PROJECT LIST APPENDIX

Southern Association of Governments ADOPTED APRIL 2012 PROJECT LIST

Framework 1 Strategic Projects 441 Imperial County 441 FTIP Projects 2 County 443 Imperial County 2 Orange County 463 Los Angeles County 7 Riverside County 470 Orange County 58 San Bernardino County 472 Riverside County 72 Ventura County 473 San Bernardino County 95 Various Counties 473 Ventura County 117 Various Counties 127

Financially-Constrained RTP Projects 128 Imperial County 128 Los Angeles County 136 Orange County 222 Riverside County 244 San Bernardino County 319 Ventura County 412 Various Counties 433

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005) 437 Project List 1

Framework

The project list is divided into three sections, consistent with the framework in FIGURE 1. At the center is the Federal Transportation Improvement Program (FTIP), which forms the foundation of the RTP project investment strategy and represents the first six years of already-committed funding. This RTP incorporates the adopted 2011 FTIP. The RTP con- tains an additional financially constrained set of transportation projects above and beyond the FTIP. Finally, the Strategic Plan represents an unconstrained list of potential projects that the region would pursue given additional funding and commitment.

FIGURE 1 RTP Framework

Strategic Plan

Financially Constrained RTP

New Additional Funding FTIP Investments

Reasonable Available Funding for O&M and Committed Projects

Source of Future Amendments 2 Project List

FTIP Projects

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) IMPERIAL TRANSIT IMP110902 0 3 REPLACEMENT LARGER BUSES IN 10/11 $315 IMPERIAL TRANSIT IMP090502 0 ADA PARA-TRANSIT FOR COUNTY OF IMPERIAL – 2 NEW LARGE TYPE III BUSES $130 IMPERIAL TRANSIT IMP33003 0 ADA PARATRANSIT SERVICE OPERATING ASSISTANCE $5,700 IMPERIAL TRANSIT IMP33004 0 BRAWLEY DIAL-A-RIDE – OPERATING ASSISTANCE $1,571 IMPERIAL TRANSIT IMP33021 0 CALEXICO DIAL-A-RIDE OPERATING ASSISTANCE $2,890 IMPERIAL TRANSIT IMP090504 0 CITY OF EL CENTRO DIAL-A-RIDE (ARC-IMPERIAL VALLEY) – REPLACEMENT OF PARATRANSIT BUSES WITH 2 LARGE TYPE III BUSES $130 IMPERIAL TRANSIT IMP33006 0 CITY OF IMPERIAL DIAL-A-RIDE – OPERATING ASSISTANCE $845 IMPERIAL TRANSIT IMP33000 0 COUNTY WIDE TRANSIT SYSTEM – OPERATING AND CAPITAL ASSISTANCE $50,901 IMPERIAL TRANSIT IMP990401 0 EL CENTRO DIAL-A-RIDE OPERATING ASSISTANCE $1,546 IMPERIAL TRANSIT IMP051104 0 IN EL CENTRO; REGIONAL PUBLIC BUS TRANSFER TERMINAL AND PASSENGER WAITING AREA INCLUDING A 24 FOOT HIGH CLOCK TOWER $4,906 AND OTHER BEAUTIFICATION AT 7TH AND STATE STREETS, WITH MISC OTHER BUS STOP IMPROVEMENTS ON FIXED ROUTE SYSTEM IMPERIAL TRANSIT IMP33023 0 MED-EXPRESS SHUTTLE OPERATIONAL ASSISTANCE $1,432 IMPERIAL TRANSIT IMP100606 0 OPERATING ASSISTANCE FOR NEW NON-EMERGENCY MEDICAL TRANSPORT SERVICE $500 IMPERIAL TRANSIT IMP100603 0 REPLACE TWO LARGE BUS TYPE III FOR ARC PARATRANSIT SERVICES $143 IMPERIAL TRANSIT IMP090106 0 TRANSIT TRANSFER TERMINAL IN THE CITY OF BRAWLEY $1,432 IMPERIAL TRANSIT IMP111101 0 TRANSIT TRANSFER TERMINAL IN THE CITY OF IMPERIAL $1,217 IMPERIAL TRANSIT IMP100604 0 TWO NEW LARGE BUS TYPE III FOR NEW NON-EMERGENCY MEDICAL TRANSPORTATION SERVICE $143 IMPERIAL TRANSIT IMP070929 0 UPGRADES AND IMPROVEMENTS TO EXISTING BUS TRANSFER TERMINAL AT IMPERIAL VALLEY COLLEGE $2,086 IMPERIAL TRANSIT IMP090503 0 WEST SHORES DIAL-A-RIDE (ARC-IMPERIAL VALLEY) – REPLACEMENT OF GASOLINE VAN WITH 1 MEDIUM TYPE II BUS $60 IMPERIAL TRANSIT IMP43000 0 WEST SHORES DIAL-A-RIDE OPERATIONAL ASSISTANCE $1,125 IMPERIAL STATE IMPL513 8 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM (PROJECTS $22,829 HIGHWAY ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 USC 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)) IMPERIAL STATE IMP00289 8 WIDEN THE OVERCROSSING BRIDGE ON SR-186 OVER I-8. IMPROVE OFF RAMPS FROM I-8 AND WIDEN SR-186 ADJACENT TO THE CASINO $9,330 HIGHWAY ENTRANCE – NON-CAPACITY ENHANCEMENT PROJECT IMPERIAL STATE IMP0021 78 BRAWLEY BYPASS – 4 LANE EXPRESSWAY – IN IMPERIAL COUNTY NEAR BRAWLEY ON ROUTE 78 FROM ROUTE 86 TO 0.6 KM EAST OF $227,512 HIGHWAY HOVLEY ROAD AND ON ROUTE 86 FROM 0.5 KM SOUTH TO 0.1 KM NORTH OF FREDRICKS ROAD IMPERIAL STATE IMPL502 86 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS- SHOPP COLLISSION REDUCTION PROGRAM (PROJECTS ARE CONSISTENT WITH $1,415 HIGHWAY 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – INTERSECTION SIGNALIZATION PROJECTS AT INDIVIDUAL INTERSECTIONS IMPERIAL STATE IMP0042A 98 IN AND NEAR CALEXICO FROM 0.6 KM WEST OF SR 111 EASTERLY TO ALAMO RIVER BRIDGE WIDEN TO 4 LANE HWY (ENV. WORK & DOC. $9,000 HIGHWAY FOR SR98) ENVIRONMENTAL WORKAND DOCUMENTATION FOR SR 98 IMPERIAL STATE 8020B 98 WIDENING SR-98 FROM VV WILLIAMS AVE. TO OLLIE AVE. AND INTERSECTION IMPROVEMENTS OF SR-98 AND CESAR CHAVEZ FROM 2 $9,357 HIGHWAY TO 4 LANES(PHASE 1B). Project List 3

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) IMPERIAL STATE IMP110901 111 CALEXICO BORDER GATEWAY AND 1ST STREET PROMENADE (IN CALEXICO, ON 1ST STREET, ADJOINING THE PEDESTRIAN AND BICYCLE $2,301 HIGHWAY BORDER CROSSING, FROM ROUTE 111 TO HEFFERNAN AVENUE. PEDESTRIAN AND BICYCLE IMPROVEMENTS.) IMPERIAL STATE 0505 186 ANDRADE INTERNATIONAL BORDER CROSSING IN ANDRADE, AT THE ANDRADE INTERNATIONAL PORT OF ENTRY. CONSTRUCT BICYCLE $2,520 HIGHWAY AND PEDESTRIAN FACILITES IMPERIAL STATE IMPL501 999 GROUPED PROJECTS FOR BRIDGE REHABILIATION AND RECONSTRUCTION – SHOPP PROGRAM (PROJECTS ARE CONSISTENT WITH 40 $22,052 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTIONG BRIDGES (NO ADDITIONAL TRAVEL LANES)) IMPERIAL STATE IMPL511 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – HIGHWAY $28,847 HIGHWAY MAINTENANCE IMPERIAL STATE IMPL508 999 GROUPED PROJECTS FOR PLANTINGS, LANDSCAPING, ETC. (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 $1,969 HIGHWAY AND TABLE 3 CATEGORIES – PLANTINGS, LANDSCAPING, ETC.) IMPERIAL STATE IMPL512 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION – $3,654 HIGHWAY MINOR PROGRAM IMPERIAL STATE IMPL505 999 GROUPED PROJECTS FOR SAFTEY IMPROVEMENTS – SHOPP PROGRAM (PROJECTS ARE CONSISTENT WITH EXEMPT TABLES 2 AND $500 HIGHWAY TABLE 3 CATEGORY – SHOULDER IMPROVEMENTS) IMPERIAL STATE IMPL503 999 GROUPED PROJECTS FOR SHOULDER IMPEROVEMETNS – SHOPP ROADSIDE PERSERVATION PROGRAM (PROJECTS ARE CONSISTENT $19,496 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – FENCING, SAFETY ROADSIDE REST AREAS) IMPERIAL STATE IMP0523A 999 IN EL CENTRO ON DOGWOOD RD; RECONTRUCT AND WIDEN BRIDGE FROM 2 TO 4 LANES; WITH 2 TURN LANES $33,120 HIGHWAY IMPERIAL STATE IMP050904 999 NEAR WESTMORLAND; AQUSITION OF 4,000 UNDEVLOPED ACRES ADJACENT TO SR-86 FOR ENVIRONMENTAL MITIGATION $445 HIGHWAY IMPERIAL STATE IMP100101 999 PLANNING, PROGRAMMING, AND MONITORING (PPM) FUNDS TO PAY FOR ELIGIBLE STAFF AND PROGRAM EXPENSES FOR ICTC $1,361 HIGHWAY IMPERIAL LOCAL IMP120207 0 9TH STREET IMPROVEMENTS BETWEEN SLAYTON ROAD AND BEALE AVENUE (INSTALLATION OF FILL PAVEMENT, CURB, GUTTER, AND $183 HIGHWAY SIDEWALK). IMPERIAL LOCAL IMP100901 0 ALAMO RIVER RECREATIONAL TRAIL, PHASE I $489 HIGHWAY IMPERIAL LOCAL IMP070926 0 ASPHALT CONCRETE PAVING OF PITZER FROM MCCABE TO CORRELL $796 HIGHWAY IMPERIAL LOCAL IMP090101 0 ASPHALT REHABILITATION AND RECONSTRUCTION OF WESTERN AVENUE FROM STATE HIGHWAY 86 TO NORTHERN CITY LIMITS $895 HIGHWAY IMPERIAL LOCAL IMP080903 0 ASPHALT REHABILITATION OF RIVER DR. $226 HIGHWAY IMPERIAL LOCAL IMP060901 0 ATEN ROAD AND OLD COUNTY ROAD 111 IMPROVEMENTS, IMPERIAL COUNTY, CA – TCSP#09CA002 $834 HIGHWAY IMPERIAL LOCAL IMP020801 0 BAUGHMAN ROAD RECONSTRUCTION FROM STATE ROUTE 78/86 TO FORRESTER ROAD; 0.65 MILE OF COUNTY ROAD NEAR $1,503 HIGHWAY WESTMORLAND- HPP 2162 4 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) IMPERIAL LOCAL IMP120205 0 BUCKLIN PARK – PARKING LOT AND PEDESTRIAN/BIKE PATH PAVEMENT PROJECT (ASPHALT CONCRETE PAVING) $140 HIGHWAY IMPERIAL LOCAL IMP091001 0 CESAR CHAVEZ BLVD/CALEXICO – WEST PORT OF ENTRY (POE) CONGESTION IMPROVEMENTS; ROAD SURFACE REHAB, TURN LANES, $2,850 HIGHWAY LIGHTING AND SIDEWALKS IMPERIAL LOCAL IMP070906 0 CNG FUELING STATION $23 HIGHWAY IMPERIAL LOCAL IMP050509 0 COLE RD. CORRIDOR IMPROVEMENTS; EXPANSION OF 2 LANE ROAD INTO 4 LANE PRINCIPAL ARTERIAL (.5 MILES) FROM BOWKER RD $1,837 HIGHWAY EAST TO SR 98 IMPERIAL LOCAL IMP050905 0 CONSTRUCT NEW SIDEWALKS IN THE CITY OF HEBER-(HPP 3548) $610 HIGHWAY IMPERIAL LOCAL IMP050901 0 CONSTRUCT ROAD SURFACE IMPROVEMENTS AND IMPROVE ROAD SAFETY FROM BRAWLEY WATER PLANT TO HWY 86 TO 9TH STREET $1,400 HIGHWAY TO 18TH STREET, BRAWLEY – (HPP 2176) IMPERIAL LOCAL IMP070917 0 CONSTRUCTION OF BICYCLE/PEDESTRIAN PATH $962 HIGHWAY IMPERIAL LOCAL IMP090701 0 DEVELOP BICYCLE PATHS AND PUBLIC PARK SPACE ADJACENT TO THE NEW RIVER, CALEXICO (HPP TEA-LU PROJECT #3092) $4,000 HIGHWAY IMPERIAL LOCAL IMP070920 0 DIESEL EMISSION COMPLIANT 2 AXLE TRUCK TRACTOR $100 HIGHWAY IMPERIAL LOCAL IMP070919 0 DIESEL EMISSION COMPLIANT WATER TRUCK $134 HIGHWAY IMPERIAL LOCAL IMP120206 0 DIESEL VEHICLE RETROFITS $174 HIGHWAY IMPERIAL LOCAL IMP050508 0 EVAN HEWES HIGHWAY RESURFACING IMPROVEMENTS FROM SILSBEE ROAD TO AUSTIN ROAD $1,519 HIGHWAY IMPERIAL LOCAL IMP070901 0 FOUR HYBRID PASSENGER VEHICLES $158 HIGHWAY IMPERIAL LOCAL IMP070925 0 FOUR HYBRID VEHICLES $153 HIGHWAY IMPERIAL LOCAL IMPL507 0 GROUPED PROJECTS FOR BRIDGE REHABILIATION AND RECONSTRUCTION – HBP PROGRAM (PROJECTS ARE CONSISTENT WITH 40 $25,132 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITONAL TRAVEL LANES)) – 6 BRIDGES; ARAZ, GENTRY, FORRESTER RD., WINTERHAVEN DRIVE, ANZA RD., AND VERDE SCHOOL ROAD. IMPERIAL LOCAL IMP070924 0 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION IN IMPERIAL COUNTY (PROJECTS ARE CONSISTENT WITH $1,520 HIGHWAY 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION) IMPERIAL LOCAL IMP080901 0 HIGHWAY 111 EAST SIDEWALK IMPROVEMENTS PROJECT. SIDEWALK IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION, $425 HIGHWAY INCLUDING INSTALLATION OF SIDEWALKS, ADA CURB RETURNS, AND CULVERT BOXES ALONG EAST HWY 111/SORENSON AVE. BETWEEN DELTA AND DATE STREETS IMPERIAL LOCAL IMP071203 0 I-8 ENTRANCE AND EXIT RAMPS AT SR86. LANDSCAPING BEAUTIFICATION $723 HIGHWAY Project List 5

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) IMPERIAL LOCAL IMP080905 0 IMPERIAL AVENUE OVERLAY WITH CURB/GUTTER/SIDEWALK. $761 HIGHWAY IMPERIAL LOCAL IMP090501 0 IMPROVE BRIDGE 58-7 ON SR115 THAT CROSSES THE ALAMO RIVER IN HOLTVILLE AND ALSO PROJECT DESIGN AND ENVIRONMENTAL $1,000 HIGHWAY ANALYSIS OF A NEW BRIDGE OVER THE SAME RIVER IMPERIAL LOCAL IMP050506 0 IMPROVEMENTS AT AND BETWEEN INTERSECTIONS AT: SR 115 AND 4TH, SR 115 AND PALM, 4TH AND PALM AND 4TH AND ORCHARD/ $1,048 HIGHWAY CEDAR (BIKE LANE AND PEDESTRIAN IMPROVEMENTS) IMPERIAL LOCAL IMP071202 0 IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD AVENUE, AROUND PARK, ENDING AT WILLARD AVENUE. BICYCLE AND PEDESTRIAN $1,310 HIGHWAY IMPROVEMENTS AND LANDSCAPING IMPERIAL LOCAL IMP050903 0 IN IMPERIAL; RECONSTRUCTION OF PASSENGER LOADING AREAS AND ROAD ACCESS IMPROVEMENTS TO THE EXPO $377 HIGHWAY IMPERIAL LOCAL IMP051101 0 IN WESTMORLAND- SOUTH CENTER STREET; ROADWAY SURFACE IMPROVEMENTS, STREET LIGHTING AND STORM DRAIN $800 HIGHWAY IMPROVEMENTS FROM BAUGHMAN RD. TO SR 78/86 IMPERIAL LOCAL IMP070910 0 INSTALLATION OF BICYCLE RACKS AT VARIOUS LOCATIONS $11 HIGHWAY IMPERIAL LOCAL IMP050902 0 KEYSTONE RD NEAR IMPERIAL, RECONSTRUCTION OF 6 MILES TO CREATE TRUCK LANE FROM SR 111 TO AUSTIN RD $2,500 HIGHWAY IMPERIAL LOCAL IMP051201 0 NEAR EL CENTRO; DOGWOOD CORRIDOR – WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ' NORTH $3,024 HIGHWAY OF MCCABE & INSTALL 2 SIGNALS ROW AND CON IMPERIAL LOCAL 0520A 0 NEAR EL CENTRO; DOGWOOD CORRIDOR – WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ' NORTH $276 HIGHWAY OF MCCABE & INSTALL 2 SIGNALS AB 3090 REIMBURSMENT FOR 11-IMP0520 IMPERIAL LOCAL IMP070602 0 NEAR IMPERIAL – WORTHINGTON RD. INTERSECTION AT MCCONNEL RD; NEW LEFT TURN LANE AT NONSIGNALIZED INTERSECTION $732 HIGHWAY IMPERIAL LOCAL IMP070601 0 NEAR WESTMORLAND – FORRESTER RD. INTERSECTION AT CADY RD.: NEW TURNING LANES AND TRAFFIC CHANNELIZATION AT $992 HIGHWAY NONSIGNALIZED INTERSECTION IMPERIAL LOCAL IMP070913 0 NEW CNG FUELING STATION $23 HIGHWAY IMPERIAL LOCAL IMP080907 0 NORTH CENTER STREET PAVEMENT REHABILITATION $339 HIGHWAY IMPERIAL LOCAL IMP070928 0 PAVING OF .75 MILE SECTION OF DIRT ROAD ON P STREET $957 HIGHWAY IMPERIAL LOCAL IMP070923 0 PAVING OF 9TH STREET BETWEEN MALAN STREET AND WILDCAT DRIVE $1,267 HIGHWAY IMPERIAL LOCAL IMP070909 0 PAVING OF WALKING/JOGGING PATHS A BUCKLIN PARK $322 HIGHWAY IMPERIAL LOCAL IMP020802 0 PRELIMINARY DESIGN OF TRAFFIC BRIDGE ON 8TH STREET OVER I-8 $120 HIGHWAY IMPERIAL LOCAL IMP120201 0 PURCHASE NEW CNG STREET SWEEPER $314 HIGHWAY 6 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) IMPERIAL LOCAL IMP120202 0 PURCHASE NEW CNG STREET SWEEPER $314 HIGHWAY IMPERIAL LOCAL IMP120209 0 PURCHASE NEW CNG STREET SWEEPER $314 HIGHWAY IMPERIAL LOCAL IMP120203 0 PURCHASE OF (1) 5% BIO-DIESEL TRUCK (TO REPLACE OLDER MODEL NON-COMPLIANT DEISEL TRUCK) $72 HIGHWAY IMPERIAL LOCAL IMP120204 0 PURCHASE OF (1) HYBRID VEHICLE $54 HIGHWAY IMPERIAL LOCAL IMP120208 0 PURCHASE OF NEW CNG STREET SWEEPER $314 HIGHWAY IMPERIAL LOCAL IMP090403 0 REHABILITATION ALONG NORTH SIDE OF 9TH STREET BETWEEN CEDER AVENUE AND HOLT AVENUE $332 HIGHWAY IMPERIAL LOCAL IMP050504 0 REHABILITATION AND OVERLAY OF IMPERIAL AVE. (.5 MILE) PHASE III FROM ORANGE TO ADAMS AVE. $563 HIGHWAY IMPERIAL LOCAL IMP090105 0 REHABILITATION AND RECONSTRUCTION OF EXISTING PAVEMENT ON BARIONI ROAD FROM B STREET TO P STREET $1,156 HIGHWAY IMPERIAL LOCAL IMP090402 0 REHABILITATION OF ADAMS AVENUE FROM IMPERIAL AVENUE TO LA BRUCHERIE AVENUE. CURB/GUTTER/SIDEWALK $700 HIGHWAY IMPERIAL LOCAL IMP050507 0 REHABILITATION OF ATEN RD. (2.25 MILES) FROM VILORE WAY TO CROSS RD AND SIGNALIZATION OF ONE INTERSECTION; PHASE ONE IN $1,866 HIGHWAY FY2007/08 OF SIGNALIZATION AND PHASE TWO IN FY2008/09 OF REHABILITATION IMPERIAL LOCAL IMP050502 0 REMOVAL AND RECONSTRUCTION OF EXISTING 2 LANE DOGWOOD RD (1.2 MILES) FROM I-8 BRIDGE TO STATE STREET ST – PHASE I $2,472 HIGHWAY IMPERIAL LOCAL IMP090406 0 RESURFACING DREW ROAD FROM ROSS ROAD TO EVEN HEWES HIGHWAY IN IMPERIAL COUNTY(0.4 MILES) $328 HIGHWAY IMPERIAL LOCAL IMP080904 0 SEISMIC BRIDGE EVALUATION STUDY $226 HIGHWAY IMPERIAL LOCAL IMP100607 0 SIGNALIZATION OF DRIVEWAY AT IMPERIAL VALLEY COLLEGE ON ATEN ROAD $178 HIGHWAY IMPERIAL LOCAL IMP080906 0 STATE ROUTE 115 AND 5TH STREET IMPROVEMENT $339 HIGHWAY IMPERIAL LOCAL IMP090104 0 STREET IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION ALONG WEST SIDE OF HOLT AVENUE BETWEEN NINTH AND TENTH $347 HIGHWAY STREETS IMPERIAL LOCAL IMP090103 0 STREET IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION OF NORTH AND SOUTH PORTION OF MAIN STREET BETWEEN $895 HIGHWAY HIGHWAY 111/115 AND LYERLY ROAD IMPERIAL LOCAL IMP090102 0 STREET REHABILITATION OF EMERSON AVENUE FROM HIGHWAY 98 TO THIRD STREET. $1,200 HIGHWAY IMPERIAL LOCAL IMP070302 0 TRAFFIC FLOW IMPROVEMENTS; TRAFFIC SIGNAL SYNCHRONIZATION $568 HIGHWAY Project List 7

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) IMPERIAL LOCAL IMP070902 0 TWO HYBRID PASSENGER VEHICLES $58 HIGHWAY IMPERIAL LOCAL IMP100602 0 TWO HYBRID VEHICLES $79 HIGHWAY IMPERIAL LOCAL IMP090404 0 WALNUT AVENUE REHABILITATION BETWEEN 5TH STREET (SR 115) AND FOURTH STREET $441 HIGHWAY LOS ANGELES TRANSIT LA0G762 0 ACCESS SERVICES – PURCHASE OF 26 REPLACEMENT MINIVAN (5 AP W/RAMP) (2 PROJECTS, 13 VEHICLES EACH). THIS PROJECT WILL $1,144 USE $ 131 IN TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G194 0 ACQUIRE ALTERNATE FOUR (4) FUEL BUSES FOR THE CITY OF ARTESIA TO BE USED FOR NEW FIXED ROUTE SERVICE EARMARK ID $1,029 #E2008-BUSP-0694 LOS ANGELES TRANSIT LA0G196 0 ACQUIRE ALTERNATE FUEL BUSES FOR RIO HONDO COLLEGE $613 LOS ANGELES TRANSIT LA0D298 0 ACQUISITION AND INSTALLATION OF TRANSIT AMENITIES $644 LOS ANGELES TRANSIT LA0G695 0 ACQUISITION OF REPLACEMENT REVENUE VEHICLES – (PROCUREMENT OF 700 FORTY-FOOT LOW FLOOR CNG TRANSIT BUSES) (NEW $330,000 BUS PROCUREMENT AND ESTIMATED TO RECEIVE THE BUSES IN THREE TO FOUR YEARS)D2011-BUSP-014 LOS ANGELES TRANSIT LA0D300 0 ACQUISITION OF TELEPHONE UPGRADES FOR TRANSIT DIVISION. $60 LOS ANGELES TRANSIT LA0D79 0 ACQUISITION OF THREE, 16-FOOT, 14-PASSENGER ALTERNATIVE FUEL TRANSIT VEHICLES FOR EXISTING INTRA-CITY CIRCULATOR $373 SYSTEM WITH CONNECTIVITY TO THE METRO GOLD LINE RAIL LOS ANGELES TRANSIT LA0D98 0 ACQUISITION OF TWO REPLACEMENT 16 OR 20 PASSENGER, CNG-FUELED VEHICLES FOR SIERRA MADRE'S ROUNDABOUT SYSTEM. $187 LOS ANGELES TRANSIT LA963542 0 ACQUISTION REVENUE VEHICLES – 2,554 CLEAN FUEL BUSES: LEASED VEH, FY02 (370) FY03 (30 HC)+FY04(70 HC)+(200 ARTICS);TOTAL $619,858 OF 1000 BUSES. INCLUDES 28.5 MIL FOR ACQ OF 41 VEHICLES FOR LACRD (RTP ID 1TR08D08 & 1TR08D07A) LOS ANGELES TRANSIT LA0G691 0 ALTERNATIVE ANALYSIS FOR THE VAN NUYS CORRIDOR $1,710 LOS ANGELES TRANSIT LA970501 0 ANNUAL EXPENDITURES INCLUDING SERVICE PROVIDER CONTRACTS & CAPITAL EXPENSES FOR COMPLEMENTARY ADA PARATRANSIT $277,737 IN LOS ANGELES COUNTY LOS ANGELES TRANSIT LA52603 0 ANNUAL TIRE PURCHASE $275 LOS ANGELES TRANSIT LA0C8232 0 ANTELOPE VALLEY LINE CHANGES AT SANTA CLARITA-ALIGNMENT CHANGES WILL PERMIT HIGHER SPEEDS OF OPERATION AND REDUCE $3,693 MAINTENANCE COST- (SCRRA). (PPNO 3202). LOS ANGELES TRANSIT LA0G509 0 ANTELOPE VALLEY LINE SEALED CORRIDOR. THIS PROJECT IS A CORRIDOR OF SAFETY IMPROVEMENTS AT GRADE CROSSINGS ALONG $14,000 THE ANTELOPE VALLEY LINE. LOS ANGELES TRANSIT LA0D299 0 AQUISITION OF (7) ALTER FUEL TRANSIT/PARATRANSIT VEHICLES FOR REPLACEMENT AND (1) FOR EXPANSION NOT TO EXCEED 35' $1,833 INCLUDING AUTOMATED ANNOUNCING SYSTEMS IN 3 FIXED-ROUTE BUSES SAFETEA-LU TRANSIT DEMO ID #251 LOS ANGELES TRANSIT LA0G773 0 ARTS & SERVICES FOR THE DISABLED – PURCHASE OF 1 SERVICE EXPANSION SMALL BUS (8 AP, 2 WC). THIS PROJECT WILL USE $ 7 OF $60 TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0C64 0 ASSOCIATED CAPITAL MAINTENANCE (ENGINES, TRANSMISSIONS, PARTICULATE TRAPS, KITS, ETC) (ONGOING) $25 LOS ANGELES TRANSIT LA0D345 0 ASSOCIATED CAPITAL MAINTENANCE FOR REVENUE VEHICLE FLEET (ONGOING) $38 LOS ANGELES TRANSIT LA55205 0 ASSOCIATED CAPITAL MAINTENANCE ITEMS (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR $7,361 LOS ANGELES TRANSIT LAF3434 0 AZUSA INTERMODAL TRANSIT CENTER. CONSTRUCT REGIONAL AZUSA INTERMODAL TRANSIT CENTER TO ACCOMMODATE EXISTING $7,832 AND FUTURE PARKING DEMAND AND SUPPORT EFFECTIVE TRANSIT USE. PARK N RIDE, THE STRUCTURE WOULD BE LOCATED ON THE SOUTHEAST QUADRANT OF ALAMEDA AVE./SANTA FE – 511 PARKING SPACES. 8 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LAF1654 0 BALDWIN PARK METROLINK PEDESTRIAN OVERCROSSING. CONSTRUCT A PEDESTRIAN OVERCROSSING OVER BOGART AVE AND THE $1,810 METROLINK LINE TO LINK THE STATION WITH VITAL BUS TRANSFER POINTS AND TO PROVIDE ACCESS TO PARKING OVERFLOW AREAS. LOS ANGELES TRANSIT LAFA141 0 BALDWIN PARK METROLINK TRANSPORTATION CENTER.CONSTRUCTION OF A TRANSPORTATION CENTER AND PARKING STRUCTURE AT $8,046 THE BALDWIN PARK METROLINK STATION. LOS ANGELES TRANSIT LA0D342 0 BEAUDRY AVE TERMINAL STREETSCAPE $509 LOS ANGELES TRANSIT LAF3432 0 BEELINE CNG FUELING AND MAINTENANCE FACILITY. THE CONSTRUCTION OF CITY-OWNED MAINTENANCE, OPERATIONS, AND $1,974 ADMINISTRATIVE FACILITY FOR THE TRANSIT SYSTEM AND GLENDALE DIAL-A-RIDE.. LOS ANGELES TRANSIT LA0D320 0 BETWEEN NORWALK AND LA MIRADA: CONSTRUCT 5.6 MILES OF NEW THIRD MAIN TRACK. PPNO# 2002 EA# R889SA TCRP# 35.2 $102,661 LOS ANGELES TRANSIT LA000789 0 BURBANK-GLENDALE-PASADENA AIRPORT INTERMODAL GROUND ACCESS LINK PROJECT STUDY $5,903 LOS ANGELES TRANSIT LA963546 0 BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, ITS, ETC. $992,884 INCLUDES $5.3 MIL FOR LACRD IMPROVEMENTS.(INCLUDES RTP ID 1TR08D08 & 1TR08D07A & 1TR08D07B) LOS ANGELES TRANSIT LA0D246 0 BUS CAPITAL ITEMS-ENGINE REBUILD AND ENGINE COMPONENTS 32 BUSES AT $50K EACH. $1,600 LOS ANGELES TRANSIT LA0G649 0 BUS CHASSI WASH REPLACEMENT: REPLACE CURRENT CHASSI WASH WITH NEW EQUIPMENT. AGENCY USING $35 OF TOLL CREDITS AS $175 A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY12. LOS ANGELES TRANSIT LA57101 0 BUS FACILITY IMPROVEMENTS $81,124 LOS ANGELES TRANSIT LA0D207 0 BUS PROCUREMENT (ON BEHALF OF SANTA MONICA COLLEGE). $1,000 LOS ANGELES TRANSIT LA0G723 0 BUS REFURBISHMENT – REPAINTING AND BODYWORK ON FIFTEEN (15) OLDER BUSES. THIS PROJECT WILL USE $20 OF TOLL CREDITS $100 TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE, IN FY12. LOS ANGELES TRANSIT LA01B114 0 BUS REHABILITATION – TWO (2) 40' BUSES (FY03) – DIESEL FUEL.BUS REHAB. – ELEVEN (11) 40' BUSES – DIESEL FUEL (FY04) BUS $358 REHAB. –TEN (10) 40' BUSES–DIESEL FUEL (FY05) LOS ANGELES TRANSIT LA0G421 0 BUS REPLACEMENT OF 13 COMMUTER OVER THE ROAD COACHES. PROJECT USING $1,514 OF TOLL CREDITS TO MATCH 5307 FUNDS IN $7,568 FY12. LOS ANGELES TRANSIT LA0D457 0 BUS REPLACEMENT OF 20 VEHICLES $8,981 LOS ANGELES TRANSIT LA57110 0 BUS REPLACEMENT: FIVE ALTERNATIVE FUELED BUSES (20 OR 30 FT WITH ASSOCIATED INFRASTRUCTURE) AND TEN ALTERNATIVE $11,500 FUELED BUSES (40 FT) LOS ANGELES TRANSIT LA0F022 0 BUS SHELTER PROGRAM (INSTALLATION OF BUS SHELTERS AND REAL TIME TRANSIT INFORMATION) $9,375 LOS ANGELES TRANSIT LA0G776 0 BUS SHELTERS FOR CITY OF HAWAIIAN GARDENS – SECTION 5309 FY10 EARMARKS E210-BUSP-019 $250 LOS ANGELES TRANSIT LA0G587 0 BUS STOP AMENITIES – INSPECTING, REPAIRING AND REPLACING COMPONENTS OF PASSENGER STATION BUILDINGS AND EQUIPMENT. $2,575 PROJECT USING $115 OF TOLL CREDITS IN FY11 AND $100 OF TOLL CREDITS IN FY12 FOR MATCH TO 5307 FUNDS. LOS ANGELES TRANSIT LA0D125 0 BUS STOP AMENITIES (BENCHES AND SHELTERS) PROJECT (ONGOING). PROJECT USING $162 OF TOLL CREDITS/TDC'S TO MATCH 5307 $2,669 FUNDS IN 11/12 LOS ANGELES TRANSIT LA963526 0 BUS STOP ENHANCEMENT/IMPROVEMENT $2,647 LOS ANGELES TRANSIT LA0G645 0 BUS STOP IMPROVEMENT PROJECT: REPLACE MBL BUS STOP SHELTERS AND AMENITIES WITHIN THE CITY OF MONTEBELLO. AGENCY $2,500 USING $500 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY11. LOS ANGELES TRANSIT LA0D347 0 BUS STOP IMPROVEMENTS $32 LOS ANGELES TRANSIT LA0G428 0 BUS STOP IMPROVEMENTS $19 LOS ANGELES TRANSIT LA0C37 0 BUS STOP IMPROVEMENTS CONSTRUCTION OF PASSENGER SHELTERS AND INFORMATION KIOSKS $686 Project List 9

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G017 0 BUS STOP IMPROVEMENTS/ AMENITIES INCLUDES: THE PURCHASE OF BENCHES, SHELTERS, SIGNAGE, TRASH RECEPTACLES, $8,781 LANDSCAPING, LIGHTING, ARTWORK AND OTHER BUS STOP RELATED AMENITIES. ADDED TOLL CREDIT IN FY10/11 IN CONSTRUCTION FOR $2. LOS ANGELES TRANSIT LA01B116 0 BUS SUPPORT EQUIPMENT – AIR COMPRESSOR, BRAKE LATHE, CNG DIAGNOSTIC HARDWARE & SOFTWARE EQUIPMENT AND FALL $295 RESTRAINT SYSTEM. THIS PROJECT WILL USE $54 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE, IN FY12. LOS ANGELES TRANSIT LA01B112 0 BUS SUPPORT EQUIPMENT (ENGINES AND TRANSMISSIONS) $1,200 LOS ANGELES TRANSIT LA0G027 0 BUS SYSTEM – MAINTENANCE FACILITY EQUIPMENT (BUS WASHER AND HEAVY DUTY VACUUM) $300 LOS ANGELES TRANSIT LA0G199 0 BUS SYSTEM – MAINTENANCE FACILITY EQUIPMENT, HOIST (1). THIS PROJECT WILL USE $30 OF TOLL CREDITS TO MATCH THE 5307 $150 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA01B111 0 BUS SYSTEM – PREVENTIVE MAINTENANCE. THIS PROJECT WILL USE $450 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN $18,098 THE CON PHASE IN FY12. LOS ANGELES TRANSIT LA0B0825 0 BUS SYSTEM OPERATING EQUIPMENT – SEAT REPLACEMENT, SPRAY BOOTH, WASH RACKS & WHEEL POLISHERS. $3,750 LOS ANGELES TRANSIT LA0G430 0 CAMERA INSTALLATION ON TRANSIT FLEET. $36 LOS ANGELES TRANSIT LAE0443 0 CAPITAL IMPROVEMENTS TO SUPPORT AND ENHANCE THE CAL STATE UNIVERSITY NORTHRIDGE TRAM SYSTEM $340 LOS ANGELES TRANSIT LA0G554 0 CAPITALIZATION OF EQUIPMENT MAINTENANCE. PROJECT USING $478 OF TOLL CREDITS TO MATCH 5307 FUNDS IN FY12. $2,390 LOS ANGELES TRANSIT LA0G393 0 CAPITALIZATION OF FTA EQUIPMENT MAINTENANCE $2,480 LOS ANGELES TRANSIT LA0G222 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE (EQUIPMENT MAINTENANCE EXPENSES). ADDED TOLL CREDITS IN FY10/11 IN CONS. $41,588 FOR $1,991. LOS ANGELES TRANSIT LA0D43 0 CAPITALIZATION OF PREVENTIVE MAINTENANCE (ONGOING). $3,980 LOS ANGELES TRANSIT LA0D297 0 CAPITALIZED COST OF CONTRACTING – BUS LEASE. NON-EXPANSION $1,000 LOS ANGELES TRANSIT LA52101 0 CERTIFICATES OF PARTICIPATION (COP) HAVE BEEN ISSUED FOR THE CULVER CITY TRANSPORTATION FACILITY. PAYMENTS WILL BE $6,480 MADE BI-ANNUALLY THROUGH JANUARY 2016. LOS ANGELES TRANSIT LA0C8380 0 CHINATOWN/COLLEGE STREET GOLD LINE STATION – INTERMODEL TRANS. CENTER ENHANCE MENT ( PEDESTRIAN WALKWAY BRIDGE, $18,190 BUS STATION, AND A BIKE STATION) LOS ANGELES TRANSIT LA0B7041 0 CIRCULATOR BUS STUDY WITHIN CITY OF SOUTH PASADENA $181 LOS ANGELES TRANSIT LA0G698 0 CITY OF ARCADIA/ARCADIA TRANSIT, REPLACEMENT OF TEN (10) PARATRANSIT VEHICLES, WHICH EACH SEATS 16-18 AMBULATORY $900 PASSENGERS AND 2 WHEELCHAIRS. LOS ANGELES TRANSIT LAF1408 0 CITY OF CERRITOS TRANSIT AMENITIES. IMPLEMENTATION OF THE CITYWIDE STREET FURNITURE PLAN. THIS PLAN IDENTIFIES ALL $320 SHARED BUS STOPS LACKING TRANSIT AMENITIES. LOS ANGELES TRANSIT LAF3401 0 CITY OF SANTA CLARITA TRANSIT BUS REPLACEMENT WITH CNG. REPLACE FIVE DIESEL POWERED TRANSIT BUSES WITH 40-FOOT $2,296 ALTERNATIVE FUELED COMPRESSED NATURAL GAS (CNG), LOW-FLOOR BUSES. LOS ANGELES TRANSIT LAFA142 0 CNG BUS REPLACEMENT. REPLACE 4 DIESEL BUSES WITH CNG FUELED BUSES. $1,280 LOS ANGELES TRANSIT LA0G669 0 CNG FUELING FACILITY $3,336 LOS ANGELES TRANSIT LA0G217 0 CNG GARAGE RETROFIT – INCLUDES MAINTENANCE OF COMPRESSED NATURAL GAS VEHICLES AND EQUIPMENT. THIS PROJECT IS A $400 CARRY-OVER FROM PRIOR FINANCIAL YEAR. LOS ANGELES TRANSIT LA0G590 0 COMMUNICATION SYSTEM UPGRADE. PROJECT USING TOLL CREDITS; $33 IN FY11 & $10 IN FY12 FOR MATCH FOR 5307 FUNDS. $365 LOS ANGELES TRANSIT LA0G491 0 COMMUTER BUS – COSMETIC UPGRADES/REHAB. $688 10 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LAF3410 0 COMMUTER EXPRESS FLEET UPGRADE TO ALTERNATIVE FUEL (CNG). PURCHASE OF FOUR 40' CNG BUSES TO REPLACE 4 DIESEL BUSES $2,324 TMC BUSES FOR THE LADOT COMMUTER EXPRESS LINE 422. LOS ANGELES TRANSIT LAF1442 0 COMMUTER EXPRESS FLEET UPGRADE. FUND 10 OF REQUESTED 85 CNG BUSES TO REPLACE OLD DIESEL BUSES. $4,917 LOS ANGELES TRANSIT LA0D362 0 COMPREHENSIVE OPERATIONAL ANALYSIS TRANSIT PLANNING $415 LOS ANGELES TRANSIT LA0C8221 0 COMPRESSED NATURAL GAS FUELING AND MAINTENANCE FACILITY; NEW PUMPING STATION WILL ALLOW FOR FLEET EXPANSION, AND $11,500 REDUCE OPERATING COST. LOS ANGELES TRANSIT LA0C8223 0 COMPTON MLK TRANSIT CENTER EXPANSION AND MULTI-MODAL/WILL ALLOW THE TRANSIT SYSTEM TO REDUCE OPERATING COST. $4,934 LOS ANGELES TRANSIT LA0G216 0 COMPUTER HARDWARE AND SOFTWARE UPGRADE $126 LOS ANGELES TRANSIT LAE0076 0 CONSTRUCT ADD'L VEHICLE PARKING (200 TO 400 SPACES), BICYCLE PARKING LOT AND PEDESTRIAN REST AREA AT THE TRANSIT $2,085 CENTER. SAFTEA-LU 76, E2009-BUSP-060 (PAGE 20059 IN FTA 2009 EARMARKS) LOS ANGELES TRANSIT LA0D127 0 CONSTRUCT CNG FUELING STATION ON EXISTING FACILITY $3,085 LOS ANGELES TRANSIT LAE0396 0 CONSTRUCTION OF EMPIRE AREA TRANSIT CENTER NEAR BURBANK AIRPORT -UPGRADE EXIST – REG,L TRANSIT & LAYOVER FACILITY $1,723 ADJACENT TO THE BURBANK-GLENDALE-PASADENA AIRPORT. WILL FACILITATE TRANSFER OF PASSENGERS TO & FROM MANY GROUND TRANS. (PE ONLY)SAFTEA-LU 396, E-2009-BUSP-063. LOS ANGELES TRANSIT LA0D376 0 CONSTRUCTION OF GRADE SEPARATIONS ON 35 MILE FREIGHT RAIL CORRIDOR FROM LOS ANGELES TO POMONA. $959 LOS ANGELES TRANSIT LA0G354 0 CONSTRUCTION OF TRANSIT CENTER AT THE COMMUNITY REC FACILITY LOCATED AT THE TAYLOR RANCH PARK AND RIDE FACILITY, 737 $325 NORTH MONTEBELLO BOULEVARD, MONTEBELLO. LOS ANGELES TRANSIT LA0G425 0 CONSTRUCTION OF VEHICLE MAINTENANCE FACILITY $7,080 LOS ANGELES TRANSIT LA0D285 0 COUNTYWIDE NON-URBANIZED AREA CAPITAL,OPERATING AND ADMINISTRATIVE ASSISTANCE $8,773 LOS ANGELES TRANSIT LA0D92 0 COUNTYWIDE UNIVERSAL FARE SYSTEM (UFS) PROJECT (ONGOING) $2,545 LOS ANGELES TRANSIT LA0D198 0 CRENSHAW/LAX TRANSIT CORRIDOR ($20 MILLION IN FY10/11 IS FOR USDOT’S TIFIA OFFICE TO SUBSIDIZE ITS COSTS FOR PROCESSING $1,733,188 THE TIFIA LOAN OF $545.9 MILLION, THEREFORE, NOT PART OF THE TOTAL PROJECT COST. LOS ANGELES TRANSIT LAF1455 0 CROSS-TOWN TRANSIT CONNECTOR AND SERVICE EXPANSION. FUNDS TO ACQUIRE TWO (2) CNG BUSES TO IMPLEMENT NEW LOCAL $811 TRANSIT SERVICE BETWEEN NORTH HOLLYWOOD RED LINE STATION AND DOWNTOWN BURBANK. LOS ANGELES TRANSIT LA0G080 0 CULVER CITY AERIAL STATION FOR EXPOSITION LIGHT RAIL STATION. $4,000 LOS ANGELES TRANSIT LAF1417 0 CULVER CITYBUS ARTICULATED CNG BUSES FOR OVERCROWDING, NON-EXPANSION. FUND SIX (6) OF EIGHT (8) REQUESTED SIXTY FOOT $5,469 ARTICULATED BUSES TO EXPAND THE PASSENGER CAPACITY OF THE CURRENT CULVER CITYBUS LINE 6 DURING PEAK HOURS. LOS ANGELES TRANSIT LA52100 0 CULVER CITYBUS OPPERATION ASSISTANCE. $20,190 LOS ANGELES TRANSIT LAES757 0 CUSTOMER INFORMATION SYSTEM PROJECT: INCLUDING AUTOMATIC VEHICLE LOCATION AND REAL-TIME PASSENGER INFORMATION $1,500 SYSTEMS. LOS ANGELES TRANSIT LAFA143 0 DASH 32-35' CNG (OR OTHER ALT FUELED) DASH REPLACEMENT BUSES TO SAVE OVERCROWDING AND INCREASE CAPACITY IN THE $5,023 DOWNTOWN AREA. 35' BUSES WILL REPLACE 30' BUSES. LOS ANGELES TRANSIT LAF3414 0 DASH CLEAN FUEL – HIGHER CAPACITY VEHICLES. PURCHASE OF ELEVEN(11)35' REPLACEMENT CNG DASH BUSES TO EASE $4,000 OVERCROWDING AND INCREASE CAPACITY ON 6 HIGH-PERFORMING DASH ROUTES. LOS ANGELES TRANSIT LAE0388A 0 DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES MISSION COLLEGE AND PUBLIC TRANSIT $263 SERVICES TO INCLUDE LIGHTING, LANDSCAPIND, AND PASSENGER AMENITIES Project List 11

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LAE0195 0 DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES PIERCE COLLEGE AND MTA'S RAPID BUS TRANSIT $4,049 STOPS TO INCLUDE PASSENGER AMENITIES, 2007 CFP # F1658. (DEMO ID 195, E2009-BUSP-181) LOS ANGELES TRANSIT LA0D281 0 DESIGN AND CONSTRUCT PARKING IMPROVEMENTS AT AND ADJACENT TO THE CITY'S EXISTING METROLINK STATION $308 LOS ANGELES TRANSIT LA0G635 0 DESIGN AND CONSTRUCTION OF PEDESTRIAN AND TRANSIT ENHANCEMENTS ALONG THE PUBLIC RIGHT-OF-WAY OF THE METRO GOLD $30,000 LINE EASTSIDE EXTENSION TO SURROUNDING NEIGHBORHOOD. LOS ANGELES TRANSIT LA973503 0 DOWNTOWN TRANSIT MALL ENHANCEMENTS; REMODEL EXISTING SPACE TO OPEN A TRANSIT CUSTOMER SERVICE CENTER & $2,261 EXTENSION ON THE TRANSIT CUSTOMER CENTER LEASE. LOS ANGELES TRANSIT LAF1415 0 EAST LA COLLEGE TRANSIT CENTER PHASE II. AMENITIES TO INCLUDE INFORMATION KIOSK AND DRIVER RESTROOMS FOR 2ND PHASE $149 OF THE EAST LOS ANGELES COMMUNITY COLLEGE TRANSIT CENTER. LOS ANGELES TRANSIT LA0G767 0 SEALS – PURCHASE OF 2 REPLACEMENT LARGE BUS. THIS PROJECT WILL USE $ 16 OF TOLL CREDITS TO MATCH THE 5310 $140 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LAF1511 0 EASTSIDE LIGHT RAIL BIKE INTERFACE PROJECT. PROJECT INCLUDES DESIGN AND CONSTRUCTION OF BIKE ROUTES WITH APPROPRIATE $1,176 SIGNAGE AND STRIPING TO ACCESS METRO GOLD LINE STATIONS. LOS ANGELES TRANSIT LA0G626 0 EASTSIDE TRANSIT CORRIDOR PHASE 2 – METRO GOLD LINE EASTSIDE EXTENSION FROM ITS EXISTING TERMINUS AT ATLANTIC $2,490,000 STATION IN EAST LOS ANGELES FARTHER EAST LOS ANGELES TRANSIT LAF1450 0 ENCINO PARK-AND-RIDE FACILITY RENOVATION. RENOVATION OF THE ENCINO PARK-AND-RIDE FACILITY IN ORDER TO ADDRESS $1,295 PHYSICAL AND STRUCTURAL DEFICIENCIES AND ADD CAPACITY TO THIS HEAVILY UTILIZED FACILITY. INCLUDES 50 NEW PARKING SPACES AND BIKE LOCKERS. LOS ANGELES TRANSIT LA973010 0 ENGINE REBUILDS FOR SERVICE FLEET $240 LOS ANGELES TRANSIT LA0G270 0 EXPANSION AND IMPROVEMENT TO EXISTING TRANSIT CENTER IN THE CITY OF PALMDALE. E2009-BUSP-137. $360 LOS ANGELES TRANSIT LA0F021 0 EXPOSITION LIGHT RAIL TRANSIT SYSTEM PHASE II – FROM CULVER CITY TO SANTA MONICA $1,317,500 LOS ANGELES TRANSIT LA0D12 0 FACILITY IMPROVEMENTS – POMONA, ARCADIA, ADMIN. OFFICE-SEISMIC RETROFIT $8,450 LOS ANGELES TRANSIT LAE0212 0 FEASIBILITY STUDY – OF DOWNTOWN STREETCAR PROJECT $1,002 LOS ANGELES TRANSIT LA0D389 0 FEDERAL GRANT WILL BE USED TO PURCHASE TWO (2) PARATRANSIT VEHICLES FOR THE CITY'S DIAL-A-RIDE SERVICE USED BY $146 ELDERLY AND HANDICAPPED RESIDENTS LOS ANGELES TRANSIT LA0G012 0 FEDERAL OPERATING ASSISTANCE (L/P UZA. PROJECT USING $1,103 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) $12,134 FOR MATCH IN FY11 IN CON AND $1,103 FOR A MATCH IN FY12. LOS ANGELES TRANSIT LA0G285 0 FINAL EXPANSION OF PARKING AT THE NEWHALL METROLINK STATION WHICH WILL ADD 95 PARKING SPOTS FOR PARK AND RIDE. $1,200 LOS ANGELES TRANSIT LA52600 0 FY 2010/11 ESTIMATED OPERATING ASSISTANCE – TRANSIT OPERATIONS $14,198 LOS ANGELES TRANSIT LAF3306 0 GARDENA MUNICIPAL BUS LINES LINE 1 TSP PROJECT. GARDENA MUNICIPAL BUS LINES IS PROPOSING TO IMPLEMENT TRANSIT SIGNAL $844 PRIORITY ALONG ITS LINE 1 TO REDUCE TRANSIT TRAVEL TIMES AND ENHANCE ON-TIME PERFORMANCE. CITY OF GARDENA: MARINE AVENUE: FROM YUKON AVENUE TO WESTERN AVENUE WESTERN AVENUE: FROM MARINE AVENUE TO 166TH STREET NORMANDIE AVENUE: FROM 166TH STREET TO GARDENA BOULEVARD VERMONT AVENUE: FROM GARDENA BOULEVARD TO 153RD STREET LOS ANGELES TRANSIT LA0G670 0 GLASSELL PARK TRANSIT PAVILION, LOS ANGELES.PAVILION WILL INCLUDE MULTIPLE PERMANENT CANOPIES CONSISTING OF FIBER $238 GLASS WITH METAL FRAMES THAT PROVIDE PASSENGERS COVERAGE FROM THE WEATHER. AMENITIES INCLUDE WANDERING PATHS, VEGETATION AND PERMANENT BENCHES FOR WAITING BETWEEN LINE TRANSFERS OF THE 5 LOCAL AND REGIONAL TRANSIT LINES WHICH USE THE PAVILION AS A STOP. LOS ANGELES TRANSIT LA0G231 0 GOLD LINE – EASTSIDE EXTENSION OPERATING ASSISTANCE $52,500 12 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G558 0 GOLD LINE FOOTHILL LRT EXTENSION – PASADENA TO AZUSA $847,000 LOS ANGELES TRANSIT LAF1427 0 HAHN'S TROLLEY AND SHUTTLE TRANSIT VEHICLES; PURCHASE THREE 25 FEET-LONG ALTERNATIVELY-FUELED CUTAWAY BUSES (TWO $375 PRIMARY SERVICE VEHICLES AND ONE SPARE VEHICLE) FOR REPLACEMENT THAT COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) AND ARE EQUIPPED WITH WHEELCHAIR LIFTS. LOS ANGELES TRANSIT LA0D380 0 HARDWARE AND SOFTWARE UPGRADE-FUEL DISPENSING/MONITORING $48 LOS ANGELES TRANSIT LA0D29 0 HEART OF THE CITY BUS TRANSFER STATION AMENITIES – CONSTRUCTION IN CITY REDEVELOPMENT AREA – (SERVICE BY 5 LACMTA $9,378 LINES, 2 TORRANCE LINES & 1 LADOT COMMUTER EXPRESS LINE). LOS ANGELES TRANSIT LA0G671 0 HISTORIC FILIPINOTOWN BUS SECURITY LIGHTS, LOS ANGELES $79 LOS ANGELES TRANSIT LA0C53 0 HOLLYWOOD INTERMODAL TRANSPORTATION AND PUBLIC PARKING CENTER ON HAWTHORNE AVE. BETWEEN HIGHLAND AVENUE AND $41,000 NORTH ORANGE DRIVE (EXIST 500 SP PARK STRUCTURE).TCRP#49.2 LOS ANGELES TRANSIT LA0D95 0 IMPLEMENTATION OF UNIVERSAL FARE SYSTEM PROJECT AT LADOT PREVIOUSLY PART OF LAOD07. $2,893 LOS ANGELES TRANSIT LA0G113 0 INSTALL PASSENGER COUNTERS, AVL, AND STOP ANNOUCEMENT SYSTEMS ON ALL BUSES $123 LOS ANGELES TRANSIT LA0G644 0 INSTALLATION OF AN AUTOMATIC PASSENGER COUNTER (APC) SYSTEM ON MBL FLEET. AGENCY USING $60 OF TOLL CREDITS AS A $300 MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY12. LOS ANGELES TRANSIT LA0G775 0 INSTALLATION OF BUS SHELTERS AND RELATED IMPROVEMENT AMENITIES FOR CITY OF WHITTIER – SECTION 5309 FY10 EARMARKS $776 E210-BUSP-021 LOS ANGELES TRANSIT LA0G260 0 INSTITUTE FOR THE REDESIGN OF LEARNING DBA THE ALMANSOR CENTER PURCHASE OF SEVEN SERVICE EXPANSION SMALL BUSES 1B $586 AT A COST OF $58,000 EACH ($6,653 LOCAL AND $51,347 FEDERAL). IN ADDITION PURCHASE OF THREE SERVICE EXPANSION MEDIUM BUSES II AT $60,000 EACH ($6882 LOCAL AND $53,118 FEDERAL). LOS ANGELES TRANSIT LA0G783 0 INSTITUTE FOR THE REDESIGN OF LEARNING-PURCHASE 3 SERVICE EXPANSION SMALL BUSES. THIS PROJECT WILL USE $21 OF TOLL $181 CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G593 0 ITS REPLACEMENT. PROJECT WILL USE TOLL CREDITS; $160 IN FY11 TO MATCH 5307 FUNDS. $800 LOS ANGELES TRANSIT LA990764 0 JOB ACCESS & REVERSE COMMUTER PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123 (TOLL CREDIT $175,990 WILL BE USED AS THE LOCAL MATCH TO SECTION 5316 FEDERAL FUNDS) TOLL CREDIT IN FY11/12 IN CON FOR $21,592. LOS ANGELES TRANSIT LA0C8114 0 LA CNTY RIDESHARE SERVICES; PROVIDE COMMUTE INFO, EMPLOYER ASSISTANCE AND INCENTIVE PROGRAMS THROUGH CORE & $82,560 EMPLOYER RIDESHARE SERVICES & MTA INCENTIVE PROGRAMS. PPNO 9003 LOS ANGELES TRANSIT LA0G142 0 LACRD – 12 BUSES FOR THE I-10 . HOT LANE. (RTP# 1TR08D08 & 1TR08D07A) $8,500 LOS ANGELES TRANSIT LA0G145 0 LACRD – 4 EXPANSION BUSES FOR THE I-110 HOT LANE(). (RTP# 1TR204) $2,800 LOS ANGELES TRANSIT LA0G159 0 LACRD – DIVISION 13 (FORMERLY NAMED UNION DIVISION) NEW BUS OPERATIONS AND MAINTENANCE FACILITY (RTP ID 1OM08D01 & $85,500 1TR08D07A & 1HL08D03 FOR HOT LACRD PROJ). PROJECT AND SCOPE ARE FROM AMENDMENT 2008 AMENDMENT #53. LOS ANGELES TRANSIT LA0G154 0 LACRD – EL MONTE TRANSIT CENTER IMPROVEMENTS AND EL MONTE BUSWAY IMPROVEMENTS, INCLUDING BIKE LOCKERS, TICKET $76,909 VENDING MACHINES AT EL MONTE BUSWAY STATIONS AND UP TO 30 BUS BAYS; EL MONTE BUSWAY TERMINUS (@ UNION STATION) IMPROVEMENTS INCLUDING PASSENGER STATION REHABILITATION AND UPGRADES AND IMPROVED PEDESTRIAN CONNECTION TO PATASOURAS PLAZA/UNION STATION. LOS ANGELES TRANSIT LA0G150 0 LACRD – I-10 AND I-110 EXPRESS LANES FORMATION OF NEW VANPOOLS AND ENHANCED TRANSIT SERVICE INCLUDING SECURITY, $4,201 MARKETING AND MAINTENANCE.(RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02). (SPLIT WITH LA0G819) LOS ANGELES TRANSIT LA0G149 0 LACRD – I-10 HOT LANE OPERATIONS – NEW TRANSIT SERVICES.(RTP# 1OM08D02). $3,634 Project List 13

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G148 0 LACRD – I-110 HOT LANE OPERATIONS – NEW TRANSIT SERVICES. (RTP# 1TR204) $1,200 LOS ANGELES TRANSIT LA0G147 0 LACRD – I-110 HOT LANE OPERATIONS – NEW TRANSIT SERVICES.(CITY OF GARDENA)(RTP# 1TR204) $600 LOS ANGELES TRANSIT LA0G153 0 LACRD – PLATFORMS AND PARKING IMPROVEMENTS AT THE METROLINK POMONA STATION. ADDITION OF 100 PARKING SPACES AND $5,600 EXTENSION OF PLATFORM.(G# CA-37-X052-00) LOS ANGELES TRANSIT LAE0127 0 LAE0127A:PROCUREMENT OF 3 CNG REPLACEMENT TRANSIT VEHICLES AND RELATED INFRASTRCTURE EQUIPMENT FOR FIXED ROUTE $858 PUBLIC TRANSPORTATION. LOS ANGELES TRANSIT LA0G499 0 LAE0127B: PURCHASE OF EQUIPMENT TO SUPPORT CNG VEHICLES AND MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE $744 IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION LOS ANGELES TRANSIT LA0G500 0 LAE0127C: MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION $806 LOS ANGELES TRANSIT LA0G501 0 LAE0127D: PURCHASE OF EQUIPMENT TO SUPPORT CNG VEHICLES AND MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE $922 IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION LOS ANGELES TRANSIT LA0F063 0 LA-FULLERTON TRIPLE TRACK & GRADE SEP (ROSECRANS) (IN SANTA FE SPRINGS, LA ON THE BNSF LINE. CONSTRUCT TRIPLE TRACK & $90,000 GRADE SEPARATION AT ROSECRANS AND MARQUARDT AVE. (PPNO 2002A) & ELIMINATE HAZARDS AT RAILROAD GRADE CROSSING. LOS ANGELES TRANSIT LA0D282 0 LANDSCAPE,STREETSCAPE & PASSENGER AMENITY IMPRVMENTS AT & ADJACENT LOS ANGELES CITY COLLEGE TO IMPROVE $9,564 PEDESTRAN MOBILITY & ACCESSIBILITY TO EXSTG MULTIMDAL CONN. (SAFETEA-LU # 223, 2007 CFP #F1641) LOS ANGELES TRANSIT LA0G596 0 LAURENCE JACKSON TRANSIT CENTER CLEAN FUEL FACILITY MODIFICATION: WILL INCLUDE THE NECESSARY FACILITY MODIFICATIONS $6,700 TO ACCOMMODATE AN ALTERNATIVE FUELING FACILITY SUCH AS FOR COMPRESSED NATURAL GAS FUELING. LOS ANGELES TRANSIT LA0F075 0 LIGHT RAIL TRANSIT FLEET-UP TO 78 NEW CARS SYSTEMWIDE $335,400 LOS ANGELES TRANSIT LA000665 0 LINE #8 – OPERATING SUBSIDY $5,046 LOS ANGELES TRANSIT LA0G492 0 LOCAL TRANSIT BUS – COSMETIC UPGRADE/REHAB. PROJECT USING $54 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL $570 CREDITS) IN FY12 FOR CON LOS ANGELES TRANSIT LA0C8237 0 LONG BEACH PARK AND RIDE FACILITY AT 4TH AND PACIFIC, SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 100 DEDICATED, TRANSIT $3,902 ORIENTED SPACES IN MIXED USE DEVELOPMENT LOS ANGELES TRANSIT LAE0332 0 LONG BEACH PARK AND RIDE FACILITY AT 3RD STREET AND PACIFIC AVE SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 300 TO 500 $1,002 SPACE AND INCLUDE RESIDENTIAL AND COMMERCIAL DEVELOPMENT LOS ANGELES TRANSIT LAF3426 0 'S PASSPORT REPLACEMENT PROJECT. PURCHASE OF UP TO 15 ALTERNATIVE FUEL 30-FOOT BUSES TO REPLACE $9,896 A PORTION OF LBT'S DIESEL PASSPORT FLEET IN DOWNTOWN LONG BEACH. LOS ANGELES TRANSIT LA0G694 0 LOS ANGELES – SAN FERNANDO VALLEY BRT TRANSIT EXTENSION CANOGA $216,000 LOS ANGELES TRANSIT LAF1657 0 LOS ANGELES VALLEY COLLEGE (LAVC) BUS STATION EXTENSION. PROJECT WILL EXTEND THE ORANGE LINE STATION AT THE LA VALLEY $2,959 COLLEGE BY PROVIDING A DIRECT PEDESTRIAN CONNECTION FROM THE STATION TO A NEW PEDESTRIAN ENTRANCE TO LAVC. LOS ANGELES TRANSIT LA974165 0 MACARTHUR PARK STATION IMPROVEMENTS INCLUDE DESIGN AND CONSTRUCTION OF A PLAZA TO ACCOMODATE PUBLIC ACCESS $1,931 (PEDESTRIAN ENTRANCES, WALKWAYS, BICYCLE FACILITIES) PPNO# 3417 LOS ANGELES TRANSIT LAF1609 0 MAIN STREET BUS STOP AND PEDESTRIAN IMPROVEMENTS. DESIGN AND CONSTRUCT BUS STOP AND PEDESTRIAN IMPROVEMENTS $823 THAT WILL INCREASE THE USAGE AND CAPACITY OF PEDESTRIAN FACILITIES ALONG A 0.4 MILE STRETCH OF MAIN STREET. LOS ANGELES TRANSIT LA0G072 0 MAINTENANCE AND ADMINISTRATIVE EQUIPMENT. USING $100 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY12 $900 IN CON FOR MATCH TO 5307 FUNDS. 14 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G722 0 MAINTENANCE FACILITY RETROFIT – FOR CNG BUSES. THIS PROJECT WILL USE $187 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL $937 FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G588 0 MAJOR BUS COMPONENTS. PROJECT USING TOLL CREDITS; $60 IN BOTH FY11 & FY12 FOR MATCH FOR 5307 FUNDS. $1,500 LOS ANGELES TRANSIT LA0G589 0 MAJOR FACILITY EQUIPMENT. PROJECT IS A CARRYOVER FROM THE 2008 FTIP AMENDMENT #44 $600 LOS ANGELES TRANSIT LAF1424 0 MCBEAN REGIONAL TRANSIT CENTER PARK AND RIDE. PURCHASE LAND, DESIGN, AND CONSTRUCT A REGIONAL PARK-AND-RIDE LOT $5,868 ADJACENT TO THE MCBEAN REGIONAL TRANSIT CENTER IN THE CITY OF SANTA CLARITA. LOS ANGELES TRANSIT LA0D338 0 METRO GOLD LINE EASTSIDE EXTENSION ENHANCEMENTS INCLUDING ADDITIONAL TVM'S; PEDESTRIAN SAFETY, LANDSCAPING AND $14,000 MULTI-MODAL INTERFACE ELEMENTS; ADDITIONAL TRACTION POWER SUBSTATION, LOS ANGELES TRANSIT LA0G447 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION SEGMENT 1 – WILSHIRE/WESTERN TO LA CIENEGA (EXCLUDING P/E WHICH IS $2,511,121 UNDER LA0G642) LOS ANGELES TRANSIT LA0G642 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION TO WESTWOOD – P/E ONLY $107,400 LOS ANGELES TRANSIT LA29212XY 0 METRO RAIL GOLD LINE EXTENSION- PASADENA TO MONTCLAIR 24- MILE, 12- STATION LRT EXTENSION. SAFETEA-LU # 285 LEAD $35,530 AGENCY WILL CHANGE TO METRO GOLD LINE LOS ANGELES TRANSIT LA0C8413 0 BUS STATIONS-PHASE II: INCLUDES COMMUNICATIONS & EQUIPMENT – EQUIPMENT AND BUS SHELTERS ONLY. $144,900 LOS ANGELES TRANSIT LAF3712 0 METROLINK PARKING RESOURCE MANAGEMENT DEMONSTRATION PROJECT. DEMONSTRATION PROJECT PROVIDES COMMUTERS $266 OF METROLINK AND TRANSIT SERVICES WITH A PROACTIVE SYSTEM TO ASSIST IN LOCATING AVAILABLE PARKING WITHIN CITY'S METROLINK STATION VICINITY. LOS ANGELES TRANSIT LA0D206 0 METROLINK PEDESTRIAN BRIDGE PROJECT. THIS FACILITY WILL BE CONSTRUCTED ON THE WEST SIDE OF CITRUS AVE. THE METROLINK $469 STATION IS ON THE EAST SIDE OF CITRUS AVE. LOS ANGELES TRANSIT LA0G456 0 METROLINK SEALED CORRIDOR GRADE CROSSING IMPROVEMENTS LOS ANGELES VENTURA SUBDIVISION $446 LOS ANGELES TRANSIT LA0C10 0 MID-CITY/EXPOSITION CORRIDOR LIGHT RAIL TRANSIT PROJECT PHASE I TO VENICE-ROBERTSON STATION. (INCLUDING E200- $930,562 BUSP-095, LA CIENEGA INTERMODAL CENTER) LOS ANGELES TRANSIT LA0D197 0 MID-CITY/EXPOSITION CORRIDOR LRT OPERATING ASSISTANCE $114,801 LOS ANGELES TRANSIT LA0G300 0 MODIFY AND ENHANCE EXISTING INTERMODAL PASSENGER AMENITIES AT CALSTATE UNIVERSITY, NORTHRIDGE EARMARK ID # $504 E2008-BUSP-0696 LOS ANGELES TRANSIT LA0C8250 0 MONROVIA RAILROAD DEPOT MULTI-MODAL TRANSIT CENTER: STABILIZING STRUCTURE AND THEN OVERALL STRUCTURAL ELEMENTS $2,053 WILL BE REPAIRED FOLLOWED BY RESTORING KEY ARCHITECTURAL . PPNO# 3415 LOS ANGELES TRANSIT LAES187 0 MULTI-COUNTY FUNDED POSITIVE TRAIN CONTROL (PTC). SCRRA IS DEVELOPING AN ACCELERATED STRATEGY TO HAVE POSITIVE TRAIN $201,600 CONTROL (PTC) OPERATIONAL ON ALL METROLINK TRAINS BY 2012 AND THE FULL PTC SYSTEM INSTALLED ON THE 216 MILES OF METROLINK-OWNED RIGHT-OF-WAY BY 2015.(5307 FUNDS FROM 5340) LOS ANGELES TRANSIT LA0G431 0 MULTI-MODAL TRANSIT CENTER AT CSUN TO INCLUDE PASSENGER LOADING AREAS AND BUS SHELTERS $492 LOS ANGELES TRANSIT LA0G110 0 NEW EQUIPMENT FOR BUS MAINTENANCE. CARRYOVER FROM THE ADOPTED 2011 FTIP. $120 LOS ANGELES TRANSIT LA0D471 0 NEW FREEDOM PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123. ADDED TOLL CREDITS IN FY11/12 IN $66,347 CONS. FOR $9,309. LOS ANGELES TRANSIT LA0F096 0 NORWALK SANTA FE SPRINGS TRANSPORTATION CENTER PARKING EXPANSION AND BIKEWAY IMPROVEMENTS. PROVIDE ADDITIONAL $4,057 400 PARKING SPACES FOR TRANSIT CENTER PATRONS AND IMPROVE BICYCLES ACCESS TO THE TRANSIT CENTER Project List 15

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G073 0 NORWALK/SANTA FE SPRINGS TRANSPORTATION CENTER-METROLINK STATION IMPROVEMENTS. REHAB/IMPROVEMENT OF THE $649 TRANSIT FACILITY, EQUIPMENT MAINTENANCE FACILITY, OPERATIONS/DISPATCH OFFICES, FUEL ISLAND, BUS WASH AND DRAINAGE, PARKING, AND PEDESTRIAN PLAZA PASSENGER AMENITIES. THIS PROJECT WILL USE $23 TOLL CREDITS TO MATCH $113 – FTA LA/LB UZA IN FY 10/11. LOS ANGELES TRANSIT LAF3402 0 NORWALK/SANTA FE SPRINGS TRANSPORTATION CTR PHASE II PARKING. CONSTRUCT A TOTAL OF APPROX. 160 PARKING SPACES ON A $2,819 SITE ADJACENT TO THE METROLINK STATION. LOS ANGELES TRANSIT LAF1451 0 OLIVE/PICO BUS STOP IMPROVEMENT. LENGTHEN THE OLIVE/PICO BUS ZONE BY ENLARGING THE ISLAND WHERE MULTIPLE AGENCY $424 BUS STOPS ARE LOCATED, INSTALLING LIGHTING, AND CONSTRUCTING A CONCRETE BUS PAD. LOS ANGELES TRANSIT LAES534 0 ON-BOARD CAMERA UPGRADE $500 LOS ANGELES TRANSIT LA0G108 0 ONE REPLACEMENT TRANSIT VEHICLE WOULD BE PURCHASED TO REPLACE VEHICLE # 328 $554 LOS ANGELES TRANSIT LA0G081 0 ONGOING ADMINISTATION. INCLUDES: ITS SOFTWARE IMPLEMENTATION – MAINTENANCE MANAGEMENT SOFTWARE. THE PROJECT IS $1,300 USING $60 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY 11 AND $100 IN FY12 FOR MATCH TO 5307 FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G085 0 ONGOING BUS REPLACEMENT: ALTERNATIVE FUEL BUSES – QTY 16. (PROJECT USING $689 OF TOLL CREDITS TO MATCH 5307 FUNDS IN $5,282 FY11 AND $281 TOLL CREDITS FOR FY12) LOS ANGELES TRANSIT LA0G435 0 ON-GOING CAPITALIZATION OF TRAINING AND EDUCATION. ADDED TOLL CREDITS IN FY10/11 IN CONS. FOR $12. $220 LOS ANGELES TRANSIT LA0G024 0 ON-GOING FLEET REPLACEMENT (40' & 30', ADA COMPLIANT, ALTERNATIVE FUEL). ADDED TOLL CREDITS IN FY10/11 IN CONS.FOR $45,867 $1,245. LOS ANGELES TRANSIT LA50300 0 OPERATING ASSISTANCE – TRANSIT OPERATIONS AND DIAL-A -RIDE SERVICE $4,061 LOS ANGELES TRANSIT LA0G640 0 CORIDOR – RAYMER/BERNSON DOUBLE TRACK IMPROVEMENTS. THIS PROJECT WILL UPGRADE THE RAIL CORRIDOR $1,955 FROM A SINGLE TRACK TO A DOUBLE TRACK, INSTALLING CONCRETE TIES ON BOTH TRACKS. IN ADDITION THIS PROJECT WILL INSTALL: FOUR NEW SPECIAL TRACKWORK TURNOUTS, NINE AT-GRADE CROSSINGS, FOUR BRIDGES, A NEW SECOND PLATFORM AT NORTHRIDGE, NEW PEDESTRIAN UNDERPASSES, NEW FENCING AND NEW PEDESTRIAN CROSSINGS AT CHATSWORTH. OTHER INHANCEMENTS INCLUDE SIGNAL RELOCATION, UTILITY RELOCATION AND DRAINAGE IMP LOS ANGELES TRANSIT LA0G639 0 PACIFIC SURFLINER CORRIDOR VAN NUYS NORTH PLATFORM IMPROVEMENTS. THE PROJECT WILL WIDEN A RAIL BRIDGE OVER VAN $1,000 NUYS BOULEVARD, REPLACE THE SOUTH SIDE PLATFORM WITH A CENTRAL PLATFORM TO SERVE BOTH MAIN LINE TRACKS, UPGRADE ONE MILE OF MAIN LINE TRACK, UPGRADE CROSSOVERS TO HIGHER SPEED AUTOMATIC, UTILITY RELOCATION, AND RECONFIGURE THE ADJACENT UP TRACK AND YARD ENTRANCE. LOS ANGELES TRANSIT LA0G417 0 PAINT TRANSPORTATION DEPARTMENT BUILDING $90 LOS ANGELES TRANSIT LAF3403 0 PALMDALE TRANSPORTATION CENTER – PLATFORM EXTENSION. EXTENSION OF THE EXISTING PALMDALE TRANSPORTATION CENTER $1,012 METROLINK PLATFORM FROM 510 LINEAL FEET TO 680 LINEAL FEET; 170 LINEAL FEET EXTENSION.. PROJECT IS CENTRALLY LOCATED WITHIN THE CITY LIMITS ON A 26-ACRE SITE ADJACENT TO 6TH STREET EAST AND TECHNOLOGY DRIVE (FORMERLY AVENUE P-8). THE SERVICE AREA INCLUDES PALMDALE, LANCASTER, QUARTZ HILL, PEARBLOSSOM AND LITTLEROCK. THIS SERVICE AREA IS A VERY LARGE PORTION OF THE ANTELOPE VALLEY. LOS ANGELES TRANSIT LA0B311 0 PARK AND RIDE FACILITIES (TRANSIT ORIENTED NEIGHBORHOOD PROGRAM). 3 PARK AND RIDES LOCATED IN THE CITIES OF AZUSA, $42,175 INDUSTRY AND WEST COVINA LOS ANGELES TRANSIT LA0G078 0 PARTS & EQUIPMENT PURCHASE. INCLUDES: REFURBISH ENGINE – REBUILD/REPOWER. PROJECT USING $320 OF TOLL CREDITS IN FY12 $6,612 IN CON TO MATCH 5307 FUNDS. 16 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G198 0 PASSENGER AND PEDESTRIAN IMPROVEMENTS BY LANI $315 LOS ANGELES TRANSIT LA0G119 0 PASSENGER BENCHES AND SMALL SHELTERS – PURCHASE AND INSTALL 60 PASSENGER BENCHES AND SMALL SHELTERS $1,207 THROUGHOUT THE CITY.E2009-BUSP-066. E2010-BUSP-016 FOR $500,000. LOS ANGELES TRANSIT LA52105 0 PAYMENTS FOR THE LEASEING OF BUS TIRES FOR THE CULVER CITYBUS FLEET. $480 LOS ANGELES TRANSIT LA0F023 0 PEAK-HOUR BUS-ONLY LANES ON LINCOLN BLVD. BETWEEN PICO BOULEVARD AND THE SOUTH CITY LIMIT (IN BOTH DIRECTIONS) $170 LOS ANGELES TRANSIT LAF1605 0 PEDESTRIAN SAFE BUS STOP LINKAGE. LINKING 11 BUS STOPS CURRENTLY INACCESSIBLE BECAUSE OF LACK OF SIDEWALKS ON BOTH $1,544 THE EAST AND WEST SIDE OF HAWTHORNE BLVD. FROM CREST RD. TO PALOS VERDES DR. SOUTH (ABOUT 13,000') LOS ANGELES TRANSIT LA0G493 0 PLANNING – OPERATIONAL PLANNING. PROJECT USING $120 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) LOCAL $600 MATCH IN FY 11 FOR CON. LOS ANGELES TRANSIT LA0G764 0 POMONA VALLEY TRANSPORTATION AUTHORITY – PURCHASE OF 6 REPLACEMENT LARGE BUS (16AP, 2 WC). THIS PROJECT WILL USE $ $420 48 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0B358 0 PREVENTATIVE MAINTENANCE FOR THE CULVER CITYBUS FLEET $12,500 LOS ANGELES TRANSIT LA0F048 0 PREVENTIVE MAINTENANCE – OPERATING $21,800 LOS ANGELES TRANSIT LA963543 0 PREVENTIVE MAINTENANCE (CAPITAL & OPERATING MAINTENANCE ITEMS ONLY) $2,972,200 LOS ANGELES TRANSIT LA50200 0 PREVENTIVE MAINTENANCE (LANCASTER/PALMDALE UZA). ADDING $1,056 OF TOLL CREDITS IN CON FOR 11/12. $34,981 LOS ANGELES TRANSIT LA0G418 0 PREVENTIVE MAINTENANCE FOR TRANSIT FLEET $400 LOS ANGELES TRANSIT LA0G770 0 PRIDE INDUSTRIES, INC. – PURCHASE OF 1 OPERATING EQUIPMENT GPS UNITS (6). THIS PROJECT WILL USE $ 1 OF TOLL CREDITS TO $5 MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G768 0 PRIDE INDUSTRIES, INC. – PURCHASE OF 3 SERVICE EXPANSION LARGE BUS (16 AP; 2 WC). THIS PROJECT WILL USE $ 24 OF TOLL $210 CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G693 0 PROCUREMENT OF FIVE (5) REPLACEMENT ALTERNATIVE FUEL TRANSIT VEHICLES NOT TO EXCEED 35-FEET, INCLUDING AUTOMATED $2,307 ANNOUNCING SYSTEMS. DEMO ID 251 LOS ANGELES TRANSIT LA0G700 0 PROCUREMENT OF THREE (3) REPLACEMENT ALTERNATIVE FUEL TRANSIT VEHICLES NOT TO EXCEED 35-FEET, INCLUDING AUTOMATED $1,426 ANNUNCIATING SYSTEMS AND OTHER ASSOCIATED VEHICLE EQUIPMENT. LOS ANGELES TRANSIT LA0F024 0 PROP 1B SECURITY BOND PROJECTS: INCLUDING SECURITY PROJECTS SUCH AS SURVEILLANCE SYSTEM AND LIGHTING. IN ADDITION, $2,534 TO PURCHASE OF SECURITY AND SAFETY EQUIPMENT. LOS ANGELES TRANSIT LA0D356 0 PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT EAST LOS ANGELES COLLEGE TO PROVIDE A OFF-STREET $3,856 TRANSIT CENTER TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL LOS ANGELES TRANSIT LA0D357 0 PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES TRADE TECHNICAL COLLEGE TO IMPROVE $5,925 PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS.SAFETEA-LU # 307, 2007 CFP #F1645 LOS ANGELES TRANSIT LA0D358 0 PROVIDE HARDSCAPE, LANDSCAPE, AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES VALLEY COLLEGE TO IMPROVE PEDESTRIAN $4,679 MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS LOS ANGELES TRANSIT LA0G082 0 PURCHASE & INSTALL NEW SHELTERS & BENCHES AT BUS STOPS AND TRANSFER CENTERS. ADDED $70 OF TRANSPORTATION $1,848 DEVELOPMENT CREDITS IN FY11 AND $100 IN FY 12 FOR 5307 MATCH IN CON PHASE. LOS ANGELES TRANSIT LA0D348 0 PURCHASE (10) REPLACEMENT VANS WITH ALTERNATE FUEL VANS $1,320 LOS ANGELES TRANSIT LA0G059 0 PURCHASE (5) RELIEF VEHICLES AND (4) SERVICE VEHICLES TO REPLACE EXISTING VEHICLES THAT HAVE REACHED THE END OF THEIR $350 USEFUL SERVICE LIFE. Project List 17

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G580 0 PURCHASE 1 MEDIUM BUS TYPE II CNG FOR SERVICE EXPANSION OF PARATRANSIT SERVICES. (LIFE STEPS FOUNDATION, INC. AKA $100 CIRCLE OF FRIENDS) LOS ANGELES TRANSIT LA0D335 0 PURCHASE 1 PARATRANSIT VEHICLE $70 LOS ANGELES TRANSIT LAES430 0 PURCHASE 16 REPLACEMENT BUSES ALT-FUEL BUSES $8,023 LOS ANGELES TRANSIT LA0G677 0 PURCHASE 17 CNG REPLACEMENT BUSES $7,424 LOS ANGELES TRANSIT LA0G227 0 PURCHASE 2 BUSES FOR ROUTE 757 SERVICE EXPANSION TO NORTH HOLLYWOOD PER THE ADOPTED TRANSPORTATION DEVELOPMENT $1,081 PLAN. LOS ANGELES TRANSIT LAES725 0 PURCHASE 2 REPLACEMENT PARATRANSIT VEHICLES 25'LONG THAT WILL CARRY 18 PASSENGERS AND ARE GASOLINE POWERED. $150 LOS ANGELES TRANSIT LA0G206 0 PURCHASE 21 REPLACEMENT ALT-FUEL BUSES. PROJECT IS A CARRYOVER FROM PRIOR FISCAL YEAR. $10,396 LOS ANGELES TRANSIT LAE0172 0 PURCHASE 21 REPLACEMENT BUSES FOR SANTA MONICA'S TRANSIT SERVICE. 5 BUSES PURCHASED IN FY11/12 $21,392 LOS ANGELES TRANSIT LA0D453 0 PURCHASE 5 REPLACEMENT ALTERNATIVE FUEL 40' BUSES $3,000 LOS ANGELES TRANSIT LA0G004 0 PURCHASE 57 REPLACEMENT ALTERNATIVE FUEL 40' BUSES $25,107 LOS ANGELES TRANSIT LA0G697 0 PURCHASE 7 REPLACEMENT ALTERNATIVE-FUEL BUSES $4,737 LOS ANGELES TRANSIT LAE0132 0 PURCHASE A NEW ALTERNATE FUEL BUS. BUS WILL REDUCE EMISSIONS & CONTINUE TO PROVIDE TRANSPORTATION $250 LOS ANGELES TRANSIT LA0G193 0 PURCHASE AND REPLACEMENT OF BRAKE LATHE. $60 LOS ANGELES TRANSIT LA0G210 0 PURCHASE AND REPLACEMENT OF MAINTENANCE EQUIPMENT: FORK LIFT AND BUS TRACTOR $80 LOS ANGELES TRANSIT LA0G661 0 PURCHASE ASSOCIATED CAPITAL EQUIPMENT. THESE ITEMS WOULD INCLUDE SPARE ENGINES, TRANSMISSIONS, ETC. $324 LOS ANGELES TRANSIT LA0G268 0 PURCHASE CLEAN AIR BUSES FOR SERVICE WITHIN THE CITY OF PARAMOUNT EARMARK ID #E2009-BUSP-074 $250 LOS ANGELES TRANSIT LA0D349 0 PURCHASE EXPANSION BUSES WITH ALTERNATE FUEL (HYBRID/ELECTRIC) $600 LOS ANGELES TRANSIT LA0G672 0 PURCHASE FIVE REPLACEMENT 32' CNG BUSES $1,980 LOS ANGELES TRANSIT LAES587 0 PURCHASE FOUR (4) 32 FOOT BUSES FOR BUS REPLACEMENT OF THE LINES. $610 LOS ANGELES TRANSIT LA0G662 0 PURCHASE FOUR REPLACEMENT PARATRANSIT VEHICLES. $500 LOS ANGELES TRANSIT LA0C36 0 PURCHASE FOUR REPLACEMENT PARATRANSIT VEHICLES. CARRYOVER FROM PRIOR FISCAL YEAR. $500 LOS ANGELES TRANSIT LA0G424 0 PURCHASE FOUR(4) COMMUTER 40' ALT-FUEL BUSES TO REPLACE DIESEL BUSES. $2,100 LOS ANGELES TRANSIT LA0D109 0 PURCHASE LAND FOR VEHICLE MAINTENACE TRANSIT FACILITY $2,062 LOS ANGELES TRANSIT LAF3430 0 PURCHASE OF (17) 40-FT REPLACEMENT CNG BUSES FOR GLENDALE BEELINE FLEET. PURCHASE OF (17) 40-FOOT LOW FLOOR CNG $4,000 HEAVY-DUTY VEHICLES FOR THE GLENDALE BEELINE TRANSIT SYSTEM SERVING THE GLENDALE DOWNTOWN AND GLENDALE MULTI- MODAL TRANSPORTATION CENTER. LOS ANGELES TRANSIT LA0G586 0 PURCHASE OF 1 LARGE BUS TYPE IIIA FOR SERVICE EXPANSION OF PARATRANSIT SERVICES. (GRANT AME CHURCH) $117 LOS ANGELES TRANSIT LA0G573 0 PURCHASE OF 13 REPLACEMENT MINIVANS FOR PARATRANSIT SERVICES. (ACCESS SERVICES, INC) $696 LOS ANGELES TRANSIT LAE0001A 0 PURCHASE OF 2 CNG BUSES FOR GLENDALE BEELINE TRANSIT SYSTEM $786 LOS ANGELES TRANSIT LA0G577 0 PURCHASE OF 2 REPLACEMENT LARGE BUSES TYPE III CNG FOR PARATRANSIT SERVICES. (LIFE STEPS FOUNDATION, INC. AKA CIRCLE $216 OF FRIENDS). LOS ANGELES TRANSIT LA0G584 0 PURCHASE OF 2 REPLACEMENT MINIVANS AND 3 SMALL REPLACEMENT BUSES TYPE IB FOR PARATRANSIT SERVICES. (INSTITUTE FOR $321 THE REDESIGN OF LEARNING DBA THE ALMANSOR CENTER.) LOS ANGELES TRANSIT LA0G572 0 PURCHASE OF 2 REPLACEMENT MINIVANS FOR PARATRANSIT SERVICES FOR TARZANA TREAMENT CENTER. $107 18 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G582 0 PURCHASE OF 2 SMALL TYPE IA BUSES AND 1 MINIVAN FOR SERVICE EXPANSION OF PARATRANSIT SERVICES. (EXCEPTIONAL $181 CHILDREN'S FOUNDATION) LOS ANGELES TRANSIT LAF1441 0 PURCHASE OF 2-40' REPLACEMENT CNG BUSES FOR THE GLENDALE BEELINE. $899 LOS ANGELES TRANSIT LA0G575 0 PURCHASE OF 3 REPLACEMENT MINIVANS FOR PARATRANSIT SERVICES. (VALLEY VILLAGE) $161 LOS ANGELES TRANSIT LA0G574 0 PURCHASE OF 4 MEDIUM BUS TYPE II PARATRANSIT EXPANSION VEHICLES FOR EXPANSION OF PARATRANSIT SERVICES. (LOS AMIGOS $295 RESEARCH AND EDUCATION INSTITUTE) LOS ANGELES TRANSIT LA0G427 0 PURCHASE OF 4 PARATRANSIT REPLACEMENT TRANSIT VEHICLES (GASOLINE). $652 LOS ANGELES TRANSIT LAFA144 0 PURCHASE OF 4-40'REPLACEMENT CNG BUSES FOR THE GLENDALE BEELINE. $1,566 LOS ANGELES TRANSIT LA0B305 0 PURCHASE OF 9 BUSES FOR EXPANDED SERVICE OF WHICH TWO ARE CNG POWERED. $955 LOS ANGELES TRANSIT LA0G647 0 PURCHASE OF A MAINTENANCE SOFTWARE TO MAINTAIN TRANSIT FACILITIES & VEHICLE RECORDS,AND TO REPLACE CURRENT $527 INVENTORY CONTROL SOFTWARE. AGENCY USING $106 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY12. LOS ANGELES TRANSIT LA900520 0 PURCHASE OF ADD'L 13 REPLACEMENT VEHICLES FY10 TO FY11. 13 VEHICLES IN FY10 – FY 11 $624 LOS ANGELES TRANSIT LA0G429 0 PURCHASE OF BIKE RACKS FOR TRANSIT VEHICLES. $32 LOS ANGELES TRANSIT LA973018 0 PURCHASE OF DIESEL TRANSMISSION REBUILDS AND HYBRID ELECTRIC POWER TRAIN COMPONENTS FOR SERVICE FLEET $120 LOS ANGELES TRANSIT LAES133 0 PURCHASE OF EIGHT (8) HYBRID GASOLINE-ELECTRIC 40' BUSES TO REPLACE EXISTING DIESEL BUSES WHO HAVE ACHIEVED OR $4,527 EXCEEDED TWELVE (12) YEARS/500,000+ MILES. LOS ANGELES TRANSIT LA0G052 0 PURCHASE OF EIGHT REPLACEMENT AUTOMOBILES FOR USE BY TRANSIT STAFF AND BUS OPERATORS. $200 LOS ANGELES TRANSIT LA0G653 0 PURCHASE OF FOUR (4) ALTERNATIVE FUEL TRANSIT BUSES TO REPLACE DIESEL BUSES. USING $420 OF TRANSPORTATION $2,100 DEVELOPMENT CREDITS AS MATCHING FOR CON PHASE. LOS ANGELES TRANSIT LA0G051 0 PURCHASE OF FOUR PARATRANSIT VANS TO REPLACE FOUR (4) 2002 MODEL YEAR VANS. $200 LOS ANGELES TRANSIT LA0C63 0 PURCHASE OF MISC OFFICE EQUIPMENT- (ONGOING) $106 LOS ANGELES TRANSIT LA0G394 0 PURCHASE OF RUNCUTTING/SCHEDULING SOFTWARE. $40 LOS ANGELES TRANSIT LAF1404 0 PURCHASE OF SIX ALTERNATIVE FUEL REPLACEMENT BUSES. PROJECT WILL PURCHASE SIX ALTERNATIVE FUEL 40 FOOT TRANSIT $3,825 BUSES TO REPLACE SIX 1997 MODEL YEAR DIESEL BUSES, INCLUDING ON-BOARD RADIOS. LOS ANGELES TRANSIT LA0B203 0 PURCHASE OF SUPPORT EQUIPMENT – TIRES $480 LOS ANGELES TRANSIT LA0G416 0 PURCHASE OF THREE ALTERNATIVE FUEL REPLACEMENT BUSES $1,950 LOS ANGELES TRANSIT LA0G283 0 PURCHASE OF TOOLS AND EQUIPMENT FOR MAINTENANCE OF THE LA MIRADA TRANSIT FLEET. $69 LOS ANGELES TRANSIT LA0G050 0 PURCHASE OF TWO (2) ALTERNATIVE FUEL 40 FT. TRANSIT BUSES TO REPLACE TWO (2) 1997 MODEL YEAR DIESEL BUSES. $1,220 LOS ANGELES TRANSIT LA0G228 0 PURCHASE OF TWO 30 FOOT CLEAN AIR MOTOR BUSES FOR REPLACEMENT.E2008-BUSP-0671 $470 LOS ANGELES TRANSIT LA0G307 0 PURCHASE OF TWO REPLACEMENT 30 PASSENGER GASOLINE VEHICLES. $219 LOS ANGELES TRANSIT LA0G190 0 PURCHASE OF UFS FAREBOXES AND RELATED EQUIPMENT. $1,448 LOS ANGELES TRANSIT LA0G578 0 PURCHASE OF VARIOUS EQUIPMENT FOR PARATRANSIT SERVICES (7 RADIOS, 1 BASE STATION, COMPUTER W/MONITOR & PRINTER). $12 (LIFE STEPS FOUNDATION, INC. AKA CIRCLE OF FRIENDS). LOS ANGELES TRANSIT LA0G581 0 PURCHASE OF VARIOUS EQUIPMENT FOR PARATRANSIT SERVICES. EXCEPTIONAL CHILDREN'S FOUNDATION. $13 LOS ANGELES TRANSIT LA0G660 0 PURCHASE ONE FLEET VEHICLE TO SERVE AS BACK-UP FOR EXISTING FLEET. THIS WILL HELP COMMERCE BUS LINES IMPROVE SERVICE $554 RELIABILITY. Project List 19

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G689 0 PURCHASE ONE REPLACEMENT PARATRANSIT BUS. NEW CNG-POWERED PARATRANSIT VEHICLE WOULD REPLACE A GASOLINE- $142 POWERED VEHICLE. VEHICLE #370 IS PROPOSED FOR REPLACEMENT. THIS VEHICLE WAS PURCHASED IN 2004, IS GASOLINE-POWERED, AND HAS EXCEEDED ITS FTA LIFESPAN. LOS ANGELES TRANSIT LAE0407 0 PURCHASE ONE TROLLEY BUS VEHICLE FOR EXISTING SERVICE ALONG CARSON ST. BETWEEN THE HARBOR TRANSIT WAY STATION AND $250 THE CARSON CIVIC CENTER AT AVALON BLVD LOS ANGELES TRANSIT LAE0108 0 PURCHASE TWO REPLACEMENT TRIPPER BUSES. ROUTE G AND D, BLUELINE STATION AT DEL AMO BLVD/I-710 TO SOUTH BAY PAVILION $502 MALL, DEL AMO BLVD LOS ANGELES TRANSIT LA0G015 0 PURCHASE UNIVERSAL FARE SYSTEM FAREBOXES FOR FLEET $120 LOS ANGELES TRANSIT LAF1413 0 PV TRANSIT LPG BUSES. PURCHASE OF TWELVE (12) ALTERNATIVE FUELED VEHICLES TO REPLACE EXISTING GASOLINE-POWERED $1,623 VEHICLES. LOS ANGELES TRANSIT LA963580 0 RADIO SYSTEM; REPLACEMENT OF EXISTING RADIO/DISPATCH SYSTEM / ADVANCED BUS TECHNOLOGY $10,300 LOS ANGELES TRANSIT LA990724 0 RADIOS ON BUSES 81 VEHICLES TO INCLUDE AVL SYSTEM $3,156 LOS ANGELES TRANSIT LAF3729 0 REAL-TIME BUS ARRIVAL INFORMATION SYSTEM. DEVELOP & INSTALL ON 60 BUS STOP REAL-TIME BUS ARRIVAL INFORMATION SYSTEM $2,522 USING INTELLIGENT TRANSPORTATION SYSTEM (ITS) TECHNOLOGY TO DISSEMINATE NEXT BUS INFO TO TRAVELERS. THE PROJECT'S PHYSICAL COMPONENT IS LOCATED AT BUS STOPS AND TRANSIT CENTER WITHIN THE CITY OF CULVER CITY. THE NON-PHYSICAL COMPONENT OF THE PROJECT IS LOCATED ON A WEB SERVER. LOS ANGELES TRANSIT LA0G191 0 RED CAR TROLLEY ENGINEERING STUDY FOR DOWNTOWN LOS ANGELES STREETCAR. $1,248 LOS ANGELES TRANSIT LA0G376 0 REFURBISH 40-FOOT NABI BUSES $2,400 LOS ANGELES TRANSIT LA0G010 0 REGIONAL CONNECTOR – LIGHT RAIL IN TUNNEL ALLOWING THROUGH MOVEMENTS OF TRAINS, BLUE, GOLD, EXPO LINES. FROM $1,366,100 ALAMEDA / 1ST STREET TO 7TH STREET/METRO CENTER LOS ANGELES TRANSIT LA0D454 0 REHAB TRANSIT ADMINISTRATIVE AND OPERATIONS OFFICES $400 LOS ANGELES TRANSIT LA0G195 0 REMODEL TRAINING ROOM AND MAINTENANCE AREA $625 LOS ANGELES TRANSIT LA0C08 0 REPLACE 10 PARATRANSIT VEHICLES $701 LOS ANGELES TRANSIT LA0F093 0 REPLACE 1997 NEW FLYER BUSES (40 FT-DIESEL WITH CNG BUSES. PURCHASE UP TO 30 BUSES) $36,692 LOS ANGELES TRANSIT LA0G220 0 REPLACE 25 ACCESSIBLE MINIVANS (@ 40K APIECE) FOR ADA PARATRANSIT SERVICE IN LOS ANGELES COUNTY $1,000 LOS ANGELES TRANSIT LA0G650 0 REPLACE BUS WASH PROJECT: REPLACEMENT OF TRANSIT FACILITY'S BUS WASH EQUIPMENT. AGENCY USING $60 OF TOLL CREDITS $300 AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY11. LOS ANGELES TRANSIT LA0G109 0 REPLACE BUS WASHER. $284 LOS ANGELES TRANSIT LA0D13 0 REPLACE FAREBOX/UFS $1,700 LOS ANGELES TRANSIT LA0G422 0 REPLACE FOUR(4) 30' OR 32' ALT-FUEL BUSES $1,373 LOS ANGELES TRANSIT LA0D455 0 REPLACE RELIEF AND SUPERVISOR VEHICLES $160 LOS ANGELES TRANSIT LA0G062 0 REPLACE SIX(6)COMMUTER COACHES – THREE (3) IN FY 13/14 & THREE (3) IN 15/16. $5,000 LOS ANGELES TRANSIT LA0F094 0 REPLACE TEN (10) THOMAS BUSES (DIESEL WITH LNG BUSES) $8,061 LOS ANGELES TRANSIT LA0D349A 0 REPLACEMENT BUSES – 25FT VANS/BUSES – PURCHASE QTY OF 6 GASOLINE-22 PASSENGER CAPACITY EACH. C/O FROM 2006/2007. $600 CARRYOVER FROM 2008 FTIP AMENDMENT 08-53. LOS ANGELES TRANSIT LA0B310 0 REPLACEMENT CNG & ELECTRIC BUSES – 20 IN FY11 AND 30 IN FY12 $63,923 LOS ANGELES TRANSIT LA0G432 0 REPLACEMENT OF 12 – 40' CNG BUSES FROM THE 2001 BUS FLEET AND 6 – 30' CNG BUSES FROM THE 2003 FLEET. $11,220 20 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G654 0 REPLACEMENT OF 16 GASOLINE FUEL TRANSIT SUPPORT VEHICLES WITH CNG AND/OR GAS-HYBRID FUEL VEHICLES. USING $111 OF $555 TRANSPORTATION DEVELOPMENT CREDITS AS MATCHING CON PHASE. LOS ANGELES TRANSIT LA0G058 0 REPLACEMENT OF 20 – 40' CNG BUSES FROM THE 1998 BUS FLEET. DEMO#207 $11,108 LOS ANGELES TRANSIT LA0G433 0 REPLACEMENT OF 8 – 40' CNG BUSES FROM THE 2004 BUS FLEET. $5,280 LOS ANGELES TRANSIT LA0G132 0 REPLACEMENT OF BUSES AND PARATRANSIT VEHICLES. SAFTEA-LU 668, E2009-BUSP-174. $696 LOS ANGELES TRANSIT LA0G655 0 REPLACEMENT OF DIESEL FUEL SHOP SERVICE TRUCK WITH A NEW CNG FUEL SERVICE TRUCK. USING $26 OF TRANSPORTATION $130 DEVELOPMENT CREDITS AS MATCHING IN CON PHASE. LOS ANGELES TRANSIT LA0D116 0 REPLACEMENT OF HVAC SYSTEM AT TORRANCE TRANSIT FACILITY $500 LOS ANGELES TRANSIT LA0F002 0 REPLACEMENT OF OMS SYSTEM (HARDWARE AND SOFTWARE) $1,200 LOS ANGELES TRANSIT LA0B204 0 REPLACEMENT OF SUPPORT EQUIPMENT – FAREBOXES FOR THE UNIVERSAL FARE SYSTEM $569 LOS ANGELES TRANSIT LA996086 0 REPLACMENT – 3 ALTERNATIVE FUEL SHUTTLES $376 LOS ANGELES TRANSIT LA0G374 0 REPOWER 40-FOOT NABI BUSES $4,000 LOS ANGELES TRANSIT LA0G549 0 REPOWER 40-FOOT NABI BUSES $5,000 LOS ANGELES TRANSIT LA0G656 0 REPOWER FIVE HYBRID BUSES REHABILITATION PROJECT: REPLACEMENT OF HYBRID POWER PLANTS WITH CNG-FUEL POWER PLANTS $1,500 AND REPLACEMENT OF HVAC SYSTEM OF 5 HYBRID BUSES THAT HAVE MET THEIR MIDLIFE STATUS. USING $300 OF TRANSPORTATION DEVELOPMENT CREDITS AS MATCHING FOR CON PHASE. LOS ANGELES TRANSIT LA0G687 0 REPOWERING OF CNG TRANSIT BUSES D20-BUSP-012 $1,600 LOS ANGELES TRANSIT LA0G592 0 SAFETY & SECURITY EMERGENCY PREPAREDNESS PLANNING. PROJECT USING TOLL CREDIT; $5 IN FY11 AS MATCH TO 5307 FUNDS. $75 LOS ANGELES TRANSIT LAE0191B 0 SAFETY IMPROVEMENTS AT BUS STOPS, INCLUDING BUS LOADING AREAS, LIGHTING, PASSENGER AMENITIES, BUS PADS & TURNOUTS, $2,009 IMPROVED DRAINAGE, & APPURTENANCE WORK (SAFETEA-LU # 191 & # 321) LOS ANGELES TRANSIT LA29202U1 0 SAN FERNANDO VALLEY E/W BRT (FROM TERMINUS OF METRO RED LINE IN NO HOLLYWOOD TO WARNER CTR)14-MILE EXCLUSIVE BUS $21,129 LANES AT FORMER RAIL RD ROW (PPNO 3333 AB3090REP ) SAFETEA-LU # 326 LOS ANGELES TRANSIT LA29202U3 0 SAN FERNANDO VALLEY NORTH/SOUTH BRT EXTENSION PHASE I: METRO RAPID SERVICE ALONG RESEDA BLVD. AND SEPULVEDA BLVD. $11,702 SAFETEA-LU # 183. THE FUNDS ARE FOR TYPICAL PASSENGER AMENITIES. LOS ANGELES TRANSIT LAF1601 0 SAN GABRIEL CITY-WIDE BUS SHELTER INSTALLATION. INSTALL BUS SHELTERS AT EXISTING BUS STOPS ON MTA AND MONTEBELLO $688 BUS LINE ROUTES. LOS ANGELES TRANSIT LAF1420 0 SANTA CLARITA TRANSIT BUS STOP EXPANSION AND AMENITIES. PURCHASE AND INSTALL NEW BUS STOPS AND AMENITIES ALONG $387 FUTURE ROUTES IDENTIFIED IN THE CITY OF SANTA CLARITA'S TRANSIT DEVELOPMENT PLAN. LOS ANGELES TRANSIT LAE0364 0 SANTA MONICA'S BIG BLUE BUS/SANTA MONICA COLLEGE TRANSIT SERVICE. BUS IMPROVEMENTS NEAR THE CAMPUS ALONG THE BUS $2,000 ROUTES. CARRYOVER FROM PRIOR FISCAL YEAR LOS ANGELES TRANSIT LAES732 0 SECTION 5307 1% TRANSIT ENHANCEMENTS ACTIVITIES $3,750 LOS ANGELES TRANSIT LA0G591 0 SOFTWARE MODIFICATIONS. TOLL CREDITS USED FOR THIS PROJECT; $40 IN BOTH FY11 AND FY12 TO MATCH 5307 FUNDS. $1,000 LOS ANGELES TRANSIT LA0G060 0 SOFTWARE/HARDWARE REPLACEMENT & UPGRADE OF AUTOMATIC VEHICLE LOCATOR (AVL). $600 LOS ANGELES TRANSIT LA0D372 0 SOUTH ACCESS PEDESTRIAN BRIDGE TO SIERRA MADRE VILLA LIGHT RAIL STATION. THIS PEDESTRIAN BRIDGE OVER THE ROUTE 210 $8,000 FREEWAY WILL PROVIDE A DIRECT AND SAFE APPROACH FOR PEDESTRIANS LOS ANGELES TRANSIT LA0G632 0 SOUTH BAY GREEN LINE EXTENSION-FOLLOWS HARBOR SUBDIVISION FROM METRO GREEN LINE TO THE PROPOSED REDONDO BEACH $555,000 TRANSIT CENTER.FROM MARINE AVENUE STATION TO REDONDO BEACH. TRANSIT CENTER (GALLERIA) Project List 21

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LA0G358 0 SOUTH BAY REGIONAL INTERMODAL TRANSIT CENTER PROJECT AT 465 N. CRENSHAW BLVD., TORRANCE, CA 90503. $21,000 LOS ANGELES TRANSIT LA0D272 0 SOUTH SAN FERNANDO VALLEY REGIONAL PARK AND RIDE. ADD 50 NEW PARKING SPACES TO EXISTING COMMUTER EXPRESS PARK $767 AND RIDE LOT WITHIN EXISTING AREA. LOS ANGELES TRANSIT LA0G758 0 511 ONE-CALL/ONE-CLICK TRANSPORTATION RESOURCE CENTER EXPANSION $2,500 LOS ANGELES TRANSIT LA0G377 0 STEETCAR STUDY FOR CITY OF SANTA MONICA $500 LOS ANGELES TRANSIT LAF3409 0 STOCKER/MLK CRENSHAW ACCESS TO EXPO LRT STATION. BUS HUB INTERSECTIONS OF STOCKER ST AND MARTIN LUTHER KING, JR. $2,172 BL AT CRENSHAW BL LOCATED IN THE 8TH AND 10TH COUNCIL DISTRICTS OF THE CITY OF LOS ANGELES. LOS ANGELES TRANSIT LA0G548 0 STREETCAR STUDY FOR CITY OF SANTA MONICA $1,000 LOS ANGELES TRANSIT LAF3440 0 SUNSHINE SHUTTLE TRANSIT VEHICLES. THE PROCUREMENT OF TWO COMPRESSED NATURAL GAS (CNG)-FUELED, LOW-FLOOR BUSES $850 FOR A FIXED-ROUTE SHUTTLE SERVICE TO REPLACE EXISTING BUSES. THE SUNSHINE SHUTTLE ROUTE SERVES THE UNINCORPORATED SOUTH WHITTIER AREA. THE SERVICE AREA IS BOUNDED BY WHITTIER BOULEVARD TO THE NORTH, BEATY AVENUE TO THE SOUTH, SANTA GERTRUDES AVENUE TO THE EAST, AND BROADWAY AVENUE TO THE WEST. LOS ANGELES TRANSIT LAES772 0 TARZANA TREATMENT CENTER HARDWARE 5 $7,124 LOS ANGELES TRANSIT LAES770 0 TARZANA TREATMENT CENTER PURCHASE OF 2 HARDWARE $2,849 LOS ANGELES TRANSIT LA0G760 0 TARZANA TREATMENT CENTERS – PURCHASE OF 1 REPLACEMENT SMALL BUS 10 AP. THIS PROJECT WILL USE $7 OF TOLL CREDITS TO $61 MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G784 0 TARZANA TREATMENT CENTERS, INC-PURCHASE 1 REPLACEMENT MINI VAN. THIS PROJECT WILL USE $5 OF TOLL CREDITS TO MATCH $44 THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0D437 0 TEN (10) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE:THREE (3) 1995 MODEL & (7) SEVEN 1997 MODEL YEAR BUSES. $6,040 LOS ANGELES TRANSIT LA0G701 0 THE METRO GOLD LINE FOOTHILL EXTENSION TRANSIT ORIENTED DEVELOPMENT STUDY WILL ILLUSTRATE POSSIBLE TRANSIT $278 ORIENTED DEVELOPMENTS INTENSITIES AROUND FUTURE METRO GOLD LINE FOOTHILL EXTENSION STATIONS. LOS ANGELES TRANSIT LA0G221 0 THE ON-GOING BUS CAPITAL PROJECT INCLUDES: BUS COMPONENTS, PROJECT ADMINISTRATION/ FACILITY IMPROVEMENTS, $25,769 COMPUTER EQUIPMENT, SAFETY/ SECURITY EQUIPMENT, SHOP EQUIPMENT, SUPPORT VEHICLES AND TIRES. ADDED TOLL CREDITS IN FY10/11 IN CONS. FOR $657. LOS ANGELES TRANSIT LA0G601 0 THE PROJECT INCLUDES PREVENTATIVE MAINTENANCE OF THE LA MIRADA TRANSIT FLEET. PREVENTATIVE MAINTENANCE MAY $245 INCLUDE PURCHASES SUCH AS TIRES, LUBRICANTS, OIL AND FUEL FILTERS, AIR CONDITIONING UNIT PARTS, AND GENERAL VEHICLE AND COMPONENT HARDWARE. THE PROJECT ALSO INCLUDES THE PORTION OF THE MECHANIC’S SALARY RELATED TO PREVENTATIVE MAINTENANCE OF LA MIRADA TRANSIT VEHICLES. MOVING PRIOR FUNDS INTO FY10/11. USING TOLL CREDITS IN FY10/11 IN CONS. FOR $25. CARRYOVER FROM PRIOR FISCAL YEAR. LOS ANGELES TRANSIT LA0G719 0 THE ROSA PARKS TRANSIT STATION IMPROVEMENTS PROJECT MODERNIZES EXISTING RAIL/BUS TRANSIT STATION, RELOCATES AND $5,500 EXPANDS BUS FACILITIES AND IMPROVES ACCESSIBILITY TO THE STATION AND INTEGRATION WITH SURROUNDING TRANSIT ORIENTED DISTRICT MEDICAL AND MEDICAL-EDUCATIONAL FACILITIES. LOS ANGELES TRANSIT LAF1414 0 THIRD STREET & LA VERNE AVENUE PARKING STRUCTURE. CONSTRUCT A PARKING STRUCTURE AT THIRD STREET AND LA VERNE $19,035 AVENUE TO PROVIDE PARK AND RIDE SPACES FOR AREA TRANSIT USERS. LOS ANGELES TRANSIT LAF3405 0 THREE ALTERNATIVE FUEL BUSES FOR SERVICE EXPANSION. PURCHASE THREE ALTERNATIVE FUEL 40-FOOT TRANSIT BUSES FOR $2,074 SERVICE EXPANSION. LOS ANGELES TRANSIT LA0G732 0 TORRANCE TRANSIT ALTERNATIVE FUEL/CNG REFUELING STATION $3,300 22 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LAF1405 0 TORRANCE TRANSIT SYSTEM – FLEET MODERNIZATION PROJECT. FUND FORTY ONE (41) ALTERNATIVE FUEL/CNG BUSES TO REPLACE $20,508 EXISTING DIESEL VEHICLES (UPDATED 7/29/11). THIS PROJECT WILL USE $2,198 OF TOLL CREDITS TO MATCH THE CMAQ & 5307 FUNDS IN THE CON PHASE IN FY 11/12. LOS ANGELES TRANSIT LA0G615 0 TORRANCE TRANSIT SYSTEM BUS RAPID PROJECT (REDONDO BEACH TO LONG BEACH) – FOR THE ACQUITIONS OF EIGHT (8) EXPANSION $9,400 BUSES ($6,400,000), AND INCLUDES TWO (2) YEARS OF OPERATING ASSISTANCE TO OPERATE THE NEW RAPID SERVICE ($1,500,000). LOS ANGELES TRANSIT LAF3438 0 TORRANCE TRANSIT SYSTEM FLEET MODERNIZATION PROJECT PHASE 3. REPLACE SIX (6) DIESEL BUSES WITH HYBRID GASOLINE $4,006 ELECTRIC BUSES. LOS ANGELES TRANSIT LA0D11 0 TRANSIT – ENHANCEMENTS (STREET FURNITURE) $327 LOS ANGELES TRANSIT LA0G203 0 TRANSIT ACCESS PASS INTEGRATION – PURCHASE FARE/TICKET VENDING EQUIPMENT TO BE INTEGRATED INTO THE LOS ANGELES $4,000 COUNTY TRANSIT ACCESS PASS (TAP) SYSTEM. LOS ANGELES TRANSIT LA0G269 0 TRANSIT CENTER AND PASSENGER AMENITIES AT LA SOUTHWEST COLLEGE EARMARK ID #E2008-BUSP-0678 AND E2009-BUSP-101 $1,381 LOS ANGELES TRANSIT LA55207 0 TRANSIT COACH TIRE (LEASE) (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR $2,000 LOS ANGELES TRANSIT LA0C61 0 TRANSIT DATA AND COMMUNICATION SYSTEMS; ITS (RADIO, AVL, DISPATCHING, AND OTHER ADVANCED TECHNOLOGY) ONGOING. $75 LOS ANGELES TRANSIT LA0D337 0 TRANSIT ENHANCEMENT ACTIVITIES: 1% FORMULA FUNDS – LOS ANGELES COUNTY $31,352 LOS ANGELES TRANSIT LA0D346 0 TRANSIT FACILITY IMPROVEMENTS (ONGOING) AT 15679 PHOEBE AVENUE, LA MIRADA $396 LOS ANGELES TRANSIT LA0G648 0 TRANSIT MAINTENANCE FACILITY ENHANCEMENT PROJECT: UPGRADE FACILITY TO ACCOMODATE THE MAINTENANCE AND REPAIR OF $400 CNG TRANSIT BUSES. AGENCY USING $80 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY11. LOS ANGELES TRANSIT LA0D137 0 TRANSIT STATION RIGHT OF WAY PROCUREMENT FOR LAND AT THE EXISTING SANTA CLARITA METROLINK STATION. CARRYOVER FROM $4,517 PRIOR FISCAL YEAR LOS ANGELES TRANSIT LA0G595 0 TRANSIT VEHICLE REPAINT. PROJECT USING $80 OF TOLL CREDIT IN 10/11 OF THE CON PHASE IN PLACE OF A LOCAL MATCH. FUNDING $400 FROM FY 10-11 WAS PREVIOUSLY IN FY 09-10 LOS ANGELES TRANSIT LAE0039 0 TRANSIT VILLAGE – PROVIDE A TRANS. FACILITY FOR SATELLITE PARKING FOR SIERRA MADRE VILLA GOLD LINE STA, P-N-R FOR $3,026 COMMUTERS, A STORE. THE CENTER WILL HAVE THREE (3) BUS BAYS AND AT LEAST FOUR (4) SHELTERS. THE SHELTERS WILL ALL HAVE BENCHES WITH A SEATING CAPACITY OF AT LEAST TEN PEOPLE IN EACH SHELTER. THE AREA WILL HAVE LIGHTING FOR SAFETY AND SECURITY, TRASH RECEPTACLES, DRINKING FOUNTAINS, AND INFORMATION KIOSKS. ADIDTIONAL TRAFFIC SIGNALS AND A R-HAND BUS ONLY TURN LANE. LOS ANGELES TRANSIT LA0G219 0 UNIVERSAL FARE COLLECTION EQUIPMENT. $226 LOS ANGELES TRANSIT LA990313 0 UNIVERSAL FARE SYSTEM (UFS) PROGRAM $3,945 LOS ANGELES TRANSIT LA0F059 0 UPGRADE SECURITY CAMERA SYSTEMS (L/P UZA. USING $80 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY12 $400 FOR CON. LOS ANGELES TRANSIT LA0G076 0 UPGRADE TO EXISTING PHONE SYSTEM. USING $20 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY11 IN CON $100 PHASE. LOS ANGELES TRANSIT LA0G761 0 VALLEY VILLAGE – PURCHASE OF 1 REPLACEMENT SMALL BUS 8 AP, 2 WC. THIS PROJECT WILL USE $ 7 OF TOLL CREDITS TO MATCH $60 THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0G772 0 VALLEY VILLAGE – PURCHASE OF 7 SERVICE EXPANSION SMALL BUS 8 AP, 2 WC. THIS PROJECT WILL USE $ 49 OF TOLL CREDITS TO $420 MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE. LOS ANGELES TRANSIT LA0D343 0 VEHICLE MAINTENANCE FACILITY $9,627 LOS ANGELES TRANSIT LAES771 0 VILLA ESPERANZA SERVICES REPLACEMENT OF THREE MINI VANS IV AT $4,817 LOCAL AND $37,183 FEDERAL EACH. $126 Project List 23

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES TRANSIT LAF1630 0 WASHINGTON BLVD TRANSIT ENHANCEMENTS. WASHINGTON BL TRANSIT ENHANCEMENT IS A STREETSCAPE DESIGN PROJECT THAT $2,384 ENCOURAGES INCREASED USE OF PUBLIC TRANSIT WHILE SUPPORTING LAND USES THAT ARE COMPATIBLE W/TOD LOS ANGELES TRANSIT LA0G200 0 WHEELCHAIR STRAPS FOR BUS FLEET $130 LOS ANGELES TRANSIT LAF3407 0 WHITTIER BUS STOP IMPROVEMENT PLAN. IMPLEMENTATION OF A CITYWIDE BUS STOP IMPROVEMENT PLAN. THIS PLAN IDENTIFIES $1,656 THE AMENITIES TO 45 BUS STOPS IN THE CITY. LOS ANGELES TRANSIT LA29202W 0 WILSHIRE BLVD BRTPHASE I: 12.5-MI. CORRIDOR WITH 7.7-MI. PEAK PERIOD BUS LANE ON WILSHIRE WITHIN THE CITY AND COUNTY OF $80,610 LA FROM VALENCIA ST. TO CITY OF SANTA MONICA. INCLUDES STREET WIDENING, CURB LANE REPAVING/RECONSTRUCTING, IMPROVED TRAFFIC SIGNAL TIMING & BUS SIGNAL PRIORITY. PHASE II: INCLUDES ENHANCED SHELTERS & LANDSCAPING; STREET REPAIR/ RECONSTRUCTION; CONCRETE BUS PADS AND P&R FACILITIES. LOS ANGELES TRANSIT LAE0036 0 WILSHIRE/ VERMONT PEDESTRIAN PLAZA IMPROVEMENTS AND INTERMODAL PEDESTRIAN LINKAGES $1,960 LOS ANGELES TRANSIT LA0G299 0 ZERO EMISSION BUS DEMONSTRATION PROJECT EARMARK ID# E2009-BUSP-115 $594 LOS ANGELES TRANSIT LAF3419 1 SUNSET JUNCTION PHASE 2. CREATE A MULTI-MODAL TRANSIT PLAZA TO INTEGRATE PUBLIC TRANSPORTATION, PEDESTRIAN & $5,869 BICYCLE IMPROVEMENTS THAT WOULD RESULT IN REGIONAL & LOCAL BENEFITS (CFP3844). TRIANGLE PROPERTY ON SUNSET BLVD BWT MANZANITA AND SANTA MONICA. LOS ANGELES STATE LA0G818 1 ALONG PACIFIC COAST HIGHWAY (SR-1) FROM THE INTERSECTION OF TRANCAS CANYON ROAD WESTWARD TO THE CITY MALIBU LIMITS $1,806 HIGHWAY TO IMPROVE THE EXISTING BIKE ROUTE, INSTALL SAFETY IMPROVEMENTS AND UPGRADE BIKE ROUTE. WORK INCLUDES SIGNAGE, STRIPING, INTERSECTION IMPROVEMENTS, MINOR GRADING AND OVERLAY WORK TO WIDEN THE SHOULDER IN SOME SECTIONS. (TEA- 21 #707)PROJECT USING $44 OF TOLL CREDIT TO MATCH $105 OF TEA-21 FUNDS IN ENG PHASE IN FY11/12. LOS ANGELES STATE LA0G720 1 F46 – PACIFIC COAST HIGHWAY ARTERIAL IMPROVEMENTS FROM ANITA ST. TO PALOS VERDES BLVD. STUDY, DESIGN, OBTAIN RIGHT $1,400 HIGHWAY OF WAY AND CONSTRUCT ROADWAY IMPROVEMENTS, STRIPING/SIGNAL ENHANCEMENTS FOR TURN LANES AND OTHER INTERSECTION IMPROVEMENTS. PROJECT NO. MR312.06, FA NO. MOU.MR312.06. LOS ANGELES STATE LA0G714 1 F47 – INTERSECTION IMPROVEMENTS ON PACIFIC COAST HWY AT TORRANCE BLVD. DEVELOP PLANS, SPECIFICATIONS AND ESTIMATES $585 HIGHWAY FOR A NORTHBOUND RIGHT TURN LANE. PROJECT NO. MR312.07, FA NO. MOU.MR312.07. LOS ANGELES STATE LA0F074 1 ROUTE 1: INSTALLATION OF NEW TRAFFIC SIGNAL TO CONTROL TRAFFIC FLOW THROUGH THE INTERSECTION OF ROUTE 1 (PACIFIC $596 HIGHWAY COAST HIGHWAY) AND CORRAL CANYON RD;SPEED ADVISORY SIGNS ON PCH, TRAFFIC INFORMATION. LOS ANGELES STATE LA0C8080 1 ROUTE 1: MANHATTAN BEACH: ON ROUTE 1 BETWEEN 33RD STREET & ROSECRANS AV; ADD ONE THROUGH LN TO NORTH BOUND $13,555 HIGHWAY SEPULVEDA BLVD. TO WIDEN EXISTING STRUCTURE FROM 6 TO 7 THROUGH LANES PPNO 2947. PROJECT USING $288 OF TOLL CREDITS TO OBLIGATE 100% FEDERAL FUNDS IN ENG PHASE. LOS ANGELES STATE 16606 1 ROUTE 1: NEAR MARINA REY ON LINCOLN BL FRM JEFFERSON BL TO FIJI WAY – WIDEN FROM 3 TO 4 THRU LNES IN EA. DIR. & RPLCE $3,232 HIGHWAY CULVER BL OC &CNSTRCT NEW BRDG OVR BALLONA CREK (EA 1661C, PPNO 0027P). LOS ANGELES STATE LA0G692 2 ROUTE 002: FROM 0.5 MILES SOUTH OF BRANDEN STREET TO I-5/SR-2 INTERCHANGE – MODIFY TERMINUS, SOUNDWALLS, $9,329 HIGHWAY LANDSCAPING, INSTALLING DETECTOR LOOPS AND RAMP METERS, RESTRIPING (WITH NO LANE ADDITION) AND IMPROVING ARTERIAL STREETS (RESTRIPING-NO INCREASE IN CAPACITY, AND REMOVING & WIDENING SIDEWALK. (EA 20550, PPNO 2689)(TOLL CREDITS = LOCAL MATCH) LOS ANGELES STATE LA000358 5 ROUTE 005: – FROM ROUTE 134 TO ROUTE 170 HOV LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 12180, $712,274 HIGHWAY 12181,12182+12183=1218W,12184, 13350 PPNO 0142F,151E,3985,3986,3987) SAFETEA LU # 570. CONSTRUCT MODIFIED IC @ I-5 EMPIRE AVE, AUX LNS NB & SB BETWEEN BURBANK BLVD & EMPIRE AVE; AND MODIFY EXISTING STRUCTURES. ADD AUXILIARY LANE BETWEEN ALAMEDA AND OLIVE FROM PM 28.43 TO PM 29.78 24 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES STATE LA000357 5 ROUTE 005: – FROM ROUTE 170 TO ROUTE 118 ONE HOV LANE IN EACH DIRECTION (10 TO 12 LANES) INCLUDING THE RECONSTRUCTION $207,838 HIGHWAY OF THE I-5/SR-170 MIXED FLOW CONNECTOR AND THE CONSTRUCTION OF THE I-5/SR-170 HOV TO HOV CONNECTOR (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO 0158K) (TCRP#41.2) LOS ANGELES STATE LAE0465 5 ROUTE 005: PHASE 1 OF 3– IN SANTA CLARITA FROM ROUTE 14 TO PICO CANYON/LYONS AVENUE IN THE SOUTHBOUND DIRECTION AND $131,000 HIGHWAY FROM ROUTE 14 TO GAVIN CANYON ROAD IN THE NORTHBOUND DIRECTION. CONST TRUCK CLIMBING LANES. (EA 2332A, PPNO 3189), (SAFTETEA-LU#465 FUNDED PAED FOR THIS PHASE INCLUDED IN LA0G440). LOS ANGELES STATE LA0G440 5 ROUTE 005: PHASE 2 AND 3 OF 3– IN LA/SANTA CLARITA: PHASE 2 (N/B FR RTE 14 TO WELDON CNYN ROAD; CONSTRUCT HOV LANE $410,000 HIGHWAY )& PHASE 3 (FR SR14 TO PARKER RD OC; CONSTRUCT HOV, TRUCK & AUX LANES (EA 2332C, PPNO 3189A & EA 2332E PPNO 3189B), SAFTETEA-LU#465. PE & RW $ ARE PROGRAMMED FOR EA 2332E ONLY. LOS ANGELES STATE LA0D192 5 ROUTE 005: GARVEE DEBT SERVICE PAYMENTS: RT 5 FROM RT 118 TO RT 14 FROM 10 TO 12 LANES HOV LANES. EA# 122001, PPNO $28,895 HIGHWAY 0162P. LOS ANGELES STATE LA0C8012 5 ROUTE 005: I-5 WESTERN AVENUE I/C PHASE I -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2 $33,615 HIGHWAY AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A, PPNO 2120) LOS ANGELES STATE LA0D463 5 ROUTE 5: I-5 LAKE HUGHES RD- INTERSECTION IMPROVEMENTS & WIDENING TO PROVIDE ADDITIONAL LANES ON EASTBOUND AND $500 HIGHWAY WESTBOUND APPROACHES LOS ANGELES STATE LA0D462 5 ROUTE 5: I-5 PARKER RD INTERSECTION IMPROVEMENTS INCLUDING BRIDGE WIDENING AND LANE ADDITIONS $500 HIGHWAY LOS ANGELES STATE LA0D74 5 ROUTE 5: IN LOS ANGELES FROM CHAMBERLAIN STREET TO LARKSPUR STREET SOUNDWALL CONSTRUCTION PART OF RTE 5 FR 118 TO $41,724 HIGHWAY 14 HOV PRJ (CFP 8925). EA# 23550 .PPNO 3236. LOS ANGELES STATE LA0D73B 5 ROUTE 5: IN NORWALK: FROM ORANGE COUNTY LINE TO ROUTE 605: CARMENITA INTERCHANGE IMPROVEMENT (EA 2159C0, PPNO $379,730 HIGHWAY 2808A) (TCRP 42.3, & 43) LOS ANGELES STATE LA0D73 5 ROUTE 5: LA MIRADA, NORWALK & SANTA FE SPRINGS-ORANGE CO LINE TO RTE 605 JUNCTION. WIDEN FOR HOV & MIXED FLOW $1,241,757 HIGHWAY LNS, RECONSTRUCT VALLEY VIEW (EA 2159A0 = 21591, 21592, 21593, 21594, 21595, PPNO 2808 = 4153, 2808, 4154, 4155, 4156). TCRP#42.2&42.1 LOS ANGELES STATE LA996134 5 ROUTE 5: RTE. 5/14 INTERCHANGE & HOV LNS ON RTE 14 – CONSTRUCT 2 ELEVATED LANES – HOV CONNECTOR (DIRECT CONNECTORS) $161,100 HIGHWAY (EA# 16800)(2001 CFP 8343) (PPNO 0168M) LOS ANGELES STATE LAE2577 5 ROUTE 5: STUDY NORWALK, SANTA FE SPRINGS, DOWNEY, MONTEBELLO, & COMMERCE: ON I-5, CONDUCT PLAN'G, ENV. STUDIES FOR $4,730 HIGHWAY WIDEN'G W/HOV & MIXED FLOW LNS FROM I-605 TO I-710.(EA2159E, 2159F, PPNO 2808C, 2808D)PAED ONLY LOS ANGELES STATE LA0G139 10 LACRD – EXPAND CAPACITY OF THE I-10 HOT LANE (RESTRIPING AND BUFFER CHANGES). RESTRIPE TO ADD A SECOND LANE (WB – $3,200 HIGHWAY SANTA ANITA TO I-710; EB – I-710 TO BALDWIN AVE.)FOR HOT LANES ON THE I-10. (RTP# 1HL08D01) LOS ANGELES STATE LA0G137 10 LACRD – HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182ND ST./ARTESIA TRANSIT CENTER $66,679 HIGHWAY TO ADAMS BLVD.(IT AND TOLL TECHNOLOGY)(RTP # 1HL08D01, HL08D03, 1OM08D01)CONVERSION OF HOV LANES TO HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605. (RTP ID 1HL08D01 & 1HL08D03 & 1TR08D07B) LOS ANGELES STATE LA0G819 10 LACRD – I-10 AND I-110 EXPRESSLANES TOLL SYSTEM OPERATIONS, MAINTENANCE, MARKETING AND DATA COLLECTION (RTP ID $2,499 HIGHWAY 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02) LOS ANGELES STATE LAE3805 10 PLANNING, DESIGN AND PRELIMINARY ENGINEERING OF ON/OFF RAMP SYSTEM AT INTERSECTION OF I-10 AND ROBERTSON/NATIONAL $2,500 HIGHWAY BLVD. Project List 25

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES STATE LA0F098 10 ROUTE 010: L.A. COUNTY I-10 AND I-605 IC;CONSTRUCT ONE/TWO LANE BRIDGE STRUCTURE, BRANCHING OFF SB OF RTE 605 TO EB OF $78,760 HIGHWAY RTE 10 AT-GRADE CONNECTOR RAMP (EA 24540, PPNO 3529; CONSTRUCT ONE-LANE CONNECTOR FROM SB I-605 TO WB I-10. LOS ANGELES STATE LA01342 10 ROUTE 010: RT 10 FROM RT 605 TO PUENTE AVE HOV LANES (8+0 TO 8+2) (EA# 117070, PPNO 0306H) PPNO 3333 3382 AB 3090 REP $200,064 HIGHWAY (TCRP #40) LOS ANGELES STATE LA000548 10 ROUTE 10: FROM PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES & SOUNDWALLS (C-ISTEA 77720, 95 STIP-IIP) (EA# $184,522 HIGHWAY 117080,11172, 1170U, PPNO# 0309N, 0309S) LOS ANGELES STATE LA0B875 10 ROUTE 10: HOV LANES FROM CITRUS TO ROUTE 57/210 – (EA# 11934, PPNO# 0310B) $192,643 HIGHWAY LOS ANGELES STATE LA0G665 14 COMPLETE PA/ED FOR AN APPROXIMATE 63-MILE WEST-EAST FREEWAY/EXPRESSWAY AND POSSIBLE TOLL FACILITY BETWEEN SR-14 $30,000 HIGHWAY IN LA COUNTY AND SR-18 IN SB COUNTY. HIGH DESERT CORRIDOR PA/ED COMBINES THE LA COUNTY MEASURE R PROJECT FROM SR-14 TO I-15 AND SB COUNTY FEDERAL EARMARKS PROVIDED TO CITY OF VICTORVILLE FOR US-395 TO SR-18. BOTH PROJECTS AND FUNDS ARE COMBINED TO COMPLETE THE PA/ED FROM SR-14 TO SR-18. [EA 26000] LOS ANGELES STATE LA0C8102 14 ROUTE 14: SR-14 FREEWAY/AVENUE I INTERCHANGE IMPROVEMENTS-WIDENING AVE I FROM 2 TO 3 LANES IN EACH DIRECTION, ADDING $10,581 HIGHWAY DUAL LEFT TURN LANES, AND WIDENING A BRIDGE STRUCTURE. PPNO 3123. LOS ANGELES STATE LA0D336 14 ROUTE 14: SR14/AVENUE K INTERCHANGE IMPROVEMENTS. WIDEN NORTHBOUND OFFRAMP AND 15TH STREET WEST. WIDEN N/B $4,250 HIGHWAY OFFRAMP FROM 3 TO 4 LANES AT AVE K/15TH ST-W. LOS ANGELES STATE LAE0357 19 CONSTRUCT NEW LEFT TURN LANE AT THE STATE ROUTE 19 AND TELSTAR. THE ADDITION OF A SECONDARY LEFT TURN LANE AND $2,360 HIGHWAY TRAFFIC SIGNAL AT THE INTERSECTION OF ROSEMEAD BLVD (STATE) AND TELSTAR AVE. PROJECT USING $347 TOLL CREDIT FOR CONSTRUCTION PHASE IN FY 10/11 FOR STPL AND DEMO FUNDS. LOS ANGELES STATE LA0G600 47 ROUTE 047: REPLACEMENT OF SCHUYLER HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 $278,993 HIGHWAY AUX LANE SB (EA 13820, PPNO 0444E). LOS ANGELES STATE LA0D45 47 SR-47 EXPRESSWAY:REPLACEMENT OF SCHUYLER HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES $687,000 HIGHWAY AND 1 AUX LANE SB; CONSTRUCT EXPRESSWAY AND 2-LANE FLYOVER. SAFETEA-LU #712 & #3797 LOS ANGELES STATE LA0D391 47 VINCENT THOMAS BRIDGE STUDY – DEVELOP AND ANALYZE ALTERNATIVES TO INCREASE NEEDED CAPACITY. SAFETEA-LU HPP # 297 $1,400 HIGHWAY NON-CAPACITY LOS ANGELES STATE LA0D393 60 GRAND AVENUE/SR 57/60 INTERCHANGE MODIFICATION: RESTRIPE THE EXISTING GRAND AVE, ADD WB ON-RAMP AND ADD WB AUX $19,002 HIGHWAY LANE, ADD SECOND SB LFT TURN LN AT EB RAMP (09 CFP 3137) LOS ANGELES STATE LA0D450 60 RECONSTRUCT SR 60/GRAND AV INTERCHANGE – WIDEN GRAND AV: SB ADD 1THRU LN (2 EXSTNG); NB ADD 1 THRU LN (3 EXSTNG), $257,900 HIGHWAY REPLACE GRAND AV OC, ADD EB LOOP ON-RAMP, CONSTRUCT ADDITIONAL EB THRU LN FROM GRAND AVE TRAP LN TO SR57 ADD LN, ADD TWO BYPASS RAMP CONNECTORS, ADD AUX LNS EB AND WB FROM EAST TO WEST JUNCTION OF THE CONFLUENCE. LOS ANGELES STATE LA0D399 60 ROUTE 60: CONSTRUCTION OF NEW PARTIAL DIAMOND INTERCHANGE FOR STATE ROUTE 60 (SR-60) AT LEMON AVE (SAFETEA-LU # $19,000 HIGHWAY 587). LOS ANGELES STATE LA0B951 71 ROUTE 71: ROUTE 10 TO ROUTE 60 – EXPRESSWAY TO FREEWAY CONVERSION – ADD 1 HOV LANE AND 1 MIXED FLOW LANE . (2001 CFP $250,000 HIGHWAY 8349, TCRP #50) (EA# 210600, PPNO 2741) (TCRP #50) LOS ANGELES STATE LA0G317 71 STATE ROUTE 71 EXPANSION FROM SR 60 TO I-10 POMONA CA (ADD PA&ED ONLY). $878 HIGHWAY 26 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES STATE LA0G208 101 PROJECT WILL REPLACE EXISTING 2 LANE BRIDGE WITH 4 LANE BRIDGE AND ONE TURN LANE AT LOST HILLS ROAD/US 101 $28,080 HIGHWAY INTERCHANGE. THIS WILL BRING BRIDGE TO CURRENT LANE CONFIGURATION OF LOST HILLS ROAD ON EITHER SIDE OF BRIDGE. THE INTERCHANGE WILL ELIMINATE A CROSS-TRAFFIC MOVEMENT TO ACCESS THE NB US 101. THERE WILL BE NO ADDITIONAL LANES ON THE US 101 FREEWAY. THE REPLACEMENT BRIDGE WILL BE WIDER,4 LANES RATHER THAN 2 AND THE SPAN WILL BE APPROXIMATELY 280 FEET LONG, ACCOMMODATING THE WIDTH OF THE ROAD ON EIT LOS ANGELES STATE LA0D31 101 ROUTE 101: CONSTRUCT ONE ADDITIONAL LANE FOR BOTH NORTH AND SOUTH BOUND OFF-RAMPS AT VAN NUYS BLVD. (RIP 1 M, IIP 8 $10,232 HIGHWAY M) (EA # 199630) (PPNO 2789) (DEMO= NAT. CORRIDOR PLANNING AND BORDER DEV.) LOS ANGELES STATE LAOB416 101 ROUTE 101: IN LOS ANGELES – DOWNTOWN OVER FREEWAY 101 – PEDESTRIAN BRIDGE ENHANCEMENT $3,916 HIGHWAY LOS ANGELES STATE LA960142 101 RTE 101/LINDERO CANYON ROAD INTERCHANGE IMPROVEMENT PROJECT. LINDERO CYN RD BTW VIA COLINAS AND AGOURA RD $23,382 HIGHWAY WIDENED FROM 2 TO 3 LANES IN EACH DIRECTION. RAMP G-6 WIDENED TO 2 LANES TO PROVIDE FOR 2 FREE RT LANES FOR EASTBOUND VIA COLINAS TRAFFIC AT LINDERO CYN RD. THE EXISTING NORTHBOUND AUX LANE WILL BE EXTENDED SOUTHERLY FROM ITS TERMINUS AT RAMP G-6 TO RAMP G-3. INCLUDES BIKE PATH CONSTRUCTION. LOS ANGELES STATE LA0G230 101 U.S. 101 FREEWAY AND PALO COMADO CANYON ROAD BRIDGE-AT CHESEBRO ROAD (PM 33.0/34.4). WIDENING OF BRIDGE FROM $22,850 HIGHWAY 2-LANES TO 4-LANES, CONSTRUCTION OF SIDEWALKS AND BIKE LANES, MODIFICATION OF ON/OFF RAMPS, AND MODIFICATION OF VARIOUS INTERSECTIONS. LOS ANGELES STATE LA0D344 101 WIDENING OF THE REYES ADOBE ROAD OVERCROSSING OF THE 101 FREEWAY FROM 3 LANES TO 6 LANES, ALONG WITH BIKE LANES $11,072 HIGHWAY AND SIDEWALKS LOS ANGELES STATE LAE1609 105 ROUTE 105: STUDY REPORT FOR INTERCHANGE IMPROVEMENTS AT LAX AIRPORT (E/P, PS/E ONLY) $400 HIGHWAY LOS ANGELES STATE LA0G141 110 LACRD – HOT LANES ON THE I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER $46,900 HIGHWAY TO ADAMS BLVD. INCLUDES OPERATIONAL IMPROVEMENTS AT I-110 OFF-RAMP AT ADAMS BLVD (RE-STRIPE OFF-RAMP TO ADD A RIGHT TURN LANE AND WIDEN ADAMS BLVD BRIDGE FOR AN ADDITIONAL THROUGH LANE TO FIGUEROA WAY). CONVERSION OF HOV LANES TO HOT LANES. (INFRASTRUCTURE/PAVEMENT) (1HL08D01, 1HL08D03) LOS ANGELES STATE LA0G138 110 LACRD – HOT LANES ON THE I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER $3,881 HIGHWAY TO ADAMS BLVD. CONVERSION OF HOV LANES TO HOT LANES.(INFRASTRUCTURE/PAVEMENT)(1HL08D01, 1HL08D03) LOS ANGELES STATE LA0D328 110 ROUTE 110: IN LOS ANGELES FROM 8TH STREET ON RAMP TO I-110/I-10 CONNECTOR, CONSTRUCT NB & SB AUXILIARY LANES AND $54,932 HIGHWAY MODIFY RAMPS (EA 2411U, PPNO 3343) CONVERT EXIST'G SB AUX LANE TO OPTIONAL LANE & MODIFY RAMPS; NB HARBOR FWY, FROM NORTH END OF 12TH ST UC TO NORTH END OF THE 7TH ST UC, ADD STORAGE LANE ON THE MAINLINE & RECONSTRUCT RAMP LOS ANGELES STATE LA0G086 110 TO EXTEND I-110 NORTH FROM ITS CURRENT TERMINUS AT I-10 INTO DOWNTOWN LOS ANGELES VIA CENTRAL CITY WEST AREA IN $7,841 HIGHWAY LOS ANGELES, CALIFORNIA. THE ADAMS/FIGUEROA FLYOVER STUDY, PSR, WILL INVESTIGATE HOW THE CONSTRUCTION OF A NEW STRUCTURE – CONNECTING THE I-110 NORTHBOUND HOV LANE OFF-RAMP DIRECTLY TO FIGUEROA STREET. LOS ANGELES STATE LAF1204 118 ROUTE 118: 118 FREEWAY WESTBOUND OFF-RAMP AT TAMPA AV. THIS PROJECT WILL EXTEND THE RIGHT-TURN ONLY FROM THE WB $1,055 HIGHWAY SR-118 OFF-RAMP AT TAMPA AV AND WILL INSTALL AN ADDITIONAL SB LEFT-TURN LANE ON TAMPA AT THE EB SR-118 ON-RAMP. LOS ANGELES STATE LA0D480 126 ROUTE 126: SR-126 IMPROVEMENTS – LOS ANGELES COUNTY LINE TO CASTAIC CREEK BRIDGE: IMPROVE 5 INTERSECTIONS ADD LT & $35,500 HIGHWAY RT LANES, ADD 1 SB AUX LANE FROM LONG CANYON RD TO WOLCOTT WAY LOS ANGELES STATE LA0C8099 126 ROUTE 126: SR-126/COMMERCE CTR DR NEW IC. CONSTRUCT A PARTIAL CLOVERLEAF, GRADE SEPARATED IC AND WIDEN ST 126 FROM $60,000 HIGHWAY .76 KM EAST OF IC TO .85 KM WEST 4-6 LANES. (2001 CFP 8099) (PPNO 3118) Project List 27

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES STATE 18850 134 ROUTE 134: BETWEEN PASS AVE AND CALIFORNIA ST (MEDIA DISTRICT) – MODIFY RTE 134/HOLLYWOOD WAY I/C, NEW RAMPS BET. $47,031 HIGHWAY HOLLYWOOD WAY & ALAMEDA (2001 CFP, 8415). (EA 18850 PPNO 2223). LOS ANGELES STATE 17870 134 ROUTE 134: RTE 134 BETWEEN I-5 & PACIFIC AVE MODIFY 134/SAN FERNANDO RD I/C & GRADE SEP AT UPRR SAN FERNANDO/FLOW- ER $31,375 HIGHWAY (WIDEN 1 BRIDGE & 1 OFF RAMP) NON-CAPACITY INCREASING (PPNO 9814 ) LOS ANGELES STATE LA0G403 134 UPGRADE TRAFFIC SIGNAL AT SR-134 FREEWAY WB/OFF RAMPS AT HARVEY DR. INTERSECTION. UPGRADE TRAFFIC SIGNAL AT HARVEY $3,000 HIGHWAY DR. AND WILSON AVE. ADD THIRD LANE ON HARVEY DR. AT WILSON AVE. LOS ANGELES STATE LA0D180 138 ROUTE 138 WIDENING FROM 2 TO 4 LANES WITH MEDIAN TURN LANE- NEAR LIANO FROM 0.30 MILES WEST OF 165TH STREET EAST TO $89,811 HIGHWAY 0.37 MILES WEST OF 190TH STREET EAST. (SEG.12). EA# 127271, PPNO 0694Q. LOS ANGELES STATE LA962212 138 ROUTE 138: IN PALMDALE @ AVENUE P-8 FROM ROUTE 14 TO 100TH STREET – ACQUISITION OF ROW FOR FUTURE RTE 138 (TIER 2 ENV) $700,000 HIGHWAY (CFP 2212 $3540 2001 CFP 8021)(EA# 116720,PPNO 0393F) LOS ANGELES STATE LA0D451 138 ROUTE 138: ROUTE 138 FROM AVE. T TO ROUTE 18-WIDEN 2 TO 4 THRU LANES WITH MEDIAN TURN LANE. EA# 12721,12722,12723,1272 $48,247 HIGHWAY 4,12725,12728. PPNO# 3325,3326,3327,3328,3329,3331 LOS ANGELES STATE LA0G411 210 I-210 SOUNDWALLS BETWEEN PENNSYVANIA AVE. TO LOWELL AVE. $25,000 HIGHWAY LOS ANGELES STATE LA0G121 210 LA CANADA FLINTRIDGE, CA I-210 – DESIGN OF TWO SOUNDWALL SEGMENTS. DESIGN/ENGINEERING OF TWO SOUNDWALL $294 HIGHWAY SEGMENTS:SOUNDWALL NO. S341 (SOUTH OF I-210 – FOOTHILL BOULEVARD EASTBOUND ON RAMP TO BERKSHIRE PLACE – EASTBOUND OFF RAMP; AND PORTION OF SOUNDWALL NO. S338 (NORTH SIDE OF I-210 FREEWAY – FOOTHILL BOULEVARD – WESTBOUND OFF RAMP TO BERKSHIRE PLACE WESTBOUND ON RAMP. LOS ANGELES STATE LAE0219 210 ROUTE 210: CONSTRUCT SOUND WALLS ALONG PORTIONS OF THE I-210 FREEWAY BETWEEN ARROYO BLVD AND ORANGE GROVE $1,800 HIGHWAY (SAFETEA-LU #219 HIGH PRIORITY PROJECTS) LOS ANGELES STATE LA0G124 405 RECONFIGURING THE I-405 FREEWAY INTERCHANGES, AT CHERRY AVENUE, TO INCORPORATE BOTH NORTHBOUND AND SOUTHBOUND $474 HIGHWAY ON/OFF RAMPS AND TO CONFORM WITH CALTRANS DESIGN CRITERIA. (NO ADDITIONAL CAPACITY, ONLY AN INTERCHANGE RECONFIGURATION.)ONLY FOR PSR PHASE. LOS ANGELES STATE LA0B408 405 ROUTE 405: ADD A 10-MILE HOV LANE ON THE NORTHBOUND 405 BETWEEN I-10 AND U.S. 101 IN LA FROM RTE 10 TO RTE 101 WIDEN $1,034,000 HIGHWAY FOR HOV LANE & MODIFY RAMPS, ADD NEW WB ON RAMP AT SUNSET & HOV INGRESS/EGRESS AT SANTA MONICA BLV(EA 12030, PPNO 0851G, SAFETLU SECTION 1302 #18, 1934 #20) LOS ANGELES STATE LA0D77 405 ROUTE 405: CITY OF L.A.-AT ROUTE 405 & US 101 INTERCHANGE. CONSTRUCT FREEWAY CONNECTOR FROM SB RTE 405 TO NB&SB US $120,144 HIGHWAY 101 & ADD AUX LANE FROM BURBANK TO NB 101 CONNECTOR (EA# 199610, PPNO 2787) LOS ANGELES STATE LA0D193 405 ROUTE 405: GARVEE DEBT PAYMENTS RTE. 405 – WATERFORD AV. TO RTE 10 – AUX LNE:LOS ANGELES – WATERFORD AV. TO RTE 10 – $34,470 HIGHWAY CNSTRCT S/B AUX LNE & S/B HOV LNE (2001 CFP 8354) (EA 195900 ,PPNO 2333). LOS ANGELES STATE LA0D194 405 ROUTE 405: GARVEE DEBT SERVICE PAYMENTS: IN LOS ANGELES ON ROUTE 405/101 CONNECTOR GAP CLOSURE (2001 CFP 7248, 2001 $30,787 HIGHWAY CFP 8347) (EA# 20120K, PPNO 2336). (BOTH RIP & IIP) LOS ANGELES STATE 49160 405 ROUTE 405: IN INGLEWOOD AT ARBOR VITAE AVENUE-CONSTRUCT SOUTH HALF OF INTER-CHANGE. EA# 491601, PPNO 0831) $55,922 HIGHWAY LOS ANGELES STATE 1178A 405 ROUTE 405: IN LOS ANGELES AND CULVER CITY FROM ROUTE 90 TO ROUTE 10 – HOV LANES (SB 5+0 TO 5+1; NB 5+0 TO 5+1 HOV) $190,228 HIGHWAY (2206LK CFP) OBLIGATED 6207 (034) LOS ANGELES STATE LA0D332 405 ROUTE 405: IN LOS ANGELES: FROM LA TIJERA BLVD TO JEFFERSON BLVD; ADD AUXILIARY LANE PPNO: 3348 EA: 24130 $38,711 HIGHWAY 28 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES STATE LAF1103 405 ROUTE 405: WILMINGTON AVENUE INTERCHANGE MODIFICATION AT I-405. IMPROVE I-405/WILMINGTON AVENUE INTERCHANGE BY $26,170 HIGHWAY ADDING A NEW NORTHBOUND ON-RAMP AND WIDENING OF WILMINGTON AVENUE, 223RD, AND EXISTING ON- AND OFF-RAMPS. LOS ANGELES STATE LAE0574 605 ROUTE 605: STUDY – CONSTRUCT I-605 INTERCHANGE CAPACITY IMPROVEMENTS IN IRWINDALE $1,920 HIGHWAY LOS ANGELES STATE 18790 710 ROUTE 710: STUDY TO EVALUATE TECHNICAL FEASIBILITY AND IMPACTS OF AN ALTERNATIVE TO CLOSE 710 FREEWAY GAP. THIS STUDY $87,454 HIGHWAY INCLUDES ENVIRONMENTAL STUDIES (EIR/EIS) (EA# 187901, PPNO# 2215) LOS ANGELES STATE LA0B952 710 ROUTE 710: RECONSTRUCT I-710 INTERCHANGES AT I-5, AT I-405, AT SR 91, AND AT I-105. AS PART OF OF THE I-710 CORRIDOR $40,500 HIGHWAY PROGRAM PROPOSING 4 TRUCK LANES (PORTS-RAIL YARDS), 10 GENERAL LANES (PORT-SR-60)(ISTEA ID # 37)(SAFTEA-LU 3773) LOS ANGELES STATE LA996143 710 ROUTE 710: RTE 710 PCH TO DOWNTOWN L.B., PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE (EA 2203U, 23640, PPNO: $7,496 HIGHWAY 2945,3248) LOS ANGELES STATE LALS02 999 ROUTE 999: GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM $914,264 HIGHWAY . PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) LOS ANGELES STATE LA0G441 999 ROUTE 999: GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – HIGHWAY $29,817 HIGHWAY MAINTENANCE. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION. LOS ANGELES STATE LALS08 999 ROUTE 999: GROUPED PROJECTS FOR EMERGENCY REPAIR – SHOPP EMERGENCY RESPONSE PROGRAM. PROJECTS ARE CONSISTENT $94,523 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. THIS APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD. LOS ANGELES STATE LALS01 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP COLLISION REDUCTION PROGRAM. PROJECTS ARE $142,624 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES. LOS ANGELES STATE LALS07 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MANDATES PROGRAM PROJECTS ARE CONSISTENT WITH 40 $127,250 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES. LOS ANGELES STATE LALS06 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MOBILITY PROGRAM. PROJECTS ARE CONSISTENT WITH 40 $6,378 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES. LOS ANGELES STATE LALS09 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/ $22,418 HIGHWAY OR REHABILITATION – MINOR PROGRAM. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – RR/HWY CROSSING, SAFER NON-FED AID SYS RDS, SHLDER IMPROV, TRAFFIC CONTROL DEVICES & OPERATING ASSISTANCE OTHER THAN SIGNALIZPAVEMENT RESURFACING AND/OR REHABILITATION. LOS ANGELES STATE LALS03 999 ROUTE 999: IN LOS ANGELES COUNTY, LUMP SUM ROADSIDE PRESERAVATION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR $4,752 HIGHWAY PART 93.126,127,128, EXEMPT TABLES 2 & 3) LOS ANGELES STATE LA0D479 999 ROUTE 999: LOS ANGELES COUNTY ITIP TRANSPORTATION ENHANCEMENT PROJECT LUMP SUM (PPNO 3546, 3547, 3548, 3549, 3550, $12,947 HIGHWAY ETC) LOS ANGELES STATE LA990921 999 ROUTE 999: ON VARIOUS HIGHWAYS. GROUPED PROJECTS FOR NOISE ATTENUATION (SOUNDWALLS) (ONLY EA00234 ON RTE 710 $236,700 HIGHWAY REMAINING. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES. Project List 29

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES STATE LALS04 999 ROUTE 999:IN L.A. GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – SHOPP PROGRAM. PROJECTS ARE $116,148 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). LOS ANGELES LOCAL LA0D445 0 10TH STREET WEST CAPACITY IMPROVEMENTS FROM AVE L TO AVE M. CAPACITY IMPROVEMENTS ON 10TH STREET WEST BY WIDENING $4,221 HIGHWAY EXISTING ROADWAY TO ROW EXTENTS, CLOSING ANY MIXED FLOW LANE GAPS, PROVIDING CONTINUOUS PEDESTRIAN WALKS, & BUS TURNOUTS. LOS ANGELES LOCAL LA9811099 0 20TH STREET WEST FROM AVENUE P-8 TO ELIZABETH LAKE ROAD 1 MILE STREET EXTENSION AND BRIDGE CONSTRUCTION (NEW $6,600 HIGHWAY ROAD). LOS ANGELES LOCAL LAE2932 0 213TH ST. PEDESTRIAN SIDEWALK BRIGE OVER DOMINGUEZ CHANNEL. CONSTRUCT 213TH ST. PEDESTRIAN BRIDGE TO PROVIDE SAFE $2,200 HIGHWAY PASSAGE FOR PEDESTRIANS & WHEELCHAIRS OVER DOMINGUEZ CHANNEL. LOS ANGELES LOCAL LAF1508 0 6TH STREET EAST BIKEWAY EXTENSION. THIS PROJECT WILL PROVIDE A MISSING LINK IN THE CLASS I BWY TO CONNECT THE EXISTING $544 HIGHWAY SIERRA HWY BIKEWAY TO THE TRANSPORTATION CENTER AND AN EXISTING BIKEWAY IN CLOCK TOWER PLAZA LOS ANGELES LOCAL LAF3703 0 A 'NO NET NEW TRIPS' RIDESHARE TOOLKIT. DEVELOP A TDM TOOLKIT WITH ONLINE MULTI-MODAL MOBILITY INFORMATION, $849 HIGHWAY BIKE ACCOMMODATIONS, 300 WALKING-ROLLING CARTS, 75 BIKE LOCKERS & INCENTIVE PROGRAMS FOR EMPLOYERS, SCHOOLS & NEIGHBORHOODS. WITHIN THE CITY OF SANTA MONICA IN DEMAND MANAGEMENT AREAS AS DEFINED IN THE LAND USE AND CIRCULATION ELEMENT (LUCE) STRATEGY FRAMEWORK. LOS ANGELES LOCAL LA000800A 0 AC CONVERSION. HBRR LOCAL BRIDGE LUMP SUM – (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES $49,820 HIGHWAY 2 & 3) LOS ANGELES LOCAL LA0C57 0 ACE/GATEWAY CITIES-CONSTRUCT GRADE SEP. AT PASSONS BLVD IN PICO RIVERA (& MODIFY PROFILE OF SERAPIS AV,)(PART OF $44,530 HIGHWAY ALAMEDA CORR EAST PROJ.)SAFETEA-LU HPP # 1666 (TCRP #54.3) LOS ANGELES LOCAL LAE0084 0 ADAMS STREET REHABILITATION PROJECT $372 HIGHWAY LOS ANGELES LOCAL LA0G739 0 AGOURA ROAD WIDENING. WIDEN AND REALIGN ROADWAY FROM WESTERLY CITY LIMITS TO CORNELL DRIVE (APROX 2 MILES). SOME $5,500 HIGHWAY AREAS ARE TWO LANES AND WILL BE WIDENED TO FOUR LANES. THE OTHER PORTIONS OF THE STREET ALREADY HAVE FOUR LANES. CONSTRUCT/MODIFY SIDEWALKS AND BIKE LANES; ADD LANDSCAPED MEDIANS LOS ANGELES LOCAL LA98STIP3 0 ALAMEDA ST AND N SPRING ST ARTERIAL REDESIGN -REALIGN ALAMEDA/N.SPRING ELIMINATING INEFFICENT INTERSECTN WITH MAIN $8,555 HIGHWAY ST/N. MAIN STREET. 3 NB LANES & 3 SB LANES. LOS ANGELES LOCAL LA0D333 0 ANAHEIM STREET PLANNING, COORDINATION AND DESIGN OF OPERATIONAL & STREETSCAPE (NON-CAPACITY IMPROVEMENTS). $566 HIGHWAY LOS ANGELES LOCAL LAF3722 0 ANGELS WALK BOYLE HEIGHTS. PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET $818 HIGHWAY INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS. LOS ANGELES LOCAL LAF1844 0 ANGELS WALK CRENSHAW. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET $764 HIGHWAY INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS. LOS ANGELES LOCAL LAF1845 0 ANGELS WALK HIGHLAND PARK. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 $784 HIGHWAY ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS. LOS ANGELES LOCAL LAF1846 0 ANGELS WALK NORTH HOLLYWOOD. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 $714 HIGHWAY ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS. 30 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3721 0 ANGELS WALK SILVERLAKE. PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET $844 HIGHWAY INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS. LOS ANGELES LOCAL LA0D188 0 ARBOR VITAE STREET FROM LA BREA AVENUE TO PRAIRIE AVENUE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, $3,532 HIGHWAY SIDEWALKS, DRIVEWAYS, PEDESTRIAN RAMPS, LANDSCAPING AND STREET LIGHTING. LOS ANGELES LOCAL LAF3607 0 ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECT. DESIGN AND CONSTRUCTION OF PEDESTRIAN IMPROVEMENTS AROUND $2,379 HIGHWAY THE PLANNED GOLD LINE ARCADIA STATION, CONNECTING THE COMMUNITIES WITH THE REGIONAL RAIL SYSTEM. LOS ANGELES LOCAL LAF3714 0 ARROYO VERDUGO COMMUTE MANAGER SYSTEM. DEVELOPMENT OF A CUSTOMIZED TDM-SPECIFIC GEOGRAPHICALLY BASED WEBSITE. $800 HIGHWAY LOS ANGELES LOCAL LA0G711 0 ARTESIA BLVD. TRAFFIC SIGNAL INTERSECTION IMPROVEMENTS AT WESTERN AVE. – WITH DUAL LEFT TURN LANES. $675 HIGHWAY LOS ANGELES LOCAL LA0D120 0 ARTESIA TRAFFIC ENHANCEMENT PROJECT FOR ARTESIA BLVD, PIONEER BLVD AND 183RD STREET RESURFACING, STREETSCAPING, $1,192 HIGHWAY TRAFFIC CALMING, ANGLE-PARKING SIGNALS, ETC. LOS ANGELES LOCAL LAF3646 0 ARTS DISTRICT/LITTLE TOKYO GOLD LINE STATION LINKAGES. PEDESTRIAN ENHANCEMENTS INCLUDING SIDEWALK/PATH PAVING; $1,269 HIGHWAY PED LIGHTS; STREET TREES/PLANTING; DISTRICT SIGNAGE; ENTRY ELEMENTS; STREET FURNITURE; CROSSWALK PAVING; AND BIKE PARKING. LOS ANGELES LOCAL LA0D390 0 AT I-110 NB AT JOHN S GIBSON BLVD NB RAMPS & NB SR-47/I-110 CONNECTOR. WIDEN SB 47 TO NB 110 CONNECTOR FROM 1 TO 2 LNS $35,051 HIGHWAY BEGIN AT SB 47 PM 0.72 (STATION 535+00) JUST W OF FRONT ST ON-RAMP. ADDL THROUGH LN CONTINUES ON NB 110 & ENDS JUST N OF THE J S GIBSON OFF-RAMP. WIDEN NB 110/J S GIBSON ON-RAMP TO IMPROVE ACCESS TO FWY & INTERSECTION OF J S GIBSON/110 NB RAMPS W/ IMPROVED TURN RADII & RE-STRIPING LOS ANGELES LOCAL LA0G181 0 ATCS – CENTRAL BUSINESS DISTRICT. DEVELOP A FULLY TRAFFIC RESPONSIVE SIGNAL CONTROL SYSTEM TO APPROXIMATELY 180 $9,215 HIGHWAY INTERSECTIONS CURRENTLY OPERATIONAL WITH ATSAC CAPABILITY. LOS ANGELES LOCAL LAE2835 0 ATHERTON ST ENCLOSE, CONSTRUCT STORM DRAIN AND LANDSCAPE EXISTING OPEN CULVERT $1,440 HIGHWAY LOS ANGELES LOCAL LAE2378 0 ATLANTIC BLVD STREET IMPROVEMENTS FROM 52ND DRIVE TO 58TH STREET. RESURFACING EXISTING PAVEMENT, SIGNING AND $809 HIGHWAY STRIPING, MINOR CONCRETE REPAIRS, LANDSCAPING, TRAFFIC LOOPS. LOS ANGELES LOCAL LA0D279 0 ATLANTIC BLVD. BRIDGE OVER THE L.A RIVER 5/8 MILE N SLAUSON AVE, WIDEN 6 LANE BRIDGE TO ADD RIGHT TURN LANE (BRIDGE $9,302 HIGHWAY #53C0252) LOS ANGELES LOCAL LA0G074 0 ATMS INTEGRATION BUENA PARK (ORANGE COUNTY)WITH IEN (LOS ANGELES COUNTY)FIBER OPTIC CABLE ALONG IMPERIAL HIGHWAY $1,546 HIGHWAY FROM CARMENITA RD TO VALLEY VIEW AVENUE AND ALONG VALLEY VIEW AVENUE FROM IMPERIAL HIGHWAY TO ROSECRANS AVENUE LOS ANGELES LOCAL LAF1342 0 ATSAC/ATCS – PLATT RANCH PROJECT. PROVIDE ATSAC/ATCS TYPE FACILITIES AND BUS PRIORITY INFRASTRUCTURE TO APPROX. 29 $5,469 HIGHWAY SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER BASED REAL-TIME TRAFFIC SIGNALIZATION LOS ANGELES LOCAL LA0G729 0 AVALON BLVD IMPROVEMENT FROM I-405 TO 223RD STREET CONSIST OF REVING AND REPLACING DAMAGED SIDEWALK, CURB & $500 HIGHWAY GUTTERS, AND WHEELCHAIR RAMPS, REMOVING AND REPLACING PORTIONS OF FAILED PAVEMENTS, AND GRINDING AND OVERLAY THE EXISTING PAVEMENT UTILIZING ROBBERIZED ASPHALT. LOS ANGELES LOCAL LA0G730 0 AVALON BLVD IMPROVEMENT FROM VICTORIA STREET TO I-405 FREEWAY CONSIST OF REMOVING AND REPLACING DAMAGED $550 HIGHWAY SIDEWALK, CURB & GUTTER, AND WHILCHAIR RAMPS, REMOVING AND REPLACING SECTIONS OF FAILED PAVEMENTS, AND GRINDING AND OVERLAYING THE EXISTING PAVEMENT UTILIZING RUBBERIZED ASPHALT. LOS ANGELES LOCAL LAE2198 0 AVALON BLVD INTERCHANGE MODIFICATION AT I-405 IMPROVING AVALON/I-405 INTERCHANGE BY CONSTRUCTING A NEW SOUTHBOUND $21,800 HIGHWAY ON-RAMP, WIDENING NORTHBOUND OFF-RAMP AND ON-RAMP, WIDENING AVALON BLVD NORTHBOUND. Project List 31

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA9708289 0 AVENUE G FROM RT14 TO 25TH ST WEST. WIDEN FROM 2 TO 6 LANES (0.2 MILES) (TOTAL 6 LANES IN BOTH DIRECTIONS). INCLUDES $23,400 HIGHWAY INTERCHANGE IMPROVEMENTS. LOS ANGELES LOCAL LA0D446 0 AVENUE K GAP CLOSURE FROM 40TH STREET WEST TO 60TH STREET WEST. WIDEN GAPS TO ADD AN ADDITIONAL LANE IN EACH $3,410 HIGHWAY DIRECTION (4 LANES TOTAL) WITHIN THE CITY JURISDICTION. LOS ANGELES LOCAL LA0D447 0 AVENUE L GAP CLOSURE FROM 60TH STREET WEST TO 30TH WEST, ADDING AN ADDITIONAL LANE IN EACH DIRECTION, INCLUDING A $4,620 HIGHWAY MEDIAN (WITHIN CITY JURISDICTION) LOS ANGELES LOCAL LAF3129 0 AVENUE L WIDENING: 15TH TO 30TH STREET WEST. CONSTRUCT CAPACITY IMPROVEMENTS ALONG AVENUE L BY WIDENING EXISTING $3,273 HIGHWAY ROADWAY TO AVAILABLE ROW EXTENTS & CLOSING ANY MIXED FLOW LANE GAPS, & PROVIDE IMPROVED CIRCULATION TO SR-14. WIDENING FROM 2 TO 3 LANES. LOS ANGELES LOCAL LA0D449 0 AVENUE M AND SR14 OVERCROSSING IMPROVEMENTS. WIDENING AVENUE M FROM 2 TO 7 LANES FROM 10TH STREET WEST TO 15TH $13,650 HIGHWAY STREET WEST. LOS ANGELES LOCAL LAF1507 0 AVENUE S BIKEWAY PHASE 2. CLASS I BIKEWAY IMPROVEMENTS ALONG THE GENERAL ALIGNMENT OF AVENUE S IN THE CITY OF $1,733 HIGHWAY PALMDALE. THIS PROJECT WILL INCLUDE CLOSING GAPS IN OUR LOCAL BICYCLE PLAN. LOS ANGELES LOCAL LA960134 0 AVENUE S HIGHWAY 14/DOWNING ST WIDENING. WIDEN AVENUE S FROM STATE HIGHWAY 14 TO DOWNING ST (FROM 4 TO 6 LANES) 3 $7,200 HIGHWAY LANES IN EA. DIR.) APPROX 1.6 MILES. LOS ANGELES LOCAL LA9811102 0 AVENUE S RAIROAD GRADE SEPARATION (OVERPASS/UNDERPASS) OF METROLINK RR TRACKS, WEST OF SIERRA HIGHWAY – 6 LANES. $56,800 HIGHWAY INCLUDES GRADE SEPARATION OF SIERRA HIGHWAY AND APPLICABLE RAMPING. LOS ANGELES LOCAL LAF3107 0 AVENUE S WIDENING PHASE II. AVENUE S WIDENING PHASE II PROJECT PROVIDES A 6 LANE ROADWAY, SIDEWALK, CURB AND GUTTER, $11,023 HIGHWAY CLASS 1 BIKEWAY, TRAFFIC SIGNALS, AND ENHANCEMENTS.. THE PROJECT IS SITUATED IN THE HEART OF THE CITY OF PALMDALE IN THE NORTHERN LOS ANGELES COUNTY. THE PROJECT SPANS ALONG AVENUE S, A MAJOR ARTERIAL THAT HAS BEEN IDENTIFIED AS A SIGNIFICANT ARTERIAL BY METRO AS PART THE LOS ANGELES COUNTYWIDE SIGNIFICANT ARTERIAL NETWORK. LOS ANGELES LOCAL LA000373 0 AVIATION BLVD FROM MANHATTAN BEACH BLVD TO ARBOR VITAE WIDEN FROM 4 TO 6 LANES (ISTEA, 102-240, 1991) $13,984 HIGHWAY LOS ANGELES LOCAL LA0C8089 0 BARHAM / CAHUENGA / INTERSECTION WIDEN IMPROVEMENT, FOR LEFT/RIGHT TURN IMPROV. PPNO 3111. $1,495 HIGHWAY LOS ANGELES LOCAL LA960018 0 BEVERLY BOULEVARD MONTEBELLO BLVD TO W/O REA DRIVE RECONSTRUCT & WIDEN FROM 4 TO 6 LANES $3,650 HIGHWAY LOS ANGELES LOCAL LAF1530 0 BICYCLE SYSTEM GAP CLOSURES & IMPROVED LA RIVER BIKE PATH. PROJECT WILL CONSTRUCT PRIORITY CLASS I & III BICYCLE $1,231 HIGHWAY SYSTEM GAP CLOSURES IN LONG BEACH AND IMPROVE CONNECTION TO LA RIVER. LOS ANGELES LOCAL LAF1535 0 BICYCLE WAYFINDING SIGNAGE PROGRAM. WAYFINDING SIGNS TO DIRECT BICYCLISTS, AND EDUCATE MOTORISTS, TO THE LOCATIONS $504 HIGHWAY OF DEDICATED BIKE PATHS, LANES AND ROUTES, DESTINATIONS, AND TRANSIT HUBS THROUGHOUT LOS ANGELES. LOS ANGELES LOCAL LAF1506 0 BIKE COMPATIBLE RDWY SAFETY AND LINKAGE ON PALOS VERDES DR. THE PROJECT WILL HAVE A CLASS II BIKE LANE ON BOTH SIDES $788 HIGHWAY OF PALOS VERDES DRIVE SOUTH, WITH AN UNPAVED SHOULDER FOR EMERGENCY USE. LOS ANGELES LOCAL LAF3505 0 BIKE NETWORK LINKAGES TO EXPOSITION LIGHT RAIL. BIKE NETWORK ENHANCEMENTS TO SUPPORT EXPOSITION LINE. INCREASED $3,429,147 HIGHWAY SAFETY AND CONVENIENCE WITH SIGNAL DETECTION, HIGHLY VISIBLE LANE MARKINGS AND NEW BIKE RACKS. THE PROJECT AREA IS LOCATED THROUGHOUT THE CITY OF SANTA MONICA AND NO MORE THAN TWO MILES FROM THE PROPOSED EXPOSITION LIGHT RAIL LINE STATIONS. LOS ANGELES LOCAL LAF1522 0 BIKE SAFE ROADWAY GRATES. THIS PROJECT IS TO UPGRADE EXISTING ROADWAY GRATES TO IMPROVE BIKE SAFETY AND PROMOTE $539 HIGHWAY CYCLING USAGE. 32 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF1534 0 BIKE TECHNOLOGY DEMONSTRATION. PROJECT WILL CONSIST OF DESIGN, INSTALLATION AND EVALUATION OF SEVERAL BICYCLE $399 HIGHWAY TECHNOLOGIES, INCLUDING BICYCLE ACTIVATED DETECTION AT INTERSECTIONS, BIKE BOXES, AND BIKE PARKING. LOS ANGELES LOCAL LAF1503 0 BIKEWAY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS WASH. THE BWY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS $2,390 HIGHWAY WASH; WILL CLOSE THE GAP ON A BRIDGE & CONNECT THE EXISTING CLASS II BIKE LANES TO THE EAST & WEST OF SAN DIMAS WASH CROSSING. LOS ANGELES LOCAL LA002738 0 BIKEWAY/PEDESTRIAN BRIDGE OVER LA RIVER AT TAYLOR YARD CLASS I (CFP 738, 2077) (PPNO# 3156) $5,000 HIGHWAY LOS ANGELES LOCAL LAF3643 0 BOYLE HEIGHTS CHAVEZ AVE STREETSCAPE/PEDESTRIAN IMPROVEMENTS. ENHANCE USE OF PUBLIC TRANSIT, PROVIDE NEW PED. $5,478 HIGHWAY AMENITIES & SAFE ACCESS TO METRO GOLD LINE STATIONS ON 1ST STREET. LOS ANGELES LOCAL LA0F010 0 BRIDGE NO. 53C0327 AND 53C0328, THE OLD ROAD, OVER SANTA CLARA RIVER AND OVER SPTCO(ABND)FROM 550 SOUTH OF SKYVIEW $47,991 HIGHWAY LANE TO RYE CANYON ROAD.REPLACE 4 LANE APPROACHES AND BRIDGES WITH 6 LANE APPROACHES AND BRIDGES. LOS ANGELES LOCAL LA0G451 0 BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA CR. BETWEEN EASTHAM DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE $7,594 HIGHWAY WITH A NEW 4 LANE BRIDGE. LOS ANGELES LOCAL LA0G104 0 BRIDGE NO. 53C1880,530595, SIXTH STREET, OVER LA RIVER, E SANTA ANA FREEWAY. REPLACE SEISMICALLY/STRUCTURALLY $695,786 HIGHWAY DEFICIENT SIXTH STREET VIADUCT WITH NEW VIADUCT. NO LANES BEING ADDED. TOLL CREDITS USED FOR R/W IN LIEU OF PROP 1B SEISMIC BOND FUNDS. LOS ANGELES LOCAL LA0D171 0 BROADWAY IMPROVEMENTS FROM ALBERTONI TO 168TH ST. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND $1,540 HIGHWAY HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT. LOS ANGELES LOCAL LA0D170 0 BROADWAY IMPROVEMENTS FROM GRIFFITH ST TO ALBERTONI. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND $1,980 HIGHWAY HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT. LOS ANGELES LOCAL LA0D169 0 BROADWAY IMPROVEMENTS FROM MAIN ST TO GRIFFITH ST. CONSTRUCTION OF MISSING CURB & GUTTER AND RECONSTRUCTION OF $1,203 HIGHWAY EXISTING PAVEMENT AND UNDERGROUNDING THE OVERHEAD POWER LINES. LOS ANGELES LOCAL LA0D167 0 BROADWAY IMPRVMNTS FRM 168TH ST. TO NORTH CITY LIMIT (ALONDRA BLVD). CONSTRUCT RAISED CONCRETE MEDIANS W/ $1,070 HIGHWAY LANDSCAPE & HARDSCAPE, ADD CURB & GUTTER & SIDEWLK ,RECNSTRUCT EXSTNG PAVEMNT. LOS ANGELES LOCAL LA0G383 0 BROCKWAY BUS CONNECTOR. CONNECT BROCKWAY STREET TO EL MONTE TRANSIT STATION (BUS ACCESS ONLY). RIGHT OF WAY IS $4,550 HIGHWAY ROUGHLY THE WEST 1/3 OF FORMER GUNDERSON SITE (PARCEL 8578-019-008), LOCATED ON NORTHWEST CORNER OF SANTA ANITA AVENUE AND BROCKWAY STREET. LOS ANGELES LOCAL LAE1816 0 BURBANK BLVD & HAYVENHURST AVE INTERSECTION IMPROVEMENTS – REDUCE WIDTH OF MEDIAN ISLANDS ON BURBANK BLVD TO $1,081 HIGHWAY INSTALL ADDITIONAL LEFT TURN LANE FROM W/B BURBANK TO S/B HAYVENHURST, AND EXCLUSIVE RIGHT TURN LANE FROM E/B BURBANK TO S/B HAYVENHURST; MODIFY TRAFFIC SIGNAL & STREET LIGHTING. LOS ANGELES LOCAL LAE1181 0 BURBANK BLVD & WOODLEY AVE INTERSECTION IMPROVEMENTS. REDUCE WIDTH OF MADIAN ISLAND ON BURBANK BLVD TO $495 HIGHWAY CONSTRUCT ADDITIONAL LEFT TURN LANE FROM E/B BURBANK BLVD TO N/B WOODLEY AVE; MODIFY TRAFFIC SIGNAL AND STREET LIGHTING. PROP C FUNDING RECEIVED THROUGH CFP 2009 (F3169). LOS ANGELES LOCAL LA0C8046 0 BURBANK BLVD WIDENING-LANKERSHIM BLVD TO CLEON AVE. FROM VARYING ROADWAY WIDTH TO FULL MAJOR HIGHWAY STANDARDS. $15,417 HIGHWAY FROM 1 LN TO 2 LNS IN EACH DIRECTION. PPNO 3097. LOS ANGELES LOCAL LAF3317 0 BUS SIGNAL PRIORITY IN CULVER CITY. DESIGN, DEVELOP & INSTALL WIRELESS BUS SIGNAL PRIORITY SYSTEM ON CULVER CITY $2,751 HIGHWAY BUS FLEET AND AT INTERSECTIONS TO INCREASE OPERATION EFFICIENCY & TRAVEL TIME SAVINGS. THE PROJECT INCLUDES INTERSECTIONS WITH TRANSIT SERVICE WITHIN THE BOUNDARY OF THE CITY OF CULVER CITY. Project List 33

