Willamette Basin Reservoirs
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Oregon Historic Trails Report Book (1998)
i ,' o () (\ ô OnBcox HrsroRrc Tnans Rpponr ô o o o. o o o o (--) -,J arJ-- ö o {" , ã. |¡ t I o t o I I r- L L L L L (- Presented by the Oregon Trails Coordinating Council L , May,I998 U (- Compiled by Karen Bassett, Jim Renner, and Joyce White. Copyright @ 1998 Oregon Trails Coordinating Council Salem, Oregon All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or any information storage or retrieval system, without permission in writing from the publisher. Printed in the United States of America. Oregon Historic Trails Report Table of Contents Executive summary 1 Project history 3 Introduction to Oregon's Historic Trails 7 Oregon's National Historic Trails 11 Lewis and Clark National Historic Trail I3 Oregon National Historic Trail. 27 Applegate National Historic Trail .41 Nez Perce National Historic Trail .63 Oregon's Historic Trails 75 Klamath Trail, 19th Century 17 Jedediah Smith Route, 1828 81 Nathaniel Wyeth Route, t83211834 99 Benjamin Bonneville Route, 1 833/1 834 .. 115 Ewing Young Route, 1834/1837 .. t29 V/hitman Mission Route, 184l-1847 . .. t4t Upper Columbia River Route, 1841-1851 .. 167 John Fremont Route, 1843 .. 183 Meek Cutoff, 1845 .. 199 Cutoff to the Barlow Road, 1848-1884 217 Free Emigrant Road, 1853 225 Santiam Wagon Road, 1865-1939 233 General recommendations . 241 Product development guidelines 243 Acknowledgements 241 Lewis & Clark OREGON National Historic Trail, 1804-1806 I I t . .....¡.. ,r la RivaÌ ï L (t ¡ ...--."f Pðiräldton r,i " 'f Route description I (_-- tt |". -
In the Upper Blue River Drainage of the Mckenzie River Ranger District, Willamette National Forest
FY2009 ISSSP Surveys for Salamander Slug [aka Axetail Slug] (Gliabates oregonius) in the Upper Blue River drainage of the McKenzie River Ranger District, Willamette National Forest. Authored by Joe Doerr and Tiffany Young, Wildlife Biologists, Willamette National Forest, 10/20/2009. In 2008, the salamander slug (Gliabates oregonius), also known as the axetail slug, was added to the sensitive species list for the Bureau of Land Management and the Forest Service in the Pacific Northwest. This species was first described as Gliabates oregonia from specimens collected in north-central Lane County (Webb 1959). The scientific name was subsequently changed to Gliabates oregonius by other researchers (Tom Burke personal communication). Gliabates oregonius is classified a S1 species endemic to Oregon and confirmed from a handful of locations in the Cascade and Coast Ranges within the Willamette River drainage. The mollusk is reported associated with conifer and leaf litter in Douglas-fir (Psuedotsuga menziesii) and western hemlock (Tsuga heterophylla) forest habitat. Due to its apparent low abundance and association with forest habitat, there is considerable potential for negative impacts from silvicultural activities, such as logging, fuel treatments and prescribed burning. There is a management need to better understand the abundance and distribution of this species. Following its inclusion on the sensitive species list, biologists on the McKenzie River Ranger District reviewed previous mollusk surveys conducted under the “Survey and Manage Program”. In their review they found a high number of reported detections of axetail slugs in the upper portion of the Blue River drainage. The reports showed detections of 139 individuals at 86 locations during surveys in the fall of 1998 and the spring of 1999 connected with a timber sale planned in that area. -
Endangered Species Act Biological Opinion and Magnuson-Stevens
UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NA TIO NAL MARINE FISHERIES SERVICE 1201 NE Lloyd Boulevard. SUite 1100 PORT LAND, OREGON 97232·1274 January 11 , 2013 Lorri Lee Pacific Northwest Regional Director U .S. Bureau ofReclamation 1160 North Curtis Road, Suite 100 Boise, Idaho 83706-1234 Re: Endangered Species Act Section 7(a)(2) Biological Opinion and Magnuson-Stevens Fishery Conservation and Management Act Essential Fish Habitat Consultation for the U.S. Bureau of Reclamation's Odessa Subarea Modified Partial Groundwater Replacement Project. (NWR-2012-9371) Dear Ms. Lee: Enclosed is the Endangered Species Act (ESA) Biological Opinion and Magnuson-Stevens Fishery Conservation and Management Act (MSA) Essential Fish Habitat (EFH) Consultation prepared by National Marine Fisheries Service (NMFS) regarding the U.S. Bureau of Reclamation's (Reclamation) Odessa Subarea Modified Partial Groundwater Replacement Project on the Colwnbia River in Adams, Lincoln, Franklin and Grant Counties, Washington. NMFS received a final biological assessment (BA) from Reclamation on November 6, 2012. Reclamation's BA determined that Columbia River chum salmon were likely to be adversely affected by the proposed action, 12 other species ofESA listed salmon and steelhead would not likely be adversely affected by the proposed action, and that Pacific eulachon, green sturgeon, and southern resident killer whales would not likely be adversely affected by the proposed action. NMFS disagreed with Reclamation's "Not Likely -
