Green Initiatives

1. LED lighting is completed at all the stations in Parliamentary Constituency jurisdiction 2. Revival of Water bodies is completed with the cost of `6 Lakh. 3. Towards Environmental measures 10 kWp solar panels at Anantapur, 860 kWP solar panels at are installed.

Safety – The First Priority Proposed FOBs

Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Station Cost in ` Crore Bridges (FoBs)/ Road under/over Bridges are constructed / proposed for construction at various stations/ locations in Anantapur Parliamentary Rayalacheruvu 1.50 Constituency Jurisdiction. Timmanacherla 1.67 Vanganuru 1.22 Guntakal 5.26

Anantapur Constructed FOBs Parliamentary Constituency Station Cost in ` Crore Shri Narendra Modi Guntakal 3.00 Hon’ble Prime Minister

Passenger Train Services Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/ Increase in the frequency of Trains in RAIL DEVELOPMENTAL WORKS Anantapur Parliamentary Constituency Jurisdiction. Provision of Stoppage Express stoppage at Guntakal Anantapur Parliamentary Constituency Jurisdiction 1.Tr.No.16353/16354 Kacheguda‐Nagercoil‐Kacheguda 17.Tr.No.82653/82654 Yesvantpur‐Jaipur Suvidha Express (Weekly) Express stoppage at & stoppage is given at Guntakal 2.Tr.No.17621/17622 Aurangabad‐‐Aurangabad Extension of Trains (Weekly) Expres stoppage at Guntakal, Gooty & Tadipatri 1. Tr.No.57477/57478 ‐Guntakal‐Tirupati Passenger 3.Tr.No.17417/17418 Tirupati‐Shirdi‐Tirupati Weekly Express extended to and further extended upto stoppage at Anantapur, Gooty & Guntakal Kadiridevarapalle South Central Railway serving 4.Tr.No.17215/17216 ‐Dharmavaram‐Vijayawada 2. Tr.No.16571/16572 Yesvantpur – Bidar Express up to Latur the entire state of Telangana, Tri‐Weekly Express stoppage at Tadipatri, Gooty & Anantpur with new Tr. No.16583/16584 Yesvantpur–Latur Express. major portion of 5.Tr.No.17419/17420 Tirupati‐Vasco‐da‐gama‐Tirupati Weekly 3. Tr.No.11303/11304 Kolhapur– up to Manuguru. Express stoppage at Tadipatri, Gooty & Guntakal and considerable portion of 4. Tr.No.12785/12786 Kacheguda–Bengaluru up to Mysuru. , Maharastra states 6.Tr.No.17021/17022 Hyderabad‐Vasco‐da‐Gama–Hyderabad Increase in Frequency Weekly express stoppage is given at Guntakal and small parts of Tamilnadu and 1. Tr.No.17225/17226 Vijayawada‐‐Vijayawada SOUTH CENTRAL 7.Tr.No.22705/22706 Tirupati‐Jammutawai‐Tirupati Weekly Amaravathi tri‐weekly express to Daily at Guntakal Madhya Pradesh. Humsafar Exp stoppage is given at Guntakal Running of Special Trains 8.Tr.No.11073/11074 LTT‐‐LTT (Weekly) Express stoppage at Guntakal & Gooty 1. Guntakal to Pakala 4 special trains The Rail developmental activities RAILWAY 9. Tr.No.16229/16230 Mysore‐Varanasi‐Mysore (Bi‐Weekly) 2. Guntakal to Dharmabad 7 special trains in the jurisdiction of Anantapur Express stoppage at Guntakal 3. Guntakal to Narasapur 7 special trains Parliamentary constituency of 10.Tr.No.19419/19420 Chennai‐Ahmedabad‐ (Bi‐Weekly) 4. Guntakal to Giddalur 4 special trains Express stoppage at Guntakal, Gooty & Tadipatri Andhra Pradesh, served by 5. Guntakal to Krishna 12 special trains 11. Tr.No.18112/18111 Yeshvantpur‐Tatanagar Exp Weekly South Central Railway and stoppage at Guntakal (Total 34 special Trains) South Western Railway has Capacity Enhancement 12.Tr.No.22920/22919 Ahmedabad‐Chennai Central Humsafar picked up its pace in the recent weekly Express stoppage at Guntakal,Gooty & Tadipatri 1. Setting up of New Electric Loco Shed (Phase‐I) for homing ` 13.Tr.No.12214/12213 DEE‐Yeswantpur‐DEE Duronto Express 100 locos is in progress with the cost of 92.80 crore. past in all spheres. Focused stoppage at Guntakal 2. Extension of sick wagon attention shed for over hauling attention has been given for 14.Tr.No.16533/16534 KSR ‐Bhagat ki kothi and minor repairs maintenance is under progress with the ` improvement in the thrust areas. (Jodhpur) Express stoppage at Anantapur cost of 3.80 crore. Some of the major activities are 15.Tr.No.82651/82652 Yesvantpur‐Katra Suvidha Express 3. Additional Loop Lines are provided at Garladinne station stoppage at Guntakal with the cost of `1 crore. showcased in this brochure. 