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE3793 0 CALIFORNIA AVE WIDENING: FROM WILLOW AVE AND SPRING ST WIDEN CALIFORNIA AVE TO SECONDARY MODIFIED HIGHWAY STREET $1,200 HIGHWAY STANDARDS (NON-CAPACITY). LOS ANGELES LOCAL LA0G616 0 CALIFORNIA STATE POLYTECHNIC UNIVERSITY ROADWAYS TO TRANSIT CENTER, CALIFORNIA; STREET IMPROVEMENTS ROADWAY $2,519 HIGHWAY REHABILITATION – SOUTH CAMPUS DRIVE, MULTIPLE PHASES. LOS ANGELES LOCAL LA9711031 0 CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT $7,600 HIGHWAY SHOULDERS LOS ANGELES LOCAL LA996328 0 CCTV CAMERA INSTALLATION $602 HIGHWAY LOS ANGELES LOCAL LAE1934A 0 CENTURY BLVD PEDESTRIAN SAFETY AND TRANSPORTATION IMPROVEMENTS. $3,600 HIGHWAY LOS ANGELES LOCAL LAF1612 0 CENTURY CITY URBAN DESIGN AND PEDESTRIAN CONNECTION PLAN. PROJECT WILL IMPLEMENT SIDEWALK IMPROVEMENTS, $3,342 HIGHWAY DECORATIVE CROSSWALKS, MEDIAN ISLAND, CURB RAMPS, PEDESTRIAN LIGHTING, SHELTERS, BENCHES, TRASH RECEPTACLES & STREET TREES. LOS ANGELES LOCAL LA0C8075 0 CESAR CHAVEZ AVE/ LORENA ST / INDIANA ST INTERSECTION IMPROVEMENTS. RECONSTRUCTION OF A FIVE-LEGGED SIGNALIZED $10,933 HIGHWAY INTERSECTION INTO A MODERN ROUNDABOUT. THE CONSTRUCTION OF THE ROUNDABOUT WILL REDUCE THE COMPLEXITY OF THE INTERSECTION AND WILL IMPROVE TRAFFIC FLOW AND SAFETY. LOS ANGELES LOCAL LAF1611 0 CESAR CHAVEZ TRANSIT CORRIDOR (110 FWY TO ALAMEDA). INSTALLATION OF PEDESTRIAN/TRANSIT RIDER AMENITIES INC. BUS $2,350 HIGHWAY STOP GARDENS AT THREE INTERSECTIONS, NEW PEDESTRIAN LIGHTING, STREET TREES IN A LANDSCAPED PARKWAY & WAYFINDING SIGNAGE. LOS ANGELES LOCAL LA0C8095 0 CHERRY AVE. WIDENING PROJECT. BET 19TH ST AND PACIFIC COAST HIGHWAY BY WIDENING THE ARTERIAL FROM ONE TO TWO LANES $6,721 HIGHWAY IN EACH DIRECTION.(PPNO 3128). SAFETEA-LU #3203 LOS ANGELES LOCAL LAE0595 0 CHEVY CHASE RAIL ROAD IMPROVEMENTS. SAFETY IMPROVEMENTS AT THE CHEVY CHASE AND AT-GRADE CROSSING AT DORAN, $919 HIGHWAY BROADWAY, GRANDVIEW AND SONORA AT-GRADE CROSSING. LOS ANGELES LOCAL LAF1734 0 CITY OF BELL GARDENS SIGNAGE PROGRAM. BELL GARDENS CAPITAL IMPROVEMENT PROJECT THAT WILL PROMOTE THE CITY $322 HIGHWAY THROUGH NEW SIGNAGE. LOS ANGELES LOCAL LAF1836 0 CITY OF LONG BEACH ATHERTON STREET ENHANCEMENT PROJECT. REHABILITATING THE LANDSCAPED MEDIAN TO ENHANCE THE $1,322 HIGHWAY EXPERIENCE OF OVER 37,000 PEDESTRIANS, BICYCLISTS, TRANSIT USERS AND AUTOS DAILY. LOS ANGELES LOCAL LSTEA0044 0 CITY OF ROLLING HILLS ESTATES – DEEP VALLEY DRIVE FROM 718 DEEP VALLEY DRIVE TO ROXCOVE DRIVE. – CONSTRUCT $322 HIGHWAY STREETSCAPE AND PEDESTRIAN IMPROVEMENTS. LOS ANGELES LOCAL LAF1728 0 CITY OF SANTA MONICA ITS IMPROVEMENTS. SANTA MONICA REAL TIME BEACH PARKING SIGNS. THIS PROJECT WILL MAKE $1,166 HIGHWAY INFORMATION REGARDING BEACH PARKING AVAILABLE TO MOTORISTS DESTINED FOR SANTA MONICA BEACH PARKING LOTS. LOS ANGELES LOCAL LAF3312 0 CITY OF TORRANCE ITS & TRAFFIC IMPROVEMENTS. IMPLEMENT ITS COMPONENTS AT LOCATIONS NOT COVERED BY '95 METRO $1,364 HIGHWAY CFP SOUTH BAY SIGNAL SYNCH PROJECT, TO PROVIDE EFFECTIVE CITYWIDE AND MULTI-JURISDICTIONAL TRAFFIC MANAGEMENT. *CRENSHAW BLVD BETWEEN PCH AND THE MOST SOUTH CITY CONTROLLED SIGNALIZED INTERSECTION. LOS ANGELES LOCAL LAF3535 0 CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS. SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR $271 HIGHWAY PEDESTRIANS AND BICYCLISTS TO DIRECT THEM TO METROLINK STATIONS AND OTHER REGIONAL TRIP GENERATORS.. THE SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS WILL DESIGN AND INSTALL WAYFINDING SIGNS ALONG THE CITY'S EXISTING NETWORK OF MULTI-USE PATHS, ON-STREET BIKEWAYS, PASEOS IN THE VALENCIA AND SAUGUS NEIGHBORHOODS, AND SIDEWALKS ALONG MOST MAJOR ROADWAYS. 34 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF1510 0 CLAREMONT PORTION OF THE CITRUS REGIONAL BIKEWAY. THIS PROJECT PROPOSES THE IMPLEMENTATION OF THE CLAREMONT $1,794 HIGHWAY PORTION OF THE CITRUS REGIONAL BIKEWAY UTILIZING BONITA AVENUE AND FIRST STREET AS PRIMARY CLASS II BIKE ROUTES. LOS ANGELES LOCAL LA0G674 0 COLDMILL AND ASPHALT OVERLAY OF EXISTING STREETS AT VARIOUS LOCATIONS. REMOVE AND REPLACE CURB, GUTTER, AND $560 HIGHWAY SIDEWALK, AND RE-STRIPE SAME STREETS. LOS ANGELES LOCAL LA0D465 0 COLIMA RD- HALIBURTON RD/ CITY OF DIAMOND BAR CB ROAD WIDENING: RESTRIPE FOR 3ED THROUGH LANE ON EB APPROACH $10,038 HIGHWAY (HACIENDA BLVD- FULLERTON RD) & WB APPROACH (FULLERTON- CAMINO DEL SUR) LOS ANGELES LOCAL LAE0896 0 COLIMA ROAD AT FULLERTON ROAD INTERSECTION IMPROVEMENT $1,500 HIGHWAY LOS ANGELES LOCAL LAF3612 0 COLORADO PEDESTRIAN PROMENADE: LRT STATION TO PIER/BEACH. A PEDESTRIAN PROMENADE ON COLORADO AVENUE TO CONNECT $6,568 HIGHWAY THE EXPO LIGHT RAIL TERMINUS STATION AT 4TH STREET WITH DOWNTOWN SANTA MONICA, THE CIVIC CENTER AREA, THE PIER AND THE BEACH. THE PROJECT IS LOCATED ON COLORADO AVENUE BETWEEN 4TH STREET AND THE SANTA MONICA PIER IN THE CITY OF SANTA MONICA, AND INCLUDES THE STREET, THE SIDEWALKS AND BOTH INTERSECTIONS. THE TOTAL PROJECT AREA IS APPROXIMATELY 1,240 LINEAR FEET. LOS ANGELES LOCAL LA0G321 0 COMPLETION OF PARK PLACE EXTENSION BETWEEN ALASKA AVENUE AND SEPULVEDA BOULEVARD IN THE CITY OF EL SEGUNDO. PARK $3,783 HIGHWAY PLACE FOUR LANE ROADWAY EXTENSION BETWEEN NASH AND ALLIED WAY. LOS ANGELES LOCAL LAE1321 0 COMPTON ARTERIAL RECONSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY). $3,840 HIGHWAY LOS ANGELES LOCAL LAE3768 0 COMPTON ARTERIAL REONCSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY). $3,000 HIGHWAY LOS ANGELES LOCAL LAOB7326 0 COMPTON CREEK BIKEWAY EXTSN – PHASE III.DSIGN & CNSTRUCT .6 MI OF CLAS 1 BIKE/PED PATH FRM GREENLEAF BL TO ARTESIA $464 HIGHWAY FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRPNG. (PPNO 2869). LOS ANGELES LOCAL LAE1915 0 CONSTRUCT AND IMPROVE MEDIANS AND DRAINAGE ON IMPERIAL HIGHWAY FROM WEST BORDER TO EAST BORDER OF CITY OF LA $5,503 HIGHWAY MIRADA LOS ANGELES LOCAL LAE2333 0 CONSTRUCT AND REPAIR LINING IN FOUR TUNNELS ON KANAN, KANAN DUME, AND MALIBU ROADS BETWEEN US-1 AND US-101. $12,000 HIGHWAY (PROJECT USING $1,581 OF TOLL CREDITS IN FY 10/11 FOR MATCH FOR STPL AND DEMO FUNDS) LOS ANGELES LOCAL LA0G395 0 CONSTRUCT CONCRETE SIDEWALKS AND CURB RAMPS, INSTALL SPEED RADAR FEEDBACK SIGNS AND PEDESTRIAN COUNTDOWN $600 HIGHWAY HEADS AND RESTRIPE CROSSWALKS ON FOSTER ROAD FROM STUDEBAKER ROAD TO MCRAE STREET. LOS ANGELES LOCAL LAE2651 0 CONSTRUCT CROSSWALK BUMP-OUTS AND RELATED STREETSCAPE IMPROVEMENTS ON TEMPLE ST BETWEEN HOOVER ST & $500 HIGHWAY GLENDALE. PROJECT WILL PROVIDE FOR VARIOUS STREETSCAPE IMPROVEMENTS. LOS ANGELES LOCAL LA0D477 0 CONSTRUCT IMPROVEMENTS FOR SR-14 INTERCHANGE AT GOLDEN VALLEY ROAD. DIAMOND CONFIRGURATION, TWO RAMPS, $7,370 HIGHWAY IMPROVEMENTS INCLUDE WIDENING OF BRIDGE OVERCROSSING, NEW SIGNALS, RAMP MOD. LOS ANGELES LOCAL LAE0001B 0 CONSTRUCT SAFE ACCESS TO STREETS FOR BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALKS, SIDEWALKS, AND TRAFFIC $500 HIGHWAY CALMING MEASURES LOS ANGELES LOCAL LAE1138 0 CONSTRUCT VALLEY DRAINAGE AND RESURFACING IMPROVEMENTS: WEST OF SANTA ANITA AV- INCLUDING NO CAPACITY INCREASE $1,533 HIGHWAY STREET RESURFACING LOS ANGELES LOCAL LAE3229 0 CONSTRUCTION AND ENHANCEMENTS OF TRAILS IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA $960 HIGHWAY Project List 35

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE1531 0 CONSTRUCTION OF A SMART CROSSWALK SYSTEM AT THE INTERSECTION OF ARMINTA ST. AND MASON AVE. $50 HIGHWAY LOS ANGELES LOCAL LAE2634 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF HAMLIN ST. AND CORBIN AVE. $125 HIGHWAY LOS ANGELES LOCAL LAE0388B 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF INDEPENDENCE AVE. AND SHERMAN WAY. $125 HIGHWAY LOS ANGELES LOCAL LAE3201 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF OSO AVE. AND VANOWEN ST. $125 HIGHWAY LOS ANGELES LOCAL LAE2699 0 CONSTRUCTION OF NEW MULTI-USE PATH/TRAIL ALONG RIVER BANK BETWEEN SEPULVEDA BLVD & KESTER AVE INCLUDING ACCESS $574 HIGHWAY RAMPS, REATAINING WALLS, LANDSCAPING ETC. LOS ANGELES LOCAL LAE1697 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHEAST SAN FERNANDO VALLEY RD & $500 HIGHWAY SAFETY IMPROVEMENT. DEVONSHIRE STREET (LANGDON TO WOODMAN), SEPULVEDA BLV LOS ANGELES LOCAL LAE2147 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHWEST SAN FERNANDO VALLEY RD & $1,000 HIGHWAY SAFETY IMPROVEMENT. LINDLEY AVE. (STRATHERN TO CHASE), ROSCOE BLVD LOS ANGELES LOCAL LAE1509 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. SOUTHWEST SAN FERNANDO VALLEY RD & $1,000 HIGHWAY SAFETY IMPROVEMENT. VICTORY BLVD (OAKLAND TO RESEDA) TAMPA AVE LOS ANGELES LOCAL LAE1867 0 CONSTRUCTION OF SMART CROSSWALK AT THE INTERSECTION OF TOPANGA CANYON AND GAULT ST. $50 HIGHWAY LOS ANGELES LOCAL LA0G212 0 CONVERT LAS VIRGENES RD. FROM 2 LANE ROAD TO 4 LANE ROAD BETWEEN AGOURA RD. AND LOST HILLS RD.; 2 LANES IN EACH $2,000 HIGHWAY DIRECTION AND PROVIDING TURNING POCKETS, TRAFFIC SIGNAL INSTALLATIONS AND MODIFICATIONS, BIKE LANES AND SIDEWALKS LOS ANGELES LOCAL LAF3522 0 CORDOVA STREET ROAD DIET PROJECT. CONVERT THE VEHICULAR-ORIENTED STREET TO A COMPLETE STREET BY REMOVING 2 $3,694 HIGHWAY VEHICULAR TRAFFIC LANES TO ACCOMMODATE BIKE AND PED FACILITIES. CITY OF PASADENA- HILL STREET TO ARROYO PARKWAY. LOS ANGELES LOCAL LAF1501 0 COUNTY CLUB DRIVE BIKEWAY IMPROVEMENT PROJECT. CONSTRUCTION OF A 4-FOOT WIDE CLASS II BIKE LANE IN BOTH DIRECTIONS $1,802 HIGHWAY ALONG A ONE MILE SECTION OF COUNTRY CLUB DRIVE. LOS ANGELES LOCAL LA0G414 0 COYOTE CREEK BIKE TRAIL: CLASS 1 BIKE PATH ALONG THE COYOTE CREEK FLOOD CHANNEL FROM HILLSBOROUGH DRIVE TO $709 HIGHWAY ROSECRANS AVNEUE LOS ANGELES LOCAL LAE0326 0 CREATION OF A RAISED MEDIAN ON ALONDRA BLVD.BETWEEN CLARK AND WOODRUFF TO IMPROVE TRAFFIC SAFETY AND EFFICIENCE. $385 HIGHWAY THE MEDIAN WILL PROVIDE LANDSCAPING, LIGHTING AND IRRIGATION LOS ANGELES LOCAL LAE2843 0 CRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE $3,730 HIGHWAY LOS ANGELES LOCAL LAE2157 0 CRENSHAW BLVD REHABILITATION. BETWEEN 182ND ST & 190TH. NEW RIGHT TURN LANES NEAR I-405 RAMPS – NO NEW THROUGH- $3,458 HIGHWAY TRAVEL LANES. LOS ANGELES LOCAL LAF3175 0 CULVER BOULEVARD REALIGNMENT PROJECT. CULVER BL. WIDENING W/ FRONTAGE ROAD NARROWING, SEPARATED BY REBUILT $6,965 HIGHWAY BIKE/PED MEDIAN, W/ RAISED MEDIAN, TURN LANES, TRAFFIC SIGNAL, COUNTDOWN PED HEADS AND OTHER IMPROVEMENTS.. THE PROJECT LIMITS ARE SEPULVEDA BL. TO THE WEST AND ELENDA STREET TO THE EAST, LOCATED ENTIRELY WITHIN THE CITY OF CULVER CITY. ALL OF THE REALIGNMENT WILL BE WITHIN THE EXISTING PUBLIC RIGHT-OF-WAY. SAFTEA-LU 3069 PG 119 STAT. 1375. LOS ANGELES LOCAL LAF3518 0 DAISY CORRIDOR AND 6TH STREET BIKE BOULEVARD. CONSTRUCT TWO (2) BICYCLE BOULEVARDS ALONG TWO CORRIDORS KNOWN AS $2,655 HIGHWAY THE DAISY CORRIDOR AND 6TH STREET IN LONG BEACH. THE PROPOSED BIKE BOULEVARD ALONG THE DAISY CORRIDOR IS A NORTH- SOUTH ROUTE BETWEEN BROADWAY. BIKE LANE (CLASS II) IS LESS THAN 1 MILE. 36 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3171 0 DE SOTO AVE WIDENING: RONALD REAGAN FWY TO DEVONSHIRE ST.. WIDEN DE SOTO AVE FR SR-118 TO DEVONSHIRE ST TO PROVIDE $11,600 HIGHWAY 3 LANES IN EACH DIRECTION & UNIFORM ROADWAY WIDTH. EXISTING ASPHALT BERMS TO BE REPLACED WITH CURB, GUTTER, & 10' SIDEWALK. LOS ANGELES LOCAL LAE1920 0 DEL AMO BLVD – FROM NORMANDIE AVE AND NEW HAMPSHIRE – RECONSTRUCT AND WIDEN . FROM 1 LANE EA. DIR TO 2 LANES IN EA $29,920 HIGHWAY DIR. LOS ANGELES LOCAL LA000389 0 DEL AMO BLVD FROM MADRONA AVE TO CRENSHAW BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314; PPNO $32,439 HIGHWAY 2371). LOS ANGELES LOCAL LAF3115 0 DEL AMO BOULEVARD BRIDGE REPLACEMENT IMPROVEMENTS. REMOVE/REPLACE DEL AMO BRIDGE FROM 2 TO 4 LANES OVER COYOTE $12,162 HIGHWAY CREEK WITHIN CURRENT 100-FT ROW & REALIGN DEL AMO TO A STRAIGHT ROADWAY CONFIG W/LANDSC MEDIAN, CURB & GUTTER, & SIDEWK.. LOS ANGELES LOCAL LA0F062 0 DESIGN AND CONST. OF REAL-TIME PARKING INF./GUIDANCE SYSTEM. PHASE I COVERS SANTA MONICA AREA, BOUNDED BY COLORADO $700 HIGHWAY AVE., OCEAN AVE., WILSHIRE BLVD AND LINCOLN BLVD. LOS ANGELES LOCAL LAF3514 0 DESIGN AND CONSTRUCT 0.28 MILES CLASS I BIKE FACILITY NORTH OF I-10 FROM MOTOR AVE. TO 500 FEET EAST OF DUNLEER DR. $6,169 HIGHWAY (CONTINUOUS BIKEWAY FROM EXPOSITION PARK TO SANTA MONICA BEACH). LOS ANGELES LOCAL LA960179 0 DESIGN AND CONSTRUCT A GRADE SEPARATION IN SOUTH WILMINGTON TO SEPARATE VEHICLE/TRUCK TRAFFIC FROM AN ACTIVE RAIL $69,029 HIGHWAY LINE AND PROVIDE DIRECT ACCESS TO PORT TERMINALS, A COMMUNITY CENTER AND OTHER BUSINESSES. LOS ANGELES LOCAL LAE0938 0 DESIGN AND CONSTRUCT REALIGNMENT OF BRAHMA DRIVE AT WINNETKA TO ELIMINATE HAZARDOUS CONDITION $300 HIGHWAY LOS ANGELES LOCAL LA0G727 0 DESIGN AND CONSTRUCTION TO REHABILITATE MAPLE AVENUE FROM SEPULVEDA BOULEVARD TO PARKVIEW DRIVE, NO LANE $2,500 HIGHWAY ADDITION. LOS ANGELES LOCAL LAE0191 0 DESIGN,RIGHT-OF-WAY, AND CONSTRUCT 2.8 MILE BIKEWAY AND PEDESTRIAN PATH FROM MILLS AVE. TO VALLEY HOME IN WHITTIER. $2,000 HIGHWAY LOS ANGELES LOCAL LAF3501 0 DETECTION OF BICYCLES AT SIGNAL CONTROLLED INTERSECTIONS. BICYCLE DETECTION SYSTEMS AT INTERSECTIONS CONTROLLED BY $2,495 HIGHWAY TRAFFIC SIGNALS ALONG BIKE CORRIDORS.. LOS ANGELES LOCAL LAE0701 0 DEVELOP AND IMPLEMENT TRAFFIC CALMING MEASURES FOR TRAFFIC EXITING THE I-710 INTO LONG BEACH $1,920 HIGHWAY LOS ANGELES LOCAL LAE2978 0 DEVELOP CONCEPTUAL MASTER PLAN TO IMPROVE THE EFFICIENCY OF TRANSPORTATION FACILITIES (E/P & PS/E ONLY) $194 HIGHWAY LOS ANGELES LOCAL LA0D473 0 DOCKWEILER DR EXTENSION FROM LYONS AV TO EXISTING DOCKWEILER DR: CONSTRUCT A 4-LANE FACILITY (2 LANES IN EACH $11,126 HIGHWAY DIRECTION), OUTSIDE CURB & GUTTER, AND DRAINAGE IMPROVEMENTS LOS ANGELES LOCAL LAF1704 0 DOWNTOWN L.A. ALTERNATIVE GREEN TRANSIT MODES TRIAL PROGRAM. OFFER SHARED RIDE-BICYCLE AND NEIGHBORHOOD $1,026 HIGHWAY ELECTRIC VEHICLE TRANSIT SERVICES TO LA CITY HALL AS AN ALTERNATIVE TO OVERCROWDED DASH SERVICE LOS ANGELES LOCAL LAF3731 0 DOWNTOWN LA INTER-MODAL TRANSIT INFORMATION AND WAYFINDING. INSTALL TRANSIT INFORMATION MONITORS, VARIABLE $1,612 HIGHWAY MESSAGE SIGNS, INTERACTIVE KIOSKS & PARKING AVAILABILITY SIGNAGE ALONG BROADWAY CORRIDOR TO OLYMPIC. LOS ANGELES LOCAL LAF3624 0 DOWNTOWN TORRANCE PEDESTRIAN IMPROVEMENT PROJECT. INCREASE CONNECTIVITY, IMPROVE PEDESTRIAN SAFETY, REDUCE $1,118 HIGHWAY AUTOMOBILE DEPENDENCY, AND STIMULATE ECONOMIC DEVELOPMENT IN DOWNTOWN TORRANCE.. THE PROJECT AREA IS BOUND BY TORRANCE BOULEVARD TO THE NORTH, CARSON STREET TO THE SOUTH, CRAVENS AVENUE TO THE WEST, AND CABRILLO AVENUE TO THE EAST. Project List 37

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF1655 0 EAST COLORADO BOULEVARD PEDESTRIAN ENHANCEMENTS (PHASE I). INSTALLATION OF PEDESTRIAN-SCALE STREET LIGHTING ON $1,093 HIGHWAY REGIONALLY SIGNIFICANT STREET IN A SPECIFIC PLAN AREA OF PASADENA IN ORDER TO INCREASE LIVABILITY/ENHANCE PEDESTRIAN MOVEMENT. LOS ANGELES LOCAL LAF3603 0 EAST COLORADO BOULEVARD PEDESTRIAN IMPROVEMENTS (PHASE 2). INSTALL PED-SCALE STREET LIGHTS, DECORATIVE $754 HIGHWAY CROSSWALKS, BUS BENCHES & TRASH RECEPTACLES ON A REGIONALLY SIGNIFICANT STREET TO INCREASE LIVABILITY, SAFETY & ENHANCE PED MOVEMENT. EAST COLORADO BOULEVARD BETWEEN HILL AVENUE AND ALLEN AVENUE IN THE CITY OF PASADENA. (0.46 MILES) LOS ANGELES LOCAL LA996393 0 EAST DOWNTOWN TRUCK ACCESS IMPROVEMENTS: WIDENINGS, IMPRVMNTS, STRIPING, AT AND NEAR ALAMEDA ST & WASHINGTON BL $2,153 HIGHWAY IN THE EAST DOWNTOWN L.A. AREA LOS ANGELES LOCAL LA962314 0 EAST SAN GABRIEL VALLEY SOM PILOT PROJECT TRAFFIC SIGNALS INTERCONNECT PROJECT $9,071 HIGHWAY LOS ANGELES LOCAL LAF1615 0 EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGE. IMPROVE LINKAGES WITHIN 1/4 MILE OF METRO'S GOLD LINE LRT. $2,990 HIGHWAY LOS ANGELES LOCAL LAF3651 0 EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGES, PHASE II. ENHANCE MULTI-MODAL ACCESS TO THE MARIACHI & SOTO GOLD LINE $1,698 HIGHWAY STATIONS, FOCUSING ON 1ST STREET. LOS ANGELES LOCAL LA0G710 0 ECHO PARK/SUNSET BL STREETSCAPE BEAUTIFICATION – PROJECT WILL PROVIDE FOR CONSTRUCTION OF PEDESTRIAN AND $750 HIGHWAY STREETSCAPE IMPROVEMENTS ALONG SUNSET BL IN THE ECHO PARK AREA.PROJECT ELEMENTS WILL INCLUDE SIDEWALK IMPROVEMENTS, STREET TREES, TRANSIT AMNENITIES, AND PARKWAY LANDSCAPING. LOS ANGELES LOCAL LA0G709 0 EL DORADO & BROMWICH SIDEWALK IMPROVEMENTS – IMPROVEMENTS WILL BE ON: 1) EL DORADO AV-BROMWICH ST TO MONTAGUE $649 HIGHWAY ST; AND 2) BROMWICH ST-EL DORADO AV TO SAN FERNANDO RD. CONSTRUCTION ELEMENTS WILL INCLUDE CONCRETE CURB, GUTTER, SIDEWALKS, ADA-COMPLIANT ACCESS RAMPS AND ASPHALT CONCRETE PAVING. LOS ANGELES LOCAL LAF1504 0 EL MONTE: TRANSIT CYCLE FRIENDLY. EL MONTE PROPOSES TO IMPLEMENT THE 1ST PHASE OF THE EL MONTE BIKE-TRANSIT HUB $167 HIGHWAY COMPONENT (METRO BICYCLE TRANSPORTATION STRATEGIC PLAN) A COUNTYWIDE EFFORT TO IMPROVE BIKE FACILITIES LOS ANGELES LOCAL LAF1718 0 EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, III & IV. WAYFINDING ELEMENT OF ENHANCED PEDESTRIAN FACILITIES TO IMPROVE $1,746 HIGHWAY AND ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. ALSO IN PED MODE (F1661) LOS ANGELES LOCAL LAF1634 0 EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, III, & IV. DESIGN AND CONSTRUCTION OF ENHANCED FACILITIES TO IMPROVE & $12,763 HIGHWAY ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. WAYFINDING ELEMENT IN TDM F1718. LOS ANGELES LOCAL LA990358 0 EL SEGUNDO EMPLOYMENT CTR ITS PRJ (T21-1477) $5,721 HIGHWAY LOS ANGELES LOCAL LAF1514 0 EMERALD NECKLACE BIKE TRAIL PROJECT. DESIGN AND CONSTRUCT 1.1 MILES OF CLASS I BIKE PATH TO CONNECT DUARTE ROAD TO $503 HIGHWAY THE SAN GABRIEL RIVER BICYCLE TRAIL. LOS ANGELES LOCAL LAE2750A 0 ENGINEERING SUPPORT TO I-5 JOINT POWERS AUTHORITY TO WIDEN I-5 FREEWAY. PAVEMENT AND INTERSECTION IMPROVEMENT AT LA $1,945 HIGHWAY MIRADA BLVD AND ALONDRA BLVD PRIOR TO I-5 IMPROVEMENTS LOS ANGELES LOCAL LAE1933 0 ENHANCE BYZANTINE LATINO QUARTER TRANSIT PLAZAS AT NORMANDIE AND PICO, AND HOOVER AND PICO, LOS ANGELES BY $500 HIGHWAY IMPROVING STREETSCAPES, INCLUDING EXPANDING CONCRETE AND PAVING 38 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE2476 0 ENHANCE PEDESTRIAN ENVIRONMENT AND INCREASE SAFETY ALONG OLYMPIC BL BETWEEN VERMONT AVE AND WESTERN AVE. $2,000 HIGHWAY PROJECT WILL PROVIDE VARIOUS STREETSCAPE IMPROVEMENTS ALONG LIMITS. LOS ANGELES LOCAL LAF1136 0 ENHANCEMENTS TO THE GRANDVIEW AVE GRADE CROSSING, THE INTERSECTION OF AIR WAY AND GRANDVIEW AVE, AND THE $4,535 HIGHWAY INTERSECTION OF GRANDVIEW AVE AND SAN FERNANDO RD ALONG WITH ROADWAY WIDENING FOR TURNING LANES AND TRUCK MANEUVERS (NO LANE ADDITION). IMPROVEMENTS ARE FOR TURNING LANES, INSTALLATION OF MESSAGE SIGNS, AND OTHER SAFETY ISSUES. LOS ANGELES LOCAL LA0D318 0 ESPLANADE STREETSCAPE IMPROVEMENTS INCLUDES RESURFACING, RELOCATING CURB & GUTTER FOR ADDITIONAL LANDSCAPING, $3,034 HIGHWAY STREET GUTTER AND STORM DRAINS SAFETEA HPP# 1662 LOS ANGELES LOCAL LAE3439 0 EXPAND DIESEL EMISSIONS REDUCTION PROGRAM OF GATEWAY CITIES COG $2,676 HIGHWAY LOS ANGELES LOCAL LAF1720 0 EXPERIENCELA.COM WEB 2.0 INTERACTIVE TRANSIT MAPPING. PROVIDE INTERACTIVE MAPPING, WIFI AND MOBILE INTERFACE, AND $377 HIGHWAY WEB 2.0 TECHNOLOGY AS NEW SERVICES ON EXPERIENCELA.COM. LOS ANGELES LOCAL LAF1613 0 EXPO LINE STN STREETSCAPE PROJECT-EAST CRENSHAW TO JEFFERSON. DESIGN & CONSTRUCTION OF PEDESTRIAN RELATED $3,262 HIGHWAY STREETSCAPE IMPROVEMENTS WITHIN 1/4 MILE FROM EACH OF 3 LIGHT RAIL STATIONS ALONG EXPOSITION BLVD BETWEEN CRENSHAW & JEFFERSON. LOS ANGELES LOCAL LA0C8164 0 EXPOSITION BLVD RIGHT-OF-WAY BIKE PATH-WESTSIDE EXTENSION. DESIGN AND CONSTRUCTION OF 2.5 MILES OF CLASS 1 BIKEWAY, $14,710 HIGHWAY LIGHTING, LANDSCAPING & INTERSECTION IMPROVEMENTS. (PPNO# 3184) LOS ANGELES LOCAL LAF3142 0 EXPOSITION PARK TRAFFIC CIRCULATION IMPROVEMENTS. WIDEN THE INTERSECTIONS OF VERMONT AVE & MARTIN LUTHER KING, JR. $4,477 HIGHWAY BLVD & FIGUEROA ST & MARTIN LUTHER KING JR BLVD TO PROVIDE EXCLUSIVE RIGHT TURN LANES.. LOS ANGELES LOCAL LA0G717 0 F48 – INTERSECTION IMPROVEMENTS ON PACIFIC COAST HWY AT PALOS VERDES BLVD. PLANS, SPECIFICATIONS, AND ESTIMATES FOR $320 HIGHWAY CONSTRUCTION OF A RIGHT TURN ONLY LANE ON WESTBOUND PALOS VERDES BLVD AT PACIFIC COAST HWY. PROJECT NO. MR318.08, FA NO. MOU.MR318.08. LOS ANGELES LOCAL LA0B702 0 FAIR OAKS AV CORRIDOR & COLUMBIA ST STREET IMPROVEMENTS – MEDIAN, CURB BULBOUTS, PAVEMENT REHAB, AND LANDSCAPING $4,382 HIGHWAY PROJECT (ROGAN FUNDS; HR5394) LOS ANGELES LOCAL LAOB422 0 FAIR OAKS AV & SR-110 IMPROVEMENT PROJECT (ROGAN FUNDS, HR5394)EXPAND EXIT OFF-RAMP OF 110 NB, ADD A HOOK RAMP FOR $9,418 HIGHWAY EXISTING ON-RAMP 110 SB. LOS ANGELES LOCAL LA0G406 0 FAIRMONT AVE. PARK-N-RIDE FACILTY (83 PARKING SPACES) TO SERVE COMMUTERS USING SR-134, I-5. THE LOCATION OF THE $3,000 HIGHWAY PARK-N-RIDE IS FAIRMONT AVENUE AND SAN FERNANDO RD, ON THE SOUTH SIDE OF FAIRMONT AVENUE BETWEEN SAN FERNANDO ROAD AND SR-134 WESTBOUND FREEWAY RAMPS. THE WORK INCLUDES EARTHWORK, DRAINAGE, AND PLACEMENT OF AC, LIGHTING, LANDSCAPING, FENCING, AND SIGNAGE WORK. THE WORK ALSO INCLUDES INSTALLING A SIDEWALK FOR PEDESTRIAN ACCESS FROM SAN FERNANDO ROAD. LOS ANGELES LOCAL LAF1639 0 FASHION DISTRICT STREETSCAPE PHASE II. STREETSCAPE IMPROVEMENTS ENHANCING THE PEDESTRIAN ENVIRONMENT TO FACILITATE $2,034 HIGHWAY INCREASED PEDESTRIAN USAGE BETWEEN LA FASHION DISTRICT'S CORE AND THE 7TH ST TRANSIT CORRIDOR. LOS ANGELES LOCAL LA0G559 0 FIGUEROA STREET PAVEMENT RECONSTRUCTION AND REHABILITATION PROJECT FROM I-405 FREEWAY TO VICTORIA STREET INCLUDE $500 HIGHWAY RECONSTRUCTION OF DAMAGED CURB & GUTTER AND SIDEWALK. RECONSTRUCTION OF EXISTING PAVEMENT AND OVERLAY WITH RUBBERIZED ASPHALT. LOS ANGELES LOCAL LAF1513 0 FIJI WAY BICYCLE LANE PROJECT. WIDEN THE SOUTH SIDE OF FIJI WAY FROM WEST OF ADMIRALTY WAY FOR BIKE LANES. $1,007 HIGHWAY Project List 39

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF1219 0 FIRESTONE BLVD BRIDGE WIDENING OVER SAN GABRIEL RIVER. PROJECT PROPOSES TO WIDEN BRIDGE TO IMPROVE PEDESTRIAN $4,890 HIGHWAY SAFETY, VEHICLE EFFICIENCY, IMPROVE ACCESS LINKS WITH OTHER MODAL NEEDS, AND ADDRESS CAPACITY ENHANCEMENTS FOR THE REGION LOS ANGELES LOCAL LAE0479 0 FIRESTONE BLVD. FROM RYERSON AVE AND STEWART & GRAY RD. WIDEN SECTIONS OF FIRESTONE (BOTTLENECK FOR TURN LANES; ST $2,000 HIGHWAY RECONSTRUCTION, REHAB, & RESURFACE; & UPGRADE HANDICAP RAMPS LOS ANGELES LOCAL LAF3124 0 FIRESTONE BOULEVARD CAPACITY IMPROVEMENTS. INCREASE THE NUMBER OF LANES FROM 4 TO 6 ON FIRESTONE BLVD WITHIN THE $14,721 HIGHWAY ROW, RAISED LS MEDIANS, SIDEWALKS, BUS SHELTERS & PULLOUTS, C&G, STREET LIGHTING, & UTILITY RELOCATION.. LOS ANGELES LOCAL LAF3726 0 FIRST AND LAST MILE TRANSIT CONNECTIVITY OPTIONS. IMPLEMENT A PILOT SHARED FLEET VEHICLE PROGRAM THAT INCLUDES, $1,641 HIGHWAY BIKES, ALTERNATIVE GREEN VEHICLES FOR FIRST & LAST MILES FROM UNION STATION TO AND OTHER DOWNTOWN LOCATIONS. LOS ANGELES LOCAL LAF3130 0 FLORENCE AVE REGIONAL TRANSPORTATION CORRIDOR IMPRVMT PROJ. RECONFIGURATION OF 1.2 MILE SEGMENT OF FLORENCE $5,000 HIGHWAY AV INCLUDING NEW FLORENCE AV/REDONDO BL INTERSECTION & RELATED CAPACITY PED/BIKE IMPRV TO REBALANCE STREET INTO MULTIMODAL CORRIDOR.. LOS ANGELES LOCAL LAF1635 0 FLORENCE AVENUE PEDESTRIAN IMPROVEMENT PROJECT. PROVIDES PEDESTRIAN ORIENTED IMPROVEMENTS ON FLORENCE AVENUE $7,988 HIGHWAY INCLUDING PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE, CROSSWALK TREATMENT, AND BUS AND STREET FURNITURE. LOS ANGELES LOCAL LAF1328 0 FLORENCE AVENUE TRAFFIC SIGNAL COMMUNICATION SYSTEM. INSTALL FIBER OPTIC COMMUNICATION & VIDEO-DETECTION SYSTEM $1,798 HIGHWAY ON FLORENCE AVE AND INTERCONNECT FLORENCE TO EXISTING FIBER BACKBONE TO DEVELOP AN ETHERNET BASED COMMUNICATION NETWORK. LOS ANGELES LOCAL LAF3702 0 FOLD-N-GO PASADENA – FOLDING BICYCLE DEMONSTRATION PROGRAM. PROVIDE INCENTIVE TO TRANSIT RIDERS TOWARD THE $325 HIGHWAY PURCHASE OF COLLAPSIBLE BIKES – APPROX. 1000 TO USE IN CONJUNCTION WITH BUS & RAIL SYSTEMS.. LOS ANGELES LOCAL LAF3144 0 FOOTHILL BLVD AND SIERRA HWY INTERSECTION IMPROVEMENTS. WIDEN FOOTHILL BL TO PROVIDE AN ADDITIONAL N/B THROUGH $1,860 HIGHWAY LANE, RESTRIPE SIERRA HWY TO PROVIDE ADDITIONAL W/B RIGHT TURN LANE, & SIGNALIZE THE INTERSECTION.. LOS ANGELES LOCAL LA0C8128 0 FOX HILLS AREA TRAF SIG SYNCH EFFORT & CITY-WIDE AUTO TRAF SIGNAL CONTROL AND MONITORING PROJECT. INCORPORATE 11 $2,036 HIGHWAY SIGNALIZED INTERSECTIONS INTO AN ATSAC / ADAPTIVE TRAF CONTROL SYS. LOS ANGELES LOCAL LAE2617 0 GALE AVENUE –FROM FULLERTON ROAD TO NOGALES ST, WIDEN FROM 4 TO 6 LANES AND NOGALES ST INTERSECTION WIDENING AT $600 HIGHWAY GALE AVE. TO ADD LEFT TURN LANE. LOS ANGELES LOCAL LA0G306 0 GARFIELD AVENUE AT SLAUSON AVENUE INTERSECTION (GARFIELD AVENUE AT FLOTILLA AVENUE) – PROJECT INVOLVES PAVEMENT $570 HIGHWAY RECONSTRUCTION IN CONCRETE, NEW CURB AND GUTTER, DRAINAGE, TRAFFIC SIGNAL, BUS SHELTERS, AND STRIPING OF THE INTERSECTION. LOS ANGELES LOCAL LA0G807 0 GARFIELD AVENUE IMPROVEMENT (PHASE I), GAGE AVENUE TO FERGUSON DRIVE, PAVEMENT RECONSTRUCTION/OVERLAY, ADD- $677 HIGHWAY COMPLIANT CURB RAMPS. PROJECT USING TOLL CREDIT IN THE AMOUNT OF $148 FOR CONSTRUCTION IN FY 11/12 ($125 FOR DEMO AND $23 FOR STPL) LOS ANGELES LOCAL LAF3309 0 GATEWAY CITIES FORUM TRAFFIC SIGNAL CORRIDORS PROJ, PHASE VI. DESIGN AND CONSTRUCT MULTIJURISDICTIONAL TRAFFIC $17,000 HIGHWAY SIGNAL SYNCHRONIZATION, INTERSECTION OPERATIONAL IMPROVEMENTS & ITS COMPONENTS ON REGIONAL ARTERIALS IN GATEWAY CITES AREA. LOS ANGELES LOCAL LA0F008 0 GLENDALE BLVD. OVER L.A RIVER, REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET, UPGRADE BRIDGE RAILINGS. NO ADDED $1,880 HIGHWAY LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 (53C1881) GLENDALE-HYPERION COMPLEX OF BRIDGES. (#53C-1883) 40 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA0F009 0 GLENDALE BLVD. OVER LA RIVER. REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET. UPGRADE BRIDGE RAILINGS. NO ADDED $2,350 HIGHWAY LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 GLENDALE-HYPERION COMPLEX OF BRIDGES. (BRIDGE #53C1884, BHLS-5006(187)) LOS ANGELES LOCAL LA0F007 0 GLENDALE BLVD.-HYPERION AVE. COMPLEX OF BRIDGES OVER LA RIVER, I-5 AND RIVERSIDE DR, REHABILITATION/SEISMIC RETROFIT; $66,557 HIGHWAY UPGRADE BRIDGE RAILING; INCLUDES BRIDGES 53C-1881, 53C-1882, 53C-1883, 53C-1884 AND 53-1069. NO ADDITIONAL LANES. REALIGN I-5 NORTH BOUND OFF RAMP (FED PROJECT ID: BHLS-5006(181) LOS ANGELES LOCAL LA0G186 0 GLENDALE PARKS, RECREATION & COMMUNITY SERVICES DEPARTMENT WILL CONSTRUCT A 1,825 FOOT ADA ACCESSIBLE $197 HIGHWAY RECREATIONAL TRAIL (NOT FOR COMMUTING PURPOSES) ADJACENT TO THE 27-ACRE GLENDALE SPORTS COMPLEX IN THE SAN RAFAEL HILLS ABOVE THE CITY OF GLENDALE. A PORTION OF THE SPORTS COMPLEX PARKING LOT WILL BE RE-STRIPED TO INCLUDE ADDITIONAL HANDICAPPED SPACES NEAR THE TRAILHEAD. (NO ADDITIONAL PARKING SPACES WILL BE ADDED). LOS ANGELES LOCAL LA0B104 0 GOLDEN VALLEY ROAD – NEWHALL RANCH ROAD TO PLUM CANYON ROAD. 0 TO 4 LANES APPROXIMATELY 1.5 MILES. $11,000 HIGHWAY LOS ANGELES LOCAL LA990359 0 GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY – EAST. L.A. TO POMONA ALONG UPRR $1,347,101 HIGHWAY ALHAMBRA &L.A. SUBDIV – ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318 LOS ANGELES LOCAL LA0G088 0 GRADE SEPERATION FOR REEVES CROSSING AT TERMINAL ISLAND WOULD ELIMINATE TRAFFIC CONFLICTS AND ALLOW EFFICIENT $108,760 HIGHWAY MOVEMENT OF TRAINS IN TERMINAL ISLAND WITHOUT CONCERN FOR IMPACTS TO VEHICULAR TRAFFIC. LOS ANGELES LOCAL LA0G036 0 GRAND AVENUE REHABILITATION. BEAUTIFICATION, STREETSCAPE/HARDSCAPE, PEDESTRIAN IMPROVEMENTS, ETC. $700 HIGHWAY LOS ANGELES LOCAL LAE2194 0 GREENLEAF ROW COMMUNITY ENHANCEMENT PROJECT DESIGN AND CONSTRUCTION OF BIKEWAY PED WALK WAY AND UPGRADE $3,840 HIGHWAY SIGNALIZATION LOS ANGELES LOCAL LA11G2T 0 GROUP PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT $24,473 HIGHWAY TABLES 2 & 3 CATEGORIES. PROJECTS TO UPGRADE, CREATE, MAINTAIN, ENHANCE, OR ELIMINATE HAZARDS FOR PEDESTRIANS AND CYCLIST FACILITIES THROUGHOUT COUNTY. LOS ANGELES LOCAL LA11G2 0 GROUP PROJECTS FOR BICYLCE AND PEDESTRIAN FACILITES. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT $60,828 HIGHWAY TABLES 2 & 3 CATEGORIES. PROJECTS TO UPGRADE, CREATE, MAINTAIN, ENHANCE, OR ELIMINATE HAZARDS FOR PEDESTRIANS AND CYCLIST FACILITIES THROUGHOUT COUNTY. LOS ANGELES LOCAL LA11G5 0 GROUP PROJECTS FOR DIRECTIONAL AND INFORMATIONAL SIGNAGE ON LOCAL ROADS THROUGHOUT THE COUNTY. PROJECTS ARE $21,222 HIGHWAY CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. DIRECTIONAL AND INFORMARMATIONAL SIGNS, SIGN REMOVALS, AND/OR SYSTEMS TO IMPROVE OR UPGRADE SIGNAGE MECHANISMS. LOS ANGELES LOCAL LA11G1 0 GROUP PROJECTS FOR PAVEMENT RESURFACING AND OR REHABILITATION ON LOCAL ROADS THROUGHOUT COUNTY. PROJECTS ARE $561,030 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. PAVEMENT RESURFACING, REHABILITATION, RECONSTRUCTION, AC OVERLAYS, ROAD MAINTENANCE TO PREVENT AND ELIMINATE HAZARDS, NO LANE ADDITIONS. THERE ARE PROJECTS IN THE GROUPED PROJECT LISTING THAT CONTAIN PROJECTS WITH TOLL CREDITS. LOS ANGELES LOCAL LA11G4 0 GROUP PROJECTS FOR PLANTING, LANDSCAPING, TRANSPORTATION SYSTEM BETTERMENTS, BEAUTIFICATION AND SCENIC $36,650 HIGHWAY EASEMENTS THOUGHOUT THE COUNTY (NO LANE ADDITIONS). PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. LOS ANGELES LOCAL LA11G4T 0 GROUP PROJECTS FOR PLANTING, LANDSCAPING, TRANSPORTATION SYSTEM BETTERMENTS, BEAUTIFICATION AND SCENIC $16,154 HIGHWAY EASEMENTS THOUGHOUT THE COUNTY (NO LANE ADDITIONS). PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. Project List 41

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA11G3 0 GROUP PROJECTS FOR SAFETY AND OPERATING IMPROVEMENTS ON THE LOCAL HIGHWAY SYSTEM THROUGHOUT THE COUNTY. $356,811 HIGHWAY PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. RAILROAD/HIGHWAY CROSSING, SAFER FEDERAL-AID SYSTEM ROADS, SHOULDER IMPROVEMENTS, PROJECTS THAT CORRECT, IMPROVE, OR ELIMINATE A HAZARDOUS LOCATION OR FEATURE, TRAFFIC CONTROL DEVICES AND OPERATING ASSISTANCE, SIGNALIZATION PROJECTS (INDIVIDUAL INTERSECTIONS), PAVEMENT MARKING DEMONSTRATION PROJECTS, TRUCK CLIMBING LA LOS ANGELES LOCAL LA000800 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM PROJECTS ARE CONSISTENT WITH 40 $304,330 HIGHWAY CFP PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTION BRIDGES (NO ADDITIONAL TRAVEL LANES) LOS ANGELES LOCAL LA0C8126 0 HARBOR-GATEWAY ATSAC/ATCS PROJECT; IMPROVEMENTS TO 109 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A $11,142 HIGHWAY COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTROL SYSTEM. LOS ANGELES LOCAL LA960176 0 HARRY S BRIDGES BLVD RELOCATION/CONSOLIDATION OF STREETS, STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND $51,813 HIGHWAY SIGNALIZATION (TEA21-#978) LOS ANGELES LOCAL LAF3109 0 HAWTHORNE BOULEVARD MOBILITY IMPROVEMENT PROJECT. IMPROVE CIRCULATION, INCREASING EFFICIENCY FOR VEHICULAR, $8,200 HIGHWAY PEDESTRIAN, PUBLIC TRANSIT AND BICYCLE MOVEMENT ON HAWTHORNE BLVD.. THE PROJECT LIMIT IS FROM EL SEGUNDO BOULEVARD TO THE NORTH AND TO THE SOUTHERN CITY LIMIT AT ROSECRANS AVENUE. FROM I-105/120 STREET TO EL SEGUNDO BOULEVARD. LOS ANGELES LOCAL LAF3146 0 HIGHLAND AVENUE WIDENING-ODIN STREET TO FRANKLIN AVENUE. WIDEN THE EXISTING ROADWAY FROM 75 FT TO 87 FT TO ADD $5,804 HIGHWAY ADDITIONAL TURNING TRAFFIC LANE ALONG HIGHLAND AVE & UPGRADE THE HIGHWAY TO MAJOR HIGHWAY STANDARDS. LOS ANGELES LOCAL LA0G686 0 HIGHLAND PARK PEDESTRIAN IMPROVEMENTS ALONG FIGUEROA BETWEEN AVENUE 50 AND AVENUE 60 $250,000 HIGHWAY LOS ANGELES LOCAL LAF1708 0 HOLLYWOOD INTEGRATED MODAL INFORMATION SYSTEM. INSTALLATION OF ELECTRONIC, DIRECTION AND PARKING AVAILABILITY $3,130 HIGHWAY SIGNS WITH INTERNET CONNECTIVITY TO PROVIDE ADVANCE AND REAL-TIME INFORMATION INTENDED TO INCREASE TRANSIT RIDERSHIP LOS ANGELES LOCAL LA0C8209 0 HOLLYWOOD MEDIA DISTRICT-PED IMPRV. STREETSCAPE ELEMNTS: LANDSCAPE MEDIAN ISLANDS, PED LIGHTING,STAMPED XWALK, $810 HIGHWAY ON SANTA MONICA BL- VINE ST TO HIGHLAND & HIGHLAND – MELROSE TO FOUNTAIN LOS ANGELES LOCAL LAF1617 0 HOLLYWOOD PEDESTRIAN/TRANSIT CROSSROADS PHASE II. DESIGN AND INSTALL PEDESTRIAN AND TRANSIT USER ENHANCEMENTS, $860 HIGHWAY EXTENDING THE ORIGINAL HOLLYWOOD PEDESTRIAN/TRANSIT IMPROVEMENT PROJECT TO INCLUDE HIGHLAND AVENUE AND VINE STREET. LOS ANGELES LOCAL LAF1197 0 HUNTINGTON DR CAPACITY IMPROVEMENTS. MITIGATION COSTS EXCLUDED [PROJECT INVOLVES TRAFFIC FLOW AND CAPACITY $2,925 HIGHWAY IMPRMENTS INCL THE ADDITION OF A THROUGH LANE, TURN LANES & RECONSTRUCTION OF MEDIAN & CHANNELIZING ISLANDS] LOS ANGELES LOCAL LA0C8036 0 HYPERION AV UNDR WAVERLY DR BRDGE, RE-COFIGURE SIDEWKS ALONG HYPERION. RE-ALLIGN I-5 NB OFF-RAMP AT GLENDALE BLVD. $14,422 HIGHWAY PROVIDE ALTERNATIVE BIKEWAY ACCESS TO LA RIVER. PPNO 3092. LOS ANGELES LOCAL LAF1326 0 I-5/SR-134 CONGESTION MANAGEMENT PROJECT. MONITOR AND CONTROL TRAFFIC USING SURFACE STREETS IN GLENDALE AND $1,931 HIGHWAY BURBANK TO TRAVEL BETWEEN I-5 AND SR-134. THE SYSTEM WILL PROVIDE SEAMLESS TRAFFIC MONITORING AND CONTROL. LOS ANGELES LOCAL LAF1178 0 I-710 EARLY ACTION PLAN – INTERSECTION IMPROVEMENTS AT FIRESTONE BLVD/ATLANTIC AVENUE INTERSECTION. FIRESTONE BLVD $50,360 HIGHWAY IS EXISTING 2 LANES IN EACH DIRECTION, AFTER THE PROJECT WILL BE 3 LANES IN EACH DIRECTION. THE LENGTH OF THE PROJECT IS .75 MILES. PRIMARILY IT WILL WIDEN FIRESTONE BLVD AND ATLANTIC AVENUE AND REALIGN THEIR INTERSECTION. 42 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA996347 0 I-710/FIRESTONE BLVD.IC, PHASE IV (FIRESTONE BLVD. BRIDGE WIDENING OVER L.A RIVER) PROJECT NO. HP21L-5257 (016) (HBRR: $21,816 HIGHWAY 53C1972) WIDEN OF FIRESTONE BLVD FROM RAYO AVE TO I-710 FREEWAY, ON-RAMP MOD. REHABILITATE 5-LANE BRIDGE TO 6 LANE, ADD SHOULDERS, UPGRADE BRIDGE RAILIN LOS ANGELES LOCAL LAF1520 0 IMPERIAL HIGHWAY BIKE LANES. THIS PROJECT INVOLVES THE MODIFICATION OF THE MEDIAN ISLAND AND THE WIDENING OF IMPERIAL $2,322 HIGHWAY HIGHWAY ALONG 1000 FT EAST OF PERSHING DRIVE TO ACCOMMODATE BIKE LANES. LOS ANGELES LOCAL LAF3305 0 IMPERIAL HWY FIBER OPTIC TRAFFIC SIGNAL COMMUNICATIONS PROJ. INSTALL FIBER-OPTIC COMMUNICATION & VIDEO-DETECTION $900 HIGHWAY SYSTEM ON IMPERIAL HWY AND INTERCONNECT IT TO EXISTING FIBER BACKBONE TO DEVELOP AN ETHERNET-BASED COMMUNICATION NETWORK. LOS ANGELES LOCAL LAE1142 0 IMPLEMENT ITS SUBREGIONAL MASTERPLAN: FOCUS INTEGRATING STATE, LOCAL, & PRIVATE SYSTEMS FOR REAL TIME TRAFFIC $2,688 HIGHWAY CONTROL & FREIGHT TRAVELER INFO, TRUCK SAFETY, SECURITY, & EMISSIONS LOS ANGELES LOCAL LAE2828 0 IMPLEMENT STREETSCAPE IMPROVEMENTS ALONG WILBUR AVE TO ENHANCE TRAFFIC AND PEDESTRIAN TRAFIC. ALL WORK SHALL BE $100 HIGHWAY COMPLETED IN CITY OF LA ROW LOS ANGELES LOCAL LAE1023 0 IMPLEMENT VAN NUYS RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS $500 HIGHWAY STREETS IN AND AROUND THE VAN NUYS AREA OF THE CITY. NO TRAFFIC CAPACITY LOS ANGELES LOCAL LA990351 0 IMPROVE GLENDALE BLVD/FWY RT 2 TERMINUS RECONFIG/REDSIGN, TRAFFIC MGMT. NEIGHBORHOOD SAFETY MEASURES (TEA21- $14,258 HIGHWAY #413) (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH FOR THE DEMO FUNDS)TOLL CREDIT IN FY10/11 IN CON. FOR $375 AND FY11/12 IN CON. FOR $1,875. LOS ANGELES LOCAL LA0C8052 0 IMPROVE SAN FERNANDO ROAD BETWEEN ELM ST AND EAGLE ROCK BL, ADD TURN LANES. MAKE IMPROVEMENTS AT SR-2 RAMPS. $1,991 HIGHWAY PPNO 3102. LOS ANGELES LOCAL LAE0884 0 IMPROVEMENTS TO THE SOUTH AZUSA AVE./AMAR RD. INTERSECTION (500 FEET IN ALL DIRECTIONS FROM INTERSECTION) $1,200 HIGHWAY IMPROVEMENTS INCLUDE WIDENING, ADDING LEFT LANE, AND TRAFFIC SIGNAL MODIFICATIONS. LOS ANGELES LOCAL LAE0427 0 IN CITY OF LOS ANGELES, ON 103RD STREET FROM CENTRAL TO GRAHAM & CENTRAL AV. FROM 103RD STREET TO IMPERIAL HWY. $4,000 HIGHWAY PROJECT WILL PROVIDE STREETSCAPE, TRANSIT, AND PEDESTRIAN AMENITIES. LOS ANGELES LOCAL LSTEA0019 0 IN LOS ANGELES – ALONG THE LA RIVER FROM BARCLAY ST. TO N. SPRING ST. – CONSTRUCT BIKE PATH $1,542 HIGHWAY LOS ANGELES LOCAL LAE0518 0 IN THE CITY OF LOS ANGELES, ON BROADWAY W/S FROM 4TH ST. TO 235 N/O 4TH ST, AND 4TH ST FROM BROADWAY TO 120 W/O $2,500 HIGHWAY BROADWAY. REMOVE AND REPLACE SIDEWALKS INCLUDING PORTIONS THAT SPAN. LOS ANGELES LOCAL LAF3303 0 INDUSTRY-ATMS SIGNAL UPGRADE/CCTV VIDEO SURVEILLANCE SYSTEM. DESIGN & IMPLEMENT 20 ATMS SIGNAL UPGRADE, 6 CCTV $1,004 HIGHWAY VIDEO SURVEILLANCE SYSTEM, WIRELESS COMMUNICATIONS & LOCAL CONTROL CENTER (LCC) VIDEO SCREEN SYSTEM. LOS ANGELES LOCAL 1ITS04 0 INFORMATION EXCHANGE NETWORK PHASE III. DESIGN AND IMPLEMENTATION OF VARIOUS DESIRED FEATURE ENHANCEMENTS TO LOS $4,000 HIGHWAY ANGELES COUNTY'S INFORMATION EXCHANGE NETWORK, A MULTIJURISDICTIONAL ADVANCED TRAFFIC MANAGEMENT SYSTEM. LOS ANGELES LOCAL LAE2906 0 INGLEWOOD AVENUE CORRIDOR IMPROVEMENT AT MARINE AVENUE FOR ROADWAY WIDENING AT THREE INTERSECTION CORNERS $4,515 HIGHWAY TO ACCOMMODATE DEDICATED RIGHT TURN LANE POCKETS TO IMPROVE THRU TRAFFIC FLOW AND REDUCE CONGESTION. THIS PROJECT WILL INCLUDE CURB, GUTTER, SIDEWALK, ADA ACCESSIBLE RAMPS, UTILITY RELOCATION, AND SIGNAL REPLACEMENTS/ MODIFICATIONS. RIGHT OF WAY ACQUISITION WILL BE REQUIRED IN ORDER TO ACCOMMODATE RIGHT TURN POCKETS OF SUFFICIENT STACKING LENGTH. Project List 43

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA996425 0 INSTALL REVERSIBLE LANE ON SEPULVEDA BL THROUGH TUNNEL AT MULHOLLAND DR, INSTALL BIKE FACILITIES FROM SKIRBALL $8,301 HIGHWAY CENTER DR TO BEL AIR CREST RD, IMPLEMENT INTERSECTION IMPROVEMENTS AT SKIRBALL CENTER DR, I-405 FWY SB ON-RAMP, MORAGA DR, WILSHIRE BL LOS ANGELES LOCAL LAES235 0 INSTALL SAFETY IMPROVEMENTS AT THE AT-GRADE CROSSING OF BUENA VISTA STREET NEAR VANOWEN STREET, INCLUDING $3,205 HIGHWAY CROSSING GATES, PEDESTRIAN IMPROVEMENTS, MEDIAN ISLANDS, PAVEMENT MARKINGS AND CCTV. LOS ANGELES LOCAL LA0G718 0 INSTALL SAFETY LIGHTS ON COMPTON CREEK.(DEMO ID 205 PUBLIC LAW 03 APP ACT 108-72002) $496 HIGHWAY LOS ANGELES LOCAL LAE2591 0 INSTALL TRAFFIC SIGNAL ON BALBOA BL. AT KNOLLWOOD SHOPPING CENTER $120 HIGHWAY LOS ANGELES LOCAL LAE2883 0 INSTALLATION OF NEW AND THE REMOVE/REPLACE OF EXISTING DAMAGED OR SUBSTANDARD SIDEWALKS, DRIVE APPROACHES, AND $742 HIGHWAY CONFLICTING OBSTRUCTIONS AND ADA RAMPS. PROJECT AREA IS BOUNDED BY FOSTER RD TO ROSECRANS AVE AND LAKEWOOD BLVD TO CLARK AVE. LOS ANGELES LOCAL LAF3314 0 INTELLIGENT TRANSPORTATION SYSTEM (ITS) COMMUNICATION SYSTEM. UPGRADE AND REPLACE UNDER CAPACITY COMMUNICATION $5,493 HIGHWAY SYSTEM HARDWARE IN ORDER TO PROVIDE A VIABLE AND COST EFFECTIVE COMMUNICATION LINK BETWEEN TRAFFIC CORRIDORS AND THE LA COUNTY IEN. LOS ANGELES LOCAL LAF3302 0 INTELLIGENT TRANSPORTATION SYSTEM (ITS) PHASE III. COMPLETE THE MAIN COMMUNICATION INFRASTRUCTURE SYSTEM OF THE $5,294 HIGHWAY ITS COMMUNICATION MASTER PLAN BY CLOSING ALL GAPS IN THE EXISTING FIBER COMMUNICATION NETWORK. AS STATED IN THE PROJECT DESCRIPTION, THIS PROJECT TARGETS CRITICAL EXISTING GAPS WITHIN THE CITY'S ITS FIBER MASTER PLAN. LOS ANGELES LOCAL LA0D439 0 INTELLIGENT TRANSPORTATION SYSTEM LOGISTICS & SYSTEMS MANAGEMENT, WILL PRODUCE AN ITS MASTERPLAN FOR THE $500 HIGHWAY GATEWAY CITIES SUBREGION WITH AN EMPHASIS IN GOODS MOVEMENT LOS ANGELES LOCAL LA0G734 0 INTERMODAL ACCESS AT HENRY MAYO NEWHALL MEMORIAL CENTER – IMPROVE BUS TURN-OUT ON MCBEAN PARKWAY AT AVENIDA $251 HIGHWAY NAVAREE AND DEVELOPMENT OF NORTHBOUND LEFT-TURN POCKETS AT MCBEAN PARKWAY AND ORCHARD VILLAGE ROAD AT HENRY MAYO NEWHALL MEMORIAL CENTER. LOS ANGELES LOCAL LAE0134 0 INTERSECTION AT BALBOA BLVD & SAN FERNANDO RD.MINOR WIDEN TO PROVIDE TURN LANES, & REALIGNMENT OF BALBOA RD.RIGHT- $500 HIGHWAY TURN LANE AT BALBOA BLVD. LOS ANGELES LOCAL LAF3307 0 INTERSECTION IMPROVEMENTS ON BONITA AVE. AT CATARACT AVE. INSTALLATION OF NEW TRAFFIC SIGNAL, LIGHTING ON BONITA AVE $1,674 HIGHWAY AT CATARACT AVE AND THE SYNCHRONIZATION OF EXISTING SIGNALS ALONG BONITA AVE BETWEEN EUCLA AVE AND EASTERLY CITY LIMIT. NEW TRAFFIC SIGNAL ON BONITA AVENUE AT CATARACT AVENUE, AND SYNCHRONIZATION OF THE EXISTING SIGNALS ON BONITA AVENUE AT EUCLA AVENUE, SAN DIMAS AVENUE, IGLESIA STREET, WALNUT AVENUE, SAN DIMAS CANYON ROAD WITH THE NEW SIGNAL. LOS ANGELES LOCAL LA0G724 0 INTERSECTION IMPROVEMENTS TO ADD NORTHBOUND, EASTBOUND AND WESTBOUND DEDICATED RIGHT TURN-LANES; ADD SECOND $19,600 HIGHWAY EASTBOUND LEFT-TURN LANE; AND TRAFFIC SIGNAL UPGRADES THROUGH WIDENING AND RECHANNELIZATION. LOS ANGELES LOCAL LA0G683 0 INTERSECTION MODERNICATION, SYNCHRONIZATION, AND RE-PAVEMENT. THE PROJECT CONSISTS OF THE INSTALLATION OF $428 HIGHWAY INTERSECTION (PORTLAND CONCRETE CEMENT) AT GAGE AVENUE AND WALKER AVENUE, AND THE REHABILITATION OF GAGE AVENUE FROM WILLCOX AVENUE TO CHANSLOR AVENUE AND TRAFFIC SIGNAL MODIFICATIONS AND APPURTENANCES. TOLL CREDIT FOR CONSTRUCTION PHASE IN FY 11/12 FOR $86. LOS ANGELES LOCAL LAE3764 0 ITS & INTERSECTION IMPROVEMENTS IN AND NEAR LAX AIRPORT, WHICH MAY INCLUDE RESTRIPING, SIGNAL PHASE CHANGES, AND $1,250 HIGHWAY THE ADDITION OF INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT. LOS ANGELES LOCAL LA996324 0 ITS IMPROVEMENTS: LAKE AVENUE AND DEL MAR BLVD. $963 HIGHWAY 44 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE2538 0 KOREATOWN PAVILION GARDEN-TO ENHANCE THE NORTHEAST CORNER OF NORMANDIE AND OLYMPIC BL. $250 HIGHWAY LOS ANGELES LOCAL LA0D108 0 L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY ALONG WEST BANK OF LA RIVER- FLETCHER DR TO BARCLAY ST INCLUDES $2,536 HIGHWAY LIGHTING, SIGNAGE, PAVEMNT MARKINGS & FENCING (LA996245) (PPNO 5006) LOS ANGELES LOCAL LA0D209 0 LA BREA AVENUE, FROM FLORENCE AVE TO CENTURY BLVD AND IMPERIAL HIGHWAY, FROM PRAIRIE AVE TO VAN NESS AVE BY $5,977 HIGHWAY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS. LOS ANGELES LOCAL LA990360 0 LA LOMA BRIDGE CONTRUCTION (TEA21-#1208) THE LENGTH OF THE PROJECT IS 379 FT. RECONSTRUCT THE ONE LANE IN EACH $18,195 HIGHWAY DIRECTION. BRIDGE NO. 53C0759, LA LOMA RD, OVER ARROYO SECO CHANNEL, 0.8 MIS S. FOOTHHILL FREEWAY. LOS ANGELES LOCAL LA0C8058 0 LA TIJERA BRIDGE WIDENING OVER I-405 FREEWAY; PROVIDE SIDE-BY-SIDE DUAL LEFT -TURN LANES IN EAST & WESTBOUND $14,515 HIGHWAY DIRECTION ONTO FREEWAY RAMPS. LOS ANGELES LOCAL LA0G155 0 LACRD – TRANSIT SIGNAL PRIORITY IN THE CITY OF LOS ANGELES. $1,000 HIGHWAY LOS ANGELES LOCAL LAF3114 0 LAKEWOOD BOULEVARD PHASE 3 IMPROVEMENTS. WIDEN TO PROVIDE 3 LANES IN EACH DIRECTION & 50 CURB RETURNS AT $7,778 HIGHWAY INTERSECTIONS, RECONSTRUCT INFRASTRUCTURE TO EXTEND LIFE BY 50 YEARS, REPLACE LANDSCAPING, LIGHTING, & TRAFFIC SIGNALS. PROJECT WILL GO FROM 4 TO 6 LANES. LOS ANGELES LOCAL LAE1655 0 LANDSCAPE AND IRRIGATE EAST BOUND 91 FREEWAY ON AND OFF RAMPS AT BELLFLOWER BL. $240 HIGHWAY LOS ANGELES LOCAL LAF3640 0 LANI – EVERGREEN PARK STREET ENHANCEMENT PROJECT. INCREASE PEDESTRIAN SAFETY AND ACCESS BY PROVIDING IMPROVED $1,075 HIGHWAY CROSSWALKS, NEW BUS SHELTERS AND STREET TREES TO ENHANCE CONNECTIVITY BETWEEN TRANSIT AND AREA LANDMARKS.. THE PROPOSED PROJECT IS LOCATED IN THE BOYLE HEIGHTS COMMUNITY OF LOS ANGELES. LOS ANGELES LOCAL LAE2389 0 LAS TUNAS PED ENHANCEMENTS. INSTALL AND REPLACE ADA RAMPS. UPDATE CROSSING MARKING AND SIGNALS $791 HIGHWAY LOS ANGELES LOCAL LAE0180 0 LAUREL CANYON BLVD BETWEEN HAMLIN STREET AND VICTORY BLVD. PROJECT WILL PROVIDE FOR PEDESTRIAN SAFETY AND $1,200 HIGHWAY BEAUTIFICATION TREATMENT. ELEMENTS INCLUDE LANDSCAPED MEDIAN ISLANDS. LOS ANGELES LOCAL LA0C8038 0 LAUREL CANYON BLVD BRDGE OVER TUJUNGA WASH WIDENING (BRIDGE #53C-1233)- REHABILITATE 4-LANE BRIDGE AND WIDEN TO $3,700 HIGHWAY ADD SHOULDERS, UPGRADE BRIDGE RAILINGS. PPNO 3094 3379 AB 3090 LOS ANGELES LOCAL LAES085 0 LAX HOSPITALITY ZONE STREET AND SIDEWALK REHABILITATION – PHASE 1: THIS PROJECT WILL RESURFACE STREETS AND $3,500 HIGHWAY CONSTRUCT SIDEWALK IMPROVEMENTS IN THE VICINITY OF THE LAX INTERNATIONAL AIRPORT. PROJECT LIMITS WILL BE WITHIN THE NEWLY CREATED AIRPORT HOSPITALITY ZONE. LOS ANGELES LOCAL LAE0346 0 LIGHTING, AND SAFETY IMPROVEMENTS ON ROAD LEADING TO HANSEN DAM RECREATION AREA. ACCESS IMPROVEMENTS INCLUDING $6,500 HIGHWAY HILLSIDE STABILIZATION AND PARKING LOT REHABILITATION ALONG OSBORNE STREET BETWEEN GLENOAKS BOULEVARD AND DRONFIELD AVENUE [REF P.L. 110-244, SEC 105(A)(234)] (CHANGE PER H.R.1195-6/6/08) LOS ANGELES LOCAL LAF1206 0 LINCOLN BL WIDENING AT VENICE BL. WIDEN BOTH SIDES OF LINCOLN BL NORTH AND SOUTH OF VENICE BL TO PROVIDE AN $1,050 HIGHWAY ADDITIONAL LANE IN EACH DIRECTION DURING WEEKDAY PEAK COMMUTE HOURS. LOS ANGELES LOCAL LAF3615 0 LONG BEACH BLVD. PEDESTRIAN IMPROVEMENT PROJECT. PROJECT PROVIDES PEDESTRIAN-ORIENTED IMPROVEMENTS TO LONG $2,521 HIGHWAY BEACH BOULEVARD INCLUDING PEDESTRIAN LIGHTING, STREET TREES, AND CROSSWALK TREATMENTS. LOS ANGELES LOCAL LAE1296 0 LONG BEACH INTELLIGENT TRANSPORTATION SYSTEM $2,880 HIGHWAY Project List 45

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3503 0 LONG BEACH SOUTH WATERFRONT BIKE PATH GAP CLOSURE. THE SOUTH WATERFRONT BIKE PATH CONNECTION PROPOSES A $885 HIGHWAY MAIN GAP-CLOSURE TO LONG BEACH'S PRIMARY BIKEWAY NETWORK. THIS CLASS I PATH INCLUDES A MID-BLOCK CROSSING AND WAYFINDING SIGNS.. THE PROPOSED SOUTH WATERFRONT BIKE PATH STARTS AT THE NORTH END OF THE QUEENSWAY BRIDGE AT THE EXISTING TERMINUS OF THE CLASS I PATH. THE PROPOSED ALIGNMENT FOLLOWS THE NORTH SIDE OF QUEENSWAY DRIVE WITHIN THE CITY RIGHT-OF-WAY AS A CLASS I BIKE PATH TO THE EXISTING CLASS I PAT LOS ANGELES LOCAL LAF1848 0 LOS ANGELES CITY COLLEGE (LACC) RED LINE STATION EXTENSION. CREATE AN EXTENSION OF THE ENTRANCE TO THE METRO RED $1,471 HIGHWAY LINE STATION AT VERMONT/WILLOW BROOK AV TO THE LACC CAMPUS LOS ANGELES LOCAL LAF1817 0 LOS ANGELES NEIGHBORHOOD INITIATIVE WEST ADAMS ENHANCEMENTS. THIS PROJECT WILL PROVIDE VIBRANT LANDSCAPING AND $892 HIGHWAY HISTORICALLY INSPIRED GATEWAY MARKERS ON A BLIGHTED TRANSPORTATION CORRIDOR, ENHANCING THE DRIVING AND TRANSIT ENVIRONMENT. LOS ANGELES LOCAL LAE1148 0 LOS ANGELES REGIONAL DIESEL EMISSIONS REDUCTION PROGRAM FOR ENGINE RETROFIT PROVIDES INCENTIVE GRANTS TO OWNER $449 HIGHWAY OPERATORS OLD DIESEL TRUCKS TO UPGRADE EQUIPMENT TO REDUCE EMISSIONS LOS ANGELES LOCAL LA0F003 0 LOS ANGELES STREET, OVER BIG DALTON WASH, 0.5 MI S IRWINDALE AVE. WIDEN 2-LANE BRIDGE TO 4-LANE BRIDGE, ADD $2,319 HIGHWAY SHOULDERS, UPGRADE BRIDGE RAILING (# 53C0676) LOS ANGELES LOCAL LA960170 0 MAGIC MOUNTAIN PARKWAY EXTENSION FROM SAN FERNANDO RD TO VIA PRINCESSA: CONSTRUCT A NEW ROAD WITH 3 LANES IN $21,101 HIGHWAY EACH DIRECTION LOS ANGELES LOCAL LA0C8087 0 MAGNOLIA BLVD WIDENING-CAHUENGA BLVD TO VINELAND AVE. FROM THE EXISTING ROADWY STANDARD TO SECONDARY HWY $4,030 HIGHWAY STANDARD. FROM 1 LANE TO 2 LANES IN EACH DIRECTION. (PPNO 3110). LOS ANGELES LOCAL LA0G218 0 MAINE AVENUE MASTER PLAN DEVELOPMENT PROJECT. DEVELOP PRELIMINARY AND PS&E DESIGN FOR MAINE AVENUE IN BALDWIN $119 HIGHWAY PARK THAT IMPROVES THE DOWNTOWN/CIVIC CENTER AREA FOR USE BY PEDESTRIANS, BICYCLISTS AND TRANSIT USERS. LOS ANGELES LOCAL LA0D448 0 MAJOR ARTERIAL GAP CLOSURES CITYWIDE. AVENUE J FROM 36TH ST WEST TO 32ND ST WEST, 20TH ST EAST FROM AVENUE J-4 TO $2,902 HIGHWAY AVENUE J-8 LOS ANGELES LOCAL LAF1527 0 MANCHESTER AVENUE BIKE LANES & ISLAND REDUCTION. THE PROJECT CONSISTS OF THE INSTALLATION OF ONE MILE OF BIKE LANES $2,328 HIGHWAY AND THE REDUCTION OF THE LANDSCAPED MEDIAN ISLAND ON MANCHESTER BL BETWEEN SEPULVEDA BL AND OSAGE AV LOS ANGELES LOCAL LAF3105 0 MCBEAN PARKWAY WIDENING/GAP CLOSURE OVER SANTA CLARA RIVER. WIDEN MCBEAN PARKWAY BRIDGE TO 8 LANES AND $6,864 HIGHWAY CONSTRUCT CLASS I PATH CONNECTION BETWEEN MCBEAN PARKWAY AND .. THE PROJECT IS LOCATED IN THE CITY OF SANTA CLARITA. MCBEAN PARKWAY WITHIN THE PROJECT LIMITS IS ON A ROUGHLY NORTH-SOUTH ALIGNMENT. THE NEAREST MAJOR CROSS STREETS ARE NEWHALL RANCH ROAD TO THE NORTH AND MAGIC MOUNTAIN PARKWAY TO THE SOUTH. THE TOTAL LENGTH OF THE ROADWAY GAP CLOSURE PROJECT IS APPROXIMATELY 0.25 MILES LOS ANGELES LOCAL LAF3647 0 MENLO AVE/MLK VERMONT EXPO STATION PEDESTRIAN IMPROVEMENTS. IMPROVE PEDESTRIAN ACCESS TO THE NEW EXPO STATION $3,302 HIGHWAY ON VERMONT AVE BY INSTALLING SIDEWALKS, LANDSCAPING, AND LIGHTING ALONG MENLO AVE. AND MLK JR. BLVD. PLUS A MEDIAN ON MLK BLVD. LOS ANGELES LOCAL LAF3301 0 METRO GOLD LINE AT-GRADE CROSSING MOBILITY ENHANCEMENTS. DEPLOYMENT OF ITS AT SIGNALIZED INTERSECTIONS ADJACENT $1,695 HIGHWAY TO METRO GOLD LINE AT-GRADE CROSSINGS TO PROVIDE ADAPTIVE TRAFFIC SIGNAL CONTROL TO IMPROVE MOBILITY & ENHANCE SAFETY. LOS ANGELES LOCAL LA996340 0 MISSION BLVD. GRADE SEPARATION AT SR. 71(FROM UPRR UNDERCROSSING TO 9TH ST. MISSION BLVD FROM WESTERN TO CURRAN $51,000 HIGHWAY PLACE (CFP 6340, 8400). PPNO 2232. SAFETEA-LU # 511 (PPNO 2232)AND SAFETEA-LU # 3771 (2232). 46 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3524 0 MISSION CITY TRAIL BICYCLE BRIDGE AT WORKMAN. CONSTRUCT A BICYCLE BRIDGE OVER THE RAIL CORRIDOR TO PROVIDE LINKAGES $2,742 HIGHWAY BETWEEN THE NORTH AND SOUTH SIDES OF THE CITY AND THE MISSION CITY BICYCLE TRAIL.. THIS PROJECT PROPOSES TO CONSTRUCT A BRIDGE OVER THE METRO RAILROAD TRACK CONNECTING THE NORTHERNMOST PORTION OF SOUTH WORKMAN AVENUE (SOUTH OF THE RAIL ROAD TRACKS) WITH THE MISSION CITY BICYCLE TRAIL (IMMEDIATELY NORTH OF THE RAIL ROAD TRACKS). LOS ANGELES LOCAL LA0G372 0 MODIFY EXISTING SIGNALS AT INTERSECTIONS ALONG VALLEY VIEW AVE., CARMENITA RD., ALONDRA BLVD. AND ROSECRANS AVE. $1,050 HIGHWAY TO ACCOMODATE ADDITIONAL TRAFFIC DURING CONSTRUCTION OF I-5/CARMENITA & I-5/ALONDRA PROJECTS. TO BE COMPLETED IN ADVANCE OF THE I-5 WIDENING PROJECT START OF CONSTRUCTION. LOS ANGELES LOCAL LA0C8055 0 MOORPARK ST WIDENING – WOODMAN AVE TO MURIETTA AVE.- WIDEN EXISTING ROADWAY FROM VARYING WIDTH TO 70 FTEET TO $6,788 HIGHWAY PROVIDE ON ADDTL TRAFFIC LANE IN EA DIR & UPGRADE HIGHWAY TO SECONDARY HWY STANDARDS. THIS PROJECT IMPROVES 2080 LF OF MOORPARK AVE. PPNO 3103. LOS ANGELES LOCAL LA29202N 0 MTA TIP ADMINISTRATION PLANNING, PROGRAMMING AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 $65,022 HIGHWAY STATE ONLY 3594,2001 CFP 8401, PPNO 3535, 9001A, 9001) LOS ANGELES LOCAL LA0G716 0 N17- AVIATION BLVD INTERSECTION IMPROVEMENTS AT ARTESIA BLVD. INSTALL AN EASTBOUND RIGHT TURN LANE VIA STRIPING ON $22 HIGHWAY ARTESIA BLVD AT AVIATION BLVD. PROJECT NO. MR312.13, FA NO. MOU.MR312.13. LOS ANGELES LOCAL LA0G715 0 N19 – INGLEWOOD AVE INTERSECTION IMPROVEMENTS AT MANHATTAN BEACH BLVD. INSTALL EASTBOUND RIGHT TURN OVERLAP $30 HIGHWAY SIGNAL PHASE. PROJECT NO. MR312.14, FA NO. MOU.MR312.14. LOS ANGELES LOCAL LA0G721 0 N58 – AVIATION BLVD. INTERSECTION IMPROVEMENTS AT ARTESIA BLVD. PLANS, SPECIFICATIONS, ESTIMATES, OBTAINING RIGHT OF $847 HIGHWAY WAY, AND CONSTRUCTION OF A RIGHT TURN ONLY LANE ON NORTHBOUND AVIATION BLVD AT ARTESIA BLVD. PROJECT NO. MR312.20. FA NO. MOU.MR312.20. LOS ANGELES LOCAL LA0C8056 0 NASH ST/DOUGLAS ST, & ROSECRANS AVE. INTERSECTION IMPROVEMENTS. PROVIDES A 2ND W-BOUND L- TURN LANE & SEPARATE $5,382 HIGHWAY E-BOUND R- TURN LANE ON ROSECRANS AVE AT NASH ST/PRKWAY. (PPNO 3129). LOS ANGELES LOCAL LAE0319 0 NEIGHBORHOOD TRAFFIC SAFETY IMPROVEMENTS, INCLUDING STREET LIGHTING AND OTHER PEDESTRIAN & TRANSIT ENHANCEMENT. $1,400 HIGHWAY ELYSIAN VALLEY NEIGHBORHOOD FROM QUEEN ST. ON THE NORTH, BARCLAY ST. LOS ANGELES LOCAL LAF3800 0 NEWHALL GATEWAY ROUNDABOUT. CONSTRUCT A ROUNDABOUT AND INSTALL LANDSCAPING AND ENTRY MONUMENT AT THE $1,003 HIGHWAY INTERSECTION OF MAIN STREET AND NEWHALL AVENUE. WILL SERVE AS A SOUTHERN GATEWAY INTO DOWNTOWN NEWHALL.. THIS PROJECT IS LOCATED IN THE CITY OF SANTA CLARITA WITHIN THE DOWNTOWN NEWHALL AREA OF THE CITY. THE PROJECT PROPOSES TO CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF MAIN STREET AND NEWHALL AVENUE. LOS ANGELES LOCAL LA0G032 0 NORMANDIE AVE & PICO BLVD INTERSECTION IMPROV -THIS PROJECT WILL RECONSTRUCT & WIDEN THE NORTHWEST CORNER OF THE $1,744 HIGHWAY INSTERSECTION OF NORMANDIE AV & PICO BLVD. IT WILL REMOVE THE TRAFFIC ISLAND S/O THE INTERSECTION ON NORMANDIE AV. THE PROPSED ALIGNMENT AT TH LOS ANGELES LOCAL LA0B7237 0 NORTH ATLANTIC BLVD WIDENING AND CHANNELIZATION-INCLUDES THE ENVIRONMENTAL ANALYSIS AND PREPARATION OF PLANS, $641 HIGHWAY SPCIFICATIONS, AND ESTIMATES FOR THE WIDENING OF ATLANTIC. PPNO 2915 LOS ANGELES LOCAL LAF3519 0 NORTH COUNTY BIKEWAYS. INSTALL FOUR CLASS II AND THREE CLASS III BIKEWAY SEGMENTS, INCLUDING SIGNAGE, STRIPING, ROAD $1,600 HIGHWAY WIDENING, & ROAD SHOULDER IMPROVEMENTS. LOS ANGELES LOCAL LAF1300 0 NORTH COUNTY TRAFFIC FORUM ITS EXPANSION. MULTIJURISDICTIONAL PROJECT WILL UPGRADE CENTRAL TOC SOFTWARE AND $11,194 HIGHWAY SIGNAL CONTROLLERS; CONNECT TO LA COUNTY IEN; AND ADD TRAFFIC SIGNALS/CORRIDORS TO EXISTING INTERCONNECT SYSTEM. Project List 47

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3148 0 NORTH MAIN ST. GRADE SEPARATION: CONSTRUCT A NEW GRADE SEPARATION OVER UPRR AND METROLINK & LA RIVER WHILE $91,280 HIGHWAY PRESERVING THE EXISTING HISTORIC N. MAIN ST. BRIDGE. BIKE LANES WILL BE ADDED AT THE SHOULDERS OF THE BRIDGE. OTHER WORK COMPONENTS INCLUDE REALIGNING ALBION STREET AND MODIFYING THE INTERSECTIONS OF NORTH MAIN AND MESNAGER STREET AT THE WEST END. LOS ANGELES LOCAL LA0C8086 0 NORTH SPRING ST, OVER LOS ANGELES RIVER .4 MILES WEST OF I-5. REHABILITATE AND WIDEN 4 LANE BRIDGE (NO ADDED LANES) $63,193 HIGHWAY ADD SIDEWALKS UPGRADE BRIDGE RAILINGS (53C0859). LOS ANGELES LOCAL LAF1163 0 NORTH VENICE BL WIDENING AT LA CIENEGA BL. WIDEN THE NORTH SIDE OF VENICE BL FROM DAVID AV TO CHARITON ST TO PROVIDE $1,057 HIGHWAY AN ADDITIONAL FULL-TIME WB THROUGH LANE AT LA CIENEGA BL LOS ANGELES LOCAL LAE1703 0 NORTHEAST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF $200 HIGHWAY VARIOUS STREETS IN THE NORTHEAST SAN FERNANDO VALLEY. LOS ANGELES LOCAL LAE3269 0 NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENTS; WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS $3,056 HIGHWAY STREETS IN THE NORTHWEST SAN FERNANDO VALLEY AREA.WILL NOT INCREASE CAP LOS ANGELES LOCAL LA000512 0 OCEAN BOULEVARD, FROM THE LOS ANGELES RIVER OVER UPRR AND BACK CHANNEL, TO 0.1 MILE E OF STATE ROUTE 47, REPLACE 5 $1,001,617 HIGHWAY LANE EXISTING GERALD DESMOND BRIDGE WITH NEW 6 LANE BRIDGE (3 LANES IN EACH DIRECTION); OTHER IMPROVEMENTS INCLUDE CONSTRUCTION OF NEW APPROACH STRUCTURES AND ROADS, RECONSTRUCTION OF THE EXISTING HORSESHOE INTERCHANGE RAMP CONNECTORS, RECONSTRUCTION OF THE EXISTING CONNECTORS TO SR-710, AND RECONSTRUCTION OF TWO RAMP CONNECTIONS TO PICO AVENUE. LOS ANGELES LOCAL LAF1205 0 OLYMPIC BL AND MATEO STREET GOODS MOVEMENT IMP-PHASE II. IMPROVEMENT OF FREEWAY ACCESS BY WIDENING WB OLYMPIC $4,421 HIGHWAY BL BET MATEO ST & SANTA FE AV FOR A RIGHT-TURN LANE, AND NB MATEO ST BET OLYMPIC BL & PORTER ST FOR INCREASED CURB RETURN. LOS ANGELES LOCAL LA0G708 0 ON MAPLE AVENUE, ADD A DESIGNATED SOUTHBOUND RIGHT-TURN LANE AT THE INTERSECTION WITH SEPULVEDA BLVD. (MEASURE R $600 HIGHWAY PROJECT N47) LOS ANGELES LOCAL LA0B7234 0 OVERLAND BRIDGE – OVER I-10 FREEWAY -WIDEN W SIDE OF OVERLAND AVE BRIDGE OVER THE I-10 FROM NATIONAL BLVD/I-10 $8,641 HIGHWAY WESTBOUND RAMPS TO NATIONAL BLVD/NATIONAL PLACE. PPNO 2863 LOS ANGELES LOCAL LA990352 0 PALISADES BLUFF STABILIZATION PROJ. (TEA21-#453) $8,897 HIGHWAY LOS ANGELES LOCAL LAF1700 0 PALMDALE TRANSPORTATION CENTER – WAYFINDING SIGNAGE PROGRAM. THIS PROJECT WILL PROVIDE A WAYFINDING SIGN PROGRAM $260 HIGHWAY TO ASSIST MOTORISTS, BICYCLISTS AND PEDESTRIANS WITH LOCATING THE PALMDALE TRANSPORTATION CENTER IN THE CITY OF PALMDALE. LOS ANGELES LOCAL LAF1529 0 PALOS VERDES DRIVE NORTH BIKE LANES. CONSTRUCTION OF CLASS II BIKELANE AND RELATED IMPROVEMENTS ON PALOS VERDES $2,574 HIGHWAY DRIVE NORTH LOS ANGELES LOCAL LAF1120 0 PARAMOUNT BL AT FIRESTONE BL IMPROVEMENTS. RECONSTRUCT CURB RETURNS AT EACH OF THE 4 CORNERS WITH 50' TURNING $3,019 HIGHWAY RADII; CONSTRUCT EB RIGHT-TURN POCKET AND STRIPE 3RD EB THRU LANE, MODIFY TRAFFIC SIGNAL LOS ANGELES LOCAL LA0D388 0 PARAMOUNT BLVD BETWEEN COVER ST. AND CANDLEWOOD ST-PAVEMENT REHAB. RAISED MEDIAN AND LANDSCAPE SAFETEALU # $1,350 HIGHWAY 2288. LOS ANGELES LOCAL LAE2293 0 PARAMOUNT BLVD FROM GARDENDALE ST AND TELEGRAP RD – ITS IMPROVEMENTS AS WELL AS MINOR WIDENING AT CRITICAL $1,904 HIGHWAY INTERSECTIONS TO ALLOW FOR SAID IMPROVEMENTS (NON-CAPACITY). LOS ANGELES LOCAL LAE0489 0 PASADENA AVE / MONTEREY RD PARTIAL GRADE SEPERATION – PRELIMINARY ENGINEERING – FEASABILITY. SAFTEA-LU DEMO # 489. $288 HIGHWAY 48 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3653 0 PASADENA AVE PED CONNECTION TO GOLD LINE HERITAGE SQ STATION. PROVIDE PEDESTRIAN/BIKE CONNECTIVITY, TREES, FURNITURE, $2,567 HIGHWAY LIGHTING, ENHANCED CROSSWALKS AND TRAFFIC CALMING/SAFETY IMPROVEMENTS ALONG PASADENA AV. LOS ANGELES LOCAL LAF1659 0 PEDESTRIAN IMPROVEMENTS FOR INTERSECTIONS WITH BUS STOPS. THIS PROJECT CONSISTS OF SAFETY AND AESTHETIC-RELATED $1,066 HIGHWAY PEDESTRIAN IMPROVEMENTS AT INTERSECTIONS ALONG MAJOR ARTERIALS WITH HIGH TRANSIT AND PEDESTRIAN ACTIVITIES WITHIN THE CITY OF CULVER CITY. LOS ANGELES LOCAL LA0D106 0 PEDESTRIAN/BICYCLE FACILITIES, LANDSCAPE AND ARTWORK ENHANCEMENTS ADJACENT TO THE I-5/SR 10 AND THE LOS ANGELES $5,038 HIGHWAY RIVER. LOS ANGELES LOCAL LA0C8094 0 PIER B ST INTERMODAL RAILYARD EXPANSION. PROJECT WILL EXPAND PIER B ST INTERMODAL RAILYARD TO FACILITATE ADDITIONAL $81,800 HIGHWAY RAIL SHIPMENTS AND REALIGN AND WIDEN PIER B STREET. LOS ANGELES LOCAL LAE1407 0 PLAZA DRIVE FROM VINCENT AVE. TO CALIFORNIA AVE. INCLUDING INSTALLATION OF TRAFFIC SIGNAL SYS AT INTERSECTION OF PLAZA $721 HIGHWAY DR. & CALIF. THE SYNC. OF TWO TRAFFIC SY, & ADD TURN LANES. LOS ANGELES LOCAL LAF3170 0 PORT TRUCK TRAFFIC REDUCTION PROGRAM: WEST BASIN RAILYARD. INTERMODAL RAILYARD CONNECTING PORT OF LA WITH $119,079 HIGHWAY ALAMEDA CORRIDOR TO ACCOMMODATE INCREASED LOADING OF TRAINS AT THE PORT, THEREBY REDUCING TRUCK TRIPS TO OFF- DOCK RAILYARDS.. LOS ANGELES LOCAL LA0C8129 0 PORTS OF LONG BEACH AND LOS ANGELES ATMS/ATIS PROJECT TO IMPROVE TRAFFIC OPERATIONS ON THE: I-710, I-110, SR47/103. $11,410 HIGHWAY LOS ANGELES LOCAL LA0F076 0 PRIME DESSERT WOODLAND PRESERVE TRAILS PROJECT, PHASE II, WILL AUGMENT THE 57-ACRE RECREATIONAL TRAIL SYSTEM AT $604 HIGHWAY THE PRIME DESERT WOODLAND PRESERVE IN LANCASTER. LOS ANGELES LOCAL LA0F030 0 PROJECT WILL IMPROVE FLOW OF TRAFFIC FROM I-110 FWY ON/OFF-RAMPS AT C STREET BY CONSOLIDATING TWO CLOSELY SPACED $23,980 HIGHWAY INTERSECTIONS INTO ONE. LOS ANGELES LOCAL LA0F073 0 PROJECTS WITHIN AND NEAR LOS ANGELES INTERNATIONAL AIRPORT TO ELIMINATE TRAFFIC BOTTLENECKS. (LOS ANGELES WORLD $5,067 HIGHWAY AIRPORTS) SEC. 336 FUNDING LOS ANGELES LOCAL LA0F019 0 PURCHASE OF BUS BENCHES, TRASH CANS, AND SMALL SHELTERS FOR VARIOUS TRANIST STOPS THROUGHOUT CITY OF LAKEWOOD. $480 HIGHWAY LOS ANGELES LOCAL LA0F016 0 PURCHASE, INSTALL, AND INTEGRATE OPTICOM PRIORITY CONTROL SYSTEM TO EXISTING TRAFFIC CONTROLLERS AT VARIOUS $216 HIGHWAY LOCATIONS WITHIN CITY LIMITS. (SAFETEA-LU#2345) LOS ANGELES LOCAL LAF3125 0 RAMONA CORRIDOR TRANSIT CENTER ACCESS PROJECT. CONSTRUCT A NEW UNDERPASS STRUCTURE (APPROXIMATELY ONE MILE) $16,000 HIGHWAY ON RAMONA BLVD UNDER SANTA ANITA AVE TO PROVIDE DIRECT ACCESS TO LOWER LEVEL OF NEW EL MONTE TRANSIT CENTER. THE PROPOSED BUS TUNNEL RAMPS WILL BEGIN EAST OF THE SANTA ANITA AVENUE AND RAMONA BOULEVARD INTERSECTION ON RAMONA BOULEVARD AND THE TUNNEL WILL CONTINUE UNDER SANTA ANITA AVENUE (ALONG ROMONA BOULEVARD) TO THE LOWER LEVEL OF THE EL MONTE TRANSIT CENTER. THE TUNNEL WILL HAVE TWO BUS ONLY L LOS ANGELES LOCAL LAF1104 0 RANCHO VISTA BL (RVB) GRADE SEPARATION AT SIERRA HWY/UPRR/METROLINK RR CROSSING AND APPLICABLE CONNECTOR RAMPS/ $64,172 HIGHWAY ROADS AND AUXILIARY ROADS IMPROVEMENTS: RVB/AVE P WIDEN FROM 4 TO 6 LANES FROM FAIRWAY DR TO 10TH ST EAST, SIERRA HWY WIDEN FROM 4 TO 6 LANES FROM APPROX 400FT NORTH OF AVE O-8 TO AVE P-8, AVE P-8 WIDEN FROM 4-6 LANES FROM APPROX 400FT WEST OF DIVISION ST TO SIERRA HWY, AND 4TH STREET EAST CONSTRUCT NEW 2 LANE ROAD FROM 3RD ST EAST TO AVE P-8. IMPROVEMENTS ALSO INCLUDE INTERSECTIONS ON THE PRIMARY LOS ANGELES LOCAL LAE2246 0 RANCHO VISTA BLVD – WIDEN INTERSECTION AT 3RD ST EAST AND INTERSECTION AT 8TH ST. EAST/LOCKHEED WAY – 6 LANES; MODIFY $9,550 HIGHWAY TRAFFIC SIGNALS, DRAINAGE, SIDEWALKS, MEDIANS, UTILITY RELOCATIONS Project List 49

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE1903 0 RANDOLPH STREET IMPROVEMENTS BETWEEN WILMINGTON AVENUE AND FISHBURN. PROJECT WILL USE $359 OF TOLL CREDITS TO $2,260 HIGHWAY MATCH DEMO AND STPL FUNDS IN FY11. LOS ANGELES LOCAL LAE2024 0 REALIGNMENT LA BREA AV TO REDUCE CONGESTION: IMPROVEMENTS AT INTERSECTION WITH HILLCREST BLVD (6-LEG TO 4-LEG/ $9,970 HIGHWAY SIGNALIZED) & WITH TAMARACK AV (ADD SIGNAL) – 2007 METRO CALL FUNDS (PC25) ONLY APPLY TO REALIGNMENT OF THE LA BREA AVENUE BETWEEN HILLCREST BL AND SPRUCE AVE/MARKET STREET INTERSECTIONS. LOS ANGELES LOCAL LAF1717 0 REAL-TIME MOTORIST PARKING INFORMATION SYSTEM DEMONSTRATION. THIS PROJECT WILL PROVIDE A REAL-TIME INFORMATION $1,072 HIGHWAY SYSTEM TO COMMUNICATE AND GUIDE MOTORISTS TO AVAILABLE PARKING SPACES IN SELECTED PARKING STRUCTURES IN THE CITY OF CULVER CITY. LOS ANGELES LOCAL LA0G173 0 RECONFIGURATION OF CONTROL POINT (CP) MOLE – THE NEW CONTROL POINT AT THE MOLE WILL ENABLE INCREASED TRAIN SPEEDS $26,460 HIGHWAY AND REDUCED TRAIN DELAYS CAUSED BY MANUAL SWITCH OPERATIONS. LOS ANGELES LOCAL LA0D441 0 RECONFIGURATION OF VALLEY BLVD ON-AND-OFF-RAMPS TO THE 605 FREEWAY TO IMPROVE MOBILITY, CIRCULATION, AND RELIEVE $28,012 HIGHWAY THE CURRENT CONGESTION AT VALLEY BLVD. LOS ANGELES LOCAL LAE1440 0 RECONFIGURE SAN FERNANDO RD. FROM FLETCHER DR. TO I-5 FWY. $6,450 HIGHWAY LOS ANGELES LOCAL LA0G122 0 RECONSTRUCT AND RESURFACE LA BREA AVE FROM 64TH STREET TO 104TH AND IMPERIAL HIGHWAY FROM PRAIRIE AND VAN NESS $4,121 HIGHWAY AVENUES. LOS ANGELES LOCAL LAE3239 0 RECONSTRUCT ATLANTIC AVE AND IMPROVE DRAINAGE FROM FIRESTONE BLVD TO ABBOTT RD PAVEMENT REHABILITATION, RAISED $5,944 HIGHWAY MEDIANS, DRAINAGE, SIGNAL, PARKWAY, AND MISC. IMPROVEMENTS. LOS ANGELES LOCAL LAE0266 0 RECONSTRUCT I-710 SOUTHERN TERMINUS OFF RAMP.CURRENT FUNDING APPLIED ONLY TOWARDS THE P/E & PRELIMINARY DESIGN $158,849 HIGHWAY PHASE.CONSTRUCTION FUNDING TO BE SOUGHT LATER (E/P,PS/E ONLY) LOS ANGELES LOCAL LAE1401 0 RECONSTRUCT LONG BEACH BLVD WITH MEDIANS AND IMPROVED DRAINAGE PHASE II FROM IMPERIAL HWY TO TWEEDY BLVD. PHASE $3,500 HIGHWAY III LIMITS ARE MAGNOLIA AVE. TO IMPERIAL HWY. LOS ANGELES LOCAL LA0D478 0 RECONSTRUCT OF WASHINGTON BLVD FROM I-5 FWY TO THE WEST; UPGRADE TRAFFIC SIGNALS AND IMPROVE THE EXISTING $592 HIGHWAY PAVEMENT LOS ANGELES LOCAL LAE1390 0 RECONSTRUCT PARAMOUNT BLVD WITH MEDIANS AND IMPROVE DRAINAGE FROM ARTESIA BLVD TO CANDLEWOOD STREET $575 HIGHWAY LOS ANGELES LOCAL LA0D461 0 RECONSTRUCT- THE OLD ROAD FROM HILLCREST PARKWAY TO LAKE HUGHES RD & WIDEN FROM 40' TO 68', 2 VEH. LANES AND A 5' $10,700 HIGHWAY CLASS II BIKELANE IN EA DIR & STRIPPED MEDIAN (FROM 2 TO 4 LNS 2 EA DIR) LOS ANGELES LOCAL LAE1610 0 RECONSTRUCT WHITTIER BLVD AND IMPROVE PARKWAY DRAINAGE FROM PHILADELPHIA STREET TO FIVE POINTS (WASHINGTON $1,632 HIGHWAY BOULEVARD) IN WHITTIER LOS ANGELES LOCAL LAE1696 0 RECONSTRUCTION OF THE STRAND STAIRWAYS IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE $1,920 HIGHWAY INCREASED PEDESTRIAN TRAFFIC. PROJECT USING TOLL CREDITS AS A LOCAL MATCH: $320 IN CON PHASE IN FY12 FOR DEMO FUNDS. LOS ANGELES LOCAL LAF3502 0 REDONDO BEACH BICYCLE TRANSPORTATION PLAN IMPLEMENTATION. IMPLEMENT CLASS II AND III BIKE FACILITIES IDENTIFIED IN THE $1,949 HIGHWAY CITY OF REDONDO BEACH'S ADOPTED BICYCLE TRANSPORTATION PLAN. APPROXIMATELY 2.1 CENTERLINE MILES OF BIKE LANES AND 15.8 CENTERLINE MILES OF BIKE ROUTES THROUGHOUT THE CITY OF REDONDO BEACH. LOS ANGELES LOCAL LA996205 0 REHAB LANKERSHIM SP STATION REFURBISH HISTORIC DEPOT, LNDSCPE. PRKING FACILITIES, BUS SHLTRS, BIKE LOCKERS $3,600 HIGHWAY 50 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE3157 0 REHABILITATE ADDISON ST BETWEEN KESTER AVE AND LEMONA AVE: PROVIDE ASHALT CONCRETE RESURFACING ON THE PROPOSED $47 HIGHWAY PROJECT LIMITS. WILL NOT ENHANCE TRAFFIC CAPACITY. LOS ANGELES LOCAL LA0G369 0 REHABILITATE ALONDRA AVENUE FROM CARMENITA ROAD TO SHOEMAKER AVENUE, IN ADVANCE OF THE I-5/CARMENITA $420 HIGHWAY CONSTRUCTION. LOS ANGELES LOCAL LA0G368 0 REHABILITATE ALONDRA BOULEVARD FROM COYOTE CREEK TO VALLEY VIEW STREET, IN ADVANCE OF THE I-5/CARMENITA $205 HIGHWAY CONSTRUCTION. LOS ANGELES LOCAL LA0G367 0 REHABILITATE CARMENITA ROAD FROM ALONDRA BOULEVARD TO THE SOUTH LIMIT OF THE I-5/CARMENITA PROJECT ON CARMENITA $415 HIGHWAY ROAD, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. LOS ANGELES LOCAL LA0G364 0 REHABILITATE EXCELSIOR DRIVE FROM SHOEMAKER AVENUE TO BLOOMFIELD AVENUE, IN ADVANCE OF THE I-5/CARMENITA $320 HIGHWAY CONSTRUCTION. LOS ANGELES LOCAL LA0G363 0 REHABILITATE FIRESTONE BOULEVARD FROM SHOEMAKER AVENUE TO BLOOMFIELD AVENUE, IN ADVANCE OF THE I-5/CARMENITA $205 HIGHWAY CONSTRUCTION. LOS ANGELES LOCAL LA0G365 0 REHABILITATE FREEWAY DRIVE FROM MARQUARDT AVENUE TO SPRING AVENUE, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. $80 HIGHWAY LOS ANGELES LOCAL LAE1285 0 REHABILITATE PAVEMENT ON AZUSA AVE AND SAN GABRIEL AVE $480 HIGHWAY LOS ANGELES LOCAL LA0G378 0 REHABILITATE PUMICE STREET FROM SPRING AVENUE TO CARMENITA ROAD. $300 HIGHWAY LOS ANGELES LOCAL LA0G370 0 REHABILITATE ROSECRANS AVENUE FROM CARMENITA ROAD TO VALLEY VIEW STREET, IN ADVANCE OF THE I-5/CARMENITA $880 HIGHWAY CONSTRUCTION. LOS ANGELES LOCAL LA0G362 0 REHABILITATE SHOEMAKER AVE. FROM EXCELSIOR DRIVE TO FIRESTONE BLVD, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. $135 HIGHWAY LOS ANGELES LOCAL LA0G366 0 REHABILITATE SPRING AVENUE FROM PUMICE STREET TO FREEWAY DRIVE, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. $250 HIGHWAY LOS ANGELES LOCAL LAE0550 0 REHABILITATE STREET SURFACE OF CEDROS AVE BETWEEN BURBANK BLVD AND MAGNOLIA BLVD. WILL PROVIDE FOR ASPHALT $43 HIGHWAY CONCRETE RESURFACING. NON CAPACITY ENHANCING AND ALL ON LA ROW LOS ANGELES LOCAL LAE0937 0 REHABILITATE STREET SURFACES IN SHERMAN OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS $123 HIGHWAY STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CAP. LOS ANGELES LOCAL LA0D443 0 REHABILITATING THE EXISTING AZUSA AVE. BRIDGE OVER THE UPRR TRACKS AND VALLEY BLVD, APPLY NEW PAINT TO THE EXISTING $1,600 HIGHWAY STEEL BRIDGE TO AVOID FURTHER WEATHER CORROSION. LOS ANGELES LOCAL LA0D128 0 REHABILITATION OF INTERSECTIONS, PARKWAY IMPROVEMENTS, LANDSCAPING, AND SIGNALIZATION AT VARIOUS LOCATIONS ALONG $1,395 HIGHWAY ROSEMEAD BLVD WITHIN CITY LIMITS OF PICO RIVERA (FROM TELEGRAPH RD TO WASHINGTON BLVD). PROJECT WILL BE USING TOLL CREDIT FOR THE FEDERAL FUNDS; $99 IN FY11 TO MATCH DEM0 AND STPL FUNDS. LOS ANGELES LOCAL LA0B876 0 REMOVAL OF FLOOD DEBRIS & RECONSTRUCTION OF EXISTING RDWY & DRAINAGE SYSTEM (CHANTRY FLATS RD RECONSTRUCTION $640 HIGHWAY PROJECT) LOS ANGELES LOCAL LAE1228 0 REPAIR ROSECRANS AND ALONDRA BRIDGES PER THE COUNTY OF LOS ANGELES TRIENNIAL INSPECTION REPORT. $49 HIGHWAY Project List 51

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA0C8133 0 RESEDA ATSAC/ATCS PROJ.PROVIDE ATSAC/ATCS TYPE IMPROVEMENTS TO 107 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION $15,045 HIGHWAY OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTRL SYS LOS ANGELES LOCAL LA0F040 0 RESTORATION, OPERATION AND/OR MAINTENANCE COSTS ASSOCIATED WITH THE HISTORIC RAILWAY ON BUNKER HILL $224 HIGHWAY IN DOWNTOWN LOS ANGELES LOS ANGELES LOCAL LA0G745 0 RESTRIPE BOUQUET CANYON ROAD FROM SECO CANYON ROAD TO PLUM CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 2.2 $1,500 HIGHWAY MILES LOS ANGELES LOCAL LA0G748 0 RESTRIPE GOLDEN VALLEY ROAD FROM SOLEDAD CANYON ROAD TO SIERRA HIGHWAY FROM 4 TO 6 LANES; APPROXIMATELY 2.5 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G740 0 RESTRIPE LYONS AVENUE FROM WILEY CANYON ROAD TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G750 0 RESTRIPE MAGIC MOUNTAIN PARKWAY FROM AUTO CENTER DRIVE TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1 MILE $1,500 HIGHWAY LOS ANGELES LOCAL LA0G743 0 RESTRIPE NEWHALL AVENUE FROM RAILROAD AVENUE TO CARL COURT FROM 4 TO 6 LANES; APPROXIMATELY 0.4 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G742 0 RESTRIPE ORCHARD VILLAGE ROAD FROM MCBEAN PARKWAY TO LYONS AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.3 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G746 0 RESTRIPE PLUM CANYON ROAD FROM BOUQUET CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 0.5 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G744 0 RESTRIPE RAILROAD AVENUE FROM NEWHALL AVENUE TO BOUQUET CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 3 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G752 0 RESTRIPE SIERRA HIGHWAY FROM SOLEDAD CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G751 0 RESTRIPE SIERRA HIGHWAY FROM VIA PRINCESSA TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 5.5 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G747 0 RESTRIPE WHITES CANYON ROAD FROM SOLEDAD CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G741 0 RESTRIPE WILEY CANYON ROAD FROM LYONS AVENUE TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES $1,500 HIGHWAY LOS ANGELES LOCAL LA0G187 0 RESURFACING AND RECONSTRUCTION OF PACIFIC BOULEVARD. REMOVE AND REPLACE PORTIONS OF THE CURB, GUTTER, SIDEWALK, $880 HIGHWAY CROSS GUTTER AND RESURFACE THE STREET, INCLUDING REMOVAL OF PORTIONS OF THE RAILROAD UNDER THE EXISTING PAVING FROM SLAUSON AVENUE TO THE NORTHERLY CITY LIMIT. (2008 AABILL – HR.2764- SEC 129 PUBLIC LAW 110-161, PG 279) LOS ANGELES LOCAL LA0D442 0 RETROFITING THE EXISTING TWO-LANE WIDE PECK ROAD BRIDGE OVER THE SAN GABRIEL RIVER FWY (ROUTE 605) & WIDEN IT TO $12,000 HIGHWAY ACCOMODATE 4 LANES (2 EACH DIRECTION) TO ELIMINATE BOTTLENECK LOS ANGELES LOCAL LA0C8063 0 RIVERSIDE DR. VIADUCT REPLACEMENT. REPLACEMENT OF EXISTING 2-LANE BRIDGE WITH 2 THROUGH LANES BRIDGE FLARING 4 $55,092 HIGHWAY LANES AT SAN FERNANDO ROAD WITH NEW ROUNDABOUT. BIKE LANE ADDED COMBINED WITH 53C-1932 – WILL RESULT IN INCR. CIRCULATION. PPNO 3105 (53C-0160) LOS ANGELES LOCAL LAE0732 0 RIVERSIDE DRIVE NON-CAPACITY IMPROVEMENTS BETWEEN VAN NUYS BLVD AND TILDEN AVE. $400 HIGHWAY 52 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAE2819 0 ROSECRANS AVE OVERHEAD AND ARTERIAL RECONSTRUCTION PROJECT(NON-CAPACITY).SAFTEA-LU 1321. ISTEA 36. $15,000 HIGHWAY LOS ANGELES LOCAL LA0G713 0 ROSECRANS AVE. ARTERIAL IMPROVEMENTS FROM VERMONT AVE. TO CRENSHAW BLVD. INCLUDES RAISED LANDSCAPED MEDIAN $5,140 HIGHWAY ISLANDS, TRAFFIC SIGNAL UPGRADES, PAVEMENT UPGRADES, AND TRAFFIC CHANNELIZATION. LOS ANGELES LOCAL LA0G685 0 ROSECRANS AVENUE/405 FREEWAY RAMP WIDENING PROJECT, HAWTHORNE, CA. ON ROSECRANS AVENUE FROM INGLEWOOD AVENUE $4,126 HIGHWAY TO 250' WEST OF I-405 SOUTH BOUND OFF RAMP, WIDEN ROSECRANS AVENUE AND BASE OF RAMP TO ALLOW FOR RIGHT TURN ONLY LANE ON WEST BOUND ROSECRANS, UPGRADE AND CONSTRUCT RAISED MEDIANS, IMPROVE SHOULDERS, AND UPGRADE PAVEMENT MARKINGS. LOS ANGELES LOCAL LAE2663 0 ROSEMEAD BLVD SAFETY ENHANCEMENT AND BEAUTIFICATION: ACTIVITIES BETWEEN PENTLAND ST/ RAILROAD TRACKS AND $10,950 HIGHWAY ROSEMEAD/ CALLITA RD. NO ADDITIONAL LANES, OR ROAD WIDTH. PROJECT CONNECTED TO LA0G668. HSIP FUNDS FOR THIS PROJECT MAY BE FOUND IN PROJECT SCAG015. LOS ANGELES LOCAL LA0G668 0 ROSEMEAD BLVD SAFETY ENHANCEMENTS & BEAUTIFICATION PROJECT: INSTALLATION OF BICYCLE LANES, SIDEWALK $6,376 HIGHWAY IMPROVEMENTS, LANDSCAPING, WAYFINDING SIGNAGE FROM PENTLAND TO CALLITA (1.7 MI). LOS ANGELES LOCAL LAF1502 0 SAN FERNANDO BIKEWAY. IMPLEMENT A CLASS I BIKEWAY ALONG SAN FERNANDO BLVD, VICTORY PLACE AND BURBANK WESTERN $8,239 HIGHWAY CHANNEL TO COMPLETE THE BURBANK LEG OF A 12 MILE BIKEWAY. LOS ANGELES LOCAL LAF1640 0 SAN FERNANDO DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT. DESIGN AND CONSTRUCTION OF THE DOWNTOWN PORTION OF THE $3,782 HIGHWAY SAN FERNANDO CORRIDORS PLAN. THE PROJECT WILL INCREASE PEDESTRIAN ACTIVITY, PROMOTE PUBLIC TRANSIT AND ENHANCE SAFETY. LOS ANGELES LOCAL LA0G704 0 SAN FERNANDO HIGH SCHOOL STREET IMPROVEMENTS NEAR LAUREL CANYON AT FOX, NO LANE ADDITION. $250 HIGHWAY LOS ANGELES LOCAL LA0C8064 0 SAN FERNANDO MISSION BLVD WIDENING, WHERE NECESSARY, BET SEPULVEDA BLVD & I-5 FWY. FROM 1 LANE TO 2 LANES IN EACH $2,469 HIGHWAY DIRECTION.PPNO 3106. LOS ANGELES LOCAL LAF1505 0 SAN FERNANDO PACOIMA WASH BIKE PATH. THE SAN FERNANDO PACOIMA WASH BIKE PATH WILL BE A 1.6-MILE LONG CLASS I $2,495 HIGHWAY FACILITY ALONG THE PACOIMA WASH IN SAN FERNANDO. IT INCLUDES 3 BRIDGES, 5 OVERPASSES AND 8 ACCESS POINTS. LOS ANGELES LOCAL LAE1093 0 SAN FERNANDO RD NORTH – FROM ASTORIA ST TO SAYRE ST. WIDEN ROADWAY AND CONSTRUCT CONCRETE SIDEWALK, CURB, $1,060 HIGHWAY GUTTER, ACCESS RAMPS, AND BULKHEAD. LOS ANGELES LOCAL LA0B7330 0 SAN FERNANDO RD ROW BIKE PATH PHSE II-CONSTRUCT 2.75 MILES CLAS I FRM FIRST ST TO BRANFORD ST,ON MTA-OWND ROW $10,198 HIGHWAY PARLEL TO SAN FERNANDO RD. LINK CYCLSTS TO NUMROUS BUS LNE. PPNO 2868. LOS ANGELES LOCAL LA0G400 0 SAN FERNANDO RD. /GRANDVIEW AVE. AT GRADE CROSSING INTERSECTION IMPROVEMENTS. $3,500 HIGHWAY LOS ANGELES LOCAL LAF1524 0 SAN FERNANDO RD. BIKE PATH PH. IIIA/IIIB – CONSTRUCTION. RECOMMEND PHASE IIIA-CONSTRUCTION OF A CLASS I BIKE PATH $10,463 HIGHWAY WITHIN METRO OWNED RAIL RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN BRANFORD ST. AND TUXFORD ST INCL BRIDGE. LOS ANGELES LOCAL LAF3515 0 SAN FERNANDO RD. BIKE PATH PH. IIIB CONSTRUCTION. CONSTRUCT 2.75 MILE CLASS I BIKE PATH WITHIN METRO RIGHT-OF-WAY $10,714 HIGHWAY ALONG SAN FERNANDO RD. BETWEEN TUXFORD ST. AND COHASSET ST. TO COMPLETE 12-MILE BIKEWAY.. THE PROJECT IS LOCATED WITHIN THE CITY OF LOS ANGELES, IN THE COMMUNITY OF SUN VALLEY. THE PROJECT CONSISTS OF A CLASS I FACILITY 12 FEET IN WIDTH AND 2.75 MILES IN LENGTH BETWEEN TUXFORD ST. AND COHASSET ST. (BURBANK CITY LIMIT). LOS ANGELES LOCAL LAF1130 0 SAN FERNANDO RD-FLETCHER DR TO SR-2, ELM ST TO I-5 FWY. WIDEN SAN FERNANDO RD AT FLETCHER DR & SR-2 SB ON-RAMP TO $9,211 HIGHWAY ADD RIGHT-TURN LANES. WIDEN SAN FERNANDO RD AT ELM ST TO I-5 TO ADD NB THRU LANE, LEFT-TURN LANE, PED AND TRANSIT FEATURES Project List 53

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3621 0 SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT. THE SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN $4,390 HIGHWAY IMPROVEMENT PROJECT INCLUDES THE DESIGN AND CONSTRUCTION OF IMPROVEMENTS TO PROMOTE WALKING, PUBLIC TRANSIT USE AND SAFETY.. THIS PROJECT IS LOCATED ON SAN FERNANDO ROAD BETWEEN SAN FERNANDO MISSION BOULEVARD AND WEST CITY LIMIT AT HUBBARD STREET. LOS ANGELES LOCAL LA0D129 0 SAN GABRIEL BLVD REHAB – FROM BROADWAY TO LAS TUNAS: PVEMNT RECONSTRCT & OVERLAY, CONCRT REPRS., DRAINAGE IMPS. $2,000 HIGHWAY LOS ANGELES LOCAL LA9910012 0 SAN GABRIEL BLVD REHAB – FROM MISSION TO BROADWAY: PVMT RECONSTRCT & OVERLAY, CONCRT REPRS, DRAINAGE $2,000 HIGHWAY IMPROVEMENTS. SAFETEA-LU HPP #471 (REVISED BY PUBLIC LAW 110-244 TO INCLUDE FUNDING FROM HPP #1579, #2690, & 2811). LOS ANGELES LOCAL LAF1528 0 SAN GABRIEL RIVER BIKE PATH GAP CLOSURE AT WILLOW STREET. CREATION OF OFF-STREET BICYCLE PATH TO ACHIEVE BICYCLE $970 HIGHWAY ROUTE GAP CLOSURE ON WILLOW STREET FROM THE SAN GABRIEL RIVER BIKE PATH WEST TO STUDEBAKER ROAD LOS ANGELES LOCAL LAF3308 0 SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT. DESIGN AND CONSTRUCTION OF MULTIJURISDICTIONAL TRAFFIC $25,000 HIGHWAY SIGNAL SYNCH, INTERSECTION OPERATIONAL IMPROVEMENTS, AND INTELLIGENT TRANSPORTATION SYSTEM COMPONENTS ON REGIONAL ARTERIALS. LOS ANGELES LOCAL LAE0340 0 SANTA ANITA AVE CORRIDOR IMPROVEMENTS PRJ. INSTALL NEW RIGHT AND LEFT TURN POCKETS, NEW TRAFFIC SIGNALS, $3,000 HIGHWAY INTERSECTION WIDEN AND NEW STRIPING AT FOOTHILL BLVD, LIVE OAK AVE, DUARTE LOS ANGELES LOCAL LA0B7335 0 SANTA CLARA RIV. REGIONAL COMMUTER TRAIL-DESIGNING FINAL SEGMENT (5) OF THE TOTAL 7 MILES OF CLASS I BIKE/PED PATH $700 HIGHWAY ALONG THE NORTH SIDE OF THE RIVER FROM THE KEYSTONE DEVELOPMENT LOS ANGELES LOCAL LA9708004 0 SANTA CLARITA PARKWAY FROM BOUQUET CYN RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE) $17,550 HIGHWAY LOS ANGELES LOCAL LA9910016 0 SANTA CLARITA PKWY FROM SOLEDAD CYN RD TO VIA PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES. $4,000 HIGHWAY LOS ANGELES LOCAL LA9910017 0 SANTA CLARITA PKWY FROM VIA PRINCESSA TO STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES. $3,100 HIGHWAY LOS ANGELES LOCAL LAE0509 0 SCENIC PRESERVATION AND RUN-OFF MITIGATION IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA NEAR PCH AND $1,440 HIGHWAY US101 LOS ANGELES LOCAL LAF1532 0 SCHOOL BASED BICYCLE TRAINING, SANTA MONICA. PROVIDE TRAINING FOR STUDENTS AT 2 MIDDLE SCHOOLS ON HOW TO SAFELY $130 HIGHWAY RIDE BICYCLE ON CITY STREETS TO ACCESS SCHOOL. LOS ANGELES LOCAL LA0D173 0 SEPULVEDA BLVD, ALAMEDA ST. TO EAST CITY LIMIT. STREET WIDENING, MEDIAN ISLANDS, REHAB. 4-LANE BRIDGE, & WIDEN TO 6 $1,375 HIGHWAY LANES, UPGRADE BRIDGE RAILINGS.(53C0652) LOS ANGELES LOCAL LAE3069 0 SEPULVEDA BOULEVARD WIDENING PROJECT TO ADD A THIRD SOUTHBOUND LANE ON SEPULVEDA BOULEVARD WITHIN THE EXISTING $8,132 HIGHWAY RIGHT OF WAY BETWEEN JEFFERSON BL/PLAYA STREET TO GREEN VALLEY CIRCLE.SEPULVEDA BL FROM SAWTELL AVE TO JEFFERSON/ PLAYA ST WILL BE RE-STRIPED. LOS ANGELES LOCAL LA0C8054 0 SKIRBALL CENTER DR WIDENING – I-405 FWY TO MULHOLLAND DR, WIDEN AND RESTRIPE SKIRBALL CENTER DR TO PROVIDE AN $2,200 HIGHWAY ADDITIONAL S/B LANE. (PPNO 3132). LOS ANGELES LOCAL LAF1662 0 SOLANO CANYON-ZANJA MADRE-CHINATOWN-BROADWAY BUS STOP IMPROV. IMPROVE 8 BUS STOPS ALONG BROADWAY-BERNARD ST $1,115 HIGHWAY TO SOLANO AV WITH STREET FURNITURE & LANDSCAPING, INCREASING ACCESSIBILITY, TRANSFERS & TRANSIT USE LOS ANGELES LOCAL LA0G401 0 SONORA AVE. AT GRADE CROSSING SAFETY IMPROVEMENTS, SONORA AND AIR WAY – AT GRADE CROSSING NON CAPACITY NO LANE $3,700 HIGHWAY ADDITION. 54 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA0C8037 0 SOTO ST BRIDGE OVER MISSION RD & HUNTINGTON DR WILL DEMOLISH EXISTING BRIDGE AND REALIGN THE STREET TO INCREASE $23,602 HIGHWAY TRAFFIC FLOW ADDING A BIKE LANE. PPNO 3093 3380 (BRIDGE #53C0013) LOS ANGELES LOCAL LAF3507 0 SOUTH BALDWIN PARK COMMUTER BIKEWAY PROJECT. CONSTRUCT 3-MILE COMMUTER CLASS I BIKE PATH ALONG SAN GABRIEL RIVER $820 HIGHWAY AND WALNUT CREEK CONNECTING TO MAJOR EMPLOYMENT CENTERS ON BALDWIN PARK BLVD. LOS ANGELES LOCAL LAF3310 0 SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT. DESIGN AND CONSTRUCTION OF MULTIJURISDICTIONAL TRAFFIC SIGNAL $13,000 HIGHWAY SYNCHRONIZATION, OPERATIONAL IMPROVEMENTS & ITS COMPONENTS ON ARTERIALS IN THE SOUTH BAY AREA OF LA COUNTY. LOS ANGELES LOCAL LAF1607 0 SOUTH STREET PEDESTRIAN, BIKEWAY AND TRANSIT IMPROVEMENT. IMPROVE PEDESTRIAN ENVIRONMENT AND TRANSIT STOP $1,457 HIGHWAY LOCATIONS WITH LANDSCAPED MEDIANS, TRANSIT SHELTERS, BENCHES, SIDEWALK ENHANCEMENTS AND LIGHTING. CLOSE EXISTING BIKE LANE GAP. LOS ANGELES LOCAL LAE0284 0 SOUTHWEST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF $2,300 HIGHWAY VARIOUS STREETS. PROJECT WILL NOT ENHANCE TRAFFIC CAPACITY. LOS ANGELES LOCAL LA0G313 0 SPRING STREET AND LAKEWOOD BLVD. TUNNEL IMPROVEMENTS; MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS. ON SPRING ST. $1,723 HIGHWAY BETWEEN LAKEWOOD BLVD. & KILROY AIRPORT WAY. ON LAKEWOOD BLVD. BETWEEN SPRING ST. AND 405 FREEWAY. ISTEA #51 ACCESS LOS ANGELES LOCAL LA0D47 0 SR 710 MITIGATION PROJECT-TRAFFIC CONTROL AND MONITORING SYSTEM-INTELLIGENT TRANSPORTATION SYSTEMS (ITS). $9,575 HIGHWAY CONSTRUCT AND INSTALL ITS TECHNOLOGY AND VARIOUS DEGREES OF SMART SIGNALS LOS ANGELES LOCAL LA0G409 0 SR-134/I-5 TSM PROJECT INCL. RAMP METERS,CCTV,CMS $350 HIGHWAY LOS ANGELES LOCAL LA0G408 0 SR-2 / VERDUGO BLVD. INTERCHANGE SIGNALIZATION. $350 HIGHWAY LOS ANGELES LOCAL LA0G397 0 SR-2 SB CONNECTOR TO WB SR-134 METERING. SR-2 NB TO WB SR-134 METERING. SR-2 NB CONNECTOR TO WB SR-134 METERING. $3,500 HIGHWAY SR-2 NB TO WB SR-134 METERING. LOS ANGELES LOCAL LA0G404 0 SR-2/HOLLY DR. INTERCHANGE RAMP SIGNALIZATION $600 HIGHWAY LOS ANGELES LOCAL LA0D260 0 STATE ROUTE 90 CONNECTOR ROAD TO ADMIRALTY WAY. THIS PROJECT WILL IMPROVE THE SR-90/SR-1 INTERSECTION INCLUDING THE $6,000 HIGHWAY ADDITION OF A LANE IN EACH DIRECTION AND CONSTRUCTION OF A DIRECT ROAD BETWEEN ADMIRALTY WAY AND SR-90 LOS ANGELES LOCAL LA0G349 0 STREET AND DRAINAGE RECONSTRUCTION AT SHEILA STREET AND COMMERCE WAY. $600 HIGHWAY LOS ANGELES LOCAL LAE2279 0 STREETSCAPE IMPROVMENTS ALONG CENTRAL AVE FROM WASHINGTON BLVD TO VERNON AVE INCLUDING PED LIGHTING, NEW BUS $4,000 HIGHWAY STOPS AND STREET FURNITURE, SIDEWALK WIDENING, CROSSWALK ENHANCEMENTS, TREES ETC. LOS ANGELES LOCAL LAE1883 0 STUDY – ORANGELINE CORRIDOR DEVELOPMENT PROJ – HIGH SPEED MAGLEV & STATION AREA DEVLOPMENT FROM NORTH LA TO $336 HIGHWAY SOUTH OC FOLLOWING SR14 AND FORMER PACIFIC RAILRD CORRIDOR LOS ANGELES LOCAL LAE1633 0 STUDY REPORT FOR THE INTER. OF OLD RIVER SCHOOL RD, FIRESTONE BLVD & UNION PACIFIC RAILROAD. REVIEW/ANALYZE $500 HIGHWAY OPERATIONS & SAFETY ASPECTS, DESIGN OPTIONS ETC. (E/P & PS/E ONLY) LOS ANGELES LOCAL LAE0881 0 STUDY, ENVIRONMENTAL REVIEW, PERMITS AND PRELIMINARY ENGINEERING FOR A PEDESTRIAN BRIDGE OVER ATLANTIC BLVD IN THE $600 HIGHWAY CITY OF MONTEREY PARK (E/P,PS/E ONLY) LOS ANGELES LOCAL LAF1663 0 SUNSET JUNCTION TRANSIT PLAZA. CONVERT AN UNUSED ROADWAY SECTION INTO A TRANSIT PLAZA WITH NEW CONCRETE $1,671 HIGHWAY PLATFORM, STREET FURNITURE, PED LIGHTS, & LANDSCAPING, INCREASING ACCESSIBILITY, TRANSFERS & TRANSIT USE. Project List 55

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA0D420 0 SUNSET OVERLOOK TRAILHEAD AREA IN HAHAMONGNA WATERSHED PARK NEAR THE DEVIL'S GATE DAM (GRANT FROM RECREATIONAL $264 HIGHWAY TRAILS PROGRAM) LOS ANGELES LOCAL LA0G006 0 SYCAMORE, CANYON PARK TRAIL PHASE IV – RECOMMENDED FOR FUNDING UNDER THE NON-MOTORIZED ELEMENT OF THE $347 HIGHWAY RECREATIONAL TRAILS PROGRAM (GRANT AWARD: $304,920). DECOMPOSED GRANITE 2/3 MI LOS ANGELES LOCAL LAF1316 0 SYNCHRONIZATION OF TRAFFIC SIGNALS ON REGIONAL ARTERIALS IN THE SANTA CLARITA AREA OF LOS ANGELES COUNTY AND $3,355 HIGHWAY INSTALLATION OF FIBER OPTIC INTERCONNECT GAP CLOSURE. LOS ANGELES LOCAL LA0C8031 0 TAMPA AVE BRDGE WIDENING. WIDEN RIVER CROSSING FROM 4 LNS TO 6 LNS ON TAMPA AVE BRDGE, CONSTRUCT BIKE UNDERPASS $10,800 HIGHWAY PPNO 3090 3376 REP (BRIDGE # 53C1335) LOS ANGELES LOCAL LA0G182 0 THE CENTRAL CITY EAST PROJECT WILL PROVIDE A FULLY TRAFFIC RESPONSIVE SIGNAL CONTROL SYSTEM TO APPROXIMATELY 150 $4,885 HIGHWAY INTERSECTIONS CURRENTLY OPERATIONAL WITH ATSAC CAPABILITY. LOS ANGELES LOCAL LA0G007 0 THE MOUNTAIN AVE./DUARTE ROAD REALIGNMENT/RECONSTRUCTION. INLCUDING RE-ALIGNMENT AND RECONSTRUCTION OF A $568 HIGHWAY PORTION OF MOUNTAIN AVE AND DUARTE ROAD STREET PAVEMENT, RELOCATION OF STORM DRAIN STRUCTURES, REMOVAL AND REPLACEMENT OF CURB/GUTTER/SIDEWALK. LOS ANGELES LOCAL LAF3136 0 THE OLD ROAD FROM MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE. WIDEN THE OLD ROAD FROM NORTH OF MAGIC MOUNTAIN $47,453 HIGHWAY PKWY TO TURNBERRY LN & HENRY MAYO DR TO 1200 FEET WEST OF THE OLD ROAD. THE PROPOSED PROJECT IS LOCATED ON THE OLD ROAD FROM APPROXIMATELY 700 FEET NORTH OF MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE, HENRY MAYO DRIVE FROM THE OLD ROAD TO THE STATE ROUTE 126 HOOK RAMPS, AND RYE CANYON ROAD BETWEEN THE OLD ROAD AND AVENUE STANFORD. LOS ANGELES LOCAL LAE3790 0 THE PASADENA ITS INTEGRATES 2 COMPONENTS; TRAFFIC SIGNAL COMMUNICATION AND CONTRL, AND PUBLIC PARKING AVAILABILITY $3,545 HIGHWAY INFO. SAFETEA-LU PRJ #3790 LOS ANGELES LOCAL LA0G171 0 THE PROPOSED PROJECT INCLUDES THREE NEW TRACKS ALONG THE WEST SIDE OF PIER T. THIS PROJECT WILL ALSO INVOLVE $32,960 HIGHWAY RELOCATING THE EXISTING UTILITIES. LOS ANGELES LOCAL LA0G169 0 THIS PROJECT PROVIDES STORAGE TRACKS ON THE PIER F ROAD CUL-DE-SAC,WHICH ARE USEFUL FOR SUPPORT FUNCTIONS SUCH AS $24,140 HIGHWAY SET OUT OF BAD ORDER RAIL CARS AND POSSIBLY ENGINE TIE-UP. LOS ANGELES LOCAL LA0G170 0 THIS PROJECT WILL CREATE IMPROVED LEAD TRACKS TO THE METROPOLITAN STEVEDORING CO. (METRO) RAIL YARD AND TO PIER F $65,840 HIGHWAY ON-DOCK RAIL YARD. LOS ANGELES LOCAL LA0G371 0 THIS PROJECT WILL MODIFY EXISTING RAISED MEDIANS AT INTERSECTIONS ALONG VALLEY VIEW ST., CARMENITA RD. ALONDRA BLVD. $710,000 HIGHWAY AND ROSECRANS AVE. TO ACCOMMODATE LONGER LEFT TURN POCKETS NECESSARY TO HANDLE ADDITIONAL TRAFFIC DUE TO THE I-5/ CARMENITA AND THE I-5 ALONDRA PROJECTS CONSTRUCTION. LOS ANGELES LOCAL LA0G172 0 THIS PROJECT WILL PROVIDE FOR DOUBLE TRACKING THE SOUTH LEG OF THE WYE TO ACCOMMODATE SIMULTANEOUS TRAIN $12,850 HIGHWAY SWITCHING MOVES FROM THESE VARIOUS ACTIVITIES ON TERMINAL ISLAND. LOS ANGELES LOCAL LA0G168 0 THIS PROJECT WILL PROVIDE FOR SIDEWALK AND LANDSCAPING IMPROVEMENTS IN THE WESTCHESTER AREA OF THE CITY OF LOS $980 HIGHWAY ANGELES ON THE WEST SIDE OF SEPULVEDA BL BETWEEN 80TH ST. AND 84TH PL. LOS ANGELES LOCAL LA0D145B 0 TIERRA SUBIDA WIDENING FROM AVENUE S TO AVENUE RAYBURN RD. – FROM 2 TO 4 LANES; WITH TRAFFIC SIGNALS, STREETLIGHTS, $6,900 HIGHWAY RAISED MEDIANS, DRAINAGE IMPROVEMENTS AND PEDESTRIAN IMPROVEMENTS. SPLIT FROM LA0D145. LOS ANGELES LOCAL LA996297 0 TMOC & RETROFIT OF CITY TRAFFIC SIGNAL SYSTEM (TEA21-#940) $6,478 HIGHWAY LOS ANGELES LOCAL LA0G202 0 TRAFFIC LIGHT SYNCHRONIZATION ALONG THREE MAJOR ARTERIIALS , GLENDALE AVE, BRAND BLVD.,SAN FERNANDO RD., AND $5,000 HIGHWAY COLORADO ST. 56 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3318 0 TRAFFIC MONITORING AND SURVEILLANCE SYSTEM GAP CLOSURE. DESIGN AND IMPLEMENTATION OF 14 CCTV CAMERA TRAFFIC $3,048 HIGHWAY MONITORING AND SURVEILLANCE SYSTEM, HUB SWITCHING EQUIPMENT AND APPROX. 4 MI OF FIBER OPTIC COMMUNICATION CABLES, AND EOC VIDEO. LOS ANGELES LOCAL LA0G351 0 TRAFFIC SIGNAL MODIFICATIONS ON ARTERIAL STREETS CITYWIDE $600 HIGHWAY LOS ANGELES LOCAL LAE1955 0 TRAFFIC SIGNAL UPGRADES ALONG THE US-101 FREEWAY RAMPS BETWEEN WINNETKA AVE AND VAN NUYS BLVD. $400 HIGHWAY LOS ANGELES LOCAL LAE1601 0 TRANSPORTATION ENHANCEMENT TO CHILDREN'S MUSEUM OF LOS ANGELES. $1,200 HIGHWAY LOS ANGELES LOCAL LA996343 0 U.S. 101 FWY/KANAN RD. INTERCHANGE IMPROVEMENTS – ADD 1 LANE TO NB OFF RAMP (1 TO 2). SAFETEA-LU # 3099 $24,460 HIGHWAY LOS ANGELES LOCAL LAE1274 0 UPGRADE INTERSECTION ON BELLFLOWER @ ALONDRA AND ROSECRANS TO INSTALL LEFT-TURN PHASING (NORTH AND SOUTH $280 HIGHWAY BOUND). LOS ANGELES LOCAL LAE3018 0 VALLEY BLVD IMPROVEMENTS BETWEEN 710 AND MARGUERITA. INVOLVES TRAFFIC FLOW IMPROVEMENTS INCLUDING RAISED $3,724 HIGHWAY MEDIANS AND TURN LANES. LOS ANGELES LOCAL LA996427 0 VALLEY BLVD. GRADE SEPARATION $54,285 HIGHWAY LOS ANGELES LOCAL LA0G350 0 VALLEY BLVD: ADD 1 THROUGH EB LANE, INSTALLATION OF STREET LIGHTING, CURB & GUTTER, 7 BUS TURNOUTS AND MODIFICATIONS $3,300 HIGHWAY TO 2 TRAFFIC SIGNALS. NO ROW IMPACTS. LOS ANGELES LOCAL LAE2750B 0 VALLEY VIEW AVE AND ALONDRA BLVD INTERSECTION IMPROVEMENTS IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS $2,235 HIGHWAY LOS ANGELES LOCAL LA0C8092 0 VALLEY VIEW AVE GRADE SPARATN AT BNSF RAILWAY SOUTH OF STAGE RD. CONSTRUCT A GRADE SPARATN FOR VALLEY VIEW AVE $75,177 HIGHWAY FROM EXSTNG BNSF TRACKS BY CONSTRCTNG A HWY UNDERPASS PPNO 3117 (3022). PROJECT USING $175 IN TOLL CREDITS TO MATCH TEA21 AND SAFETEA-LU FUNDS IN THE CON PHASE IN FY 11/12. LOS ANGELES LOCAL LA0G361 0 VALLEY VIEW STREET REHABILITATION FROM ROSECRANS AVENUE TO STAGE ROAD AT THE NORTH LIMIT OF VALLEY VIEW GRADE $145 HIGHWAY SEPARATION LOS ANGELES LOCAL LA0G360 0 VALLEY VIEW STREET REHABILITATION FROM SOUTH LIMIT OF VALLEY VIEW GRADE SEPARATION AT STAGE ROAD TO FIRESTONE $660 HIGHWAY BOULEVARD (SOUTH), IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS. LOS ANGELES LOCAL LA0C8042 0 VANOWEN ST BRDGE WIDENING & REHAB. PRJCT WILL WIDEN EXISTING BRIDGE TO MATCH THE STREET IT WILL ALLOW INC TRAFFIC $14,917 HIGHWAY FLOW AND SAFETY. CONSTRUCT BIKE PATH UNDER. PPNO 3095 3378 AB 3090 LOS ANGELES LOCAL LAE0726 0 VANOWEN/EMPIRE/CLYBOURN RAILROAD CROSSING GRADE SEPARATION STUDY PROJECT $1,000 HIGHWAY LOS ANGELES LOCAL LA0G712 0 VERMONT AVE. ARTERIAL IMPROVEMENTS FROM ROSECRANS AVE. TO 182ND STREET. INCLUDES ADDITION OF TURN POCKETS WHERE $2,350 HIGHWAY GEOMETRICALLY POSSIBLE, CHANNELIZATION, TRAFFIC SIGNAL IMPROVEMENTS, PAVEMENT UPGRADES AND SOME CONCRETE WORK. LOS ANGELES LOCAL LA9910013 0 VIA PRINCESSA EXTENSION FROM GOLDEN VALLEY ROAD TO APPROXIMATELY 350M WEST OF RAINBOW GLEN DRIVE, EAST OF $46,935 HIGHWAY ISABELLA PKWY LOS ANGELES LOCAL LA0D476 0 VIA PRINCESSA EXTENSION FROM MAGIC MOUNTAIN PKWY TO GOLDEN VALLEY RD: CONSTRUCT APPROXMTLY A 1-MILE FACILITY (3 $22,602 HIGHWAY LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, & DRAINAGE IMPRVMT Project List 57

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LA9910014 0 VIA PRINCESSA FROM OAKRIDGE DRIVE TO MAGIC MTN PRKWAY. FROM 0 – 6 LANES; LESS THAN ONE MILE. $11,650 HIGHWAY LOS ANGELES LOCAL LAF1141 0 VICTORY BL WIDENING FROM TOPANGA CYN BL TO DE SOTO AV. WIDEN THE SOUTH SIDE OF VICTORY BL FROM TOPANGA CYN BL TO DE $11,655 HIGHWAY SOTO AV TO PROVIDE AN ADDITIONAL EB TRAVEL LANE LOS ANGELES LOCAL LAE3308 0 WALNUT GROVE AT BROADWAY INTERSECTION IMPROVEMENT. REHAB INTERSECTION; ACQUIRE CORNER CUT OFF TO INCREASE CURB $1,675 HIGHWAY RETURN RADII TO ADD LEFT TURN LANE IMPROVE PED SAFETY LOS ANGELES LOCAL LAF1736 0 WAYFINDING PROGRAM. DEVELOP A SIGNAGE PROGRAM AS PART OF THE MIXED-USE AND PEDESTRIAN LINKAGES PLAN TO IMPROVE $165 HIGHWAY PEDESTRIAN ACCESS IN DOWNTOWN LOS ANGELES LOCAL LAE3284 0 WEST ADAMS BLVD STREETSCAPE-INSTALL STREETSCAPE AND COMMUNITY GATEWAY IMPROVEMENTS ALONG WEST ADAMS BLVD. $250 HIGHWAY LOS ANGELES LOCAL LAF3632 0 WESTERN AV BUS STOP & PEDESTRIAN IMPROVEMENT PROJECT. INSTALL PEDESTRIAN AND TRANSIT AMENITIES TO ENHANCE THE $1,472 HIGHWAY PEDESTRIAN ENVIRONMENT ALONG WESTERN AV BTW EXPOSITION BL & I-10 FREEWAY. LOS ANGELES LOCAL LAF3650 0 WESTERN AVE EXPO LINE STATION LINKAGE PROJECT (SOUTH). TO DESIGN & CONSTRUCT PEDESTRIAN & SAFETY ENHANCEMENTS $858 HIGHWAY INTENDED TO INCREASE THE USAGE OF PUBLIC TRANSPORTATION AND CREATE A LINK TO METRO EXPO LR STATION AT WESTERN & EXPOSITION.. LOS ANGELES LOCAL LAF3631 0 WESTLAKE MACARTHUR PARK PEDESTRIAN IMPROVEMENT PROJECT. INSTALL PEDESTRIAN IMPROVEMENTS INCL PEDESTRIAN $1,674 HIGHWAY LIGHTING, SIDEWALK ENHANCEMENTS, STREET FURNITURE & TREES, ENHANCED CROSSWALKS, & BUS STOP AMENITIES. LOS ANGELES LOCAL LA0G257 0 WHITTIER GREENWAY TRAILHEAD PARK. EXTENSION OF WHITTIER GREENWAY TRAIL FROM MILLS AVENUE TO 300 FEET EAST OF MILLS $650 HIGHWAY AVENUE IN CONJUNCTION WITH CONSTRUCTION OF NEW TRAILHEAD PARK AND 20 SPACE PARKING LOT FOR BICYCLE COMMUNTERS. LOS ANGELES LOCAL LAE3085 0 WIDEN AND RECONSTRUCT WASHINGTON BOULEVARD FROM WESTERN CITY BOUNDARY AT VERNON [350' WEST OF INDIANA STREET] $32,000 HIGHWAY TO I-5 FREEWAY AT TELEGRAPH RD., WIDEN FROM 2 LANES TO 3 LANES IN EACH DIRECTION, INCREASE TURN RADIUS AND MEDIANS, UPGRADE TRAFFIC SIGNALS AND STREET LIGHTING AND IMPROVE SIDEWALKS. LOS ANGELES LOCAL LAE2515 0 WIDEN BUNDY DR. BETWEEN WILSHIRE AND SANTA MONICA BLVD – WIDEN FROM 2 LANES TO 4 LANES. $4,250 HIGHWAY LOS ANGELES LOCAL LAE2517 0 WIDEN MAINE AVE. IN BALDWIN PARK ADD 1 THRU LN & 1 RIGHT TURN AND 1 LEFT TURN ONLY LANE (SAFETEA-LU DEMO ID #2517. $360 HIGHWAY PROJECT USING $60 OF TOLL CREDIT IN FY12 FOR ENG PHASE TO MATCH DEMO FUNDS. LOS ANGELES LOCAL LA0G166 0 WIDENING OF 30TH ST WEST FROM AVENUE M TO AVENUE L (APPROX. 1 MILE) FROM 2 VEHICULAR TRAVEL LANES TO 4 LANES. 8 FOOT $1,140 HIGHWAY CLASS II BIKE LANES WILL BE STRIPPED ON BOTH SIDES OF THE STREET. LOS ANGELES LOCAL LAF1129 0 WIDENING SAN FERNANDO RD AT BALBOA RD. INSTALL A RIGHT-TURN LANE ON WEST SIDE OF SAN FERNANDO RD AT BALBOA RD TO $1,632 HIGHWAY PROVIDE ADD'L CAPACITY; WILL REQUIRE ROW ACQUISITION, RETAINING WALLS AND RE-STRIPING LOS ANGELES LOCAL LA996419 0 WIDN NATIONAL BLVD. & ALLO FOR A 2ND W/B LEFT-TRN LNE & ADDTNL E/B RGHT-TURN ONLY LNE FOR THE I-405 S/B ON RAMP. 2ND $603 HIGHWAY LFT-TRN LNE ON NATIONAL AT SEPULVEDA AND A 2ND (SEE COMMENTS) LOS ANGELES LOCAL LAF1725 0 WIFI ON THE GOLD LINE. WIFI INTERNET INSTALLED ON GOLD LINE TRAINS, POLES & STATIONS, EASTSIDE EXTENSION, CHINATOWN & $1,213 HIGHWAY LITTLE TOKYO/ARTS DISTRICTS. LOS ANGELES LOCAL LA0F041 0 WILL ADD STREETLIGNTS ON LEMON GROVE RECREATION CENTER ON THE EAST HOLLYWOOD COMMUNITY, MAKING PROPERTY $293 HIGHWAY OWNERS, COMMUNITY MEMBERS, PEDESTRIANS AND MOTORISTS FEEL SAFER LOS ANGELES LOCAL LAF1649 0 WILLOW STREET PEDESTRIAN IMPROVEMENT PROJECT. THIS PROJECT PROVIDES PEDESTRIAN-ORIENTED IMPROVEMENTS TO WILLOW $3,097 HIGHWAY ST INCLUDING MEDIANS, PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE AND CROSSWALK TREATMENTS. 58 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) LOS ANGELES LOCAL LAF3716 0 WILLOWBROOK AREA ACCESS IMPROVEMENTS TO MLK MACC. IMPLEMENT WAYFINDING SYSTEM INCLUDING TRANSIT INFORMATION AS $4,000 HIGHWAY PART OF A LARGER PROJECT, INCLUDING PEDESTRIAN IMPROVEMENTS, BIKEWAY & STREETSCAPING.. THE PROJECT IS LOCATED IN THE COUNTY OF LOS ANGELES, IN THE UNINCORPORATED COMMUNITY OF WILLOWBROOK NEAR THE IMPERIAL/WILMINGTON ROSA PARKS METRO RAIL STATION AND THE MARTIN LUTHER KING JR. MULTI-SERVICE AMBULATORY CARE CENTER (MACC). LOS ANGELES LOCAL LAF3521 0 WILLOWBROOK AREA BIKEWAY IMPROVEMENTS. INSTALL A BIKE PATH AND TWO BIKE ROUTES IN THE WILLOWBROOK AREA TO IMPROVE $600 HIGHWAY MOBILITY. LOS ANGELES LOCAL LA0C8124 0 WILMINGTON ATSAC/ATCS PROJECT; IMPROVEMENTS TO 70 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF COMPUTER $12,467 HIGHWAY BASED REAL TIME TRAFFIC SIGNAL MONITORING AND CONTROL SYSTEM. LOS ANGELES LOCAL LA0C8050 0 WILSHIRE BL CORRDR IMPRVMNTS-SELBY AV TO COMSTOCK AV WIDEN WILSHIRE BL TO RELIEF CONGESTION AT KEY INTERSECT AND $7,479 HIGHWAY PROVIDE PEAK HOUR BUS LANES & INSTALL RAISED LANDSCAPE MEDIAN. PPNO 3101. LOS ANGELES LOCAL LA0C8084 0 WINNETKA AVE BRDGE WIDEN & REHAB. – WIDEN THE RIVER CROSSING FROM 4 TO 6 LANES, CONSTRUCT BIKE UNDERPASS. PPNO 3108 $10,519 HIGHWAY 3377 AB 3090 REP (53C1388) LOS ANGELES LOCAL LAF3304 0 WOODRUFF AV FIBER-OPTIC TRAFFIC SIGNAL COMMUNICATIONS PROJ. INSTALL FIBER-OPTIC COMMUNICATION & VIDEO DETECTION $923 HIGHWAY SYSTEM ON WOODRUFF AV & INTERCONNECT IT TO EXISTING FIBER BACKBONE TO DEVELOP AN ETHERNET-BASED COMMUNICATION NETWORK. LOS ANGELES LOCAL LAF3709 0 ZERO EMISSION VEHICLE CHARGING STATIONS. INSTALL 43 ELECTRIC VEHICLE CHARGING STATIONS FOR USE BY ELECTRIC VEHICLES $717 HIGHWAY USING AVAILABLE TECHNOLOGY.. THE CHARGERS WILL BE INSTALLED AT EXISTING AND NEW LOCATIONS TO CREATE A CITY-WIDE CHARGING NETWORK. THE NETWORK WILL REDUCE VEHICLE MILES TRAVELLED BY PROVIDING CHARGING AT LIGHT RAIL STATIONS AND EMPLOYMENT DESTINATION POINTS. ORANGE TRANSIT ORA110632 0 1% TRANSIT ENHANCEMENTS – BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (MISSION VIEJO) PROJECTS ARE CONSISTENT $890 WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED) ORANGE TRANSIT ORA110634 0 1% TRANSIT ENHANCEMENTS – BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (OCTA) PROJECTS ARE CONSISTENT WITH 40 $4,227 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED) ORANGE TRANSIT ORA080917 0 1% TRANSIT SECURITY PROJECTS (MISSION VIEJO). TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $21 & FY10/11 FOR $21, FY11/12 $736 $19,650 ORANGE TRANSIT ORA080907 0 1% TRANSIT SECURITY PROJECTS (OCTA). TRANSIT DEVELOPMENT CREDITS IN FY10/11 $96,747, IN FY11/12 $94,245 $3,491 ORANGE TRANSIT ORA080909 0 A PROJECT STUDY FOR THE CITY OF SANTA ANA – FIXED GUIDEWAY SYSTEM LINKING THE SANTA ANA REGIONAL TRANSPORTATION $5,541 INTERMODAL CENTER TO HARBOR BLVD IN THE CITY OF GARDEN GROVE. PE AND ENV ORANGE TRANSIT ORA080908 0 A TRANSIT CORRIDOR FOR THE CITY OF ANAHEIM – ANAHEIM RAPID CONNECTION (ARC) FIXED GUIDEWAY SYSTEM LINKING THE $18,536 ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER (ARTIC) TO THE PLATINUM TRIANGLE TO THE ANAHEIM RESORT. ALTERNATIVES ANALYSIS, EIR/EIS, LPA AND CONCEPTUAL AND ADVANCED ENGINEERING, PROJECT DEVELOPMENT ACTIVITIES AND PRELIMINARY ENGINEERING. ORANGE TRANSIT ORA111220 0 ABRAZAR – 2 SMALL BUSES, 3 MEDIUM BUSES, 4 MINIVANS FOR REPLACEMENT, 5 COMPUTERS, 2 SERVERS, 10 RESTRAINTS, 12 $526 RADIOS, 1 BASE STATION. (UTILIZING $60,378 IN TOLL CREDIT FOR FY10/11) ORANGE TRANSIT ORA080904 0 ABRAZAR – THREE (R) SMALL BUSES TYPE1A ,THREE SE SMALL BUSES TYPE1A, EIGHT MRS $299 ORANGE TRANSIT ORA111231 0 AGE WELL – 12 RADIOS, 1 BASE STATION, 3 COMPUTERS. (UTILIZING $2,283 IN TOLL CREDIT FOR FY10/11) $20 Project List 59

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE TRANSIT ORA111225 0 AGE WELL, INC – 12 MINIVANS FOR EXPANSION SERVICE (UTILIZING $60,562 IN TOLL CREDIT FOR FY10/11) $528 ORANGE TRANSIT ORA085004 0 ANAHEIM CANYON STATION PROJECT WILL ADD DOUBLE TRACK AND ANOTHER PLATFORM AS WELL AS EXTEND THE EXISTING $22,050 PLATFORM TO BE IN CONFORMANCE WITH THE METROLINK STANDARDS FOR PASSENGER PLATFORM LENGTH. (MAY USE TOLL CREDIT IF CMAQ REQUIRES A MATCH) ORANGE TRANSIT ORA120318 0 ANAHEIM REGIONAL TRANS INTERMODAL CENTER (ARTIC) PHASE I – INCLUDE EXPAND OF EXIST AMTRAK/METROLINK STATION AT ANA $183,864 STAD TO PROVIDE ACCESS W/ TRANS SVC ORANGE TRANSIT ORA021202 0 BUS OPERATING ASSISTANCE FTA9 – FOR PARATRANSIT – MISSION VIEJO – UZA $8,908 ORANGE TRANSIT ORA174 0 BUS OPERATING ASSISTANCE FTA9 – FOR PARATRANSIT (OCTA) $126,990 ORANGE TRANSIT ORA110616 0 (BRT) – PURCHASE (3) 40' EXPANSION VEHICLES FOR SERVICE IN ORANGE COUNTY $1,005 ORANGE TRANSIT ORA080803 0 CAPITAL COST OF CONTRACTING (COSTS ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT) $178,379 ORANGE TRANSIT ORA990920 0 CAPITAL COST OF CONTRACTING (COSTS ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT)(MISSION VIEJO). $27,864 INCLUDES TOLL CREDITS IN FY12/13 $1,294,673, FY13/14 $336,951 & FY14/15 $323,422. ORANGE TRANSIT ORA110614 0 CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT ANAHEIM MAINTENANCE $4,845 BASE ORANGE TRANSIT ORA110615 0 CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT GARDEN GROVE $4,935 MAINTENANCE BASE ORANGE TRANSIT ORA37111 0 CAPITAL MAINTENANCE ON METROLINK SYSTEM. (REHAB OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, $92,697 MAINTENANCE OF WAY RAIL SPURS, AND ROLLING STOCK) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OR RECONSTRUCTION OF TRACK STRUCTURES, TRACK, AND TRACKBED IN EXISTING RIGHTS-OF-WAY.(NON-CAPACITY INCREASING) FY11/12 INCLUDES $768,237 IN TOLL CREDIT. ORANGE TRANSIT ORA111222 0 CITY OF BUENA PARK SENIOR CENTER – 2 LARGE BUSES FOR REPLACEMENT (UTILIZING $16,000 IN TOLL CREDIT FOR FY10/11) $140 ORANGE TRANSIT ORA111226 0 CITY OF HUNTINGTON BEACH SENIORS – 4 MINIVANS FOR REPLACEMENT SERVICE. (UTILIZING $20,187 IN TOLL CREDIT FOR FY10/11) $176 ORANGE TRANSIT ORA111227 0 CITY OF IRVINE TRIPS – 1 LARGE BUS, 2 MINIVANS FOR REPLACEMENT SERVICE. (UTILIZING $21,220 IN TOLL CREDIT FOR FY10/11) $185 ORANGE TRANSIT ORA080901 0 CITY SHUTTLE SYSTEM CAPITAL AND OPERATIONS & MAINTENANCE PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT $7,552 TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES ORANGE TRANSIT ORA020812 0 COMMUTER RAIL CROSSING MONITORS UPGRADE AND OR INSTALL MONITORING EQUIPMENT AT RAIL CROSSINGS IN ORANGE COUNTY $273 TO PROVIDE NOTIFICATION IN THE EVENT OF DAMAGE OR MALFUNCTION ORANGE TRANSIT ORA020815 0 COMMUTER RAIL RIGHT-OF-WAY FENCING REPLACE DESTROYED OR DAMAGED FENCING ALONG THE RAIL CORRIDORS WITHIN ORANGE $818 COUNTY TO DETER UNAUTHORIZED ACCESS ORANGE TRANSIT ORA112006 0 CONTROL POINT 4TH STREET WILL ESTABLISH A NEW CP AT 4TH STREET (MP 175.7) AND PROVIDE A NEW NO. 10 POWER TURNOUT TO $4,000 THE UNION PACIFIC RAILROAD (UPRR) SPUR APPROXIMATELY 0.5 MILES SOUTH OF THE SANTA ANA STATION (MP 175.6), REPLACING THE EXISTING HAND-THROWN TURNOUT, AS WELL AS CONSTRUCTING A NEW POWER DERAIL ON THE UPRR CONNECTING TRACK. PROJECT WILL UTILIZE $1 MILLION IN TOLL CREDIT MATCH ORANGE TRANSIT ORA990930 0 CONTROL POINT STADIUM CROSSOVER (ANAHEIM) LOCATED NEAR THE ANAHEIM STADIUM METROLINK STATION, FROM THE KATELLA $6,649 AVENUE OVERPASS TO THE STATE COLLEGE BOULEVARD GRADE CROSSING. THE PROJECT WILL CONSTRUCT UNIVERSAL POWER CROSSOVERS, POWER TURNOUT AND POWER DERAIL ORANGE TRANSIT ORA080903 0 ENVIRONMENTAL CLEARANCE AND ADVANCED CONCEPTUAL DESIGN OF THE CALIFORNIA HIGH SPEED RAIL AUTHORITY, HIGH SPEED $7,000 RAIL PROJECT FROM SAN FRANCISCO TO LOS ANGELES 60 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE TRANSIT ORA55134 0 FACILITY MODIFICATIONS FOR BUS TRANSIT (ELEVATOR UPGRADES, JOINT SEALANT, FALL PROTECTION, VEHICLE LIFTS AND OTHER $1,084 FACILITY MODIFICATIONS) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ORANGE TRANSIT ORA020120 0 FIXED ROUTE OPERATING COSTS $1,537,414 ORANGE TRANSIT ORA020113 0 FULLERTON TRAIN STATION – PARKING STRUCTURE, PHASE I AND II. TOTAL OF 800 SPACES (PPNO 2026) $33,385 ORANGE TRANSIT ORA081623 0 FULLERTON TRANSPORTATION CENTER – INITIAL PLANNING AND CONCEPTUAL ENGINEERING OF THE EXPANSION FOR THE FULLERTON $875 TRANSPORTATION CENTER. ORANGE TRANSIT ORA111240 0 GOLDEN RAIN FOUNDATION LAGUNA WOODS – 4 LARGER BUSES FOR REPLACEMENT SERVICE. (UTILIZING $48,174 IN TOLL CREDIT FOR $420 FY10/11) ORANGE TRANSIT ORA110304 0 GOLDENWEST TRANSPORTATION CENTER PARKING STRUCTURE EXPANSION. CONSTRUCT A SURFACE PARKING LOT AND A FOUR LEVEL $8,900 PARKING GARAGE STRUCTURE OF APPROXIMATELY 300 SPACES AT THE SURFACE PARKING AREA FOR THE EXISTING TRANSPORTATION CENTER. ORANGE TRANSIT ORA020818 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $2,896 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT ORANGE TRANSIT ORA110618 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $18,708 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT ORANGE TRANSIT ORA110619 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $43,820 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT ORANGE TRANSIT ORA990909 0 GROUPED PROJECTS FOR GRANTS FOR TRAINING AND RESEARCH PROGRAMS SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART $3,602 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – GRANTS FOR TRAINING AND RESEARCH PROGRAMS ORANGE TRANSIT ORA020819 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART $3,126 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES ORANGE TRANSIT ORA990910 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART $5,880 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES ORANGE TRANSIT ORA112005 0 IMPLEMENT BIKE STATIONS AND BIKE SHARING PROGRAM IN ORANGE COUNTY $960 ORANGE TRANSIT ORA110621 0 INTERMODAL PARK AND RIDE FACILITY AT DISCOVERY SCIENCE CENTER IN SANTA ANA $372 ORANGE TRANSIT ORA081622 0 IRVINE TRANSIT STATION – EXPANSION OF THE IRVINE TRANSIT CENTER (ITC). INITIAL PLANNING AND CONCEPTUAL ENGINEERING $2,660 PHASE Project List 61

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE TRANSIT ORA020817 0 KEY CARD ACCESS SYSTEM FOR BASE FACILITIES – INSTALL KEY CARD ACCESS SYSTEM AT FIVE OCTA BASE FACILITIES IN ANAHEIM, $754 GARDEN GROVE, IRVINE (SAND CANYON AND CONSTRUCTION CIRCLE) AND SANTA ANA. ORANGE TRANSIT ORA120537 0 LAGUNA NIGUEL RAIL STATION PARKING EXPANSION – CONSTRUCTION OF 562 NEW SPACES (281 EXISTING + 562 NEW = 843 SPACES) $63,000 ORANGE TRANSIT ORA111209 0 LAGUNA NIGUEL TO SAN JUAN CAPISTRANO PASSING SIDING – ADD 1.8 MILES OF NEW RAILROAD TRACK ADJACENT TO THE EXISTING $26,806 MAIN TRACK. MP 193.9 – MP 195.7 ORANGE TRANSIT ORA081618 0 METROLINK COMMUTER RAIL PROGRAM – HIGH FREQUENCY METROLINK SERVICE OPERATIONS BETWEEN FULLERTON AND LAGUNA $15,000 NIGUEL/MISSION VIEJO. ORANGE TRANSIT ORA020820 0 METROLINK SERVICE TRACK EXPANSION AND GRADE CROSSING IMPROVEMENTS. PART OF A PLAN TO IMPLEMENT 30 MINUTE $178,971 HEADWAYS COULD INCLUDE TURNBACK FACILITIES, LAYOVER FACILITIES, AND OR RELIABILITY IMPROVEMENTS. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – RAILROAD/HIGHWAY CROSSING ORANGE TRANSIT ORA110101 0 OCTA MAINTENANCE OF WAY (MOW) SPURS. 1,000 FT MOW SPUR TRACKS AT 2 LOCATIONS ON THE ORANGE SUBDIVISION IN ANAHEIM $2,100 AND LAGUNA NIGUEL ORANGE TRANSIT ORA020505 0 OCTA SHARE OF DEMOLITION OF EXISTING MAIL DOCK AND CONSTRUCTION OF NEW, EXPANDED PASSENGER PLATFORM AT LA UNION $3,000 STATION. ORANGE TRANSIT ORA090302 0 OCTA SHARE OF THE METROLINK ROLLING STOCK AQUISITION. CARS & LOCOS, UP TO 87 CARS/CABS ORDERED IN FY 09 & IN FUTURE $158,110 YRS, UP TO 22 CARS/CABS, UP TO 11 LOCOS ORDERED BY FY09, & UP TO 4 LOCOS IN FUTURE ORANGE TRANSIT ORA199 0 OPERATING ASSISTANCE $10,156 ORANGE TRANSIT ORA37115 0 OPERATING ASSISTANCE FOR COMMUTER RAIL $194,122 ORANGE TRANSIT ORA111229 0 ORANGE COUNTY ARC – 10 LARGE BUSES FOR EXPANSION SERVICE. (UTILIZING $80,290 IN TOLL CREDIT FOR FY10/11) $700 ORANGE TRANSIT ORA080906 0 ORANGE COUNTY ARC – TEN (SE) LARGE BUSES TYPE III, CAMERAS $669 ORANGE TRANSIT ORA082605 0 ORANGE COUNTY METROLINK FIBER OPTICS INSTALLATION PROJECT. (REPLACE AND UPGRADE COMMUNICATIONS SYSTEM $12,300 THROUGHOUT METROLINK) PROVIDE A FIBER OPTIC BACKBONE AND SUE MICROWAVE HOPS TO TRANSMIT DATA TO THE MOC IN POMONA. CTOS THAT WILL FILL CONDUIT GAPS ARE BEING PROCESSED. VERIZON (FORMERLY MCI) CONDUIT WILL BE USED BETWEEN RITCHEY ST. AND SOUTHERN TERMINUS. METROLINK RAIL REHAB ORA37111 CONTAINS THE 5309 FUNDS ORANGE TRANSIT ORA120357 0 ORANGE COUNTY. TRAFFIC SIGNAL SYNCHRONIZATION FOR BUS RAPID TRANSIT CORRIDORS $14,673 ORANGE TRANSIT ORA085001 0 ORANGE TRANSPORTATION CENTER PARKING EXPANSION – PROJECT WILL PROVIDE APPROXIMATLY 1,100 ADDITIONAL TRANSIT $23,701 PARKING SPACES AT THE ORANGE STATION PARKING CENTER. ORANGE TRANSIT ORA030612 0 PLACENTIA TRANSIT STATION – E OF SR-57 AND MELROSE ST AND N OF CROWTHER AVE. CONSTRUCT NEW METROLINK STATION AND $23,420 RAIL SIDEING PPNO 9514 ORANGE TRANSIT ORA080801 0 POSTIVE TRAIN CONTROL FOR METROLINK WILL HELP TO PREVENT TRAIN-TO-TRAIN COLLISIONS, SPEEDING AND OVER-SPEED $250,000 DERAILMENTS, AND MOVEMENT OF A TRAIN THROUGH A WRONG RAIL SEGMENT OR INTO TRACK WORK ZONES. THE IMPLEMENTATION OF THE PROJECT WILL ENHANCE THE SAFETY AND SECURITY OF COMMUTER RAIL SERVICE, WHILE HELPING TO MEET 2015 FEDERAL MANDATE ENACTED IN THE RSIA OF 2008. ORANGE TRANSIT ORA111211 0 PREVENTATIVE MAINTENANCE (ATN) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 $1,668 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ORANGE TRANSIT ORA021203 0 PREVENTATIVE MAINTENANCE (MISSION VIEJO) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 $42,633 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $1,826 & FY10/11 FOR $1,874. 62 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE TRANSIT ORA020106 0 PREVENTATIVE MAINTENANCE (OCTA) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 $209,581 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (TRANSIT DEVELOPMENT CREDITS IN FY10/11 FOR $5,424,800 FY11/12 FOR $23,561, FY12/13 $759,582, FY13/14 $6,933,620, FY14/15 $7,086,190, FY15/16 $7,335,639) ORANGE TRANSIT ORA020810 0 PURCHASE (1) 40' REPLACEMENT VEHICLE FOR EXPRESS SERVICE IN ORANGE COUNTY FTA# E-2008-BUSP-677 $590 ORANGE TRANSIT ORA55241 0 PURCHASE (1) STANDARD 40 FT REPLACEMENT ALT FUEL BUSES – (1) IN FY15/16 $700 ORANGE TRANSIT ORA110303 0 PURCHASE (11) MID-SIZE 32' ALTERNATIVE FUEL REPLACEMENT BUSES $4,498 ORANGE TRANSIT ORA020811 0 PURCHASE (202) 40' REPLACEMENT VEHICLE IN ORANGE COUNTY – (90) IN FY11/12, (89) IN FY12/13, AND (23) IN FY15/16. INCLUDES $102,213 TOLL CREDITS IN FY11-12 $7,776,200 ORANGE TRANSIT ORA000817 0 PURCHASE (50) STANDARD 60FT REPLACEMENT – ALTERNATIVE FUEL – IN FY15/16 $44,395 ORANGE TRANSIT ORA041501 0 PURCHASE (71) STANDARD 30FT EXPANSION BUSES – ALTERNATIVE FUEL – (31) IN FY08-09, (9) IN FY09-10, (7) IN FY11-12, (6) IN FY12- $8,998 13 AND (18) IN FY13-14 ORANGE TRANSIT ORA0826016 0 PURCHASE (72) PARATRANSIT EXPANSION VANS – (21) IN FY09/10, (51) IN FY10/11. $7,641 ORANGE TRANSIT ORA111802 0 PURCHASE 40' ALTERNATIVE FUEL REPLACEMENT BUS (MV) – (16) FY11/12, (4) FY 12/13. TOLL CREDIT MATCH FOR $1,724 AND $452 $10,880 ORANGE TRANSIT ORA112003 0 PURCHASE AND INSTALL 100 SOLAR LIGHTS AT BUS STOPS. $100 ORANGE TRANSIT ORA080918 0 PURCHASE MISCELLANEOUS SUPPORT EQUIPMENT. SUCH AS CEA VEHICLES, SHERIFF VEHICLES, FORKLIFTS AND OTHER $1,000 MISCELLANEOUS SUPPORT EQUIPMENT ORANGE TRANSIT ORA080919 0 PURCHASE MISCELLANEOUS SUPPORT VEHICLES $625 ORANGE TRANSIT ORA082618 0 PURCHASE PARATRANSIT VEHICLES EXPANSION (MISSION VIEJO) (11) IN FY10/11. $3,384 ORANGE TRANSIT ORA020118 0 PURCHASE REPLACEMENT PARATRANSIT VANS (230) – (32) IN FY11/12, (58) IN FY12/13, (140) IN FY15/16 PROJECTS ARE CONSISTENT $13,507 WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF NEW BUSES AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET ORANGE TRANSIT ORA110301 0 PURCHASE TWENTY (20) 32-35' REPLACEMENT ALTERNATIVE FUEL BUSES AND AUXILIARY EQUIPMENT SUCH AS TICKET VENDING $4,620 MACHINES AND ASSET MANAGEMENT SOFTWARE FOR ANAHEIM TRANSPORTATION NETWORK ORANGE TRANSIT ORA080804 0 RADIO COMMUNICATION SYSTEM UPGRADE $28,895 ORANGE TRANSIT ORA112004 0 REMOVE UNDERGROUND DIESEL STORAGE TANKS AT THREE BUS BASES AND INSTALL THREE ABOVE GROUND TANKS. $1,035 ORANGE TRANSIT ORA112002 0 REPLACE AND MODERNIZE THE METHANE DETECTION SYSTEMS AT THE ANAHEIM AND GARDEN GROVE BASES. $245 ORANGE TRANSIT ORA65002 0 RIDESHARE SERVICES RIDEGUIDE, DATABASE, CUSTOMER INFO, AND MARKETING (ORANGE COUNTY PORTION). $5,223 ORANGE TRANSIT ORA110633 0 RIDESHARE VANPOOL PROGRAM – CAPITAL LEASE COSTS $2,197 ORANGE TRANSIT ORA100099 0 ROUTE 792/A RIVERSIDE/CORONA TO ANAHEIM RESORT AREA EXPRESS BUS SERVICE $780 ORANGE TRANSIT ORA081621 0 SANTA ANA TRANSIT STATION – EXPANSION OF THE SANTA ANA REGIONAL TRANSPORTATION CENTER. INITIAL PLANNING AND $3,400 CONCEPTUAL ENGINEERING PHASE ORANGE TRANSIT ORA110624 0 SANTA ANA TRANSIT TERMINAL FACILITY IMPROVEMENTS, INC. INCREASE VENTILATION / SAFETY $282 ORANGE TRANSIT ORA110613 0 SECURITY SURVEILLANCE AND MONITORING EQUIPMENT FOR TRANSIT $5,528 ORANGE TRANSIT ORA112008 0 SLOPE STABILIZATION IN THE PACIFIC SURFLINER CORRIDOR IN THE CITIES OF LAGUNA NIGUEL AND MISSION VIEJO. WILL UTILIZE 500K $2,000 IN TOLL CREDIT MATCH. ORANGE TRANSIT ORA111230 0 ST. ANSELM'S CROSS CULTURAL CENTER – 2 SMALL BUSES FOR REPLACEMENT SERVICE. (UTILIZING $13,764 IN TOLL CREDIT FOR $120 FY10/11) Project List 63

