List of References

v. 2016.01e | Page 1/6

Info Period Client Project Modules Contact Person Geneva Airport, Aile Est Financial budgeting and controlling of all www.gva.ch

2016-2019 investments related to the project of the SISOBUDGET Mr. Bruno Volery Geneva Airport, new international departure terminal (+41 22 717 70 84) [Client] "East Wing" Brenner Base Tunnel, Tulfes-Pfons Preliminary northern section of the fu- ture Brenner Base Tunnel, which includes www.bbt-se.com SISOTEAM 2015-2020 38 km of underground works (twin-tube SISOTUNNEL Mr. Adrian Fontana rail tunnel, exploratory tunnel, rescue (+43 699 122 217 01) ÖBA Pini&Partner, tunnel and two interconnecting tunnels), [Site Supervision] site supervision software, 40 users Crapteig Tunnel, Switzerland Innovative system to perform and moni- www.astra.admin.ch

2015-2018 tor secure road closure and opening pro- SISOMonSys ASTRA Bellinzona, Switzerland Mr. Peter Wartmann cesses as well as all accesses to the work- (+41 58 469 16 33) [Client & all project stakeholders] ing areas

www.rhb.ch Albula Tunnel II, Switzerland TEAM SISO 2015-2019 5.8 km long railway tunnel, realization TUNNEL Rhaetische Bahn AG, Switzerland SISO Mr. Paul Loser phase, 1 server, 75 users (+41 81 288 63 36) [Client, Designers & Site Supervision] Safety tunnels at the Lake of Brienz, Monitoring System, Switzerland www.astra.admin.ch

2015-2021 Innovative system to control and monitor SISOPerSys ASTRA , Switzerland Mr. Sereivouth Yang accesses to the working areas during (+41 33 228 24 51) [Client & all project stakeholders] road closures

Canton of , Switzerland www.ti.ch/dt/dc/ Financial budgeting and controlling of all 2014- SISOBUDGET Mr. Ilario Maninetti Canton of Ticino, DT DC, Switzerland investments related to the road infra- structure, 100 users (+41 91 814 27 54) [Client] Alto Maipo Hydropower Project, Chile Design, construction and operation of www.altomaipo.com SISOTEAM two run-of-the-river hydroelectric plants 2014-2018 SISOTUNNEL with a combined capacity of 531 MW, lo- WebGIS Mr. Karl Grossauer SISO Alto Maipo SpA, JV SAM, Chile cated in the Maipo River Basin, 50 km (+56 9 500 26878) [Owner & Owner's Engineers] southeast of Santiago, Chile

Morbio Inferiore, Switzerland www.morbioinf.ch

2014- Electronic Quality Management System, SISOTEAM Municipality of Morbio Inferiore, Mr. Flavio Marchetti Switzerland 30 users (+41 91 695 46 33) [Client] Second tube of the St. Gotthard road tunnel, Switzerland www.astra.admin.ch

2014-2016 Design studies for the construction of a SISOTEAM ASTRA Bellinzona, Switzerland Mr. Valentina Kumpusch second tube and the refurbishment of (+41 91 820 68 50) [Client & Designers] the existing one, 50 users

www.siso.net List of References

v. 2016.01e | Page 2/6

Info Period Client Project Modules Contact Person Safety tunnels at the Lake of Brienz, Switzerland www.lombardi.ch Construction of safety tunnels o the 3.3 SISOTEAM 2013-2018 TUNNEL km long Giessbach, 1.3 km long Chüebalm SISO Mr. Matthias Neidhart ASTRA Thun, Lombardi, Switzerland and the 0.9 km long Sengg road tunnels in (+41 41 226 40 52) [Owner's support] the worldwide known Bernese Oberland

Metropolitana di Torino, www.infrato.it SISOTEAM 2.2 km long extension of the 2012-2020 SISOTUNNEL Infra.To, Italy underground line 1, Lingotto-Bengasi, 1 WebGIS Mr. Fabio Cocito SISO [Client, Designers, server, 50 users (+39 011 559 27 43) Site Supervision & Contractor]

N08 EP Tunnel Sachseln, Switzerland Safety tunnel construction and imple- www.lombardi.ch SISOTEAM 2012-2019 mentation of industrial and safety SISOTUNNEL Mr. Matthias Neidhart equipment in the 5.2 km long road tunnel IG BHU Sachseln, Switzerland (+41 41 226 40 50) Sachseln, 50 users [Client Assistance]

Gotthard Base Tunnel, Switzerland www.alptransit.ch

2012-2016 "Bergwasserdatenbank": database for SISOTUNNEL AlpTransit Gotthard AG, Mr. Davide Fabbri Switzerland managing underground water parame- (+41 91 735 31 11) ters [Client, Designers] Galbenbuck Tunnel, Switzerland The 1'138 m long tunnel Galbenbuck be- www.galgenbucktunnel.ch

