Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore New Lines (PH-11) 1 Amravati- Narkher (138km) 668.34 Commissioned 100% 2 Ahmednagar- Beed-Parli Vaijnath 3712.50 Work in Progress 59% (250km) 3 Baramati-Lonand(54 Kms) 736.44 Work in Progress 50% Over all

4 Wardha-Nanded (285 km) 3168.00 Work in Progress 16% 5 Indore-Manmad via Malegaon (368km) 8857.98 DPR under sanction - (Transferred to IPRCL by Rly.Board) 6 Pune - Nasik (265 km) 5341.68 MRIDL has been asked to - study and decide whether they would like to take up the project. They have submitted preliminary report C. Rly’s comments on the same have been sent to Board. 7 Vaibhavwadi-Kolhapur(107 km) 3438.49 DPR with Detailed - estimate sanctioned by Railway Board vide letter dtd. 19.08.2019. 8 Karad – Chiplun ( 112 km) 2953.84 DPR under sanction - 9 Jeur-Ashti- 78 Km. 1101.00 DPR under sanction - 10 Phaltan- Pandharpur 105 Km. 1153.00 DPR under sanction - 11 Hatkanangale- Ichalkaranji. 8 Km. 191.59 DPR under sanction - 12 Solapur- Tuljapur – Osmanabad 84.44 904.92 DPR under preparation - Km. 13 Dhule (Borvihi) – Nardana (Umbrella 492.76 Rly. Board is requested to - work) 50.6 Km decide executing agency 14 -Murbad via 726.46 FLS & DPR in process - (Umbrella work) 28 Km Gauge Conversion (PH-14)

1 Pachora- Jamner with extension upto 850.00 New Work 2019-20 - Malkapur-Narrow gauge to broad gauge Doublings (PH-15) 1 Pen - Roha (40 kms) 389.73 Commissioned 100% 2 Godhani-Kalumna chord (13.7km) 59.13 Completed 100% (6 Km C.Rly) (CR Portion 5.465 km) 3 Kalyan-Kasara 3 rd line. 792.89 Work in Progress 25% 4 Third line between Bhusawal-Jalgaon 305.00 Work in progress 50% 5 Wardha – Sewagram NGP 3 rd line 540.02 Work in Progress 42% 6 Constn of 3rd line between Teegaon 175.66 Work in Progress 85% and chichonda 7 Wardha - Ballaharshah 3rd line 1272.19 Work in Progress 22% 8 Itarsi-Nagpur (Bal. 3rd line) 2449.91 Work is in progress. 16% 9 Pune-Miraj- Londa 2436.57 Work in progress 25% 10 Daund- Manmad (236 Kms) 2081.27 Work is in progress. 5% 11 Manmad- Jalgaon 3rd line(160Kms) 1035.16 Work is in progress. 15% 12 Wardha- Nagpur 4th line (76Kms) 637.95 Work is in progress. 20% Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore 13 Jalgaon- Bhusawal 4th line (24 Kms) 261.37 Work is in progress 35% 14 Igatpuri-Manmad 124 Km. 1860.00 Fixing of agency for FLS, - Detail Est. & Detail Engg. In process Traffic Facility Works (PH-16) 1 Bagmar-Loop lines in both directions 11.67 Completed 100% 2 Igatpuri Extn. of PF line No. 1,2,3,4 19.01 Completed 100% for 24coaches 3 Kasara – Extension of 3 R&D lines in 19.99 Work in Progress 68% UP yard & 3 R&D lines in DN Yard. 4 – Extn of R&D lines connecting 34.76 Work in Progress 46% UP yard to Karjat-PNVL line & 4 th line between KJT- Palasdari 5 Jalgaon yard remodeling 31.30 Completed 100% 6 Akola-Yard remodeling 6.10 Completed 100% 7 Kalamboli Yard-2 nd goods line 9.24 Completed 92% 8 Lokmanya Tilak Terminus - 64.10 Work in Progress 12% Augmentation of coaching facilities 9 Panvel - Kalamboli coaching terminus 154.00 Work in Progress 36% (Phase-I) (Stage-I) (1/3Rly.