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE TRANSIT ORA081619 0 STATION IMPROVMENTS – SUPPORT CONTINUED AND EXPANDED METROLINK OPERATIONS, AND STATION IMPROVEMENT $250 ORANGE TRANSIT ORA110305 0 THE LAGUNA NIGUEL/MISSION VIEJO STATION ENHANCEMENTS. IMPROVEMENTS INCLUDE PARKING, PEDESTRIAN ACCESSIBILITY, $8,524 TICKETING MACHINES, RESTROOMS, ELEVATORS, BENCHES, SHADE STRUCTURES, AND OTHER STRUCTURES OR AMENTITIES. ORANGE TRANSIT ORA120536 0 TUSTIN RAIL STATION PARKING EXPANSION – CONSTRUCTION OF 191 NEW SPACES (281 EXISTING SPACES + 191 NEW SPACES = 472 $17,600 TOTAL SPACES) PPNO 9510 ORANGE TRANSIT ORA110625 0 VARIOUS PLANNING & TRANSPORTATION PROJECTS DETERMINED BY THE ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) TO $2,395 REDUCE CONGESTION IN OC, INCLUDING SMARTH GROWTH AND INCREASED TRANSIT ORANGE TRANSIT ORA37122 0 VEHICLE MODIFICATIONS/MISC, REPLACE SUPP VEHICLES AND SUPPORT EQUIP, BUS AND FACILITY EQUIPMENT PROJECTS ARE $9,011 CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF SUPPORT VEHICLES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $250 ORANGE TRANSIT ORA020814 0 VIDEO SURVEILLANCE SYSTEM FOR BASE FACILITIES – INSTALL VIDEO SURVEILLANCE EQUIPMENT AT FOUR OCTA BASE FACILITIES IN $803 ANAHEIM, GARDEN GROVE, IRVINE (SAND CANYON AND CONSTRUCTION CIRCLE) ORANGE STATE ORA000100 5 GENE AUTRY WAY WEST @ I-5 (I-5 HOV TRANSITWAY TO HASTER) ADD OVERCROSSING ON I-5 (S)/MANCHESTER AND EXTEND GENE $70,984 HIGHWAY AUTRY WAY WEST FROM I-5 TO HASTER (3 LANES IN EA DIR.) ORANGE STATE ORA55063 5 I-5 @ AVERY PARKWAY (MARGUERITE TO CAMINO CAPISTRANO) INTERCHANGE IMPROVEMENTS. WIDEN FROM 4 TO 5 LANES (FOR TURN $840 HIGHWAY LANE) UNDER FREEWAY BRIDGE. ORANGE STATE ORA120359 5 I-5 @ JAMBOREE – CONSTRUCT AUX LN ON I-5 SB; WIDEN SB OFF-RAMP FROM 1 TO 2 LANES; AND WIDENING JAMBOREE RD EB $8,485 HIGHWAY UNDERCROSSING TO CREATE A TURN LANE TO NB ON-RAMP PPNO 2806B ORANGE STATE ORA000122 5 I-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125) $8,943 HIGHWAY ORANGE STATE ORA020109 5 I-5 AT CAMINO CAPISTRANO INTERSECTION IMPROVEMENT. WIDEN S/B OFFRAMP FROM 2 TO 3 LANES. PPNO 2615. DUAL LEAD. OCTA $19,207 HIGHWAY PA&ED. CALTRANS PS&E ROW AND CON ORANGE STATE ORA111210 5 I-5 FROM SR 55 TO SR 57 – ADD 1 HOV LANE EACH DIRECTION; RECONSTRUCT THE FIRST ST/FOURTH ST IC ON SB I-5 TO INCREASE $45,669 HIGHWAY WEAVING LENGTH TO STANDARD (EXTEND MERGE LANES BY 100 FEET) ORANGE STATE ORA111801 5 I-5 WIDENING (AVERY PARKWAY TO ALICIA PARKWAY) – ONE LANE IN EACH DIRECTIONS (4-5 LANES EACH DIRECTION) AND $588,746 HIGHWAY RECONSTRUCTION OF LA PAZ AND AVERY PARKWAY INTERCHANGES ORANGE STATE ORA081601 5 I-5/SR-55 INTERIM IMPROVEMENTS INCLUDE RECONSTRUCTING THE I-5 S/B ON-RAMP AT FIRST ST TO A LOOP RAMP, PROVIDING MORE $1,250 HIGHWAY MERGING ROOM FOR TRAFFIC BETWEEN THE I-5 S/B CONNECTION AND SR-55 S/B MCFADDEN AVE OFF-RAMP. FURTHER PLANNING STUDIES WILL BE UNDERTAKEN TO ADDRESS THE LONG-TERM I-5/SR-55 TRAFFIC DEFICIENCIES (I-5 BEGIN PM 29.1, END PM 31.1; SR-55 BEGIN PM 9.2, END PM 11.2) ORANGE STATE ORA110607 5 IN ORANGE COUNTY, ON ROUTE 5 FROM CALLE JUANITA TO 4TH STREET. PROVIDE ENHANCED PAVING AND LANDSCAPING PPNO #2592 $1,873 HIGHWAY ORANGE STATE ORA030602 5 IN SAN CLEMENTE – SB CAMINO DE ESTRELLA – WIDEN OFF RAMP FROM 1 TO 2 LANES AND WIDEN OVERCROSSING FROM 5 TO 7 $13,493 HIGHWAY LANES (1 W/B LEFT TURN LANE AND 1 E/B LANE), EA 0F0600, SHOPP, MOBILITY ORANGE STATE ORA120402 5 IN SAN CLEMENTE NORTHBOUND INTERSTATE 5 AT AVENIDA VAQUERO – SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2580A. DUAL $2,760 HIGHWAY LEAD AGENCY. OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON ORANGE STATE ORA030604 5 IN THE CITY OF MISSION VIEJO SB OFFRAMP AT CROWN VALLEY PARKWAY – WIDEN OFF RAMP FROM 4 TO 5 LANES SHOPP PROJECT EA $3,249 HIGHWAY 12-0F8201 64 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE STATE ORA990929 5 INTERSTATE 5 ADD 1 HOV IN EACH DIRECTION FROM SOUTH OF AVENIDA PICO TO SOUTH OF AVENIDA VISTA HERMOSA AND $106,289 HIGHWAY RECONFIGURE AVENIDA PICO INTERCHANGE. PPNO:2531D ORANGE STATE ORA111002 5 INTERSTATE 5 ADD 1 HOV IN EACH DIRECTION FROM SOUTH OF AVENIDA VISTA HERMOSA TO SOUTH OF PACIFIC COAST HIGHWAY. PPNO $74,705 HIGHWAY 2531E ORANGE STATE ORA111001 5 INTERSTATE 5 ADD 1 HOV IN EACH DIRECTION FROM SOUTH OF PACIFIC COAST HIGHWAY TO SAN JUAN CREEK ROAD. PPNO:2531F $63,093 HIGHWAY ORANGE STATE ORA120326 5 RECONSTRUCT I-5/SR-74 INTERCHANGE (IN SAN JUAN CAPISTRANO, ON ROUTE 74 FROM ROUTE 5 TO EAST OF THE CITY LIMIT. $84,514 HIGHWAY RECONSTRUCT THE ROUTE 74 AND ROUTE 5 INTERCHANGE) PPNO 4102 DUAL LEAD SJC CALTRANS ORANGE STATE ORA120401 5 SOUTHBOUND INTERSTATE 5 FROM REAL TO AVENIDA RAMONA – SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2544B. $4,995 HIGHWAY DUAL LEAD AGENCY OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON ORANGE STATE ORA000193 22 HOV CONNECTORS FROM SR-22 TO I-405, BETWEEN SEAL BEACH BLVD. (I-405 PM 022.558) AND VALLEY VIEW ST. (SR-22 PM $119,625 HIGHWAY R000.917), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS. ORANGE STATE ORA000195 22 ON SR-22 (I-405 TO SR55) ADD 2 HOV LANES/1 EA DIR (FRM 0 – 2) & 2 AUX LANES/1 EA DIR (FRM 0- 2) (I-5 TO BEACH) & OPERATING $546,587 HIGHWAY IMPROVMENTS (SEE COMMENTS) TCRP PAYBACK WHEN AVAILABLE ORANGE STATE ORA084902 22 SR-22/I-405 HOV CONNECTOR REPLACEMENT PLANTING $2,040 HIGHWAY ORANGE STATE ORA030610 55 ADD SOUTHBOUND AUXILIARY LANE FROM DYER TO MACARTHUR. PPNO 3473 $2,619 HIGHWAY ORANGE STATE ORA015 55 BAKER STREET AND SR-55; N/B & S/B FRONTAGE ROAD IMPROVEMENTS. S/B FREE RIGHT TURN, N/B LEFT-TURN AND 2ND E/B LEFT. $900 HIGHWAY ORANGE STATE ORA030603 55 CONSTRUCT 1 AUX LANE ON S/B SR-55 BETWEEN E EDINGER AVE ON RAMP AND E DYER RD OFF RAMP EA0G9600 (SHOPP MOBILITY) $34,064 HIGHWAY ORANGE STATE ORA084401 55 IN COSTA MESA, SANTA ANA, TUSTIN ON SR-55 BETWEEN PAULARINO AVE AND .2 MILES NORTH OF 17TH STREET – CONVERT EXISTING $1,490 HIGHWAY LIMITED ACCESS HOV STRIPING TO FULL TIME CONTINUOUS ACCESS HOV STRIPING ORANGE STATE ORA016 55 PAULARINO AVE (SR-55 NB FRONTAGE ROAD @ PAULARINO AVE) IN COSTA MESA INTERSECTION IMPROVEMENT. ADDING A N/B RAMP $505 HIGHWAY AND W/B RIGHT-TURN-LANE. ORANGE STATE ORA017 55 PAULARINO AVE IN SR-55 SB FRONTAGE ROAD COSTA MESA. INTERSECTION IMPROVEMENT ADD S/B RIGHT-TURN LANE. $270 HIGHWAY ORANGE STATE ORA100511 55 SR-55 WIDENING BETWEEN I-405 AND I-5. ADD ONE LANE IN BOTH DIRECTION. (PLANNING ONLY) $297,000 HIGHWAY ORANGE STATE ORA120332 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0311 (SR91/ORANGETHORPE TO $72,208 HIGHWAY YORBA LINDA SEGMENT) SPLIT PROJECT WITH ORA081901 ORANGE STATE ORA081901 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0321 (YORBA LINDA TO $73,243 HIGHWAY LAMBERT SEGMENT) SPLIT PROJECT WITH ORA120332 ORANGE STATE ORA120333 57 EXIST 4 MF N/B; WIDEN TO 5 MF LANES N/B FROM 0.3 MI S/O KATELLA TO 0.3 MI N/O LINCOLN (2.92 MILES) – 0F0400 $41,086 HIGHWAY ORANGE STATE ORA000820 57 SR-57 TRUCK CLIMBING AUX LANE FROM LAMBERT TO LA CO. LINE PPNO 3847A EA 0C120 $124,600 HIGHWAY Project List 65

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE STATE ORA120320 57 SR-57/LAMBERT RD INTERCHANGE IMPROVEMENTS – RECONFIG EXISTING DIAMOND INTERCHANGE TO LOOP RAMP, ADD SB LN ON $38,150 HIGHWAY OFFRAMP ORANGE STATE 10254 73 SJHC, 15 MI TOLL RD BETWEEN I-5 IN SAN JUAN CAPISTRANO & RTE 73 IN IRVINE, EXISTING 3/M/F EA.DIR.1 ADD'L M/F EA DIR, PLUS $351,111 HIGHWAY CLIMBING & AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/5/01 ORANGE STATE ORA000152 74 ORTEGA HWY (RANCHO VIEJO RD TO JUST EAST OF I-5/SR-74 INTERCHAGE) RDWAY WIDEN ADD RT TRN LNE TO CAPAC & REDUCE QUE $2,550 HIGHWAY ON WB SR-74 TO NB I-5 TRN. N/B FRM 2TO3 & S/B 2TO3 . ORANGE STATE ORA120507 74 WIDEN ORTEGA HIGHWAY FROM COUNTY/CITY OF SAN JUAN CAPISTRANO TO APPROXIMATELY 1,900 FEET EAST OF THE INTERSECTION $42,694 HIGHWAY OF THE LA PATA/ORTEGA HIGHWAY INTERSECTION (APPROXIMATELY 1.2 MILES). WIDEN FROM 2 TO 4. INCLUDING WIDENING OF THE BRIDGE OVER SAN JUAN CREEK. ORANGE STATE ORA120506 74 WIDEN ROUTE 74 FROM 2 TO 4 LANES – COUNTY SEGMENT (ON ROUTE 74 FROM CITY/COUNTY LINE TO ANTONIO PARKWAY / LA PATA $40,905 HIGHWAY AVE. WIDEN FROM 2 LANES TO 4 LANES) PPNO 4110A EA 08691 SPLIT FROM ORA120507 ORANGE STATE ORA000115 90 IMPERIAL HWY SMART ST (LAC TO HARBOR) RESTRIPE 4 TO 6 LNS (LAC LINE TO IDAHO ST. ADD RAISED MEDIAN. MODFY MEDIANS AT 4 $16,244 HIGHWAY INTSECS. ADD BUS PADS, TURNOUTS.(COMBINES ORA028 AND ORA029) ORANGE STATE ORA020808 90 IN ORANGE COUNTY, ON RTE 90 IMPERIAL HIGHWAY, IN THE CITIES OF YORBA LINDA AND ANAHEIM ON ROUTE 90 FROM EAST OF $1,669 HIGHWAY KELLOGG DRIVE UNDERCROSSING TO LA PALMA AVENUE. THE PROJECT IS TO PROVIDE ENHANCEMENT AND MITIGATION PLANTING. PPNO 4434B EA 12-056221 ORANGE STATE ORA000822 91 CONNECT EXISTING AUXILIARY LANE THROUGH INTERCHANGES ON WB SR-91 BETWEEN SR-57 AND I-5 WITH ITS ELEMENTS PPNO $73,400 HIGHWAY 4516A EA 0C5700 ORANGE STATE ORA110502 91 EASTBOUND RTE 91 FROM RTE 91/55 CONNECTOR TO EAST OF WEIR CANYON ROAD INTERCHANGE; WESTBOUND RTE 91 FROM EAST OF $2,498 HIGHWAY WEIR CANYON RD INTERCHANGE TO IMPERIAL HWY INTERCHANGE. WIDENING. REPLACEMENT PLANTING/LANDSCAPING. SPLIT FROM ORA030601 ORANGE STATE ORA111207 91 HOV/HOT CONNECTOR: NB SR-241 TO EB SR-91, WB SR-91 TO SB SR-241 (1 LANE EACH DIR) $3,000 HIGHWAY ORANGE STATE ORA020807 91 IN ORANGE COUNTY, AT THE COAL CANYON ROAD INTERCHANGE. THE PROJECT IS TO INSTALL VEGETATION ENHANCEMENTS $802 HIGHWAY ORANGE STATE ORA120336 91 SR-91 EASTBOUND LANE ADDITION BETWEEN SR-241 & SR-71, & IMPROVE NB SR-71 CONNECTOR FROM SR-91 TO STD ONE LANE AND $77,575 HIGHWAY SHOULDER WIDTH. 0G0400 ORANGE STATE ORA000821 91 SR-91 WB (SR-55 THROUGH TUSTIN INTERCHANGE) EXTEND LANE AND RECONSTRUCT AUX. LANE. PPNO 4587A EA 0C560) $41,930 HIGHWAY ORANGE STATE ORA030601 91 SR-91: ADD 1 MF LANE E/B BTWN 91/55 CONNECTOR & SR-241 – W/B BTWN SR-241 & IMPERIAL HWY; MODIFY W/B ON RAMPS FROM $85,986 HIGHWAY LAKEVIEW AVE TO IMPRV MERGE (ADD AUX LANE BETWEEN NB 55 – TO – EB 91 ON-RAMP AND LAKEVIEW OFF RAMP). PROJECT SPLIT LANDSCAPING ORANGE STATE ORA990911 142 IN ORANGE COUNTY, ON RTE. 142, TO PROVIDE NATIVE LANDSCAPING. $525 HIGHWAY ORANGE STATE ORA051 241 (FTC-N) (OSO PKWY TO ETC) (13MI) EXISTING 2 MF IN EA. DIR, 2 ADDITIONAL M/F LANES, PLS CLMBNG & AUX LANS AS REQ BY 2020 $143,517 HIGHWAY PER SCAG/TCA MOU 4/05/01. ORANGE STATE ORA052 241 (FTC-S) (I-5 TO OSO PKWY) (15MI) 2 MF EA. DIR BY 2013; AND 1 ADDITIONAL M/F EA. DIR. PLS CLMBNG & AUX LANES AS REQ BY 2030 $1,509,133 HIGHWAY PER SCAG/TCA MOU 4/05/01. #1988 66 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE STATE ORA050 241 ETC (RTE 241/261/133) (RTE 91 TO I-5/JAMBOREE) EXISTING 2 M/F EA.DIR, 2 ADD'L M/F IN EA. DIR, PLUS CLIMB AND AUX LNS AS REQ, $1,156,097 HIGHWAY BY 2020 PER SCAG/TCA MOU 4/05/01. ORANGE STATE ORA082601 241 HIGHWAY MAINTENANCE (SHOPP) PROJECT, EA 12-0K5900, RTE.241, PM 27.9/39.0, IN ORANGE COUNTY, IN IRVINE AND IN AND NEAR $7,803 HIGHWAY ANAHEIM AND YORBA LINDA. THE PROJECT IS TO PROVIDE TYPE O OVERLAY. ORANGE STATE ORA100507 405 CONSTRUCT FOURTH NB THROUGH LANE ON BEACH BLVD AT THE I-405 INTERCHANGE AND REMOVE OFF-RAMP ON I-405 AT BEACH $1,500 HIGHWAY (NORTH-EAST CORNER OF BEACH/EDINGER). CO LEAD WITH WESTMINSTER ORANGE STATE ORA082602 405 HIGHWAY MAINTENANCE PROJECT (SHOPP), EA 12-0L0601, IN ORANGE COUNTY, ON RTE 405. IN THE CITIES OF IRVINE AND COSTA $8,750 HIGHWAY MESA FROM RTE. 5 TO HARBOR BLVD. THE PROJECT IS TO PROVIDE PCC PROFILE GRINDING. ORANGE STATE ORA000194 405 HOV CONNECTORS FROM I-405 TO I-605, BETWEEN KATELLA AVE. (I-605 PM R001.104) AND SEAL BEACH BLVD. (I-405 PM 022.643), $159,630 HIGHWAY WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS ORANGE STATE ORA030605 405 I-405 FROM SR-73 TO I-605 ADD 1 MF LANE EACH DIR AND PROVIDE ADDITIONAL CAPITAL IMPROVEMENTS. #317. COMBINED WITH $1,694,000 HIGHWAY ORA045, ORA151 AND ORA120310 ORANGE STATE ORA084901 405 I-405/I-605 HOV CONNECTOR REPLACEMENT PLANTING $3,840 HIGHWAY ORANGE STATE ORA080916 405 IN ORANGE COUNTY, I-405 FROM BEAR STREET TO FAIRVIEW ROAD. PROVIDE ROADWAY REHABILITATION INCLUDING PAVEMENT REPAIR. $1,365 HIGHWAY ORANGE STATE ORA001109 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – SHOPP PROGRAM. SCOPE: PROJECTS ARE CONSISTENT $5,902 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). ORANGE STATE ORA082603 999 GROUPED PROJECTS FOR EMERGENCY REPAIR – SHOPP EMERGENCY RESPONSE PROGRAM. SCOPE: PROJECTS ARE CONSISTENT $60,998 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. THIS APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD ORANGE STATE ORA001103 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM. $124,984 HIGHWAY SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) ORANGE STATE ORA084402 999 GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES. SCOPE – PROJECTS ARE $580 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ORANGE STATE ORA001102 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP COLLISION REDUCTION PROGRAM SCOPE: PROJECTS ARE CONSISTENT $32,565 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – RAILROAD/HIGHWAY CROSSING,SHOULDER IMP, TRAFFIC CONTROL DEVICES,OPS ASSISTANCE INTERSECTION SIGNALIZATION PROJECTS PAVEMENT MARKING, LIGHTING IMPROVEMENTS ORANGE STATE ORA001108 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MANDATES PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 $63,657 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – RAILROAD/HIGHWAY CROSSING, SAFER NON-FEDERAL-AID SYSTEM ROADS, SHOULDER IMP, TRAFFIC CONTROL DEVICES AND OPS ASSISTANCE OTHER THAN SIGNALIZATION PROJECTS, LIGHTING IMP ORANGE STATE ORA001105 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MOBILITY PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR $10,032 HIGHWAY PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – RAILROAD/HIGHWAY CROSSING, SAFER NON-FEDERAL-AID SYSTEM ROADS, SHOULDER IMP, TRAFFIC CONTROL DEVICES OPS ASSISTANCE.INTERSECTION SIGNALIZATION PROJECTS, PAVEMENT MARKING DEMO,LIGHTING Project List 67

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE STATE ORA001104 999 GROUPED PROJECTS FOR SHOULDER IMPROVEMENTS – SHOPP ROADSIDE PRESERVATION PROGRAM. SCOPE: PROJECTS ARE $7,409 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – FENCING,SAFETY ROADSIDE REST AREAS ORANGE STATE ORA040607 999 ORANGE COUNTY – COUNTYWIDE ACTIVITIES: PLANNING, PROGRAMMING AND MONITORING (PPM) $20,257 HIGHWAY ORANGE LOCAL 550 0 ALTON AVE IN SANTA ANA CONSTRUCT A NEW 4-LANE (2E/B AND 2W/B) OVERCROSSING & HOV ACCESS RAMPS @ SR-55 $76,988 HIGHWAY ORANGE LOCAL ORA990919 0 ALTON PARKWAY IMPROVEMENTS – CONSTRUCT NEW 4 LANE ROADWAY FROM COMMERCENTRE DRIVE TO TOWNE CENTRE DRIVE, A $6,400 HIGHWAY LENGTH OF APPROXIMATELY 4,800 FEET. ORANGE LOCAL ORA990932 0 ANTONIO PARKWAY PAVEMENT REHABILITATION – THE PROJECT WILL REHABILITATE ANTONIO PARKWAY BY COLD-PLANING AND $445 HIGHWAY OVERLAYING THE EXISTING ROADWAY FROM VIA HONESTO TO COTO DE CAZA/LA PROMESA. INCLUDED IN THIS REHABILITATION WILL BE ISOLATED AREAS OF FULL RECONSTRUCTION, CURB RAMPS. ORANGE LOCAL ORA110603 0 BIKEWAY WAYFINDING SIGNAGE – ASSESS EXISTING BIKEWAY WAYFINDING SIGNAGE CITYWIDE WITH FOCUS ON SIGNAGE IN AND $50 HIGHWAY AROUND CLASS I BIKEWAYS, MAJOR INSTITUTIONS, CITY PARKS, RECREATIONAL FACILITIES, SCHOOLS, AND OTHER PUBLICLY-OWNED ASSETS. PRODUCE DETAILED RECOMMENDATIONS ON PLACEMENT AND/OR REPLACEMENT OF SIGNAGE TO DETERMINE THE 60 LOCATIONS FOR SIGNAGE INSTALLATION AND/OR REPLACEMENT. ORANGE LOCAL ORA02926 0 BNSF RAILWAY LINE (KRAEMER BLVD TO KELLOGG DR) ALONG SS OF ORANGETHORPE. INSTALL SUPPLEMENTAL SAFETY MEASURES AT $7,518 HIGHWAY 8 AT-GRADE CROSSINGS (4.4 MILES). ORANGE LOCAL ORA02925 0 BNSF RAILWAY LINE (PLACENTIA) ALONG SS OF ORANGETHORPE. GRADE SEPARATION/ CORRIDOR IMPROVEMENTS $78,230 HIGHWAY ORANGE LOCAL ORA125 0 BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT $166,286 HIGHWAY TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/TRN LNS ORANGE LOCAL ORA120501 0 BROOKHURST STREET WIDENING FROM S/O BALL ROAD TO N/O KATELLA AVENUE (4-6 LANES) $26,480 HIGHWAY ORANGE LOCAL ORA100601 0 BUD TURNER REC TRAIL AT LAGUNA LAKE. TRAIL RECONSTRUCTION, LANDSCAPE AND IRRIGATION IMPROVEMENT $1,070 HIGHWAY ORANGE LOCAL ORA020115 0 CABOT ROAD BRIDGE TO CAMINO CAPISTRANO -PROVIDE ALT ACCESS TO METROLINK STATION & RELIEF TO INTERCHANGE AT I-5 & $2,678 HIGHWAY AVERY ORANGE LOCAL ORA000162 0 CHAPMAN AVE (TUSTIN TO SR-55) WIDEN FROM 4 TO 6 LANES. ADD 2 DEDIC. RT TURN LANES (1@ WB CHAPMAN & 1@NB TUSTIN) $5,870 HIGHWAY PLUS, 2 BUS TURNOUTS (1@NB TUSTIN AND 1@WB CHAPMAN INTERSECTION.) ORANGE LOCAL ORA020506 0 CITY OF ORANGE – SANTA FE DEPOT SPECIFIC PLAN UPDATE $232 HIGHWAY ORANGE LOCAL ORA020804 0 CONSTRUCT MULTI USE TRAIL STAGING FACILITY ON THE WEST OF THE SOUTH OF LINCOLN AVE. IN THE CITY OF $472 HIGHWAY ANAHEIM, WHICH WILL INCLUDE: 14 PARKING STALS, RESTROOM BUILDING, 1 DRINKING FOUNTAIN, A HORSE D-RAIL, BICYCLE RACKS, BENCHES, NATIVE LANDSCAPING, SECURITY LIGHTING AND SECURITY FENCING ORANGE LOCAL ORA100606 0 CONSTRUCT REGIONAL CLASS 1 BIKEWAY ALONG COYOTE CREEK FLOOD CONTROL CHANNEL FROM IMPERIAL HWY IN LA HABRA TO LA $609 HIGHWAY COUNTY BORDER ORANGE LOCAL ORA082401 0 COW CAMP ROAD (4 LANES) FROM ANTONIO TO FOOTHILL TRANSPORTATION CORRIDOR (FTC)IS A MAJOR ARTERIAL HIGHWAY AND $193,434 HIGHWAY FROM FTC TO ORTEGA PRIMARY ARTERIAL HIGHWAY. 68 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE LOCAL ORA000163 0 CROWN VALLEY PARKWAY (PUERTA REAL TO CITY LIMITS, NEAR JARDINES) WIDENING FROM 6 LANE DIVIDED TO 8 LANE DIVIDED. $5,443 HIGHWAY ORANGE LOCAL ORA100509 0 DESIGN AND IMPLEMENT HARBOR BOULEVARD ITS IN GARDEN GROVE. $3,179 HIGHWAY ORANGE LOCAL ORA100508 0 DEVELOP AND IMPLEMENT AN ITS MASTER PLAN IN ANAHEIM $1,000 HIGHWAY ORANGE LOCAL ORA085003 0 FLOWER STREET BIKE TRAIL GAP CLOSURE- CONSTRUCTION OF A 10-FOOT WIDE BY ONE-HALF MILE LONG ASPHALT BICYCLE TRAIL, $625 HIGHWAY INCLUDING LANDSCAPING, IRRIGATION, AND TRAILHEAD PLAZA ORANGE LOCAL ORA990906 0 GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES FUNDED WITH TE – SCOPE: PROJECTS ARE CONSISTENT WITH 40 $35,834 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED) ORANGE LOCAL ORA020501 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM – PROJECTS ARE CONSISTENT WITH 40 $33,527 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). ORANGE LOCAL ORA55013 0 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM – $79,771 HIGHWAY PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) ORANGE LOCAL ORA990907 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $16,337 HIGHWAY EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES) ORANGE LOCAL ORA082001 0 HARBOR BLVD – ADAMS AVE: ADD A SECOND SOUTHBOUND RIGHT-TURN LANE, ADD A THIRD EASTBOUND LEFT-TURN LANE. $6,964 HIGHWAY ORANGE LOCAL ORA120522 0 HUNTINGTON BEACH – ATLANTA AVE WIDENING (FRM HUNTINGTON TO DELEWARE; FRM 2 TO 4 LNS) $4,423 HIGHWAY ORANGE LOCAL ORA102904 0 IMAGE BASED TOLL COLLECTION SYSTEM – DEMONSTRATION PROJECT (ITS) $745 HIGHWAY ORANGE LOCAL ORA110302 0 IN PLACENTIA AND FULLERTON, N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES). REPLACEMENT PLANTING $2,688 HIGHWAY AS THE RESULT OF THE SR-57 NORTHBOUND WIDENING. REPLACEMENT PLANTING RELATED TO ORA081901 AND ORA120332 ORANGE LOCAL ORA120510 0 IRVINE – BARANCA & RED HILL INT IMPV (ADD 4TH WB, SB, EB, NB THRU LNS & EB/WB LFT TRN LNS & WB DEDICATED RT TRN LN) $15,475 HIGHWAY ORANGE LOCAL ORA120511 0 IRVINE – JAMBOREE RD @ I-5/MICHELLE (ADD 4TH SB AND NB THRU LANES) $15,545 HIGHWAY ORANGE LOCAL ORA120315 0 IRVINE – SAND CANYON @ I-5 (ADD 3RD AND 4TH NB AND SB THRU LNS ON SND CYN; IMP EB APPROACH ADD 2 LFT TRN LNS,1 THRU $8,441 HIGHWAY LN, & 1 RT TRN LN) ORANGE LOCAL ORA120514 0 IRVINE – TRABUCO RD @ SR-133 (ADD NEW ON-RAMPS AND OFF RAMPS AT TRABUCO & SR-133) $71,875 HIGHWAY ORANGE LOCAL ORA48 0 JEFFERY RD (IRVINE CENTER DR TO WALNUT) RAILROAD GRADE SEPARATION. FROM 4 TO 6 LANES. DUAL LEAD OCTA IRVINE $46,449 HIGHWAY Project List 69

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE LOCAL ORA020823 0 KRAEMER BLVD GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON KRAEMER BLVD AT THE BNSF RR TRACKS. ORANGE $67,662 HIGHWAY COUNTY GATEWAY PROJECT. ORANGE LOCAL ORA000173 0 LA PAZ RD (MURILANDS/I-5 TO CHRISANTA DR) WIDENING FROM 4 TO 6 LANES BRIDGE # 55C0215 $12,250 HIGHWAY ORANGE LOCAL ORA120316 0 LAGUNA NIGUEL – CROWN VALLEY PKWY WIDENING (WIDEN EB FROM CABOT TO I-5 ON RAMP, FROM 4 TO 5 LANES; ADD DED RT TRN $10,109 HIGHWAY LN FOR SB I-5 ON RAMP AND DED RT TRN LN FOR NB ON RAMP) ORANGE LOCAL ORA020825 0 LAKEVIEW AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON LAKEVIEW AVE AT THE BNSF RR TRACKS. ORANGE COUNTY $99,763 HIGHWAY GATEWAY PROJECT. PROJECT UTILIZING $1,938 TOLL CREDITS FOR ROW PHASE IN FY11/12. ORANGE LOCAL ORA000146 0 MEATS AVE @ SR55 INTERCHANGE. CONSTRUCT ON-RAMP/OFF-RAMPS. PART OF SR-55 ENHANCEMENT PROJECTS.(0 TO 2 LANES) $60,000 HIGHWAY ORANGE LOCAL ORA112001 0 MOULTON PARKWAY SMART STREET SEGMENT 3 PHASE II – FROM APPROXIMATELY 400’ NORTH OF EL TORO ROAD TO 500’ NORTH OF $7,986 HIGHWAY SANTA MARIA AVENUE (0.7 MILES) – IMPROVE ROADWAY TRAFFIC CAPACITY AND SMOOTH TRAFFIC FLOW THROUGH TRAFFIC SIGNAL SYNCHRONIZATION, BUS TURNOUTS, INTERSECTION IMPROVEMENTS, ADDITIONAL SIDEWALK, ADDITIONAL TURNING LANES AND ON-ROAD BIKE LANES WITHIN THE PROJECT LIMITS. ORANGE LOCAL ORA000125 0 MOULTON PKWY (SANTA MARIA TO EL PACIFICO) WIDEN FRM 7 TO 9 LANES (N/B 3 TO 4 AND S/B 4 TO 5), WIDEN INTERSECTIONS, ADD $7,685 HIGHWAY SIDEWALK AND LANDSCAPING. ORANGE LOCAL ORA000813 0 NEWPORT AVENUE EXTENSION PROJECT, PHASE II (FROM N/O EDINGER AVE. TO MYRTLE AVE.) GRADE SEPARATION AT OCTA/SCRRA $2,316 HIGHWAY RAILWAY PAED ONLY ORANGE LOCAL ORA040605 0 NEWPORT BEACH – JAMBOREE RD WIDENING (BETWEEN BAYVIEW WAY & MACARTHUR BLVD) FROM 6 TO 8 LANES $1,631 HIGHWAY ORANGE LOCAL ORA120527 0 ORANGE – MAIN ST (WIDEN FRM CULVER TO 260' N/O PALMYRA; FRM 4 TO 6 LNS) $4,043 HIGHWAY ORANGE LOCAL ORA120505 0 ORANGE COUNTY – ALTON PARKWAY EXTENSION (IRVINE) (IRVINE BLVD TO CMMERCENTER DR; FRM 0 TO 6 LNS) $40,000 HIGHWAY ORANGE LOCAL ORA120504 0 ORANGE COUNTY – LA PATA AVENUE WIDENING & GAP CLOSURE (WIDEN FROM 3 TO 5 LNS (2,700 FT S/O ORTEGA HWY TO RD $38,610 HIGHWAY TERMINUS); GAP CLOSURE – ADD 4 LNS (EXISTING LA PATA TERMINUS TO CALLE SALUDA); EXTENSION – ADD 4 LANES (EXISTING CAMINO DEL RIO TERMINUS TO LA PATA) ORANGE LOCAL ORA020507 0 ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) – REDUCE ORANGE COUNTY CONGESTION (ROCC) PROGRAM (INCLUDES $1,500 HIGHWAY STUDIES AND PLANNING)CO-LEAD OCTA ORANGE LOCAL ORA020805 0 ORANGE COUNTY SIGNAL IMPROVEMENT PROGRAM. THIS PROJECT WILL TARGET 158 MILES AND 533 SIGNALIZED INTERSECTIONS $8,000 HIGHWAY ALONG TEN HIGH-VOLUME REGIONAL TRAFFIC CORRIDORS ACROSS THE COUNTY OF ORANGE FOR COORDINATED SIGNAL SYNCHRONIZATION. ORANGE LOCAL ORA020824 0 ORANGETHORPE AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON ORANGETHORPE AVE AT THE BNSF RR TRACKS. $114,983 HIGHWAY ORANGE COUNTY GATEWAY PROJECT. PROJECT UTILIZING $1,922 IN TOLL CREDITS FOR ROW PHASE ORANGE LOCAL ORA100605 0 OSO CREEK TRAIL – COMPREHENSIVE SIGNAGE INCLUDING 4 KIOSKS AND WAYFINDING SIGNS ALONG 5.5 MILES OF TRAIL $324 HIGHWAY 70 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE LOCAL ORA111601 0 PCH DEL PRADO STREETSCAPE IMPROVEMENT PROJECT PHASE 1 STUDY- BETWEEN BLUE LANTERN AND COPPER LANTERN, CONVERT $2,338 HIGHWAY FROM 1-WAY TO 2-WAY STREETS, INTERSECTION IMPROVEMENTS, TRAFFIC CALMING, TRAFFIC SIGNAL MODIFICATION, BICYCLE AND TRANSPORTATION ENHANCEMENTS, STREET REPAIR AND OTHER STREET MODIFICATION. ORANGE LOCAL ORA120524 0 PLACENTIA – ORANGETHORPE AVE WIDENING (FRM MELROSE AVE TO ECL; FRM 4 TO 6 LNS) $1,188 HIGHWAY ORANGE LOCAL ORA120523 0 PLACENTIA – RICHFIELD AVE – ATWOOD CHANNEL BRIDGE WIDENING FROM 3 TO 4 LANES $347 HIGHWAY ORANGE LOCAL ORA080604 0 PLANNING FOR TRANSIT IN STANTON: CITYWIDE POLICIES AND SITE SPECIFIC DEVELOPMENT STANDARDS FOR TRANSIT-ORIENTED $264 HIGHWAY PROJECTS. (OCCOG ROCC) ORANGE LOCAL ORA190601 0 PLANNING STUDIES AND PSR'S (SR-55 STUDY 19TH STREET TO INDUSTRIAL WAY IN COSTA MESA) $1,130 HIGHWAY ORANGE LOCAL ORA080602 0 PLANNING STUDY TO EVALUATE THE LAND USE IN THE GATEWAY SPECIFIC PLAN (GSP) INCLUDING TRANSIT ORIENTED DEVELOPMENT $203 HIGHWAY AND MIXED USE DEVELOPMENT (OCCOG ROCC) ORANGE LOCAL ORA080902 0 PROJECT FEASIBILITY STUDY OF SIX MILES OF NEW ROADWAYS INCLUDING TRABUCO RD, O STREET AND MARINE WAY $500 HIGHWAY ORANGE LOCAL ORA082406 0 PROJECT WILL BUILD OUT ANTONIO PARKWAY TO ITS MASTER PLAN OF ARTERIAL HIGHWAYS DESIGNATION WIDTH BETWEEN LADERA $47,499 HIGHWAY PLANNED COMMUNITY AND ORTEGA HIGHWAY BY WIDENING THE ROAD FROM FOUR TO SIX LANES. THE PROJECT WILL INCLUDE WIDENING ANTONIO PARKWAY BRIDGE BY ONE LANE IN EACH DIRECTLY. ORANGE LOCAL ORA990918 0 RANCHO PARKWAY EXTENSION: HERMANA CIRCLE TO PORTOLA PARKWAY APPROX 1700 FEET. RANCHO PARKWAY WILL BE A 4-LANE $2,056 HIGHWAY DIVIDED ROADWAY ORANGE LOCAL ORA000809 0 RAYMOND AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON RAYMOND AVE AT THE BNSF RR TRACKS $76,792 HIGHWAY ORANGE LOCAL ORA020801 0 RECONSTRUCT OR REHABILITATE RECREATIONAL TRAIL ALONG LEMON ST. FROM SANTIAGO TO VALLEY DR. $733 HIGHWAY ORANGE LOCAL ORA000177 0 RED HILL @ EDINGER AVE/RR TRACKS. GRADE SEPARATION THE PE STUDY WILL ADDRESS VARIOUS ALTERNATIVES $2,097 HIGHWAY ORANGE LOCAL ORA020802 0 SALT CREEK TRAIL ENHANCEMENT PROJECT $637 HIGHWAY ORANGE LOCAL ORA120525 0 SAN JUAN CAPISTRANO – DEL OBISPO WIDENING (WIDEN FRM ALIPAZ TO CAMINO CAPISTRANO; TO ACCOMMODATE BIKE LANES AND $7,480 HIGHWAY SIDEWALK IN EACH DIRECTION) ORANGE LOCAL ORA000118 0 SAND CYN RD @ SCRRA TRACKS (BURT RD TO LAGUNA CANYON/OAK CANYON) – RAILROAD GRADE SEPARATION. WIDENS FROM 4 TO 6 $55,590 HIGHWAY LANES. CO LEAD WITH OCTA ORANGE LOCAL ORA120521 0 SANTA ANA – FIRST STREET WIDENING (FRM SUSAN TO FAIRVIEW; FRM 4 TO 6 LNS) BRIDGE 55C0022 $16,171 HIGHWAY ORANGE LOCAL ORA120520 0 SANTA ANA – GRAND AVENUE WIDENING (FRM 1ST TO 4TH; FRM 2 TO 3 LNS ) $13,537 HIGHWAY ORANGE LOCAL ORA120519 0 SANTA ANA – MACARTHUR BLVD WIDENING (WIDEN SB ONRAMP (FRM EB MACARTHUR) TO SR-55 BY ADDING 1LN) WIDEN FROM 3 TO 4 $1,499 HIGHWAY LANES. Project List 71

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) ORANGE LOCAL ORA082610 0 SANTA ANA BLVD GRADE SEPARATION – NEAR THE EXPANSION OF THE SANTA ANA REGIONAL TRANSPORTATION CENTER. (SARTIC) $1,671 HIGHWAY INITIAL PLANNING AND CONCEPTUAL ENGINEERING PHASE. RELATED TO ORA81621 ORANGE LOCAL ORA020809 0 SANTA ANA GOLDEN LOOP TRAIL REHABILITATION – REHAB 19,000 LINEAR FEET OF TRAIL $293 HIGHWAY ORANGE LOCAL ORA100603 0 SANTA ANA RIVER TRAIL FAIRVIEW TRIANGLE HABITAT RESTORATION PROJECT IMPROVEMENTS FOR AND ALONG THE SANTA ANA RIVER $150 HIGHWAY TRAIL ORANGE LOCAL ORA120518 0 SANTA ANTA – MAC ARTHUR BLVD WIDENING (WIDEN NB ONRAMP (FROM EB MACARTHUR) TO SR-55 BY ADDING 1 LN). $1,841 HIGHWAY ORANGE LOCAL ORA120330 0 SEAL BEACH – SEAL BEACH BLVD, OVERPASS BRIDGE LENGTHENING TURN LANES AND RAMPS REALIGNMENT (FROM BEVERLY MANOR $9,926 HIGHWAY RD TO OLD RANCH PKWY) ORANGE LOCAL ORA990928 0 SEAL BEACH BLVD AT 405 FWY SOUTHBOUND OFF RAMP. TO WIDEN THE EASTSIDE AND ADD AN ADDITIONAL THRU LANE (FROM 6 TO $1,443 HIGHWAY 7). ORANGE LOCAL ORA990912 0 SEAL BEACH BLVD FROM OLD RANCH PKWY TO ST. CLOUD. WIDEN STREET TO MATCH NEW BRIDGE OVER 405 FWY. 2 EXISTING LANES $1,443 HIGHWAY IN EACH DIRECTION. 3 LANES IN EACH DIRECTION WHEN CONSTRUCTED ORANGE LOCAL ORA100506 0 SIGNAL UPGRADES ON AVENIDA DE LAS FLORES, MELINDA ROAD, AVENIDA DE LAS BANDERAS, AND ALMA ALDEA, IN RSM. $145 HIGHWAY ORANGE LOCAL ORA000815 0 SR-91/GYPSUM CANYON ROAD INTERCHANGE. WIDEN GYPSUM CANYON ROAD FROM 2 TO 4 LANES. ADD CLASS II ON-ROAD BIKE $5,000 HIGHWAY LANES, ADD MULTI USE TRAIL AND SIDEWALK ON WEST SIDE OF ROADWAY. THIS WILL REQUIRE MODIFICATION OF EXISTING ENTRANCE RAMP TO GYPSUM. SR-91 CONNECTIONS ARE UNCHANGED, THE EASTBOUND SR-91 EXIT RAMP INTERSECTION WILL BE RECONSTRUCTED AND SIGNALIZED. ORANGE LOCAL ORA040602 0 STATE COLLEGE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON STATE COLLEGE BLVD AT THE BNSF RR TRACKS (SANTA FE $73,648 HIGHWAY AVE TO 700 FT SOUTH OF VALENCIA) ORANGE LOCAL ORA080603 0 THE CITY'S CONSULTANT WILL PREPARE A PROGRAM ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE SANTA FE SPECIFIC PLAN $223 HIGHWAY UPDATE (OCCOG ROCC) ORANGE LOCAL ORA020826 0 TUSTIN AVE / ROSE DRIVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON TUSTIN AVE / ROSE DRIVE AT THE BNSF RR $92,193 HIGHWAY TRACKS. ORANGE COUNTY GATEWAY PROJECT ORANGE LOCAL ORA990452 0 TUSTIN BRANCH RAIL TRAIL ALONG THE FROM TUSTIN ST. TO WALNUT AVE. AND CITY OWNED RW FROM WALNUT $2,436 HIGHWAY AVE. TO COLLINS AVE. FILLS 2 MILE GAP IN A REGIONAL TRAIL. ORANGE LOCAL ORA55244 0 TUSTIN RANCH ROAD EXTENSION FROM WALNUT AVENUE TO VALENCIA AVENUE INCLUDING CONSTRUCTION OF A BRIDGE OVER THE $13,995 HIGHWAY OCTA/SCRRA RAILWAY LINE AND EDINGER AVENUE. 3 NEW LANES IN EACH DIRECTION FOR A TOTAL OF 6. ORANGE LOCAL ORA080920 0 WIDEN AND RECONSTRUCT FIRESTONE BLVD FROM ARTESIA BLVD TO APPROXIMATELY 900 FEET NORTH OF ARTESIA. ADD A DUAL LEFT $6,723 HIGHWAY TURN LANE AND THIRD THROUGH LANE ALONG ARTESIA BLVD AT THE EASTBOUND APPROACH OF THE INTERSECTION ORANGE LOCAL ORA082405 0 WIDEN OSO PARKWAY FROM BLASCO TO INTERSTATE 5 – PROJECT WILL WIDEN BOTH THE EAST BOUND AND WEST BOUND DIRECTIONS $11,408 HIGHWAY FROM THE CURRENT THREE LANES IN EACH DIRECTION TO FOUR LANES IN EACH DIRECTION. ORANGE LOCAL ORA110602 0 WIDENING OF LAGUNA CANYON / I-405 OVERCROSSING FROM 2 LANES TO 4 LANES $11,950 HIGHWAY ORANGE LOCAL ORA120322 0 YORBA LINDA – CONSTRUCT PEDESTRIAN BRIDGE OVER IMPERIAL HWY NEAR MAIN ST $4,215 HIGHWAY 72 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV080927 0 AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: MAINTENANCE FACILITY UPGRADES (UNLEADED FUEL DISPENSERS, FIRE DOOR, $430 ENERGY EFFICIENT LIGHTING, ROOF REPAIRS, EASEMENT RESTORATION (RIVERSIDE YARD PROPERTY), AND RE-KEY AND INSTALL FUEL FORCE SYSTEM TO STANDARIZE AND UPDATE MAINTENANCE AND SECURITY PROCEDURES)) (FY 09 5307). RIVERSIDE TRANSIT RIV041021 0 BUS RAPID TRANSIT (BRT) ENHANCEMENTS: ADVERTISING, MARKETING, PLACEMENT/LOGISTICS OF BRT INFRASTRUCTURE, STUDIES, $262 ETC. FOR BRT DEVELOPMENT & IMPLEMENTATION (FY 05 5307) RIVERSIDE TRANSIT RIV050556 0 BUS RAPID TRANSIT (BRT) ENHANCEMENTS: DEVELOP BRT ENHANCEMENT PLAN (E.G. PROMOTIONAL STRATEGIES, BRAND AWARENESS $400 & RIDERSHIP SCENARIOS, ETC.) (FY 06 5307 UZA: TEM/MURR) (TE) RIVERSIDE TRANSIT RIV061138 0 FACILITIES IMPROVEMENTS AT EXISTING RTA RIVERSIDE & HEMET FACILITIES (E.G. CONCRETE REPLACEMENT, FLOOR RECOATING, $138 FACILITY PAINTING, ROOF REPAIRS, ETC.) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV050524 0 FOR RIV SS – CONSTRUCT EXPANDED SERVICE BAY FOR VEHICLE MAINTENANCE AT EXISTING RIVERSIDE MAINT. FACILITY OPS AREA $1,000 SUPPORTING EXISTING VEHICLE FLEET (FY 07 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV080926 0 FOR RIVERSIDE SPECIAL SERVICES – CONSTRUCT FLEET BAY FOR PARARANSIT VEHICLES, PER APPROVED 2008/2009 SRTP, TABLE 4 – $1,030 CAPITAL PROJECT NO. FY 09-3 (FY 09 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV071263 0 IN COACHELLA VALLEY – FRED WARING CORRIDOR EXPRESS SERVICE DEMONSTRATION PROJECT: PROVIDE LIMITED EXPRESS SERVICE $350 FROM THE INDIO TRANSFER LOCATION TO THE TRANSFER LOCATION ON TOWN CENTER WAY WITH SERVICE TO COLLEGE OF THE DESERT AND LIMITED STOPS ALONG THE CORRIDOR. RIVERSIDE TRANSIT RIV070708 0 IN COACHELLA VALLEY – PURCHASE 16 REPLACEMENT BUSES (ALT-FUEL 30-40 FT, 30-43 PASSENGER) W/ LIFTS, RACKS, FARE BOXES, $5,226 RADIOS & ACCESSORIES (FY 08 5307) (UZA: INCCPS) (E-BUSP-0101) RIVERSIDE TRANSIT RIV110408 0 IN COACHELLA VALLEY – RIDESHARE PROGRAM (FTA 5316, FY'S 09 AND 10). $165 RIVERSIDE TRANSIT RIV090109 0 IN COACHELLA VALLEY – RIDESHARE PROGRAM (FY 07 & 08 – 5316). $50 RIVERSIDE TRANSIT RIV090403 0 IN COACHELLA VALLEY AREA – CNG FUELING STATION IMPROVEMENTS (2008/2009 SRTP – REV TABLE 4 – SL09-09). $439 RIVERSIDE TRANSIT RIV090912 0 IN COACHELLA VALLEY AREA – PURCHASE FIVE (5) REPLACEMENT ALT FUEL PARATRANSIT VEHICLES (2008/2009 SRTP – TABLE 4 – SL $515 09-13, UPDATED 9/16/2009) (FTA 5307 – FY 09). RIVERSIDE TRANSIT RIV110805 0 IN COACHELLA VALLEY AREA – PURCHASE SEVEN (7) REPLACEMENT CNG PARATRANSIT BUSES (FTA 5307 – FY 12)(UZA: INCCPS). $665 RIVERSIDE TRANSIT RIV090113 0 IN COACHELLA VALLEY AREA FOR DESERT ARC: PURCHASE ONE REPLACEMENT LARGE BUS – VII (FY 08 – 5310). $95 RIVERSIDE TRANSIT RIV110106 0 IN COACHELLA VALLEY AREA FOR SUNLINE TRANSIT AGENCY – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 – 5307 CARRY OVER) $1,875 (UZA: INCCPS). RIVERSIDE TRANSIT RIV090615 0 IN COACHELLA VALLEY AREA FOR SUNLINE TRANSIT AGENCY – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 5307) (UZA: INCCPS). $1,745 RIVERSIDE TRANSIT RIV110110 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES – TRANSIT SECURITY ENHANCEMENT PROJECT (E.G., FENCING AROUND $810 PERIMETERS OF THOUSAND PALMS AND INDIO FACILITIES). RIVERSIDE TRANSIT RIV110809 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES – TRANSIT SECURITY ENHANCEMENT PROJECT, INCLUDING REPLACEMENT $395 VEHICLES FOR STAFF IN THE SAFETY/SECURITY DEPARTMENT AND TO ENHANCE BUS STOPS THROUGHOUT THE VALLEY (PROP 1B FUNDED PROJECT). RIVERSIDE TRANSIT RIV071232 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES/MAINTENACE BUILDING: MAINTENANCE BUILDING CAPABILITY EXPANSION $3,250 AND REHABILITATION/ENHANCEMENTS OF THE EXISTING MAINTENANCE BUILDING. (FY 09 – ARRA 5307). RIVERSIDE TRANSIT RIV110111 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITY – FACILITY IMPROVEMENTS: IMPROVE EXISTING FACILITIES, INCLUDING ROOF $451 REPAIR, CARPET REPLACEMENT, BLIND REPLACEMENT, PARKING LOT REPAIRS, ETC., AT THE THOUSAND PALMS AND INDIO FACILITIES (FY 11 – 5307) (UZA: INDCCPS). Project List 73

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV071266 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT – CONSTRUCTION OF NEW ADMINISTRATIVE OFFICE AND TRANSIT HUB AT 32-505 $16,980 HARRY OLIVER TR., IN THOUSAND PALMS, CA. THE NEW ADMINISTRATIVE OFFICE WILL REPLACE THE 24-YR. OLD TEMPORARY TRAILER FACILITIES THAT HAVE EXCEEDED THEIR USEFUL LIFE BY 4 YEARS (FTA 5309C – E-2009-BUSP-171; 2009 HR 1105, PUBLIC LAW 11-8). RIVERSIDE TRANSIT RIV110801 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – CAPITALIZED PREVENTIVE MAINTENANCE (FY 12 – 5307 & CARRY OVER) (UZA: $1,967 INCCPS). RIVERSIDE TRANSIT RIV110808 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – FACILITY IMPROVEMENTS: IMPROVE THE THOUSAND PALMS AND INDIO $550 FACILITIES, INCLUDING ROOF REPAIR, BUILDING ROOF, REPLACEMENT OF CARPETING AND BLINDS, AND REPAIR OF PARKING FACILITIES FOR STAFF USE (FTA 5307 – FY 12) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090614 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR $20,960 2009/2010 (FY 10 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110105 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR $19,449 2010/2011 (FTA 5307 – FY 11 AND C/O FY 10) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110803 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR $20,077 2011/2012 (FTA 5307 – FY 12 AND C/O FY 11) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110103 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – FURNITURE REPLACEMENT: PURCHASE NEW FURNITURE TO REPLACE $300 EXISTING FURNITURE FOR STAFF IN VARIOUS DEPARTMENTS (FY 11 – 5307) (UZA: INDCCPS). RIVERSIDE TRANSIT RIV110827 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – FURNITURE REPLACEMENT: PURCHASE OF OFFICE FURNITURE TO REPLACE $120 AND ADD FURNITURE AS THE FURNITURE REACHES THE END OF ITS CYCLE LIFE (FY 12 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090107 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – JOB ACCESS & REVERSE COMMUTER PROGRAM & NEW FREEDOM PROJECTS $207 LUMP SUM FOR NON-PROFIT ORGANIZATIONS (CONSISTENT W/40 CFR PART 93 EXEMPT TABLES 2 AND 3 ) ( FY 07 & 08 – 5316 & 5317). RIVERSIDE TRANSIT RIV090620 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – JOINT PARTNERSHIP WITH CALSTART/WESTSTART FOR FUEL CELL BUS $282 RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE A ZERO EMISSION BUS (E-2008-BUSP-0102). RIVERSIDE TRANSIT RIV071228 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE 4 EXPANSION PARATRANSIT DAR BUSES (CNG, 30 FT., APPROX. 12 $412 PASSENGER), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES (PER SUNLINE'S REV. 2008/2009 SRTP T-4 – SL09-08). RIVERSIDE TRANSIT RIV090617 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE FIVE REPLACEMENT NON-REVENUE SUPPORT VEHICLES (FY 10 $231 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090619 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE FOUR EXPANSION PARATRANSIT DAR BUSES (CNG, 30' TO 35' – $400 APPROX. 12 PASSENGER), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES (FY 10 5307) (FTA 5309 – E-2009-BUSP-135)(UZA: INCCPS). RIVERSIDE TRANSIT RIV090618 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE FOUR EXPANSION, NON-REVENUE SUPPORT VEHICLES (FY 10 5307) $112 (UZA: INCCPS). RIVERSIDE TRANSIT RIV110810 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE OF TICKET VENDING MACHINE (TVM) FOR INSTALLATION AT A $75 SELECTED BUS TRANSFER LOCATION (FY 12 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110102 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE ONE EXPANSION PARATRANSIT VEHICLE (CNG, 30' TO 35' – $938 APPROX. 12 PASSENGER), WITH LIFT, RADIO, FARE BOX, AND ACCESSORIES TO EXPAND DEMAND RESPONSE SERVICE AND ONE COMMUTER BUS TO PROVIDE COMMUTER SERVICE FROM THE COACHELLA VALLEY TO THE PASS AREA (FY 11 – 5309). 74 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV110108 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE SEVEN EXPANSION PARATRANSIT DAR BUSES (CNG – 25' TO 35' $748 BUSES), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES FOR SERVICE EXPANSION THROUGHOUT THE SERVICE AREA, BASED ON RECOMMENDATIONS IN THE 2006 COA AND 2009 COA UPDATE. THE BUSES WILL BE USED TO EXPAND DAR, SPECIALIZED TRANSIT SERVICES AND FOR SENIORS AND PERSONS W/DISABILITIES. RIVERSIDE TRANSIT RIV110109 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., BUS $300 SHELTERS, KIOSK LEXANS, LEXAN SCHEDULES, SOLAR BATTERIES, AND MISC. SUPPLIES) FOR VARIOUS BUS STOPS (FY 11 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090621 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., KIOSK $80 LEXANS, LEXAN SCHEDULES, SOLAR BATTERIES, AND MISC. SUPPLIES), FOR VARIOUS BUS STOPS (FY 10 5307) (UZA: INDCCPS). RIVERSIDE TRANSIT RIV110806 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES FOR CONTINUED $66 IMPROVEMENTS TO BUS STOPS FOR THE SAFETY AND COMFORT OF PASSENGERS AS RECOMMENDED IN THE COMPREHENSIVE OPERATIONAL ANALYSIS (FY 12 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090622 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR $650 EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS (FY 10 5307) (UZA: INDCCPS). RIVERSIDE TRANSIT RIV080921 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR $1,417 EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS. ITS EQUIPMENT TO BE PURCHASED INCLUDES: AUTOMATED VEHICLE LOCATORS (AVL), GEOGRAPHIC POSITIONING SYSTEM (GPS), AND MOBILE DATA TERMINALS (MDT) (FY 09 – ARRA 5307). RIVERSIDE TRANSIT RIV110812 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – TECHNICAL TRANSIT PLANNING AND FACILITY FEASIBILITY STUDIES (FY 12 – $450 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090120 0 IN CORONA – BUS STOP SHELTERS AND BUS STOP AMENITIES AND REPLACEMENT EQUIPMENT (FY 10 – ARRA FTA 5307). $240 RIVERSIDE TRANSIT RIV090610 0 IN CORONA – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 – 5307) (UZA: RIV-SB). $606 RIVERSIDE TRANSIT RIV051201 0 IN CORONA – CONTINUE THE IMPLEMENTATION OF A 60 SPACE PARK-AND-RIDE LOT (VIA ANNUAL LEASE AGREEMENT) AT LIVING TRUTH $40 CHRISTIAN FELLOWSHIP AT 1114 W. ONTARIO AVE. RIVERSIDE TRANSIT RIV090119 0 IN CORONA – PURCHASE 4 REPLACEMENT TYPE II CNG PARATRANSIT DIAL-A-RIDE BUSES W/LIFTS, FAREBOXES, SECURITY CAMERAS, $360 COMMUNICATION EQUIPMENT & ACCESSORIES (FY 10 – ARRA FTA 5307). RIVERSIDE TRANSIT RIV091210 0 IN CORONA – PURCHASE THREE REPLACEMENT TYPE II CNG PARATRANSIT DIAL-A-RIDE BUSES W/LIFTS, FAREBOXES, SECURITY $260 CAMERAS, COMMUNICATION EQUIPMENT & ACCESSORIES (FEDERAL APPROPRIATION THROUGH HR 3288, FFY 2009/2010 – FTA 5309). RIVERSIDE TRANSIT RIV110802 0 IN EASTERN RIVERSIDE COUNTY FOR PALO VERDE TRANSIT AGENCY – OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE $960 OPERATING ASSISTANCE FOR FISCAL YEAR 2011/2012 (UZA: PALO VERDE). RIVERSIDE TRANSIT RIV110112 0 IN EASTERN RIVERSIDE COUNTY FOR PALO VERDE VALLEY TRANSIT AGENCY – FIXED ROUTE AND DIAL-A-RIDE: OPERATING ASSISTANCE $828 FOR FISCAL YEAR 2010/2011 (FY 11 – 5307) (UZA: PALO VERDE). RIVERSIDE TRANSIT RIV041029 0 IN RIVERSIDE – CONSTRUCT NEW RIVERSIDE TRANSIT CENTER AT 4141 VINE ST., IN THE VICINITY OF DOWNTOWN METROLINK STATION $7,510 (5309C FY 03+04+06+08, E-2006-BUSP-156 & E-2008-BUSP-0688 EARMARKS) (FY 09 5309) (UZA: RIV-SAN) (TE) RIVERSIDE TRANSIT RIV110914 0 IN RIVERSIDE AND SAN BERNARDINO COUNTY – FOR RIVERSIDE – SAN BERNARDINO COUNTY INDIAN HEALTH, INC.: PURCHASE OF FIVE $220 MINI-VANS FOR SERVICE EXPANSION (FTA 5310 – FFYS 10 & 11) ($25 TDC USED TO MATCH FTA 5310 IN CONS). Project List 75

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV110828 0 IN RIVERSIDE CO – GROUPED PROJECTS FOR PURCHASE OF NEW BUSES & RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR $234 EXPANSIONS OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF NEW AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET (FTA 5310 – FFYS 10 & 11) ($27 TDC USED TO MATCH FTA 5310 IN CONS). RIVERSIDE TRANSIT RIV110915 0 IN RIVERSIDE CO – GROUPED PROJECTS FOR PURCHASE OF NEW BUSES & RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR $630 EXPANSIONS OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF NEW AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET (FTA 5310 – FFYS 10 & 11) ($72 TDC USED TO MATCH FTA 5310 IN CONS). RIVERSIDE TRANSIT RIV100604 0 IN RIVERSIDE COUNTY – GROUPED PROJECTS FOR PURCHASE OF NEW BUSES AND REPLACEMENT OF EXISTING VEHICLES OR FOR $1,364 MINOR EXPANSION OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES – PURCHASE OF NEW BUSES AND REPLACEMENT OF EXISTING VEHICLES OR FOR MINOR EXPANSION OF THE FLEET (FTA 5310 – FY 2009). RIVERSIDE TRANSIT RIV110829 0 IN RIVERSIDE COUNTY – GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES: $2 PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (FTA 5310 – FFY'S 10 AND 11) (.27K TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FTA 5310 IN CONS). RIVERSIDE TRANSIT RIV090611 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 – 5307) (UZA: RIV-SB). $300 RIVERSIDE TRANSIT RIV110101 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 11 – 5307) (UZA: RIV-SB). $300 RIVERSIDE TRANSIT RIV110807 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 12 – 5307) (UZA: RIV-SB). $350 RIVERSIDE TRANSIT RIV090121 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES – PURCHASE FAREBOX SYSTEM (FY 10 –ARRA FTA 5307). $530 RIVERSIDE TRANSIT RIV110826 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES – REPLACEMENT VEHICLES: PURCHASE OF FOUR (4) REPLACEMENT ALT-FUEL (CNG) $475 DIAL-A-RIDE PARATRANSIT VEHICLES W/LIFTS, TIEDOWNS, FAREBOXES, RADIOS, CAMERAS, AND ACCESSORIES (FY 12 – 5307) (UZA: RIV-SAN). RIVERSIDE TRANSIT RIV090122 0 IN RIVERSIDE, FOR RIVERSIDE SPECIAL SERVICES – PURCHASE EQUIPMENT TO SUPPORT THE CNG MAINTENANCE FACILITY OPERATION $170 (FY 10 – ARRA FTA 5307). RIVERSIDE TRANSIT RIV050553 0 IN TEMECULA – CONSTRUCT NEW TEMECULA TRANSIT CENTER AT 27199 JEFFERSON AVE. (SW OF JEFFERSON AVE & SE OF CHERRY ST) $8,000 (04, 05, 06, 07, E-2006-091, E-2007-0131, & 2008-BUSP-0131, SAFETEA-LU). RIVERSIDE TRANSIT RIV041030 0 IN THE CITY OF HEMET – CONSTRUCT NEW HEMET TRANSIT CENTER (WITH APPROXIMATELY 4 BUS BAYS) AT 700 SCARAMELLA CR., $1,442 HEMET, CA (5309C FY 04 + 05 EARMARKS). RIVERSIDE TRANSIT RIV110406 0 IN THE COACHELLA VALLEY FOR CVAG – JOB ACCESS & REVERSE COMMUTE PROGRAM: PROVIDE SHUTTLE SERVICE FOR THE $199 HOMELESS SEEKING EMPLOYMENT – SHUTTLE SERVICE WILL PROVIDE CONNECTIONS TO SUNLINE BUS HUBS AND TO AREAS WHERE SUNLINE DOES NOT CURRENTLY SERVE. PROGRAM ALSO INCLUDES MOBILITY MANAGER (FTA 5316, FY'S 09 AND 10). RIVERSIDE TRANSIT RIV090103 0 IN THE COACHELLA VALLEY FOR SUNLINE – JOB ACCESS & REVERSE COMMUTE PROGRAM: OPERATING ASSISTANCE TO PROVIDE $506 EXTENDED NIGHT/GUARANTEED SERVICE PROGRAM (FY 07 & 08 – 5316). RIVERSIDE TRANSIT RIV090108 0 IN THE COACHELLA VALLEY FOR SUNLINE – NEW FREEDOM PROGRAM: OPERATING ASSISTANCE TO FUND TRIP PROGRAM (FY 07 & 08 $208 -5317). RIVERSIDE TRANSIT RIV071283 0 IN THE COACHELLA VALLEY FOR SUNLINE – OPERATING ASSISTANCE TO PROVIDE COMMUNITY BASED FLEX ROUTE IN THE CITY OF $477 DESERT HOT SPRINGS (FY 06 5316 AND 5317) . RIVERSIDE TRANSIT RIV110813 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT – PURCHASE MISCELLANEOUS MAINTENANCE TOOLS AND EQUIPMENT: PURCHASE $100 OF MAJOR REPLACEMENT TOOLS, EQUIPMENT AND PARTS USED IN ROUTINE VEHICLE MAINTENANCE (FY 12 – 5307) (UZA: INCCPS). 76 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV110104 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT – PURCHASE OF MAJOR REPLACEMENT TOOLS, EQUIPMENT AND PARTS USED IN $200 ROUTINE VEHICLE MAINTENANCE (E.G., MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SOFTWARE UPDATES, SERVICE JACKS, MISC. AIR AND HAND TOOLS AND DRILL BITS) (FY 11 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110811 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – IMPLEMENT INTELLIGENT TRANSPORTATION SYSTEM (ITS) PROJECT: $500 PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR SERVICE PLANNING AND DEVELOPMENT FOR NEW AND EXISTING ROUTES, IN ADDITION TO SCHEDULE ADHERENCE (FY 12 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110407 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – JOB ACCESS & REVERSE COMMUTE AND NEW FREEDOM PROJECT: $535 EXPRESS SERVICE TO THE PASS AREA WITH SERVICE TO BANNING AND BEAUMONT, CONNECTING COACHELLA VALLEY COMMUTERS TO WESTERN RIVERSIDE COUNTY (FTA 5316 AND FTA 5317, FY'S 09 AND 10). RIVERSIDE TRANSIT RIV110409 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY –TAXI VOUCHER PROGRAM FOR COACHELLA VALLEY RESIDENTS AGE 60 $332 AND OVER AND /OR DISABLED. PROGRAM OFFERS A FIFTY PERCENT DISCOUNT FOR INTER CITY AND INTRA CITY TRAVEL, WITHIN THE COACHELA VALLEY (FTA 5317, FY'S 09 AND 10). RIVERSIDE TRANSIT RIV090616 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE'S FLEET OLDER BUSES, INCLUDING $743 RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/ REHAB BUSES (FY 10 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110107 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE'S FLEET OLDER BUSES, INCLUDING $300 RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/REHAB BUSES (FY 11 – 5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV110804 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE'S FLEET OLDER BUSES, INCLUDING $160 RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/REHAB BUSES (FY 12 -5307) (UZA: INCCPS). RIVERSIDE TRANSIT RIV090404 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE'S FLEET OLDER BUSES, INCLUDING $418 RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR. RIVERSIDE TRANSIT RIV100602 0 IN WESTERN RIVERSIDE COUNTY – GROUPED PROJECT LISTING FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR $4 EXISTING FACILITIES: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND 3 CATEGORIES – PURCHASE OF OFFICE, SHOP AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (FTA 5310 – FY 2009). RIVERSIDE TRANSIT RIV110121 0 IN WESTERN RIVERSIDE COUNTY – RTA FACILITY IMPROVEMENTS: CARPET REPLACEMENT AT THE RIVERSIDE FACILITY (FTA 11 – 5307) $5 (UZA: HEM/SJ). RIVERSIDE TRANSIT RIV090607 0 IN WESTERN RIVERSIDE COUNTY AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: FACILITY MAINTENANCE AND IMPROVEMENTS $376 – ROOF REPLACEMENT AND UPGRADE OF SHOP VENTILATION IN THE REPAIR GARAGE AREA, PER CFC 2211.7 AND THE CALIFORNIA MECHANICAL CODE (FY 10 5307) (UZA: RIV/SAN). RIVERSIDE TRANSIT RIV090116 0 IN WESTERN RIVERSIDE COUNTY FOR CARE CONNEXXUS, INC: PURCHASE ONE REPLACEMENT LARGE BUS (APPROX. 16 PASSENGERS, $95 GAS/DIESEL) W/LIFT AND TIEDOWNS (FY 08 – 5310). RIVERSIDE TRANSIT RIV090112 0 IN WESTERN RIVERSIDE COUNTY FOR MOUNTAIN SHADOWS SUPPORT GROUP – RIVERSIDE: PURCHASE TWO EXPANSION VEHICLES $126 (MED. BUSES – II) (FY 08 – 5310). RIVERSIDE TRANSIT RIV090111 0 IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE: PURCHASE ONE REPLACEMENT MODIFIED VAN (TYPE V – APPROX. 8 $51 PASSENGER, GAS/DIESEL) WITH MOBILE RADIO (FY 08 -5310). Project List 77

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV090613 0 IN WESTERN RIVERSIDE COUNTY FOR RIVERSIDE SPECIAL SERVICES -INSTALLATION OF ADDITIONAL CNG SLOW FILL STATIONS, $500 ACCOMMODATING FUTURE FLEET EXPANSION (FROM 20 TO 29 FILL STATIONS), PER APPROVED 2009/2010 SRTP – TABLE 4A PROJECT NO. 10-4 (FY 10 5307) (UZA: RIV-SAN). RIVERSIDE TRANSIT RIV090612 0 IN WESTERN RIVERSIDE COUNTY FOR RIVERSIDE SPECIAL SERVICES -PURCHASE OFFICE EQUIPMENT FOR ADMINISTRATIVE OFFICES, $20 CONFERENCE ROOM, TRAINING ROOM AND FOR THE CNG VEHICLE MAINTENANCE FACILITY, PER APPROVED 2009/2010 SRTP – TABLE 4A – PROJECT NO. 10-1 (FY 10 5307) (UZA:RIV-SAN). RIVERSIDE TRANSIT RIV041028 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – BUS RAPID TRANSIT (BRT) AMENITIES (E.G. SIGNS, ATIS KIOSKS, SHELTER MATERIALS, $1,582 ETC.) FOR VARIOUS BRT STOPS. RIVERSIDE TRANSIT RIV090127 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – BUS STOP AMENITIES: PURCHASE BENCHES, POLES/EXTENSIONS, SIGNS, TRASH $225 RECEPTACLES, I-STOPS, ETC., TO REHAB & EXPAND EXISTING STOP/SHELTERS (FY 10 – ARRA-FTA 5307 & ARRA-FTA 5311). RIVERSIDE TRANSIT RIV110115 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL COST OF CONTRACTING (FY 11 – FTA 5307) (UZA: RIV-SB, TEM/MURR, & ARRA FTA $6,713 5307 CARRY OVER). RIVERSIDE TRANSIT RIV110816 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL COST OF CONTRACTING (FY 12 – FTA 5307) (UZA: RIV-SB, TEM/MURR). $5,313 RIVERSIDE TRANSIT RIV110120 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL MAINTENANCE EQUIPMENT: PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT $64 (E.G., LIFT REBUILD, POINJAR, AIR COMPRESSOR/GENERATORS) (FY 11 – 5307) (UZA: HEM/SJ). RIVERSIDE TRANSIT RIV110822 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL MAINTENANCE SPARES: PURCHASE OF SPARE PARTS FOR ROLLING STOCK UNDER $1,679 THE BUS MAINTENANCE PROGRAM (FY 12 – 5307) (UZA: RIV-SB). RIVERSIDE TRANSIT RIV110118 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL MAINTENANCE SPARES: PURCHASE OF SPARE PARTS FOR ROLLING STOCK UNDER $1,666 THE MAINTENANCE PROGRAM (FY 11 – 5307) (UZA: TEM/MURR). RIVERSIDE TRANSIT RIV090604 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL MAINTENANCE SPARES: PURCHASE ROLLING STOCK CAPITAL PARTS (E.G., $2,484 ALTERNATOR, MANIFOLDS, PUMPS, CONTROLLER, TRANSMISSIONS, COMPRESSOR, ETC.) (FY 10 – 5307)(UZA: TEM/MURR). RIVERSIDE TRANSIT RIV110119 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED COST OF TIRE LEASE (FY 11 – 5307) (UZA: HEM/SJ). $261 RIVERSIDE TRANSIT RIV110823 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED COST OF TIRE LEASE (FY 12 – 5307) (UZA: RIV-SB). $243 RIVERSIDE TRANSIT RIV090123 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 – ARRA FTA 5307 & ARRA-FTA 5311 + $9,448 $58 FROM FY 10 – FTA 5307 UZA:TEM/MURR + $104 FROM FY'S 07, 08 & 09 UZA: LA/LB/STA ANA). RIVERSIDE TRANSIT RIV110114 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 11 – 5307) (UZA: RIV/SB, TEM/MUUR & $8,714 ARRA FTA 5307 CARRY OVER). RIVERSIDE TRANSIT RIV110815 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 12 – FTA 5307) (UZA: RIV-SB, TEM/MURR). $9,188 RIVERSIDE TRANSIT RIV071219 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – DEBT FINANCING (FY 08/09 PORTION) FOR 55 CNG REPLACEMENT 40-FT BUSES $2,032 PURCHASED IN 2001 THROUGH THE CTFC (FY 09 5307). RIVERSIDE TRANSIT RIV090126 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – DEBT FINANCING (FY 09/10) FOR 55 CNG REPLACEMENT 40-FT BUSES PURCHASED IN 2001 $4,810 THROUGH THE CTFC (FY 10 – ARRA-FTA 5307 + FY 10 – FTA 5307 UZA: RIV/SB + TEM/MURR). RIVERSIDE TRANSIT RIV090105 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – PROJECTS ARE $2,174 CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES (FY 07 & 08 5316 & 5317). 78 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV110824 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – IMPROVEMENTS TO THE HEMET AND RIVERSIDE FACILITIES, INCLUDING FLOORING $2,797 REPLACEMENT, LIGHTING RETROFIT, RESURFACING OF MAINTENANCE SHOP FLOORS, PAINTING OF THE INTERIOR AND EXTERIOR, CONCRETE REPAIR/REPLACEMENT, ROOF REPAIRS, PURCHASE OF ERGONOMICALLY DESIGNED FURNITURE, AND CONVERSION OF UNDERGROUND STORAGE TANKS TO ABOVE-GROUND STORAGE. RIVERSIDE TRANSIT RIV090608 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – INFORMATION SYSTEMS: REPLACEMENT AND UPGRADES OF TELEPHONE SYSTEM AND $170 MICROSOFT EXCHANGE SERVER IN THE RIVERSIDE AND HEMET FACILITIES(FY 10 5307) (UZA: RIV/SAN). RIVERSIDE TRANSIT RIV090104 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – JOB ACCESS & REVERSE COMMUTE PROGRAM OPERATING ASSISTANCE: COMMUTER LINK $1,541 SERVICES – ROUTES 212 AND 217 (FY 07 & 08 – 5316) (UZAS: HEM/SAN JAC + TEM/MURR). RIVERSIDE TRANSIT RIV110402 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – JOB ACCESS & REVERSE COMMUTE PROGRAM: EXTENDED SERVICE PROGRAM (FTA 5316, $1,264 FY'S 09 AND 10). RIVERSIDE TRANSIT RIV110403 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – JOB ACCESS AND REVERSE COMMUTE PROGRAM OPERATING ASSISTANCE: COMMUTER $1,399 LINK SERVICES – ROUTES 212 AND 217 (UZAS: HEM/SAN JAC + TEM/MURR) (FTA 5316, FY'S 09 AND 10). RIVERSIDE TRANSIT RIV051007 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – NEAR MORENO VALLEY – REGIONAL TRANSIT CENTER FOR MASS TRANSIT SERVICE IN $6,000 WESTERN RIVERSIDE COUNTY SOUTH OF SR60 ALONG THE I-215 CORRIDOR(PA&ED ONLY). RIVERSIDE TRANSIT RIV071286 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – OPERATING ASSISTANCE FOR THE HEMET OPPORTUNITY PROJECT EXPRESS (HOPE) BUS TO $730 PROVIDE SPECIALIZED TRANSPORTATION SERVICES TO DPSS CLIENTS IN THE HEMET AREA (SEC 5316 – 2006 FUNDS). RIVERSIDE TRANSIT RIV071206 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – PURCHASE REPLACEMENT SUPPORT VEHICLES: 1 RELIEF SUPPORT VEHICLE, AND 1 $54 VEHICLE FOR STOPS AND ZONE OPERATIONS (FY 09 5307) RIVERSIDE TRANSIT RIV110830 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT OF REVENUE VEHICLES: PURCHASE OF 45 REPLACEMENT REVENUE $6,263 VEHICLES (GASOLINE), 21 TYPE VII COMMUTERLINK VEHICLES AND 24 TYPE VII FIXED ROUTE VEHICLES. RIVERSIDE TRANSIT RIV110818 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT REVENUE VEHICLES FOR CONTRACTED OPERATIONS: PURCHASE OF NINE $1,577 (9) E-LO BUSES – THREE (3) COMMUTERLINK SERVICE AND SIX (6) FOR CONTRACTED FIXED ROUTES. THE 3-LO BUSES ARE MED-SIZE, MED-DUTY, APPROX. 30-FT IN LENGTH AND HAVE ESTIMATED SERVICE LIFE OF SEVEN YEARS OR 200,000 MILES (FY 12 – 5307) (UZA: RIV-SB). RIVERSIDE TRANSIT RIV110819 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT REVENUE VEHICLES FOR DIAL-A-RIDE OPERATIONS: PURCHASE OF 38 $2,788 TYPE II VEHICLES FOR DIAL-A-RIDE OPERATIONS. (FY 12 5307 & FY 11 5309C STATE OF GOOD REPAIR DISCRETIONARY FUNDING) (UZA: RIV-SB). RIVERSIDE TRANSIT RIV110820 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT SUPPORT VEHICLES: PURCHASE OF NINE (9) RELIEF CARS FOR OPERATIONS $136 (FY 12 – 5307) (UZA: RIV-SB). RIVERSIDE TRANSIT RIV110821 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT TRUCKS FOR STOP AND ZONE OPERATIONS: PURCHASE OF THREE (3) $161 TRUCKS FOR STOP AND ZONE OPERATIONS (FY 12 – 5307) (UZA: RIV-SB). RIVERSIDE TRANSIT RIV090606 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REVENUE VEHICLE SYSTEMS: PURCHASE GFI FAREBOX UPGRADE (BV-8) (FY 10 5307) (UZA: $65 RIV/SAN). RIVERSIDE TRANSIT RIV091211 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – VEHICLE REPLACEMENT: PURCHASE FIFTY EIGHT (58) REPLACEMENT HEAVY DUTY CNG $33,825 REVENUE VEHICLE ROLLING STOCK (FEDERAL APPROPRIATION THROUGH HR 3288, FFY 2009/2010 – FTA 5309). RIVERSIDE TRANSIT RIV110113 0 IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 2010/2011 – OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE (FY 11 – 5307) $34,540 (UZA: HEM/SJ). RIVERSIDE TRANSIT RIV110814 0 IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 2011/2012 – OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE (FY 12 – 5307) $37,812 (UZA: HEM/SJ). Project List 79

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV110410 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: DRIVER SENSITIVITY TRAINING FOR CARE CONNEXXUS, INC. (FTA 5317, FY'S 09 AND 10). $30 RIVERSIDE TRANSIT RIV090609 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: INSTALL ADVANCE TRAVELER INFORMATION SYSTEMS (ATIS) ON VARIOUS FIXED ROUTE $612 VEHICLES AND INSTALLATION OF ELECTRONIC MESSAGE SIGNS AT APPROX. 60 BUS STOPS (FY 'S 05, 07, 08, 09, AND 10 – 5309). RIVERSIDE TRANSIT RIV110405 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: MOBILITY MANAGEMENT AND TRAVEL TRAINING PROGRAM (FTA 5316 AND 5317, FY'S 09 $616 AND 10). RIVERSIDE TRANSIT RIV061142 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE DIRECT TV & WIFI ON COMMUTER LINK FOR ENHANCED COMMUTER TRAVEL (FY $290 08 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV061136 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE IT OFFICE EQUIPMENT (E.G. PC & NOTEBOOK COMPUTERS AND REPLACE $186 NETWORK EQUIPMENT & COPIERS, ETC.) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV080928 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: UPGRADE AND REPLACE ORACLE SERVERS AND IMPLEMENT A DATA CENTER SERVER $379 VIRTUALIZATION SYSTEM IN RIVERSIDE CONNECTED WITH A LIVE REPLICATED DISASTER RECOVERY SITE IN HEMET (FY 09 5307). RIVERSIDE TRANSIT RIV110404 0 IN WESTERN RIVERSIDE COUNTY OPERATING ASSISTANCE FOR RIVERSIDE COUNTY REGIONAL MEDICAL CENTER FOR DIRECTLY $820 OPERATED TRANSPORTATION SERVICES – SPECIALIZED NON-EMERGENCY MEDICAL TRANSPORTATION PROGRAM (FTA 5317, FY'S 09 AND 10). RIVERSIDE TRANSIT RIV070712 0 JOINT PARTNERSHIP W/ CALSTART/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP & OPERATE $489 A ZERO EMISSION BUS (E-2006-BUSP-149 + E-2007-BUSP-0102) RIVERSIDE TRANSIT RIV080919 0 JOINT PARTNERSHIP W/CALSTAR/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE $271 A ZERO EMISSION BUS (E-2008-BUSP-0102). RIVERSIDE TRANSIT RIV090301 0 METROLINK POSITIVE TRAIN CONTROL (PTC): SYSTEM WIDE IMPLEMENTATION OF PTC – JOINT PROJECT FUNDED BY LACMT, OCTA, $4,786 SANBAG, AND VCTC (RCTC PROGRAMMING ONLY ITS SHARE OF THE PROJECT COST) (FY 09 – ARRA FTA 5307). RIVERSIDE TRANSIT RIV011242 0 PURCHASE EXPANSION ROLLING STOCK (2 CAB CARS AND 3 LOCOMOTIVES) FOR METROLINK IEOC AND RIVERSIDE/FULLERTON/LA $19,693 LINES (EA: RIVFUL, PPNO: 0079E) RIVERSIDE TRANSIT RIV061137 0 PURCHASE NEW SHOP EQUIPMENT: (E.G. CUT-OFF SAW, BRAKE DRUM DOLLY, TRANSMISSION JACK, IMPACT WRENCHES, LAP TOP $26 COMPUTERS & SOFTWARE, ETC.) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV061113 0 PURCHASE REPLACE. SHOP EQUIP. (E.G. PARALLELOGRAM & SEFEC LIFTS, STAR BRAKE LATHE, PRESSURE WASHER, BUS WASH BRUSH, $155 TIRE/VACUUM MACHINES, SWEEPERS, ETC.) (FY 07 5307)(UZA: RIV-SAN) RIVERSIDE TRANSIT RIV061153 0 PURCHASE REPLACEMENT MAINTENANCE TOOLS, EQUIPMENT, & PARTS (E.G. MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, $200 SERVICE JACKS, AIR & HAND TOOLS, ETC.) (FY 07 5307) (UZA: INCCPS) RIVERSIDE TRANSIT RIV071218 0 PURCHASE SCHEDULING AND RUNCUTTING SOFTWARE FOR IMPROVED OPERATIONS COST/BENEFIT ANALYSIS OF TRIP TIMES, REVENUE $350 HOURS, HEADWAYS, OPERATOR PAY SHEETS, ETC. (FY 07 5307 & FY 09 5307 ). RIVERSIDE TRANSIT RIV061157 0 PURCHASE TRANSIT ENHANCE. BUS STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, $799 SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 08 5307) (UZA: INDCCPS) (TE) RIVERSIDE TRANSIT RIV071229 0 PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, $1,250 SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 09 5307 + FY 09 – ARRA-FTA 5307) (UZA: INDCCPS) (TE) RIVERSIDE TRANSIT RIV120101 0 RCTC COMMUTER RAIL SYSTEMATIC IMP. OF FACILITIES AND EQUIPMENT: REHAB OF RCTC’S COMM. RAIL IN COORDINATION W/ $10,000 METROLINK, INCLUDING REHAB OF TRACK, SIGNALS, COMMUNICATION, MECHANICAL & LAYOVER FACILITIES, ROLLING STOCK (LOCOMOTIVES/PASSENGER RAIL CARS), DEV. OF PTC IN SO. CA., AND IMPROVEMENTS, EXPANSION, AND REHAB OF METROLINK STATION PARKING AND FACILITIES ($2,000 TC UTILIZED FOR 20% MATCH). 80 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE TRANSIT RIV010214 0 RCTC SHARE OF PURCHASE OF METROLINK CARS & LOCOMOTIVES – UP TO 47 CARS/CABS & 8 LOCOS TO BE ORDERED BY 6/30/06 (FY $15,448 03 & 04 5307) (SHARES AMONG LAOC8231, SBD20020801, & ORA090302) RIVERSIDE TRANSIT RIV061143 0 RCTC'S SHARE OF OCTA'S FY 07 REHAB AND RENOVATION (FY 07 5307) (UZA: RIV-SAN) $75 RIVERSIDE TRANSIT RIV520109 0 RECONSTRUCT & UPGRADE SAN JACINTO BRANCH LINE FOR RAIL PASSENGER SERVICE (RIVERSIDE TO PERRIS) (PERRIS VALLEY LINE) $246,827 (FY 07 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV520111 0 REGIONAL RIDESHARE – CONTINUING PROGRAM. $10,157 RIVERSIDE TRANSIT RIV090601 0 REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING $3,377 STOCK. UTILIZATION OF TOLL DEVELOPMENT CREDITS TO MATCH FTA 5307 AND FTA5309(A) IN CONSTRUCTION IS AS FOLLOWS: $245 IN FY 11 FOR FTA 5307 AND 5309(A); AND $251.2 IN FY 12 FOR FTA 5307. RIVERSIDE TRANSIT RIV050530 0 SCRAA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 07 5307 PORTION TO SCRA $406 PROJECT) (FY 07 5307) (UZA: RIV-SAN) (PARENT: LA963505) RIVERSIDE TRANSIT RIV090303 0 SCRRA CENTRAL MAINTENANCE FACILITY AND KELLER STREET YARD MAINTENANCE FACILITY: INSTALLATION OF A GUARD GATE AND $760 MODIFICATION OF AN EXISTING LOCKING DOCK FOR BETTER ACCESS AND ADDITIONAL STORAGE FOR NEW EQUIPMENT (FY 09 – ARRA FTA 5307). RIVERSIDE TRANSIT RIV090302 0 SCRRA REHAB & RENOVATION OF METROLINK RAIL: REHABILITATION OF METROLINK TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES $1,670 AND EQUIPMENT (FY 09 – ARRA FTA 5307). RIVERSIDE TRANSIT RIV061145 0 SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 08 PORTION) TO SCRRA $509 PROJECT) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE TRANSIT RIV071235 0 SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 09 PORTION TO SCRRA $2,782 PROJECT) (FY 09 5307) RIVERSIDE STATE 47520 10 AT I-10/JEFFERSON ST IC: RECONSTRUCT, REALIGN, & WIDEN IC 2 TO 6 LANES (SOUTHERLY OF VARNER RD TO UPRR), WIDEN RAMPS, $81,117 HIGHWAY ADD NEW ENTRY RAMPS, INCLUDING RAMP METERING (NO HOV PREFERENTIAL LANE INCLUDED), ADD ACCEL/DECEL LANES AT WB ENTRY AND EB EXIT (<1/4 MILE), AND ADD DEDICATED RIGHT-TURN LANES. (EA: 47520) RIVERSIDE STATE RIV031208 10 AT I-10/MONTEREY AVE IC – RECONFIGURE IC: CONSTRUCT NEW WB ENTRY RAMP AND REALIGN/RELOCATE WB EXIT RAMP (EA: 0F050) $12,699 HIGHWAY RIVERSIDE STATE RIV060115 10 AT I-10/OAK VALLEY PKWY IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES FROM APPROX 500' W/O DESERT LAWN DR TO $25,425 HIGHWAY GOLF CLUB DR, WIDEN RAMPS – EB ENTRY 1 TO 2 LANES, EB & WB EXIT 1 TO 4 LANES, WB ENTRY 1 TO 3 LANES, , ADD NEW EB/WB ENTRY LOOP RAMPS (2 LANES) , ENTRY RAMPS INCLUDE HOV PREFERENTIAL LANE, AND RAMPS INCLUDE EXTENDED ACCELERATION/ DECELERATION LANE (EA: 0G280) RIVERSIDE STATE RIV031209 10 AT I-10/PORTOLA AVE (B/W MONTEREY IC & COOK IC): CONSTRUCT NEW 6 THRU LANE PORTOLA AVE IC FROM DINAH SHORE DR TO $71,993 HIGHWAY VARNER RD & RAMPS (EB & WB EXIT 3 LNS, EB & WB ENTRY 2 LNS, EB ENTRY LOOP RAMP 2 LNS, ENTRY INCL HOV LN, WIDENING INCLUDES BRIDGE OVER UPRR & RELOCATE/WIDEN VARNER 2 TO 4 LNS, ADD EB/WB AUX LNS (MONTEREY TO PORTOLA AND PORTOLA TO COOK), EXTEND 4TH WB LANE COOK TO PORTOLA (EA: 0F120K) RIVERSIDE STATE RIV060116 10 I-10/CHERRY VALLEY BLVD IC: RECON/WIDEN 2 TO 5 & 6 THRU LNS (3 NB+2&3 SB) FROM E/O CALIMESA BLVD TO APPROX W/O ROBERTS $51,500 HIGHWAY RD, RECON/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV LN, RECONFIGURE/WIDEN AS HOOK RAMPS WB ENTRY 1 TO 3 LNS W/ HOV LN & WB EXIT 1 TO 2 LNS, WIDEN EB EXIT RAMP 1 TO 2 LNS, RELOCATE/WIDEN CALIMESA/CHERRY VALLEY BLVD 2 TO 4 LNS, & INCLUDE EXTENDED RAMP ACCEL/DECEL LNS (EA: 0G170) Project List 81

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIV62036 10 I-10/INDIAN CYN DR IC – WIDEN 2 TO 6 LNS BTWN GARNET AVE & 20TH AVE, RELOCATE EB EXIT RAMP (1-3 LNS) AS HOOK RAMP TO $35,099 HIGHWAY GARNET, ADD EB ENTRY HOOK RAMP (1 LN), RELOCATE WB EXIT RAMP (2-3 LNS) AS HOOK RAMP TO 20TH AVE, ADD ADJOINING WB ENTRY HOOK RAMP (2 LNS) & LOOP RAMP (2 LNS), RECON EXISTING EB & WB ENTRY RAMPS (1 LN), WIDEN GARNET 2 TO 4 LNS, WIDEN 20TH AVE 2 TO 3 LNS (2 WB & 1 EB) (EA: 45570) RIVERSIDE STATE RIV060124 10 IN BANNING ON SUNSET AVE AT I-10 FROM S/O RAMSEY ST TO S/O LINCOLN ST: LOWER SUNSET AVE TO CONSTRUCT NEW 4-LANE UC $26,200 HIGHWAY AT UPRR CROSSING (NON-CAPACITY) AND RECONSTRUCT THE I-10 IC RAMPS TO MEET THE NEW STREET GRADE (SAFETEA CA438, #1261+ HR4818+HR3058) (EA:33471) RIVERSIDE STATE RIV100605 10 IN RIVERSIDE COUNTY FROM SAN BERNARDINO COUNTY LINE TO ARIZONA STATE LINE – DEVELOP CORRIDOR MASTER PLAN FOR I-10 $279 HIGHWAY (EA 0N440, PPNO 0013H) RIVERSIDE STATE 45580 10 NEAR PALM SPRINGS ON I-10 AT GENE AUTRY TR/PALM DR IC FROM I-10 IC SOUTH TO SALVIA ROAD – WIDEN 2 TO 6 THROUGH LANES, $35,393 HIGHWAY I-10 IC IMPROVEMENTS, WIDEN/MODIFY RAMPS FROM 1 TO 2 LNS (SAFETEA LU CA451 #1369) (EA: 45580) RIVERSIDE STATE RIV071251 10 ON I-10 AT APPROX PM 41.17: CONSTRUCT NEW DA VALL DR IC (6 LNS) & RAMPS (2 LNS) FROM VARNER RD TO RAMON RD INCLUDING $132,986 HIGHWAY BRIDGE OVER UPRR AND LONG CYN CREEK CHANNEL, ADD EB/WB AUX LANES ( DATE PALM DR IC TO DA VALL & DA VALL TO RAMON RD) RIVERSIDE STATE 45590 10 ON I-10 IN CATHEDRAL CITY AT DATE PALM DR IC: MODIFY IC/WIDEN OC & ARTERIAL INCLUDING UPRR BRIDGE 2 TO 6 LNS FROM N. $31,476 HIGHWAY RAMPS SOUTH TO VISTA CHINO & RAMPS FROM 1 TO 2 LNS (EA: 45590K) ($955 TOLL CREDIT FOR STPL MATCH IN CONS) RIVERSIDE STATE RIV030901 10 ON I-10 IN EASTERN COACHELLA (AT 5.5 KM E/O DILLON RD & 14.6 KM W/O CACTUS CITY SRRA): CONSTRUCT NEW 6 THROUGH LANE $45,164 HIGHWAY MCNAUGHTON PKWY IC (3 LANES EACH DIR. APPROX 1/2 MILE N/O AND S/O I-10), EB EXIT RAMP (3 LANES), WB EXIT RAMP (2 LANES), EB & WB ENTRY RAMPS (1 LANE), EB & WB LOOP ENTRY RAMPS (1 LANE) WITH EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 45210) RIVERSIDE STATE RIV071253 10 ON I-10 IN INDIO AT GOLF CENTER PKWY IC: RECONSTRUCT/WIDEN IC FROM 4 TO 6 THROUGH LANES INCLUDING BRIDGE OVER $27,000 HIGHWAY WHITEWATER RIVER CHANNEL BETWEEN AVENUE 44 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/DECELERATION LANES RIVERSIDE STATE RIV071252 10 ON I-10 IN INDIO AT JACKSON ST IC (AT PM 55.575): RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER $56,000 HIGHWAY WHITEWATER RIVER CHANNEL FROM SHOWCASE PKWY TO SOUTH OF WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, MODIFY TRAFFIC SIGNALS RIVERSIDE STATE RIV071254 10 ON I-10 IN INDIO AT MONROE ST IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER $47,000 HIGHWAY RIVER CHANNEL FROM AVENUE 42 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/DECELERATION LANES (EA: 0K730K) RIVERSIDE STATE RIV110302 10 ON I-10 IN THE CITY OF BLYTHE – PROVIDE NEW W/B ON AND W/B OFF RAMPS TO HOBSON WAY APPROX 1,800' W/O EXISTING RAMPS $3,635 HIGHWAY TO RIVIERA DR/INSPECTION STATION. THE NEW RAMPS WILL REPLACE EXISTING CONNECTION TO RIVIERA DR. RIVERSIDE STATE RIV070310 10 ON I-10 NEAR BEAUMONT: ADD/CONSTRUCT NEW EASTBOUND TRUCK CLIMBING LANE FROM SAN BERNARDINO COUNTY LINE TO I-10/ $26,000 HIGHWAY SR60 JCT (EA: 35300) RIVERSIDE STATE 45600 10 ON I-10 NEAR RANCHO MIRAGE FROM 3.3 KM WEST TO 2.0 KM EAST OF RAMON RD IC – CONSTRUCT BOB HOPE DR EXTENSION (6 $52,269 HIGHWAY LANES) W/ A NEW DIAMOND IC & MODIFY RAMON RD IC & RAMPS (PPNO: 0007D, EA: 45600) RIVERSIDE STATE RIV060117 10 ON I-10/SINGLETON RD IC: RECONSTRUCT/WIDEN 2 TO 4 THROUGH LANES (WOODHOUSE TO CALIMESA BLVD), RECONSTRUCT/WIDEN $38,400 HIGHWAY RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV PREFERENTIAL LN, WB EXIT 1 TO 3 LNS, ADD EB EXIT RAMP (3 LNS), WB ENTRY RAMP (2 LNS W/ HOV PREFERENTIAL LN), INCLUDE EXTENDED RAMP ACCEL/DECEL LNS, RELOCATE CALIMESA BLVD/SINGLETON RD INTERSECTION, ADD SB EXTENDED DEDICATED RIGHT-TURN LN (EA: 0F980) 82 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIV010208 15 AT I-15/CAJALCO RD IC NEAR CORONA: DESIGN, RECONST/REALIGN & WIDEN CAJALCO RD FROM 2 TO 6 THRU LNS FROM TEMESCAL $58,199 HIGHWAY CYN RD TO BEDFORD CYN RD, RECONST/WIDEN SB ENTRY FROM 1-2 LNS, SB EXIT FROM 2-5 LNS, NB ENTRY FROM 1-2 LNS, NB EXIT FROM 2-4 LNS, ADD AUX LNS BTWN NB ENTRY AND NB EXIT TO EL CERRITO RD AND BTWN SB ENTRY FROM EL CERRITO RD AND SB EXIT. ($840/$600 TOLL CREDITS IN ENG/ROW TO MATCH DEMO) RIVERSIDE STATE RIV010204 15 AT I-15/CALIFORNIA OAKS RD/KALMIA ST IC – RECONFIGURE RAMPS (CONSTRUCT NB/SB LOOP ON RAMPS, RELOCATE SB/NB OFF $36,208 HIGHWAY RAMP), WIDEN CAL OAKS 4 TO 6 LNS FROM UC TO CAL OAKS PLAZA (EA: 0A490) RIVERSIDE STATE RIV011233 15 AT I-15/LIMONITE AVE IC – WIDEN IC 4 TO 6 LNS, WIDEN NB AND SB EXIT RAMPS 1 TO 2 LNS, ADD 2 LANE LOOP RAMPS IN THE NB AND $29,211 HIGHWAY SB DIRECTIONS & WIDEN LIMONITE AVE FROM HAMNER TO WINEVILLE 4 TO 6 LNS (APPROX 1 MI) (EA: 0E150K) RIVERSIDE STATE RIV080901 15 AT I-15/MURRIETA HOT SPRINGS RD IC – CONSTRUCT NEW NB LOOP ON RAMP AND REALIGN EXISTING NB OFF RAMP (EA: 0J650K) $8,100 HIGHWAY RIVERSIDE STATE RIV010206 15 AT I-15/RAILROAD CYN RD IC & I-15/FRANKLIN ST: CONSTRUCT NEW FULL IC AT FRANKLIN ST, RECONSTRUCT/WIDEN FRANKLIN ST OC 2 $71,838 HIGHWAY TO 4 LNS, RECONSTRUCT/WIDEN RR CYN UC 4 TO 6 LNS (SUMMERHILL DR TO CASINO RD), ADD AUX LNS FROM NEW FRANKLIN ST IC TO RR CYN RD, ADD RAMP ACCEL/DECEL LNS AT RR CYN RD AND FRANKLIN ST, REALIGN MAIN ST SB ENTRY RAMP, REPLACE NB ENTRY/SB EXIT RAMPS AT RR CYN W/ HOOK RAMPS(EA: 0A440) RIVERSIDE STATE 991202 15 FRENCH VALLEY PKWY (FVP) – PHASE 1: DESIGN & CONSTRUCT FVP 2 THROUGH LANES ARTERIAL WESTBOUND FROM I-15 TO $29,273 HIGHWAY JEFFERSON AVE, CONSTRUCT FVP SB EXIT RAMP (1 LANE), SB AUX LANE (FROM FVP IC TO WINCHESTER RD IC) & WIDEN WINCHESTER RD IC SB EXIT RAMP (1 TO 3 LNS) (EA: 43270) RIVERSIDE STATE RIV031215 15 FRENCH VALLEY PKWY IC/ARTERIAL PHASES: CONSTRUCT 6 LN IC (JEFFERSON TO YNEZ) & RAMPS, NB/SB AUX LN, CD LNS (3 LNS $156,171 HIGHWAY NB&SB) & MODIFY WINCHESTER RD IC (I-215 PM: 8.43-9.75) (EA:43270) RIVERSIDE STATE RIV071267 15 I-15 – SBD CO LINE TO JCT I-15/I-215: CONSTRUCT 4 HOT LNS (2 HOT LNS EA DIR) FROM SBD CO LINE TO HIDDEN VALLEY PKWY AND $1,706,347 HIGHWAY FROM CAJALCO RD TO SR-74; CONS 2 MF LNS (1 LN EA DIR FROM SBD CO LINE TO SR-74); CONS 2 HOT LNS ( 1 HOT LN EA DIR) FROM HIDDEN VALLEY PKWY TO CAJALCO RD; CONS 2 HOV LNS (1 LN EA DIR) FROM SR74 TO JCT I-15/I-215. RIVERSIDE STATE RIV62034 15 I-15/CLINTON KEITH RD IC: RECONSTRUCT/WIDEN OC 2 TO 6 LNS & RAMPS 1 & 2 LNS TO 3 & 4 LNS, ADD NB/SB AUX LNS PRIOR TO & $17,460 HIGHWAY AFTER EXIT/ENTRY RAMPS & LEFT-TURN LNS (EA: 0F580K) RIVERSIDE STATE RIV060109 15 I15/SR74 (CENTRAL AV) IC JCT MOD B/W 1000’ W/O COLLIER TO CONARD: ADD NB LOOP ENTRY RAMP W/ACCEL LANE, REALIGN NB $85,000 HIGHWAY ENTRY/EXIT RAMPS, WIDEN SB ENTRY/EXIT RAMPS, ADD SB ACCEL/DECEL LANES, ADD NB DECEL LANE, WIDEN SR74 RIVERSIDE TO CENTRAL 2 TO 4 THRU LNS & COLLIER TO CAMBERN 4 TO 6 THRU LNS, CONSTRUCT RIVERSIDE OC & WIDEN RIVERSIDE COLLIER TO CAMBERN 2 TO 4 THRU LNS. SR74 PM 15.5-18.5. EA: 0F3100 RIVERSIDE STATE RIV62031 15 I-15/SR79 SO. IC: REMOVE SB EXIT RAMP, ADD NEW SB EXIT LOOP RAMP, REALIGN SB EXIT RAMP (2 LNS) W/AUX LN. WIDEN SB ENTRY 1 $35,978 HIGHWAY TO 3, NB EXIT 1 TO 4, NB ENTRY 1 TO 3 & RECON SR79S. RIVERSIDE STATE RIV100106 15 IN SW RIVERSIDE COUNTY – I-15/LOS ALAMOS RD. BRIDGE REPLACEMENT & WIDENING: REPLACEMENT OF EXISTING TWO LANE $11,440 HIGHWAY OVERCROSSING AT LOS ALAMOS RD. AND INTERSTATE 15 WITH A FOUR LANE OVERCROSSING (GAP CLOSURE), BRINGING THE BRIDGE VERTICAL CLEARANCE TO CALTRANS STANDARDS. RIVERSIDE STATE RIV100105 15 IN WESTERN RIVERSIDE COUNTY – I-15 AT INDIAN TRUCK TRAIL IC: WIDEN INDIAN TRUCK TRAIL FROM 2 TO 4 LANES, INCLUDING $8,900 HIGHWAY DEDICATED LEFT-TURN LANES TO NB AND SB ON RAMP; WIDENING OF THE SB EXIT RAMP FROM 1 TO 3 LANES; AND WIDENING OF THE NB EXIT RAMP AND ENTRY RAMP FROM 1 TO 3 LANES PLUS INTERSECTION IMPROVEMENTS AT TEMESCAL CYN RD. RIVERSIDE STATE RIV050532 15 ON I-15 NEAR THE CITY OF NORCO – CONSTRUCT NEW SCHLEISMAN RD IC (6 THROUGH LANES) AND RAMPS (2 LANES) AND NB/SB AUX $62,750 HIGHWAY LANE BETWEEN SCHLEISMAN RD IC AND LIMONITE RD IC (EA: 0E140K) Project List 83

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIV080903 60 AT SR-60/GILMAN SPRINGS RD IC – REALIGN GILMAN SPRINGS RD/REMOVE EXISTING EB/WB RAMPS; WIDEN OC FROM 2 TO 6 THRU $70,000 HIGHWAY LANES; WB EXIT IS 1 LANE WIDENING TO 2 LANES THEN TO 3 LANES AT ARTERIAL, WB LOOP & EB ENTRY RAMPS FROM 1 LANE TO 2 LANES W/ HOV; WIDEN EB EXIT RAMPS FROM 1 LANE TO 2 LANES AT EXIT AND 3 LANES AT ARTERIAL; ADD AUX LANES TO WEST OF IC 1200' EB AND 2200' WB RIVERSIDE STATE 32300 60 AT SR60/NASON ST IC – MODIFY/RECONSTRUCT IC & NASON ST FROM ELDER AVE TO FIR AVE: REALIGN EB, WB EXIT RAMPS PLUS EB $19,946 HIGHWAY & WB ENTRY RAMPS, ADD EB & WB ENTRY RAMP HOV LANES, & ADD EB AND WB AUX LANES (EA: 32300) ($845/$1,225 TOLL CREDITS USED TO MATCH DEMO/STPL IN CONST) RIVERSIDE STATE RIV080902 60 AT SR-60/REDLANDS BLVD – WIDEN OC FROM 2 TO 6 THRU LANES; WIDEN WB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ $52,000 HIGHWAY ENTRY, 3 LANES AT ARTERIAL AND HOV AT ENTRY; WIDEN EB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ENTRY AND HOV AT ENTRY; ADD AUX LANES 1000' EACH DIRECTION WEST OF IC AND 1700' EACH DIRECTION EAST OF IC RIVERSIDE STATE RIV080904 60 AT SR-60/THEODORE ST IC: WIDEN OC FROM 2 TO 6 THRU LANES; WIDEN WB EXIT/ENTRY RAMPS FROM 1 LN TO 2 LNS AT EXIT/ENTRY, $52,000 HIGHWAY 3 LNS AT ART. W/ HOV AT ENTRY; WIDEN EB EXIT RAMP FROM 1 LN TO 2 LNS AT EXIT AND 3 LNS AT ART.; WIDEN EB ENTRY RAMP FROM 1 LN TO 2 LNS W/HOV; ADD EB LOOP ENTRY WITH 2 LNS AT ART. AND 1 LN AT ENTRY; ADD AUX LNS 1700' EACH DIR WEST OF IC & 1200' EB AND 2200' WB EAST OF IC -RTP 3M0801 RIVERSIDE STATE RIV110401 60 IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: MODIFY MORENO BEACH DR IC – REALIGN/WIDEN RAMPS (EB EXIT 1 TO 3 LANES, $10,410 HIGHWAY EB ENTRY 1 TO 2 LANES) AND ADD EB AUX LANE (EA: 32301) RIVERSIDE STATE RIV041052 60 IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: MODIFY MORENO BEACH DR IC – WIDEN OC FROM 2 TO 6 THROUGH LANES, $38,700 HIGHWAY REALIGN/WIDEN RAMPS (WB EXIT 1 TO 2 LANES), ADD NEW WB ENTRY RAMP (2 LANES), AND ADD WB AUX LANE (EA: 32303) RIVERSIDE STATE RIV090117 60 IN MORENO VALLEY AT SR60/NASON ST IC: WIDEN NASON ST OC FROM 2 TO 4 THROUGH LANES FROM ELDER AVE TO FIR AVE (EA: $19,980 HIGHWAY 32302) RIVERSIDE STATE RIV071242 60 IN THE CITY OF MORENO VALLEY – RECONSTRUCT INDIAN ST X-ING SR 60 FROM 150' S/O SUNNYMEAD BLVD., TO HEMLOCK AVE: $15,000 HIGHWAY COMPLETE RECONSTRUCT. OF THE BRIDGE TO PROVIDE 16'6" CLEARANCE & 4 THROUGH LANES (2 LNS IN EA DIR) & ASSOC. ST IMP. WITHIN THE PROJECT LIMITS (LEFT TURN POCKETS AT SUNNYMEAD AND HEMLOCK INTERSECT., RIGHT-TURN ONLY SB AT SUNNYMEAD, NEW TS AT HEMLOCK/INDIAN ST., & INTERCONNECT MOD) (PA&ED) RIVERSIDE STATE RIV050535 60 ON SR60 BETWEEN JACK RABBIT TR & SR60/I-10 JCT: PH1-CONSTRUCT NEW POTRERO 6 LN OC (3 LNS EACH DIR) W/TEMP CONNECT TO $78,500 HIGHWAY WESTERN KNOLLS (EA34141). PH2: NEW IC ON/OFF RAMPS. CONSTRUCT WB/EB EXIT & ENTRY RAMPS (2 LNS) & WB/EB LOOP ENTRY RAMPS (2 LNS) (ENTRY RAMPS INCL HOV LANE), INCL EB/WB AUX LNS AT EXIT RAMPS, REALIGN WESTERN KNOLLS AVE, AND REMOVE WESTERN KNOLLS AVE CONNECTION TO SR60 (EA34142) RIVERSIDE STATE RIV070307 60 ON SR60 IN MORENO VALLEY: CONTINUE THE IMPLEMENTATION OF SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #8, 2 TRUCKS) $791 HIGHWAY BETWEEN DAY ST AND REDLANDS BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT) RIVERSIDE STATE RIV070303 60 ON SR60 IN NW RIV CO: CONTINUE THE IMPLEMENTATION OF THE EXPANDED SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #7 PATROL , $751 HIGHWAY 2 TRUCKS) BETWEEN MILIKEN AVE & MAIN ST (SR60 HOV LN CHANGE TCM SUBSTITUTION PROJECT) RIVERSIDE STATE RIV120201 60 ON SR-60 NEAR BEAUMONT: CONSTRUCT NEW EASTBOUND AND WESTBOUND TRUCK LANES FROM GILMAN SPRINGS RD TO 1.6 MILES $100,000 HIGHWAY WEST OF JACK RABBIT TRAIL (EA: 0N690)($746 TOLL CREDITS USED TO MATCH CMAQ IN PA&ED) RIVERSIDE STATE RIV091007 74 IN MID-WESTERN RIVERSIDE COUNTY IN THE CITY OF LAKE ELSINORE: WIDENING OF SR-74 FROM 2 TO 4 THROUGH LANES (2 LANES $5,200 HIGHWAY IN EACH DIRECTION), WEST OF I-15 TO THE ORTEGA MOUNTAINS. OTHER IMPROVEMENTS INCLUDE TURN POCKETS AND ONE TRAFFIC SIGNAL . RIVERSIDE STATE RIV050517 74 ON SR74 IN/NEAR HEMET FROM CALVERT AVE TO CALIFORNIA AVE: CURVE, MEDIAN, & PAVEMENT WIDENING (NON CAPACITY) (EA $4,872 HIGHWAY 0N3600) 84 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIV62029 79 AT HWY 79 SO AND LA PAZ ST: ACQUIRE LAND, DESIGN AND CONSTRUCT PARK-AND-RIDE LOT – 157 SPACES. $2,374 HIGHWAY RIVERSIDE STATE 46460 79 IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 79 – WIDEN FROM 2 TO 4 THROUGH LANES FROM THOMPSON RD TO DOMENIGONI $57,306 HIGHWAY PKWY RIVERSIDE STATE RIV62024 79 ON SR79 IN SOUTHWESTERN RIVERSIDE COUNTY BETWEEN 2.0 KILOMETERS SOUTH OF DOMENIGONI PKWY TO GILMAN SPRINGS ROAD: $1,125,438 HIGHWAY REALIGN AND WIDEN SR79 FROM 2 TO 4 THROUGH LANES. RIVERSIDE STATE RIV061159 86 AT SR86/AVENUE 50: WIDEN AND CONSTRUCT NEW 6THROUGH LANE IC FROM E/O COACHELLA STORMWATER CHANNEL BRIDGE TO E/O $26,640 HIGHWAY TYLER ST. IMPROVEMENTS INCLUDE: EXTENDED RAMP ACCELERATION/DECELERATION LANES, RELOCATE/REALIGN AVE 50 AND TYLER ST, BIKE LANES, SIDEWALKS, AND RECONSTRUCT TRAFFIC SIGNALS (SAFETEA LU 1702, CA583, #2543) (EA: 0C970) RIVERSIDE STATE RIV060101 86 AT SR86S/AIRPORT BLVD (AVE 56): CONSTRUCT NEW IC (3 LANE OC – 2 LNS (1 LN IN EA DIR) + 1 MEDIAN LN)) AND RAMPS (1 LANE) $35,610 HIGHWAY FROM APPROX DESERT CACTUS DR TO 57TH AVE (EA: 47860, PPNO: 0078L) RIVERSIDE STATE RIV071274 86 AT SR86S/AVENUE 52 (FROM APPROX 1.57 KM S/O AVE 52 TO 0.52 KM S/O AVE 50): CONSTRUCT 6 LANE IC AND RAMPS (2 LANES), $17,328 HIGHWAY REALIGN/RELOCATE POLK ST (APPROX 1 MILE E/O AVE 52/POLK ST INTERSECTION) AND AVE 52 (APPROX ½ MILE E/O POLK ST), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 0C960) RIVERSIDE STATE RIV070308 91 AT SR91/71 JCT: REPLACE EB 91 TO NB 71 CONNECTOR W/ DIRECT FLY-OVER CONNECTOR, AND RECONSTRUCT THE GREEN RIVER ROAD $122,658 HIGHWAY EB ON-RAMP (EA: 0F541) ($1,501/$639/$200 TOLL CREDITS WILL BE USED IN PS&E TO MATCH DEMO-SAFETEALU/DEMO-TEA21/STP, RESPECTIVELY. $159 TOLL CREDITS WILL BE USED IN R/W TO MATCH DEMO-SAFETEALU.) RIVERSIDE STATE RIV050102 91 GREEN RIVER RD LANDSCAPE ENHANCEMENTS: NEAR CORONA FROM 1.0 KM E/O ORANGE/RIVERSIDE CNTY LINE TO 1.35 KM W/O SR $1,832 HIGHWAY 71/91 SEP – INSTALL LANDSCAPE ENHANCEMENTS (EA: 45662, PPNO: 0072G) RIVERSIDE STATE RIV031225 91 NEAR CORONA ON SR71 & SR91 (R0.0 TO R3.25): CONDUCT WILDLIFE MOVEMENT STUDY FOR MITIGATION COMMITMENT FOR SR71 $808 HIGHWAY WIDENING & TO AID ENV PROCESS FOR SR71/91 CONNECTORS CONS (PPNO 0048W) (EA44655) RIVERSIDE STATE RIV010212 91 ON SR91 – ADAMS TO 60/215 IC: ADD ONE HOV LN IN EACH DIRECTION, RESTRIPE TO EXTEND 4TH WB MIXED FLOW LANE FROM $278,456 HIGHWAY 60/215 IC TO CENTRAL OFF-RAMP, RESTRIPE TO EXTEND 5TH WB MIXED FLOW LANE FROM 60/215 IC TO 14TH ST OFF-RAMP, AUX LNS (MADISON-CENTRAL), BRIDGE WIDENING & REPLACEMENTS, EB/WB BRAIDED RAMPS, IC MOD/RECONSTRUCT + SOUND/RETAINING WALLS RIVERSIDE STATE RIV071250 91 ON SR-91/I-15: SR91 – CONST 1 MF LN (SR71-I15)/1 AUX LN VAR LOCS(SR241-PIERCE) (OC PM 14.43-18.91), CD SYSTEM (2/3/4 LNS $1,104,240 HIGHWAY MAIN-I15), 1 TOLL EXPR LN (TEL) & CONVERT HOV TO TEL EA DIR (OC-I15); I15- CONST TEL MED DIR CONNCT NB15 TO WB91 AND EB91 TO SB15, 1 TEL EA DIR SR91 DIR CONNCT-ONTARIO IC (I15 PM 37.56-42.94). RIVERSIDE STATE RIV091008 111 IN PALM SPRINGS HWY 111 (VISTA CHINO) WIDENING: HWY 111 FROM 5 TO 6 THRU LNS (ADD A 3RD WB LN) BTWN VOLTURNO RD AND $17,000 HIGHWAY SUNRISE WY, INC. INT IMP @ SUNRISE WY/HWY 111 & FARRELL DR/HWY 111; AND WID. FROM 4 TO 6 THRU LNS (ADD A 3RD WB & EB LN) BTWN VOLTURNO RD & GENE AUTRY TR, INC. INT IMP AT GENE AUTRY TR/HWY 111. OTHER IMP INC. INT IMP @ HWY 111/ INDIAN CYN DR & PALM CYN DR/HWY 111. RIVERSIDE STATE RIV071246 111 IN THE CITY OF COACHELLA – CONSTRUCT A NEW 6-LN AVE 52 GRADE SEPARATION OVERHEAD STRUCTURE SPANNING OVER UPRR $22,290 HIGHWAY MAINLINE TRACKS AND GRAPEFRUIT BLVD/HWY 111, FROM SHADY LN TO APPROX 600' E/O INDUSTRIAL WAY/TYLER ST. IMPROVEMENTS INCL: RECONFIG CONNECTION FROM AVE 52 TO GRAPEFRUIT BLVD/HWY 111, BIKE LANES, SIDEWALKS, RETAINING WALLS, RECONST TRAFFIC SIGNALS/DRIVEWAYS, REMOVE EXISTING AT-GRADE CROSSING Project List 85

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIV050533 215 AT I-215/CACTUS AVE IC: WIDEN IC FROM 3 TO 6 THRU LNS (EB FROM 2 TO 3 BTWN W/O BNSF RR TO 1300' E/O VETERANS WAY, ADD $65,370 HIGHWAY 4TH EB LANE FROM NB EXIT RAMP TO E/O ELSWORTH ST, WIDEN WB FROM 1&2 TO 3 THRU LNS FROM COMMERCE CENTER DR TO BNSF RR), WIDEN RAMPS 1 TO 2&3 LNS (ENTRY RAMPS INCL HOV), EXTEND NB AUX LN BTWN ALESSANDRO BLVD SOUTH TO CACTUS AVE NB ENTRY LOOP RAMP & ADD DEDICATED RT-TURN LNS (EA0E760) RIVERSIDE STATE RIV010203 215 AT I-215/CLINTON KEITH RD IC – CONSTRUCT PARTIAL CLOVERLEAF: WIDEN OC 2 TO 6 THROUGH LANES, RECONSTRUCT RAMPS $35,668 HIGHWAY (WIDENING TO EXISTING NB/SB DIAMOND RAMPS) & CONSTRUCT NEW NB/SB LOOP ENTRY RAMPS (EA: 32780) RIVERSIDE STATE RIV050534 215 AT I-215/NEWPORT RD IC: RECONSTRUCT/WIDEN FROM 4 TO 6 THROUGH LANES BETWEEN HAUN RD AND ANTELOPE RD, RELOCATE $47,700 HIGHWAY NB AND SB EXIT RAMPS (3 LANES), RECONFIGURE NB & SB ENTRY RAMPS TO INCLUDE HOV LANE, ADD NEW NB AND SB LOOP ENTRY RAMPS (2 LANES), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES, ADD EXTENDED DEDICATED RIGHT-TURN LANES (EA: 0J440) RIVERSIDE STATE RIV011232 215 AT I-215/SCOTT RD IC: RECONSTRUCT/WIDEN FROM 2 TO 6 THROUGH LANES BTWN E/O ANTELOPE RD & HAUN RD, RECONSTRUCT/ $76,000 HIGHWAY WIDEN RAMPS – NB EXIT 1 TO 3 LNS, NB ENTRY 2 TO 3 LNS, SB EXIT 1 TO 4 LNS, SB ENTRY 1 TO 2 LNS, ADD NB EXIT LOOP RAMP (2 LNS) & SB ENTRY RAMP (3 LNS), ENTRY RAMPS INCLUDE HOV LN, RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LNS, ADD EXTENDED RIGHT-TURN LNS (EA: 0A020) RIVERSIDE STATE RIV060120 215 AT I-215/VAN BUREN BLVD IC: RECONSTRUCT/WIDEN IC FROM 2 TO 4 THROUGH LANES FROM MUSEUM ENTRANCE ST TO OPPORTUNITY $68,403 HIGHWAY WAY, ADD NEW NB ENTRY RAMP (3 LANES), & WIDEN RAMPS – NB ENTRY 1 TO 2 LANES, NB EXIT 2 TO 3 LANES, SB EXIT 2 TO 3 LANES, SB ENTRY 1 TO 3 LANES, ENTRY RAMPS INCLUDE HOV LANE, ADD NB/SB AUX LANE BETWEEN VAN BUREN BLVD IC AND CACTUS AVE IC (EA 0E520) RIVERSIDE STATE RIV050501 215 I-215 AT SR74/G ST IC: REPLACE 2 THROUGH LANE OC WITH A 4 THROUGH LANE OC & WIDEN REDLANDS AVE (4TH TO SAN JACINTO), $25,034 HIGHWAY WIDEN/REALIGN RAMPS, MODIFY 4TH ST (G ST TO EASTERLY TERMINUS) & RECONSTRUCT INTERSECTIONS (EA: 46420) RIVERSIDE STATE RIV060111 215 IN MID WESTERN-RIVERSIDE CO IN THE CITY OF PERRIS – I-215/ETHANAC RD IC IMP.: IC OPERATIONAL IMP. OF THE NB & SB OFF RAMPS $10,000 HIGHWAY @ I-215/ETHANAC RD AND ON ETHANAC ON EITHER SIDE OF I-215 FOR UP TO 1,200 FT. IMPROVEMENTS CONSIST OF THE WIDENING OF THE ON AND OFF RAMPS TO PROVIDE LEFT AND RIGHT TURN POCKETS, T.S. UPGRADE AT THE RAMP TERMINI & WIDEN OC 2 TO 4 LANES WITH TURN LANE RIVERSIDE STATE RIV091012 215 IN MID-WESTERN RIVERSIDE COUNTY IN THE CITY OF PERRIS – CASE ROAD/MATTHEWS RD. (SR-74) AT I-215 INTERCHANGE: $21,000 HIGHWAY RECONFIGURATION OF THE EXISTING CASE RD/MATTHEWS RD. (SR-74) AT I-215 IC, IMPROVING THE INTERSECTION OPERATIONS AND ELIMINATING CROSS TRAFFIC CONFLICTS ON THE SB RAMPS, WIDEN MATTHEWS RD FROM 2/3 TO 4 LANES FROM CASE RD TO TRUMBLE RD (EA: 0P420 ). RIVERSIDE STATE RIV100606 215 IN RIVERSIDE COUNTY FROM I-15/I-215 IN/NEAR MURRIETA TO SAN BERNARDINO COUNTY LINE – DEVELOP CORRIDOR MASTER PLAN $279 HIGHWAY FOR I-215 (EA 0N450, PPNO 0247R) RIVERSIDE STATE RIV100107 215 IN SW RIVERSIDE COUNTY – I-215/KELLER RD. IC: REPLACE EXISTING 2-LN I-215/KELLER RD. UNDERPASS WITH A NEW 4-LN (2 LNS $12,000 HIGHWAY IN EA DIR 500' EAST AND WEST OF I-215 CL) IC, INCLUDING LEFT TURN LANES IN EACH DIRECTION, AUXILIARY LANES AT THE SB OFF- RAMP (APPROX. 1300'), ADD 2-LN NB/SB OFF RAMPS AND 2-LN NB/SB ON-RAMPS W/HOV, SIDEWALKS, AND REALIGN ANTELOPE RD APPROX 1/4 MI EAST. RIVERSIDE STATE RIV050555 215 ON I-215 (N/O EUCALYPTUS AVE TO N/O BOX SPRINGS RD) & SR60 (E/O DAY ST TO SR60/I-215 JCT): RECONSTRUCT JCT TO PROVIDE $47,414 HIGHWAY 2 HOV DIRECT CONNECTOR LNS (SR60 PM: 12.21 TO 13.6) AND MINOR WIDENING TO BOX SPRINGS RD FROM 2 TO 4 THROUGH LANES BETWEEN MORTON RD AND BOX SPRINGS RD/FAIR ISLE DR IC (EA: 449311) RIVERSIDE STATE RIV071277 215 ON I-215 AT LOS ALAMOS RD IC – INSTALL LANDSCAPING AND IRRIGATION IMPROVEMENTS TO THE I-215/LOS ALAMOS ROAD $2,488 HIGHWAY INTERCHANGE (SAFETEA-LU 2005 SEC. 1702. HPP #3140). 86 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIV071275 215 ON I-215 AT RAMONA EXPWY IC: WIDEN/RECONSTRUCT SB AND NB EXIT RAMPS 1 TO 2 LANES AND WIDEN/MODIFY OC BRIDGE $8,546 HIGHWAY STRUCTURE (NON CAPACITY IMPROVEMENTS TO STRUCTURE) (EA: OG980) RIVERSIDE STATE RIV071276 215 ON I-215 FROM NUEVO RD TO BOX SPRINGS RD: CONSTRUCT 2 HOV LANES (1 LANE IN EACH DIRECTION) – PA&ED. $212,500 HIGHWAY RIVERSIDE STATE RIV070309 215 ON I-215 IN SOUTHWEST RIVERSIDE COUNTY FROM SCOTT RD TO NUEVO RD IC: CONSTRUCT A MIXED FLOW LANE IN EACH DIRECTION $190,947 HIGHWAY AND RECONSTRUCT AUX LANES BETWEEN D ST IC AND NUEVO RD IC (EA: 0F162) RIVERSIDE STATE RIV070304 215 ON I-215 IN SW RIV CO: CONTINUE THE IMPLEMENTATION OF I-215 FREEWAY SERVICE PATROL (FSP) (BEAT #19, 2 TRUCKS) BETWEEN $791 HIGHWAY SR74/4TH ST AND ALESSANDRO BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT) RIVERSIDE STATE RIV070305 215 ON I-215 IN SW RIVERSIDE CO. FROM MURRIETA HOT SPRINGS RD TO SCOTT RD: CONSTRUCT A 3RD MIXED FLOW LANE IN EA DIR $29,228 HIGHWAY (WIDENS I-215 FROM 4 TO 6 LANES – 3 IN EA. DIR). THE PROJECT INCLUDES THE CONSTRUCTION OF A NEW INSIDE SHOULDER IN BOTH DIRECTIONS, A NEW MEDIAN BARRIER, OVERLAY OF EXISTING LANES, AND WIDENS THE EXISTING KELLER UC BRIDGES (NON-CAPACITY ENHANCING) TO SUPPORT THE NEW LANES (EA: 0F161). RIVERSIDE STATE RIV110122 215 ON I-215 IN SW RIVERSIDE COUNTY FROM MURRIETA HOT SPRINGS RD TO I-215/I-15 JUNCTION, CONSTRUCT A THIRD MIXED FLOW $13,000 HIGHWAY LANE SOUTHBOUND (WIDENS I-215/I-15 CONNECTOR FROM 2 TO 3 LANES) RIVERSIDE STATE 0121D 215 ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ – FROM 60/91/215 JCT TO 60/215 SPLIT – WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/ $782,720 HIGHWAY IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN, AND LANDSCAPING (EA: 3348U1, 33486, 33487, AND 33488) RIVERSIDE STATE RIV090902 215 ON INTERSTATE 215, FROM BLAINE ST SB OFF-RAMP TO 0.3 MILES SOUTH OF MARTIN LUTHER KING BLVD UNDERCROSSING (PM 40.2 $2,628 HIGHWAY TO PM 42.5), EXTEND THE EXISTING SB LANE #4 (LANE DROP) TO 0.3 MILES SOUTH OF MARTIN LUTHER KING BLVD UNDERCROSSING (EA 0N890) ($230 TOLL CREDITS USED TO MATCH STPL IN CONS) RIVERSIDE STATE RIVLS06 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – SHOPP PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR $23,922 HIGHWAY 93.126 EXEMPT TABLE 2 – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). RIVERSIDE STATE RIVLS12 999 GROUPED PROJECTS FOR EMERGENCY REPAIR – SHOPP EMERGENCY RESPONSE PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR $3,790 HIGHWAY PART 93.126 EXEMPT TABLE 2 – REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FED EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FED EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD. RIVERSIDE STATE RIVLS02 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM: PROJECTS $119,017 HIGHWAY ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLE 2 – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 USC 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) RIVERSIDE STATE RIVLS13 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – HIGHWAY $11,165 HIGHWAY MAINTENANCE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 – PAVEMENT RESURFACING AND/OR REHABILITATION RIVERSIDE STATE RIVLS01 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP COLLISION REDUCTION PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR $32,991 HIGHWAY PART 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS RIVERSIDE STATE RIVLS09 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MANDATES PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART $1,740 HIGHWAY 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS Project List 87

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE STATE RIVLS10 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MOBILITY PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 $28,352 HIGHWAY EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/ OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS RIVERSIDE STATE RIVLS08 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION $14,903 HIGHWAY – MINOR PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED- AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CONTROL DEVICES/OPERATING ASSISTANCE OTHER THAN SIGNALS, INTERSCTN SIGNAL PROJECTS AT INDVL INTERSCTN, (DESCRIPTION CONT. IN COMMENTS) RIVERSIDE LOCAL 991206 0 BUTTERFIELD STAGE RD EXTENSIONS: EXTEND MURRIETA HOT SPRINGS RD (4 LNS) FROM BUTTERFIELD STAGE RD TO SERAPHINA $40,265 HIGHWAY RD; BUTTERFIELD STAGE RD (4 LNS) FROM RANCHO CALIFORNIA RD TO MURRIETA HOT SPRINGS RD; & NICHOLAS RD (4 LNS) FROM BUTTERFIELD STAGE RD. TO CALLE GIRASOL RIVERSIDE LOCAL RIV060113 0 CONSTRUCT NEW 4 LANE BRIDGE OVER MURRIETA CREEK (PART OF WESTERN BYPASS CORRIDOR) INCLUDING APPROACHES, CURB & $12,411 HIGHWAY GUTTER, SIDEWALKS, & STORM DRAIN FACILITIES RIVERSIDE LOCAL RIV010227 0 CORONA ADVANCED TRAFFIC MANAGEMENT SYSTEM (ATMS) – AND REGIONAL ITS INTEGRATION PHASE 2. $6,011 HIGHWAY RIVERSIDE LOCAL RIV061161 0 ESSENTIAL ROAD IMPROVEMENTS-PHASE III: CITY SECTION 31 INCLUDING PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS $1,040 HIGHWAY GUTTERS, ADA RAMPS & DRAINAGE IMPROVEMENTS ON ACOMA AVE, BUENA VISTA AVE, CAHUILLA AVE, DESERT VIEW AVE, ESTRELLA AVE, FLORA AVE, AND GRANADA AVE BETWEEN CACTUS DR. AND PALM DR. (2006 AAA EARMARK). RIVERSIDE LOCAL 991203 0 EXTEND OVERLAND DRIVE (4 LANES) FROM COMMERCE CENTER DRIVE TO AVENIDA ALVARADO/DIAZ ROAD INTERSECTION INCLUDING $13,281 HIGHWAY CONSTRUCTION OF 4 LANE BRIDGE OVER MURRIETA CREEK RIVERSIDE LOCAL RIV031202 0 I-10 BYPASS SOUTH: CONSTRUCT TWO LANES OF ROADWAY TO PROVIDE A BY-PASS/NETWORK FACILITY FOR THE I-10, APPROX. $17,970 HIGHWAY 1/2 MILE S/O I-10 BETWEEN THE EASTERN END OF THE CITY OF BANNING AND APACHE TRAIL IN CABAZON. OTHER IMPROVEMENTS INCLUDE THE CONSTRUCTION OF SEVERAL LOW-WATER CROSSINGS AT SMITH CREEK AND SAN GORGONIO RIVER (PA&ED). RIVERSIDE LOCAL RIV060102 0 IN CALIMESA – WIDEN COUNTY LN RD FROM 1 TO 2 LNS (I-10 TO CALIMESA BLVD), ADD EB DEDICATED RIGHT-TURN LN, WIDEN SB $2,366 HIGHWAY CALIMESA BLVD FROM 2 TO 3 LNS FOR APPROX. 150' S/O COUNTY LN RD SOUTH R-O-W, ADD CURB AND GUTTER AS REQUIRED. ADDITIONAL IMPROVEMENTS INCLUDE THE LENGTHENING OF BOX CULVERT AND/OR ADD CONCRETE RETAINING WINGWALL SYSTEM (TOLL CR UTILIZATION: $101/$187 FOR ENG/R/W – DEMO-SAFETEA-LU). RIVERSIDE LOCAL RIV071247 0 IN CATHEDRAL CITY – SIGNAL SYNCHRONIZATION ALONG EAST PALM CANYON FROM EAST BUDDY ROGERS TO ALLEN AVE: $283 HIGHWAY SYNCHRONIZE LIGHTS AT FOUR INTERSECTIONS WHERE ROADWAY LANES VARY FROM A 6 LN ARTERIAL TO A 4 LN ARTERIAL AT INTERVALS ($28 TOLL CREDITS USED TO MATCH CMAQ IN CONST). RIVERSIDE LOCAL RIV011212 0 IN CATHEDRAL CITY ON RAMON RD – DATE PALM DR TO DA VALL – WIDEN 4 TO 6 LNS & PAVEMENT REHAB, SIDEWALKS, SIGNAL $2,750 HIGHWAY INTERCONNECT, RETAINING WALLS, DRAIN IMP. RIVERSIDE LOCAL RIV091202 0 IN COACHELLA VALLEY IN CATHEDRAL CITY – DATE PALM DR. SIGNAL SYNCHRONIZATION EQUIPMENT: INSTALLATION OF SIGNAL $445 HIGHWAY SYNCHRONIZATION EQUIPMENT AT TEN INTERSECTIONS ON DATE PALM DR FROM RAMON RD TO EAST PALM CANYON DR., UTILIZING THE ALREADY INSTALLED HARD-WIRE INTERCONNECT ALONG THE DATE PALM DR CORRIDOR ($47 TOLL CREDITS USED TO MATCH CMAQ IN CONS). RIVERSIDE LOCAL RIV091205 0 IN COACHELLA VALLEY IN CITY OF PALM SPRINGS – FARRELL DR RIGHT TURN LANE AT VISTA CHINO: CONSTRUCTION OF A SEPARATE $482 HIGHWAY RIGHT TURN LANE FOR NB TRAFFIC AT THE INTERSECTION OF FARRELL DR AND VISTA CHINO, INCLUDING RELOCATION AND UPGRADE OF THE TRAFFIC SIGNAL. 88 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV110130 0 IN COACHELLA VALLEY IN RANCHO MIRAGE – WIDENING OF SOUTH BOUND MONTEREY AVE. FROM 2 TO 3 LANES FROM DINAH SHORE $1,045 HIGHWAY DR TO GERALD FORD DR. (APPROX. 3,480 L.F.). OTHER IMPROVEMENTS INCLUDE INSTALLATION OF CURB AND GUTTER, DRAINAGE IMPROVEMENTS (RETENTION BASINS), SIGNING AND STRIPING, AND TRAFFIC SIGNAL MODIFICATION AT GINGER ROGERS RD. RIVERSIDE LOCAL RIV091208 0 IN COACHELLA VALLEY IN THE CITY OF INDIO – JACKSON ST TRAFFIC SIGNAL INTERCONNECT AND TRAFFIC SIGNAL INSTALL: INSTALL $367 HIGHWAY A NEW TS AT JACKSON ST & MARKET ST/DILLON AVE., & INSTALL. OF A WIRELESS INTERCONNECT SYSTEM ON JACKSON ST BTWN AVE. 44 TO THE NO. & AVE. 45 TO THE SO., A DISTANCE OF APROX. 1 MILE. INTERCONNECT SYSTEM INCLUDES 2 EXIST. TS & 1 NEW TS ($38 TOLL CREDITS USED FOR CMAQ MATCH IN CONS). RIVERSIDE LOCAL RIV011241 0 IN CORONA ON AUTO CENTER DRIVE – CONSTRUCT 4 LANE OVERCROSSING (GRADE SEPARATION) OVER EXISTING BNSF TRACKS $32,675 HIGHWAY ($1,835/$1,240 TOLL CREDITS IN CONST TO MATCH CMAQ/PNRS). RIVERSIDE LOCAL RIV011240 0 IN CORONA ON EXISTING MCKINLEY ST – CONSTRUCT GRADE SEPARATION AT BNSF RAILROAD CROSSING (PROJECT STUDY REPORT & $4,023 HIGHWAY PRELIMINARY ENVIRONMENTAL ANALYSIS REPORT ACTIVITIES) RIVERSIDE LOCAL RIV060108 0 IN CORONA ON N. MAIN ST: ADD NB DEDICATED RIGHT-TURN LANE (APPROX 300') FROM SR91 EXIT RAMP TO N. GRAND BLVD, ADD 3RD $3,702 HIGHWAY WB SR-91 ON RAMP LANE, SIGNAL MODS & CONSTRUCT RETAINING WALL AT PARK-N-RIDE LOT RIVERSIDE LOCAL RIV071259 0 IN EASTERN COACHELLA VALLEY – MECCA COMMUNITY ROUNDABOUT: CONSTRUCT A ROUNDABOUT ENTRY TO THE UNINCORPORATED $2,599 HIGHWAY MECCA COMM. ON HAMMOND RD & 4TH ST BTWN 5TH & 3RD STREETS, CONSISTING OF A SINGLE LN. TRAFFIC CIRCLE W/ONE BYPASS RT LN FOR THE SE TRAFFIC; MOUNTABLE MEDIAN APRONS; LANDSCAPED CENTER; S/W & PED. X-ING; LANDSCAPE BUFFER; REALIGNMENT OF HAMMOND RD.; AND AN ENTRY MONUMENT. RIVERSIDE LOCAL RIV071288 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY – 66TH AVE GRADE SEPARATION: CONSTRUCT A TWO-LN (1-LN IN EA DIR) 66TH $25,250 HIGHWAY AVE ELEVATED STRUCTURE OVER THE UPRR, HAMMOND RD., AND SH-111., FROM WESTERLY OF LINCOLN ST TO JOHNSON ST ON THE EAST IN THE COMMUNITY OF MECCA. ADD. IMPROVEMENTS WILL BE CONSTRUCTED TO TIE BACK INTO THE EXISTING ALIGNMENT. RIVERSIDE LOCAL RIV091006 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY – HWY 111 WIDENING W/IN INDIAN WELLS CITY LIMITS: WID FROM 4 TO 6 THRU $27,788 HIGHWAY LNS (3 LNS IN EA DIR) BTWN THE WCL (570' W/O VILLAGE CTR DR) & EL DORADO DR (RTP ID'S 3A07316 & 3A07257) INCLUDING THE INSTAL OF A RAISED, LANDSCAPE MEDIAN, LEFT TURN PH @ EL DORADO DR, DUAL LEFT TURN PH @ THE SB AND EB COOK ST, RT TURN ONLY LNS AT THE EAST, WEST, AND SB COOK ST. RIVERSIDE LOCAL RIV091209 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY – HWY 111 WIDENING WITHIN INDIAN WELLS CITY LIMITS: WIDENING FROM 4 $32,779 HIGHWAY TO 6 THRU LNS (3 LNS IN EA DIR) BTWN EL DORADO & EAST CITY LIMITS (W/O WASHINGTON), INCLUDING THE INSTALL OF A RAISED, LANDSCAPE MEDIAN AND RIGHT TURN ONLY LANE AT INDIAN WELLS LN (RTP ID'S 3A07258 & 3A07259). RIVERSIDE LOCAL RIV070302 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – DATE PALM DR BRIDGE REPLACEMENT/WIDENING: REPLACEMENT OF A $10,424 HIGHWAY TW0 LANE (1 LN IN EA DIR) LOW WATER CROSSING BRIDGE OVER LONG CANYON CREEK (BRIDGE NO. 00L0043) WITH A SIX LANE (3 LNS IN EA DIR), FOR APPROXIMATELY 350 FT. (FROM VARNER RD. TO 350' S/O VARNER RD). RIVERSIDE LOCAL RIV091011 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – DATE PALM DR OVER THE WHITEWATER RIVER: WIDENING OF DATE PALM $18,703 HIGHWAY DR FROM 4 TO 6 LNS (3 LNS IN EA DIR), FROM APPROX. 350' S/O THE BRIDGE TO 250' N/O THE BRIDGE (VIA ESTRADA TO THE NORTH AND PEREZ RD. TO THE SOUTH), INCLUDING THE CONSTRUCTION OF A RAISED MEDIAN AND SIDEWALK ALONG THE EAST SIDE OF THE PROJECT (BRIDGE NO. 56C0189). RIVERSIDE LOCAL RIV110501 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – DATE PALM DR WIDENING FROM I-10 TO 350' S/O VARNER RD.: $8,576 HIGHWAY WIDENING OF DATE PALM DR. FROM 2 TO 6 LNS (3 LNS IN EA DIR) FROM I-10 TO 350' S/O VARNER RD . OTHER IMPROVEMENTS INCLUDE ADDITIONAL TURNING LANES AT INTERSECTION OF DATE PALM DR. & VARNER RD., TRAFFIC SIGNALIZATION, SIDEWALKS, MEDIANS AND BIKE LANES. Project List 89

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV091010 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – MONTEREY AVE WIDENING FROM 4 TO 6 THROUGH LANES (ADDING A $5,345 HIGHWAY 3RD NB & SB THROUGH LANE) FROM HOVLEY LANE WEST TO PARK VIEW DR IN THE CITIES OF RANCHO MIRAGE AND PALM DESERT, INCLUDING TS MODIFICATION, AND SIGNING AND STRIPING IMPROVEMENTS (RTP ID 3A07116 & 3A07128). RIVERSIDE LOCAL RIV090118 0 IN JOSHUA TREE NATIONAL PARK ON PARK ROUTE 11 FROM GOLD POINT TO SAND HILL – WIDEN AND REALIGN ROADWAY TO IMPROVE $10,298 HIGHWAY SIGHT DISTANCE AND TO PROVIDE CAR PULLOUTS EVERY .25 MILES AND REDESIGN PARKING AREAS FOR SAFETY. RIVERSIDE LOCAL RIV111203 0 IN LAKE ELSINORE – TEMESCAL CANYON RD BRIDGE REPLACEMENT/WIDENING: REPLACE TEMESCAL CANYON RD. 2 LANE BRIDGE WITH $19,452 HIGHWAY A 4 LANE BRIDGE OVER TEMESCAL WASH, 0.22 MI. W/O LAKE STREET (BRIDGE NO. 56C0050). RIVERSIDE LOCAL RIV091005 0 IN MID WESTERN RIVERSIDE COUNTY IN THE CITY OF LAKE ELSINORE – CONSTRUCTION OF A 6-PHASE TRAFFIC SIGNAL AT THE $470 HIGHWAY INTERSECTION OF SR-74 AND GUNNERSON AVENUE AND WIDENING OF THE ROUTE TO PROVIDE FOR TWO LEFT TURN LANES. RIVERSIDE LOCAL RIV110125 0 IN MORENO VALLEY ON COTTONWOOD AVE. FROM INDIAN ST. TO KITCHING ST: PAVEMEMENT RESURFACING, ADJUSTMENT OF UTILITY $600 HIGHWAY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS. RIVERSIDE LOCAL RIV110126 0 IN MORENO VALLEY ON FREDERICK ST FROM SUNNYMEAD BLVD TO ALESSANDRO BLVD.: PAVEMENT RESURFACING, ADJUSTMENT $650 HIGHWAY OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS. RIVERSIDE LOCAL RIV110127 0 IN MORENO VALLEY ON GILMAN SPRINGS RD. FROM EUCALYPTUS AVE TO 2,225 FT. S/O VIRGINIA ST.: PAVEMENT RESURFACING, $800 HIGHWAY ADJUSTMENT OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS. RIVERSIDE LOCAL RIV110128 0 IN MORENO VALLEY ON HEACOCK ST FROM ALESSANDRO BLVD TO COTTONWOOD AVE.: PAVEMENT RESURFACING, ADJUSTMENT $600 HIGHWAY OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS. RIVERSIDE LOCAL RIV060122 0 IN MORENO VALLEY ON HEACOCK ST OVER PERRIS VALLEY STORM DRAIN LATERAL A (APROX. 2.7 MILES N/O RAMONA EXPWY): $2,970 HIGHWAY REPLACE EXISTING 2 LANE BRIDGE WITH A 4 LANE BRIDGE (BRIDGE #: 56C0233) RIVERSIDE LOCAL RIV110129 0 IN MORENO VALLEY ON IRIS AVE. FROM LASSELLE ST TO VIA DELLAGO: PAVEMENT RESURFACING, ADJUSTMENT OF UTILITY MANHOLE $1,350 HIGHWAY COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS. RIVERSIDE LOCAL RIV090911 0 IN MORENO VALLEY, WIDEN KITCHING ST FROM 2 TO 4 LANES FROM GENTIAN AVE TO CACTUS AVE , INCLUDING SIDEWALK $4,555 HIGHWAY INSTALLATION WITHIN PROJECT LIMITS. RIVERSIDE LOCAL RIV090909 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES + 2 AUX LANES FROM EUCALYPTUS AVE TO SR-60 EB RAMPS, $4,791 HIGHWAY INCLUDING MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE LOCAL RIV090908 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES FROM ALESSANDRO BLVD TO EUCALYPTUS AVE, INCLUDING TRAFFIC $15,456 HIGHWAY SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE LOCAL RIV090910 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES FROM SR-60 WB RAMPS TO IRONWOOD AVE, INCLUDING TRAFFIC $4,791 HIGHWAY SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE LOCAL RIV011210 0 IN MORENO VALLEY/COUNTY – REALIGN RECHE VISTA DR (PERRIS BLVD TO NORTH CITY LIMITS – APPROX 2,450') & INSTALL SIGNAL $6,150 HIGHWAY (PERRIS/HEACOCK/RECHE VISTA DR) 90 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV041044 0 IN MORENO VALLEY: WIDEN PERRIS BLVD 2 TO 6 LNS (PERRIS VALLEY STORM DRAIN LATERAL B TO CACTUS AVE.), INCLUDING CURB, $14,669 HIGHWAY GUTTER, SIDEWALKS, SIGNALS, & MEDIANS RIVERSIDE LOCAL RIV031204 0 IN MURRIETA – CONSTRUCT NEW 2 LANE GUAVA ST. BRIDGE (400') OVER MURRIETA CREEK FROM WASHINGTON AVE TO ADAMS AVE W/ $7,575 HIGHWAY SHOULDERS & ALL REQUIRED APPROACHES (BR#: 56C0162) ($28 TOLL CREDITS UTILIZED TO MATCH HBPL IN R/W). RIVERSIDE LOCAL RIV060123 0 IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST FROM APPROX 100' SW OF GENERAL DR TO APPROX 500' N/O LINARES AVE: REPLACE $35,827 HIGHWAY EXISTING 4-LANE (2 LNS IN EACH DIRECTION) AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION – NON-CAPACITY) UNDERCROSSING (UPRR). RIVERSIDE LOCAL RIV071278 0 IN NORTHWEST RIVERSIDE COUNTY ON MAGNOLIA AVE: REPLACE EXISTING 4 LANE (2 LNS IN EA. DIR) R/R X-ING WITH A 4-LN (2 LNS IN $60,205 HIGHWAY EA DIR – NON-CAPACITY) O.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN BUCHANAN AVE. (ON THE EAST) AND LINCOLN STREET (ON THE WEST). RIVERSIDE LOCAL RIV090402 0 IN PALM SPRINGS – RDWAY, DRAIN., VEH. PARKING & APPURTENANT STRUCTURES & FAC. FOR THE AGUA CALIENTE MUSEUM (SE $1,193 HIGHWAY CORNER OF TAHQUITZ CNYN WY & HERMOSA DR). IMP INC: WIDEN HERMOSA DR. (TAHQUITZ CYN WY-ARENAS RD (NON-CAP)) TO PROVIDE OFFSITE BAY PARK. STALLS); EXT. HERMOSA DR (ARENAS RD-BARISTO RD, CAP ENH 2 LNS, 1 LN IN EA DIR); & CONS PALM SPRINGS SD L-9 (BARISTO CHANNEL – ARENAS RD). RIVERSIDE LOCAL RIV011203 0 IN PALM SPRINGS – WIDEN INDIAN CANYON DRIVE FROM 2 TO 4 LANES (2 IN EACH DIRECTION) "AT GRADE" FROM UPRR OVERCROSSING $4,961 HIGHWAY (BRIDGE 56C0025) TO TRAMVIEW ROAD. RIVERSIDE LOCAL RIV990727 0 IN PALM SPRINGS: WIDEN INDIAN CANYON DR FROM 2 TO 6 LANES (3 IN EACH DIRECTION), FROM UPRR OVERCROSSING TO GARNET AVE $19,860 HIGHWAY (HBRR#:56C0025). RIVERSIDE LOCAL RIV011205 0 IN PERRIS – WIDEN PERRIS BLVD 2 TO 6 LANES FROM RAMONA EXPRESSWAY TO PERRIS VALLEY STORM DRAIN – LATERAL 'B' $5,226 HIGHWAY (APPROX. 1 MILE), INCLUDING CURB, GUTTER, SIDEWALK, RAISED MEDIAN, SIGNAL WORK, UTILITY RELOCATIONS, AND MINOR DRAINAGE IMPROVEMENTS. RIVERSIDE LOCAL RIV011236 0 IN RIV COUNTY & MURRIETA – EXTEND/CONSTRUCT CLINTON KEITH ROAD (6 LANES TOTAL – APPROX 3.4 MILES) WITH 2 BRIDGES FROM $61,597 HIGHWAY ANTELOPE ROAD TO WINCHESTER ROAD (SR79) RIVERSIDE LOCAL RIV110116 0 IN RIVERSIDE – QUIET ZONE X-ING IMPROVEMENTS: UPGRADE OF 14 AT-GRADE HWY-RAIL X-INGS & ONE PEDESTRIAN ONLY AT-GRADE $8,000 HIGHWAY X-ING ALONG THE BNSF SAN BERNARDINO SUBD. & ONE AT-GRADE HWY-RAIL X-ING ALONG THE UPRR LOS ANGELES SUBD W/IN THE CITY OF RIVERSIDE. THE IMPROVEMENTS ARE NEEDED TO OPTIMIZE SAFETY AT THE X-INGS AND ALLOW FOR QUIET ZONE TO MITIGATE EXISTING AND PROJECTED TRAIN HORN NOISE IMPACTS. RIVERSIDE LOCAL RIV050201 0 IN RIVERSIDE COUNTY GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM; PROJECTS ARE $148,156 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLE 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). $717 TOLL CREDITS USED TO MATCH HBP IN CONS IN FY 2012/2013. RIVERSIDE LOCAL RIV52001 0 IN RIVERSIDE COUNTY GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE LOCAL ROADS SYSTEM $565 HIGHWAY – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION. RIVERSIDE LOCAL RIV090903 0 IN RIVERSIDE COUNTY ON CAJALCO RD – CAJALCO RD. WIDENING FROM 2 TO 4 THRU LNS (2 IN EA DIR) FROM TEMESCAL CANYON RD. $173,185 HIGHWAY TO HARVILL AVE AND FROM 4 TO 6 LANES FROM HARVILL AVE TO I-215, INCLUDING TURN POCKETS AND A BRIDGE RECONSTRUCTION OVER A WATER CROSSING (RTP IDS: 3A04WT137 AND 3A04WT138) (PA&ED ONLY) ($803 TOLL CREDITS USED FOR STPL MATCH IN PA&ED). Project List 91

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV070703 0 IN RIVERSIDE ON IOWA AVE: REPLACE EXISTING 4 LANE (2-LNS IN EA DIR) R/R X-ING WITH A 4 LANE (2-LNS IN EA DIR – NON-CAPACITY) $32,168 HIGHWAY O.C. GRADE SEPARATION ON IOWA AVE BTWN SPRING ST & PALMYRITA AVE W/PEDESTRIAN IMPROVEMENTS & RECONSTRUCT CITRUS ST INTERSECTION (NON-CAPACITY ENHANCING). RIVERSIDE LOCAL RIV071281 0 IN RIVERSIDE ON MAGNOLIA AVE: REPLACE EXISTING 4-LN (2 LNS IN EA DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR – NON-CAPACITY) $52,960 HIGHWAY U.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN SUNNYSIDE DR AND ELIZABETH ST. ADD. NON-CAPACITY IMP. INCLUDE: INSTAL. OF A TRAFFIC SIGNAL AT BEATTY DR AND MAGNOLIA; AND CONVERTING THE INTERSECTION OF MAGNOLIA AND MERRILL AVES TO ALLOW ONLY RIGHT-IN AND RIGHT-OUT MOVEMENTS. RIVERSIDE LOCAL RIV071280 0 IN RIVERSIDE ON MARY STREET: REPLACE EXISTING 4 LN (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) $38,000 HIGHWAY U.C. GRADE SEPARATION ON MARY ST BETWEEN MARGUERITE AVE AND INDIANA AVE. RIVERSIDE LOCAL RIV071272 0 IN RIVERSIDE ON RIVERSIDE AVENUE: REPLACE EXISTING 4-LANE (2 LNS IN EA DIR) R/R/ X-ING WITH A 4 LN (2 LNS IN EA DIR – $29,512 HIGHWAY NON-CAPACITY) U.C. GRADE SEPARATION ALONG RIVERSIDE AVE BTWN MERRILL AVE AND 400' N/O ELIZABETH ST. ADDITIONAL IMPROVEMENTS INCLUDE INSTALLATION OF APPROX 1,100 FT OF PCC S/W ON EACH SIDE OF RIVERSIDE AVENUE WITHIN THE PROJECT LIMITS ($791 TOLL CREDITS USED TO MATCH STPL IN R/W). RIVERSIDE LOCAL RIV071271 0 IN RIVERSIDE ON STREETER AVENUE: REPLACE EXISTING 4 LANE (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR – NON- $36,800 HIGHWAY CAPACITY) U.C. GRADE SEPARATION ON STREETER AVE BETWEEN LANTANA ST AND BEATTY DR., AND INSTALL APPROX. 1,000 FT OF PCC S/W ON EACH SIDE OF STREETER AVENUE WITHIN THE PROJECT LIMITS. RIVERSIDE LOCAL RIV060114 0 IN SOUTHWEST TEMECULA: DESIGN AND CONSTRUCT 4 LANE WESTERN BYPASS CORRIDOR (PHASE 1) FROM SR79 SOUTH TO RANCHO $13,500 HIGHWAY CALIFORNIA RD RIVERSIDE LOCAL RIV110825 0 IN THE CITY OF COACHELLA – AVE 50 OVER COACHELLA STORMWATER CHANNEL: REPLACEMENT OF A 2-LN LOW WATER X-ING $29,916 HIGHWAY (BRIDGE NO. 00L0055) WITH A NEW 6-LN (3-LNS IN EA DIR) BRIDGE FROM 300-FT W/O APACHE TRAIL TO SR-86S INTERSECTION. OTHER IMPROVEMENTS INCLUDE: BIKE LANES/TRAILS, SIDEWALKS, RECONSTRUCT TRAFFIC SIGNAL/DRIVEWAYS, CHANNEL SCOUR PROTECTION, AND REMOVAL OF LOW WATER CROSSING AND CULVERTS. RIVERSIDE LOCAL RIV010209 0 IN THE CITY OF CORONA – CONSTRUCT FOOTHILL PARKWAY WESTERLY EXTENSION 4 LANE ROAD FROM LINCOLN AVE TO PASEO $49,311 HIGHWAY GRANDE (APPROX 2.5 MILES) RIVERSIDE LOCAL RIV071236 0 IN THE CITY OF DESERT HOT SPRINGS – WESTERN AVE-SCENIC DR. PAVING PROJECT: CONSTRUCT 30' OF ASPHALT PAVING FROM $350 HIGHWAY PIERSON BLVD TO 600' N/O SCENIC DR., AND FROM 200' W/O WESTERN AVE. TO 600' E/O WESTERN AVE. ON SCENIC DR. ($36 TOLL CREDITS USED TO MATCH CMAQ IN CONST). RIVERSIDE LOCAL RIV110831 0 IN THE CITY OF INDIO – WIDEN JEFFERSON ST FROM VARNER RD TO SUN CITY BLVD FROM 4 TO 6 LANES AND WIDEN VARNER RD FROM $5,300 HIGHWAY 2 TO 4 LANES FROM JEFFERSON ST TO APPROX 500' EAST OF JEFFERSON ST AND THEN TAPERING BACK TO 2 LANES. INCL MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT-TURN POCKETS, DED RT TURN LANES ON SB JEFFERSON AND EB VARNER, DRAINAGE IMPROVEMENTS, SIDEWALKS, AND BIKE LANES. RIVERSIDE LOCAL RIV071240 0 IN THE CITY OF MORENO VALLEY – EAST BOUND CACTUS AVE WIDENING BETWEEN VETERANS WAY & HEACOCK: WIDENING OF EAST $6,243 HIGHWAY BOUND CACTUS AVE FROM 2 TO 3 LANES, INCLUDING TRAFFIC SIGNAL MODIFICATIONS WITHIN THE PROJECT REACH, CHANNELIZATION, AND SIGNAL INTERCONNECT SYSTEM. RIVERSIDE LOCAL RIV080905 0 IN THE CITY OF MORENO VALLEY – WIDEN ALESSANDRO BLVD BETWEEN I-215 AND FREDERICK ST FROM 4 TO 6 LANES. $12,401 HIGHWAY 92 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV080907 0 IN THE CITY OF MORENO VALLEY – WIDEN ALESSANDRO BLVD BETWEEN NASON ST AND GILMAN SPRINGS RD FROM 2 TO 4 LANES; $62,000 HIGHWAY REALIGN ALESSANDRO BLVD WITHIN PROJECT LIMITS BETWEEN THEODORE ST AND GILMAN SPRINGS RD. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS. RIVERSIDE LOCAL RIV080912 0 IN THE CITY OF MORENO VALLEY – WIDEN BOX SPRINGS RD BETWEEN 500' WEST OF CLARK ST AND DAY ST FROM 2 TO 4 LANES. $3,178 HIGHWAY INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING. RIVERSIDE LOCAL RIV080909 0 IN THE CITY OF MORENO VALLEY – WIDEN GILMAN SPRINGS RD BETWEEN ALESSANDRO BLVD AND BRIDGE ST FROM 2 TO 6 LANES. $51,000 HIGHWAY IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE LOCAL RIV080908 0 IN THE CITY OF MORENO VALLEY – WIDEN GILMAN SPRINGS RD BETWEEN SR-60 AND ALESSANDRO BLVD FROM 2 TO 6 LANES. $41,500 HIGHWAY IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE LOCAL RIV080910 0 IN THE CITY OF MORENO VALLEY – WIDEN HEACOCK ST BETWEEN CACTUS AVE AND SAN MICHELE RD FROM 2 TO 4 LANES INCLUDING $10,103 HIGHWAY CURB, GUTTER, SIDEWALK, AND SIGNAL. RIVERSIDE LOCAL RIV080911 0 IN THE CITY OF MORENO VALLEY – WIDEN HEACOCK ST BETWEEN SAN MICHELE RD AND HARLEY KNOX RD (PERRIS CITY LIMITS), FROM $6,100 HIGHWAY 2 TO 4 LANES; REALIGN HEACOCK ST WITHIN PROJECT LIMITS BETWEEN NANDINA AND OLEANDER; REPLACE BRIDGE OVER PVSD LATERAL B. RIVERSIDE LOCAL RIV080913 0 IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD AVE BETWEEN DAY ST AND BARCLAY DR FROM 2 TO 4 LANES. INCLUDES UTILITY $3,237 HIGHWAY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING. RIVERSIDE LOCAL RIV080914 0 IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD AVE BETWEEN HEACOCK ST AND PERRIS BLVD FROM 2 TO 4 LANES. INCLUDES $8,011 HIGHWAY UTILITY RELOCATION, DRAINAGE, CURB, GUTTER, AND SIDEWALK. RIVERSIDE LOCAL RIV080915 0 IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD AVE BETWEEN PERRIS BLVD AND VISTA DE CERROS DR. FROM 2 TO 5 LANES (2 $13,397 HIGHWAY LANES IN EACH DIRECTION AND 1 CENTER TURNING LANE) . ADDITIONAL IMPROVEMENTS INCLUDE SIGNAL MODIFICATIONS, LIGHTING, DRAINAGE, CURB, GUTTER, STRIPING, AND SIDEWALK. RIVERSIDE LOCAL RIV080917 0 IN THE CITY OF MORENO VALLEY – WIDEN MORENO BEACH DR BETWEEN CACTUS AVE AND AUTO MALL DR FROM 2 TO 6 LANES. $23,000 HIGHWAY INCLUDES SIGNALS AT COTTONWOOD AVE, ALESSANDRO BLVD, AND CACTUS AVE. RIVERSIDE LOCAL RIV080918 0 IN THE CITY OF MORENO VALLEY – WIDEN REDLANDS BLVD BETWEEN SR-60 AND CACTUS AVE FROM 2 TO 4 LANES. IMPROVEMENTS $18,300 HIGHWAY INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS. RIVERSIDE LOCAL RIV071243 0 IN THE CITY OF PALM DESERT – FREE RIGHT TURN LANE-WB FRED WARING DR TO NB HWY 111: RECONFIGURATION OF A FREE RIGHT $706 HIGHWAY TURN LANE AT THE INTERSECTION FROM WEST BOUND FRED WARING DR TO NORTH BOUND HWY 111 ($61 TOLL CREDITS USED TO MATCH CMAQ IN CONST). . RIVERSIDE LOCAL RIV071262 0 IN THE CITY OF PALM DESERT – HWY 111 IMP BTWN THE NO. CITY LIMITS AND LARKSPUR LN: EXT OF & PROVIDE DUAL LEFT TURN $691 HIGHWAY POCKET AT THE INT OF NB HWY 111 & PLAZA WAY & RECONSTRUCTION OF CROSS GUTTER (ELIMINATE ABRUPT DIP); CONSTRUCT BUS TURNOUT ON SB HWY 111 AT THE FAR SIDE OF SAN PABLO AVE; AND INSTALL APPROX. 12,000 S.F. OF S/W AND 14 ADA COMPLIANT CURB RAMPS ($71 TOLL CR USED TO MATCH CMAQ IN CONST). Project List 93

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV071257 0 IN THE CITY OF PALM DESERT – INSTALL INTERCONNECT CONDUIT AND FIBER-OPTIC CABLE IN THE AREA SURROUNDED BY MONTEREY $773 HIGHWAY AVE., COUNTRY CLUB DR., COOK ST., AND HWY 111, ESTABLISHING COMM LINKS TO THE TS MAINT OFFICE; RELOCATE THE TS CENTRAL COMPUTER SYSTEM HDWE TO THE SIGNAL MAINT FAC; & IMPROVE COMM. ON TO LOCAL INTERSECTION CONTROLLERS THROUGHOUT THE CITY ($86 TOLL CR USED TO MATCH CMAQ IN CONST). RIVERSIDE LOCAL RIV071255 0 IN THE CITY OF PALM DESERT – MID VALLEY BIKE PATH: CONSTRUCT A 6.5 MILE CLASS 1 BIKE PATH ALONG THE NORTHERN CITY $5,800 HIGHWAY LIMITS BETWEEN S/O WASHINGTON ST. AND N/O MONTEREY AVE. RIVERSIDE LOCAL RIV000103 0 IN THE CITY OF PALM SPRINGS – CONSTRUCT BELARDO RD (2 LNS, 1 EA DIR), FROM RAMON RD TO S. PALM CANYON DR., INCLUDING $5,500 HIGHWAY NEW BRIDGE OVER TAHQUITZ CREEK, & INTERSECTION. IMPROVEMENTS. AT SUNNY DUNES RD, MESQUITE AVE., & MORONGO RD., & CONSTRUCT TRIBAL ACCESS RD TO INTERPRETIVE CENTER. RIVERSIDE LOCAL RIV071258 0 IN THE CITY OF PALM SPRINGS – TRAFFIC MANAGEMENT CENTER: ADVANCE THE INTERCONNECTED SIGNAL TIMING TO BE UNIFIED $2,082 HIGHWAY CITYWIDE, COORDINATE THE COMM. EQUIP., BRINGING THEM ALL ONTO THE SAME COMM. PLATFORM FOR THE TRANSMISSION OF COMPLETE DATA & DISSEMINATION OF INFO. TO THE PUBLIC. RIVERSIDE LOCAL RIV031205 0 IN THE CITY OF PALM SPRINGS – WIDEN RAMON RD FROM 4 TO 6 LNS (3 IN EA DIR), FROM EL CIELO RD TO SUNRISE WY., WITH $4,750 HIGHWAY INTERSECTION WIDENING AT EL CIELO RD (ADD WB RT TURN LANE), AT FARRELL DR (ADD SB LEFT TURN LANE), & AT SUNRISE WY (ADD SB LEFT, NB LEFT, AND WB LEFT). RIVERSIDE LOCAL RIV090405 0 IN THE CITY OF PALM SPRINGS: REPLACE EXISTING 4-LANE LOW WATER CROSSING ON VISTA CHINO AT WHITEWATER RIVER WITH A $95,000 HIGHWAY NEW 4-LANE BRIDGE – BRIDGE NO. 00L0052. RIVERSIDE LOCAL RIV091001 0 IN THE COACHELLA VALLEY IN THE CITY OF DESERT HOT SPRINGS – INDIAN AVE WIDENING: WIDENING OF INDIAN AVE FROM 2 TO 6 $44,000 HIGHWAY THROUGH LANES (3 IN EA DIR), BETWEEN HWY 62 AND MISSION LAKES BLVD., INCLUDING THE CONSTRUCTION OF AN ALL WEATHER BRIDGE OVER MISSION CREEK (PA&ED). RIVERSIDE LOCAL RIV091201 0 IN THE COACHELLA VALLEY IN THE CITY OF DESERT HOT SPRINGS – INDIAN AVE. WIDENING: WIDENING OF INDIAN AVE. FROM 2 TO 6 $20,000 HIGHWAY THROUGH LANES (3 IN EA DIR) BETWEEN MISSION LAKES BLVD., AND PIERSON BLVD. (PA&ED ONLY). RIVERSIDE LOCAL RIV110124 0 IN THE COACHELLA VALLEY IN THE CITY OF PALM SPRINGS – RAMON RD. WIDENING BETWEEN SAN LUIS REY DR & LANDAU BLVD.: $36,160 HIGHWAY WIDENING OF RAMON RD. FROM A 4-LN ARTERIAL TO A 6-LN ARTERIAL (3-LNS IN EA DIR) BETWEEN SAN LUIS REY DR & LANDAU BLVD., INCLUDING THE WIDENING/REPLACEMENT OF THE WHITEWATER RIVER BRIDGE (BRIDGE NO. 56C0287), INCLUDING SEISMIC RETROFIT AND SCOUR COUNTERMEASURES AS NECESSARY. RIVERSIDE LOCAL RIV090102 0 IN THE COACHELLA VALLEY PM-10 PROGRAM – CLEAN VEHICLE ACQUISITION PROGRAM: FLEET ACQUISITION OF ALTERNATIVE FUEL $2,000 HIGHWAY SWEEPERS FOR REGIONAL STREET SWEEPING PROGRAM OF MAJOR ARTERIALS, FOR THE REDUCTION OF PM10 FUGITIVE DUST THROUGHOUT THE COACHELLA VALLEY ($229 TOLL CREDITS USED TO MATCH CMAQ IN CONST). RIVERSIDE LOCAL RIV071285 0 IN THE SOUTHEAST COACHELLA VALLEY IN EASTERN RIVERSIDE COUNTY, JUST SOUTH OF THE CITY OF COACHELLA ON AVE. 56 $22,300 HIGHWAY (AIRPORT BLVD) – FROM POLK ST TO THE WEST TO ORANGE ST. TO THE EAST OF THE R/R X-ING: REPLACE EXISTING 2 LN (1 LN IN EA DIR) AT GRADE R/R X-ING WITH A 2 LN OC (1 LN IN EA DIR – NON-CAPACITY) ACROSS THE UPRR TRACKS. RIVERSIDE LOCAL RIV031218 0 IN WESTERN RIV CO – NEW MID CO PKWY: CONS 6 THRU LN (3 LNS IN EA DIR) APPROX 16 MI. BTWN I-215 IN PERRIS EAST TO SR79 IN $1,700,000 HIGHWAY SAN JACINTO, INC. CONS/RECONS OF APPROX 10 ICS, ADD OF AUX LN REDLANDS-EVANS & EB AUXILIARY LN EVANS-ANTELOPE. I-215 IMP: ADD 1 MF LN IN EA DIR NUEVO RD -VAN BUREN BLVD, & 1 AUX LN IN EA DIR MID CO PKWY-CAJALCO/RAMONA EXP & FROM MID CO PKWY-NUEVO. 94 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV100102 0 IN WESTERN RIVERSIDE CO IN BEAUMONT: SR79 BYPASS EXT NO. PH II – INSTAL OF A 3-LN PRE-FAB BRIDGES ON THE EASTSIDE OF THE $21,846 HIGHWAY PH I POTRERO BRIDGE SR79 BYPASS EXT. NO., EXTENDING THE POTRERO BLVD 0.675 MI. NO. FROM THE FUTURE SR60/POTRERO FWY IC (RIV050535), TO CONNECT TO THE OAK VALLEY PKWY IN BEAUMONT, INCLUDING THE INSTAL OF A CLASS I MULTI-PURPOSES TRAIL, FLARED INTERSECTION AND TURNING POCKETS. RIVERSIDE LOCAL RIV091004 0 IN WESTERN RIVERSIDE CO. IN THE CITY OF MORENO VALLEY – CACTUS AVE WIDENING: WIDEN CACTUS AVE FROM 2 TO 4 THROUGH $6,350 HIGHWAY LANES (2 IN EA DIR), FROM LASSELLE ST TO NASON ST. OTHER IMPROVEMENTS INCLUDE THE INSTALLATION OF A DEDICATED RIGHT TURN LANE, A 2-WAY LEFT TURN LANE, BUS TURN-OUTS, LANDSCAPING & SIDEWALKS. RIVERSIDE LOCAL RIV111003 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF JURUPA VALLEY – MARKET STREET BRIDGE REPLACEMENT: REPLACE THE EXISTING $40,900 HIGHWAY TWO LANE (ONE LANE IN EACH DIRECTION) MARKET STREET BRIDGE OVER THE SANTA ANA RIVER, 0.4 MILES NORTHWEST OF SR60 WITH A FOUR LANE (TWO LANES IN EACH DIRECTION) BRIDGE. BRIDGE NO. 56C0024 RIVERSIDE LOCAL RIV091002 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF MORENO VALLEY – EUCALYPTUS AVE. EXTENSION: CONSTRUCTION OF 3 THROUGH $6,266 HIGHWAY LANES (2 LANES WB & 1 LANE EB) BETWEEN REDLANDS BLVD. AND THEODORE STREET, INCLUDING THE INSTALLATION OF MEDIANS, LEFT TURN POCKETS, DEDICATED RIGHT TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND A CLASS I BIKE PATH. RIVERSIDE LOCAL RIV091003 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF MORENO VALLEY – EUCALYPTUS AVE. WIDENING/EXTENSION: CONSTRUCTION OF A $3,550 HIGHWAY 4TH THROUGH LANE IN THE EASTERN DIRECTION FROM REDLANDS BLVD. TO THEODORE ST & EXTENSION OF EUCALYPTUS AVE. TO REDLANDS BLVD., WITH A SIGNALIZED INTERSECTION. RIVERSIDE LOCAL RIV090101 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF RIVERSIDE – UNDERGROUNDING OF EXISTING OVERHEAD UTILITIES ON VICTORIA $1,804 HIGHWAY AVENUE BETWEEN WASHINGTON AVE AND MAUDE ST (DEMO-STL HPP#3336; CA DEMO ID 668). RIVERSIDE LOCAL RIV100103 0 IN WESTERN RIVERSIDE COUNTY IN THE UNINCORPORATED AREA OF THE COUNTY OF RIVERSIDE – PIGEON PASS RD CORRIDOR: $33,327 HIGHWAY CONSTRUCT A NEW 4-LANE PIGEON PASS RD CORRIDOR FACILITY BETWEEN MT. VERNON AVE. AND HIDDEN SPRINGS RD, INCLUDING SIGNALS AND MEDIANS (PA&ED ONLY). RIVERSIDE LOCAL RIV011237 0 NEAR CORONA – WIDEN GREEN RIVER ROAD FROM 3 TO 6 LANES FROM SR91 SOUTHSIDE OFF/ON RAMPS TO PALISADES DRIVE. $7,583 HIGHWAY RIVERSIDE LOCAL RIV070702 0 NEAR SR60 AND BEAUMONT W/O JCT SR60/I-10: CONSTRUCT NEW 4 LANE (2 LNS EACH DIR) POTRERO BLVD FROM SR 60 SOUTH & $2,800 HIGHWAY EAST TO SR79 (PA&ED/PRE-DESIGN) RIVERSIDE LOCAL RIV031206 0 ON S. PALM CANYON DR OVER ARENAS CANYON SOUTH DRAINAGE CHANNEL: REPLACE EXISTING 4 LANE LOW-WATER CROSSING WITH $4,875 HIGHWAY A NEW 4-LANE BRIDGE, INCLUDING DRAINAGE IMPROVEMENTS CONSISTING OF LEVEE CHANNELIZATION (HBRR #: 00L0027). RIVERSIDE LOCAL RIV060121 0 ON VAN BUREN BLVD NEAR MARCH AIR RESERVE BASE: WIDEN FROM 4 TO 6 LANES FROM APPROXIMATELY 0.5 MILES WEST OF I-215 TO $6,700 HIGHWAY BARTON ST RIVERSIDE LOCAL RIV041047 0 THROUGHOUT RIVERSIDE COUNTY – GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE $3,473 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES). UTIL OF TOLL CREDITS TO MATCH STPL IN CONS – $108 FY11 & $290 FY13. RIVERSIDE LOCAL RIV010213 0 WIDEN GENE AUTRY TRAIL FROM 2 TO 6 LANES (3 IN EACH DIRECTION), INCLUDING WIDENING OF EXISTING UPRR OVERCROSSING $4,893 HIGHWAY (BRIDGE 56C0082) FROM 1700' S/O UPRR BRIDGE TO SALVIA ROAD. RIVERSIDE LOCAL RIV041045 0 WIDEN PERRIS BLVD FROM 2 TO 4 LANES FROM IRONWOOD AVE TO MANZANITA AVE INCLUDING CURB, GUTTER, SIDEWALKS, SIGNAL $6,670 HIGHWAY MODS, STREET LIGHTS & MEDIANS IMPROVEMENTS Project List 95

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) RIVERSIDE LOCAL RIV041043 0 WIDEN RECHE VISTA DR 2 TO 4 LNS (HEACOCK ST/PERRIS BLVD-RECHE CYN RD); WIDEN RECHE CYN RD 2 TO 4 LNS (RECHE VISTA- $3,386 HIGHWAY BARTON/HUNTS) PLUS REALIGN, SIGNALS, MEDIANS (PA&ED). SAN TRANSIT 20080902 0 29 PALMS TRANSIT CENTER $500 BERNARDINO SAN TRANSIT 20111204 0 5310 PROGRAM – REPLACE 5 SMALL BUSES FOR VOCATIONAL IMPROVEMENT PROGRAM, INC. (TOLL CREDITS TO BE USED IN THE $300 BERNARDINO AMOUNT OF $34 IN FY2010/11) SAN TRANSIT 20111203 0 5310 PROGRAM-REPLACEMENT BUSES – 16 LARGE BUSES (TOLL CREDITS TO BE USED IN THE AMOUNT OF $128 IN FY2010/11) $1,120 BERNARDINO SAN TRANSIT 20040815 0 ADMINISTRATION EQUIPMENT – COMPUTER HARDWARE AND OFFICE FURNISHINGS $30 BERNARDINO SAN TRANSIT 20060606 0 BARSTOW -OPERATING EXPENSES $16,763 BERNARDINO SAN TRANSIT 20111807 0 BUS EXPANSION ALT. FUEL – FY12 TWO (2) BUS EXPANSION NEW SERVICE $281 BERNARDINO SAN TRANSIT 20020811 0 BUS STOP AMENITIES – BARSTOW CITY HALL – FOR CENTRAL TRANSFER POINT AND OTHER AMENITIES $345 BERNARDINO SAN TRANSIT SBD41064 0 BUS SYSTEM – BUS SHELTERS ON VARIOUS ROUTES-REPLACING MISSING AND/OR DAMAGED BUS STOPS, PURCHASE AND REPAIR $158 BERNARDINO SHELTERS, BENCHES, ETC. SAN TRANSIT SBD41084 0 BUS SYSTEM – BUSES REPLACEMENT – ALT FUEL, FY 12 FIXED ROUTE TRANSIT COACHES (2) $6,827 BERNARDINO SAN TRANSIT SBD31037 0 BUS SYSTEM – OPERATING ASSISTANCE $15,547 BERNARDINO SAN TRANSIT SBD31581 0 BUS SYSTEM – OPERATING ASSISTANCE $75,338 BERNARDINO SAN TRANSIT SBD31612 0 BUS SYSTEM – OPERATING ASSISTANCE $2,271 BERNARDINO SAN TRANSIT SBD41055 0 BUS SYSTEM – OPERATING ASSISTANCE $14,086 BERNARDINO SAN TRANSIT 200086 0 BUS SYSTEM – PASSENGER FACILITIES. FY12-10 BUS SHELTERS INCLUDING UPGRADES FOR ACCESSIBILITY AND AMENITIES FOR THESE $522 BERNARDINO AND OTHER BUS STOPS; FY13-3 BUS SHELTERS AND AMENITIES;FY14-3 BUS SHELTERS AND AMENITIES; BUS SHELTERS INCLUDES BUS STOP LIGHTING EVERY YEAR. SAN TRANSIT 981118 0 BUS SYSTEM – PASSENGER FACILITIES: DESIGN AND BUILDING OF ONTARIO TRANSCENTER $1,244 BERNARDINO SAN TRANSIT 200101 0 BUS SYSTEM – PASSENGER FACILITIES: DEVELOPMENT OF SAN BERNARDINO TERMINAL LOCATED ON RIALTO AND E STREET. TRANSFER $10,000 BERNARDINO POINT CENTER SAN TRANSIT SBD41117 0 BUS SYSTEM – PURCHASE SERVICE VEHICLES 2012- ONE (1) SERVICE TRUCK $520 BERNARDINO 96 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN TRANSIT SBD20030 0 BUS SYSTEM OPERATING ASSISTANCE (NOTE: 'OTHER' FUNDS ARE FOR JOB ACCESS REVERSE COMMUTE FUNDS. $106,170 BERNARDINO SAN TRANSIT 20041303 0 BUS SYSTEM REPLACEMENT 35' GAS FUEL $1,290 BERNARDINO SAN TRANSIT SBD90105 0 BUS SYSTEM-BUSES BUS REPLACEMENTS ALT. FUEL, 2010-15 AND 15 COACHES PER YEAR AFTER 2010 $43,953 BERNARDINO SAN TRANSIT 20111301 0 BUS SYSTEM-OPERATING ASSISTANCE-LIFELINE CONNECTIVITY BUS SERVICE BETWEEN VICTOR VALLEY AND SAN BERNARDINO VALLEY $1,000 BERNARDINO (SPLIT PROJECT FROM SBD31581) SAN TRANSIT SBD31084 0 BUS SYSTEM-SERVICE VEHICLES, PURCHASE SEVERAL EXPANSION SERVICE VEHICLES $1,558 BERNARDINO SAN TRANSIT 20111805 0 BUSES – REHABILITATION/IMPROVEMENTS – SPARE PARTS/ASSOCIATED CAPITAL MAINTENANCE ITEMS $475 BERNARDINO SAN TRANSIT 20110302 0 CAPITAL – BUS FACILITY – CAPITAL LEASE PAYMENTS $29,544 BERNARDINO SAN TRANSIT SBD41073 0 CAPITAL – PURCHASE OF LAND AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS $25,500 BERNARDINO FACILITY (PH I & II) SAN TRANSIT 20080807 0 CAPITAL COST OF CONTRACTING $53 BERNARDINO SAN TRANSIT 200427 0 CAPITAL COST OF CONTRACTING FOR OPERATIONS $7,803 BERNARDINO SAN TRANSIT 20060601 0 CAPITALIZATION OF LEASES – FOR CONTRACTORS, RADIO SITES, APC, TIRE LEASES $4,910 BERNARDINO SAN TRANSIT 20080804 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE $428 BERNARDINO SAN TRANSIT 20080805 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE $193 BERNARDINO SAN TRANSIT 20080806 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE $180 BERNARDINO SAN TRANSIT 981122 0 CAPITALIZATION OF PREVENTIVE MAINT $69,467 BERNARDINO SAN TRANSIT 20080206 0 CHINO TRANSIT CENTER PHASE II – PHASE II WILL CONSIST OF BUILDING ADDITIONAL BUS BAYS FOR FUTURE INTER-COUNTY ROUTES $2,527 BERNARDINO SAN TRANSIT 20041302 0 COMPUTER HARDWARE AND SOFTWARE $138 BERNARDINO SAN TRANSIT 20110104 0 DISPATCH & MAINTENANCE. OFFICE EQUIPMENT $50 BERNARDINO SAN TRANSIT 20061012 0 DOWNTOWN SAN BERNARDINO PASSENGER RAIL- PROJECT-REDLANDS SUBDIVISION FROM APPROX.SAN BERNARDINO METROLINK $66,021 BERNARDINO STATION TO APPROX. WABASH/COLTON AVE.-THE TERMINUS REDLANDS-PSE& ANALYSIS OF ALT. FOR FTA NEW START (FULL FUNDING WILL BE PROGRAMMED AS SOON AS SANBAG BOARD APPROVES CMAQ ALLOCATION TO PROJECT) Project List 97

