Agenda Item No. 8 Appendix A APPENDIX A – South Mid County Local Committee Infrastructure Plan

Proposed New Priorities

Parish Council Parking Scheme

• Leylands Road, – Traffic Calming Measures

• Chanctonbury Road, Burgess Hill – Parking and Traffic Congestion

• A272 – Request for a Crossing

Existing Priorities

• Village Enhancements – High Street (B2116), . • Queen Elizabeth Avenue Boulevard Project – supporting measures including cycling facilities (only on the South Side), coordinated with new street lighting, carriageway resurfacing and tree planting. • Safer Routes to Schools Project at Manor Field School, Burgess Hill. • School Safety Zone at Birchwood Grove/ Newick House Schools, Burgess Hill • Public Right of Way Improvements – footpath 12BH between Folders Lane and Thatchers Close, Burgess Hill. • Creation of a ramp/sloping footpath at the steps by Burnside on the Victoria Park industrial estate, Burgess Hill. • Introduction of Pedestrian Crossing Phase - Stone Pound Crossroads, Hassocks (additional pedestrian phases in particular to serve the Road/ Eastern arm). • Replacement pedestrian and cycle bridge over railway line between St. Wilfrids Close and Cants Lane.

Community issues list South Mid Sussex CLC

Description of issue Area Possible solutions and suggested ideas for schemes TRO. Albourne Road (B2116), Western Hurstpierpoint 1. TRO/IP Scheme Road & High Street. 2. Candidate for a wider scheme incorporating other roads in Hurstpierpoint: Concerns about parking Hurstpierpoint obstructing visibility and vehicles passing 3. Review of current TRO each other. Request for Speed Calming 4. Part of the Hurstpierpoint Parking and Traffic Working Measures or measures aimed allowing for Group Initiative a ‘give-n-take’

Confirm cases 604507; 308614; 308532; 289750; 281477; 278035; 277762; 276546 Victoria Avenue, Burgess Hill. Burgess Hill 1. Signage Scheme Concerns for Road Safety, Noise Pollution 2. Funding sources raised by locals on Victoria Avenue 3. Awareness raising resulting from presence of HGV accessing the route on way to Victoria Industrial Business Park. Request for HGV Restrictions accessing Victoria Avenue from Royal George Avenue.

A272 Bolney. Bolney Parish 1. IP process High volume of vehicles using A road. Council 2. Explore possibility of Village Gates and Crossing. Perceptions of speeding issues and 3. TRO to reduce current speed from 40mph to 30mph accidents on the road. Concerns for 4. Explore possibility of a crossing (involve School Travel residents’ and school children safety. Team) Parish and locals have in the past 5. Engage school to review school travel plan requested for a traffic controlled crossing just before the filling station. A request has also been made for village gates. Filling station is the main shop in the area.

Petition received from locals

Area around Glebe Cottage, is Poynings 1. Possible Operation Watershed monies constantly flooding and is a cause for 2. Engage Highways colleagues to carry out reactive stuff concern for the safety of road users and locals alike.

Chanctonbury Road. Parking and Traffic Congestion Burgess Hill IP Process Proposals for creation of parking spaces at the top of Chanctonbury Road especially the area with the grass screet. Proposals for laybys and junction protections have been costed.

Victoria Way, Burgess Hill (CONFIRM Burgess Hill 1. TRO process requiring local member support 604660). 2. Demonstration of local support e.g. petitions/signatories Concerns for Road Safety especially 3. Site visits already carried with traffic engineer and local entries to businesses being blocked by member. cars/Trucks parked on or mounting pavements. Problem made worse by driving school companies using route. Need to deal with indiscriminate parking

Cycle Path Scheme Hassocks 1. Partnership Approach (WSCC, Parish, MSDC, ) 2. IP Process

Fairfield Road, Burgess Hill. Burgess Hill 1. TRO Process Petition Request from Residents for DYLs 2. Discussed to protect access to residential area. CONFIRM: 606012 Malthouse Lane, Hurstpierpoint 1. TRO Process Hurstpierpoint: Reduction of current speed 2. Evidence of community and member support has already limit of 60mph to 40mph been demonstrated 3. Traffic Survey Data been requested for (September) deployment

4. Alternative localised measures

Ref 606073 SPEEDING: VALEBRIDGE Burgess Hill 1. Signage ROAD, BURGESS HILL. 2. Alternative local solutions e.g. policing and neighbourhood 30mph area with signage, however speed watch residents are of view that there is excessive speeding. Request for repeater signs, red ash grip or road markings.

Isaacs Lane, Burgess Hill. Burgess Hill 1. IP Process Request for Traffic Calming Measures to 2. Evidence of locals and member support deal with high volume and speeding 3. Possible local solutions e.g. policing, Operation Air-walk vehicles on this road. Residents and the and Speed Indicator Device local member have expressed concerns for 4. Community Speed Watch safety and there have been a number of accidents and near misses Leylands Road Burgess Hill 1. IP Speeding Calming Measures on Leylands 2. Evidence of local member and community support Road, Burgess Hill. Request for permanent 3. Other localised measures 30mph flashing signs on both ends of the road Malthouse Lane Hurstpierpoint 1. TRO Request for speed reduction (TRO) from 2. Evidence of local member and community support 60mph to 40mph. Area has no public 3. Other localised measures footpath but is used by horse riders. An e- petition is currently being completed and matter brought to attention of MP Soames. If TRO not achievable, warnings signs could be best alternative. Lane, Albourne Twineham 1. IP Request to upgrade junction B2116 and 2. Evidence of local member and community support Twineham Lane to include one-way system following a spate of complaints of overspeeding from members of the public, local member and parish council.

Albourne Road, Hurstpierpoint Hurstpierpoint 1. IP/TRO process Request for a crossing/access to footpath 2. Evidence of local member support over the verge by Paykins Court and 3. Funding sources possible reduction of speed. Bolney Chapel Road, Hurstpierpoint Twineham 1. IP Process Request for reduction of speed from 2. Evidence of local member and community support (petition current 40mph to 30mph and if possible, already in place) Speed Calming Measures especially areas 3. Traffic data requested (September deployment) where there are residential dwellings e.g. the school and the area close to Bob Lane. Junction Stonepound, Hassocks (Ref Hassocks/ 1. IP process 607204) Hurstpierpoint 2. Evidence of community and member support 3. Alternative solutions Request to turn junction of Stonepound, Hassocks into a Roundabout Middle Way (Ref 607171) Burgess Hill 1. IP process Request for CPZ on Middle Way, Burgess 2. Evidence of parish, community and member support Hill 3.

Birchwood Grove Road Request to turn road to a ONE-WAY Burgess Hill 1. IP Process STREET 2. Evidence of community and local member support

Hassocks Parish Council Parking Hassocks 1. IP priority Scheme 2. Request follows several complaints and presentations from local residents regarding challenges with parking in the Parish Council request for a review of area parking across the parish 3. Parish has already commissioned a consultation exercise followed by a comprehensive reporting identifying challenges and then outlining suitable solutions. 4. Suggestions for this to be delivered as a parish-wide scheme

Hurstpierpoint Parish Council Parking Hurstpierpoint 1. IP priority and Traffic Scheme 2. Request follows several complaints and presentations from local residents regarding challenges with parking in the area 3. Parish has commissioned a study to identify major challenges and suggest suitable solutions 4. Delivered through Hurstpierpoint Parking & Traffic Working Group