+2/3 CIDCO) 10 Wardha-Chidoda-2nd goods line 21.08 Work in Progress 10.5% 11 CSTM Exn. Of platform 60.48 Work in Progress 10% Nos.10,11,12,13 for dealing 24. 12 Itarsi- Amla-Nagpur- Wardha-BSL- 58.02 Work transferred to Open - Jalgaon (713.88 Km.) Longer Loop Line 13 Pune - Daund - Chord line for 29.10 Completed 100% connecting with 14 Bhusawal - Separate up & down main 49.67 Work is being done by 10% lines Open Line 15 Pune - Extension of platform for 51.85 Work in progress. 2% 24/26 16 Hadapsar - Development as satellite 34.71 Work in progress. 57% terminal 17 Ajni - Development as satellite 45.33 Work in Progress 20% terminal 18 Kalyan-Segregation of long distance 961.25 Detailed estimate under - and suburban Traffic and unification of preparation Goods Yard (Part of MUTP-III/A ) 19 Parel-Development of coaching 194.20 DPR under preparation. - complex for long distance tranis in place of workshop area (Umbrella Work) Road Saftey Works (ROB/RUBs) Latest (PH-30) Anticipated Cost (Rly’s Share) 1 Niphad Road Over Bridge 6.45 Rly. Portion completed 100% 2 Vikhroli ROB 10.23 Work in Progress 60% 3 Kalyan -ROB 47/B 9.29 Rly. Portion Completed 100% 4 Narkhed-Road Over Bridge 8.49 Completed. 100% 5 Nagargaon – ROB in lieu of LC gate 10.08 Tender awarded - No.32

Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore 6 Rajapath – ROB in lieu of LC gate 13.50 Work in Progress 90% No.S-4 7 Mhasawad ROB in lieu of LC no. 144 9.55 Rly. Portion completed. 100% 8 Nandgaon-Chalisgaon Nagar Road 11.27 Completed 100% ROB in 9 Diva-ROB in lieu of level crossing 14.24 Tender awarded. 1% No.29-C 10 Thakurli-ROB in lieu of level crossing 6.96 Completed. 100% No.38- 11 -Kalyan-ROB in lieu of level 10.61 Rly. Portion completed 100% crossing No.28/C(Kharegaon) 12 Jawaharlal Nehru Port Trust Jasai 11.47 Work is in progress. 20% ROB in lieu of level crossing No.2 13 Diva-Vasai-ROB in lieu of level 3.205 Tender awarded. - crossing No.9 14 Panvel-Roha RUB in lieu of level 3.33 Work is in progress. 65% crossing No.20 15 Panvel-Jasai RUB in lieu of level 6.86 Completed. 100% crossing No.26 16 Panvel-Jasai ROB in lieu of level 3.205 Tender awarded. - crossing No.23 17 Diva-Panvel ROB in lieu of level 3.20 Work is in progress 10% crossing No.6 18 Diva-Vasai ROB in lieu of level 3.20 Work is in progress 30% crossing No.4 19 Diva-Vasai ROB in lieu of level 3.20 Work is in progress 7% crossing No.8 20 Jasai-JawaharLal Nehru Port Trust 3.20 Work is in progress. 20% ROB in lieu of level crossing No.3 21 Diva-Panvel ROB in lieu of level 3.20 Planning Stage. - crossing No.9/C 22 Diva-Vasai ROB in lieu of level 7.09 Planning Stage. crossing No.1 23 Diva-Panvel RUB in lieu of level 9.49 Work is in progress. 60% crossing No.10 24 Diva-Vasai ROB in lieu of level 3.20 Work is in progress 25% crossing No.6 25 Gulbarga ROB construction of 17.53 Rly. Portion completed. 100% (Afzalpur) ROB LC- 83 B 26 Daund-Solapur ROB in lieu of level 11.92 Work in Progress. - crossing No.23 27 Chindwara-ROB in lieu of level 10.80 Work in Progress. 20% crossing No.PC-18 28 Kalyan-Igatpuri Road over bridge in 6.49 Tender awarded - lieu of level crossing No.51 29 Pune-Miraj-ROB in lieu of level 10.46 Completed 100% crossing No.130 30 Wadi Yard-ROB in lieu of LC No.3( 2 10.01 Tender awarded lane) 31 Solapur-Wadi-ROB in lieu of level 14.03 Tender awarded - crossing No.66 32 Solapur-Wadi-ROB in lieu of LC- 10. 89 Planning Stage - 91(2Lane)