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN TRANSIT 200625 0 E STREET TRANSIT CORRIDOR- FROM SAN BERNARDINO TO LOMA LINDA (INCLUDES 14 ARTIC BUSES AND PARK AND RIDES) $192,236 BERNARDINO SAN TRANSIT SBD31073 0 FACILITIES IMPROVEMENTS – EQUIPMENT AND FURNISHINGS – EAST/WEST VALLEY FACILITY PURCHASE OFFICE EQUIPMENT $3,106 BERNARDINO SAN TRANSIT 200441 0 FACILITIES: EASTERN AREA MAINTENANCE: THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA & RCTC $29,619 BERNARDINO SAN TRANSIT 20111202 0 FAREBOX REPLACEMENTS, REPLACE FAREBOXES ON THE 40 FOOT REVENUE VEHICLES. THIS PHASE WILL COMPLETE ALL THE $1,700 BERNARDINO VEHICLES. SAN TRANSIT 20061704 0 FTA5316 JOBS ACCESS REVERSE COMMUTE (JARC) VARIOUS PROJECTS TO INCREASE TRANSPORTATION ACCESS TO JOBS FOR LOW $1,514 BERNARDINO INCOME INDIVIDUALS, INCLUDING VOUCHER PROGRAMS AND VANPOOLS SAN TRANSIT 20111801 0 HOLT BOULEVARD/4TH STREET BRT CORRIDOR ALTERNATIVE ANALYSIS – CONDUCT AN ALTERNATIVE ANALYSIS STUDY FOR THE HOLT $1,790 BERNARDINO BOULEVARD/4TH STREET BRT PROJECT SAN TRANSIT 20111808 0 VANPOOL PROGRAM – VICTOR VALLEY PHASE LIVABILITY GRANT $1,864 BERNARDINO SAN TRANSIT R589TA 0 INTERSTATE – LOS ANGELES/CHICAGO AT EL GARCES STATION MULTIMODAL – STATION – FACILITY $8,090 BERNARDINO SAN TRANSIT 20110604 0 ITS SOFTWARE/HARDWARE $712 BERNARDINO SAN TRANSIT 20061701 0 JOBS ACCESS AND REVERSE COMMUTE ADMINISTRATION OPERATIONS AND CAPITAL SECTION 5316 JOB ACCESS REVERSE COMMUTE $2,826 BERNARDINO (JARC) VARIOUS PROJECTS (C/O PROJECT FROM PRIOR YEAR) SAN TRANSIT 20080803 0 METROLINK – CMF AND KELLER STREET YARD – JOINT PROJECT FUNDED BY LAMTA, OCTA, RCTC, & VCTC (SANBAG ONLY $6,600 BERNARDINO PROGRAMMING THEIR PORTION OF PROJECT) SAN TRANSIT 20020802 0 METROLINK ADD'L PARKING STRUCTURE – CONSTRUCT 5 LEVEL PARKING STRUCTURE TO SERVE EXISTING METROLINK STATION AT $11,064 BERNARDINO SANTA FE DEPOT LOCATION SAN TRANSIT 990602 0 METROLINK CAPITAL MAINTENANCE (REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, $18,156 BERNARDINO STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING STOCK)($496 TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FY 2011/12 FTA 5309 IN CONSTRUCTION) SAN TRANSIT SBD41109 0 METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK) $40,000 BERNARDINO SAN TRANSIT 20080802 0 METROLINK POSITIVE TRAIN CONTROL – SYSTEM WIDE. IMPLEMENTATION OF PTC, JOINT PROJECT FUNDED BY LACMT, OCTA, RCTC, & $34,000 BERNARDINO VCTC (SANBAG PROGRAMMING ONLY THEIR PORTION OF THE PROJECT) SAN TRANSIT 20020801 0 METROLINK ROLLING STOCK – SANBAG'S SHARE OF PURCHASE OF METROLINK CARS & LOCOM UP TO 47 CARS/CABS AND IN FUTURE $22,584 BERNARDINO YEARS UP TO 22 CARS/CABS & UP TO 8 LOCOM (CO-OP LA0C8231, RIV010214) SAN TRANSIT 20061009 0 METROLINK-SEALED CORRIDOR-SAN GABRIEL SUB-THIS PROJECTS CONSISTS OF A COMPREHENSIVE CORRIDOR SAFETY $2,000 BERNARDINO ENHANCEMENT PROGRAM ALONG SANBAG OWNED ROW SAN TRANSIT 20061703 0 NEW FREEDOM – 5317 – VARIOUS PROJECTS AND TRANSPORTATION SERVICES BEYOND THOSE REQUIRED BY ADA, INCLUDING $647 BERNARDINO VOUCHER PROGRAMS-COORDINATED MOBILITY PROGRAM FOR VICTOR VALLEY (CARRYOVER FROM PRIOR FTIP 2007 DOLLARS) 98 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN TRANSIT 20061901 0 NEW FREEDOM PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL $1,399 BERNARDINO SAN TRANSIT 20040808 0 OFFICE EQUIPMENT $907 BERNARDINO SAN TRANSIT 20080203 0 OLDTIMERS FOUNDATION – PURCHASE 1 TYPE II AND 1 TYPE III VEHICLES (16 PASSENGER) FOR ELDERLY AND HANDICAPPED-5310 $125 BERNARDINO PROGRAM SAN TRANSIT 20111825 0 ONE CALL ONE CLICK VETERANS TRANSPORTATION INITIATIVE – PURCHASE HARDWARE AND SOFWARE TO EXPAND THE CAPACITY OF $284 BERNARDINO THE 211 SYSTEM AND CREATE A NEW VETERANS ONE-CLICK INFO. CONSOLIDATOR FOR SB COUNTY. SAN TRANSIT 20080205 0 ONTARIO YMCA – PURCHASE 2 TYPE III BUSES – 16 PASSENGER FOR ELDERLY AND HANDICAPPED – 5310 PROGRAM $66 BERNARDINO SAN TRANSIT 20080208 0 OPARC – PURCHASE 4 TYPE VANS – 8 PASSENGER FOR ELDERLY AND HANDICAPPED PROGRAM – 5310 PROGRAM $200 BERNARDINO SAN TRANSIT 20111201 0 OPERATIONS OF THE ACCESS SERVICE. ( WILL UTILIZE PART OF ITS ALLOCATED FTA5307 FORMULA FUNDS TO HELP PAY $11,600 BERNARDINO FOR THESE OPERATIONS) SAN TRANSIT SBD41114 0 PARATRANSIT – VEHICLE REPLACEMENT ALT. FUEL, 2012-3; $2,911 BERNARDINO SAN TRANSIT 20020140 0 PARATRANSIT – VEHICLES 17 PASSENGER REPLACEMENT – ALT. FUEL; 05-01 – REPLACEMENT YEAR 2005-FY 2001 VEHICLE $663 BERNARDINO SAN TRANSIT 20040701 0 PARATRANSIT – VEHICLES 22 PASSENGER REPLACEMENT – GAS 08-1;5-2010;2-2011; $533 BERNARDINO SAN TRANSIT 20040811 0 PARATRANSIT VEHICLE REPLACEMENT – 16 PASSENGER – GAS-07-6;08-4 $709 BERNARDINO SAN TRANSIT SBD44003 0 PARATRANSIT VEHICLE REPLACEMENT (10/11-1-18 PAX AND 11/12 1-18 PAX $225 BERNARDINO SAN TRANSIT 200423 0 PARATRANSIT VEHICLES – REPLACEMENT – GAS/DIESEL; 04-3;05-2;06-4;08-3,09-3 $1,198 BERNARDINO SAN TRANSIT 200426 0 PARATRANSIT VEHICLES – REPLACING 7 PASSENGER GAS BUS 06-1;08-2;09-1 $190 BERNARDINO SAN TRANSIT 20060603 0 PASSENGER FACILITIES – STOPS AND ZONES – SAN BERNARDINO VALLEY -PURCHASE EQUIPMENT FOR STOP AND ZONE $513 BERNARDINO IMPROVEMENTS SAN TRANSIT 20111815 0 PREVENTATIVE MAINTENANCE OPERATING ASSISTANCE $8,517 BERNARDINO SAN TRANSIT 20081602 0 PRUCHASE 1 BUS FOR BIG BEAR TO SAN BERNARDINO ROUTE $300 BERNARDINO SAN TRANSIT 20081601 0 PRUCHASE 2 30' GAS BUSES $300 BERNARDINO SAN TRANSIT 20040816 0 PRUCHASE SHELTERS AND BENCHES AND I-STOPS $249 BERNARDINO Project List 99

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN TRANSIT 20112006 0 PURCHASE 3 EXPANSION 40' BUSES ALT FUEL $1,800 BERNARDINO SAN TRANSIT 200424 0 PURCHASE REPLACEMENT DIESEL BUSES – 06-1;07-4 $1,416 BERNARDINO SAN TRANSIT 20081103 0 REHAB./REPAIR/RETROFIT TRANSIT FACILITIES $278 BERNARDINO SAN TRANSIT 20110105 0 REPLACE CUMMINS ENGINES AT MIDLIFE TO ENSURE THEY ARE KEPT IN TOP PERFORMING ORDER. THE ENGINE OVERHAULS ARE FOR $125 BERNARDINO 28-33 PASSENGER VEHICLES ONLY. SAN TRANSIT 20040813 0 REPLACEMENT – ALT. FUEL 37 PASSENGER VEHICLES; 3-2011 $1,275 BERNARDINO SAN TRANSIT 20040208 0 REPLACEMENT BUS – PURCHASE 1 40' 40 PASSENGER LNG/CNG BUS $464 BERNARDINO SAN TRANSIT 20040211 0 REPLACEMENT PARATRANSIT VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET;08-50;2011-50 $9,234 BERNARDINO SAN TRANSIT 20020810 0 REPLACEMENT-PARATRANSIT – 9 PASSENGER VEHICLES – GAS – 1-2010/11 $205 BERNARDINO SAN TRANSIT 200809 0 RIALTO AVE. & E STREET PLATFORM AND TRACK $7,600 BERNARDINO SAN TRANSIT 200450 0 RIALTO METROLINK STATION – INCREASE PARKING SPACES FROM 225-775 $3,356 BERNARDINO SAN TRANSIT 200416 0 SCLA RAIL SERVICE FROM AIR EXPRESSWAY APPROX. 5 MILES N0 TO COLUSA RD. BETWEEN PHANTOM EAST & MOJAVE RIVER-PUT IN $250,000 BERNARDINO NEW RAIL LINE FROM BNSF TO SCLA.(FOR FREIGHT)PROJECT IN CONNECTION WITH NEW INTERMODAL/MULTIMODAL FACILITY ON SCLA PROPERTY SAN TRANSIT SBD200436 0 SERVICE EQUIPMENT: PURCHASE & INSTALL GPS EQUIPMENT AT STATIONS. THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA, RCTC $305 BERNARDINO & VCTC SAN TRANSIT SBD200437 0 SERVICE EQUIPMENT: PURCHASE AND INSTALL UPGRADED TICKET VENDING MACHINES AT VARIOUS STATIONS SYSTEM WIDE. THIS IS $400 BERNARDINO PART OF PROJECT FUNDED BY LACMTA, OCTA, RCTC, & VCTC SAN TRANSIT 981111 0 TRANSIT – ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS $1,451 BERNARDINO SAN TRANSIT 20020806 0 TRANSIT – FACILITIES – IMPROVEMENT/UPKEEP OF EXISTING FACILITIES $5,281 BERNARDINO SAN TRANSIT 981104 0 TRANSIT – SECURITY $972 BERNARDINO SAN TRANSIT 981114 0 TRANSIT – SECURITY CAPITALIZATION OF SECURITY COSTS $1,315 BERNARDINO SAN TRANSIT SBD31055 0 TRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS $25,376 BERNARDINO 100 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN TRANSIT SBD44006 0 TRANSIT ADMINISTRATION EQUIPMENT OFFICE EQUIPMENT $128 BERNARDINO SAN TRANSIT 20111806 0 TRANSIT BUS STOP ACCESS IMPROVEMENTS – PATH OF TRAVEL FOR EXISTING BUS STOPS $141 BERNARDINO SAN TRANSIT 20110301 0 TRANSIT OPERATING EQUIPMENT – ITS SOFTWARE/HARDWARE $75 BERNARDINO SAN TRANSIT 20010120 0 TRANSIT SERVICE EQUIPMENT – PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (ON-GOING PROJECT) $31 BERNARDINO SAN TRANSIT 20110103 0 TRANSTRACK SOFTWARE MAINTENANCE CONTRACT PLUS DISPATCHING MODULE $70 BERNARDINO SAN TRANSIT 20040825 0 UPLAND METROLINK STATION – ADDITIONAL PARKING $5,810 BERNARDINO SAN TRANSIT 20040817 0 VEHICLE OVERHAULS – TO REBUILD ENGINES, TRANSMISSIONS, ETC. ON AGING FLEET $90 BERNARDINO SAN TRANSIT 20040812 0 VEHICLE REPLACEMENT – 28 PASSENGER DEVIATED FIXED ROUTE; 11/12-01 $527 BERNARDINO SAN TRANSIT 200425 0 VEHICLE REPLACEMENT – PARATRANSIT VEHICLES – 2 -18 PASSENGER ACCESSIBLE SMALL BUSES $147 BERNARDINO SAN STATE 200455 0 PLANNING, PROGRAMMING AND MONITORING AB3090 PAYBACK PROJECTS $632 BERNARDINO HIGHWAY SAN STATE SBD41147 10 AIRPORT GROUND ACCESS -I-10 AT ARCHIBALD AVE – INSTALL IRRIGATION SYSTEM AND LANDSCAPE PLANTING $3,085 BERNARDINO HIGHWAY SAN STATE 200432 10 AT I-10 AND FORD ST. ON RAMP TO THE FREEWAY – SIGNAL AND INTERSECTIONS IMPROVEMENTS $700 BERNARDINO HIGHWAY SAN STATE 1830 10 I-10 AT CEDAR AVE. BETWEEN SLOVER AND VALLEY- RECONSTRUCT I/C-WIDEN FROM 4-6 LANES WITH LEFT AND RIGHT TURN LANES. $56,948 BERNARDINO HIGHWAY ADD AUX LANE ON E/B ON AND OFF RAMPS SAN STATE 2002160 10 I-10 AT GROVE INTERCHANGE AND GROVE AVE. CORRIDOR – RELOCATE I/10 & 4TH ST. I/C TO GROVE AVE. AND WIDEN GROVE AVE $156,000 BERNARDINO HIGHWAY BETWEEN I-10 TO HOLT (WIDEN 4-6 LANES) SAN STATE 200803 10 I-10 AT VINEYARD AVE. INTERCHANGE. INTERCHANGE WIDENING FROM 4-6 LANES AND WIDEN ON AND OFF RAMPS TO TWO LANES, $83,550 BERNARDINO HIGHWAY INTERSECTION IMPROVEMENTS AND ENHANCE EXISTING LANDSCAPING SAN STATE 44812 10 I-10 TIPPECANOE RECONFIGURE INTERCHANGE & LOCAL RD IMP/MOD (HP 1366)(FORMERLY PART OF RTP ID 44810)(NON-CAPACITY $57,070 BERNARDINO HIGHWAY LOCAL ROAD IMPROVEMENTS – NO THRU LANES) SAN STATE 20020812 10 I-10/CHERRY AVENUE INTERCHANGE – INTERCHANGE RECONSTRUCT – REPLACE O/C, WIDEN O/H AND WIDEN I/C FROM SLOVER TO $84,090 BERNARDINO HIGHWAY VALLEY FROM 4-6 LANES WITH DOUBLE LEFT TURNS TO RAMPS(PROJECT COST INCREASED TO $84,090 DUE TO LOCAL A/C – TRUE PROJECT COSTS REMAIN AT $76,113) SAN STATE 200845 10 I-10/WABASH AVENUE INTERCHANGE – PSR IN CONJUNCTION WITH CALTRANS $40,000 BERNARDINO HIGHWAY Project List 101

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN STATE 0C2500 10 I-1O HOV LANE ADDITION – FROM HAVEN (ONTARIO TO FORD ST (REDLANDS)-WIDENING FROM 8-10 LANES, AUX LANES WIDENING $1,090,014 BERNARDINO HIGHWAY UNDERCROSSINGS AND OVERCROSSINGS AND RECONSTRUCTION OF RAMPS WHERE NEEDED SAN STATE 150D 10 IN COLTON FROM 0.2 MIL (0.3 KM) W/O RANCHO AVE TO 0.9 MI (1.5 KM) E/O LA CADENA DRIVE – CONSTRUCT RR TO RR GRADE $201,994 BERNARDINO HIGHWAY SEPARATION SAN STATE 34090 10 IN FONTANA AT ALDER AVENUE CONSTRUCT 4 LANE INTERCHANGE (2 LANES IN EACH DIRECTION.) $99,105 BERNARDINO HIGHWAY SAN STATE SBD031269 10 IN FONTANA AT BEECH AVENUE CONSTRUCT 4 LANE INTERCHANGE ( 2 LANES IN EACH DIRECTION. $113,023 BERNARDINO HIGHWAY SAN STATE SBD45000 10 IN FONTANA: I-10 AT CITRUS AVE IC RECONSTRUCT IC WITH 6 THRU LANES; & REPLACE BRIDGE OVERCROSSING(O/C WIDEN FROM 2-6 $56,392 BERNARDINO HIGHWAY LNS) AND WIDEN CITRUS FROM SLOVER TO VALLEY 4-6 LNS. SAN STATE 47440 10 IN REDLANDS FROM ORANGE ST. TO FORD ST. – ADD ONE MIXED FLOW LANE IN EACH DIRECTION AND FULL WIDENING OF 11 BRIDGES $34,067 BERNARDINO HIGHWAY ONE LANE IN EA DIRECTION SAN STATE 44811 10 I-TO TIPPECANOE INTERCHANGE ADD EASTBOUND OFF-RAMP AUXILIARY LN FROM WATERMAN ON-RAMP TO TIPPECANOE OFF-RAMP $22,450 BERNARDINO HIGHWAY AND WIDEN BRIDGE (NON-CAPACITY)(FORMERLY PART OF RTP ID 44810) SAN STATE 200434 10 ON I-10 IN REDLANDS AND YUCAIPA FROM FORD ST. O/C TO LIVE OAK CANYON RD. CONSTRUCT 1 W/B MIXED-FLOW LANE $43,186 BERNARDINO HIGHWAY SAN STATE SBD41339 10 PEPPER AVE. AT I-10 MODIFICATION OF PEPPER AVE. INTERCHANGE WIDEN BRIDGE FROM 3-7 LANES (2 THRU LANES, 2 TURN LANES $39,815 BERNARDINO HIGHWAY SOUTH, 1 TURN LANE NORTH) AND ADD AUXILIARY LANES TO FREEWAY (POST MILES KILOMETERS -32.5-34.4) (T21-#499) SAN STATE 0L340 10 VARIOUS AGENCIES/CITIES AESTHETIC CORRIDOR MASTER PLAN (ON URBAN CORRIDOR IN A COUNTY – DEVELOP MASTER PLAN) $440 BERNARDINO HIGHWAY SAN STATE 0G841 15 C. V. KANE SCRRA INTERPRETIVE DISPLAYS (NEAR THE CITY OF BARSTOW, AT THE C.V. KANE SAFETY ROADSIDE REST AREA (SCRRA) $260 BERNARDINO HIGHWAY INSTALL INTERPRETIVE DISPLAYS SAN STATE 200626 15 CONSTRUCT NEW INLAND EMPIRE TRANSPORTATION MANAGEMENT CENTER – INSTALL TMC-IN THE S/E QUADRANT OF I-15 AND SR 210 $44,345 BERNARDINO HIGHWAY I/C ON N/S VICTORIA AVE (I/T CITY OF FONTANA EA37704 SAN STATE SBD41446 15 EUCALYPTUS AT I-15 CONSTRUCT INTERCHANGE 3 LANES IN EA DIR STANDARD I/C CONFIG.(JOINT PROJECT BETWEEN VICTORVILLE $61,100 BERNARDINO HIGHWAY AND HESPERIA) SAN STATE SBD55026 15 EUCALYPTUS STREET FROM I-15 TO PEACH AVENUE – RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES AND CONSTRUCT RAILROAD $8,546 BERNARDINO HIGHWAY CROSSING SAN STATE 200613 15 I-15 & MUSCATEL STREET CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1700 FT AUX LANE $71,100 BERNARDINO HIGHWAY UPSTREAM TO SB EXIT RAMP” SAN STATE 200048 15 I-15 AT BASELINE INTERCHANGE – FROM 1,800 N/O BASELINE TO 2,400' S/O; 1800' W/O TO EAST AVE. TO 1500' E/O EAST AVE-WIDEN $43,100 BERNARDINO HIGHWAY RAMPS (INCLUDING BRIDGES), WIDEN BASELINE RD. FROM 4-6 LANES, WIDEN EAST AVE. FROM 2-4 LANES, REALIGN AND WIDEN S/B AND N/B DIAMOND RAMPS FROM 1-2 LNS (INCLUDG BRIDGES, AD S.B LOOP ON-RAMP (INCL BRIDGES) ADD I-15 ACCEL/DECEL LANES, AND OPERATIONAL IMPROVEMENTS (EA497100)(CA435) SAN STATE 0H1300 15 I-15/DUNCAN CANYON INTERCHANGE – CONVERT EXIST 2 LN OVERCROSSING TO DIAMOND IC, WIDEN TO 4 LANES PLUS DBL LEFT $35,834 BERNARDINO HIGHWAY TURNS TO SB RAMP ACCEL/DECEL LANES & SINGLE LEFT TO NORTHBOUND RAMP SAN STATE 20061201 15 I-15/I-215 I/C IMPROVMTS-DEVORE I/C S/O GLEN HELEN PARKWY TO N/O KENWOOD & I-215 FROM S/O DEVORE RD. I/C TO I-15 (16.0- $324,246 BERNARDINO HIGHWAY 17.8) ADD 1 M/F LN IN EA DIR TO EXISTG 3 M/F LNS FROM 3800' S/O GLEN HELEN PARKWY TO 3100' N/O I-215 I/C ADD 1 DECEL LN FROM 3200'S/O 12/215I/C OFFRMP TO S/B DEVORE ON I-215 102 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN STATE SBD031279 15 IN HESPERIA AT I-15 AND RANCHERO ROAD – CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1300 $80,625 BERNARDINO HIGHWAY FT. AUX LANE PRIOR TO N/B OFF RAMP AND 3200 FT. AUX LANE FROM TO S/B LOOP ON RAMP SAN STATE 35558 15 IN SAN BERNARDINO CO. – GATEWAY ENHANCEMENTS ON I-15 FROM MOJAVE DR. IN VICTORVILLE TO STODDARD WELLS RD. IN $2,446 BERNARDINO HIGHWAY BARSTOW-RETENTION WALL ENHANCMENTS AND LANDSCAPING(PPNO0175N) SAN STATE 35556 15 IN THE CITY OF VICTORVILLE FROM 0.6 MILES NORTH OF MOJAVE DRIVE TO 1.0 NORTH OF EXISTING STODDARD WELLS ROAD WELLS $146,676 BERNARDINO HIGHWAY OVERCROSSING. RECONSTRUCT D/E/STODDARD WELLS RD IC'S. WIDEN BRIDGES (NO NEW LANES). CONSTRUCT NEW COLLECTOR DISTRIBUTOR RD OVER D/E/AND BNSF RR TO PARRALLEL I-15 NB INCLUDES ITS OWN BRIDGE. RECONST/REALIGN EAST/WEST FRONTAGE RDS. CONST NEW AUX LN. (REFER TO MODELING DETAILS)(CA061) SAN STATE 34170 15 IN VICTORVILLE AT LA MESA ROAD/NISQUALLI ROAD CONSTRUCT I/C NEW 6 LANE INTERCHANGE $90,009 BERNARDINO HIGHWAY SAN STATE 200152 15 ON I-15 FROM 3,500 FT. S OF ARROW RTE. TO 3,500 ' N/O FOOTHILL BLVD AND AND ON ARROW RT. FROM 1000 FT.W/TO 100 FT. E/ OF $91,370 BERNARDINO HIGHWAY I- 15-CONSTRUCT NEW I/C AR ARROW RTE, CONSTRUCT S/B DOUBLE DECEL LANES TO FOOTHILL BLVD OFFRAMP AND MODIFY RAMPS AT FOOTHILL. SAN STATE 200078 15 PARK-N-RIDE LOT EXPANSION AND FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES) $755 BERNARDINO HIGHWAY SAN STATE 20061702 18 E-220 HIGH DESERT CORRIDOR-WEST TO EAST SR-14 TO US 395 CONNECTING AT SB COUNTY, . CONSTRUCT NEW 4-6 LANE FACILITY $4,000,000 BERNARDINO HIGHWAY (PART OF 20020144) JPA PROJECT. SR. 138 PM 43.4 TO SR18T 17.0 S.B. COUNTY LINE 0.0. SAN STATE 20020144 18 HI- DESERT CORR. PHASE 1, SR-18 REALIGNMENT FROM US 395 IN ADELANTO TO SR-18 E/O APPLE VALLEY. COONSTRUCT 4-6 LANE $1,156,000 BERNARDINO HIGHWAY FREEWAY/EXPRESSWAY. CONSTRUCT NEW IC @I-15 W/AUX LANES NORTH AND SOUTH OF NEW IC. CONSTRUCT INTERSECTION @US 395 W/TURN POCKETS TO NORTH AND SOUTH SAN STATE 0A7910 18 IN RUNNING SPRINGS FROM RTE. 18 FROM N/O NOB HILL DR. TO S/O R.S. SCHOOL RD. AND RTE 330 FROM S/O RTE. 18 TO RTE. $2,265 BERNARDINO HIGHWAY 18-RURAL GATEWAY BEAUTIFICATION-AESTHETIC IMPROVEMTNS SAN STATE 200612 18 SR 18 FROM APPLE VALLEY RD. TO CORWIN RD. – WIDEN FROM 4-6 LANES (APPROX. 3 MI) $14,400 BERNARDINO HIGHWAY SAN STATE 20110602 18 SR18 AT APPLEY VALLEY ROAD INTERSECTION REALIGNMENT WITH TURN AND APPROACH LANES $4,650 BERNARDINO HIGHWAY SAN STATE 34770 58 0.4 MILES WEST OF KERN CO LINE TO 7.5 MI EAST OF JCT RTE 395 – CONSTRUCT 4 LANE EXPRESS WAY ON NEW ALIGNMENT, NEW $148,067 BERNARDINO HIGHWAY INTERCHANGE AT US 395 AND SR 58 SAN STATE 4351 58 SR58 EXPRESSWAY-REALIGN AND WIDEN FROM 2-4 LANE EXPRESSWAY. NEW INTERCHANGES AT LENWOOD RD AND HINKLEY RD. 2.4 $298,326 BERNARDINO HIGHWAY MILES WEST OF HIDDEN RIVER RD. TO 0.7 MILES EAST OF LENWOOD ROAD – REALIGN AND WIDEN TO 4 LANE EXPRESSWAY (2-4 LANES) (PHASE 2) SAN STATE 200602 60 SR 60 AND VINEYARD AVE. INTERCHANGE RECONSTRUCTION-LENGTHEN BRIDGE TO ACOMMODATE VINEYARD AVE WIDENING AND RAMP $50,810 BERNARDINO HIGHWAY WIDENING 4-6 LANES SAN STATE 201133 60 SR 60 AT EUCLID WIDEN W/B EXIT RAMP FROM 2-3 LANES $1,620 BERNARDINO HIGHWAY SAN STATE 201132 60 SR-60 AT ARCHIBALD AVENUE WIDEN ON AND OFF RAMPS (2-3 LANES EACH WAY) $7,900 BERNARDINO HIGHWAY Project List 103

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN STATE 200604 60 SR60 AT GROVE AVENUE INTERCHANGE RECONSTRUCTION AND GROVE AVE. +/-300 FT. N/S OF SR 60-WIDEN FROM 4-6 LANES $50,810 BERNARDINO HIGHWAY SAN STATE 201114 60 WIDENING OF CENTRAL AVENUE BRIDGE CROSSING SR-60 TO ACCOMODATE WIDENING OF RAMPS AND THE DESIGNATED FREEWAY $27,779 BERNARDINO HIGHWAY LANES. SAN STATE 200435 62 ON SH62 IN YUCCA VALLEY FROM APACHE TRAIL EAST TO APPROX 0.5 MILES TO PALM AVE. INSTALL NEW RAISED MEDIAN, CONSTRUCT $2,740 BERNARDINO HIGHWAY CURB & GUTTER & NEW STREET LIGHTS, AND NEW SIGNAL AT CHURCH ST.(CA543) SAN STATE 20080901 62 ON SR 62 FROM ENCELIA RD. TO CIENEGA RD. ROAD REHABILITATION $4,650 BERNARDINO HIGHWAY SAN STATE 0L350 62 ON VARIOUS ROUTES – RURAL ROADSIDE -ARCHAEOLOGICAL INVENTORY – DIST. 8 (PPNO 0227J)-ARRA STATE TE FUNDING $1,405 BERNARDINO HIGHWAY SAN STATE 200851 62 SR 62 FROM FAIRWAY TO CAMINO DEL CIELO; AND PALM TO AIRWAY WIDENING FROM 4-6 LANES, INSTALL MEDIANS, SIGNALS, $11,000 BERNARDINO HIGHWAY SIDEWALKS, AND CURB AND GUTTER SAN STATE 0G930 62 SR 62 REALIGNMENT FROM APPROX. 445' W/O CAMINO DEL CIELO TO TROJAN LANE-WIDEN 4-6 LANES. REALIGNING KICKAPOO TO $50,544 BERNARDINO HIGHWAY ACOMA, RAISED MEDIAN ISLAND, TRAFFIC SIGNALS, SIDEWALKS AND STREET LIGHTS SAN STATE 20060203 62 SR 62 SAFETY & UTILITY IMPROVMNTS-TCRP 129 ON SR 62 FROM LA HONDA WY EAST APPROX. 0.2 MILES TO DOMOSA – INSTALL $320 BERNARDINO HIGHWAY RAISED LANDSCAPED MEDIANS, SIDEWALKS, UTIL U/GROUND/DRAINAGE SAN STATE 20084103 62 SR62 -TRAFFIC CONTROL SYCNRONIZATION OF 4 TRAFFIC SIGNALS FROM CAMINO DEL CIELO/SR62 TRAFFIC SIGNAL THROUGH ACOMA $226 BERNARDINO HIGHWAY TRAIL SR 62 TRAFFIC SIGNAL PROGRAM SAN STATE 2011185 66 WIDEN FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN GROVE AVENUE AND SAN BERNARDINO RDWIDEN FROM 4-6 LANES $6,006 BERNARDINO HIGHWAY INCLUDES RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BOULEVARD AS A MONUMENT TO THE HISTORIC ROUTE 66. SAN STATE 20010133 66 WIDEN FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN SAN BERNARDINO RD AVENUE AND VINEYARD AVE. REMOVES THE EAST $10,632 BERNARDINO HIGHWAY UPLAN UNDERPASS BRIDGE ALSO KNOWN AS THE RR BRIDGE, CONSTRUCTS A NEW PUBLIC TRAIL BRIDGE ALONG THE RR ALIGNMENT AND ADDES, RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BOULEVARD AS A MONUMENT TO THE HISTORIC ROUTE 66. SAN STATE 0F100 71 ON RTE. 71 FROM SOQUEL CYN PARKWY TO RIVERSIDE CO. LINE AND RIV. CO FROM S.B. CO LINE TO SANTA ANA RIVER BRIDGE -PHASE $1,974 BERNARDINO HIGHWAY 1- TREE PLANTING AND AESTHETICS- SAN STATE 0P240 138 CONSTRUCT A NEW VISTA POINT AT ROUTE 138 WITH PAVED AREA FOR 10 PARKING SPACES INCLUDING 2 SPACES FOR ADA DRIVERS $570 BERNARDINO HIGHWAY WITH DECORATIVE FENCE AND INTERPRETIVE SIGNS. SAN STATE 34011 138 NEAR WRIGHTWOOD FROM PHELAN RD TO I-15 WIDEN FROM 2 TO 4 LANES (EA3401U) $87,181 BERNARDINO HIGHWAY SAN STATE 20110110 210 CONSTRUCT NEW FULL-SERVICE INTERCHANGE WITH DIAMOND CONFIGURATION AT SR-210 AND PEPPER AVENUE IN THE CITY OF $18,965 BERNARDINO HIGHWAY RIALTO. ADD WB AND EB ACCEL AND DECEL LANES AND LOCAL STREET IMPROVEMENTS (CONSTRUCT 4 LANES ON PEPPER AVE FROM HIGHLAND AVE TO 160 FT SOUTH OF SR-210). SAN STATE 20432 210 ON RTE 210 FROM ETIWANDA AVE.- 2.0 MI. NORTH TO 0.5 MI SOUTH OF RTE 210 – MITIGATION PLANTING 2,200 1-GAL. EUCALYPTUS $1,802 BERNARDINO HIGHWAY TREES SAN STATE 20084106 210 ON SR 210 LANDSCAPING SEGMENTS 8-11 – PROVIDE PLANTING, IRRIGATION AND INERT GROUNDCOVER ALONG SR210 FROM WEST $9,574 BERNARDINO HIGHWAY OF SIERRA AVE IN THE CITY OF FONTANA TO SR210/I-215 I.C IN SAN BERNARDINO (TOLL CREDITS TO BE USED IN CON PHASE. STPLS ADDED FOR $210,000 IN FY2010/11). 104 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN STATE 2011154 210 SR 210 AT 5TH ST/GREENSPOT RD; ON AND OFF RAMPS WIDENING; ADD LANES (.45) ORIGINALLY PORTION OF PROJECT 200429 $6,225 BERNARDINO HIGHWAY PROJECT ADDS 1 LANE N/B TO EXISTING 2 LANES AND ADDING 2 LANES TO EXISTING TO LANES TO N/B OFF RAMP AND ADDING 1 LANE TO EXISTING 2 LANE S/B OFF RAMP SAN STATE 20111625 210 SR210 LANE ADDITION – ADD 1 MIXED FLOW LANE IN EACH DIRECTION FROM HIGHLAND AVE(S/B). TO I-10 (REDLANDS) INCLUDES AUX. $143,939 BERNARDINO HIGHWAY LANES BETWEEN HIGHLAND AND 5TH STS AND AN ACCELERATION LANE AT 5TH ST. S/B ON RAMP SAN STATE 20620 210 UPLAND TO SAN BERNARDINO FROM LA CO LINE TO RTE 215 – 8 LN FREEWAY INCLUDING 2 HOV LNS (6+2)-210 CORR. W/AUX LNS $482,339 BERNARDINO HIGHWAY THRUOUT SEGS. 9-11(SEG.11 INCL CONNECTOR BETWEEN 210 & 215 (MORE) SAN STATE 201153 210 WIDEN 5TH ST FROM CITY CRK TO SR210; RESTRIPE 5TH ST FROM 4-6LNS BTW CHURCH AVE & SR210; RESTRIPE 210 UNDERCROSSING $5,070 BERNARDINO HIGHWAY 4-5LNS BTW RAMPS WITH ADD. TURN LN. CONSTRUCT TRUCK ACCL. LN ON SB SR210 ON-RAMP AND FWY MAINLINE INCLUDING WIDENING OF EXISTING FWY BRIDGE SAN STATE SBD59204 215 I-215 AT UNIVERSITY PARKWAY INTERCHANGE – CONSTRUCT SOUTHBOUND UNIVERSITY PARKWAY -INTERCHANGE RECONFIGURATION $22,513 BERNARDINO HIGHWAY AND AUX. LANE ON EACH SIDE, NEW RAMP SAN STATE 200614 215 I-215 BI-COUNTY HOV LANE GAP CLOSURE PROJECT- ADD 1 HOV LANE IN EACH DIRECTION FROM SPRUCE ST. ON RIV 91 TO ORANGE $184,694 BERNARDINO HIGHWAY SHOW RD;(ALSO INCLUDES RTP 4M0803 (STIP 2010 $24881 RCTC AND $45089 SANBAG) SAN STATE 713 215 I-215 CORRIDOR NORTH – IN SAN BERNARDINO, ON I-215 FROM RTE 10 TO RTE 210 – ADD 2 HOV & 2 MIXED FLOW LNS (1 IN EA. DIR.) $718,586 BERNARDINO HIGHWAY AND OPERATIONAL IMP INCLUDING AUX LANES AND BRAIDED RAMP SAN STATE OM630 215 I-215 MT. VERNON/WASHINGTON ST. INTERCHANGE-RECONSTRUCT I/C-(PROJECT IS IN REPLACE O/C STRUCTURE; RECONFIGURE ON/ $152,821 BERNARDINO HIGHWAY OFF RAMPS; ADD SB ACCEL AND NB DECEL LANE-IMPROVEMENTS TO LOCAL STREETS (PA & ED ONLY) SAN STATE SBD31850 215 IN GRAND TERRACE AT I-215 BARTON ROAD INTERCHANGE RECONSTRUCT OC AND RAMPS WITH PARTIAL CLOVERLEAF CONFIGURATION $141,407 BERNARDINO HIGHWAY NW OF I-215 WORK INCL ADD OF NB AUX LN.LOCAL STREET WORK TO INCL WIDENING OF BARTON RD, REMOVAL OF LA CROSSE AVE. BETWEEN VIVENDA AVE & BARTON RD, REPLACEMENT W/ NEW LOCAL ROAD, IMPROVEMENTS TO THE BARTON RD AND MICHIGAN WAY/ VIVENDA AVE INTERSECTION AND REALIGNMENT OF COMMERCE WAY SAN STATE 34040 395 ON US395 FROM HIGH DESERT CORRIDOR TO FARMINGTON RD.NEW 4 LANE EXPRESSWAY- WIDEN FROM 2-4 LANES ON EXISTING $14,000 BERNARDINO HIGHWAY ALIGNMENT LEFT TURN CHANNELIZATIONS AT INTERSECTIONS SAN STATE 200451 395 US-395 (HESPERIA, VICTORVILLE, & ADELANTO) FROM I-15 TO 1.8 MI. S/O DESERT FLOWER RD.-INTERIM WIDENING-WIDEN FROM 2-4 $2,000 BERNARDINO HIGHWAY LANES AND ADD LEFT TURN CHANNELIZATION AT INTERSECTIONS (PA&ED) SAN STATE SBD59303 999 ___SET ASIDES/RESERVATIONS FOR FUTURE SB45 -PLANNING, PROGRAMMING, & MONITORING $7,440 BERNARDINO HIGHWAY SAN STATE SBDLS07 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – SHOPP PROGRAM-PROJECTS ARE CONSISTENT WITH $132,148 BERNARDINO HIGHWAY 40 CFR PART 93.123 EXEMPT TABLES 2 CATEGORY WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) SAN STATE SBDLS09 999 GROUPED PROJECTS FOR EMERGENCY RESPONSE PROJECTS AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY (PROJECTS ARE $38,061 BERNARDINO HIGHWAY CONSISTENT WITH 40 CFR PART 93.126,127,128 EXEMPT) SAN STATE SBDLS13 999 GROUPED PROJECTS FOR IIP TE STATE PROJECTS – VARIOUS LOCATIONS WITHIN SAN BERNARDINO COUNTY (PROJECTS ARE EXEMPT $1,620 BERNARDINO HIGHWAY UNDER CFR 40 PARTS 51 AND 93 SAN STATE SBDLS02 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM-PROJECTS $374,322 BERNARDINO HIGHWAY ARE CONSISTENT W/40 CFR PART 93.126 EXEMPT TABLES 2-PAVEMENT RESURFACING AND/OR REHAB. EMERGENCY RELIEF (23 U.S.C.125) WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDL TRAVEL LANES) Project List 105

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN STATE SBDLS14 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – HIGHWAY $22,696 BERNARDINO HIGHWAY MAINTENANCE-PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 TABLES 2 AND 3 CATEGORIES -PAVEMENT RESURFACING OR REHABILITATION SAN STATE SBDLS011 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MANDATES PROGRAM-PROJECTS ARE CONSISTENT WITH 40 CFR PART $7,334 BERNARDINO HIGHWAY 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES-RAILROAD/HIGHWAY CROSSING, SAFER NON-FEDERAL AID SYSTEM ROADS. SHOULDER IMPROVEMENTS, TRAFFIC CONTROL DEVICES AND OPERATING ASSISTANCE OTHER THAN SIGNALIZATION PROJECTS. INTERSECTION SIGNALIZATION PROJECTS AT INDIVIDUAL INTERSECTIONS, PAVEMENT MARKING SAN STATE SBDLS04 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MOBILITY PROGRAM-PROJECTS ARE CONSISTENT W/40 CFR PART 93.126 $233,045 BERNARDINO HIGHWAY EXEMPT TABLES 2 & 3-RAILROAD/HIWAY XING, SAFER NON-FED AID SYSTEM ROADS, SHOULDER IMPRVMTS,TRAFFIC CONTROL DEV., &OPERATING ASSIST OTHER THAN SIGNALIZATION PROJECTS, INTERSECT SIGNALIZATION PROJS AT INDIVIDUAL INTERSECTS, PAVEMENT MARKING DEMOS,TRUCK CLIMBING LNS OUTSIDE URBAN AREA, LIGHT SAN STATE SBDLS05 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURF AND/OR OTHER REHAB – $12,110 BERNARDINO HIGHWAY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3) R/R/HIWAY XING, SAFER NON FED-AD SYSTEM ROADS, SHOULDER IMPROVMENTS, TRAFFIC CONTROL DEVICES&OPERATING ASSIST OTHER THAN SIGNALIZATION PROJECTS OR PROJECTS AT INDIVIDUAL SIGNALS, PAVEMT. MARK DEMOS, TRUCK CLIMBING LNS OUTSIDE UR SAN STATE SBDLS01 999 GROUPED PROJECTS FOR SAFETY IMPROVMNTS – SHOPP COLLISION REDUCTION PROGRAM-PROJECTS ARE CONSISTENT WITH 40 $218,082 BERNARDINO HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES -RAILROAD/HIWAY XING, SAFER NON-FED AID SYSTEM ROADS, SHOULDER IMPROVMTS, TRAFFIC CONTRL DEVICES & OPER ASSIST OTHER THAN SIGNALIZATION PROJECTS @ INDIVIDUAL INTERSECTIONS, PAVEMT MARKING DEMOS, TRUCK CLIMBING LNS O/S THE URBANIZED AREA SAN STATE SBDLS03 999 GROUPED PROJECTS FOR SHOULDER IMPROVEMENTS – SHOPP ROADSIDE PRESERVATION PROGRAM-PROJECTS ARE CONSISTENT WITH $16,960 BERNARDINO HIGHWAY 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORY -PAVEMENT RESURFACING AND OR REJABILITATION. EMMERGENCY RELIEF (23U.S.C. 125) WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDLT TRAVEL LANES SAN LOCAL 201157 0 .WASHINGTON ST. FROM .90 MILES WEST OF WASHINGTON ST. TO LA CADENA MT. VERNON CONSTRUCT NEW 4 LANE ROADWAY (FOR PA $28,000 BERNARDINO HIGHWAY & ED ONLY) SAN LOCAL SBD031422 0 3RD AVENUE NISQUALLI ROAD TO GREEN TREE BOULEVARD WIDEN FROM 2 LANES TO 4 LANES $750 BERNARDINO HIGHWAY SAN LOCAL 201181 0 3RD STREET FROM TIPPECANOE AVENUE TO LELAND/NORTON WAY AND FROM LELAND/NORTON WAY TO VICTORIA AVENUE SHOULDER $3,200 BERNARDINO HIGHWAY WIDENING AND MEDIANS- 1.25 MILES)(NO THROUGH LANE WIDENING) TOTAL LENGTH 1.95 MILES FORMERLY PART OF PROJECT ID 200852 SAN LOCAL 201185 0 3RD STREET FROM VICTORIA AVENUE TO PALM AVENUE – SHOULDER IMPROVEMENTS (REMAINS 4 LANES) (1 MILE) FORMERLY PART OF $1,592 BERNARDINO HIGHWAY PROJECT ID 200430 SAN LOCAL SBD59019 0 40TH ST. FROM ACRE LANE TO ELECTRIC AVENUE; ACQUIRE ROW AND WIDEN ROAD FROM 2 TO 4 LANES (1,200 FT.) $3,264 BERNARDINO HIGHWAY SAN LOCAL 201183 0 5TH ST FROM TIPPECANOE AVENUE TO DEL ROSA DR.-WIDEN FROM 2-4 LANES $5,255 BERNARDINO HIGHWAY SAN LOCAL 201170 0 5TH STREET FROM STERLING AVE TO VICTORIA AVE WIDEN FROM 2-4 LANES. $5,800 BERNARDINO HIGHWAY SAN LOCAL 201158 0 AGUA MANSA FROM RIALTO CHANNEL TO RANCHO AVE. 2-4 LANE WIDENING.(PROGRAMMED FUNDING FOR PA & ED ONLY) $6,652 BERNARDINO HIGHWAY 106 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL SBD55031 0 ALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS – WIDEN FROM 2 TO 3 S/B LANES (0.25 MILES) $1,078 BERNARDINO HIGHWAY SAN LOCAL 200419 0 ALABAMA STREET WIDENING – WIDEN FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO $7,200 BERNARDINO HIGHWAY SAN LOCAL SBD031218 0 ALDER AVENUE BASELINE TO FOOTHILL BOULEVARD WIDEN 2 LANES TO 4 LANES W/TURN LANES $2,624 BERNARDINO HIGHWAY SAN LOCAL 20080801 0 AMBOY RD: OVERLAY PAVEMENT SAN BERNARDINO COUNTY – LUMP SUM MAINTENANCE AND REHAB. PROJECTS FOR LOCAL PROJECTS $2,165 BERNARDINO HIGHWAY WITH SAN BERNARDINO COUNTY. ALL PROJECTS FALL UNDER THE 23 CFR 450.324 (F) AND ARE UNDER THE EXEMPT PROJECT LISTING 40 CFR PART 93 SAN LOCAL SBD41427 0 AMBOY ROAD – LEAR AVE TO ADOBE RD. (5.5 MILES) CONSTRUCT NEW 2 LANE ROAD (ONE LANE IN EACH DIRECTION) $550 BERNARDINO HIGHWAY SAN LOCAL SBD031418 0 AMETHYST ROAD PALMDALE ROAD TO HOPLAND STREET WIDEN EXISTING ROAD FROM 2 LANES TO 4 LANES $4,000 BERNARDINO HIGHWAY SAN LOCAL SBD031233 0 ARROW BOULEVARD ALDER TO MAPLE AVENUE WIDEN 2 LANES TO 4 LANES $2,008 BERNARDINO HIGHWAY SAN LOCAL SBD031235 0 ARROW HIGHWAY ALMERIA TO CITRUS AVENUE WIDEN 2 LANES TO 4 LANES $1,265 BERNARDINO HIGHWAY SAN LOCAL 201101 0 ARROW ROUTE WIDENING FROM 2 TO 4 LANES. BRIDGE AND STREET WIDENING FOR ARROW ROUTE, FROM MONTE VISTA AVENUE TO $3,420 BERNARDINO HIGHWAY BENSON AVENUE (PROJECT WAS 200630 IN 2008 RTIP) SAN LOCAL 200157 0 AT MAIN STREET AND IOWA AVENUE AND APPROX. 300' NORTH AND 300' EAST OF EACH SIDE OF STREET-INTERSECTION $369 BERNARDINO HIGHWAY IMPROVEMENTS, CURB & GUTTER, REMOVE BILLBOARD AND TRAFFIC SIGNAL SAN LOCAL 2011157 0 AVENUE E IMPROVEMENTS FROM BRYANT ST. TO 5TH STREET, WIDEN 2-4 LANES $2,200 BERNARDINO HIGHWAY SAN LOCAL SBD031361 0 AYALA DRIVE BASELINE ROAD TO SR210 WIDEN FROM 2 LANES TO 4 LANES $2,703 BERNARDINO HIGHWAY SAN LOCAL 200810 0 BAKER BLVD. BRIDGE – OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANE BRIDGE (BRIDGE NO $2,910 BERNARDINO HIGHWAY 54C0127) SAN LOCAL SBD031295 0 BARTON ROAD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SPOT WIDENINGS $690 BERNARDINO HIGHWAY SAN LOCAL 201187 0 BASE LINE BETWEEN SR-210 RAMPS – WIDEN FROM 4 LANES TO 6 LANES (0.1 MILES) WIDEN SR-210 BRIDGE ON BASE LINE FROM 4 $4,150 BERNARDINO HIGHWAY LANES TO 6 LANES SAN LOCAL 201191 0 BASE LINE FROM SEINE AVENUE TO STONEY CREEK DRIVE – WIDEN FROM 4-6 LANES (0.2 MILES) $583 BERNARDINO HIGHWAY SAN LOCAL 200019 0 BASELINE ACROSS CITY CREEK – FROM 600' W TO 600' EAST OF CITY CREEK RECONSTRUCT EXISTING BRIDGE TO INCREASE $22,810 BERNARDINO HIGHWAY HYDRAULIC CAPACITY (NO ADDTL LANES – STILL 4) REPLACING LOW WATER XING(54C0035) SAN LOCAL SBD031217 0 BEECH AVENUE FOOTHILL TO MILLER AVE WIDEN FROM 2 LANES TO 4 LANES $4,630 BERNARDINO HIGHWAY Project List 107

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 200018 0 BOULDER AV ACROSS CITY CREEK S/O BASELINE – RECONSTRUCT EXISTING BRIDGE FROM 2 TO 4 LANES; ALSO WIDEN BOULDER AVE $21,898 BERNARDINO HIGHWAY FROM 190' NORTH TO 1,430' SOUTH OF BRIDGE FROM 2-4 LANES (54C0648) SAN LOCAL SBD55033 0 BOULDER AVE. FROM GREENSPOT TO SOUTH CITY LIMITS – WIDEN FROM 2-4 LANES (0.60 MILES) $2,350 BERNARDINO HIGHWAY SAN LOCAL 200866 0 BRIDGE NO 54C0547, BEAR VALLEY RD. OVER BNSF RAILWAY, AMTRAK & UP RR, 3.8 MILES E. OF I-15.WIDEN 6 LANE BRIDGE TO 7 LANE $5,427 BERNARDINO HIGHWAY BRIDGE FOR MEDIAN TURN LANE AND SEISMICALLY RETROFITTING BRIDGE SAN LOCAL 2011158 0 BRYANT STREET IMPROVEMENTS, OAK GLEN RD. TO DATE AVE. EMBANKMENT/SLOPE PROTECTION $720 BERNARDINO HIGHWAY SAN LOCAL 2011121 0 CACTUS WIDENING – WIDEN CACTUS FROM VALLEY TO WALNUT AVENUES FROM 2-4 LANES $2,235 BERNARDINO HIGHWAY SAN LOCAL SBD31876 0 CALIFORNIA STREET BARTON ROAD TO REDLANDS BOULEVARD WIDEN FROM 2 TO 4 LANES $1,090 BERNARDINO HIGHWAY SAN LOCAL SBD59023 0 CAMPUS PKWY-PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY – CONSTRUCT (4) LANE ROADWAY – BETWEEN $22,000 BERNARDINO HIGHWAY KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT) SAN LOCAL 201139 0 CASA GRANDE AVENUE FROM LYTLE CREEK ROAD TO MANGO AVENUE CONSTRUCT 4 LANES $10,500 BERNARDINO HIGHWAY SAN LOCAL 200608 0 CENTRAL AVENUE WIDENING PROJECT BETWEEN WATERMAN AND MT.VIEW AVE.(2 MI) -WIDEN FROM 2-4 LANES BETWEEN TIPPECANOE $5,600 BERNARDINO HIGHWAY AND MT.VIEW, ADDING CURBS, SIDEWALKS AND LIGHTING SAN LOCAL 200023 0 CHERRY AV FROM SOUTH CITY LIMITS TO WILSON AV – WIDEN FROM 2 TO 4 LANES $470 BERNARDINO HIGHWAY SAN LOCAL 200409 0 CHERRY AVE. AT SCRRA RR CROSSING – WIDEN BRIDGE FROM 4-6 LANES ON CHERRY OVER RR CROSSING (FROM MERRILL TO $8,829 BERNARDINO HIGHWAY WHITTRAM) SAN LOCAL 200410 0 CHERRY AVE. WIDENING FROM WHITTRAM TO FOOTHILL BLVD. -WIDEN 4-6 LANES $7,291 BERNARDINO HIGHWAY SAN LOCAL 201107 0 CHERRY AVENUE FROM SOUTH HIGHLAND TO I-15 WIDEN (2-6 LANES) $2,625 BERNARDINO HIGHWAY SAN LOCAL SBD58044 0 CITRUS AVENUE AUBURN CT. TO WABASH AVENUE WIDEN FROM 2 TO 4 LANES $525 BERNARDINO HIGHWAY SAN LOCAL 200006 0 CITRUS AVENUE FROM JURUPA TO SLOVER – WIDEN FROM 2-4 LANES W/LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA $5,830 BERNARDINO HIGHWAY AVE. & JURUPA-3 INTERSECTIONS) SAN LOCAL 201140 0 CITRUS AVENUE FROM SUMMIT AVENUE TO I-15 WIDEN FROM 2 TO 4 LANES $2,625 BERNARDINO HIGHWAY SAN LOCAL 201106 0 COMMERCE WAY FROM MICHIGAN AVENUE TO BARTON ROAD AT VIVIENDA AVENUE. NEW ROAD – 4 LANE ROAD EXTENSION $1,066 BERNARDINO HIGHWAY SAN LOCAL 20110109 0 CONSTRUCT NEW RAILROAD GRADE-SEPARATED CROSSING BETWEEN LAUREL STREET AND THE BNSF RAILROAD IN THE CITY OF $53,995 BERNARDINO HIGHWAY COLTON. WORK ALONG LAUREL STREET BEGINS APPROXIMATELY 420 FT EAST OF PENNSYLVANIA AVE AND 195FT WEST OF 9TH ST. NO ADDITIONAL LANES ARE PROPOSED. 108 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 2011159 0 COUNTY LINE ROAD IMPROVEMENTS FROM I-10 TO CALIMESA – INSTALL LEFT TURN LANE AND SIGNAL AT CALIMESA AND COUNTY LINE $480 BERNARDINO HIGHWAY RD. SAN LOCAL 200408 0 CUMBERLAND DRIVE EXTENSION – SH 18 NORTH TO CUMBERLAND DRIVE -PAVE NEW ROAD – 1 LANE IN EACH DIRECTION $3,000 BERNARDINO HIGHWAY SAN LOCAL 201142 0 CYPRESS AVENUE FROM DUNCAN CANYON ROAD TO FRONTAGE ROAD (I-15)-CONSTRUCT NEW 2 LANE ROAD $3,200 BERNARDINO HIGHWAY SAN LOCAL 201141 0 CYPRESS AVENUE FROM SLOVER TO JURUPA AVENUE WIDEN FROM 2-4 LANES $2,498 BERNARDINO HIGHWAY SAN LOCAL 201180 0 DEL ROSA DRIVE FROM 5TH STREET TO 6TH STREET-WIDEN FROM 2 TO 4 LANES (0.2 MILES) FORMERLY PART OF PROJECT ID 200852 $673 BERNARDINO HIGHWAY SAN LOCAL 201143 0 DUNCAN CANYON ROAD FROM CITRUS AVENUE TO SIERRA AVENUE CONSTRUCT 4 LANES. $5,251 BERNARDINO HIGHWAY SAN LOCAL 201166 0 DUNCAN CANYON ROAD FROM I-15 TO CITRUS AVENUE-WIDEN FROM 2-4 LANES $1,312 BERNARDINO HIGHWAY SAN LOCAL SBD031118 0 EDISON AVENUE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING) $2,000 BERNARDINO HIGHWAY SAN LOCAL SBD031419 0 EL EVADO ROAD, PALMDALE RD TO AIR BASE ROAD PALMDALE TO HOPLAND (12/98) HOPLAND TO AIR BASE (12/96), WIDEN FROM 2 TO $4,000 BERNARDINO HIGHWAY 4 WITH LEFT TURN LANES SAN LOCAL 200151 0 EL MIRAGE RD. FROM RICHARDSON RD. (CITY LIMITS) TO SR 395 – PAVE EXISTING 2 LANE DIRT ROAD AND RESURFACE $5,295 BERNARDINO HIGHWAY SAN LOCAL 201134 0 ETIWANDA AVE. GRADE SEPARATION PROJECT REPLACES AN AT-GRADE RAILROAD CROSSING AT THE INTERSECTION OF ETIWANDA $54,050 BERNARDINO HIGHWAY AVENUE AND THE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (SCRRA) RAILROAD TRACKS WITH AN OVERHEAD ROADWAY/AT GRADE RAILRAOD TRACK GRADE SEPARATION SAN LOCAL SBD031228 0 ETIWANDA AVENUE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES $2,635 BERNARDINO HIGHWAY SAN LOCAL SBD31785 0 EUCALYPTUS FROM PEYTON DR. TO CHINO HILLS COMMUNITY PARK ENTRANCE – CONSTRUCT 2 LANE RD. (PHASE 1 FROM PEYTON $3,542 BERNARDINO HIGHWAY DRIVE TO GALLOPING HILLS RD. COMPLETED IN 2/2007) SAN LOCAL SBD88086 0 EUCLID AVENUE FROM D ST TO FOOTHILL BOULEVARD – STORM DRAIN EXTENSION $1,414 BERNARDINO HIGHWAY SAN LOCAL 200403 0 EVANS/WEST STREET FROM REDLANDS BLVD TO BARTON -CONSTRUCT 4 NEW LANES, A N/S ARTERIAL ROADWAY FROM REDLANS $9,153 BERNARDINO HIGHWAY BLVD TO BARTON, WEST OF ANDERSON ST. SAN LOCAL 200401 0 FAIRFIELD RANCH EXT.-EXTEND FAIRFIELD RANCH RD. FROM 950 FT. S/O INTERSECTION OF FFRANCH RD TO 5000 FT. PARALLEL TO $6,990 BERNARDINO HIGHWAY SR71 TO PINE INTERSECTION-CONSTRUCT NEW 2 LANE RD. W/BIKE LANES SAN LOCAL 200407 0 FLAMINGO HEIGHTS LANDERS ROAD IMPROVEMTS-SH 247 PIPES WASH TO JOHNSON VALLEY-WIDEN TO ACCOMMODATE PASSING $2,826 BERNARDINO HIGHWAY LANES WITH TURN POCKETS (SAME AS 20061705) SAN LOCAL SBD031248 0 FONTANA AVENUE VALLEY BOULEVARD TO MERRILL AVENUE WIDEN FROM 2-4 LANES $5,250 BERNARDINO HIGHWAY SAN LOCAL 201137 0 FOOTHILL BLVD AT ARCHIBALD AVE. INTERSECTION IMPROVEMENTS AND ADD DESIGNATED RIGHT TURN LANE $640 BERNARDINO HIGHWAY Project List 109

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 2011123 0 FOOTHILL BLVD FROM EAST CITY LIMITS TO WEST CITY LIMITS -WIDEN FROM 4 TO 6 LANES $8,706 BERNARDINO HIGHWAY SAN LOCAL 201102 0 FOOTHILL BLVD. FROM 500' W/O MONTE VISTA TO CENTRAL AVE. -WIDEN TO ULTIMATE WIDTH TO PROVIDE DUAL LEFT TURN LANES . $2,270 BERNARDINO HIGHWAY SAN LOCAL SBD31903 0 FOOTHILL BOULEVARD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL, INTERSECTION IMPROVEMENTS/ $1,137 BERNARDINO HIGHWAY REALIGN INTERSECTION (0.11 MILE) SAN LOCAL SBD031335 0 FOOTHILL BOULEVARD AT ARCHIBALD AVENUE INTERSECTION IMPROVEMENTS (ADD RIGHT TURN LANE) $640 BERNARDINO HIGHWAY SAN LOCAL 201103 0 FOOTHILL BOULEVARD BOTTLENECK AND SAFETY IMPROVEMENTS- FROM CENTRAL TO GROVE AVE.INSTALL RIGHT TURN LANES AT $5,300 BERNARDINO HIGHWAY MAJOR INTERSECTIONS, ELONGATE LEFT TURNS FOR SAFE TURNING, CURB, GUTTER DRAINAGE, ROADWAY REHAB. SAN LOCAL SBD031246 0 FOOTHILL BOULEVARD CITRUS AVENUE TO MAPLE AVENUE WIDEN TO STATE STANDARDS FROM 4 TO 6 LANES $7,218 BERNARDINO HIGHWAY SAN LOCAL SBD59004 0 FRANCIS ST. FROM BON VIEW AVE TO GROVE WIDENING 2 TO 4 LANES (STORM DRAIN FROM BON VIEW TO PARCO) $12,300 BERNARDINO HIGHWAY SAN LOCAL 200619 0 GLEN HELEN PARKWAY – FROM 0.2 MILES WEST OF CAJON CREEK TO 0.2 MILES EAST OF CAJON CREEK-REPLACE 36' WIDE 48' LONG $19,858 BERNARDINO HIGHWAY 2 LN BRIDGE OVER CAJON CREEK W/ 102', 526'LONG 4 LN BRIDGE (54C0025)(HBRRL FUNDS IN 2016/17 FOR LOCAL A/C PAYBACK- COMPLETION DATE REMAINS THE SAME) SAN LOCAL 20040826 0 GLEN HELEN PARKWAY AT UPRR AND BNSF- GRADE SEPARATION $29,000 BERNARDINO HIGHWAY SAN LOCAL SBD97147 0 GREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD $30,850 BERNARDINO HIGHWAY SAN LOCAL 200853 0 GREENSPOT FROM BOULDER AVE. TO SR210 – WIDEN FROM 4-6 LANES (0.80) $15,700 BERNARDINO HIGHWAY SAN LOCAL 201156 0 GREENSPOT RD. FROM SANTA PAULA ST. TO 2,600' S/O SANTA ANA RIVER – WIDEN FROM 2-4 LANES WITH MEDIAN (2.2 MILES) $22,530 BERNARDINO HIGHWAY SAN LOCAL 20061015 0 GREENSPOT ROAD BRIDGE AT SANTA ANA RIVER – GREENSPOT RD.CONSTRUCT NEW 4 LANE BRIDGE (STRIPING FOR 2 LANES) AT SAR $10,907 BERNARDINO HIGHWAY W/ CHANNEL IMPROVMENTS-REALIGN APPROX 2400' OF 2 LANE RD.(54C0368) SAN LOCAL 200074 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS FOR SAN BERNARDINO COUNTY-BIKE/PED $4,071 BERNARDINO HIGHWAY PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126,127,128, EXEMPT TABLE 2 & 3). SAN LOCAL SBDLS08 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM -PROJECTS ARE CONSISTENT WITH 40 CFR $39,238 BERNARDINO HIGHWAY PART 93.126, 127, 128 EXEMPT TABLES 2 & 3 SAN LOCAL SBD031505 0 GROUPED PROJECTS FOR LTF ARTICLE 3 PROJECTS LTF, ARTICLE 3 BICYCLE/PEDESTRIAN PROJECTS AT VARIOUS LOCATIONS $7,900 BERNARDINO HIGHWAY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128, EXEMPT TABLES 2 & 3) SAN LOCAL 20040830 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $14,668 BERNARDINO HIGHWAY EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES) SAN LOCAL 200075 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS – LANDSCAPE, ETC. FOR SAN BERNARDINO CNTY – $3,271 BERNARDINO HIGHWAY PROJECTS CONSISTENT WITH 40 CFR PART93.126,127,128, EXEMPT TABLES 2 & 3) 110 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 20081104 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES -PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $700 BERNARDINO HIGHWAY EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES) SAN LOCAL SBD59006 0 GROVE AVENUE FROM STATE ST. TO 350' NORTH OF HOLT BLVD. WIDENING FROM 4 TO 6 LANES WIDENING RAILROAD BRIDGE ALSO $8,400 BERNARDINO HIGHWAY (1,450'),LANDSCAPE RESTORATION, LEFT TURN LANES AT HOLT SAN LOCAL 201169 0 H STREET FROM KENDALL DRIVE TO 40TH STREET WIDENING FROM 2-4 LANES $918 BERNARDINO HIGHWAY SAN LOCAL 200404 0 HOLT BLVD CORRIDOR WIDENING FROM BENSON AVE. TO VINEYARD AVE. WIDEN ROAD FROM 4-6 LANES INCLUDING TRAFFIC SIGNAL $42,320 BERNARDINO HIGHWAY MODIFICATIONS AND RESTRIPING SAN LOCAL 20010137 0 HUNTS LANE @ UNION PACIFIC RAILROAD CROSSING – GRADE SEPARATION -PART OF ALAMEDA CORRIDOR STUDY (TCRP #55.3)(TOLL $37,176 BERNARDINO HIGHWAY CREDITS TO BE USED FOR FY10/11 CONST PHASE IN THE AMOUNT OF $4371) SAN LOCAL SBD031284 0 I AVENUE FROM RANCHERO RD TO MAIN ST. WIDEN FROM 2 LANES TO 4 LANES $6,870 BERNARDINO HIGHWAY SAN LOCAL 20081704 0 I-10/ALABAMA AND REDLANDS BLVD AND ALABAMA COLTON INTERSECTION IMPROVEMENTS – WIDEN INTERSECTION APPROACHES ON $13,527 BERNARDINO HIGHWAY ALL FOUR LEGS OF REDLANDS/ALABAMA BLVD ST. INTERSECTION ADD DUAL LEFT TURN LANES. REALIGN ALABAMA ST ON NORTH SIDE OF INTERSECTION TO ELIMINATE THE 23' HORIZONTAL OFFSET AT INTERSECTION SAN LOCAL 20112007 0 I-40 NEEDLES CONNECTOR: ROADWAY/SIDEWALK IMPROVEMENTS ALONG 6,300FT: J ST FROM I-40 OFF-RAMPS TO W BROADWAY; W $5,521 BERNARDINO HIGHWAY BROADWAY FROM J ST TO NEEDLES HWY; NEEDLES HWY FROM W BROADWAY TO N K ST; N K ST TO SOUTH ABUTMENT OF CO RIVER BRIDGE. INTERSECTION IMPROVEMENTS AT J ST/W BROADWAY, W BROADWAY/NEEDLES HWY, NEEDLES HWY/N K ST WILL INCLUDE TRAFFIC SIGNALS, TURN LANES, STRIPING/SIGNAGE & SIDEWALK SAN LOCAL 20040804 0 I-40/AZ95 CONNECTOR- J ST. FROM I-40 OFFRAMPS TO W. BROADWY;NEEDLES HGWY FROM W. BROADWY TO N.K ST; N.K ST FROM $24,817 BERNARDINO HIGHWAY NEEDLES TO AZ 95-WIDEN 2-4 LNS-INTERSCTN& CORRIDOR IMPRVT. SAN LOCAL 200201 0 IN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM EL MIRAGE RD. TO 1 $560 BERNARDINO HIGHWAY MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD. SAN LOCAL 20111810 0 IN BARSTOW, N. 1ST AVE. OVER BNSF RAILWAY UP RR AMTRAK 0.2 MI N MAIN ST. (BRIDGE NO 54C0088) REPLACE EXISTING 2 LANE $40,780 BERNARDINO HIGHWAY BRIDGE WITH 4 LANE BRIDGE, EXISTING BRIDGE TO BE REMOVED SAN LOCAL 200202 0 IN CHINO – ON CHINO AVENUE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES AND INSTALL SIGNAL AT $584 BERNARDINO HIGHWAY INTERSECTION OF CHINO AVE. AND MONTE VISTA SAN LOCAL 200207 0 IN CHINO – ON PINE AVE EXTENSION FROM SR 71 TO EUCLID IN THE CITY OF CHINO – WIDEN BRIDGE FROM 2-4 LANES $25,000 BERNARDINO HIGHWAY SAN LOCAL 200209 0 IN HESPERIA – PAVE ESCONDIDO ROAD FROM RANCHERO TO CEDAR (2.0 MILES). PAVE 4 LANES OF ROADWAY 2 IN EACH DIRECTION. $5,900 BERNARDINO HIGHWAY SAN LOCAL 200211 0 IN HESPERIA ON I STREET FROM MAIN ST. TO BEAR VALLEY RD. APPROX. 4.4 MILES – WIDEN FROM 2-4 LANES $7,700 BERNARDINO HIGHWAY SAN LOCAL 20010139 0 IN ONTARIO: ON MILLIKEN AT UNION PACIFIC RAILROAD – GRADE SEPARATION – PART OF ALAMEDA CORRIDOR STUDY – TCRP #55.2 $73,983 BERNARDINO HIGHWAY SAN LOCAL 20020134 0 IN RANCHO CUCAMONGA – ON ARROW RTE. FROM ETIWANDA AVENUE TO EAST STREET – WIDEN FROM 2-4 LANES (3,200 FEET) $1,100 BERNARDINO HIGHWAY Project List 111

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 200431 0 INLAND PACIFIC ELECTRIC TRAIL – ON OLD SP ABANDONED RR BETWEEN I-15 TO MAPLE AVE.-CONSTRUCT CLASS 1 BIKE LANE $3,054 BERNARDINO HIGHWAY (APPROX. 7 MILES LONG) SAN LOCAL 201110 0 INSTALLATION OF VARIOUS TRAFFIC SIGNALS (3) ALONG LA MESA ROAD $1,200 BERNARDINO HIGHWAY SAN LOCAL 20084104 0 JOSHUA STREET PARK & RIDE EXPANSION – ON JOSHUA STREET WEST OF US 395,C ITY OF HESPERIA, EXISTING PNR HAS 188 SPACES $638 BERNARDINO HIGHWAY AND NEEDS TO ADD 150 SPACES, TO INCLUDE LANDSCAPING, LIGHTING AND VARIOUS NON-CAPACITY STREET IMPROVEMENTS TO FACILITATE ADDITIONAL SPACES (TOLL CREDITS TO BE USED IN ENG & CON PHASES.CMAQ ADDED $5 IN 10/11 AND $67 2011/12 ) SAN LOCAL SBD031227 0 JURUPA AVENUE ETIWANDA TO SIERRA AVENUE CONSTRUCT 6 LANE ROAD $24,463 BERNARDINO HIGHWAY SAN LOCAL 201144 0 JURUPA AVENUE FROM TAMARIND AVENUE TO ALDER AVENUE WIDEN FROM 2 TO 4 LANES $958 BERNARDINO HIGHWAY SAN LOCAL 20110601 0 LA CADENA DR OVER SANTA ANA RIVER, 1.5 MI SOUTH OF I-10 – REPLACE EXISTING 4 LANE BRIDGE WITH 6 LANE BRIDGE (54C0077) $27,535 BERNARDINO HIGHWAY SAN LOCAL 201190 0 LANZIT DITCH BRIDGE: REPLACE 2 LANE BRIDGE WITH 2 LANE BRIDGE 2008 RTIP PROJECT NUMBER: 20083303 $2,476 BERNARDINO HIGHWAY SAN LOCAL 201104 0 LEMON STREET/MAUNA LOA STREET-NEW RR UNDERCROSSING THAT INCLUDES CONSTRUCTION OF A NEW OVERCROSSING BRIDGE AND $47,900 BERNARDINO HIGHWAY REALIGNMENT AND RECONSTRUCTION OF LEMON AND MAUNA LOA STREETS FROM 3RD AVE. TO JUST WEST OF E AVE. SAN LOCAL 200607 0 LENA ROAD EXENSION PROJECT – EXTENSION OF LENA RD. FROM MILL ST. TO ORANGE SHOW RD.-NEW 4 LANE ROAD (CO-OP PROJECT $6,300 BERNARDINO HIGHWAY WITH IVDA)SAFETEA-LU -#1701 SAN LOCAL 200622 0 LENWOOD GRADE SEPARATION – NORTH OF WEST MAIN ST; APPROX.400 FT. N/O TO 600 FT. S/O BNSF AND SANTA FE RR RIGHT-OF- $31,732 BERNARDINO HIGHWAY WAY-4 TRAVEL LANE GRADE SEPARATION (CA627) SAN LOCAL SBD55025 0 MAIN STREET FROM I-15 TO MAPLE (PHASE 1) FROM MAPLE TO 11TH (PHASE 2) – I-15 TO SR 395 (PHASE 3); WIDEN AND RECONSTRUCT $14,500 BERNARDINO HIGHWAY FROM 4 – 6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75 MILES) SAN LOCAL 200807 0 MAIN STREET GRADE SEPARATION WIDENING – BNSF TO WEST CITY LIMITS-WIDENING FROM 1-2 LANES IN THE E/B & W/B DIRECTION- $20,435 BERNARDINO HIGHWAY (BRIDGE WIDENING AND APPROACHES OF ABOUT 100' IN EACH DIRECTION" SAN LOCAL 200013 0 MAPLE AVENUE FROM MAIN ST. TO 650' SOUTH OF CROMDALE STREET – REHABILITATION – RESURFACE 2 LANE RD. (NO NEW LANES) $1,975 BERNARDINO HIGHWAY SAN LOCAL 200012 0 MAPLE AVENUE FROM MARIPOSA TD. TO MAIN STREET – ROAD REHAB. – RESURFACING 2 EXISTING LANES (NO NEW LANES) $2,310 BERNARDINO HIGHWAY SAN LOCAL SBD031254 0 MERRILL AVENUE ALDER TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES $2,065 BERNARDINO HIGHWAY SAN LOCAL 201105 0 MICHIGAN AVENUE WIDENING (2-4 LANES) FROM COMMERCE WAY TO MAIN STREET $1,205 BERNARDINO HIGHWAY SAN LOCAL SBD55034 0 MISSION BLVD. FROM LA COUNTY LINE TO BENSON AVE (2.2 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM $8,560 BERNARDINO HIGHWAY DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60) SAN LOCAL SBD031315 0 MISSION BOULEVARD GROVE TO HAVEN WIDEN FROM 4 LANES TO 6 LANES ,LANDSCAPED MEDIAN AND STORM DRAIN(3.3 MI) (T21- $50,000 BERNARDINO HIGHWAY #60) SEG.1 ARCHIBALD TO HAVEN AND SEG.2- GROVE TO ARCHIBALD 112 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 2011151 0 MOJAVE DESERT AIR BASIN RIDESHARE PROGRAM $1,293 BERNARDINO HIGHWAY SAN LOCAL 200049 0 MOJAVE RIVER BRIDGE CROSSING FROM TERMINUS OF YUCCA LOMA RD TO TERMINUS OF GREEN TREE BLVD – PRE. ENVIRONMENTAL $32,550 BERNARDINO HIGHWAY REVIEW FOR CONSTRUCTION OF NEW 4 LANE BRIDGE-INCLUDES A BRIDGE OVER THE BNSF RR TO HESPERIA ROAD (PROJECT 97147 ENVIRONMENTAL DOC IS BEING INCLUDED IN THIS PROJECT. THE PROJECTS CONNECT AND ENVIRON. DOC IS REQUIRING THAT THE WHOLE PROJECT BE INCLUDED ON BOTH SBD97147 AND 200049) SAN LOCAL 200857 0 MONTE VISTA AVE. FROM PHILLIPS BLVD. TO MISSION BLVD (0.5 MILES)-WIDENING FROM 2-4 LANES $5,450 BERNARDINO HIGHWAY SAN LOCAL 20010135 0 MONTE VISTA AVENUE @ UNION PACIFIC RAILROAD CROSSING – GRADE SEPARATION PART OF ALAMEDA CORRIDOR GRADE SEPARATION $18,100 BERNARDINO HIGHWAY PROJECTS FUNDED WITH TCRP #55.1(CA505) SAN LOCAL 200808 0 MT. VERNON AVEN. WIDENING – WIDEN FROM 1-2 LANES NORTHBOUND FROM RAVEN WAY TO PICO ST.. $543 BERNARDINO HIGHWAY SAN LOCAL SBD31905 0 MT. VERNON AVENUE BRIDGE (OVERHEAD) AT BNSF REPLACE GRADE SEPARATION, REPLACE 4 LANE BRIDGE WITH 4 LANE BRIDGE $40,112 BERNARDINO HIGHWAY FROM 2ND TO 5TH STREETS (0.2 MILES SOUTH OF RTE. 66)(BRIDGE NO 54C0066)(HBRRL IS PAID BACK IN 2016/17 TO COVER LOCAL A/C PROJECT STILL ON SCHEDULE) SAN LOCAL 200856 0 MT. VERNON BRIDGE OVER UPRR -ON MT. VERNON AVE. FROM "M" ST. TO I-10 ON RAMP. WIDENING BRIDGE FROM 2-4 LANES (CA338) $10,877 BERNARDINO HIGHWAY SAN LOCAL SBD41317 0 MT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTING BRIDGE AT MT. VIEW -1 LN. $1,655 BERNARDINO HIGHWAY NO. & SO. TO 2 LNS N/S & LFT_TURNS TO MAKE A TOTAL OF 4 LANES ( 2 IN EACH DIRECTION) SAN LOCAL 2011160 0 MT. VIEW AVE. BRIDGE OVER SANTA ANA RIVER. CONSTRUCT NEW 4 LANE BRIDGE. MT. VIEW CURRENTLY TERMINATES AT SOUTH EDGE $12,500 BERNARDINO HIGHWAY OF SANTA ANA RIVER. PROJECT WOULD EXTEND BY MEANS OF BRIDGE ACROSS RIVER. SAN LOCAL SBD41316 0 MT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1 LANE NORTH & SOUTH $1,724 BERNARDINO HIGHWAY TO 2 LANES NORTH & SOUTH & UPGRADE GATES (0.75 MILES) SAN LOCAL 200609 0 MT.VIEW WIDENING/EXTENSION PROJECT- WIDEN S/B FROM 2-4LNS- FROM COULSTON TO RIVERVIEW (SOUTH OF SANTA ANA RIVER) $7,500 BERNARDINO HIGHWAY (PROJECT IS SPLIT INTO 2 SEPARATE PROJECTS AS OF THE 2011 ENTRY) SAN LOCAL 20083303 0 NATIONAL TRAILS HGWY OVER LANZIT DITCH, 2.8 MILES E. OF KELBAKER RD. – REPLACE 2 LANE BRIDGE WITH NEW 2 LANE BRIDGE $2,476 BERNARDINO HIGHWAY (54C0286) SAN LOCAL 201111 0 NATIONAL TRAILS HIGHWAY AND MOJAVE RIVER – BRIDGE REHAB. REPLACE EXISTING RAILING TO MEET CURRENT STANDARDS $1,375 BERNARDINO HIGHWAY SAN LOCAL 20111804 0 NATIONAL TRAILS HIGHWAY REPAVING – OVERLAY BETWEEN VICTORVILLE CITY LIMITS AND BARSTOW CITY LIMITS $10,000 BERNARDINO HIGHWAY SAN LOCAL 20083302 0 NATIONAL TRAILS HIGHWAY, OVER DOLA DITCH, 2.1 MI EAST OF KELBAKER RD. REPLACE 2 LANE BRIDGE WITH NEW 2 LANE BRIDGE $2,124 BERNARDINO HIGHWAY (54C0285 SAN LOCAL SBD88140 0 NATIONAL TRAILS ROAD BETWEEN INTERSTATE 15 & AIRBASE RD. WIDEN FROM 2 LANES TO 4 LANES $2,600 BERNARDINO HIGHWAY SAN LOCAL 201179 0 NATIONAL TRIALS HIGHWAY BETWEEN INTERSTATE 15 & AIR EXPRESSWAY WIDEN FROM 2-4 LANES (1.9 MILES) $12,225 BERNARDINO HIGHWAY Project List 113

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 20040209 0 NATL TRAILS HIWAY FROM BRYMAN RD S/O MORNING GLORY ST. TO BRYMAN TO N O MARIGOLD- WIDEN EXISTG 2 LN RD FOR PASSING $2,154 BERNARDINO HIGHWAY LNS – 1 IN EA DIRECT., INCL TRANSITIONS Y (CO W/#200106) SAN LOCAL SBD031426 0 NEEDLES HIGHWAY FROM 'N' STREET TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING $65,500 BERNARDINO HIGHWAY LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL. (CURRENTLY PROGRAMMED FOR PSE ONLY) SAN LOCAL SBD031412 0 NISQUALLI RD FROM BALSAM RD TO HESPERIA RD – WIDEN FROM 2 LANES TO 4 LANES, DRAINAGE IMPROVEMENTS, AND VERTICAL $3,750 BERNARDINO HIGHWAY REALIGNMENT SAN LOCAL 200805 0 NORTH VINEYARD AVE. GRADE SEPARATION – BETWEEN HOLT BLVD AND AIRPORT DR. BUILDING RR BRIDGE FLYOVER-NO LANES ADDED $56,088 BERNARDINO HIGHWAY TO ARTERIALS. THE GRADE SEP. IS AT THE UP RR ALHAMBRA LINE SAN LOCAL 200846 0 OLD WATERMAN CANYON BRIDGE REPLACMENT-APPROX 1 MILE NORTH OF SR18. REMOVE AND RECONSTRUCT BRIDGE ON OLD $2,603 BERNARDINO HIGHWAY WATERMAN CANYON ROAD. EXISTING 2- LANE TO 2 LANE BRIDGE (0.02 MILES) SAN LOCAL 200213 0 ON 3RD ST. FROM PALM AVE. TO 5TH ST. WIDEN 3RD ST. E/O PALM AVE. FROM 2 TO 3 LANES AND EXTEND 3RD ST. EASTERLY TO $1,571 BERNARDINO HIGHWAY CONNECT 5TH ST. SAN LOCAL 200414 0 ON DUNCAN ROAD FROM OASIS EAST TO BALDY MESA PAVE DIRT ROADS 1 LANE IN EACH DIRECTION INCLUDING STOP SIGNS AT RR $22,000 BERNARDINO HIGHWAY CROSSING SAN LOCAL 201113 0 ORANGE STREET FROM LUGONIA TO SAN BERNARDINO AVE. -WIDEN THE EAST SIDE OF THE STREET TO REMOVE A RESTRICTION $540 BERNARDINO HIGHWAY IN THE ROADWAY TRAVEL AREA. PROJECT INCLUDES ROAD PAVING, CURB AND GUTTER, SIDEWALK, STREET LIGHTING, STRIPING AND MARKING, AND LANDSCAPE IMPROVEMENTS. THE PROJECT WILL IMPROVE PEDESTRIAN AND VEHICULAR SAFE TRAVEL AND CIRCULATION. SAN LOCAL 200420 0 ORANGE STREET WIDENING – FROM NORTH CITY LIMITS TO RIVERVIEW DRIVE – WIDEN STREET FROM 2-4 LANES $540 BERNARDINO HIGHWAY SAN LOCAL 2011105 0 PALM AVE. FROM 3RD ST. TO 5TH ST. – SHOULDER IMPROVEMENTS (NO WIDENING) $818 BERNARDINO HIGHWAY SAN LOCAL 200850 0 PALM AVE. GRADE SEPARATION , PALM AVE. APPROX. 530' S/O I-215 PALM AVE. INTERCHANGE TO APPROX. 1450' S/O CAJON BLVD.- $30,077 BERNARDINO HIGHWAY CONSTRUCT AT GRADE RR SEPARATION – BUILD BRIDGE OVERCROSSING SEPARATING TRAFFIC FROM RR CROSSING (NO ADDITIONAL LANES) 2-2 LANES (CA615) SAN LOCAL 201159 0 PEPPER AVE. (SEGMENT SOUTH OF I-10) FROM SLOVER TO AGUA MANSA – NEW 2 LANE CONNECTION. TRAFFIC SIGNAL AT PEPPER AND $4,646 BERNARDINO HIGHWAY AGUA MANSA. SAN LOCAL 2002170 0 PEPPER AVE: FOOTHILL BLVD TO SR 210 – WIDEN EXISTING 2 LANES TO 4 LANES (2 EACH DIR) $15,000 BERNARDINO HIGHWAY SAN LOCAL 20083401 0 PEYTON DRIVE FROM ENGLISH RD. TO EUCALYPTUS; WIDEN PEYTON FROM 4-6 LANES WITH MARKED BIKE LANES IN EACH DIRECTION $3,951 BERNARDINO HIGHWAY (PHASE 2) OF SBD41242 SAN LOCAL 20083402 0 PEYTON DRIVE FROM EUCALYPTUS TO SR 142; WIDEN PEYTON TO 2-4 LANES WITH MARKED BIKE LANES IN EACH DIRECTION $7,119 BERNARDINO HIGHWAY SAN LOCAL 200021 0 RAMONA AV AT STATE ST – RAILROAD CROSSING GRADE SEPARATION-FUNDED WITH TCRP (PART OF ALAMEDA CORRIDOR STUDY) $22,408 BERNARDINO HIGHWAY (CA505) SAN LOCAL SBD55028 0 RANCHERO RD. FROM DANBURY TO ARROWHEAD LAKE RD. – WIDEN FROM 2 TO 4 LANES (3 MILES) $11,000 BERNARDINO HIGHWAY 114 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL SBD55030 0 RANCHERO RD. FROM I-15 TO 7TH ST. – WIDEN FROM 2 TO 4 LANES (5.50 MILES) $11,000 BERNARDINO HIGHWAY SAN LOCAL SBD031276 0 RANCHERO ROAD 7TH AVENUE TO DANBURY REALIGN ROAD AND WIDEN FROM 2-4 LANES AND CONSTRUCT RAILROAD $30,058 BERNARDINO HIGHWAY UNDERCROSSING SAN LOCAL 200815 0 RANCHERO ST. FROM .3 M E/O MARIPOSA TO HESPERIA CL (3 MILES)-WIDEN 2-4 LANES $11,025 BERNARDINO HIGHWAY SAN LOCAL SBD41289 0 RANCHO LAS FLORES PARKWAY -NO LANES CURRENTLY EXIST. DEVELOPER TO CONST RUCT HIGHWY 138 TO RANCHERO RD. 2 LANES $10,000 BERNARDINO HIGHWAY IN EACH DIRECTION. SAN LOCAL SBD031259 0 RANDALL AVENUE ALDER AVENUE TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES $1,715 BERNARDINO HIGHWAY SAN LOCAL 200843 0 RECHE CANYON RD. FROM 1.20 MILES OF S. BARTON ROAD TO 0.42 MILES SOUTH OF BARTON RD (.078 MILES)-WIDEN FROM 2-4 LANES $5,650 BERNARDINO HIGHWAY SAN LOCAL SBD031294 0 REDLANDS BOULEVARD AT CALIFORNIA STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE AND CURB AND $6,000 BERNARDINO HIGHWAY GUTTERS SAN LOCAL SBD031296 0 REDLANDS BOULEVARD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES $6,850 BERNARDINO HIGHWAY SAN LOCAL 20020202 0 REDLANDS PARK ONCE PROGRAM – NEW PARKING STRUCTURE BETWEEN EUREKA AND 3RD ST. S/O STUART AND N/O RR APPROX. 200 $6,290 BERNARDINO HIGHWAY SPACES (NOT PNR) (THIS PROJECT REPLACES 200421) SAN LOCAL 20061707 0 RIDESHARE ACTIVITIES FOR SOUTHCOAST AIR BASIN $4,486 BERNARDINO HIGHWAY SAN LOCAL 200603 0 RIVERSIDE AVE. OVER METROLINK AND BNSF RY, 0.1 MI S OF I-10 REMOVE AND REPLACE EXISTING 5 LANE BRIDGE WITH 7 LANE BRIDGE $37,575 BERNARDINO HIGHWAY (PA&ED ONLY) SCOPING FOR PORJECT. HIGH COST PROJECT AGREEMENT REQUIRED PRIOR TO PE AUTHORIZATION.(#54C0062) SAN LOCAL SBD031360 0 RIVERSIDE AVENUE SANTA ANA TO AGUA MANSA CONTINUOUS LEFT TURN LANE;WIDEN WEST SIDE(FOR LEFT TURN LANE AND ADDING $2,200 BERNARDINO HIGHWAY CURB AND GUTTER SAN LOCAL SBD031152 0 RIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES $1,120 BERNARDINO HIGHWAY SAN LOCAL 200816 0 ROCK SPRINGS RD. FROM 0.25 MI. E/O GLENDALE AVE. TO KIOWA (1.86 MILES) WIDEN FROM 2-4 LANES $20,000 BERNARDINO HIGHWAY SAN LOCAL 20110603 0 ROCK SPRINGS ROAD OVER MOJAVE RIVER, .9 MILES E ARROWHEAD LK RD. REPLACE TWO LANE LOW WATER CROSSING WITH NEW 4 $18,533 BERNARDINO HIGHWAY LANE BRIDGE SAN LOCAL 200405 0 S. MILLIKEN AVE. GRADE SEPARATION – ON MILLIKEN FROM UPR TO NORTH OF MISSION BLVD. RR GRADE SEP-CONSTRUCT O/C/U/C AT $80,468 BERNARDINO HIGHWAY RR-REALIGNMENT OF STS TO MEET O/CROSSING & INTERSTN IMPROVMTS SAN LOCAL 200835 0 SAN BERNARDINO AVE. FROM CHERRY AVE. TO FONTANA CITY LIMITS (LIME AVE.) (1.25 MILES)-WIDEN 2-4 LANES $3,665 BERNARDINO HIGHWAY SAN LOCAL 20110801 0 SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL MAINTENANCE/MONITORING $1,450 BERNARDINO HIGHWAY SAN LOCAL 20061502 0 SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL SYSTEM – TIERS 3 & 4 – UPGRADE AND SYNCHRONIZE APPROX. 500 $7,948 BERNARDINO HIGHWAY SIGNALS LOCATED ALONG ARTERIAL ROADEWAYS IN SAN BERNARDINO VALLEY Project List 115

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL SBD031266 0 SIERRA AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES $8,129 BERNARDINO HIGHWAY SAN LOCAL 201145 0 SIERRA AVENUE FROM VALLEY BOULEVARD TO SAN BERNARDINO AVENUE WIDEN FROM 4 TO 6 LANES $2,823 BERNARDINO HIGHWAY SAN LOCAL 201146 0 SIERRA LAKES PARKWAY FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES. $4,290 BERNARDINO HIGHWAY SAN LOCAL 201161 0 SLOVER AVE: FROM ALDER AVE EAST TO LINDEN AVENUE WIDEN 2-4 LANES $3,218 BERNARDINO HIGHWAY SAN LOCAL 201150 0 SLOVER AVENUE FROM CEDAR AVE. EAST TO LARCH AVE. WIDEN FROM 2-4 LANES $650 BERNARDINO HIGHWAY SAN LOCAL 201147 0 SLOVER AVENUE FROM ETIWANDA AVENUE TO 800 FEET EAST OF ETIWANDA AVENUE WIDEN FROM 2-4 LANES $2,095 BERNARDINO HIGHWAY SAN LOCAL SBD41241 0 SOQUEL CANYON PARKWAY EXTENSNION CONSTRUCT NEW 2 LANE_ROAD W BIKE LANES FROM EXISTING TERMINUS OF SOQUEL $4,000 BERNARDINO HIGHWAY CANYON PARKWAY AT PIPELINE AVE. TO WOODVIEW ROAD AT MEDLARINCLUDED ARE BICYCLE LANES MARKED IN EACH DIRECTION SAN LOCAL 200804 0 SOUTH ARCHIBALD AVE. GRADE SEPARATION (AT MISSION BLVD) CONSTRUCT A HIGHWAY AND RR GRADE SEPARTION AT EXISTING $57,932 BERNARDINO HIGHWAY AT-GRADE CROSSING SOUTH OF ARCHIBALD AND THE UPPR LA LINE-PROJECT TO BUILD NEW FLY-OVER BRIDGE FOR RR – WIDENING FROM 2-6 LANES 3 LANES IN EACH DIRECTION AND LEFT AND RIGHT TURN LANES;DRAINAGE IMPROVMENTS SAN LOCAL 2011150 0 SOUTH COAST AIR BASIN RIDESHARE PROGRAM $2,400 BERNARDINO HIGHWAY SAN LOCAL 201148 0 SOUTH HIGHLAND AVENUE FROM CHERRY AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES $5,250 BERNARDINO HIGHWAY SAN LOCAL 201186 0 SR 210 RAMPS AT BASE LINE-RAMP WIDENING – ADD LANES WIDEN ON AND OFF RAMPS AT SOUTHBOUND SR-210/BASE LINE I/C $6,536 BERNARDINO HIGHWAY SAN LOCAL SBD94177 0 STATE ROUTE 62 AT LARREA AVENUE & HATCH ROAD RECONFIGURE AND SIGNALIZATION (NO SYNCHRONIZATION) $196 BERNARDINO HIGHWAY SAN LOCAL SBD94174 0 STATE ROUTE 62 CANYON TO SUNRISE WIDEN FROM 4 TO 5 LANES FOR CONINUOUS LEFT TURN LANE $323 BERNARDINO HIGHWAY SAN LOCAL SBD94173 0 STATE ROUTE 62 LEE DRIVE TO LUPINE DRIVE WIDEN FROM 4 TO 5 LANES FOR CONTINUOUS LEFT TURN LANE $300 BERNARDINO HIGHWAY SAN LOCAL SBD59021 0 STATE STREET FROM 16TH STREET TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (4) LANES OF ROADWAY (1.5 MILES) TO CONNECT $22,290 BERNARDINO HIGHWAY STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT SAN LOCAL 200824 0 STATE STREET FROM ADAMS NORTH TO NOLAN/SHORT ST. (1.44 MILES) WIDEN FROM 2-4 LANES – GRADE SEPARATION $6,300 BERNARDINO HIGHWAY SAN LOCAL 201184 0 STERLING AVE FROM 3RD STREET TO 5TH STREET – WIDEN FROM 2-4 LANES (0.13 MILES) FORMERLY PART OF PROJECT ID 200852 $400 BERNARDINO HIGHWAY SAN LOCAL 200801 0 STEWART STREET WIDENING WIDEN FROM 2-4 LANES FROM ANDERSON TO CAMPUS ST. $650 BERNARDINO HIGHWAY 116 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 20040210 0 SUMMIT VALLEY ROAD – FROM SH138 TO RANCHERO ROAD-WIDEN FROM 2-4 LANES $21,000 BERNARDINO HIGHWAY SAN LOCAL 201115 0 THE CHINO-CORONA ROAD EAST/WEST IMPROVMTS NEWLY ANNEXED AREA IN CHINO. MILL CREEK/CHINO CORONA N/S TO HELLMAN. $6,659 BERNARDINO HIGHWAY CHINO/CORONA N/S EXTENDS FROM PINE AV TO S/OF CHINO-CORONA E/W. IMPROVMTS INCL CONST OF NEW BRIDGE XING OVER MILL CREEK (BOX CULVERT W/ RD OVER DRAINAGE), NAT DRAINAGE SYS MAINTAINED BY US ARMY CORPS ALONG CHINO-CORONA RD.(BRDG TO BE 1 IN EACH DIRECTION) EXISTG RD.IMPROVMTS NON-CAPACITY SAN LOCAL 201182 0 TIPPECANOE AVENUE FROM 3RD STREET TO 5TH STREET – WIDEN FROM 2-4 LANES (0.3 MILES) FORMERLY PART OF PROJECT ID $798 BERNARDINO HIGHWAY 200852 SAN LOCAL 200610 0 TIPPECANOE WIDENING PROJECT – BETWEEN MILL AND SANTA ANA RIVER BRIDGE ST. (1.4 MI)-WIDEN FROM 4-6 LANES INCLUD. $2,978 BERNARDINO HIGHWAY MEDIAN LANDSCAPE SAN LOCAL 201162 0 VALLEY BOULEVARD FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 4-6 LANES $2,418 BERNARDINO HIGHWAY SAN LOCAL 201149 0 VALLEY BOULEVARD FROM CHERRY AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES $2,418 BERNARDINO HIGHWAY SAN LOCAL 201163 0 VALLEY BOULEVARD FROM CITRUS AVENUE TO SIERRA AVENUE WIDEN FROM 4-6 LANES $2,418 BERNARDINO HIGHWAY SAN LOCAL 201165 0 VALLEY BOULEVARD FROM HEMLOCK AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES $604 BERNARDINO HIGHWAY SAN LOCAL 201164 0 VALLEY BOULEVARD FROM SIERRA AVENUE TO ALDER AVENUE WIDEN FROM 4-6 LANES $724 BERNARDINO HIGHWAY SAN LOCAL 200111 0 VICTOR VALLEY COLLEGE TRANSFER POINT FACILITY – LOCATED 18422 BEAR VALLEY RD. IN VICTORVILLE $823 BERNARDINO HIGHWAY SAN LOCAL 2011104 0 VICTORIA AVE FROM 3RD ST. TO 6TH ST. – SHOULDER IMPROVEMENTS (NO WIDENING) $3,195 BERNARDINO HIGHWAY SAN LOCAL 200837 0 VISTA ROAD GRADE SEPARATION-WIDEN 2-4 LANES AND CONSTRUCT GRADE SEPARATION $23,000 BERNARDINO HIGHWAY SAN LOCAL 200035 0 WABASH AV FROM 5TH ST TO I-10 – CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING $950 BERNARDINO HIGHWAY LINK (2 LANE IN EACH DIRECTION)-1 MILE SAN LOCAL 200064 0 WASHINGTON ST FROM RECHE CANYON TO HUNTS LN – ELIMINATE BOTTLENECK ADD NB TURN POCKET;WIDEN 2- 4 LNS ON $570 BERNARDINO HIGHWAY WASHINGTON FROM RECHE CYN. TO HUNTS LN. USING EXISTING WIDTH;MODIFY SIGNALS SAN LOCAL 2011103 0 WIDEN 5TH STREET FROM 2 TO 4 LANES BETWEEN DEL ROSA DR AND PALM AVENUE; CONSTRUCT NEW TRAFFIC SIGNAL AT 5TH/ $13,587 BERNARDINO HIGHWAY CENTRAL INTERSECTION; WIDEN 5TH ST AT SR210 FREEWAY UNDERCROSSING FROM 4 TO 5 LANES; ADD TURN LANE, MODIFY RAMP TERMINI; SHOULDER IMPROVEMENTS ON DEL ROSA DR BETWEEN 3RD ST AND 5TH ST (NO ADDITIONAL LANES); SAN LOCAL 20082402 0 WIDEN BASE LINE BETWEEN CHURCH AVE. AND SEINE AVE. FROM 4-6 LANES (EXCLUDING FREEWAY BRIDGE OVER SR210) $1,200 BERNARDINO HIGHWAY SAN LOCAL 201136 0 WIDEN FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN SAN BERNARDINO ROAD AND VINEYARD AVENUE. REMOVE THE EAST $10,632 BERNARDINO HIGHWAY UPLAND UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RAILROAD BRIDGE, CONSTRCT A NEW PUBLIC TRAIL BRIDGE ALONG THE RAILROAD ALIGNMENT AND ADD A RAISED MEDIAN, STREET LIGHTING, SIDEWALKS AND LANDSCAPING. Project List 117

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) SAN LOCAL 2011156 0 WILDWOOD CANYON ROAD IMPROVEMENTS – HOLMES TO MESA GRANDE INSTALL LEFT TURN LANE AND CURB AND GUTTER. $120 BERNARDINO HIGHWAY SAN LOCAL 201135 0 WILSON AVE FROM EAST AVE. TO WARDMAN BULLOCK RD. CONSTRUCTION OF A 2 LANE ROAD (ONE LANE EACH DIRECTION) WITH CURB $4,010 BERNARDINO HIGHWAY AND GUTTER, AND STREET LIGHTS. SAN LOCAL 200836 0 YATES RD. FROM .24 MILE NORTH OF CHINQUAPIN TO .02 MILES SOUTH OF FORTUNA (1.5 MILES) -WIDEN 2-4 LANES $4,325 BERNARDINO HIGHWAY SAN LOCAL 201138 0 YOUNGS CANYON RD. FROM SAN SEVAINE TO CHERRY AVE. CONSTRUCT NEW 4 LANE DIVIDED STREET $3,400 BERNARDINO HIGHWAY SAN LOCAL 200042 0 YUCAIPA BLVD. FROM 5TH TO 14TH STREET – WIDENING FROM 4-6 LANES $2,200 BERNARDINO HIGHWAY SAN LOCAL 2011155 0 YUCAIPA BLVD. IMPROVEMENTS – YUCAIPA BLVD FRIN 14TH ST. TO I-10 FREEWAY- WIDEN FROM 4-6 LANES $8,300 BERNARDINO HIGHWAY SAN LOCAL SBD55012 0 YUCCA LOMA RD. AT SR 18 CONNECTION NEW CONNECTION – CONNECTING YUCCA LOMA RD. AND SR 18 – NEW INTER- SECTION $2,772 BERNARDINO HIGHWAY SAN LOCAL SBD55011 0 YUCCA LOMA RD. FROM APPLE VALLEY RD. TO NAVAJO RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) $6,500 BERNARDINO HIGHWAY (3 MILES) VENTURA TRANSIT VEN090703 0 ADA PARATRANSIT SERVICE- OPERATING ASSISTANCE $52 VENTURA TRANSIT VEN030612 0 ADA SERVICE – CAPITAL LEASE & OPERATING COST $1,303 VENTURA TRANSIT VEN061006 0 BUS BENCH REPLACEMENT $10 VENTURA TRANSIT VEN090705 0 BUS SHELTER AT CENTRAL AVENUE AND DEL NORTE TRANSFER LOCATION $24 VENTURA TRANSIT VEN101101 0 BUS STOP ENHANCEMENTS FOR . $50 VENTURA TRANSIT VEN011219 0 BUS WASHER REPLACEMENT $484 VENTURA TRANSIT VEN070203 0 CAMARILLO METROLINK STATION IMPROVEMENTS INCLUDING PLATFORM AND PEDESTRIAN CIRCULATION, PASSENGER STATION $4,424 BUILDING/RESTROOMS, PLUS RELATED CONSTRUCTION OF NEW SIDING BETWEEN CAMARILLO AND OXNARD. VENTURA TRANSIT VEN090109 0 CAMERA SYSTEM FOR SUPERVISORY AND SUPPORT VEHICLES $30 VENTURA TRANSIT VEN110102 0 CONSTRUCT BUS SHELTER AT ROUTE 33/150 JUNCTION AND ASSOCIATED PEDESTRIAN IMPROVEMENTS; INSTALL PRE-FABRICATED $170 SHELTERS AT VARIOUS OTHER LOCATIONS IN OJAI VENTURA TRANSIT VEN090501 0 CONSTRUCT NEW TRANSIT MAINTENANCE AND OPERATIONS FACILITY (PRIOR 5309 = EARMARK NUMBER E2009-BUS091; 11/12 5309 = $50,000 10/11 STATE OF GOOD REPAIR DISCRETIONARY FUNDS) VENTURA TRANSIT VEN011214 0 DBE GOAL EVALUATION/SETTING CONSULTING SERVICE $58 VENTURA TRANSIT VEN101104 0 DIAL-A-RIDE VEHICLE CAPITAL LEASE $124 VENTURA TRANSIT VEN090107 0 EIGHT (8) CNG-FUELED 25-FOOT TO 40-FOOT BUSES FOR EXPANSION. BUSES WILL BE USED ON ALL GOLD COAST LINES TO REDUCE $3,608 SPARE RATIO AND INCREASE FREQUENCY WHERE WARRANTED BY DEMAND. VENTURA TRANSIT VEN081001 0 ELDERLY/DISABLED PLANNING INCLUDING PATRON DISABILITY EVALUATION $1,440 VENTURA TRANSIT VEN055401 0 EXPAND TRANSIT MAINTENANCE FACILITY TO ACCOMMODATE SYSTEM EXPANSION $2,019 VENTURA TRANSIT VEN056402 0 EXPANSION OF CNG TIME FILL AND GAS STORAGE $253 VENTURA TRANSIT VEN110111 0 EXTEND OPERATING HOURS FOR THOUSAND OAKS FIXED ROUTE AND DIAL A RIDE SYSTEMS $355 118 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA TRANSIT VEN090108 0 FAREBOX SYSTEM UPGRADE $600 VENTURA TRANSIT VEN050301 0 FARM RAILROAD CROSSING IMPROVEMENTS IN VENTURA COUNTY $500 VENTURA TRANSIT VEN020902 0 FINANCIAL MANAGEMENT SYSTEM $64 VENTURA TRANSIT VEN090105 0 FIVE LARGE 12 PASSENGER CUTAWAY VEHICLES FOR PARATRANSIT FOR REPLACEMENT $425 VENTURA TRANSIT VEN055406 0 FIVE REPLACEMENT PARATRANSIT VANS $523 VENTURA TRANSIT VEN090115 0 FIVE REPLACEMENT PARATRANSIT VEHICLES FOR CAMARILLO HEALTH CARE DISTRICT $259 VENTURA TRANSIT VEN090202 0 FOUR (4) REPLACEMENT MINIVANS FOR ARC VENTURA COUNTY $180 VENTURA TRANSIT VEN090106 0 FOUR (4) TRANSIT SUPERVISORY VEHICLES AND RELATED EQUIPMENT FOR REPLACEMENT $185 VENTURA TRANSIT VEN020901 0 FUEL TANK REMEDIATION – MTBE PROJECT $96 VENTURA TRANSIT VEN031246 0 GFI FAREBOX REPLACEMENT $288 VENTURA TRANSIT VEN110902 0 GPS UNITS FOR CAMARILLO HEALTH CARE DISTRICT PARATRANSIT VEHICLES IN FISCAL YEAR 2010/11 (5310 INCLUDES $321 TOLL $3 CREDITS) VENTURA TRANSIT VEN030608 0 GROUPED PROJ FOR RECONSTR OR RENOVATION TRANSIT BUILDNGS/STRUCTURES & REHAB TRANSIT VEH – MOORPARK BUSES & $1,264 TRANSIT CENTER SCOPE: PROJ ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT – TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING) VENTURA TRANSIT VEN090502 0 GROUPED PROJECTS FOR CONSTRUCTION OF SMALL PASSENGER SHELTERS AND INFORMATION KIOSKS – TRANSIT ENHANCEMENTS $151 PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – CONSTRUCTION OF SMALL PASSENGER SHELTERS AND INFORMATION KIOSKS VENTURA TRANSIT VEN051005 0 GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP – ELDERLY & DISABLED NEW FREEDOMS INITIATIVE $2,434 (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC) VENTURA TRANSIT VEN070202 0 GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP – JOBS ACCESS REVERSE COMMUTE PROJECTS (PROJECTS $4,302 ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC) VENTURA TRANSIT VEN54095 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO PARATRANSIT AGENCIES – ADA PARATRANSIT CAPITAL SCOPE: PROJECTS ARE $7,633 CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA TRANSIT VEN050401 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – CAMARILLO AREA TRANSIT SCOPE: PROJECTS ARE $5,300 CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA TRANSIT VEN010409 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – EAST COUNTY ADA PARATRANSIT SERVICE SCOPE: $1,169 PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA TRANSIT VEN34206 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – FIXED ROUTE SCOPE: PROJECTS ARE CONSISTENT WITH 40 $14,046 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA TRANSIT VEN34253 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – OJAI TROLLEY SCOPE: PROJECTS ARE CONSISTENT WITH $4,118 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES Project List 119

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA TRANSIT VEN981107 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES ADA SERVICE – PARATRANSIT CAPITAL SCOPE: PROJECTS $5,103 ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA TRANSIT VEN057404 0 GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES – REPLACE $505 MAINTENANCE EQUIPMENT SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES VENTURA TRANSIT VEN091118 0 GROUPED PROJECTS FOR RECON/RENOV O TRANSIT BUILDINGS & STRUCT – CENTRAL MAINTENANCE FACILITY & KELLER STREET YARD $960 SCOPE: PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – RECON/RENOV OF TRANSIT BUILDINGS AND STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE AND MAINTENANCE FACILITIES, STATIONS, TERMINALS, AND ANCILLARY STRUCTURES).(NON-CAPACITY INCREASING) VENTURA TRANSIT VEN061000 0 GROUPED PROJECTS FOR RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS AND STRUCTURES – CAMARILLO RAIL $600 STATION MAINT SCOPE: PROJECTS CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 & TABLE 3 CATEGORIES – RECONSTR OR RENOVATION OF TRANSIT BUILDINGS & STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINTENANCE FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING) VENTURA TRANSIT VEN030611 0 GROUPED PROJECTS FOR RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS/STRUCTURES & REHABILIATION OF TRANSIT $2,378 VEHICLES SCOPE: PROJECTS ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT – TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING) VENTURA TRANSIT VEN64003 0 GROUPED PROJECTS FOR REHABILITATION OF TRANSIT VEHICLES – FIXED ROUTE & ADA SCOPE: PROJECTS ARE CONSISTENT $14,609 WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN) VENTURA TRANSIT VEN981118 0 GROUPED PROJECTS FOR REHABILITATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 $3,077 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN) VENTURA TRANSIT VEN059401 0 GROUPED PROJECTS LISTING FOR PURCHASE/REHAB OF OPERATING EQUIP – VENTURA COUNTY SMARTCARD SYSTEM MAINTENANCE, $3,542 REHABILITATION & UPGRADE INCLUDING BUS FLEET CHANGES (DEINSTALLS AND INSTALLS) SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE/REHAB OF OPERATING EQUIPMENT FOR VEHICLES (E.G., RADIOS, FAREBOXES, LIFTS, ETC.) VENTURA TRANSIT VEN990609 0 GRPD PROJ REHAB/RECON TRACK STRUCT, TRACK, TRACKBED IN EXT ROW; RECON/RENOV TRANS BLGS/STRUCT;VEH;POWER/SIGNAL $47,947 COMM EQ SCOPE: PROJ CONS W 40 CFR PART 93.126 EXMPT TABLES 2&3 CAT- RECON/RENOV TRANS BLDINGS/STRUCT;VEH;PWR/ SGIN/COMM SYS;REHAB/RENOV TRK STRUC,TRK,TRKBED IN EXT ROW (EG, RAIL/BUS BLDNGS,STORE/MAIN FAC, STATIONS, TERMINALS, & ANCILL STRUCT).NON-CAP INCR.TDCRED=$1,991 10/11, $1,384 11/12 VENTURA TRANSIT VEN54036 0 IN VENTURA COUNTY VENTURA INTERCITY SERVICE TRANSIT AUTHORITY (VISTA) CAPITAL LEASE (INCLUDES PURCHASE OF 40 $29,551 PARTICULATE TRAPS) VENTURA TRANSIT VEN991203 0 INSTALLATION OF ABOVE GROUND HOIST SYSTEM $175 VENTURA TRANSIT VEN110607 0 MAINTENANCE DIAGNOSTIC TOOL $6 VENTURA TRANSIT VEN090201 0 MARKET/VALENTINE INDUSTRIAL PARK SHUTTLE SERVICE ON MARKET STREET, VALENTINE ROAD, AND TELEPHONE ROAD $866 120 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA TRANSIT VEN54057 0 MARKETING & PASSENGER AWARENESS ACTIVITIES (PLANNING: PROGRAM SUPPORT & ADM) $2,041 VENTURA TRANSIT VEN030609 0 METROLINK STATION SECURITY WALL (TRANSIT ENHANCEMENT) $79 VENTURA TRANSIT VEN030610 0 MILLS RD AT MAPLE ST – TWO BUS TURNOUTS WITH BUS SHELTERS, BIKE RACKS, BENCHES, & OTHER BUS STOP AMENITIES $450 VENTURA TRANSIT VEN061007 0 MILLS ROAD AT MAPLE ADJACENT TO PACIFIC VIEW MALL – BUS TURNOUTS WITH BUS SHELTERS, AND OTHER BUS STOP AMENITIES $359 VENTURA TRANSIT VEN057414 0 MIS EQUIPMENT REPLACE/UPGRADE $114 VENTURA TRANSIT VEN090708 0 MODERNIZE TRANSIT OPERATIONS FACILITY $2,091 VENTURA TRANSIT VEN090111 0 MODERNIZE, UPGRADE, AND REHABILITATE SIMI VALLEY TRANSIT OPERATIONS CENTER AND GARAGE (INCLUDES TRANSPORTATION $814 DEVEL CREDITS OF $25 IN 10/11, $4 IN 11/12). VENTURA TRANSIT VEN110605 0 MOORPARK RAIL STATION UPGRADES INCLUDING PLANTING/IRRIGATION UPGRADE, TICKET MACHINES RELOCATION, STRIPING AND $59 PAINTING, LIGHTING IMPROVEMENTS VENTURA TRANSIT VEN051202 0 MULTI-AGENCY TRANSPORTATION / VEHICLE FACILITY (INCLUDING OJAI TROLLEY MAINTENANCE FACILITY) $312 VENTURA TRANSIT VEN040405 0 NEXT BUS UPGRADE FOR REAL-TIME BUS STOP SIGNAGE (TRANSIT ENHANCEMENTS) $868 VENTURA TRANSIT VEN031203 0 ONE (1) CNG PARATRANSIT VAN FOR EXPANSION $100 VENTURA TRANSIT VEN081003 0 ONE (1) FIXED-ROUTE BUS FOR REPLACEMENT $112 VENTURA TRANSIT VEN091202 0 ONE (1) REPLACEMENT COLOR LASER JET PRINTER $4 VENTURA TRANSIT VEN110901 0 ONE EXPANSION MINIVAN IN FISCAL YEAR 10/11 FOR HELP OF OJAI (5310 INCLUDES $5,047 OF TOLL CREDITS) $44 VENTURA TRANSIT VEN055410 0 ONE EXPANSION PARATRANSIT VAN $121 VENTURA TRANSIT VEN055413 0 ONE EXPANSION PARATRANSIT VAN $128 VENTURA TRANSIT VEN090709 0 OPERATING ASSISTANCE – METROLINK $582 VENTURA TRANSIT VEN110108 0 OPERATING ASSISTANCE – VINEYARD AVENUE LINE THREE YEAR DEMONSTRATION (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT $1,701 CREDIT OF $195.) VENTURA TRANSIT VEN011221 0 PAINT 4 CNG BUSES $35 VENTURA TRANSIT VEN54056 0 PLANNING/IMPLEMENTATION OF COORDINATED PARATRANSIT $786 VENTURA TRANSIT VEN090117 0 POSITIVE TRAIN CONTROL SYSTEM – VENTURA COUNTY FUNDING SHARE OF FIVE-COUNTY PROJECT ALSO IN L.A., ORANGE, RIVERSIDE $2,480 AND SAN BERNARDINO COUNTIES VENTURA TRANSIT VEN090104 0 PURCHASE 3 REPLACEMENT BUSES. $1,260 VENTURA TRANSIT VEN081004 0 PURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE $100 VENTURA TRANSIT VEN090701 0 PURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE. $100 VENTURA TRANSIT VEN110606 0 PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS $130 VENTURA TRANSIT VEN090702 0 PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT $100 VENTURA TRANSIT VEN081005 0 PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE $100 VENTURA TRANSIT VEN110110 0 PURCHASE THREE CNG TRANSIT BUSES FOR REPLACEMENT AND ONE TRANSIT SERVICE VEHICLE FOR EXPANSION PLUS ADDITIONAL $1,388 FARE EQUIPMENT AND AUTOMATIC STOP ANNUNCIATORS (CMAQ INCLUDES TRANSIT DEVELOPMENT CREDITS OF $53 IN FY 2011/12). VEN110604 HAS BEEN COMBINED IN TO THIS PROJECT. VENTURA TRANSIT VEN090707 0 PURCHASE TWO (2) WHEELCHAIR-SIZE SCALES FOR USE IN ADA CERTIFICATION $10 VENTURA TRANSIT VEN031218 0 REALIGN MOORPARK RAIL STATION SOUTH PARKING LOT ENTRANCE $932 Project List 121

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA TRANSIT VEN031242 0 REPLACE GARAGE CNG BUS HOISTS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDITS OF $13.) $113 VENTURA TRANSIT VEN061008 0 REPLACE MAINTENANCE MIS EQUIPMENT $500 VENTURA TRANSIT VEN110603 0 REPLACE PHONE SYSTEM FOR DIAL-A-RIDE CALL-IN CENTER $69 VENTURA TRANSIT VEN051207 0 REPLACE TWENTY-EIGHT (28) COMPUTERS $63 VENTURA TRANSIT VEN090110 0 REPLACE/UPGRADE TRANSIT SHELTERS AND ADD NEW SHELTERS $484 VENTURA TRANSIT VEN091204 0 REPLACEMENT ENGINE FOR CNG BUS $20 VENTURA TRANSIT VEN091203 0 REPLACEMENT ENGINE FOR CNG PARATRANSIT VAN $8 VENTURA TRANSIT VEN031241 0 SAFETY AND SECURITY PLANNING AND TRAINING $10 VENTURA TRANSIT VEN057416 0 SCHEDULING / RUN CUTTING SYSTEM $150 VENTURA TRANSIT VEN100101 0 SIMI VALLEY / MOORPARK METROLINK GRADE CROSSING IMPROVEMENTS (FY 10 TRANSPORATION APPROPRIATION HIGH SPEED RAIL $750 GRADE CROSSING DEMO FUND) VENTURA TRANSIT VEN010406 0 SMART CARD DATA MANAGEMENT $1,666 VENTURA TRANSIT VEN070204 0 SMARTCARD UPGRADE $420 VENTURA TRANSIT VEN110109 0 THOUSAND OAKS TRANSIT CENTER PARKING LOT EXPANSION AND OTHER IMPROVEMENTS – EXPAND PARKING LOT BY APPROXIMATELY $521 77 SPACES, INSTALL ASSOCIATED LANDSCAPING, AND UPGRADE TRANSIT CENTER LIGHTING VENTURA TRANSIT VEN090114 0 THREE (3) FIXED-ROUTE CNG BUSES FOR REPLACEMENT (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDITS OF $17.) $1,530 VENTURA TRANSIT VEN101103 0 THREE (3) MINIVANS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE SYSTEM EXPANSION $150 VENTURA TRANSIT VEN055412 0 THREE (3) REPLACEMENT PARATRANSIT VANS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $36 IN FY 10/11.) $317 VENTURA TRANSIT VEN011223 0 THREE (3) REPLACEMENT UTILITY VANS $105 VENTURA TRANSIT VEN090116 0 THREE FIXED-ROUTE BUSES FOR REPLACEMENT – OJAI TROLLEY $466 VENTURA TRANSIT VEN055409 0 THREE REPLACEMENT PARATRANSIT VANS – CARRYOVER FROM PRIOR YEAR $302 VENTURA TRANSIT VEN051203 0 TITLE VI SURVEYS $50 VENTURA TRANSIT VEN54069 0 TRANSIT INFORMATION CENTER $1,581 VENTURA TRANSIT VEN031244 0 TRANSIT MARKETING $30 VENTURA TRANSIT VEN101102 0 TRANSIT MARKETING $50 VENTURA TRANSIT VEN54070 0 TRANSIT MARKETING (CMAQ INCLUDES TRANSP DEVEL CREDITS OF $57 IN 10/11, $92 IN 11/12.) $3,309 VENTURA TRANSIT VEN110601 0 TRANSIT MARKETING FOR THOUSAND OAKS TRANSIT $38 VENTURA TRANSIT VEN081002 0 TRANSIT OPERATIONS FACILITY EXPANSION FOR THOUSAND OAKS TRANSIT $1,856 VENTURA TRANSIT VEN990602 0 TRANSIT PLANNING & PROGRAMMING (PLANNING: PROGRAM SUPPORT & ADM) $1,935 VENTURA TRANSIT VEN110602 0 TRANSIT PLANNING FOR THOUSAND OAKS TRANSIT $25 VENTURA TRANSIT VEN34348 0 TRANSIT PROGRAMMING & PLANNING $2,241 VENTURA TRANSIT VEN54149 0 TWO-WAY RADIO SYSTEM REPLACEMENT $125 VENTURA TRANSIT VEN54115 0 VISTA BUS SYSTEM PLANNING $1,679 VENTURA STATE VEN051213 23 IN MOORPARK RTE 23 MOORPARK AVE FROM THIRD ST TO CASEY RD WIDEN FROM 1 LANE IN EACH DIRECTION TO 1 LANE NB AND 2 $2,095 HIGHWAY LANES SB. REALIGN FIRST ST/POINDEXTER INTERSECTION AND UPGRADE RAIL CROSSING. 122 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA STATE VEN110114 34 IN CAMARILLO LEWIS ROAD FROM PLEASANT VALLEY ROAD TO DAWSON DRIVE LANDSCAPING ENHANCEMENT $1,300 HIGHWAY VENTURA STATE VEN040401 34 IN OXNARD AT RICE AVE. RAILROAD GRADE SEPARATION $12,327 HIGHWAY VENTURA STATE VEN050404 101 AT CENTRAL AVENUE – LANDSCAPING ENHANCEMENTS $600 HIGHWAY VENTURA STATE VEN54020 101 IN CAMARILLO CONSTRUCT AIRPORT NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & $40,000 HIGHWAY PONDEROSA DR) INTERSECTING US 101 VENTURA STATE VEN051210 101 IN CAMARILLO RECONFIGURE CENTRAL AVENUE / ROUTE 101 INTERCHANGE (INCLUDES CENTRAL AVE BRIDGE WIDENING FROM 1 TO 2 $37,861 HIGHWAY LANES EACH DIRECTION) VENTURA STATE VEN031226 101 IN CAMARILLO ROUTE 101 AT PLEASANT VALLEY ROAD IMPROVE INTERSECTION WITH SOUTHBOUND RAMPS – WIDEN ONRAMP $1,053 HIGHWAY ENTRANCE FROM 1 TO 2 LANES AND ADD TURN LANES VENTURA STATE VEN051006 101 IN OXNARD AT DEL NORTE BOULEVARD – IMPROVE INTERCHANGE, WIDEN DEL NORTE BRIDGE OVER 101 (FROM VENTURA BLVD TO RTE $56,706 HIGHWAY 101 SB RAMPS) FROM 2 TO 4 LANES PLUS LEFT-TURN LANE. ADD NB LOOP ONRAMPS AND REALIGN AND IMPROVE OTHER RAMPS. VENTURA STATE 343 101 IN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) (SAFETEA-LU #2639 AND 'TIP') $83,977 HIGHWAY (TCSP – 2010 APPROP EARMARK) VENTURA STATE VEN053402 101 IN OXNARD LANDSCAPING/IRRIGATION ENHANCEMENTS SOUTH SIDE OF ROUTE 101 AT DEL NORTE – REGIONAL STP INCLUDES $9 OF $694 HIGHWAY TOLL CREDITS FOR FY 10/11 PE VENTURA STATE VEN011205 101 IN THOUSAND OAKS – IMPROVEMENTS AT VAR LOCATIONS LA CNTY LINE-MOORPARK RD: CONV AUX LANES TO MF LANES, ADD 1 LANE $60,342 HIGHWAY EACH DIRECTION BY SHIFTING CL NORTHWARDS & WIDENING ON NB SIDE, REALIGN & WIDEN RAMPS, CONSTR SOUNDWALLS (EA 19521, 19522), WIDEN 3 BRIDGES ON NORTHSIDE (HAMPSHIRE UC, CONEJO SCHOOL UC, & MOORPARK UC); IMPROVE 101/23 CONNECTORS. (STP=FY 2010 APPROPS EARMARK)(INCL RT 23 PM 3.3/3.8) VENTURA STATE VEN070201 101 NEAR MUSSEL SHOALS ADD 1 HOV LANE EACH DIR FROM MOBIL PIER ROAD UC TO S/O CASITAS PASS RD IN SANTA BARBARA CO. (PM $87,760 HIGHWAY R 39.8 TO 2.2). HOV LANES ARE PROPOSED TO BE PART-TIME (AM & PM PEAK PERIODS) ONLY. EXTEND ON/OFF-LANES AT MUSSEL SHOALS & LA CONCHITA FOR BETTER ACCEL AND DECEL; KEEP AS SINGLE LANES. CLOSE EXISTING 3 MEDIAN OPENINGS LOCATED NEAR LA CONCHITA AND MUSSEL SHOALS AND TANK FARM. VENTURA STATE VEN010202 101 RECONFIGURE N/B CALIFORNIA ST OFFRAMP (RECONFIGURE RAMP TO TERMINATE AT OAKS ST INSTEAD OF THE CURRENT CALIFORNIA $24,720 HIGHWAY ST LOCATION) VENTURA STATE VEN110301 101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 2 INCLUDING WENDY DRIVE BRIDGE SOUTHBOUND WIDENING ACROSS ROUTE $6,300 HIGHWAY 101; SB OFF-RAMP IMPROVEMENT TO WIDEN FROM 1 TO 2 LANES AT WENDY DRIVE INTERSECTION TO PROVIDE TURN LANE (RAMP TO REMAIN 1 LANE EXITING FREEWAY) TOLL CREDIT = $88 FOR CON SPLIT FROM VEN056406 VENTURA STATE VEN110302 101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 3 IMPROVE SB ONRAMP (SPLIT FROM VEN056406) $3,587 HIGHWAY VENTURA STATE VEN056406 101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PHASE I INCLUDING WENDY DRIV BRIDGE NB WIDENING ACROSS ROUTE 101; $6,271 HIGHWAY NB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD (OTHER PHASES SPLIT TO VEN110301 & VEN110302.) TOLL CREDIT = $77 FOR CON VENTURA STATE VEN34089 118 IN MOORPARK L.A. AVE FROM ROUTE 23 (MOORPARK AVE) TO E/O SPRING CONSTRUCT SIDEWALKS, REALIGN ROADWAY AND WIDEN $1,158 HIGHWAY FROM 4 TO 6 LANES Project List 123

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA STATE 12020 118 IN MOORPARK LOS ANGELES AVE WIDEN FROM 4 TO 6 LANES BETWEEN MAUREEN AND LETA YANCY $950 HIGHWAY VENTURA STATE VEN071106 118 IN SIM VLY WIDEN RTE 118 WB LA CONTY LN TO TAPO CYN FR 3 TO 4 LANES (TAPO CYN TO KUEHNER) AND FR 4 TO 5 LANES (KUEHNER $29,717 HIGHWAY TO COUNTY LN); WIDEN EB TAPO CYN TO TAPO FR 3 TO 4 LANES; WIDEN EB KUEHNER TO LA CNTY LINE FR 4 TO 5 LAN VENTURA STATE VEN070804 118 IN SIMI VALLEY LANDSCAPE ENHANCEMENTS AT FIRST STREET. $1,500 HIGHWAY VENTURA STATE VEN051003 118 IN SIMI VALLEY LANDSCAPE ENHANCEMENTS FROM WESTERN CITY LIMIT TO EASTERN CITY LIMIT. $1,400 HIGHWAY VENTURA STATE 6566 118 NEAR SIMI VALLEY AT ALAMOS CYN RD ADD RAMPS $2,560 HIGHWAY VENTURA STATE VEN080401 118 ROUTE 118 FROM ROUTE 126 IN VENTURA TO ROUTE 23 IN MOORPARK – PLANNING/FEASIBILITY STUDY OF POTENTIAL IMPROVEMENTS. $271 HIGHWAY TCSP EARMARK 08CA005 EA 28750 PPNO 4407 VENTURA STATE VEN110113 150 IN SANTA PAULA TEN STREET FROM SANTA PAULA STREET TO ROUTE 126 – LANDSCAPING/AESTHETIC ENHANCEMENTS, PEDESTRIAN & $600 HIGHWAY BICYCLE AMENITIES AND IMPROVEMENTS (RIP-TE INCLUDES TOLL CREDITS OF $6 FOR 11/12 PE, $63 FOR 12/13 CON, TOTAL OF $69.) VENTURA STATE VEN54187 999 2% FOR PLANNING, PROGRAMMING, & MONITORING $2,395 HIGHWAY VENTURA STATE VENLS01 999 GROUPED PROJ FOR SAFETY IMPROV – SHOPP COLLISION REDUCT PROJ CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 & $3,688 HIGHWAY TABLE 3 CAT – RR/HWY XING, SAFER NON-FED-AID SYS RDS, SHOULDER IMPROV, TRAFF CONTROL DEV & OPER ASSIST OTH THAN SIGNALIZATION PROJ, INTRSCTION SIGNALIZATION PROJ @ INDIVI INTERSECTIONS, PAVEMNT MARKING DEMO, TRUCK CLIMB LANES OUTSIDE URB AREAS, LIGHTNG IMPROV, EMERGENCY TRUCK PULLOVERS VENTURA STATE VENLS05 999 GROUPED PROJ FOR SAFETY IMPROV-SHOPP MOBILITY PROG PROJ CONSISTENT W/ 40 CFR PT 93.126 EXEMPT TABLES 2 AND TABLE $3,899 HIGHWAY 3 CAT – RR/HWY XING, SAFER NON-FED-AID SYS RDS, SHOULDER IMPROV, TRAFF CONTRL DEVS & OPERATING ASSIST OTHER THAN SIGNALIZATION PROJ, INTERSECTION SIGNALIZATION PROJ @ INDIV INTERSECTIONS, PAVEMENT MARKING DEMO, TRUCK CLIMBING LANES OUTSIDE URB AREA, LIGHTING IMPROV, EMER TRUCK PULLOVERS VENTURA STATE VENLS08 999 GROUPED PROJ LISTING MANDATES (SCOPE: PROJ CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 &3 CAT – RR/HWY XING, $984 HIGHWAY SAFER NON-FED-AID SYSTEM RDS, SHOULDER IMPR, TRAFFIC CONTROL DEVICES & OPER ASSISTANCE OTH THAN SIGNALIZATION PROJ, INTERSECTION SIGNALIZATION PROJ AT INDIVID INTERSECTIONS, PAVEMENT MARKING DEMO, TRUCK CLIMBING LANES OUTSIDE URBANIZED AREA, LIGHTING IMPROV, EMER TRUCK PULLOVERS) VENTURA STATE VENLS03 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – SHOPP PROGRAM COPE: PROJECTS ARE CONSISTENT $16,521 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). VENTURA STATE VENLS10 999 GROUPED PROJECTS FOR EMERGENCY REPAIR – SHOPP EMERGENCY RESPONSE PROGRAM SCOPE: PROJ CONSISTENT W/ 40 CFR PART $23,197 HIGHWAY 93.126 EXEMPT TABLES 2 CATEGORIES – REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. THIS APPLIES TO DAMAGES THAT DON'T QUALIFY FOR FED EMER RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FED EMER RELIEF FUNDS BUT EXTEND BEYOND THE FED-DECLARED DISASTER PERIOD VENTURA STATE VENLS06 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – CALTRANS MINOR PROGRAM SCOPE: PROJECTS $3,341 HIGHWAY ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION 124 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA STATE VENLS02 999 GROUPED PROJECTS LISTING FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – ROADWAY $145,562 HIGHWAY PRESERVATION PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATON) VENTURA LOCAL VEN090504 0 1000' E. OF ROUTE 126/CTR ST TO 0.75 MILE WEST OF RANCHO CAMULOS CONSTRUCT BIKE/PED PATH FOR 1.2 MILES IN SANTA PAULA $1,018 HIGHWAY BRANCH ROW (PHASE III OF PIRU/CAMULUS PROJECT, SPLIT FROM VEN990310) VENTURA LOCAL VEN990310 0 1000' E. OF RTE 126/CTR ST/RANCHO CAMULOS PIRU CRK BRIDGE (PHASE I & IV) FENCING RE-LAY TRK, INSTALL PLATFRM @ RANCHO $6,000 HIGHWAY CAMULOS (VEN070101) , BIKE/PED PATH FROM 0.75 MILE WEST OF RANCHO CAMULOS TO RANCHO CAMULOS. (BIKE/PED PATH ALSO IN VEN090504.) VENTURA LOCAL VEN050402 0 ADOLFO ROAD EASTBOUND AT SANTA ROSA ROAD – ADD DUAL LEFT AND RIGHT TURN LANES (TOLL CREDITS = $135 FOR FY 10/11 $1,177 HIGHWAY CON) VENTURA LOCAL VEN54164 0 BICYCLE & PEDESTRIAN TRAIL EXTENSION: FOX CYN BARRANCA FROM RT 150 TO OJAI VALLEY TRAIL $148 HIGHWAY VENTURA LOCAL VEN990319 0 CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN ENHANCEMENTS $1,525 HIGHWAY VENTURA LOCAL VEN050403 0 CALLEGUAS BIKE PATH – CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH $2,083 HIGHWAY CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II). (CMAQ INCLUDES $191 IN TOLL CREDITS FOR 11/12 CONSTRUCTION.) VENTURA LOCAL VEN110106 0 CALLEGUAS CREEK BIKE PATH PHASE 4 – SOUTH SIDE OF ROUTE 101 FROM PETIT STREET TO CALLEGUAS CREEK / VILLAGE AT THE $400 HIGHWAY PARK DRIVE – CONSTRUCT APPROXIMATELY 3500 FOOT CLASS I BIKE PATH VENTURA LOCAL VEN110105 0 CALLEGUAS CREEK BIKE TRAIL PHASE 3 – CONSTRUCT 3800 FOOT BIKE PATH ALONG WEST SIDE OF CALLEGUAS CREEK FROM ROUTE $700 HIGHWAY 101 TO PLEASANT VALLEY ROAD VENTURA LOCAL VEN054605 0 CONEJO CREEK PARK BIKE PATH – CLASS I BIKE PATH FOR 1.4 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD AND $1,601 HIGHWAY PAIGE LANE VENTURA LOCAL VEN110304 0 CONSTRUCT 300-FOOT CLASS I BIKE PATH FROM SHERIDAN WAY TO VENTURA RIVER BIKE TRAIL – CMAQ INCLUDES TOLL CREDIT OF $6 $250 HIGHWAY FOR PE AND $23 FOR CON VENTURA LOCAL VEN071104 0 CONSTRUCT PONDEROSA EXTENSION FROM EARL JOSEPH TO VENTURA BLVD INCLUDING BIKE LANES (SPLIT FROM PROJECT $5,114 HIGHWAY 07-VEN990305) VENTURA LOCAL VEN053403 0 EAST VENTURA BOULEVARD FROM NYLAND AVENUE TO EAST OF ALMOND DRIVE – LANDSCAPE ENHANCEMENT, PEDESTRIAN AND $4,246 HIGHWAY BICYCLE FACILITIES, DRAINAGE IMPROVEMENT AND PAVEMENT REHABILITATION VENTURA LOCAL VEN110308 0 ERBES ROAD FROM FALMOUTH TO THOUSAND OAKS BLVD (3900') CONSTRUCT CLASS II BIKE LANES, SIDEWALK/DRAINAGE $5,600 HIGHWAY IMPROVEMENTS, EXTEND TURN LANES AT INTERSECTION OF ERBES/HILLCREST VENTURA LOCAL VEN031212 0 EXPAND TRAFFIC SIGNAL COORDINATION SYSTEM $450 HIGHWAY VENTURA LOCAL VEN54168 0 FACILITY INCL BIKEWAY/WALKWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC $4,094 HIGHWAY ACCESS POINTS/ SAFETY ITEMS VENTURA LOCAL VENLS07 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM SCOPE: PROJECTS ARE CONSISTENT $6,742 HIGHWAY WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) Project List 125

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA LOCAL VEN54032 0 GROUPED PROJECTS FOR PAVEMNT RESURFACING AND/OR REHABILITATION – LOCAL STREETS & ROADS SCOPE: PROJECTS ARE $34,427 HIGHWAY CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADD TRAV LANES) TOLL CRED FOR CON FY11=$578, FY 12=$80. VENTURA LOCAL VEN056407 0 HILLCREST DRIVE FROM TELLER ROAD TO CONEJO BLVD – CLASS II BIKE LANES $284 HIGHWAY VENTURA LOCAL VEN011202 0 HUENEME RD FROM OXNARD CITY LIMITS TO RICE RD – WIDEN FROM 2 TO 4 LANES $6,953 HIGHWAY VENTURA LOCAL VEN54019 0 IN CAMARILLO ADOLFO RD EXTENSION EXTEND ROAD EASTERLY TO CAMARILLO SPRINGS RD/US 101 (TWO-LANE UNDIVIDED ROAD) $11,358 HIGHWAY VENTURA LOCAL VEN110306 0 IN MEINERS OAKS ON LOMITA AVENUE FROM RICE RD TO S LOMITA AVE CONSTRUCT 1.5 MILE CLASS III BIKE ROUTE $309 HIGHWAY VENTURA LOCAL VEN34095 0 IN OXNARD COLONIA RD/CAMINO DEL SOL RT 1 TO ENTRADA DR CONSTRUCT 4 LANES $10,269 HIGHWAY VENTURA LOCAL VEN34094 0 IN OXNARD HUENEME RD SAVIERS TO ARCTURUS WIDEN AND CONSTRUCT FROM 2 TO 4 LANES (SAFETEA-LU PROJECT #2639 & 'TIP') $3,616 HIGHWAY VENTURA LOCAL VEN053401 0 INSTALL INTERCONNECT CABLE TO CONNECT SIGNALIZED INTERSECTIONS AT VARIOUS LOCATIONS THROUGHOUT THE CITY $500 HIGHWAY VENTURA LOCAL VEN031216 0 INSTALL NEW SIGNALS AT INTERSECTION OF PALM AVENUE AND ROUTE 126 EB OFF-RAMP, AND TENTH STREET AND ROUTE 126 EB $558 HIGHWAY OFF-RAMP VENTURA LOCAL VEN051211 0 LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES $4,417 HIGHWAY VENTURA LOCAL VEN090503 0 LYNN ROAD FROM HILLCREST DRIVE TO AVENIDA DE LOS ARBOLES CONSTRUCT CLASS II BIKE LANES FOR 3 MILES (TEA21#221). $1,251 HIGHWAY VENTURA LOCAL VEN056403 0 LYNN ROAD FROM ROUTE 101 TO AVENIDA DE LAS FLORES SIGNAL SYNCHRONIZATION IMPROVEMENT (PHASE III) $460 HIGHWAY VENTURA LOCAL VEN040501 0 NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL $50,265 HIGHWAY IMPROVEMENTS – CON PHASE (PE & ROW IN 07-VEN54122) – INCL FINANCE COST VENTURA LOCAL VEN54122 0 NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL $3,362 HIGHWAY IMPROVEMENTS – PE AND ROW PHASES (CON IN 07-VEN040501) – PHASE I VENTURA LOCAL VEN110303 0 NEAR DEL NORTE ON SANTA CLARA AVENUE FROM CENTRAL TO ROUTE 118 CONSTRUCT 2.98 MILES OF CLASS II BIKE LANES $1,100 HIGHWAY VENTURA LOCAL VEN090102 0 NEW SIGNAL AT KIMBALL ROAD AND FOOTHILL ROAD $500 HIGHWAY VENTURA LOCAL VEN010203 0 OJAI VALLEY BIKE TRAIL EXTENSION/FULTON ST EXTENSION (STP INCLUDES TOLL CREDITS OF $54 FOR FY 2010/11 CON.) $611 HIGHWAY VENTURA LOCAL VEN110104 0 OJAI VALLEY BIKE TRAIL NEAR CASITAS SPRINGS – REPLACE DRY-WEATHER CROSSING WITH 790-FOOT BRIDGE OVER SAN ANTONIO $1,820 HIGHWAY CREEK 126 Project List

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VENTURA LOCAL VEN051002 0 OLSON ROAD WIDENING FROM FOUR TO SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET $2,984 HIGHWAY VENTURA LOCAL VEN990317 0 OXNARD BLVD 5TH/VINEYARD & ON 5TH ST (RT 34) OXNARD BLVD/ROSE AVE CONSTRUCT NEW BICYCLE & PEDESTRIAN FACILITIES 1.5 $4,589 HIGHWAY MILES IN LENGTH VENTURA LOCAL VEN110305 0 PONDEROSA DRIVE FROM ARNEILL TO LAS POSAS REPLACE AND UPGRADE SIDEWALK, CURB AND GUTTER, MEDIAN, LANDSCAPING, $1,174 HIGHWAY TREES AND IRRIGATION (RIP-TE INCLUDES TOLL CREDIT OF $117,000) VENTURA LOCAL VEN110307 0 PONDEROSA DRIVE FROM LANTANA TO 200' E OF CARMEN CONSTRUCT ENHANCED HARDSCAPE, LANDSCAPE, AND IRRIGATION – $460 HIGHWAY RIP-TE INCLUDES TOLL CREDIT OF $46 FOR CON VENTURA LOCAL VEN051004 0 RECONSTRUCT AND DEEP LIFT ASPHALT ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24 $6,000 HIGHWAY VENTURA LOCAL VEN93017 0 REGIONAL RIDESHARE PROGRAM FOR 10/11, 11/12, 12/13, 13/14, 14/15, & 15/16 $4,465 HIGHWAY VENTURA LOCAL VEN071105 0 REIMBURSEMENT OF LEWIS ROAD WIDENING ADVANCE CONSTRUCTION FUNDS PAID WITH LOCAL BONDS (PROJECT 07-VEN040501) $23,000 HIGHWAY VENTURA LOCAL VEN051401 0 ROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK – CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH (CMAQ $1,395 HIGHWAY INCLUDES $8 TOLL CREDITS FOR PE.) VENTURA LOCAL VEN031229 0 ROUTE 126 BIKE PATH – PHASE II BIKE PATH (CLASS I) CROSSING THE HARMON BARRANCA -(INCLUDES $221 OF CMAQ PROVIDING $1,930 HIGHWAY MATCH THROUGH TOLL CREDITS) VENTURA LOCAL VEN031230 0 ROUTE 126 BIKE PATH PHASE III BIKE PATH (CLASS I) PARALLEL AND SOUTH OF ROUTE 126 0.3 MILES FROM PARRISH TO BACH $1,000 HIGHWAY (ADJACENT TO IMPERIAL MOBILE HOME PARK) – CMAQ INCLUDES TOLL CREDITS OF $11 FOR PE, $7 FOR ROW, AND $96 FOR CON VENTURA LOCAL VEN111102 0 SANTA PAULA BIKE TRAIL FROM PECK ROAD TO SANTA PAULA CREEK IMPROVEMENTS AT VAROIUS LOCATIONS INCLUDING BIKE/ $1,110 HIGHWAY PEDESTRIAN IMPROVEMENTS AT 16 ADJACENT INTERSECTIONS AND CONSTRUCTION OF ONE REST AREA SHADE STRUCTURE (PROJECT DOES NOT EXTEND THE EXISTING FACILITY.) VENTURA LOCAL VEN040502 0 SANTA ROSA ROAD FROM UPLAND ROAD TO WOODCREEK ROAD WIDEN FROM TWO TO FOUR LANES AND ADD BIKE LANES $2,113 HIGHWAY VENTURA LOCAL VEN031205 0 SIMI VALLEY BIKE PATH CLASS I 1400-FOOT CONNECTION FROM METROLINK STATION TO STEARNS STREET. (CMAQ INCLUDES TOLL $254 HIGHWAY CREDITS OF $23 FOR 2010/11 CON.) VENTURA LOCAL VEN990341 0 SURFERS' POINT BIKE PATH RESTORATION RESTORE 0.8 KM BIKEWAY SEGMENT DESTROYED BY STORMS ENVIRONMENTAL $2,214 HIGHWAY VENTURA LOCAL VEN110107 0 THOUSAND OAKS COMMUNITY TRANSPORTATON CENTER PARK & RIDE LOT – LANDSCAPING EHANCEMENTS & BIKE RACKS $180 HIGHWAY VENTURA LOCAL VEN090101 0 TRAFFIC SIGNAL IMPROVEMENTS AT VARIOUS LOCATIONS $740 HIGHWAY VENTURA LOCAL VEN110112 0 VICTORIA AVENUE FROM GUM TREE ST TO GONZALES RD SIDEWALK AND DRAINAGE IMPROVEMENTS, RESTRIPING TO PROVIDE THREE $1,100 HIGHWAY NB THROUGH LANES AND BIKE LANE VENTURA LOCAL VEN051201 0 WEST LOS ANGELES AVENUE FROM WEST CITY LIMIT TO EASY STREET 0.4 MILE CLASS II BIKE LANES – CMAQ INCLUDES $228 OF TOLL $1,986 HIGHWAY CREDITS FOR 10/11 CON. Project List 127

FTIP Projects County System FTIP ID Route Description Project Cost ($1,000’s) VARIOUS TRANSIT SCAG5316 0 FTA SECTION 5316 JOB ACCESS AND REVERSE COMMUTE ADMINISTRATIVE ASSISTANCE FOR FY 2009, 2010 AND 2011. $200 VARIOUS TRANSIT SCAG5317 0 FTA SECTION 5317 NEW FREEDOM SCAG ADMINISTRATIVE ASSISTANCE FOR FY 2009-2011. $180 VARIOUS STATE SCAG206 999 GROUPED PROJECTS FOR EMERGENCY REPAIR PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 1 & 3 $4,500 HIGHWAY CATEGORIES – REPAIR OF DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS, EXCEPT PROJECTS INVOLVING SUBSTANTIAL FUNCTIONAL, LOCATIONAL OR CAPACITY CHANGES. VARIOUS LOCAL SCAG205 0 GROUPED PROJECTS FOR RAILROAD/HIGHWAY CROSSING – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 $4,241 HIGHWAY CATEGOIRES – RAILROAD/HIGHWAY CROSSING. VARIOUS LOCAL SCAG015 0 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – HSIP PROGRAM PROJECTS CONSISTENT WITH 40 CFR PART 93.126.TABLES 2 & $120,000 HIGHWAY 3 CATEGORIES – RAILROAD/HIGHWAY CROSSING, SAFER ONO-FEDERAL-AID SYSTEM ROADS, SHOULDER IMPROVEMENTS, TRAFFIC CONTROL DEVICES & OPERATING ASSISTANCE OTHER THAN SIGNALIZATION PROJECTS, INTERSECTION SIGNALIZATION PROJECTS AT INDIVIDUAL INTERSECNS, PAVEMENT MARKING DEMO VARIOUS LOCAL SCAG016 0 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SAFE ROUTES TO SCHOOL PROGRAM (SRTS) PROJECTS CONSISTENT WITH 40 $53,434 HIGHWAY CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES – RAILROAD/HWY CROSSING, SAFER NON-FEDERAL-AID SYSTEM RDS, SHOULDER IMP, TRAFFIC CONTROL DEVICES , INTERSECTIPN SIGNALIZATION & INDIVIDUAL INTERSECTIONS, PAVEMT MARKING DEMO. VARIOUS LOCAL SCAG014 0 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS ON HIGH RISK RURAL ROAD – HRRR PROGRAM – (PROJECTS ARE CONSISTENT WITH $3,708 HIGHWAY 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES – SAFER NON-FEDERAL-AID SYSTEM ROADS. VARIOUS LOCAL ORA3711 0 IMPROVE AND EXPAND THE SANTA ANA RIVER TRAIL ALONG THE AREA IMMEDIATELY BOARDING THE EASTSIDE OF THE ANAHEIM $736,700 HIGHWAY REGIONAL TRANSPORTATION INTERMODAL CENTER (ARTIC) (THE CITY OF ANAHEIM IS THE LEAD AGENCY) VARIOUS LOCAL SC3711 0 IMPROVE BUS TURN-OUT ON MCBEAN PARKWAY AT AVENIDA NAVARRE AND DEVELOPMENT OF NORTHBOUND LEFT-TURN POCKET AT $250 HIGHWAY MCBEAN PARKWAY AND ORCHARD VILLAGE ROAD AT HENRY MAYO NEWHALL MEMORIAL CENTER (THE CITY OF SANTA CLARITA IS THE LEAD AGENCY) VARIOUS LOCAL SCAG 3711 0 STUDY – EXPRESS TRAVEL CHOICES (PHASE II) – (CALTRANS IS THE LEAD AGENCY) $4,000 HIGHWAY 128 Project List

Financially-Constrained RTP Projects

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL 6120006 TRANSIT 0 CALEXICO CONSTRUCT CALEXICO INTERMODAL 2018 $9,315 INTERMODAL TRANSPORTATION CENTER TRANSPORTATION CENTER IMPERIAL 6OM0701- TRANSIT 0 3 REPLACEMENT LARGER BUSES IN 10/11 2012 $315 IMP110902 IMPERIAL 6OM0701- TRANSIT 0 ADA PARA-TRANSIT FOR COUNTY OF IMPERIAL – 2 2010 $130 IMP090502 NEW LARGE TYPE III BUSES IMPERIAL IMP33003 TRANSIT 0 ADA PARATRANSIT SERVICE OPERATING ASSISTANCE 2012 $5,700 IMPERIAL IMP33004 TRANSIT 0 BRAWLEY DIAL-A-RIDE – OPERATING ASSISTANCE 2012 $1,571 IMPERIAL IMP33021 TRANSIT 0 CALEXICO DIAL-A-RIDE OPERATING ASSISTANCE 2012 $2,890 IMPERIAL 6OM0701- TRANSIT 0 CITY OF EL CENTRO DIAL-A-RIDE (ARC-IMPERIAL 2010 $130 IMP090504 VALLEY) – REPLACEMENT OF PARATRANSIT BUSES WITH 2 LARGE TYPE III BUSES IMPERIAL IMP33006 TRANSIT 0 CITY OF IMPERIAL DIAL-A-RIDE – OPERATING 2012 $845 ASSISTANCE IMPERIAL IMP33000 TRANSIT 0 COUNTY WIDE TRANSIT SYSTEM – OPERATING AND 2012 $50,901 CAPITAL ASSISTANCE IMPERIAL IMP990401 TRANSIT 0 EL CENTRO DIAL-A-RIDE OPERATING ASSISTANCE 2012 $1,546 IMPERIAL IMP051104 TRANSIT 0 IN EL CENTRO; REGIONAL PUBLIC BUS TRANSFER 2011 $4,906 TERMINAL AND PASSENGER WAITING AREA INCLUDING A 24 FOOT HIGH CLOCK TOWER AND OTHER BEAUTIFICATION AT 7TH AND STATE STREETS, WITH MISC OTHER BUS STOP IMPROVEMENTS ON FIXED ROUTE SYSTEM IMPERIAL IMP33023 TRANSIT 0 MED-EXPRESS SHUTTLE OPERATIONAL ASSISTANCE 2012 $1,432 IMPERIAL 6OM0701- TRANSIT 0 OPERATING ASSISTANCE FOR NEW NON-EMERGENCY 2012 $500 IMP100606 MEDICAL TRANSPORT SERVICE IMPERIAL 6OM0701- TRANSIT 0 REPLACE TWO LARGE BUS TYPE III FOR ARC 2011 $143 IMP100603 PARATRANSIT SERVICES IMPERIAL 6TDL04- TRANSIT 0 TRANSIT TRANSFER TERMINAL IN THE CITY OF 2013 $1,432 IMP090106 BRAWLEY *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 129

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL 6TDL04- TRANSIT 0 TRANSIT TRANSFER TERMINAL IN THE CITY OF 2013 $1,217 IMP111101 IMPERIAL IMPERIAL 6OM0701- TRANSIT 0 TWO NEW LARGE BUS TYPE III FOR NEW NON- 2011 $143 IMP100604 EMERGENCY MEDICAL TRANSPORTATION SERVICE IMPERIAL 6OM0701- TRANSIT 0 UPGRADES AND IMPROVEMENTS TO EXISTING BUS 2010 $2,086 IMP070929 TRANSFER TERMINAL AT IMPERIAL VALLEY COLLEGE IMPERIAL 6OM0701- TRANSIT 0 WEST SHORES DIAL-A-RIDE (ARC-IMPERIAL VALLEY) 2010 $60 IMP090503 – REPLACEMENT OF GASOLINE VAN WITH 1 MEDIUM TYPE II BUS IMPERIAL IMP43000 TRANSIT 0 WEST SHORES DIAL-A-RIDE OPERATIONAL 2012 $1,125 ASSISTANCE IMPERIAL 6120008 STATE 0 TBD, STATE ROUTE SR-111 SR-7 FROM SR-111 TO SR-7. WIDEN AND IMPROVE TO 4/6 2035 $1,170,483 HIGHWAY 98 OR JASPER LANES. ON EITHER JASPER ROAD OR SR-98 ROAD IMPERIAL 6120002 STATE 8 I-8 IMPERIAL AVENUE IMPERIAL RECONSTRUCT I-8 INTERCHANGE AT IMPERIAL AVE.: 2020 $39,635 HIGHWAY AVENUE FROM A TWO-LANE TO A FOUR-LANE DIAMOND TYPE OVERCROSSING, REALIGN AND RECONSTRUCT ON AND OFF-RAMPS, AND PROVIDE ACCESS TO IMPERIAL AVE. SOUTH OF I-8. IMPERIAL 6120009 STATE 8 I-8 SR-186 SR-186 AT I-8/SR-186, IMPROVE INTERCHANGE – WIDEN AND 2035 $91,038 HIGHWAY IMPROVE RAMPS IMPERIAL 6OM0701- STATE 8 WIDEN THE OVERCROSSING BRIDGE ON SR-186 OVER 2011 $9,330 IMP00289 HIGHWAY I-8. IMPROVE OFF RAMPS FROM I-8 AND WIDEN SR-186 ADJACENT TO THE CASINO ENTRANCE – NON- CAPACITY ENHANCEMENT PROJECT IMPERIAL IMP0021 STATE 78 BRAWLEY BYPASS – 4 LANE EXPRESSWAY – IN 2012 $227,512 HIGHWAY IMPERIAL COUNTY NEAR BRAWLEY ON ROUTE 78 FROM ROUTE 86 TO 0.6 KM EAST OF HOVLEY ROAD AND ON ROUTE 86 FROM 0.5 KM SOUTH TO 0.1 KM NORTH OF FREDRICKS ROAD IMPERIAL 6120004 STATE 98 SR-98 ALL AMERICAN VV WILLIAMS PHASE 1C – FROM 30.9 TO 32.2 WIDEN FROM 2 TO 4 2020 $58,850 HIGHWAY CANAL LANES IMPERIAL 6120005 STATE 98 SR-98 DOGWOOD ALL AMERICAN PHASE 2 – FROM 30.0 TO 30.9 WIDEN FROM 2 TO 4 2023 $34,656 HIGHWAY CANAL LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 130 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL 6120003 STATE 98 SR-98 OLLIE AVE. ROCKWOOD IN CALEXICO – WIDEN CONVENTIONAL HIGHWAY 2018 $9,781 HIGHWAY PHASE 1A – FROM 32.4 TO 32.6 WIDEN FROM 4 TO 6 LANES IMPERIAL IMP0042A STATE 98 IN AND NEAR CALEXICO FROM 0.6 KM WEST OF SR 2012 $9,000 HIGHWAY 111 EASTERLY TO ALAMO RIVER BRIDGE WIDEN TO 4 LANE HWY (ENV. WORK & DOC. FOR SR98) ENVIRONMENTAL WORKAND DOCUMENTATION FOR SR 98 IMPERIAL 8020B STATE 98 WIDENING SR-98 FROM VV WILLIAMS AVE. TO OLLIE 2014 $9,357 HIGHWAY AVE. AND INTERSECTION IMPROVEMENTS OF SR-98 AND CESAR CHAVEZ FROM 2 TO 4 LANES(PHASE 1B). IMPERIAL 6120010 STATE 111 SR-111 SR-98 I-8 WIDEN AND IMPROVE TO 6 LANE FREEWAY WITH 2030 $997,259 HIGHWAY INTERCHANGES AT HEBER, MCCABE, AND JASPER AND OVERPASS AT CHICK RD. IMPERIAL 6TDL04- STATE 111 CALEXICO BORDER GATEWAY AND 1ST STREET 2018 $2,301 IMP110901 HIGHWAY PROMENADE (IN CALEXICO, ON 1ST STREET, ADJOINING THE PEDESTRIAN AND BICYCLE BORDER CROSSING, FROM ROUTE 111 TO HEFFERNAN AVENUE. PEDESTRIAN AND BICYCLE IMPROVEMENTS.) IMPERIAL 6120007 STATE 115 SR-115 I-8/SR-7 EVAN HEWES CONSTRUCT 4-LANE EXPRESSWAY 2030 $231,816 HIGHWAY INTERCHANGE HIGHWAY/SR-115 JUNCTION IMPERIAL 0505 STATE 186 ANDRADE INTERNATIONAL BORDER CROSSING IN 2013 $2,520 HIGHWAY ANDRADE, AT THE ANDRADE INTERNATIONAL PORT OF ENTRY. CONSTRUCT BICYCLE AND PEDESTRIAN FACILITES IMPERIAL 6OM0701- STATE 999 GROUPED PROJECTS FOR PLANTINGS, LANDSCAPING, 2015 $1,969 IMPL508 HIGHWAY ETC. (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PLANTINGS, LANDSCAPING, ETC.) IMPERIAL 6M04018 STATE 999 IN EL CENTRO ON DOGWOOD RD; RECONTRUCT AND 2012 $33,120 HIGHWAY WIDEN BRIDGE FROM 2 TO 4 LANES; WITH 2 TURN LANES IMPERIAL 6OM0701- STATE 999 NEAR WESTMORLAND; AQUSITION OF 4,000 2011 $445 IMP050904 HIGHWAY UNDEVLOPED ACRES ADJACENT TO SR-86 FOR ENVIRONMENTAL MITIGATION *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 131

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL 6OM0701- STATE 999 PLANNING, PROGRAMMING, AND MONITORING (PPM) 2015 $1,361 IMP100101 HIGHWAY FUNDS TO PAY FOR ELIGIBLE STAFF AND PROGRAM EXPENSES FOR ICTC IMPERIAL 6120011 LOCAL 0 CESAR CHAVEZ 2ND STREET SR-98 WIDEN AND IMPROVE 2018 $13,196 HIGHWAY IMPERIAL 6120001 LOCAL 0 FORRESTER ROAD I-8 SR-78 WIDEN AND IMPROVE TO FOUR-LANE ARTERIAL 2018 $250,578 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 9TH STREET IMPROVEMENTS BETWEEN SLAYTON 2012 $183 IMP120207 HIGHWAY ROAD AND BEALE AVENUE (INSTALLATION OF FILL PAVEMENT, CURB, GUTTER, AND SIDEWALK). IMPERIAL 6TDL04- LOCAL 0 ALAMO RIVER RECREATIONAL TRAIL, PHASE I 2012 $489 IMP100901 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 ASPHALT CONCRETE PAVING OF PITZER FROM 2010 $796 IMP070926 HIGHWAY MCCABE TO CORRELL IMPERIAL 6OM0701- LOCAL 0 ASPHALT REHABILITATION AND RECONSTRUCTION 2011 $895 IMP090101 HIGHWAY OF WESTERN AVENUE FROM STATE HIGHWAY 86 TO NORTHERN CITY LIMITS IMPERIAL IMP080903 LOCAL 0 ASPHALT REHABILITATION OF RIVER DR. 2012 $226 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 ATEN ROAD AND OLD COUNTY ROAD 111 2011 $834 IMP060901 HIGHWAY IMPROVEMENTS, IMPERIAL COUNTY, CA – TCSP#09CA002 IMPERIAL IMP020801 LOCAL 0 BAUGHMAN ROAD RECONSTRUCTION FROM STATE 2011 $1,503 HIGHWAY ROUTE 78/86 TO FORRESTER ROAD; 0.65 MILE OF COUNTY ROAD NEAR WESTMORLAND- HPP 2162 IMPERIAL 6OM0701- LOCAL 0 BUCKLIN PARK – PARKING LOT AND PEDESTRIAN/ 2013 $140 IMP120205 HIGHWAY BIKE PATH PAVEMENT PROJECT (ASPHALT CONCRETE PAVING) IMPERIAL 6OM0701- LOCAL 0 CESAR CHAVEZ BLVD/CALEXICO – WEST PORT OF 2012 $2,850 IMP091001 HIGHWAY ENTRY (POE) CONGESTION IMPROVEMENTS; ROAD SURFACE REHAB, TURN LANES, LIGHTING AND SIDEWALKS IMPERIAL 6TDL04- LOCAL 0 CNG FUELING STATION 2011 $23 IMP070906 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 132 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL IMP050509 LOCAL 0 COLE RD. CORRIDOR IMPROVEMENTS; EXPANSION OF 2012 $1,837 HIGHWAY 2 LANE ROAD INTO 4 LANE PRINCIPAL ARTERIAL (.5 MILES) FROM BOWKER RD EAST TO SR 98 IMPERIAL IMP050905 LOCAL 0 CONSTRUCT NEW SIDEWALKS IN THE CITY OF HEBER- 2011 $610 HIGHWAY (HPP 3548) IMPERIAL IMP050901 LOCAL 0 CONSTRUCT ROAD SURFACE IMPROVEMENTS AND 2011 $1,400 HIGHWAY IMPROVE ROAD SAFETY FROM BRAWLEY WATER PLANT TO HWY 86 TO 9TH STREET TO 18TH STREET, BRAWLEY – (HPP 2176) IMPERIAL 6TDL04- LOCAL 0 CONSTRUCTION OF BICYCLE/PEDESTRIAN PATH 2011 $962 IMP070917 HIGHWAY IMPERIAL 6TDL04- LOCAL 0 DEVELOP BICYCLE PATHS AND PUBLIC PARK SPACE 2011 $4,000 IMP090701 HIGHWAY ADJACENT TO THE NEW RIVER, CALEXICO (HPP TEA-LU PROJECT #3092) IMPERIAL 6OM0701- LOCAL 0 DIESEL EMISSION COMPLIANT 2 AXLE TRUCK 2011 $100 IMP070920 HIGHWAY TRACTOR IMPERIAL 6OM0701- LOCAL 0 DIESEL EMISSION COMPLIANT WATER TRUCK 2011 $134 IMP070919 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 DIESEL VEHICLE RETROFITS 2012 $174 IMP120206 HIGHWAY IMPERIAL IMP050508 LOCAL 0 EVAN HEWES HIGHWAY RESURFACING IMPROVEMENTS 2011 $1,519 HIGHWAY FROM SILSBEE ROAD TO AUSTIN ROAD IMPERIAL IMP070901 LOCAL 0 FOUR HYBRID PASSENGER VEHICLES 2010 $158 HIGHWAY IMPERIAL 6TDL04- LOCAL 0 FOUR HYBRID VEHICLES 2011 $153 IMP070925 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 GROUPED PROJECTS FOR PAVEMENT RESURFACING 2011 $1,520 IMP070924 HIGHWAY AND/OR REHABILITATION IN IMPERIAL COUNTY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 133

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL IMP080901 LOCAL 0 HIGHWAY 111 EAST SIDEWALK IMPROVEMENTS 2012 $425 HIGHWAY PROJECT. SIDEWALK IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION, INCLUDING INSTALLATION OF SIDEWALKS, ADA CURB RETURNS, AND CULVERT BOXES ALONG EAST HWY 111/ SORENSON AVE. BETWEEN DELTA AND DATE STREETS IMPERIAL 6OM0701- LOCAL 0 I-8 ENTRANCE AND EXIT RAMPS AT SR86. 2011 $723 IMP071203 HIGHWAY LANDSCAPING BEAUTIFICATION IMPERIAL IMP080905 LOCAL 0 IMPERIAL AVENUE OVERLAY WITH CURB/GUTTER/ 2012 $761 HIGHWAY SIDEWALK. IMPERIAL 6OM0701- LOCAL 0 IMPROVE BRIDGE 58-7 ON SR115 THAT CROSSES 2013 $1,000 IMP090501 HIGHWAY THE ALAMO RIVER IN HOLTVILLE AND ALSO PROJECT DESIGN AND ENVIRONMENTAL ANALYSIS OF A NEW BRIDGE OVER THE SAME RIVER IMPERIAL IMP050506 LOCAL 0 IMPROVEMENTS AT AND BETWEEN INTERSECTIONS 2012 $1,048 HIGHWAY AT: SR 115 AND 4TH, SR 115 AND PALM, 4TH AND PALM AND 4TH AND ORCHARD/CEDAR (BIKE LANE AND PEDESTRIAN IMPROVEMENTS) IMPERIAL 6TDL04- LOCAL 0 IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD 2013 $1,310 IMP071202 HIGHWAY AVENUE, AROUND PARK, ENDING AT WILLARD AVENUE. BICYCLE AND PEDESTRIAN IMPROVEMENTS AND LANDSCAPING IMPERIAL 6OM0701- LOCAL 0 IN IMPERIAL; RECONSTRUCTION OF PASSENGER 2010 $377 IMP050903 HIGHWAY LOADING AREAS AND ROAD ACCESS IMPROVEMENTS TO THE EXPO IMPERIAL IMP051101 LOCAL 0 IN WESTMORLAND- SOUTH CENTER STREET; 2011 $800 HIGHWAY ROADWAY SURFACE IMPROVEMENTS, STREET LIGHTING AND STORM DRAIN IMPROVEMENTS FROM BAUGHMAN RD. TO SR 78/86 IMPERIAL 6TDL04- LOCAL 0 INSTALLATION OF BICYCLE RACKS AT VARIOUS 2010 $11 IMP070910 HIGHWAY LOCATIONS IMPERIAL IMP050902 LOCAL 0 KEYSTONE RD NEAR IMPERIAL, RECONSTRUCTION 2011 $2,500 HIGHWAY OF 6 MILES TO CREATE TRUCK LANE FROM SR 111 TO AUSTIN RD

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 134 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL IMP051201 LOCAL 0 NEAR EL CENTRO; DOGWOOD CORRIDOR – WIDEN 2012 $3,024 HIGHWAY & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ' NORTH OF MCCABE & INSTALL 2 SIGNALS ROW AND CON IMPERIAL 0520A LOCAL 0 NEAR EL CENTRO; DOGWOOD CORRIDOR – WIDEN 2012 $276 HIGHWAY & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ' NORTH OF MCCABE & INSTALL 2 SIGNALS AB 3090 REIMBURSMENT FOR 11-IMP0520 IMPERIAL 6OM0701- LOCAL 0 NEAR IMPERIAL – WORTHINGTON RD. INTERSECTION 2011 $732 IMP070602 HIGHWAY AT MCCONNEL RD; NEW LEFT TURN LANE AT NONSIGNALIZED INTERSECTION IMPERIAL 6OM0701- LOCAL 0 NEAR WESTMORLAND – FORRESTER RD. 2011 $992 IMP070601 HIGHWAY INTERSECTION AT CADY RD.: NEW TURNING LANES AND TRAFFIC CHANNELIZATION AT NONSIGNALIZED INTERSECTION IMPERIAL 6TDL04- LOCAL 0 NEW CNG FUELING STATION 2011 $23 IMP070913 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 NORTH CENTER STREET PAVEMENT REHABILITATION 2012 $339 IMP080907 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 PAVING OF .75 MILE SECTION OF DIRT ROAD ON P 2012 $957 IMP070928 HIGHWAY STREET IMPERIAL 6OM0701- LOCAL 0 PAVING OF 9TH STREET BETWEEN MALAN STREET 2011 $1,267 IMP070923 HIGHWAY AND WILDCAT DRIVE IMPERIAL 6OM0701- LOCAL 0 PAVING OF WALKING/JOGGING PATHS A BUCKLIN PARK 2010 $322 IMP070909 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 PRELIMINARY DESIGN OF TRAFFIC BRIDGE ON 8TH 2010 $120 IMP020802 HIGHWAY STREET OVER I-8 IMPERIAL 6OM0701- LOCAL 0 PURCHASE NEW CNG STREET SWEEPER 2012 $314 IMP120201 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 PURCHASE NEW CNG STREET SWEEPER 2012 $314 IMP120202 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 PURCHASE NEW CNG STREET SWEEPER 2013 $314 IMP120209 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 135

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL 6OM0701- LOCAL 0 PURCHASE OF (1) 5% BIO-DIESEL TRUCK (TO REPLACE 2012 $72 IMP120203 HIGHWAY OLDER MODEL NON-COMPLIANT DEISEL TRUCK) IMPERIAL 6OM0701- LOCAL 0 PURCHASE OF (1) HYBRID VEHICLE 2012 $54 IMP120204 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 PURCHASE OF NEW CNG STREET SWEEPER 2012 $314 IMP120208 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 REHABILITATION ALONG NORTH SIDE OF 9TH STREET 2010 $332 IMP090403 HIGHWAY BETWEEN CEDER AVENUE AND HOLT AVENUE IMPERIAL IMP050504 LOCAL 0 REHABILITATION AND OVERLAY OF IMPERIAL AVE. (.5 2011 $563 HIGHWAY MILE) PHASE III FROM ORANGE TO ADAMS AVE. IMPERIAL 6OM0701- LOCAL 0 REHABILITATION AND RECONSTRUCTION OF EXISTING 2011 $1,156 IMP090105 HIGHWAY PAVEMENT ON BARIONI ROAD FROM B STREET TO P STREET IMPERIAL 6OM0701- LOCAL 0 REHABILITATION OF ADAMS AVENUE FROM IMPERIAL 2010 $700 IMP090402 HIGHWAY AVENUE TO LA BRUCHERIE AVENUE. CURB/GUTTER/ SIDEWALK IMPERIAL IMP050507 LOCAL 0 REHABILITATION OF ATEN RD. (2.25 MILES) FROM 2011 $1,866 HIGHWAY VILORE WAY TO CROSS RD AND SIGNALIZATION OF ONE INTERSECTION; PHASE ONE IN FY2007/08 OF SIGNALIZATION AND PHASE TWO IN FY2008/09 OF REHABILITATION IMPERIAL IMP050502 LOCAL 0 REMOVAL AND RECONSTRUCTION OF EXISTING 2 2011 $2,472 HIGHWAY LANE DOGWOOD RD (1.2 MILES) FROM I-8 BRIDGE TO STATE STREET ST – PHASE I IMPERIAL 6OM0701- LOCAL 0 RESURFACING DREW ROAD FROM ROSS ROAD TO 2011 $328 IMP090406 HIGHWAY EVEN HEWES HIGHWAY IN IMPERIAL COUNTY(0.4 MILES) IMPERIAL IMP080904 LOCAL 0 SEISMIC BRIDGE EVALUATION STUDY 2012 $226 HIGHWAY IMPERIAL 6TDL04- LOCAL 0 SIGNALIZATION OF DRIVEWAY AT IMPERIAL VALLEY 2011 $178 IMP100607 HIGHWAY COLLEGE ON ATEN ROAD IMPERIAL IMP080906 LOCAL 0 STATE ROUTE 115 AND 5TH STREET IMPROVEMENT 2012 $339 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 136 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* IMPERIAL 6OM0701- LOCAL 0 STREET IMPROVEMENTS OF REHABILITATION AND 2011 $347 IMP090104 HIGHWAY RECONSTRUCTION ALONG WEST SIDE OF HOLT AVENUE BETWEEN NINTH AND TENTH STREETS IMPERIAL 6OM0701- LOCAL 0 STREET IMPROVEMENTS OF REHABILITATION AND 2011 $895 IMP090103 HIGHWAY RECONSTRUCTION OF NORTH AND SOUTH PORTION OF MAIN STREET BETWEEN HIGHWAY 111/115 AND LYERLY ROAD IMPERIAL 6OM0701- LOCAL 0 STREET REHABILITATION OF EMERSON AVENUE FROM 2011 $1,200 IMP090102 HIGHWAY HIGHWAY 98 TO THIRD STREET. IMPERIAL 6OM0701- LOCAL 0 TRAFFIC FLOW IMPROVEMENTS; TRAFFIC SIGNAL 2011 $568 IMP070302 HIGHWAY SYNCHRONIZATION IMPERIAL 6TDL04- LOCAL 0 TWO HYBRID PASSENGER VEHICLES 2010 $58 IMP070902 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 TWO HYBRID VEHICLES 2011 $79 IMP100602 HIGHWAY IMPERIAL 6OM0701- LOCAL 0 WALNUT AVENUE REHABILITATION BETWEEN 5TH 2010 $441 IMP090404 HIGHWAY STREET (SR 115) AND FOURTH STREET LOS ANGELES 1TL104 TRANSIT 0 BUS CAPITAL COUNTYWIDE COUNTYWIDE BUS SYSTEM IMPROVEMENT – METRO 2035 $8,433,800 FLEET LOS ANGELES 1TR1010 TRANSIT 0 BUS CAPITAL COUNTYWIDE COUNTYWIDE BUS SYSTEM IMPROVEMENT–MUNI 2035 $6,683,200 FLEET LOS ANGELES 1TR1012 TRANSIT 0 CALIFORNIA HIGH- CALIFORNIA HIGH-SPEED RAIL PHASE 1 – ENV/PE 2011 $80,000 SPEED RAIL LOS ANGELES 1120006 TRANSIT 0 EXPAND RAIL AZUSA COUNTY LINE METRO GOLD LINE FOOTHILL EXTENSION: AZUSA TO 2035 $1,000,000 COUNTY LINE LOS ANGELES 1120003 TRANSIT 0 EXPAND RAIL CRENSHAW METRO BLUE SLAUSON LIGHT RAIL: CRENSHAW CORRIDOR TO 2035 $554,000 CORRIDOR LINE SLAUSON METRO BLUE LINE SLAUSON STATION STATION LOS ANGELES 1120004 TRANSIT 0 EXPAND RAIL METRO RED LINE BURBANK BOB METRO RED LINE EXTENSION: METRO RED LINE 2035 $940,000 STATION NORTH HOPE AIRPORT STATION NORTH HOLLYWOOD TO BURBANK BOB HOPE HOLLYWOOD AIRPORT LOS ANGELES 1120002 TRANSIT 0 EXPAND RAIL WILSHIRE/VERMONT EXPOSITION/ VERMONT SHORT CORRIDOR: WILSHIRE/VERMONT TO 2035 $1,180,000 VERMONT EXPOSITION/VERMONT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 137

