - - - - 0.40 0.40 0.42 1.22 February 2015 - - - - 1.20 1.20 1.00 3.40 March 2015 - - - - 0.00 0.00 0.00 0.00 April 2015 - - - - 0.00 0.00 0.00 0.00 May 2015 - - - - 0.00 0.00 0.00 0.00 June 2015 - - - - 0.00 0.00 0.00 0.00 Total 12.33 * 2.85 2.85 2.42 8.12

* Data are not reported on Ten daily basis.

86 AWA - 3

WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15 (As measured at canal head)

Name of Project : Kunda tank Sakalda tank

Category : Medium Medium

Name of river / tributary : Buti Nalla Chiri/Khuh Nalla

Reporting Officer : E.E, W.R.Dn., Dhar E.E, W.R.Dn., Manawar C.E., N/T Basin, WRD, Indore. C.E., N/T Basin, WRD, Indore.

(Figures in MCM) (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

July 2014 0.00 0.00 0.00 0.00 - - - - August 2014 0.00 0.00 0.00 0.00 - - - - September 2014 0.00 0.00 0.00 0.00 - - - - October 2014 0.00 0.00 0.00 0.00 - - - - November 2014 0.00 0.00 1.25 1.25 - - - - December 2014 1.00 1.00 1.00 3.00 - - - - January 2015 0.50 0.50 0.50 1.50 - - - - Feburary 2015 0.50 0.50 0.50 1.50 - - - - March 2015 0.50 0.35 0.00 0.85 - - - - April 2015 0.00 0.00 0.00 0.00 - - - - May 2015 0.00 0.00 0.00 0.00 - - - - June 2015 0.00 0.00 0.00 0.00 - - - -

Total 2.50 2.35 3.25 8.10 - - - 12.68*

* Data are not reported on Ten daily basis. 87 AWA-4

AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

Cropwise actual / planned irrigated area during Kharif season (Ha) Total S.No. Project Category CCA (Ha) Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Man Project* Major 15000 - 418 40 87 30 35 40 30 25 705 300 3000 1500 3000 750 750 9300 2 Jobat Project* Major 9848 - 354 10 65 20 30 10 50 11 550 197 1477 1477 1970 191 295 5607 3 Segwal Tank Medium 1813 ------109 134 268 134 27 672 4 Satak tank Medium 2707 ------243 40 283 5 Kunda tank Medium 1938 ------

6 Sakalda Tank Medium 2060 ------400 50 100 50 600 7 Sardar Sarovar Project Major 1869000 ------63534 44576 20051 1984 7930 2737 1727 2184 2203 83392

8 Narmada Main Canal Project Major - - - - 38637 3816 4770 477 - - 47700 14036 7377 4918 2761 29092

88 AWA - 4

AREA IRRIGATED BY NARMADA WATER BY MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

S.No. Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. ) Project Category Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot (HYV) (ORD) & others Rabi others Weather 1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

1 Man Project* Major 7062 5070 1402 890 1582 180 170 16356 98 97 99 800 1094 3000 3000 1500 300 7800 300 300 600 2 Jobat Project* Major 4365 4008 1089 1000 500 112 100 11174 98 88 100 360 646 3940 985 492 295 5712 985 192 1177

3 Segwal Tank Medium 300 - 40 40 20 12 600 1012 - - - - - 68 672 402 1142

4 Satak tank Medium ------3699 - - - - - 810 40 324 1174 5 Kunda tank Medium 990 260 - - - - - 1250 - - - - - 1658 1658 6 Sakalda Tank Medium 2536 ------2536 - - - - - 1000 100 1100 Sardar Sarovar 7 Project Major ------190437 - - - - - 50262 103539 23798 7265 13898 22716 35431 238909 8 Narmada Main Major Canal Project 31257 - - - - - 125028* 156285 ------* This includes Cumin-93770, Mustord-7814, Horticulture-1500 Ha, Caster-10972 Ha, Isabgol-10972 Ha.