33 Solapur-Wadi-ROB in lieu of level 13.50 Tender awarded -- crossing No.82 Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore 34 Bhusaval-Badnera-Road over bridge 13.33 Tender awarded - in lieu of level crossing No.7 35 Diva-Panvel RUB in lieu of level 3.85 Tender awarded 20% crossing No.2 36 Bhusaval-Khandwa (Nimbhora)- Road 14.38 Tender awarded over bridge in lieu of level crossing No. 162 37 Igatpuri-Bhusaval (Kajgaon) - Road 13.69 Tender awarded 50% over bridge in lieu of level crossing No.126 38 Bhusaval-Khandwa (Savda) - Road 17.39 Tender awarded 20% over bridge in lieu of level crossing No. 169 39 Pune-Daund - Road over bridge in lieu 12.20 Work is in progress 50% of level crossing No. 3A atManjari 40 Panvel-Jasai - Subway in lieu of level 1.88 Completed 100% crossing No.21 ROB Transferred to Rail Infrastructure Development Limited (MRIDL) 1 Pulgaon-Road Over Bridge 6.07 Transferred to MRIDL 1% 2 Jalgaon ROB in lieu of LC no. 147 17.50 -do- -

3 Pune-Miraj-ROB in lieu of level 8.02 -do- crossing No.109 4 Wardha-Nagpur Road over bridge in 12.94 -do- - lieu of level crossing No.111 near Butibori village 5 Daund-Solapur ROB in lieu of level 10.75 -do- - crossing No.21 6 Karjat-Lonavala-Road over bridge in 7.43 -do- - lieu of of level crossing No.30 7 Wardha-Nagpur Road over bridge in 10.86 -do- - lieu of level crossing No.103 near Sindi 8 Babupeth-Road over bridge in lieu of 12.83 -do- - level crossing No.43/A & Chanda fort 9 Igatpuri-Bhusaval- (near Kherwadi)4 10.08 -do- - lane Road over bridge in lieu of level crossing No.95 10 Bhusaval-Badnera (Nandura Yard) - 9.60 -do- - Road over bridge in lieu of levelcrossing No.20 11 Bhusaval-Khandwa (Raver) - Road 8.87 -do- - over bridge in lieu of level crossing No. 171 12 Pune-Miraj - Road over bridge in lieu 9.13 -do- - of level crossing No. 47 13 Igatpuri-Bhusaval (Asoda) - Road over 10.34 -do- - bridge in lieu of level crossing No.149 14 Miraj - Kolhapur - Road over bridge in 9.13 -do- -- lieu of level crossing No.20 15 Pune-Miraj - Road over bridge in lieu 9.13 -do- - of level crossing No.81 16 Miraj-Hubli - Road over bridge in lieu 9.13 -do- - of level crossing No. 465 Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore 17 Pune - Miraj - Road over bridge in lieu 14.85 -do- - of level crossing No.92 18 Pune - Miraj - Road over bridge in lieu 16.50 -do- - of level crossing No.96 19 Pune - Miraj - Road over bridge in lieu 17.10 -do- - of level crossing No.112 20 Nasik Road - Devlali- Road over 10.92 -do- - bridge in lieu of level crossing No.90 21 Chandur Yard - Road over bridge in 14.10 -do- - lieu of level crossing No.70 22 Amla-NGP-2 lane ROB in lieu of level 8.25 -do- - xing No. 290 23 Amla-NGP-2 lane