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1120005 TRANSIT 0 EXPAND RAIL METRO GREEN METRO GREEN LINE EXTENSION: METRO GREEN 2035 $500,000 LINE NORWALK LINE NORWALK STATION TO NORWALK METROLINK STATION STATION LOS ANGELES 1TR1001 TRANSIT 0 GREEN LINE SOUTH MARINE AVENUE PROPOSED GREEN LINE EXTENSION ALONG HARBOR SUBDIVISION 2035 $555,000 BAY EXTENSION STATION REDONDO TO THE PROPOSED REDONDO BEACH TRANSIT BEACH TRANSIT CENTER CENTER LOS ANGELES 1TR1009 TRANSIT 0 LAKEWOOD METRO GREEN LINE METRO GREEN CONSTRUCT TRANSIT CENTER AND PARK-AND-RIDE 2018 $5,100 STATION TRANSIT LAKEWOOD STATION LINE LAKEWOOD LOT FOR CONNECTION TO THE METRO GREEN LINE CENTER AND STATION AT LAKEWOOD STATION. A TOTAL OF 230 PARKING PARK-AND-RIDE SPACES ARE PROPOSED. LOS ANGELES 1TR0101 TRANSIT 0 METRO RAIL GREEN MARIPOSA & NASH CENTURY & PEOPLE MOVER OR LIGHT RAIL 2030 $330,000 LINE EXTENSION SEPULVEDA-LAX TERMINAL LOS ANGELES 1TL0703 TRANSIT 0 METRO RAIL COUNTYWIDE RAIL CAPITAL PROJECTS 2035 $19,151,000 TRANSIT CAPITAL LOS ANGELES 1TR1019 TRANSIT 0 METRO RAIL COUNTYWIDE RAIL SYSTEM IMPROVEMENTS (CAPITAL COSTS ONLY) 2035 $2,365,700 TRANSIT CAPITAL LOS ANGELES 1TL204 TRANSIT 0 METRO RAIL COUNTYWIDE TRANSIT CONTINGENCY/NEW RAIL YARDS/ 2030 $592,700 TRANSIT CAPITAL ADDITIONAL RAIL CARS (CAPITAL COSTS ONLY) LOS ANGELES 1TR1015 TRANSIT 0 METROLINK COUNTYWIDE METROLINK CAPITAL SUBSIDY (DOES NOT INCLUDE 2035 $991,600 COMMUTER RAIL METROLINK FARES AND OTHER NON-METRO FUNDS) LOS ANGELES 1CR04 TRANSIT 0 METROLINK COUNTYWIDE METROLINK OPERATIONS SUBSIDY (DOES NOT 2035 $1,916,700 COMMUTER RAIL INCLUDE METROLINK FARES AND OTHER NON-METRO FUNDS) LOS ANGELES 1TR1003 TRANSIT 0 PURPLE/RED LINE CENTURY CITY WESTWOOD METRO WESTSIDE SUBWAY EXTENSION SEGMENT 3 2035 $1,615,000 (CENTURY CITY TO WESTWOOD) LOS ANGELES 1TR1002 TRANSIT 0 PURPLE/RED LINE LA CIENEGA CENTURY CITY METRO WESTSIDE SUBWAY EXTENSION SEGMENT 2 2030 $2,450,000 (LA CIENEGA TO CENTURY CITY) LOS ANGELES 1O1003 TRANSIT 0 RAIL RAIL REHABILITATION AND REPLACEMENT (CAPITAL 2035 $6,538,500 REHABILITATION COSTS ONLY) AND REPLACEMENT (CAPITAL COSTS ONLY)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 138 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1TR0705 TRANSIT 0 SAN FERNANDO CANOGA STATION CHATSWORTH SAN FERNANDO VALLEY NORTH-SOUTH METRO 2014 $221,000 VALLEY NORTH- (ORANGE LINE) METROLINK ORANGE LINE CANOGA EXTENSION SOUTH METRO STATION ORANGE LINE LOS ANGELES 1TR0706 TRANSIT 0 SFV N/S BRT SAN FERNANDO VALLEY NORTH/SOUTH BRT PHASE II 2018 $157,464 PHASE II (METRO RAPID SERVICE IMPROVEMENTS ON MAJOR NORTH/SOUTH ARTERIALS IN SFV) LOS ANGELES 1TR1011 TRANSIT 0 WEST SANTA ANA LA/OC COUNTY LINE TOWARD WEST SANTA ANA BRANCH ROW CORRIDOR – 2030 $649,000 BRANCH ROW DOWNTOWN LA PROVIDES FOR THE DEVELOPMENT OF A GRADE- CORRIDOR SEPARATED TRANSIT CORRIDOR – PHASE FROM LA COUNTY LINE TOWARD DOWNTOWN LA LOS ANGELES 1TR1014 TRANSIT 0 ACCESS SERVICES INCORPORATED (PARATRANSIT) – 2035 $4,210,300 METRO SUBSIDY LOS ANGELES 1OM0702- TRANSIT 0 ACQUISITION AND INSTALLATION OF TRANSIT 2012 $644 LA0D298 AMENITIES LOS ANGELES LA0D300 TRANSIT 0 ACQUISITION OF TELEPHONE UPGRADES FOR TRANSIT 2011 $60 DIVISION. LOS ANGELES LA970501 TRANSIT 0 ANNUAL EXPENDITURES INCLUDING SERVICE 2015 $277,737 PROVIDER CONTRACTS & CAPITAL EXPENSES FOR COMPLEMENTARY ADA PARATRANSIT IN LOS ANGELES COUNTY LOS ANGELES LA52603 TRANSIT 0 ANNUAL TIRE PURCHASE 2012 $275 LOS ANGELES LA0C8232 TRANSIT 0 ANTELOPE VALLEY LINE CHANGES AT SANTA 2018 $3,693 CLARITA-ALIGNMENT CHANGES WILL PERMIT HIGHER SPEEDS OF OPERATION AND REDUCE MAINTENANCE COST- (SCRRA). (PPNO 3202). LOS ANGELES LA0D299 TRANSIT 0 AQUISITION OF (7) ALTER FUEL TRANSIT/ 2012 $1,833 PARATRANSIT VEHICLES FOR REPLACEMENT AND (1) FOR EXPANSION NOT TO EXCEED 35' INCLUDING AUTOMATED ANNOUNCING SYSTEMS IN 3 FIXED- ROUTE BUSES SAFETEA-LU TRANSIT DEMO ID #251 LOS ANGELES LA0C64 TRANSIT 0 ASSOCIATED CAPITAL MAINTENANCE (ENGINES, 2012 $25 TRANSMISSIONS, PARTICULATE TRAPS, KITS, ETC) (ONGOING)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 139

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D345 TRANSIT 0 ASSOCIATED CAPITAL MAINTENANCE FOR REVENUE 2014 $38 VEHICLE FLEET (ONGOING) LOS ANGELES LA55205 TRANSIT 0 ASSOCIATED CAPITAL MAINTENANCE ITEMS 2011 $7,361 (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR LOS ANGELES LAF3434 TRANSIT 0 AZUSA INTERMODAL TRANSIT CENTER. CONSTRUCT 2018 $7,832 REGIONAL AZUSA INTERMODAL TRANSIT CENTER TO ACCOMMODATE EXISTING AND FUTURE PARKING DEMAND AND SUPPORT EFFECTIVE TRANSIT USE. PARK N RIDE, THE STRUCTURE WOULD BE LOCATED ON THE SOUTHEAST QUADRANT OF ALAMEDA AVE./ SANTA FE – 511 PARKING SPACES. LOS ANGELES 1NL04-LAF1654 TRANSIT 0 BALDWIN PARK METROLINK PEDESTRIAN 2015 $1,810 OVERCROSSING. CONSTRUCT A PEDESTRIAN OVERCROSSING OVER BOGART AVE AND THE METROLINK LINE TO LINK THE STATION WITH VITAL BUS TRANSFER POINTS AND TO PROVIDE ACCESS TO PARKING OVERFLOW AREAS. LOS ANGELES LA0D342 TRANSIT 0 BEAUDRY AVE TERMINAL STREETSCAPE 2008 $509 LOS ANGELES LA0D320 TRANSIT 0 BETWEEN NORWALK AND LA MIRADA: CONSTRUCT 2010 $102,661 5.6 MILES OF NEW THIRD MAIN TRACK. PPNO# 2002 EA# R889SA TCRP# 35.2 LOS ANGELES 1TR08D08 TRANSIT 0 BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, 2016 $992,884 EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, ITS, ETC. INCLUDES $5.3 MIL FOR LACRD IMPROVEMENTS.(INCLUDES RTP ID 1TR08D08 & 1TR08D07A & 1TR08D07B) LOS ANGELES LA57101 TRANSIT 0 BUS FACILITY IMPROVEMENTS 2010 $81,124 LOS ANGELES NULL-LA01B114 TRANSIT 0 BUS REHABILITATION – TWO (2) 40' BUSES (FY03) – 2008 $358 DIESEL FUEL.BUS REHAB. – ELEVEN (11) 40' BUSES – DIESEL FUEL (FY04) BUS REHAB. –TEN (10) 40' BUSES–DIESEL FUEL (FY05) LOS ANGELES LA57110 TRANSIT 0 BUS REPLACEMENT: FIVE ALTERNATIVE FUELED 2010 $11,500 BUSES (20 OR 30 FT WITH ASSOCIATED INFRASTRUCTURE) AND TEN ALTERNATIVE FUELED BUSES (40 FT)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 140 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D125 TRANSIT 0 BUS STOP AMENITIES (BENCHES AND SHELTERS) 2014 $2,669 PROJECT (ONGOING). PROJECT USING $162 OF TOLL CREDITS/TDC'S TO MATCH 5307 FUNDS IN 11/12 LOS ANGELES LA963526 TRANSIT 0 BUS STOP ENHANCEMENT/IMPROVEMENT 2011 $2,647 LOS ANGELES 1NL04-LA0G428 TRANSIT 0 BUS STOP IMPROVEMENTS 2011 $19 LOS ANGELES NULL-LA0D347 TRANSIT 0 BUS STOP IMPROVEMENTS 2008 $32 LOS ANGELES LA0C37 TRANSIT 0 BUS STOP IMPROVEMENTS CONSTRUCTION OF 2010 $686 PASSENGER SHELTERS AND INFORMATION KIOSKS LOS ANGELES LA01B112 TRANSIT 0 BUS SUPPORT EQUIPMENT (ENGINES AND 2011 $1,200 TRANSMISSIONS) LOS ANGELES LA01B111 TRANSIT 0 BUS SYSTEM – PREVENTIVE MAINTENANCE. THIS 2012 $18,098 PROJECT WILL USE $450 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE IN FY12. LOS ANGELES 1OM0702- TRANSIT 0 BUS SYSTEM OPERATING EQUIPMENT – SEAT 2011 $3,750 LA0B0825 REPLACEMENT, SPRAY BOOTH, WASH RACKS & WHEEL POLISHERS. LOS ANGELES 1TR1022 TRANSIT 0 CALL FOR PROJECTS TRANSIT CAPITAL MODE 2030 $394,900 LOS ANGELES LAE0443 TRANSIT 0 CAPITAL IMPROVEMENTS TO SUPPORT AND ENHANCE 2010 $340 THE CAL STATE UNIVERSITY NORTHRIDGE TRAM SYSTEM LOS ANGELES LA0D43 TRANSIT 0 CAPITALIZATION OF PREVENTIVE MAINTENANCE 2013 $3,980 (ONGOING). LOS ANGELES LA0D297 TRANSIT 0 CAPITALIZED COST OF CONTRACTING – BUS LEASE. 2011 $1,000 NON-EXPANSION LOS ANGELES LA52101 TRANSIT 0 CERTIFICATES OF PARTICIPATION (COP) HAVE BEEN 2016 $6,480 ISSUED FOR THE CULVER CITY TRANSPORTATION FACILITY. PAYMENTS WILL BE MADE BI-ANNUALLY THROUGH JANUARY 2016. LOS ANGELES LA0C8380 TRANSIT 0 CHINATOWN/COLLEGE STREET GOLD LINE STATION 2012 $18,190 – INTERMODEL TRANS. CENTER ENHANCE MENT ( PEDESTRIAN WALKWAY BRIDGE, BUS STATION, AND A BIKE STATION)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 141

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF1442 TRANSIT 0 COMMUTER EXPRESS FLEET UPGRADE. FUND 10 OF 2014 $4,917 REQUESTED 85 CNG BUSES TO REPLACE OLD DIESEL BUSES. LOS ANGELES LA0D362 TRANSIT 0 COMPREHENSIVE OPERATIONAL ANALYSIS TRANSIT 2013 $415 PLANNING LOS ANGELES LA0C8223 TRANSIT 0 COMPTON MLK TRANSIT CENTER EXPANSION AND 2011 $4,934 MULTI-MODAL/WILL ALLOW THE TRANSIT SYSTEM TO REDUCE OPERATING COST. LOS ANGELES LAE0076 TRANSIT 0 CONSTRUCT ADD'L VEHICLE PARKING (200 TO 400 2014 $2,085 SPACES), BICYCLE PARKING LOT AND PEDESTRIAN REST AREA AT THE TRANSIT CENTER. SAFTEA-LU 76, E2009-BUSP-060 (PAGE 20059 IN FTA 2009 EARMARKS) LOS ANGELES LA0D127 TRANSIT 0 CONSTRUCT CNG FUELING STATION ON EXISTING 2010 $3,085 FACILITY LOS ANGELES LAE0396 TRANSIT 0 CONSTRUCTION OF EMPIRE AREA TRANSIT CENTER 2011 $1,723 NEAR BURBANK AIRPORT -UPGRADE EXIST – REG,L TRANSIT & LAYOVER FACILITY ADJACENT TO THE BURBANK-GLENDALE-PASADENA AIRPORT. WILL FACILITATE TRANSFER OF PASSENGERS TO & FROM MANY GROUND TRANS. (PE ONLY)SAFTEA-LU 396, E-2009-BUSP-063. LOS ANGELES 1TDL04- TRANSIT 0 CONSTRUCTION OF TRANSIT CENTER AT THE 2012 $325 LA0G354 COMMUNITY REC FACILITY LOCATED AT THE TAYLOR RANCH PARK AND RIDE FACILITY, 737 NORTH MONTEBELLO BOULEVARD, MONTEBELLO. LOS ANGELES LA0D198 TRANSIT 0 CRENSHAW/LAX TRANSIT CORRIDOR ($20 MILLION IN 2018 $1,733,188 FY10/11 IS FOR USDOT’S TIFIA OFFICE TO SUBSIDIZE ITS COSTS FOR PROCESSING THE TIFIA LOAN OF $545.9 MILLION, THEREFORE, NOT PART OF THE TOTAL PROJECT COST. LOS ANGELES LAF1455 TRANSIT 0 CROSS-TOWN TRANSIT CONNECTOR AND SERVICE 2018 $811 EXPANSION. FUNDS TO ACQUIRE TWO (2) CNG BUSES TO IMPLEMENT NEW LOCAL TRANSIT SERVICE BETWEEN NORTH HOLLYWOOD RED LINE STATION AND DOWNTOWN BURBANK.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 142 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA52100 TRANSIT 0 CULVER CITYBUS OPPERATION ASSISTANCE. 2012 $20,190 LOS ANGELES LAE0388A TRANSIT 0 DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN 2010 $263 LINKAGES BETWEEN LOS ANGELES MISSION COLLEGE AND PUBLIC TRANSIT SERVICES TO INCLUDE LIGHTING, LANDSCAPIND, AND PASSENGER AMENITIES LOS ANGELES LAE0195 TRANSIT 0 DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN 2014 $4,049 LINKAGES BETWEEN LOS ANGELES PIERCE COLLEGE AND MTA'S RAPID BUS TRANSIT STOPS TO INCLUDE PASSENGER AMENITIES, 2007 CFP # F1658. (DEMO ID 195, E2009-BUSP-181) LOS ANGELES 1TR0704- TRANSIT 0 DESIGN AND CONSTRUCTION OF PEDESTRIAN AND 2020 $30,000 LA0G635 TRANSIT ENHANCEMENTS ALONG THE PUBLIC RIGHT-OF-WAY OF THE METRO GOLD LINE EASTSIDE EXTENSION TO SURROUNDING NEIGHBORHOOD. LOS ANGELES LA973503 TRANSIT 0 DOWNTOWN TRANSIT MALL ENHANCEMENTS; 2015 $2,261 REMODEL EXISTING SPACE TO OPEN A TRANSIT CUSTOMER SERVICE CENTER & EXTENSION ON THE TRANSIT CUSTOMER CENTER LEASE. LOS ANGELES 1NL04-LAF1511 TRANSIT 0 EASTSIDE LIGHT RAIL BIKE INTERFACE PROJECT. 2014 $1,176 PROJECT INCLUDES DESIGN AND CONSTRUCTION OF BIKE ROUTES WITH APPROPRIATE SIGNAGE AND STRIPING TO ACCESS METRO GOLD LINE STATIONS. LOS ANGELES 1TR0704- TRANSIT 0 EASTSIDE TRANSIT CORRIDOR PHASE 2 – METRO 2035 $2,490,000 LA0G626 GOLD LINE EASTSIDE EXTENSION FROM ITS EXISTING TERMINUS AT ATLANTIC STATION IN EAST LOS ANGELES FARTHER EAST LOS ANGELES LA973010 TRANSIT 0 ENGINE REBUILDS FOR SERVICE FLEET 2011 $240 LOS ANGELES 1TDL04- TRANSIT 0 EXPANSION AND IMPROVEMENT TO EXISTING 2012 $360 LA0G270 TRANSIT CENTER IN THE CITY OF PALMDALE. E2009-BUSP-137. LOS ANGELES LA0F021 TRANSIT 0 EXPOSITION LIGHT RAIL TRANSIT SYSTEM PHASE II – 2018 $1,317,500 FROM CULVER CITY TO SANTA MONICA LOS ANGELES 1OM0702- TRANSIT 0 FACILITY IMPROVEMENTS – POMONA, ARCADIA, 2011 $8,450 LA0D12 ADMIN. OFFICE-SEISMIC RETROFIT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 143

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE0212 TRANSIT 0 FEASIBILITY STUDY – OF DOWNTOWN STREETCAR 2011 $1,002 PROJECT LOS ANGELES LA0D389 TRANSIT 0 FEDERAL GRANT WILL BE USED TO PURCHASE TWO 2008 $146 (2) PARATRANSIT VEHICLES FOR THE CITY'S DIAL-A- RIDE SERVICE USED BY ELDERLY AND HANDICAPPED RESIDENTS LOS ANGELES 1OM0702- TRANSIT 0 FEDERAL OPERATING ASSISTANCE (L/P UZA. PROJECT 2012 $12,134 LA0G012 USING $1,103 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) FOR MATCH IN FY11 IN CON AND $1,103 FOR A MATCH IN FY12. LOS ANGELES LA52600 TRANSIT 0 FY 2010/11 ESTIMATED OPERATING ASSISTANCE – 2011 $14,198 TRANSIT OPERATIONS LOS ANGELES 1OM0701 TRANSIT 0 GOLD LINE – EASTSIDE EXTENSION OPERATING 2014 $52,500 ASSISTANCE LOS ANGELES LA29212XY- TRANSIT 0 GOLD LINE FOOTHILL LRT EXTENSION – PASADENA 2018 $847,000 LA0G558 TO AZUSA LOS ANGELES LA0D29 TRANSIT 0 HEART OF THE CITY BUS TRANSFER STATION 2014 $9,378 AMENITIES – CONSTRUCTION IN CITY REDEVELOPMENT AREA – (SERVICE BY 5 LACMTA LINES, 2 TORRANCE LINES & 1 LADOT COMMUTER EXPRESS LINE). LOS ANGELES 1NL04-LA0G671 TRANSIT 0 HISTORIC FILIPINOTOWN BUS SECURITY LIGHTS, LOS 2011 $79 ANGELES LOS ANGELES LA0C53 TRANSIT 0 HOLLYWOOD INTERMODAL TRANSPORTATION AND 2020 $41,000 PUBLIC PARKING CENTER ON HAWTHORNE AVE. BETWEEN HIGHLAND AVENUE AND NORTH ORANGE DRIVE (EXIST 500 SP PARK STRUCTURE).TCRP#49.2 LOS ANGELES LA0D95 TRANSIT 0 IMPLEMENTATION OF UNIVERSAL FARE SYSTEM 2008 $2,893 PROJECT AT LADOT PREVIOUSLY PART OF LAOD07. LOS ANGELES LA990764 TRANSIT 0 JOB ACCESS & REVERSE COMMUTER PROGRAM 2016 $175,990 ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123 (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH TO SECTION 5316 FEDERAL FUNDS) TOLL CREDIT IN FY11/12 IN CON FOR $21,592.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 144 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8114 TRANSIT 0 LA CNTY RIDESHARE SERVICES; PROVIDE COMMUTE 2016 $82,560 INFO, EMPLOYER ASSISTANCE AND INCENTIVE PROGRAMS THROUGH CORE & EMPLOYER RIDESHARE SERVICES & MTA INCENTIVE PROGRAMS. PPNO 9003 LOS ANGELES LA0G142 TRANSIT 0 LACRD – 12 BUSES FOR THE I-10 EL MONTE BUSWAY. 2012 $8,500 HOT LANE. (RTP# 1TR08D08 & 1TR08D07A) LOS ANGELES 1TR204- TRANSIT 0 LACRD – 4 EXPANSION BUSES FOR THE I-110 HARBOR 2010 $2,800 LA0G145 TRANSITWAY HOT LANE(TORRANCE TRANSIT). (RTP# 1TR204) LOS ANGELES 1OM08D01 TRANSIT 0 LACRD – DIVISION 13 (FORMERLY NAMED UNION 2014 $85,500 DIVISION) NEW BUS OPERATIONS AND MAINTENANCE FACILITY (RTP ID 1OM08D01 & 1TR08D07A & 1HL08D03 FOR HOT LACRD PROJ). PROJECT AND SCOPE ARE FROM AMENDMENT 2008 AMENDMENT #53. LOS ANGELES 1TR08D7A TRANSIT 0 LACRD – EL MONTE TRANSIT CENTER IMPROVEMENTS 2012 $76,909 AND EL MONTE BUSWAY IMPROVEMENTS, INCLUDING BIKE LOCKERS, TICKET VENDING MACHINES AT EL MONTE BUSWAY STATIONS AND UP TO 30 BUS BAYS; EL MONTE BUSWAY TERMINUS (@ UNION STATION) IMPROVEMENTS INCLUDING PASSENGER STATION REHABILITATION AND UPGRADES AND IMPROVED PEDESTRIAN CONNECTION TO PATASOURAS PLAZA/ UNION STATION. LOS ANGELES 1TR08D7B- TRANSIT 0 LACRD – I-10 AND I-110 EXPRESS LANES FORMATION 2011 $4,201 LA0G150 OF NEW VANPOOLS AND ENHANCED TRANSIT SERVICE INCLUDING SECURITY, MARKETING AND MAINTENANCE.(RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02). (SPLIT WITH LA0G819) LOS ANGELES 1OM08D02 TRANSIT 0 LACRD – I-10 HOT LANE OPERATIONS – NEW TRANSIT 2011 $3,634 SERVICES.(RTP# 1OM08D02). LOS ANGELES 1TR204- TRANSIT 0 LACRD – I-110 HOT LANE OPERATIONS – NEW 2011 $1,200 LA0G148 TRANSIT SERVICES. (RTP# 1TR204) LOS ANGELES 1TR204- TRANSIT 0 LACRD – I-110 HOT LANE OPERATIONS – NEW 2012 $600 LA0G147 TRANSIT SERVICES.(CITY OF GARDENA)(RTP# 1TR204)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 145

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1TR08D07A- TRANSIT 0 LACRD – PLATFORMS AND PARKING IMPROVEMENTS 2010 $5,600 LA0G153 AT THE METROLINK POMONA STATION. ADDITION OF 100 PARKING SPACES AND EXTENSION OF PLATFORM. (G# CA-37-X052-00) LOS ANGELES LAE0127 TRANSIT 0 LAE0127B: PURCHASE OF EQUIPMENT TO SUPPORT 2013 $744 CNG VEHICLES AND MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION LOS ANGELES LA0F063 TRANSIT 0 LA-FULLERTON TRIPLE TRACK & GRADE SEP 2015 $90,000 (ROSECRANS) (IN SANTA FE SPRINGS, LA ON THE BNSF LINE. CONSTRUCT TRIPLE TRACK & GRADE SEPARATION AT ROSECRANS AND MARQUARDT AVE. (PPNO 2002A) & ELIMINATE HAZARDS AT RAILROAD GRADE CROSSING. LOS ANGELES LA0D282 TRANSIT 0 LANDSCAPE,STREETSCAPE & PASSENGER AMENITY 2012 $9,564 IMPRVMENTS AT & ADJACENT LOS ANGELES CITY COLLEGE TO IMPROVE PEDESTRAN MOBILITY & ACCESSIBILITY TO EXSTG MULTIMDAL CONN. (SAFETEA-LU # 223, 2007 CFP #F1641) LOS ANGELES LA000665 TRANSIT 0 LINE #8 – OPERATING SUBSIDY 2009 $5,046 LOS ANGELES LA0C8237 TRANSIT 0 LONG BEACH PARK AND RIDE FACILITY AT 4TH AND 2014 $3,902 PACIFIC, SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 100 DEDICATED, TRANSIT ORIENTED SPACES IN MIXED USE DEVELOPMENT LOS ANGELES LAE0332 TRANSIT 0 LONG BEACH PARK AND RIDE FACILITY AT 3RD 2012 $1,002 STREET AND PACIFIC AVE SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 300 TO 500 SPACE AND INCLUDE RESIDENTIAL AND COMMERCIAL DEVELOPMENT LOS ANGELES 1NL04-LAF1657 TRANSIT 0 LOS ANGELES VALLEY COLLEGE (LAVC) BUS STATION 2013 $2,959 EXTENSION. PROJECT WILL EXTEND THE ORANGE LINE STATION AT THE LA VALLEY COLLEGE BY PROVIDING A DIRECT PEDESTRIAN CONNECTION FROM THE STATION TO A NEW PEDESTRIAN ENTRANCE TO LAVC.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 146 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA974165 TRANSIT 0 MACARTHUR PARK STATION IMPROVEMENTS 2011 $1,931 INCLUDE DESIGN AND CONSTRUCTION OF A PLAZA TO ACCOMODATE PUBLIC ACCESS (PEDESTRIAN ENTRANCES, WALKWAYS, BICYCLE FACILITIES) PPNO# 3417 LOS ANGELES 1NL04-LAF1609 TRANSIT 0 MAIN STREET BUS STOP AND PEDESTRIAN 2015 $823 IMPROVEMENTS. DESIGN AND CONSTRUCT BUS STOP AND PEDESTRIAN IMPROVEMENTS THAT WILL INCREASE THE USAGE AND CAPACITY OF PEDESTRIAN FACILITIES ALONG A 0.4 MILE STRETCH OF MAIN STREET. LOS ANGELES LAF1424 TRANSIT 0 MCBEAN REGIONAL TRANSIT CENTER PARK AND 2014 $5,868 RIDE. PURCHASE LAND, DESIGN, AND CONSTRUCT A REGIONAL PARK-AND-RIDE LOT ADJACENT TO THE MCBEAN REGIONAL TRANSIT CENTER IN THE CITY OF SANTA CLARITA. LOS ANGELES 1TR1021 TRANSIT 0 METRO AND MUNICIPAL REGIONAL CLEAN FUEL BUS 2035 $150,000 CAPITAL–FACILITIES AND ROLLING STOCK (METRO'S SHARE TO BE USED FOR CLEAN FUEL BUSES) (CAPITAL COSTS ONLY) LOS ANGELES LA0D338 TRANSIT 0 METRO GOLD LINE EASTSIDE EXTENSION 2010 $14,000 ENHANCEMENTS INCLUDING ADDITIONAL TVM'S; PEDESTRIAN SAFETY, LANDSCAPING AND MULTI- MODAL INTERFACE ELEMENTS; ADDITIONAL TRACTION POWER SUBSTATION, LOS ANGELES LA0G447 TRANSIT 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION 2023 $2,511,121 SEGMENT 1 – WILSHIRE/WESTERN TO LA CIENEGA (EXCLUDING P/E WHICH IS UNDER LA0G642) LOS ANGELES UT101 TRANSIT 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION 2012 $107,400 TO WESTWOOD – P/E ONLY LOS ANGELES LA29212XY- TRANSIT 0 METRO RAIL GOLD LINE EXTENSION- PASADENA TO 2014 $35,530 LA29212XY MONTCLAIR 24- MILE, 12- STATION LRT EXTENSION. SAFETEA-LU # 285 LEAD AGENCY WILL CHANGE TO METRO GOLD LINE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 147

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8413 TRANSIT 0 METRO RAPID BUS STATIONS-PHASE II: INCLUDES 2012 $144,900 COMMUNICATIONS & EQUIPMENT – EQUIPMENT AND BUS SHELTERS ONLY. LOS ANGELES 1TDL04-LAF3712 TRANSIT 0 METROLINK PARKING RESOURCE MANAGEMENT 2014 $266 DEMONSTRATION PROJECT. DEMONSTRATION PROJECT PROVIDES COMMUTERS OF METROLINK AND TRANSIT SERVICES WITH A PROACTIVE SYSTEM TO ASSIST IN LOCATING AVAILABLE PARKING WITHIN CITY'S METROLINK STATION VICINITY. LOS ANGELES LA0C10 TRANSIT 0 MID-CITY/EXPOSITION CORRIDOR LIGHT RAIL 2012 $930,562 TRANSIT PROJECT PHASE I TO VENICE-ROBERTSON STATION. (INCLUDING E200-BUSP-095, LA CIENEGA INTERMODAL CENTER) LOS ANGELES LA0D197 TRANSIT 0 MID-CITY/EXPOSITION CORRIDOR LRT OPERATING 2015 $114,801 ASSISTANCE LOS ANGELES 1TDL04- TRANSIT 0 MODIFY AND ENHANCE EXISTING INTERMODAL 2012 $504 LA0G300 PASSENGER AMENITIES AT CALSTATE UNIVERSITY, NORTHRIDGE EARMARK ID # E2008-BUSP-0696 LOS ANGELES LA0C8250 TRANSIT 0 MONROVIA RAILROAD DEPOT MULTI-MODAL TRANSIT 2008 $2,053 CENTER: STABILIZING STRUCTURE AND THEN OVERALL STRUCTURAL ELEMENTS WILL BE REPAIRED FOLLOWED BY RESTORING KEY ARCHITECTURAL . PPNO# 3415 LOS ANGELES 1TR1020 TRANSIT 0 NEW AIRPORT BUS DIVISION (CAPITAL COSTS ONLY) 2022 $155,500 LOS ANGELES LA0D471 TRANSIT 0 NEW FREEDOM PROGRAM ADMINISTRATION, 2016 $66,347 OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123. ADDED TOLL CREDITS IN FY11/12 IN CONS. FOR $9,309. LOS ANGELES 1NL04-LA0F096 TRANSIT 0 NORWALK SANTA FE SPRINGS TRANSPORTATION 2011 $4,057 CENTER PARKING EXPANSION AND BIKEWAY IMPROVEMENTS. PROVIDE ADDITIONAL 400 PARKING SPACES FOR TRANSIT CENTER PATRONS AND IMPROVE BICYCLES ACCESS TO THE TRANSIT CENTER LOS ANGELES 1OM0702- TRANSIT 0 ON-GOING CAPITALIZATION OF TRAINING AND 2013 $220 LA0G435 EDUCATION. ADDED TOLL CREDITS IN FY10/11 IN CONS. FOR $12. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 148 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA50300 TRANSIT 0 OPERATING ASSISTANCE – TRANSIT OPERATIONS AND 2012 $4,061 DIAL-A -RIDE SERVICE LOS ANGELES LA0B311 TRANSIT 0 PARK AND RIDE FACILITIES (TRANSIT ORIENTED 2014 $42,175 NEIGHBORHOOD PROGRAM). 3 PARK AND RIDES LOCATED IN THE CITIES OF AZUSA, INDUSTRY AND WEST COVINA LOS ANGELES 1NL04-LA0G198 TRANSIT 0 PASSENGER AND PEDESTRIAN IMPROVEMENTS BY 2012 $315 LANI LOS ANGELES LA52105 TRANSIT 0 PAYMENTS FOR THE LEASEING OF BUS TIRES FOR THE 2014 $480 CULVER CITYBUS FLEET. LOS ANGELES LA0F023 TRANSIT 0 PEAK-HOUR BUS-ONLY LANES ON LINCOLN BLVD. 2011 $170 BETWEEN PICO BOULEVARD AND THE SOUTH CITY LIMIT (IN BOTH DIRECTIONS) LOS ANGELES 1NL04-LAF1605 TRANSIT 0 PEDESTRIAN SAFE BUS STOP LINKAGE. LINKING 11 2013 $1,544 BUS STOPS CURRENTLY INACCESSIBLE BECAUSE OF LACK OF SIDEWALKS ON BOTH THE EAST AND WEST SIDE OF HAWTHORNE BLVD. FROM CREST RD. TO PALOS VERDES DR. SOUTH (ABOUT 13,000') LOS ANGELES 1TR1017 TRANSIT 0 PLANNING FOR TRANSIT PROJECTS 2028 $25,500 LOS ANGELES LA0B358 TRANSIT 0 PREVENTATIVE MAINTENANCE FOR THE CULVER 2015 $12,500 CITYBUS FLEET LOS ANGELES LA0F048 TRANSIT 0 PREVENTIVE MAINTENANCE – OPERATING 2011 $21,800 LOS ANGELES LA963543 TRANSIT 0 PREVENTIVE MAINTENANCE (CAPITAL & OPERATING 2016 $2,972,200 MAINTENANCE ITEMS ONLY) LOS ANGELES LA50200 TRANSIT 0 PREVENTIVE MAINTENANCE (LANCASTER/PALMDALE 2015 $34,981 UZA). ADDING $1,056 OF TOLL CREDITS IN CON FOR 11/12. LOS ANGELES LA0F024 TRANSIT 0 PROP 1B SECURITY BOND PROJECTS: INCLUDING 2013 $2,534 SECURITY PROJECTS SUCH AS SURVEILLANCE SYSTEM AND LIGHTING. IN ADDITION, TO PURCHASE OF SECURITY AND SAFETY EQUIPMENT.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 149

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D356 TRANSIT 0 PROVIDE HARDSCAPE, LANDSCAPE AND 2013 $3,856 STREETSCAPE IMPROVEMENTS AT EAST LOS ANGELES COLLEGE TO PROVIDE A OFF-STREET TRANSIT CENTER TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL LOS ANGELES LA0D357 TRANSIT 0 PROVIDE HARDSCAPE, LANDSCAPE AND 2013 $5,925 STREETSCAPE IMPROVEMENTS AT LOS ANGELES TRADE TECHNICAL COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS.SAFETEA-LU # 307, 2007 CFP #F1645 LOS ANGELES LA0D358 TRANSIT 0 PROVIDE HARDSCAPE, LANDSCAPE, AND 2011 $4,679 STREETSCAPE IMPROVEMENTS AT LOS ANGELES VALLEY COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS LOS ANGELES LA0D348 TRANSIT 0 PURCHASE (10) REPLACEMENT VANS WITH 2011 $1,320 ALTERNATE FUEL VANS LOS ANGELES LA0335 TRANSIT 0 PURCHASE 1 PARATRANSIT VEHICLE 2008 $70 LOS ANGELES LA0G227 TRANSIT 0 PURCHASE 2 BUSES FOR ROUTE 757 SERVICE 2012 $1,081 EXPANSION TO NORTH HOLLYWOOD PER THE ADOPTED TRANSPORTATION DEVELOPMENT PLAN. LOS ANGELES LAE0172 TRANSIT 0 PURCHASE 21 REPLACEMENT BUSES FOR SANTA 2012 $21,392 MONICA'S BIG BLUE BUS TRANSIT SERVICE. 5 BUSES PURCHASED IN FY11/12 LOS ANGELES LA0D453 TRANSIT 0 PURCHASE 5 REPLACEMENT ALTERNATIVE FUEL 40' 2010 $3,000 BUSES LOS ANGELES LAE0132 TRANSIT 0 PURCHASE A NEW ALTERNATE FUEL BUS. BUS 2011 $250 WILL REDUCE EMISSIONS & CONTINUE TO PROVIDE TRANSPORTATION LOS ANGELES LA0D109 TRANSIT 0 PURCHASE LAND FOR VEHICLE MAINTENACE TRANSIT 2008 $2,062 FACILITY LOS ANGELES LAE0001A TRANSIT 0 PURCHASE OF 2 CNG BUSES FOR GLENDALE BEELINE 2011 $786 TRANSIT SYSTEM LOS ANGELES NULL-LA0B305 TRANSIT 0 PURCHASE OF 9 BUSES FOR EXPANDED SERVICE OF 2010 $955 WHICH TWO ARE CNG POWERED.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 150 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA900520 TRANSIT 0 PURCHASE OF ADD'L 13 REPLACEMENT VEHICLES 2016 $624 FY10 TO FY11. 13 VEHICLES IN FY10 – FY 11 LOS ANGELES 1NL04-LA0G429 TRANSIT 0 PURCHASE OF BIKE RACKS FOR TRANSIT VEHICLES. 2012 $32 LOS ANGELES LA973018 TRANSIT 0 PURCHASE OF DIESEL TRANSMISSION REBUILDS AND 2011 $120 HYBRID ELECTRIC POWER TRAIN COMPONENTS FOR SERVICE FLEET LOS ANGELES LA0C63 TRANSIT 0 PURCHASE OF MISC OFFICE EQUIPMENT- (ONGOING) 2013 $106 LOS ANGELES 1OM0702- TRANSIT 0 PURCHASE OF RUNCUTTING/SCHEDULING SOFTWARE. 2011 $40 LA0G394 LOS ANGELES LA0B203 TRANSIT 0 PURCHASE OF SUPPORT EQUIPMENT – TIRES 2011 $480 LOS ANGELES 1OM0702- TRANSIT 0 PURCHASE OF TOOLS AND EQUIPMENT FOR 2013 $69 LA0G283 MAINTENANCE OF THE LA MIRADA TRANSIT FLEET. LOS ANGELES LAE0407 TRANSIT 0 PURCHASE ONE TROLLEY BUS VEHICLE FOR EXISTING 2010 $250 SERVICE ALONG CARSON ST. BETWEEN THE HARBOR TRANSIT WAY STATION AND THE CARSON CIVIC CENTER AT AVALON BLVD LOS ANGELES LAE0108 TRANSIT 0 PURCHASE TWO REPLACEMENT TRIPPER BUSES. 2012 $502 ROUTE G AND D, BLUELINE STATION AT DEL AMO BLVD/I-710 TO SOUTH BAY PAVILION MALL, DEL AMO BLVD LOS ANGELES LA963580 TRANSIT 0 RADIO SYSTEM; REPLACEMENT OF EXISTING RADIO/ 2010 $10,300 DISPATCH SYSTEM / ADVANCED BUS TECHNOLOGY LOS ANGELES LA990724 TRANSIT 0 RADIOS ON BUSES 81 VEHICLES TO INCLUDE AVL 2009 $3,156 SYSTEM LOS ANGELES 1TR204- TRANSIT 0 RED CAR TROLLEY ENGINEERING STUDY FOR 2014 $1,248 LA0G191 DOWNTOWN LOS ANGELES STREETCAR. LOS ANGELES 1TR0404 TRANSIT 0 REGIONAL CONNECTOR – LIGHT RAIL IN TUNNEL 2020 $1,366,100 ALLOWING THROUGH MOVEMENTS OF TRAINS, BLUE, GOLD, EXPO LINES. FROM ALAMEDA / 1ST STREET TO 7TH STREET/METRO CENTER LOS ANGELES LA0D454 TRANSIT 0 REHAB TRANSIT ADMINISTRATIVE AND OPERATIONS 2012 $400 OFFICES LOS ANGELES LA0C08 TRANSIT 0 REPLACE 10 PARATRANSIT VEHICLES 2008 $701

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 151

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1TDL04- TRANSIT 0 REPLACE 25 ACCESSIBLE MINIVANS (@ 40K APIECE) 2010 $1,000 LA0G220 FOR ADA PARATRANSIT SERVICE IN LOS ANGELES COUNTY LOS ANGELES LA0D13 TRANSIT 0 REPLACE FAREBOX/UFS 2011 $1,700 LOS ANGELES LA0D455 TRANSIT 0 REPLACE RELIEF AND SUPERVISOR VEHICLES 2008 $160 LOS ANGELES LA0D349A TRANSIT 0 REPLACEMENT BUSES – 25FT VANS/BUSES – 2011 $600 PURCHASE QTY OF 6 GASOLINE-22 PASSENGER CAPACITY EACH. C/O FROM 2006/2007. CARRYOVER FROM 2008 FTIP AMENDMENT 08-53. LOS ANGELES LA0B310 TRANSIT 0 REPLACEMENT CNG & ELECTRIC BUSES – 20 IN FY11 2013 $63,923 AND 30 IN FY12 LOS ANGELES LA0D116 TRANSIT 0 REPLACEMENT OF HVAC SYSTEM AT TORRANCE 2008 $500 TRANSIT FACILITY LOS ANGELES LA0F002 TRANSIT 0 REPLACEMENT OF OMS SYSTEM (HARDWARE AND 2010 $1,200 SOFTWARE) LOS ANGELES NULL-LA0B204 TRANSIT 0 REPLACEMENT OF SUPPORT EQUIPMENT – 2008 $569 FAREBOXES FOR THE UNIVERSAL FARE SYSTEM LOS ANGELES LA996086 TRANSIT 0 REPLACMENT – 3 ALTERNATIVE FUEL SHUTTLES 2010 $376 LOS ANGELES LAE0191B TRANSIT 0 SAFETY IMPROVEMENTS AT BUS STOPS, INCLUDING 2010 $2,009 BUS LOADING AREAS, LIGHTING, PASSENGER AMENITIES, BUS PADS & TURNOUTS, IMPROVED DRAINAGE, & APPURTENANCE WORK (SAFETEA-LU # 191 & # 321) LOS ANGELES LA29202U1 TRANSIT 0 SAN FERNANDO VALLEY E/W BRT (FROM TERMINUS 2010 $21,129 OF METRO RED LINE IN NO HOLLYWOOD TO WARNER CTR)14-MILE EXCLUSIVE BUS LANES AT FORMER RAIL RD ROW (PPNO 3333 AB3090REP ) SAFETEA-LU # 326 LOS ANGELES LA29202U3 TRANSIT 0 SAN FERNANDO VALLEY NORTH/SOUTH BRT 2014 $11,702 EXTENSION PHASE I: METRO RAPID SERVICE ALONG RESEDA BLVD. AND SEPULVEDA BLVD. SAFETEA-LU # 183. THE FUNDS ARE FOR TYPICAL PASSENGER AMENITIES.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 152 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1TDL04-LAF1601 TRANSIT 0 SAN GABRIEL CITY-WIDE BUS SHELTER 2013 $688 INSTALLATION. INSTALL BUS SHELTERS AT EXISTING BUS STOPS ON MTA AND MONTEBELLO BUS LINE ROUTES. LOS ANGELES LAE0364 TRANSIT 0 SANTA MONICA'S BIG BLUE BUS/SANTA MONICA 2014 $2,000 COLLEGE TRANSIT SERVICE. BUS IMPROVEMENTS NEAR THE CAMPUS ALONG THE BUS ROUTES. CARRYOVER FROM PRIOR FISCAL YEAR LOS ANGELES LA0D372 TRANSIT 0 SOUTH ACCESS PEDESTRIAN BRIDGE TO SIERRA 2012 $8,000 MADRE VILLA LIGHT RAIL STATION. THIS PEDESTRIAN BRIDGE OVER THE ROUTE 210 FREEWAY WILL PROVIDE A DIRECT AND SAFE APPROACH FOR PEDESTRIANS LOS ANGELES LA0D272 TRANSIT 0 SOUTH SAN FERNANDO VALLEY REGIONAL PARK AND 2008 $767 RIDE. ADD 50 NEW PARKING SPACES TO EXISTING COMMUTER EXPRESS PARK AND RIDE LOT WITHIN EXISTING AREA. LOS ANGELES LA0D437 TRANSIT 0 TEN (10) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO 2011 $6,040 REPLACE:THREE (3) 1995 MODEL & (7) SEVEN 1997 MODEL YEAR BUSES. LOS ANGELES 1TR0704- TRANSIT 0 THE METRO GOLD LINE FOOTHILL EXTENSION 2013 $278 LA0G701 TRANSIT ORIENTED DEVELOPMENT STUDY WILL ILLUSTRATE POSSIBLE TRANSIT ORIENTED DEVELOPMENTS INTENSITIES AROUND FUTURE METRO GOLD LINE FOOTHILL EXTENSION STATIONS. LOS ANGELES 1NL04-LA0G719 TRANSIT 0 THE ROSA PARKS TRANSIT STATION IMPROVEMENTS 2014 $5,500 PROJECT MODERNIZES EXISTING RAIL/BUS TRANSIT STATION, RELOCATES AND EXPANDS BUS FACILITIES AND IMPROVES ACCESSIBILITY TO THE STATION AND INTEGRATION WITH SURROUNDING TRANSIT ORIENTED DISTRICT MEDICAL AND MEDICAL- EDUCATIONAL FACILITIES. LOS ANGELES LA0D11 TRANSIT 0 TRANSIT – ENHANCEMENTS (STREET FURNITURE) 2011 $327 LOS ANGELES 1TDL04- TRANSIT 0 TRANSIT ACCESS PASS INTEGRATION – PURCHASE 2011 $4,000 LA0G203 FARE/TICKET VENDING EQUIPMENT TO BE INTEGRATED INTO THE LOS ANGELES COUNTY TRANSIT ACCESS PASS (TAP) SYSTEM.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 153

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1TR08D07A- TRANSIT 0 TRANSIT CENTER AND PASSENGER AMENITIES AT 2012 $1,381 LA0G269 LA SOUTHWEST COLLEGE EARMARK ID #E2008- BUSP-0678 AND E2009-BUSP-101 LOS ANGELES LA55207 TRANSIT 0 TRANSIT COACH TIRE (LEASE) (ONGOING). 2011 $2,000 CARRYOVER FROM PRIOR FISCAL YEAR LOS ANGELES LA0C61 TRANSIT 0 TRANSIT DATA AND COMMUNICATION SYSTEMS; ITS 2013 $75 (RADIO, AVL, DISPATCHING, AND OTHER ADVANCED TECHNOLOGY) ONGOING. LOS ANGELES LA0D337 TRANSIT 0 TRANSIT ENHANCEMENT ACTIVITIES: 1% FORMULA 2016 $31,352 FUNDS – LOS ANGELES COUNTY LOS ANGELES 1OM0702- TRANSIT 0 TRANSIT FACILITY IMPROVEMENTS (ONGOING) AT 2011 $396 LA0D346 15679 PHOEBE AVENUE, LA MIRADA LOS ANGELES LA0D137 TRANSIT 0 TRANSIT STATION RIGHT OF WAY PROCUREMENT FOR 2011 $4,517 LAND AT THE EXISTING SANTA CLARITA METROLINK STATION. CARRYOVER FROM PRIOR FISCAL YEAR LOS ANGELES LAE0039 TRANSIT 0 TRANSIT VILLAGE – PROVIDE A TRANS. FACILITY 2012 $3,026 FOR SATELLITE PARKING FOR SIERRA MADRE VILLA GOLD LINE STA, P-N-R FOR COMMUTERS, A FOOTHILL TRANSIT STORE. THE CENTER WILL HAVE THREE (3) BUS BAYS AND AT LEAST FOUR (4) SHELTERS. THE SHELTERS WILL ALL HAVE BENCHES WITH A SEATING CAPACITY OF AT LEAST TEN PEOPLE IN EACH SHELTER. THE AREA WILL HAVE LIGHTING FOR SAFETY AND SECURITY, TRASH RECEPTACLES, DRINKING FOUNTAINS, AND INFORMATION KIOSKS. ADIDTIONAL TRAFFIC SIGNALS AND A R-HAND BUS ONLY TURN LANE. LOS ANGELES 1TR1016 TRANSIT 0 UNION BUS DIVISION (CAPITAL COSTS ONLY) 2012 $90,100 LOS ANGELES LA0F059 TRANSIT 0 UPGRADE SECURITY CAMERA SYSTEMS (L/P UZA. 2012 $400 USING $80 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY12 FOR CON. LOS ANGELES LA0D343 TRANSIT 0 VEHICLE MAINTENANCE FACILITY 2008 $9,627 LOS ANGELES 1TDL04- TRANSIT 0 VILLA ESPERANZA SERVICES REPLACEMENT OF 2010 $126 LAES771 THREE MINI VANS IV AT $4,817 LOCAL AND $37,183 FEDERAL EACH.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 154 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA29202W TRANSIT 0 WILSHIRE BLVD BRTPHASE I: 12.5-MI. CORRIDOR 2014 $80,610 WITH 7.7-MI. PEAK PERIOD BUS LANE ON WILSHIRE WITHIN THE CITY AND COUNTY OF LA FROM VALENCIA ST. TO CITY OF SANTA MONICA. INCLUDES STREET WIDENING, CURB LANE REPAVING/RECONSTRUCTING, IMPROVED TRAFFIC SIGNAL TIMING & BUS SIGNAL PRIORITY. PHASE II: INCLUDES ENHANCED SHELTERS & LANDSCAPING; STREET REPAIR/RECONSTRUCTION; CONCRETE BUS PADS AND P&R FACILITIES. LOS ANGELES LAE0036 TRANSIT 0 WILSHIRE/ VERMONT PEDESTRIAN PLAZA 2011 $1,960 IMPROVEMENTS AND INTERMODAL PEDESTRIAN LINKAGES LOS ANGELES LA0G774 TRANSIT 0 VISTA CANYON RANCH TRANSIT CENTER – RELOCATE 2018 $1,500 THE EXISTING, TEMPORARY VIA PRINCESSA METROLINK STATION TO THE VISTA CANYON PROJECT SITE. THE VISTA CANYON TRANSIT STATION WILL CONSIST OF A METROLINK STATION AND BUS TRANSFER STATION. ADDITIONALLY, THE STATION WILL INCLUDE A PEDESTRIAN OVERPASS OR UNDERCROSSING OF THE TRACKS AND AN ADJACENT PARKING STRUCTURE WITH UP TO 750 PARKING SPACES. PROJECT USING $100 OF TOLL CREDITS FOR EACH PHASE (ENG,ROW & CONS $300 IN TOTAL) TO MATCH 5307 FUNDS. LOS ANGELES 1M1005 STATE 0 HIGH DESERT HIGH DESERT CORRIDOR (ENVIRONMENTAL) 2014 $33,000 HIGHWAY CORRIDOR (MULTIPLE COMBINATIONS OF MODES UNDER STUDY, INCLUDING BUT NOT LIMITED TO TSM/TDM, FREEWAY, EXPRESSWAY, TOLLWAY, AND RAIL) LOS ANGELES 1O1005 STATE 0 CALL FOR PROJECTS GOODS MOVEMENT MODE 2030 $682,100 HIGHWAY LOS ANGELES 1O1004 STATE 0 CALL FOR PROJECTS RSTI MODE 2030 $753,900 HIGHWAY LOS ANGELES 1O1002 STATE 0 SAFETY NET (IMMEDIATE NEEDS) PROGRAM 2035 $253,700 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 155

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8080 STATE 1 ROUTE 1: MANHATTAN BEACH: ON ROUTE 1 BETWEEN 2014 $13,555 HIGHWAY 33RD STREET & ROSECRANS AV; ADD ONE THROUGH LN TO NORTH BOUND SEPULVEDA BLVD. TO WIDEN EXISTING STRUCTURE FROM 6 TO 7 THROUGH LANES PPNO 2947. PROJECT USING $288 OF TOLL CREDITS TO OBLIGATE 100% FEDERAL FUNDS IN ENG PHASE. LOS ANGELES 16606 STATE 1 ROUTE 1: NEAR MARINA REY ON LINCOLN BL FRM 2018 $3,232 HIGHWAY JEFFERSON BL TO FIJI WAY – WIDEN FROM 3 TO 4 THRU LNES IN EA. DIR. & RPLCE CULVER BL OC &CNSTRCT NEW BRDG OVR BALLONA CREK (EA 1661C, PPNO 0027P). LOS ANGELES LA990351- STATE 2 ROUTE 002: FROM 0.5 MILES SOUTH OF BRANDEN 2016 $9,329 LA0G692 HIGHWAY STREET TO I-5/SR-2 INTERCHANGE – MODIFY TERMINUS, SOUNDWALLS, LANDSCAPING, INSTALLING DETECTOR LOOPS AND RAMP METERS, RESTRIPING (WITH NO LANE ADDITION) AND IMPROVING ARTERIAL STREETS (RESTRIPING-NO INCREASE IN CAPACITY, AND REMOVING & WIDENING SIDEWALK. (EA 20550, PPNO 2689)(TOLL CREDITS = LOCAL MATCH) LOS ANGELES 1H0103 STATE 5 " SOUTH NORTH I-5/I-405 CARPOOL LANE PARTIAL CONNECTOR 2030 $330,000 HIGHWAY I-5/I-405" (SOUTH TO NORTH) LOS ANGELES 1TL1001 STATE 5 I-5 PICO CANYON PARKER ROAD IN L.A./SANTA CLARITA ON RTE 5 FROM PICO 2030 $390,000 HIGHWAY CANYON TO PARKER RD, HOV AND AUXILIARY LANE IMPROVEMENTS LOS ANGELES LAE0465 STATE 5 I-5 SR-14 PICO CANYON/ PHASE 1 OF 3: IN SANTA CLARITA: CONSTRUCT 2018 $131,000 HIGHWAY LYONS AVE / TRUCK CLIMBING LANES FROM ROUTE 14 TO PICO GAVIN CANYON CANYON/LYONS AVE IN THE SOUTHBOUND DIRECTION RD AND FROM ROUTE 14 TO GAVIN CANYON RD IN THE NORTHBOUND DIRECTION LOS ANGELES LA0G440 STATE 5 I-5 SR-14 WELDON PHASE 2 AND 3 OF 3: IN LA/SANTA CLARITA: PHASE 2018 $410,000 HIGHWAY CANYON RD / 2: CONSTRUCT HOV LANE NORTHBOUND FROM ROUTE PARKER RD 14 TO WELDON CANYON RD; PHASE 3: CONSTRUCT HOV, TRUCK, & AUX LANES FROM SR-14 TO PARKER RD OC.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 156 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA000358 STATE 5 ROUTE 005: – FROM ROUTE 134 TO ROUTE 170 HOV 2014 $712,274 HIGHWAY LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 12180, 12181,12182+12183=1218W,12184, 13350 PPNO 0142F,151E,3985,3986,3987) SAFETEA LU # 570. CONSTRUCT MODIFIED IC @ I-5 EMPIRE AVE, AUX LNS NB & SB BETWEEN BURBANK BLVD & EMPIRE AVE; AND MODIFY EXISTING STRUCTURES. ADD AUXILIARY LANE BETWEEN ALAMEDA AND OLIVE FROM PM 28.43 TO PM 29.78 LOS ANGELES LA000357 STATE 5 ROUTE 005: –- FROM ROUTE 170 TO ROUTE 118 ONE 2012 $207,838 HIGHWAY HOV LANE IN EACH DIRECTION (10 TO 12 LANES) INCLUDING THE RECONSTRUCTION OF THE I-5/SR-170 MIXED FLOW CONNECTOR AND THE CONSTRUCTION OF THE I-5/SR-170 HOV TO HOV CONNECTOR (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO 0158K) (TCRP#41.2) LOS ANGELES LA0D192 STATE 5 ROUTE 005: GARVEE DEBT SERVICE PAYMENTS: RT 2015 $28,895 HIGHWAY 5 FROM RT 118 TO RT 14 FROM 10 TO 12 LANES HOV LANES. EA# 122001, PPNO 0162P. LOS ANGELES LA0C8012 STATE 5 ROUTE 005: I-5 WESTERN AVENUE I/C PHASE I 2014 $33,615 HIGHWAY -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2 AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A, PPNO 2120) LOS ANGELES LA0D463 STATE 5 ROUTE 5: I-5 LAKE HUGHES RD- INTERSECTION 2018 $500 HIGHWAY IMPROVEMENTS & WIDENING TO PROVIDE ADDITIONAL LANES ON EASTBOUND AND WESTBOUND APPROACHES LOS ANGELES LA0D462 STATE 5 ROUTE 5: I-5 PARKER RD INTERSECTION 2018 $500 HIGHWAY IMPROVEMENTS INCLUDING BRIDGE WIDENING AND LANE ADDITIONS LOS ANGELES LA0D74 STATE 5 ROUTE 5: IN LOS ANGELES FROM CHAMBERLAIN 2016 $41,724 HIGHWAY STREET TO LARKSPUR STREET SOUNDWALL CONSTRUCTION PART OF RTE 5 FR 118 TO 14 HOV PRJ (CFP 8925). EA# 23550 .PPNO 3236.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 157

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D73B STATE 5 ROUTE 5: IN NORWALK: FROM ORANGE COUNTY 2014 $379,730 HIGHWAY LINE TO ROUTE 605: CARMENITA INTERCHANGE IMPROVEMENT (EA 2159C0, PPNO 2808A) (TCRP 42.3, & 43) LOS ANGELES LA0D73 STATE 5 ROUTE 5: LA MIRADA, NORWALK & SANTA FE 2018 $1,241,757 HIGHWAY SPRINGS-ORANGE CO LINE TO RTE 605 JUNCTION. WIDEN FOR HOV & MIXED FLOW LNS, RECONSTRUCT VALLEY VIEW (EA 2159A0 = 21591, 21592, 21593, 21594, 21595, PPNO 2808 = 4153, 2808, 4154, 4155, 4156). TCRP#42.2&42.1 LOS ANGELES LA996134 STATE 5 ROUTE 5: RTE. 5/14 INTERCHANGE & HOV LNS ON 2014 $161,100 HIGHWAY RTE 14 – CONSTRUCT 2 ELEVATED LANES – HOV CONNECTOR (DIRECT CONNECTORS) (EA# 16800) (2001 CFP 8343) (PPNO 0168M) LOS ANGELES LAE2577 STATE 5 ROUTE 5: STUDY NORWALK, SANTA FE SPRINGS, 2023 $4,730 HIGHWAY DOWNEY, MONTEBELLO, & COMMERCE: ON I-5, CONDUCT PLAN'G, ENV. STUDIES FOR WIDEN'G W/HOV & MIXED FLOW LNS FROM I-605 TO I-710.(EA2159E, 2159F, PPNO 2808C, 2808D)PAED ONLY LOS ANGELES 1HL08D01- STATE 10 LACRD – EXPAND CAPACITY OF THE I-10 HOT LANE 2012 $3,200 LA0G139 HIGHWAY (RESTRIPING AND BUFFER CHANGES). RESTRIPE TO ADD A SECOND LANE (WB – SANTA ANITA TO I-710; EB – I-710 TO BALDWIN AVE.)FOR HOT LANES ON THE I-10. (RTP# 1HL08D01) LOS ANGELES 1HL08D01- STATE 10 LACRD – HOT LANES ON I-10 FROM ALAMEDA ST./ 2012 $66,679 LA0G137 HIGHWAY UNION STATION TO I-605, AND ON I-110 FROM 182ND ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD.(IT AND TOLL TECHNOLOGY)(RTP # 1HL08D01, HL08D03, 1OM08D01)CONVERSION OF HOV LANES TO HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605. (RTP ID 1HL08D01 & 1HL08D03 & 1TR08D07B)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 158 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1HL08D01- STATE 10 LACRD – HOT LANES ON THE I-10 FROM ALAMEDA 2012 $3,881 LA0G138 HIGHWAY ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD. CONVERSION OF HOV LANES TO HOT LANES. (INFRASTRUCTURE/PAVEMENT)(1HL08D01, 1HL08D03) LOS ANGELES 1OM0702- STATE 10 LACRD – I-10 AND I-110 EXPRESSLANES TOLL 2013 $2,499 LA0G819 HIGHWAY SYSTEM OPERATIONS, MAINTENANCE, MARKETING AND DATA COLLECTION (RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02) LOS ANGELES LAE3805 STATE 10 PLANNING, DESIGN AND PRELIMINARY ENGINEERING 2013 $2,500 HIGHWAY OF ON/OFF RAMP SYSTEM AT INTERSECTION OF I-10 AND ROBERTSON/NATIONAL BLVD. LOS ANGELES LA0F098 STATE 10 ROUTE 010: L.A. COUNTY I-10 AND I-605 2014 $78,760 HIGHWAY IC;CONSTRUCT ONE/TWO LANE BRIDGE STRUCTURE, BRANCHING OFF SB OF RTE 605 TO EB OF RTE 10 AT-GRADE CONNECTOR RAMP (EA 24540, PPNO 3529; CONSTRUCT ONE-LANE CONNECTOR FROM SB I-605 TO WB I-10. LOS ANGELES LA01342 STATE 10 ROUTE 010: RT 10 FROM RT 605 TO PUENTE AVE HOV 2014 $200,064 HIGHWAY LANES (8+0 TO 8+2) (EA# 117070, PPNO 0306H) PPNO 3333 3382 AB 3090 REP (TCRP #40) LOS ANGELES LA000548 STATE 10 ROUTE 10: FROM PUENTE TO CITRUS HOV LANES 2018 $184,522 HIGHWAY FROM 8 TO 10 LANES & SOUNDWALLS (C-ISTEA 77720, 95 STIP-IIP) (EA# 117080,11172, 1170U, PPNO# 0309N, 0309S) LOS ANGELES LA0B875 STATE 10 ROUTE 10: HOV LANES FROM CITRUS TO ROUTE 2018 $192,643 HIGHWAY 57/210 – (EA# 11934, PPNO# 0310B) LOS ANGELES 1H0101 STATE 14 SR-14 AVE. P-8 AVE. L ADD 1 HOV LANE EACH DIRECTION ON THE SR-14 2030 $120,000 HIGHWAY FROM AVE. P-8 TO AVE. L LOS ANGELES LA0C8102 STATE 14 ROUTE 14: SR-14 FREEWAY/AVENUE I INTERCHANGE 2012 $10,581 HIGHWAY IMPROVEMENTS-WIDENING AVE I FROM 2 TO 3 LANES IN EACH DIRECTION, ADDING DUAL LEFT TURN LANES, AND WIDENING A BRIDGE STRUCTURE. PPNO 3123.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 159

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D336 STATE 14 ROUTE 14: SR14/AVENUE K INTERCHANGE 2023 $4,250 HIGHWAY IMPROVEMENTS. WIDEN NORTHBOUND OFFRAMP AND 15TH STREET WEST. WIDEN N/B OFFRAMP FROM 3 TO 4 LANES AT AVE K/15TH ST-W. LOS ANGELES 1OM0702- STATE 19 CONSTRUCT NEW LEFT TURN LANE AT THE STATE 2012 $2,360 LAE0357 HIGHWAY ROUTE 19 AND TELSTAR. THE ADDITION OF A SECONDARY LEFT TURN LANE AND TRAFFIC SIGNAL AT THE INTERSECTION OF ROSEMEAD BLVD (STATE) AND TELSTAR AVE. PROJECT USING $347 TOLL CREDIT FOR CONSTRUCTION PHASE IN FY 10/11 FOR STPL AND DEMO FUNDS. LOS ANGELES 1M0430 STATE 47 SR-47 AT NAVY WAY CONSTRUCTION OF INTERCHANGE AT SR-47 / NAVY 2014 $47,800 HIGHWAY WAY LOS ANGELES LA0D45- STATE 47 ROUTE 047: REPLACEMENT OF SCHUYLER HEIM 2014 $278,993 LA0G600 HIGHWAY BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 AUX LANE SB (EA 13820, PPNO 0444E). LOS ANGELES LA0D45-LA0D45 STATE 47 SR-47 EXPRESSWAY:REPLACEMENT OF SCHUYLER 2018 $687,000 HIGHWAY HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 AUX LANE SB; CONSTRUCT EXPRESSWAY AND 2-LANE FLYOVER. SAFETEA-LU #712 & #3797 LOS ANGELES 1M0104 STATE 57 SR-57/SR-60 SR-57/SR-60 INTERCHANGE IMPROVEMENT 2030 $475,000 HIGHWAY LOS ANGELES LA0D399 STATE 60 ROUTE 60: CONSTRUCTION OF NEW PARTIAL 2018 $19,000 HIGHWAY DIAMOND INTERCHANGE FOR STATE ROUTE 60 (SR- 60) AT LEMON AVE (SAFETEA-LU # 587). LOS ANGELES 1M1001 STATE 71 SR-71 MISSION BLVD RIO RANCHO RD EXPRESSWAY TO FREEWAY CONVERSION – ADD 1 HOV 2030 $330,000 HIGHWAY LANE AND 1 MIXED FLOW LANE LOS ANGELES LA0B951 STATE 71 ROUTE 71: ROUTE 10 TO ROUTE 60 – EXPRESSWAY 2023 $250,000 HIGHWAY TO FREEWAY CONVERSION – ADD 1 HOV LANE AND 1 MIXED FLOW LANE . (2001 CFP 8349, TCRP #50) (EA# 210600, PPNO 2741) (TCRP #50) LOS ANGELES 1M1003 STATE 91 91/105/110/405 I-405, I-110, I-105 AND SR-91 RAMP AND 2014 $1,265,200 HIGHWAY INTERCHANGE IMPROVEMENTS (SOUTH BAY)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 160 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1M0802 STATE 101 US-101 AT UNIVERSAL US-101/UNIVERSAL TERRACE PARKWAY (CAMPO DE 2014 $21,516 HIGHWAY TERRACE PARKWAY CAHUENGA WAY) INTERCHANGE IMPROVEMENTS LOS ANGELES LA0G598 STATE 101 DESIGN AND CONSTRUCTION OF A PARK AND 2018 $2,239 HIGHWAY RIDE FACILITY WITH 375 PARKING SPACES AT THE PROPOSED COMMUNITY RECREATIONAL FACILITY WILL CONSTRUCTION OF A ACCESS ROAD, RETAINING WALLS TO THE PARK AND RIDE FACILITY, BUS STOP SHELTER FOR WAITING PASSENGERS, NECESSARY DRAINAGE, UTILITY AND LANDSCAPING AND IRRIGATION IMPROVEMENTS. LOS ANGELES LA0G208 STATE 101 PROJECT WILL REPLACE EXISTING 2 LANE BRIDGE 2014 $28,080 HIGHWAY WITH 4 LANE BRIDGE AND ONE TURN LANE AT LOST HILLS ROAD/US 101 INTERCHANGE. THIS WILL BRING BRIDGE TO CURRENT LANE CONFIGURATION OF LOST HILLS ROAD ON EITHER SIDE OF BRIDGE. THE INTERCHANGE WILL ELIMINATE A CROSS-TRAFFIC MOVEMENT TO ACCESS THE NB US 101. THERE WILL BE NO ADDITIONAL LANES ON THE US 101 FREEWAY. THE REPLACEMENT BRIDGE WILL BE WIDER,4 LANES RATHER THAN 2 AND THE SPAN WILL BE APPROXIMATELY 280 FEET LONG, ACCOMMODATING THE WIDTH OF THE ROAD ON EIT LOS ANGELES LA0D31 STATE 101 ROUTE 101: CONSTRUCT ONE ADDITIONAL LANE 2018 $10,232 HIGHWAY FOR BOTH NORTH AND SOUTH BOUND OFF-RAMPS AT VAN NUYS BLVD. (RIP 1 M, IIP 8 M) (EA # 199630) (PPNO 2789) (DEMO= NAT. CORRIDOR PLANNING AND BORDER DEV.) LOS ANGELES LA960142 STATE 101 RTE 101/LINDERO CANYON ROAD INTERCHANGE 2014 $23,382 HIGHWAY IMPROVEMENT PROJECT. LINDERO CYN RD BTW VIA COLINAS AND AGOURA RD WIDENED FROM 2 TO 3 LANES IN EACH DIRECTION. RAMP G-6 WIDENED TO 2 LANES TO PROVIDE FOR 2 FREE RT LANES FOR EASTBOUND VIA COLINAS TRAFFIC AT LINDERO CYN RD. THE EXISTING NORTHBOUND AUX LANE WILL BE EXTENDED SOUTHERLY FROM ITS TERMINUS AT RAMP G-6 TO RAMP G-3. INCLUDES BIKE PATH CONSTRUCTION.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 161

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D344 STATE 101 WIDENING OF THE REYES ADOBE ROAD 2012 $11,072 HIGHWAY OVERCROSSING OF THE 101 FREEWAY FROM 3 LANES TO 6 LANES, ALONG WITH BIKE LANES AND SIDEWALKS LOS ANGELES 1M0132 STATE 103 PIER B ST/ INTERCHANGE IMPROVEMENT – NEW NB ON-RAMP 2012 $1,000 HIGHWAY TERMINAL ISLAND TO SR-103 FWY LOS ANGELES LAE1609 STATE 105 ROUTE 105: STUDY REPORT FOR INTERCHANGE 2011 $400 HIGHWAY IMPROVEMENTS AT LAX AIRPORT (E/P, PS/E ONLY) LOS ANGELES 1HL08D03 STATE 110 LACRD – HOT LANES ON THE I-10 FROM ALAMEDA 2012 $46,900 HIGHWAY ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD. INCLUDES OPERATIONAL IMPROVEMENTS AT I-110 OFF-RAMP AT ADAMS BLVD (RE-STRIPE OFF-RAMP TO ADD A RIGHT TURN LANE AND WIDEN ADAMS BLVD BRIDGE FOR AN ADDITIONAL THROUGH LANE TO FIGUEROA WAY). CONVERSION OF HOV LANES TO HOT LANES. (INFRASTRUCTURE/PAVEMENT) (1HL08D01, 1HL08D03) LOS ANGELES LA0D328 STATE 110 ROUTE 110: IN LOS ANGELES FROM 8TH STREET ON 2012 $54,932 HIGHWAY RAMP TO I-110/I-10 CONNECTOR, CONSTRUCT NB & SB AUXILIARY LANES AND MODIFY RAMPS (EA 2411U, PPNO 3343) CONVERT EXIST'G SB AUX LANE TO OPTIONAL LANE & MODIFY RAMPS; NB HARBOR FWY, FROM NORTH END OF 12TH ST UC TO NORTH END OF THE 7TH ST UC, ADD STORAGE LANE ON THE MAINLINE & RECONSTRUCT RAMP LOS ANGELES LAF1204 STATE 118 ROUTE 118: 118 FREEWAY WESTBOUND OFF-RAMP 2018 $1,055 HIGHWAY AT TAMPA AV. THIS PROJECT WILL EXTEND THE RIGHT-TURN ONLY FROM THE WB SR-118 OFF-RAMP AT TAMPA AV AND WILL INSTALL AN ADDITIONAL SB LEFT-TURN LANE ON TAMPA AT THE EB SR-118 ON-RAMP. LOS ANGELES LA0D480 STATE 126 ROUTE 126: SR-126 IMPROVEMENTS – LOS ANGELES 2018 $35,500 HIGHWAY COUNTY LINE TO CASTAIC CREEK BRIDGE: IMPROVE 5 INTERSECTIONS ADD LT & RT LANES, ADD 1 SB AUX LANE FROM LONG CANYON RD TO WOLCOTT WAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 162 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8099 STATE 126 ROUTE 126: SR-126/COMMERCE CTR DR NEW 2014 $60,000 HIGHWAY IC. CONSTRUCT A PARTIAL CLOVERLEAF, GRADE SEPARATED IC AND WIDEN ST 126 FROM .76 KM EAST OF IC TO .85 KM WEST 4-6 LANES. (2001 CFP 8099) (PPNO 3118) LOS ANGELES 17870 STATE 134 ROUTE 134: RTE 134 BETWEEN I-5 & PACIFIC AVE 2011 $31,375 HIGHWAY MODIFY 134/SAN FERNANDO RD I/C & GRADE SEP AT UPRR SAN FERNANDO/FLOW- ER (WIDEN 1 BRIDGE & 1 OFF RAMP) NON-CAPACITY INCREASING (PPNO 9814 ) LOS ANGELES 1OM0702- STATE 134 UPGRADE TRAFFIC SIGNAL AT SR-134 FREEWAY WB/ 2012 $3,000 LA0G403 HIGHWAY OFF RAMPS AT HARVEY DR. INTERSECTION. UPGRADE TRAFFIC SIGNAL AT HARVEY DR. AND WILSON AVE. ADD THIRD LANE ON HARVEY DR. AT WILSON AVE. LOS ANGELES LA0D180 STATE 138 ROUTE 138 WIDENING FROM 2 TO 4 LANES WITH 2012 $89,811 HIGHWAY MEDIAN TURN LANE- NEAR LIANO FROM 0.30 MILES WEST OF 165TH STREET EAST TO 0.37 MILES WEST OF 190TH STREET EAST. (SEG.12). EA# 127271, PPNO 0694Q. LOS ANGELES LA962212 STATE 138 ROUTE 138: IN PALMDALE @ AVENUE P-8 FROM 2019 $700,000 HIGHWAY ROUTE 14 TO 100TH STREET – ACQUISITION OF ROW FOR FUTURE RTE 138 (TIER 2 ENV) (CFP 2212 $3540 2001 CFP 8021)(EA# 116720,PPNO 0393F) LOS ANGELES LA0D451 STATE 138 ROUTE 138: ROUTE 138 FROM AVE. T TO ROUTE 2014 $48,247 HIGHWAY 18-WIDEN 2 TO 4 THRU LANES WITH MEDIAN TURN LANE. EA# 12721,12722,12723,12724,12725,12728. PPNO# 3325,3326,3327,3328,3329,3331 LOS ANGELES LAE0219 STATE 210 ROUTE 210: CONSTRUCT SOUND WALLS ALONG 2013 $1,800 HIGHWAY PORTIONS OF THE I-210 FREEWAY BETWEEN ARROYO BLVD AND ORANGE GROVE (SAFETEA-LU #219 HIGH PRIORITY PROJECTS) LOS ANGELES 1OM0702- STATE 405 RECONFIGURING THE I-405 FREEWAY INTERCHANGES, 2020 $474 LA0G124 HIGHWAY AT CHERRY AVENUE, TO INCORPORATE BOTH NORTHBOUND AND SOUTHBOUND ON/OFF RAMPS AND TO CONFORM WITH CALTRANS DESIGN CRITERIA. (NO ADDITIONAL CAPACITY, ONLY AN INTERCHANGE RECONFIGURATION.)ONLY FOR PSR PHASE. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 163

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0B408 STATE 405 ROUTE 405: ADD A 10-MILE HOV LANE ON THE 2018 $1,034,000 HIGHWAY NORTHBOUND 405 BETWEEN I-10 AND U.S. 101 IN LA FROM RTE 10 TO RTE 101 WIDEN FOR HOV LANE & MODIFY RAMPS, ADD NEW WB ON RAMP AT SUNSET & HOV INGRESS/EGRESS AT SANTA MONICA BLV(EA 12030, PPNO 0851G, SAFETLU SECTION 1302 #18, 1934 #20) LOS ANGELES LA0D77 STATE 405 ROUTE 405: CITY OF L.A.-AT ROUTE 405 & US 101 2018 $120,144 HIGHWAY INTERCHANGE. CONSTRUCT FREEWAY CONNECTOR FROM SB RTE 405 TO NB&SB US 101 & ADD AUX LANE FROM BURBANK TO NB 101 CONNECTOR (EA# 199610, PPNO 2787) LOS ANGELES LA0D193 STATE 405 ROUTE 405: GARVEE DEBT PAYMENTS RTE. 405 – 2015 $34,470 HIGHWAY WATERFORD AV. TO RTE 10 – AUX LNE:LOS ANGELES – WATERFORD AV. TO RTE 10 – CNSTRCT S/B AUX LNE & S/B HOV LNE (2001 CFP 8354) (EA 195900 ,PPNO 2333). LOS ANGELES LA0D194 STATE 405 ROUTE 405: GARVEE DEBT SERVICE PAYMENTS: IN 2015 $30,787 HIGHWAY LOS ANGELES ON ROUTE 405/101 CONNECTOR GAP CLOSURE (2001 CFP 7248, 2001 CFP 8347) (EA# 20120K, PPNO 2336). (BOTH RIP & IIP) LOS ANGELES 49160 STATE 405 ROUTE 405: IN INGLEWOOD AT ARBOR VITAE AVENUE- 2018 $55,922 HIGHWAY CONSTRUCT SOUTH HALF OF INTER-CHANGE. EA# 491601, PPNO 0831) LOS ANGELES 1178A STATE 405 ROUTE 405: IN LOS ANGELES AND CULVER CITY FROM 2012 $190,228 HIGHWAY ROUTE 90 TO ROUTE 10 – HOV LANES (SB 5+0 TO 5+1; NB 5+0 TO 5+1 HOV) (2206LK CFP) OBLIGATED 6207 (034) LOS ANGELES LA0D332 STATE 405 ROUTE 405: IN LOS ANGELES: FROM LA TIJERA BLVD 2014 $38,711 HIGHWAY TO JEFFERSON BLVD; ADD AUXILIARY LANE PPNO: 3348 EA: 24130 LOS ANGELES LAF1103 STATE 405 ROUTE 405: WILMINGTON AVENUE INTERCHANGE 2014 $26,170 HIGHWAY MODIFICATION AT I-405. IMPROVE I-405/ WILMINGTON AVENUE INTERCHANGE BY ADDING A NEW NORTHBOUND ON-RAMP AND WIDENING OF WILMINGTON AVENUE, 223RD, AND EXISTING ON- AND OFF-RAMPS. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 164 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1M1004 STATE 605 I-605 I-605 CORRIDOR "HOT SPOT" INTERCHANGES IN 2025 $3,200,000 HIGHWAY GATEWAY CITIES LOS ANGELES LAE0574 STATE 605 ROUTE 605: STUDY – CONSTRUCT I-605 2013 $1,920 HIGHWAY INTERCHANGE CAPACITY IMPROVEMENTS IN IRWINDALE LOS ANGELES 1C0401 STATE 710 I-710 OCEAN BLVD IN INTERMODAL I-710 CORRIDOR USER-FEE BACKED CAPACITY 2030 $5,580,000 HIGHWAY LONG BEACH RAILROAD ENHANCEMENT – WIDEN TO 5 MIXED FLOW + YARDS IN 2 DEDICATED LANES FOR CLEAN TECHNOLOGY COMMERCE/ TRUCKS (EACH DIRECTION) AND INTERCHANGE VERNON IMPROVEMENTS, FROM OCEAN BLVD IN LONG BEACH TO THE INTERMODAL RAILROAD YARDS IN COMMERCE/VERNON LOS ANGELES LA0G830 STATE 710 I-710 POST MILE 6 POST MILE 6.4 I-710 IMPROVEMENTS/SHOEMAKER BRIDGE – 2023 $85,000 HIGHWAY DOWNTOWN OFF RAMPS. THE PROJECT REPLACES THE EXISTING SHOEMAKER BRIDGE AND MAKES BICYCLE, PEDESTRIAN, AND STREETSCAPE IMPROVEMENTS ON MAJOR THOROUGHFARES. LOS ANGELES 1M1002 STATE 710 I-710 I-710 EARLY ACTION PROJECTS 2022 $687,000 HIGHWAY LOS ANGELES 1M0101 STATE 710 SR-710 VALLEY BOULEVARD CALIFORNIA BL SR-710 NORTH EXTENSION (TUNNEL) (ALIGNMENT 2030 $5,636,000 HIGHWAY & PASADENA AVE TBD) LOS ANGELES 18790 STATE 710 ROUTE 710: STUDY TO EVALUATE TECHNICAL 2025 $87,454 HIGHWAY FEASIBILITY AND IMPACTS OF AN ALTERNATIVE TO CLOSE 710 FREEWAY GAP. THIS STUDY INCLUDES ENVIRONMENTAL STUDIES (EIR/EIS) (EA# 187901, PPNO# 2215) LOS ANGELES LA0B952 STATE 710 ROUTE 710: RECONSTRUCT I-710 INTERCHANGES AT 2015 $40,500 HIGHWAY I-5, AT I-405, AT SR 91, AND AT I-105. AS PART OF OF THE I-710 CORRIDOR PROGRAM PROPOSING 4 TRUCK LANES (PORTS-RAIL YARDS), 10 GENERAL LANES (PORT-SR-60)(ISTEA ID # 37)(SAFTEA-LU 3773) LOS ANGELES LA996143 STATE 710 ROUTE 710: RTE 710 PCH TO DOWNTOWN L.B., 2013 $7,496 HIGHWAY PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE (EA 2203U, 23640, PPNO: 2945,3248)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 165

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D479 STATE 999 ROUTE 999: LOS ANGELES COUNTY ITIP 2016 $12,947 HIGHWAY TRANSPORTATION ENHANCEMENT PROJECT LUMP SUM (PPNO 3546, 3547, 3548, 3549, 3550, ETC) LOS ANGELES LA990921 STATE 999 ROUTE 999: ON VARIOUS HIGHWAYS. GROUPED 2012 $236,700 HIGHWAY PROJECTS FOR NOISE ATTENUATION (SOUNDWALLS) (ONLY EA00234 ON RTE 710 REMAINING. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES. LOS ANGELES 1O0707 OTHER 0 PORTS OF LOS NEW CERRITOS CHANNEL RAIL BRIDGE 0 $91,000 ANGELES/LONG BEACH LOS ANGELES 1O0710 OTHER 0 PORTS OF LOS OTHER IN-PORT MAINLINE 0 $204,700 ANGELES/LONG BEACH LOS ANGELES 1O0706 OTHER 0 PORTS OF LOS PORTS RAIL SYSTEM 2018 $257,900 ANGELES/LONG BEACH LOS ANGELES 1O0709 OTHER 0 PORTS OF LOS REEVES GRADE SEPARATION 2014 $61,000 ANGELES/LONG BEACH LOS ANGELES 1O0708 OTHER 0 PORTS OF LOS TRIPLE TRACK S/O THENARD 2020 $16,500 ANGELES/LONG BEACH LOS ANGELES 1AL04 LOCAL 0 ARTERIAL COUNTYWIDE REGIONAL SURFACE TRANSPORTATION 2021 $563,750 HIGHWAY IMPROVEMENTS IMPROVEMENTS, INCLUDING GOODS MOVEMENT GRADE CROSSINGS LOS ANGELES 1O0703 LOCAL 0 FREEWAY SERVICE COUNTYWIDE FREEWAY SERVICE PATROL 2035 $795,200 HIGHWAY PATROL LOS ANGELES 1ITS04 LOCAL 0 ITS COUNTYWIDE CALL FOR PROJECTS SIGNAL SYNCHRONIZATION 2030 $1,023,700 HIGHWAY MODE LOS ANGELES 1120001 LOCAL 0 NEWHALL RANCH .25M WEST OF .14 MILES EAST WIDEN BRIDGE 53C2164 TO ACCOMMODATE EIGHT 2014 $15,710 HIGHWAY ROAD NEWHALL RANCH OF NEWHALL 12 FT LANES, 4 FT SHOULDERS, A CLASS 1 BIKE ROAD/MCBEAN RANCH ROAD/ TRAIL, AND AN ADDITIONAL 6 FT SIDEWALK. MINOR PKWY AVENUE SIDEWALK AND ROADWAY APPROACH WORK. TIBBITTS

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 166 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1O1007 LOCAL 0 NON-MOTORIZED COUNTYWIDE CALL FOR PROJECTS BICYCLE MODE 2030 $260,800 HIGHWAY LOS ANGELES 1O1008 LOCAL 0 NON-MOTORIZED COUNTYWIDE CALL FOR PROJECTS PEDESTRIAN MODE 2030 $260,800 HIGHWAY LOS ANGELES 1O1009 LOCAL 0 NON-MOTORIZED COUNTYWIDE CALL FOR PROJECTS TRANSPORTATION 2030 $159,300 HIGHWAY ENHANCEMENT ACTIVITIES (TEA MODE) LOS ANGELES 1O0701 LOCAL 0 PORTS OF LOS EXPANSION OF PIER B ST INTERMODAL RAILYARD 2015 $245,300 HIGHWAY ANGELES/LONG (FOR PIER B ST REALIGNMENT PHASE OF PROJECT BEACH SEE LA0C8094) LOS ANGELES 1O0702 LOCAL 0 RETROFIT COUNTYWIDE COUNTYWIDE SOUNDWALLS (METRO REGIONAL LINES 2035 $2,149,900 HIGHWAY SOUNDWALL AND MONTEREY PARK/SR-60) PROGRAM LOS ANGELES 1RL04 LOCAL 0 RIDESHARE COUNTYWIDE RIDESHARE SERVICES 2035 $528,400 HIGHWAY LOS ANGELES 1O0704 LOCAL 0 SAFE COUNTYWIDE SAFE 2035 $253,700 HIGHWAY LOS ANGELES 1TR1023 LOCAL 0 TDM COUNTYWIDE CALL FOR PROJECTS TDM MODE 2030 $157,700 HIGHWAY LOS ANGELES LA0D445 LOCAL 0 10TH STREET WEST CAPACITY IMPROVEMENTS FROM 2014 $4,221 HIGHWAY AVE L TO AVE M. CAPACITY IMPROVEMENTS ON 10TH STREET WEST BY WIDENING EXISTING ROADWAY TO ROW EXTENTS, CLOSING ANY MIXED FLOW LANE GAPS, PROVIDING CONTINUOUS PEDESTRIAN WALKS, & BUS TURNOUTS. LOS ANGELES LA9811099 LOCAL 0 20TH STREET WEST FROM AVENUE P-8 TO ELIZABETH 2014 $6,600 HIGHWAY LAKE ROAD 1 MILE STREET EXTENSION AND BRIDGE CONSTRUCTION (NEW ROAD). LOS ANGELES LAE2932 LOCAL 0 213TH ST. PEDESTRIAN SIDEWALK BRIGE OVER 2012 $2,200 HIGHWAY DOMINGUEZ CHANNEL. CONSTRUCT 213TH ST. PEDESTRIAN BRIDGE TO PROVIDE SAFE PASSAGE FOR PEDESTRIANS & WHEELCHAIRS OVER DOMINGUEZ CHANNEL.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 167

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1508 LOCAL 0 6TH STREET EAST BIKEWAY EXTENSION. THIS 2015 $544 HIGHWAY PROJECT WILL PROVIDE A MISSING LINK IN THE CLASS I BWY TO CONNECT THE EXISTING SIERRA HWY BIKEWAY TO THE TRANSPORTATION CENTER AND AN EXISTING BIKEWAY IN CLOCK TOWER PLAZA LOS ANGELES LA000800- LOCAL 0 AC CONVERSION. HBRR LOCAL BRIDGE LUMP SUM 2016 $49,820 LA000800A HIGHWAY – (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3) LOS ANGELES LA0C57 LOCAL 0 ACE/GATEWAY CITIES-CONSTRUCT GRADE SEP. AT 2010 $44,530 HIGHWAY PASSONS BLVD IN PICO RIVERA (& MODIFY PROFILE OF SERAPIS AV,)(PART OF ALAMEDA CORR EAST PROJ.)SAFETEA-LU HPP # 1666 (TCRP #54.3) LOS ANGELES LAE0084 LOCAL 0 ADAMS STREET REHABILITATION PROJECT 2011 $372 HIGHWAY LOS ANGELES LA0G739 LOCAL 0 AGOURA ROAD WIDENING. WIDEN AND REALIGN 2014 $5,500 HIGHWAY ROADWAY FROM WESTERLY CITY LIMITS TO CORNELL DRIVE (APROX 2 MILES). SOME AREAS ARE TWO LANES AND WILL BE WIDENED TO FOUR LANES. THE OTHER PORTIONS OF THE STREET ALREADY HAVE FOUR LANES. CONSTRUCT/MODIFY SIDEWALKS AND BIKE LANES; ADD LANDSCAPED MEDIANS LOS ANGELES LA98STIP3 LOCAL 0 ALAMEDA ST AND N SPRING ST ARTERIAL REDESIGN 2013 $8,555 HIGHWAY -REALIGN ALAMEDA/N.SPRING ELIMINATING INEFFICENT INTERSECTN WITH MAIN ST/N. MAIN STREET. 3 NB LANES & 3 SB LANES. LOS ANGELES LA0D333 LOCAL 0 ANAHEIM STREET PLANNING, COORDINATION AND 2011 $566 HIGHWAY DESIGN OF OPERATIONAL & STREETSCAPE (NON- CAPACITY IMPROVEMENTS). LOS ANGELES 1NL04-LAF1844 LOCAL 0 ANGELS WALK CRENSHAW. TO PROMOTE PEDESTRIAN 2014 $764 HIGHWAY ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 168 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1845 LOCAL 0 ANGELS WALK HIGHLAND PARK. TO PROMOTE 2012 $784 HIGHWAY PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS. LOS ANGELES 1NL04-LAF1846 LOCAL 0 ANGELS WALK NORTH HOLLYWOOD. TO PROMOTE 2012 $714 HIGHWAY PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS. LOS ANGELES LA0D188 LOCAL 0 ARBOR VITAE STREET FROM LA BREA AVENUE TO 2011 $3,532 HIGHWAY PRAIRIE AVENUE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS, DRIVEWAYS, PEDESTRIAN RAMPS, LANDSCAPING AND STREET LIGHTING. LOS ANGELES 1NL04-LAF3607 LOCAL 0 ARCADIA GOLD LINE STATION PEDESTRIAN 2015 $2,379 HIGHWAY LINKAGE PROJECT. DESIGN AND CONSTRUCTION OF PEDESTRIAN IMPROVEMENTS AROUND THE PLANNED GOLD LINE ARCADIA STATION, CONNECTING THE COMMUNITIES WITH THE REGIONAL RAIL SYSTEM. LOS ANGELES LA0D120 LOCAL 0 ARTESIA TRAFFIC ENHANCEMENT PROJECT FOR 2012 $1,192 HIGHWAY ARTESIA BLVD, PIONEER BLVD AND 183RD STREET RESURFACING, STREETSCAPING, TRAFFIC CALMING, ANGLE-PARKING SIGNALS, ETC. LOS ANGELES 1NL04-LAF3646 LOCAL 0 ARTS DISTRICT/LITTLE TOKYO GOLD LINE STATION 2015 $1,269 HIGHWAY LINKAGES. PEDESTRIAN ENHANCEMENTS INCLUDING SIDEWALK/PATH PAVING; PED LIGHTS; STREET TREES/PLANTING; DISTRICT SIGNAGE; ENTRY ELEMENTS; STREET FURNITURE; CROSSWALK PAVING; AND BIKE PARKING. LOS ANGELES LA0D390 LOCAL 0 AT I-110 NB AT JOHN S GIBSON BLVD NB RAMPS & 2014 $35,051 HIGHWAY NB SR-47/I-110 CONNECTOR. WIDEN SB 47 TO NB 110 CONNECTOR FROM 1 TO 2 LNS BEGIN AT SB 47 PM 0.72 (STATION 535+00) JUST W OF FRONT ST ON-RAMP. ADDL THROUGH LN CONTINUES ON NB 110 & ENDS JUST N OF THE J S GIBSON OFF-RAMP. WIDEN NB 110/J S GIBSON ON-RAMP TO IMPROVE ACCESS TO FWY & INTERSECTION OF J S GIBSON/110 NB RAMPS W/ IMPROVED TURN RADII & RE-STRIPING

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 169

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE2835 LOCAL 0 ATHERTON ST ENCLOSE, CONSTRUCT STORM DRAIN 2012 $1,440 HIGHWAY AND LANDSCAPE EXISTING OPEN CULVERT LOS ANGELES LAE2378 LOCAL 0 ATLANTIC BLVD STREET IMPROVEMENTS FROM 2013 $809 HIGHWAY 52ND DRIVE TO 58TH STREET. RESURFACING EXISTING PAVEMENT, SIGNING AND STRIPING, MINOR CONCRETE REPAIRS, LANDSCAPING, TRAFFIC LOOPS. LOS ANGELES LA0D279 LOCAL 0 ATLANTIC BLVD. BRIDGE OVER THE L.A RIVER 5/8 2016 $9,302 HIGHWAY MILE N SLAUSON AVE, WIDEN 6 LANE BRIDGE TO ADD RIGHT TURN LANE (BRIDGE #53C0252) LOS ANGELES LAF1342 LOCAL 0 ATSAC/ATCS – PLATT RANCH PROJECT. PROVIDE 2012 $5,469 HIGHWAY ATSAC/ATCS TYPE FACILITIES AND BUS PRIORITY INFRASTRUCTURE TO APPROX. 29 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER BASED REAL-TIME TRAFFIC SIGNALIZATION LOS ANGELES LAE2198 LOCAL 0 AVALON BLVD INTERCHANGE MODIFICATION AT 2014 $21,800 HIGHWAY I-405 IMPROVING AVALON/I-405 INTERCHANGE BY CONSTRUCTING A NEW SOUTHBOUND ON-RAMP, WIDENING NORTHBOUND OFF-RAMP AND ON-RAMP, WIDENING AVALON BLVD NORTHBOUND. LOS ANGELES LA9708289 LOCAL 0 AVENUE G FROM RT14 TO 25TH ST WEST. WIDEN 2023 $23,400 HIGHWAY FROM 2 TO 6 LANES (0.2 MILES) (TOTAL 6 LANES IN BOTH DIRECTIONS). INCLUDES INTERCHANGE IMPROVEMENTS. LOS ANGELES LA0D446 LOCAL 0 AVENUE K GAP CLOSURE FROM 40TH STREET WEST 2030 $3,410 HIGHWAY TO 60TH STREET WEST. WIDEN GAPS TO ADD AN ADDITIONAL LANE IN EACH DIRECTION (4 LANES TOTAL) WITHIN THE CITY JURISDICTION. LOS ANGELES LA0D447 LOCAL 0 AVENUE L GAP CLOSURE FROM 60TH STREET WEST 2020 $4,620 HIGHWAY TO 30TH WEST, ADDING AN ADDITIONAL LANE IN EACH DIRECTION, INCLUDING A MEDIAN (WITHIN CITY JURISDICTION)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 170 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1A1003 LOCAL 0 AVENUE L WIDENING: 15TH TO 30TH STREET WEST. 2014 $3,273 HIGHWAY CONSTRUCT CAPACITY IMPROVEMENTS ALONG AVENUE L BY WIDENING EXISTING ROADWAY TO AVAILABLE ROW EXTENTS & CLOSING ANY MIXED FLOW LANE GAPS, & PROVIDE IMPROVED CIRCULATION TO SR-14. WIDENING FROM 2 TO 3 LANES. LOS ANGELES LA0D449 LOCAL 0 AVENUE M AND SR14 OVERCROSSING 2023 $13,650 HIGHWAY IMPROVEMENTS. WIDENING AVENUE M FROM 2 TO 7 LANES FROM 10TH STREET WEST TO 15TH STREET WEST. LOS ANGELES 1NL04-LAF1507 LOCAL 0 AVENUE S BIKEWAY PHASE 2. CLASS I BIKEWAY 2014 $1,733 HIGHWAY IMPROVEMENTS ALONG THE GENERAL ALIGNMENT OF AVENUE S IN THE CITY OF PALMDALE. THIS PROJECT WILL INCLUDE CLOSING GAPS IN OUR LOCAL BICYCLE PLAN. LOS ANGELES LA960134 LOCAL 0 AVENUE S HIGHWAY 14/DOWNING ST WIDENING. 2018 $7,200 HIGHWAY WIDEN AVENUE S FROM STATE HIGHWAY 14 TO DOWNING ST (FROM 4 TO 6 LANES) 3 LANES IN EA. DIR.) APPROX 1.6 MILES. LOS ANGELES LA9811102 LOCAL 0 AVENUE S RAIROAD GRADE SEPARATION (OVERPASS/ 2018 $56,800 HIGHWAY UNDERPASS) OF METROLINK RR TRACKS, WEST OF SIERRA HIGHWAY – 6 LANES. INCLUDES GRADE SEPARATION OF SIERRA HIGHWAY AND APPLICABLE RAMPING. LOS ANGELES LA000373 LOCAL 0 AVIATION BLVD FROM MANHATTAN BEACH BLVD TO 2014 $13,984 HIGHWAY ARBOR VITAE WIDEN FROM 4 TO 6 LANES (ISTEA, 102-240, 1991) LOS ANGELES LA0C8089 LOCAL 0 BARHAM / CAHUENGA / INTERSECTION WIDEN 2014 $1,495 HIGHWAY IMPROVEMENT, FOR LEFT/RIGHT TURN IMPROV. PPNO 3111. LOS ANGELES LA960018 LOCAL 0 BEVERLY BOULEVARD MONTEBELLO BLVD TO W/O REA 2014 $3,650 HIGHWAY DRIVE RECONSTRUCT & WIDEN FROM 4 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 171

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1530 LOCAL 0 BICYCLE SYSTEM GAP CLOSURES & IMPROVED 2014 $1,231 HIGHWAY LA RIVER BIKE PATH. PROJECT WILL CONSTRUCT PRIORITY CLASS I & III BICYCLE SYSTEM GAP CLOSURES IN LONG BEACH AND IMPROVE CONNECTION TO LA RIVER. LOS ANGELES 1NL04-LAF1535 LOCAL 0 BICYCLE WAYFINDING SIGNAGE PROGRAM. 2012 $504 HIGHWAY WAYFINDING SIGNS TO DIRECT BICYCLISTS, AND EDUCATE MOTORISTS, TO THE LOCATIONS OF DEDICATED BIKE PATHS, LANES AND ROUTES, DESTINATIONS, AND TRANSIT HUBS THROUGHOUT LOS ANGELES. LOS ANGELES 1NL04-LAF1506 LOCAL 0 BIKE COMPATIBLE RDWY SAFETY AND LINKAGE ON 2014 $788 HIGHWAY PALOS VERDES DR. THE PROJECT WILL HAVE A CLASS II BIKE LANE ON BOTH SIDES OF PALOS VERDES DRIVE SOUTH, WITH AN UNPAVED SHOULDER FOR EMERGENCY USE. LOS ANGELES 1NL04-LAF3505 LOCAL 0 BIKE NETWORK LINKAGES TO EXPOSITION LIGHT 2015 $3,429,147 HIGHWAY RAIL. BIKE NETWORK ENHANCEMENTS TO SUPPORT EXPOSITION LINE. INCREASED SAFETY AND CONVENIENCE WITH SIGNAL DETECTION, HIGHLY VISIBLE LANE MARKINGS AND NEW BIKE RACKS. THE PROJECT AREA IS LOCATED THROUGHOUT THE CITY OF SANTA MONICA AND NO MORE THAN TWO MILES FROM THE PROPOSED EXPOSITION LIGHT RAIL LINE STATIONS. LOS ANGELES 1NL04-LAF1522 LOCAL 0 BIKE SAFE ROADWAY GRATES. THIS PROJECT IS TO 2012 $539 HIGHWAY UPGRADE EXISTING ROADWAY GRATES TO IMPROVE BIKE SAFETY AND PROMOTE CYCLING USAGE. LOS ANGELES 1NL04-LAF1534 LOCAL 0 BIKE TECHNOLOGY DEMONSTRATION. PROJECT WILL 2015 $399 HIGHWAY CONSIST OF DESIGN, INSTALLATION AND EVALUATION OF SEVERAL BICYCLE TECHNOLOGIES, INCLUDING BICYCLE ACTIVATED DETECTION AT INTERSECTIONS, BIKE BOXES, AND BIKE PARKING.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 172 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1503 LOCAL 0 BIKEWAY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN 2013 $2,390 HIGHWAY DIMAS WASH. THE BWY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS WASH; WILL CLOSE THE GAP ON A BRIDGE & CONNECT THE EXISTING CLASS II BIKE LANES TO THE EAST & WEST OF SAN DIMAS WASH CROSSING. LOS ANGELES LA002738 LOCAL 0 BIKEWAY/PEDESTRIAN BRIDGE OVER LA RIVER AT 2015 $5,000 HIGHWAY TAYLOR YARD CLASS I (CFP 738, 2077) (PPNO# 3156) LOS ANGELES LA0F010 LOCAL 0 BRIDGE NO. 53C0327 AND 53C0328, THE OLD ROAD, 2018 $47,991 HIGHWAY OVER SANTA CLARA RIVER AND OVER SPTCO(ABND) FROM 550 SOUTH OF SKYVIEW LANE TO RYE CANYON ROAD.REPLACE 4 LANE APPROACHES AND BRIDGES WITH 6 LANE APPROACHES AND BRIDGES. LOS ANGELES LA0G451 LOCAL 0 BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA 2018 $7,594 HIGHWAY CR. BETWEEN EASTHAM DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE WITH A NEW 4 LANE BRIDGE. LOS ANGELES LA0D171 LOCAL 0 BROADWAY IMPROVEMENTS FROM ALBERTONI TO 2010 $1,540 HIGHWAY 168TH ST. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT. LOS ANGELES LA0D170 LOCAL 0 BROADWAY IMPROVEMENTS FROM GRIFFITH ST 2011 $1,980 HIGHWAY TO ALBERTONI. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT. LOS ANGELES LA0D169 LOCAL 0 BROADWAY IMPROVEMENTS FROM MAIN ST TO 2013 $1,203 HIGHWAY GRIFFITH ST. CONSTRUCTION OF MISSING CURB & GUTTER AND RECONSTRUCTION OF EXISTING PAVEMENT AND UNDERGROUNDING THE OVERHEAD POWER LINES. LOS ANGELES LA0D167 LOCAL 0 BROADWAY IMPRVMNTS FRM 168TH ST. TO NORTH 2010 $1,070 HIGHWAY CITY LIMIT (ALONDRA BLVD). CONSTRUCT RAISED CONCRETE MEDIANS W/ LANDSCAPE & HARDSCAPE, ADD CURB & GUTTER & SIDEWLK ,RECNSTRUCT EXSTNG PAVEMNT. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 173

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE1816 LOCAL 0 BURBANK BLVD & HAYVENHURST AVE INTERSECTION 2014 $1,081 HIGHWAY IMPROVEMENTS – REDUCE WIDTH OF MEDIAN ISLANDS ON BURBANK BLVD TO INSTALL ADDITIONAL LEFT TURN LANE FROM W/B BURBANK TO S/B HAYVENHURST, AND EXCLUSIVE RIGHT TURN LANE FROM E/B BURBANK TO S/B HAYVENHURST; MODIFY TRAFFIC SIGNAL & STREET LIGHTING. LOS ANGELES LAE1181 LOCAL 0 BURBANK BLVD & WOODLEY AVE INTERSECTION 2013 $495 HIGHWAY IMPROVEMENTS. REDUCE WIDTH OF MADIAN ISLAND ON BURBANK BLVD TO CONSTRUCT ADDITIONAL LEFT TURN LANE FROM E/B BURBANK BLVD TO N/B WOODLEY AVE; MODIFY TRAFFIC SIGNAL AND STREET LIGHTING. PROP C FUNDING RECEIVED THROUGH CFP 2009 (F3169). LOS ANGELES LA0C8046 LOCAL 0 BURBANK BLVD WIDENING-LANKERSHIM BLVD TO 2014 $15,417 HIGHWAY CLEON AVE. FROM VARYING ROADWAY WIDTH TO FULL MAJOR HIGHWAY STANDARDS. FROM 1 LN TO 2 LNS IN EACH DIRECTION. PPNO 3097. LOS ANGELES LAE3793 LOCAL 0 CALIFORNIA AVE WIDENING: FROM WILLOW AVE 2013 $1,200 HIGHWAY AND SPRING ST WIDEN CALIFORNIA AVE TO SECONDARY MODIFIED HIGHWAY STREET STANDARDS (NON-CAPACITY). LOS ANGELES 1O1010 LOCAL 0 CALL FOR PROJECTS RESERVE 2030 $93,300 HIGHWAY LOS ANGELES LA9711031 LOCAL 0 CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN 2018 $7,600 HIGHWAY FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT SHOULDERS LOS ANGELES LA996328 LOCAL 0 CCTV CAMERA INSTALLATION 2010 $602 HIGHWAY LOS ANGELES LAE1934A LOCAL 0 CENTURY BLVD PEDESTRIAN SAFETY AND 2012 $3,600 HIGHWAY TRANSPORTATION IMPROVEMENTS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 174 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1612 LOCAL 0 CENTURY CITY URBAN DESIGN AND PEDESTRIAN 2015 $3,342 HIGHWAY CONNECTION PLAN. PROJECT WILL IMPLEMENT SIDEWALK IMPROVEMENTS, DECORATIVE CROSSWALKS, MEDIAN ISLAND, CURB RAMPS, PEDESTRIAN LIGHTING, SHELTERS, BENCHES, TRASH RECEPTACLES & STREET TREES. LOS ANGELES LA0C8075 LOCAL 0 CESAR CHAVEZ AVE/ LORENA ST / INDIANA ST 2014 $10,933 HIGHWAY INTERSECTION IMPROVEMENTS. RECONSTRUCTION OF A FIVE-LEGGED SIGNALIZED INTERSECTION INTO A MODERN ROUNDABOUT. THE CONSTRUCTION OF THE ROUNDABOUT WILL REDUCE THE COMPLEXITY OF THE INTERSECTION AND WILL IMPROVE TRAFFIC FLOW AND SAFETY. LOS ANGELES 1NL04-LAF1611 LOCAL 0 CESAR CHAVEZ TRANSIT CORRIDOR (110 FWY TO 2015 $2,350 HIGHWAY ALAMEDA). INSTALLATION OF PEDESTRIAN/TRANSIT RIDER AMENITIES INC. BUS STOP GARDENS AT THREE INTERSECTIONS, NEW PEDESTRIAN LIGHTING, STREET TREES IN A LANDSCAPED PARKWAY & WAYFINDING SIGNAGE. LOS ANGELES LA0C8095 LOCAL 0 CHERRY AVE. WIDENING PROJECT. BET 19TH ST AND 2012 $6,721 HIGHWAY PACIFIC COAST HIGHWAY BY WIDENING THE ARTERIAL FROM ONE TO TWO LANES IN EACH DIRECTION.(PPNO 3128). SAFETEA-LU #3203 LOS ANGELES LAE0595 LOCAL 0 CHEVY CHASE RAIL ROAD IMPROVEMENTS. SAFETY 2013 $919 HIGHWAY IMPROVEMENTS AT THE CHEVY CHASE AND AT-GRADE CROSSING AT DORAN, BROADWAY, GRANDVIEW AND SONORA AT-GRADE CROSSING. LOS ANGELES 1NL04-LAF1734 LOCAL 0 CITY OF BELL GARDENS SIGNAGE PROGRAM. BELL 2011 $322 HIGHWAY GARDENS CAPITAL IMPROVEMENT PROJECT THAT WILL PROMOTE THE CITY THROUGH NEW SIGNAGE. LOS ANGELES 1NL04-LAF1836 LOCAL 0 CITY OF LONG BEACH ATHERTON STREET 2012 $1,322 HIGHWAY ENHANCEMENT PROJECT. REHABILITATING THE LANDSCAPED MEDIAN TO ENHANCE THE EXPERIENCE OF OVER 37,000 PEDESTRIANS, BICYCLISTS, TRANSIT USERS AND AUTOS DAILY.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 175

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04- LOCAL 0 CITY OF ROLLING HILLS ESTATES – DEEP VALLEY 2012 $322 LSTEA0044 HIGHWAY DRIVE FROM 718 DEEP VALLEY DRIVE TO ROXCOVE DRIVE. – CONSTRUCT STREETSCAPE AND PEDESTRIAN IMPROVEMENTS. LOS ANGELES 1NL04-LAF1728 LOCAL 0 CITY OF SANTA MONICA ITS IMPROVEMENTS. SANTA 2012 $1,166 HIGHWAY MONICA REAL TIME BEACH PARKING SIGNS. THIS PROJECT WILL MAKE INFORMATION REGARDING BEACH PARKING AVAILABLE TO MOTORISTS DESTINED FOR SANTA MONICA BEACH PARKING LOTS. LOS ANGELES 1NL04-LAF3535 LOCAL 0 CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS 2016 $271 HIGHWAY AND BICYCLISTS. SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS TO DIRECT THEM TO METROLINK STATIONS AND OTHER REGIONAL TRIP GENERATORS.. THE SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS WILL DESIGN AND INSTALL WAYFINDING SIGNS ALONG THE CITY'S EXISTING NETWORK OF MULTI-USE PATHS, ON-STREET BIKEWAYS, PASEOS IN THE VALENCIA AND SAUGUS NEIGHBORHOODS, AND SIDEWALKS ALONG MOST MAJOR ROADWAYS. LOS ANGELES 1NL04-LAF1510 LOCAL 0 CLAREMONT PORTION OF THE CITRUS REGIONAL 2012 $1,794 HIGHWAY BIKEWAY. THIS PROJECT PROPOSES THE IMPLEMENTATION OF THE CLAREMONT PORTION OF THE CITRUS REGIONAL BIKEWAY UTILIZING BONITA AVENUE AND FIRST STREET AS PRIMARY CLASS II BIKE ROUTES. LOS ANGELES 1OM0702- LOCAL 0 COLDMILL AND ASPHALT OVERLAY OF EXISTING 2012 $560 LA0G674 HIGHWAY STREETS AT VARIOUS LOCATIONS. REMOVE AND REPLACE CURB, GUTTER, AND SIDEWALK, AND RE-STRIPE SAME STREETS. LOS ANGELES LA0D465 LOCAL 0 COLIMA RD- HALIBURTON RD/ CITY OF DIAMOND BAR 2018 $10,038 HIGHWAY CB ROAD WIDENING: RESTRIPE FOR 3ED THROUGH LANE ON EB APPROACH (HACIENDA BLVD- FULLERTON RD) & WB APPROACH (FULLERTON- CAMINO DEL SUR) LOS ANGELES LAE0896 LOCAL 0 COLIMA ROAD AT FULLERTON ROAD INTERSECTION 2012 $1,500 HIGHWAY IMPROVEMENT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 176 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF3612 LOCAL 0 COLORADO PEDESTRIAN PROMENADE: LRT STATION 2015 $6,568 HIGHWAY TO PIER/BEACH. A PEDESTRIAN PROMENADE ON COLORADO AVENUE TO CONNECT THE EXPO LIGHT RAIL TERMINUS STATION AT 4TH STREET WITH DOWNTOWN SANTA MONICA, THE CIVIC CENTER AREA, THE PIER AND THE BEACH. THE PROJECT IS LOCATED ON COLORADO AVENUE BETWEEN 4TH STREET AND THE SANTA MONICA PIER IN THE CITY OF SANTA MONICA, AND INCLUDES THE STREET, THE SIDEWALKS AND BOTH INTERSECTIONS. THE TOTAL PROJECT AREA IS APPROXIMATELY 1,240 LINEAR FEET. LOS ANGELES LAE1321 LOCAL 0 COMPTON ARTERIAL RECONSTRUCTION AND 2011 $3,840 HIGHWAY IMPROVEMENT PROGRAM (NON-CAPACITY). LOS ANGELES LAE3768 LOCAL 0 COMPTON ARTERIAL REONCSTRUCTION AND 2012 $3,000 HIGHWAY IMPROVEMENT PROGRAM (NON-CAPACITY). LOS ANGELES LAOB7326 LOCAL 0 COMPTON CREEK BIKEWAY EXTSN – PHASE III.DSIGN 2010 $464 HIGHWAY & CNSTRUCT .6 MI OF CLAS 1 BIKE/PED PATH FRM GREENLEAF BL TO ARTESIA FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRPNG. (PPNO 2869). LOS ANGELES LAE1915 LOCAL 0 CONSTRUCT AND IMPROVE MEDIANS AND DRAINAGE 2012 $5,503 HIGHWAY ON IMPERIAL HIGHWAY FROM WEST BORDER TO EAST BORDER OF CITY OF LA MIRADA LOS ANGELES LAE2333 LOCAL 0 CONSTRUCT AND REPAIR LINING IN FOUR TUNNELS 2011 $12,000 HIGHWAY ON KANAN, KANAN DUME, AND MALIBU ROADS BETWEEN US-1 AND US-101. (PROJECT USING $1,581 OF TOLL CREDITS IN FY 10/11 FOR MATCH FOR STPL AND DEMO FUNDS) LOS ANGELES 1NL04-LA0G395 LOCAL 0 CONSTRUCT CONCRETE SIDEWALKS AND CURB 2011 $600 HIGHWAY RAMPS, INSTALL SPEED RADAR FEEDBACK SIGNS AND PEDESTRIAN COUNTDOWN HEADS AND RESTRIPE CROSSWALKS ON FOSTER ROAD FROM STUDEBAKER ROAD TO MCRAE STREET.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 177

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE2651 LOCAL 0 CONSTRUCT CROSSWALK BUMP-OUTS AND RELATED 2010 $500 HIGHWAY STREETSCAPE IMPROVEMENTS ON TEMPLE ST BETWEEN HOOVER ST & GLENDALE. PROJECT WILL PROVIDE FOR VARIOUS STREETSCAPE IMPROVEMENTS. LOS ANGELES LA0D477 LOCAL 0 CONSTRUCT IMPROVEMENTS FOR SR-14 2014 $7,370 HIGHWAY INTERCHANGE AT GOLDEN VALLEY ROAD. DIAMOND CONFIRGURATION, TWO RAMPS, IMPROVEMENTS INCLUDE WIDENING OF BRIDGE OVERCROSSING, NEW SIGNALS, RAMP MOD. LOS ANGELES LAE0001B LOCAL 0 CONSTRUCT SAFE ACCESS TO STREETS FOR 2011 $500 HIGHWAY BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALKS, SIDEWALKS, AND TRAFFIC CALMING MEASURES LOS ANGELES LAE1138 LOCAL 0 CONSTRUCT VALLEY DRAINAGE AND RESURFACING 2011 $1,533 HIGHWAY IMPROVEMENTS: WEST OF SANTA ANITA AV- INCLUDING NO CAPACITY INCREASE STREET RESURFACING LOS ANGELES LAE3229 LOCAL 0 CONSTRUCTION AND ENHANCEMENTS OF TRAILS 2010 $960 HIGHWAY IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA LOS ANGELES LAE1531 LOCAL 0 CONSTRUCTION OF A SMART CROSSWALK SYSTEM AT 2012 $50 HIGHWAY THE INTERSECTION OF ARMINTA ST. AND MASON AVE. LOS ANGELES LAE2634 LOCAL 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE 2012 $125 HIGHWAY INTERSECTION OF HAMLIN ST. AND CORBIN AVE. LOS ANGELES LAE0388B LOCAL 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE 2012 $125 HIGHWAY INTERSECTION OF INDEPENDENCE AVE. AND SHERMAN WAY. LOS ANGELES LAE3201 LOCAL 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE 2012 $125 HIGHWAY INTERSECTION OF OSO AVE. AND VANOWEN ST. LOS ANGELES LAE2699 LOCAL 0 CONSTRUCTION OF NEW MULTI-USE PATH/TRAIL 2012 $574 HIGHWAY ALONG RIVER BANK BETWEEN SEPULVEDA BLVD & KESTER AVE INCLUDING ACCESS RAMPS, REATAINING WALLS, LANDSCAPING ETC.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 178 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE1697 LOCAL 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON 2010 $500 HIGHWAY MAJOR TRANSPORTATION CORRIDORS. NORTHEAST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. DEVONSHIRE STREET (LANGDON TO WOODMAN), SEPULVEDA BLV LOS ANGELES LAE2147 LOCAL 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON 2010 $1,000 HIGHWAY MAJOR TRANSPORTATION CORRIDORS. NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. LINDLEY AVE. (STRATHERN TO CHASE), ROSCOE BLVD LOS ANGELES LAE1509 LOCAL 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON 2010 $1,000 HIGHWAY MAJOR TRANSPORTATION CORRIDORS. SOUTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. VICTORY BLVD (OAKLAND TO RESEDA) TAMPA AVE LOS ANGELES LAE1867 LOCAL 0 CONSTRUCTION OF SMART CROSSWALK AT THE 2012 $50 HIGHWAY INTERSECTION OF TOPANGA CANYON AND GAULT ST. LOS ANGELES LA0G212 LOCAL 0 CONVERT LAS VIRGENES RD. FROM 2 LANE ROAD TO 2012 $2,000 HIGHWAY 4 LANE ROAD BETWEEN AGOURA RD. AND LOST HILLS RD.; 2 LANES IN EACH DIRECTION AND PROVIDING TURNING POCKETS, TRAFFIC SIGNAL INSTALLATIONS AND MODIFICATIONS, BIKE LANES AND SIDEWALKS LOS ANGELES 1NL04-LAF1501 LOCAL 0 COUNTY CLUB DRIVE BIKEWAY IMPROVEMENT 2013 $1,802 HIGHWAY PROJECT. CONSTRUCTION OF A 4-FOOT WIDE CLASS II BIKE LANE IN BOTH DIRECTIONS ALONG A ONE MILE SECTION OF COUNTRY CLUB DRIVE. LOS ANGELES 1NL04-LA0G414 LOCAL 0 COYOTE CREEK BIKE TRAIL: CLASS 1 BIKE PATH 2011 $709 HIGHWAY ALONG THE COYOTE CREEK FLOOD CHANNEL FROM HILLSBOROUGH DRIVE TO ROSECRANS AVNEUE LOS ANGELES LAE0326 LOCAL 0 CREATION OF A RAISED MEDIAN ON ALONDRA BLVD. 2012 $385 HIGHWAY BETWEEN CLARK AND WOODRUFF TO IMPROVE TRAFFIC SAFETY AND EFFICIENCE. THE MEDIAN WILL PROVIDE LANDSCAPING, LIGHTING AND IRRIGATION LOS ANGELES LAE2843 LOCAL 0 CRENSHAW BLVD REHABILITATION, MARICOPA ST TO 2011 $3,730 HIGHWAY SEPULVEDA BLVD, CITY OF TORRANCE LOS ANGELES LAE2157 LOCAL 0 CRENSHAW BLVD REHABILITATION. BETWEEN 182ND 2012 $3,458 HIGHWAY ST & 190TH. NEW RIGHT TURN LANES NEAR I-405 RAMPS – NO NEW THROUGH-TRAVEL LANES. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 179

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF3518 LOCAL 0 DAISY CORRIDOR AND 6TH STREET BIKE BOULEVARD. 2015 $2,655 HIGHWAY CONSTRUCT TWO (2) BICYCLE BOULEVARDS ALONG TWO CORRIDORS KNOWN AS THE DAISY CORRIDOR AND 6TH STREET IN LONG BEACH. THE PROPOSED BIKE BOULEVARD ALONG THE DAISY CORRIDOR IS A NORTH-SOUTH ROUTE BETWEEN BROADWAY. BIKE LANE (CLASS II) IS LESS THAN 1 MILE. LOS ANGELES LAE1920 LOCAL 0 DEL AMO BLVD – FROM NORMANDIE AVE AND NEW 2018 $29,920 HIGHWAY HAMPSHIRE – RECONSTRUCT AND WIDEN . FROM 1 LANE EA. DIR TO 2 LANES IN EA DIR. LOS ANGELES LA000389 LOCAL 0 DEL AMO BLVD FROM MADRONA AVE TO CRENSHAW 2012 $32,439 HIGHWAY BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314; PPNO 2371). LOS ANGELES LA0F062 LOCAL 0 DESIGN AND CONST. OF REAL-TIME PARKING INF./ 2010 $700 HIGHWAY GUIDANCE SYSTEM. PHASE I COVERS SANTA MONICA AREA, BOUNDED BY COLORADO AVE., OCEAN AVE., WILSHIRE BLVD AND LINCOLN BLVD. LOS ANGELES 1NL04-LAF3514 LOCAL 0 DESIGN AND CONSTRUCT 0.28 MILES CLASS I BIKE 2015 $6,169 HIGHWAY FACILITY NORTH OF I-10 FROM MOTOR AVE. TO 500 FEET EAST OF DUNLEER DR. (CONTINUOUS BIKEWAY FROM EXPOSITION PARK TO SANTA MONICA BEACH). LOS ANGELES LAE0938 LOCAL 0 DESIGN AND CONSTRUCT REALIGNMENT OF BRAHMA 2010 $300 HIGHWAY DRIVE AT WINNETKA TO ELIMINATE HAZARDOUS CONDITION LOS ANGELES LAE0191 LOCAL 0 DESIGN,RIGHT-OF-WAY, AND CONSTRUCT 2.8 MILE 2012 $2,000 HIGHWAY BIKEWAY AND PEDESTRIAN PATH FROM MILLS AVE. TO VALLEY HOME IN WHITTIER. LOS ANGELES 1NL04-LAF3501 LOCAL 0 DETECTION OF BICYCLES AT SIGNAL CONTROLLED 2015 $2,495 HIGHWAY INTERSECTIONS. BICYCLE DETECTION SYSTEMS AT INTERSECTIONS CONTROLLED BY TRAFFIC SIGNALS ALONG BIKE CORRIDORS.. LOS ANGELES LAE0701 LOCAL 0 DEVELOP AND IMPLEMENT TRAFFIC CALMING 2013 $1,920 HIGHWAY MEASURES FOR TRAFFIC EXITING THE I-710 INTO LONG BEACH

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 180 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE2978 LOCAL 0 DEVELOP CONCEPTUAL MASTER PLAN TO IMPROVE 2010 $194 HIGHWAY THE EFFICIENCY OF TRANSPORTATION FACILITIES (E/P & PS/E ONLY) LOS ANGELES LA0D473 LOCAL 0 DOCKWEILER DR EXTENSION FROM LYONS AV TO 2014 $11,126 HIGHWAY EXISTING DOCKWEILER DR: CONSTRUCT A 4-LANE FACILITY (2 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, AND DRAINAGE IMPROVEMENTS LOS ANGELES 1TDL04-LAF3731 LOCAL 0 DOWNTOWN LA INTER-MODAL TRANSIT INFORMATION 2014 $1,612 HIGHWAY AND WAYFINDING. INSTALL TRANSIT INFORMATION MONITORS, VARIABLE MESSAGE SIGNS, INTERACTIVE KIOSKS & PARKING AVAILABILITY SIGNAGE ALONG BROADWAY CORRIDOR TO OLYMPIC. LOS ANGELES 1NL04-LAF3624 LOCAL 0 DOWNTOWN TORRANCE PEDESTRIAN IMPROVEMENT 2015 $1,118 HIGHWAY PROJECT. INCREASE CONNECTIVITY, IMPROVE PEDESTRIAN SAFETY, REDUCE AUTOMOBILE DEPENDENCY, AND STIMULATE ECONOMIC DEVELOPMENT IN DOWNTOWN TORRANCE.. THE PROJECT AREA IS BOUND BY TORRANCE BOULEVARD TO THE NORTH, CARSON STREET TO THE SOUTH, CRAVENS AVENUE TO THE WEST, AND CABRILLO AVENUE TO THE EAST. LOS ANGELES 1NL04-LAF1655 LOCAL 0 EAST COLORADO BOULEVARD PEDESTRIAN 2014 $1,093 HIGHWAY ENHANCEMENTS (PHASE I). INSTALLATION OF PEDESTRIAN-SCALE STREET LIGHTING ON REGIONALLY SIGNIFICANT STREET IN A SPECIFIC PLAN AREA OF PASADENA IN ORDER TO INCREASE LIVABILITY/ENHANCE PEDESTRIAN MOVEMENT. LOS ANGELES 1NL04-LAF3603 LOCAL 0 EAST COLORADO BOULEVARD PEDESTRIAN 2014 $754 HIGHWAY IMPROVEMENTS (PHASE 2). INSTALL PED-SCALE STREET LIGHTS, DECORATIVE CROSSWALKS, BUS BENCHES & TRASH RECEPTACLES ON A REGIONALLY SIGNIFICANT STREET TO INCREASE LIVABILITY, SAFETY & ENHANCE PED MOVEMENT. EAST COLORADO BOULEVARD BETWEEN HILL AVENUE AND ALLEN AVENUE IN THE CITY OF PASADENA. (0.46 MILES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 181

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA996393 LOCAL 0 EAST DOWNTOWN TRUCK ACCESS IMPROVEMENTS: 2011 $2,153 HIGHWAY WIDENINGS, IMPRVMNTS, STRIPING, AT AND NEAR ALAMEDA ST & WASHINGTON BL IN THE EAST DOWNTOWN L.A. AREA LOS ANGELES LA962314 LOCAL 0 EAST SAN GABRIEL VALLEY SOM PILOT PROJECT 2011 $9,071 HIGHWAY TRAFFIC SIGNALS INTERCONNECT PROJECT LOS ANGELES 1NL04-LAF1615 LOCAL 0 EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGE. 2012 $2,990 HIGHWAY IMPROVE LINKAGES WITHIN 1/4 MILE OF METRO'S GOLD LINE LRT. LOS ANGELES 1NL04-LAF3651 LOCAL 0 EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGES, PHASE 2015 $1,698 HIGHWAY II. ENHANCE MULTI-MODAL ACCESS TO THE MARIACHI & SOTO GOLD LINE STATIONS, FOCUSING ON 1ST STREET. LOS ANGELES 1NL04-LA0G710 LOCAL 0 ECHO PARK/SUNSET BL STREETSCAPE 2013 $750 HIGHWAY BEAUTIFICATION – PROJECT WILL PROVIDE FOR CONSTRUCTION OF PEDESTRIAN AND STREETSCAPE IMPROVEMENTS ALONG SUNSET BL IN THE ECHO PARK AREA.PROJECT ELEMENTS WILL INCLUDE SIDEWALK IMPROVEMENTS, STREET TREES, TRANSIT AMNENITIES, AND PARKWAY LANDSCAPING. LOS ANGELES 1NL04-LA0G709 LOCAL 0 EL DORADO & BROMWICH SIDEWALK IMPROVEMENTS 2012 $649 HIGHWAY – IMPROVEMENTS WILL BE ON: 1) EL DORADO AV-BROMWICH ST TO MONTAGUE ST; AND 2) BROMWICH ST-EL DORADO AV TO SAN FERNANDO RD. CONSTRUCTION ELEMENTS WILL INCLUDE CONCRETE CURB, GUTTER, SIDEWALKS, ADA-COMPLIANT ACCESS RAMPS AND ASPHALT CONCRETE PAVING. LOS ANGELES 1NL04-LAF1504 LOCAL 0 EL MONTE: TRANSIT CYCLE FRIENDLY. EL MONTE 2013 $167 HIGHWAY PROPOSES TO IMPLEMENT THE 1ST PHASE OF THE EL MONTE BIKE-TRANSIT HUB COMPONENT (METRO BICYCLE TRANSPORTATION STRATEGIC PLAN) A COUNTYWIDE EFFORT TO IMPROVE BIKE FACILITIES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 182 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1718 LOCAL 0 EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE 2014 $1,746 HIGHWAY I, II, III & IV. WAYFINDING ELEMENT OF ENHANCED PEDESTRIAN FACILITIES TO IMPROVE AND ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. ALSO IN PED MODE (F1661) LOS ANGELES 1NL04-LAF1634 LOCAL 0 EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, 2014 $12,763 HIGHWAY III, & IV. DESIGN AND CONSTRUCTION OF ENHANCED FACILITIES TO IMPROVE & ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. WAYFINDING ELEMENT IN TDM F1718. LOS ANGELES LA990358 LOCAL 0 EL SEGUNDO EMPLOYMENT CTR ITS PRJ (T21-1477) 2011 $5,721 HIGHWAY LOS ANGELES 1NL04-LAF1514 LOCAL 0 EMERALD NECKLACE BIKE TRAIL PROJECT. DESIGN 2011 $503 HIGHWAY AND CONSTRUCT 1.1 MILES OF CLASS I BIKE PATH TO CONNECT DUARTE ROAD TO THE SAN GABRIEL RIVER BICYCLE TRAIL. LOS ANGELES LAE2750A LOCAL 0 ENGINEERING SUPPORT TO I-5 JOINT POWERS 2011 $1,945 HIGHWAY AUTHORITY TO WIDEN I-5 FREEWAY. PAVEMENT AND INTERSECTION IMPROVEMENT AT LA MIRADA BLVD AND ALONDRA BLVD PRIOR TO I-5 IMPROVEMENTS LOS ANGELES LAE1933 LOCAL 0 ENHANCE BYZANTINE LATINO QUARTER TRANSIT 2014 $500 HIGHWAY PLAZAS AT NORMANDIE AND PICO, AND HOOVER AND PICO, LOS ANGELES BY IMPROVING STREETSCAPES, INCLUDING EXPANDING CONCRETE AND PAVING LOS ANGELES LAE2476 LOCAL 0 ENHANCE PEDESTRIAN ENVIRONMENT AND INCREASE 2012 $2,000 HIGHWAY SAFETY ALONG OLYMPIC BL BETWEEN VERMONT AVE AND WESTERN AVE. PROJECT WILL PROVIDE VARIOUS STREETSCAPE IMPROVEMENTS ALONG LIMITS. LOS ANGELES LA0D318 LOCAL 0 ESPLANADE STREETSCAPE IMPROVEMENTS 2013 $3,034 HIGHWAY INCLUDES RESURFACING, RELOCATING CURB & GUTTER FOR ADDITIONAL LANDSCAPING, STREET GUTTER AND STORM DRAINS SAFETEA HPP# 1662 LOS ANGELES LAE3439 LOCAL 0 EXPAND DIESEL EMISSIONS REDUCTION PROGRAM OF 2011 $2,676 HIGHWAY GATEWAY CITIES COG

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 183

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1613 LOCAL 0 EXPO LINE STN STREETSCAPE PROJECT-EAST 2012 $3,262 HIGHWAY CRENSHAW TO JEFFERSON. DESIGN & CONSTRUCTION OF PEDESTRIAN RELATED STREETSCAPE IMPROVEMENTS WITHIN 1/4 MILE FROM EACH OF 3 LIGHT RAIL STATIONS ALONG EXPOSITION BLVD BETWEEN CRENSHAW & JEFFERSON. LOS ANGELES LA0C8164 LOCAL 0 EXPOSITION BLVD RIGHT-OF-WAY BIKE PATH- 2012 $14,710 HIGHWAY WESTSIDE EXTENSION. DESIGN AND CONSTRUCTION OF 2.5 MILES OF CLASS 1 BIKEWAY, LIGHTING, LANDSCAPING & INTERSECTION IMPROVEMENTS. (PPNO# 3184) LOS ANGELES LAOB422 LOCAL 0 FAIR OAKS AV & SR-110 IMPROVEMENT PROJECT 2018 $9,418 HIGHWAY (ROGAN FUNDS, HR5394)EXPAND EXIT OFF-RAMP OF 110 NB, ADD A HOOK RAMP FOR EXISTING ON-RAMP 110 SB. LOS ANGELES LA0G406 LOCAL 0 FAIRMONT AVE. PARK-N-RIDE FACILTY (83 PARKING 2014 $3,000 HIGHWAY SPACES) TO SERVE COMMUTERS USING SR-134, I-5. THE LOCATION OF THE PARK-N-RIDE IS FAIRMONT AVENUE AND SAN FERNANDO RD, ON THE SOUTH SIDE OF FAIRMONT AVENUE BETWEEN SAN FERNANDO ROAD AND SR-134 WESTBOUND FREEWAY RAMPS. THE WORK INCLUDES EARTHWORK, DRAINAGE, AND PLACEMENT OF AC, LIGHTING, LANDSCAPING, FENCING, AND SIGNAGE WORK. THE WORK ALSO INCLUDES INSTALLING A SIDEWALK FOR PEDESTRIAN ACCESS FROM SAN FERNANDO ROAD. LOS ANGELES 1NL04-LAF1639 LOCAL 0 FASHION DISTRICT STREETSCAPE PHASE II. 2013 $2,034 HIGHWAY STREETSCAPE IMPROVEMENTS ENHANCING THE PEDESTRIAN ENVIRONMENT TO FACILITATE INCREASED PEDESTRIAN USAGE BETWEEN LA FASHION DISTRICT'S CORE AND THE 7TH ST TRANSIT CORRIDOR. LOS ANGELES 1NL04-LAF1513 LOCAL 0 FIJI WAY BICYCLE LANE PROJECT. WIDEN THE SOUTH 2014 $1,007 HIGHWAY SIDE OF FIJI WAY FROM WEST OF ADMIRALTY WAY FOR BIKE LANES.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 184 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE0479 LOCAL 0 FIRESTONE BLVD. FROM RYERSON AVE AND 2011 $2,000 HIGHWAY STEWART & GRAY RD. WIDEN SECTIONS OF FIRESTONE (BOTTLENECK FOR TURN LANES; ST RECONSTRUCTION, REHAB, & RESURFACE; & UPGRADE HANDICAP RAMPS LOS ANGELES LAF3124 LOCAL 0 FIRESTONE BOULEVARD CAPACITY IMPROVEMENTS. 2018 $14,721 HIGHWAY INCREASE THE NUMBER OF LANES FROM 4 TO 6 ON FIRESTONE BLVD WITHIN THE ROW, RAISED LS MEDIANS, SIDEWALKS, BUS SHELTERS & PULLOUTS, C&G, STREET LIGHTING, & UTILITY RELOCATION.. LOS ANGELES 1TDL04-LAF3726 LOCAL 0 FIRST AND LAST MILE TRANSIT CONNECTIVITY 2014 $1,641 HIGHWAY OPTIONS. IMPLEMENT A PILOT SHARED FLEET VEHICLE PROGRAM THAT INCLUDES, BIKES, ALTERNATIVE GREEN VEHICLES FOR FIRST & LAST MILES FROM UNION STATION TO AND OTHER DOWNTOWN LOCATIONS. LOS ANGELES 1NL04-LAF3130 LOCAL 0 FLORENCE AVE REGIONAL TRANSPORTATION 2014 $5,000 HIGHWAY CORRIDOR IMPRVMT PROJ. RECONFIGURATION OF 1.2 MILE SEGMENT OF FLORENCE AV INCLUDING NEW FLORENCE AV/REDONDO BL INTERSECTION & RELATED CAPACITY PED/BIKE IMPRV TO REBALANCE STREET INTO MULTIMODAL CORRIDOR.. LOS ANGELES 1NL04-LAF1635 LOCAL 0 FLORENCE AVENUE PEDESTRIAN IMPROVEMENT 2014 $7,988 HIGHWAY PROJECT. PROVIDES PEDESTRIAN ORIENTED IMPROVEMENTS ON FLORENCE AVENUE INCLUDING PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE, CROSSWALK TREATMENT, AND BUS AND STREET FURNITURE. LOS ANGELES LA0C8128 LOCAL 0 FOX HILLS AREA TRAF SIG SYNCH EFFORT & 2010 $2,036 HIGHWAY CITY-WIDE AUTO TRAF SIGNAL CONTROL AND MONITORING PROJECT. INCORPORATE 11 SIGNALIZED INTERSECTIONS INTO AN ATSAC / ADAPTIVE TRAF CONTROL SYS. LOS ANGELES LAE2617 LOCAL 0 GALE AVENUE –FROM FULLERTON ROAD TO NOGALES 2014 $600 HIGHWAY ST, WIDEN FROM 4 TO 6 LANES AND NOGALES ST INTERSECTION WIDENING AT GALE AVE. TO ADD LEFT TURN LANE.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 185

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1OM0702- LOCAL 0 GARFIELD AVENUE AT SLAUSON AVENUE 2011 $570 LA0G306 HIGHWAY INTERSECTION (GARFIELD AVENUE AT FLOTILLA AVENUE) – PROJECT INVOLVES PAVEMENT RECONSTRUCTION IN CONCRETE, NEW CURB AND GUTTER, DRAINAGE, TRAFFIC SIGNAL, BUS SHELTERS, AND STRIPING OF THE INTERSECTION. LOS ANGELES LA0F008 LOCAL 0 GLENDALE BLVD. OVER L.A RIVER, REHABILITATE / 2013 $1,880 HIGHWAY RETROFIT BRIDGE AND WIDEN BY 12 FEET, UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 (53C1881) GLENDALE-HYPERION COMPLEX OF BRIDGES. (#53C-1883) LOS ANGELES LA0F009 LOCAL 0 GLENDALE BLVD. OVER LA RIVER. REHABILITATE / 2013 $2,350 HIGHWAY RETROFIT BRIDGE AND WIDEN BY 12 FEET. UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 GLENDALE-HYPERION COMPLEX OF BRIDGES. (BRIDGE #53C1884, BHLS-5006(187)) LOS ANGELES LA0F007 LOCAL 0 GLENDALE BLVD.-HYPERION AVE. COMPLEX OF 2016 $66,557 HIGHWAY BRIDGES OVER LA RIVER, I-5 AND RIVERSIDE DR, REHABILITATION/SEISMIC RETROFIT; UPGRADE BRIDGE RAILING; INCLUDES BRIDGES 53C-1881, 53C-1882, 53C-1883, 53C-1884 AND 53-1069. NO ADDITIONAL LANES. REALIGN I-5 NORTH BOUND OFF RAMP (FED PROJECT ID: BHLS-5006(181) LOS ANGELES 1NL04-LA0G186 LOCAL 0 GLENDALE PARKS, RECREATION & COMMUNITY 2010 $197 HIGHWAY SERVICES DEPARTMENT WILL CONSTRUCT A 1,825 FOOT ADA ACCESSIBLE RECREATIONAL TRAIL (NOT FOR COMMUTING PURPOSES) ADJACENT TO THE 27-ACRE GLENDALE SPORTS COMPLEX IN THE SAN RAFAEL HILLS ABOVE THE CITY OF GLENDALE. A PORTION OF THE SPORTS COMPLEX PARKING LOT WILL BE RE-STRIPED TO INCLUDE ADDITIONAL HANDICAPPED SPACES NEAR THE TRAILHEAD. (NO ADDITIONAL PARKING SPACES WILL BE ADDED). LOS ANGELES LA0B104 LOCAL 0 GOLDEN VALLEY ROAD – NEWHALL RANCH ROAD TO 2018 $11,000 HIGHWAY PLUM CANYON ROAD. 0 TO 4 LANES APPROXIMATELY 1.5 MILES. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 186 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA990359 LOCAL 0 GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT 2018 $1,347,101 HIGHWAY RAIL CORR. THRGH SAN.GAB. VALLEY – EAST. L.A. TO POMONA ALONG UPRR ALHAMBRA &L.A. SUBDIV – ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318 LOS ANGELES LAE2194 LOCAL 0 GREENLEAF ROW COMMUNITY ENHANCEMENT 2011 $3,840 HIGHWAY PROJECT DESIGN AND CONSTRUCTION OF BIKEWAY PED WALK WAY AND UPGRADE SIGNALIZATION LOS ANGELES 1NL04-LA11G2T LOCAL 0 GROUP PROJECTS FOR BICYCLE AND PEDESTRIAN 2014 $24,473 HIGHWAY FACILITIES. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. PROJECTS TO UPGRADE, CREATE, MAINTAIN, ENHANCE, OR ELIMINATE HAZARDS FOR PEDESTRIANS AND CYCLIST FACILITIES THROUGHOUT COUNTY. LOS ANGELES 1NL04-LA11G4T LOCAL 0 GROUP PROJECTS FOR PLANTING, LANDSCAPING, 2014 $16,154 HIGHWAY TRANSPORTATION SYSTEM BETTERMENTS, BEAUTIFICATION AND SCENIC EASEMENTS THOUGHOUT THE COUNTY (NO LANE ADDITIONS). PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. LOS ANGELES LA000800- LOCAL 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION 2016 $304,330 LA000800 HIGHWAY AND RECONSTRUCTION – HBP PROGRAM PROJECTS ARE CONSISTENT WITH 40 CFP PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTION BRIDGES (NO ADDITIONAL TRAVEL LANES) LOS ANGELES LA0C8126 LOCAL 0 HARBOR-GATEWAY ATSAC/ATCS PROJECT; 2011 $11,142 HIGHWAY IMPROVEMENTS TO 109 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTROL SYSTEM. LOS ANGELES LA960176 LOCAL 0 HARRY S BRIDGES BLVD RELOCATION/ 2014 $51,813 HIGHWAY CONSOLIDATION OF STREETS, STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND SIGNALIZATION (TEA21-#978) LOS ANGELES 1OM0702- LOCAL 0 HIGHLAND PARK PEDESTRIAN IMPROVEMENTS ALONG 2014 $250,000 LA0G686 HIGHWAY FIGUEROA BETWEEN AVENUE 50 AND AVENUE 60 *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 187

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1O1012 LOCAL 0 HIGHWAY OPERATIONAL IMPROVEMENTS IN ARROYO 2014 $260,000 HIGHWAY VERDUGO SUBREGION LOS ANGELES 1O1013 LOCAL 0 HIGHWAY OPERATIONAL IMPROVEMENTS IN LAS 2014 $253,000 HIGHWAY VIRGENES/MALIBU SUBREGION LOS ANGELES LA0C8209 LOCAL 0 HOLLYWOOD MEDIA DISTRICT-PED IMPRV. 2009 $810 HIGHWAY STREETSCAPE ELEMNTS: LANDSCAPE MEDIAN ISLANDS, PED LIGHTING,STAMPED XWALK, ON SANTA MONICA BL- VINE ST TO HIGHLAND & HIGHLAND – MELROSE TO FOUNTAIN LOS ANGELES 1NL04-LAF1617 LOCAL 0 HOLLYWOOD PEDESTRIAN/TRANSIT CROSSROADS 2013 $860 HIGHWAY PHASE II. DESIGN AND INSTALL PEDESTRIAN AND TRANSIT USER ENHANCEMENTS, EXTENDING THE ORIGINAL HOLLYWOOD PEDESTRIAN/TRANSIT IMPROVEMENT PROJECT TO INCLUDE HIGHLAND AVENUE AND VINE STREET. LOS ANGELES LAF1197 LOCAL 0 HUNTINGTON DR CAPACITY IMPROVEMENTS. 2014 $2,925 HIGHWAY MITIGATION COSTS EXCLUDED [PROJECT INVOLVES TRAFFIC FLOW AND CAPACITY IMPRMENTS INCL THE ADDITION OF A THROUGH LANE, TURN LANES & RECONSTRUCTION OF MEDIAN & CHANNELIZING ISLANDS] LOS ANGELES LA0C8036 LOCAL 0 HYPERION AV UNDR WAVERLY DR BRDGE, 2013 $14,422 HIGHWAY RE-COFIGURE SIDEWKS ALONG HYPERION. RE-ALLIGN I-5 NB OFF-RAMP AT GLENDALE BLVD. PROVIDE ALTERNATIVE BIKEWAY ACCESS TO LA RIVER. PPNO 3092. LOS ANGELES LAF1178 LOCAL 0 I-710 EARLY ACTION PLAN – INTERSECTION 2014 $50,360 HIGHWAY IMPROVEMENTS AT FIRESTONE BLVD/ATLANTIC AVENUE INTERSECTION. FIRESTONE BLVD IS EXISTING 2 LANES IN EACH DIRECTION, AFTER THE PROJECT WILL BE 3 LANES IN EACH DIRECTION. THE LENGTH OF THE PROJECT IS .75 MILES. PRIMARILY IT WILL WIDEN FIRESTONE BLVD AND ATLANTIC AVENUE AND REALIGN THEIR INTERSECTION.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 188 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA996347 LOCAL 0 I-710/FIRESTONE BLVD.IC, PHASE IV (FIRESTONE 2018 $21,816 HIGHWAY BLVD. BRIDGE WIDENING OVER L.A RIVER) PROJECT NO. HP21L-5257 (016) (HBRR: 53C1972) WIDEN OF FIRESTONE BLVD FROM RAYO AVE TO I-710 FREEWAY, ON-RAMP MOD. REHABILITATE 5-LANE BRIDGE TO 6 LANE, ADD SHOULDERS, UPGRADE BRIDGE RAILIN LOS ANGELES 1NL04-LAF1520 LOCAL 0 IMPERIAL HIGHWAY BIKE LANES. THIS PROJECT 2014 $2,322 HIGHWAY INVOLVES THE MODIFICATION OF THE MEDIAN ISLAND AND THE WIDENING OF IMPERIAL HIGHWAY ALONG 1000 FT EAST OF PERSHING DRIVE TO ACCOMMODATE BIKE LANES. LOS ANGELES LAE1142 LOCAL 0 IMPLEMENT ITS SUBREGIONAL MASTERPLAN: FOCUS 2011 $2,688 HIGHWAY INTEGRATING STATE, LOCAL, & PRIVATE SYSTEMS FOR REAL TIME TRAFFIC CONTROL & FREIGHT TRAVELER INFO, TRUCK SAFETY, SECURITY, & EMISSIONS LOS ANGELES LAE2828 LOCAL 0 IMPLEMENT STREETSCAPE IMPROVEMENTS ALONG 2012 $100 HIGHWAY WILBUR AVE TO ENHANCE TRAFFIC AND PEDESTRIAN TRAFIC. ALL WORK SHALL BE COMPLETED IN CITY OF LA ROW LOS ANGELES LAE1023 LOCAL 0 IMPLEMENT VAN NUYS RD AND SAFETY 2010 $500 HIGHWAY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN AND AROUND THE VAN NUYS AREA OF THE CITY. NO TRAFFIC CAPACITY LOS ANGELES LA990351- LOCAL 0 IMPROVE GLENDALE BLVD/FWY RT 2 TERMINUS 2014 $14,258 LA990351 HIGHWAY RECONFIG/REDSIGN, TRAFFIC MGMT. NEIGHBORHOOD SAFETY MEASURES (TEA21-#413) (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH FOR THE DEMO FUNDS)TOLL CREDIT IN FY10/11 IN CON. FOR $375 AND FY11/12 IN CON. FOR $1,875. LOS ANGELES LAOC8052 LOCAL 0 IMPROVE SAN FERNANDO ROAD BETWEEN ELM 2012 $1,991 HIGHWAY ST AND EAGLE ROCK BL, ADD TURN LANES. MAKE IMPROVEMENTS AT SR-2 RAMPS. PPNO 3102.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 189

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE0884 LOCAL 0 IMPROVEMENTS TO THE SOUTH AZUSA AVE./AMAR 2010 $1,200 HIGHWAY RD. INTERSECTION (500 FEET IN ALL DIRECTIONS FROM INTERSECTION) IMPROVEMENTS INCLUDE WIDENING, ADDING LEFT LANE, AND TRAFFIC SIGNAL MODIFICATIONS. LOS ANGELES 1OM0702- LOCAL 0 IN CITY OF LOS ANGELES, ON 103RD STREET 2011 $4,000 LAE0427 HIGHWAY FROM CENTRAL TO GRAHAM & CENTRAL AV. FROM 103RD STREET TO IMPERIAL HWY. PROJECT WILL PROVIDE STREETSCAPE, TRANSIT, AND PEDESTRIAN AMENITIES. LOS ANGELES 1NL04- LOCAL 0 IN LOS ANGELES – ALONG THE LA RIVER FROM 2013 $1,542 LSTEA0019 HIGHWAY BARCLAY ST. TO N. SPRING ST. – CONSTRUCT BIKE PATH LOS ANGELES LAE0518 LOCAL 0 IN THE CITY OF LOS ANGELES, ON BROADWAY W/S 2010 $2,500 HIGHWAY FROM 4TH ST. TO 235 N/O 4TH ST, AND 4TH ST FROM BROADWAY TO 120 W/O BROADWAY. REMOVE AND REPLACE SIDEWALKS INCLUDING PORTIONS THAT SPAN. LOS ANGELES LAE2906 LOCAL 0 INGLEWOOD AVENUE CORRIDOR IMPROVEMENT 2014 $4,515 HIGHWAY AT MARINE AVENUE FOR ROADWAY WIDENING AT THREE INTERSECTION CORNERS TO ACCOMMODATE DEDICATED RIGHT TURN LANE POCKETS TO IMPROVE THRU TRAFFIC FLOW AND REDUCE CONGESTION. THIS PROJECT WILL INCLUDE CURB, GUTTER, SIDEWALK, ADA ACCESSIBLE RAMPS, UTILITY RELOCATION, AND SIGNAL REPLACEMENTS/MODIFICATIONS. RIGHT OF WAY ACQUISITION WILL BE REQUIRED IN ORDER TO ACCOMMODATE RIGHT TURN POCKETS OF SUFFICIENT STACKING LENGTH. LOS ANGELES LA996425 LOCAL 0 INSTALL REVERSIBLE LANE ON SEPULVEDA BL 2012 $8,301 HIGHWAY THROUGH TUNNEL AT MULHOLLAND DR, INSTALL BIKE FACILITIES FROM SKIRBALL CENTER DR TO BEL AIR CREST RD, IMPLEMENT INTERSECTION IMPROVEMENTS AT SKIRBALL CENTER DR, I-405 FWY SB ON-RAMP, MORAGA DR, WILSHIRE BL

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 190 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAES235 LOCAL 0 INSTALL SAFETY IMPROVEMENTS AT THE AT-GRADE 2012 $3,205 HIGHWAY CROSSING OF BUENA VISTA STREET NEAR VANOWEN STREET, INCLUDING CROSSING GATES, PEDESTRIAN IMPROVEMENTS, MEDIAN ISLANDS, PAVEMENT MARKINGS AND CCTV. LOS ANGELES LAE2591 LOCAL 0 INSTALL TRAFFIC SIGNAL ON BALBOA BL. AT 2010 $120 HIGHWAY KNOLLWOOD SHOPPING CENTER LOS ANGELES LAE2883 LOCAL 0 INSTALLATION OF NEW AND THE REMOVE/ 2011 $742 HIGHWAY REPLACE OF EXISTING DAMAGED OR SUBSTANDARD SIDEWALKS, DRIVE APPROACHES, AND CONFLICTING OBSTRUCTIONS AND ADA RAMPS. PROJECT AREA IS BOUNDED BY FOSTER RD TO ROSECRANS AVE AND LAKEWOOD BLVD TO CLARK AVE. LOS ANGELES LA0D439 LOCAL 0 INTELLIGENT TRANSPORTATION SYSTEM LOGISTICS 2011 $500 HIGHWAY & SYSTEMS MANAGEMENT, WILL PRODUCE AN ITS MASTERPLAN FOR THE GATEWAY CITIES SUBREGION WITH AN EMPHASIS IN GOODS MOVEMENT LOS ANGELES LAE0134 LOCAL 0 INTERSECTION AT BALBOA BLVD & SAN FERNANDO 2011 $500 HIGHWAY RD.MINOR WIDEN TO PROVIDE TURN LANES, & REALIGNMENT OF BALBOA RD.RIGHT-TURN LANE AT BALBOA BLVD. LOS ANGELES LAE3764 LOCAL 0 ITS & INTERSECTION IMPROVEMENTS IN AND NEAR 2011 $1,250 HIGHWAY LAX AIRPORT, WHICH MAY INCLUDE RESTRIPING, SIGNAL PHASE CHANGES, AND THE ADDITION OF INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT. LOS ANGELES LA996324 LOCAL 0 ITS IMPROVEMENTS: LAKE AVENUE AND DEL MAR 2010 $963 HIGHWAY BLVD. LOS ANGELES LAE2538 LOCAL 0 KOREATOWN PAVILION GARDEN-TO ENHANCE THE 2012 $250 HIGHWAY NORTHEAST CORNER OF NORMANDIE AND OLYMPIC BL. LOS ANGELES LA0D108 LOCAL 0 L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY 2010 $2,536 HIGHWAY ALONG WEST BANK OF LA RIVER- FLETCHER DR TO BARCLAY ST INCLUDES LIGHTING, SIGNAGE, PAVEMNT MARKINGS & FENCING (LA996245) (PPNO 5006)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 191

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D209 LOCAL 0 LA BREA AVENUE, FROM FLORENCE AVE TO CENTURY 2011 $5,977 HIGHWAY BLVD AND IMPERIAL HIGHWAY, FROM PRAIRIE AVE TO VAN NESS AVE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS. LOS ANGELES LA990360 LOCAL 0 LA LOMA BRIDGE CONTRUCTION (TEA21-#1208) THE 2016 $18,195 HIGHWAY LENGTH OF THE PROJECT IS 379 FT. RECONSTRUCT THE ONE LANE IN EACH DIRECTION. BRIDGE NO. 53C0759, LA LOMA RD, OVER ARROYO SECO CHANNEL, 0.8 MIS S. FOOTHHILL FREEWAY. LOS ANGELES LA0C8058 LOCAL 0 LA TIJERA BRIDGE WIDENING OVER I-405 FREEWAY; 2012 $14,515 HIGHWAY PROVIDE SIDE-BY-SIDE DUAL LEFT -TURN LANES IN EAST & WESTBOUND DIRECTION ONTO FREEWAY RAMPS. LOS ANGELES 1TR08D7B- LOCAL 0 LACRD – TRANSIT SIGNAL PRIORITY IN THE CITY OF 2011 $1,000 LA0G155 HIGHWAY LOS ANGELES. LOS ANGELES LAF3114 LOCAL 0 LAKEWOOD BOULEVARD PHASE 3 IMPROVEMENTS. 2018 $7,778 HIGHWAY WIDEN TO PROVIDE 3 LANES IN EACH DIRECTION & 50 CURB RETURNS AT INTERSECTIONS, RECONSTRUCT INFRASTRUCTURE TO EXTEND LIFE BY 50 YEARS, REPLACE LANDSCAPING, LIGHTING, & TRAFFIC SIGNALS. PROJECT WILL GO FROM 4 TO 6 LANES. LOS ANGELES LAE1655 LOCAL 0 LANDSCAPE AND IRRIGATE EAST BOUND 91 FREEWAY 2011 $240 HIGHWAY ON AND OFF RAMPS AT BELLFLOWER BL. LOS ANGELES 1NL04-LAF3640 LOCAL 0 LANI – EVERGREEN PARK STREET ENHANCEMENT 2016 $1,075 HIGHWAY PROJECT. INCREASE PEDESTRIAN SAFETY AND ACCESS BY PROVIDING IMPROVED CROSSWALKS, NEW BUS SHELTERS AND STREET TREES TO ENHANCE CONNECTIVITY BETWEEN TRANSIT AND AREA LANDMARKS.. THE PROPOSED PROJECT IS LOCATED IN THE BOYLE HEIGHTS COMMUNITY OF LOS ANGELES. LOS ANGELES LAE2389 LOCAL 0 LAS TUNAS PED ENHANCEMENTS. INSTALL AND 2013 $791 HIGHWAY REPLACE ADA RAMPS. UPDATE CROSSING MARKING AND SIGNALS

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 192 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE0180 LOCAL 0 LAUREL CANYON BLVD BETWEEN HAMLIN STREET 2011 $1,200 HIGHWAY AND VICTORY BLVD. PROJECT WILL PROVIDE FOR PEDESTRIAN SAFETY AND BEAUTIFICATION TREATMENT. ELEMENTS INCLUDE LANDSCAPED MEDIAN ISLANDS. LOS ANGELES LA0C8038 LOCAL 0 LAUREL CANYON BLVD BRDGE OVER TUJUNGA WASH 2015 $3,700 HIGHWAY WIDENING (BRIDGE #53C-1233)- REHABILITATE 4-LANE BRIDGE AND WIDEN TO ADD SHOULDERS, UPGRADE BRIDGE RAILINGS. PPNO 3094 3379 AB 3090 LOS ANGELES LAE0346 LOCAL 0 LIGHTING, AND SAFETY IMPROVEMENTS ON ROAD 2012 $6,500 HIGHWAY LEADING TO HANSEN DAM RECREATION AREA. ACCESS IMPROVEMENTS INCLUDING HILLSIDE STABILIZATION AND PARKING LOT REHABILITATION ALONG OSBORNE STREET BETWEEN GLENOAKS BOULEVARD AND DRONFIELD AVENUE [REF P.L. 110- 244, SEC 105(A)(234)] (CHANGE PER H.R.1195-6/6/08) LOS ANGELES 1NL04-LAF3615 LOCAL 0 LONG BEACH BLVD. PEDESTRIAN IMPROVEMENT 2015 $2,521 HIGHWAY PROJECT. PROJECT PROVIDES PEDESTRIAN- ORIENTED IMPROVEMENTS TO LONG BEACH BOULEVARD INCLUDING PEDESTRIAN LIGHTING, STREET TREES, AND CROSSWALK TREATMENTS. LOS ANGELES LAE1296 LOCAL 0 LONG BEACH INTELLIGENT TRANSPORTATION SYSTEM 2012 $2,880 HIGHWAY LOS ANGELES 1NL04-LAF3503 LOCAL 0 LONG BEACH SOUTH WATERFRONT BIKE PATH GAP 2016 $885 HIGHWAY CLOSURE. THE SOUTH WATERFRONT BIKE PATH CONNECTION PROPOSES A MAIN GAP-CLOSURE TO LONG BEACH'S PRIMARY BIKEWAY NETWORK. THIS CLASS I PATH INCLUDES A MID-BLOCK CROSSING AND WAYFINDING SIGNS.. THE PROPOSED SOUTH WATERFRONT BIKE PATH STARTS AT THE NORTH END OF THE QUEENSWAY BRIDGE AT THE EXISTING TERMINUS OF THE CLASS I PATH. THE PROPOSED ALIGNMENT FOLLOWS THE NORTH SIDE OF QUEENSWAY DRIVE WITHIN THE CITY RIGHT-OF-WAY AS A CLASS I BIKE PATH TO THE EXISTING CLASS I PAT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 193

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1817 LOCAL 0 LOS ANGELES NEIGHBORHOOD INITIATIVE WEST 2013 $892 HIGHWAY ADAMS ENHANCEMENTS. THIS PROJECT WILL PROVIDE VIBRANT LANDSCAPING AND HISTORICALLY INSPIRED GATEWAY MARKERS ON A BLIGHTED TRANSPORTATION CORRIDOR, ENHANCING THE DRIVING AND TRANSIT ENVIRONMENT. LOS ANGELES LAE1148 LOCAL 0 LOS ANGELES REGIONAL DIESEL EMISSIONS 2014 $449 HIGHWAY REDUCTION PROGRAM FOR ENGINE RETROFIT PROVIDES INCENTIVE GRANTS TO OWNER OPERATORS OLD DIESEL TRUCKS TO UPGRADE EQUIPMENT TO REDUCE EMISSIONS LOS ANGELES LA0F003 LOCAL 0 LOS ANGELES STREET, OVER BIG DALTON WASH, 2014 $2,319 HIGHWAY 0.5 MI S IRWINDALE AVE. WIDEN 2-LANE BRIDGE TO 4-LANE BRIDGE, ADD SHOULDERS, UPGRADE BRIDGE RAILING (# 53C0676) LOS ANGELES LA960170 LOCAL 0 MAGIC MOUNTAIN PARKWAY EXTENSION FROM SAN 2014 $21,101 HIGHWAY FERNANDO RD TO VIA PRINCESSA: CONSTRUCT A NEW ROAD WITH 3 LANES IN EACH DIRECTION LOS ANGELES LA0C8087 LOCAL 0 MAGNOLIA BLVD WIDENING-CAHUENGA BLVD TO 2012 $4,030 HIGHWAY VINELAND AVE. FROM THE EXISTING ROADWY STANDARD TO SECONDARY HWY STANDARD. FROM 1 LANE TO 2 LANES IN EACH DIRECTION. (PPNO 3110). LOS ANGELES 1NL04-LA0G218 LOCAL 0 MAINE AVENUE MASTER PLAN DEVELOPMENT 2011 $119 HIGHWAY PROJECT. DEVELOP PRELIMINARY AND PS&E DESIGN FOR MAINE AVENUE IN BALDWIN PARK THAT IMPROVES THE DOWNTOWN/CIVIC CENTER AREA FOR USE BY PEDESTRIANS, BICYCLISTS AND TRANSIT USERS. LOS ANGELES LA0D448 LOCAL 0 MAJOR ARTERIAL GAP CLOSURES CITYWIDE. AVENUE 2018 $2,902 HIGHWAY J FROM 36TH ST WEST TO 32ND ST WEST, 20TH ST EAST FROM AVENUE J-4 TO AVENUE J-8 LOS ANGELES 1NL04-LAF1527 LOCAL 0 MANCHESTER AVENUE BIKE LANES & ISLAND 2015 $2,328 HIGHWAY REDUCTION. THE PROJECT CONSISTS OF THE INSTALLATION OF ONE MILE OF BIKE LANES AND THE REDUCTION OF THE LANDSCAPED MEDIAN ISLAND ON MANCHESTER BL BETWEEN SEPULVEDA BL AND OSAGE AV *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 194 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1A1007 LOCAL 0 MCBEAN PARKWAY WIDENING/GAP CLOSURE OVER 2018 $6,864 HIGHWAY SANTA CLARA RIVER. WIDEN MCBEAN PARKWAY BRIDGE TO 8 LANES AND CONSTRUCT CLASS I PATH CONNECTION BETWEEN MCBEAN PARKWAY AND SANTA CLARA RIVER TRAIL.. THE PROJECT IS LOCATED IN THE CITY OF SANTA CLARITA. MCBEAN PARKWAY WITHIN THE PROJECT LIMITS IS ON A ROUGHLY NORTH-SOUTH ALIGNMENT. THE NEAREST MAJOR CROSS STREETS ARE NEWHALL RANCH ROAD TO THE NORTH AND MAGIC MOUNTAIN PARKWAY TO THE SOUTH. THE TOTAL LENGTH OF THE ROADWAY GAP CLOSURE PROJECT IS APPROXIMATELY 0.25 MILES LOS ANGELES 1NL04-LAF3647 LOCAL 0 MENLO AVE/MLK VERMONT EXPO STATION 2015 $3,302 HIGHWAY PEDESTRIAN IMPROVEMENTS. IMPROVE PEDESTRIAN ACCESS TO THE NEW EXPO STATION ON VERMONT AVE BY INSTALLING SIDEWALKS, LANDSCAPING, AND LIGHTING ALONG MENLO AVE. AND MLK JR. BLVD. PLUS A MEDIAN ON MLK BLVD. LOS ANGELES LA996340 LOCAL 0 MISSION BLVD. GRADE SEPARATION AT SR. 71(FROM 2012 $51,000 HIGHWAY UPRR UNDERCROSSING TO 9TH ST. MISSION BLVD FROM WESTERN TO CURRAN PLACE (CFP 6340, 8400). PPNO 2232. SAFETEA-LU # 511 (PPNO 2232) AND SAFETEA-LU # 3771 (2232). LOS ANGELES 1NL04-LAF3524 LOCAL 0 MISSION CITY TRAIL BICYCLE BRIDGE AT WORKMAN. 2015 $2,742 HIGHWAY CONSTRUCT A BICYCLE BRIDGE OVER THE RAIL CORRIDOR TO PROVIDE LINKAGES BETWEEN THE NORTH AND SOUTH SIDES OF THE CITY AND THE MISSION CITY BICYCLE TRAIL.. THIS PROJECT PROPOSES TO CONSTRUCT A BRIDGE OVER THE METRO RAILROAD TRACK CONNECTING THE NORTHERNMOST PORTION OF SOUTH WORKMAN AVENUE (SOUTH OF THE RAIL ROAD TRACKS) WITH THE MISSION CITY BICYCLE TRAIL (IMMEDIATELY NORTH OF THE RAIL ROAD TRACKS).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 195

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8055 LOCAL 0 MOORPARK ST WIDENING – WOODMAN AVE TO 2012 $6,788 HIGHWAY MURIETTA AVE.- WIDEN EXISTING ROADWAY FROM VARYING WIDTH TO 70 FTEET TO PROVIDE ON ADDTL TRAFFIC LANE IN EA DIR & UPGRADE HIGHWAY TO SECONDARY HWY STANDARDS. THIS PROJECT IMPROVES 2080 LF OF MOORPARK AVE. PPNO 3103. LOS ANGELES LA29202N LOCAL 0 MTA TIP ADMINISTRATION PLANNING, PROGRAMMING 2016 $65,022 HIGHWAY AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 STATE ONLY 3594,2001 CFP 8401, PPNO 3535, 9001A, 9001) LOS ANGELES LA0C8056 LOCAL 0 NASH ST/DOUGLAS ST, & ROSECRANS AVE. 2011 $5,382 HIGHWAY INTERSECTION IMPROVEMENTS. PROVIDES A 2ND W-BOUND L- TURN LANE & SEPARATE E-BOUND R- TURN LANE ON ROSECRANS AVE AT NASH ST/ PRKWAY. (PPNO 3129). LOS ANGELES LAE0319 LOCAL 0 NEIGHBORHOOD TRAFFIC SAFETY IMPROVEMENTS, 2010 $1,400 HIGHWAY INCLUDING STREET LIGHTING AND OTHER PEDESTRIAN & TRANSIT ENHANCEMENT. ELYSIAN VALLEY NEIGHBORHOOD FROM QUEEN ST. ON THE NORTH, BARCLAY ST. LOS ANGELES LA450022 LOCAL 0 NORMANDIE AVE & PICO BLVD INTERSECTION IMPROV 2008 $1,744 HIGHWAY -THIS PROJECT WILL RECONSTRUCT & WIDEN THE NORTHWEST CORNER OF THE INSTERSECTION OF NORMANDIE AV & PICO BLVD. IT WILL REMOVE THE TRAFFIC ISLAND S/O THE INTERSECTION ON NORMANDIE AV. THE PROPSED ALIGNMENT AT TH LOS ANGELES 1NL04-LAF3519 LOCAL 0 NORTH COUNTY BIKEWAYS. INSTALL FOUR CLASS 2016 $1,600 HIGHWAY II AND THREE CLASS III BIKEWAY SEGMENTS, INCLUDING SIGNAGE, STRIPING, ROAD WIDENING, & ROAD SHOULDER IMPROVEMENTS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 196 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1OM0702- LOCAL 0 NORTH MAIN ST. GRADE SEPARATION: CONSTRUCT 2018 $91,280 LAF3148 HIGHWAY A NEW GRADE SEPARATION OVER UPRR AND METROLINK & LA RIVER WHILE PRESERVING THE EXISTING HISTORIC N. MAIN ST. BRIDGE. BIKE LANES WILL BE ADDED AT THE SHOULDERS OF THE BRIDGE. OTHER WORK COMPONENTS INCLUDE REALIGNING ALBION STREET AND MODIFYING THE INTERSECTIONS OF NORTH MAIN AND MESNAGER STREET AT THE WEST END. LOS ANGELES LA0C8086 LOCAL 0 NORTH SPRING ST, OVER LOS ANGELES RIVER .4 2015 $63,193 HIGHWAY MILES WEST OF I-5. REHABILITATE AND WIDEN 4 LANE BRIDGE (NO ADDED LANES) ADD SIDEWALKS UPGRADE BRIDGE RAILINGS (53C0859). LOS ANGELES LAE1703 LOCAL 0 NORTHEAST SAN FERNANDO VALLEY RD AND SAFETY 2011 $200 HIGHWAY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHEAST SAN FERNANDO VALLEY. LOS ANGELES LAE3269 LOCAL 0 NORTHWEST SAN FERNANDO VALLEY RD & SAFETY 2013 $3,056 HIGHWAY IMPROVEMENTS; WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHWEST SAN FERNANDO VALLEY AREA.WILL NOT INCREASE CAP LOS ANGELES LA000512 LOCAL 0 OCEAN BOULEVARD, FROM THE LOS ANGELES RIVER 2018 $1,001,617 HIGHWAY OVER UPRR AND BACK CHANNEL, TO 0.1 MILE E OF STATE ROUTE 47, REPLACE 5 LANE EXISTING GERALD DESMOND BRIDGE WITH NEW 6 LANE BRIDGE (3 LANES IN EACH DIRECTION); OTHER IMPROVEMENTS INCLUDE CONSTRUCTION OF NEW APPROACH STRUCTURES AND ROADS, RECONSTRUCTION OF THE EXISTING HORSESHOE INTERCHANGE RAMP CONNECTORS, RECONSTRUCTION OF THE EXISTING CONNECTORS TO SR-710, AND RECONSTRUCTION OF TWO RAMP CONNECTIONS TO PICO AVENUE.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 197

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF1205 LOCAL 0 OLYMPIC BL AND MATEO STREET GOODS MOVEMENT 2013 $4,421 HIGHWAY IMP-PHASE II. IMPROVEMENT OF FREEWAY ACCESS BY WIDENING WB OLYMPIC BL BET MATEO ST & SANTA FE AV FOR A RIGHT-TURN LANE, AND NB MATEO ST BET OLYMPIC BL & PORTER ST FOR INCREASED CURB RETURN. LOS ANGELES LA0B7234 LOCAL 0 OVERLAND BRIDGE – OVER I-10 FREEWAY -WIDEN 2012 $8,641 HIGHWAY W SIDE OF OVERLAND AVE BRIDGE OVER THE I-10 FROM NATIONAL BLVD/I-10 WESTBOUND RAMPS TO NATIONAL BLVD/NATIONAL PLACE. PPNO 2863 LOS ANGELES 1OM0702- LOCAL 0 PALISADES BLUFF STABILIZATION PROJ. 2011 $8,897 LA990352 HIGHWAY (TEA21-#453) LOS ANGELES 1NL04-LAF1529 LOCAL 0 PALOS VERDES DRIVE NORTH BIKE LANES. 2012 $2,574 HIGHWAY CONSTRUCTION OF CLASS II BIKELANE AND RELATED IMPROVEMENTS ON PALOS VERDES DRIVE NORTH LOS ANGELES LAE2293 LOCAL 0 PARAMOUNT BLVD FROM GARDENDALE ST AND 2012 $1,904 HIGHWAY TELEGRAP RD – ITS IMPROVEMENTS AS WELL AS MINOR WIDENING AT CRITICAL INTERSECTIONS TO ALLOW FOR SAID IMPROVEMENTS (NON-CAPACITY). LOS ANGELES 1NL04-LAF3653 LOCAL 0 PASADENA AVE PED CONNECTION TO GOLD LINE 2017 $2,567 HIGHWAY HERITAGE SQ STATION. PROVIDE PEDESTRIAN/ BIKE CONNECTIVITY, TREES, FURNITURE, LIGHTING, ENHANCED CROSSWALKS AND TRAFFIC CALMING/ SAFETY IMPROVEMENTS ALONG PASADENA AV. LOS ANGELES 1NL04-LAF1659 LOCAL 0 PEDESTRIAN IMPROVEMENTS FOR INTERSECTIONS 2013 $1,066 HIGHWAY WITH BUS STOPS. THIS PROJECT CONSISTS OF SAFETY AND AESTHETIC-RELATED PEDESTRIAN IMPROVEMENTS AT INTERSECTIONS ALONG MAJOR ARTERIALS WITH HIGH TRANSIT AND PEDESTRIAN ACTIVITIES WITHIN THE CITY OF CULVER CITY. LOS ANGELES 1NL04-LA0D106 LOCAL 0 PEDESTRIAN/BICYCLE FACILITIES, LANDSCAPE AND 2008 $5,038 HIGHWAY ARTWORK ENHANCEMENTS ADJACENT TO THE I-5/SR 10 AND THE LOS ANGELES RIVER.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 198 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8094 LOCAL 0 PIER B ST INTERMODAL RAILYARD EXPANSION. 2016 $81,800 HIGHWAY PROJECT WILL EXPAND PIER B ST INTERMODAL RAILYARD TO FACILITATE ADDITIONAL RAIL SHIPMENTS AND REALIGN AND WIDEN PIER B STREET. LOS ANGELES LAE1407 LOCAL 0 PLAZA DRIVE FROM VINCENT AVE. TO CALIFORNIA 2010 $721 HIGHWAY AVE. INCLUDING INSTALLATION OF TRAFFIC SIGNAL SYS AT INTERSECTION OF PLAZA DR. & CALIF. THE SYNC. OF TWO TRAFFIC SY, & ADD TURN LANES. LOS ANGELES LA0C8129 LOCAL 0 PORTS OF LONG BEACH AND LOS ANGELES ATMS/ATIS 2010 $11,410 HIGHWAY PROJECT TO IMPROVE TRAFFIC OPERATIONS ON THE: I-710, I-110, SR47/103. LOS ANGELES 1NL04-LA0F076 LOCAL 0 PRIME DESSERT WOODLAND PRESERVE TRAILS 2008 $604 HIGHWAY PROJECT, PHASE II, WILL AUGMENT THE 57-ACRE RECREATIONAL TRAIL SYSTEM AT THE PRIME DESERT WOODLAND PRESERVE IN LANCASTER. LOS ANGELES LA0F030 LOCAL 0 PROJECT WILL IMPROVE FLOW OF TRAFFIC 2014 $23,980 HIGHWAY FROM I-110 FWY ON/OFF-RAMPS AT C STREET BY CONSOLIDATING TWO CLOSELY SPACED INTERSECTIONS INTO ONE. LOS ANGELES LA0F073 LOCAL 0 PROJECTS WITHIN AND NEAR LOS ANGELES 2011 $5,067 HIGHWAY INTERNATIONAL AIRPORT TO ELIMINATE TRAFFIC BOTTLENECKS. (LOS ANGELES WORLD AIRPORTS) SEC. 336 FUNDING LOS ANGELES LA0F019 LOCAL 0 PURCHASE OF BUS BENCHES, TRASH CANS, AND 2009 $480 HIGHWAY SMALL SHELTERS FOR VARIOUS TRANIST STOPS THROUGHOUT CITY OF LAKEWOOD. LOS ANGELES LA0F016 LOCAL 0 PURCHASE, INSTALL, AND INTEGRATE OPTICOM 2011 $216 HIGHWAY PRIORITY CONTROL SYSTEM TO EXISTING TRAFFIC CONTROLLERS AT VARIOUS LOCATIONS WITHIN CITY LIMITS. (SAFETEA-LU#2345) LOS ANGELES LAE2246 LOCAL 0 RANCHO VISTA BLVD – WIDEN INTERSECTION AT 2015 $9,550 HIGHWAY 3RD ST EAST AND INTERSECTION AT 8TH ST. EAST/ LOCKHEED WAY – 6 LANES; MODIFY TRAFFIC SIGNALS, DRAINAGE, SIDEWALKS, MEDIANS, UTILITY RELOCATIONS

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 199

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE1903 LOCAL 0 RANDOLPH STREET IMPROVEMENTS BETWEEN 2012 $2,260 HIGHWAY WILMINGTON AVENUE AND FISHBURN. PROJECT WILL USE $359 OF TOLL CREDITS TO MATCH DEMO AND STPL FUNDS IN FY11. LOS ANGELES LAE2024 LOCAL 0 REALIGNMENT LA BREA AV TO REDUCE CONGESTION: 2014 $9,970 HIGHWAY IMPROVEMENTS AT INTERSECTION WITH HILLCREST BLVD (6-LEG TO 4-LEG/SIGNALIZED) & WITH TAMARACK AV (ADD SIGNAL) – 2007 METRO CALL FUNDS (PC25) ONLY APPLY TO REALIGNMENT OF THE LA BREA AVENUE BETWEEN HILLCREST BL AND SPRUCE AVE/MARKET STREET INTERSECTIONS. LOS ANGELES LA0D441 LOCAL 0 RECONFIGURATION OF VALLEY BLVD ON-AND- 2018 $28,012 HIGHWAY OFF-RAMPS TO THE 605 FREEWAY TO IMPROVE MOBILITY, CIRCULATION, AND RELIEVE THE CURRENT CONGESTION AT VALLEY BLVD. LOS ANGELES LAE1440 LOCAL 0 RECONFIGURE SAN FERNANDO RD. FROM FLETCHER 2013 $6,450 HIGHWAY DR. TO I-5 FWY. LOS ANGELES 1OM0702- LOCAL 0 RECONSTRUCT AND RESURFACE LA BREA AVE FROM 2012 $4,121 LA0G122 HIGHWAY 64TH STREET TO 104TH AND IMPERIAL HIGHWAY FROM PRAIRIE AND VAN NESS AVENUES. LOS ANGELES LAE3239 LOCAL 0 RECONSTRUCT ATLANTIC AVE AND IMPROVE 2009 $5,944 HIGHWAY DRAINAGE FROM FIRESTONE BLVD TO ABBOTT RD PAVEMENT REHABILITATION, RAISED MEDIANS, DRAINAGE, SIGNAL, PARKWAY, AND MISC. IMPROVEMENTS. LOS ANGELES LAE0266 LOCAL 0 RECONSTRUCT I-710 SOUTHERN TERMINUS 2011 $158,849 HIGHWAY OFF RAMP.CURRENT FUNDING APPLIED ONLY TOWARDS THE P/E & PRELIMINARY DESIGN PHASE. CONSTRUCTION FUNDING TO BE SOUGHT LATER (E/P,PS/E ONLY) LOS ANGELES LAE1401 LOCAL 0 RECONSTRUCT LONG BEACH BLVD WITH MEDIANS 2012 $3,500 HIGHWAY AND IMPROVED DRAINAGE PHASE II FROM IMPERIAL HWY TO TWEEDY BLVD. PHASE III LIMITS ARE MAGNOLIA AVE. TO IMPERIAL HWY.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 200 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0D478 LOCAL 0 RECONSTRUCT OF WASHINGTON BLVD FROM I-5 2011 $592 HIGHWAY FWY TO THE WEST; UPGRADE TRAFFIC SIGNALS AND IMPROVE THE EXISTING PAVEMENT LOS ANGELES LAE1390 LOCAL 0 RECONSTRUCT PARAMOUNT BLVD WITH MEDIANS 2011 $575 HIGHWAY AND IMPROVE DRAINAGE FROM ARTESIA BLVD TO CANDLEWOOD STREET LOS ANGELES LA0D461 LOCAL 0 RECONSTRUCT- THE OLD ROAD FROM HILLCREST 2014 $10,700 HIGHWAY PARKWAY TO LAKE HUGHES RD & WIDEN FROM 40' TO 68', 2 VEH. LANES AND A 5' CLASS II BIKELANE IN EA DIR & STRIPPED MEDIAN (FROM 2 TO 4 LNS 2 EA DIR) LOS ANGELES LAE1610 LOCAL 0 RECONSTRUCT WHITTIER BLVD AND IMPROVE 2011 $1,632 HIGHWAY PARKWAY DRAINAGE FROM PHILADELPHIA STREET TO FIVE POINTS (WASHINGTON BOULEVARD) IN WHITTIER LOS ANGELES LAE1696 LOCAL 0 RECONSTRUCTION OF THE STRAND STAIRWAYS 2012 $1,920 HIGHWAY IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE INCREASED PEDESTRIAN TRAFFIC. PROJECT USING TOLL CREDITS AS A LOCAL MATCH: $320 IN CON PHASE IN FY12 FOR DEMO FUNDS. LOS ANGELES 1NL04-LAF3502 LOCAL 0 REDONDO BEACH BICYCLE TRANSPORTATION PLAN 2014 $1,949 HIGHWAY IMPLEMENTATION. IMPLEMENT CLASS II AND III BIKE FACILITIES IDENTIFIED IN THE CITY OF REDONDO BEACH'S ADOPTED BICYCLE TRANSPORTATION PLAN. APPROXIMATELY 2.1 CENTERLINE MILES OF BIKE LANES AND 15.8 CENTERLINE MILES OF BIKE ROUTES THROUGHOUT THE CITY OF REDONDO BEACH. LOS ANGELES LAE3157 LOCAL 0 REHABILITATE ADDISON ST BETWEEN KESTER AVE 2010 $47 HIGHWAY AND LEMONA AVE: PROVIDE ASHALT CONCRETE RESURFACING ON THE PROPOSED PROJECT LIMITS. WILL NOT ENHANCE TRAFFIC CAPACITY. LOS ANGELES LAE1285 LOCAL 0 REHABILITATE PAVEMENT ON AZUSA AVE AND SAN 2010 $480 HIGHWAY GABRIEL AVE LOS ANGELES LAE0550 LOCAL 0 REHABILITATE STREET SURFACE OF CEDROS AVE 2010 $43 HIGHWAY BETWEEN BURBANK BLVD AND MAGNOLIA BLVD. WILL PROVIDE FOR ASPHALT CONCRETE RESURFACING. NON CAPACITY ENHANCING AND ALL ON LA ROW