2012-2019 tween Engi and Bahntal represents the SISOTEAM INGE Galgenbuck, Switzerland Mr. Markus Sidler core element of the redevelopment of (+41 41 226 40 50) [Designers & Site Supervision] the Schaffhausen-South A4 Hub, 20 users

Albula Tunnel II, Switzerland www.rhb.ch

2011-2016 5.8 km long railway tunnel, SISOTEAM Rhaetische Bahn AG, Switzerland Mr. Paul Loser 1 server, 20 users (+41 81 288 63 36) [Client, Designers & Site Supervision]

Kerenzerberg Tunnel, Switzerland www.lombardi.ch TEAM 2011- Refurbishment of a 5.8 km long motor- SISO Lombardi AG, Lucerne, Switzerland Mr. Matthias Neidhart way tunnel, 10 users (+41 41 226 40 50) [Designers, Client Assistance]

www.ircon.org IRCON Tunnel T-48, India 2011- SISOTEAM Railway tunnel, 10 km, 1 server, 30 users Mr. Anshuman Sharma Ircon, Lombardi-SNC-Lavalin, India (+91 011 29565666) [Client, Designers & Site Supervision]

Andermatt Swiss , www.andermatt-swissalps.ch Switzerland 2011- SISOTEAM Andermatt Swiss Alps AG, Samih Sawiris's expansion project for An- Mr. Andrea Mordasini Switzerland dermatt, 20 users (+41 735 31 00) [Client, Designers & Site Supervision]

www.siso.net List of References

v. 2016.01e | Page 3/6

Info Period Client Project Modules Contact Person

Lyon-Turin Ferroviaire, Galérie de recon- www.ltf-sas.com

2010- naissance de St-Martin La Porte 3, SISOTEAM Group Lombardi / Bonnard & Gardel, Mr. Christian Fournier Switzerland-France Investigation tunnel, 1 server, 30 users (+33 4 79 68 56 67) [Client, Designers & Site supervision]

www.gougra.ch Projet d'adduction de Zinal, Switzerland 2010- SISOTEAM Groupement GIZ, Switzerland Preliminary design, 20 users Mr. Philippe Lazaro (+41 91 735 31 00) [Designers] , Section Sedrun, Switzerland www.ig-gbts.ch

2010- Full drawing management, incl. planning SISOTEAM IG GBTS, Switzerland Mr. Andreas Theiler and time controlling, approval process, (+41 41 226 40 51) [Client, Designers & Site Supervision] delivering and storage

Gotthard Base Tunnel, Switzerland "Raumdatenbank": management of room www.alptransit.ch Special 2010- and equipment characteristics during AlpTransit Gotthard AG, module Mr. Davide Fabbri Switzerland construction and operation stages, 50 (+41 91 735 31 11) users [Client, Designers] Cityring Luzern, Si+V Monitoring System, www.cityring.ch Switzerland SISOTEAM

2009-2013 Innovative system to perform & monitor SISOMonSys Mr. René Schnüriger ASTRA Zofingen, Switzerland secure road closure and opening pro- (+41 62 745 75 44) [Client, Designers & Site supervision] cesses, 2 servers, 160 users

Chespi Hydroelectric Project, Ecuador www.heq.com.ec

2009-2010 Hydroelectric project (dam and 250 MW SISOTEAM Mr. Fabio Micheli power plant) to supply power to Quito, 1 Consorcio LPC-Chespí, Ecuador (+593 2 2508 865) local server, 30 users [Designers]

Roveredo bypass tunnel, www.astra.admin.ch Switzerland SISOTEAM 2009-2016 ASTRA Bellinzona, Switzerland San Fedele tunnel, 2.4 km, 1 local server, SISOTUNNEL Mr. Andrea Galli [Client, Designers & Site supervisions] 20 users (+41 91 935 99 89)

Cityring Luzern, Switzerland www.cityring.ch TEAM 2009-2013 Refurbishment of 2 road tunnels and ad- SISO ASTRA Zofingen, Switzerland Mr. Franz Koch ditional works, 1 local server, 60 users (+41 62 745 75 42) [Client, Designers & Site supervision]

H 144, Route Rennaz - Les Evouettes www.sdingenierie.com Switzerland 2008-2012 SISOBUDGET SD Ingénierie, Switzerland Budget and finance controlling of the Mr. Michel Dory [Consulting Engineers] whole project H 144 (+41 21 345 81 77)

www.astra.admin.ch EP12 Bellinzona, Switzerland TEAM 2008-2010 SISO ASTRA Bellinzona, Switzerland New highway junction, 10 users Mr. Renato Guidicelli (+41 91 820 68 45) [Client & Designers]

www.siso.net List of References

v. 2016.01e | Page 4/6

Info Period Client Project Modules Contact Person

www.sdingenierie.com SD Ingénierie, Switzerland SISOTEAM 2008- BUDGET Intranet & Finance Management SISO Mr. Jean-Daniel Girard SD Ingénierie, Switzerland (+41 32 843 01 00) [Consulting Engineers]