89 AWA - 5

A.II. UPSTREAM UTILIZATION

(b) MINOR PROJECTS (i) MINOR SURFACE GRAVITY SCHEMES

Planned Actual Area Irrigated (Ha) Water Utilization (MCM) No of CCA annual S.No. Cardinal Site Water Resources Division Hot Peren Schems (Ha) Irrigation Kharif Rabi weather nial Total Kharif Rabi Total (Ha) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 SARDAR SAROVAR (i) E.E, W.R.Dn., Khargone (part) 34 10318 8480 - 8970 - - 8970 - 39.74 39.74 (ii) E.E, W.R.Dn., Barwani 98 11922 10845 - 17938 - - 17938 - 92.31 92.31 (iii) E.E, W.R.Dn., Dhar 69 9689 8282 - 12051 - - 12051 - 69.58 69.58 (iv) E.E, W.R.Dn., Manawar 141 15773 13157 - 17701 - - 17701 - 91.32 91.32 (v) E.E, W.R.Dn., Alirajpur 114 9317 9225 - 9215 - - 9215 - 69.24 69.24 (vi) E.E, N.D. Dn., Nandurbar 1 182 105 ------

Sub Total 457 57201 50094 - 65875 - - 65875 - 362.19 362.19

90 AWA - 5

A.II. UPSTREAM UTILIZATION (b) MINOR PROJECTS (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

No of C C A Planned Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM) Sr No Water Resources Division Schemes (Ha) annual Irrigation Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total 1 2 3 4 5 6 7 8 8 10 11 12 13 14 15 16

1 E.E, W.R.Dn., Khargone (part) 1 100 100 ------

2 E.E, W.R.Dn., Barwani 4 629 585 ------

3 E.E, W.R.Dn., Dhar 1 923 710 ------

4 E.E, W.R.Dn., Manawar 4 2850 2980 - 110 - - 2408 - - 0.62 - - 0.62

5 E.E, W.R.Dn., Alirajpur ------

6 E.E, N.D. Dn., Nandurbar, GoM 2 105 - - 10 - - - - - 0.10 - - 0.10

7 Schemes of PHED & Local 10 ------24659 - - 2.98 - 2.98 administration 8 Private Pumping Schemes under 13840 ------744.57 - - 744.57 * Agriculture Department reported by NVDA. 9 SSNNL, GoG 1 ------0.02 - 0.02

Sub Total 13863 4607 4375 - 110 - - 2408 24467 - 745.29 3.00 0.00 748.29

TOTAL 14320 61808 51355 - 65985 - - 2408 24467 - 1107.48 3.00 0.00 1110.48

* Data are not received , last year data is repeated.

91 AWA - 6

CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

Gross Dead Live Live storage Live storage Difference (Col. Name of river C.C.A. S.No. Reporting Officer Name of Project Storage Storage Storage as on 1.7.2014 as on 1.7.2015 10-9) / tributary (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM) 1 2 3 4 5 6 7 8 9 10 11

1 C.E., Lower Narmada Zone, Man Man 145.03 15.48 127.87 15000 3.40 5.38 1.98 NVDA, Indore 2 C.E., Lower Narmada Zone, Jobat Hathni 77.84 7.80 70.04 9848 14.70 29.70 15.00 NVDA, Indore 3 General Manager, SSNNL, Sardar Sarovar Dam Narmada 9460.00 3700.00 5760.00 1869000 482.41 695.23 212.82 Gandhinagar

Total ( Major Project ) 9682.87 3723.28 5957.91 1893848 500.51 730.31 229.80

MEDIUM PROJECTS 1 E.E, W.R.Dn., No 1, Dhar Kunda Tank Buti nalla 8.50 0.40 8.10 1938 0.00 0.00 0.00

2 E.E, W.R.Dn., Khargone Satak Tank Satak 19.79 1.42 18.37 2707 1.50 5.75 4.25 Zozar nalla / 3 E.E, W.R.Dn., Barwani Segwal Tank 8.96 0.34 8.62 1813 BLSL 0.55 0.55 Borad Chiri/Khug 4 E.E, W.R.Dn., Manawar Sakalda Tank 15.66 2.97 12.69 2060 BLSL BLSL 0.00 nalla