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 201

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE0937 LOCAL 0 REHABILITATE STREET SURFACES IN SHERMAN 2010 $123 HIGHWAY OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CA P. LOS ANGELES LA0D443 LOCAL 0 REHABILITATING THE EXISTING AZUSA AVE. BRIDGE 2012 $1,600 HIGHWAY OVER THE UPRR TRACKS AND VALLEY BLVD, APPLY NEW PAINT TO THE EXISTING STEEL BRIDGE TO AVOID FURTHER WEATHER CORROSION. LOS ANGELES 1OM0702- LOCAL 0 REHABILITATION OF INTERSECTIONS, PARKWAY 2012 $1,395 LA0D128 HIGHWAY IMPROVEMENTS, LANDSCAPING, AND SIGNALIZATION AT VARIOUS LOCATIONS ALONG ROSEMEAD BLVD WITHIN CITY LIMITS OF PICO RIVERA (FROM TELEGRAPH RD TO WASHINGTON BLVD). PROJECT WILL BE USING TOLL CREDIT FOR THE FEDERAL FUNDS; $99 IN FY11 TO MATCH DEM0 AND STPL FUNDS. LOS ANGELES LAE1228 LOCAL 0 REPAIR ROSECRANS AND ALONDRA BRIDGES PER THE 2012 $49 HIGHWAY COUNTY OF LOS ANGELES TRIENNIAL INSPECTION REPORT. LOS ANGELES LA0C8133 LOCAL 0 RESEDA ATSAC/ATCS PROJ.PROVIDE ATSAC/ 2012 $15,045 HIGHWAY ATCS TYPE IMPROVEMENTS TO 107 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTRL SYS LOS ANGELES LA0F040 LOCAL 0 RESTORATION, OPERATION AND/OR MAINTENANCE 2012 $224 HIGHWAY COSTS ASSOCIATED WITH THE HISTORIC ANGELS FLIGHT RAILWAY ON BUNKER HILL IN DOWNTOWN LOS ANGELES LOS ANGELES LA0G745 LOCAL 0 RESTRIPE BOUQUET CANYON ROAD FROM SECO 2018 $1,500 HIGHWAY CANYON ROAD TO PLUM CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 2.2 MILES LOS ANGELES LA0G748 LOCAL 0 RESTRIPE GOLDEN VALLEY ROAD FROM SOLEDAD 2014 $1,500 HIGHWAY CANYON ROAD TO SIERRA HIGHWAY FROM 4 TO 6 LANES; APPROXIMATELY 2.5 MILES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 202 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0G740 LOCAL 0 RESTRIPE LYONS AVENUE FROM WILEY CANYON 2018 $1,500 HIGHWAY ROAD TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES LOS ANGELES LA0G750 LOCAL 0 RESTRIPE MAGIC MOUNTAIN PARKWAY FROM AUTO 2018 $1,500 HIGHWAY CENTER DRIVE TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1 MILE LOS ANGELES LA0G743 LOCAL 0 RESTRIPE NEWHALL AVENUE FROM RAILROAD 2018 $1,500 HIGHWAY AVENUE TO CARL COURT FROM 4 TO 6 LANES; APPROXIMATELY 0.4 MILES LOS ANGELES LA0G742 LOCAL 0 RESTRIPE ORCHARD VILLAGE ROAD FROM MCBEAN 2018 $1,500 HIGHWAY PARKWAY TO LYONS AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.3 MILES LOS ANGELES LA0G746 LOCAL 0 RESTRIPE PLUM CANYON ROAD FROM BOUQUET 2018 $1,500 HIGHWAY CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 0.5 MILES LOS ANGELES LA0G744 LOCAL 0 RESTRIPE RAILROAD AVENUE FROM NEWHALL 2018 $1,500 HIGHWAY AVENUE TO BOUQUET CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 3 MILES LOS ANGELES LA0G752 LOCAL 0 RESTRIPE SIERRA HIGHWAY FROM SOLEDAD 2018 $1,500 HIGHWAY CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES LOS ANGELES LA0G751 LOCAL 0 RESTRIPE SIERRA HIGHWAY FROM VIA PRINCESSA TO 2018 $1,500 HIGHWAY CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 5.5 MILES LOS ANGELES LA0G747 LOCAL 0 RESTRIPE WHITES CANYON ROAD FROM SOLEDAD 2014 $1,500 HIGHWAY CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES LOS ANGELES LA0G741 LOCAL 0 RESTRIPE WILEY CANYON ROAD FROM LYONS 2018 $1,500 HIGHWAY AVENUE TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES LOS ANGELES LA0D442 LOCAL 0 RETROFITING THE EXISTING TWO-LANE WIDE PECK 2018 $12,000 HIGHWAY ROAD BRIDGE OVER THE SAN GABRIEL RIVER FWY (ROUTE 605) & WIDEN IT TO ACCOMODATE 4 LANES (2 EACH DIRECTION) TO ELIMINATE BOTTLENECK

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 203

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0C8063 LOCAL 0 RIVERSIDE DR. VIADUCT REPLACEMENT. 2018 $55,092 HIGHWAY REPLACEMENT OF EXISTING 2-LANE BRIDGE WITH 2 THROUGH LANES BRIDGE FLARING 4 LANES AT SAN FERNANDO ROAD WITH NEW ROUNDABOUT. BIKE LANE ADDED COMBINED WITH 53C-1932 – WILL RESULT IN INCR. CIRCULATION. PPNO 3105 (53C-0160) LOS ANGELES LAE0732 LOCAL 0 RIVERSIDE DRIVE NON-CAPACITY IMPROVEMENTS 2012 $400 HIGHWAY BETWEEN VAN NUYS BLVD AND TILDEN AVE. LOS ANGELES LAE2819 LOCAL 0 ROSECRANS AVE OVERHEAD AND ARTERIAL 2014 $15,000 HIGHWAY RECONSTRUCTION PROJECT(NON-CAPACITY). SAFTEA-LU 1321. ISTEA 36. LOS ANGELES LAE2663 LOCAL 0 ROSEMEAD BLVD SAFETY ENHANCEMENT AND 2013 $10,950 HIGHWAY BEAUTIFICATION: ACTIVITIES BETWEEN PENTLAND ST/ RAILROAD TRACKS AND ROSEMEAD/ CALLITA RD. NO ADDITIONAL LANES, OR ROAD WIDTH. PROJECT CONNECTED TO LA0G668. HSIP FUNDS FOR THIS PROJECT MAY BE FOUND IN PROJECT SCAG015. LOS ANGELES 1NL04-LA0G668 LOCAL 0 ROSEMEAD BLVD SAFETY ENHANCEMENTS & 2013 $6,376 HIGHWAY BEAUTIFICATION PROJECT: INSTALLATION OF BICYCLE LANES, SIDEWALK IMPROVEMENTS, LANDSCAPING, WAYFINDING SIGNAGE FROM PENTLAND TO CALLITA (1.7 MI). LOS ANGELES 1NL04-LAF1502 LOCAL 0 SAN FERNANDO BIKEWAY. IMPLEMENT A CLASS I 2014 $8,239 HIGHWAY BIKEWAY ALONG SAN FERNANDO BLVD, VICTORY PLACE AND BURBANK WESTERN CHANNEL TO COMPLETE THE BURBANK LEG OF A 12 MILE BIKEWAY. LOS ANGELES 1NL04-LAF1640 LOCAL 0 SAN FERNANDO DOWNTOWN PEDESTRIAN 2014 $3,782 HIGHWAY IMPROVEMENT PROJECT. DESIGN AND CONSTRUCTION OF THE DOWNTOWN PORTION OF THE SAN FERNANDO CORRIDORS PLAN. THE PROJECT WILL INCREASE PEDESTRIAN ACTIVITY, PROMOTE PUBLIC TRANSIT AND ENHANCE SAFETY. LOS ANGELES LA0C8064 LOCAL 0 SAN FERNANDO MISSION BLVD WIDENING, WHERE 2012 $2,469 HIGHWAY NECESSARY, BET SEPULVEDA BLVD & I-5 FWY. FROM 1 LANE TO 2 LANES IN EACH DIRECTION.PPNO 3106.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 204 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1505 LOCAL 0 SAN FERNANDO PACOIMA WASH BIKE PATH. THE SAN 2015 $2,495 HIGHWAY FERNANDO PACOIMA WASH BIKE PATH WILL BE A 1.6- MILE LONG CLASS I FACILITY ALONG THE PACOIMA WASH IN SAN FERNANDO. IT INCLUDES 3 BRIDGES, 5 OVERPASSES AND 8 ACCESS POINTS. LOS ANGELES LAE1093 LOCAL 0 SAN FERNANDO RD NORTH – FROM ASTORIA ST 2010 $1,060 HIGHWAY TO SAYRE ST. WIDEN ROADWAY AND CONSTRUCT CONCRETE SIDEWALK, CURB, GUTTER, ACCESS RAMPS, AND BULKHEAD. LOS ANGELES 1NL04- LOCAL 0 SAN FERNANDO RD ROW BIKE PATH PHSE 2011 $10,198 LA0B7330 HIGHWAY II-CONSTRUCT 2.75 MILES CLAS I FRM FIRST ST TO BRANFORD ST,ON MTA-OWND ROW PARLEL TO SAN FERNANDO RD. LINK CYCLSTS TO NUMROUS BUS LNE. PPNO 2868. LOS ANGELES 1NL04-LAF1524 LOCAL 0 SAN FERNANDO RD. BIKE PATH PH. IIIA/IIIB 2015 $10,463 HIGHWAY – CONSTRUCTION. RECOMMEND PHASE IIIA- CONSTRUCTION OF A CLASS I BIKE PATH WITHIN METRO OWNED RAIL RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN BRANFORD ST. AND TUXFORD ST INCL BRIDGE. LOS ANGELES 1NL04-LAF3515 LOCAL 0 SAN FERNANDO RD. BIKE PATH PH. IIIB 2016 $10,714 HIGHWAY CONSTRUCTION. CONSTRUCT 2.75 MILE CLASS I BIKE PATH WITHIN METRO RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN TUXFORD ST. AND COHASSET ST. TO COMPLETE 12-MILE BIKEWAY.. THE PROJECT IS LOCATED WITHIN THE CITY OF LOS ANGELES, IN THE COMMUNITY OF SUN VALLEY. THE PROJECT CONSISTS OF A CLASS I FACILITY 12 FEET IN WIDTH AND 2.75 MILES IN LENGTH BETWEEN TUXFORD ST. AND COHASSET ST. (BURBANK CITY LIMIT).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 205

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF3621 LOCAL 0 SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN 2015 $4,390 HIGHWAY IMPROVEMENT PROJECT. THE SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT INCLUDES THE DESIGN AND CONSTRUCTION OF IMPROVEMENTS TO PROMOTE WALKING, PUBLIC TRANSIT USE AND SAFETY.. THIS PROJECT IS LOCATED ON SAN FERNANDO ROAD BETWEEN SAN FERNANDO MISSION BOULEVARD AND WEST CITY LIMIT AT HUBBARD STREET. LOS ANGELES LA0D129 LOCAL 0 SAN GABRIEL BLVD REHAB – FROM BROADWAY TO 2010 $2,000 HIGHWAY LAS TUNAS: PVEMNT RECONSTRCT & OVERLAY, CONCRT REPRS., DRAINAGE IMPS. LOS ANGELES LA9910012 LOCAL 0 SAN GABRIEL BLVD REHAB – FROM MISSION TO 2011 $2,000 HIGHWAY BROADWAY: PVMT RECONSTRCT & OVERLAY, CONCRT REPRS, DRAINAGE IMPROVEMENTS. SAFETEA-LU HPP #471 (REVISED BY PUBLIC LAW 110-244 TO INCLUDE FUNDING FROM HPP #1579, #2690, & 2811). LOS ANGELES 1NL04-LAF1528 LOCAL 0 SAN GABRIEL RIVER BIKE PATH GAP CLOSURE AT 2014 $970 HIGHWAY WILLOW STREET. CREATION OF OFF-STREET BICYCLE PATH TO ACHIEVE BICYCLE ROUTE GAP CLOSURE ON WILLOW STREET FROM THE SAN GABRIEL RIVER BIKE PATH WEST TO STUDEBAKER ROAD LOS ANGELES LAE0340 LOCAL 0 SANTA ANITA AVE CORRIDOR IMPROVEMENTS PRJ. 2012 $3,000 HIGHWAY INSTALL NEW RIGHT AND LEFT TURN POCKETS, NEW TRAFFIC SIGNALS, INTERSECTION WIDEN AND NEW STRIPING AT FOOTHILL BLVD, LIVE OAK AVE, DUARTE LOS ANGELES LA0B7335 LOCAL 0 SANTA CLARA RIV. REGIONAL COMMUTER TRAIL- 2008 $700 HIGHWAY DESIGNING FINAL SEGMENT (5) OF THE TOTAL 7 MILES OF CLASS I BIKE/PED PATH ALONG THE NORTH SIDE OF THE RIVER FROM THE KEYSTONE DEVELOPMENT LOS ANGELES LA9708004 LOCAL 0 SANTA CLARITA PARKWAY FROM BOUQUET CYN 2018 $17,550 HIGHWAY RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE) LOS ANGELES LA9910016 LOCAL 0 SANTA CLARITA PKWY FROM SOLEDAD CYN RD TO VIA 2018 $4,000 HIGHWAY PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 206 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA9910017 LOCAL 0 SANTA CLARITA PKWY FROM VIA PRINCESSA TO 2018 $3,100 HIGHWAY STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES. LOS ANGELES LAE0509 LOCAL 0 SCENIC PRESERVATION AND RUN-OFF MITIGATION 2010 $1,440 HIGHWAY IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA NEAR PCH AND US101 LOS ANGELES 1NL04-LAF1532 LOCAL 0 SCHOOL BASED BICYCLE TRAINING, SANTA MONICA. 2013 $130 HIGHWAY PROVIDE TRAINING FOR STUDENTS AT 2 MIDDLE SCHOOLS ON HOW TO SAFELY RIDE BICYCLE ON CITY STREETS TO ACCESS SCHOOL. LOS ANGELES LA0D173 LOCAL 0 SEPULVEDA BLVD, ALAMEDA ST. TO EAST CITY LIMIT. 2018 $1,375 HIGHWAY STREET WIDENING, MEDIAN ISLANDS, REHAB. 4-LANE BRIDGE, & WIDEN TO 6 LANES, UPGRADE BRIDGE RAILINGS.(53C0652) LOS ANGELES LAE3069 LOCAL 0 SEPULVEDA BOULEVARD WIDENING PROJECT TO 2012 $8,132 HIGHWAY ADD A THIRD SOUTHBOUND LANE ON SEPULVEDA BOULEVARD WITHIN THE EXISTING RIGHT OF WAY BETWEEN JEFFERSON BL/PLAYA STREET TO GREEN VALLEY CIRCLE.SEPULVEDA BL FROM SAWTELL AVE TO JEFFERSON/PLAYA ST WILL BE RE-STRIPED. LOS ANGELES LA0C8054 LOCAL 0 SKIRBALL CENTER DR WIDENING – I-405 FWY TO 2012 $2,200 HIGHWAY MULHOLLAND DR, WIDEN AND RESTRIPE SKIRBALL CENTER DR TO PROVIDE AN ADDITIONAL S/B LANE. (PPNO 3132). LOS ANGELES LA0C8037 LOCAL 0 SOTO ST BRIDGE OVER MISSION RD & HUNTINGTON 2014 $23,602 HIGHWAY DR WILL DEMOLISH EXISTING BRIDGE AND REALIGN THE STREET TO INCREASE TRAFFIC FLOW ADDING A BIKE LANE. PPNO 3093 3380 (BRIDGE #53C0013) LOS ANGELES 1NL04-LAF3507 LOCAL 0 SOUTH BALDWIN PARK COMMUTER BIKEWAY 2015 $820 HIGHWAY PROJECT. CONSTRUCT 3-MILE COMMUTER CLASS I BIKE PATH ALONG SAN GABRIEL RIVER AND WALNUT CREEK CONNECTING TO MAJOR EMPLOYMENT CENTERS ON BALDWIN PARK BLVD.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 207

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF1607 LOCAL 0 SOUTH STREET PEDESTRIAN, BIKEWAY AND TRANSIT 2014 $1,457 HIGHWAY IMPROVEMENT. IMPROVE PEDESTRIAN ENVIRONMENT AND TRANSIT STOP LOCATIONS WITH LANDSCAPED MEDIANS, TRANSIT SHELTERS, BENCHES, SIDEWALK ENHANCEMENTS AND LIGHTING. CLOSE EXISTING BIKE LANE GAP. LOS ANGELES LAE0284 LOCAL 0 SOUTHWEST SAN FERNANDO VALLEY RD AND SAFETY 2009 $2,300 HIGHWAY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS. PROJECT WILL NOT ENHANCE TRAFFIC CAPACITY. LOS ANGELES LA0D260 LOCAL 0 STATE ROUTE 90 CONNECTOR ROAD TO ADMIRALTY 2018 $6,000 HIGHWAY WAY. THIS PROJECT WILL IMPROVE THE SR-90/SR-1 INTERSECTION INCLUDING THE ADDITION OF A LANE IN EACH DIRECTION AND CONSTRUCTION OF A DIRECT ROAD BETWEEN ADMIRALTY WAY AND SR-90 LOS ANGELES LAE2279 LOCAL 0 STREETSCAPE IMPROVMENTS ALONG CENTRAL AVE 2014 $4,000 HIGHWAY FROM WASHINGTON BLVD TO VERNON AVE INCLUDING PED LIGHTING, NEW BUS STOPS AND STREET FURNITURE, SIDEWALK WIDENING, CROSSWALK ENHANCEMENTS, TREES ETC. LOS ANGELES LAE1883 LOCAL 0 STUDY – ORANGELINE CORRIDOR DEVELOPMENT 2010 $336 HIGHWAY PROJ – HIGH SPEED MAGLEV & STATION AREA DEVLOPMENT FROM NORTH LA TO SOUTH OC FOLLOWING SR14 AND FORMER PACIFIC RAILRD CORRIDOR LOS ANGELES LAE1633 LOCAL 0 STUDY REPORT FOR THE INTER. OF OLD RIVER 2011 $500 HIGHWAY SCHOOL RD, FIRESTONE BLVD & UNION PACIFIC RAILROAD. REVIEW/ANALYZE OPERATIONS & SAFETY ASPECTS, DESIGN OPTIONS ETC. (E/P & PS/E ONLY) LOS ANGELES LAE0881 LOCAL 0 STUDY, ENVIRONMENTAL REVIEW, PERMITS AND 2013 $600 HIGHWAY PRELIMINARY ENGINEERING FOR A PEDESTRIAN BRIDGE OVER ATLANTIC BLVD IN THE CITY OF MONTEREY PARK (E/P,PS/E ONLY) LOS ANGELES LA0D420 LOCAL 0 SUNSET OVERLOOK TRAILHEAD AREA IN 2010 $264 HIGHWAY HAHAMONGNA WATERSHED PARK NEAR THE DEVIL'S GATE DAM (GRANT FROM RECREATIONAL TRAILS PROGRAM) *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 208 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LA0G006 LOCAL 0 SYCAMORE, CANYON PARK TRAIL PHASE IV – 2010 $347 HIGHWAY RECOMMENDED FOR FUNDING UNDER THE NON- MOTORIZED ELEMENT OF THE RECREATIONAL TRAILS PROGRAM (GRANT AWARD: $304,920). DECOMPOSED GRANITE 2/3 MI LOS ANGELES LA0C8031 LOCAL 0 TAMPA AVE BRDGE WIDENING. WIDEN RIVER 2012 $10,800 HIGHWAY CROSSING FROM 4 LNS TO 6 LNS ON TAMPA AVE BRDGE, CONSTRUCT BIKE UNDERPASS PPNO 3090 3376 REP (BRIDGE # 53C1335) LOS ANGELES 1A1005 LOCAL 0 THE OLD ROAD FROM MAGIC MOUNTAIN PARKWAY 2018 $47,453 HIGHWAY TO TURNBERRY LANE. WIDEN THE OLD ROAD FROM NORTH OF MAGIC MOUNTAIN PKWY TO TURNBERRY LN & HENRY MAYO DR TO 1200 FEET WEST OF THE OLD ROAD. THE PROPOSED PROJECT IS LOCATED ON THE OLD ROAD FROM APPROXIMATELY 700 FEET NORTH OF MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE, HENRY MAYO DRIVE FROM THE OLD ROAD TO THE STATE ROUTE 126 HOOK RAMPS, AND RYE CANYON ROAD BETWEEN THE OLD ROAD AND AVENUE STANFORD. LOS ANGELES LAE3790 LOCAL 0 THE PASADENA ITS INTEGRATES 2 COMPONENTS; 2011 $3,545 HIGHWAY TRAFFIC SIGNAL COMMUNICATION AND CONTRL, AND PUBLIC PARKING AVAILABILITY INFO. SAFETEA-LU PRJ #3790 LOS ANGELES 1OM0702- LOCAL 0 THIS PROJECT WILL PROVIDE FOR SIDEWALK AND 2012 $980 LA0G168 HIGHWAY LANDSCAPING IMPROVEMENTS IN THE WESTCHESTER AREA OF THE CITY OF LOS ANGELES ON THE WEST SIDE OF SEPULVEDA BL BETWEEN 80TH ST. AND 84TH PL. LOS ANGELES LA0D145 LOCAL 0 TIERRA SUBIDA WIDENING FROM AVENUE S TO 2018 $6,900 HIGHWAY AVENUE RAYBURN RD. – FROM 2 TO 4 LANES; WITH TRAFFIC SIGNALS, STREETLIGHTS, RAISED MEDIANS, DRAINAGE IMPROVEMENTS AND PEDESTRIAN IMPROVEMENTS. SPLIT FROM LA0D145. LOS ANGELES LAE1955 LOCAL 0 TRAFFIC SIGNAL UPGRADES ALONG THE US-101 2012 $400 HIGHWAY FREEWAY RAMPS BETWEEN WINNETKA AVE AND VAN NUYS BLVD.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 209

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE1601 LOCAL 0 TRANSPORTATION ENHANCEMENT TO CHILDREN'S 2012 $1,200 HIGHWAY MUSEUM OF LOS ANGELES. LOS ANGELES LA996343 LOCAL 0 U.S. 101 FWY/KANAN RD. INTERCHANGE 2012 $24,460 HIGHWAY IMPROVEMENTS – ADD 1 LANE TO NB OFF RAMP (1 TO 2). SAFETEA-LU # 3099 LOS ANGELES LAE1274 LOCAL 0 UPGRADE INTERSECTION ON BELLFLOWER @ 2012 $280 HIGHWAY ALONDRA AND ROSECRANS TO INSTALL LEFT-TURN PHASING (NORTH AND SOUTH BOUND). LOS ANGELES LAE3018 LOCAL 0 VALLEY BLVD IMPROVEMENTS BETWEEN 710 2012 $3,724 HIGHWAY AND MARGUERITA. INVOLVES TRAFFIC FLOW IMPROVEMENTS INCLUDING RAISED MEDIANS AND TURN LANES. LOS ANGELES LA996427 LOCAL 0 VALLEY BLVD. GRADE SEPARATION 2011 $54,285 HIGHWAY LOS ANGELES LA0G350 LOCAL 0 VALLEY BLVD: ADD 1 THROUGH EB LANE, 2014 $3,300 HIGHWAY INSTALLATION OF STREET LIGHTING, CURB & GUTTER, 7 BUS TURNOUTS AND MODIFICATIONS TO 2 TRAFFIC SIGNALS. NO ROW IMPACTS. LOS ANGELES LAE2750B LOCAL 0 VALLEY VIEW AVE AND ALONDRA BLVD INTERSECTION 2010 $2,235 HIGHWAY IMPROVEMENTS IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS LOS ANGELES LA0C8092 LOCAL 0 VALLEY VIEW AVE GRADE SPARATN AT BNSF RAILWAY 2014 $75,177 HIGHWAY SOUTH OF STAGE RD. CONSTRUCT A GRADE SPARATN FOR VALLEY VIEW AVE FROM EXSTNG BNSF TRACKS BY CONSTRCTNG A HWY UNDERPASS PPNO 3117 (3022). PROJECT USING $175 IN TOLL CREDITS TO MATCH TEA21 AND SAFETEA-LU FUNDS IN THE CON PHASE IN FY 11/12. LOS ANGELES 1NL04-LA0G361 LOCAL 0 VALLEY VIEW STREET REHABILITATION FROM 2011 $145 HIGHWAY ROSECRANS AVENUE TO STAGE ROAD AT THE NORTH LIMIT OF VALLEY VIEW GRADE SEPARATION LOS ANGELES LA0C8042 LOCAL 0 VANOWEN ST BRDGE WIDENING & REHAB. PRJCT 2012 $14,917 HIGHWAY WILL WIDEN EXISTING BRIDGE TO MATCH THE STREET IT WILL ALLOW INC TRAFFIC FLOW AND SAFETY. CONSTRUCT BIKE PATH UNDER. PPNO 3095 3378 AB 3090 *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 210 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAE0726 LOCAL 0 VANOWEN/EMPIRE/CLYBOURN RAILROAD CROSSING 2012 $1,000 HIGHWAY GRADE SEPARATION STUDY PROJECT LOS ANGELES LA9910013 LOCAL 0 VIA PRINCESSA EXTENSION FROM GOLDEN VALLEY 2018 $46,935 HIGHWAY ROAD TO APPROXIMATELY 350M WEST OF RAINBOW GLEN DRIVE, EAST OF ISABELLA PKWY LOS ANGELES LA0D476 LOCAL 0 VIA PRINCESSA EXTENSION FROM MAGIC MOUNTAIN 2018 $22,602 HIGHWAY PKWY TO GOLDEN VALLEY RD: CONSTRUCT APPROXMTLY A 1-MILE FACILITY (3 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, & DRAINAGE IMPRVMT LOS ANGELES LA9910014 LOCAL 0 VIA PRINCESSA FROM OAKRIDGE DRIVE TO MAGIC 2018 $11,650 HIGHWAY MTN PRKWAY. FROM 0 – 6 LANES; LESS THAN ONE MILE. LOS ANGELES LAE3308 LOCAL 0 WALNUT GROVE AT BROADWAY INTERSECTION 2011 $1,675 HIGHWAY IMPROVEMENT. REHAB INTERSECTION; ACQUIRE CORNER CUT OFF TO INCREASE CURB RETURN RADII TO ADD LEFT TURN LANE IMPROVE PED SAFETY LOS ANGELES 1NL04-LAF1736 LOCAL 0 WAYFINDING PROGRAM. DEVELOP A SIGNAGE 2011 $165 HIGHWAY PROGRAM AS PART OF THE MIXED-USE AND PEDESTRIAN LINKAGES PLAN TO IMPROVE PEDESTRIAN ACCESS IN DOWNTOWN LOS ANGELES LAE3284 LOCAL 0 WEST ADAMS BLVD STREETSCAPE-INSTALL 2012 $250 HIGHWAY STREETSCAPE AND COMMUNITY GATEWAY IMPROVEMENTS ALONG WEST ADAMS BLVD. LOS ANGELES 1NL04-LAF3632 LOCAL 0 WESTERN AV BUS STOP & PEDESTRIAN 2015 $1,472 HIGHWAY IMPROVEMENT PROJECT. INSTALL PEDESTRIAN AND TRANSIT AMENITIES TO ENHANCE THE PEDESTRIAN ENVIRONMENT ALONG WESTERN AV BTW EXPOSITION BL & I-10 FREEWAY. LOS ANGELES 1NL04-LAF3650 LOCAL 0 WESTERN AVE EXPO LINE STATION LINKAGE PROJECT 2017 $858 HIGHWAY (SOUTH). TO DESIGN & CONSTRUCT PEDESTRIAN & SAFETY ENHANCEMENTS INTENDED TO INCREASE THE USAGE OF PUBLIC TRANSPORTATION AND CREATE A LINK TO METRO EXPO LR STATION AT WESTERN & EXPOSITION..

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 211

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1NL04-LAF3631 LOCAL 0 WESTLAKE MACARTHUR PARK PEDESTRIAN 2015 $1,674 HIGHWAY IMPROVEMENT PROJECT. INSTALL PEDESTRIAN IMPROVEMENTS INCL PEDESTRIAN LIGHTING, SIDEWALK ENHANCEMENTS, STREET FURNITURE & TREES, ENHANCED CROSSWALKS, & BUS STOP AMENITIES. LOS ANGELES LA0G257 LOCAL 0 WHITTIER GREENWAY TRAILHEAD PARK. EXTENSION 2014 $650 HIGHWAY OF WHITTIER GREENWAY TRAIL FROM MILLS AVENUE TO 300 FEET EAST OF MILLS AVENUE IN CONJUNCTION WITH CONSTRUCTION OF NEW TRAILHEAD PARK AND 20 SPACE PARKING LOT FOR BICYCLE COMMUNTERS. LOS ANGELES LAE3085 LOCAL 0 WIDEN AND RECONSTRUCT WASHINGTON BOULEVARD 2014 $32,000 HIGHWAY FROM WESTERN CITY BOUNDARY AT VERNON [350' WEST OF INDIANA STREET] TO I-5 FREEWAY AT TELEGRAPH RD., WIDEN FROM 2 LANES TO 3 LANES IN EACH DIRECTION, INCREASE TURN RADIUS AND MEDIANS, UPGRADE TRAFFIC SIGNALS AND STREET LIGHTING AND IMPROVE SIDEWALKS. LOS ANGELES LAE2515 LOCAL 0 WIDEN BUNDY DR. BETWEEN WILSHIRE AND SANTA 2014 $4,250 HIGHWAY MONICA BLVD – WIDEN FROM 2 LANES TO 4 LANES. LOS ANGELES LAE2517 LOCAL 0 WIDEN MAINE AVE. IN BALDWIN PARK ADD 1 THRU 2014 $360 HIGHWAY LN & 1 RIGHT TURN AND 1 LEFT TURN ONLY LANE (SAFETEA-LU DEMO ID #2517. PROJECT USING $60 OF TOLL CREDIT IN FY12 FOR ENG PHASE TO MATCH DEMO FUNDS. LOS ANGELES 1NL04-LA0G166 LOCAL 0 WIDENING OF 30TH ST WEST FROM AVENUE M TO 2014 $1,140 HIGHWAY AVENUE L (APPROX. 1 MILE) FROM 2 VEHICULAR TRAVEL LANES TO 4 LANES. 8 FOOT CLASS II BIKE LANES WILL BE STRIPPED ON BOTH SIDES OF THE STREET. LOS ANGELES LA996419 LOCAL 0 WIDN NATIONAL BLVD. & ALLO FOR A 2ND W/B 2011 $603 HIGHWAY LEFT-TRN LNE & ADDTNL E/B RGHT-TURN ONLY LNE FOR THE I-405 S/B ON RAMP. 2ND LFT-TRN LNE ON NATIONAL AT SEPULVEDA AND A 2ND (SEE COMMENTS)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 212 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0F041 LOCAL 0 WILL ADD STREETLIGNTS ON LEMON GROVE 2010 $293 HIGHWAY RECREATION CENTER ON THE EAST HOLLYWOOD COMMUNITY, MAKING PROPERTY OWNERS, COMMUNITY MEMBERS, PEDESTRIANS AND MOTORISTS FEEL SAFER LOS ANGELES 1NL04-LAF1649 LOCAL 0 WILLOW STREET PEDESTRIAN IMPROVEMENT 2014 $3,097 HIGHWAY PROJECT. THIS PROJECT PROVIDES PEDESTRIAN- ORIENTED IMPROVEMENTS TO WILLOW ST INCLUDING MEDIANS, PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE AND CROSSWALK TREATMENTS. LOS ANGELES LA0C8050 LOCAL 0 WILSHIRE BL CORRDR IMPRVMNTS-SELBY AV TO 2012 $7,479 HIGHWAY COMSTOCK AV WIDEN WILSHIRE BL TO RELIEF CONGESTION AT KEY INTERSECT AND PROVIDE PEAK HOUR BUS LANES & INSTALL RAISED LANDSCAPE MEDIAN. PPNO 3101. LOS ANGELES LA0C8084 LOCAL 0 WINNETKA AVE BRDGE WIDEN & REHAB. – WIDEN THE 2012 $10,519 HIGHWAY RIVER CROSSING FROM 4 TO 6 LANES, CONSTRUCT BIKE UNDERPASS. PPNO 3108 3377 AB 3090 REP (53C1388) LOS ANGELES 1120007 LOCAL 47 SR-47 @ FRONT NEW WESTBOUND S.R. 47 ON- AND OFF-RAMPS 2035 $23,800 HIGHWAY STREET AT FRONT STREET JUST WEST OF THE VINCENT THOMAS BRIDGE AND ELIMINATE THE EXISTING NON-STANDARD RAMP CONNECTION TO THE HARBOR BOULEVARD OFF-RAMP. FRONT STREET NORTH OF THE NEW INTERSECTION WILL BE MODIFIED TO PROVIDE TWO NORTHBOUND LANES, TWO SOUTHBOUND LANES AND AN EXCLUSIVE RIGHT- TURN LANE. FRONT STREET SOUTH OF THE NEW INTERSECTION WILL BE MODIFIED TO PROVIDE ONE NORTHBOUND LANE, TWO NORTHBOUND LEFT-TURN LANES AND TWO SOUTHBOUND LANES. LOS ANGELES 1120008 LOCAL 0 BALDWIN AVENUE ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2014 $85,100 HIGHWAY (EL MONTE)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 213

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1120011 LOCAL 0 DEL MAR AVE (SAN ALAMEDA CORRIDOR-EAST SAN GABRIEL TRENCH 2016 PART OF SAN HIGHWAY GABRIEL) GABRIEL TRENCH – TOTAL PROJECT IS $498,500 LOS ANGELES 1120021 LOCAL 0 DURFEE AVE (PICO ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $64,500 HIGHWAY RIVERA) LOS ANGELES 1120019 LOCAL 0 "FAIRWAY DRIVE ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $100,080 HIGHWAY (INDUSTRY/LA COUNTY)" LOS ANGELES 1120017 LOCAL 0 FAIRWAY DRIVE ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $72,907 HIGHWAY (INDUSTRY/ WALNUT) LOS ANGELES 1120014 LOCAL 0 FULLERTON RD ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $131,836 HIGHWAY (INDUSTY/LA COUNTY) LOS ANGELES 1120015 LOCAL 0 GREENWOOD AVE ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $61,700 HIGHWAY (MONTEBELLO) LOS ANGELES 1120016 LOCAL 0 HAMILTON BLVD ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $68,148 HIGHWAY (POMONA) LOS ANGELES 1120010 LOCAL 0 MISSION RD (SAN ALAMEDA CORRIDOR-EAST SAN GABRIEL TRENCH 2016 PART OF SAN HIGHWAY GABRIEL) GABRIEL TRENCH – TOTAL PROJECT IS $498,500 LOS ANGELES 1120013 LOCAL 0 NOGALES ST ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2015 $97,100 HIGHWAY (INDUSTRY/LA COUNTY) LOS ANGELES 1120020 LOCAL 0 "PUENTE AVENUE ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $82,832 HIGHWAY (INDUSTRY/LA COUNTY)"

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 214 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES 1120009 LOCAL 0 RAMONA ST (SAN ALAMEDA CORRIDOR-EAST SAN GABRIEL TRENCH 2016 PART OF SAN HIGHWAY GABRIEL) GABRIEL TRENCH – TOTAL PROJECT IS $498,500 LOS ANGELES 1120012 LOCAL 0 SAN GABRIEL BLVD ALAMEDA CORRIDOR-EAST SAN GABRIEL TRENCH 2016 PART OF SAN HIGHWAY (SAN GABRIEL) GABRIEL TRENCH – TOTAL PROJECT IS $498,500 LOS ANGELES 1120018 LOCAL 0 "TURNBULL CYN ALAMEDA CORRIDOR-EAST GRADE SEPARATION 2020 $84,836 HIGHWAY RD (INDUSTRY/LA COUNTY)" LOS ANGELES LAF5115 LOCAL 0 40TH STREET WEST 57TH STREET AVENUE L ROADWAY WIDENING PROJECT. THIS 2018 $9,594 HIGHWAY PROJECT WILL WIDEN AVENUE L FROM ONE LANE TO TWO LANES IN EACH DIRECTION FROM 40TH ST WEST TO 57TH ST, A DISTANCE OF 1.7 MILES. THE ROADWAY WILL BE RECONFIGURED TO INCLUDE LEFT- AND RIGHT-TURN POCKETS WHERE AVENUE L INTERSECTS WITH 40TH, 42ND, 45TH, 50TH AND 55TH STREETS. THE PROJECT INCLUDES CURBS AND GUTTERS, A 12-FOOT WIDE CLASS II BIKE LANE IN EACH DIRECTION AND 8-FOOT WIDE SIDEWALKS ON BOTH SIDES OF THE STREET.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 215

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF5301 LOCAL 0 AVIATION BLVD INGLEWOOD GRANT AVENUE SIGNAL IMPROVEMENTS. THIS 2020 $1,535 HIGHWAY AVENUE PROJECT IS LOCATED IN REDONDO BEACH IN THE SOUTH BAY SUBREGION ON GRANT AV BETWEEN INGLEWOOD AV AND AVIATION BL. THE PROJECT WILL UPGRADE SIX EXISTING TRAFFIC SIGNALS. THE PROJECT INVOLVES SYNCHRONIZATION, BIKE DETECTION, SIGNAL REPLACEMENT, VIDEO DETECTION, ADAPTIVE SIGNAL COORDINATION, WIRELESS CONNECTION AND INTEGRATION INTO THE REDONDO BEACH TRAFFIC MANAGEMENT CENTER (TMC). FUNDS ARE REQUESTED FOR DESIGN AND CONSTRUCTION COSTS. PROJECT SPONSOR WILL BE REQUIRED, UPON COMPLETION OF THE PROJECT, TO DEMONSTRATE CONGESTION REDUCTION AND TRANSIT TRAVEL TIME REDUCTION BENEFITS. IN ADDITION, PROJECT SPONSOR WILL BE REQUIRED TO CREDIT TO MTA, AS COST SAVINGS IN PROPORTION TO THE MTA SHARE OF THE TOTAL COST OF THIS GRANT, ANY ELEMENT OF THE WORK SCOPE FOR THIS PROJECT THAT CAN UTILIZE PREVIOUSLY-INSTALLED SIGNAL INFRASTRUCTURE (INTERCONNECT, SIGNAL EQUIPMENT, ETC.). LOS ANGELES LAF5306 LOCAL 0 GLENOAKS AVE. SR-134 THIS PROJECT IS LOCATED IN THE SAN FERNANDO 2020 $743 HIGHWAY VALLEY/NORTH COUNTY SUBREGION ON HOLLYWOOD WAY BETWEEN SAN FERNANDO BL AND OLIVE AV, AND ON BUENA VISTA ST BETWEEN GLENOAKS BL AND RIVERSIDE DR. IT WILL UPGRADE 20 SIGNALS ON HOLLYWOOD WAY AND 18 ON BUENA VISTA ST., CONNECT 38 SIGNALS TO THE FIBER-OPTIC CABLE- TRUNK LINE, AND PURCHASE FIBER-OPTIC MODEMS. IT WILL IMPLEMENT A DEMAND-RESPONSIVE TRAFFIC SIGNAL SYSTEM ALONG HOLLYWOOD WAY AND BUENA VISTA ST. THE PROJECT ALSO INCLUDES LICENSE, SYSTEM INTEGRATION AND TESTING OF THE QUICK TRACK ADAPTIVE CONTROL SOFTWARE.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 216 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF5101 LOCAL 0 HAWTHORNE BLVD. CRENSHAW EL SEGUNDO BOULEVARD IMPROVEMENT PROJECT. 2018 $4,171 HIGHWAY BLVD. THIS PROJECT IS LOCATED IN THE CITY OF HAWTHORNE AND WILL IMPROVE EL SEGUNDO BL AT THE INTERSECTIONS OF HAWTHORNE BL, PRAIRIE AV, DOTY AV, CERISE AV, AND CHADRON AV, A DISTANCE OF 1.3 MILES. LOS ANGELES LAF5305 LOCAL 0 HILL AVENUE SIERRA MADRE MOBILITY CORRIDORS – ROSE BOWL ACCESS 2018 $1,623 HIGHWAY VILLA AVENUE SYSTEMS. THIS PROJECT IS LOCATED IN THE CITY OF PASADENA ON THESE THREE CORRIDORS: COLORADO BL, LINCOLN BL AND ORANGE GROVE BL. THE NUMBER OF INTERSECTIONS SCHEDULED FOR UPGRADES AND ENHANCEMENTS IS 28. THIS PROJECT WILL IMPLEMENT THE FOLLOWING IMPROVEMENTS TO ALL ABOVE- MENTIONED CORRIDORS AND CORRESPONDING INTERSECTIONS: NEW 332-TYPE TRAFFIC-SIGNAL CABINETS, ADVANCED TYPE 2070 TRAFFIC- SIGNAL CONTROLLERS, IMPLEMENTATION OF NEW VEHICULAR VIDEO-DETECTION SYSTEMS AND ADVANCED COMMUNICATION SYSTEMS TO ALLOW FOR CONNECTIVITY TO THE CITY'S TRANSPORTATION MANAGEMENT CENTER. CONNECTIVITY WILL BE ACCOMPLISHED VIA FIBER OPTICS AND ALL COMMUNICATION DEVICES NECESSARY TO INTEGRATE THE TRAFFIC SIGNAL CONTROLLERS INTO THE CITY'S FIBER-OPTIC NETWORK WILL BE DESIGNED FOR AT EACH INTERSECTION. LOS ANGELES LA0G754 LOCAL 0 JAKES WAY SOLEDAD VISTA CANYON ROAD BRIDGE OVER THE SANTA 2018 $1,500 HIGHWAY CANYON CLARA RIVER AND ROADWAY FROM VISTA CANYON COMMUNITY (JAKES WAY/LOST CANYON) TO SOLEDAD CANYON ROAD. INCLUDES 750-FOOT LONG BRIDGE, 1 LANE IN EACH DIRECTION, CLASS I BIKE LANE. LOS ANGELES LA0G755 LOCAL 0 MCBEAN PKWY AVENUE NEWHALL RANCH ROAD BRIDGE WIDENING OVER THE 2018 $15,000 HIGHWAY TIBBITTS SAN FRANCISQUITO CREEK LOS ANGELES LA996345 LOCAL 0 MONTEBELLO BLVD. REA DR. BEVERLY BLVD. WIDENING PHASE III – WIDEN FROM 2014 $4,001 HIGHWAY 56 FT. TO 76 FT. BET. CURB TO PROVIDE SIX 11- FT. TRAVEL LANES, 10 FT. TURN LANE. (PPNO 2367).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 217

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LA0G726 LOCAL 0 SOLEDAD CANYON LOST CANYON VISTA CANYON PROJECT – NEW TWO LANE ROADWAY 2018 $1,500 HIGHWAY ON SAND CANYON BETWEEN SOLEDAD CANYON AND LOST CANYON ROAD. LOS ANGELES LA0G814 LOCAL 0 SR 134 BROADWAY CENTRAL AVE IMPROVEMENTS FROM SR 134 TO 2018 $3,250 HIGHWAY BROADWAY. THIS PROJECT INCLUDES UPGRADE AND MODIFICATIONS OF 6 TRAFFIC SIGNALS, CHANNELIZATION, INSTALLATION OF BIKE LANES, AND STREET IMPROVEMENTS. LOS ANGELES LAF5100 LOCAL 0 SR 60 LAVENDER DR SR57/60 CONFLUENCE, IMPROVE GRAND AVENUE 2018 $16,819 HIGHWAY INTERSECTION AT GOLDEN SPRINGS DRIVE: WIDEN GRAND AVE, FROM SR-60 FREEWAY TO LAVENDER DRIVE, A DISTANCE OF 0.2 MILES. PROJECT WILL ADD 1 THRU SB LANE AND 2 THRU NB LANE. WIDEN GOLDEN SPRINGS DRIVE BETWEEN COPLEY DR AND RACQUET CLUB DRIVE. ADD WB LEFT-TURN LANE AND A DEDICATED RIGHT-TURN LANE, WIDEN SIDEWALKS AND ADD PEDESTRIAN COUNTDOWN SIGNALS. LOS ANGELES LAF5129 LOCAL 0 WEST CITY LIMIT EAST CITY LIMIT VALLEY BOULEVARD CAPACITY ENHANCEMENT 2018 $1,420 HIGHWAY PROJECT. THIS PROJECT WILL IMPROVE A 1.7-MILE SECTION OF VALLEY BL FROM TEMPLE CITY BL TO CHARLOTTE AV BY WIDENING AND RECONFIGURING TO ACCOMMODATE AN ADDITIONAL PEAK-PERIOD TRAVEL LANE IN EACH DIRECTION, RELOCATE TRAFFIC SIGNALS AND PEDESTRIAN LIGHTS, ADD RAISED CENTER-MEDIAN WITH PEDESTRIAN LIGHTING, LANDSCAPING, SIDEWALK IMPROVEMENTS, A CLASS III BIKE ROUTE AND WAYFINDING SIGNAGE. LOS ANGELES LAF5309 LOCAL 0 CITY OF AZUSA TRAFFIC MANAGEMENT SYSTEM. THIS 2018 $5,846 HIGHWAY PROJECT WILL UPGRADE TRAFFIC SIGNALS AT 43 INTERSECTIONS IN THE CITY OF AZUSA. THE PROJECT WILL FUND THE DESIGN AND CONSTRUCTION/ IMPLEMENTATION OF CONTROLLERS, WIRING, DETECTION, CONDUIT, FIBER OPTIC, COUNTDOWN PEDESTRIAN HEADS, SIGNALS, VIDEO DETECTION, CCTV CAMERAS AND TRAFFIC CONTROL AND MONITORING UPGRADES AT THE 43 INTERSECTIONS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 218 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF5300 LOCAL 0 CITY OF INGLEWOOD ITS – PHASE IV. 2.7 MILES OF 2018 $1,245 HIGHWAY FIBER-OPTICS ON LA CIENEGA BLVD., CENTINELA AVE., FLORENCE AVE. AND PRAIRIE AVE. NEW CCTV, SPEED DETECTION SYSTEMS AND WEB-BASED TRAVELER INFORMATION. UPGRADE THE CURRENT TRAFFIC CONTROL SYSTEM (TCS) TO ADAPTIVE TCS AND REPLACE 4 TYPE 170 CONTROLLERS WITH TYPE 2070 CONTROLLERS ON PRAIRIE AVE. LOS ANGELES LAF5302 LOCAL 0 CULVER CITY ADAPTIVE TRAFFIC CONTROL SYSTEM 2020 $1,475 HIGHWAY (ATCS) PROJECT. THIS PROJECT IS LOCATED IN CULVER CITY IN THE WESTSIDE SUBREGION. IT WILL UPGRADE THE CURRENT TRAFFIC CONTROL SYSTEM TO AN ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS). PROJECT WILL REPLACE 90 TYPE 170 CONTROLLERS WITH TYPE 2070, ADD ADDITIONAL VEHICLE DETECTORS AT 102 LOCATIONS, AND UPGRADE COMMUNICATIONS EQUIPMENT AND CONNECTION TO FIBER-OPTIC BACKBONE. THE ATCS WILL CONTROL 102 INTERSECTIONS THROUGHOUT CULVER CITY. FUNDS ARE REQUESTED FOR DESIGN AND CONSTRUCTION COSTS. PROJECT SPONSOR WILL BE REQUIRED, UPON COMPLETION OF THE PROJECT, TO DEMONSTRATE CONGESTION REDUCTION AND TRANSIT TRAVEL TIME REDUCTION BENEFITS. IN ADDITION, PROJECT SPONSOR WILL BE REQUIRED TO CREDIT TO MTA, AS COST SAVINGS IN PROPORTION TO THE MTA SHARE OF THE TOTAL COST OF THIS GRANT, ANY ELEMENT OF THE WORK SCOPE FOR THIS PROJECT THAT CAN UTILIZE PREVIOUSLY-INSTALLED SIGNAL INFRASTRUCTURE (INTERCONNECT, SIGNAL EQUIPMENT, ETC.).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 219

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF5314 LOCAL 0 GATEWAY CITIES FORUM TRAFFIC SIGNAL CORRIDORS 2020 $2,481 HIGHWAY PROJECT – IMPROVE TRAFFIC SIGNAL OPERATIONS BY UPGRADING EACH TRAFFIC SIGNAL TO FEDERAL AND STATE STANDARDS, PROVIDING ADDITIONAL VEHICLE DETECTION TO ENABLE OPERATION AS A FULLY TRAFFIC-ACTUATED SIGNAL, INSTALLING THE APPROPRIATE COMPONENTS TO ENABLE EACH SIGNAL TO BE CAPABLE OF TIME-BASED COORDINATION AND RETIMING SIGNALS TO IMPROVE THE OVERALL PROGRESSION OF TRAFFIC. LOS ANGELES LAF5307 LOCAL 0 GLENDALE SUB-REGIONAL TRAFFIC MANAGEMENT 2018 $696 HIGHWAY CENTER IMPLEMENTATION. THIS PROJECT IS LOCATED IN THE CITY OF GLENDALE AND WILL CONNECT TO THE TRAFFIC SIGNAL NETWORK CITYWIDE. IT WILL DESIGN AND IMPLEMENT A SUBREGIONAL TRAFFIC MANAGEMENT CENTER (TMC), LOCATED WITHIN THE EXISTING CITY OF GLENDALE'S TMC (GTMC), COMPRISING A NEW VIDEO WALL, COMPUTER SERVERS, WORKSTATIONS, NETWORK AND VIDEO EQUIPMENT, DATA ARCHIVE STORAGE SYSTEM, BATTERY BACK UP SYSTEMS, AND COMMERCIAL OFF THE SHELF (COTS) TRAFFIC SIGNAL CONTROL SYSTEM. THE NEW SYSTEM WILL ALSO BE INTEGRATED WITH METRO'S REGIONAL INTEGRATION OF ITS (RIITS) AND THE COUNTY INFORMATION EXCHANGE NETWORK (IEN) SYSTEMS. LOS ANGELES LAF5303 LOCAL 0 IT WILL DEPLOY AN ADAPTIVE TRAFFIC SIGNAL 2020 $2,238 HIGHWAY SYSTEM ON 12 CORRIDORS WITH 101 TRAFFIC SIGNALS: MCBEAN PKWY, MAGIC MOUNTAIN PKWY, WILEY CANYON RD, ORCHARD VILLAGE RD, LYONS AV, RAILROAD AV, NEWHALL AV, BOUQUET CNYN RD, GOLDEN VALLEY RD, NEWHALL RANCH RD, SIERRA HWY, AND VIA PRINCESSA.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 220 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF1343 LOCAL 0 OCEAN PARK BL, MAIN ST, NEILSON WY SIGNAL 2018 $1,167 HIGHWAY SYSTEM. INSTALL COMMUNICATION & SIGNAL MODIFICATIONS NEEDED TO BRING INTERSECTIONS ONTO THE SIGNAL CONTROL SYSTEM ALONG THE OCEAN PARK BL, MAIN ST, AND NEILSON WY CORRIDORS. INCLUDES 26 INTERSECTIONS ON 3 CORRIDORS. LOS ANGELES LAF5310 LOCAL 0 RAMONA BOULEVARD/BADILLO STREET/COVINA 2020 $4,242 HIGHWAY BOULEVARD TSSP/BSP. IMPLEMENTION OF A TRAFFIC SIGNAL SYNCHRONIZATION PROJECT (TSSP) ON RAMONA BL/BADILLO ST/COVINA BL FROM SANTA ANITA AV TO THE 57 FREEWAY. A BUS SIGNAL PRIORITY (BSP) PROJECT WILL BE IMPLEMENTED ON RAMONA BL/BADILLO ST FROM TYLER AV TO GRAND AV TO GIVE TRANSIT PRIORITY FOR FOOTHILL TRANSIT OPERATIONS TO IMPROVE RUN TIMES WITH MINIMAL IMPACT ON CROSS-STREET TRAFFIC. LOS ANGELES LAF5315 LOCAL 0 SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL 2020 $1,551 HIGHWAY CORRIDORS PROJECT. THIS PROJECT INCLUDES 6 INTERSECTIONS AT MYRTLE AV/PECK RD BETWEEN HUNTINGTON DR AND CLARK ST AND PROVIDES FOR SYSTEM WIDE COORDINATION, TIMING AND OPERATIONAL IMPROVEMENTS AND TRAFFIC SIGNAL SYNCHRONIZATION, EQUIPMENT UPGRADES AND INTERSECTION OPERATIONAL IMPROVEMENTS. THE ORIGINAL SCOPE OF THIS PROJECT WAS REDUCED BY ELIMINATING THE OLYMPIC BL ROUTE WHICH IS BEING DONE AS PART OF OTHER PROJECTS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 221

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s) By* LOS ANGELES LAF5316 LOCAL 0 SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS 2020 $2,351 HIGHWAY PROJECT – SYSTEMWIDE COORDINATION, TIMING AND OPERATIONAL IMPROVEMENTS AND TRAFFIC SIGNAL SYNCHRONIZATION, EQUIPMENT UPGRADES AND INTERSECTION OPERATIONAL IMPROVEMENTS IN SOUTH BAY REGION. 25 SIGNALS SYSTEM WIDE. ADDITIONALLY, THIS PROJECT WILL INSTALL ANY WARRANTED AND FEASIBLE ROADWAY IMPROVEMENTS ALONG THE ROUTES TO IMPROVE OVERALL PROGRESSION

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 222 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE 2TR0701 TRANSIT 0 ANAHEIM RAPID ARTIC ANAHEIM RESORT ANAHEIM RAPID CONNECTION: ELEVATED FIXED- 2020 $676,000 CONNECTION GUIDEWAY SYSTEM CONNECTING THE ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER, THE PLATINUM TRIANGLE, AND THE ANAHEIM RESORT ORANGE 2120009 TRANSIT 0 BRISTOL/STATE BREA MALL IRVINE STATION 28-MILE FIXED-ROUTE BRT AND STRUCTURES 2030 $4,080 COLLEGE BETWEEN BREA MALL AND IRVINE STATION ORANGE 2TR0702 TRANSIT 0 COMMUNITY-BASED COUNTYWIDE DEPLOY CITY-INITIATED COMMUNITY-BASED 2035 $264,500 SHUTTLES PROGRAM SHUTTLES ORANGE 2TR0703 TRANSIT 0 ELDERLY & COUNTYWIDE EXPAND TRANSPORTATION CHOICES FOR SENIORS 2035 $381,635 HANDICAPPED AND THE DISABLED ASSISTANCE ORANGE 2L206 TRANSIT 0 FIXED ROUTE BUS COUNTYWIDE COUNTYWIDE FIXED ROUTE, EXPRESS, AND 2035 $1,810,653 PARATRANSIT CAPITAL. ORANGE 2TR0708 TRANSIT 0 GO LOCAL RAIL COUNTYWIDE PROGRAM TO DEVELOP CITY-INITIATED PROJECTS TO 2035 $1,168,000 FEEDER PROGRAM IMPROVE ACCESS TO METROLINK STATIONS ORANGE 2120007 TRANSIT 0 HARBOR CSU, FULLERTON BALBOA 19-MILE FIXED-ROUTE BRT AND STRUCTURES 2030 $3,490 BETWEEN FULLERTON AND NEWPORT BEACH ORANGE 2TR0704 TRANSIT 0 METROLINK COUNTYWIDE HIGH-FREQUENCY SERVICE FROM LAGUNA NIGUEL 2035 $1,184,400 SERVICE EXPANSION TO LA AND PROVIDE CORRIDOR IMPROVEMENTS AND PROGRAM RAIL FEEDER SERVICE WITHIN THE COUNTY. ORANGE 2TR0705 TRANSIT 0 REGIONAL GATEWAY COUNTYWIDE STATION IMPROVEMENTS TO SUPPORT HIGH-SPEED 2035 $264,700 PROGRAM RAIL SYSTEMS ORANGE 2TR0709 TRANSIT 0 SAFE TRANSIT STOPS COUNTYWIDE IMPROVE SAFETY AND AMENITIES AT TRANSIT STOPS 2035 $29,200 ORANGE 2TR1001 TRANSIT 0 SANTA ANA AND SANTA ANA HARBOR BLVD/ SANTA ANA AND GARDEN GROVE FIXED GUIDEWAY 2018 $252,000 GARDEN GROVE REGIONAL WESTMINSTER AVE BETWEEN SARTC AND A NEW TRANSIT CENTER FIXED GUIDEWAY TRANSPORTATION IN GARDEN GROVE, NEAR THE INTERSECTION OF CENTER (SARTC) HARBOR BOULEVARD AND WESTMINSTER AVENUE. ORANGE 2120001 TRANSIT 0 VANPOOL AND IDENTIFY OPPORTUNITIES AND EXPAND RIDESHARE 2035 $161,540 PARK&RIDE SERVICES FOR ORANGE COUNTY. PROGRAM ORANGE 2120008 TRANSIT 0 WESTMINSTER/17TH LONG BEACH SANTA ANA 22-MILE FIXED-ROUTE BRT AND STRUCTURES 2030 $2,080 TRANSIT MALL REGIONAL BETWEEN SANTA ANA AND LONG BEACH TRANSPORTATION CENTER *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 223

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA110632 TRANSIT 0 1% TRANSIT ENHANCEMENTS – BICYCLE AND 2016 $890 PEDESTRIAN FACILITIES COUNTYWIDE (MISSION VIEJO) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED) ORANGE ORA110634 TRANSIT 0 1% TRANSIT ENHANCEMENTS – BICYCLE AND 2016 $4,227 PEDESTRIAN FACILITIES COUNTYWIDE (OCTA) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED) ORANGE ORA120318 TRANSIT 0 ANAHEIM REGIONAL TRANS INTERMODAL CENTER 2018 $183,864 (ARTIC) PHASE I – INCLUDE EXPAND OF EXIST AMTRAK/METROLINK STATION AT ANA STAD TO PROVIDE ACCESS W/ TRANS SVC ORANGE ORA021202 TRANSIT 0 BUS OPERATING ASSISTANCE FTA9 – FOR 2016 $8,908 PARATRANSIT – MISSION VIEJO – UZA ORANGE ORA174 TRANSIT 0 BUS OPERATING ASSISTANCE FTA9 – FOR 2020 $126,990 PARATRANSIT (OCTA) ORANGE ORA110616 TRANSIT 0 BUS RAPID TRANSIT (BRT) – PURCHASE (3) 40' 2012 $1,005 EXPANSION VEHICLES FOR SERVICE IN ORANGE COUNTY ORANGE 2OM0701- TRANSIT 0 CAPITAL COST OF CONTRACTING (COSTS 2020 $178,379 ORA080803 ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT) ORANGE ORA110614 TRANSIT 0 CAPITAL LEASE COSTS ASSOCIATED WITH THE 2016 $4,845 CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT ANAHEIM MAINTENANCE BASE ORANGE ORA110615 TRANSIT 0 CAPITAL LEASE COSTS ASSOCIATED WITH THE 2012 $4,935 CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT GARDEN GROVE MAINTENANCE BASE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 224 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA37111- TRANSIT 0 CAPITAL MAINTENANCE ON METROLINK SYSTEM. 2020 $92,697 ORA37111 (REHAB OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, MAINTENANCE OF WAY RAIL SPURS, AND ROLLING STOCK) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OR RECONSTRUCTION OF TRACK STRUCTURES, TRACK, AND TRACKBED IN EXISTING RIGHTS-OF-WAY.(NON-CAPACITY INCREASING) FY11/12 INCLUDES $768,237 IN TOLL CREDIT. ORANGE HSRT0701 TRANSIT 0 ENVIRONMENTAL CLEARANCE AND ADVANCED 2015 $7,000 CONCEPTUAL DESIGN OF THE CALIFORNIA HIGH SPEED RAIL AUTHORITY, HIGH SPEED RAIL PROJECT FROM SAN FRANCISCO TO LOS ANGELES ORANGE ORA55134 TRANSIT 0 FACILITY MODIFICATIONS FOR BUS TRANSIT 2016 $1,084 (ELEVATOR UPGRADES, JOINT SEALANT, FALL PROTECTION, VEHICLE LIFTS AND OTHER FACILITY MODIFICATIONS) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ORANGE ORA020113 TRANSIT 0 FULLERTON TRAIN STATION – PARKING STRUCTURE, 2012 $33,385 PHASE I AND II. TOTAL OF 800 SPACES (PPNO 2026) ORANGE ORA110618- TRANSIT 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO 2016 $18,708 ORA110618 NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 225

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA110619- TRANSIT 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO 2030 $2,896 ORA020818 NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT ORANGE ORA110619- TRANSIT 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO 2030 $43,820 ORA110619 NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT ORANGE ORA110619- TRANSIT 0 GROUPED PROJECTS FOR GRANTS FOR TRAINING 2016 $3,602 ORA990909 AND RESEARCH PROGRAMS SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – GRANTS FOR TRAINING AND RESEARCH PROGRAMS ORANGE ORA110618- TRANSIT 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE 2030 $3,126 ORA020819 TO TRANSIT AGENCIES – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 226 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA110619- TRANSIT 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE 2016 $5,880 ORA990910 TO TRANSIT AGENCIES – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES ORANGE ORA110621 TRANSIT 0 INTERMODAL PARK AND RIDE FACILITY AT 2016 $372 DISCOVERY SCIENCE CENTER IN SANTA ANA ORANGE 2TR0712 TRANSIT 0 IRVINE TRANSIT STATION – EXPANSION OF THE 2015 $2,660 IRVINE TRANSIT CENTER (ITC). INITIAL PLANNING AND CONCEPTUAL ENGINEERING PHASE ORANGE ORA120537 TRANSIT 0 LAGUNA NIGUEL RAIL STATION PARKING EXPANSION 2013 $63,000 – CONSTRUCTION OF 562 NEW SPACES (281 EXISTING + 562 NEW = 843 SPACES) ORANGE ORA090302 TRANSIT 0 OCTA SHARE OF THE METROLINK ROLLING STOCK 2020 $158,110 AQUISITION. CARS & LOCOS, UP TO 87 CARS/CABS ORDERED IN FY 09 & IN FUTURE YRS, UP TO 22 CARS/ CABS, UP TO 11 LOCOS ORDERED BY FY09, & UP TO 4 LOCOS IN FUTURE ORANGE ORA199 TRANSIT 0 OPERATING ASSISTANCE 2010 $10,156 ORANGE ORA37115 TRANSIT 0 OPERATING ASSISTANCE FOR COMMUTER RAIL 2016 $194,122 ORANGE ORA37111- TRANSIT 0 ORANGE COUNTY METROLINK FIBER OPTICS 2011 $12,300 ORA082605 INSTALLATION PROJECT. (REPLACE AND UPGRADE COMMUNICATIONS SYSTEM THROUGHOUT METROLINK) PROVIDE A FIBER OPTIC BACKBONE AND SUE MICROWAVE HOPS TO TRANSMIT DATA TO THE MOC IN POMONA. CTOS THAT WILL FILL CONDUIT GAPS ARE BEING PROCESSED. VERIZON (FORMERLY MCI) CONDUIT WILL BE USED BETWEEN RITCHEY ST. AND SOUTHERN TERMINUS. METROLINK RAIL REHAB ORA37111 CONTAINS THE 5309 FUNDS ORANGE ORA120357 TRANSIT 0 ORANGE COUNTY. TRAFFIC SIGNAL 2012 $14,673 SYNCHRONIZATION FOR BUS RAPID TRANSIT CORRIDORS

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 227

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA030612 TRANSIT 0 PLACENTIA TRANSIT STATION – E OF SR-57 AND 2014 $23,420 MELROSE ST AND N OF CROWTHER AVE. CONSTRUCT NEW METROLINK STATION AND RAIL SIDEING PPNO 9514 ORANGE ORA020106- TRANSIT 0 PREVENTATIVE MAINTENANCE (ATN) PROJECTS ARE 2017 $1,668 ORA111211 CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES ORANGE ORA021203 TRANSIT 0 PREVENTATIVE MAINTENANCE (MISSION VIEJO) 2016 $42,633 PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $1,826 & FY10/11 FOR $1,874. ORANGE ORA020106- TRANSIT 0 PREVENTATIVE MAINTENANCE (OCTA) PROJECTS 2016 $209,581 ORA020106 ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (TRANSIT DEVELOPMENT CREDITS IN FY10/11 FOR $5,424,800 FY11/12 FOR $23,561, FY12/13 $759,582, FY13/14 $6,933,620, FY14/15 $7,086,190, FY15/16 $7,335,639) ORANGE ORA55241 TRANSIT 0 PURCHASE (1) STANDARD 40 FT REPLACEMENT ALT 2018 $700 FUEL BUSES – (1) IN FY15/16 ORANGE ORA041501 TRANSIT 0 PURCHASE (71) STANDARD 30FT EXPANSION BUSES 2018 $8,998 – ALTERNATIVE FUEL – (31) IN FY08-09, (9) IN FY09- 10, (7) IN FY11-12, (6) IN FY12-13 AND (18) IN FY13-14 ORANGE 2OM0701- TRANSIT 0 PURCHASE MISCELLANEOUS SUPPORT EQUIPMENT. 2020 $1,000 ORA080918 SUCH AS CEA VEHICLES, SHERIFF VEHICLES, FORKLIFTS AND OTHER MISCELLANEOUS SUPPORT EQUIPMENT ORANGE 2OM0701- TRANSIT 0 PURCHASE MISCELLANEOUS SUPPORT VEHICLES 2020 $625 ORA080919

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 228 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA020118 TRANSIT 0 PURCHASE REPLACEMENT PARATRANSIT VANS (230) 2016 $13,507 – (32) IN FY11/12, (58) IN FY12/13, (140) IN FY15/16 PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF NEW BUSES AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET ORANGE ORA65002 TRANSIT 0 RIDESHARE SERVICES RIDEGUIDE, DATABASE, 2016 $5,223 CUSTOMER INFO, AND MARKETING (ORANGE COUNTY PORTION). ORANGE ORA110633 TRANSIT 0 RIDESHARE VANPOOL PROGRAM – CAPITAL LEASE 2012 $2,197 COSTS ORANGE 2L207 TRANSIT 0 ROUTE 792/A RIVERSIDE/CORONA TO ANAHEIM 2012 $780 RESORT AREA EXPRESS BUS SERVICE ORANGE ORA110624 TRANSIT 0 SANTA ANA TRANSIT TERMINAL FACILITY 2015 $282 IMPROVEMENTS, INC. INCREASE VENTILATION / SAFETY ORANGE ORA110613- TRANSIT 0 SECURITY SURVEILLANCE AND MONITORING 2016 $5,528 ORA110613 EQUIPMENT FOR TRANSIT ORANGE ORA120536 TRANSIT 0 TUSTIN RAIL STATION PARKING EXPANSION – 2012 $17,600 CONSTRUCTION OF 191 NEW SPACES (281 EXISTING SPACES + 191 NEW SPACES = 472 TOTAL SPACES) PPNO 9510 ORANGE ORA110625 TRANSIT 0 VARIOUS PLANNING & TRANSPORTATION PROJECTS 2016 $2,395 DETERMINED BY THE ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) TO REDUCE CONGESTION IN OC, INCLUDING SMARTH GROWTH AND INCREASED TRANSIT ORANGE ORA37122 TRANSIT 0 VEHICLE MODIFICATIONS/MISC, REPLACE SUPP 2016 $9,011 VEHICLES AND SUPPORT EQUIP, BUS AND FACILITY EQUIPMENT PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF SUPPORT VEHICLES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $250

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 229

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA110613- TRANSIT 0 VIDEO SURVEILLANCE SYSTEM FOR BASE FACILITIES 2016 $803 ORA020814 – INSTALL VIDEO SURVEILLANCE EQUIPMENT AT FOUR OCTA BASE FACILITIES IN ANAHEIM, GARDEN GROVE, IRVINE (SAND CANYON AND CONSTRUCTION CIRCLE) ORANGE 2120010 STATE 0 CONTINUOUS COMPLETE CONTINUOUS ACCESS CONVERSION 2014 $12,300 HIGHWAY ACCESS HOV OF THE ORANGE COUNTY HOV SYSTEM WHERE FEASIBLE. ORANGE 2L149 STATE 0 MOTORIST SERVICES COUNTYWIDE FREEWAY SERVICE PATROL AND CALLBOX PROGRAM 2035 $241,200 HIGHWAY ORANGE 2L150 STATE 0 SOUNDWALLS COUNTYWIDE RETROFIT SOUNDWALL PROGRAM 2035 $28,366 HIGHWAY ORANGE 2H01143 STATE 5 I-5 AVENIDA PICO SAN JUAN CREEK ADD 1 HOV LANE EACH DIRECTION FROM AVENIDA 2018 $270,400 HIGHWAY ROAD PICO TO SAN JUAN CREEK ROAD AND RECONFIGURE AVENIDA PICO INTERCHANGE ORANGE 2H0702 STATE 5 I-5 BARRANCA BARRANCA PARKWAY HOV INTERCHANGE 2023 $13,600 HIGHWAY PARKWAY IMPROVEMENT – ADD SB HOV ON-RAMP AND NB HOV OFF-RAMP ORANGE 2M0731 STATE 5 I-5 EL TORO Y TRUCK SR-55 ADD 1 MF LANE EACH DIRECTION AND MERGING 2023 $298,025 HIGHWAY BYPASS IMPROVEMENTS. ORANGE 2M0717 STATE 5 I-5 LOS ALISOS ADD RAMPS AT LOS ALISOS 2023 $57,954 HIGHWAY ORANGE 2M0718 STATE 5 I-5 MARGUERITE ADD NEW INTERCHANGE AT MARGUERITE PARKWAY 2020 $133,723 HIGHWAY PARKWAY (SADDLEBACK CC CONNECTION) ORANGE 2H0703 STATE 5 I-5 SR-55 SR-57 ADD 1 HOV LANE EACH DIRECTION; RECONSTRUCT 2018 $46,400 HIGHWAY THE FIRST ST/FOURTH ST IC ON SB I-5 TO INCREASE WEAVING LENGTH TO STANDARD; EXTEND MERGE LANES BY 100 FEET ORANGE 2M0732 STATE 5 I-5 SR-57 SR-91 ADD 1 LANE EACH DIRECTION (57 TO 91) 2030 $336,904 HIGHWAY ORANGE 2M0730 STATE 5 I-5 SR-73 EL TORO RD ADD 2 GP LANES FROM AVERY TO ALICIA IN BOTH 2023 $558,700 HIGHWAY DIRECTIONS; EXTEND 2ND HOV FROM EL TORO TO ALICIA IN BOTH DIRECTIONS; PROVIDE OPERATIONAL IMPROVEMENTS; AND RECONFIGURE INTERCHANGES AT AVERY PKWY & LA PAZ

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 230 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE 2M04109A STATE 5 I-5 STONEHILL DR ADD SOUTHBOUND I-5 OFF-RAMP AT STONEHILL 2020 $84,700 HIGHWAY ORANGE ORA000100 STATE 5 GENE AUTRY WAY WEST @ I-5 (I-5 HOV TRANSITWAY 2012 $70,984 HIGHWAY TO HASTER) ADD OVERCROSSING ON I-5 (S)/ MANCHESTER AND EXTEND GENE AUTRY WAY WEST FROM I-5 TO HASTER (3 LANES IN EA DIR.) ORANGE ORA55063 STATE 5 I-5 @ AVERY PARKWAY (MARGUERITE TO CAMINO 2010 $840 HIGHWAY CAPISTRANO) INTERCHANGE IMPROVEMENTS. WIDEN FROM 4 TO 5 LANES (FOR TURN LANE) UNDER FREEWAY BRIDGE. ORANGE ORA120359 STATE 5 I-5 @ JAMBOREE – CONSTRUCT AUX LN ON I-5 SB; 2012 $8,485 HIGHWAY WIDEN SB OFF-RAMP FROM 1 TO 2 LANES; AND WIDENING JAMBOREE RD EB UNDERCROSSING TO CREATE A TURN LANE TO NB ON-RAMP PPNO 2806B ORANGE ORA000122 STATE 5 I-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. 2012 $8,943 HIGHWAY EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125) ORANGE ORA020109 STATE 5 I-5 AT CAMINO CAPISTRANO INTERSECTION 2012 $19,207 HIGHWAY IMPROVEMENT. WIDEN S/B OFFRAMP FROM 2 TO 3 LANES. PPNO 2615. DUAL LEAD. OCTA PA&ED. CALTRANS PS&E ROW AND CON ORANGE ORA110607 STATE 5 IN ORANGE COUNTY, ON ROUTE 5 FROM CALLE 2013 $1,873 HIGHWAY JUANITA TO 4TH STREET. PROVIDE ENHANCED PAVING AND LANDSCAPING PPNO #2592 ORANGE ORA030602 STATE 5 IN SAN CLEMENTE – SB CAMINO DE ESTRELLA – 2012 $13,493 HIGHWAY WIDEN OFF RAMP FROM 1 TO 2 LANES AND WIDEN OVERCROSSING FROM 5 TO 7 LANES (1 W/B LEFT TURN LANE AND 1 E/B LANE), EA 0F0600, SHOPP, MOBILITY ORANGE ORA120402 STATE 5 IN SAN CLEMENTE NORTHBOUND INTERSTATE 5 2011 $2,760 HIGHWAY AT AVENIDA VAQUERO – SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2580A. DUAL LEAD AGENCY. OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 231

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA030604 STATE 5 IN THE CITY OF MISSION VIEJO SB OFFRAMP AT 2012 $3,249 HIGHWAY CROWN VALLEY PARKWAY – WIDEN OFF RAMP FROM 4 TO 5 LANES SHOPP PROJECT EA 12-0F8201 ORANGE ORA120326 STATE 5 RECONSTRUCT I-5/SR-74 INTERCHANGE (IN SAN 2014 $84,514 HIGHWAY JUAN CAPISTRANO, ON ROUTE 74 FROM ROUTE 5 TO EAST OF THE CITY LIMIT. RECONSTRUCT THE ROUTE 74 AND ROUTE 5 INTERCHANGE) PPNO 4102 DUAL LEAD SJC CALTRANS ORANGE ORA120401 STATE 5 SOUTHBOUND INTERSTATE 5 FROM EL CAMINO REAL 2011 $4,995 HIGHWAY TO AVENIDA RAMONA – SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2544B. DUAL LEAD AGENCY OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON ORANGE ORA000193- STATE 22 HOV CONNECTORS FROM SR-22 TO I-405, BETWEEN 2014 $119,625 ORA000193 HIGHWAY SEAL BEACH BLVD. (I-405 PM 022.558) AND VALLEY VIEW ST. (SR-22 PM R000.917), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS. ORANGE ORA000195 STATE 22 ON SR-22 (I-405 TO SR55) ADD 2 HOV LANES/1 EA 2012 $546,587 HIGHWAY DIR (FRM 0 – 2) & 2 AUX LANES/1 EA DIR (FRM 0- 2) (I-5 TO BEACH) & OPERATING IMPROVMENTS (SEE COMMENTS) TCRP PAYBACK WHEN AVAILABLE ORANGE ORA000193- STATE 22 SR-22/I-405 HOV CONNECTOR REPLACEMENT 2014 $2,040 ORA084902 HIGHWAY PLANTING ORANGE 2M0733 STATE 55 SR-55 I-405 SR-91 ADD 1 MF LANE EACH DIRECTION AND FIX 2023 $343,055 HIGHWAY CHOKEPOINTS FROM I-405 TO SR-22; ADD 1 AUX LANE EA DIR BTWN SELECT ON/OFF RAMP AND OPERATIONAL IMPROVEMENTS THROUGH PROJECT LIMITS ORANGE ORA030610 STATE 55 ADD SOUTHBOUND AUXILIARY LANE FROM DYER TO 2012 $2,619 HIGHWAY MACARTHUR. PPNO 3473 ORANGE ORA015 STATE 55 BAKER STREET AND SR-55; N/B & S/B FRONTAGE 2014 $900 HIGHWAY ROAD IMPROVEMENTS. S/B FREE RIGHT TURN, N/B LEFT-TURN AND 2ND E/B LEFT.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 232 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA030603 STATE 55 CONSTRUCT 1 AUX LANE ON S/B SR-55 BETWEEN E 2012 $34,064 HIGHWAY EDINGER AVE ON RAMP AND E DYER RD OFF RAMP EA0G9600 (SHOPP MOBILITY) ORANGE 2OM0701- STATE 55 IN COSTA MESA, SANTA ANA, TUSTIN ON SR-55 2012 $1,490 ORA084401 HIGHWAY BETWEEN PAULARINO AVE AND .2 MILES NORTH OF 17TH STREET – CONVERT EXISTING LIMITED ACCESS HOV STRIPING TO FULL TIME CONTINUOUS ACCESS HOV STRIPING ORANGE ORA016 STATE 55 PAULARINO AVE (SR-55 NB FRONTAGE ROAD @ 2018 $505 HIGHWAY PAULARINO AVE) IN COSTA MESA INTERSECTION IMPROVEMENT. ADDING A N/B RAMP AND W/B RIGHT-TURN-LANE. ORANGE ORA017 STATE 55 PAULARINO AVE IN SR-55 SB FRONTAGE ROAD COSTA 2014 $270 HIGHWAY MESA. INTERSECTION IMPROVEMENT ADD S/B RIGHT-TURN LANE. ORANGE 2H0705 STATE 57 SR-57 CERRITOS HOV DROP RAMP 2035 $166,904 HIGHWAY ORANGE 2M0724 STATE 57 SR-57 LAMBERT ST LAMBERT INTERCHANGE IMPROVEMENT 2035 $12,477 HIGHWAY ORANGE 2M0735A STATE 57 SR-57 NB ORANGEWOOD KATELLA ADD 1 MF LANE NB BETWEEN ORANGEWOOD AND 2020 $20,875 HIGHWAY KATELLA ORANGE ORA120332- STATE 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O 2014 $72,208 ORA120332 HIGHWAY SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0311 (SR91/ORANGETHORPE TO YORBA LINDA SEGMENT) SPLIT PROJECT WITH ORA081901 ORANGE ORA120332- STATE 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O 2014 $73,243 ORA081901 HIGHWAY SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0321 (YORBA LINDA TO LAMBERT SEGMENT) SPLIT PROJECT WITH ORA120332 ORANGE ORA120333 STATE 57 EXIST 4 MF N/B; WIDEN TO 5 MF LANES N/B FROM 2018 $41,086 HIGHWAY 0.3 MI S/O KATELLA TO 0.3 MI N/O LINCOLN (2.92 MILES) – 0F0400 ORANGE 2TK01116 STATE 57 SR-57 TRUCK CLIMBING AUX LANE FROM LAMBERT 2030 $124,600 HIGHWAY TO LA CO. LINE PPNO 3847A EA 0C120

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 233

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA120320 STATE 57 SR-57/LAMBERT RD INTERCHANGE IMPROVEMENTS 2018 $38,150 HIGHWAY – RECONFIG EXISTING DIAMOND INTERCHANGE TO LOOP RAMP, ADD SB LN ON OFFRAMP ORANGE 2M0726 STATE 73 SR-73 GLENWOOD DRIVE/ COMPLETE SOUTHBOUND RAMP AT INTERCHANGE 2035 $42,727 HIGHWAY PACIFIC PARK WITH GLENWOOD DR/PACIFIC PARK DR DRIVE ORANGE 2H0707 STATE 73 SR-73 I-405 MACARTHUR ADD 1 HOV LANE EACH DIRECTION FROM 2035 $249,424 HIGHWAY MACARTHUR TO 405 ORANGE 2H0706 STATE 73 SR-73 I-405 HOV CONNECTOR BETWEEN I405 AND SR73. 2035 $174,242 HIGHWAY INCLUDES MERGING LANES AND RECONSTRUCTION OF FAIRVIEW BRIDGE. ORANGE 10254 STATE 73 SJHC, 15 MI TOLL RD BETWEEN I-5 IN SAN JUAN 2020 $351,111 HIGHWAY CAPISTRANO & RTE 73 IN IRVINE, EXISTING 3/M/F EA.DIR.1 ADD'L M/F EA DIR, PLUS CLIMBING & AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/5/01 ORANGE ORA000152 STATE 74 ORTEGA HWY (RANCHO VIEJO RD TO JUST EAST OF 2014 $2,550 HIGHWAY I-5/SR-74 INTERCHAGE) RDWAY WIDEN ADD RT TRN LNE TO CAPAC & REDUCE QUE ON WB SR-74 TO NB I-5 TRN. N/B FRM 2TO3 & S/B 2TO3 . ORANGE ORA120507- STATE 74 WIDEN ORTEGA HIGHWAY FROM COUNTY/CITY OF 2012 $42,694 ORA120507 HIGHWAY SAN JUAN CAPISTRANO TO APPROXIMATELY 1,900 FEET EAST OF THE INTERSECTION OF THE LA PATA/ ORTEGA HIGHWAY INTERSECTION (APPROXIMATELY 1.2 MILES). WIDEN FROM 2 TO 4. INCLUDING WIDENING OF THE BRIDGE OVER SAN JUAN CREEK. ORANGE ORA120507- STATE 74 WIDEN ROUTE 74 FROM 2 TO 4 LANES – COUNTY 2012 $40,905 ORA120506 HIGHWAY SEGMENT (ON ROUTE 74 FROM CITY/COUNTY LINE TO ANTONIO PARKWAY / LA PATA AVE. WIDEN FROM 2 LANES TO 4 LANES) PPNO 4110A EA 08691 SPLIT FROM ORA120507 ORANGE ORA000115 STATE 90 IMPERIAL HWY SMART ST (LAC TO HARBOR) 2012 $16,244 HIGHWAY RESTRIPE 4 TO 6 LNS (LAC LINE TO IDAHO ST. ADD RAISED MEDIAN. MODFY MEDIANS AT 4 INTSECS. ADD BUS PADS, TURNOUTS.(COMBINES ORA028 AND ORA029)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 234 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE 2L224- STATE 90 IN ORANGE COUNTY, ON RTE 90 IMPERIAL 2012 $1,669 ORA020808 HIGHWAY HIGHWAY, IN THE CITIES OF YORBA LINDA AND ANAHEIM ON ROUTE 90 FROM EAST OF KELLOGG DRIVE UNDERCROSSING TO LA PALMA AVENUE. THE PROJECT IS TO PROVIDE ENHANCEMENT AND MITIGATION PLANTING. PPNO 4434B EA 12-056221 ORANGE 2T04128 STATE 91 SR-91 FAIRMONT DRIVE CONSTRUCT OVERCROSSING AND SR-91 2030 $123,943 HIGHWAY INTERCHANGE AT FAIRMONT BLVD ORANGE 2120004 STATE 91 SR-91 GYPSUM CANYON IMPROVE INTERCHANGE AT GYPSUM CANYON. 2025 $40,000 HIGHWAY ORANGE 2M0737 STATE 91 SR-91 SR-241 I-15 IN ORANGE COUNTY, ADD A WB MF LANE FROM 241 2018 $173,728 HIGHWAY OFF RAMP TO GYPSUM CANYON AND AUX LANES EACH DIRECTION BETWEEN 241 AND COUNTY LINE. SEE RIVERSIDE COUNTY FOR ADDITIONAL IMPROVEMENTS. ORANGE 2T01135 STATE 91 SR-91 SR-241 HOV/HOT CONNECTOR NB 241 TO EB 91, WB 91 TO 2018 $473,191 HIGHWAY SB 241 ORANGE 2M0736 STATE 91 SR-91 EB SR-57 SR-55 ADD 1 MF LANE EASTBOUND; IMPROVE 2023 $355,764 HIGHWAY INTERCHANGE AT SR-91/SR-55 AND LAKEVIEW AVE; OPERATIONAL, NO INCREASE IN CAPACITY ORANGE 2M01126 STATE 91 CONNECT EXISTING AUXILIARY LANE THROUGH 2018 $73,400 HIGHWAY INTERCHANGES ON WB SR-91 BETWEEN SR-57 AND I-5 WITH ITS ELEMENTS PPNO 4516A EA 0C5700 ORANGE ORA030601- STATE 91 EASTBOUND RTE 91 FROM RTE 91/55 CONNECTOR 2018 $2,498 ORA110502 HIGHWAY TO EAST OF WEIR CANYON ROAD INTERCHANGE; WESTBOUND RTE 91 FROM EAST OF WEIR CANYON RD INTERCHANGE TO IMPERIAL HWY INTERCHANGE. WIDENING. REPLACEMENT PLANTING/LANDSCAPING. SPLIT FROM ORA030601 ORANGE 2L224- STATE 91 IN ORANGE COUNTY, AT THE COAL CANYON ROAD 2013 $802 ORA020807 HIGHWAY INTERCHANGE. THE PROJECT IS TO INSTALL VEGETATION ENHANCEMENTS ORANGE ORA120336 STATE 91 SR-91 EASTBOUND LANE ADDITION BETWEEN SR-241 2012 $77,575 HIGHWAY & SR-71, & IMPROVE NB SR-71 CONNECTOR FROM SR-91 TO STD ONE LANE AND SHOULDER WIDTH. 0G0400 *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 235

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE 2M01125 STATE 91 SR-91 WB (SR-55 THROUGH TUSTIN INTERCHANGE) 2018 $41,930 HIGHWAY EXTEND LANE AND RECONSTRUCT AUX. LANE. PPNO 4587A EA 0C560) ORANGE ORA030601- STATE 91 SR-91: ADD 1 MF LANE E/B BTWN 91/55 CONNECTOR 2014 $85,986 ORA030601 HIGHWAY & SR-241 – W/B BTWN SR-241 & IMPERIAL HWY; MODIFY W/B ON RAMPS FROM LAKEVIEW AVE TO IMPRV MERGE (ADD AUX LANE BETWEEN NB 55 – TO – EB 91 ON-RAMP AND LAKEVIEW OFF RAMP). PROJECT SPLIT LANDSCAPING ORANGE 2120003 STATE 241 SR-241 JEFFREY NEW INTERCHANGE AT JEFFREY AND 241. 2030 $70,000 HIGHWAY ORANGE ORA051 STATE 241 (FTC-N) (OSO PKWY TO ETC) (13MI) EXISTING 2 MF 2020 $143,517 HIGHWAY IN EA. DIR, 2 ADDITIONAL M/F LANES, PLS CLMBNG & AUX LANS AS REQ BY 2020 PER SCAG/TCA MOU 4/05/01. ORANGE ORA052 STATE 241 (FTC-S) (I-5 TO OSO PKWY) (15MI) 2 MF EA. DIR BY 2030 $1,509,133 HIGHWAY 2013; AND 1 ADDITIONAL M/F EA. DIR. PLS CLMBNG & AUX LANES AS REQ BY 2030 PER SCAG/TCA MOU 4/05/01. #1988 ORANGE ORA050 STATE 241 ETC (RTE 241/261/133) (RTE 91 TO I-5/JAMBOREE) 2020 $1,156,097 HIGHWAY EXISTING 2 M/F EA.DIR, 2 ADD'L M/F IN EA. DIR, PLUS CLIMB AND AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/05/01. ORANGE 2M0728 STATE 405 I-405 I-5 SR-55 ADD 1 MF LANE EACH DIRECTION FROM I-5 TO SR-55 2023 $374,540 HIGHWAY AND IMPROVE MERGING ORANGE ORA030605 STATE 405 I-405 SR-55 I-605 I-405 FROM SR-73 TO I-605. IN EACH DIRECTION, 2023 $1,694 HIGHWAY ADD 1 MF LANE, CONVERT EXISTING HOV TO HOT, ADD 1 ADDITIONAL HOT LANE, AND ADDITIONAL CAPITAL IMPROVEMENTS ORANGE 2M04131 STATE 405 I-405 NB JEFFREY CULVER ADD AUXILIARY LANE 2020 $15,618 HIGHWAY ORANGE ORA100507 STATE 405 CONSTRUCT FOURTH NB THROUGH LANE ON BEACH 2012 $1,500 HIGHWAY BLVD AT THE I-405 INTERCHANGE AND REMOVE OFF- RAMP ON I-405 AT BEACH (NORTH-EAST CORNER OF BEACH/EDINGER). CO LEAD WITH WESTMINSTER

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 236 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA000193- STATE 405 HOV CONNECTORS FROM I-405 TO I-605, BETWEEN 2014 $159,630 ORA000194 HIGHWAY KATELLA AVE. (I-605 PM R001.104) AND SEAL BEACH BLVD. (I-405 PM 022.643), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS ORANGE ORA000193- STATE 405 I-405/I-605 HOV CONNECTOR REPLACEMENT 2013 $3,840 ORA084901 HIGHWAY PLANTING ORANGE 2M0719 STATE 605 I-605 KATELLA ON-RAMP IMPROVE INTERCHANGE 2020 $20,789 HIGHWAY ORANGE ORA040607 STATE 999 ORANGE COUNTY – COUNTYWIDE ACTIVITIES: 2020 $20,257 HIGHWAY PLANNING, PROGRAMMING AND MONITORING (PPM) ORANGE 2120002 OTHER 0 ENVIRONMENTAL TRANSPORTATION-RELATED WATER QUALITY 2035 $368,410 CLEANUP AND PROGRAM AND ACQUISITION/RESTORATION OF FREEWAY MITIGATION HABITAT. PROGR ORANGE 2120006 OTHER 0 PPM AND OTHER PLANNING, PROGRAMMING, AND MONITORING 2035 $87,430 STUDIES STUDIES, AND OTHER STUDIES INCLUDING TDM/TSM ORANGE 550 LOCAL 0 ALTON DAIMLER ST STANDARD AVE ALTON AVE IN SANTA ANA CONSTRUCT A NEW 2018 $35,000 HIGHWAY 4-LANE (2E/B AND 2W/B) OVERCROSSING (PLUS PA/ ED FOR OVERCROSSING & HOV ACCESS RAMPS @ SR-55 COMPLETED IN 2012, $3.5 MIL) ORANGE 2120005 LOCAL 0 LOCAL FAIR SHARE ROADWAY MAINTENANCE AND IMPROVEMENT 2035 $2,381,600 HIGHWAY PROGRAM PROJECTS. ORANGE 2L220 LOCAL 0 NON-MOTORIZED COUNTYWIDE IMPLEMENT THE COMMUTER BIKEWAYS STRATEGIC 2035 $469,034 HIGHWAY PLAN ORANGE 2120011 LOCAL 0 PCH/DEL PRADO BLUE LANTERN COPPER LANTERN BETWEEN BLUE LANTERN AND COPPER LANTERN, 2014 $22,000 HIGHWAY RECONFIG PCH FROM 3 NB LANES TO 2 NB; 2 SB, AND RECONFIG DEL PRADO FROM 3 SB LANES TO 1 NB; 1 SB. ALSO INCLUDES INTERSECTION IMPROVEMENTS, TRAFFIC CALMING, TRAFFIC SIGNAL MODIFICATION, BICYCLE AND TRANSPORTATION ENHANCEMENTS, STREET REPAIR, AND OTHER STREET MODIFICATIONS. ORANGE 2A0704 LOCAL 0 REGIONAL CAPACITY COUNTYWIDE COMPLETE MPAH, IMPROVE ARTERIAL CAPACITY 2035 $1,984,650 HIGHWAY PROGRAM

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 237

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE 2A0705 LOCAL 0 SIGNAL COUNTYWIDE SYNCHRONIZE SIGNALS ACROSS JURISDICTIONS AND 2035 $635,040 HIGHWAY SYNCHRONIZATION SMART STREETS PROGRAM ORANGE 2A1001- LOCAL 0 ALTON PARKWAY IMPROVEMENTS – CONSTRUCT 2014 $6,400 ORA990919 HIGHWAY NEW 4 LANE ROADWAY FROM COMMERCENTRE DRIVE TO TOWNE CENTRE DRIVE, A LENGTH OF APPROXIMATELY 4,800 FEET. ORANGE 2OM0701- LOCAL 0 ANTONIO PARKWAY PAVEMENT REHABILITATION 2012 $445 ORA990932 HIGHWAY – THE PROJECT WILL REHABILITATE ANTONIO PARKWAY BY COLD-PLANING AND OVERLAYING THE EXISTING ROADWAY FROM VIA HONESTO TO COTO DE CAZA/LA PROMESA. INCLUDED IN THIS REHABILITATION WILL BE ISOLATED AREAS OF FULL RECONSTRUCTION, CURB RAMPS. ORANGE 2GL04- LOCAL 0 BNSF RAILWAY LINE (KRAEMER BLVD TO KELLOGG 2010 $7,518 ORA02926 HIGHWAY DR) ALONG SS OF ORANGETHORPE. INSTALL SUPPLEMENTAL SAFETY MEASURES AT 8 AT-GRADE CROSSINGS (4.4 MILES). ORANGE 2GL04- LOCAL 0 BNSF RAILWAY LINE (PLACENTIA) ALONG SS OF 2015 $78,230 ORA02925 HIGHWAY ORANGETHORPE. GRADE SEPARATION/ CORRIDOR IMPROVEMENTS ORANGE ORA125 LOCAL 0 BRISTOL ST (WARNER TO MEMORY LANE) WIDEN 2012 $166,286 HIGHWAY FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/ TRN LNS ORANGE ORA120501 LOCAL 0 BROOKHURST STREET WIDENING FROM S/O BALL 2014 $26,480 HIGHWAY ROAD TO N/O KATELLA AVENUE (4-6 LANES) ORANGE ORA020115 LOCAL 0 CABOT ROAD BRIDGE TO CAMINO CAPISTRANO 2012 $2,678 HIGHWAY -PROVIDE ALT ACCESS TO METROLINK STATION & RELIEF TO INTERCHANGE AT I-5 & AVERY ORANGE ORA000162 LOCAL 0 CHAPMAN AVE (TUSTIN TO SR-55) WIDEN FROM 2012 $5,870 HIGHWAY 4 TO 6 LANES. ADD 2 DEDIC. RT TURN LANES (1@ WB CHAPMAN & 1@NB TUSTIN) PLUS, 2 BUS TURNOUTS (1@NB TUSTIN AND 1@WB CHAPMAN INTERSECTION.)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 238 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA020506 LOCAL 0 CITY OF ORANGE – SANTA FE DEPOT SPECIFIC PLAN 2010 $232 HIGHWAY UPDATE ORANGE 2A0804 LOCAL 0 COW CAMP ROAD (4 LANES) FROM ANTONIO TO 2018 $193,434 HIGHWAY FOOTHILL TRANSPORTATION CORRIDOR (FTC)IS A MAJOR ARTERIAL HIGHWAY AND FROM FTC TO ORTEGA PRIMARY ARTERIAL HIGHWAY. ORANGE ORA000163 LOCAL 0 CROWN VALLEY PARKWAY (PUERTA REAL TO CITY 2012 $5,443 HIGHWAY LIMITS, NEAR JARDINES) WIDENING FROM 6 LANE DIVIDED TO 8 LANE DIVIDED. ORANGE ORA100509 LOCAL 0 DESIGN AND IMPLEMENT HARBOR BOULEVARD ITS IN 2011 $3,179 HIGHWAY GARDEN GROVE. ORANGE ORA100508 LOCAL 0 DEVELOP AND IMPLEMENT AN ITS MASTER PLAN IN 2012 $1,000 HIGHWAY ANAHEIM ORANGE ORA990906 LOCAL 0 GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN 2014 $35,834 HIGHWAY FACILITIES FUNDED WITH TE – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED) ORANGE ORA020501 LOCAL 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION 2030 $33,527 HIGHWAY AND RECONSTRUCTION – HBP PROGRAM – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). ORANGE ORA55013 LOCAL 0 GROUPED PROJECTS FOR PAVEMENT RESURFACING 2010 $79,771 HIGHWAY AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 239

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA990907 LOCAL 0 GROUPED PROJECTS FOR TRANSPORTATION 2020 $16,337 HIGHWAY ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES) ORANGE ORA120522 LOCAL 0 HUNTINGTON BEACH – ATLANTA AVE WIDENING (FRM 2012 $4,423 HIGHWAY HUNTINGTON TO DELEWARE; FRM 2 TO 4 LNS) ORANGE ORA120332- LOCAL 0 IN PLACENTIA AND FULLERTON, N/B SR-57 FROM 2018 $2,688 ORA110302 HIGHWAY 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES). REPLACEMENT PLANTING AS THE RESULT OF THE SR-57 NORTHBOUND WIDENING. REPLACEMENT PLANTING RELATED TO ORA081901 AND ORA120332 ORANGE ORA120510 LOCAL 0 IRVINE – BARANCA & RED HILL INT IMPV (ADD 4TH 2011 $15,475 HIGHWAY WB, SB, EB, NB THRU LNS & EB/WB LFT TRN LNS & WB DEDICATED RT TRN LN) ORANGE ORA120511 LOCAL 0 IRVINE – JAMBOREE RD @ I-5/MICHELLE (ADD 4TH 2012 $15,545 HIGHWAY SB AND NB THRU LANES) ORANGE ORA120315 LOCAL 0 IRVINE – SAND CANYON @ I-5 (ADD 3RD AND 4TH NB 2012 $8,441 HIGHWAY AND SB THRU LNS ON SND CYN; IMP EB APPROACH ADD 2 LFT TRN LNS,1 THRU LN, & 1 RT TRN LN) ORANGE ORA120514 LOCAL 0 IRVINE – TRABUCO RD @ SR-133 (ADD NEW 2020 $71,875 HIGHWAY ON-RAMPS AND OFF RAMPS AT TRABUCO & SR-133) ORANGE ORA48 LOCAL 0 JEFFERY RD (IRVINE CENTER DR TO WALNUT) 2012 $46,449 HIGHWAY RAILROAD GRADE SEPARATION. FROM 4 TO 6 LANES. DUAL LEAD OCTA IRVINE ORANGE ORA120534- LOCAL 0 KRAEMER BLVD GRADE SEPARATION: CONSTRUCT A 2015 $67,662 ORA020823 HIGHWAY GRADE SEPARATION ON KRAEMER BLVD AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT. ORANGE ORA000173 LOCAL 0 LA PAZ RD (MURILANDS/I-5 TO CHRISANTA DR) 2014 $12,250 HIGHWAY WIDENING FROM 4 TO 6 LANES BRIDGE # 55C0215

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 240 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA120316 LOCAL 0 LAGUNA NIGUEL – CROWN VALLEY PKWY WIDENING 2012 $10,109 HIGHWAY (WIDEN EB FROM CABOT TO I-5 ON RAMP, FROM 4 TO 5 LANES; ADD DED RT TRN LN FOR SB I-5 ON RAMP AND DED RT TRN LN FOR NB ON RAMP) ORANGE ORA120534- LOCAL 0 LAKEVIEW AVE GRADE SEPARATION: CONSTRUCT A 2015 $99,763 ORA020825 HIGHWAY GRADE SEPARATION ON LAKEVIEW AVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT. PROJECT UTILIZING $1,938 TOLL CREDITS FOR ROW PHASE IN FY11/12. ORANGE ORA000146 LOCAL 0 MEATS AVE @ SR55 INTERCHANGE. CONSTRUCT 2018 $60,000 HIGHWAY ON-RAMP/OFF-RAMPS. PART OF SR-55 ENHANCEMENT PROJECTS.(0 TO 2 LANES) ORANGE ORA000125 LOCAL 0 MOULTON PKWY (SANTA MARIA TO EL PACIFICO) 2012 $7,685 HIGHWAY WIDEN FRM 7 TO 9 LANES (N/B 3 TO 4 AND S/B 4 TO 5), WIDEN INTERSECTIONS, ADD SIDEWALK AND LANDSCAPING. ORANGE ORA040605 LOCAL 0 NEWPORT BEACH – JAMBOREE RD WIDENING 2012 $1,631 HIGHWAY (BETWEEN BAYVIEW WAY & MACARTHUR BLVD) FROM 6 TO 8 LANES ORANGE ORA120527 LOCAL 0 ORANGE – MAIN ST (WIDEN FRM CULVER TO 260' N/O 2012 $4,043 HIGHWAY PALMYRA; FRM 4 TO 6 LNS) ORANGE ORA120505 LOCAL 0 ORANGE COUNTY – ALTON PARKWAY EXTENSION 2012 $40,000 HIGHWAY (IRVINE) (IRVINE BLVD TO CMMERCENTER DR; FRM 0 TO 6 LNS) ORANGE ORA120504 LOCAL 0 ORANGE COUNTY – LA PATA AVENUE WIDENING & 2014 $38,610 HIGHWAY GAP CLOSURE (WIDEN FROM 3 TO 5 LNS (2,700 FT S/O ORTEGA HWY TO RD TERMINUS); GAP CLOSURE – ADD 4 LNS (EXISTING LA PATA TERMINUS TO CALLE SALUDA); EXTENSION – ADD 4 LANES (EXISTING CAMINO DEL RIO TERMINUS TO LA PATA) ORANGE ORA020507 LOCAL 0 ORANGE COUNTY COUNCIL OF GOVERNMENTS 2012 $1,500 HIGHWAY (OCCOG) – REDUCE ORANGE COUNTY CONGESTION (ROCC) PROGRAM (INCLUDES STUDIES AND PLANNING)CO-LEAD OCTA

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 241

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA120534- LOCAL 0 ORANGETHORPE AVE GRADE SEPARATION: 2015 $114,983 ORA020824 HIGHWAY CONSTRUCT A GRADE SEPARATION ON ORANGETHORPE AVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT. PROJECT UTILIZING $1,922 IN TOLL CREDITS FOR ROW PHASE ORANGE ORA120524 LOCAL 0 PLACENTIA – ORANGETHORPE AVE WIDENING (FRM 2014 $1,188 HIGHWAY MELROSE AVE TO ECL; FRM 4 TO 6 LNS) ORANGE ORA120523 LOCAL 0 PLACENTIA – RICHFIELD AVE – ATWOOD CHANNEL 2012 $347 HIGHWAY BRIDGE WIDENING FROM 3 TO 4 LANES ORANGE ORA080604 LOCAL 0 PLANNING FOR TRANSIT IN STANTON: CITYWIDE 2010 $264 HIGHWAY POLICIES AND SITE SPECIFIC DEVELOPMENT STANDARDS FOR TRANSIT-ORIENTED PROJECTS. (OCCOG ROCC) ORANGE 2SL04 LOCAL 0 PLANNING STUDIES AND PSR'S (SR-55 STUDY 19TH 2015 $1,130 HIGHWAY STREET TO INDUSTRIAL WAY IN COSTA MESA) ORANGE ORA080602 LOCAL 0 PLANNING STUDY TO EVALUATE THE LAND USE IN 2011 $203 HIGHWAY THE GATEWAY SPECIFIC PLAN (GSP) INCLUDING TRANSIT ORIENTED DEVELOPMENT AND MIXED USE DEVELOPMENT (OCCOG ROCC) ORANGE 2A0803 LOCAL 0 PROJECT WILL BUILD OUT ANTONIO PARKWAY TO ITS 2018 $47,499 HIGHWAY MASTER PLAN OF ARTERIAL HIGHWAYS DESIGNATION WIDTH BETWEEN LADERA PLANNED COMMUNITY AND ORTEGA HIGHWAY BY WIDENING THE ROAD FROM FOUR TO SIX LANES. THE PROJECT WILL INCLUDE WIDENING ANTONIO PARKWAY BRIDGE BY ONE LANE IN EACH DIRECTLY. ORANGE 2A1001- LOCAL 0 RANCHO PARKWAY EXTENSION: HERMANA CIRCLE 2014 $2,056 ORA990918 HIGHWAY TO PORTOLA PARKWAY APPROX 1700 FEET. RANCHO PARKWAY WILL BE A 4-LANE DIVIDED ROADWAY ORANGE 2GL04- LOCAL 0 RAYMOND AVE GRADE SEPARATION: CONSTRUCT A 2016 $76,792 ORA000809 HIGHWAY GRADE SEPARATION ON RAYMOND AVE AT THE BNSF RR TRACKS ORANGE ORA000177 LOCAL 0 RED HILL @ EDINGER AVE/RR TRACKS. GRADE 2016 $2,097 HIGHWAY SEPARATION THE PE STUDY WILL ADDRESS VARIOUS ALTERNATIVES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 242 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA120525 LOCAL 0 SAN JUAN CAPISTRANO – DEL OBISPO WIDENING 2012 $7,480 HIGHWAY (WIDEN FRM ALIPAZ TO CAMINO CAPISTRANO; TO ACCOMMODATE BIKE LANES AND SIDEWALK IN EACH DIRECTION) ORANGE ORA000118 LOCAL 0 SAND CYN RD @ SCRRA TRACKS (BURT RD TO 2014 $55,590 HIGHWAY LAGUNA CANYON/OAK CANYON) – RAILROAD GRADE SEPARATION. WIDENS FROM 4 TO 6 LANES. CO LEAD WITH OCTA ORANGE ORA120521 LOCAL 0 SANTA ANA – FIRST STREET WIDENING (FRM SUSAN 2014 $16,171 HIGHWAY TO FAIRVIEW; FRM 4 TO 6 LNS) BRIDGE 55C0022 ORANGE ORA120520 LOCAL 0 SANTA ANA – GRAND AVENUE WIDENING (FRM 1ST 2012 $13,537 HIGHWAY TO 4TH; FRM 2 TO 3 LNS ) ORANGE ORA120519 LOCAL 0 SANTA ANA – MACARTHUR BLVD WIDENING (WIDEN 2012 $1,499 HIGHWAY SB ONRAMP (FRM EB MACARTHUR) TO SR-55 BY ADDING 1LN) WIDEN FROM 3 TO 4 LANES. ORANGE ORA120518 LOCAL 0 SANTA ANTA – MAC ARTHUR BLVD WIDENING (WIDEN 2012 $1,841 HIGHWAY NB ONRAMP (FROM EB MACARTHUR) TO SR-55 BY ADDING 1 LN). ORANGE ORA120330 LOCAL 0 SEAL BEACH – SEAL BEACH BLVD, OVERPASS 2010 $9,926 HIGHWAY BRIDGE LENGTHENING TURN LANES AND RAMPS REALIGNMENT (FROM BEVERLY MANOR RD TO OLD RANCH PKWY) ORANGE 2M1001 LOCAL 0 SEAL BEACH BLVD AT 405 FWY SOUTHBOUND 2012 $1,443 HIGHWAY OFF RAMP. TO WIDEN THE EASTSIDE AND ADD AN ADDITIONAL THRU LANE (FROM 6 TO 7). ORANGE 2A1003 LOCAL 0 SEAL BEACH BLVD FROM OLD RANCH PKWY TO ST. 2012 $1,443 HIGHWAY CLOUD. WIDEN STREET TO MATCH NEW BRIDGE OVER 405 FWY. 2 EXISTING LANES IN EACH DIRECTION. 3 LANES IN EACH DIRECTION WHEN CONSTRUCTED ORANGE ORA100506 LOCAL 0 SIGNAL UPGRADES ON AVENIDA DE LAS FLORES, 2010 $145 HIGHWAY MELINDA ROAD, AVENIDA DE LAS BANDERAS, AND ALMA ALDEA, IN RSM.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 243

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* ORANGE ORA000815 LOCAL 0 SR-91/GYPSUM CANYON ROAD INTERCHANGE. WIDEN 2018 $5,000 HIGHWAY GYPSUM CANYON ROAD FROM 2 TO 4 LANES. ADD CLASS II ON-ROAD BIKE LANES, ADD MULTI USE TRAIL AND SIDEWALK ON WEST SIDE OF ROADWAY. THIS WILL REQUIRE MODIFICATION OF EXISTING ENTRANCE RAMP TO GYPSUM. SR-91 CONNECTIONS ARE UNCHANGED, THE EASTBOUND SR-91 EXIT RAMP INTERSECTION WILL BE RECONSTRUCTED AND SIGNALIZED. ORANGE ORA040602 LOCAL 0 STATE COLLEGE GRADE SEPARATION: CONSTRUCT A 2016 $73,648 HIGHWAY GRADE SEPARATION ON STATE COLLEGE BLVD AT THE BNSF RR TRACKS (SANTA FE AVE TO 700 FT SOUTH OF VALENCIA) ORANGE ORA080603 LOCAL 0 THE CITY'S CONSULTANT WILL PREPARE A PROGRAM 2012 $223 HIGHWAY ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE SANTA FE SPECIFIC PLAN UPDATE (OCCOG ROCC) ORANGE ORA120534- LOCAL 0 TUSTIN AVE / ROSE DRIVE GRADE SEPARATION: 2015 $92,193 ORA020826 HIGHWAY CONSTRUCT A GRADE SEPARATION ON TUSTIN AVE / ROSE DRIVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT ORANGE ORA990452 LOCAL 0 TUSTIN BRANCH RAIL TRAIL ALONG THE SANTIAGO 2011 $2,436 HIGHWAY CREEK FROM TUSTIN ST. TO WALNUT AVE. AND CITY OWNED RW FROM WALNUT AVE. TO COLLINS AVE. FILLS 2 MILE GAP IN A REGIONAL TRAIL. ORANGE ORA55244 LOCAL 0 TUSTIN RANCH ROAD EXTENSION FROM WALNUT 2012 $13,995 HIGHWAY AVENUE TO VALENCIA AVENUE INCLUDING CONSTRUCTION OF A BRIDGE OVER THE OCTA/SCRRA RAILWAY LINE AND EDINGER AVENUE. 3 NEW LANES IN EACH DIRECTION FOR A TOTAL OF 6. ORANGE 2A0801 LOCAL 0 WIDEN OSO PARKWAY FROM BLASCO TO INTERSTATE 2018 $11,408 HIGHWAY 5 – PROJECT WILL WIDEN BOTH THE EAST BOUND AND WEST BOUND DIRECTIONS FROM THE CURRENT THREE LANES IN EACH DIRECTION TO FOUR LANES IN EACH DIRECTION. ORANGE ORA110602 LOCAL 0 WIDENING OF LAGUNA CANYON / I-405 2014 $11,950 HIGHWAY OVERCROSSING FROM 2 LANES TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 244 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3TL807 TRANSIT 0 ATIS MAINTENANCE N/A N/A SYSTEM MAINTENANCE 2027 $4,000 RIVERSIDE 3TL504 TRANSIT 0 BUS PURCHASES COACHELLA PURCHASE ADDITIONAL BUSES FOR SERVICE 2030 $10,000 VALLEY IMPROVEMENTS, INCLUDING SERVICE REALIGNMENT AND SERVICE EXPANSION. RIVERSIDE 3TL507 TRANSIT 0 BUS PURCHASES COACHELLA PURCHASE ADDITIONAL REPLACEMENT BUSES FOR 2020 $11,518 VALLEY FIXED ROUTE AND PARATRANSIT SERVICES. THE ADDITIONAL VEHICLES WILL CONSIST OF 60FT, 45FT, 40FT, 32 FT, AND 30FT BUSES. RIVERSIDE 3TR04C TRANSIT 0 BUS RAPID TRANSIT COACHELLA IMPLEMENT BUS RAPID SERVICE/BRT ON 2018 $11,743 VALLEY HIGHWAY 111 BASED ON RECOMMENDATIONS IN THE COMPREHENSIVE OPERATIONAL ANALYSIS CONDUCTED IN 2005/06. PROJECT WILL ENTAIL COMPLETING FEASIBILITY STUDY AND WORKING WITH THE LOCAL JURISDICTION ON VARIOUS ACTIVITIES PRIOR TO IMPLEMENTING PROJECT. RIVERSIDE 3TR04A, TRANSIT 0 BUS RAPID TRANSIT CORONA MORENO VALLEY INFRASTRUCTURE TO SUPPORT THE OPERATION 2018 $5,200 3TR04B INFRASTRUCTURE OF BRT, INCLUDING FACILITY PLANNING AND ENGINEERING AND RETROFIT OF APPROXIMATELY 65 INTERSECTIONS FOR SIGNAL PRIORITY FOR TRANSIT AND AUTOMATED TRAVEL INFORMATION AT MULTIPLE BUS STOPS. RIVERSIDE 3TL1107 TRANSIT 0 CAPITALIZED WESTERN EQUIPMENT FOR CONTINUED FACILITY 2020 $270 PREVENTATIVE RIVERSIDE COUNTY MAINTENANCE, REPAIR AND REPLACEMENT. MAINTENANCE SERVICE AREA RIVERSIDE 3TL104 TRANSIT 0 ELDERLY &AMP; COACHELLA IMPROVE PARATRANSIT SERVICES FOR THE ELDERLY 2015 $19,500 DISABLED VALLEY &AMP; PERSONS WITH DISABILITIES ASSISTANCE RIVERSIDE 3TL1507 TRANSIT 0 ENHANCED WESTERN SAN DIEGO, PROPOSED COMMUTER LINK SERVICE AT THE 2012 $16,901 COMMUTER LINK – RIVERSIDE COUNTY ORANGE, AND LOS EASTERN SIDE OF I-215 CORRIDOR TO SAN DIEGO EAST CORRIDOR ANGELES COUNTIES AND NEIGHBORING COUNTIES OF ORANGE AND LOS ANGELES THROUGH METROLINK SERVICE CONNECTIONS. THE RESIDENTS OF CALIMESA, BEAUMONT, BANNING , HEMET/SAN JACINTO WILL BE ABLE TO GO TO NEIGHBORING NORTHERN AND EASTERN COUNTIES WITH THE COMFORT AND CONVENIENCE OF AN EXPRESS BUS SERVICE.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 245

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3TL1607 TRANSIT 0 ENHANCED WESTERN SAN DIEGO, PROPOSED COMMUTER LINK SERVICE AT THE 2012 $7,717 COMMUTER LINK – RIVERSIDE COUNTY ORANGE, AND LOS WESTERN SIDE OF I-15 CORRIDOR TO SAN DIEGO WEST CORRIDOR ANGELES COUNTIES AND NEIGHBORING COUNTIES OF ORANGE AND LOS ANGELES THROUGH METROLINK CONNECTIONS. A PROPOSED EXPANSION AN IMPROVEMENT OF THE EXISTING COMMUTER SERVICE FROM MURRIETA/ TEMECULA INCLUDING THE CITIES OF PERRIS, MORENO VALLEY, NORCO, AND CORONA. RIVERSIDE 3TL907 TRANSIT 0 EXPRESS/COMMUTER COACHELLA RIVERSIDE IMPLEMENT EXPRESS BUS SERVICE TO CONNECT 2018 $3,149 BUS SERVICE VALLEY COMMUTERS TO METROLINK SERVICE IN RIVERSIDE, AS WELL AS EXPRESS BUS SERVICE ALONG I-10. SUNLINE WILL PURCHASE DIFFERENT SIZE BUSES, INCLUDING 45FT (MCI BUSES) FOR COMMUTER SERVICE. RIVERSIDE 3TL707 TRANSIT 0 GFI FAREBOXES, COACHELLA INSTALL SECURITY SYSTEMS IN SUNLINE BUSES 2013 $2,429 SMARTCARDS, VALLEY AND ACQUIRE NEW FAREBOXES WITH SMARTCARD & SECURITY TECHNOLOGY AND CAPABILITIES. SYSTEMS RIVERSIDE 3ITS09 TRANSIT 0 ITS COUNTYWIDE FULLY INTEGRATED TRANSIT OPS, MANAGEMENT, 2020 $5,000 AND TRAVELER INFORMATION SYSTEM/BRT/BUS SIGNAL PRIORITY RIVERSIDE 3CR104 TRANSIT 0 METROLINK COUNTYWIDE METROLINK IMPROVEMENTS(TRACK AND ROLLING 2030 $206,184 COMMUTER RAIL STOCK) RIVERSIDE 3TL1707 TRANSIT 0 METROLINK IEOC AND 91 LINES METROLINK CONSTRUCT NEW STATION AT 3360 VAN 2035 $24,746 COMMUTER RAIL BUREN BLVD IN RIVERSIDE (PARKING 550 SPACES) RIVERSIDE 3TL1207 TRANSIT 0 MISCELLANEOUS COACHELLA PURCHASE VARIOUS MAINTENANCE EQUIPMENT FOR 2020 $200 MAINTENANCE VALLEY THE MAINTENANCE DEPARTMENT. EQUIPMENT RIVERSIDE 3TC0703 TRANSIT 0 PARK &AMP; COACHELLA ACQUIRE PROPERTY AND CONSTRUCT 3 PARK AND 2014 $13,496 RIDE LOTS VALLEY RIDE LOTS RIVERSIDE 3CR0702 TRANSIT 0 PERRIS VALLEY LINE CITY OF PERRIS CITY OF SAN METROLINK PERRIS VALLEY LINE COMMUTER RAIL 2035 $201,716 JACINTO EXTENSION FROM PERRIS TO SAN JACINTO (~16.5 MILES), STATIONS AT WINCHESTER RD (SR-79 @ ASBURY ST), HEMET AIRPORT (SANDERSON AVE @ STETSON RD), SAN JACINTO (STATE ST @ 7TH ST)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 246 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3CR0703 TRANSIT 0 PERRIS VALLEY LINE CITY OF PERRIS CITY OF TEMECULA METROLINK PERRIS VALLEY LINE COMMUTER RAIL 2035 $450,258 EXTENSION FROM PERRIS TO TEMECULA (~16.5 MILES), STATIONS AT NEWPORT RD (@ I-215), CLINTON KEITH RD (@ I-215), AND WINCHESTER RD (SR-79 @ I-215) RIVERSIDE 3TL1007 TRANSIT 0 PREVENTIVE COACHELLA PURCHASE VEHICLE PARTS AND PAY FOR LABOR 2020 $1,500 MAINTENANCE VALLEY COST ASSOCIATED WITH ONGOING MAINTENANCE OF REVENUE VEHICLES RIVERSIDE 3TL607 TRANSIT 0 PURCHASE COACHELLA PURCHASE MORE AMENITIES FOR INSTALLATION AT 2020 $5,068 AMENITIES VALLEY BUS STOPS THROUGHOUT THE SERVICE AREA BASED ON RECOMMENDATIONS FROM THE COA. RIVERSIDE 3CR0701 TRANSIT 0 RIVERSIDE LINE, 91 THROUGHOUT METROLINK COMMUTER RAIL EXISTING LINES 2035 $690,021 LINE, & IEOC RIVERSIDE, SERVICES EXPANSION – RIVERSIDE, 91, AND IEOC LINE ORANGE COUNTY, LINES & LOS ANGELES COUNTY RIVERSIDE 3TL1307 TRANSIT 0 SUPPORT VEHICLES COACHELLA PURCHASE VEHICLES THAT WILL BE USED AS RELIEF 2013 $150 VALLEY VEHICLES FOR SUNLINE DRIVERS AT THE BEGINNING OR ENDING OF THEIR SHIFTS IN MID-ROUTE. RIVERSIDE 3TL0407 TRANSIT 0 TRANSFER LOCATION COACHELLA FACILITY IMPROVEMENT TO ACCOMMODATE 2025 $6,178 IMPROVEMENT VALLEY ADDITIONAL SERVICE ROUTES BASED ON RECOMMENDATION FROM COMPREHENSIVE OPERATIONAL ANALYSIS RIVERSIDE 3TC04TR1 TRANSIT 0 TRANSIT CENTER BANNING/ REGIONAL TRANSIT CENTER FOR MASS TRANSIT 2025 $8,000 BEAUMONT/ SERVICE IN WESTERN RIVERSIDE COUNTY IN THE CALIMESA AREA VICINITY OF I-10 AND I-60 JUNCTION. RIVERSIDE 3TC04TR3 TRANSIT 0 TRANSIT CENTER COACHELLA CONSTRUCT 4 TRANSIT CENTERS IN THE COACHELLA 2013 $11,166 VALLEY VALLEY, LOCATIONS TBD RIVERSIDE 3TC04TR8 TRANSIT 0 TRANSIT CENTER JURUPA REGIONAL TRANSIT CENTER FOR BUS SERVICE IN THE 2025 $8,000 NORTHWEST AREA OF RIVERSIDE COUNTY. RIVERSIDE 3TC04TR10 TRANSIT 0 TRANSIT CENTER LAKE ELSINORE/ REGIONAL TRANSIT CENTER FOR MASS TRANSIT 2025 $7,000 CANYON LAKE SERVICE IN CENTRAL WESTERN RIVERSIDE COUNTY ALONG I-15 CORRIDOR. RIVERSIDE 3TC04TR6 TRANSIT 0 TRANSIT CENTER SOUTHERN REGIONAL TRANSIT CENTER FOR MASS TRANSIT 2030 $10,000 SERVICE AREA SERVICE IN CENTRAL WESTERN RIVERSIDE COUNTY O&M FACILITY ALONG I-215 CORRIDOR. *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 247

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3TL307 TRANSIT 0 TRANSIT CENTER N/A N/A MAINTENANCE OF NINE TRANSIT CENTERS 2030 $20,000 MAINTENANCE RIVERSIDE 3TC0702 TRANSIT 0 TRANSIT WESTERN TRANSIT CENTER ENHANCEMENTS FOR 2035 $13,500 ENHANCEMENTS RIVERSIDE COUNTY LANDSCAPING, STREETSCAPES, AND TRANSIT STOP SERVICE AREA AMENITIES. RIVERSIDE RIV080927 TRANSIT 0 AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: 2012 $430 MAINTENANCE FACILITY UPGRADES (UNLEADED FUEL DISPENSERS, FIRE DOOR, ENERGY EFFICIENT LIGHTING, ROOF REPAIRS, EASEMENT RESTORATION (RIVERSIDE YARD PROPERTY), AND RE-KEY AND INSTALL FUEL FORCE SYSTEM TO STANDARIZE AND UPDATE MAINTENANCE AND SECURITY PROCEDURES)) (FY 09 5307). RIVERSIDE 3TR04A TRANSIT 0 BUS RAPID TRANSIT (BRT) ENHANCEMENTS: 2010 $262 ADVERTISING, MARKETING, PLACEMENT/LOGISTICS OF BRT INFRASTRUCTURE, STUDIES, ETC. FOR BRT DEVELOPMENT & IMPLEMENTATION (FY 05 5307) RIVERSIDE RIV050556 TRANSIT 0 BUS RAPID TRANSIT (BRT) ENHANCEMENTS: 2011 $400 DEVELOP BRT ENHANCEMENT PLAN (E.G. PROMOTIONAL STRATEGIES, BRAND AWARENESS & RIDERSHIP SCENARIOS, ETC.) (FY 06 5307 UZA: TEM/ MURR) (TE) RIVERSIDE RIV061138 TRANSIT 0 FACILITIES IMPROVEMENTS AT EXISTING RTA 2012 $138 RIVERSIDE & HEMET FACILITIES (E.G. CONCRETE REPLACEMENT, FLOOR RECOATING, FACILITY PAINTING, ROOF REPAIRS, ETC.) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE RIV050524 TRANSIT 0 FOR RIV SS – CONSTRUCT EXPANDED SERVICE BAY 2010 $1,000 FOR VEHICLE MAINTENANCE AT EXISTING RIVERSIDE MAINT. FACILITY OPS AREA SUPPORTING EXISTING VEHICLE FLEET (FY 07 5307) (UZA: RIV-SAN) RIVERSIDE RIV080926 TRANSIT 0 FOR RIVERSIDE SPECIAL SERVICES – CONSTRUCT 2010 $1,030 FLEET BAY FOR PARARANSIT VEHICLES, PER APPROVED 2008/2009 SRTP, TABLE 4 – CAPITAL PROJECT NO. FY 09-3 (FY 09 5307) (UZA: RIV-SAN)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 248 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 30M0701- TRANSIT 0 IN COACHELLA VALLEY – FRED WARING CORRIDOR 2011 $350 RIV071263 EXPRESS SERVICE DEMONSTRATION PROJECT: PROVIDE LIMITED EXPRESS SERVICE FROM THE INDIO TRANSFER LOCATION TO THE TRANSFER LOCATION ON TOWN CENTER WAY WITH SERVICE TO COLLEGE OF THE DESERT AND LIMITED STOPS ALONG THE CORRIDOR. RIVERSIDE RIV080921 TRANSIT 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT 2010 $1,417 AGENCY – PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS. ITS EQUIPMENT TO BE PURCHASED INCLUDES: AUTOMATED VEHICLE LOCATORS (AVL), GEOGRAPHIC POSITIONING SYSTEM (GPS), AND MOBILE DATA TERMINALS (MDT) (FY 09 – ARRA 5307). RIVERSIDE RIV051201 TRANSIT 0 IN CORONA – CONTINUE THE IMPLEMENTATION 2014 $40 OF A 60 SPACE PARK-AND-RIDE LOT (VIA ANNUAL LEASE AGREEMENT) AT LIVING TRUTH CHRISTIAN FELLOWSHIP AT 1114 W. ONTARIO AVE. RIVERSIDE RIV041029 TRANSIT 0 IN RIVERSIDE – CONSTRUCT NEW RIVERSIDE 2012 $7,510 TRANSIT CENTER AT 4141 VINE ST., IN THE VICINITY OF DOWNTOWN METROLINK STATION (5309C FY 03+04+06+08, E-2006-BUSP-156 & E-2008- BUSP-0688 EARMARKS) (FY 09 5309) (UZA: RIV-SAN) (TE) RIVERSIDE HSRT0702 TRANSIT 0 IN RIVERSIDE COUNTY – GROUPED PROJECTS FOR 2014 $2 PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (FTA 5310 – FFY'S 10 AND 11) (.27K TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FTA 5310 IN CONS).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 249

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV050553 TRANSIT 0 IN TEMECULA – CONSTRUCT NEW TEMECULA 2013 $8,000 TRANSIT CENTER AT 27199 JEFFERSON AVE. (SW OF JEFFERSON AVE & SE OF CHERRY ST) (04, 05, 06, 07, E-2006-091, E-2007-0131, & 2008-BUSP-0131, SAFETEA-LU). RIVERSIDE 3ITS0701 TRANSIT 0 IN THE COACHELLA VALLEY FOR SUNLINE 2011 $500 TRANSIT AGENCY – IMPLEMENT INTELLIGENT TRANSPORTATION SYSTEM (ITS) PROJECT: PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR SERVICE PLANNING AND DEVELOPMENT FOR NEW AND EXISTING ROUTES, IN ADDITION TO SCHEDULE ADHERENCE (FY 12 – 5307) (UZA: INCCPS). RIVERSIDE RIV051007 TRANSIT 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – NEAR 2018 $6,000 MORENO VALLEY – REGIONAL TRANSIT CENTER FOR MASS TRANSIT SERVICE IN WESTERN RIVERSIDE COUNTY SOUTH OF SR60 ALONG THE I-215 CORRIDOR(PA&ED ONLY). RIVERSIDE RIV071286 TRANSIT 0 IN WESTERN RIVERSIDE COUNTY FOR RTA 2012 $730 – OPERATING ASSISTANCE FOR THE HEMET OPPORTUNITY PROJECT EXPRESS (HOPE) BUS TO PROVIDE SPECIALIZED TRANSPORTATION SERVICES TO DPSS CLIENTS IN THE HEMET AREA (SEC 5316 – 2006 FUNDS). RIVERSIDE RIV061142 TRANSIT 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: 2012 $290 PURCHASE DIRECT TV & WIFI ON COMMUTER LINK FOR ENHANCED COMMUTER TRAVEL (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE RIV061136 TRANSIT 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE 2012 $186 IT OFFICE EQUIPMENT (E.G. PC & NOTEBOOK COMPUTERS AND REPLACE NETWORK EQUIPMENT & COPIERS, ETC.) (FY 08 5307) (UZA: RIV-SAN)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 250 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV080928 TRANSIT 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: UPGRADE 2012 $379 AND REPLACE ORACLE SERVERS AND IMPLEMENT A DATA CENTER SERVER VIRTUALIZATION SYSTEM IN RIVERSIDE CONNECTED WITH A LIVE REPLICATED DISASTER RECOVERY SITE IN HEMET (FY 09 5307). RIVERSIDE RIV080919 TRANSIT 0 JOINT PARTNERSHIP W/CALSTAR/WESTSTART FOR 2010 $271 FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE A ZERO EMISSION BUS (E-2008-BUSP-0102). RIVERSIDE RIV011242 TRANSIT 0 PURCHASE EXPANSION ROLLING STOCK (2 CAB CARS 2012 $19,693 AND 3 LOCOMOTIVES) FOR METROLINK IEOC AND RIVERSIDE/FULLERTON/LA LINES (EA: RIVFUL, PPNO: 0079E) RIVERSIDE RIV061137 TRANSIT 0 PURCHASE NEW SHOP EQUIPMENT: (E.G. CUT-OFF 2012 $26 SAW, BRAKE DRUM DOLLY, TRANSMISSION JACK, IMPACT WRENCHES, LAP TOP COMPUTERS & SOFTWARE, ETC.) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE RIV061113 TRANSIT 0 PURCHASE REPLACE. SHOP EQUIP. (E.G. 2012 $155 PARALLELOGRAM & SEFEC LIFTS, STAR BRAKE LATHE, PRESSURE WASHER, BUS WASH BRUSH, TIRE/ VACUUM MACHINES, SWEEPERS, ETC.) (FY 07 5307) (UZA: RIV-SAN) RIVERSIDE RIV061153 TRANSIT 0 PURCHASE REPLACEMENT MAINTENANCE TOOLS, 2010 $200 EQUIPMENT, & PARTS (E.G. MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SERVICE JACKS, AIR & HAND TOOLS, ETC.) (FY 07 5307) (UZA: INCCPS) RIVERSIDE RIV061157 TRANSIT 0 PURCHASE TRANSIT ENHANCE. BUS STOP AMENITIES 2011 $799 (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 08 5307) (UZA: INDCCPS) (TE) RIVERSIDE RIV061143 TRANSIT 0 RCTC'S SHARE OF OCTA'S FY 07 REHAB AND 2013 $75 RENOVATION (FY 07 5307) (UZA: RIV-SAN) RIVERSIDE RIV520109 TRANSIT 0 RECONSTRUCT & UPGRADE SAN JACINTO BRANCH 2014 $246,827 LINE FOR RAIL PASSENGER SERVICE (RIVERSIDE TO PERRIS) (PERRIS VALLEY LINE) (FY 07 5307) (UZA: RIV-SAN)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 251

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV520111 TRANSIT 0 REGIONAL RIDESHARE – CONTINUING PROGRAM. 2011 $10,157 RIVERSIDE RIV050530 TRANSIT 0 SCRAA REHABILITATION AND RENOVATION OF TRACK 2013 $406 AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 07 5307 PORTION TO SCRA PROJECT) (FY 07 5307) (UZA: RIV-SAN) (PARENT: LA963505) RIVERSIDE RIV061145 TRANSIT 0 SCRRA REHABILITATION AND RENOVATION OF TRACK 2012 $509 AND ROLLING STOCK SIGNAL STRUCTURE (RCTC'S FY 08 PORTION) TO SCRRA PROJECT) (FY 08 5307) (UZA: RIV-SAN) RIVERSIDE 3120035 TRANSIT 0 CENTRAL SPINE WESTERN EQUIPMENT FOR COMMTUER TRANSIT SERVICE WITH 2020 $13,200 SERVICE RIVERSIDE COUNTY STOPS LOCATED A MILE OR MORE APART. – CORONA TO MORENO VALLEY RIVERSIDE 3120028 TRANSIT 0 HEAVY DUTY BUS WESTERN EQUIP. FOR TRANSIT SVC EXPANSION AS POPULATION 2035 $22,500 EXPANSION RIVERSIDE COUNTY AND URBAN DEVELOPMENT GROWS THROUGHOUT THE RTA SVC ARE. RIVERSIDE 3120030 TRANSIT 0 HEAVY DUTY BUSES WESTERN EQUIPMENT FOR TRANSIT SERVICE SUSTAINABILITY 2035 $60,000 RIVERSIDE COUNTY THROUGHOUT THE RTA SVC AREA W/OPERATION LEVELS FROM 10 MIN. TO 60 MIN. HEADWAYS. RIVERSIDE 3120032 TRANSIT 0 I-15 REGIONAL FLYER I-10 TEMECULA EQUIP. FOR COMMUTER TRANSIT SVC W/STOPS 2023 $26,950 LOCATED A MILE OR MORE APART. RIVERSIDE 3120033 TRANSIT 0 I-215/SR74 REGIONAL RIVERSIDE SAN JACINTO EQUIP. FOR COMMUTER TRANSIT SVC W/STOPS 2023 $20,350 FLYER – ROUTE 212 LOCATED A MILE OR MORE APART. EXPANDED RIVERSIDE 3120029 TRANSIT 0 NON-HEAVY DUTY WESTERN EQUIPMENT FOR TRANSIT SVC EXPANSION AS 2035 $5,625 BUS EXPANSION RIVERSIDE COUNTY POPULATION AND URBAN DEVELOPMENT GROWS THROUGHOUT RTA SERVICE AREA . RIVERSIDE 3120031 TRANSIT 0 NON-HEAVY DUTY WESTERN EQUIPMENT FOR TRANSIT SVC SUSTAINABILITY 2035 $45,000 BUSES RIVERSIDE COUNTY THROUGHOUT THE RTA SVC AREA WITH OPERATION LEVELS FROM 10-60 MINUTE HEADWAYS. RIVERSIDE 3120034 TRANSIT 0 REGIONAL FLYER WESTERN BUSES FOR EXPRESS AND RAPID BUS SERVICE 2030 $17,600 VEHICLE FLEET RIVERSIDE COUNTY EXPANSION OF RTA. RIVERSIDE 3120026 TRANSIT 0 SR60 REGIONAL I-15 BANNING EQUIP. FOR COMMUTER TRANSIT SVC W/STOPS 2020 $24,750 FLYER – ROUTE LOCATED A MILE OR MORE APART. 204/210 EXPANDED

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 252 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3120027 TRANSIT 0 TRANSIT CENTER CITY OF RIVERSIDE REGIONAL TRANSIT CENTER FOR BUS SERVICE IN THE 2030 $8,000 IN THE NORTHEAST NORTHEAST AREA OF THE CITY OF RIVERSIDE AREA OF THE CITY OF RIVERSIDE RIVERSIDE 3120015 TRANSIT 0 PARK-N-RIDE FACILITY IN THE VICINITY OF GRAND 2018 $4,500 AVE AND SR74 RIVERSIDE 3C01MA01 STATE 0 CETAP EAST-WEST I-15 I-215 CETAP: PROVIDE NEW EAST-WEST TRANSPORTATION 2035 $2,367,661 HIGHWAY CORRIDOR CORRIDOR BETWEEN I-15 IN THE WEST, I-215 IN THE EAST, SOUTH OF LAKE MATHEWS IN THE NORTH, AND SR 74 IN THE SOUTH. RIVERSIDE 3ITS0717 STATE 0 FREEWAY SERVICE FREEWAY SERVICE PATROL FROM ORANGE COUNTY 2016 $21,702 HIGHWAY PATROL LINE TO RIVERSIDE COUNTY. RIVERSIDE 3M0722 STATE 0 I-10 AT LANDAU BTWN VISTA CHINO CONSTRUCT NEW 6-LANE MIXED FLOW, PARTIAL 2035 $111,664 HIGHWAY & VARNER RD CLOVERLEAF IC WITH AUXILIARY LANES AND 4 TWO LANE RAMPS PLUS 6 LANE GRADE SEPARATION BRIDGE OVER UPRR BETWEEN PALM DR IC AND DATE PALM DRIVE IC RIVERSIDE 3ITS07 STATE 0 ITS COUNTYWIDE ITS CALTRANS D8 LUMP SUM 2035 $91,864 HIGHWAY RIVERSIDE 3M01CV01 STATE 10 I-10 AT AVE 50 I-10 CONSTRUCT NEW 4 LANE IC AND RAMPS 2018 $23,371 HIGHWAY RIVERSIDE 3M04SH05 STATE 10 I-10 CALIMESA @ 500 METERS E/O REPLACE BRIDGE, RAMPS, CONSTRUCT AUXILIARY 2020 $73,396 HIGHWAY COUNTY LINE RD SANDLWOOD DR I/C LANES, AND REALIGN CALIMESA RD (EA 0A710K) (R4.0) (R4.3) RIVERSIDE 3M01SH06 STATE 10 I-10 MONTEREY AVE DILLON RD (58.9) ADD 1 MF LANE EACH DIRECTION (EA 0A030K) 2030 $127,317 HIGHWAY (44.5) RIVERSIDE 3M04WT003 STATE 10 I-10 (PM 0.0 TO 2.8) AT CALIMESA BTWN 7TH RECONSTRUCT IC AND RECONSTRUCT/WIDEN RAMPS 2020 $31,740 HIGHWAY BLVD/ ST & SANDALWOOD DR SANDALWOOD DR RIVERSIDE 3A04WT007 STATE 10 I-10 (PM 11.1 TO 11.6) AT SUNSET AVE BTWN RAMPS RECONSTRUCT/WIDEN IC RAMPS, ADD TURN LANES 2023 $27,659 HIGHWAY TO EB RAMPS, AND ADD WB AUX LANE ON I-10 FROM 22ND ST TO SUNSET AVE RIVERSIDE 3M0715 STATE 10 I-10 (PM 58.39 TO AT DILLON RD BTWN VISTA DEL RECONSTRUCT/WIDEN IC RAMPS 2020 $22,022 HIGHWAY 59.39) NORTE AND VISTA DEL SUR

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 253

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3M04WT001 STATE 10 I-10 (PM 7.07 TO AT SR-79/ BTWN 6TH ST AND RECONSTRUCT/WIDEN SR-79/BEAUMONT AVE IC 2020 $20,665 HIGHWAY 8.07) BEAUMONT AVE 1ST ST FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3M04WT004 STATE 10 I-10 (PM 7.71 TO AT PENNSYLVANIA BTWN 6TH ST AND RECONSTRUCT PENNSYLVANIA AVE IC AND 2020 $20,665 HIGHWAY 8.71) AVE 3RD ST RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3A04WT003 STATE 10 I-10 (PM 8.81 TO AT HIGHLAND BTWN 5TH ST AND RECONSTRUCT/WIDEN HIGHLAND SPRINGS AVE IC 2030 $37,394 HIGHWAY 9.81) SPRINGS AVE SOUTH RAMPS FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3M0705 STATE 10 I-10 (PM SBD 38.66 AT COUNTY LINE BTWN 7TH ST RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND 2020 $20,665 HIGHWAY TO RIV 0.52) RD & I-10 EAST RECONSTRUCT/WIDEN RAMPS RAMPS RIVERSIDE 3M04WT002 STATE 10 I-10 (PM12.35 TO AT 8TH ST BTWN RAMSEY ST RECONSTRUCT/WIDEN 8TH ST IC UC 2 TO 4 LANES 2023 $8,879 HIGHWAY 13.35) AND LINCOLN ST AND RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3M04MA05 STATE 10 I-10/SR-60 JCT/SPLIT SR60/I-10 JCT/ CONSTRUCT NEW INTERCHANGE 2030 $184,464 HIGHWAY SPLIT RIVERSIDE 47520-47520 STATE 10 AT I-10/JEFFERSON ST IC: RECONSTRUCT, REALIGN, 2018 $81,117 HIGHWAY & WIDEN IC 2 TO 6 LANES (SOUTHERLY OF VARNER RD TO UPRR), WIDEN RAMPS, ADD NEW ENTRY RAMPS, INCLUDING RAMP METERING (NO HOV PREFERENTIAL LANE INCLUDED), ADD ACCEL/DECEL LANES AT WB ENTRY AND EB EXIT (<1/4 MILE), AND ADD DEDICATED RIGHT-TURN LANES. (EA: 47520) RIVERSIDE RIV031208 STATE 10 AT I-10/MONTEREY AVE IC – RECONFIGURE IC: 2014 $12,699 HIGHWAY CONSTRUCT NEW WB ENTRY RAMP AND REALIGN/ RELOCATE WB EXIT RAMP (EA: 0F050) RIVERSIDE RIV060115 STATE 10 AT I-10/OAK VALLEY PKWY IC: RECONSTRUCT/ 2018 $25,425 HIGHWAY WIDEN IC FROM 2 TO 6 THROUGH LANES FROM APPROX 500' W/O DESERT LAWN DR TO GOLF CLUB DR, WIDEN RAMPS – EB ENTRY 1 TO 2 LANES, EB & WB EXIT 1 TO 4 LANES, WB ENTRY 1 TO 3 LANES, , ADD NEW EB/WB ENTRY LOOP RAMPS (2 LANES) , ENTRY RAMPS INCLUDE HOV PREFERENTIAL LANE, AND RAMPS INCLUDE EXTENDED ACCELERATION/ DECELERATION LANE (EA: 0G280)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 254 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV031209 STATE 10 AT I-10/PORTOLA AVE (B/W MONTEREY IC & COOK 2018 $71,993 HIGHWAY IC): CONSTRUCT NEW 6 THRU LANE PORTOLA AVE IC FROM DINAH SHORE DR TO VARNER RD & RAMPS (EB & WB EXIT 3 LNS, EB & WB ENTRY 2 LNS, EB ENTRY LOOP RAMP 2 LNS, ENTRY INCL HOV LN, WIDENING INCLUDES BRIDGE OVER UPRR & RELOCATE/ WIDEN VARNER 2 TO 4 LNS, ADD EB/WB AUX LNS (MONTEREY TO PORTOLA AND PORTOLA TO COOK), EXTEND 4TH WB LANE COOK TO PORTOLA (EA: 0F120K) RIVERSIDE RIV060116 STATE 10 I-10/CHERRY VALLEY BLVD IC: RECON/WIDEN 2 2018 $51,500 HIGHWAY TO 5 & 6 THRU LNS (3 NB+2&3 SB) FROM E/O CALIMESA BLVD TO APPROX W/O ROBERTS RD, RECON/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV LN, RECONFIGURE/WIDEN AS HOOK RAMPS WB ENTRY 1 TO 3 LNS W/ HOV LN & WB EXIT 1 TO 2 LNS, WIDEN EB EXIT RAMP 1 TO 2 LNS, RELOCATE/ WIDEN CALIMESA/CHERRY VALLEY BLVD 2 TO 4 LNS, & INCLUDE EXTENDED RAMP ACCEL/DECEL LNS (EA: 0G170) RIVERSIDE RIV62036 STATE 10 I-10/INDIAN CYN DR IC – WIDEN 2 TO 6 LNS BTWN 2014 $35,099 HIGHWAY GARNET AVE & 20TH AVE, RELOCATE EB EXIT RAMP (1-3 LNS) AS HOOK RAMP TO GARNET, ADD EB ENTRY HOOK RAMP (1 LN), RELOCATE WB EXIT RAMP (2-3 LNS) AS HOOK RAMP TO 20TH AVE, ADD ADJOINING WB ENTRY HOOK RAMP (2 LNS) & LOOP RAMP (2 LNS), RECON EXISTING EB & WB ENTRY RAMPS (1 LN), WIDEN GARNET 2 TO 4 LNS, WIDEN 20TH AVE 2 TO 3 LNS (2 WB & 1 EB) (EA: 45570) RIVERSIDE RIV060124 STATE 10 IN BANNING ON SUNSET AVE AT I-10 FROM S/O 2015 $26,200 HIGHWAY RAMSEY ST TO S/O LINCOLN ST: LOWER SUNSET AVE TO CONSTRUCT NEW 4-LANE UC AT UPRR CROSSING (NON-CAPACITY) AND RECONSTRUCT THE I-10 IC RAMPS TO MEET THE NEW STREET GRADE (SAFETEA CA438, #1261+ HR4818+HR3058) (EA:33471)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 255

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 45580 STATE 10 NEAR PALM SPRINGS ON I-10 AT GENE AUTRY 2012 $35,393 HIGHWAY TR/PALM DR IC FROM I-10 IC SOUTH TO SALVIA ROAD – WIDEN 2 TO 6 THROUGH LANES, I-10 IC IMPROVEMENTS, WIDEN/MODIFY RAMPS FROM 1 TO 2 LNS (SAFETEA LU CA451 #1369) (EA: 45580) RIVERSIDE 3M0720 STATE 10 ON I-10 AT APPROX PM 41.17: CONSTRUCT NEW DA 2023 $132,986 HIGHWAY VALL DR IC (6 LNS) & RAMPS (2 LNS) FROM VARNER RD TO RAMON RD INCLUDING BRIDGE OVER UPRR AND LONG CYN CREEK CHANNEL, ADD EB/WB AUX LANES ( DATE PALM DR IC TO DA VALL & DA VALL TO RAMON RD) RIVERSIDE 45590 STATE 10 ON I-10 IN CATHEDRAL CITY AT DATE PALM DR IC: 2012 $31,476 HIGHWAY MODIFY IC/WIDEN OC & ARTERIAL INCLUDING UPRR BRIDGE 2 TO 6 LNS FROM N. RAMPS SOUTH TO VISTA CHINO & RAMPS FROM 1 TO 2 LNS (EA: 45590K) ($955 TOLL CREDIT FOR STPL MATCH IN CONS) RIVERSIDE RIV030901 STATE 10 ON I-10 IN EASTERN COACHELLA (AT 5.5 KM E/O 2018 $45,164 HIGHWAY DILLON RD & 14.6 KM W/O CACTUS CITY SRRA): CONSTRUCT NEW 6 THROUGH LANE MCNAUGHTON PKWY IC (3 LANES EACH DIR. APPROX 1/2 MILE N/O AND S/O I-10), EB EXIT RAMP (3 LANES), WB EXIT RAMP (2 LANES), EB & WB ENTRY RAMPS (1 LANE), EB & WB LOOP ENTRY RAMPS (1 LANE) WITH EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 45210) RIVERSIDE 3A07021 STATE 10 ON I-10 IN INDIO AT GOLF CENTER PKWY IC: 2023 $27,000 HIGHWAY RECONSTRUCT/WIDEN IC FROM 4 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL BETWEEN AVENUE 44 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/ DECELERATION LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 256 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07020 STATE 10 ON I-10 IN INDIO AT JACKSON ST IC (AT PM 55.575): 2023 $56,000 HIGHWAY RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL FROM SHOWCASE PKWY TO SOUTH OF WHITEWATER RIVER CHANNEL, RECONSTRUCT/ WIDEN RAMPS 1 TO 2 LANES, MODIFY TRAFFIC SIGNALS RIVERSIDE 3A07022 STATE 10 ON I-10 IN INDIO AT MONROE ST IC: RECONSTRUCT/ 2023 $47,000 HIGHWAY WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL FROM AVENUE 42 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/ DECELERATION LANES (EA: 0K730K) RIVERSIDE 30M0701- STATE 10 ON I-10 IN THE CITY OF BLYTHE – PROVIDE NEW 2015 $3,635 RIV110302 HIGHWAY W/B ON AND W/B OFF RAMPS TO HOBSON WAY APPROX 1,800' W/O EXISTING RAMPS TO RIVIERA DR/INSPECTION STATION. THE NEW RAMPS WILL REPLACE EXISTING CONNECTION TO RIVIERA DR. RIVERSIDE 3TK04MA12 STATE 10 ON I-10 NEAR BEAUMONT: ADD/CONSTRUCT NEW 2020 $26,000 HIGHWAY EASTBOUND TRUCK CLIMBING LANE FROM SAN BERNARDINO COUNTY LINE TO I-10/SR60 JCT (EA: 35300) RIVERSIDE 45600 STATE 10 ON I-10 NEAR RANCHO MIRAGE FROM 3.3 KM WEST 2012 $52,269 HIGHWAY TO 2.0 KM EAST OF RAMON RD IC – CONSTRUCT BOB HOPE DR EXTENSION (6 LANES) W/ A NEW DIAMOND IC & MODIFY RAMON RD IC & RAMPS (PPNO: 0007D, EA: 45600) RIVERSIDE RIV060117 STATE 10 ON I-10/SINGLETON RD IC: RECONSTRUCT/WIDEN 2 2018 $38,400 HIGHWAY TO 4 THROUGH LANES (WOODHOUSE TO CALIMESA BLVD), RECONSTRUCT/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV PREFERENTIAL LN, WB EXIT 1 TO 3 LNS, ADD EB EXIT RAMP (3 LNS), WB ENTRY RAMP (2 LNS W/ HOV PREFERENTIAL LN), INCLUDE EXTENDED RAMP ACCEL/DECEL LNS, RELOCATE CALIMESA BLVD/SINGLETON RD INTERSECTION, ADD SB EXTENDED DEDICATED RIGHT-TURN LN (EA: 0F980)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 257

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A04A26 STATE 15 I-15 AT BELLEGRAVE BTWN HAMNER AVE ADD SIGNALS AND RAMPS. 0.1 MI. 2030 $4,407 HIGHWAY AVE & WINEVILLE RD RIVERSIDE 3M0737 STATE 15 I-15 AT LAKE ST BTWN WALKER RECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND 2023 $20,275 HIGHWAY CYN RD TEMESCAL RECONSTRUCT/WIDEN RAMPS CYN RD RIVERSIDE 3M0734 STATE 15 I-15 AT MALAGA RD BTWN CASINO DR CONSTRUCT NEW 4 LANE OC OVER I-15 2030 $30,686 HIGHWAY LAKEVIEW TERRACE AND GRAPE ST RIVERSIDE 3A04A17 STATE 15 I-15 AT RIVERSIDE DR BTWN COLLIER AVE CONSTRUCT NEW 4 LANE OC OVER I-15 2023 $30,604 HIGHWAY AND DEXTER AVE RIVERSIDE 3A04A16 STATE 15 I-15 AT SECOND ST BTWN COLLIER AVE CONSTRUCT NEW 4 LANE ARTERIAL CONNECTING 2035 $42,640 HIGHWAY (CHANEY AVE) AND CAMINO DEL OVERCROSS OVER I-15 NORTE RIVERSIDE 3M0702 STATE 15 I-15 SR-60 (51.5) SAN BERNARDINO ALSO SBD-15-0.0/2.39 ROUTE 60 TO I-10 ADD & 2030 $22,779 HIGHWAY COUNTY LINE (52.8) EXTEND AUX LANES (EA: 0C350) RIVERSIDE 3M0729 STATE 15 I-15 (28.36 TO 29.36) AT HORSETHIEF JUST BEYOND AND RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND 2030 $5,206 HIGHWAY CANYON RD BTWN RAMPS RECONSTRUCT RAMPS RIVERSIDE 3M0727 STATE 15 I-15 (PM 15.8 TO AT BUNDY CANYON BTWN ORANGE ST RECONSTRUCT/WIDEN BUNDY CANYON RD IC FROM 2 2030 $22,635 HIGHWAY 16.8) RD AND CHERRY ST TO 4 LANES AND RECONSTRUCT RAMPS RIVERSIDE 3M0735 STATE 15 I-15 (PM 17.01 TO AT OLIVE ST BTWN ORCHARD ST CONSTRUCT NEW 4 LANE IC AND RAMPS 2018 $43,392 HIGHWAY 18.01) AND GRAPE ST RIVERSIDE 3M0736 STATE 15 I-15 (PM 23.35 TO AT NICHOLS RD BTWN RAMPS RECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND 2030 $44,947 HIGHWAY 24.35) RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3M0728 STATE 15 I-15 (PM 32.60 TO AT TEMESCAL NORTH OF GLENN RECONSTRUCT/WIDEN TEMESCAL CANYON IC FROM 2030 $19,989 HIGHWAY 33.60) CANYON IVY JUST BEYOND 2 TO 4 LANES AND RECONSTRUCT RAMPS AND BTWN RAMPS RIVERSIDE 3M0721 STATE 15 I-15 (PM 4.48 TO AT I-15/RANCHO BTWN YNEZ RD AND RECONFIGURE 4 TO 6 LANE IC AND RAMPS AT I-15 2035 $33,008 HIGHWAY 5.48) CALIFORNIA JEFFERSON AVE AND RANCHO CALIFORNIA. TYPE OF LANES FOR ARTERIAL WIDENING WILL BE THROUGH LANES. RIVERSIDE 3M04WT007 STATE 15 I-15 (PM 42.37 TO AT HIDDEN VALLEY BTWN HAMNER AVE RECONSTRUCT INTERCHANGE/RAMPS/ 2018 $3,648 HIGHWAY 43.37) PKWY & BEYOND NB CHANNELIZATION IMPROVEMENTS EXIT RAMP

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 258 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3M0733 STATE 15 I-15 (PM 43.13 TO AT 2ND ST BTWN HAMNER AVE RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND 2018 $3,760 HIGHWAY 44.13) & VALLEY VIEW WIDEN RAMPS AVE RIVERSIDE 3M04WT005 STATE 15 I-15 (PM 45.1 TO AT 6TH ST BTWN HAMNER AVE RECONSTRUCT INTERCHANGE/RAMPS/ 2018 $18,238 HIGHWAY 46.1) & SIERRA AVE CHANNELIZATION IMPROVEMENTS RIVERSIDE RIV010208 STATE 15 AT I-15/CAJALCO RD IC NEAR CORONA: DESIGN, 2018 $58,199 HIGHWAY RECONST/REALIGN & WIDEN CAJALCO RD FROM 2 TO 6 THRU LNS FROM TEMESCAL CYN RD TO BEDFORD CYN RD, RECONST/WIDEN SB ENTRY FROM 1-2 LNS, SB EXIT FROM 2-5 LNS, NB ENTRY FROM 1-2 LNS, NB EXIT FROM 2-4 LNS, ADD AUX LNS BTWN NB ENTRY AND NB EXIT TO EL CERRITO RD AND BTWN SB ENTRY FROM EL CERRITO RD AND SB EXIT. ($840/$600 TOLL CREDITS IN ENG/ROW TO MATCH DEMO) RIVERSIDE RIV010204 STATE 15 AT I-15/CALIFORNIA OAKS RD/KALMIA ST IC – 2012 $36,208 HIGHWAY RECONFIGURE RAMPS (CONSTRUCT NB/SB LOOP ON RAMPS, RELOCATE SB/NB OFF RAMP), WIDEN CAL OAKS 4 TO 6 LNS FROM UC TO CAL OAKS PLAZA (EA: 0A490) RIVERSIDE RIV011233 STATE 15 AT I-15/LIMONITE AVE IC – WIDEN IC 4 TO 6 LNS, 2018 $29,211 HIGHWAY WIDEN NB AND SB EXIT RAMPS 1 TO 2 LNS, ADD 2 LANE LOOP RAMPS IN THE NB AND SB DIRECTIONS & WIDEN LIMONITE AVE FROM HAMNER TO WINEVILLE 4 TO 6 LNS (APPROX 1 MI) (EA: 0E150K) RIVERSIDE 3M0730 STATE 15 AT I-15/MURRIETA HOT SPRINGS RD IC – CONSTRUCT 2014 $8,100 HIGHWAY NEW NB LOOP ON RAMP AND REALIGN EXISTING NB OFF RAMP (EA: 0J650K)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 259

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV010206 STATE 15 AT I-15/RAILROAD CYN RD IC & I-15/FRANKLIN 2018 $71,838 HIGHWAY ST: CONSTRUCT NEW FULL IC AT FRANKLIN ST, RECONSTRUCT/WIDEN FRANKLIN ST OC 2 TO 4 LNS, RECONSTRUCT/WIDEN RR CYN UC 4 TO 6 LNS (SUMMERHILL DR TO CASINO RD), ADD AUX LNS FROM NEW FRANKLIN ST IC TO RR CYN RD, ADD RAMP ACCEL/DECEL LNS AT RR CYN RD AND FRANKLIN ST, REALIGN MAIN ST SB ENTRY RAMP, REPLACE NB ENTRY/SB EXIT RAMPS AT RR CYN W/ HOOK RAMPS(EA: 0A440) RIVERSIDE 991202 STATE 15 FRENCH VALLEY PKWY (FVP) – PHASE 1: DESIGN 2012 $29,273 HIGHWAY & CONSTRUCT FVP 2 THROUGH LANES ARTERIAL WESTBOUND FROM I-15 TO JEFFERSON AVE, CONSTRUCT FVP SB EXIT RAMP (1 LANE), SB AUX LANE (FROM FVP IC TO WINCHESTER RD IC) & WIDEN WINCHESTER RD IC SB EXIT RAMP (1 TO 3 LNS) (EA: 43270) RIVERSIDE RIV031215 STATE 15 FRENCH VALLEY PKWY IC/ARTERIAL PHASES: 2018 $156,171 HIGHWAY CONSTRUCT 6 LN IC (JEFFERSON TO YNEZ) & RAMPS, NB/SB AUX LN, CD LNS (3 LNS NB&SB) & MODIFY WINCHESTER RD IC (I-215 PM: 8.43-9.75) (EA:43270) RIVERSIDE RIV071267 STATE 15 I-15 – SBD CO LINE TO JCT I-15/I-215: CONSTRUCT 2020 $1,706,347 HIGHWAY 4 HOT LNS (2 HOT LNS EA DIR) FROM SBD CO LINE TO HIDDEN VALLEY PKWY AND FROM CAJALCO RD TO SR-74; CONS 2 MF LNS (1 LN EA DIR FROM SBD CO LINE TO SR-74); CONS 2 HOT LNS ( 1 HOT LN EA DIR) FROM HIDDEN VALLEY PKWY TO CAJALCO RD; CONS 2 HOV LNS (1 LN EA DIR) FROM SR74 TO JCT I-15/I-215. RIVERSIDE RIV62034 STATE 15 I-15/CLINTON KEITH RD IC: RECONSTRUCT/WIDEN 2014 $17,460 HIGHWAY OC 2 TO 6 LNS & RAMPS 1 & 2 LNS TO 3 & 4 LNS, ADD NB/SB AUX LNS PRIOR TO & AFTER EXIT/ENTRY RAMPS & LEFT-TURN LNS (EA: 0F580K)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 260 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV060109 STATE 15 I15/SR74 (CENTRAL AV) IC JCT MOD B/W 1000’ W/O 2018 $85,000 HIGHWAY COLLIER TO CONARD: ADD NB LOOP ENTRY RAMP W/ACCEL LANE, REALIGN NB ENTRY/EXIT RAMPS, WIDEN SB ENTRY/EXIT RAMPS, ADD SB ACCEL/DECEL LANES, ADD NB DECEL LANE, WIDEN SR74 RIVERSIDE TO CENTRAL 2 TO 4 THRU LNS & COLLIER TO CAMBERN 4 TO 6 THRU LNS, CONSTRUCT RIVERSIDE OC & WIDEN RIVERSIDE COLLIER TO CAMBERN 2 TO 4 THRU LNS. SR74 PM 15.5-18.5. EA: 0F3100 RIVERSIDE RIV62031 STATE 15 I-15/SR79 SO. IC: REMOVE SB EXIT RAMP, ADD NEW 2012 $35,978 HIGHWAY SB EXIT LOOP RAMP, REALIGN SB EXIT RAMP (2 LNS) W/AUX LN. WIDEN SB ENTRY 1 TO 3, NB EXIT 1 TO 4, NB ENTRY 1 TO 3 & RECON SR79S. RIVERSIDE 3A10WT07 STATE 15 IN SW RIVERSIDE COUNTY – I-15/LOS ALAMOS RD. 2012 $11,440 HIGHWAY BRIDGE REPLACEMENT & WIDENING: REPLACEMENT OF EXISTING TWO LANE OVERCROSSING AT LOS ALAMOS RD. AND INTERSTATE 15 WITH A FOUR LANE OVERCROSSING (GAP CLOSURE), BRINGING THE BRIDGE VERTICAL CLEARANCE TO CALTRANS STANDARDS. RIVERSIDE 3M10WT02 STATE 15 IN WESTERN RIVERSIDE COUNTY – I-15 AT INDIAN 2012 $8,900 HIGHWAY TRUCK TRAIL IC: WIDEN INDIAN TRUCK TRAIL FROM 2 TO 4 LANES, INCLUDING DEDICATED LEFT-TURN LANES TO NB AND SB ON RAMP; WIDENING OF THE SB EXIT RAMP FROM 1 TO 3 LANES; AND WIDENING OF THE NB EXIT RAMP AND ENTRY RAMP FROM 1 TO 3 LANES PLUS INTERSECTION IMPROVEMENTS AT TEMESCAL CYN RD. RIVERSIDE RIV050532 STATE 15 ON I-15 NEAR THE CITY OF NORCO – CONSTRUCT 2020 $62,750 HIGHWAY NEW SCHLEISMAN RD IC (6 THROUGH LANES) AND RAMPS (2 LANES) AND NB/SB AUX LANE BETWEEN SCHLEISMAN RD IC AND LIMONITE RD IC (EA: 0E140K) RIVERSIDE 3M04WT018 STATE 60 SR-60 (PM 11.23 TO AT MAIN ST BTWN RUSSELL RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN 2020 $4,133 HIGHWAY 12.23) ST &AMP; RAMPS, CHANNELIZATION IMPROVEMENTS STODDARD AVE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 261

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3M04WT017 STATE 60 SR-60 (PM 14.84 TO AT HEACOCK ST BTWN HEMLOCK WIDEN/RECONSTRUCT HEACOCK IC, RAMPS, AND 2020 $23,873 HIGHWAY 15.84) AVE & CHANNELIZATION IMPROVEMENTS. NO ADDITIONAL SUNNYMEAD BLVD LANES PLANNED. RIVERSIDE 3M0713 STATE 60 SR-60 (PM 15.85 TO AT PERRIS BLVD BTWN SUNNYMEAD RECONSTRUCT/WIDEN ARTERIAL FROM 4 TO 6 LANES 2018 $37,379 HIGHWAY 16.85) BLVD & AND RECONSTRUCT/WIDEN RAMPS (NO ADDITIONAL IRONWOOD LANES PLANNED) RIVERSIDE 3M01WT020 STATE 60 SR-60 (PM 2.53 TO AT MISSION BLVD BTWN GRANITE HILL RECONSTRUCT INTERCHANGE/RAMPS 2030 $3,822 HIGHWAY 3.53) DR & SEVAINE WAY RIVERSIDE 3A04A29 STATE 60 SR-60 (PM 9.06 TO AT RUBIDOUX BLVD BTWN 30TH & RECONSTRUCT/WIDEN IC, RAMPS AND 2030 $22,875 HIGHWAY 10.06) 34TH STS CHANNELIZATION IMPROVEMENTS RIVERSIDE 3A04A30 STATE 60 SR-60 (PM SBD 9.46 AT MILLIKEN AVE BTWN HARREL AVE RECONSTRUCT/WIDEN IC, RAMPS, AND 2020 $4,133 HIGHWAY TO 10.46) & IBERIA CHANNELIZATION IMPROVEMENTS RIVERSIDE 3M0714 STATE 60 AT SR-60/GILMAN SPRINGS RD IC – REALIGN GILMAN 2018 $70,000 HIGHWAY SPRINGS RD/REMOVE EXISTING EB/WB RAMPS; WIDEN OC FROM 2 TO 6 THRU LANES; WB EXIT IS 1 LANE WIDENING TO 2 LANES THEN TO 3 LANES AT ARTERIAL, WB LOOP & EB ENTRY RAMPS FROM 1 LANE TO 2 LANES W/ HOV; WIDEN EB EXIT RAMPS FROM 1 LANE TO 2 LANES AT EXIT AND 3 LANES AT ARTERIAL; ADD AUX LANES TO WEST OF IC 1200' EB AND 2200' WB RIVERSIDE 32300 STATE 60 AT SR60/NASON ST IC – MODIFY/RECONSTRUCT IC 2012 $19,946 HIGHWAY & NASON ST FROM ELDER AVE TO FIR AVE: REALIGN EB, WB EXIT RAMPS PLUS EB & WB ENTRY RAMPS, ADD EB & WB ENTRY RAMP HOV LANES, & ADD EB AND WB AUX LANES (EA: 32300) ($845/$1,225 TOLL CREDITS USED TO MATCH DEMO/STPL IN CONST) RIVERSIDE 3M0712 STATE 60 AT SR-60/REDLANDS BLVD – WIDEN OC FROM 2 TO 2018 $52,000 HIGHWAY 6 THRU LANES; WIDEN WB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ENTRY, 3 LANES AT ARTERIAL AND HOV AT ENTRY; WIDEN EB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ ENTRY AND HOV AT ENTRY; ADD AUX LANES 1000' EACH DIRECTION WEST OF IC AND 1700' EACH DIRECTION EAST OF IC

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 262 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3M0801 STATE 60 AT SR-60/THEODORE ST IC: WIDEN OC FROM 2 TO 6 2018 $52,000 HIGHWAY THRU LANES; WIDEN WB EXIT/ENTRY RAMPS FROM 1 LN TO 2 LNS AT EXIT/ENTRY, 3 LNS AT ART. W/ HOV AT ENTRY; WIDEN EB EXIT RAMP FROM 1 LN TO 2 LNS AT EXIT AND 3 LNS AT ART.; WIDEN EB ENTRY RAMP FROM 1 LN TO 2 LNS W/HOV; ADD EB LOOP ENTRY WITH 2 LNS AT ART. AND 1 LN AT ENTRY; ADD AUX LNS 1700' EACH DIR WEST OF IC & 1200' EB AND 2200' WB EAST OF IC -RTP 3M0801 RIVERSIDE RIV041052- STATE 60 IN MORENO VALLEY AT SR-60/MORENO BEACH DR 2014 $10,410 RIV110401 HIGHWAY IC: MODIFY MORENO BEACH DR IC – REALIGN/WIDEN RAMPS (EB EXIT 1 TO 3 LANES, EB ENTRY 1 TO 2 LANES) AND ADD EB AUX LANE (EA: 32301) RIVERSIDE RIV041052- STATE 60 IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: 2014 $38,700 RIV041052 HIGHWAY MODIFY MORENO BEACH DR IC – WIDEN OC FROM 2 TO 6 THROUGH LANES, REALIGN/WIDEN RAMPS (WB EXIT 1 TO 2 LANES), ADD NEW WB ENTRY RAMP (2 LANES), AND ADD WB AUX LANE (EA: 32303) RIVERSIDE RIV041052- STATE 60 IN MORENO VALLEY AT SR60/NASON ST IC: WIDEN 2014 $19,980 RIV090117 HIGHWAY NASON ST OC FROM 2 TO 4 THROUGH LANES FROM ELDER AVE TO FIR AVE (EA: 32302) RIVERSIDE RIV050535 STATE 60 ON SR60 BETWEEN JACK RABBIT TR & SR60/I-10 2014 $78,500 HIGHWAY JCT: PH1-CONSTRUCT NEW POTRERO 6 LN OC (3 LNS EACH DIR) W/TEMP CONNECT TO WESTERN KNOLLS (EA34141). PH2: NEW IC ON/OFF RAMPS. CONSTRUCT WB/EB EXIT & ENTRY RAMPS (2 LNS) & WB/EB LOOP ENTRY RAMPS (2 LNS) (ENTRY RAMPS INCL HOV LANE), INCL EB/WB AUX LNS AT EXIT RAMPS, REALIGN WESTERN KNOLLS AVE, AND REMOVE WESTERN KNOLLS AVE CONNECTION TO SR60 (EA34142) RIVERSIDE 30M0701- STATE 60 ON SR60 IN MORENO VALLEY: CONTINUE THE 2010 $791 RIV070307 HIGHWAY IMPLEMENTATION OF SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #8, 2 TRUCKS) BETWEEN DAY ST AND REDLANDS BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 263

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 30M0701- STATE 60 ON SR60 IN NW RIV CO: CONTINUE THE 2010 $751 RIV070303 HIGHWAY IMPLEMENTATION OF THE EXPANDED SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #7 PATROL , 2 TRUCKS) BETWEEN MILIKEN AVE & MAIN ST (SR60 HOV LN CHANGE TCM SUBSTITUTION PROJECT) RIVERSIDE 3TK04MA13 STATE 60 ON SR-60 NEAR BEAUMONT: CONSTRUCT NEW 2018 $100,000 HIGHWAY EASTBOUND AND WESTBOUND TRUCK LANES FROM GILMAN SPRINGS RD TO 1.6 MILES WEST OF JACK RABBIT TRAIL (EA: 0N690)($746 TOLL CREDITS USED TO MATCH CMAQ IN PA&ED) RIVERSIDE 3M01MA09 STATE 71 SR-71 SR-91 SAN BERNARDINO WIDEN TO 3 MF LANES EACH DIRECTION 2035 $177,132 HIGHWAY COUNTY LINE RIVERSIDE RIV050517 STATE 74 ON SR74 IN/NEAR HEMET FROM CALVERT AVE TO 2011 $4,872 HIGHWAY CALIFORNIA AVE: CURVE, MEDIAN, & PAVEMENT WIDENING (NON CAPACITY) (EA 0N3600) RIVERSIDE 3A04SH12 STATE 79 SR-79 HUNTER RD DOMENIGONI PKWY WIDEN FROM 4 TO 6 LANES 2030 $100,147 HIGHWAY RIVERSIDE RIV62029 STATE 79 AT HWY 79 SO AND LA PAZ ST: ACQUIRE LAND, 2018 $2,374 HIGHWAY DESIGN AND CONSTRUCT PARK-AND-RIDE LOT – 157 SPACES. RIVERSIDE 46460 STATE 79 IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 2014 $57,306 HIGHWAY 79 – WIDEN FROM 2 TO 4 THROUGH LANES FROM THOMPSON RD TO DOMENIGONI PKWY RIVERSIDE RIV62024 STATE 79 ON SR79 IN SOUTHWESTERN RIVERSIDE COUNTY 2018 $1,400,000 HIGHWAY BETWEEN 2.0 KILOMETERS SOUTH OF DOMENIGONI PKWY TO GILMAN SPRINGS ROAD: REALIGN AND WIDEN SR79 FROM 2 TO 4 THROUGH LANES. RIVERSIDE RIV061159 STATE 86 AT SR86/AVENUE 50: WIDEN AND CONSTRUCT 2018 $26,640 HIGHWAY NEW 6THROUGH LANE IC FROM E/O COACHELLA STORMWATER CHANNEL BRIDGE TO E/O TYLER ST. IMPROVEMENTS INCLUDE: EXTENDED RAMP ACCELERATION/DECELERATION LANES, RELOCATE/ REALIGN AVE 50 AND TYLER ST, BIKE LANES, SIDEWALKS, AND RECONSTRUCT TRAFFIC SIGNALS (SAFETEA LU 1702, CA583, #2543) (EA: 0C970)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 264 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV060101 STATE 86 AT SR86S/AIRPORT BLVD (AVE 56): CONSTRUCT NEW 2012 $35,610 HIGHWAY IC (3 LANE OC – 2 LNS (1 LN IN EA DIR) + 1 MEDIAN LN)) AND RAMPS (1 LANE) FROM APPROX DESERT CACTUS DR TO 57TH AVE (EA: 47860, PPNO: 0078L) RIVERSIDE 3M0717 STATE 86 AT SR86S/AVENUE 52 (FROM APPROX 1.57 KM 2018 $17,328 HIGHWAY S/O AVE 52 TO 0.52 KM S/O AVE 50): CONSTRUCT 6 LANE IC AND RAMPS (2 LANES), REALIGN/ RELOCATE POLK ST (APPROX 1 MILE E/O AVE 52/ POLK ST INTERSECTION) AND AVE 52 (APPROX ½ MILE E/O POLK ST), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 0C960) RIVERSIDE RIV071250B STATE 91 SR-91 SR-241 PIERCE ON SR-91/I-15: SR91 – ADD 1 MFL EA DIR 2035 $386,160 HIGHWAY (SR241-SR71)(I15-PIERCE); I15 – ADD TEL MED DIR CONNCT SB15 TO WB91 & EB91 TO NB15, 1 TEL EA DIR HIDDEN VALLEY-SR91 DIR CONNCT AND ONTARIO IC TO CAJACLO IC. RIVERSIDE 3M01WT024 STATE 91 SR-91 (PM 10.6 TO AT MAGNOLIA AVE BTWN MERCED DR RECONSTRUCT/WIDEN IC UC FROM 4 TO 6 LANES 2020 $23,164 HIGHWAY 11.6) AND FILLMORE ST AND RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3M01WT026 STATE 91 SR-91 (PM 12.9 TO AT TYLER ST BTWN DIANA AVE RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN 2030 $48,311 HIGHWAY 13.1) & INDIANA AVE RAMPS RIVERSIDE 3M01WT022 STATE 91 SR-91 (PM 15.50 TO AT ADAMS ST BTWN DIANA AVE RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN 2020 $23,164 HIGHWAY 15.70) & INDIANA AVE RAMPS RIVERSIDE 3M01WT023 STATE 91 SR-91 (PM 16.15 TO AT MADISON ST BTWN GARDEN ST RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN 2020 $23,164 HIGHWAY 17.15) & INDIANA AVE RAMPS RIVERSIDE RIV070308 STATE 91 AT SR91/71 JCT: REPLACE EB 91 TO NB 71 2018 $122,658 HIGHWAY CONNECTOR W/ DIRECT FLY-OVER CONNECTOR, AND RECONSTRUCT THE GREEN RIVER ROAD EB ON-RAMP (EA: 0F541) ($1,501/$639/$200 TOLL CREDITS WILL BE USED IN PS&E TO MATCH DEMO- SAFETEALU/DEMO-TEA21/STP, RESPECTIVELY. $159 TOLL CREDITS WILL BE USED IN R/W TO MATCH DEMO-SAFETEALU.)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 265

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV050102 STATE 91 GREEN RIVER RD LANDSCAPE ENHANCEMENTS: 2015 $1,832 HIGHWAY NEAR CORONA FROM 1.0 KM E/O ORANGE/RIVERSIDE CNTY LINE TO 1.35 KM W/O SR 71/91 SEP – INSTALL LANDSCAPE ENHANCEMENTS (EA: 45662, PPNO: 0072G) RIVERSIDE RIV010212 STATE 91 ON SR91 – ADAMS TO 60/215 IC: ADD ONE HOV LN 2018 $278,456 HIGHWAY IN EACH DIRECTION, RESTRIPE TO EXTEND 4TH WB MIXED FLOW LANE FROM 60/215 IC TO CENTRAL OFF-RAMP, RESTRIPE TO EXTEND 5TH WB MIXED FLOW LANE FROM 60/215 IC TO 14TH ST OFF-RAMP, AUX LNS (MADISON-CENTRAL), BRIDGE WIDENING & REPLACEMENTS, EB/WB BRAIDED RAMPS, IC MOD/ RECONSTRUCT + SOUND/RETAINING WALLS RIVERSIDE 30M0701- STATE 91 ON SR-91/I-15: SR91 – CONST 1 MF LN (SR71-I15)/1 2018 $1,104,240 RIV071250 HIGHWAY AUX LN VAR LOCS(SR241-PIERCE) (OC PM 14.43- 18.91), CD SYSTEM (2/3/4 LNS MAIN-I15), 1 TOLL EXPR LN (TEL) & CONVERT HOV TO TEL EA DIR (OC-I15); I15- CONST TEL MED DIR CONNCT NB15 TO WB91 AND EB91 TO SB15, 1 TEL EA DIR SR91 DIR CONNCT-ONTARIO IC (I15 PM 37.56-42.94). RIVERSIDE 3A07131 STATE 111 IN PALM SPRINGS HWY 111 (VISTA CHINO) WIDENING: 2020 $17,000 HIGHWAY HWY 111 FROM 5 TO 6 THRU LNS (ADD A 3RD WB LN) BTWN VOLTURNO RD AND SUNRISE WY, INC. INT IMP @ SUNRISE WY/HWY 111 & FARRELL DR/HWY 111; AND WID. FROM 4 TO 6 THRU LNS (ADD A 3RD WB & EB LN) BTWN VOLTURNO RD & GENE AUTRY TR, INC. INT IMP AT GENE AUTRY TR/HWY 111. OTHER IMP INC. INT IMP @ HWY 111/ INDIAN CYN DR & PALM CYN DR/ HWY 111. RIVERSIDE 3A04A27 STATE 215 I-215 (PM 15.95 TO AT GARBANI RD BTWN HAUN CONSTRUCT NEW 4 LANE (2 LNS EAC DIR) AND 2030 $44,813 HIGHWAY 16.95) RD &AMP; RAMPS ANTELOPE RD RIVERSIDE 3M0719 STATE 215 I-215 (PM 20.34 TO AT MCCALL BLVD BTWN BRADLEY RD RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND 2030 $22,265 HIGHWAY 21.34) & ENCANTO DR RECONSTRUCT RAMPS