Mckenzie River Sub-Basin Action Plan 2016-2026
McKenzie River Sub-basin Strategic Action Plan for Aquatic and Riparian Conservation and Restoration, 2016-2026 MCKENZIE WATERSHED COUNCIL AND PARTNERS June 2016 Photos by Freshwaters Illustrated MCKENZIE RIVER SUB-BASIN STRATEGIC ACTION PLAN June 2016 MCKENZIE RIVER SUB-BASIN STRATEGIC ACTION PLAN June 2016 ACKNOWLEDGEMENTS The McKenzie Watershed Council thanks the many individuals and organizations who helped prepare this action plan. Partner organizations that contributed include U.S. Forest Service, Eugene Water & Electric Board, Oregon Department of Fish and Wildlife, Bureau of Land Management, U.S. Army Corps of Engineers, McKenzie River Trust, Upper Willamette Soil & Water Conservation District, Lane Council of Governments and Weyerhaeuser Company. Plan Development Team Johan Hogervorst, Willamette National Forest, U.S. Forest Service Kate Meyer, McKenzie River Ranger District, U.S. Forest Service Karl Morgenstern, Eugene Water & Electric Board Larry Six, McKenzie Watershed Council Nancy Toth, Eugene Water & Electric Board Jared Weybright, McKenzie Watershed Council Technical Advisory Group Brett Blundon, Bureau of Land Management – Eugene District Dave Downing, Upper Willamette Soil & Water Conservation District Bonnie Hammons, McKenzie River Ranger District, U.S. Forest Service Chad Helms, U.S. Army Corps of Engineers Jodi Lemmer, McKenzie River Trust Joe Moll, McKenzie River Trust Maryanne Reiter, Weyerhaeuser Company Kelly Reis, Springfield Office, Oregon Department of Fish and Wildlife David Richey, Lane Council of Governments Kirk Shimeall, Cascade Pacific Resource Conservation and Development Andy Talabere, Eugene Water & Electric Board Greg Taylor, U.S. Army Corps of Engineers Jeff Ziller, Springfield Office, Oregon Department of Fish and Wildlife MCKENZIE RIVER SUB-BASIN STRATEGIC ACTION PLAN June 2016 Table of Contents EXECUTIVE SUMMARY ................................................................................................................................. -
Oakridge-Westfir Community Trails Plan
Oakridge-Westfir Community Trails Plan The Oakridge-Westfir Community Trails Committee and the Oakridge-Westfir Area Chamber of Commerce with assistance from the National Park Service Rivers, Trails and Conservation Assistance Program Table of Contents Table of Contents........................................................................................................... i Acknowledgments........................................................................................................ iii Executive Summary ...................................................................................................... 1 Planning Process .......................................................................................................... 3 Purpose .....................................................................................................................................................................3 Steps in the Trails Plan Process ................................................................................................................................3 Community Involvement ..........................................................................................................................................4 Background and History............................................................................................... 6 Economic Development................................................................................................ 7 Benefits of Non- Motorized Trails ............................................................................... -
Analyzing Dam Feasibility in the Willamette River Watershed
Portland State University PDXScholar Dissertations and Theses Dissertations and Theses Spring 6-8-2017 Analyzing Dam Feasibility in the Willamette River Watershed Alexander Cameron Nagel Portland State University Follow this and additional works at: https://pdxscholar.library.pdx.edu/open_access_etds Part of the Geography Commons, Hydrology Commons, and the Water Resource Management Commons Let us know how access to this document benefits ou.y Recommended Citation Nagel, Alexander Cameron, "Analyzing Dam Feasibility in the Willamette River Watershed" (2017). Dissertations and Theses. Paper 4012. https://doi.org/10.15760/etd.5896 This Thesis is brought to you for free and open access. It has been accepted for inclusion in Dissertations and Theses by an authorized administrator of PDXScholar. Please contact us if we can make this document more accessible: [email protected]. Analyzing Dam Feasibility in the Willamette River Watershed by Alexander Cameron Nagel A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in Geography Thesis Committee: Heejun Chang, Chair Geoffrey Duh Paul Loikith Portland State University 2017 i Abstract This study conducts a dam-scale cost versus benefit analysis in order to explore the feasibility of each the 13 U.S. Army Corps of Engineers (USACE) commissioned dams in Oregon’s Willamette River network. Constructed between 1941 and 1969, these structures function in collaboration to comprise the Willamette River Basin Reservoir System (WRBRS). The motivation for this project derives from a growing awareness of the biophysical impacts that dam structures can have on riparian habitats. This project compares each of the 13 dams being assessed, to prioritize their level of utility within the system. -