ROB in lieu of level 8.25 -do- - xing No. 282/A 24 Amla-NGP-2 lane ROB in lieu of level 8.25 -do- - xing No. 288/A 25 Amla-NGP-2 lane ROB in lieu of level 8.25 -do- - xing No. 282/B 26 Amla-NGP-2 lane ROB in lieu of level 8.25 -do- - xing No. 290/B 27 Wardha-Ballharshah 2 lane ROB in 8.25 -do- - lieu of level Xing No. 42 28 Amla- NGP -2 lane ROB in lieu of L- 8.25 -do- - Xing No. 293 29 NGP-Wardha- 2 lane ROB in lieu of 8.25 -do- - level Xing No. 108 30 Wardha-Ballharshah 2 lane ROB in 8.25 -do- - lieu of level Xing No. 19 31 Wardha-Ballaharshah 2 lane Road 8.25 -do- - over bridge in lieu of level xing No. 27 32 Wardha-Ballaharshah 2 lane Road 8.25 -do- - over bridge in lieu of level xing No. 34 33 Wardha-Ballharshah 2 lane ROB in 8.25 -do- - lieu of level Xing No. 40 34 Tadali-Ghugus 2 lane ROB in lieu of 7.44 -do- - level xing No. 39/G 35 NGP-Wardha- 2 lane ROB in lieu of 8.25 -do- - level Xing No. 116 36 Tadali-Ghugus 2 lane ROB in lieu of 7.44 -do- - level xing No. 39/A 37 Wardha-Badnera 2 lane ROB in lieu of 8.25 -do- - level Xing No. 74 38 Amla -Nagpur- 2 lane ROB in lieu of 8.25 -do- - level crossing No. 282 39 Bilavadi Yard Road over bridge in lieu 18.18 -do- - of level xing gate No. 117 40 Bilavadi- Nandre Road over bridge in 12.92 -do- - lieu of level xing gate No. 119 41 Murtizapur- Yard in lieu of level xing 9.18 -do- - No. 50/A 42 Panvel-Roha Road over bridge in lieu 9.87 -do- - of Padma level crossing gate No. 52 43 Panvel -Roha Road over bridge in lieu 15.83 -do- - of Ashtmi level crossing gate No. 57 Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore 44 Badnera-Amravati-Proposed 8.35 -do- - construction of ROB in liue of existing LC No. S-1 at Kms. 664/11-12 on BD- AMI section on cost sharing basis (WP No: 30003) (Umbrella Work ) 45 Badnera-Amravati-Proposed 7.89 -do- - construction of ROB in liue of existing LC No. S-3 at Kms. 668/08-09 on BD- AMI section on cost sharing basis (WP No: 30004) (Umbrella Work ) ROB Transferred to Other agency (NHAI & NMRCL) 46 Ahmednagar- Daund ROB in lieu of 10.25 Transferred to NHAI - LC no. 12 with land acquisition for approaches SH no.60 47 NGP-Wardha 2 lane ROB in lieu of 8.25 Transferred to NMRCL - level Xing no 120 S&T Works (PH-33) - 1 Pune-LNL-track circuiting with ABS 32.27 Work in Progress 80% (122.83 km) (B route) 2 Bhusawal Goods Yard -Repl. of worn 16.14 Completed 100% out level of points & signals & merger of GC-2, GC-4 with 3 C.Rly isolation & upgradation 19.98 Completed 100% alteration of signals (9 stations) 4 Kamshet-Pune-Track equipment of 4.35 Work in Progress 40% auxillary warning system Workshops & Sheds (PH-42) 1 Matunga – Modernization of workshop 39.88 Completed 100% 2 Wadi Bunder – Four maintenance 46.06 Work in progress 60% sidings and extension of IOH shed 3 Pune(Diesel loco shed)-Infrastructural 9.99 Completed 100% maintenance 4 Pune diesel loco shed augmentation of 29.45 Planning Stage capacity by 50 HP diesel locos 5 Ajni TRS – augmentation of homing 15.58 Completed 100% capacity of Electric Locoshed from 175- 200 loco. 6 Nasik Road- Setting up of