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 266 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3M0731 STATE 215 I-215 (PM 24.7 TO AT ELLIS AVE BTWN PERRIS CONSTRUCT NEW 2 LANE IC AND RAMPS (1 LANE) 2030 $92,443 HIGHWAY 26.1) VALLEY STORM DRAIN W/O I-215 TO DUNLAP DR E/O I-215 RIVERSIDE 3M04WT014 STATE 215 I-215 (PM 27.38 TO AT NUEVO RD BTWN A ST & RECONSTRUCT INTERCHANGE, ADD CHANNELIZATION 2030 $35,749 HIGHWAY 28.38) E. FRONTAGE RD LANES ON RAMPS, MODIFY TRAFFIC SIGNALS RIVERSIDE 3M0725 STATE 215 I-215 (PM 29.5 AT PLACENTIA BTWN RAMPS CONSTRUCT NEW 6 LANE IC AND RAMPS AT 2020 $59,216 HIGHWAY – 30.0) PLACENTIA OC RIVERSIDE 3M0708 STATE 215 I-215 (PM 30.9) AT RAMONA BTWN RAMPS RECONSTRUCT/WIDEN FROM 4 TO 8 LANES, WIDEN 2030 $56,473 HIGHWAY EXPWY SB AND NB EXIT RAMPS AT I-215/RAMONA EXPWY IC AND OC, CONSTRUCT DUAL LEFT-TURN LANES AT THE EXIT RAMPS TEMINI RIVERSIDE 3A04WT059 STATE 215 I-215 (PM 31.83 TO AT HARLEY KNOX BTWN HARVILL AVE RECONSTRUCT AND WIDEN HARLEY KNOX BLVD OC 2018 $28,525 HIGHWAY 32.83) BLVD AND WESTERN WAY FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS RIVERSIDE 3M0724 STATE 215 I-215 (PM 35.92 TO AT ALESSANDRO BTWN BNSF & WIDEN/RECONSTRUCT IC FROM 4 TO 6 LANES AND 2030 $4,985 HIGHWAY 36.92) BLVD OLD 215 FRONTAGE RECONSTRUCT/WIDEN RAMPS ROAD RIVERSIDE 3M04WT012 STATE 215 I-215 (PM 43.40 TO AT COLUMBIA AVE BTWN PRIMER RECONSTRUCT INTERCHANGE/RAMPS 2035 $25,414 HIGHWAY 44.40) ST & BRANDYWINE AVE RIVERSIDE 3M04WT011 STATE 215 I-215 (PM 44.51 TO AT CENTER ST BTWN STEPHENS RECONSTRUCT INTERCHANGE/RAMPS 2035 $40,727 HIGHWAY 45.51) AVE & IOWA AVE RIVERSIDE RIV050533 STATE 215 AT I-215/CACTUS AVE IC: WIDEN IC FROM 3 TO 6 2018 $65,370 HIGHWAY THRU LNS (EB FROM 2 TO 3 BTWN W/O BNSF RR TO 1300' E/O VETERANS WAY, ADD 4TH EB LANE FROM NB EXIT RAMP TO E/O ELSWORTH ST, WIDEN WB FROM 1&2 TO 3 THRU LNS FROM COMMERCE CENTER DR TO BNSF RR), WIDEN RAMPS 1 TO 2&3 LNS (ENTRY RAMPS INCL HOV), EXTEND NB AUX LN BTWN ALESSANDRO BLVD SOUTH TO CACTUS AVE NB ENTRY LOOP RAMP & ADD DEDICATED RT-TURN LNS (EA0E760)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 267

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV010203 STATE 215 AT I-215/CLINTON KEITH RD IC – CONSTRUCT 2012 $35,668 HIGHWAY PARTIAL CLOVERLEAF: WIDEN OC 2 TO 6 THROUGH LANES, RECONSTRUCT RAMPS (WIDENING TO EXISTING NB/SB DIAMOND RAMPS) & CONSTRUCT NEW NB/SB LOOP ENTRY RAMPS (EA: 32780) RIVERSIDE RIV050534 STATE 215 AT I-215/NEWPORT RD IC: RECONSTRUCT/WIDEN 2018 $47,700 HIGHWAY FROM 4 TO 6 THROUGH LANES BETWEEN HAUN RD AND ANTELOPE RD, RELOCATE NB AND SB EXIT RAMPS (3 LANES), RECONFIGURE NB & SB ENTRY RAMPS TO INCLUDE HOV LANE, ADD NEW NB AND SB LOOP ENTRY RAMPS (2 LANES), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES, ADD EXTENDED DEDICATED RIGHT-TURN LANES (EA: 0J440) RIVERSIDE RIV011232 STATE 215 AT I-215/SCOTT RD IC: RECONSTRUCT/WIDEN FROM 2018 $76,000 HIGHWAY 2 TO 6 THROUGH LANES BTWN E/O ANTELOPE RD & HAUN RD, RECONSTRUCT/WIDEN RAMPS – NB EXIT 1 TO 3 LNS, NB ENTRY 2 TO 3 LNS, SB EXIT 1 TO 4 LNS, SB ENTRY 1 TO 2 LNS, ADD NB EXIT LOOP RAMP (2 LNS) & SB ENTRY RAMP (3 LNS), ENTRY RAMPS INCLUDE HOV LN, RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LNS, ADD EXTENDED RIGHT-TURN LNS (EA: 0A020) RIVERSIDE RIV060120 STATE 215 AT I-215/VAN BUREN BLVD IC: RECONSTRUCT/WIDEN 2014 $68,403 HIGHWAY IC FROM 2 TO 4 THROUGH LANES FROM MUSEUM ENTRANCE ST TO OPPORTUNITY WAY, ADD NEW NB ENTRY RAMP (3 LANES), & WIDEN RAMPS – NB ENTRY 1 TO 2 LANES, NB EXIT 2 TO 3 LANES, SB EXIT 2 TO 3 LANES, SB ENTRY 1 TO 3 LANES, ENTRY RAMPS INCLUDE HOV LANE, ADD NB/SB AUX LANE BETWEEN VAN BUREN BLVD IC AND CACTUS AVE IC (EA 0E520) RIVERSIDE RIV050501 STATE 215 I-215 AT SR74/G ST IC: REPLACE 2 THROUGH LANE 2012 $25,034 HIGHWAY OC WITH A 4 THROUGH LANE OC & WIDEN REDLANDS AVE (4TH TO SAN JACINTO), WIDEN/REALIGN RAMPS, MODIFY 4TH ST (G ST TO EASTERLY TERMINUS) & RECONSTRUCT INTERSECTIONS (EA: 46420)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 268 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV060111 STATE 215 IN MID WESTERN-RIVERSIDE CO IN THE CITY 2018 $10,000 HIGHWAY OF PERRIS – I-215/ETHANAC RD IC IMP.: IC OPERATIONAL IMP. OF THE NB & SB OFF RAMPS @ I-215/ETHANAC RD AND ON ETHANAC ON EITHER SIDE OF I-215 FOR UP TO 1,200 FT. IMPROVEMENTS CONSIST OF THE WIDENING OF THE ON AND OFF RAMPS TO PROVIDE LEFT AND RIGHT TURN POCKETS, T.S. UPGRADE AT THE RAMP TERMINI & WIDEN OC 2 TO 4 LANES WITH TURN LANE RIVERSIDE 3M04WT009 STATE 215 IN MID-WESTERN RIVERSIDE COUNTY IN THE CITY 2018 $21,000 HIGHWAY OF PERRIS – CASE ROAD/MATTHEWS RD. (SR-74) AT I-215 INTERCHANGE: RECONFIGURATION OF THE EXISTING CASE RD/MATTHEWS RD. (SR-74) AT I-215 IC, IMPROVING THE INTERSECTION OPERATIONS AND ELIMINATING CROSS TRAFFIC CONFLICTS ON THE SB RAMPS, WIDEN MATTHEWS RD FROM 2/3 TO 4 LANES FROM CASE RD TO TRUMBLE RD (EA: 0P420 ). RIVERSIDE 3M10WT03 STATE 215 IN SW RIVERSIDE COUNTY – I-215/KELLER RD. 2018 $12,000 HIGHWAY IC: REPLACE EXISTING 2-LN I-215/KELLER RD. UNDERPASS WITH A NEW 4-LN (2 LNS IN EA DIR 500' EAST AND WEST OF I-215 CL) IC, INCLUDING LEFT TURN LANES IN EACH DIRECTION, AUXILIARY LANES AT THE SB OFF-RAMP (APPROX. 1300'), ADD 2-LN NB/SB OFF RAMPS AND 2-LN NB/SB ON-RAMPS W/HOV, SIDEWALKS, AND REALIGN ANTELOPE RD APPROX 1/4 MI EAST. RIVERSIDE RIV050555 STATE 215 ON I-215 (N/O EUCALYPTUS AVE TO N/O BOX 2014 $47,414 HIGHWAY SPRINGS RD) & SR60 (E/O DAY ST TO SR60/I-215 JCT): RECONSTRUCT JCT TO PROVIDE 2 HOV DIRECT CONNECTOR LNS (SR60 PM: 12.21 TO 13.6) AND MINOR WIDENING TO BOX SPRINGS RD FROM 2 TO 4 THROUGH LANES BETWEEN MORTON RD AND BOX SPRINGS RD/FAIR ISLE DR IC (EA: 449311) RIVERSIDE RIV62040 STATE 215 ON I-215 AT LOS ALAMOS RD IC – INSTALL 2011 $2,488 HIGHWAY LANDSCAPING AND IRRIGATION IMPROVEMENTS TO THE I-215/LOS ALAMOS ROAD INTERCHANGE (SAFETEA-LU 2005 SEC. 1702. HPP #3140).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 269

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 30M0701- STATE 215 ON I-215 AT RAMONA EXPWY IC: WIDEN/ 2012 $8,546 RIV071275 HIGHWAY RECONSTRUCT SB AND NB EXIT RAMPS 1 TO 2 LANES AND WIDEN/MODIFY OC BRIDGE STRUCTURE (NON CAPACITY IMPROVEMENTS TO STRUCTURE) (EA: OG980) RIVERSIDE 3H07A STATE 215 ON I-215 FROM NUEVO RD TO BOX SPRINGS RD: 2030 $212,500 HIGHWAY CONSTRUCT 2 HOV LANES (1 LANE IN EACH DIRECTION) – PA&ED. RIVERSIDE RIV070309 STATE 215 ON I-215 IN SOUTHWEST RIVERSIDE COUNTY FROM 2018 $190,947 HIGHWAY SCOTT RD TO NUEVO RD IC: CONSTRUCT A MIXED FLOW LANE IN EACH DIRECTION AND RECONSTRUCT AUX LANES BETWEEN D ST IC AND NUEVO RD IC (EA: 0F162) RIVERSIDE 30M0701- STATE 215 ON I-215 IN SW RIV CO: CONTINUE THE 2010 $791 RIV070304 HIGHWAY IMPLEMENTATION OF I-215 FREEWAY SERVICE PATROL (FSP) (BEAT #19, 2 TRUCKS) BETWEEN SR74/4TH ST AND ALESSANDRO BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT) RIVERSIDE RIV070305 STATE 215 ON I-215 IN SW RIVERSIDE CO. FROM MURRIETA 2014 $29,228 HIGHWAY HOT SPRINGS RD TO SCOTT RD: CONSTRUCT A 3RD MIXED FLOW LANE IN EA DIR (WIDENS I-215 FROM 4 TO 6 LANES – 3 IN EA. DIR). THE PROJECT INCLUDES THE CONSTRUCTION OF A NEW INSIDE SHOULDER IN BOTH DIRECTIONS, A NEW MEDIAN BARRIER, OVERLAY OF EXISTING LANES, AND WIDENS THE EXISTING KELLER UC BRIDGES (NON-CAPACITY ENHANCING) TO SUPPORT THE NEW LANES (EA: 0F161). RIVERSIDE 3M0738 STATE 215 ON I-215 IN SW RIVERSIDE COUNTY FROM 2018 $13,000 HIGHWAY MURRIETA HOT SPRINGS RD TO I-215/I-15 JUNCTION, CONSTRUCT A THIRD MIXED FLOW LANE SOUTHBOUND (WIDENS I-215/I-15 CONNECTOR FROM 2 TO 3 LANES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 270 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 0121D STATE 215 ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ – 2012 $782,720 HIGHWAY FROM 60/91/215 JCT TO 60/215 SPLIT – WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN, AND LANDSCAPING (EA: 3348U1, 33486, 33487, AND 33488) RIVERSIDE 3M0803 STATE 215 ON INTERSTATE 215, FROM BLAINE ST SB OFF- 2014 $2,628 HIGHWAY RAMP TO 0.3 MILES SOUTH OF MARTIN LUTHER KING BLVD UNDERCROSSING (PM 40.2 TO PM 42.5), EXTEND THE EXISTING SB LANE #4 (LANE DROP) TO 0.3 MILES SOUTH OF MARTIN LUTHER KING BLVD UNDERCROSSING (EA 0N890) ($230 TOLL CREDITS USED TO MATCH STPL IN CONS) RIVERSIDE 30M0701- STATE 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION 2013 $23,922 RIVLS06 HIGHWAY AND RECONSTRUCTION – SHOPP PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR 93.126 EXEMPT TABLE 2 – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). RIVERSIDE 30M0701- STATE 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING 2016 $119,017 RIVLS02 HIGHWAY AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLE 2 – PAVEMENT RESURFACING AND/ OR REHABILITATION, EMERGENCY RELIEF (23 USC 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES) RIVERSIDE 30M0701- STATE 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING 2011 $11,165 RIVLS13 HIGHWAY AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – HIGHWAY MAINTENANCE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 – PAVEMENT RESURFACING AND/OR REHABILITATION

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 271

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3GR104 STATE 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS 2014 $28,352 HIGHWAY – SHOPP MOBILITY PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED- AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS RIVERSIDE RIVLS08 STATE 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, 2012 $14,903 HIGHWAY SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION – MINOR PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CONTROL DEVICES/ OPERATING ASSISTANCE OTHER THAN SIGNALS, INTERSCTN SIGNAL PROJECTS AT INDVL INTERSCTN, (DESCRIPTION CONT. IN COMMENTS) RIVERSIDE 3M01CV03 STATE 86S SR-86S (PM 17.81 TO AT AVE 54 BTWN SR-111 CONSTRUCT 4 LANE BRIDGE/INTERCHANGE AND 2030 $64,710 HIGHWAY 18.81) & FILLMORE RAMPS ACROSS SR-86S RIVERSIDE 3M0716 STATE 86S SR86S (PM 21.02 TO AT DILLON RD BTWN WEST OF RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND 2020 $26,851 HIGHWAY 22.9) COACHELLA STORM RECONSTRUCT/WIDEN RAMPS WATER CHANNEL AND AVENUE 47 RIVERSIDE RIV050531 STATE 0 I-15 @ NEW EASTERN ON I-15 S/O TEMECULA – CONSTRUCT NEW EASTERN 2030 $30,000 HIGHWAY BYPASS IC S/O BYPASS/I-15 IC (4 LANES) & RAMPS (1 LANE) AND TEMECULA 4 LANE (2 LNS EACH DIR) EASTERLY CONNECTING ROAD (APPROX 2 MILES) RIVERSIDE RIV071241 STATE 0 SR-60 GRAHAM ST OC IN MORENO VALLEY ON GRAHAM ST: CONSTRUCT 2020 $20,350 HIGHWAY 4 THROUGH LANE OC (2 LANES EACH DIR) OVER SR60 BETWEEN SUNNYMEAD BLVD AND HEMLOCK AVE, ADD SIGNALS AT HEMLOCK, LEFT-TURN POCKET LANES AT BOTH INTERSECTIONS, AND ADD PEDESTRIAN SIDEWALK (APPROX 1/4 MILES) ON OC BOTH SIDES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 272 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A04A23 LOCAL 0 "A" STREET NUEVO RD 4TH ST WIDEN FROM 2 TO 4 LANES 2020 $7,500 HIGHWAY RIVERSIDE 3A04WT092 LOCAL 0 11TH ST/CASE RD PERRIS BLVD GOETZ RD WIDEN FROM 2 TO 4 LANES 2018 $2,000 HIGHWAY RIVERSIDE 3A04A05 LOCAL 0 14TH AVE RIVER VALLEY RD 7TH ST WIDEN EXISTING BRIDGE AT D-CANAL FROM 2 TO 4 2023 $1,780 HIGHWAY LANES RIVERSIDE 3A04WT086 LOCAL 0 1ST ST PARKRIDGE AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2018 $1,616 HIGHWAY RIVERSIDE 3A04WT087 LOCAL 0 2ND ST RIVER RD HAMNER AVE WIDEN FROM 2 TO 4 LANES 2018 $4,641 HIGHWAY RIVERSIDE 3A04A08 LOCAL 0 7TH ST HOBSONWAY RICE ST WIDEN FROM 2 TO 4 LANES 2023 $750 HIGHWAY RIVERSIDE 3A07062 LOCAL 0 ADAMS ST BEFORE AND CONSTRUCT NEW 4 LANE BRIDGE 2014 $11,900 HIGHWAY AFTER BRIDGE AT WHITEWATER CHANNEL RIVERSIDE 3A01WT050C LOCAL 0 ALESSANDRO BLVD 500' E/O KITCHING NASON ST WIDEN ALESSANDRO BLVD FROM 500' E/O KITCHING 2018 $12,200 HIGHWAY ST ST TO NASON ST FROM 2 TO 6 LANES RIVERSIDE 3A01WT049B LOCAL 0 ALESSANDRO BLVD FREDERICK ST PERRIS BLVD WIDEN FROM 4 TO 6 LANES 2018 $5,300 HIGHWAY RIVERSIDE 3A01WT123 LOCAL 0 ALESSANDRO BLVD TRAUTWEIN RD I-215 WIDEN FROM 4 TO 6 LANES 2030 $6,118 HIGHWAY RIVERSIDE 3120007 LOCAL 0 ANTELOPE ROAD CLINTON KEITH SCOTT ROAD CONSTRUCT – REALIGN ANTELOPE RD FROM 2020 $20,000 HIGHWAY ROAD CLINTON KEITH RD. TO SCOTT ROAD – 4 THROUGH LANES, 2 LANE IN EACH DIRECTION. RIVERSIDE 3A04A20 LOCAL 0 ARABY DR ANZA TR STAGECOACH RD CONSTRUCT NEW BRIDGE CROSSING OVER PALM 2020 $25,000 HIGHWAY CANYON WASH RIVERSIDE 3A01WT124 LOCAL 0 ARCHIBALD AVE SAN BERNARDINO RIVER RD WIDEN FROM 2 TO 4 LANES, INCLUDING WIDENING OF 2030 $23,310 HIGHWAY COUNTY LINE BRIDGE OVER SANTA ANA RIVER. RIVERSIDE 3A01WT112 LOCAL 0 ARLINGTON AVE MAGNOLIA AVE ALESSANDRO BLVD WIDEN FROM 4 TO 6 LANES 2018 $13,494 HIGHWAY RIVERSIDE 3A04WT125 LOCAL 0 ARMSTRONG RD SAN BERNARDINO VALLEY WAY WIDEN FROM 2 TO 4 LANES 2035 $6,132 HIGHWAY COUNTY LINE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 273

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3AL104 LOCAL 0 ARTERIAL COACHELLA EASTERN COUNTY WIDEN/RECONSTRUCT/ 2035 $501,280 HIGHWAY IMPROVEMENTS VALLEY REHABILITATE REGIONAL ARTERIALS RIVERSIDE 3AL204 LOCAL 0 ARTERIAL COUNTYWIDE WIDEN/CONSTRUCT REGIONAL ARTERIALS 2035 $728,586 HIGHWAY IMPROVEMENTS RIVERSIDE 3AL304 LOCAL 0 ARTERIAL WESTERN COUNTY WESTERN COUNTY WIDEN/REHABILITATE ARTERIAL 2035 $652,709 HIGHWAY IMPROVEMENTS IMPROVEMENTS RIVERSIDE 3A04A13 LOCAL 0 AUTO CENTER DR FRANKLIN ST DIAMOND DR WIDEN BRIDGE OVER SAN JACINTO RIVER FROM 2 TO 2018 $9,000 HIGHWAY (CASINO DR) (RAILROAD CYN RD) 4 LANES RIVERSIDE 3A07092 LOCAL 0 AVE 48 GRADE WIDEN FROM 4 TO 6 LANES 2023 $4,936 HIGHWAY SEPARATION AT HWY 111/SPRR RIVERSIDE 3A07167 LOCAL 0 AVE 48 INTERSECTION WIDEN FROM 4 TO 6 LANES 2014 $113 HIGHWAY OF AVE 48 AND HWY 86 RIVERSIDE 3A07057 LOCAL 0 AVE 48 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 6 LANES 2020 $7,886 HIGHWAY (CENTER LINE) RIVERSIDE 3A07108 LOCAL 0 AVE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2020 $4,010 HIGHWAY RIVERSIDE 3A07172 LOCAL 0 AVE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2030 $3,918 HIGHWAY TO W RIVERSIDE 3A01CV002 LOCAL 0 AVE 50 BRIDGE. AT ALL CONSTRUCT 4-LANE BRIDGE 2030 $3,603 HIGHWAY AMER.CANAL RIVERSIDE 3A04CV113 LOCAL 0 AVE 50 HWY 111 TO SR-86S WIDEN FROM 2 TO 4 LANES 2020 $102,558 HIGHWAY SR-86S RIVERSIDE 3A07039 LOCAL 0 AVE 50 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2020 $10,588 HIGHWAY RIVERSIDE 3A07070 LOCAL 0 AVE 50 JEFFERSON MADISON STREET WIDEN FROM 2 TO 4 LANES. SHARED PROJECT 2018 $1,383 HIGHWAY STREET BETWEEN THE CITY OF LA QUINTA AND INDIO. THE SOUTH SIDE OF AVENUE 50 WIDENING FROM 1 TO 2 LANES, WHERE SECTIONS ARE MISSING, IS CITY OF LA QUINTA PROJECT. THE NORTH SIDE WITHIN THE SAME LIMITS ON AVENUE 50 IS THE CITY OF INDIO PROJECT. RIVERSIDE 3A01CV004 LOCAL 0 AVE 50 SR-86S TO I-10 I-10 WIDEN FROM 2 TO 4 LANES 2030 $24,830 HIGHWAY *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 274 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01CV005 LOCAL 0 AVE 50 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2020 $7,174 HIGHWAY RIVERSIDE 3A01CV014 LOCAL 0 AVE 52 CALHOUN ST FREDRICK ST WIDEN FROM 2 TO 6 LANES 2020 $8,532 HIGHWAY RIVERSIDE 3A07174 LOCAL 0 AVE 52 CALHOUN ST FREDRICK ST WIDEN FROM 2 TO 6 LANES 2035 $4,095 HIGHWAY RIVERSIDE 3A01CV015A LOCAL 0 AVE 52 FREDRICK ST HARRISON ST WIDEN FROM 2 TO 6 LANES 2020 $2,305 HIGHWAY RIVERSIDE 3A07094 LOCAL 0 AVE 52 GRADE WIDEN FROM 2 TO 6 LANES 2020 $4,853 HIGHWAY SEPARATION AT HWY 111/SPRR RIVERSIDE 3A01CV015B LOCAL 0 AVE 52 HARRISON ST HWY 111 WIDEN FROM 2 TO 6 LANES 2020 $1,375 HIGHWAY RIVERSIDE 3A01CV015C LOCAL 0 AVE 52 HWY 111 SR-86S WIDEN FROM 2 TO 6 LANES 2020 $115,056 HIGHWAY RIVERSIDE 3A07164 LOCAL 0 AVE 52 INTERSECTION OF WIDEN FROM 2 TO 6 LANES 2020 $139 HIGHWAY AVE 52 AND HWY 111 RIVERSIDE 3A07165 LOCAL 0 AVE 52 INTERSECTION OF WIDEN FROM 2 TO 6 LANES 2020 $122 HIGHWAY AVE 52 AND SR-86 RIVERSIDE 3A07098 LOCAL 0 AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2014 $4,630 HIGHWAY RIVERSIDE 3A07173 LOCAL 0 AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2035 $2,086 HIGHWAY RIVERSIDE 3A01CV010 LOCAL 0 AVE 52 JEFFERSON MADISON STREET WIDEN FROM 2 TO 4 LANES IN AREAS WITH MISSING 2014 $780 HIGHWAY STREET SECTIONS ON THE NORTH SIDE OF AVENUE 52. RIVERSIDE 3A01CV017 LOCAL 0 AVE 54 HARRISON ST TYLER ST WIDEN FROM 2 TO 4 LANES 2020 $9,024 HIGHWAY RIVERSIDE 3A07011 LOCAL 0 AVE 54 HWY 111 FILLMORE CONSTRUCT 4-LANE BRIDGE 2023 $34,937 HIGHWAY RIVERSIDE 3A01CV018 LOCAL 0 AVE 54 TYLER ST HWY 111 WIDEN FROM 2 TO 4 LANES 2020 $6,340 HIGHWAY RIVERSIDE 3A01CV016 LOCAL 0 AVE 54 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2023 $7,984 HIGHWAY *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 275

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01CV023 LOCAL 0 AVE 56 / AIRPORT 0.25 MI. W OF VAN HARRISON ST WIDEN FROM 2 TO 4 LANES 2023 $11,009 HIGHWAY BLVD BUREN ST RIVERSIDE 3A07181 LOCAL 0 AVE 56 / AIRPORT 0.25 MI. W OF VAN HARRISON ST WIDEN FROM 2 TO 6 LANES 2035 $5,853 HIGHWAY BLVD BUREN ST RIVERSIDE 3A07180 LOCAL 0 AVE 56 / AIRPORT GRADE BTWN PALM ST WIDEN FROM 2 TO 6 LANES INCLUDING GRADE 2023 $22,439 HIGHWAY BLVD SEPARATION OVER AND EAST SIDE OF SEPARATION OVER UPRR HWY 111 AND COACHELLA STORM SPRR CHNL RIVERSIDE 3A07177 LOCAL 0 AVE 56 / AIRPORT HARRISON ST TYLER ST WIDEN FROM 2 TO 6 LANES 2030 $4,759 HIGHWAY BLVD RIVERSIDE 3A07176 LOCAL 0 AVE 56 / AIRPORT JACKSON ST 0.25 MILES W OF WIDEN FROM 2 TO 6 LANES 2035 $2,645 HIGHWAY BLVD VAN BUREN ST RIVERSIDE 3A07175 LOCAL 0 AVE 56 / AIRPORT MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2035 $3,894 HIGHWAY BLVD RIVERSIDE 3A07179 LOCAL 0 AVE 56 / AIRPORT POLK ST HWY 111 WIDEN FROM 2 TO 6 LANES 2030 $1,414 HIGHWAY BLVD RIVERSIDE 3A04CV027 LOCAL 0 AVE 56 / AIRPORT SPRR E SIDE OF BR. AT WIDEN FROM 2 TO 4 LANES 2023 $1,644 HIGHWAY BLVD COACHELLA VLLY STORM CHNL RIVERSIDE 3A07182 LOCAL 0 AVE 56 / AIRPORT SPRR TO E SIDE OF SR86S WIDEN FROM 2 TO 6 LANES 2030 $11,548 HIGHWAY BLVD BR. AT COACHELLA VLLY STORM CHNL RIVERSIDE 3A07178 LOCAL 0 AVE 56 / AIRPORT TYLER ST POLK ST WIDEN FROM 2 TO 6 LANES 2030 $3,883 HIGHWAY BLVD RIVERSIDE 3A07185 LOCAL 0 AVE 58 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2030 $4,371 HIGHWAY RIVERSIDE 3A07102 LOCAL 0 AVE 58 JEFFERSON ST MADISON ST WIDEN SOUTH SIDE FROM 1 TO 2 LANES 2018 $3,442 HIGHWAY RIVERSIDE 3A07106 LOCAL 0 AVE 58 MADISON ST MONROE ST WIDEN SOUTH SIDE FROM 1 TO 2 LANES IN AREAS 2018 $690 HIGHWAY WITH MISSING SECTIONS. RIVERSIDE 3A07184 LOCAL 0 AVE 58 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2035 $3,618 HIGHWAY RIVERSIDE 3A07078 LOCAL 0 AVE 58 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2023 $6,267 HIGHWAY (SR-86)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 276 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07186 LOCAL 0 AVE 62 AVE 62 SR-86S IC BTWN W/O SR111 WIDEN FROM 0 TO 6 LANES 2035 $46,550 HIGHWAY TO BUCHANAN ST RIVERSIDE 3A07193 LOCAL 0 AVE 62 FILLMORE ST PIERCE ST WIDEN FROM 2 TO 6 LANES 2035 $25,959 HIGHWAY RIVERSIDE 3A07190 LOCAL 0 AVE 62 HARRISON ST TYLER ST WIDEN FROM 2 TO 6 LANES 2035 $5,628 HIGHWAY RIVERSIDE 3A07188 LOCAL 0 AVE 62 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 6 LANES 2035 $8,105 HIGHWAY RIVERSIDE 3A07187 LOCAL 0 AVE 62 MONROE ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2035 $6,772 HIGHWAY RIVERSIDE 3A07194 LOCAL 0 AVE 62 PIERCE ST SR86S WIDEN FROM 2 TO 6 LANES 2030 $7,714 HIGHWAY RIVERSIDE 3A07192 LOCAL 0 AVE 62 POLK ST FILLMORE ST WIDEN FROM 2 TO 6 LANES 2035 $10,148 HIGHWAY RIVERSIDE 3A07191 LOCAL 0 AVE 62 TYLER ST POLK ST WIDEN FROM 2 TO 6 LANES 2035 $5,628 HIGHWAY RIVERSIDE 3A07189 LOCAL 0 AVE 62 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 6 LANES 2035 $8,041 HIGHWAY RIVERSIDE 3A07196 LOCAL 0 AVE 66 AVE 66 BR./LOW BTWN W/O WIDEN FROM 2 TO 6 LANES 2030 $3,334 HIGHWAY WATER XING COACHELLA VALLEY STORM WATER CHNL AND PERCE ST RIVERSIDE 3A07195 LOCAL 0 AVE 66 AVE 66 SR-86S IC BTWN W/O WIDEN FROM 0 TO 6 LANES 2030 $46,934 HIGHWAY BUCHANAN ST AND E/O SR86S RIVERSIDE 3A07137 LOCAL 0 AVENUE 44 AVE. 44 BR. / LOW WIDEN FROM 2 TO 4 LANES, INCLUDING NEW BRIDGE. 2018 $19,230 HIGHWAY WATER XING RIVERSIDE 3A07017 LOCAL 0 AVENUE 44 LOW WATER XING DILLON RD WIDEN FROM 2 TO 4 LANES, INCLUDING 2018 $11,145 HIGHWAY REPLACEMENT OF A 2 LANE LOW WATER CROSSING WITH A 4 LANE BRIDGE. RIVERSIDE 3A07029 LOCAL 0 AVENUE 44 MONROE ST LOW WATER XING WIDEN FROM 2 TO 4 LANES, INCLUDING BRIDGE OVER 2020 $14,504 HIGHWAY WHITEWATER RIVER. RIVERSIDE 3A07043 LOCAL 0 AVENUE 48 HJORTH ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2018 $9,898 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 277

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07166 LOCAL 0 AVENUE 48 INTERSECTION INTERSECTION IMPROVEMENTS 2018 $973 HIGHWAY OF AVE 48 AND HWY 86 RIVERSIDE 3A07025 LOCAL 0 AVENUE 48 JEFFERSON ST ALL AMERICAN WIDEN FROM 4 TO 6 LANES 2018 $7,531 HIGHWAY CANAL RIVERSIDE 3A07117 LOCAL 0 AVENUE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2018 $3,918 HIGHWAY RIVERSIDE 3A07065 LOCAL 0 AVENUE 50 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2018 $3,762 HIGHWAY (CENTER LINE) RIVERSIDE 3A01CV003 LOCAL 0 AVENUE 50 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 4 LANES 2018 $4,185 HIGHWAY (EXCL BR. AT ALLAMERICAN CANAL) RIVERSIDE 3A07056 LOCAL 0 AVENUE 50 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2018 $4,089 HIGHWAY RIVERSIDE 3A07052 LOCAL 0 AVENUE 50 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2018 $3,679 HIGHWAY RIVERSIDE 3A07115 LOCAL 0 AVENUE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2018 $2,086 HIGHWAY RIVERSIDE 3A01CV011 LOCAL 0 AVENUE 52 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2018 $3,973 HIGHWAY RIVERSIDE 3A01CV012 LOCAL 0 AVENUE 52 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2018 $7,945 HIGHWAY RIVERSIDE 3A04A10 LOCAL 0 BARNARD ST DATE ST INTAKE BLVD CONSTRUCT/EXTEND 2 LANE ARTERIAL 2020 $1,675 HIGHWAY RIVERSIDE 3A04WT126 LOCAL 0 BAXTER RD I-15 CENTRAL ST WIDEN FROM 2 TO 4 LANES 2030 $17,929 HIGHWAY RIVERSIDE 3A01WT127 LOCAL 0 BELLGRAVE AVE CANTU-GALLEANO VAN BUREN BLVD WIDEN FROM 2 TO 4 LANES 2035 $4,745 HIGHWAY RANCH RD RIVERSIDE 3A01WT128 LOCAL 0 BENTON RD SR-79 EASTERN BYPASS WIDEN FROM 2 TO 4 LANES 2030 $7,145 HIGHWAY RIVERSIDE 3A07197 LOCAL 0 BOB HOPE DR DINAH SHORE RAMON RD WIDENING OF THE SOUTH BOUND LANE FROM 2 TO 2018 $3,123 HIGHWAY 3 LANES.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 278 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07138 LOCAL 0 BOB HOPE DR FRANK SINATRA GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2018 $5,820 HIGHWAY DR RIVERSIDE 3A07082 LOCAL 0 BOB HOPE DR GERALD FORD DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2018 $5,861 HIGHWAY RIVERSIDE 3A04WT056A LOCAL 0 BOX SPRINGS RD MORTON RD 500' W/O CLARK ST WIDEN FROM 2 TO 4 LANES 2018 $2,500 HIGHWAY (IRONWOOD AVE) RIVERSIDE 3A04WT131 LOCAL 0 BRIGGS RD NEWPORT RD SCOTT RD WIDEN FROM 2 TO 4 LANES 2035 $9,048 HIGHWAY RIVERSIDE 3A04WT132 LOCAL 0 BRIGGS RD SCOTT RD SR-79 (WINCHESTER CONSTRUCT 4 LANE ARTERIAL 2035 $19,153 HIGHWAY RD) RIVERSIDE 3A04WT130 LOCAL 0 BRIGGS RD SIMPSON RD NEWPORT RD CONSTRUCT 4 LANE ARTERIAL 2035 $17,370 HIGHWAY RIVERSIDE 3A04WT129 LOCAL 0 BRIGGS RD SR-74 (PINACATE SIMPSON RD CONSTRUCT 4 LANE ARTERIAL 2035 $14,863 HIGHWAY RD) RIVERSIDE 3A01WT133 LOCAL 0 BUNDY CANYON RD I-15 MURRIETA RD WIDEN FROM 2 TO 4 LANES 2020 $30,279 HIGHWAY RIVERSIDE 3A01WT134 LOCAL 0 BUNDY CANYON RD MISSION TRAIL I-15 WIDEN FROM 2 TO 4 LANES 2030 $3,635 HIGHWAY RIVERSIDE 3A01WT136 LOCAL 0 BUTTERFIELD STAGE MURRIETA HOT SR-79 CONSTRUCT 4 LANE ARTERIAL 2030 $40,674 HIGHWAY RD+ POURROY RD SPRINGS RD (WINCHESTER) RIVERSIDE 3120004 LOCAL 0 CACTUS AVE. LASSELLE ST. NASON ST. WIDEN FROM 2 TO 4 LANES 2014 $9,900 HIGHWAY RIVERSIDE 3A04WT140 LOCAL 0 CANTU-GALLEANO WINEVILLE RD BELLGRAVE AVE CONSTRUCT 4 LANE ARTERIAL 2030 $12,281 HIGHWAY RANCH RD (AKA GALENA ST& RIVERSIDE 3A07107 LOCAL 0 CANYON CREST DR COUNTRY CLUB CENTURY WIDEN 2 TO 4 LANES 2018 $4,034 HIGHWAY RIVERSIDE 3A07262 LOCAL 0 CASE RD GOETZ RD I-215 WIDEN FROM 2 TO 4 LANES, INCLUDING 2 BRIDGES 2020 $60,000 HIGHWAY OVER SAN JACINTO RIER AND INTERCHANGE AT I-215 RIVERSIDE 3A07099 LOCAL 0 CATHEDRAL CYN DR TERRACE RD E PALM CYN WIDEN FROM 2 TO 4 LANES 2018 $2,525 HIGHWAY RIVERSIDE 3A07287 LOCAL 0 CAWSTON AVE ESPLANADE AVE RAMONA EXPWAY CONSTRUCT 4 LANES 2018 $12,000 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 279

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A04WT141 LOCAL 0 CENTER ST MT VERNON AVE RECHE CANYON RD CONSTRUCT 4 LANE ARTERIAL 2035 $15,639 HIGHWAY RIVERSIDE 3A01WT114 LOCAL 0 CENTRAL AVE MAGNOLIA AVE SR91 WIDEN FROM 4 TO 6 LANES BTWN SR-91 AND 2018 $2,730 HIGHWAY MAGNOLIA RIVERSIDE 3A04WT142 LOCAL 0 CENTRAL ST BAXTER RD PALOMAR ST WIDEN FROM 2 TO 4 LANES 2030 $2,801 HIGHWAY RIVERSIDE 3A04WT143 LOCAL 0 CENTRAL ST GRAND AVE PALOMAR ST WIDEN FROM 2 TO 4 LANES 2030 $1,937 HIGHWAY RIVERSIDE 3A07199 LOCAL 0 CHASE SCHOOL RD I-10 RAMON RD WIDEN FROM 0 TO 4 LANES 2030 $21,183 HIGHWAY RIVERSIDE 3A04WT144 LOCAL 0 CHERRY VALLEY DESERT LAWN DR NOBLE ST WIDEN FROM 2 TO 4 LANES 2035 $9,608 HIGHWAY BLVD RIVERSIDE 3A04WT145 LOCAL 0 CHERRY VALLEY NOBLE ST HIGHLAND SPRINGS CONSTRUCT 4 LANE ARTERIAL 2035 $10,519 HIGHWAY BLVD AVE RIVERSIDE 3A01WT072 LOCAL 0 CLINTON KEITH RD COPPERCRAFT TOULON DR WIDEN FROM 4 TO 6 LANES 2020 $1,645 HIGHWAY RIVERSIDE 3A01WT071 LOCAL 0 CLINTON KEITH RD I-15 COPPERCRAFT WIDEN FROM 2 TO 6 LANES 2018 $18,700 HIGHWAY RIVERSIDE 3A01WT073 LOCAL 0 CLINTON KEITH RD I-215 MEADOWLARK LN WIDEN FROM 4 TO 6 LANES 2020 $2,041 HIGHWAY RIVERSIDE 3A04WT146 LOCAL 0 CLINTON KEITH RD MEADOWLARK LN SR-79 CONSTRUCT 6 LANE ARTERIAL 2020 $47,592 HIGHWAY RIVERSIDE 3A01WT083 LOCAL 0 CLINTON KEITH RD TOULON DR I-215 WIDEN FROM 4 TO 6 LANES 2014 $35,501 HIGHWAY RIVERSIDE 3A04WT147 LOCAL 0 CLOVERDALE RD ARCHIBALD AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2035 $4,126 HIGHWAY RIVERSIDE 3A07299 LOCAL 0 COOK ST BR. AT WIDEN FROM 4 TO 6 LANES 2023 $8,823 HIGHWAY WHITEWATER CHNL RIVERSIDE 3A07301 LOCAL 0 COOK ST COUNTRY CLUB WHITEWATER BRG. WIDEN FROM 4 TO 6 LANES 2023 $8,791 HIGHWAY RIVERSIDE 3A07311 LOCAL 0 COOK ST WHITEWATER BR. FRED WARING DR WIDEN FROM 4 TO 6 LANES 2023 $2,331 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 280 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07136 LOCAL 0 COOK STREET FRANK SINATRA COUNTRY CLUB DR. WIDEN FROM 4 TO 6 LANES 2023 $2,500 HIGHWAY RIVERSIDE 3A04WT088 LOCAL 0 CORYDON AVE RIVER RD NORCO DR WIDEN FROM 2 TO 4 LANES 2030 $5,743 HIGHWAY RIVERSIDE 3A07288 LOCAL 0 COTTONWOOD AVE WARREN RD STATE ST WIDEN FROM 2 TO 4 LANES 2020 $20,000 HIGHWAY RIVERSIDE 3A07147 LOCAL 0 COUNTRY CLUB DR INTERSECTION OF INTERSECTION IMPROVEMENTS AT COUNTRY CLUB 2016 $1,550 HIGHWAY COUNTRY CLUB DRIVE AND BOB HOPE DR. DR. AND BOB HOPE DR. RIVERSIDE 3A07200 LOCAL 0 COUNTRY CLUB DR MONTEREY AVE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2030 $7,559 HIGHWAY RIVERSIDE 3A07123 LOCAL 0 COUNTRY CLUB COOK STREET ELDORADO DR WIDEN FROM 4 TO 6 LANES 2030 $3,250 HIGHWAY DRIVE RIVERSIDE 3A01CV030 LOCAL 0 COUNTRY CLUB EL DORADO DRIVE OASIS CLUB DRIVE WIDEN FROM 4 TO 6 LANES 2030 $3,135 HIGHWAY DRIVE RIVERSIDE 3A01CV031 LOCAL 0 COUNTRY CLUB OASIS CLUB DRIVE WASHINGTON WIDEN FROM 4 TO 6 LANES 2030 $3,203 HIGHWAY DRIVE STREET RIVERSIDE 3A01CV033 LOCAL 0 COUNTRY CLUB PORTOLA AVENUE COOK STREET WIDEN FROM 4 TO 6 LANES 2030 $3,049 HIGHWAY DRIVE RIVERSIDE 3A07095 LOCAL 0 CROSSLEY RD / GOLF DINAH SHORE DR. AVE 34 WIDEN FROM 2 TO 4 LANES 2030 $4,714 HIGHWAY CLUB DR RIVERSIDE 3A07009 LOCAL 0 CROSSLEY RD / GOLF N. BANK OF WASH S. BANK OF WASH NEW BRIDGE OVER PALM CANYON WASH. 2030 $50,644 HIGHWAY CLUB DR RIVERSIDE 3A07112 LOCAL 0 CROSSLEY RD / GOLF RAMON RD DINAH SHORE DR. WIDEN FROM 2 TO 4 LANES 2018 $3,765 HIGHWAY CLUB DR RIVERSIDE 3A07120 LOCAL 0 DA VALL RD AVE 30 I-10 CONSTRUCT NEW 6-LANE ROAD 2030 $3,263 HIGHWAY RIVERSIDE 3A07055 LOCAL 0 DA VALL RD DINAH SHORE RAMON RD WIDEN FROM 2 TO 6 LANES 2018 $8,100 HIGHWAY RIVERSIDE 3A07042 LOCAL 0 DA VALL RD I-10 VARNER RD CONSTRUCT NEW 6-LANE ROAD, INCLUDING BRIDGE 2030 $21,480 HIGHWAY AT LONG CANYON RIVERSIDE 3A07201 LOCAL 0 DA VALL RD MCCALLUM WAY AVE 30 WIDEN FROM 2 TO 4 LANES 2030 $2,681 HIGHWAY *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 281

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07127 LOCAL 0 DA VALL RD MCCALLUM WAY AVE 30 WIDEN FROM 2 TO 6 LANES 2023 $2,977 HIGHWAY RIVERSIDE 3A07125 LOCAL 0 DA VALL RD RAMON RD MCCALLUM WAY WIDEN FROM 2 TO 6 LANES 2020 $3,075 HIGHWAY RIVERSIDE 3A07032 LOCAL 0 DATE PALM DR DINAH SHORE DR RAMON RD WIDEN FROM 4 TO 6 LANES 2020 $4,003 HIGHWAY RIVERSIDE 3A07060 LOCAL 0 DATE PALM DR EAST PALM CYN GERALD FORD DR WIDEN FROM 4 TO 6 LANES, INCLUDING BRIDGE AT N. 2018 $13,015 HIGHWAY CATHERAL CHANNEL RIVERSIDE 3A07048 LOCAL 0 DATE PALM DR GERALD FORD DR DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2020 $3,333 HIGHWAY RIVERSIDE 3A07129 LOCAL 0 DIAZ ROAD DENDY PARKWAY NORTH CITY LIMITS CONSTRUCT 4 LANE ARTERIAL 2020 $2,880 HIGHWAY RIVERSIDE 3A07051 LOCAL 0 DILLON RD AVE 44 I-10 WIDEN FROM 2 TO 4 LANES 2020 $8,895 HIGHWAY RIVERSIDE 3A07212 LOCAL 0 DILLON RD BR. AT EASTERLY WIDEN FROM 2 TO 4 LANES 2030 $1,265 HIGHWAY WHITEWATER CHNL RIVERSIDE 3A07091 LOCAL 0 DILLON RD GRADE WIDEN FROM 2 TO 4 LANES 2018 $5,030 HIGHWAY SEPARATION AT HWY 111 / SPRR RIVERSIDE 3A07096 LOCAL 0 DILLON RD I-10 WHITEWATER BR. WIDEN FROM 2 TO 4 LANES 2014 $4,669 HIGHWAY RIVERSIDE 3A07205 LOCAL 0 DILLON RD INDIAN AVE PALM DR WIDEN FROM 2 TO 4 LANES, INCLUDING A NEW 2018 $11,550 HIGHWAY BRIDGE AT MISSION CR. RIVERSIDE 3A07204 LOCAL 0 DILLON RD INTERSECTION EASTERLY WIDEN FROM 2 TO 6 LANES 2030 $956 HIGHWAY OF DILLON RD &AMP; INDIAN AVE RIVERSIDE 3A07206 LOCAL 0 DILLON RD INTERSECTION EASTERLY WIDEN FROM 4 TO 6 LANES 2030 $956 HIGHWAY OF DILLON RD &AMP; PALM DR RIVERSIDE 3A07207 LOCAL 0 DILLON RD PALM DR MOUNTAIN VIEW WIDEN FROM 2 TO 4 LANES, INCLUDING 2018 $5,541 HIGHWAY INTERSECTION IMPROVEMENTS AT DILLON & PALM DR (TRAFFIC SIGNAL IMPROVEMENTS).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 282 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07026 LOCAL 0 DILLON RD SR-62 INDIAN AVE WIDEN FROM 2 TO 4 LANES 2030 $14,850 HIGHWAY RIVERSIDE 3A07213 LOCAL 0 DILLON RD WHITEWATER BR. HWY 111 WIDEN FROM 2 TO 4 LANES 2030 $3,285 HIGHWAY RIVERSIDE 3A04WT148 LOCAL 0 DOMENIGONI PKWY SR-79 WARREN RD WIDEN FROM 4 TO 6 LANES 2035 $15,110 HIGHWAY (WINCHESTER RD) RIVERSIDE 3A04WT034 LOCAL 0 DOMENIGONI PKWY WARREN RD SANDERSON AVE WIDEN FROM 4 TO 6 LANES 2018 $5,601 HIGHWAY RIVERSIDE 3A07061 LOCAL 0 DUNE PALMS RD BR. AT CONSTRUCT 4-LANE BRIDGE 2018 $11,900 HIGHWAY WHITEWATER CHNL RIVERSIDE 3A07264 LOCAL 0 DUNLAP ORANGE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2018 $4,000 HIGHWAY RIVERSIDE 3EL04 LOCAL 0 ECONOMIC WESTERN COUNTY INFRASTRUCTURE AND FACILITY IMPROVEMENTS 2035 $42,549 HIGHWAY DEVELOPMENT INCENTIVES RIVERSIDE 3A04WT149 LOCAL 0 EL CERRITO RD I-15 ONTARIO AVE WIDEN FROM 2 TO 4 LANES 2030 $1,763 HIGHWAY RIVERSIDE 3A04WT150 LOCAL 0 ELLIS AVE POST RD SR-74 WIDEN FROM 2 TO 4 LANES 2035 $7,830 HIGHWAY RIVERSIDE 3A04WT093 LOCAL 0 ELLIS AVE SR-74 I-215 CONSTRUCT 2 LANE ARTERIAL AND 2 LANE 2030 $15,407 HIGHWAY GRADE SEPARATION OVER BNSF RR (KEEP GRADE SEPARATION IN ARTERIAL SECTION) RIVERSIDE 3120005 LOCAL 0 ELM STREET ADAMS AVENUE JACKSON AVENUE WIDEN FROM 2 TO 4 LANES WITH I-15 2020 $10,000 HIGHWAY OVERCROSSING RIVERSIDE 3A04WT208 LOCAL 0 ESPLANADE AVE WARREN RD STATE ST WIDEN FROM 2 TO 4 LANES 2014 $10,553 HIGHWAY RIVERSIDE 3A01WT152 LOCAL 0 ETHANAC RD SHERMAN RD MATTHEWS RD WIDEN FROM 2 TO 4 LANES INCL. GRADE 2030 $43,027 HIGHWAY SEPARATION OVER BNSF RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE) RIVERSIDE 3A01WT151 LOCAL 0 ETHANAC RD SR-74 KEYSTONE DR CONSTRUCT 4 LANE ARTERIAL 2030 $6,393 HIGHWAY RIVERSIDE 3A04WT052 LOCAL 0 EUCALYPTUS AVE I-215 TOWNGATE BLV WIDEN FROM 4 TO 6 LANES 2014 $3,848 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 283

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07162 LOCAL 0 EUCALYPTUS AVE TOWNGATE BLV ELSWORTH ST STREET IMPROVEMENT / WIDENING 2014 $183 HIGHWAY RIVERSIDE 3A01WT100 LOCAL 0 EVANS RD NUEVO RD I-215 CONSTRUCT 4 LANE ARTERIAL 2018 $17,494 HIGHWAY RIVERSIDE 3A04WT099 LOCAL 0 EVANS RD PLACENTIA AVE NUEVO RD CONSTRUCT 4 LANE ARTERIAL 2018 $7,000 HIGHWAY RIVERSIDE 3A01CV040B LOCAL 0 FRANK SINATRA DR COOK ST ELDORADO DR WIDEN FROM 4 TO 6 LANES 2023 $5,450 HIGHWAY RIVERSIDE 3A01CV040A LOCAL 0 FRANK SINATRA DR ELDORADO DR TAMARISK ROW DR WIDEN FROM 4 TO 6 LANES 2023 $1,301 HIGHWAY RIVERSIDE 3A07149 LOCAL 0 FRANK SINATRA DR INTERSECTION OF INTERSECTION IMPROVEMENTS AT FRANK SINATRA 2013 $1,500 HIGHWAY FRANK SINATRA DR. AND BOB HOPE DR. DR. AND BOB HOPE DR. RIVERSIDE 3A07304 LOCAL 0 FRANK SINATRA DR MONTEREY AVE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2023 $6,858 HIGHWAY RIVERSIDE 3A07306 LOCAL 0 FRANK SINATRA DR PORTOLA AVE COOK ST WIDEN FROM 4 TO 6 LANES 2023 $5,034 HIGHWAY RIVERSIDE 3A07024 LOCAL 0 FRANK SINATRA DR WHITEWATER AT FRANK SINATRA REPLACE A 4 LANE AT GRADE LOW-WATER CROSSING 2018 $39,390 HIGHWAY RIVER BRIDGE DRIVE WITH A NEW 4 LANE BRIDGE RIVERSIDE 3A04A14 LOCAL 0 FRANKLIN ST AVENUE 6 CANYON ESTATES WIDEN STREET AND BRIDGE OVER I-15 FROM 2 TO 4 2018 $1,222 HIGHWAY DR LANES RIVERSIDE 3A07217 LOCAL 0 FRED WARING DR ADAMS ST. DUNE PALMS RD WIDEN FROM 2 TO 3 LANES ON THE NORTH SIDE 2014 $5,012 HIGHWAY OF FRED WARING DRIVE FROM ADAMS ST TO DUNE PALMS RD. RIVERSIDE 3A07111 LOCAL 0 FRED WARING DR DUNE PALMS RD JEFFERSON ST WIDEN FROM 3 TO 6 LANES 2012 $3,775 HIGHWAY RIVERSIDE 3A07218 LOCAL 0 FRED WARING DR DUNE PALMS RD JEFFERSON ST WIDEN NORTH SIDE OF FRED WARING DRIVE FROM 2 2020 $1,144 HIGHWAY TO 3 LANES RIVERSIDE 3A07063 LOCAL 0 FRED WARING DR WASHINGTON ST DUNE PALMS RD WIDEN FROM 4 TO 6 LANES 2012 $7,813 HIGHWAY RIVERSIDE 3A01WT221 LOCAL 0 FRENCH VALLEY MARGARITA RD MURRIETA CREEK CONSTRUCT 0 TO 6 LANE ARTERIAL 2020 $19,384 HIGHWAY (WESTERN BYPASS)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 284 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01WT222A LOCAL 0 FRENCH VALLEY MURRIETA CREEK RANCHO CONSTRUCT 0 TO 4 LANE ARTERIAL 2030 $24,977 HIGHWAY (WESTERN BYPASS) CALIFORNIA RD RIVERSIDE 3A04A32 LOCAL 0 GARBANI RD BRADLEY RD I-215 CONSTRUCT 4-LANE ARTERIAL 2030 $2,558 HIGHWAY RIVERSIDE 3A04A31 LOCAL 0 GARBANI RD I-215 MENIFEE RD RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES 2030 $2,251 HIGHWAY RIVERSIDE 3A07004 LOCAL 0 GENE AUTRY TRAIL N. BANK OF S. BANK OF NEW BRIDGE TO REPLACE EXISTING LOW WATER 2023 $105,100 HIGHWAY WHITEWATER WHITEWATER RIVER CROSSING AT WHITEWATER RIVER. RIVER RIVERSIDE 3A07312 LOCAL 0 GERALD FORD DR COOK ST FRANK SINATRA DR WIDEN FROM 3 TO 4 LANES 2030 $1,250 HIGHWAY RIVERSIDE 3A01WT192 LOCAL 0 GILMAN SPRINGS SANDERSON AVE STATE ST WIDEN FROM 2 TO 4 LANES 2035 $8,208 HIGHWAY RIVERSIDE 3A01WT154 LOCAL 0 GILMAN SPRINGS RD BRIDGE ST SANDERSON AVE WIDEN FROM 2 TO 4 LANES 2030 $8,752 HIGHWAY RIVERSIDE 3A01WT101 LOCAL 0 GOETZ RD CASE RD ETHANAC RD WIDEN FROM 2 TO 4 LANES 2018 $18,000 HIGHWAY RIVERSIDE 3A04WT156 LOCAL 0 GOETZ RD JUANITA DR LESSER LN WIDEN FROM 2 TO 4 LANES 2030 $7,513 HIGHWAY RIVERSIDE 3A04WT102 LOCAL 0 GOETZ RD LESSER LN ETHANAC RD WIDEN FROM 2 TO 4 LANES 2020 $7,000 HIGHWAY RIVERSIDE 3A04WT155 LOCAL 0 GOETZ RD NORMANDY RD JUANITA DR WIDEN FROM 2 TO 4 LANES 2030 $2,000 HIGHWAY RIVERSIDE 3GL04 LOCAL 0 GRADE SEPARATION COUNTYWIDE GRADE SEPARATION IMPROVEMENTS 2035 $1,217,800 HIGHWAY RIVERSIDE 3A04WT157 LOCAL 0 GRAND AVE ORTEGA HWY CENTRAL ST WIDEN FROM 2 TO 4 LANES 2030 $22,400 HIGHWAY (SR-74) RIVERSIDE 3A04WT042 LOCAL 0 GRAND AVE TOFT DR SR-74 WIDEN FROM 2 TO 4 LANES 2023 $2,658 HIGHWAY RIVERSIDE 3A07040 LOCAL 0 GRAPEFRUIT BLVD AVE 48/DILLON RD AVE 50 WIDEN FROM 4 TO 6 LANES 2020 $10,326 HIGHWAY RIVERSIDE 3A07071 LOCAL 0 GRAPEFRUIT BLVD AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2020 $6,955 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 285

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07069 LOCAL 0 GRAPEFRUIT BLVD AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2020 $7,074 HIGHWAY RIVERSIDE 3A07088 LOCAL 0 GRAPEFRUIT BLVD AVE 54 AVE 56 WIDEN FROM 2 TO 4 LANES 2023 $5,152 HIGHWAY RIVERSIDE 3120008 LOCAL 0 GUAVA AVENUE WASHINGTON MONROE AVENUE WIDEN FROM 2 TO 4 LANES 2020 $10,000 HIGHWAY AVENUE RIVERSIDE 3A01CV047A LOCAL 0 HACIENDA AVE CHOLLA DR PALM DR WIDEN FROM 2 TO 4 LANES (2 LANES IN EACH 2018 $2,416 HIGHWAY DIRECTION) FROM CHOLLA DR. TO PALM DR. RIVERSIDE 3A01CV047B LOCAL 0 HACIENDA AVE LITTLE MORONGO CHOLLA CONSTRUCT NEW FOUR 12-FT LANES WITH 14-FT 2018 $5,623 HIGHWAY RD DR(MISSINGLINK) MEDIANS BETWEEN LITTLE MORONGO RD AND CHOLLA DR. RIVERSIDE 3A01CV049 LOCAL 0 HACIENDA AVE MOUNTAIN VIEW DILLON WIDEN FROM 2 TO 4 LANES 2018 $8,225 HIGHWAY RD RD(LONGCYNRD) RIVERSIDE 3A01CV048 LOCAL 0 HACIENDA AVE PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2018 $4,594 HIGHWAY RIVERSIDE 3A04WT089 LOCAL 0 HAMNER COTA STREET HAMNER AVE WIDEN FROM 4 TO 6 LANES 2018 $1,111 HIGHWAY RIVERSIDE 3A01WT159 LOCAL 0 HAMNER AVE BELLEGRAVE AVE SANTA ANA RIVER WIDEN FROM 2 TO 6 LANES, INCLUDING BRIDGE OVER 2030 $30,269 HIGHWAY SANTA ANA RIVER RIVERSIDE 3A01WT158 LOCAL 0 HAMNER AVE MISSION BLVD BELLEGRAVE AVE WIDEN FROM 2 TO 6 LANES 2030 $9,051 HIGHWAY RIVERSIDE 3A04WT160 LOCAL 0 HARLEY JOHN RD WASHINGTON ST CAJALCO RD WIDEN FROM 2 TO 4 LANES 2030 $3,779 HIGHWAY RIVERSIDE 3A04WT060 LOCAL 0 HARLEY KNOX BLVD. WESTERN WAY INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $7,000 HIGHWAY RIVERSIDE 3A07074 LOCAL 0 HARRISON ST AVE 54 AVE 56 WIDEN FROM 2 TO 4 LANES 2020 $6,648 HIGHWAY RIVERSIDE 3A07168 LOCAL 0 HEACOCK ST-SI DRACAEA EUCALYPTUS STREET IMPROVEMENT / WIDENING 2020 $105 HIGHWAY RIVERSIDE 3A07160 LOCAL 0 HEACOCK ST-SI EUCALYPTUS FIR STREET IMPROVEMENT / WIDENING 2020 $275 HIGHWAY RIVERSIDE 3A07169 LOCAL 0 HEACOCK ST-SI IRONWOOD AVE MANZANITA AVE STREET IMPROVEMENT / WIDENING 2020 $57 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 286 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07289 LOCAL 0 HEWITT ST MAIN ST SOUTH CITY LIMIT WIDEN FROM 2 TO 4 LANES 2030 $15,000 HIGHWAY RIVERSIDE 3A07087 LOCAL 0 HIGHWAY 111 JACKSON ST INDIO BLVD WIDEN FROM 4 TO 6 LANES 2018 $5,185 HIGHWAY RIVERSIDE 3A07031 LOCAL 0 HIGHWAY 111 MADISON ST RUBIDOUX ST. WIDEN FROM 4 TO 6 LANES, INCLUDING THE BRIDGE 2014 $7,826 HIGHWAY AT ALL AMERICAN CANAL RIVERSIDE 3A07049 LOCAL 0 HIGHWAY 111 MONROE ST JACKSON ST WIDEN FROM 4 TO 6 LANES 2018 $9,248 HIGHWAY RIVERSIDE 3A07053 LOCAL 0 HIGHWAY 111 SHIELDS RD. MADISON ST WIDEN FROM 4 TO 6 LANES 2014 $1,879 HIGHWAY RIVERSIDE 3A04WT090 LOCAL 0 HILLSIDE AVE 1ST ST HIDDEN VALLEY CONSTRUCT 2 LANE ARTERIAL 2030 $1,602 HIGHWAY PKWY RIVERSIDE 3A04A03 LOCAL 0 HOBSONWAY ARROWHEAD BLVD CARLTON AVE WIDEN FROM 2 TO 4 LANES 2020 $3,075 HIGHWAY RIVERSIDE 3A04A06 LOCAL 0 HOBSONWAY OLIVE LAKE BLVD INTAKE BLVD WIDEN EXISTING BRIDGE AT C-CANAL FROM 2 TO 4 2035 $2,255 HIGHWAY LANES RIVERSIDE 3A04WT161 LOCAL 0 HORSETHIEF CANYON TEMESCAL I-15 WIDEN FROM 2 TO 4 LANES 2030 $3,692 HIGHWAY RD CANYON RD RIVERSIDE 3A07220 LOCAL 0 INDIAN AVE 14TH AVE PIERSON BLVD WIDEN FROM 2 TO 6 LANES 2030 $4,715 HIGHWAY RIVERSIDE 3A07054 LOCAL 0 INDIAN AVE 19TH AVE 300 FT. SOUTH OF WIDEN FROM 2 TO 4 LANES 2030 $8,267 HIGHWAY 18TH AVE. RIVERSIDE 3A07223 LOCAL 0 INDIAN AVE 19TH AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2030 $9,071 HIGHWAY RIVERSIDE 3A07222 LOCAL 0 INDIAN AVE 20TH AVE 19TH AVE WIDEN FROM 2 TO 4 LANES 2023 $2,422 HIGHWAY RIVERSIDE 3A07219 LOCAL 0 INDIAN AVE DILLON RD 14TH AVE WIDEN FROM 2 TO 6 LANES 2030 $5,344 HIGHWAY RIVERSIDE 3A07221 LOCAL 0 INDIAN AVE INTERSECTION OF NORTHERLY WIDEN FROM 2 TO 6 LANES 2018 $956 HIGHWAY INDIAN AVE AND 20TH AVE RIVERSIDE 3A07265 LOCAL 0 INDIAN AVE NORTH CITY LIMIT ORANGE WIDEN FROM 2 TO 4 LANES 2018 $9,000 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 287

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07045 LOCAL 0 INDIAN ST HEMLOCK ST SUNNYMEAD BLD WIDEN OC FROM 2 TO 4 LANES 2030 $9,750 HIGHWAY RIVERSIDE 3A04WT055 LOCAL 0 INDIAN ST SAN MICHELE RD OLEANDER AVE WIDEN FROM 2 TO 4 LANES 2020 $2,674 HIGHWAY RIVERSIDE 3A04WT162 LOCAL 0 INDIAN TRUCK TRAIL TEMESCAL I-15 WIDEN FROM 2 TO 4 LANES 2030 $3,569 HIGHWAY CANYON RD RIVERSIDE 3A04WT115 LOCAL 0 IOWA AVE CENTER ST 3RD ST WIDEN FROM 4 TO 6 LANES 2020 $8,559 HIGHWAY RIVERSIDE 3A04WT056G LOCAL 0 IRONWOOD AVE NASON ST REDLANDS BLVD WIDEN FROM 2 TO 4 LANES 2023 $8,063 HIGHWAY RIVERSIDE 3ITS08 LOCAL 0 ITS COUNTYWIDE ITS INLAND EMPIRE LUMP SUM (GRADE CROSSING 2035 $24,539 HIGHWAY IMPROVEMENTS, IE 511, REGIONAL MOBILITY MANAGER, ETC.) RIVERSIDE 3120006 LOCAL 0 IVY STREET JEFFERSON WASHINGTON WIDEN FROM 2 TO 4 LANES 2020 $2,000 HIGHWAY AVENUE AVENUE RIVERSIDE 3120009 LOCAL 0 JACKSON AVENUE MURRIETA HOT INEZ RD. WIDEN FROM 2 TO 4 LANES WITH BRIDGE OVER 2020 $10,000 HIGHWAY SPRINGS ROAD WARM SPRINGS CREEK RIVERSIDE 3A01CV123 LOCAL 0 JACKSON ST AVE 40 I-10 IC WIDEN FROM 4 TO 6 LANES 2018 $9,958 HIGHWAY RIVERSIDE 3A01CV110A LOCAL 0 JACKSON ST AVE 44 AVE 46 WIDEN FROM 4 TO 6 LANES 2018 $6,460 HIGHWAY RIVERSIDE 3A01CV111 LOCAL 0 JACKSON ST AVE 46 AVE 48 WIDEN FROM 4 TO 6 LANES 2018 $8,403 HIGHWAY RIVERSIDE 3A01CV054 LOCAL 0 JACKSON ST AVE 48 AVE 50 WIDEN FROM 2 TO 4 LANES 2018 $3,907 HIGHWAY RIVERSIDE 3A07086 LOCAL 0 JACKSON ST AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2018 $3,134 HIGHWAY RIVERSIDE 3A07224 LOCAL 0 JACKSON ST AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2030 $3,133 HIGHWAY RIVERSIDE 3A01CV110B LOCAL 0 JACKSON ST I-10 IC AVE 44 WIDEN FROM 4 TO 6 LANES 2020 $1,268 HIGHWAY RIVERSIDE 3A01WT076 LOCAL 0 JEFFERSON AVE NUTMEG ST MURRIETA HOT WIDEN FROM 2 TO 4 LANES 2020 $9,555 HIGHWAY SPRINGS RD

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 288 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01WT075 LOCAL 0 JEFFERSON AVE PALOMAR ST NUTMEG ST CONSTRUCT 6 LANE ARTERIAL 2020 $5,221 HIGHWAY RIVERSIDE 3A01CV116 LOCAL 0 JEFFERSON ST AVE 40 AVE 38 WIDEN FROM 2 TO 4 LANES 2018 $3,237 HIGHWAY RIVERSIDE 3A07171 LOCAL 0 JEFFERSON ST I-10 AVE 40 WIDEN FROM 2 TO 6 LANES 2018 $2,824 HIGHWAY RIVERSIDE 3A07019 LOCAL 0 JEFFERSON ST I-10 IC AND BR. WIDEN FROM 2 TO 6 LANES 2018 $18,734 HIGHWAY OVER RR RIVERSIDE 3A04WT043 LOCAL 0 LAKE ST I-15 LINCOLN ST WIDEN FROM 2 TO 6 LANES 2018 $32,000 HIGHWAY RIVERSIDE 3A07018B LOCAL 0 LANDAU I-10 VALLEY CENTER CONSTRUCT NEW 6-LANE ROAD 2030 $1,688 HIGHWAY BLVD RIVERSIDE 3A07018C LOCAL 0 LANDAU VALLEY CENTER VARNER RD CONSTRUCT NEW 4-LANE ROAD 2030 $4,185 HIGHWAY BLVD RIVERSIDE 3A07018A LOCAL 0 LANDAU VISTA CHINO I-10 CONSTRUCT NEW 6-LANE ROAD, INCLUDING OC OF 2030 $16,100 HIGHWAY UPRR RIVERSIDE 3A01WT057B LOCAL 0 LASSELLE ST EUCALYPTUS ALESSANDRO WIDEN FROM 2 TO 4 LANES 2018 $2,300 HIGHWAY RIVERSIDE 3A04A18 LOCAL 0 LEMON ST MISSION TR GRAPE ST WIDEN FROM 2 TO 4 LANES 2018 $8,000 HIGHWAY RIVERSIDE 3A01WT163 LOCAL 0 LIMONITE AVE ETIWANDA AVE VAN BUREN BLVD WIDEN FROM 2 TO 4 LANES 2030 $8,129 HIGHWAY RIVERSIDE 3A01WT164 LOCAL 0 LIMONITE AVE VAN BUREN BLVD CLAY ST WIDEN FROM 4 TO 6 LANES 2030 $2,353 HIGHWAY RIVERSIDE 3A07016 LOCAL 0 LIMONITE AVE WINEVILLE AVE. ETIWANDA AVE WIDEN EB LANE FROM 1 LANE TO 2 LANES. 2020 $7,000 HIGHWAY RIVERSIDE 3120002 LOCAL 0 LIMONITE AVE. ARCHIBALD HAMNER WIDENING OF LIMONITE AVE FROM 4 TO 6 LANES 2030 $5,000 HIGHWAY RIVERSIDE 3A01CV104 LOCAL 0 LITTLE MORONGO RD MISSION LAKES PIERSON BLVD WIDEN FROM 2 TO 4 LANES 2018 $3,062 HIGHWAY BLVD RIVERSIDE 3A01CV105 LOCAL 0 LITTLE MORONGO RD PIERSON BLVD TWO BUNCH PALMS WIDEN FROM 2 TO 4 LANES 2018 $8,874 HIGHWAY TR

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 289

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01CV103 LOCAL 0 LITTLE MORONGO RD TWO BUNCH DILLON RD WIDEN FROM 2 TO 4 LANES 2018 $11,072 HIGHWAY PALMS TR RIVERSIDE 3120013 LOCAL 0 LOS ALAMOS RD. – HANCOCK AVE. WHITEWOOD AVE. WIDENING FROM 4 TO 6 LANES. 2020 $1,195 HIGHWAY NORTH SIDE RIVERSIDE 3120010 LOCAL 0 MADISON AVE. MURRIETA HOT DATE ST. WIDEN FROM 2 TO 4 LANES 2020 $15,000 HIGHWAY SPRINGS RD. RIVERSIDE 3A01CV060 LOCAL 0 MADISON ST AVE 50 AVE 49 (MISSING CONSTRUCT NEW 4 – LANE ROAD 2018 $9,208 HIGHWAY LINK) RIVERSIDE 3A01CV059B LOCAL 0 MADISON ST AVE 52 AVE 50 WIDEN WEST SIDE OF MADISON FROM 1 TO 2 2014 $3,590 HIGHWAY LANES. JOINT PROJECT WITH CITY OF INDIO WHO IS RESPONSIBLE FOR THE EAST SIDE OF MADISON. RIVERSIDE 3A01CV059A LOCAL 0 MADISON ST AVE 52 AVE 50 WIDENING FROM 2 TO 6 LANES 2014 $8,626 HIGHWAY RIVERSIDE 3A01CV064 LOCAL 0 MADISON ST FRED WARING DR INDIO BLVD WIDEN FROM 2 TO 4 LANES 2018 $4,631 HIGHWAY RIVERSIDE 3A01CV062 LOCAL 0 MADISON ST HWY 111 .25 MILES NORTH WIDEN FROM 2 TO 4 LANES 2014 $1,251 HIGHWAY OF HWY 111 RIVERSIDE 3A01CV061 LOCAL 0 MADISON ST HWY 111 AVE. 49 CONSTRUCT NEW 4 – LANE ROAD 2014 $5,662 HIGHWAY RIVERSIDE 3A07225 LOCAL 0 MADISON ST MILES AVE FRED WARING DR CONSTRUCT NEW 4-LANE ROAD 2030 $15,745 HIGHWAY RIVERSIDE 3A01CV063 LOCAL 0 MADISON ST MILES AVE FRED WARING DR CONSTRUCT NEW 4 – LANE ROAD, INCLUDING 2018 $17,870 HIGHWAY (MISSING LINK) BRIDGE AT ALL AMERICAN CANAL AND WHITEWATER RIVER. RIVERSIDE 3A04T027 LOCAL 0 MAGNOLIA AVE ONTARIO AVE KELLOGG AVE. INTERSECTION UPGRADES ON MAGNOLIA AVE. 2035 $150 HIGHWAY BETWEEN ONTARIO AVE. AND KELLOGG AVE.TO ACCOMMODATE RESTRIPING FROM 4 TO 6 LANES. RIVERSIDE 3A04A25 LOCAL 0 MAIN ST OLD TOWN FRONT PUJOL ST CONSTRUCT 2 LANE BRIDGE ACROSS MURRIETA 2012 $7,842 HIGHWAY ST CREEK RIVERSIDE 3A04WT030 LOCAL 0 MAIN ST SOUTH GRAND ONTARIO AVE. WIDEN FROM 2 TO 4 LANES. 2035 $2,473 HIGHWAY BLVD. RIVERSIDE 3A04A15 LOCAL 0 MALAGA RD MISSION TR CASINO DR/ WIDEN FROM 2 TO 4 LANES 2023 $9,700 HIGHWAY LAKEVIEW TERRACE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 290 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07266 LOCAL 0 MAPES AVE GOETZ RD WEST CITY LIMIT CONSTRUCT 4 LANES 2020 $7,000 HIGHWAY RIVERSIDE 3A04WT165 LOCAL 0 MARKET ST AT THE SANTA ANA N/A WIDEN FROM 2 TO 4 LANES INCL. BRIDGE OVER 2020 $40,900 HIGHWAY RIVER SANTA ANA RIVER RIVERSIDE 3A07268 LOCAL 0 MARKHAM ST WADE REDLANDS AVE WIDEN FROM 2 TO 4 LANES 2020 $6,000 HIGHWAY RIVERSIDE 3A01WT167 LOCAL 0 MCCALL BLVD ASPEL RD MENIFEE RD WIDEN FROM 2 TO 4 LANES 2030 $2,924 HIGHWAY RIVERSIDE 3A01WT166 LOCAL 0 MCCALL BLVD I-215 ASPEL RD WIDEN FROM 4 TO 6 LANES 2030 $3,645 HIGHWAY RIVERSIDE 3A04WT168 LOCAL 0 MCCALL BLVD MENIFEE RD SR-79 CONSTRUCT 2 LANE ARTERIAL INCL. GRADE 2035 $28,841 HIGHWAY (WINCHESTER) SEPARATION OVER BNSF RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE) RIVERSIDE 3A04WT169 LOCAL 0 MCCALL BLVD SR-79 WARREN RD CONSTRUCT 2 LANE ARTERIAL INCL. GRADE 2035 $23,249 HIGHWAY (WINCHESTER RD) SEPARATION OVER BNSF RR – GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN IN THE ARTERIAL SECTION. RIVERSIDE 3A07267 LOCAL 0 MCPHERSON RD ETHANAC RD MAPES AVE CONSTRUCT 2 LANES 2030 $3,100 HIGHWAY RIVERSIDE 3A04WT080 LOCAL 0 MENIFEE RD GARBANI RD SCOTT RD WIDEN FROM 2 TO 4 LANES 2020 $2,957 HIGHWAY RIVERSIDE 3A04WT079 LOCAL 0 MENIFEE RD HOLLAND RD GARBANI RD CONSTRUCT 4 LANE ARTERIAL 2020 $6,794 HIGHWAY RIVERSIDE 3A01WT170 LOCAL 0 MENIFEE RD RAMONA EXPWY SR-74 (PINACATE WIDEN FROM 2 TO 4 LANES 2030 $19,552 HIGHWAY RD) RIVERSIDE 3A01WT172 LOCAL 0 MENIFEE RD SIMPSON RD ALDERGATE DR CONSTRUCT 4 LANE ARTERIAL 2030 $6,069 HIGHWAY RIVERSIDE 3A01WT171 LOCAL 0 MENIFEE RD SR-74 (PINACATE SIMPSON RD WIDEN FROM 2 TO 4 LANES INCL. GRADE 2030 $39,176 HIGHWAY RD) SEPARATION OVER RR (GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE) RIVERSIDE 3A01CV121A LOCAL 0 MILES AVE MONROE ST INDIO BLVD WIDEN FROM 2 TO 4 LANES 2018 $4,029 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 291

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01CV067 LOCAL 0 MISSION LAKES BLVD INDIAN AVE LITTLE MORONGO WIDEN FROM 2 TO 4 LANES 2018 $8,874 HIGHWAY RD RIVERSIDE 3A07226 LOCAL 0 MISSION LAKES BLVD INDIAN AVE LITTLE MORONGO WIDEN FROM 2 TO 6 LANES 2030 $8,851 HIGHWAY RD RIVERSIDE 3A01CV068 LOCAL 0 MISSION LAKES BLVD LITTLE MORONGO PALM DR WIDEN FROM 2 TO 4 LANES 2018 $4,594 HIGHWAY RD RIVERSIDE 3A07227 LOCAL 0 MISSION LAKES BLVD LITTLE MORONGO PALM DR WIDEN FROM 2 TO 6 LANES 2023 $8,102 HIGHWAY RD RIVERSIDE 3A07001 LOCAL 0 MISSION LAKES BLVD PALM DR EASTERN TERMINUS WIDEN FROM 2 TO 4 LANES 2018 $1,531 HIGHWAY AT VERBENA DR RIVERSIDE 3A01WT044 LOCAL 0 MISSION TR RAILROAD CANYON BUNDY CANYON RD WIDEN FROM 4 TO 6 LANES 2023 $7,243 HIGHWAY RD RIVERSIDE 3120014 LOCAL 0 MONROE AVE. MURRIETA HOT LOS ALAMOS AVE. CONSTRUCT A 4 LANE FACILITY – MONROE AVE. 2020 $8,000 HIGHWAY SPRINGS RD. FROM MURRIETA HOT SPRINGS RD. TO LOS ALAMOS RD. RIVERSIDE 3A07030 LOCAL 0 MONROE ST AVE 40 I-10 IC WIDEN FROM 2 TO 6 LANES 2018 $5,716 HIGHWAY RIVERSIDE 3120011 LOCAL 0 MONROE ST. AVE. 49 AVE. 52 WIDENING FROM 2 TO 4 LANES – 2 LANES IN EACH 2014 $4,419 HIGHWAY DIRECTION RIVERSIDE 3A07116 LOCAL 0 MONTEREY AVE CLANCY LANE HOVLEY LANE WEST WIDEN FROM 4 TO 6 LANES 2018 $3,591 HIGHWAY RIVERSIDE 3A07228 LOCAL 0 MONTEREY AVE I-10 RAMON RD WIDEN FROM 2 TO 6 LANES 2030 $3,625 HIGHWAY RIVERSIDE 3A07128 LOCAL 0 MONTEREY AVE PARKVIEW DR. CLANCY LANE WIDEN FROM 4 TO 6 LANES 2018 $2,967 HIGHWAY RIVERSIDE 3A07105 LOCAL 0 MORENO BEACH DR RECHE CANYON RD SR-60 WIDEN FROM 2 TO 4 LANES 2020 $4,284 HIGHWAY RIVERSIDE 3A07135 LOCAL 0 MORENO BEACH DR. AUTO MALL DR. CACTUS AVE CONSTRUCT 6 LANES 2018 $23,000 HIGHWAY RIVERSIDE 3A07270 LOCAL 0 MORGAN ST INDIAN AVE BRADLEY RD CONSTRUCT 4 LANES 2030 $15,000 HIGHWAY RIVERSIDE 3A07269 LOCAL 0 MORGAN ST NEVADA INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $1,000 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 292 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07271 LOCAL 0 MOUNTAIN AVE MCPHERSON A ST WIDEN FROM 2 TO 4 LANES 2030 $2,000 HIGHWAY RIVERSIDE 3A01CV073 LOCAL 0 MOUNTAIN VIEW 20TH AVE VARNER RD WIDEN FROM 2 TO 6 LANES 2030 $5,226 HIGHWAY RIVERSIDE 3A07231 LOCAL 0 MOUNTAIN VIEW 20TH AVE VARNER RD WIDEN FROM 2 TO 6 LANES 2030 $6,100 HIGHWAY RIVERSIDE 3A07230 LOCAL 0 MOUNTAIN VIEW DILLON RD 20TH AVE WIDEN FROM 2 TO 4 LANES 2030 $5,125 HIGHWAY RIVERSIDE 3A01CV071 LOCAL 0 MOUNTAIN VIEW HACIENDA AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2018 $6,125 HIGHWAY RIVERSIDE 3A07232 LOCAL 0 MOUNTAIN VIEW HACIENDA AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2030 $7,829 HIGHWAY RIVERSIDE 3A01WT174 LOCAL 0 MURRIETA HOT MARGARITA RD SR-79 WIDEN FROM 4 TO 6 LANES 2020 $5,050 HIGHWAY SPRINGS RD (WINCHESTER) RIVERSIDE 3A01WT173 LOCAL 0 MURRIETA HOT POURROY RD SR-79 (EASTERN CONSTRUCT 4 LANE ARTERIAL 2030 $9,755 HIGHWAY SPRINGS RD BYPASS) RIVERSIDE 3A07272 LOCAL 0 MURRIETA RD CASE RD ETHANAC RD WIDEN FROM 2 TO 4 LANES 2020 $7,000 HIGHWAY RIVERSIDE 3A04WT175 LOCAL 0 MURRIETA RD ETHANAC RD MCCALL BLVD WIDEN FROM 2 TO 4 LANES 2030 $5,921 HIGHWAY RIVERSIDE 3A07002 LOCAL 0 N. INDIAN CANYON TRAMVIEW RD. RR XING (INCL. BR. WIDEN FROM 4 TO 6 LANES 2030 $304,044 HIGHWAY DR. AT WHITEWATER RVR) RIVERSIDE 3A04A04 LOCAL 0 N. LOVEKIN BLVD 10TH AVE 8TH AVE WIDEN EXISTING BRIDGE AT C-CANAL FROM 2 TO 4 2023 $2,000 HIGHWAY LANES RIVERSIDE 3A04A09 LOCAL 0 N. LOVEKIN BLVD HOBSONWAY 10TH AVE WIDEN FROM 2 TO 4 LANES 2020 $4,160 HIGHWAY RIVERSIDE 3A07118 LOCAL 0 N. PALM CYN DR ALEJO RD TAHQUITZ CYN RD WIDEN FROM 3 TO 4 LANES 2030 $3,460 HIGHWAY RIVERSIDE 3A07101 LOCAL 0 NASON ST ALESSANDRO CACTUS AVE. WIDEN FROM 2 TO 4 LANES (2 LANES IN EACH 2020 $3,000 HIGHWAY BLVD. DIRECTION) RIVERSIDE 3A07119 LOCAL 0 NASON ST CACTUS AVE IRIS AVE. WIDEN 4 TO 6 LANES / STREET IMPROVEMENT 2014 $13,400 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 293

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07154 LOCAL 0 NASON ST ELDER AVE IRONWOOD AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $624 HIGHWAY RIVERSIDE 3A01WT176 LOCAL 0 NEWPORT RD GOETZ RD MURRIETA RD CONSTRUCT 6 LANE ARTERIAL 2030 $16,228 HIGHWAY RIVERSIDE 3A04WT178 LOCAL 0 NEWPORT RD I-215 MENIFEE RD WIDEN FROM 4 TO 6 LANES 2030 $3,085 HIGHWAY RIVERSIDE 3A04WT177 LOCAL 0 NEWPORT RD MURRIETA RD I-215 WIDEN FROM 4 TO 6 LANES 2030 $22,944 HIGHWAY RIVERSIDE 3A04A11 LOCAL 0 NICHOLS RD COLLIER AVE DEXTER AVE WIDEN FROM 2 TO 6 LANES 2023 $8,480 HIGHWAY RIVERSIDE 3NL04 LOCAL 0 NON-MOTORIZED COUNTYWIDE VARIOUS PEDESTRIAN AND BIKEWAY NON- 2030 $43,308 HIGHWAY MOTORIZED IMPROVEMENT PROJECTS RIVERSIDE 3A04WT091 LOCAL 0 NORCO DR CORYDON AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2020 $4,549 HIGHWAY RIVERSIDE 3A04WT179 LOCAL 0 NUEVO RD DUNLAP DR MENIFEE RD WIDEN FROM 2 TO 4 LANES 2030 $8,604 HIGHWAY RIVERSIDE 3A07273 LOCAL 0 ORANGE AVE INDIAN AVE DUNLAP DR WIDEN FROM 2 TO 4 LANES 2030 $23,000 HIGHWAY RIVERSIDE 3A04WT117 LOCAL 0 OVERLOOK PKWY CHATEAU RIDGE LN SANDTRACK RD CONSTRUCT NEW 4 LANE ARTERIAL 2020 $19,368 HIGHWAY RIVERSIDE 3A07291 LOCAL 0 PALM AVE ESPLANADE AVE SEVENTH ST CONSTRUCT 4 LANES 2018 $1,900 HIGHWAY RIVERSIDE 3A07292 LOCAL 0 PALM AVE SEVENTH ST RAMONA BLVD WIDEN FROM 2 TO 4 LANES 2018 $5,000 HIGHWAY RIVERSIDE 3A01WT180 LOCAL 0 PALOMAR ST MISSION TRAIL JEFFERSON WIDEN FROM 2 TO 4 LANES 2030 $28,000 HIGHWAY RIVERSIDE 3A07170 LOCAL 0 PERRIS BLVD DRACAEA FIR WIDEN FROM 4 TO 6 LANES / STREET IMPROVEMENT 2020 $36 HIGHWAY RIVERSIDE 3A07140 LOCAL 0 PERRIS BLVD IRONWOOD AVE SUNNYMEAD BLD WIDEN FROM 4 TO 6 LANES 2020 $1,930 HIGHWAY RIVERSIDE 3A01WT106 LOCAL 0 PERRIS BLVD NUEVO RD 11TH ST WIDEN FROM 2 TO 4 LANES 2020 $40,000 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 294 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01WT105 LOCAL 0 PERRIS BLVD RAMONA EXPWY NUEVO RD WIDEN FROM 4 TO 6 LANES 2020 $20,000 HIGHWAY RIVERSIDE 3A01WT062 LOCAL 0 PERRIS BLVD RECHE VISTA DR IRONWOOD AVE WIDEN FROM 2 TO 4 LANES 2014 $8,854 HIGHWAY RIVERSIDE 3A04A34 LOCAL 0 PHILADELPHIA AVE MILLIKEN AVE I-15 WIDEN FROM 1 EB EXISTING TO 2 LANES 2035 $938 HIGHWAY RIVERSIDE 3A04A33 LOCAL 0 PHILADELPHIA AVE WINEVILLE RD ETIWANDA AVE WIDEN FROM 1 EB EXISTING TO 2 LANES 2035 $1,018 HIGHWAY RIVERSIDE 3A01CV076 LOCAL 0 PIERSON BLVD INDIAN AVE LITTLE MORONGO WIDEN FROM 2 TO 4 LANES 2018 $6,593 HIGHWAY RD RIVERSIDE 3A07234 LOCAL 0 PIERSON BLVD INDIAN AVE LITTLE MORONGO WIDEN FROM 2 TO 6 LANES 2030 $6,839 HIGHWAY RD RIVERSIDE 3A01CV075 LOCAL 0 PIERSON BLVD SR-62 INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $9,950 HIGHWAY RIVERSIDE 3A07233 LOCAL 0 PIERSON BLVD SR-62 INDIAN AVE WIDEN FROM 2 TO 6 LANES 2030 $10,813 HIGHWAY RIVERSIDE 3A04WT064 LOCAL 0 PIGEON PASS RD CANTARINI N HIDDEN SPRINGS WIDEN FROM 2 TO 4 LANES 2018 $6,000 HIGHWAY RIVERSIDE 3A01WT107 LOCAL 0 PLACENTIA AVE INDIAN AVE EVANS RD WIDEN FROM 2 TO 4 LANES 2030 $25,000 HIGHWAY RIVERSIDE 3A07305 LOCAL 0 PORTOLA AVE COUNTRY CLUB DR FRANK SINATRA DR WIDEN FROM 4 TO 6 LANES 2030 $6,154 HIGHWAY RIVERSIDE 3A07309 LOCAL 0 PORTOLA AVE GERALD FORD DR I-10 WIDEN FROM 4 TO 6 LANES 2030 $2,678 HIGHWAY RIVERSIDE 3A07314 LOCAL 0 PORTOLA AVE HWY 111 MAGNESIA FALLS WIDEN FROM 4 TO 6 LANES 2030 $898 HIGHWAY DR RIVERSIDE 3A07298 LOCAL 0 PORTOLA AVE MAGNESIA FALLS COUNTRY CLUB DR WIDEN FROM 4 TO 6 LANES 2030 $9,084 HIGHWAY DR RIVERSIDE 3A07122 LOCAL 0 PORTOLA AVENUE FRANK SINATRA GERALD FORD WIDEN FROM 4 TO 6 LANES 2030 $3,250 HIGHWAY DRIVE DRIVE RIVERSIDE 3120003 LOCAL 0 POTRERO BLVD. CALIFORNIA MICHIGAN AVE. CONSTRUCT NEW 4 LANE ARTERIAL HIGHWAY 2018 $30,000 HIGHWAY EXTENSION EXTENSION AND OVERPASS FACILITY AT SR79

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 295

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A04WT032 LOCAL 0 RAILROAD ST SHERMAN AVE MAIN ST (AT WIDEN FROM 2 TO 4 LANES 2035 $5,090 HIGHWAY GRAND) RIVERSIDE 3A07068 LOCAL 0 RAMON RD GENE AUTRY TRAIL SAN LUIS REY DR. WIDEN FROM 4 TO 6 LANES 2023 $2,450 HIGHWAY RIVERSIDE 3A01CV078 LOCAL 0 RAMON RD GENE AUTRY TRAIL W BANK OF THE WIDEN FROM 4 TO 6 LANES 2018 $3,157 HIGHWAY WHITEWATER RVR RIVERSIDE 3A07235 LOCAL 0 RAMON RD INTERSECTION DATE GARDEN DR. WIDEN FROM 4 TO 6 LANES 2030 $188 HIGHWAY OF RAMON RD &AMP; VARNER RD RIVERSIDE 3A07238 LOCAL 0 RAMON RD MONTEREY AVE THOUSAND PALMS WIDEN FROM 2 TO 4 LANES 2030 $14,428 HIGHWAY CYN RD RIVERSIDE 3A07005 LOCAL 0 RAMON RD S. INDIAN CYN SUNRISE WAY (INCL. WIDEN FROM 4 TO 6 LANES 2020 $98,070 HIGHWAY BARISTO STORM CHNL XING) RIVERSIDE 3A07145 LOCAL 0 RAMON RD S. PALM CYN DR S. INDIAN CYN DR WIDEN FROM 4 TO 6 LANES 2018 $1,099 HIGHWAY RIVERSIDE 3A01WT110B LOCAL 0 RAMONA EXPWY EVANS RD RIDER ST WIDEN FROM 2 TO 6 LANES 2018 $10,500 HIGHWAY RIVERSIDE 3A01WT183 LOCAL 0 RAMONA EXPWY PICO AVE BRIDGE ST WIDEN FROM 2 TO 6 LANES 2035 $43,065 HIGHWAY RIVERSIDE 3A01WT182 LOCAL 0 RAMONA EXPWY RIDER ST PICO AVE WIDEN FROM 4 TO 6 LANES 2035 $3,012 HIGHWAY RIVERSIDE 3A01WT210 LOCAL 0 RAMONA EXPWY SANDERSON AVE EAGLE RD. WIDENING FROM 4 TO 6 LANES 2014 $10,600 HIGHWAY RIVERSIDE 3A01WT217 LOCAL 0 RANCHO CALIFORNIA JEFFERSON AVE MARGARITA RD WIDEN FROM 4 TO 6 LANES 2035 $9,883 HIGHWAY RD RIVERSIDE 3120001 LOCAL 0 RANCHO WAY DIAZ RD. MARGARITA RD. CONSTRUCT RANCHO WAY – 4 LANE LOCAL ARTERIAL 2035 $36,000 HIGHWAY FROM DIAZ RD. TO MARGARITA RD. RIVERSIDE 3A04WT065 LOCAL 0 RECHE CANYON RD RECHE VISTA DR MORENO BEACH DR CONSTRUCT 4 LANE ARTERIAL 2018 $15,680 HIGHWAY RIVERSIDE 3A04WT184 LOCAL 0 RECHE CANYON RD SAN BERNARDINO RECHE VISTA DR WIDEN FROM 2 TO 4 LANES 2030 $17,429 HIGHWAY CO LINE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 296 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07274 LOCAL 0 REDLANDS AVE HARLEY KNOX PLACENTIA AVE CONSTRUCT 4 LANES 2020 $15,000 HIGHWAY BLVD. RIVERSIDE 3A07275 LOCAL 0 REDLANDS AVE PLACENTIA AVE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2030 $5,000 HIGHWAY RIVERSIDE 3A07148 LOCAL 0 REDLANDS BLVD IRONWOOD AVE KALMIA AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $884 HIGHWAY RIVERSIDE 3A07159 LOCAL 0 REDLANDS BLVD KALMIA AVE LOCUST AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $372 HIGHWAY RIVERSIDE 3A01WT067 LOCAL 0 REDLANDS BLVD LOCUST AVE ALESSANDRO BLVD WIDEN FROM 2 TO 4 LANES 2014 $7,428 HIGHWAY RIVERSIDE 3A07161 LOCAL 0 REDLANDS BLVD SPRUCE AVE IRONWOOD AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $208 HIGHWAY RIVERSIDE 3A07276 LOCAL 0 RIDER ST NEVADA RAMONA EXPWY WIDEN FROM 2 TO 4 LANES 2030 $15,000 HIGHWAY RIVERSIDE 3RL04 LOCAL 0 RIDESHARE COUNTYWIDE RCTC COMMUTER ASSISTANCE PROGRAM: 2035 $94,175 HIGHWAY RIDESHARE AND OTHER INCENTIVE PROGRAMS, TDM (TELECOMMUTE, PARK AND RIDE, ETC.) RIVERSIDE 3A04A35 LOCAL 0 RIVERSIDE DR HAMNER AVE ETIWANDA AVE WIDEN FROM 2 TO 4 LANES 2030 $2,455 HIGHWAY RIVERSIDE 3A04A36 LOCAL 0 RIVERSIDE DR AT DAY WINEVILLE RD ETIWANDA AVE WIDEN BRIDGE FROM 2 TO 4 LANES 2035 $389 HIGHWAY CREEK RIVERSIDE 3A04A07 LOCAL 0 RIVIERA DR 18TH AVE 20TH AVE CONSTRUCT 2 LANE OVERCROSSING AT THE LOWER 2023 $1,796 HIGHWAY OUTFALL DRAIN RIVERSIDE 3A07114 LOCAL 0 S. PALM CYN DR TAHQUITZ CYN RD RAMON RD WIDEN FROM 3 TO 4 LANES 2030 $3,626 HIGHWAY RIVERSIDE 3A04A21 LOCAL 0 SALVIA RD. GARNETT HILL GENE AUTRY TR. CONSTRUCT 4 LANE ARTERIAL CONNECTOR 2030 $9,600 HIGHWAY RIVERSIDE 3A07279 LOCAL 0 SAN JACINTO AVE A ST REDLANDS AVE WIDEN FROM 2 TO 4 LANES, INCLUDING BRIDGE OVER 2030 $25,000 HIGHWAY I-215. RIVERSIDE 3A07278 LOCAL 0 SAN JACINTO AVE NAVAJO A ST CONSTRUCT 4 LANES 2030 $4,500 HIGHWAY RIVERSIDE 3A07280 LOCAL 0 SAN JACINTO AVE REDLANDS AVE DUNLAP DR WIDEN FROM 2 TO 6 LANES, INCLUDING BRIDGE OVER 2030 $15,000 HIGHWAY PERRIS VALLEY STORN DRAIN.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 297

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07277 LOCAL 0 SAN JACINTO AVE WEST CITY LIMIT NAVAJO WIDEN FROM 2 TO 6 LANES 2030 $4,500 HIGHWAY RIVERSIDE 3A04WT068 LOCAL 0 SAN MICHELE RD HEACOCK ST INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $1,580 HIGHWAY RIVERSIDE 3A01WT185 LOCAL 0 SANDERSON AVE GILLMAN SPRINGS RAMONA EXPWY WIDEN FROM 4 TO 6 LANES 2030 $22,965 HIGHWAY (SR-79) RD (AT SR-79) RIVERSIDE 3A04WT188 LOCAL 0 SCHLEISMAN RD CLEVELAND AVE 68TH ST WIDEN FROM 2 TO 4 LANES 2030 $6,088 HIGHWAY RIVERSIDE 3A04WT187 LOCAL 0 SCHLEISMAN RD HARRISON AVE CLEVELAND AVE CONSTRUCT 4 LANE ARTERIAL 2030 $11,574 HIGHWAY RIVERSIDE 3A07014 LOCAL 0 SCHLEISMAN RD I-15 ARLINGTON AVE CONSTRUCT 4 LANE ARTERIAL 2035 $25,735 HIGHWAY RIVERSIDE 3A04WT186 LOCAL 0 SCHLEISMAN RD SAN BERNARDINO HARRISON AVE WIDEN FROM 2 TO 4 LANES 2030 $14,093 HIGHWAY COUNTY LINE RIVERSIDE RIV010205C LOCAL 0 SCOTT RD EL CENTRO SR-79 (WINCHESTER IN RIVERSIDE COUNTY NEAR MURRIETA 2030 $16,500 HIGHWAY RD) RECONSTRUCT AND WIDEN SCOTT ROAD FROM 2 TO 6 LANES BETWEEN EL CENTRO AND SR79 (WINCHESTER RD) RIVERSIDE RIV010205B LOCAL 0 SCOTT RD I-215 EL CENTRO WIDEN SCOTT RD FROM 4 TO 6 LANES BETWEEN 2030 $8,500 HIGHWAY I-215 AND EL CENTRO RIVERSIDE 3A01WT207 LOCAL 0 SCOTT RD MURRIETA RD I-215 WIDEN FROM 2 TO 4 LANES 2018 $6,094 HIGHWAY RIVERSIDE 3A07295 LOCAL 0 SEVENTH ST CAWSTON AVE RAMONA EXPWAY WIDEN FROM 2 TO 4 LANES 2030 $9,200 HIGHWAY (CURRENTLY MOUNTAIN AVE.) RIVERSIDE 3A07294 LOCAL 0 SEVENTH ST WARREN RD CAWSTON AVE CONSTRUCT 4 LANES 2030 $14,000 HIGHWAY RIVERSIDE 3A07296 LOCAL 0 SOBOBA RD CHABELA DR CITY LIMIT WIDEN FROM 2 TO 4 LANES 2018 $4,000 HIGHWAY RIVERSIDE 3A04WT191 LOCAL 0 SR-74 I-15 ETHANAC RD WIDEN FROM 4 TO 6 LANES 2035 $20,440 HIGHWAY RIVERSIDE 3A04WT037 LOCAL 0 SR-74 WINCHESTER RD WARREN RD WIDEN FROM 4 TO 6 LANES 2018 $9,535 HIGHWAY (SR-79)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 298 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A04WT190 LOCAL 0 SR-74 (ETHANAC) MATTHEWS RD SR-79 WIDEN FROM 2 TO 4 LANES (MATTHEWS TO BRIGGS). 2035 $16,537 HIGHWAY (WINCHESTER) WIDDEN FROM 4 TO 6 LANES(BRIGGS TO SR-79). RIVERSIDE 3A01WT045 LOCAL 0 SR-74 (GRAND AVE) RIVERSIDE DR ORTEGA HWY WIDEN FROM 2 TO 6 LANES 2023 $11,000 HIGHWAY (SR-74) (SR-74) RIVERSIDE 3A04WT046 LOCAL 0 SR-74 (RIVERSIDE LAKESHORE DR GRAND AVE WIDEN FROM 2 TO 6 LANES 2020 $12,000 HIGHWAY DR) RIVERSIDE 3A04WT047 LOCAL 0 SR-74 (RIVERSIDE I-15 LAKESHORE DR WIDEN FROM 4 TO 6 LANES 2018 $3,500 HIGHWAY DR/COLLIER AVE) RIVERSIDE 3A01WT213 LOCAL 0 SR79 – SAN JACINTO NORTH RAMONA 7TH ST WIDEN FROM 2 TO 4 LANES 2018 $6,870 HIGHWAY AVE. BLVD RIVERSIDE 3A01WT196 LOCAL 0 SR-79 (EASTERN SR79 I-15 CONSTRUCT 4 LANE ARTERIAL 2030 $260,167 HIGHWAY BYPASS) (WINCHESTER RD NEAR SCOTT RD) RIVERSIDE 3A01WT218 LOCAL 0 SR-79 SOUTH I-15 PECHANGA PKWY WIDEN FROM 6 TO 8 LANES 2020 $2,060 HIGHWAY (TEMECULA PKWY) RIVERSIDE 3A01WT214 LOCAL 0 STATE ST GILLMAN SPRINGS QUANDT RANCH RD WIDEN FROM 2 TO 4 LANES 2018 $5,718 HIGHWAY RD RIVERSIDE 3A01WT039 LOCAL 0 STATE ST JOHNSTON AVE FLORIDA AVE WIDEN FROM 2 TO 4 LANES 2018 $1,481 HIGHWAY (SR-74) RIVERSIDE 3A01WT040 LOCAL 0 STETSON AVE WARREN RD CAWSTON AVE RELOCATE AND CONSTRUCT 4 LANE ARTERIAL 2018 $4,366 HIGHWAY RIVERSIDE 3A07126 LOCAL 0 SUNRISE PARKWAY N. INDIAN CANYON NORTH PALM CONSTRUCT/EXTEND 4 LANE ARTERIAL CONNECTOR 2030 $15,800 HIGHWAY DR CANYON DRIVE (SR 111) RIVERSIDE 3A04A22 LOCAL 0 SUNRISE PARKWAY SUNRISE WAY N. INDIAN CANYON CONSTRUCT/EXTEND 4 LANE ARTERIAL CONNECTOR 2030 $12,700 HIGHWAY NORTH OF SAN DR. RAFAEL DR RIVERSIDE 3A04WT197 LOCAL 0 TEMESCAL CANYON EL CERRITO RD. INDIAN TRUCK WIDEN FROM 2 TO 4 LANES 2030 $22,665 HIGHWAY RD TRAIL RIVERSIDE 3A04WT198 LOCAL 0 TEMESCAL CANYON OVER TEMESCAL N/A WIDEN FROM 2 TO 4 LANES 2020 $19,452 HIGHWAY RD WASH, 0.22 MI. W/O LAKE ST. RIVERSIDE 3A07281 LOCAL 0 TRUMBLE RD MAPES AVE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2018 $4,000 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 299

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07240 LOCAL 0 TWO BUNCH PALMS INDIAN AVE LITTLE MORONGO WIDEN FROM 0 TO 6 LANES 2030 $10,727 HIGHWAY TR RD RIVERSIDE 3A01CV085 LOCAL 0 TWO BUNCH PALMS LITTLE MORONGO PALM DR WIDEN FROM 2 TO 4 LANES 2018 $4,990 HIGHWAY TR RD RIVERSIDE 3A01CV086 LOCAL 0 TWO BUNCH PALMS PALM DR MIRACLE HILL RD WIDEN FROM 2 TO 4 LANES 2018 $3,541 HIGHWAY TR RIVERSIDE 3A04WT118 LOCAL 0 TYLER ST WELLS AVE ARLINGTON AVE WIDEN FROM 2 TO 4 LANES 2020 $5,650 HIGHWAY RIVERSIDE 3A0803 LOCAL 0 VALLEY CENTER DATE PALM DR DA VALL DR IN THE CITY OF CATHEDRAL CITY, CONSTRUCT 2020 $26,225 HIGHWAY BLVD (FUTURE VALLEY CENTER BLVD NORTH OF I-10 AND SOUTH OF EXTENSION) VARNER RD AS A 4 LANE ARTERIAL FROM DATE PALM DR TO FUTURE DA VALL RD EXTENSION RIVERSIDE 3A0802 LOCAL 0 VALLEY CENTER PALM DR DATE PALM DR IN THE CITY OF CATHEDRAL CITY, CONSTRUCT 2023 $28,204 HIGHWAY BLVD VALLEY CENTER BLVD NORTH OF I-10 AND SOUTH OF VARNER RD AS A 4 LANES ARTERIAL FROM PALM DR TO DATE PALM DR RIVERSIDE 3A07315 LOCAL 0 VAN BUREN BLVD JACKSON ST GARFIELD WIDEN FROM 4 TO 6 LANES 2018 $20,000 HIGHWAY RIVERSIDE 3A01WT199 LOCAL 0 VAN BUREN BLVD MOCKINGBIRD WOOD RD WIDEN FROM 4 TO 6 LANES 2018 $12,928 HIGHWAY CANYON RD RIVERSIDE 3A07007 LOCAL 0 VAN BUREN BLVD ORANGE TERRACE OPPORTUNITY WAY WIDEN FROM 4 TO 6 LANES 2030 $2,900 HIGHWAY PKWY RIVERSIDE 3A07036 LOCAL 0 VAN BUREN ST AVE 48 AVE 50 WIDEN FROM 2 TO 6 LANES 2020 $10,669 HIGHWAY RIVERSIDE 3A07037 LOCAL 0 VAN BUREN ST AVE 50 AVE 52 WIDEN FROM 2 TO 6 LANES 2020 $10,669 HIGHWAY RIVERSIDE 3A07241 LOCAL 0 VAN BUREN ST AVE 50 AVE 52 WIDEN FROM 2 TO 6 LANES 2030 $3,818 HIGHWAY RIVERSIDE 3A01CV087 LOCAL 0 VAN BUREN ST AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2023 $475 HIGHWAY RIVERSIDE 3A07242 LOCAL 0 VAN BUREN ST AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2030 $4,170 HIGHWAY RIVERSIDE 3A07243 LOCAL 0 VAN BUREN ST AVE 54 AVE 56/AIRPORT WIDEN FROM 2 TO 4 LANES 2030 $3,964 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 300 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01CV088 LOCAL 0 VAN BUREN ST AVE 54 AVE 56/AIRPORT WIDEN FROM 2 TO 4 LANES 2023 $478 HIGHWAY BLVD RIVERSIDE 3A07244 LOCAL 0 VAN BUREN ST INDIO BLVD AVE 48 WIDEN THE EAST SIDE OF VAN BUREN FROM 2 TO 3 2030 $4,054 HIGHWAY LANES. RIVERSIDE 3A07097 LOCAL 0 VAN BUREN ST INDIO BLVD AVE 48 WIDEN THE WEST SIDE OF VAN BUREN BLVD. FROM 2 2012 $4,662 HIGHWAY TO 3 LANES. RIVERSIDE 3A01CV091 LOCAL 0 VARNER RD DATE PALM DR RAMON RD WIDEN FROM 2 TO 4 LANES 2030 $42,356 HIGHWAY RIVERSIDE 3A07251 LOCAL 0 VARNER RD DATE PALM DR RAMON RD WIDEN FROM 2 TO 4 LANES 2030 $42,055 HIGHWAY RIVERSIDE 3A01CV090 LOCAL 0 VARNER RD MOUNTAIN VIEW DATE PALM DR WIDEN FROM 2 TO 4 LANES 2018 $11,431 HIGHWAY RD RIVERSIDE 3A07250 LOCAL 0 VARNER RD MOUNTAIN VIEW DATE PALM DR WIDEN FROM 2 TO 4 LANES 2030 $11,281 HIGHWAY RD RIVERSIDE 3A01CV089 LOCAL 0 VARNER RD PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2018 $5,566 HIGHWAY RIVERSIDE 3A07249 LOCAL 0 VARNER RD PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2030 $5,566 HIGHWAY RIVERSIDE 3A07252 LOCAL 0 VARNER RD WASHINGTON ST ADAMS ST WIDEN FROM 3 TO 4 LANES 2035 $898 HIGHWAY RIVERSIDE 3A07075 LOCAL 0 VARNER RD / AVE 42 JACKSON ST GOLF CTR PKWY WIDEN FROM 2 TO 6 LANES 2018 $6,552 HIGHWAY RIVERSIDE 3A07079 LOCAL 0 VARNER RD / AVE 42 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 6 LANES, INCLUDING BRIDGE OVER 2018 $8,305 HIGHWAY ALL AMERICAN CANAL. RIVERSIDE 3A07050 LOCAL 0 VARNER RD / AVE 42 MADISON ST MONROE ST WIDEN FROM 2 TO 6 LANES 2018 $9,905 HIGHWAY RIVERSIDE 3A07064 LOCAL 0 VARNER RD / AVE 42 MONROE ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2018 $5,365 HIGHWAY RIVERSIDE 3A01CV097 LOCAL 0 VISTA CHINO DATE PALM DA VALL DR CONSTRUCT NEW 4-LANE ROAD 2023 $16,236 HIGHWAY RIVERSIDE 3A01CF096 LOCAL 0 VISTA CHINO E BANK OF LANDAU BLVD WIDEN FROM 4 TO 6 LANES 2018 $3,726 HIGHWAY WHITEWATER BR.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 301

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01WT041 LOCAL 0 WARREN RD ESPLANADE AVE DOMENIGONI PKWY WIDEN FROM 2 TO 4 LANES 2030 $16,783 HIGHWAY RIVERSIDE 3A01WT215 LOCAL 0 WARREN RD RAMONA EXPWY ESPLANADE AVE WIDEN FROM 2 TO 4 LANES 2018 $13,155 HIGHWAY RIVERSIDE 3A04WT202 LOCAL 0 WASHINGTON ST HERMOSA DR HARLEY JOHN RD WIDEN FROM 2 TO 4 LANES 2030 $12,112 HIGHWAY RIVERSIDE 3A07253 LOCAL 0 WASHINGTON ST I-10 AVE 38 WIDEN FROM 4 TO 6 LANES 2030 $3,192 HIGHWAY RIVERSIDE 3A04WT120 LOCAL 0 WASHINGTON ST VICTORIA AVE HERMOSA DR WIDEN FROM 2 TO 4 LANES 2020 $7,732 HIGHWAY RIVERSIDE 3A07282 LOCAL 0 WATSON A ST MCPHERSON RD CONSTRUCT 4 LANES 2030 $8,000 HIGHWAY RIVERSIDE 3A07283 LOCAL 0 WEBSTER AVE HARLEY KNOX MARKHAM CONSTRUCT 6 LANES 2030 $8,000 HIGHWAY BLVD. RIVERSIDE 3A07284 LOCAL 0 WEBSTER AVE MARKHAM RAMONA EXPWY WIDEN FROM 2 TO 6 LANES 2018 $4,000 HIGHWAY RIVERSIDE 3A07285 LOCAL 0 WEBSTER AVE RAMONA EXPWY RIDER ST WIDEN FROM 2 TO 4 LANES 2020 $6,000 HIGHWAY RIVERSIDE 3120012 LOCAL 0 WHITEWOOD AVE. MURRIETA HOT JACKSON AVE. NEW FACILITY 2018 $5,000 HIGHWAY SPRINGS RD. RIVERSIDE 3A04WT078 LOCAL 0 WHITEWOOD RD. KELLER RD CLINTON KEITH RD CONSTRUCT 4 LANE ARTERIAL 2020 $12,032 HIGHWAY RIVERSIDE 3A04WT121 LOCAL 0 WOOD RD JOHN F KENNEDY VAN BUREN WIDEN FROM 2 TO 4 LANES 2020 $4,445 HIGHWAY DR RIVERSIDE 3A04WT203 LOCAL 0 WOOD RD KRAMERIA AVE CAJALCO RD WIDEN FROM 2 TO 4 LANES 2030 $8,799 HIGHWAY RIVERSIDE 991206 LOCAL 0 BUTTERFIELD STAGE RD EXTENSIONS: EXTEND 2014 $40,265 HIGHWAY MURRIETA HOT SPRINGS RD (4 LNS) FROM BUTTERFIELD STAGE RD TO SERAPHINA RD; BUTTERFIELD STAGE RD (4 LNS) FROM RANCHO CALIFORNIA RD TO MURRIETA HOT SPRINGS RD; & NICHOLAS RD (4 LNS) FROM BUTTERFIELD STAGE RD. TO CALLE GIRASOL

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 302 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV060113 LOCAL 0 CONSTRUCT NEW 4 LANE BRIDGE OVER MURRIETA 2018 $12,411 HIGHWAY CREEK (PART OF WESTERN BYPASS CORRIDOR) INCLUDING APPROACHES, CURB & GUTTER, SIDEWALKS, & STORM DRAIN FACILITIES RIVERSIDE RIV010227 LOCAL 0 CORONA ADVANCED TRAFFIC MANAGEMENT SYSTEM 2010 $6,011 HIGHWAY (ATMS) – AND REGIONAL ITS INTEGRATION PHASE 2. RIVERSIDE RIV061161 LOCAL 0 ESSENTIAL ROAD IMPROVEMENTS-PHASE III: 2014 $1,040 HIGHWAY CITY SECTION 31 INCLUDING PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS GUTTERS, ADA RAMPS & DRAINAGE IMPROVEMENTS ON ACOMA AVE, BUENA VISTA AVE, CAHUILLA AVE, DESERT VIEW AVE, ESTRELLA AVE, FLORA AVE, AND GRANADA AVE BETWEEN CACTUS DR. AND PALM DR. (2006 AAA EARMARK). RIVERSIDE 991203 LOCAL 0 EXTEND OVERLAND DRIVE (4 LANES) FROM 2018 $13,281 HIGHWAY COMMERCE CENTER DRIVE TO AVENIDA ALVARADO/DIAZ ROAD INTERSECTION INCLUDING CONSTRUCTION OF 4 LANE BRIDGE OVER MURRIETA CREEK RIVERSIDE RIV031202 LOCAL 0 I-10 BYPASS SOUTH: CONSTRUCT TWO LANES 2018 $17,970 HIGHWAY OF ROADWAY TO PROVIDE A BY-PASS/NETWORK FACILITY FOR THE I-10, APPROX. 1/2 MILE S/O I-10 BETWEEN THE EASTERN END OF THE CITY OF BANNING AND APACHE TRAIL IN CABAZON. OTHER IMPROVEMENTS INCLUDE THE CONSTRUCTION OF SEVERAL LOW-WATER CROSSINGS AT SMITH CREEK AND SAN GORGONIO RIVER (PA&ED). RIVERSIDE RIV060102 LOCAL 0 IN CALIMESA – WIDEN COUNTY LN RD FROM 1 TO 2 2014 $2,366 HIGHWAY LNS (I-10 TO CALIMESA BLVD), ADD EB DEDICATED RIGHT-TURN LN, WIDEN SB CALIMESA BLVD FROM 2 TO 3 LNS FOR APPROX. 150' S/O COUNTY LN RD SOUTH R-O-W, ADD CURB AND GUTTER AS REQUIRED. ADDITIONAL IMPROVEMENTS INCLUDE THE LENGTHENING OF BOX CULVERT AND/OR ADD CONCRETE RETAINING WINGWALL SYSTEM (TOLL CR UTILIZATION: $101/$187 FOR ENG/R/W – DEMO-SAFETEA-LU).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 303

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV011212 LOCAL 0 IN CATHEDRAL CITY ON RAMON RD – DATE PALM 2012 $2,750 HIGHWAY DR TO DA VALL – WIDEN 4 TO 6 LNS & PAVEMENT REHAB, SIDEWALKS, SIGNAL INTERCONNECT, RETAINING WALLS, DRAIN IMP. RIVERSIDE 3A07067 LOCAL 0 IN COACHELLA VALLEY IN RANCHO MIRAGE – 2014 $1,045 HIGHWAY WIDENING OF SOUTH BOUND MONTEREY AVE. FROM 2 TO 3 LANES FROM DINAH SHORE DR TO GERALD FORD DR. (APPROX. 3,480 L.F.). OTHER IMPROVEMENTS INCLUDE INSTALLATION OF CURB AND GUTTER, DRAINAGE IMPROVEMENTS (RETENTION BASINS), SIGNING AND STRIPING, AND TRAFFIC SIGNAL MODIFICATION AT GINGER ROGERS RD. RIVERSIDE RIV011241 LOCAL 0 IN CORONA ON AUTO CENTER DRIVE – CONSTRUCT 2014 $32,675 HIGHWAY 4 LANE OVERCROSSING (GRADE SEPARATION) OVER EXISTING BNSF TRACKS ($1,835/$1,240 TOLL CREDITS IN CONST TO MATCH CMAQ/PNRS). RIVERSIDE RIV011240 LOCAL 0 IN CORONA ON EXISTING MCKINLEY ST – CONSTRUCT 2019 $4,023 HIGHWAY GRADE SEPARATION AT BNSF RAILROAD CROSSING (PROJECT STUDY REPORT & PRELIMINARY ENVIRONMENTAL ANALYSIS REPORT ACTIVITIES) RIVERSIDE RIV060108 LOCAL 0 IN CORONA ON N. MAIN ST: ADD NB DEDICATED 2013 $3,702 HIGHWAY RIGHT-TURN LANE (APPROX 300') FROM SR91 EXIT RAMP TO N. GRAND BLVD, ADD 3RD WB SR-91 ON RAMP LANE, SIGNAL MODS & CONSTRUCT RETAINING WALL AT PARK-N-RIDE LOT RIVERSIDE 30M07 LOCAL 0 IN EASTERN COACHELLA VALLEY – MECCA 2012 $2,599 01-RIV071259 HIGHWAY COMMUNITY ROUNDABOUT: CONSTRUCT A ROUNDABOUT ENTRY TO THE UNINCORPORATED MECCA COMM. ON HAMMOND RD & 4TH ST BTWN 5TH & 3RD STREETS, CONSISTING OF A SINGLE LN. TRAFFIC CIRCLE W/ONE BYPASS RT LN FOR THE SE TRAFFIC; MOUNTABLE MEDIAN APRONS; LANDSCAPED CENTER; S/W & PED. X-ING; LANDSCAPE BUFFER; REALIGNMENT OF HAMMOND RD.; AND AN ENTRY MONUMENT.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 304 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07316 LOCAL 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA 2014 $27,788 HIGHWAY VALLEY – HWY 111 WIDENING W/IN INDIAN WELLS CITY LIMITS: WID FROM 4 TO 6 THRU LNS (3 LNS IN EA DIR) BTWN THE WCL (570' W/O VILLAGE CTR DR) & EL DORADO DR (RTP ID'S 3A07316 & 3A07257) INCLUDING THE INSTAL OF A RAISED, LANDSCAPE MEDIAN, LEFT TURN PH @ EL DORADO DR, DUAL LEFT TURN PH @ THE SB AND EB COOK ST, RT TURN ONLY LNS AT THE EAST, WEST, AND SB COOK ST. RIVERSIDE 3A07258 LOCAL 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA 2014 $32,779 HIGHWAY VALLEY – HWY 111 WIDENING WITHIN INDIAN WELLS CITY LIMITS: WIDENING FROM 4 TO 6 THRU LNS (3 LNS IN EA DIR) BTWN EL DORADO & EAST CITY LIMITS (W/O WASHINGTON), INCLUDING THE INSTALL OF A RAISED, LANDSCAPE MEDIAN AND RIGHT TURN ONLY LANE AT INDIAN WELLS LN (RTP ID'S 3A07258 & 3A07259). RIVERSIDE 3A07028- LOCAL 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA 2018 $10,424 RIV070302 HIGHWAY VALLEY – DATE PALM DR BRIDGE REPLACEMENT/ WIDENING: REPLACEMENT OF A TW0 LANE (1 LN IN EA DIR) LOW WATER CROSSING BRIDGE OVER LONG CANYON CREEK (BRIDGE NO. 00L0043) WITH A SIX LANE (3 LNS IN EA DIR), FOR APPROXIMATELY 350 FT. (FROM VARNER RD. TO 350' S/O VARNER RD). RIVERSIDE 3A07027 LOCAL 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA 2018 $18,703 HIGHWAY VALLEY – DATE PALM DR OVER THE WHITEWATER RIVER: WIDENING OF DATE PALM DR FROM 4 TO 6 LNS (3 LNS IN EA DIR), FROM APPROX. 350' S/O THE BRIDGE TO 250' N/O THE BRIDGE (VIA ESTRADA TO THE NORTH AND PEREZ RD. TO THE SOUTH), INCLUDING THE CONSTRUCTION OF A RAISED MEDIAN AND SIDEWALK ALONG THE EAST SIDE OF THE PROJECT (BRIDGE NO. 56C0189).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 305

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A07028- LOCAL 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA 2018 $8,576 RIV110501 HIGHWAY VALLEY – DATE PALM DR WIDENING FROM I-10 TO 350' S/O VARNER RD.: WIDENING OF DATE PALM DR. FROM 2 TO 6 LNS (3 LNS IN EA DIR) FROM I-10 TO 350' S/O VARNER RD . OTHER IMPROVEMENTS INCLUDE ADDITIONAL TURNING LANES AT INTERSECTION OF DATE PALM DR. & VARNER RD., TRAFFIC SIGNALIZATION, SIDEWALKS, MEDIANS AND BIKE LANES. RIVERSIDE RIV060122 LOCAL 0 IN MORENO VALLEY ON HEACOCK ST OVER PERRIS 2012 $2,970 HIGHWAY VALLEY STORM DRAIN LATERAL A (APROX. 2.7 MILES N/O RAMONA EXPWY): REPLACE EXISTING 2 LANE BRIDGE WITH A 4 LANE BRIDGE (BRIDGE #: 56C0233) RIVERSIDE 3A0805 LOCAL 0 IN MORENO VALLEY, WIDEN KITCHING ST FROM 2 2012 $4,555 HIGHWAY TO 4 LANES FROM GENTIAN AVE TO CACTUS AVE , INCLUDING SIDEWALK INSTALLATION WITHIN PROJECT LIMITS. RIVERSIDE 3A0807 LOCAL 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 2018 $4,791 HIGHWAY TO 4 LANES + 2 AUX LANES FROM EUCALYPTUS AVE TO SR-60 EB RAMPS, INCLUDING MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE 3A0808 LOCAL 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 2018 $15,456 HIGHWAY 4 LANES FROM ALESSANDRO BLVD TO EUCALYPTUS AVE, INCLUDING TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE 3A0806 LOCAL 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 2018 $4,791 HIGHWAY TO 4 LANES FROM SR-60 WB RAMPS TO IRONWOOD AVE, INCLUDING TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 306 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV011210 LOCAL 0 IN MORENO VALLEY/COUNTY – REALIGN RECHE VISTA 2012 $6,150 HIGHWAY DR (PERRIS BLVD TO NORTH CITY LIMITS – APPROX 2,450') & INSTALL SIGNAL (PERRIS/HEACOCK/RECHE VISTA DR) RIVERSIDE RIV041044 LOCAL 0 IN MORENO VALLEY: WIDEN PERRIS BLVD 2 TO 2012 $14,669 HIGHWAY 6 LNS (PERRIS VALLEY STORM DRAIN LATERAL B TO CACTUS AVE.), INCLUDING CURB, GUTTER, SIDEWALKS, SIGNALS, & MEDIANS RIVERSIDE RIV031204 LOCAL 0 IN MURRIETA – CONSTRUCT NEW 2 LANE GUAVA 2018 $7,575 HIGHWAY ST. BRIDGE (400') OVER MURRIETA CREEK FROM WASHINGTON AVE TO ADAMS AVE W/ SHOULDERS & ALL REQUIRED APPROACHES (BR#: 56C0162) ($28 TOLL CREDITS UTILIZED TO MATCH HBPL IN R/W). RIVERSIDE RIV060123 LOCAL 0 IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST 2015 $35,827 HIGHWAY FROM APPROX 100' SW OF GENERAL DR TO APPROX 500' N/O LINARES AVE: REPLACE EXISTING 4-LANE (2 LNS IN EACH DIRECTION) AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION – NON-CAPACITY) UNDERCROSSING (UPRR). RIVERSIDE 3G01G04 LOCAL 0 IN NORTHWEST RIVERSIDE COUNTY ON MAGNOLIA 2015 $60,205 HIGHWAY AVE: REPLACE EXISTING 4 LANE (2 LNS IN EA. DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR – NON- CAPACITY) O.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN BUCHANAN AVE. (ON THE EAST) AND LINCOLN STREET (ON THE WEST). RIVERSIDE RIV011203 LOCAL 0 IN PALM SPRINGS – WIDEN INDIAN CANYON DRIVE 2012 $4,961 HIGHWAY FROM 2 TO 4 LANES (2 IN EACH DIRECTION) "AT GRADE" FROM UPRR OVERCROSSING (BRIDGE 56C0025) TO TRAMVIEW ROAD. RIVERSIDE RIV990727 LOCAL 0 IN PALM SPRINGS: WIDEN INDIAN CANYON DR FROM 2018 $19,860 HIGHWAY 2 TO 6 LANES (3 IN EACH DIRECTION), FROM UPRR OVERCROSSING TO GARNET AVE (HBRR#:56C0025).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 307

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV011205 LOCAL 0 IN PERRIS – WIDEN PERRIS BLVD 2 TO 6 LANES FROM 2014 $5,226 HIGHWAY RAMONA EXPRESSWAY TO PERRIS VALLEY STORM DRAIN – LATERAL 'B' (APPROX. 1 MILE), INCLUDING CURB, GUTTER, SIDEWALK, RAISED MEDIAN, SIGNAL WORK, UTILITY RELOCATIONS, AND MINOR DRAINAGE IMPROVEMENTS. RIVERSIDE RIV011236 LOCAL 0 IN RIV COUNTY & MURRIETA – EXTEND/CONSTRUCT 2018 $61,597 HIGHWAY CLINTON KEITH ROAD (6 LANES TOTAL – APPROX 3.4 MILES) WITH 2 BRIDGES FROM ANTELOPE ROAD TO WINCHESTER ROAD (SR79) RIVERSIDE RIV050201 LOCAL 0 IN RIVERSIDE COUNTY GROUPED PROJECTS FOR 2018 $148,156 HIGHWAY BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM; PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLE 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). $717 TOLL CREDITS USED TO MATCH HBP IN CONS IN FY 2012/2013. RIVERSIDE RIV52001 LOCAL 0 IN RIVERSIDE COUNTY GROUPED PROJECTS FOR 2012 $565 HIGHWAY PAVEMENT RESURFACING AND/OR REHABILITATION ON THE LOCAL ROADS SYSTEM – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION. RIVERSIDE 3A04WT137A LOCAL 0 IN RIVERSIDE COUNTY ON CAJALCO RD – CAJALCO 2020 $173,185 HIGHWAY RD. WIDENING FROM 2 TO 4 THRU LNS (2 IN EA DIR) FROM TEMESCAL CANYON RD. TO HARVILL AVE AND FROM 4 TO 6 LANES FROM HARVILL AVE TO I-215, INCLUDING TURN POCKETS AND A BRIDGE RECONSTRUCTION OVER A WATER CROSSING (RTP IDS: 3A04WT137 AND 3A04WT138) (PA&ED ONLY) ($803 TOLL CREDITS USED FOR STPL MATCH IN PA&ED).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 308 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV071281 LOCAL 0 IN RIVERSIDE ON MAGNOLIA AVE: REPLACE EXISTING 2011 $52,960 HIGHWAY 4-LN (2 LNS IN EA DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN SUNNYSIDE DR AND ELIZABETH ST. ADD. NON-CAPACITY IMP. INCLUDE: INSTAL. OF A TRAFFIC SIGNAL AT BEATTY DR AND MAGNOLIA; AND CONVERTING THE INTERSECTION OF MAGNOLIA AND MERRILL AVES TO ALLOW ONLY RIGHT-IN AND RIGHT-OUT MOVEMENTS. RIVERSIDE 3G01G10 LOCAL 0 IN RIVERSIDE ON MARY STREET: REPLACE EXISTING 2016 $38,000 HIGHWAY 4 LN (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ON MARY ST BETWEEN MARGUERITE AVE AND INDIANA AVE. RIVERSIDE 30M0701- LOCAL 0 IN RIVERSIDE ON RIVERSIDE AVENUE: REPLACE 2013 $29,512 RIV071272 HIGHWAY EXISTING 4-LANE (2 LNS IN EA DIR) R/R/ X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ALONG RIVERSIDE AVE BTWN MERRILL AVE AND 400' N/O ELIZABETH ST. ADDITIONAL IMPROVEMENTS INCLUDE INSTALLATION OF APPROX 1,100 FT OF PCC S/W ON EACH SIDE OF RIVERSIDE AVENUE WITHIN THE PROJECT LIMITS ($791 TOLL CREDITS USED TO MATCH STPL IN R/W). RIVERSIDE 3G01G06 LOCAL 0 IN RIVERSIDE ON STREETER AVENUE: REPLACE 2013 $36,800 HIGHWAY EXISTING 4 LANE (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ON STREETER AVE BETWEEN LANTANA ST AND BEATTY DR., AND INSTALL APPROX. 1,000 FT OF PCC S/W ON EACH SIDE OF STREETER AVENUE WITHIN THE PROJECT LIMITS. RIVERSIDE RIV060114 LOCAL 0 IN SOUTHWEST TEMECULA: DESIGN AND CONSTRUCT 2020 $13,500 HIGHWAY 4 LANE WESTERN BYPASS CORRIDOR (PHASE 1) FROM SR79 SOUTH TO RANCHO CALIFORNIA RD

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 309

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV110825 LOCAL 0 IN THE CITY OF COACHELLA – AVE 50 OVER 2018 $29,916 HIGHWAY COACHELLA STORMWATER CHANNEL: REPLACEMENT OF A 2-LN LOW WATER X-ING (BRIDGE NO. 00L0055) WITH A NEW 6-LN (3-LNS IN EA DIR) BRIDGE FROM 300-FT W/O APACHE TRAIL TO SR-86S INTERSECTION. OTHER IMPROVEMENTS INCLUDE: BIKE LANES/TRAILS, SIDEWALKS, RECONSTRUCT TRAFFIC SIGNAL/DRIVEWAYS, CHANNEL SCOUR PROTECTION, AND REMOVAL OF LOW WATER CROSSING AND CULVERTS. RIVERSIDE RIV010209 LOCAL 0 IN THE CITY OF CORONA – CONSTRUCT FOOTHILL 2014 $49,311 HIGHWAY PARKWAY WESTERLY EXTENSION 4 LANE ROAD FROM LINCOLN AVE TO PASEO GRANDE (APPROX 2.5 MILES) RIVERSIDE 30M0701- LOCAL 0 IN THE CITY OF DESERT HOT SPRINGS – WESTERN 2012 $350 RIV071236 HIGHWAY AVE-SCENIC DR. PAVING PROJECT: CONSTRUCT 30' OF ASPHALT PAVING FROM PIERSON BLVD TO 600' N/O SCENIC DR., AND FROM 200' W/O WESTERN AVE. TO 600' E/O WESTERN AVE. ON SCENIC DR. ($36 TOLL CREDITS USED TO MATCH CMAQ IN CONST). RIVERSIDE 47520- LOCAL 0 IN THE CITY OF INDIO – WIDEN JEFFERSON ST FROM 2014 $5,300 RIV110831 HIGHWAY VARNER RD TO SUN CITY BLVD FROM 4 TO 6 LANES AND WIDEN VARNER RD FROM 2 TO 4 LANES FROM JEFFERSON ST TO APPROX 500' EAST OF JEFFERSON ST AND THEN TAPERING BACK TO 2 LANES. INCL MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT-TURN POCKETS, DED RT TURN LANES ON SB JEFFERSON AND EB VARNER, DRAINAGE IMPROVEMENTS, SIDEWALKS, AND BIKE LANES. RIVERSIDE RIV071240 LOCAL 0 IN THE CITY OF MORENO VALLEY – EAST BOUND 2012 $6,243 HIGHWAY CACTUS AVE WIDENING BETWEEN VETERANS WAY & HEACOCK: WIDENING OF EAST BOUND CACTUS AVE FROM 2 TO 3 LANES, INCLUDING TRAFFIC SIGNAL MODIFICATIONS WITHIN THE PROJECT REACH, CHANNELIZATION, AND SIGNAL INTERCONNECT SYSTEM.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 310 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01WT049A LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN 2014 $12,401 HIGHWAY ALESSANDRO BLVD BETWEEN I-215 AND FREDERICK ST FROM 4 TO 6 LANES. RIVERSIDE 3A01WT051 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN 2014 $62,000 HIGHWAY ALESSANDRO BLVD BETWEEN NASON ST AND GILMAN SPRINGS RD FROM 2 TO 4 LANES; REALIGN ALESSANDRO BLVD WITHIN PROJECT LIMITS BETWEEN THEODORE ST AND GILMAN SPRINGS RD. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS. RIVERSIDE 3A04WT056B LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN BOX 2012 $3,178 HIGHWAY SPRINGS RD BETWEEN 500' WEST OF CLARK ST AND DAY ST FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING. RIVERSIDE 3A01WT153 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN 2014 $51,000 HIGHWAY GILMAN SPRINGS RD BETWEEN ALESSANDRO BLVD AND BRIDGE ST FROM 2 TO 6 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE 3A01WT053 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN GILMAN 2018 $41,500 HIGHWAY SPRINGS RD BETWEEN SR-60 AND ALESSANDRO BLVD FROM 2 TO 6 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES. RIVERSIDE 3A04WT054 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN HEACOCK 2012 $10,103 HIGHWAY ST BETWEEN CACTUS AVE AND SAN MICHELE RD FROM 2 TO 4 LANES INCLUDING CURB, GUTTER, SIDEWALK, AND SIGNAL.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 311

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A0801 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN HEACOCK 2014 $6,100 HIGHWAY ST BETWEEN SAN MICHELE RD AND HARLEY KNOX RD (PERRIS CITY LIMITS), FROM 2 TO 4 LANES; REALIGN HEACOCK ST WITHIN PROJECT LIMITS BETWEEN NANDINA AND OLEANDER; REPLACE BRIDGE OVER PVSD LATERAL B. RIVERSIDE 3A04WT056C LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD 2012 $3,237 HIGHWAY AVE BETWEEN DAY ST AND BARCLAY DR FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING. RIVERSIDE 3A04WT056E LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD 2012 $8,011 HIGHWAY AVE BETWEEN HEACOCK ST AND PERRIS BLVD FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, DRAINAGE, CURB, GUTTER, AND SIDEWALK. RIVERSIDE 3A04WT056F LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN 2018 $13,397 HIGHWAY IRONWOOD AVE BETWEEN PERRIS BLVD AND VISTA DE CERROS DR. FROM 2 TO 5 LANES (2 LANES IN EACH DIRECTION AND 1 CENTER TURNING LANE) . ADDITIONAL IMPROVEMENTS INCLUDE SIGNAL MODIFICATIONS, LIGHTING, DRAINAGE, CURB, GUTTER, STRIPING, AND SIDEWALK. RIVERSIDE 3A07155 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN MORENO 2018 $23,000 HIGHWAY BEACH DR BETWEEN CACTUS AVE AND AUTO MALL DR FROM 2 TO 6 LANES. INCLUDES SIGNALS AT COTTONWOOD AVE, ALESSANDRO BLVD, AND CACTUS AVE. RIVERSIDE 3A07156 LOCAL 0 IN THE CITY OF MORENO VALLEY – WIDEN REDLANDS 2018 $18,300 HIGHWAY BLVD BETWEEN SR-60 AND CACTUS AVE FROM 2 TO 4 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 312 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 30M0701- LOCAL 0 IN THE CITY OF PALM DESERT – HWY 111 IMP BTWN 2011 $691 RIV071262 HIGHWAY THE NO. CITY LIMITS AND LARKSPUR LN: EXT OF & PROVIDE DUAL LEFT TURN POCKET AT THE INT OF NB HWY 111 & PLAZA WAY & RECONSTRUCTION OF CROSS GUTTER (ELIMINATE ABRUPT DIP); CONSTRUCT BUS TURNOUT ON SB HWY 111 AT THE FAR SIDE OF SAN PABLO AVE; AND INSTALL APPROX. 12,000 S.F. OF S/W AND 14 ADA COMPLIANT CURB RAMPS ($71 TOLL CR USED TO MATCH CMAQ IN CONST). RIVERSIDE RIV000103 LOCAL 0 IN THE CITY OF PALM SPRINGS – CONSTRUCT 2012 $5,500 HIGHWAY BELARDO RD (2 LNS, 1 EA DIR), FROM RAMON RD TO S. PALM CANYON DR., INCLUDING NEW BRIDGE OVER TAHQUITZ CREEK, & INTERSECTION. IMPROVEMENTS. AT SUNNY DUNES RD, MESQUITE AVE., & MORONGO RD., & CONSTRUCT TRIBAL ACCESS RD TO INTERPRETIVE CENTER. RIVERSIDE RIV031205 LOCAL 0 IN THE CITY OF PALM SPRINGS – WIDEN RAMON RD 2020 $4,750 HIGHWAY FROM 4 TO 6 LNS (3 IN EA DIR), FROM EL CIELO RD TO SUNRISE WY., WITH INTERSECTION WIDENING AT EL CIELO RD (ADD WB RT TURN LANE), AT FARRELL DR (ADD SB LEFT TURN LANE), & AT SUNRISE WY (ADD SB LEFT, NB LEFT, AND WB LEFT). RIVERSIDE 30M07 LOCAL 0 IN THE CITY OF PALM SPRINGS: REPLACE EXISTING 2021 $95,000 01-RIV090405 HIGHWAY 4-LANE LOW WATER CROSSING ON VISTA CHINO AT WHITEWATER RIVER WITH A NEW 4-LANE BRIDGE – BRIDGE NO. 00L0052. RIVERSIDE 3A07023 LOCAL 0 IN THE COACHELLA VALLEY IN THE CITY OF DESERT 2020 $44,000 HIGHWAY HOT SPRINGS – INDIAN AVE WIDENING: WIDENING OF INDIAN AVE FROM 2 TO 6 THROUGH LANES (3 IN EA DIR), BETWEEN HWY 62 AND MISSION LAKES BLVD., INCLUDING THE CONSTRUCTION OF AN ALL WEATHER BRIDGE OVER MISSION CREEK (PA&ED).

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 313

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A01CV053 LOCAL 0 IN THE COACHELLA VALLEY IN THE CITY OF DESERT 2020 $20,000 HIGHWAY HOT SPRINGS – INDIAN AVE. WIDENING: WIDENING OF INDIAN AVE. FROM 2 TO 6 THROUGH LANES (3 IN EA DIR) BETWEEN MISSION LAKES BLVD., AND PIERSON BLVD. (PA&ED ONLY). RIVERSIDE 3A07100 LOCAL 0 IN THE COACHELLA VALLEY IN THE CITY OF PALM 2020 $36,160 HIGHWAY SPRINGS – RAMON RD. WIDENING BETWEEN SAN LUIS REY DR & LANDAU BLVD.: WIDENING OF RAMON RD. FROM A 4-LN ARTERIAL TO A 6-LN ARTERIAL (3-LNS IN EA DIR) BETWEEN SAN LUIS REY DR & LANDAU BLVD., INCLUDING THE WIDENING/ REPLACEMENT OF THE WHITEWATER RIVER BRIDGE (BRIDGE NO. 56C0287), INCLUDING SEISMIC RETROFIT AND SCOUR COUNTERMEASURES AS NECESSARY. RIVERSIDE 3OM0701 LOCAL 0 IN THE COACHELLA VALLEY PM-10 PROGRAM – 2014 $2,000 HIGHWAY CLEAN VEHICLE ACQUISITION PROGRAM: FLEET ACQUISITION OF ALTERNATIVE FUEL SWEEPERS FOR REGIONAL STREET SWEEPING PROGRAM OF MAJOR ARTERIALS, FOR THE REDUCTION OF PM10 FUGITIVE DUST THROUGHOUT THE COACHELLA VALLEY ($229 TOLL CREDITS USED TO MATCH CMAQ IN CONST). RIVERSIDE RIV071285 LOCAL 0 IN THE SOUTHEAST COACHELLA VALLEY IN EASTERN 2014 $22,300 HIGHWAY RIVERSIDE COUNTY, JUST SOUTH OF THE CITY OF COACHELLA ON AVE. 56 (AIRPORT BLVD) – FROM POLK ST TO THE WEST TO ORANGE ST. TO THE EAST OF THE R/R X-ING: REPLACE EXISTING 2 LN (1 LN IN EA DIR) AT GRADE R/R X-ING WITH A 2 LN OC (1 LN IN EA DIR – NON-CAPACITY) ACROSS THE UPRR TRACKS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 314 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV031218 LOCAL 0 IN WESTERN RIV CO – NEW MID CO PKWY: CONS 6 2020 $1,700,000 HIGHWAY THRU LN (3 LNS IN EA DIR) APPROX 16 MI. BTWN I-215 IN PERRIS EAST TO SR79 IN SAN JACINTO, INC. CONS/RECONS OF APPROX 10 ICS, ADD OF AUX LN REDLANDS-EVANS & EB AUXILIARY LN EVANS- ANTELOPE. I-215 IMP: ADD 1 MF LN IN EA DIR NUEVO RD -VAN BUREN BLVD, & 1 AUX LN IN EA DIR MID CO PKWY-CAJALCO/RAMONA EXP & FROM MID CO PKWY-NUEVO. RIVERSIDE 3A10WT06 LOCAL 0 IN WESTERN RIVERSIDE CO IN BEAUMONT: SR79 2020 $21,846 HIGHWAY BYPASS EXT NO. PH II – INSTAL OF A 3-LN PRE-FAB BRIDGES ON THE EASTSIDE OF THE PH I POTRERO BRIDGE SR79 BYPASS EXT. NO., EXTENDING THE POTRERO BLVD 0.675 MI. NO. FROM THE FUTURE SR60/POTRERO FWY IC (RIV050535), TO CONNECT TO THE OAK VALLEY PKWY IN BEAUMONT, INCLUDING THE INSTAL OF A CLASS I MULTI-PURPOSES TRAIL, FLARED INTERSECTION AND TURNING POCKETS. RIVERSIDE 3A10WT01 LOCAL 0 IN WESTERN RIVERSIDE CO. IN THE CITY OF 2014 $6,350 HIGHWAY MORENO VALLEY – CACTUS AVE WIDENING: WIDEN CACTUS AVE FROM 2 TO 4 THROUGH LANES (2 IN EA DIR), FROM LASSELLE ST TO NASON ST. OTHER IMPROVEMENTS INCLUDE THE INSTALLATION OF A DEDICATED RIGHT TURN LANE, A 2-WAY LEFT TURN LANE, BUS TURN-OUTS, LANDSCAPING & SIDEWALKS. RIVERSIDE 3A10WT02 LOCAL 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF 2012 $6,266 HIGHWAY MORENO VALLEY – EUCALYPTUS AVE. EXTENSION: CONSTRUCTION OF 3 THROUGH LANES (2 LANES WB & 1 LANE EB) BETWEEN REDLANDS BLVD. AND THEODORE STREET, INCLUDING THE INSTALLATION OF MEDIANS, LEFT TURN POCKETS, DEDICATED RIGHT TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND A CLASS I BIKE PATH.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 315

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3A10WT03 LOCAL 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF 2014 $3,550 HIGHWAY MORENO VALLEY – EUCALYPTUS AVE. WIDENING/ EXTENSION: CONSTRUCTION OF A 4TH THROUGH LANE IN THE EASTERN DIRECTION FROM REDLANDS BLVD. TO THEODORE ST & EXTENSION OF EUCALYPTUS AVE. TO REDLANDS BLVD., WITH A SIGNALIZED INTERSECTION. RIVERSIDE 3A04WT139 LOCAL 0 IN WESTERN RIVERSIDE COUNTY IN THE 2020 $33,327 HIGHWAY UNINCORPORATED AREA OF THE COUNTY OF RIVERSIDE – PIGEON PASS RD CORRIDOR: CONSTRUCT A NEW 4-LANE PIGEON PASS RD CORRIDOR FACILITY BETWEEN MT. VERNON AVE. AND HIDDEN SPRINGS RD, INCLUDING SIGNALS AND MEDIANS (PA&ED ONLY). RIVERSIDE RIV011237 LOCAL 0 NEAR CORONA – WIDEN GREEN RIVER ROAD FROM 3 2014 $7,583 HIGHWAY TO 6 LANES FROM SR91 SOUTHSIDE OFF/ON RAMPS TO PALISADES DRIVE. RIVERSIDE RIV031206 LOCAL 0 ON S. PALM CANYON DR OVER ARENAS CANYON 2018 $4,875 HIGHWAY SOUTH DRAINAGE CHANNEL: REPLACE EXISTING 4 LANE LOW-WATER CROSSING WITH A NEW 4-LANE BRIDGE, INCLUDING DRAINAGE IMPROVEMENTS CONSISTING OF LEVEE CHANNELIZATION (HBRR #: 00L0027). RIVERSIDE RIV060121 LOCAL 0 ON VAN BUREN BLVD NEAR MARCH AIR RESERVE 2014 $6,700 HIGHWAY BASE: WIDEN FROM 4 TO 6 LANES FROM APPROXIMATELY 0.5 MILES WEST OF I-215 TO BARTON ST

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 316 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE RIV041047 LOCAL 0 THROUGHOUT RIVERSIDE COUNTY – GROUPED 2014 $3,473 HIGHWAY PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES). UTIL OF TOLL CREDITS TO MATCH STPL IN CONS – $108 FY11 & $290 FY13. RIVERSIDE RIV010213 LOCAL 0 WIDEN GENE AUTRY TRAIL FROM 2 TO 6 LANES 2012 $4,893 HIGHWAY (3 IN EACH DIRECTION), INCLUDING WIDENING OF EXISTING UPRR OVERCROSSING (BRIDGE 56C0082) FROM 1700' S/O UPRR BRIDGE TO SALVIA ROAD. RIVERSIDE RIV041045 LOCAL 0 WIDEN PERRIS BLVD FROM 2 TO 4 LANES FROM 2012 $6,670 HIGHWAY IRONWOOD AVE TO MANZANITA AVE INCLUDING CURB, GUTTER, SIDEWALKS, SIGNAL MODS, STREET LIGHTS & MEDIANS IMPROVEMENTS RIVERSIDE RIV041043 LOCAL 0 WIDEN RECHE VISTA DR 2 TO 4 LNS (HEACOCK ST/ 2023 $3,386 HIGHWAY PERRIS BLVD-RECHE CYN RD); WIDEN RECHE CYN RD 2 TO 4 LNS (RECHE VISTA-BARTON/HUNTS) PLUS REALIGN, SIGNALS, MEDIANS (PA&ED). RIVERSIDE 3A01CV098 LOCAL 111 VISTA CHINO N. PALM CANYON SUNRISE WAY WIDEN FROM 4 TO 6 LANES 2030 $6,970 HIGHWAY DR RIVERSIDE 3G01G36 LOCAL 0 22ND ST I-10 LINCOLN ST GRADE SEPARATION – 2 LANES OVER UPRR TRACKS 2018 $27,151 HIGHWAY RIVERSIDE 3G01G01 LOCAL 0 3RD STREET SR-91 KANSAS AVE GRADE SEPARATION – 4 LANES UNDER BNSF AND 2016 $37,302 HIGHWAY UPRR TRACKS RIVERSIDE 3G01G23 LOCAL 0 ADAMS ST INDIANA AVE LINCOLN ST GRADE SEPARATION – 4 LANES OVER BNSF RR 2035 $110,337 HIGHWAY RIVERSIDE 3G0703 LOCAL 0 AVENUE 62 WEST OF SR 111 WEST OF SR 86 S GRADE SEPARATION – 2 LANES AT UPRR TRACKS 2031 $98,554 HIGHWAY AND SR111 RIVERSIDE 3G0705 LOCAL 0 AVENUE 66 WEST OF SR 111/ EAST OF HAMMOND GRADE SEPARATION – 2 LANES AT UPRR 2031 $39,740 HIGHWAY LINCOLN ST RD

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 317

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3G01G40 LOCAL 0 BELLGRAVE AV BAIN ST RUTILE ST GRADE SEPARATION – 2 LANES OVER UPRR TRACKS 2018 $117,159 HIGHWAY RIVERSIDE 3G01G26 LOCAL 0 CALIFORNIA AVE 3RD ST I-10 GRADE SEPARATION – 2 LANES OVER UPRR TRACKS 2018 $32,465 HIGHWAY RIVERSIDE 3G01G05 LOCAL 0 CHICAGO AV THORTON ST COLUMBIA AVE GRADE SEPARATION – 4 LANES OVER BNSF RR 2035 $223,893 HIGHWAY TRACKS RIVERSIDE 3G01G19 LOCAL 0 HARGRAVE ST I-10 LINCOLN ST GRADE SEPARATION – 2 LANES OVER UPRR 2019 $32,318 HIGHWAY RIVERSIDE 3G01G33 LOCAL 0 JOY ST SR-91 HARRISON ST GRADE SEPARATION – 2 LANES OVER BNSF RR 2019 $32,318 HIGHWAY TRACKS RIVERSIDE 3120036 LOCAL 0 JURUPA RD CEDAR ST E'LY OF FELSPAR ST GRADE SEPARATION – 2 LANES OVER UPRR TRACKS 2025 $101,228 HIGHWAY RIVERSIDE RIV111131 LOCAL 0 KELLER RD. WHITEWOOD RD SR79 (WINCHESTER KELLER RD. EXT. FROM WHITEWOOD RD (EAST) TO 2020 $34,000 HIGHWAY (EAST) RD) SR79 (WINCHESTER RD), CONSISTING OF 4 LANES (2 LNS IN EA DIR), LEFT TURN LN, BIKE LANES, AND CG&S.. RIVERSIDE 3G01G24 LOCAL 0 MADISON ST INDIANA AVE LINCOLN ST GRADE SEPARATION – 4 LANES UNDER BNSF RR 2030 $61,629 HIGHWAY TRACKS RIVERSIDE 3120016 LOCAL 0 MARKET ST RUBIDOUX BLVD. NORTH OF THE WIDEN FROM 2 TO 4 LANES 2030 $25,000 HIGHWAY SANTA ANA RIVER RIVERSIDE 3120017 LOCAL 0 MISSION LAKES BLVD SR62 INDIAN AVE. WIDEN FROM 2 TO 4 LANES 2018 $6,938 HIGHWAY RIVERSIDE 3120018 LOCAL 0 MOUNTAIN VIEW RD. PIERSON BLVD. AT HACIENDA AVE. WIDEN FROM 2 TO 4 LANES 2018 $766 HIGHWAY EAST TERMINUS OF DESERT VIEW AVE. RIVERSIDE RIV111201 LOCAL 0 NASON ST FIR AVE ALESSANDRO BLVD. "PA&ED – NASON ST. WIDENING FROM FIR AVE TO 2017 $10,000 HIGHWAY ALESSANDRO AVE. IS AN ALIGNMENT STUDY/TRAFFIC ANALYSIS PROJECT AT THIS TIME. THE EXISTING NUMBER OF THROUGH LANES WITHIN THE WIDENING SEGMENT VARIES FROM 2 TO 4 LANES AND COULD BE IMPROVED FROM 2 TO 6 LANES.