Total ( Medium Project ) 52.91 5.13 47.78 8518 1.50 6.30 4.80

Total ( Major & Medium Project ) 9735.78 3728.41 6005.69 1902366 502.01 736.61 234.60

92 92 AWA - 3

TEN DAILY RELEASES OF NARMADA WATER FROM NARMADA MAIN CANAL TO RAJASTHAN, 2014-15 (As measured at Narmada main canal at 458.318 KM)

Name of Gauge site : GUJARAT-RAJASTHAN BORDER Category : Major Name of river / tributary : Narmada Main Canal Reporting Officer : General Manager, (Technical), S.S.N.N.L., Gandhinagar. (Figures in MCM) Month Year 1-10 11-20 21-30/31 Total

July 2014 6.90 7.00 7.60 21.50 August 2014 5.50 4.70 12.00 22.20 September 2014 17.10 8.90 13.90 39.90 October 2014 10.90 6.50 5.00 22.40 November 2014 12.00 32.00 39.00 83.00 December 2014 31.00 30.00 31.00 92.00 January 2015 28.00 27.00 31.00 86.00 February 2015 26.00 28.00 20.00 74.00 March 2015 21.00 9.00 11.00 41.00 April 2015 12.00 11.00 8.00 31.00 May 2015 12.00 12.00 15.00 39.00 June 2015 11.00 11.00 9.00 31.00

Total 193.40 187.10 380.50 583.00

93 o o 80o 81 82 MAP-8

UMARIA

SHAHDOL JABALPUR JAMTARA (Closed)

DINDORI 23o 23o

MANOTE

MOHGAON PENDRA

MANDLA AMARKANTAK

HRIDAYA NAGAR LEGEND BAMNI BANJAR NARMADA BASIN BOUNDARY GAUGE DISCHARGE & SEDIMENT SITE GAUGE DISCHARGE SITE

KAWARDAH NARMADA CONTROL AUTHORITY o 22o 22 BALAGHAT NARMADA RIVER BASIN MAP SHOWING LOCATION OF GAUGE DISCHARGE & SEDIMENT SITES IN NARMADA BASIN

o o 80o 81 82 94 77o 78o 79o MAP-9 SAGAR DAMOH

VIDISHA

BHOPAL RAISEN

SEHORE PATAN

MAHESHWAR BARI BARMANGHAT o o 23 BARELI 23 GADARWARA NARSINGPUR BELKHERI

SANDIA SATRANA (Closed) HOSHANGABAD SANDALPUR HOSHANGABAD

HANDIA PACHMARHI CHHIDGAON HARDAKHAS LEGEND

MANDLA NARMADA BASIN BOUNDARY MACHNA TAWAKATI GINNORE GAUGE DISCHARGE & (Closed) CHINDAWARA 23o SEDIMENT SITE 23o GAUGE DISCHARGE SITE BETUL

NARMADA CONTROL AUTHORITY NARMADA RIVER BASIN MAP SHOWING LOCATION OF GAUGE DISCHARGE & SEDIMENT SITES IN NARMADA BASIN

o 77 78o 79o 95

o o 73 74 75o 76o MAP-10

INDORE

DHAR

VADODARA CHORAL ALIRAJPUR DHULSAR JOBAT AJANDIMAN MORTAKKA PUNASA MANDLESHWAR TIKOLA (Closed) RAJGHAT THIKRI KOGAON o o 22 22 BARWANI

PATI

DHADGAON GARUDESHWAR KHANDWA BHARUCH

KHARGONE

NANDURBAR SURAT

LEGEND 22o 22o NARMADA BASIN BOUNDARY NARMADA CONTROL AUTHORITY GAUGE DISCHARGE & NARMADA RIVER BASIN SEDIMENT SITE MAP SHOWING LOCATION OF GAUGE DISCHARGE & SEDIMENT SITES GAUGE DISCHARGE SITE INNARMADA BASIN

o 73 74o 75o 96