Gotthard Base Tunnel, Switzerland www.ig-gbtn.ch SISOTEAM 2007-2011 Section Erstfeld, 7.7 km; info-server, 20 SISOTUNNEL Mr. Daniel Kassubek IG GBTN, Switzerland users (+41 41 883 11 11) [Designers & Site Supervision]

www.alptransit.ch Gotthard Base Tunnel, Switzerland SISOTEAM Mr. Renzo Simoni 2007-2011 TUNNEL AlpTransit Gotthard AG, Section Erstfeld, 7.7 km; info-server, 20 SISO (+41 41 226 06 34) Switzerland users Mr. Rupert Lieb (+41 41 226 06 59) [Client]

www.itc-ing.ch Ceneri Base Tunnel, Switzerland 15.4 km; SISOTEAM 2007-2016 TUNNEL ITC, Switzerland 1 local server, 20 users SISO Mr. Olimpio Pini (+41 91 967 28 28) [Designers & Site Supervision]

www.alptransit.ch

Ceneri Base Tunnel, Switzerland SISOTEAM Mr. Renzo Simoni 2007-2016 TUNNEL AlpTransit Gotthard AG, 15.4 km, replicated info-server, 20 users SISO (+41 41 226 06 34) Switzerland Mr. Rupert Lieb (+41 41 226 06 59) [Client] www.bouregreg.com www.cid.co.ma Tunnel Oudayas, Rabat, Maroc SISOTEAM 2007-2009 AAVB, Maroc 1'022 m, 44 Mio. €; local server, 10 users SISOTUNNEL Mr. A. C. Lahjomri [Client, Designers, Site Supervision & Con- Mr. M. N. Mouline tractor] (+212 37714735)

Canton of Geneva, Switzerland www.ge.ch/dcti/

2006- Financial controlling of all investments, SISOBUDGET Mr. Jean-Bernard Haegler Canton of Geneva, server, >20 users DCTI, DGC, Switzerland (+41 22 3274710) [Client]

Lyon-Turin Ferroviaire, www.lombardi.ch www.ltf-sas.com Descenderie de reconnaissance de Mo- SISOTEAM 2006-2008 dane, France SISOTUNNEL Lombardi SA, Switzerland Mr. Andrea Mordasini 4'000 m, 58 Mio. €; local server, 10 users (+41 91 744 60 30) [Site Supervision] www.amberg.ch IG APT, tunnel inspections SBB, Switzer- www.preisigag.ch Ingenieurgemeinschaft www.t-c.ch 2006-2009 land SISOTEAM Amberg-Preisig-Teysseire (IG APT), Switzerland web server, 10 users Mr. Flavio Modetta [Consulting Engineers] (+41 44 870 91 61)

www.siso.net List of References

v. 2016.01e | Page 5/6

Info Period Client Project Modules Contact Person

PTL Tunnel Vedeggio-Cassarate, Switzer- www.hochtief.de www.muttoni-sa.ch land SISOTEAM 2006 2'630 m, 355 Mio. CHF; local server, 10 SISOTUNNEL Consorzio CMH, Switzerland Mr. Matteo Ortu users [Contractor] (+41 91 960 29 90)

PTL Tunnel Vedeggio-Cassarate, Switzer- www.lombardi.ch land SISOTEAM 2006-2010 2'630 m, 355 Mio. CHF; local server, 10 SISOTUNNEL Mr. M. Neuenschwander Lombardi SA, Switzerland users (+41 91 873 00 50) [Site Supervision]

www.hl-ag.com www.porr.at Tunnel Wienerwald, Austria www.bilfingerberger.de 2005-2007 SISOTUNNEL ARGE Tunnel Wienerwald, 13.1 km, 256 Mio. €; local server, 10 users Austria Mr. Martin Diewald (+43 1 22825 2501) [Contractor]

Benoît Stempfel SDI Fribourg SA and www.sdingenierie.com PERSS Ingénieurs-Conseils SA, Swit- www.perss.ch Benoît Stempfel SDI Fribourg SA, zerland TEAM 2005-2008 SISO Switzerland Project and information management for Mr. Benoît Stempfel PERSS Ingénieurs-Conseils SA, Swit- both engineering consultants; local serv- (+41 26 425 43 40) zerland er, 50 users [Consulting Engineers]

UPlaNS (motorway maintenance plan- ning) of the interstate motorway A5, www.ne.ch/spch