4. Additional Loop Lines are provided at Taticherla station 16.Tr.No.22691/22692 Bangalore‐Nizamuddin Rajadhani with a cost of `7.43 crore ASSEMBLY SEGMENTS Road Over / Under Bridges Passenger Amenities With a view to strengthen safety at Level Provision of Passenger Amenities and facilities, and its Crossing gates and to avoid untoward incidents improvements at Railway Stations is one of the most Rayadurg and also to provide seamless journey to road important aspect Railway Services. traffic, the following Road under /over Bridges (RuB/RoB) are constructed / proposed for construction under Anantapur Parliamentary Guntakal constituency. Station Amenity Amount Status Road Over Bridges Tadpatri Nakkanadoddi Toilets `1 lakh Constructed 1. Road Over Bridge in lieu of level crossing No.161 between Singanamala Challavaripalle ‐ Tadipatri is completed with the cost of ` Anantapur Toilets `41 lakh Constructed 31.32 crore ‐ ROB Commissioned in May 2016. Zangalapalle Toilets `2 lakh Constructed 2. Road Over Bridge in lieu of level crossing No.179‐A in ` Anantapur Urban Renigunta‐Guntakal section with sanctioned cost `31.79 Chigicherla Toilets 2 lakh Constructed crore and is in fast progress. Guntakal New Platform `1 crore Constructed Kalyandurg 3. Road Over Bridge in lieu of level crossing No.127 between Guntakal Escalator `1 crore In Progress Ananthapur–Prasannayapalli with the cost of `25.81 crore is completed. Gooty CIB/TIB `1.3 crore In Progress Road Under Bridge 5 Stations Wi‐Fi Facility `7.5 lakh Provided 1. All Unmanned Level Crossing gates in Anantapur Gooty Station Building `2.45 crore Proposed RAIL DEVELOPMENTAL WORKS Parliamentary jurisdiction are eliminated through construction of RuBs/LHS/Manning/Direct closure. Anantapur & 59 CCTV Cameras `1.36 crore Proposed Guntakal Anantapur Parliamentary Constituency Jurisdiction 2. Construction of RuBs in lieu of Manned Level Crossings No.136(M), 138(M), 140(M) in Dharmavaram – Gooty Anantapur Lift `50 lakh Provided section is under progress with the cost of `6.42 crore. Guntakal 4 Lifts `2 crore Provided 3. Construction of RuBs in lieu of Manned Level Crossing s No. 118(M) and 133(M) in Dharmavaram – Gooty section is Guntakal 2 ATVMs `7.5 lakh Installed Infrastructural Development completed with the cost of `4.28 crore. Anantapur 2 ATVMs Installed 4. Proposed construction of 3 RuBs in lieu of LC No. 136(M), Gooty 2 ATVM Installed L C N o . 1 3 8 ( M ) a n d L C N o . 1 4 0 ( M ) b e t w e e n Doubling of Railway Lines 4. Electrification from Guntakal to Kallur for a Garladinne–Kalluru Stations in Dharmavaram–Gooty SS Prashanti Nilayam ATVM `1.5 lakh Installed ` distance of 38 Kms at a cost of `33 crore is Section with an estimated cost of 6.51 crore. ATVM `1.5 lakh Installed 1. Doubling of Kalluru ‐ Guntakal section for a completed. Guntakal CoTVM `9 lakh Provided distance of 41 Kms at an anticipated cost of ` Anantapur CoTVM Provided 323 crore is in fast progress and sections 5. Proposed for electrification of Guntakal – Anantapur 2 WVMs ‐‐ Provided between Khadarpet – Guntakal for a distance (part of Guntakal–Hospet) 48.5 Kms Guntakal 6 WVMs ‐‐ Provided of 33 Kms is completed. with an estimated cost of ` 21 crore Gooty 2 WVM Provided Guntakal 2 COP works `1.60 crore In Progress 2. As a part of doubling project from Gooty to Guntakal CIB/TIB `3 crore In Progress Dharmavaram for a distance of 91 kms, Nakkandoddi New Stn Building `30 lakh Completed doubling of Gooty‐ and Dharmavaram Ramalingayyapalli New Crossing Stn `9.12 crore Developed Guntakal Concrete Apron `2.46 crore Proposed – Chigicherla for a distance of 33.3 km is in Anantapur Improvement to `35 lakh Completed ` progress with the cost of 636 crore Waiting Room Gooty 2 Lifts `1 crore In Progress Electrification of Railway Lines Guntakal Toilets `30 lakhs Completed 1. Electrification completed between Wadi ‐ Tadipatri Toilets `10 lakhs In Progress ‐ Guntakal for a distance of 228 Kms at Pamidi Toilets `10 lakhs In Progress Garladinne Toilets `10 lakhs In Progress a cost of `220 crore Chigicherla Toilets `10 lakhs In Progress 2. Electrification completed between Gooty ‐ Guntakal Facade `2.50 crore In Progress ` Dharmavaram ‐ Yelahanka for a distance of Guntakal Station Building 6.55 crore In Progress Guntakal Station Building `1.58 crore Proposed 304 Kms at a cost of `228.57 crore Khaderpet 3. Electrification completed from to Venkatampalli Platform Guntakal Construction `2.62 crore Proposed Guntakal for a distance of 426 Kms at a Tadipatri sanctioned cost of `432 crore