FIPA INVESTMENT PROJECT PROFILE

EXPRESSWAY “LASVA - (NEVIC POLJE)“ Project title Expressway ”Lasva - Travnik (Nevic Polje)“ *part of TEN -T Core Network E-761 / Bihac - B. Petrovac - *part of regional network of Transportation Observatory for Southeast Europe (SEETO) Route 2a - (Hrvatska) - - Travnik - Lasva Sector Infrastructure Location Canton and Central Canton Municipalities: Zenica, Busovaca, , and Travnik Location description This expressway will connect central areas of BiH (Vitez, Travnik, Donji Vakuf) with motorway on Coridor Vc near Lucani (Lasva) interchange and will represent the most important route for Federation BIH in direction West – East. By the construction of this new route communication ranked “expressway“ traffic conditions will be significantly improved along the route - Banja Luka. Company description JP Autoceste Federacije BiH d.o.o is company 100 % owned by the Government of FBiH and responsible for construction, operation and maintenance of motorways and expressways in FBiH in the last 5 years. Project status - Main design has been completed (2013) - Environmental permit obtained (2014) - Feasibility study has been completed (2010) - updating is necessary Project description Existing transport infrastructure Trunk road M5/E-661 Lasva - Nevic Polje (to Donji Vakuf) - “bottle neck ” with large number of the curves, with limited speed below 40 km/h (section Lasva- Kaonik), passing through the settlements and business zone (Kaonik-Vitez-Travnik) and grades over 7% (Travnik -Donji Vakuf). - On some sections level of service “F” Description of the expressway Lasva-Nevic Polje - Section length: app. 24 km - Designed speed: 100 km/h (80 km/h) - Traffic lanes width: 3.50 m - Number of the traffic lanes: 4 (2x2) - Central reserve width: 3.0 m - Without stopping lanes

Grbavička 4, 71000 Sarajevo / Tel. +387 33 278 080 / Fax +387 33 278 081 / www.fipa.gov.ba / [email protected] FIPA INVESTMENT PROJECT PROFILE

- Start of section is Lasva interchange which is app. 6 km far away from tool station and interchange Lucani on Corridor Vc. Also, it represents connection of this expressway and motorway on corridor Vc. - End of section is Nevic Polje interchange near Travnik town - Section is divided into three subsections: 1. Subsection Lasva – Kaonik length of 5.35 km • Three tunnels with total length: 1020 m • Four bridges with total length: 520 m • One interchange (Lasva) • One tool station (Lasva) • One rest area (Lasva) 2. Subsection Kaonik - Vitez length of 8.17 km • one tunnel with total length: 125 m • seven bridges with total length: 1 631 m • One interchange (Kaonik) • One tool station (Kaonik) 3. Subsection Vitez - Nevic Polje length of 10.85 km • seven bridges with total length: 813 m • two interchanges (Vitez and Nevic Polje) • two tool stations (Vitez and Nevic Polje)

Project advantages: - AADT for existing section M5 Lasva - Donji Vakuf (2015): Lasva - Kaonik 4 400 vehicles Busovaca - Kaonik 2 850 vehicles Kaonik - Vitez 5 700 vehicles Vitez - Nevic Polje 7 400 vehicles * (Source JP ceste Federacije BiH 2015) - The forecast AADT for M5 Lasva - Donji Vakuf (2020): 10 000 - 15 000 vehicles * Source: Feasibility study, 2010 - Estimated IRR > 15% *( Source: Feasibility study, 2010) Estimated total 217.7 million EUR with VAT investment cost Inputs provided by Value Description local partner 34.7 million EUR - Preparation of construction (expropriation): 3. 7 mil. EUR - VAT : 31.0 million EUR Inputs required from Value Description foreign partner 183 million EUR - Construction: 179.6 million EUR - Supervision : 3.4 million EUR Form of cooperation Concession, Loan with foreign partner Supporting information For additional information about this project, please contact FIPA either by e-mail: available [email protected] or phone number: +387 33 278 080.

Grbavička 4, 71000 Sarajevo / Tel. +387 33 278 080 / Fax +387 33 278 081 / www.fipa.gov.ba / [email protected]