2004-2010 Service des ponts et Switzerland SISOTEAM chaussées, Canton Mr. Adrien Pizzera 15 km, 150 Mio. CHF; web server, 100 us- (+41 32 889 67 13) Neuchâtel, Switzerland ers [Client & Designers]

Flüelen Tunnel, parallel evacuation gal- www.ur.ch lery, Switzerland 2004-2007 SISOTEAM ARGE ProFlüelen, 2.5 km, 19.4 Mio. CHF; web server, 10 us- Mr. Andreas Theiler Switzerland ers (+41 41 226 40 51) [Designers & Site Supervision]

www.tunneldufrejus.com Fréjus Tunnel, parallel evacuation gallery,

2004-2005 France/Italy SISOTEAM Mr. Alain Chabert SITAF SpA, Italy (+33 4 7920 26 00) SFTRF SA, France 12.9 km, 300 Mio. €; web server, 10 users

[Client & Designers]

www.t-l.ch/m2 Métro Lausanne-Ouchy M2, Switzerland 2004-2007 SISOTEAM SD Ingénierie Lausanne SA, 6 km, 80 Mio. CHF; web server, 10 users Mr. Dory Switzerland (+41 21 345 81 77) [Designers & Site Supervision]

Maintenance of the interstate motorway www.bar-fr.ch SISOTEAM 2003-2005 A12 (P3), Switzerland Service des autoroutes du Canton de SISOTUNNEL Mr. Roulin Fribourg, Switzerland 13 km, 100 Mio. CHF; web server, 30 users (+41 26 305 38 50) [Client & Designers]

www.siso.net List of References

v. 2016.01e | Page 6/6

Info Period Client Project Modules Contact Person

Gotthard Base Tunnel, Switzerland www.alptransit.ch Gotthard high-speed railway base tunnel, SISOTEAM Mr. Heinz Ehrbar 2002-2012 5 sections (Erstfeld, Amsteg, Sedrun, TUNNEL SISO (+41 41 226 06 25) AlpTransit Gotthard AG, , Bodio), 153 km, 8'000 Mio. CHF; Switzerland Mr. Rupert Lieb replicated info-server, 20 users (+41 41 226 06 59) [Client]

Gotthard Base Tunnel, Switzerland www.ig-gbts.ch Sections Bodio, Faido and Sedrun, 37.9 SISOTEAM 2002-2012 TUNNEL IG GBTS, Switzerland km; SISO Mr. M. Neuenschwander (+41 91 744 60 30) [Designers & Site Supervision] 3 local servers, 60 users

Gotthard Base Tunnel, Switzerland www.ig-gbtn.ch SISOTEAM 2002-2012 Section Amsteg, 11.35 km; local server, SISOTUNNEL Mr. Stefan Muff IG GBTN, Switzerland 20 users (+41 41 884 85 88) [Designers & Site Supervision]

Lötschberg Base Tunnel, Switzerland www.blsalptransit.ch Lötschberg high-speed railway base tun- nel, SISOTEAM Mr. Peter Teuscher 2001-2007 TUNNEL AlpTransit Lötschberg AG, 3 sections (Mitholz, Ferden, Steg/), SISO (+41 33 225 79 70) Switzerland 88 km, 1'700 Mio. CHF; replicated info- Mr. M. Werner (+41 33 225 79 79) [Client] server, 20 users

Lötschberg Base Tunnel, Switzerland www.blsalptransit.ch SISOTEAM 2001-2006 Section Ferden, 12.2 km; local server, 10 SISOTUNNEL Mr. Priller IG öBL Ferden, Switzerland users (+41 27 938 88 20) [Designers & Site Supervision]

Lötschberg Base Tunnel, Switzerland www.blsalptransit.ch SISOTEAM 2001-2006 Section Mitholz, 8.7 km; local server, 10 TUNNEL IG BBA-BL, Switzerland SISO Mr. Hinguely users (+41 33 672 75 75) [Designers & Site Supervisions]

Lötschberg Base Tunnel, Switzerland www.blsalptransit.ch SISOTEAM 2001-2006 Section Steg/Raron, 10.2 km; local server, IG LöB-S/R, Switzerland SISOTUNNEL Mr. Antille 10 users [Designers & Site Supervisions] (+41 27 935 82 85)

Gotthard Base Tunnel, Switzerland www.lombardi.ch SISOTEAM 2000-2002 Lombardi Engineering Ltd., Section Bodio, 'Transport adit' (551), SISOTUNNEL Mr. M. Neuenschwander Switzerland 3162 m; local server, 10 users (+41 91 744 60 30) [Designer & Site Supervisions]

Appenninic Base Tunnel, Motorway A1 www.autostrade.it 1998-2000 Bologna - Florence. Italy P0856 Società Autostrade SpA, Italy Pilot adits, 8.6 km; local server, 20 users Mr. T. Merletti [Client & Site Supervisions]

www.siso.net