NETWORK RAIL (EAST WEST 0

1 RAIL WESTERN SECTION

0 PHASE 2) ORDER 2 0 0

- N T

- KEY R

D APPLICATION BOUNDARY AND EXTENT OF - Y 0 A PERMANENT AND TEMPORARY PROPOSED W

4 T S WORKS ra

0 E P c R at k I 5 h ( H um S PERMANENT LAND TO BE ACQUIRED FOR 9 ) ID M 0 COUNTY OF ENGINEERING WORKS -

D VALE PERMANENT LAND TO BE ACQUIRED FOR X CLAYDON/ ENVIRONMENT MITIGATION O -

R EXISTING NETWORK RAIL BOUNDARY W WORKSITE AND ACCESS FOR CONSTRUCTION E - r B e b 2 EXTENT OF OVERLAP WITH ADJACENT SHEET m _

u )

5 m N

u ( 3 CONSTRUCTION COMPOUND g th n 7

i a P 3 w a 3 r EARTHWORKS D 1

PROPOSED DRAINAGE AND OUTFALLS

EXISTING DRAINAGE WORKS REQUIRED

PROW TO BE EXTINGUISHED

/2 PERMANENTLY AND MAY BE TEMPORARILY /2 L CLOSED DURING CONSTRUCTION C TF/2B/10 M P F PROPOSED FOOTPATH OXD/24C VERNEY JUNCTION NEW OVERBRIDGE PROW THAT MAY BE TEMPORARILY TO REPLACE LITTLEWORTH FARM CLOSED DURING CONSTRUCTION ACCOMMODATION CROSSING AND VERNEY JUNCTION LEVEL CROSSING TO THE EAST EXISTING FOOTPATH C F/2B/12 o

n F/2X/XX PERMANENT PROW EXTINGUISHMENT POINT E

t T

TEMPORARY PRoW CLOSURE AND i

0 L n TF/2X/XX TEMPORARY PROW EXTINGUISHMENT POINT 0

DIVERSION u 9 e 4 DURING THE CONSTRUCTION 9 d HP-SG SGN HIGH PRESSURE GAS MAIN

PHASE THE FOOTPATH (FP MCL/2/1) Tra ck o F/2B/11

WILL BE TEMPORARILY CLOSED n FP ACOUSTIC BARRIER

0 M BETWEEN TF/2B/10 AND TF/2B/11 C D 0 L /3/ 8 2 r

4 a

9 w i

k n c a r g T

0 N 0

7 o

4 . 9

FP MCL/3/3 1

F/2B/10 3 3

0 7

0 Ra 3 M ilw 6 P ay 5 ( 4 .5 disu s _ ed) 9 TF/2B/12 TF/2B/14 2 1 B 3/ L/ - V 0 C E e M r 0 ne P W y 5 Ju F FURZEN FARM n 4 c R tion 9 - TEMPORARY PRoW CLOSURE AND O DIVERSION X 0 D 0 DURING THE CONSTRUCTION

4 - 0 4 PHASE THE FOOTPATH (FP MCL/3/1)

9 9

WILL BE TEMPORARILY CLOSED 4 Th e T 3 icke BETWEEN TF/2B/12 AND TF/2B/11 t O 4 ffice

0 0

0

- A01 17/12/17 Approved for Consultation S.M. P.P. C.M. 3 D

4

R Rev Date Description of Revisions Dsnd Chkd Appr Ve 9 rne y H TF/2B/11 - Status Suitabilty

o T ACOUSTIC BARRIER use

COMPOUND B2 -

M 0 P 0 The Bungalow .2 Accepted for Outline Design A4 0

VERNEY JUNCTION 5 0

2 2

4 0 9 1 1

0

0

1

4

9 THE VERNEY

9

0 ARMS

0 9 1.1 2 m

0 P on 0 d - T - Po VERNEY JUNCTION LEVEL CROSSING nd R PROW REF. MCL/2/2 D - 0

8 LEVEL CROSSING TO BE CLOSED

6 FOOTPATH TO BE DIVERTED

5 92 .0m 9

0 FOOTPATH MCL/3/1 TO BE EXTINGUISHED - BETWEEN F/2B/10 AND F/2B/11 D FOOTPATH MCL/2/1 TO BE EXTINGUISHED X BETWEEN F/2B/10 AND F/2B/12 O - NEW FOOTPATH PROPOSED BETWEEN F/2B/12, R VERNEY JUNCTION ACCOMMODATION

W Jubilee OVERBRIDGE AND F/2B/13 E

- Cottages THE DIVERSION ROUTE PROPOSED BETWEEN

B F/2B/12, VERNEY JUNCTION OCCUPATION

2 Po OVERBRIDGE, F/2B/13 AND ALONG THE PUBLIC nd _ HIGHWAY INTO VERNEY JUNCTION 5

3 NEW FOOTPATH PROPOSED BETWEEN F/2B/14 Project 7 AND F/2B/15 TO CONNECT PROW USERS WITH 3

3 MCL/5/1 9 3. 1 4m

F/2B/13 .

o (Western Section) N

g Phase 2 n i F/2B/14 w

a /1 F/2B/15 Drawing Title r /5 L D C

M n P Scheme Drawing F o

F/2B/15

d Claydon Junction to e

u TO WINSLOW n i t n o C

Designed Signed Date Sam McLelland S. McLelland 17/12/17

004029 003027 003028 Drawn Signed Date 003026 Grace Newey G. Newey 07/12/16 003025 1 / 2 Checked Signed Date 003024 / 003023 L Paul Panini P. Panini 17/12/17

C

003022 E Approved Signed Date Colin Murphy C. Murphy 17/12/17 002009 002003 W 002001 002005 002008 B Scale(s) ELR & Project Chainage 003016 003017 003018 003021 002014 002015 002011 1:1250 OXD - 095040

Design Package Risk Classification Sheet

002010 003031 25of127 002002 002007 Normal 002006 003019 002004 003020 Alternative Reference Revision 0 25 50 75 100 125m EWR2-CEP-DRG-PBL-422010 A01

OS map data reproduced by permission of Ordnance Survey on behalf of Drawing Number HMSO. © Crown copyright 2015. All rights reserved. Ordnance Survey SCALE 1:1250 @ A1 133735_2B-EWR-OXD-095040-DR-T-002010 KEY PLAN licence number 0100040692 Sheet Size A1 594 x 841