Response to Watershed Analysis Amendment Request
Upper Middle Fork Watershed Analysis Update Response to the Watershed Analysis Amendment Request Listed below are analysis and responses provided by the Middle Fork District to issues/concerns listed in the U.S.D.I. Fish and Wildlife Service November, 1996. In this portion of the analysis amendment, the original issue is listed, as stated by the Fish and Wildlife Service. Following this, the key question and issue from the 1996 Watershed Analysis is stated. Below each key question is the scientific, analytical, and professional response to these issues. In some cases the issue presented by the Fish and Wildlife Service do not related to the key issues presented in the original watershed analysis. In these situations a new key question is developed. For the most part, the original key questions are still valid with minor changes. Listed below are the eleven aquatic habitat condition concerns. Eleven Listed Aquatic Concerns 1. Identify and map important bull trout rearing and spawning habitat, as well as current and future re-introduction sites, and potential future distribution down to Hills Creek Reservoir – if this information is known or available. Functional Relationship – Bull Trout Habitat Historical references indicate that bull trout Salvelinus confluentus in Oregon were once distributed throughout 12 basins in the Klamath River and Columbia River systems. Bull trout were probably found throughout the Willamette Basin, however available documentation is limited (Buchanan et al. 1997). Bull trout in the upper Middle Fork Willamette Watershed likely ranged throughout the mainstem Middle Fork Willamette and associated larger tributaries (Figure 1-1, Historic Bull Trout Distribution Map). -
Removal Action Report US Forest Service, Blue River Administration Site Blue River, Oregon
Removal Action Report US Forest Service, Blue River Administration Site Blue River, Oregon Prepared for: US Forest Service, Willamette National Forest McKenzie River Ranger District Report Date: August 2012 PBS Project No. 76127.000, Phase 0004 Removal Action Report US Forest Service, Blue River Administration Site Blue River, Oregon TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................... 1 2.0 SITE LOCATION AND SETTING ..................................................................................... 1 2.1 Location ............................................................................................................... 1 2.2 Physiographic Setting......................................................................................... 1 3.0 PREVIOUS SITE STUDIES .............................................................................................. 2 3.1 Assessment and Evaluation of Remedial Options ........................................... 2 3.2 Waste Determination ........................................................................................... 2 4.0 REMOVAL ACTION OBJECTIVES AND APPROACH ................................................... 2 5.0 SAFETY ............................................................................................................................ 3 6.0 SUMMARY OF FIELD ACTIVITIES.................................................................................. 4 6.1 Monitoring Well Abandonment -
South Santiam Hatchery
SOUTH SANTIAM HATCHERY PROGRAM MANAGEMENT PLAN 2020 South Santiam Hatchery/Foster Adult Collection Facility INTRODUCTION South Santiam Hatchery is located on the South Santiam River just downstream from Foster Dam, 5 miles east of downtown Sweet Home. The facility is at an elevation of 500 feet above sea level, at latitude 44.4158 and longitude -122.6725. The site area is 12.6 acres, owned by the US Army Corps of Engineers and is used for egg incubation and juvenile rearing. The hatchery currently receives water from Foster Reservoir. A total of 8,400 gpm is available for the rearing units. An additional 5,500 gpm is used in the large rearing pond. All rearing ponds receive single-pass water. ODFW has no water right for water from Foster Reservoir, although it does state in the Cooperative agreement between the USACE and ODFW that the USACE will provide adequate water to operate the facility. The Foster Dam Adult Collection Facility was completed in July of 2014 which eliminated the need to transport adults to and hold brood stock at South Santiam Hatchery. ODFW took over operations of the facility in April of 2014. The new facility consists of an office/maintenance building, pre-sort pool, fish sorting area, 5 long term post-sort pools, 4 short term post-sort pools, and a water-to-water fish-to-truck loading system. Adult fish collection, adult handling, out planting, recycling, spawning, carcass processing, and brood stock holding will take place at Foster The Foster Dam Adult Collection Facility is located about 2 miles east of Sweet Home, Oregon at the base of Foster Dam along the south shore of the South Santiam River at RM 37. -