shop for 52.78 Detailed Estimate - overhauling/repairing of wheels sanctioned traction machine workshop Staff Welfare (PH-51) 1 Pune – Transit Type IV-24 units 6.50 Completed 100% 2 Parel - RB I (80 units) & RB-II qrs 8.43 Work in progress 18% 24 units 3 Pune Divn - Type-II - 77 units 7.33 Completed 100% 4 Pune – Type V-10 units & type-Spl 5.83 Completed 100% unit 5 Mahalakshmi Chawl .Replacement 36.95 Planning stage. - of quarters K type with RB- II-151 units. 6 BB/GS Repl.of AC Plant of 3.23 Completed 100% auditorium and operation theatre, post-operative & ICCU at Byculla Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore Hospital 7 Byculla Hospital-construction of 4.31 Completed 98% patients rest house 8 PA const. of officers club for new 3.29 Completed 100% divn. Passenger Amenities (PH-53) 1 Kalyan - Remodelling & 4.65 Completed 100% improvement of station 2 LTT - New station building. 23.96 Completed 100% 3 LTT – Integration of new station 10.82 Completed 100% building by sub-way. 4 Amravati New terminal station 6.62 Completed 100% building with circulating area & new P/F 5 Amravati washable apron 2.95 Completed 100% 6 Daund: Repl. of existing FOB at 8.99 Completed 100% Solapur end by 6m wide. 7 Pune – Widening of existing centre 11.64 Completed 100% FOB by 12 m & provision of ramp in 2 n d FOB at MB end Other Specified Works (PH-64) 1 Pune New Division 24.51 Completed 100% 3 Thakurli – Const of 12 th battalion 56.00 Work in Progress 60% Rly Protection 4 Pune – Setting up of balance 8.76 Completed 100% divisional office (Phase-II) 5 Mulund – Construction of G + 2 ½ 3.08 Completed 100% structures for RPF Barrack 6 CST Mumbai – Construction of 6.80 Work in Progress 65% new running room 7 Nagpur setting up of Indian Rly. 21.25 Planning stage - Institute Adv. Electrical Technology. Training/HRD (PH-65) 1 New IRICEN bldg -Ph I 8.38 Completed 100% 2 Nasik Road -Shifting of RPF 6.59 Completed 100% training centre 3 New IRICEN bldg -Ph-II 16.32 Completed 100% 4 Nasik-Facilities for training of 15.70 Completed 100% electrical supervisors 5 Byculla-Centralised hostel building 5.26 Work in Progress 40% at S&T Workshop 6 ZRTI BSL – const. of Hostel 7.69 Completed 100% 7 Pune – Centralised training Institute 8.59 Completed 100% for supervisors of Engineering department. 8 Pune(Koregaon Park): 53.3 Transferred to MRVC. - Development of addl. Infrastructural facilities for IRICEN.

Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipate (upto Aug’19) of Progress d Cost in Approx. Rs.Crore MTP Projects On cost sharing with CIDCO) PH-81 1 Belapur- PNVL- Doubling of 437.78 Completed 90% commuter line as part of East-West corridor 10.9Km 2 Thane-Turbhe-Nerul-Vashi-Part of 564.56 Completed 95% Corridor No.1 in New Mumbai

3 Belapur-Seawood-Uran-Electrified 1781.98 Work in Progress 82% double line MUTP(III) 4 Kalyan-Asangaon 4th line 1759.16 DPR under preparation - MRVC Projects 1 EMU maintenance facilities II 95.95 Work in Progress 85 % 2 Stabling lines II 93.97 Work in Progress 80% 3 CSTM-Kurla 5 th & 6 th Line 890.89 Work in Progress 22%