Hills Creek-Lookout Point Final EA
In cooperation with the U.S. Forest Service Hills Creek-Lookout Point Transmission Line Rebuild Project Final Environmental Assessment DEPARTMENT OF ENERGY Bonneville Power Administration DOE/EA-1967 June 2017 __________________________________________________________________________________ This document is the final environmental assessment (EA) for the proposed Hills Creek-Lookout Point Transmission Line Rebuild Project (Project). Bonneville Power Administration (BPA) prepared this document as an abbreviated final EA because there have been no substantial changes to the Proposed Action, alternatives, or environmental analysis presented in the draft EA. This abbreviated final EA provides changes made to the text of the draft EA, as well as comments received on the draft EA and BPA’s responses to those comments. This final EA should be used as a companion document to the draft EA (DOE/EA-1967, dated August 2016), which contains the full text describing the project, its potential environmental impacts, and mitigation measures to reduce impacts. The draft EA is available on the project webpage at http://www.bpa.gov/goto/HillsCreekLookoutPoint. Summary BPA proposes to rebuild its Hills Creek-Lookout Point transmission line, which runs from Oakridge to Lowell in Lane County, Oregon. The existing 26-mile-long 115-kilovolt (kV) transmission line is aging, and BPA proposes to replace its wood-pole structures and other line components and improve its road system that provides access to the line. BPA released the draft EA for public comment on August 10, 2016; the comment period ran until September 19, 2016. The draft EA describes the Project, its potential environmental impacts, and mitigation measures to reduce those impacts. -
Assessment of Suspended-Sediment Transport, Bedload, and Dissolved Oxygen During a Short-Term Drawdown of Fall Creek Lake, Oregon, Winter 2012–13
Prepared in cooperation with the U.S. Army Corps of Engineers Assessment of Suspended-Sediment Transport, Bedload, and Dissolved Oxygen during a Short-Term Drawdown of Fall Creek Lake, Oregon, Winter 2012–13 Open-File Report 2014–1114 U.S. Department of the Interior U.S. Geological Survey Cover: Fall Creek Reservoir, Oregon, during drawdown. (Photograph by Liam N. Schenk, U.S. Geological Survey, December 13, 2012.) Inset: A hydrologist collects bedload samples downstream from the reservoir during drawdown. (Photograph by Heather M. Bragg, U.S. Geological Survey, December 3, 2012.) Assessment of Suspended-Sediment Transport, Bedload, and Dissolved Oxygen during a Short-Term Drawdown of Fall Creek Lake, Oregon, Winter 2012–13 By Liam N. Schenk and Heather M. Bragg Prepared in cooperation with the U.S. Army Corps of Engineers Open File Report 2014–1114 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior SALLY JEWELL, Secretary U.S. Geological Survey Suzette M. Kimball, Director U.S. Geological Survey, Reston, Virginia: 2014 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment—visit http://www.usgs.gov or call 1–888–ASK–USGS For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Suggested citation: Schenk, L.N., and Bragg, H.M., 2014, Assessment of suspended-sediment transport, bedload, and dissolved oxygen during a short-term drawdown of Fall Creek Lake, Oregon, winter 2012–13: U.S. -
The Quartz Enhancement Project Draft Environmental Assessment (EA) Is Now Available for Comment
The Quartz Enhancement Project Draft Environmental Assessment (EA) is now available for comment. The McKenzie River Ranger District is proposing to actively manage stands on approximately 1,337 acres on the Willamette National Forest. This will be done to provide a sustainable supply of timber products, improve stand conditions as they relate to density, diversity, and structure, increase vegetative habitat complexity along streams and sustainably manage the network of road systems used for this activity. To accomplish this project, the district proposes to harvest about 21 million board feet (MMBF) from 35 managed stands ranging in age from 28 to 77 years old. In these stands, proposed treatments include about 844 acres of commercial thinning while 270 acres would be retained as skips. In addition, 145 acres would be harvested as openings (gaps) and 79 acres of dominant tree releases (DTRs) ranging from 1/4 to 3 acres in size. Although the treatments identified in this project are tracked separately (commercial thinning, gaps, DTR, skips), they will all use variable density thinning treatments to increase variability within any given stand. Accessing harvest units would require about 3.1 miles of temporary road construction, which would utilize previously impacted areas when possible. There would also be approximately 31.8 miles of road maintenance, and approximately 5.3 miles of road decommissioning. The total Quartz project area encompasses 14,508 acres and is located off of Forest Service Road 2618 approximately 10 miles south of the community of Blue River, Oregon. The Quartz Creek 6th Field boundary consists of approximately 27,090 acres within the McKenzie River Ranger District (Figure 2).