"

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 318 Project List

Financially-Constrained RTP Projects County RTP ID System Route # Route Name From To Description Project Project Cost Completion ($1,000’s By* RIVERSIDE 3120023 LOCAL 0 PALM DR. DILLON RD. TWO BUNCH PALMS WIDEN FROM 4 TO 6 LANES. OTHER IMPROVEMENTS 2018 $4,990 HIGHWAY TR. INCLUDE SHOULDERS AND MEDIANS RIVERSIDE 3120024 LOCAL 0 PALM DR. PIERSON BLVD. MISSION LAKE WIDEN FROM 4 TO 6 LANES. OTHER IMPROVEMENTS 2018 $3,696 HIGHWAY BLVD. INCLUDE SHOULDERS AND MEDIANS RIVERSIDE 3G01G31 LOCAL 0 PIERCE ST MAGNOLIA AVE INDIANA AVE GRADE SEPARATION – 3 LANES OVER BNSF RR 2030 $75,947 HIGHWAY TRACKS RIVERSIDE 3120020 LOCAL 0 PIERSON BLVD. CHOLLA DR. PALM DR. WIDEN FROM 2 TO 4 LANES 2018 $4,950 HIGHWAY RIVERSIDE 3120019 LOCAL 0 PIERSON BLVD. LITTLE MORONGO CHOLLA DR. WIDEN FROM 2 TO 4 LANES 2018 $5,544 HIGHWAY RD. RIVERSIDE 3120022 LOCAL 0 PIERSON BLVD. MIRACLE HILL RD. EASTERN TERMINUS WIDEN FROM 2 TO 4 LANES 2018 $5,254 HIGHWAY OF DESERT VIEW AVE. RIVERSIDE 3120021 LOCAL 0 PIERSON BLVD. PALM DR. MIRACLE HILL RD. WIDEN FROM 2 TO 4 LANES 2018 $3,062 HIGHWAY RIVERSIDE 3G01G43 LOCAL 0 SAN GORGONIO AV I-10 LINCOLN ST GRADE SEPARATION – 2 LANES OVER UPRR TRACKS 2018 $27,741 HIGHWAY RIVERSIDE 3G01G07 LOCAL 0 SPRUCE ST (BNSF) SR-91 I-215 GRADE SEPARATION – 4 LANES OVER BNSF RR 2035 $124,129 HIGHWAY TRACKS RIVERSIDE 3A04WT198B LOCAL 0 TEMESCAL CANYON INDIAN TRUCK NEW TEMESCAL WIDEN FROM 2 TO 4 LANES 2035 $15,962 HIGHWAY RD TRAIL WASH, 0.22 MI. W/O LAKE ST. RIVERSIDE 3G01G22 LOCAL 0 TYLER ST SR-91 COMANCHE AVE GRADE SEPARATION – 4 LANES OVER BNSF RR 2030 $82,023 HIGHWAY TRACKS RIVERSIDE 3G0701 LOCAL 0 VIELE AV B STREET LUIS ESTRADA RD GRADE SEPARATION – 2 LANES AT UPRR 2031 $36,560 HIGHWAY RIVERSIDE 3120025 LOCAL 0 WORSLEY RD. PIERSON BLVD. INDIAN AVE. WIDEN FROM 2 TO 4 LANES 2018 $9,541 HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 319

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120217 TRANSIT 0 E STREET BRT CAL STATE SAN LOMA LINDA FULL BRT – 15-MIN. HEADWAYS ALL DAY 2014 $163,338 BERNARDINO BERNARDINO SAN 4120215 TRANSIT 0 EUCLID FOOHILL BLVD POMONA RINCON FULL BRT – 15-MIN. HEADWAYS PEAK, 2030 $128,695 BERNARDINO 30-MIN OFF PEAK SAN 4120219 TRANSIT 0 FOOTHILL/5TH MONTE VISTA AVE BOULDER RD FULL BRT – 15-MIN. HEADWAYS PEAK, 2020 $415,911 BERNARDINO 30-MIN OFF PEAK SAN 4120222 TRANSIT 0 GOLD LINE PHASE COUNTY LINE MONTCLAIR LIGHT RAIL EXTENDED FROM COUNTY 2035 $156,318 BERNARDINO 2B TO MONTCLAIR LINE TO MONTCLAIR (PHASE 2B) SAN 4120211 TRANSIT 0 GRAND/EDISON CHINO HILLS PKWAY MILLIKEN AVE (HAMNER AVE) EXPRESS BUS 2030 $30,088 BERNARDINO AVE SAN 4120206 TRANSIT 0 HAVEN AVE. BANYAN ST EDISON AVE EXPRESS BUS 2030 $18,387 BERNARDINO SAN 4120213 TRANSIT 0 HOLT AVE/4TH ST. GAREY AVE SIERRA AVE EXPRESS BUS 2030 $30,029 BERNARDINO SAN 4TL104 TRANSIT 0 LOCAL TRANSIT COUNTYWIDE COUNTYWIDE COUNTYWIDE LOCAL TRANSIT SERVICE 2030 $364,000 BERNARDINO SERVICE SAN 4CR04 TRANSIT 0 METROLINK COUNTYWIDE COUNTYWIDE SERVICE EXPANSION; SB LINE 72 DAILY 2030 $188,708 BERNARDINO COMMUTER RAIL TRAINS, RIVERSIDE LINE 46 DAILY TRAINS, IEOC LINE 28 DAILY TRAINS SAN 4TR0101 TRANSIT 0 REDLANDS RAIL RIALTO/E ST. UNIVERSITY OF REDLANDS EXTEND RAIL SERVICE TO REDLANDS (9 2018 $148,876 BERNARDINO PHASE I MILES); COMMUTER RAIL TECHNOLOGY SAN 4120194 TRANSIT 0 REDLANDS RAIL RIALTO/E ST. UNIVERSITY OF REDLANDS ADD A SECOND TRACK/ADDITIONAL 2020 $183,490 BERNARDINO PHASE II PASSING TRACK THROUGHOUT THE CORRIDOR OF PHASE 1 PROJECT SAN 4120209 TRANSIT 0 RIVERSIDE AVE. SIERRA AVE UNIVERSITY AVE EXPRESS BUS 2030 $28,416 BERNARDINO SAN 4120205 TRANSIT 0 SAN BERNARDINO SIERRA AVE E STREET EXPRESS BUS 2030 $15,729 BERNARDINO AVE SAN 4120204 TRANSIT 0 SIERRA AVE. RIVERSIDE AVE MARYGOLD AVE EXPRESS BUS 2030 $13,372 BERNARDINO

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 320 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD41064 TRANSIT 0 BUS SYSTEM – BUS SHELTERS ON 2010 $158 BERNARDINO VARIOUS ROUTES-REPLACING MISSING AND/OR DAMAGED BUS STOPS, PURCHASE AND REPAIR SHELTERS, BENCHES, ETC. SAN SBD31037 TRANSIT 0 BUS SYSTEM – OPERATING ASSISTANCE 2012 $15,547 BERNARDINO SAN SBD31581 TRANSIT 0 BUS SYSTEM – OPERATING ASSISTANCE 2016 $75,338 BERNARDINO SAN SBD31612 TRANSIT 0 BUS SYSTEM – OPERATING ASSISTANCE 2012 $2,271 BERNARDINO SAN SBD41055 TRANSIT 0 BUS SYSTEM – OPERATING ASSISTANCE 2011 $14,086 BERNARDINO SAN 200086 TRANSIT 0 BUS SYSTEM – PASSENGER FACILITIES. 2016 $522 BERNARDINO FY12-10 BUS SHELTERS INCLUDING UPGRADES FOR ACCESSIBILITY AND AMENITIES FOR THESE AND OTHER BUS STOPS; FY13-3 BUS SHELTERS AND AMENITIES;FY14-3 BUS SHELTERS AND AMENITIES; BUS SHELTERS INCLUDES BUS STOP LIGHTING EVERY YEAR. SAN 981118 TRANSIT 0 BUS SYSTEM – PASSENGER FACILITIES: 2012 $1,244 BERNARDINO DESIGN AND BUILDING OF ONTARIO TRANSCENTER SAN 200101 TRANSIT 0 BUS SYSTEM – PASSENGER FACILITIES: 2012 $10,000 BERNARDINO DEVELOPMENT OF SAN BERNARDINO TERMINAL LOCATED ON RIALTO AND E STREET. TRANSFER POINT CENTER SAN 20041303 TRANSIT 0 BUS SYSTEM REPLACEMENT 35' GAS 2009 $1,290 BERNARDINO FUEL SAN SBD90105 TRANSIT 0 BUS SYSTEM-BUSES BUS 2015 $43,953 BERNARDINO REPLACEMENTS ALT. FUEL, 2010-15 AND 15 COACHES PER YEAR AFTER 2010 SAN SBD31084 TRANSIT 0 BUS SYSTEM-SERVICE VEHICLES, 2013 $1,558 BERNARDINO PURCHASE SEVERAL EXPANSION SERVICE VEHICLES *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 321

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD41073 TRANSIT 0 CAPITAL – PURCHASE OF LAND 2012 $25,500 BERNARDINO AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS FACILITY (PH I & II) SAN 200427 TRANSIT 0 CAPITAL COST OF CONTRACTING FOR 2014 $7,803 BERNARDINO OPERATIONS SAN 4OM0701- TRANSIT 0 CAPITALIZATION OF LEASES – FOR 2014 $4,910 BERNARDINO 20060601 CONTRACTORS, RADIO SITES, APC, TIRE LEASES SAN 981122 TRANSIT 0 CAPITALIZATION OF PREVENTIVE MAINT 2012 $69,467 BERNARDINO SAN 200625 TRANSIT 0 E STREET TRANSIT CORRIDOR- FROM 2014 $192,236 BERNARDINO SAN BERNARDINO TO LOMA LINDA (INCLUDES 14 ARTIC BUSES AND PARK AND RIDES) SAN SBD31073 TRANSIT 0 FACILITIES IMPROVEMENTS – 2007 $3,106 BERNARDINO EQUIPMENT AND FURNISHINGS – EAST/ WEST VALLEY FACILITY PURCHASE OFFICE EQUIPMENT SAN 200441 TRANSIT 0 FACILITIES: EASTERN AREA 2012 $29,619 BERNARDINO MAINTENANCE: THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA & RCTC SAN R589TA TRANSIT 0 INTERSTATE – LOS ANGELES/CHICAGO 2012 $8,090 BERNARDINO AT EL GARCES STATION MULTIMODAL – STATION – FACILITY SAN 990602 TRANSIT 0 METROLINK CAPITAL MAINTENANCE 2012 $18,156 BERNARDINO (REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING STOCK)($496 TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FY 2011/12 FTA 5309 IN CONSTRUCTION)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 322 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD41109 TRANSIT 0 METROLINK OPERATING ASSISTANCE 2012 $40,000 BERNARDINO SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK) SAN 20020801 TRANSIT 0 METROLINK ROLLING STOCK – 2012 $22,584 BERNARDINO SANBAG'S SHARE OF PURCHASE OF METROLINK CARS & LOCOM UP TO 47 CARS/CABS AND IN FUTURE YEARS UP TO 22 CARS/CABS & UP TO 8 LOCOM (CO-OP LA0C8231, RIV010214) SAN 4OM0701- TRANSIT 0 METROLINK-SEALED CORRIDOR-SAN 2012 $2,000 BERNARDINO 20061009 GABRIEL SUB-THIS PROJECTS CONSISTS OF A COMPREHENSIVE CORRIDOR SAFETY ENHANCEMENT PROGRAM ALONG SANBAG OWNED ROW SAN SBD41114 TRANSIT 0 PARATRANSIT – VEHICLE REPLACEMENT 2013 $2,911 BERNARDINO ALT. FUEL, 2012-3; SAN 20040811 TRANSIT 0 PARATRANSIT VEHICLE REPLACEMENT – 2010 $709 BERNARDINO 16 PASSENGER – GAS-07-6;08-4 SAN SBD44003 TRANSIT 0 PARATRANSIT VEHICLE REPLACEMENT 2011 $225 BERNARDINO (10/11-1-18 PAX AND 11/12 1-18 PAX SAN 200423 TRANSIT 0 PARATRANSIT VEHICLES – 2010 $1,198 BERNARDINO REPLACEMENT – GAS/DIESEL; 04-3;05-2;06-4;08-3,09-3 SAN 200426 TRANSIT 0 PARATRANSIT VEHICLES – REPLACING 7 2009 $190 BERNARDINO PASSENGER GAS BUS 06-1;08-2;09-1 SAN 200424 TRANSIT 0 PURCHASE REPLACEMENT DIESEL 2009 $1,416 BERNARDINO BUSES – 06-1;07-4 SAN 20040211 TRANSIT 0 REPLACEMENT PARATRANSIT 2013 $9,234 BERNARDINO VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET;08-50;2011-50 SAN 20020810 TRANSIT 0 REPLACEMENT-PARATRANSIT – 9 2009 $205 BERNARDINO PASSENGER VEHICLES – GAS – 1-2010/11

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 323

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200450 TRANSIT 0 RIALTO METROLINK STATION – INCREASE 2011 $3,356 BERNARDINO PARKING SPACES FROM 225-775 SAN 200416 TRANSIT 0 SCLA RAIL SERVICE FROM AIR 2014 $250,000 BERNARDINO EXPRESSWAY APPROX. 5 MILES N0 TO COLUSA RD. BETWEEN PHANTOM EAST & MOJAVE RIVER-PUT IN NEW RAIL LINE FROM BNSF TO SCLA.(FOR FREIGHT) PROJECT IN CONNECTION WITH NEW INTERMODAL/MULTIMODAL FACILITY ON SCLA PROPERTY SAN NULL- TRANSIT 0 SERVICE EQUIPMENT: PURCHASE AND 2007 $400 BERNARDINO SBD200437 INSTALL UPGRADED TICKET VENDING MACHINES AT VARIOUS STATIONS SYSTEM WIDE. THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA, RCTC, & VCTC SAN 981111 TRANSIT 0 TRANSIT – ENHANCEMENTS: 1% 2014 $1,451 BERNARDINO TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS SAN 981104 TRANSIT 0 TRANSIT – SECURITY 2014 $972 BERNARDINO SAN 981114 TRANSIT 0 TRANSIT – SECURITY CAPITALIZATION 2014 $1,315 BERNARDINO OF SECURITY COSTS SAN SBD31055 TRANSIT 0 TRANSIT ADMINISTRATION EQUIPMENT 2014 $25,376 BERNARDINO PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS SAN SBD44006 TRANSIT 0 TRANSIT ADMINISTRATION EQUIPMENT 2010 $128 BERNARDINO OFFICE EQUIPMENT SAN 20010120 TRANSIT 0 TRANSIT SERVICE EQUIPMENT – 2010 $31 BERNARDINO PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (ON-GOING PROJECT) SAN 20040817 TRANSIT 0 VEHICLE OVERHAULS – TO REBUILD 2010 $90 BERNARDINO ENGINES, TRANSMISSIONS, ETC. ON AGING FLEET

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 324 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200425 TRANSIT 0 VEHICLE REPLACEMENT – PARATRANSIT 2008 $147 BERNARDINO VEHICLES – 2 -18 PASSENGER ACCESSIBLE SMALL BUSES SAN 4A07226 STATE 0 AGUA MANSA 0080M W, RANCHO E0073 RANCHO AVE WIDEN AGUA MANSA RD FROM 0080M 2030 $749 BERNARDINO HIGHWAY AVE W, RANCHO AVE E0073 FROM 2 TO 4 LANES SAN 4120234 STATE 0 ALDER AVE BASELINE FOOTHILL BLVD WIDEN ALDER AVE FROM BASELINE AVE 2020 $2,625 BERNARDINO HIGHWAY TO FOOTHILL BLVD FROM 2 TO 4 LANES SAN 4120235 STATE 0 AMETHYST RD SYCAMORE RD EUCALYPTUS RD WIDEN AMETHYST RD FROM SYCAMORE 2020 $1,609 BERNARDINO HIGHWAY RD TO EUCALYPTUS RD FROM 0 TO 4 LANES SAN 4120109 STATE 0 CHINO AVE MONTE VISTA RD NORTH, SOUTH AND WEST LEG 600' WIDEN CHINO AVE AT MONTE VISTA RD; 2035 $1,172 BERNARDINO HIGHWAY EACH DIRECTION NORTH, SOUTH AND WEST LEG 600' EACH DIRECTION SAN 4A07002 STATE 0 EVANS ST. PHASE II UPRR BARTON RD. NEW ROAD, 2 LANES EACH DIR 2014 $32,150 BERNARDINO HIGHWAY SAN 4120236 STATE 0 FONTANA AVE VALLEY BLVD MERILL WIDEN FONTANA AVE FROM VALLEY 2030 $5,251 BERNARDINO HIGHWAY BLVD TO MERILL AVE FROM 2 TO 4 LANES SAN 4A07020 STATE 0 NATIONAL TRAILS IN SAN BERNARDINO SAFETY UPGRADE 2020 $12,000 BERNARDINO HIGHWAY HIGHWAY COUNTY SAN 4120233 STATE 0 PIPE LINE AVE 0.04 M S/O PHILLIPS BLVD WIDEN PIPELINE AVE FROM .04M S/O 2030 $3,260 BERNARDINO HIGHWAY PHILADELPHIA AVE PHILADELPHIA AVE TO PHILLIPS BLVD FROM 2 TO 4 LANES SAN 4PD04 STATE 0 PROJECT COUNTYWIDE COUNTYWIDE PROJECT DEVELOPMENT & TRAFFIC 2025 $143,313 BERNARDINO HIGHWAY DEVELOPMENT MITIGATION & TRAFFIC MITIGATION SAN 4120231 STATE 0 RANDALL AVE MAPLE AVE RIVERSIDE AVE WIDEN RANDALL AVE FROM MAPLE AVE 2030 $1,380 BERNARDINO HIGHWAY TO RIVERSIDE AVE FROM 2 TO 4 LANES SAN 4A07218 STATE 0 VALLEY BLVD COMMERCE DR ALMOND AV WIDEN VALLEY BLVD FROM COMMERCE 2020 $1,316 BERNARDINO HIGHWAY DR TO ALMOND AVE FROM 5 TO 6 LANES SAN 4120232 STATE 0 VALLEY BLVD POPLAR AVE CATAWABA AVE WIDEN VALLEY BLVD FROM POPLAR AVE 2035 $604 BERNARDINO HIGHWAY TO CATAWBA AVE FROM 4 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 325

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07363 STATE 0 WALNUT AVE 0.10 M S/O ROSWELL ROSWELL AVE WIDEN WALNUT AVE FROM .10 M S/O 2035 $357 BERNARDINO HIGHWAY AVE ROSWELL AVE TO ROSWELL AVE FROM 2 TO 4 LANES SAN 4120230 STATE 0 WILSON AVE ETIWANDA AVE WARDMAN BULLOCK WIDEN WILSON AVE FROM ETIWANDA 2030 $2,083 BERNARDINO HIGHWAY AVE FROM 0 TO 2 LANES SAN 200455 STATE 0 PLANNING, PROGRAMMING AND 2008 $632 BERNARDINO HIGHWAY MONITORING AB3090 PAYBACK PROJECTS SAN 4M04023 STATE 10 I-10 0.1 KM E/O I-15 (PM 0.4 KM E/O I-215 (PM R24.5) INSTALL RMS, CCTV ESU; WIDEN 2014 $21,527 BERNARDINO HIGHWAY 9.9) ENTRANCE RAMPS FROM 1 TO 2 LANES AT: EB & WB AT CHERRY AVE, CITRUS AVE, CEDAR AVE, RIVERSIDE AVE AND MT VERNON AVE; WB AT RANCHO AVE; EB AT 9TH ST (EA:38430) SAN 4M01025 STATE 10 I-10 ALABAMA ST INTERCHANGE INTERCHANGE (PM 28.0-29.5) 2020 $22,000 BERNARDINO HIGHWAY SAN 4M1001 STATE 10 I-10 AT YUCAIPA BLVD YUCAIPA BLVD @ I-10 FWY – IMPROVE 2012 $1,700 BERNARDINO HIGHWAY THE WB ON-RAMP FROM 1-2 LANES AND MODIFY TRAFFIC SIGNAL SAN 4M07021 STATE 10 I-10 FORD ST. RIVERSIDE COUNTY LINE ADD 1 AUX LANE EACH DIRECTION 2030 $43,200 BERNARDINO HIGHWAY (PM33.0-0.0) SAN 4H01003 STATE 10 I-10 FORD ST. RIVERSIDE COUNTY LINE ADD 1 HOV LANE EACH DIRECTION (PM 2030 $106,800 BERNARDINO HIGHWAY 33.0-0.0) SAN 4M07013 STATE 10 I-10 HAVEN FORD ST ADD 1 AUX LANE EACH DIRECTION 2020 $546,000 BERNARDINO HIGHWAY SAN 4M07002 STATE 10 I-10 MONTE VISTA AT I-10 FREEWAY IN MONTCLAIR ON I-10 AT MONTE 2020 $26,500 BERNARDINO HIGHWAY VISTA – INTERCHANGE IMPROVEMENTS (PM.25-1.1) SAN 4M01030 STATE 10 I-10 MOUNTAIN VIEW AV AT INTERCHANGE INTERCHANGE (PM 26.5-27.5) 2020 $40,300 BERNARDINO HIGHWAY SAN 4M01031 STATE 10 I-10 MT VERNON AV IN COLTON INTERCHANGE (23.0-24.0) 2020 $28,788 BERNARDINO HIGHWAY SAN 4M01032 STATE 10 I-10 WABASH AV INTERCHANGE INTERCHANGE (PM 23.6-34.2) 2030 $24,710 BERNARDINO HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 326 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120197 STATE 10 I-10 @ ALABAMA INTERCHANGE RECONFIGURATION/NEW 2030 $37,821 BERNARDINO HIGHWAY INTERCHANGE SAN 4120200 STATE 10 I-10 @ ALDER NEW INTERCHANGE I-10 @ ALDER 2030 $138,676 BERNARDINO HIGHWAY SAN 4M01027 STATE 10 I-10 @ CALIFORNIA INTERCHANGE RECONFIGURATION/NEW 2030 $63,035 BERNARDINO HIGHWAY INTERCHANGE SAN 4M07001 STATE 10 I-10 @ EUCLID EUCLID AV IN ONTARIO ON I-10 AT EUCLID AVENUE – 2030 $12,607 BERNARDINO HIGHWAY WIDEN THE EXIT RAMP FROM 2-3 LANES SAN 4120196 STATE 10 I-10 @ MONTE RECONSTRUCT INTERCHANGE I-10 @ 2030 $35,019 BERNARDINO HIGHWAY VISTA MONTE VISTA SAN 4120198 STATE 10 I-10 @ MT. VERNON INTERCHANGE RECONFIGURATION/NEW 2030 $44,825 BERNARDINO HIGHWAY INTERCHANGE SAN 4120199 STATE 10 I-10 @ MTN. VIEW INTERCHANGE RECONFIGURATION/NEW 2030 $71,439 BERNARDINO HIGHWAY INTERCHANGE SAN 4M07003 STATE 10 I-10 @ UNIVERSITY INTERCHANGE RECONFIGURATION/NEW 2030 $8,405 BERNARDINO HIGHWAY INTERCHANGE SAN 4M04033 STATE 10 I-10 @ WILDWOOD INTERCHANGE RECONFIGURATION/NEW 2030 $49,027 BERNARDINO HIGHWAY INTERCHANGE SAN SBD41147 STATE 10 AIRPORT GROUND ACCESS -I-10 AT 2011 $3,085 BERNARDINO HIGHWAY ARCHIBALD AVE – INSTALL IRRIGATION SYSTEM AND LANDSCAPE PLANTING SAN 200432 STATE 10 AT I-10 AND FORD ST. ON RAMP TO THE 2014 $700 BERNARDINO HIGHWAY FREEWAY – SIGNAL AND INTERSECTIONS IMPROVEMENTS SAN 1830 STATE 10 I-10 AT CEDAR AVE. BETWEEN SLOVER 2018 $56,948 BERNARDINO HIGHWAY AND VALLEY- RECONSTRUCT I/C-WIDEN FROM 4-6 LANES WITH LEFT AND RIGHT TURN LANES. ADD AUX LANE ON E/B ON AND OFF RAMPS SAN 2002160 STATE 10 I-10 AT GROVE INTERCHANGE AND 2018 $156,000 BERNARDINO HIGHWAY GROVE AVE. CORRIDOR – RELOCATE I/10 & 4TH ST. I/C TO GROVE AVE. AND WIDEN GROVE AVE BETWEEN I-10 TO HOLT (WIDEN 4-6 LANES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 327

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200803 STATE 10 I-10 AT VINEYARD AVE. INTERCHANGE. 2018 $83,550 BERNARDINO HIGHWAY INTERCHANGE WIDENING FROM 4-6 LANES AND WIDEN ON AND OFF RAMPS TO TWO LANES, INTERSECTION IMPROVEMENTS AND ENHANCE EXISTING LANDSCAPING SAN 44810-44812 STATE 10 I-10 TIPPECANOE RECONFIGURE 2014 $57,070 BERNARDINO HIGHWAY INTERCHANGE & LOCAL RD IMP/MOD (HP 1366)(FORMERLY PART OF RTP ID 44810)(NON-CAPACITY LOCAL ROAD IMPROVEMENTS – NO THRU LANES) SAN 20020812 STATE 10 I-10/CHERRY AVENUE INTERCHANGE 2014 $84,090 BERNARDINO HIGHWAY – INTERCHANGE RECONSTRUCT – REPLACE O/C, WIDEN O/H AND WIDEN I/C FROM SLOVER TO VALLEY FROM 4-6 LANES WITH DOUBLE LEFT TURNS TO RAMPS(PROJECT COST INCREASED TO $84,090 DUE TO LOCAL A/C – TRUE PROJECT COSTS REMAIN AT $76,113) SAN 4H01001 STATE 10 I-1O HOV LANE ADDITION – FROM HAVEN 2020 $1,090,014 BERNARDINO HIGHWAY (ONTARIO TO FORD ST (REDLANDS)- WIDENING FROM 8-10 LANES, AUX LANES WIDENING UNDERCROSSINGS AND OVERCROSSINGS AND RECONSTRUCTION OF RAMPS WHERE NEEDED SAN 150D STATE 10 IN COLTON FROM 0.2 MIL (0.3 KM) W/O 2014 $201,994 BERNARDINO HIGHWAY RANCHO AVE TO 0.9 MI (1.5 KM) E/O LA CADENA DRIVE – CONSTRUCT RR TO RR GRADE SEPARATION SAN 34090 STATE 10 IN FONTANA AT ALDER AVENUE 2030 $99,105 BERNARDINO HIGHWAY CONSTRUCT 4 LANE INTERCHANGE (2 LANES IN EACH DIRECTION.) SAN SBD031269 STATE 10 IN FONTANA AT BEECH AVENUE 2023 $113,023 BERNARDINO HIGHWAY CONSTRUCT 4 LANE INTERCHANGE ( 2 LANES IN EACH DIRECTION.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 328 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD45000 STATE 10 IN FONTANA: I-10 AT CITRUS AVE IC 2014 $56,392 BERNARDINO HIGHWAY RECONSTRUCT IC WITH 6 THRU LANES; & REPLACE BRIDGE OVERCROSSING(O/C WIDEN FROM 2-6 LNS) AND WIDEN CITRUS FROM SLOVER TO VALLEY 4-6 LNS. SAN NULL-47440 STATE 10 IN REDLANDS FROM ORANGE ST. TO 2008 $34,067 BERNARDINO HIGHWAY FORD ST. – ADD ONE MIXED FLOW LANE IN EACH DIRECTION AND FULL WIDENING OF 11 BRIDGES ONE LANE IN EA DIRECTION SAN 44810-44811 STATE 10 I-TO TIPPECANOE INTERCHANGE ADD 2014 $22,450 BERNARDINO HIGHWAY EASTBOUND OFF-RAMP AUXILIARY LN FROM WATERMAN ON-RAMP TO TIPPECANOE OFF-RAMP AND WIDEN BRIDGE (NON-CAPACITY)(FORMERLY PART OF RTP ID 44810) SAN 200434 STATE 10 ON I-10 IN REDLANDS AND YUCAIPA 2012 $43,186 BERNARDINO HIGHWAY FROM FORD ST. O/C TO LIVE OAK CANYON RD. CONSTRUCT 1 W/B MIXED- FLOW LANE SAN SBD41339 STATE 10 PEPPER AVE. AT I-10 MODIFICATION 2018 $39,815 BERNARDINO HIGHWAY OF PEPPER AVE. INTERCHANGE WIDEN BRIDGE FROM 3-7 LANES (2 THRU LANES, 2 TURN LANES SOUTH, 1 TURN LANE NORTH) AND ADD AUXILIARY LANES TO FREEWAY (POST MILES KILOMETERS -32.5-34.4) (T21-#499) SAN 4M07034 STATE 15 I-15 AT FOOTHILL BLVD WIDEN-NB-ON-RAMP TO 2 LANES FROM 2018 $1,050 BERNARDINO HIGHWAY RAMP ENTRANCE TO THE METERING POINT AND TRANSITION TO 1 LANE AT THE GORE POINT & INSTALL RAMP METERING. (EA 0H791) SAN 4M07004 STATE 15 I-15 BEAR VALLEY RD AT INTERCHANGE INTERCHANGE MODIFICATION (PM 2020 $31,521 BERNARDINO HIGHWAY 36.5-38.5)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 329

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4M1006 STATE 15 I-15 BOULDER ROAD/ AT INTERCHANGE I-15 AT BOULDER ROAD/ DALE EVANS 2011 $500 BERNARDINO HIGHWAY DALE EVANS PKWY PKWY RECONSTRUCT INTERCHANGE-L-1 DIAMOND-PSR ONLY SAN 4M01037 STATE 15 I-15 CAJON JN/SR-138 INTERCHANGE (PM 16.0-21.7) 2020 $28,308 BERNARDINO HIGHWAY SAN 4T01003 STATE 15 I-15 DEVORE SUMMIT TRUCK CLIMBING LANE (PM 15.9-27.0) 2012 $10,000 BERNARDINO HIGHWAY SAN 4M07010 STATE 15 I-15 HIGH DESERT IN VICTORVILLE/APPLE VALLEY ON I-15 2018 $94,654 BERNARDINO HIGHWAY CORRIDOR AT EAST/WEST HIGH DESERT CORRIDOR – CONSTRUCT INTERCHANGE (PM 15.1-35.9) SAN 4H01005 STATE 15 I-15 I-215 US-395 ADD 1 HOV LANE EACH DIRECTION (PM 2020 $800,000 BERNARDINO HIGHWAY 16.0-33.2) SAN 4M07014 STATE 15 I-15 MOJAVE ST. NEW INTERCHANGE (PM 41.0-43.0) 2020 $63,043 BERNARDINO HIGHWAY SAN 4M01040 STATE 15 I-15 OAK HILL RD REPLACE OVERCROSSING (R28.4-29.8) 2020 $1,827 BERNARDINO HIGHWAY SAN 4H01004 STATE 15 I-15 RIVERSIDE COUNTY I-215 ADD 1 HOV LANE EACH DIRECTION (PM 2020 $479,798 BERNARDINO HIGHWAY LINE 0.0- 16.0) SAN 4PL07015 STATE 15 I-15 SIERRA AVE UC (12.8) 1/93 MILES S/O GLEN HELEN PKWY SIGNALIZE SB AND NB I-15 RAMP 2014 $2,760 BERNARDINO HIGHWAY U/C INTERSECTIONS (EA:0G290) (4M045054) (12.8-13.2) SAN 4M1004 STATE 15 I-15 STODDARED WELLS AT INTERCHANGE I-15 AT STODDARED WELLS NORTH 2011 $500 BERNARDINO HIGHWAY NORTH RECONSTRUCT INTERCHANGE L-8 PSR ONLY SAN 4M1005 STATE 15 I-15 STODDARED WELLS BOULDER RD I-15 BETWEEN STODDARD WELLS NORTH 2011 $500 BERNARDINO HIGHWAY NORTH AND BOULDER RD NEW INTERCHANGE -L-1 DIAMOND PSR ONLY SAN 4H01006 STATE 15 I-15 US-395 SR-18/MOJAVE RIVER ADD 1 HOV LANE EACH DIRECTION (PM 2020 $398,169 BERNARDINO HIGHWAY 31.0-40.6) SAN 4120201 STATE 15 I-15 @ BEAR INTERCHANGE RECONFIGURATION/NEW 2020 $29,958 BERNARDINO HIGHWAY VALLEY RD. INTERCHANGE SAN 4M01041 STATE 15 I-15 @ SIERRA INTERCHANGE RECONFIGURATION/NEW 2030 $21,287 BERNARDINO HIGHWAY INTERCHANGE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 330 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4ITS04-0G841 STATE 15 C. V. KANE SCRRA INTERPRETIVE 2015 $260 BERNARDINO HIGHWAY DISPLAYS (NEAR THE CITY OF BARSTOW, AT THE C.V. KANE SAFETY ROADSIDE REST AREA (SCRRA) INSTALL INTERPRETIVE DISPLAYS SAN 200626 STATE 15 CONSTRUCT NEW INLAND EMPIRE 2011 $44,345 BERNARDINO HIGHWAY TRANSPORTATION MANAGEMENT CENTER – INSTALL TMC-IN THE S/E QUADRANT OF I-15 AND SR 210 I/C ON N/S VICTORIA AVE (I/T CITY OF FONTANA EA37704 SAN SBD41446 STATE 15 EUCALYPTUS AT I-15 CONSTRUCT 2020 $61,100 BERNARDINO HIGHWAY INTERCHANGE 3 LANES IN EA DIR STANDARD I/C CONFIG.(JOINT PROJECT BETWEEN VICTORVILLE AND HESPERIA) SAN SBD55026 STATE 15 EUCALYPTUS STREET FROM I-15 TO 2012 $8,546 BERNARDINO HIGHWAY PEACH AVENUE – RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES AND CONSTRUCT RAILROAD CROSSING SAN 200613 STATE 15 I-15 & MUSCATEL STREET CONSTRUCT 2018 $71,100 BERNARDINO HIGHWAY 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1700 FT AUX LANE UPSTREAM TO SB EXIT RAMP” SAN 200048 STATE 15 I-15 AT BASELINE INTERCHANGE – 2014 $43,100 BERNARDINO HIGHWAY FROM 1,800 N/O BASELINE TO 2,400' S/O; 1800' W/O TO EAST AVE. TO 1500' E/O EAST AVE-WIDEN RAMPS (INCLUDING BRIDGES), WIDEN BASELINE RD. FROM 4-6 LANES, WIDEN EAST AVE. FROM 2-4 LANES, REALIGN AND WIDEN S/B AND N/B DIAMOND RAMPS FROM 1-2 LNS (INCLUDG BRIDGES, AD S.B LOOP ON-RAMP (INCL BRIDGES) ADD I-15 ACCEL/DECEL LANES, AND OPERATIONAL IMPROVEMENTS (EA497100)(CA435)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 331

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 0H1300 STATE 15 I-15/DUNCAN CANYON INTERCHANGE – 2014 $35,834 BERNARDINO HIGHWAY CONVERT EXIST 2 LN OVERCROSSING TO DIAMOND IC, WIDEN TO 4 LANES PLUS DBL LEFT TURNS TO SB RAMP ACCEL/DECEL LANES & SINGLE LEFT TO NORTHBOUND RAMP SAN 20061201 STATE 15 I-15/I-215 I/C IMPROVMTS-DEVORE 2018 $324,246 BERNARDINO HIGHWAY I/C S/O GLEN HELEN PARKWY TO N/O KENWOOD & I-215 FROM S/O DEVORE RD. I/C TO I-15 (16.0-17.8) ADD 1 M/F LN IN EA DIR TO EXISTG 3 M/F LNS FROM 3800' S/O GLEN HELEN PARKWY TO 3100' N/O I-215 I/C ADD 1 DECEL LN FROM 3200'S/O 12/215I/C OFFRMP TO S/B DEVORE ON I-215 SAN SBD031279 STATE 15 IN HESPERIA AT I-15 AND RANCHERO 2014 $80,625 BERNARDINO HIGHWAY ROAD – CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1300 FT. AUX LANE PRIOR TO N/B OFF RAMP AND 3200 FT. AUX LANE FROM TO S/B LOOP ON RAMP SAN 35558 STATE 15 IN SAN BERNARDINO CO. – GATEWAY 2020 $2,446 BERNARDINO HIGHWAY ENHANCEMENTS ON I-15 FROM MOJAVE DR. IN VICTORVILLE TO STODDARD WELLS RD. IN BARSTOW- RETENTION WALL ENHANCMENTS AND LANDSCAPING(PPNO0175N)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 332 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 35556 STATE 15 IN THE CITY OF VICTORVILLE FROM 0.6 2018 $146,676 BERNARDINO HIGHWAY MILES NORTH OF MOJAVE DRIVE TO 1.0 NORTH OF EXISTING STODDARD WELLS ROAD WELLS OVERCROSSING. RECONSTRUCT D/E/STODDARD WELLS RD IC'S. WIDEN BRIDGES (NO NEW LANES). CONSTRUCT NEW COLLECTOR DISTRIBUTOR RD OVER D/E/AND BNSF RR TO PARRALLEL I-15 NB INCLUDES ITS OWN BRIDGE. RECONST/REALIGN EAST/ WEST FRONTAGE RDS. CONST NEW AUX LN. (REFER TO MODELING DETAILS) (CA061) SAN 34170 STATE 15 IN VICTORVILLE AT LA MESA ROAD/ 2012 $90,009 BERNARDINO HIGHWAY NISQUALLI ROAD CONSTRUCT I/C NEW 6 LANE INTERCHANGE SAN 200152 STATE 15 ON I-15 FROM 3,500 FT. S OF ARROW 2020 $91,370 BERNARDINO HIGHWAY RTE. TO 3,500 ' N/O FOOTHILL BLVD AND AND ON ARROW RT. FROM 1000 FT.W/ TO 100 FT. E/ OF I- 15-CONSTRUCT NEW I/C AR ARROW RTE, CONSTRUCT S/B DOUBLE DECEL LANES TO FOOTHILL BLVD OFFRAMP AND MODIFY RAMPS AT FOOTHILL. SAN 200078 STATE 15 PARK-N-RIDE LOT EXPANSION AND 2012 $755 BERNARDINO HIGHWAY FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES) SAN 4A04902 STATE 18 SR-18 0.8 MI WEST OF 2.1 MI WEST OF ORCHARD DR (PM CONSTRUCT PASSING LANES (PM 2018 $14,092 BERNARDINO HIGHWAY ORCHARD DR (PM 81.2) 79.9/81.2) AND TURN LANES (PM 79.9) 73.76/84.33) SAN 4PL07026 STATE 18 SR-18 ALSO SBD-189- 0.5 KM EAST RECONSTRUCT SLOPES, STACK WALL 2012 $7,346 BERNARDINO HIGHWAY 0.0/0.37: NR RIM WIDEN LAND & SHOULDER ON RTE 189 FOREST FROM JCT AND EXTEND RETAINING WALL ON RTE RTE 18/189 18 (EA:1A900) SAN 4A01900 STATE 18 SR-18 LOS ANGELES US 395 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $47,770 BERNARDINO HIGHWAY COUNTY LINE (PM 116-100.9)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 333

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 20020144 STATE 18 HI- DESERT CORR. PHASE 1, SR-18 2020 $1,156,000 BERNARDINO HIGHWAY REALIGNMENT FROM US 395 IN ADELANTO TO SR-18 E/O APPLE VALLEY. COONSTRUCT 4-6 LANE FREEWAY/ EXPRESSWAY. CONSTRUCT NEW IC @I-15 W/AUX LANES NORTH AND SOUTH OF NEW IC. CONSTRUCT INTERSECTION @US 395 W/TURN POCKETS TO NORTH AND SOUTH SAN 0A7910 STATE 18 IN RUNNING SPRINGS FROM RTE. 18 2013 $2,265 BERNARDINO HIGHWAY FROM N/O NOB HILL DR. TO S/O R.S. SCHOOL RD. AND RTE 330 FROM S/O RTE. 18 TO RTE. 18-RURAL GATEWAY BEAUTIFICATION-AESTHETIC IMPROVEMTNS SAN 200612 STATE 18 SR 18 FROM APPLE VALLEY RD. TO 2012 $14,400 BERNARDINO HIGHWAY CORWIN RD. – WIDEN FROM 4-6 LANES (APPROX. 3 MI) SAN 4M07016 STATE 38 MENTONE BLVD WABASH AVE E/GARNET ST WIDEN MENTONE BLVD (SR-38) FROM 2020 $7,763 BERNARDINO HIGHWAY (SR-38) WABASH AVE TO E/GARNET ST FROM 2 TO 4 LANES (PM 3.0-5.5) SAN 34770 STATE 58 0.4 MILES WEST OF KERN CO LINE TO 7.5 2020 $148,067 BERNARDINO HIGHWAY MI EAST OF JCT RTE 395 – CONSTRUCT 4 LANE EXPRESS WAY ON NEW ALIGNMENT, NEW INTERCHANGE AT US 395 AND SR 58 SAN 4351 STATE 58 SR58 EXPRESSWAY-REALIGN AND 2018 $298,326 BERNARDINO HIGHWAY WIDEN FROM 2-4 LANE EXPRESSWAY. NEW INTERCHANGES AT LENWOOD RD AND HINKLEY RD. 2.4 MILES WEST OF HIDDEN RIVER RD. TO 0.7 MILES EAST OF LENWOOD ROAD – REALIGN AND WIDEN TO 4 LANE EXPRESSWAY (2-4 LANES) (PHASE 2)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 334 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4M07008 STATE 60 SR-60 RAMONA AVE IC SB I-15 CONNECTOR (R10.0) WIDEN AUX LANES IN EACH DIRECTION, 2018 $71,000 BERNARDINO HIGHWAY (R1.5) WIDEN CONNECTOR FROM SB-15 TO WB-60 AND EB-60 TO NB/SB-15, WIDEN RAMPS FROM ONE TO TWO LANES (EA:OE330) SAN 4M04050 STATE 60 SR-60 SR-60 AT CENTRAL INTERCHANGE ADD AUX LANES AND WIDEN RAMPS, 2014 $32,000 BERNARDINO HIGHWAY AVE (3.8) CONST ENTRANCE LOOP RAMP (EA:0C870) PM R2.1-3.0) SAN 4PL07019 STATE 60 SR-60 @ RECONSTRUCT INTERCHANGE SR-60 @ 2020 $31,156 BERNARDINO HIGHWAY MOUNTAIN MOUNTAIN SAN 4120202 STATE 60 SR-60 @ RAMONA RECONSTRUCT INTERCHANGE SR-60 @ 2020 $35,949 BERNARDINO HIGHWAY RAMONA SAN 200602 STATE 60 SR 60 AND VINEYARD AVE. 2018 $50,810 BERNARDINO HIGHWAY INTERCHANGE RECONSTRUCTION- LENGTHEN BRIDGE TO ACOMMODATE VINEYARD AVE WIDENING AND RAMP WIDENING 4-6 LANES SAN 4M07017- STATE 60 SR 60 AT EUCLID WIDEN W/B EXIT RAMP 2012 $1,620 BERNARDINO 201133 HIGHWAY FROM 2-3 LANES SAN 4M07017- STATE 60 SR-60 AT ARCHIBALD AVENUE WIDEN ON 2018 $7,900 BERNARDINO 201132 HIGHWAY AND OFF RAMPS (2-3 LANES EACH WAY) SAN 200604 STATE 60 SR60 AT GROVE AVENUE INTERCHANGE 2018 $50,810 BERNARDINO HIGHWAY RECONSTRUCTION AND GROVE AVE. +/-300 FT. N/S OF SR 60-WIDEN FROM 4-6 LANES SAN 4A01383 STATE 62 SR-62 (TWENTY- FAIRWAY DR SR-247 WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $38,114 BERNARDINO HIGHWAY NINE PALMS HWY) (PM 8.75-12.5) SAN 200435 STATE 62 ON SH62 IN YUCCA VALLEY FROM 2011 $2,740 BERNARDINO HIGHWAY APACHE TRAIL EAST TO APPROX 0.5 MILES TO PALM AVE. INSTALL NEW RAISED MEDIAN, CONSTRUCT CURB & GUTTER & NEW STREET LIGHTS, AND NEW SIGNAL AT CHURCH ST.(CA543)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 335

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 20060203 STATE 62 SR 62 SAFETY & UTILITY IMPROVMNTS- 2013 $320 BERNARDINO HIGHWAY TCRP 129 ON SR 62 FROM LA HONDA WY EAST APPROX. 0.2 MILES TO DOMOSA – INSTALL RAISED LANDSCAPED MEDIANS, SIDEWALKS, UTIL U/GROUND/ DRAINAGE SAN 4OM0701- STATE 62 SR62 -TRAFFIC CONTROL 2011 $226 BERNARDINO 20084103 HIGHWAY SYCNRONIZATION OF 4 TRAFFIC SIGNALS FROM CAMINO DEL CIELO/SR62 TRAFFIC SIGNAL THROUGH ACOMA TRAIL SR 62 TRAFFIC SIGNAL PROGRAM SAN 20010133- STATE 66 WIDEN FOOTHILL BOULEVARD (OLD 2012 $6,006 BERNARDINO 2011185 HIGHWAY STATE ROUTE 66) BETWEEN GROVE AVENUE AND SAN BERNARDINO RDWIDEN FROM 4-6 LANES INCLUDES RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BOULEVARD AS A MONUMENT TO THE HISTORIC ROUTE 66. SAN 20010133- STATE 66 WIDEN FOOTHILL BOULEVARD (OLD 2010 $10,632 BERNARDINO 20010133 HIGHWAY STATE ROUTE 66) BETWEEN SAN BERNARDINO RD AVENUE AND VINEYARD AVE. REMOVES THE EAST UPLAN UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RR BRIDGE, CONSTRUCTS A NEW PUBLIC TRAIL BRIDGE ALONG THE RR ALIGNMENT AND ADDES, RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BOULEVARD AS A MONUMENT TO THE HISTORIC ROUTE 66. SAN 0F100 STATE 71 ON RTE. 71 FROM SOQUEL CYN PARKWY 2015 $1,974 BERNARDINO HIGHWAY TO RIVERSIDE CO. LINE AND RIV. CO FROM S.B. CO LINE TO SANTA ANA RIVER BRIDGE -PHASE 1- TREE PLANTING AND AESTHETICS-

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 336 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01384 STATE 83 SR-83 (EUCLID) MERRIL AV KIMBALL AV WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $1,530 BERNARDINO HIGHWAY (3.9-2.8) SAN 4M07035 STATE 138 SR-138 SR-18 PHELAN RD PHASE II: WIDEN 2 TO 4 LANES FROM 2023 $75,615 BERNARDINO HIGHWAY SR-18 TO PHELAN RD (PHASE I PHELAN RD TO I-15 IN RTIP#34011) SAN 4ITS04-0P240 STATE 138 CONSTRUCT A NEW VISTA POINT AT 2015 $570 BERNARDINO HIGHWAY ROUTE 138 WITH PAVED AREA FOR 10 PARKING SPACES INCLUDING 2 SPACES FOR ADA DRIVERS WITH DECORATIVE FENCE AND INTERPRETIVE SIGNS. SAN 34011 STATE 138 NEAR WRIGHTWOOD FROM PHELAN 2018 $87,181 BERNARDINO HIGHWAY RD TO I-15 WIDEN FROM 2 TO 4 LANES (EA3401U) SAN 4A01385 STATE 142 SR-142 (CHINO CARBON CANYON RD PIPELINE DR WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $7,158 BERNARDINO HIGHWAY HILLS PKWY) (PM 2.0-5.5) SAN 4M07007 STATE 210 I-210 @ BASELINE INTERCHANGE RECONFIGURATION/NEW 2020 $10,785 BERNARDINO HIGHWAY INTERCHANGE SAN 4M01047 STATE 210 I-210 @ DEL ROSA INTERCHANGE RECONFIGURATION/NEW 2020 $43,139 BERNARDINO HIGHWAY INTERCHANGE SAN 4M01049 STATE 210 I-210 @ INTERCHANGE RECONFIGURATION/NEW 2020 $61,113 BERNARDINO HIGHWAY WATERMAN INTERCHANGE SAN 4M01005 STATE 210 SR-210 I-215 I-10 ADD 1 MF LANE AND 1 HOV LANE 2020 $138,033 BERNARDINO HIGHWAY EACH DIRECTION AND WIDEN UC'S (PM 22.0-33.2) SAN 4M0801 STATE 210 SR-210 VICTORIA AVE VICTORIA AVE. CONSTRUCT NEW DIAMOND IC AT 2030 $57,183 BERNARDINO HIGHWAY VICTORIA AVE WITH 2 LANES EACH RAMP AND MODIFICATIONS TO ARDEN AVE IC SAN 4M1007 STATE 210 CONSTRUCT NEW FULL-SERVICE 2018 $18,965 BERNARDINO HIGHWAY INTERCHANGE WITH DIAMOND CONFIGURATION AT SR-210 AND PEPPER AVENUE IN THE CITY OF RIALTO. ADD WB AND EB ACCEL AND DECEL LANES AND LOCAL STREET IMPROVEMENTS (CONSTRUCT 4 LANES ON PEPPER AVE FROM HIGHLAND AVE TO 160 FT SOUTH OF SR-210). *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 337

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 20432 STATE 210 ON RTE 210 FROM ETIWANDA AVE.- 2.0 2012 $1,802 BERNARDINO HIGHWAY MI. NORTH TO 0.5 MI SOUTH OF RTE 210 – MITIGATION PLANTING 2,200 1-GAL. EUCALYPTUS TREES SAN 4OM0701- STATE 210 ON SR 210 LANDSCAPING SEGMENTS 2014 $9,574 BERNARDINO 20084106 HIGHWAY 8-11 – PROVIDE PLANTING, IRRIGATION AND INERT GROUNDCOVER ALONG SR210 FROM WEST OF SIERRA AVE IN THE CITY OF FONTANA TO SR210/I-215 I.C IN SAN BERNARDINO (TOLL CREDITS TO BE USED IN CON PHASE. STPLS ADDED FOR $210,000 IN FY2010/11). SAN 20620 STATE 210 UPLAND TO SAN BERNARDINO FROM LA 2012 $482,339 BERNARDINO HIGHWAY CO LINE TO RTE 215 – 8 LN FREEWAY INCLUDING 2 HOV LNS (6+2)-210 CORR. W/AUX LNS THRUOUT SEGS. 9-11(SEG.11 INCL CONNECTOR BETWEEN 210 & 215 (MORE) SAN 4M0803 STATE 215 I-215 60/91/215 JUNCTION ORANGE SHOW RD I-215 BI-COUNTY IMPROVMT PROJECT – 2018 $52,280 BERNARDINO HIGHWAY ADD 1 MF LN EACH DIR ; RECONSTRUCT OVERCROSSINGS & UNDERPASSES; CONSTRUCT/MODIFY FWY ACCESS RAMPS; MODIFY FWY CONNECTORS; ADD DECEL AND ACCEL LNS; WIDEN/ REALIGN LOCAL RDS; ADD/MODIFY SIGNALS (PE FUNDING ONLY) SAN 4M07005 STATE 215 I-215 BARTON ROAD IC TO (1.95) RECONSTRUCT INTERCHANGE 2016 $74,342 BERNARDINO HIGHWAY (0.58) SAN 4M01043 STATE 215 I-215 MT VERNON/ INTERCHANGE RECONSTRUCT WASHINGTON 2016 $117,000 BERNARDINO HIGHWAY WASHINGTON STREET IC IN SB COUNTY – REPLACE OVERCROSSING STRUCTURE; RECONFIGURE ON/OFF RAMPS; ADD SB ACCELERATION LANE AND NB DECELERATION LANE; IMPROVEMENTS TO LOCAL STREETS. (PE FUNDING ONLY) SAN 4H01008 STATE 215 I-215 SR-210 I-15 ADD 1 HOV LANE EACH DIRECTION (PM 2030 $179,335 BERNARDINO HIGHWAY 9.5-18.0)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 338 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4M01003 STATE 215 I-215 SR-30 I-15 ADD 1 MF LANE EACH DIRECTION 2030 $104,146 BERNARDINO HIGHWAY (10.0-18.0) SAN 4M01044 STATE 215 I-215 @ PALM INTERCHANGE RECONFIGURATION/NEW 2035 $21,055 BERNARDINO HIGHWAY INTERCHANGE SAN 4M01045 STATE 215 I-215 @ PEPPER/ INTERCHANGE RECONFIGURATION/NEW 2035 $109,104 BERNARDINO HIGHWAY LINDEN INTERCHANGE SAN SBD59204 STATE 215 I-215 AT UNIVERSITY PARKWAY 2018 $22,513 BERNARDINO HIGHWAY INTERCHANGE – CONSTRUCT SOUTHBOUND UNIVERSITY PARKWAY -INTERCHANGE RECONFIGURATION AND AUX. LANE ON EACH SIDE, NEW RAMP SAN 200614 STATE 215 I-215 BI-COUNTY HOV LANE GAP 2014 $184,694 BERNARDINO HIGHWAY CLOSURE PROJECT- ADD 1 HOV LANE IN EACH DIRECTION FROM SPRUCE ST. ON RIV 91 TO ORANGE SHOW RD;(ALSO INCLUDES RTP 4M0803 (STIP 2010 $24881 RCTC AND $45089 SANBAG) SAN 713 STATE 215 I-215 CORRIDOR NORTH – IN SAN 2012 $718,586 BERNARDINO HIGHWAY BERNARDINO, ON I-215 FROM RTE 10 TO RTE 210 – ADD 2 HOV & 2 MIXED FLOW LNS (1 IN EA. DIR.) AND OPERATIONAL IMP INCLUDING AUX LANES AND BRAIDED RAMP SAN SBD31850 STATE 215 IN GRAND TERRACE AT I-215 BARTON 2018 $141,407 BERNARDINO HIGHWAY ROAD INTERCHANGE RECONSTRUCT OC AND RAMPS WITH PARTIAL CLOVERLEAF CONFIGURATION NW OF I-215 WORK INCL ADD OF NB AUX LN.LOCAL STREET WORK TO INCL WIDENING OF BARTON RD, REMOVAL OF LA CROSSE AVE. BETWEEN VIVENDA AVE & BARTON RD, REPLACEMENT W/ NEW LOCAL ROAD, IMPROVEMENTS TO THE BARTON RD AND MICHIGAN WAY/VIVENDA AVE INTERSECTION AND REALIGNMENT OF COMMERCE WAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 339

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01386 STATE 247 SR-247 (OLD NORTH OF SR-62 GRIFFITH RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $7,158 BERNARDINO HIGHWAY WOMAN SPRINGS (EA:34430) (PM RD) SAN 4A07004 STATE 395 US 395 AQUEDUCT HOLLY ST. WIDEN US 395 FROM AQUEDUCT TO 2020 $26,806 BERNARDINO HIGHWAY HOLLY ST. FROM 2 TO 6 LANES OR 4 TO 6 LANES, VARIOUS SEGMENTS. 22.25 LANE MILES SAN 4120229 STATE 395 US 395 AQUEDUCT MOJAVE DR WIDEN US 395 FROM AQUEDUCT TO 2020 $598 BERNARDINO HIGHWAY MOJAVE DR FROM 2 TO 6 LANES SAN 4A07141 STATE 395 US 395 AQUEDUCT WIDEN US 395 AT AQUEDUCT FROM 4 TO 2020 $2,798 BERNARDINO HIGHWAY 6 LANES SAN 4PL07027 STATE 395 US-395 15.02 KM N/O 1.0 KM S/O KRAMER JCT (45.3) CORRECT CURVE (EA: 0C130) (PM 2013 $18,729 BERNARDINO HIGHWAY SHADOW MTN RD 36.2-45.3) (36.2) SAN 4A07392 STATE 395 US-395 CALLEJA RD DESERT FLOWER RD WIDEN US-395 FROM CALLEJA TO 2018 $2,599 BERNARDINO HIGHWAY DESERT FLOWER RD FROM 2 TO 4 LANES SAN 4M0802 STATE 395 US-395 I-15 1.8 MI S/O DESERT FLOWER RD WIDEN FROM 2 TO 4 LANES EACH 2014 $136,870 BERNARDINO HIGHWAY DIR AND INSTALL LEFT TURN CHANNELIZATION SAN 4M04009 STATE 395 US-395 NB FROM 0.84MI S/O SB FROM 2.72MI N/O PURPLE ADD PASSING LANES IN BOTH 2020 $44,536 BERNARDINO HIGHWAY DESERT FLOWER SAGE ST TO 0.95MI S/O DESERT DIRECTIONS AND ADJUST VERTICAL AND RD TO 2.84MI N/O FLOWER RD, AND FROM 5.95MI N/O HORIZONTAL ALIGNMENTS (EA: 0E840) PURPLE SAGE ST, SHADOW MOUNTAI AND FROM 4MI N/O SHADOW MOUNTAIN A SAN 34040 STATE 395 ON US395 FROM HIGH DESERT 2018 $14,000 BERNARDINO HIGHWAY CORRIDOR TO FARMINGTON RD.NEW 4 LANE EXPRESSWAY- WIDEN FROM 2-4 LANES ON EXISTING ALIGNMENT LEFT TURN CHANNELIZATIONS AT INTERSECTIONS SAN SBD59303 STATE 999 ___SET ASIDES/RESERVATIONS 2012 $7,440 BERNARDINO HIGHWAY FOR FUTURE SB45 -PLANNING, PROGRAMMING, & MONITORING

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 340 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07176 LOCAL 0 "G" ST MILL ST RIALTO AVE WIDEN "G" ST FROM MILL ST TO RIALTO 2020 $2,299 BERNARDINO HIGHWAY AVE FROM 2 TO 4 LANES SAN 4A04415 LOCAL 0 14TH ST YUCAIPA BL OAK GLEN RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,405 BERNARDINO HIGHWAY SAN 4A07302 LOCAL 0 4TH ST PALMETTO SAN ANTONIO WIDEN 4TH ST FROM PALMETTO TO SAN 2030 $659 BERNARDINO HIGHWAY ANTONIO FROM 2 TO 4 LANES SAN 4A01185 LOCAL 0 4TH ST VINEYARD AV CUCAMONGA CREEK WIDEN 4TH ST FROM VINEYARD AVE TO 2030 $1,300 BERNARDINO HIGHWAY CUCAMONGA CREEK FROM 4 TO 6 LANES SAN 4A07311 LOCAL 0 4TH ST FROM CAMPUS AV GROVE AVE WIDEN 4TH ST FROM CAMPUS AVE TO 2030 $1,163 BERNARDINO HIGHWAY CAMPUS AVE TO GROVE AVE FROM 2 TO 4 LANES GROVE AVE FROM 2 TO 4 LA SAN 4A01262B LOCAL 0 5TH AV CRAFTON AV WABASH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,426 BERNARDINO HIGHWAY SAN 4A07292 LOCAL 0 5TH ST WARM CREEK PEDLEY WIDEN 5TH ST FROM WARM CREEK TO 2020 $690 BERNARDINO HIGHWAY PEDLEY FROM 2 TO 4 LANES SAN 4A01366 LOCAL 0 5TH ST YUCAIPA BLVD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,215 BERNARDINO HIGHWAY SAN 4120141 LOCAL 0 5TH STREET CITY CREEK BRIDGE SR-210 WIDEN 5TH ST FROM CITY CREEK TO 2018 $5,070 BERNARDINO HIGHWAY SR 210; RE-STRIPE 5TH ST FROM 4 TO 6 LANES BTWN CHURCH AVE AND SR 210; RE-STRIPE 5TH ST FROM 4 TO 5 LANES WITH ADDITIONAL TURN LANE AT FREEWAY UNDERCROSSING; CONSTRUCT TRUCK ACCELLERATION LANE ON SOUTHBOUND SR 210 ON-RAMP AND FREEWAY MAINLINE INCLUDING WIDENING EXISTING FREEWAY BRIDGE SAN 4120153 LOCAL 0 6TH ST CUCAMONGA CREEK WIDEN 6TH ST AT CUCAMONGA CREEK 2030 $359 BERNARDINO HIGHWAY CHANNEL (50% RC, 50% ONTARIO) SAN 4A01147 LOCAL 0 7TH AVE RANCHERO RD BEAR VALLEY RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $10,265 BERNARDINO HIGHWAY SAN 4120143 LOCAL 0 9TH ST DEL ROSA DR PALM AVE STRIPING MODIFICATION ADDING 2014 $540 BERNARDINO HIGHWAY CONTINUOUS CENTER 2-WAY LEFT TURN LANE AND BIKE LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 341

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07062 LOCAL 0 9TH ST DEL ROSA DR VICTORIA AV WIDEN 9TH ST FROM DEL ROSA DR TO 2018 $2,860 BERNARDINO HIGHWAY VICTORIA AV FROM 2 TO 4 LANES SAN 4120154 LOCAL 0 9TH ST CUCAMONGA CREEK WIDEN 9TH ST AT CUCAMONGA CREEK 2030 $359 BERNARDINO HIGHWAY CHANNEL SAN 4A04406 LOCAL 0 ADELANTO RD AUBURN AVE COLUSA RD NEW ROAD, 2 LANES EACH DIR 2018 $9,000 BERNARDINO HIGHWAY SAN 4120004 LOCAL 0 ADELANTO ROAD AIR EXPRESSWAY EL MIRAGE RD WIDEN ADELANTO ROAD FROM AIR 2030 $2,399 BERNARDINO HIGHWAY EXPRESSWAY TO EL MIRAGE SAN 4120002 LOCAL 0 ADELANTO ROAD COLUSA OLEANDER WIDEN ADELANTO ROAD FROM COLUSA 2030 $4,592 BERNARDINO HIGHWAY TO OLEANDER SAN 4120003 LOCAL 0 ADELANTO ROAD EL MIRAGE RD COLUSA RD WIDEN ADELANTO ROAD FROM EL 2030 $4,203 BERNARDINO HIGHWAY MIRAGE TO COLUSA SAN 4120001 LOCAL 0 ADELANTO ROAD HOLLY RD AIR EXPRESSWAY WIDEN ADELANTO ROAD FROM HOLLY TO 2030 $861 BERNARDINO HIGHWAY AIR EXPRESSWAY SAN 4120110 LOCAL 0 AGUA MANSA RD RANCHO AV RIVERSIDE AVE WIDEN AGUA MANSA RD FROM RANCHO 2020 $3,322 BERNARDINO HIGHWAY AVE TO RIVERSIDE AVE FROM 2 TO 4 LANES SAN 4120008 LOCAL 0 AIR EXPRESSWAY ADELANTO RD US-395 WIDEN AIR EXPRESSWAY FROM 2030 $2,294 BERNARDINO HIGHWAY ADELANTO RD TO US-395 SAN 4120006 LOCAL 0 AIR EXPRESSWAY ASTER RICHARDSON WIDEN AIR EXPRESSWAY FROM ASTER 2030 $5,064 BERNARDINO HIGHWAY TO RICHARDSON SAN 4120005 LOCAL 0 AIR EXPRESSWAY RICHARDSON RD LESSING WIDEN AIR EXPRESSWAY FROM 2030 $5,596 BERNARDINO HIGHWAY RICHARDSON TO LESSING SAN 4120007 LOCAL 0 AIR EXPRESSWAY US-395 ASTER WIDEN AIR EXPRESSWAY FROM US-395 2030 $3,282 BERNARDINO HIGHWAY TO ASTER SAN 4A01188 LOCAL 0 AIRPORT DR ROCHESTER AV KETTERING DR WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,843 BERNARDINO HIGHWAY SAN 4120145 LOCAL 0 AIRPORT DR FROM KETTERING DR ETIWANDA AVE WIDEN AIRPORT DR FROM KETTERING 2030 $476 BERNARDINO HIGHWAY KETTERING DR DR TO ETIWANDA AVE FROM 2 TO 4 TO ETIWANDA LANES AVE FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 342 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01237 LOCAL 0 ALABAMA 3RD ST SAN BERNARDINO AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $7,150 BERNARDINO HIGHWAY (NOTE: RTIP#SBD31719 WIDENS BRIDGE AT SANTA ANA RIVER) SAN 4A07017 LOCAL 0 ALABAMA LUGONIA AV BARTON RD WIDEN ALABAMA FROM LUGONIA AVE TO 2018 $12,750 BERNARDINO HIGHWAY BARTON RD FROM 4 TO 6 LANES SAN 4A07042 LOCAL 0 ALABAMA N CITY LIMITS PALMETTO WIDEN ALABAMA FROM N CITY LIMITS 2020 $7,700 BERNARDINO HIGHWAY TO PALMETTO FROM 2 TO 4 LANES SAN 4A07175 LOCAL 0 ALABAMA ST 3RD ST CITY LIMITS WIDEN ALABAMA ST FROM 3RD ST TO 2030 $2,299 BERNARDINO HIGHWAY CITY LIMITS FROM 2 TO 4 LANES SAN 4A07073 LOCAL 0 ALABAMA ST LUGONIA PALMETTO WIDEN ALABAMA ST FROM LUGONIA AVE 2020 $4,658 BERNARDINO HIGHWAY TO PALMETTO AVE FROM 4 TO 6 LANES SAN 4A07349 LOCAL 0 ALDER AV TAYLOR ST VALLEY BLVD WIDEN ALDER AVE FROM TAYLOR ST TO 2020 $304 BERNARDINO HIGHWAY VALLEY BLVD FROM 2 LANES TO 4 SAN 4A07251 LOCAL 0 ALDER AV VALLEY SAN BERNARDINO WIDEN ALDER AVE FROM VALLEY BLVD 2020 $844 BERNARDINO HIGHWAY TO SAN BERNARDINO AV FROM 2 LANES TO 4 SAN 4120181 LOCAL 0 ALDER AVE BASELINE RD SR-30 WIDEN ALDER AVE FROM BASELINE RD 2020 $4,197 BERNARDINO HIGHWAY TO SR-30 FROM 2 TO 6 LANES SAN 4A07126 LOCAL 0 ALDER AVE JURUPA N/ SLOVER WIDEN ALDER AVE FROM JURUPA TO N/O 2020 $3,038 BERNARDINO HIGHWAY SLOVER AVE FROM 2 TO 4 LANES SAN 4A07322 LOCAL 0 ALDER AVE JURUPA AVE N .12M WIDEN ALDER AVE FROM JURUPA AVE TO 2020 $405 BERNARDINO HIGHWAY .12M NORTH FROM 2 TO 4 LANES SAN 4A07262 LOCAL 0 ALDER AVE SLOVER N 0023M WIDEN ALDER AVE FROM SLOVER AVE TO 2020 $776 BERNARDINO HIGHWAY .23M NORTH FROM 2 TO 4 LANES SAN 4A07319 LOCAL 0 AMARGOSA RD 1780' N/O VILLAGE AT POWER LINE EASEMENT WIDEN AMARGOSA RD FROM 1780' 2020 $414 BERNARDINO HIGHWAY DRIVE N/O VILLAGE DR TO CENTER OF LADWP POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07318 LOCAL 0 AMARGOSA RD 2050' S/O AIR BASE AT POWER LINE EASEMENT WIDEN AMARGOSA RD FROM 2050' S/O 2020 $414 BERNARDINO HIGHWAY RD AIR BASE DR TO POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07276 LOCAL 0 AMARGOSA RD CLOVIS RD RANCHO RD WIDEN AMARGOSA RD FROM CLOVIS RD 2020 $683 BERNARDINO HIGHWAY TO RANCHO ROAD FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 343

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07281 LOCAL 0 AMARGOSA RD JUST S/O AIR BASE AT POWER LINE EASEMENT WIDEN AMARGOSA RD FROM JUST S/O 2020 $648 BERNARDINO HIGHWAY RD AIR BASE RD TO POWER LINE EASEMENT FROM 1 TO 4 LANES SAN 4A07149 LOCAL 0 AMARGOSA RD RANCHO RD VILLAGE DR WIDEN AMARGOSA RD FROM RANCHO 2012 $2,665 BERNARDINO HIGHWAY RD TO VILLAGE DR FROM 0 TO 4 LANES (INCLUDES WASH CROSSING) SAN 4120010 LOCAL 0 AMETHST DESERT FLOWER OLEANDER WIDEN AMETHST FROM DESERT FLOWER 2035 $2,298 BERNARDINO HIGHWAY TO OLEANDER SAN 4120009 LOCAL 0 AMETHST HOLLY RD RANCHO WIDEN AMETHST FROM HOLLY TO 2035 $2,298 BERNARDINO HIGHWAY RANCHO SAN 4A07210 LOCAL 0 AMETHYST PALMDALE RD SENECA RD WIDEN AMETHYST RD FROM PALMDALE 2020 $1,451 BERNARDINO HIGHWAY RD TO SENECA RD FROM 2 TO 4 LANES SAN 4A07296 LOCAL 0 AMETHYST RD JUST N/O HOPLAND POWER LINE EASEMENT WIDEN AMETHYST RD FROM JUST N/O 2020 $562 BERNARDINO HIGHWAY HOPLAND TO POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07223 LOCAL 0 AMETHYST RD RANCHO RD HOPLAND WIDEN AMETHYST RD FROM RANCHO RD 2012 $1,265 BERNARDINO HIGHWAY TO HOPLAND FROM 0 TO 4 LANES SAN 4A01008 LOCAL 0 APPLE VALLEY RD SR-18 YUCCA LOMA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $26,500 BERNARDINO HIGHWAY SAN 4120095 LOCAL 0 APPLE VALLEY RD OHNA FALCHION WIDEN APPLE VALLEY RD FROM OHNA 2020 $5,856 BERNARDINO HIGHWAY TO FALCHION FROM 0 TO 2 LANES SAN 4G0116 LOCAL 0 ARCHIBALD AV IN ONTARIO (LOS ANGELES) ROADWAY WIDENING (LOW OPTION), 2020 $42,299 BERNARDINO HIGHWAY GRADE SEPARATION (HIGH OPTION) – WIDEN 2-6 LANES SAN 4A04189 LOCAL 0 ARCHIBALD AVE EDISON AVE SOUTH CITY LIMITS WIDEN ARCHIBALD AVE FROM EDISON 2030 $7,187 BERNARDINO HIGHWAY FROM EDISON AVE AVE TO SOUTH CITY LIMITS FROM 2 TO TO SOUTH CITY 6 LANES LIMITS FROM 2 TO 6 LANES SAN 4A04190 LOCAL 0 ARCHIBALD AVE RIVERSIDE AVE EDISON AVE WIDEN ARCHIBALD AVE FROM RIVERSIDE 2030 $6,686 BERNARDINO HIGHWAY FROM RIVERSIDE AVE TO EDISON AVE FROM 2 TO 6 LANES AVE TO EDISON AVE FROM 2 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 344 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07066 LOCAL 0 ARROW BLVD ALDER AVE MAPLE AVE WIDEN FROM 2 TO 4 LANES 2018 $5,000 BERNARDINO HIGHWAY SAN 4120125 LOCAL 0 ARROW HIGHWAY ALMERIA CITRUS WIDEN ARROW HIGHWAY FROM ALMERIA 2020 $1,265 BERNARDINO HIGHWAY AVE TO CITRUS AVE FROM 2 TO 4 LANES SAN 4A07179 LOCAL 0 ARROW ROUTE CLAIRMONT CENTRAL AVE WIDEN ARROW ROUTE FROM CLAIRMONT 2020 $1,890 BERNARDINO HIGHWAY AVE TO CENTRAL AVE FROM 2 TO 4 LANES SAN 4A07076 LOCAL 0 ARROW ROUTE COUNTY LINE CENTRAL AVE WIDEN ARROW ROUTE FROM COUNTY 2030 $4,000 BERNARDINO HIGHWAY LINE TO CENTRAL AVE FROM 2 TO 4 LANES SAN 4A07024 LOCAL 0 ARROW ROUTE HICKORY AVE TOKAY AVE WIDEN ARROW ROUTE FROM HICKORY AV 2020 $5,969 BERNARDINO HIGHWAY TO TOKAY AV FROM 2 TO 4 LANES SAN 4120157 LOCAL 0 ARROW ROUTE ETIWANDA DITCH WIDEN ARROW ROUTE AT ETIWANDA 2014 $718 BERNARDINO HIGHWAY DITCH SAN 4120163 LOCAL 0 ARROW ROUTE GROVE ST TO BA BAKER ST WIDEN ARROW ROUTE FROM GROVE ST 2030 $1,260 BERNARDINO HIGHWAY TO BAKER ST FROM 2 TO 4 LANES SAN 4120161 LOCAL 0 ARROW ROUTE SOUTH SIDE 500 FT 1300 FT EAST WIDEN ARROW ROUTE FROM SOUTH SIDE 2018 $987 BERNARDINO HIGHWAY EAST OF I-15 500 FT EAST OF I-15 TO 1300 FT EAST FROM 2 TO 4 LANES SAN 4AL04 LOCAL 0 ARTERIAL COUNTYWIDE VARIOUS COUNTYWIDE ARTERIAL IMPROVEMENTS 2035 $1,340,714 BERNARDINO HIGHWAY IMPROVEMENTS SAN 4120011 LOCAL 0 ASTER AIR EXPRESSWAY EL MIRAGE RD WIDEN ASTER FROM AIR EXPRESSWAY 2030 $3,602 BERNARDINO HIGHWAY TO EL MIRAGE SAN 4120014 LOCAL 0 ASTER COLUSA OLEANDER WIDEN ASTER FROM COLUSA TO 2030 $4,593 BERNARDINO HIGHWAY OLEANDER SAN 4120013 LOCAL 0 ASTER EL MIRAGE RD COLUSA RD WIDEN ASTER FROM EL MIRAGE TO 2030 $4,861 BERNARDINO HIGHWAY COLUSA SAN 4120012 LOCAL 0 ASTER PALMDALE RD AIR EXPRESSWAY WIDEN ASTER FROM PALMDALE TO AIR 2030 $5,359 BERNARDINO HIGHWAY EXPRESSWAY SAN 4A07348 LOCAL 0 ASTER RD OLVINE RD DEL ROSA RD WIDEN ASTER RD FROM OLVINE RD TO 2020 $318 BERNARDINO HIGHWAY DEL ROSA RD FROM 0 TO 4 LANES SAN 4A07221 LOCAL 0 ASTER RD PALMDALE RD OLVINE RD WIDEN ASTER RD FROM PALMDALE RD 2020 $1,274 BERNARDINO HIGHWAY TO OLVINE RD FROM 0 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 345

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04405 LOCAL 0 ASTER RD RANCHO RD AIR EXPRESSWAY NEW ROAD, 1 LANE EACH DIR 2012 $1,850 BERNARDINO HIGHWAY SAN 4A07170 LOCAL 0 ASTER ROAD MOJAVE DR CACTUS ROAD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,025 BERNARDINO HIGHWAY SAN 4A04400 LOCAL 0 AUBURN/ CHAMBERLAIN WAY JONATHAN ST WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $1,700 BERNARDINO HIGHWAY ADELANTO (CRIPPEN RD) SAN 4A07248 LOCAL 0 AVE E 14TH ST BRYANT ST WIDEN AVE E FROM 14TH ST TO BRYANT 2020 $894 BERNARDINO HIGHWAY ST FROM 2 LANES TO 4 LANES SAN 4A04416 LOCAL 0 AVENUE E 8TH ST BRYANT ST WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $17,800 BERNARDINO HIGHWAY SAN 4A07285 LOCAL 0 BALDY MESA RD LA MESA RD OLIVINE RD WIDEN BALDY MESA RD FROM LA MESA 2020 $632 BERNARDINO HIGHWAY RD TO OLIVINE RD FROM 0 TO 4 LANES SAN 4A01310 LOCAL 0 BALDY MESA RD PALMDALE RD LA MESA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $950 BERNARDINO HIGHWAY SAN 4A07145 LOCAL 0 BANANA AVE JURUPA N/SLOVER WIDEN BANANA AVE FROM JURUPA AVE 2020 $2,734 BERNARDINO HIGHWAY TO N/SLOVER AVE FROM 2 TO 4 LANES SAN 4120159 LOCAL 0 BANYAN ST ETIWANDA EAST AVE WIDEN BANYAN ST FROM ETIWANDA TO 2014 $817 BERNARDINO HIGHWAY EAST AVE, NORTH SIDE ONLY 1-2 LANES SAN 4120018 LOCAL 0 BARTLETT ADELANTO RD US-395 WIDEN BARTLETT FROM ADELANTO TO 2020 $1,652 BERNARDINO HIGHWAY US-395 SAN 4120016 LOCAL 0 BARTLETT ASTER RICHARDSON WIDEN BARTLETT FROM ASTER TO 2020 $5,300 BERNARDINO HIGHWAY RICHARDSON SAN 4120017 LOCAL 0 BARTLETT RICHARDSON RD CAUGLIN WIDEN BARTLETT FROM RICHARDSON 2020 $3,524 BERNARDINO HIGHWAY TO CAUGLIN SAN 4120015 LOCAL 0 BARTLETT US-395 ASTER WIDEN BARTLETT FROM US-395 TO 2020 $2,552 BERNARDINO HIGHWAY ASTER SAN 4A01139 LOCAL 0 BARTON RD HONEY HILLS N.E. CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,534 BERNARDINO HIGHWAY SAN 4A01141 LOCAL 0 BARTON RD I-215 WEST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,798 BERNARDINO HIGHWAY SAN 4A07245 LOCAL 0 BARTON RD LOMA LINDA CITY CALIFORNIA ST WIDEN BARTON RD FROM LOMA LINDA 2020 $945 BERNARDINO HIGHWAY LIMITS CITY LIMITS TO CALIFORNIA ST FROM 4 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 346 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01066 LOCAL 0 BARTON RD S. CITY LIMITS WATERMAN AV WIDEN FROM 2 TO 3 LANES EACH DIR 2012 $1,043 BERNARDINO HIGHWAY (NOTE: OVERLAPS RTIP#200064 AND SBD78022, RECHE CYN TO WATERMAN) SAN 4120139 LOCAL 0 BARTON RD WEST SIDE OF I-215 EAST SIDE OF I-215 OVERCROSSING WIDEN BARTON RD AT I-215 2030 $5,747 BERNARDINO HIGHWAY OVERCROSSING OVERCROSSING FROM 2 TO 4 LANES SAN 4A07121 LOCAL 0 BASELINE WEST CITY LIMITS AYALA/CEDAR WIDEN AND RECONSTRUCT BASELINE 2035 $3,186 BERNARDINO HIGHWAY FROM WEST CITY LIMITS TO AYALA DR FROM 2 TO 4 LANES SAN 4A07083 LOCAL 0 BASELINE AV MANGO MAPLE BASELINE AVE FROM MANGO AVE TO 2012 $4,200 BERNARDINO HIGHWAY MAPLE AVE WIDEN FROM 2 TO 6 LANES SAN 4A07212 LOCAL 0 BASELINE AVE CITRUS SIERRA WIDEN BASELINE AVE FROM CITRUS AVE 2020 $7,445 BERNARDINO HIGHWAY TO SIERRA AVE FROM 2 TO 6 LANES SAN 4120182 LOCAL 0 BASELINE RD WEST TO EAST CITY EAST CITY LIMITS WIDEN AND RECONSTRUCT BASELINE RD 2020 $10,304 BERNARDINO HIGHWAY LIMITS FROM WEST TO EAST CITY LIMITS FROM 4 TO 6 LANES SAN 4120155 LOCAL 0 BASELINE RD ETIWANDA AVE I-15 WIDEN BASELINE RD FROM ETIWANDA 2030 $475 BERNARDINO HIGHWAY AV TO I-15 FROM 3 LANES TO 4 LANES SAN 4A07074 LOCAL 0 BEAR VALLEY JOSHUA RD SR-18 WIDEN BEAR VALLEY CUOFF FROM 2020 $4,617 BERNARDINO HIGHWAY CUTOFF JOSHUA RD TO SR-18 FROM 2 TO 6 LANES SAN 4A07391 LOCAL 0 BEAR VALLEY RD 1270' W/O TOPAZ RD AT POWER LINE EASEMENT WIDEN BEAR VALLEY RD FROM 1270' 2020 $26 BERNARDINO HIGHWAY W/O TOPAZ RD TO POWER LINE EASEMENT FROM 2 TO 4 LANES SAN 4A07355 LOCAL 0 BEAR VALLEY RD 1920' E/O TOPAZ RD AT POWER LINE EASEMENT WIDEN BEAR VALLEY RD FROM 1920' E/O 2020 $229 BERNARDINO HIGHWAY TOPAZ RD TO POWER LINE EASEMENT SAN 4A01011 LOCAL 0 BEAR VALLEY RD APPLE VALLEY RD NAVAJO RD WIDEN FROM 2 TO 3 LANES EACH DIR 2023 $6,900 BERNARDINO HIGHWAY SAN 4A07156 LOCAL 0 BEAR VALLEY RD US HWY 395 ASTER RD (MONTE VISTA RD) WIDEN BEAR VALLEY FROM US HWY 2020 $2,532 BERNARDINO HIGHWAY 395 TO ASTER RD FROM 2 LANES TO 6 LANES. SAN 4120096 LOCAL 0 BEAR VALLEY RD KIOWA NAVAJO RD WIDEN BEAR VALLEY RD FROM KIOWA 2030 $2,252 BERNARDINO HIGHWAY RD TO NAVAJO RD FROM 4 TO 6 LANES SAN 4A07080 LOCAL 0 BEAR VALLEY RD NAVAJO RD JOSHUA RD WIDEN BEAR VALLEY RD FROM NAVAJO 2030 $4,505 BERNARDINO HIGHWAY RD TO JOSHUA RD FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 347

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120022 LOCAL 0 BEAVER AIR EXPRESSWAY EL MIRAGE RD WIDEN BEAVER FROM AIR EXPRESSWAY 2030 $2,182 BERNARDINO HIGHWAY TO EL MIRAGE SAN 4120019 LOCAL 0 BEAVER COLUSA OLEANDER WIDEN BEAVER FROM COLUSA TO 2030 $2,488 BERNARDINO HIGHWAY OLEANDER SAN 4120020 LOCAL 0 BEAVER EL MIRAGE RD COLUSA RD WIDEN BEAVER FROM EL MIRAGE TO 2030 $2,488 BERNARDINO HIGHWAY COLUSA SAN 4120023 LOCAL 0 BEAVER PALMDALE RD AIR EXPRESSWAY WIDEN BEAVER FROM PALMDALE TO AIR 2030 $3,607 BERNARDINO HIGHWAY EXPRESSWAY SAN 4120021 LOCAL 0 BEAVER VILLA VICTOR WIDEN BEAVER FROM VILLA TO VICTOR 2030 $311 BERNARDINO HIGHWAY SAN 4A07185 LOCAL 0 BEECH ARROW ROUTE SH-66 WIDEN BEECH AVE FROM ARROW ROUTE 2020 $1,721 BERNARDINO HIGHWAY TO SH-66 FROM 2 TO 4 LANES SAN 4A07104 LOCAL 0 BEECH RANDALL AV ARROW ROUTE WIDEN BEECH AVE FROM RANDALL AVE 2020 $3,476 BERNARDINO HIGHWAY TO ARROW ROUTE FROM 2 TO 4 LANES SAN 4A07157 LOCAL 0 BEECH VALLEY RANDALL WIDEN BEECH AVE FROM VALLEY TO 2020 $2,531 BERNARDINO HIGHWAY RANDALL AVE FROM 2 TO 4 LANES SAN 4120124 LOCAL 0 BEECH AVE MILLER FOOTHILL WIDEN BEECH AVE FROM MILLER AVE TO 2020 $4,631 BERNARDINO HIGHWAY FOOTHILL BLVD FROM 2 TO 4 LANES SAN 4A04192 LOCAL 0 BELLEGRAVE AVE MERRILL AVE MILLIKEN AVE WIDEN BELLEGRAVE AVE FROM MERRILL 2020 $11,867 BERNARDINO HIGHWAY FROM MERRILL AVE TO MILLIKEN AVE (HAMNER AVE) AVE TO MILLIKEN FROM 2 TO 4 LANES AVE (HAMNER AVE) FROM 2 TO 4 LANES SAN 4120024 LOCAL 0 BELLFLOWER AIR EXPRESSWAY EL MIRAGE RD WIDEN BELLFLOWER FROM AIR 2030 $3,261 BERNARDINO HIGHWAY EXPRESSWAY TO EL MIRAGE SAN 4120026 LOCAL 0 BELLFLOWER CACTUS AIR EXPRESSWAY WIDEN BELLFLOWER FROM CACTUS TO 2030 $2,943 BERNARDINO HIGHWAY AIR EXPRESSWAY SAN 4120027 LOCAL 0 BELLFLOWER EL MIRAGE RD CALLEJA WIDEN BELLFLOWER FROM EL MIRAGE 2030 $3,896 BERNARDINO HIGHWAY TO CALLEJA SAN 4120025 LOCAL 0 BELLFLOWER PALMDALE RD MOJAVE WIDEN BELLFLOWER FROM PALMDALE 2030 $813 BERNARDINO HIGHWAY TO MOJAVE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 348 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07096 LOCAL 0 BELLFLOWER ST BEAR VALLEY RD GOODWIN DR WIDEN BELLFLOWER RD FROM BEAR 2020 $3,798 BERNARDINO HIGHWAY VALLEY RD TO .5 MI. S/O GOODWIN DR FROM 0 LANES TO 4 LANES. SAN 4A04407 LOCAL 0 BELLFLOWER ST MOJAVE DR BARTLETT RD WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $6,300 BERNARDINO HIGHWAY SAN 4A07298 LOCAL 0 BENSON AVE PHILLIPS BLVD N/ HOWARD WIDEN BENSON AVE FROM PHILLIPS 2020 $540 BERNARDINO HIGHWAY BLVD TO HOWARD ST FROM 2 TO 4 LANES SAN 4A07294 LOCAL 0 BENSON AVE FROM HOWARD ST STATE ST WIDEN BENSON AVE FROM HOWARD ST 2030 $1,087 BERNARDINO HIGHWAY HOWARD ST TO TO STATE ST FROM 2 TO 4 LANES STATE ST FROM 2 TO 4 LANES SAN 4A07195 LOCAL 0 BIG BEAR BL WEST CITY LIMITS EAST CITY LIMITS INTERSECTION SIGNALIZATION AND 2013 $1,600 BERNARDINO HIGHWAY SYNCHRONIZATION SAN 4A01025 LOCAL 0 BIG BEAR BL WEST CITY LIMITS EAST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $18,634 BERNARDINO HIGHWAY SAN 4A07241 LOCAL 0 BLOOMINGTON AVE CEDAR LARCH WIDEN BLOOMINGTON AVE FROM CEDAR 2020 $1,013 BERNARDINO HIGHWAY TO LARCH FROM 2 TO 4 LANES SAN 4A07009 LOCAL 0 BOULDER AVE BASE LINE 5TH ST WIDEN BOULDER AVE FROM 2 LANES TO 2012 $17,006 BERNARDINO HIGHWAY 4 LANES (INCLUDING BRIDGE). SAN 4A07304 LOCAL 0 BRYANT ST JUNIPER AVE SR-38 WIDEN BRYANT ST FROM JUNIPER AVE 2020 $506 BERNARDINO HIGHWAY TO SR-38 FROM 2 TO 4 LANES SAN 4A04417 LOCAL 0 BRYANT ST NORTH CITY LIMITS COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $7,796 BERNARDINO HIGHWAY SAN 4120113 LOCAL 0 C ST CITY LIMITS W/O PENNSYLVANIA AVE WIDEN C ST FROM CITY LIMITS W/O 2030 $1,296 BERNARDINO HIGHWAY RANCHO AVE RANCHO AVE TO PENNSYLVANIA AVE FROM 2 TO 4 LANES SAN 4A07192 LOCAL 0 C STREET 0007M W, JACKSON E/0007M E, TEJON AVE WIDEN C STREET FROM 0007M W, 2030 $1,758 BERNARDINO HIGHWAY JACKSON E/0007M E, TEJON AVE FROM 2 TO 4 LANES SAN 4A07143 LOCAL 0 CALABASH AVE WHITTRAM AVE N/FOOTHILL BLVD WIDEN CALABASH AVE FROM WHITTRAM 2020 $2,768 BERNARDINO HIGHWAY AVE TO N/FOOTHILL BLVD FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 349

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07291 LOCAL 0 CALIFORNIA ST ALMOND AVE SAN BERNARDINO AVE WIDEN CALIFORNIA ST FROM ALMOND 2020 $608 BERNARDINO HIGHWAY AVE TO SAN BERNARDINO AVE FROM 3 TO 6 LANES SAN 4A07190 LOCAL 0 CALIFORNIA ST SAN BERNARDINO PALMETTO WIDEN CALIFORNIA ST FROM SAN 2020 $1,688 BERNARDINO HIGHWAY BERNARDINO AVE TO PALMETTO AVE FROM 2 TO 6 LANES SAN 4A01367 LOCAL 0 CALIFORNIA ST WILDWOOD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,535 BERNARDINO HIGHWAY SAN 4A04238 LOCAL 0 CALIFORNIA ST LUGONIA AVE SAN BERNARDINO AVE WIDEN CALIFORNIA ST FROM LUGONIA 2020 $916 BERNARDINO HIGHWAY AVE TO SAN BERNARDINO AVE FROM 2 TO 6 LANES SAN 4A07184 LOCAL 0 CALIFORNIA ST REDLANDS BLVD I-10 WIDEN CALIFORNIA ST FROM REDLANDS 2020 $754 BERNARDINO HIGHWAY BLVD TO I-10 FROM 5 TO 6 LANES SAN 4A01368 LOCAL 0 CALIMESA BL OAK GLEN RD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,820 BERNARDINO HIGHWAY SAN 4A07139 LOCAL 0 CAMPUS AV FRANCIS HOLT WIDEN CAMPUS FROM FRANCIS TO HOLT 2018 $3,591 BERNARDINO HIGHWAY FROM 2 TO 4 LANES SAN 4G0104/ LOCAL 0 CAMPUS AV IN ONTARIO (ALHAMBRA)/ (LOS ANGELES) SPOT WIDENING (LOW OPTION), GRADE 2035 $21,677 BERNARDINO 4G0112 HIGHWAY SEPARATION (HIGH OPTION) WIDEN 2-4 LANES SAN 4A04193 LOCAL 0 CAMPUS AVE FROM RIVERSIDE DR MERRILL AVE WIDEN CAMPUS AVE FROM RIVERSIDE 2030 $5,016 BERNARDINO HIGHWAY RIVERSIDE DR TO DR TO MERRILL AVE FROM 2 TO 4 LANES MERRILL AVE FROM 2 TO 4 LANES SAN 4A07181 LOCAL 0 CAMPUS PKWY KENDALL I-215 CAMPUS PKWY (PEPPER-LINDEN) 2020 $1,800 BERNARDINO HIGHWAY EXTENSION FROM KENDALL TO I-215. CONSTRUCT 4 LANES AND A PARTIAL DIAMOND INTERCHANGE SAN 4120183 LOCAL 0 CASMALIA AVE WEST CITY LIMITS AYALA WIDEN CASMALIA AVE FROM WEST CITY 2020 $5,423 BERNARDINO HIGHWAY LIMITS TO AYALA DR FROM 2 TO 4 LANES SAN 4A01086 LOCAL 0 CASMALIA AVE SIERRA AV MANGO AV NEW WIDEN ROAD, 2 LANES EACH DIR 2012 $1,400 BERNARDINO HIGHWAY (CARTER AVE) SAN 4120028 LOCAL 0 CASSIA ADELANTO RD HWY 395 WIDEN CASSIA FROM ADELANTO ROAD 2035 $539 BERNARDINO HIGHWAY TO HWY 395

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 350 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120030 LOCAL 0 CAUGHLIN AIR EXPRESSWAY BARTLETT RD WIDEN CAUGHLIN FROM AIR 2020 $1,507 BERNARDINO HIGHWAY EXPRESSWAY TO BARTLETT SAN 4120029 LOCAL 0 CAUGHLIN COLUSA OLEANDER WIDEN CAUGHLIN FROM COLUSA TO 2020 $5,022 BERNARDINO HIGHWAY OLEANDER SAN 4120031 LOCAL 0 CAUGHLIN SENECA AIR EXPRESSWAY WIDEN CAUGHLIN FROM SENECA TO AIR 2020 $9,581 BERNARDINO HIGHWAY EXPRESSWAY SAN 4A01027 LOCAL 0 CENTRAL AV CHINO AVE EL PRADO WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $2,000 BERNARDINO HIGHWAY (NOTE: OVERLAPS RTIP#SBD41236 SBD31933 FROM SR-71 TO EL PRADO) SAN 4A01296 LOCAL 0 CENTRAL AV FOOTHILL BL BENSON AV NEW ROAD, 2 LANES EACH DIR 2020 $10,700 BERNARDINO HIGHWAY SAN 4A01026 LOCAL 0 CENTRAL AV FRANCIS AV RIVERSIDE DR WIDEN FROM 3 TO 4 LANES EACH DIR 2020 $2,642 BERNARDINO HIGHWAY SAN 4G07421 LOCAL 0 CENTRAL AV IN MONTCLAIR ON HOLT BOULEVARD TO MISSION WIDEN CENTRAL AV GRADE SEPARATION 2030 $5,930 BERNARDINO HIGHWAY THE ALHAMBRA AND BOULEVARD IN MONTCLAIR ON THE ALHAMBRA AND LOS ANGELES LINES LOS ANGELES LINES SAN 4A01267 LOCAL 0 CENTRAL AV MONTCLAIR CITY CHINO CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $1,407 BERNARDINO HIGHWAY LIMIT SAN 4A01297 LOCAL 0 CENTRAL AV SOUTH CITY LIMITS ARROW ROUTE WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $3,270 BERNARDINO HIGHWAY SAN 4A01266 LOCAL 0 CENTRAL AVE PHILLIPS BLVD STATE ST WIDEN CENTRAL AVE FROM PHILLIPS 2020 $2,093 BERNARDINO HIGHWAY BLVD TO STATE ST FROM 4 TO 6 LANES SAN 4120104 LOCAL 0 CENTRAL AVE RIVERSIDE DR SR-71 WIDEN CENTRAL AVE FROM RIVERSIDE 2020 $7,796 BERNARDINO HIGHWAY DR TO SR-71 FROM 4 TO 6 LANES SAN 4A07015 LOCAL 0 CENTRAL RD BEAR VALLEY WAALEW WIDEN CENTRAL RD FROM BEAR VALLEY 2020 $14,400 BERNARDINO HIGHWAY RD TO WAALEW RD FROM 2 TO 4 LANES SAN 4A07091 LOCAL 0 CENTRAL RD ROUNDUP WY N/ POPPY WIDEN CENTRAL RD FROM ROUNDUP WY 2020 $4,050 BERNARDINO HIGHWAY TO N/ POPPY RD FROM 2 TO 4 LANES SAN 4A07048 LOCAL 0 CERES AVE MERRIL CATAWBA WIDEN CERES AVE FROM MERRILL AVE 2020 $6,143 BERNARDINO HIGHWAY TO CATAWBA AVE FROM 2 TO 4 LANES SAN 4120035 LOCAL 0 CHAMBERLAINE ASTER RICHARDSON WIDEN CHAMBERLAINE FROM ASTER TO 2030 $4,317 BERNARDINO HIGHWAY RICHARDSON SAN 4120033 LOCAL 0 CHAMBERLAINE JONATHAN US-395 WIDEN CHAMBERLAINE FROM JONATHAN 2030 $2,165 BERNARDINO HIGHWAY TO US-395 *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 351

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120034 LOCAL 0 CHAMBERLAINE RICHARDSON RD CAUGHLIN RD WIDEN CHAMBERLAINE FROM 2030 $2,597 BERNARDINO HIGHWAY RICHARDSON TO CAUGLIN SAN 4120032 LOCAL 0 CHAMBERLAINE US-395 ASTER WIDEN CHAMBERLAINE FROM US-395 2030 $2,718 BERNARDINO HIGHWAY TO ASTER SAN 4A07040 LOCAL 0 CHERRY VALLEY FOOTHILL WIDEN CHERRY AV FROM VALLEY TO 2020 $7,796 BERNARDINO HIGHWAY FOOTHILL BLVD FROM 4 TO 6 LANES SAN 4A01089 LOCAL 0 CHERRY AV JURUPA AV SLOVER AV WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $4,354 BERNARDINO HIGHWAY SAN 4A04091 LOCAL 0 CHERRY AV VALLEY BL SAN BERNARDINO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $2,800 BERNARDINO HIGHWAY SAN 4120126 LOCAL 0 CHERRY AVE MERRILL AVE WHITTRAM AVE WIDEN CHERRY AVE BRIDGE FROM 2020 $11,100 BERNARDINO HIGHWAY BRIDGE MERRILL AVE TO WHITTRAM FROM 4 TO 6 LANES SAN 4A04194 LOCAL 0 CHINO AV EUCLID AV MILLIKEN BL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $15,211 BERNARDINO HIGHWAY SAN 4120105 LOCAL 0 CHINO AVE 600' E/O MONTE SIXTH ST WIDEN CHINO AVE FROM 600' E/O 2030 $761 BERNARDINO HIGHWAY VISTA RD MONTE VISTA RD TO SIXTH ST FROM 2 TO 4 LANES SAN 4A01029 LOCAL 0 CHINO AVE CENTRAL AVE 600' EAST OF MONTE VISTA WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,713 BERNARDINO HIGHWAY SAN 4A01028 LOCAL 0 CHINO AVE CENTRAL AVE MOUNTAIN AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $6,100 BERNARDINO HIGHWAY SAN 4A01030 LOCAL 0 CHINO AVE FERN AV EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $4,043 BERNARDINO HIGHWAY SAN 4A07205 LOCAL 0 CHINO AVE MOUNTAIN FERN WIDEN CHINO FROM MOUNTAIN TO FERN 2018 $1,500 BERNARDINO HIGHWAY FROM 2 TO 4 LANES SAN 4A01031 LOCAL 0 CHINO AVE SR-71 EAST END AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2035 $989 BERNARDINO HIGHWAY SAN 4A01062 LOCAL 0 CHINO HILLS PKWY RAMONA CHINO CREEK BRIDGE WIDEN CHINO HILLS PKWY FROM 2020 $203 BERNARDINO HIGHWAY RAMONA AVE TO CHINO CREEK BRIDGE FROM 4 TO 6 LANES SAN 4120165 LOCAL 0 CHURCH AVE ARCHIBALD HAVEN WIDEN CHURCH AVE FROM ARCHIBALD 2030 $1,465 BERNARDINO HIGHWAY TO HAVEN FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 352 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01239 LOCAL 0 CHURCH ST COLTON AV REDLANDS BL WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $4,150 BERNARDINO HIGHWAY (NOTE: RTIP#SBD59012 WIDENS FROM COLTON TO CLARK) SAN 4A04095 LOCAL 0 CITRUS AV SAN BERNARDINO AV FOOTHILL BLVD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,820 BERNARDINO HIGHWAY SAN 4A01094 LOCAL 0 CITRUS AV SAN BERNARDINO AV VALLEY BL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,400 BERNARDINO HIGHWAY SAN 4A01096 LOCAL 0 CITRUS AV SLOVER AV JURUPA AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,200 BERNARDINO HIGHWAY SAN 4120127 LOCAL 0 CITRUS AVE BASELINE AVE SO. HIGHLAND AVE WIDEN CITRUS AVE FROM BASELINE 2020 $5,680 BERNARDINO HIGHWAY AVE TO SO. HIGHLAND AVE FROM 2 TO 4 LANES SAN 4A04240 LOCAL 0 CITRUS AVE DEARBORN ST WABASH AVE WIDEN CITRUS AVE FROM DEARBORN ST 2030 $1,149 BERNARDINO HIGHWAY TO WABASH AVE FROM 2 TO 4 LANES SAN 4A07331 LOCAL 0 CIVIC DR MOJAVE DR ROY RODGERS DR WIDEN CIVIC DR FROM MOJAVE DR. TO 2020 $332 BERNARDINO HIGHWAY ROY ROGERS DR. FROM 0 TO 4 LANES SAN 4120036 LOCAL 0 COLBALT ROAD HOLLY RD RANCHO WIDEN COLBALT ROAD FROM HOLLY TO 2030 $1,865 BERNARDINO HIGHWAY RANCHO SAN 4120173 LOCAL 0 COLTON AV WABASH AV CRAFTON AV WIDEN COLTON AV FROM WABASH AV TO 2030 $2,358 BERNARDINO HIGHWAY CRAFTON AV FROM 2 TO 4 LANES SAN 4120111 LOCAL 0 COLTON AVE MT. VERNON AVE. CITY LIMITS WIDEN COLTON AV FROM MT. VERNON 2020 $3,409 BERNARDINO HIGHWAY AVE.AV TO CITY LIMIT FROM 2 TO 4 LANES SAN 4120038 LOCAL 0 COLUSA ASTER RICHARDSON WIDEN COLUSA FROM ASTER TO 2035 $6,619 BERNARDINO HIGHWAY RICHARDSON SAN 4120039 LOCAL 0 COLUSA MESA ADELANTO RD WIDEN COLUSA FROM MESA TO 2035 $1,768 BERNARDINO HIGHWAY ADELANTO SAN 4120037 LOCAL 0 COLUSA RICHARDSON RD CAUGHLIN RD WIDEN COLUSA FROM RICHARDSON TO 2035 $2,597 BERNARDINO HIGHWAY CAUGHLIN SAN 4A07085 LOCAL 0 COMMERCE WAY 900 FT. NORTH OF PICO WIDEN COMMERCE WY FROM 900' N/O 2014 $4,200 BERNARDINO HIGHWAY DE BERRY DEBERRY RD TO PICO AV FROM 2 TO 4 LANES SAN 4A07027 LOCAL 0 COMMERCE WY 900' N/O PICO MAIN ST EXTEND COMMERCE WY FROM 900' N/O 2020 $14,388 BERNARDINO HIGHWAY PICO TO MAIN ST FROM 0 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 353

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07150 LOCAL 0 CONE CAMP RD GREENSPOT RD SOUTH CITY LIMIT CONSTRUCT NEW STREET FROM 0 TO 2 2030 $2,635 BERNARDINO HIGHWAY LANES SAN 4A07326 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON ARCHIBALD 2030 $473 BERNARDINO HIGHWAY A BRIDGE ON AVE OVER LOWER DEER CREEK-WIDEN ARCHIBALD AVE 2-6 LANES OVER LOWER DEER CREEK SAN 4A07277 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON ARCHIBALD 2030 $868 BERNARDINO HIGHWAY A BRIDGE ON AVE OVER UPPER DEER CREEK-WIDEN ARCHIBALD AVE 4-6 LANES OVER UPPER DEER CREEK SAN 4A07278 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON ARCHIBALD 2030 $868 BERNARDINO HIGHWAY A BRIDGE ON AVE OVER UPPER DEER CREEK ARCHIBALD AVE SPILLWAY-WIDEN4-6 LANES OVER UPPER DEER CREEK SPILLWAY SAN 4A07174 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON EIGHT ST 2035 $710 BERNARDINO HIGHWAY A BRIDGE ON OVER CUCAMONGA CREEK=WIDEN 2-4 EIGHT ST OVER LANES CUCAMONGA CREEK SAN 4A07208 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON FRANCIS ST 2030 $2,189 BERNARDINO HIGHWAY A BRIDGE ON OVER CUCAMONGA CREEK-SIDEWALK FRANCIS ST OVER ONLY CUCAMONGA CREEK SAN 4A07325 LOCAL 0 CONSTRUCT A CONSTRUCT A BRIDGE ON HOLD BLVD 2030 $710 BERNARDINO HIGHWAY BRIDGE ON HOLD OVER WEST CUCAMONGA CREEK–WIDEN BLVD OVER WEST 4-6 LANES CUCAMONGA CREEK SAN 4A07327 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON HOLT BLVD 2030 $476 BERNARDINO HIGHWAY A BRIDGE ON OVER CUCAMONGA CREEK-WIDEN-4-6 HOLT BLVD OVER LANES CUCAMONGA CREEK *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 354 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07317 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON MISSION BLVD 2030 $1,736 BERNARDINO HIGHWAY A BRIDGE ON OVER CUCAMONGA CREEK-WIDEN 4-6 MISSION BLVD LANES OVER CUCAMONGA CREEK SAN 4A07215 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON MISSION BLVD 2030 $552 BERNARDINO HIGHWAY A BRIDGE ON OVER WEST CUCAMONGA CREEK-WIDEN MISSION BLVD 4-6 LANES OVER WEST CUCAMONGA CREEK SAN 4A07267 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON RIVERSIDE DR 2035 $947 BERNARDINO HIGHWAY A BRIDGE ON OVER CUCAMONGA CREEK-WIDEN 4-6 RIVERSIDE DR LANES OVER CUCAMONGA CREEK SAN 4A07260 LOCAL 0 CONSTRUCT CONSTRUCT A BRIDGE ON SIXTH ST 2020 $1,026 BERNARDINO HIGHWAY A BRIDGE ON OVER CUCAMONGA CREEK-SIDEWALK SIXTH ST OVER ONLY CUCAMONGA CREEK SAN 4120172 LOCAL 0 CONSTRUCT NEW CONSTRUCT NEW BRIDGE AT WILSON 2030 $1,436 BERNARDINO HIGHWAY BRIDGE AT WILSON AND DAY CREEK CHANNEL AND DAY CREEK CHANNEL SAN 4A01013 LOCAL 0 CORWIN RD SR-18 DALE EVANS PKWY WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $14,400 BERNARDINO HIGHWAY SAN 4A07081 LOCAL 0 COULSTON TIPPECANOE MT. VIEW WIDEN COULSTON AV FROM TIPPECANOE 2030 $4,224 BERNARDINO HIGHWAY TO MT. VIEW FROM 2 TO 4 LANES SAN 4A01370 LOCAL 0 COUNTY LINE RD CALIMESA BLVD BRYANT ST WIDEN COUNTY LINE RD FROM 2030 $2,499 BERNARDINO HIGHWAY CALIMESA BLVD TO BRYANT ST FROM 2 TO 4 LANES SAN 4A07114 LOCAL 0 COYOTE CNYN SADDLEBACK I-15 COYOTE CANYON RD FROM SADDLEBACK 2018 $3,360 BERNARDINO HIGHWAY RD TO I-15 WIDEN FROM 0 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 355

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120237 LOCAL 0 CRAFTON HILLS WABASH TENNESSEE WIDEN CRAFTON HILLS PARKWAY FROM 2030 $6,875 BERNARDINO HIGHWAY PARKWAY WABASH TO TENNESSEE FROM 0 TO 2 LANES SAN 4A07028 LOCAL 0 CRAFTON HILLS WABASH AVE OVERCREST/TENNESSEE PAVE DIRT ROAD, 1 LANE EACH DIR 2020 $10,125 BERNARDINO HIGHWAY PARKWAY SAN 4A07238 LOCAL 0 CRAFTON HILLS WABASH AVE E/CRAFTON PUD WIDEN CRAFTON HILLS PKWY FROM 2035 $1,020 BERNARDINO HIGHWAY PKWY WABASH AVE TO E/CRAFTON PUD FROM 0 TO 2 LANES SAN 4120128 LOCAL 0 CYPRESS AVE DUNCAN CANYON RD FRONTAGE RD (I-15) WIDEN CYPRESS AVE FROM DUNCAN 2030 $3,200 BERNARDINO HIGHWAY CANYON RD TO FRONTAGE RD (I-15) FROM 2 TO 4 LANES SAN 4A04098 LOCAL 0 CYPRESS AVE SO. HIGHLAND AVE SIERRA LAKES PKWY WIDEN CYPRESS AVE FROM SO. 2030 $10,000 BERNARDINO HIGHWAY HIGHLAND AVE TO SIERRA LAKES PKWY FROM 0 TO 4 LANES SAN 4A01241 LOCAL 0 CYPRESS AVE I-10 CITRUS AV WIDEN CYPRESS AVE FROM I-10 TO 2030 $620 BERNARDINO HIGHWAY CITRUS AV FROM 2 LANES TO 4 LANES SAN 4A07007 LOCAL 0 DALE EVANS PKWY THUNDERBIRD RD I-15 WIDEN DALE EVANS PKWY FROM 2020 $19,200 BERNARDINO HIGHWAY THUNDERBIRD RD TO I-15 FROM 2 LANES TO 4 LANES. SAN 4A07130 LOCAL 0 DALEY CANYON AT IN SAN BERNARDINO INTERSECTION IMPROVEMENTS 2020 $3,000 BERNARDINO HIGHWAY SH 18 COUNTY SAN 4A07063 LOCAL 0 DEEP CREEK RD BEAR VALLEY RD SITTING BULL RD WIDEN DEEP CREEK RD FROM BEAR 2023 $5,200 BERNARDINO HIGHWAY VALLEY RD TO SITTING BULL RD FROM 0 TO 4 LANES SAN 4A07069 LOCAL 0 DEEP CREEK RD TUSSING RANCH RD BEAR VALLEY RD WIDEN DEEP CREEK RD FROM TUSSING 2018 $4,800 BERNARDINO HIGHWAY RACH RD TO BEAR VALLEY RD FROM 2 TO 4 LANES SAN 4A07010 LOCAL 0 DEL ORO RD APPLE VALLEY RD CENTRAL RD WIDEN DEL ORO RD FROM APPLEY 2018 $16,800 BERNARDINO HIGHWAY VALLEY RD TO CENTRAL RD FROM 0 LANES TO 2 LANES SAN 4A07232 LOCAL 0 DEL ROSA AVE 6TH ST 9TH ST WIDEN DEL ROSA AVE FROM 6TH ST TO 2020 $2,299 BERNARDINO HIGHWAY 9TH ST FROM 2 TO 4 LANES SAN 4A07380 LOCAL 0 DEL ROSA AVE DEL ROSA DR SAN BERNARDINO CITY LIMITS WIDEN DEL ROSA AVE FROM DEL ROSA 2020 $135 BERNARDINO HIGHWAY DR TO SAN BERNARDINO CITY LIMITS FROM 2 TO 4 LANES *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 356 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120041 LOCAL 0 DESERT FLOWER ASTER CAUGHLIN RD WIDEN DESERT FLOWER FROM ASTER TO 2020 $6,746 BERNARDINO HIGHWAY CAUGHLIN SAN 4120040 LOCAL 0 DESERT FLOWER CITY LIMITS ADELANTO RD WIDEN DESERT FLOWER FROM CITY 2020 $6,281 BERNARDINO HIGHWAY LIMITS TO ADELANTO SAN 4120045 LOCAL 0 DESOTO AGUADERA US-395 WIDEN DESOTO FROM AGUADERA TO 2030 $5,843 BERNARDINO HIGHWAY US-395 SAN 4120044 LOCAL 0 DESOTO ASTER RICHARDSON WIDEN DESOTO FROM ASTER TO 2030 $6,617 BERNARDINO HIGHWAY RICHARDSON SAN 4120043 LOCAL 0 DESOTO RICHARDSON RD VINTON WIDEN DESOTO FROM RICHARDSON TO 2030 $2,295 BERNARDINO HIGHWAY VINTON SAN 4120042 LOCAL 0 DESOTO US-395 ASTER WIDEN DESOTO FROM US-395 TO ASTER 2030 $1,995 BERNARDINO HIGHWAY SAN 4A07270 LOCAL 0 DEVORE RD CAJON BLVD N/O I-215 OFF RAMPS WIDEN DEVORE RD FROM CAJON BLVD 2020 $709 BERNARDINO HIGHWAY TO N/O I-215 OFF RAMPS FROM 2 TO 4 LANES SAN 4A07125 LOCAL 0 DEVORE RD I-215 KENWOOD DR WIDEN DEVORE RD FROM I-215 TO 2020 $3,752 BERNARDINO HIGHWAY KENWOOD DR FROM 2 TO 4 LANES SAN 4A07300 LOCAL 0 DEVORE RD KENWOOD DR FOOTHILL DR. WIDEN DEVORE RD FROM KENWOOD DR 2020 $679 BERNARDINO HIGHWAY TO FOOTHILL DR FROM 2 TO 4 LANES SAN 4A07088 LOCAL 0 DOS PALMAS PACOIMA RD BOREGO RD WIDEN DOS PALMAS RD FROM PACOIMA 2020 $4,185 BERNARDINO HIGHWAY RD TO BOREGO RD FROM 2 TO 4 LANES SAN 4A07220 LOCAL 0 DOS PALMAS SAN MATEO RD PACOIMA WIDEN DOS PALMAS RD FROM SAN 2020 $1,316 BERNARDINO HIGHWAY MATEO RD TO PACOIMA RD FROM 2 TO 4 LANES SAN 4A07297 LOCAL 0 DUNCAN CANYON .33 M W/O I-15 E/O I-15 WIDEN DUNCAN CANYON RD FROM .33 M 2020 $540 BERNARDINO HIGHWAY RD W/O I-15 TO E/O I-15 SAN 4120129 LOCAL 0 DUNCAN CANYON CITRUS SIERRA WIDEN DUNCAN CANYON RD FROM 2030 $5,251 BERNARDINO HIGHWAY RD CITRUS AVE TO SIERRA AVE FROM 0 TO 4 LANES SAN 4120130 LOCAL 0 DUNCAN CANYON I-15 CITRUS WIDEN DUNCAN CANYON RD FROM I-15 2030 $1,312 BERNARDINO HIGHWAY RD TO CITRUS AVE FROM 0 TO 4 LANES SAN 4A07037 LOCAL 0 E AVENUE MAIN ST I AVENUE WIDEN E AVENUE FROM MAIN ST TO I ST 2023 $8,052 BERNARDINO HIGHWAY FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 357

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4G0156 LOCAL 0 E ST IN COLTON BNSF CROSSING SAFETY UPGRADE (LOW OPTION), 2014 $236 BERNARDINO HIGHWAY SAFETY UPGRADE (HIGH OPTION) SAN 4120162 LOCAL 0 EAST AVE FIRE STATION WILSON AVE WIDEN EAST AVE FROM FIRE STATION TO 2030 $1,145 BERNARDINO HIGHWAY WILSON AVE SAN 4A07133 LOCAL 0 EAST END AVE CHINO AVE WALNUT AVE WIDEN EAST END AVE FROM CHINO AVE 2020 $2,903 BERNARDINO HIGHWAY TO WALNUT AVE FROM 2 TO 4 LANES SAN 4A07146 LOCAL 0 EAST END AVE PHILADELPHIA AV PHILLIPS BLVD WIDEN EAST END AV FROM 2020 $2,700 BERNARDINO HIGHWAY PHILADELPHIA AV TO PHILLIPS BLVD FROM 2 TO 4 LANES SAN 4A07333 LOCAL 0 EAST END AVE PHILLIPS BLVD GRAND AVE WIDEN EAST END AVE FROM PHILLIPS 2030 $537 BERNARDINO HIGHWAY FROM PHILLIPS BLVD TO GRAND AVE FROM 2 TO 4 BLVD TO GRAND LANES AVE FROM 2 TO 4 LANES SAN 4120156 LOCAL 0 EAST ST I-15 VICTORIA AVE. WIDEN EAST ST FROM I-15 TO VICTORIA 2030 $510 BERNARDINO HIGHWAY AVE FROM 2 TO 4 LANES SAN 4120148 LOCAL 0 EAST ST WISON NORTH RIM WAY (NEW) WIDEN EAST ST FROM WISON TO NORTH 2030 $200 BERNARDINO HIGHWAY RIM WAY (NEW) SAN 4A01032 LOCAL 0 EDISON AV CENTRAL AV EUCLID AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $3,989 BERNARDINO HIGHWAY SAN 4A01033 LOCAL 0 EDISON AVE PIPELINE RAMONA WIDEN EDISON AVE FROM PIPELINE AVE 2020 $2,907 BERNARDINO HIGHWAY TO RAMONA AVE FROM 4 TO 6 LANES SAN 4A04197 LOCAL 0 EDISON AVE FROM EUCLID AVE WALKER AVE WIDEN EDISON AVE FROM EUCLID AVE TO 2030 $9,247 BERNARDINO HIGHWAY EUCLID AVE TO WALKER AVE FROM 2 TO 6 LANES WALKER AVE FROM 2 TO 6 LANES SAN 4A04196 LOCAL 0 EDISON AVE FROM MILL CREEK MILLIKEN AVE WIDEN EDISON AVE FROM MILL CREEK 2030 $5,517 BERNARDINO HIGHWAY MILL CREEK TO TO MILLIKEN AVE FROM 2 TO 8 LANES MILLIKEN AVE FROM 2 TO 8 LANES SAN 4A04198 LOCAL 0 EDISON AVE FROM VINEYARD AVE MILL CREEK WIDEN EDISON AVE FROM VINEYARD AVE 2030 $20,727 BERNARDINO HIGHWAY VINEYARD AVE TO TO MILL CREEK FROM 2 TO 8 LANES MILL CREEK FROM 2 TO 8 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 358 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04199 LOCAL 0 EDISON AVE FROM WALKER AVE VINEYARD AVE WIDEN EDISON AVE FROM WALKER AVE 2030 $3,042 BERNARDINO HIGHWAY WALKER AVE TO TO VINEYARD AVE FROM 2 TO 8 LANES VINEYARD AVE FROM 2 TO 8 LANES SAN 4A07099 LOCAL 0 EL EVADO LA BRISA RD ANACAPA RD WIDEN EL EVADO RD FROM LAS BRISA 2020 $3,645 BERNARDINO HIGHWAY RD TO ANACAPA RD FROM 2 TO 4 LANES SAN 4A07307 LOCAL 0 EL EVADO RD 1260' N/O HOOK BL AT POWER LINE EASEMENT WIDEN EL EVADO RD FROM 1260' N/O 2020 $500 BERNARDINO HIGHWAY HOOK BL TO POWER LINE EASEMENT SAN 4A07330 LOCAL 0 EL EVADO RD 510' S/O RANCHO RD AT POWER LINE EASEMENT WIDEN EL EVADO RD FROM 510' 2020 $337 BERNARDINO HIGHWAY S/O RANCHO RD TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES SAN 4A01270 LOCAL 0 EL MIRAGE RD KOALA RD LA COUNTY LINE WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $24,042 BERNARDINO HIGHWAY (NOTE: #4A01004 IN ADELANTO WIDENS FROM RICHARDSON TO US-395 TO 4 LANES EACH DIR IN 2015) SAN 4A01004 LOCAL 0 EL MIRAGE RD RICHARDSON RD US-395 WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $7,400 BERNARDINO HIGHWAY SAN 4A04408 LOCAL 0 EL MIRAGE RD US-395 ADELANTO RD NEW ROAD, 2 LANES EACH DIR 2012 $3,600 BERNARDINO HIGHWAY SAN 4120047 LOCAL 0 EL MIRAGE ROAD AGUADERA US-395 WIDEN EL MIRAGE ROAD FROM 2020 $6,191 BERNARDINO HIGHWAY AGUADERA TO US-395 SAN 4120046 LOCAL 0 EL MIRAGE ROAD US-395 ASTER WIDEN EL MIRAGE ROAD FROM US-395 2020 $5,069 BERNARDINO HIGHWAY TO ASTER SAN 4A01063 LOCAL 0 EL PRADO RD CENTRAL AV PINE AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,473 BERNARDINO HIGHWAY SAN 4A07087 LOCAL 0 EL RIVINO RD CEDAR AV AGUA MANSA RD WIDEN EL RIVINO RD FROM CEDAR AV TO 2020 $4,185 BERNARDINO HIGHWAY AGUA MANSA RD FROM 2 TO 4 LANES SAN 4TL204 LOCAL 0 ELDERLY & COUNTYWIDE COUNTYWIDE ELDERLY & HANDICAPPED ASSISTANCE 2025 $137,000 BERNARDINO HIGHWAY HANDICAPPED ASSISTANCE SAN 4A07094 LOCAL 0 ELECTRIC AVE MT. VIEW NORTHPARK BLVD WIDEN ELECTRIC AVE FROM MT VIEW 2030 $3,840 BERNARDINO HIGHWAY AVE TO NORTHPARK BLVD FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 359

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120048 LOCAL 0 EMERALD HOLLY RD AIR EXPRESSWAY WIDEN EMERALD FROM HOLLY TO AIR 2030 $4,671 BERNARDINO HIGHWAY EXPRESSWAY SAN 4A07209 LOCAL 0 EMERALD RD PALMDALE RD SENECA RD WIDEN EMERALD RD FROM PALMDALE 2020 $1,485 BERNARDINO HIGHWAY RD TO SENECA RD FROM 2 TO 4 LANES SAN 4A01149 LOCAL 0 ESCONDIDO AV MAIN ST SULTANA ST WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $1,500 BERNARDINO HIGHWAY SAN 4120152 LOCAL 0 ETIWANDA AVE MILLER 850' N/O MILLER WIDEN ETIWANDA AVE FROM MILLER TO 2030 $295 BERNARDINO HIGHWAY 850' N/O MILLER, EAST SIDE ONLY SAN 4120169 LOCAL 0 ETIWANDA AVE 6TH ARROW ROUTE WIDEN ETIWANDA AVE FROM 6TH TO 2018 $4,114 BERNARDINO HIGHWAY ARROW ROUTE FROM 2 TO 4 LANES SAN 4120164 LOCAL 0 ETIWANDA AVE BANYAN WILSON AVE WIDEN ETIWANDA AVE FROM BANYAN TO 2030 $1,363 BERNARDINO HIGHWAY WILSON SAN 4120149 LOCAL 0 ETIWANDA AVE EXISTING TERMINUS NORTH RIM WAY (NEW) WIDEN ETIWANDA AVE FROM EXISTING 2030 $271 BERNARDINO HIGHWAY TERMINUS TO NORTH RIM WY (NEW) SAN 4A04200 LOCAL 0 EUCALYPTUS AVE EUCLID AVE WALKER WIDEN EUCALYPTUS AVE FROM EUCLID 2035 $2,675 BERNARDINO HIGHWAY FROM EUCLID AVE AVE TO WALKER FROM 2 TO 4 LANES TO WALKER FROM 2 TO 4 LANES SAN 4A07249 LOCAL 0 EUCALYPTUS ST AMARGOSA RD AMETHYST RD WIDEN EUCALYPTUS ST FROM 2020 $886 BERNARDINO HIGHWAY AMARGOSA RD TO AMETHYST RD FROM 0 TO 6 LANES SAN 4A01151 LOCAL 0 EUCALYPTUS ST I-15 PEACH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $20,386 BERNARDINO HIGHWAY SAN 4A07286 LOCAL 0 EUCALYPTUS ST MESA VIEW DR BELLFLOWER RD WIDEN EUCALYPTUS ST FROM MESA 2020 $632 BERNARDINO HIGHWAY VIEW DR. TO BELLFLOWER RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY) SAN 4A07287 LOCAL 0 EUCALYPTUS ST US-395 MESA VIEW DR. WIDEN EUCALYPTUS ST FROM US 395 TO 2020 $632 BERNARDINO HIGHWAY MESA VIEW DR. FROM 0 TO 4 LANES SAN 4120224 LOCAL 0 EUCALYPTUS ST AMETHYST 0.15 MI W/O COBALT RD WIDEN EUCALYPTUS ST FROM 2020 $7,460 BERNARDINO HIGHWAY AMETHYST RD TO 0.15 MI W/O COBALT RD FROM 0 TO 4 LANES (INCLUDES WASH CROSSING)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 360 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120106 LOCAL 0 EUCILD AVE (SR-83) MERRIL AVE KIMBALL AV WIDEN EUCILD AVE (SR-83) FROM 2030 $1,227 BERNARDINO HIGHWAY MERRIL AVE TO KIMBALL AVE FROM 2 TO 4 LANES SAN 4A04035 LOCAL 0 EUCLID AV KIMBALL PINE WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $2,430 BERNARDINO HIGHWAY SAN 4A04036 LOCAL 0 EUCLID AV PINE SR71 WIDEN FROM 1 TO 4 LANES EACH DIR 2035 $11,500 BERNARDINO HIGHWAY SAN 4A04201 LOCAL 0 EUCLID AVE FROM RIVERSIDE DR MERRILL AVE WIDEN EUCLID AVE FROM RIVERSIDE DR 2035 $8,191 BERNARDINO HIGHWAY RIVERSIDE DR TO TO MERRILL AVE (EAST HALF) FROM 2 MERRILL AVE (EAST TO 4 LANES HALF) FROM 2 TO 4 LANES SAN 4120144 LOCAL 0 EVANS ST. I-10 BARTON RD. WIDEN EVANS ST FROM I-10 TO BARTON 2030 $77,647 BERNARDINO HIGHWAY RD FROM 0 TO 4 LANES SAN 4A04067 LOCAL 0 FAIRWAY DR SPERRY DR CITY LIMITS WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $1,405 BERNARDINO HIGHWAY SAN 4A07161 LOCAL 0 FALCHION RD DALE EVANS NAVAJO WIDEN FALCHION RD FROM DALE EVANS 2018 $2,400 BERNARDINO HIGHWAY PKWY TO NAVAJO RD FROM 0 TO 6 LANES SAN 4A07006 LOCAL 0 FALCHION RD I-15 DALE EVANS PKWY WIDEN FALCHION RD FROM I-15 TO DALE 2018 $20,000 BERNARDINO HIGHWAY EVANS PKWY FROM 0 TO 4 LANES SAN 4A01262A LOCAL 0 FIFTH AV WABASH AV CRAFTON AV WIDEN FIFTH AV FROM WABASH AV TO 2030 $3,387 BERNARDINO HIGHWAY CRAFTON AV FROM 2 TO 4 LANES SAN 4A07230 LOCAL 0 FIFTH ST PEDLEY RD TIPPECANOE AV WIDEN FIFTH ST FROM PEDLEY RD TO 2020 $1,181 BERNARDINO HIGHWAY TIPPECANOE AVE FROM 2 TO 4 LANES SAN 4A07234 LOCAL 0 FIFTH ST WATERMAN AVE PEDLEY RD WIDEN FIFTH ST FROM WATERMAN AVE 2020 $1,148 BERNARDINO HIGHWAY TO PEDLEY RD FROM 2 TO 4 LANES SAN 4A07162 LOCAL 0 FLORIDA ST GREENSPOT RD GARNET ST WIDEN FLORIDA ST FROM GREENSPOT 2030 $3,522 BERNARDINO HIGHWAY RD TO GARNET ST FROM 2 TO 4 LANES SAN 4A04101 LOCAL 0 FONTANA AV VALLEY BL POPLAR MERRILL WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,800 BERNARDINO HIGHWAY SAN 4120131 LOCAL 0 FONTANA AVE RIVERSIDE COUNTY LIME AVE WIDEN FONTANA AVE FROM VALLEY 2030 $1,136 BERNARDINO HIGHWAY LINE BLVD TO LIME AVE FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 361

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07014 LOCAL 0 FONTANA AVE VALLEY POPLAR WIDEN FONTANA AVE FROM VALLEY 2020 $14,850 BERNARDINO HIGHWAY BLVD TO POPLAR AVE FROM 2 TO 4 LANES SAN 4A04102 LOCAL 0 FOOTHILL BL HEMLOCK ALMERIA WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $7,560 BERNARDINO HIGHWAY SAN 4120168 LOCAL 0 FOOTHILL BL VINEYARD ARCHIBALD AVE WIDEN FOOTHILL BL FROM VINEYARD TO 2030 $2,873 BERNARDINO HIGHWAY ARCHIBALD AV FROM 4 TO 6 LANES SAN 4120132 LOCAL 0 FOOTHILL BLVD EAST AVE CHERRY AVE WIDEN FOOTHILL BLVD FROM EAST AVE 2030 $7,847 BERNARDINO HIGHWAY TO CHERRY AVD FROM 2 TO 3 LANES ON EASTBOUND SIDE SAN 4120166 LOCAL 0 FOOTHILL BLVD ARCHIBALD TO HERM HERMOSA WIDEN FOOTHILL BLVD FROM 2030 $1,819 BERNARDINO HIGHWAY ARCHIBALD TO HERMOSA FROM 4 TO 6 LANES SAN 4A01243 LOCAL 0 FORD ST 5TH AVE I-10 WIDEN FORD ST FROM 5TH AVE TO I-10 2030 $1,999 BERNARDINO HIGHWAY FROM 2 LANES TO 4 LANES SAN 4A01273 LOCAL 0 FRANCIS AV LA COUNTY LINE CHINO CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,683 BERNARDINO HIGHWAY SAN 4120100 LOCAL 0 FRANCIS AVE 600' E/O SNYDER BENSON AV WIDEN FRANCIS AVE FROM 600' E/O 2020 $507 BERNARDINO HIGHWAY SNYDER TO BENSON AVE FROM 2 TO 4 LANES SAN 4120099 LOCAL 0 FRANCIS AVE WCL 600' E/O CONCORD CT WIDEN FRANCIS AVE FROM WCL TO 600' 2020 $1,087 BERNARDINO HIGHWAY E/O CONCORD CT FROM 2 TO 4 LANES (S. SIDE ONLY) SAN 4A01272 LOCAL 0 FRANCIS AVE 0.11 M W/O EAST 0.13 E/O TELEPHONE AVE WIDEN FRANCIS AVE FROM .11 M W/O 2020 $5,255 BERNARDINO HIGHWAY END EAST END TO .13 M E/O TELEPHONE AVE FROM 2 TO 4 LANES SAN 4A01203 LOCAL 0 FRANCIS ST BENSON AV CAMPUS AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,108 BERNARDINO HIGHWAY SAN 4A07227 LOCAL 0 FRANCIS ST CONSTRUCT A BRIDGE ON FRANCIS ST 2018 $1,217 BERNARDINO HIGHWAY OVER WEST CUCAMONGA CREEK SAN 4A01104 LOCAL 0 FRONTAGE RD (I-15) DUNCAN CANYON RD RIVERSIDE AV NEW ROAD, 2 LANES EACH DIR 2018 $4,900 BERNARDINO HIGHWAY SAN 4A07352 LOCAL 0 GARNET ST .08 M S/O MENTONE MENTONE AV WIDEN GARNET ST FROM .08 M S/O 2035 $274 BERNARDINO HIGHWAY AV MENTONE AV TO MENTONE AV FROM 2 TO 4 LANES *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 362 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07320 LOCAL 0 GARNET ST MENTONE AV SR 38 WIDEN GARNET ST FROM MENTONE AV 2035 $446 BERNARDINO HIGHWAY TO SR 38 FROM 2 TO 4 LANES SAN 4A07169 LOCAL 0 GARNET ST NEWPORT AV FLORIDA ST WIDEN GARNET ST FROM NEWPORT AV 2035 $1,914 BERNARDINO HIGHWAY TO FLORIDA ST FROM 2 TO 4 LANES SAN 4A07314 LOCAL 0 GARNET ST SR-38 NEWPORT AVE WIDEN GARNET ST FROM SR-38 TO 2035 $399 BERNARDINO HIGHWAY NEWPORT AVE FROM 2 TO 4 LANES SAN 4A07127 LOCAL 0 GLEN HELEN PKWY GLEN HELEN PKWY NW/END WIDEN GLEN HELEN RD FROM GLEN 2030 $1,999 BERNARDINO HIGHWAY HELEN PKWY TO NW/END FROM 2 TO 4 LANES SAN 4G0161 LOCAL 0 GLEN HELEN PKWY IN SAN BERNARDINO (CAJON) ROADWAY WIDENING (LOW OPTION), 2018 $18,196 BERNARDINO HIGHWAY COUNTY GRADE SEPARATION (HIGH OPTION) SAN 4A07036 LOCAL 0 GLEN HELEN PKWY LYTLE CREED RD I-15 WIDEN GLEN HELEN PKWY FROM LYTLE 2020 $2,283 BERNARDINO HIGHWAY CREED RD TO I-15 FROM 2 TO 4 LANES SAN 4A07018 LOCAL 0 GLEN HELEN PKWY LYTLE CREEK RD NELY/CAJON WIDEN GLEN HELEN PKWY FROM LYTLE 2030 $11,756 BERNARDINO HIGHWAY CREEK TO NELY/CAJON BLVD FROM 2 TO 4 LANES SAN 4GL04 LOCAL 0 GRADE COUNTYWIDE VARIOUS GRADE SEPARATION IMPROVEMENTS 2035 $355,688 BERNARDINO HIGHWAY SEPARATION SAN 4A07144 LOCAL 0 GRAND AVE EAST END RD RAMONA AVE WIDEN GRAND AVE FROM EAST END RD 2020 $2,768 BERNARDINO HIGHWAY TO RAMONA AVE FROM 2 TO 4 LANES SAN 4A07011 LOCAL 0 GREEN TREE BVD HESPERIA RD RIDGECREST RD AT ATS&F RAILROAD CONSTRUCT 2020 $15,699 BERNARDINO HIGHWAY 4-LANE BRIDGE; WIDEN GREEN TREE 0 TO 4 LANES SAN 4A01173 LOCAL 0 GREENSPOT RD GOLD BUCKLE SANTA ANA RIVER WIDEN FROM 2 TO 4 LANES (EXCLUDING 2020 $9,603 BERNARDINO HIGHWAY BRIDGE) SAN 4A07044 LOCAL 0 GREENSPOT RD ORANGE ST BOULDER WIDEN FROM 4 TO 6 LANES 2020 $684 BERNARDINO HIGHWAY SAN 4A07295 LOCAL 0 GREENSPOT RD .19 M N/O FLORIDA FLORIDA ST WIDEN GREENSPOT RD FROM .19 M N/O 2035 $431 BERNARDINO HIGHWAY ST FLORIDA ST TO FLORIDA ST FROM 2 TO 4 LANES SAN 4A07019 LOCAL 0 GREENSPOT RD SANTA ANA RIVER BRYANT CONSTRUCT NEW STREET, GREENSPOT 2020 $12,292 BERNARDINO HIGHWAY BRANCH RD TO CONNECT TO BRYANT FROM 0 TO 2 LANES WITHIN CITY LIMIT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 363

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04207 LOCAL 0 GROVE AV AIRPORT DR HOLT BLVD WIDEN EXISTING GRADE SEPARATION 2018 $10,489 BERNARDINO HIGHWAY FROM 2 TO 3 LANES EACH DIR SAN 4120160 LOCAL 0 GROVE AVE 8TH TAPIA VIA WIDEN GROVE AVE FROM 8TH TO TAPIA 2030 $925 BERNARDINO HIGHWAY VIA (EAST SIDE) FROM 1 TO 2 LANES SAN 4A04206 LOCAL 0 GROVE AVE FROM RIVERSIDE DR MERRILL AVE WIDEN GROVE AVE FROM RIVERSIDE DR 2035 $8,191 BERNARDINO HIGHWAY RIVERSIDE DR TO TO MERRILL AVE FROM 2 TO 4 LANES MERRILL AVE FROM 2 TO 4 LANES SAN 4120146 LOCAL 0 GROVE AVE FROM S/O 4TH ST 350' N/O HOLT BLVD WIDEN GROVE AVE FROM S/O 4TH ST TO 2035 $23,702 BERNARDINO HIGHWAY S/O 4TH ST TO 350' N/O HOLT BLVD FROM 4 TO 6 LANES 350' N/O HOLT BLVD FROM 4 TO 6 LANES SAN 4G0157 LOCAL 0 H ST IN COLTON BNSF CROSSING SAFETY UPGRADE (LOW OPTION), 2014 $236 BERNARDINO HIGHWAY SAFETY UPGRADE (HIGH OPTION) SAN 4A04208 LOCAL 0 HAVEN AVE FROM RIVERSIDE DR BELLEGRAVE AVE WIDEN HAVEN AVE FROM RIVERSIDE 2035 $3,512 BERNARDINO HIGHWAY RIVERSIDE DR DR TO BELLEGRAVE AVE FROM 2 TO 4 TO BELLEGRAVE LANES AVE FROM 2 TO 4 LANES SAN 4120049 LOCAL 0 HELENDALE DESERT FLOWER OLEANDER WIDEN HELENDALE FROM DESERT 2030 $2,805 BERNARDINO HIGHWAY FLOWER TO OLEANDER SAN 4A04038 LOCAL 0 HELLMAN AVE KIMBALL CHINO CORONA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,300 BERNARDINO HIGHWAY SAN 4120158 LOCAL 0 HELMAN CUCAMONGA CREEK WIDEN HELMAN AT CUCAMONGA CREEK 2030 $718 BERNARDINO HIGHWAY CHANNEL CHANNEL (50%RC, 50% ONTARIO) SAN 4A01152 LOCAL 0 HESPERIA RD BEAR VALLEY YUCCA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,131 BERNARDINO HIGHWAY SAN 4A07206 LOCAL 0 HESPERIA RD WALNUT SULTANA WIDEN HESPERIA RD FROM WALNUT TO 2030 $2,500 BERNARDINO HIGHWAY SULTANA FROM 2 TO 4 LANES SAN 4A07129 LOCAL 0 HESPERIA RD YUCCA ST. WALNUT AVE WIDEN HESPERIA RD FROM YUCCA TO 2030 $3,000 BERNARDINO HIGHWAY WALNUT FROM 2 TO 4 LANES SAN 4A07261 LOCAL 0 HIGHLAND AV CAJON ST REDLANDS BL WIDEN HIGHLAND FROM CAJON TO 2035 $800 BERNARDINO HIGHWAY REDLANDS BL FROM 3 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 364 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01244 LOCAL 0 HIGHLAND AV REDLANDS BL FORD ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $1,646 BERNARDINO HIGHWAY SAN 4A07136 LOCAL 0 HIGHLAND AVE CHURCH ST BOULDER AVE WIDEN HIGHLAND AVE FROM CHURCH ST 2018 $3,131 BERNARDINO HIGHWAY TO BOULDER AVE FROM 2 TO 4 LANES SAN 4120051 LOCAL 0 HOLLY ROAD AMETHYST US-395 WIDEN HOLLY ROAD FROM AMETHYST 2020 $4,419 BERNARDINO HIGHWAY TO US-395 SAN 4120050 LOCAL 0 HOLLY ROAD ASTER RICHARDSON WIDEN HOLLY ROAD FROM ASTER TO 2020 $4,882 BERNARDINO HIGHWAY RICHARDSON SAN 4120052 LOCAL 0 HOLLY ROAD RICHARDSON RD LESSING WIDEN HOLLY ROAD FROM RICHARDSON 2020 $4,911 BERNARDINO HIGHWAY TO LESSING SAN 4120053 LOCAL 0 HOLLY ROAD US-395 ASTER WIDEN HOLLY ROAD FROM US-395 TO 2020 $4,773 BERNARDINO HIGHWAY ASTER SAN 4A07035 LOCAL 0 HOLT BLVD CONSTRUCT A BRIDGE ON HOLT BLVD 2018 $8,644 BERNARDINO HIGHWAY OVER WEST CUCAMONGA CREEK SAN 4A01325 LOCAL 0 HOOK BL US-395 AMETHYST RD WIDEN HOOK FROM US 395 TO 0.4 MILES 2020 $999 BERNARDINO HIGHWAY WEST OF AMETHYST 0 TO 4 LANES SAN 4A07383 LOCAL 0 HOOK BLVD 1680' W/O EMERALD AT POWER LINE EASEMENT WIDEN HOOK BLVD FROM 1680' W/O 2020 $83 BERNARDINO HIGHWAY RD EMERALD RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07389 LOCAL 0 HOOK BLVD 1820' E/O US-395 AT POWER LINE EASEMENT WIDEN HOOK BLVD FROM 1820' E/O 2020 $55 BERNARDINO HIGHWAY US-395 TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07387 LOCAL 0 HOPLAND ST JUST W/O AMETHYST AT POWER LINE EASEMENT WIDEN HOPLAND ST FROM JUST W/O 2020 $60 BERNARDINO HIGHWAY RD AMETHYST RD TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES SAN 4A07309 LOCAL 0 HOPLAND ST US-395 COBALT RD WIDEN HOPLAND ST FROM US-395 2020 $478 BERNARDINO HIGHWAY TO COBALT RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY) SAN 4A01212 LOCAL 0 INLAND EMPIRE BL VINEYARD AV ARCHIBALD AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $6,070 BERNARDINO HIGHWAY SAN 4A01107 LOCAL 0 JURUPA AV ETIWANDA AV LIVE OAK SIERRA WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $16,800 BERNARDINO HIGHWAY SAN 4A07165 LOCAL 0 JURUPA AV LOCUST AVE CEDAR AVE WIDEN JURUPA AVE FROM LOCUST AVE 2020 $2,228 BERNARDINO HIGHWAY TO CEDAR AVE FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 365

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07111 LOCAL 0 JURUPA AVE CEDAR AVE LILAC AVE WIDEN JURUPA AVE FROM CEDAR AVE TO 2030 $561 BERNARDINO HIGHWAY LILAC AVE FROM 2 TO 4 LANES SAN 4A07299 LOCAL 0 JURUPA AVE LILAC AVE WILLOW AVE WIDEN JURUPA AVE FROM LILAC AVE TO 2020 $540 BERNARDINO HIGHWAY WILLOW AVE FROM 2 TO 4 LANES SAN 4A07250 LOCAL 0 JURUPA AVE TAMARIND AVE ALDER AVE WIDEN JURUPA AVE FROM TAMARIND 2030 $1,012 BERNARDINO HIGHWAY AVE TO ALDER AVE FROM 2 TO 6 LANES SAN 4A01213 LOCAL 0 JURUPA ST TURNER AV ARCHIBALD AV WIDEN JURUPA ST FROM TURNER AVE TO 2018 $1,069 BERNARDINO HIGHWAY ARCHIBALD AVE FROM 2 TO 6 LANES SAN 4A01068 LOCAL 0 K AND L STREETS 3RD ST 5TH ST WIDEN TO 1 LANE EACH DIR 2012 $312 BERNARDINO HIGHWAY SAN 4120189 LOCAL 0 KENDALL DR CAMBRIDGE CAMPUS PKWY WIDEN KENDALL DR FROM CAMBRIDGE 2030 $4,200 BERNARDINO HIGHWAY AVE TO CAMPUS PKWY FROM 2 TO 4 LANES SAN 4A07086 LOCAL 0 KENDALL DR CAMBRIDGE AVE PINE AVE WIDEN KENDALL DR FROM CAMBRIDGE 2020 $5,027 BERNARDINO HIGHWAY AVE TO PINE AVE FROM 2 TO 4 LANES SAN 4A07060 LOCAL 0 KENDALL DR PALM AVE CAJON BLVD WIDEN KENDALL DR FROM PALM AVE TO 2020 $5,366 BERNARDINO HIGHWAY CAJON BLVD FROM 2 TO 4 LANES SAN 4A07052 LOCAL 0 KIMBALL EUCLID HELLMAN WIDEN KIMBALL FROM EUCLID TO 2018 $5,900 BERNARDINO HIGHWAY HELLMAN FROM 2 TO 4 LANES SAN 4A07070 LOCAL 0 KIOWA RD OCOTILLO RD BEAR VALLEY RD WIDEN KIOWA RD FROM OCOTILLO RD TO 2023 $4,800 BERNARDINO HIGHWAY BEAR VALLEY RD FROM 2 TO 4 LANES SAN 4A04017 LOCAL 0 KIOWA RD YUCCA LOMA RD BEAR VALLEY RD WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $4,800 BERNARDINO HIGHWAY SAN 4120055 LOCAL 0 KOALA AIR EXPRESSWAY EL MIRAGE RD WIDEN KOALA FROM AIR EXPRESSWAY 2030 $2,442 BERNARDINO HIGHWAY TO EL MIRAGE SAN 4120054 LOCAL 0 KOALA CACTUS AIR EXPRESSWAY WIDEN KOALA FROM CACTUS TO AIR 2030 $4,260 BERNARDINO HIGHWAY EXPRESSWAY SAN 4120058 LOCAL 0 KOALA COLUSA OLEANDER WIDEN KOALA FROM COLUSA TO 2030 $4,592 BERNARDINO HIGHWAY OLEANDER SAN 4120057 LOCAL 0 KOALA EL MIRAGE RD COLUSA RD WIDEN KOALA FROM EL MIRAGE TO 2030 $4,395 BERNARDINO HIGHWAY COLUSA SAN 4120056 LOCAL 0 KOALA PALMDALE RD VILLA WIDEN KOALA FROM PALMDALE TO 2030 $1,139 BERNARDINO HIGHWAY VILLA

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 366 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04411 LOCAL 0 KOALA RD EL MIRAGE RD DESOTO RD NEW ROAD, 1 LANE EACH DIR 2030 $1,850 BERNARDINO HIGHWAY SAN 4A04410 LOCAL 0 KOALA RD HOLLY RD EL MIRAGE RD WIDEN FROM 2 TO 4 LANES EACH DIR 2030 $7,181 BERNARDINO HIGHWAY SAN 4A04409 LOCAL 0 KOALA RD PALMDALE RD HOLLY RD NEW ROAD, 2 LANES EACH DIR 2030 $4,000 BERNARDINO HIGHWAY SAN 4A01069 LOCAL 0 LA CADENA DR RANCHO AV SOUTH CITY LIMITS WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $2,444 BERNARDINO HIGHWAY SAN 4120114 LOCAL 0 LA CADENA DR PALM AVE IOWA AVE WIDEN LA CADENA DR FROM PALM AVE 2030 $2,873 BERNARDINO HIGHWAY TO IOWA AVE FROM 4 TO 6 LANES SAN 4120115 LOCAL 0 LA CADENA DR RANCHO AVE LITTON AVE WIDEN LA CADENA DR FROM RANCHO 2030 $3,475 BERNARDINO HIGHWAY AV TO LITTON AVE FROM 4 LANES TO 6 LANES SAN 4A07382 LOCAL 0 LA MESA RD 2010' E/O TOPAZ RD AT POWER LINE EASEMENT WIDEN LA MESA RD FROM 2010' E/O 2020 $98 BERNARDINO HIGHWAY TOPAZ RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07092 LOCAL 0 LA MESA RD BALDY MESA CANTINA WIDEN LA MESA RD FROM BALDY MESA 2020 $3,963 BERNARDINO HIGHWAY TO CANTINA DR FROM 0 LANES TO 4 LANES. SAN 4A07224 LOCAL 0 LA MESA RD CAUGHLIN RD WHITE RD WIDEN LA MESA RD FROM CAUGHLIN RD 2020 $1,265 BERNARDINO HIGHWAY TO WHITE RD FRM 0 TO 4 LANES SAN 4A07288 LOCAL 0 LA MESA RD WHITE RD BALDY MESA RD WIDEN LA MESA RD FROM WHITE RD TO 2020 $632 BERNARDINO HIGHWAY BALDY MESA RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY) SAN 4A07231 LOCAL 0 LANKERSHIM AV 660' N/O BASE LINE 1200' N/O 9TH ST NEW ROAD CONSTRUCTION 2020 $2,014 BERNARDINO HIGHWAY SAN 4A01293 LOCAL 0 LEAR AV/SUNFAIR POLELINE RD MCAS NEW ROAD, 2 LANES EACH DIR 2012 $18,500 BERNARDINO HIGHWAY RD SAN 4A01155 LOCAL 0 LEMON ST MAUNA LOA MOJAVE RIVER WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $5,000 BERNARDINO HIGHWAY SAN 4A0803 LOCAL 0 LENWOOD RD 400 FEET NORTH OF 600 FEET SOUTH OF BNSF RR WIDEN FROM 4 LANES TO 6 LANES (3 2018 $29,081 BERNARDINO HIGHWAY BNSF RR EA DIR) SAN 4120059 LOCAL 0 LESSING HOLLY RD BARTLETT RD WIDEN LESSING FROM HOLLY TO 2020 $7,820 BERNARDINO HIGHWAY BARTLETT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 367

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120184 LOCAL 0 LINDEN AVE BASELINE EASTON AVE WIDEN LINDEN AVE FROM BASELINE TO 2020 $4,292 BERNARDINO HIGHWAY EASTON AVE FROM 0 TO 4 LANES SAN 4A07177 LOCAL 0 LITTLE LEAGUE DR I-215 FRONTAGE RD BELMONT AVE WIDEN LITTLE LEAGUE DR FROM 2030 $1,920 BERNARDINO HIGHWAY I-215 FRONTAGE RD TO BELMONT AVE (INCLUDING CULVERT) FROM 2 TO 4 LANES SAN 4A07134 LOCAL 0 LITTLE LEAGUE DR PALM AVE I-215 FRONTAGE RD WIDEN LITTLE LEAGUE DR FROM PALM 2030 $2,880 BERNARDINO HIGHWAY AVE TO I-215 FRONTAGE RD FROM 2 TO 4 LANES SAN 4A07308 LOCAL 0 LITTLE MOUNTAIN DEVIL CREEK 48TH ST WIDEN LITTLE MOUNTAIN DR FROM 2030 $480 BERNARDINO HIGHWAY DR CHANNEL DEVIL CREEK CHANNEL TO 48TH ST FROM 2 TO 4 LANES SAN 4120133 LOCAL 0 LIVE OAK JURUPA AVE SLOVER AVE WIDEN LIVE OAK AVE FROM JURUPA AVE 2030 $2,625 BERNARDINO HIGHWAY TO SLOVER AVE FROM 2 TO 4 LANES SAN 4A07187 LOCAL 0 LIVE OAK AVE ARROW ROUTE FOOTHILL WIDEN LIVE OAK AVE FROM ARROW 2020 $1,688 BERNARDINO HIGHWAY ROUTE TO FOOTHILL FROM 2 TO 4 LANES SAN 4A01371 LOCAL 0 LIVE OAK CYN RD WEST CITY LIMIT I-10 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,527 BERNARDINO HIGHWAY SAN 4A01245 LOCAL 0 LIVE OAK CYN RD SAN TIMOTEO CYN E. CITY LIMITS WIDEN LIVE OAK CYN RD FROM SAN 2020 $5,829 BERNARDINO HIGHWAY RD TIMOTEO CYN RD TO E. CITY LIMITS FROM 2 TO 4 LANES SAN 4A04110 LOCAL 0 LIVE OAK RD VALLEY BL MERRILL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,285 BERNARDINO HIGHWAY SAN 4120185 LOCAL 0 LOCUST AVE BASELINE EASTON AVE WIDEN LOCUST AVE FROM BASELINE TO 2020 $4,292 BERNARDINO HIGHWAY EASTON AVE FROM 0 TO 4 LANES SAN 4A07183 LOCAL 0 LOCUST AVE JURUPA AVE SANTA ANA AVE WIDEN LOCUST AVE FROM JURUPA AVE 2035 $1,705 BERNARDINO HIGHWAY TO SANTA ANA AVE FROM 2 TO 4 LANES SAN 4A07188 LOCAL 0 LOCUST AVE SAN BERNARDINO RANDALL AVE WIDEN LOCUST AVE FROM SAN 2035 $1,771 BERNARDINO HIGHWAY AVE BERNARDINO AVE TO RANDALL AVE FROM 2 TO 4 LANES SAN 4A07193 LOCAL 0 LOCUST AVE SANTA ANA AVE SLOVER AVE WIDEN LOCUST AVE FROM SANTA ANA 2035 $1,445 BERNARDINO HIGHWAY AVE TO SLOVER AVE FROM 2 TO 4 LANES SAN 4A07315 LOCAL 0 LOCUST AVE SEVENTH ST ELEVENTH ST WIDEN LOCUST AVE FROM SEVENTH ST 2020 $439 BERNARDINO HIGHWAY TO ELEVENTH ST FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 368 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07189 LOCAL 0 LOCUST AVE VALLEY BLVD SAN BERNARDINO AVE WIDEN LOCUST AVE FROM VALLEY BLVD 2020 $1,688 BERNARDINO HIGHWAY TO SAN BERNARDINO AVE FROM 2 TO 4 LANES SAN 4A07255 LOCAL 0 LUGONIA AVE ALABAMA ST TENNESEE ST WIDEN LUGONIA AVE FROM ALABAMA ST 2020 $844 BERNARDINO HIGHWAY TO TENNESEE ST FROM 2 TO 4 LANES SAN 4A07229 LOCAL 0 LUGONIA AVE CALIFORNIA ALABAMA WIDEN LUGONIA AVE FROM CALIFORNIA 2020 $1,181 BERNARDINO HIGHWAY ST TO ALABAMA ST FROM 2 TO 4 LANES SAN 4120174 LOCAL 0 LUGONIA AVE ORANGE ST WABASH AVE WIDEN LUGONIA AVE FROM ORANGE ST 2020 $7,183 BERNARDINO HIGHWAY TO WABASH AVE FROM 2 TO 4 LANES SAN 4A01246 LOCAL 0 LUGONIA AVE TENESSEE ST ORANGE ST WIDEN LUGONIA AVE FROM TENESSEE ST 2020 $3,355 BERNARDINO HIGHWAY TO ORANGE ST FROM 2 TO 4 LANES SAN 4A07045 LOCAL 0 LYTLE CREEK SUMMIT AVE DUNCAN AVE WIDEN LYTLE CREEK FROM SUMMIT AVE 2030 $7,500 BERNARDINO HIGHWAY TO DUNCAN AVE FROM 0 TO 4 LANES SAN 4A07217 LOCAL 0 MAIN ST 11TH ST 7TH ST WIDEN MAIN ST FROM 11TH ST TO 7TH 2035 $1,350 BERNARDINO HIGHWAY ST FROM 4 TO 6 LANES SAN 4A01158 LOCAL 0 MAIN ST I-15 ESCONDIDO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $900 BERNARDINO HIGHWAY SAN 4A01157 LOCAL 0 MAIN ST I-15 US HWY 395 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,075 BERNARDINO HIGHWAY SAN 4G04027 LOCAL 0 MAIN ST IN GRAND TERRACE (SAN BERNARDINO) GRADE SEPARATION AT MAIN ST 2030 $18,100 BERNARDINO HIGHWAY IN GRAND TERRACE ON THE SAN BERNARDINO LINE SAN 4A07356 LOCAL 0 MAIN ST.(W.B.) S.F.R.R. WCL WIDEN MAIN ST (W.B.) FROM SFRR TO 2012 $226 BERNARDINO HIGHWAY WCL FROM 1 TO 2 LANES SAN 4A01159 LOCAL 0 MAPLE AV EUCALYPTUS AV MAIN ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $5,280 BERNARDINO HIGHWAY SAN 4A07090 LOCAL 0 MARIPOSA EUCALYPTUS BEAR VALLEY RD WIDEN MARIPOSA FROM EUCALYPTUS 2030 $4,075 BERNARDINO HIGHWAY TO BEAR VALLEY RD FROM 2 TO 4 LANES SAN 4A07332 LOCAL 0 MARIPOSA RD PALMDALE RD YATES RD WIDEN MARIPOSA RD FROM 0.2 MI. S/O 2020 $330 BERNARDINO HIGHWAY PALMDALE RD TO YATES RD. SAN 4G0429 LOCAL 0 MAUNA LOA 3RD AVE I AVE GRADE SEPARATION-ADDING LANES 2030 $21,964 BERNARDINO HIGHWAY FROM 0-4 SAN 4A01161 LOCAL 0 MAUNA LOA 7TH AV LEMON ST NEW ROAD, 2 LANES EACH DIR 2035 $7,000 BERNARDINO HIGHWAY *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 369

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01162 LOCAL 0 MAUNA LOA MAPLE AV 7TH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2035 $4,835 BERNARDINO HIGHWAY SAN 4A07120 LOCAL 0 MERRILL WEST CITY LIMITS RIVERSIDE WIDEN MERRILL AVE FROM WEST CITY 2018 $3,200 BERNARDINO HIGHWAY LIMITS TO RIVERSIDE FROM 2 TO 4 LANES SAN 4A04114 LOCAL 0 MERRILL AV CATAWBA FONTANA AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,400 BERNARDINO HIGHWAY SAN 4A01040 LOCAL 0 MERRILL AV EUCLID AV EAST CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,159 BERNARDINO HIGHWAY SAN 4A07055 LOCAL 0 MERRILL AVE CHERRY CATAWBA WIDEN MERRILL AVE FROM CHERRY AV 2020 $5,771 BERNARDINO HIGHWAY TO CATAWBA FROM 2 TO 4 LANES SAN 4A01214 LOCAL 0 MERRILL AVE GROVE AVE MILLIKEN AVE WIDEN MERRILL AVE FROM GROVE AVE 2030 $17,887 BERNARDINO HIGHWAY FROM GROVE AVE TO MILLIKEN AVE (HAMNER AVE) FROM 2 TO MILLIKEN AVE TO 4 LANES (HAMNER AVE) FROM 2 TO 4 LANES SAN 4A01163 LOCAL 0 MESQUITE ST TOPAZ AV MAPLE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2023 $675 BERNARDINO HIGHWAY SAN 4120140 LOCAL 0 MICHIGAN ST COMMERCE WAY VAN BUREN WIDEN MICHIGAN ST FROM COMMERCE 2014 $742 BERNARDINO HIGHWAY WAY AND VAN BUREN ST FROM 2 LANES TO 4 LANES. SAN 4A07131 LOCAL 0 MIDWAY AVENUE SH 18/N SH247 PAVE DIRT ROAD 1 LANE IN EACH 2020 $3,000 BERNARDINO HIGHWAY DIRECTION SAN 4A07243 LOCAL 0 MILL PEPPER AV MERIDIAN WIDEN MILL FROM PEPPER TO MERIDIAN 2030 $960 BERNARDINO HIGHWAY FROM 2 TO 4 LANES SAN 4A04214 LOCAL 0 MILL CREEK AVE RIVERSIDE BELLGRAVE WIDEN MILL CREEK AVE FROM RIVERSIDE 2030 $3,512 BERNARDINO HIGHWAY FROM RIVERSIDE TO BELLGRAVE 2-4 LANES TO BELLGRAVE SAN 4120167 LOCAL 0 MILLER RD ETIWANDA AVE TO EAST ST WIDEN MILLER RD FROM ETIWANDA AVE 2030 $1,900 BERNARDINO HIGHWAY TO EAST ST FROM 2 TO 4 LANES SAN 4120150 LOCAL 0 MILLIKEN AVE 5TH ST 700' SOUTH WIDEN MILLIKEN AVE FROM 5TH ST TO 2030 $279 BERNARDINO HIGHWAY 700' SOUTH (WEST SIDE)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 370 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04215 LOCAL 0 MILLIKEN AVE EDISON AVE S. CITY LIMITS WIDEN MILLIKEN AVE (HAMNER AVE) 2030 $1,672 BERNARDINO HIGHWAY (HAMNER AVE) FROM EDISON AVE TO S. CITY LIMITS FROM EDISON AVE FROM 2 TO 6 LANES TO S. CITY LIMITS FROM 2 TO 6 LANES SAN 4A04216 LOCAL 0 MILLIKEN AVE RIVERSIDE AVE EDISON AVE WIDEN MILLIKEN AVE (HAMNER AVE) 2030 $4,012 BERNARDINO HIGHWAY (HAMNER AVE) FROM RIVERSIDE AVE TO EDISON AVE FROM RIVERSIDE FROM 2 TO 8 LANES AVE TO EDISON AVE FROM 2 TO 8 LANES SAN 4A07233 LOCAL 0 MISSION BLVD BENSON AV MILLIKEN AVE WIDEN MISSION BLVD FROM BENSON TO 2018 $17,241 BERNARDINO HIGHWAY MILLIKEN FROM 4 TO 6 LANES SAN 4A07182 LOCAL 0 MISSION BLVD CENTRAL BENSON WIDEN MISSION BLVD FROM CENTRAL 2030 $1,595 BERNARDINO HIGHWAY FROM CENTRAL TO TO BENSON FROM 4 TO 6 LANES BENSON FROM 4 TO 6 LANES SAN 4A01276 LOCAL 0 MISSION BLVD LA COUNTY LINE PIPE LINE WIDEN MISSION BLVD FROM LA COUNTY 2030 $1,079 BERNARDINO HIGHWAY FROM LA COUNTY LINE TO PIPE LINE FROM 2 TO 6 LANES LINE TO PIPE LINE FROM 2 TO 6 LANES SAN 4A07312 LOCAL 0 MOJAVE DR 1000' E/O EL EVADO AT POWER LINE EASEMENT WIDEN MOJAVE DR FROM 1000' E/O EL 2020 $449 BERNARDINO HIGHWAY RD EVADO RD TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES SAN 4A07388 LOCAL 0 MOJAVE DR 1190' E/O US-395 AT POWER LINE EASEMENT WIDEN MOJAVE DR FROM 1190' E/ 2020 $57 BERNARDINO HIGHWAY US-395 TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES SAN 4A07377 LOCAL 0 MOJAVE DR JUST W/O COBALT AT POWER LINE EASEMENT WIDEN MOJAVE DR FROM JUST 2020 $141 BERNARDINO HIGHWAY RD W/O COBALT RD TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES SAN 4120060 LOCAL 0 MOJAVE DRIVE ASTER RICHARDSON WIDEN MOJAVE DRIVE FROM ASTER TO 2030 $5,179 BERNARDINO HIGHWAY RICHARDSON SAN 4120062 LOCAL 0 MOJAVE DRIVE RICHARDSON RD LESSING WIDEN MOJAVE DRIVE FROM 2030 $5,264 BERNARDINO HIGHWAY RICHARDSON TO LESSING *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 371

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120061 LOCAL 0 MOJAVE DRIVE US-395 ASTER WIDEN MOJAVE DRIVE FROM US-395 TO 2030 $5,080 BERNARDINO HIGHWAY ASTER SAN 4A01165 LOCAL 0 MOJAVE ST I-15 MAPLE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,156 BERNARDINO HIGHWAY SAN 4A07202 LOCAL 0 MONTE VISTA AVE PHILLIPS BLVD STATE ST WIDEN MONTE VISTA AVE FROM PHILLIPS 2030 $1,716 BERNARDINO HIGHWAY FROM PHILLIPS BLVD TO STATE ST FROM 2 TO 4 LANES BLVD TO STATE ST FROM 2 TO 4 LANES SAN 4A01183 LOCAL 0 MONTE VISTA SAN BERNARDINO ST ARROW HWY WIDEN MONTE VISTA AVE FROM SAN 2030 $3,872 BERNARDINO HIGHWAY AVE FROM SAN BERNARDINO ST TO ARROW HWY FROM BERNARDINO ST TO 4 TO 6 LANES ARROW HWY FROM 4 TO 6 LANES SAN 4A07329 LOCAL 0 MOUNTAIN AV BICKMORE EL PRADO WIDEN MOUNTAIN AVENUE FROM 2020 $347 BERNARDINO HIGHWAY BICKMORE TO EL PRADO SAN 4A07172 LOCAL 0 MOUNTAIN AV CHINO EDISON WIDEN MOUNTAIN FROM CHINO TO 2018 $2,000 BERNARDINO HIGHWAY EDISON FROM 2 TO 4 LANES SAN 4A01041 LOCAL 0 MOUNTAIN AV PHILADELPHIA ST RIVERSIDE DR WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $1,797 BERNARDINO HIGHWAY SAN 4120147 LOCAL 0 MOUNTAIN AVE BROOKS ST SIXTH ST WIDEN FROM 4 TO 6 LANES 2018 $3,177 BERNARDINO HIGHWAY SAN 4120107 LOCAL 0 MOUNTAIN AVE SCHAEFER AVE EDISON WIDEN MOUNTAIN AVE FROM SCHAEFER 2030 $207 BERNARDINO HIGHWAY AVE TO EDISON AVE FROM 2 TO 4 LANES SAN 4120175 LOCAL 0 MOUNTAIN VIEW LUGONIA SAN BERNARDINO WIDEN MOUNTAIN VIEW AVE FROM 2020 $501 BERNARDINO HIGHWAY AVE LUGONIA TO SAN BERNARDINO FROM 1 TO 2 LANES (EAST SIDE) SAN 4A07289 LOCAL 0 MT VERNON AV BARTON RD 700' N/O MINONA ST WIDEN MT VERNON AV FROM BARTON RD 2018 $616 BERNARDINO HIGHWAY 700' N/O MINONA ST FROM 2 LANES TO 4 LANES. SAN 4A01146 LOCAL 0 MT VERNON AV CANAL ST NORTH CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $579 BERNARDINO HIGHWAY SAN 4A04071 LOCAL 0 MT VERNON AV LA CADENA DR I-215 WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $2,305 BERNARDINO HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 372 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07264 LOCAL 0 MT VIEW THOMPSON PL ELECTRIC AV WIDEN MT VIEW AVE FROM THOMPSON 2030 $768 BERNARDINO HIGHWAY PL TO ELECTRIC AVE FROM 2 TO 4 LANES SAN 4A07211 LOCAL 0 MT VIEW AV I-10 SAN BERNARDINO AV WIDEN MT VIEW AV FROM I-10 TO SAN 2020 $1,440 BERNARDINO HIGHWAY BERNARDINO AV FROM 2 TO 4 LANES (WEST SIDE ONLY) SAN 4120190 LOCAL 0 MT VIEW AVE RAILWAY CROSSING WIDEN MT VIEW AVE AT RAILWAY 2030 $345 BERNARDINO HIGHWAY CROSSING FROM 2 TO 4 LANES, INCLUDING GATE IMPROVEMENTS SAN 4A04401 LOCAL 0 MULBERRY JURUPA AV SLOVER AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,266 BERNARDINO HIGHWAY SAN 4A04115 LOCAL 0 MULBERRY VALLEY BL SAN BERNARDINO AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,688 BERNARDINO HIGHWAY SAN 4A07271 LOCAL 0 MULBERRY AVE JURUPA SANTA ANA MULBERRY AVE FROM JURUPA AVE TO 2012 $700 BERNARDINO HIGHWAY SANTA ANA AVE WIDEN FROM 2 TO 4 LANES SAN 4G07420 LOCAL 0 NATIONAL TRAILS AT ORO GRANDE WIDEN UNDERPASS FROM 2-4 REPLACE GRADE SEPARATION AND 2020 $30,000 BERNARDINO HIGHWAY GRADE SEP LANES WIDEN UNDERPASS FROM 2-4 LANES SAN 4A1016 LOCAL 0 NATIONAL TRAILS MOJAVE RIVER MOJAVE DR REPLACE EXISTING RAILING TO MEET 2015 $1,375 BERNARDINO HIGHWAY HIGHWAY BRIDGE CURRENT STANDARDS AT MOJAVE RIVER SAN 4A07239 LOCAL 0 NATIONAL TRAILS MOJAVE RIVER 1.6 MI. N/O MOJAVE RIVER WIDEN NATIONAL TRAILS HIGHWAY 2020 $1,017 BERNARDINO HIGHWAY HWY FROM MOJAVE RIVER TO 1.6 MI. N/O MOJAVE RIVER – 2 TO 4 LANES SAN 4A01339 LOCAL 0 NATIONAL TRAILS MOJAVE RIVER I-15 WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $1,121 BERNARDINO HIGHWAY HWY (NOTE: OVERLAPS RTIP#SBD88140 FROM AIR EXPWY TO I-15) SAN 4A07025 LOCAL 0 NATIONAL TRAILS MOJAVE RIVER WIDEN NATIONAL TRAILS HIGHWAY 2020 $10,921 BERNARDINO HIGHWAY HWY BRIDGE OVER MOJAVE RIVER (REPLACE EXISTING BRIDGE) SAN 4120225 LOCAL 0 NATIONAL TRAILS 0.63 MI N/O AIR 2.21 MI. N/O AIR EXPWY WIDEN NATIONAL TRAILS HWY FROM 2020 $580 BERNARDINO HIGHWAY HWY EXPRESSWAY 0.63 MI N/O AIR EXPRESSWAY TO 2.21 MI. N/O AIR EXPWY SAN 4A07071 LOCAL 0 NAVAJO RD SR-18 THUNDERBIRD RD WIDEN NAVAJO RD FROM SR-18 TO 2018 $4,800 BERNARDINO HIGHWAY THUNDERBIRD RD FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 373

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07112 LOCAL 0 NEVADA ST LUGONIA AVE PALMETTO WIDEN NEVADA ST FROM LUGONIA AVE 2020 $3,375 BERNARDINO HIGHWAY TO PALMETTO FROM 2 TO 4 LANES SAN 4A07093 LOCAL 0 NEW CONNECTOR 3RD ST 5TH ST BUILD A CONNECTOR ROAD BETWEEN 2020 $4,597 BERNARDINO HIGHWAY 3RD ST AND 5TH ST FROM 0 TO 4 LANES SAN 4A07041 LOCAL 0 OAK GLEN RD COLORADO ST CASA BLANCA AVE WIDEN OAK GLEN RD FROM COLORADO 2030 $7,748 BERNARDINO HIGHWAY ST TO CASA BLANCA AVE FROM 2 TO 4 LANES SAN 4120063 LOCAL 0 OLEANDER ASTER CAUGHLIN RD WIDEN OLEANDER FROM ASTER TO 2030 $8,941 BERNARDINO HIGHWAY CAUGHLIN SAN 4120064 LOCAL 0 OLEANDER ECL ADELANTO RD WIDEN OLEANDER FROM ECL TO 2030 $5,849 BERNARDINO HIGHWAY ADELANTO RD SAN 4A07197 LOCAL 0 OLIVE STREET 0007M W, JACKSON E/0003M W RANCHO AVE WIDEN OLIVE STREET FROM 0007M W, 2020 $1,553 BERNARDINO HIGHWAY JACKSON E/0003M W, RANCHO AVE FROM 2 TO 4 LANES SAN 4A04218 LOCAL 0 ONTARIO/HELLMAN RIVERSIDE DR. BELLGRAVE WIDEN ONTARIO/HELLMAN AVE FROM 2030 $4,346 BERNARDINO HIGHWAY AVE FROM RIVERSIDE DR TO BELLGRAVE FROM 2 RIVERSIDE DR TO TO 4 LANES BELLGRAVE FROM 2 TO 4 LANES SAN 4120176 LOCAL 0 ORANGE ST I-10 LUGOINA AVE WIDEN ORANGE ST FROM I-10 TO 2020 $2,873 BERNARDINO HIGHWAY LUGOINA AVE FROM 2 TO 4 LANES SAN 4A01248 LOCAL 0 ORANGE ST LUGONIA AVE SAN BERNARDINO AVE WIDEN ORANGE ST FROM LUGONIA AVE 2020 $1,266 BERNARDINO HIGHWAY TO SAN BERNARDINO AVE FROM 2 TO 4 LANES SAN 4A01247 LOCAL 0 ORANGE ST PIONEER AVE N. CITY LIMITS WIDEN ORANGE ST FROM PIONEER AVE 2020 $9,074 BERNARDINO HIGHWAY TO N. CITY LIMITS FROM 2 TO 4 LANES SAN 4120177 LOCAL 0 ORANGE ST SAN BERNARDINO PIONEER AVE WIDEN ORANGE ST FROM SAN 2020 $687 BERNARDINO HIGHWAY AVE BERNARDINO AVE TO PIONEER AVE FROM 2 TO 4 LANES SAN 4A07054 LOCAL 0 ORANGE ST COLTON AV LUGONIA AV WIDEN FROM 1 TO 2 LANES EACH DIR – 2020 $5,850 BERNARDINO HIGHWAY CALTRANS (STATE ROUTE 38) SAN 4A07360 LOCAL 0 OTTAWA ST HESPERIA RD INDUSTRIAL BLVD WIDEN OTTAWA ST FROM HESPERIA 2020 $184 BERNARDINO HIGHWAY RD TO INDUSTRIAL BLVD FROM 0 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 374 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01343 LOCAL 0 OTTAWA ST MARIPOSA RD OTTAWA PL WIDEN OTTAWA ST FROM MARIPOSA RD 2012 $899 BERNARDINO HIGHWAY TO OTTAWA PL FROM 0 TO 4 LANES SAN 4A07275 LOCAL 0 PACIFIC ST 2 LOTS W/O COLE PALM AVE WIDEN FROM 2 TO 4 LANES 2020 $966 BERNARDINO HIGHWAY SAN 4A01340 LOCAL 0 PALM AV 3RD ST BASELINE WIDEN FROM 2 TO 4 LANES 2020 $3,475 BERNARDINO HIGHWAY SAN 4A07247 LOCAL 0 PALM AV CAJON BLVD I-215 WIDEN PALM AV FROM CAJON BLVD TO 2020 $912 BERNARDINO HIGHWAY I-215 FROM 2 TO 4 LANES SAN 4A07323 LOCAL 0 PALM AV PACIFIC AVE ATLANTIC AVE WIDEN PALM AVE FROM PACIFIC ST 2020 $386 BERNARDINO HIGHWAY TO ATLANTIC AVE FROM 2 LANES TO 4 LANES. SAN 4120067 LOCAL 0 PALMDALE RD ASTER RICHARDSON WIDEN PALMDALE RD FROM ASTER TO 2035 $10,131 BERNARDINO HIGHWAY RICHARDSON SAN 4120066 LOCAL 0 PALMDALE RD RICHARDSON RD LESSING WIDEN PALMDALE RD FROM 2035 $9,915 BERNARDINO HIGHWAY RICHARDSON TO LESSING SAN 4A07023 LOCAL 0 PALMDALE RD US 395 I-15 WIDEN PALMDALE RD FROM US 395 2030 $11,603 BERNARDINO HIGHWAY TO I-15 FROM 4 TO 6 LANES. 8.5 LANE MILES SAN 4120065 LOCAL 0 PALMDALE RD US-395 ASTER WIDEN PALMDALE RD FROM US-395 TO 2035 $10,776 BERNARDINO HIGHWAY ASTER SAN 4A07154 LOCAL 0 PALMETTO AVE CALIFORNIA ST ALABAMA ST WIDEN PALMETTO AVE FROM 2020 $2,565 BERNARDINO HIGHWAY CALIFORNIA ST TO ALABAMA ST FROM 2 TO 4 LANES SAN 4A07068 LOCAL 0 PEPPER FOOTHILL SR-210 WIDEN PEPPER AVE FROM FOOTHILL 2035 $4,992 BERNARDINO HIGHWAY BLVD TO SR-210 FROM 2 TO 4 LANES SAN 4A07265 LOCAL 0 PEPPER RIALTO FOOTHILL WIDEN PEPPER AVE FROM RIALTO AVE TO 2035 $750 BERNARDINO HIGHWAY FOOTHILL BLVD FROM 2 TO 4 LANES SAN 4120186 LOCAL 0 PEPPER AVE N. TERMINUS HIGHLAND AVE WIDEN PEPPER AVE FROM N. TERMINUS 2014 $13,345 BERNARDINO HIGHWAY TO HIGHLAND AVE FROM 2 TO 4 LANES SAN 4A07200 LOCAL 0 PEPPER AVE SLOVER VALLEY WIDEN PEPPER AV FROM SLOVER TO 2020 $1,519 BERNARDINO HIGHWAY VALLEY FROM 2 TO 4 LANES SAN 4120112 LOCAL 0 PEPPER AVE I-10 AGUA MANSA RD WIDEN AND EXTEND PEPPER AVE FROM 2030 $5,914 BERNARDINO HIGHWAY I-10 TO AGUA MANSA RD FROM 0/2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 375

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07198 LOCAL 0 PERRIS HILL PARK 21ST ST PACIFIC ST WIDEN PERRIS HILL PARK RD FROM 21ST 2020 $1,839 BERNARDINO HIGHWAY RD ST TO PACIFIC ST FROM 2 TO 4 LANES SAN 4A01278 LOCAL 0 PHELAN RD SHEEP CREEK RD BALDY MESA RD WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $24,797 BERNARDINO HIGHWAY SAN 4A07191 LOCAL 0 PHILADELPHIA EAST END AV NORTON AVE WIDEN PHILADELPHIA AV FROM EAST 2020 $1,654 BERNARDINO HIGHWAY END AV TO NORTON AVE FROM 2 TO 4 LANES SAN 4A07293 LOCAL 0 PHILADELPHIA LOS ANGELES CRL EAST END AV WIDEN PHILADELPHIA AV FROM LOS 2020 $574 BERNARDINO HIGHWAY ANGELES CRL TO EAST END AV FROM 2 TO 4 LANES SAN 4A07269 LOCAL 0 PHILADELPHIA RAMONA MONTE VISTA WIDEN PHILADELPHIA AV FROM RAMONA 2020 $709 BERNARDINO HIGHWAY TO MONTE VISTA FROM 2 TO 4 LANES SAN 4A01042 LOCAL 0 PHILADELPHIA ST CENTRAL AV BENSON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $898 BERNARDINO HIGHWAY SAN 4A01043 LOCAL 0 PHILADELPHIA ST LA COUNTY LINE CENTRAL AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,935 BERNARDINO HIGHWAY SAN 4A07138 LOCAL 0 PHILADELPHIA ST VINEYARD AV CUCAMONGA CREEK WIDEN FROM 1 TO 2 LANES EACH DIR, 2018 $3,646 BERNARDINO HIGHWAY INCL. BRIDGE OVER CUCAMONGA CREEK SAN 4A07266 LOCAL 0 PHILADELPHIA ST CAMPUS AVE 750' E/O GROVE AVE WIDEN PHILADELPHIA ST FROM CAMPUS 2030 $948 BERNARDINO HIGHWAY FROM CAMPUS AVE AVE TO 750' E/O GROVE AVE FROM 2 TO TO 750' E/O GROVE 4 LANES AVE FROM 2 TO 4 LANES SAN 4A07252 LOCAL 0 PHILLIPS BLVD EAST END AVE ROSWELL AVE WIDEN PHILLIPS BLVD FROM EAST END 2020 $844 BERNARDINO HIGHWAY AVE TO ROSWELL AVE FROM 2 TO 4 LANES SAN 4A07124 LOCAL 0 PHILLIPS BLVD ROSWELL AVE YORBA AVE WIDEN PHILLIPS BLVD FROM ROSWELL 2020 $3,038 BERNARDINO HIGHWAY AVE TO YORBA AVE FROM 2 TO 4 LANES SAN 4A07107 LOCAL 0 PHILLIPS BLVD YORBA AV BENSON AV WIDEN PHILLIPS BLVD FROM YORBA AV 2020 $3,443 BERNARDINO HIGHWAY TO BENSON AV FROM 2 TO 4 LANES SAN 4A07390 LOCAL 0 PHILLIPS BLVD LA COUNTY LINE EAST END AVE WIDEN PHILLIPS BLVD FROM LA COUNTY 2030 $103 BERNARDINO HIGHWAY FROM LA COUNTY LINE TO EAST END AVE FROM 2 TO 4 LINE TO EAST END LANES AVE FROM 2 TO 4 LANES *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 376 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04045 LOCAL 0 PINE AV EUCLID AV HELLMAN WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $5,368 BERNARDINO HIGHWAY SAN 4A07244 LOCAL 0 PINE AV KENDALL DR BELMONT AV WIDEN PINE AVE FROM KENDALL DR TO 2030 $960 BERNARDINO HIGHWAY BELMONT AVE FROM 2 TO 4 LANES SAN 4A04044 LOCAL 0 PINE AV SR-71 EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $22,371 BERNARDINO HIGHWAY SAN 4A07116 LOCAL 0 PINE AVE SR-71 CHINO CREEK WIDEN PINE AVE FROM SR-71 TO 2018 $3,250 BERNARDINO HIGHWAY CHINO CREEK (NORTH SIDE ONLY) IN CONJUNCTION WITH CHINO PROJECT ID 200207 SAN 4C01001 LOCAL 0 PINE AVE (FOUR PINE AVE. RIVERSIDE COUNTY LINE NEW ARTERIAL CORRIDOR LINKING PINE 2030 $3,400 BERNARDINO HIGHWAY CORNERS) AVE, SCHLEISMAN AVE, ARLINGTON AVE (RIV. CO.) SAN 4A07216 LOCAL 0 PIPELINE AVE CHINO AV RIVERSIDE DR WIDEN PIPELINE AV FROM CHINO AVE TO 2020 $1,350 BERNARDINO HIGHWAY RIVERSIDE DR FROM 2 TO 4 LANES SAN 4A07059 LOCAL 0 PIPELINE AVE PHILADELPHIA MISSION BLVD WIDEN PIPELINE AV FROM PHILADELPHIA 2020 $5,400 BERNARDINO HIGHWAY AV TO MISSION BLVD FROM 2 TO 4 LANES SAN 4A07279 LOCAL 0 PIPELINE AVE RIVERSIDE WALNUT WIDEN PIPELINE AV FROM RIVERSIDE AV 2020 $675 BERNARDINO HIGHWAY TO WALNUT AV FROM 2 TO 4 LANES SAN 4A07303 LOCAL 0 PIPELINE AVE WALNUT .25 M NORTH WIDEN PIPELINE AV FROM WALNUT AV 2020 $506 BERNARDINO HIGHWAY TO .25 M NORTH FROM 2 TO 4 LANES SAN 4120134 LOCAL 0 POPLAR AVE SLOVER AVE VALLEY BLVD WIDEN POPLAR AVE FROM SLOVER AVE 2030 $16,925 BERNARDINO HIGHWAY TO VALLEY BLVD FROM 0 TO 4 LANES (I-10 OVERCROSSING) SAN 4120069 LOCAL 0 RACCOON AIR EXPRESSWAY EL MIRAGE RD WIDEN RACCOON FROM AIR 2020 $3,787 BERNARDINO HIGHWAY EXPRESSWAY TO EL MIRAGE SAN 4120071 LOCAL 0 RACCOON CACTUS AIR EXPRESSWAY WIDEN RACCOON FROM CACTUS TO AIR 2020 $3,985 BERNARDINO HIGHWAY EXPRESSWAY SAN 4120068 LOCAL 0 RACCOON COLUSA OLEANDER WIDEN RACCOON FROM COLUSA TO 2020 $3,695 BERNARDINO HIGHWAY OLEANDER SAN 4120070 LOCAL 0 RACCOON EL MIRAGE RD COLUSA RD WIDEN RACCOON FROM EL MIRAGE TO 2020 $2,658 BERNARDINO HIGHWAY COLUSA

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 377

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120072 LOCAL 0 RACCOON PALMDALE RD VILLA WIDEN RACCOON FROM PALMDALE TO 2020 $1,752 BERNARDINO HIGHWAY VILLA SAN 4A07151 LOCAL 0 RAMONA PHILADELPHIA PHILLIPS BLVD WIDEN RAMONA AV FROM PHILADELPHIA 2020 $2,633 BERNARDINO HIGHWAY TO PHILLIPS BLVD FROM 2 TO 4 LANES SAN 4A07032 LOCAL 0 RANCHERIAS RD RINCON CORWIN RD WIDEN RANCHERIAS RD FROM RINCON 2023 $9,450 BERNARDINO HIGHWAY RD TO CORWIN RD FROM 2 TO 4 LANES SAN 4A07148 LOCAL 0 RANCHO COLTON CITY LIMITS 5TH ST WIDEN RANCHO FROM COLTON CITY 2020 $3,218 BERNARDINO HIGHWAY LIMITS TO 5TH ST FROM 2 TO 4 LANES SAN 4A07351 LOCAL 0 RANCHO RD 2025' E/O GASLINE AT POWER LINE EASEMENT WIDEN RANCHO RD FROM 2025' 2020 $281 BERNARDINO HIGHWAY RD E/O GASLINE RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07160 LOCAL 0 RANCHO RD AMARGOSA NATIONAL TRAILS HWY WIDEN RANCHO FROM AMARGOSA TO 2020 $2,405 BERNARDINO HIGHWAY NATIONAL TRAILS HWY FROM 0 TO 4 LANES (INCLUDES WAS CROSSING) SAN 4A07282 LOCAL 0 RANCHO RD AMETHYST EL EVADO RD WIDEN RANCHO RD FROM AMETHYST RD 2020 $636 BERNARDINO HIGHWAY TO EL EVADO RD FROM 0 TO 4 LANES SAN 4A07257 LOCAL 0 RANCHO RD JUST W/O EL EVADO AT POWER LINE EASEMENT WIDEN RANCHO RD FROM JUST W/O EL 2020 $844 BERNARDINO HIGHWAY RD EVADO TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07376 LOCAL 0 RANCHO RD JUST W/O VILLAGE AT POWER LINE EASEMENT WIDEN RANCHO RD FROM JUST 2020 $154 BERNARDINO HIGHWAY DR W/O VILLAGE DR TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES SAN 4A04412 LOCAL 0 RANCHO RD KOALA RD CAUGHLIN RD NEW ROAD, 2 LANES EACH DIR PLUS 2020 $7,200 BERNARDINO HIGHWAY TURNING LANE SAN 4A01362 LOCAL 0 RANCHO RD NATIONAL TRAILS STODDARD WELLS RD WIDEN RANCHO RD FROM NATIONAL 2012 $1,210 BERNARDINO HIGHWAY HWY TRAILS HWY TO STODDARD WELLS RD FROM 0 TO 4 LANES. SAN 4A07301 LOCAL 0 RANCHO RD PACOIMA AT POWER LINE EASEMENT WIDEN RANCHO RD FROM PACOIMA TO 2020 $535 BERNARDINO HIGHWAY AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4120074 LOCAL 0 RANCHO ROAD AMETHYST US-395 WIDEN RANCHO ROAD FROM AMETHYST 2020 $5,434 BERNARDINO HIGHWAY TO US-395 SAN 4120073 LOCAL 0 RANCHO ROAD ASTER RICHARDSON WIDEN RANCHO ROAD FROM ASTER TO 2020 $3,487 BERNARDINO HIGHWAY RICHARDSON

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 378 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120075 LOCAL 0 RANCHO ROAD RICHARDSON RD LESSING WIDEN RANCHO ROAD FROM 2020 $6,445 BERNARDINO HIGHWAY RICHARDSON TO LESSING SAN 4120076 LOCAL 0 RANCHO ROAD US-395 ASTER WIDEN RANCHO ROAD FROM US-395 TO 2020 $2,469 BERNARDINO HIGHWAY ASTER SAN 4A07222 LOCAL 0 RANDALL AVE ALDER CEDAR WIDEN RANDALL AVE FROM ALDER AVE 2020 $1,266 BERNARDINO HIGHWAY TO CEDAR AVE FROM 2 TO 4 LANES SAN 4120135 LOCAL 0 RANDALL AVE ALDER AVE LOCUST AVE WIDEN RANDALL AVE FROM ALDER AVE 2030 $555 BERNARDINO HIGHWAY TO LOCUST AVE FROM 2 TO 4 LANES SAN 4A07061 LOCAL 0 RANDALL AVE CHERRY AV POPLAR AVE WIDEN RANDALL AVE FROM CHERRY AV 2020 $5,299 BERNARDINO HIGHWAY TO POPLAR AV FROM 2 TO 4 LANES SAN 4A04077 LOCAL 0 RECHE CANYON RD BARTON RD CITY LIMITS WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $1,438 BERNARDINO HIGHWAY SAN 4A07204 LOCAL 0 RECHE CNYN RD 1.2M S/O BARTON 0.78M NORTH BARTON RD WIDEN RECHE CNYN RD FROM 1.2M S/O 2030 $2,490 BERNARDINO HIGHWAY RD BARTON RD TO .78M NORTH FROM 2 TO 4 LANES SAN 4A07313 LOCAL 0 RECHE CNYN RD S. CRYSTAL RIDGE RIVERSIDE COUNTY LINE WIDEN RECHE CNYN RD FROM S. 2030 $2,570 BERNARDINO HIGHWAY CRYSTAL RIDGE TO RIVERSIDE COUNTY LINE FROM 2 TO 4 LANES SAN 4120116 LOCAL 0 RECHE CNYN RD WASHINGTON ST. CITY LIMITS WIDEN AND REALIGN RECHE CNYN RD 2030 $2,112 BERNARDINO HIGHWAY FROM WASHINGTON ST TO CITY LIMITS FROM 2 TO 4 LANES SAN 4A01249 LOCAL 0 REDLANDS BL WEST CITY LIMITS COLTON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $6,761 BERNARDINO HIGHWAY SAN 4120178 LOCAL 0 REDLANDS BLVD ALABAMA ST COLTON AV WIDEN REDLANDS BLVD AT 2020 $5,595 BERNARDINO HIGHWAY INTERSECTIONS OF ALABAMA ST AND COLTON AVE SAN 4120180 LOCAL 0 RENAISSANCE ALDER AVE AYALA DR REALIGN AND RECONSTRUCT 2020 $7,200 BERNARDINO HIGHWAY PKWY RENAISSANCE PKWY FROM ALDER AVE TO AYALA DR SAN 4A07135 LOCAL 0 RIALTO LENA RD TIPPECANOE WIDEN RIALTO AV FROM LENA RD TO 2030 $2,880 BERNARDINO HIGHWAY TIPPECANOE AV FROM 2 TO 4 LANES SAN 4A07199 LOCAL 0 RIALTO RIVERSIDE EAST CITY LIMITS WIDEN RIALTO AVE FROM RIVERSIDE 2018 $1,520 BERNARDINO HIGHWAY AVE TO EAST CITY LIMITS FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 379

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07178 LOCAL 0 RIALTO AVE SIERRA WY WATERMAN AVE WIDEN RIALTO AVE FROM SIERRA WY TO 2020 $2,299 BERNARDINO HIGHWAY WATERMAN AVE FROM 2 TO 4 LANES SAN 4120079 LOCAL 0 RICHARDSON AIR EXPRESSWAY EL MIRAGE RD WIDEN RICHARDSON FROM AIR 2030 $4,605 BERNARDINO HIGHWAY EXPRESSWAY TO EL MIRAGE SAN 4120077 LOCAL 0 RICHARDSON COLUSA OLEANDER WIDEN RICHARDSON FROM COLUSA TO 2030 $5,022 BERNARDINO HIGHWAY OLEANDER SAN 4120078 LOCAL 0 RICHARDSON EL MIRAGE RD COLUSA RD WIDEN RICHARDSON FROM EL MIRAGE 2030 $4,333 BERNARDINO HIGHWAY TO COLUSA SAN 4120080 LOCAL 0 RICHARDSON MOJAVE DR AIR EXPRESSWAY WIDEN RICHARDSON FROM MOJAVE TO 2030 $5,058 BERNARDINO HIGHWAY AIR EXPRESSWAY SAN 4120081 LOCAL 0 RICHARDSON PALMDALE RD VICTOR WIDEN RICHARDSON FROM PALMDALE 2030 $2,167 BERNARDINO HIGHWAY TO VICTOR SAN 4RL04 LOCAL 0 RIDESHARE COUNTYWIDE COUNTYWIDE RIDESHARE 2015 $1,600 BERNARDINO HIGHWAY SAN 4A07237 LOCAL 0 RIVERSIDE LOCUST CEDAR WIDEN RIVERSIDE AVE FROM LOCUST 2018 $1,060 BERNARDINO HIGHWAY AVE TO CEDAR AVE FROM 3 TO 4 LANES SAN 4A01079 LOCAL 0 RIVERSIDE AV RIVERSIDE COUNTY NORTH CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $1,467 BERNARDINO HIGHWAY LINE SAN 4A01258 LOCAL 0 RIVERSIDE AV SOUTH CITY LIMIT SLOVER AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $3,186 BERNARDINO HIGHWAY SAN 4A01259 LOCAL 0 RIVERSIDE AV VALLEY BL N/O SLOVER AV WIDEN FROM 2 TO 4 LANES EACH DIR 2012 $1,800 BERNARDINO HIGHWAY (NOTE: OVERLAPS RTIP#SBD31808) SAN 4120187 LOCAL 0 RIVERSIDE AVE GATEWAY PLAZA SAN BERNARDINO AVE WIDEN RIVERSIDE AVE FROM GATEWAY 2018 $755 BERNARDINO HIGHWAY PLAZA TO SAN BERNARDINO AVE FROM 4 TO 6 LANES SAN 4120188 LOCAL 0 RIVERSIDE AVE SIERRA AVE ALDER AVE WIDEN RIVERSIDE AVE FROM SIERRA AVE 2020 $8,300 BERNARDINO HIGHWAY TO ALDER AVE FROM 3 TO 6 LANES SAN 4120117 LOCAL 0 RIVERSIDE AVE RIVERSIDE COUNTY SANTA ANA RIVER WIDEN RIVERSIDE AVE FROM RIV. 2030 $8,791 BERNARDINO HIGHWAY LINE COUNTY LINE TO SANTA ANA RIVER FROM 4 TO 6 LANES SAN 4120118 LOCAL 0 RIVERSIDE AVE SANTA ANA RIVER AGUA MANSA RD WIDEN RIVERSIDE AVE FROM SANTA ANA 2030 $1,811 BERNARDINO HIGHWAY RIVER TO AGUA MANSA RD FROM 4 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 380 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01046 LOCAL 0 RIVERSIDE DR BENSON AV MAGNOLIA AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $854 BERNARDINO HIGHWAY SAN 4A01047 LOCAL 0 RIVERSIDE DR FERN AV EUCLID AV WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $777 BERNARDINO HIGHWAY SAN 4A01048 LOCAL 0 RIVERSIDE DR MOUNTAIN AV MAGNOLIA AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $466 BERNARDINO HIGHWAY SAN 4A01049 LOCAL 0 RIVERSIDE DR PIPELINE FERN AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $4,777 BERNARDINO HIGHWAY SAN 4A01050 LOCAL 0 RIVERSIDE DR WEST CITY LIMITS BENSON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $2,167 BERNARDINO HIGHWAY SAN 4120101 LOCAL 0 RIVERSIDE DR CENTRAL AVE MOUNTAIN AVE WIDEN RIVERSIDE DR FROM CENTRAL 2020 $4,668 BERNARDINO HIGHWAY AVE TO MOUNTAIN AV FROM 4 TO 6 LANES SAN 4120102 LOCAL 0 RIVERSIDE DR MOUNTAIN AVE FERN AVE WIDEN RIVERSIDE DR FROM MOUNTAIN 2020 $4,126 BERNARDINO HIGHWAY AVE TO FERN AVE FROM 2 TO 6 LANES SAN 4120103 LOCAL 0 RIVERSIDE DR PIPELINE CENTRAL AVE WIDEN RIVERSIDE DR FROM PIPELINE 2020 $5,972 BERNARDINO HIGHWAY AVE TO CENTRAL AVE FROM 4 TO 6 LANES SAN 4120108 LOCAL 0 RIVERSIDE DR WCL 800' E/O RESERVIOR AVE WIDEN RIVERSIDE DR FROM WCL TO 800' 2020 $664 BERNARDINO HIGHWAY E/O RESERVIOR AVE FROM 4 TO 6 LANES (N. SIDE ONLY) SAN 4A04219 LOCAL 0 RIVERSIDE DR EUCLID AVE MILLIKEN AVE WIDEN RIVERSIDE DR FROM EUCLID AVE 2030 $13,707 BERNARDINO HIGHWAY FROM EUCLID TO MILLIKEN AVE FROM 2 TO 4 LANES AVE TO MILLIKEN AVE FROM 2 TO 4 LANES SAN 4A01168 LOCAL 0 ROCK SPRINGS RD GLENDALE AVE E CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2023 $1,500 BERNARDINO HIGHWAY SAN 4A07082 LOCAL 0 ROCK SPRINGS RD MOJAVE RIVER CL KIOWA RD WIDEN ROCK SPRINGS RD FROM MOJAVE 2020 $4,204 BERNARDINO HIGHWAY RIVER CRL TO KIOWA RD FROM 2 TO 4 LANES SAN 4A07123 LOCAL 0 ROCK SPRINGS RD GLENDALE AVE MOJAVE RIVER CRL WIDEN ROCK SPRINGS RD FROM 2020 $428 BERNARDINO HIGHWAY GLENDALE AVE TO MOJAVE RIVER CRL FROM 2 LANES TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 381

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07058 LOCAL 0 ROUNDUP WY KIOWA CENTRAL WIDEN ROUNDUP WY FROM KIOWA RD TO 2020 $5,400 BERNARDINO HIGHWAY CENTRAL FROM 2 TO 4 LANES SAN 4G0103/ LOCAL 0 SAN ANTONIO AV IN ONTARIO (ALHAMBRA) (LOS ANGELES) SPOT WIDENING (LOW OPTION), GRADE 2035 $21,677 BERNARDINO 4G0109 HIGHWAY SEPARATION (HIGH OPTION) WIDEN 2-4 LANES SAN 4A07101 LOCAL 0 SAN BERNARDINO WEST CITY LIMITS EAST CITY LIMITS WIDEN SAN BERNARDINO FROM WEST 2020 $3,584 BERNARDINO HIGHWAY CITY LIMITS TO EAST CITY LIMITS FROM 2 TO 4 LANES SAN 4A01281 LOCAL 0 SAN BERNARDINO ALABAMA ST CALIFORNIA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $5,050 BERNARDINO HIGHWAY AV SAN 4A01080 LOCAL 0 SAN BERNARDINO PEPPER AV MERIDIAN AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $507 BERNARDINO HIGHWAY AV SAN 4A01252 LOCAL 0 SAN BERNARDINO ROUTE 30 ORANGE ST WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $3,733 BERNARDINO HIGHWAY AV SAN 4A07147 LOCAL 0 SAN BERNARDINO ALABAMA ST REDLANDS CRL WIDEN SAN BERNARDINO AVE FROM 2020 $2,700 BERNARDINO HIGHWAY AVE ALABAMA ST TO REDLANDS CRL FROM 2 TO 6 LANES SAN 4A07033 LOCAL 0 SAN BERNARDINO ALDER AVE LAUREL AVE WIDEN SAN BERNARDINO AVE FROM 2020 $9,011 BERNARDINO HIGHWAY AVE ALDER AVE TO LAUREL AVE FROM 2 TO 4 LANES SAN 4A07072 LOCAL 0 SAN BERNARDINO CHERRY AVE FONTANA CITY LIMITS AVENUE WIDEN SAN BERNARDINO AVE FROM 2020 $4,658 BERNARDINO HIGHWAY AVE CHERRY AVE TO FONTANA CITY LIMITS FROM 2 TO 4 LANES SAN 4A01250 LOCAL 0 SAN BERNARDINO CHURCH ST WABASH AVE WIDEN SAN BERNARDINO AVE FROM 2030 $2,665 BERNARDINO HIGHWAY AVE CHURCH ST TO WABASH AVE FROM 2 TO 4 LANES SAN 4120119 LOCAL 0 SAN BERNARDINO COUNTY LIMIT RANCHO AVE WIDEN SAN BERNARDINO AVE FROM 2020 $155 BERNARDINO HIGHWAY AVE COUNTY LIMIT TO RANCHO AVE FROM 2 TO 4 LANES SAN 4A07109 LOCAL 0 SAN BERNARDINO ETIWANDA AVE CHERRY AVE WIDEN SAN BERNARDINO AVE FROM 2020 $3,375 BERNARDINO HIGHWAY AVE ETIWANDA AVE TO CHERRY AVE FROM 5 TO 6 LANES SAN 4A07079 LOCAL 0 SAN BERNARDINO LAUREL AVE RIALTO CITY LIMITS WIDEN SAN BERNARDINO AVE FROM 2020 $4,421 BERNARDINO HIGHWAY AVE LAUREL AVE TO RIALTO CITY LIMITS FROM 2 TO 4 LANES *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 382 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120179 LOCAL 0 SAN BERNARDINO SR-210 ORANGE ST WIDEN SAN BERNARDINO AVE FROM 2030 $1,915 BERNARDINO HIGHWAY AVE SR-210 TO ORANGE ST FROM 2 TO 4 LANES SAN 4A07240 LOCAL 0 SAN BERNARDINO WABASH AV OPAL AV WIDEN SAN BERNARDINO AV FROM 2030 $808 BERNARDINO HIGHWAY AVE WABASH AV TO OPAL AV FROM 2 TO 4 LANES SAN 4120120 LOCAL 0 SAN BERNARDINO PEPPER AVE COUNTY LIMIT WIDEN SAN BERNARDINO AVE FROM 2020 $1,867 BERNARDINO HIGHWAY AVE PEPPER AVE TO COUNTY LIMIT FROM 2 LANES TO 4 LANES SAN 4A01184 LOCAL 0 SAN BERNARDINO LA COUNTY LINE BENSON AVE WIDEN SAN BERNARDINO ST FROM LA 2030 $4,776 BERNARDINO HIGHWAY ST FROM LA COUNTY LINE TO BENSON AVE FROM 4 COUNTY LINE TO TO 6 LANES BENSON AVE FROM 4 TO 6 LANES SAN 4A07084 LOCAL 0 SAN SEVAINE BASELINE SUMMIT SAN SEVAINE RD FROM BASELINE AVE 2018 $4,200 BERNARDINO HIGHWAY TO SUMMIT AVE WIDEN FROM 2 TO 4 LANES SAN 4A01254 LOCAL 0 SAN TIMOTEO CYN RR CROSSING LIVE OAK CYN RD WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $6,895 BERNARDINO HIGHWAY RD SAN 4A07132 LOCAL 0 SANTA ANA AVE CEDAR AVE CACTUS AVE WIDEN SANTA ANA AVE FROM CEDAR 2020 $2,970 BERNARDINO HIGHWAY AVE TO CACTUS AVE FROM 2 TO 4 LANES SAN 4A07159 LOCAL 0 SANTA ANA AVE LOCUST CEDAR WIDEN SANTA ANA AVE FROM LOCUST 2020 $2,531 BERNARDINO HIGHWAY AVE TO CEDAR AVE FROM 2 TO 4 LANES SAN 4A07158 LOCAL 0 SANTA ANA AVE MULBERRY AVE REDWOOD AVE WIDEN SANTA ANA AV FROM MULLBERRY 2020 $2,531 BERNARDINO HIGHWAY AVE TO REDWOOD AVE FROM 2 TO 4 LANES SAN 4120136 LOCAL 0 SANTA ANA AVE MULLBERRY AVE ALMOND AVE WIDEN SANTA ANA AVE FROM 2030 $3,856 BERNARDINO HIGHWAY MULLBERRY AVE TO ALMOND AVE FROM 2 TO 4 LANES SAN 4A07153 LOCAL 0 SANTA ANA AVE TAMARIND LOCUST WIDEN SANTA ANA AVE FROM TAMARIND 2020 $2,565 BERNARDINO HIGHWAY TO LOCUST AVE FROM 2 TO 4 LANES SAN 4A01051 LOCAL 0 SCHAEFER AV BENSON AV EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $3,055 BERNARDINO HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 383

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04220 LOCAL 0 SCHAEFER AVE EUCLID AVE EDISON AVE WIDEN SCHAEFER AVE FROM EUCLID AVE 2030 $31,759 BERNARDINO HIGHWAY FROM EUCLID TO EDISON AVE FROM 2 TO 4 LANES AVE TO EDISON AVE FROM 2 TO 4 LANES SAN 4A07362 LOCAL 0 SENECA RD 0.4 M E/O HESPERIA ROAD B WIDEN SENECA RD FROM .4 M E/O 2020 $172 BERNARDINO HIGHWAY RD HESPERIA RD TO ROAD B FROM 0 TO 4 LANES SAN 4A07350 LOCAL 0 SENECA RD 2340' W/O EL EVADO AT POWER LINE EASEMENT WIDEN SENECA RD FROM 2340' W/O EL 2020 $287 BERNARDINO HIGHWAY RD EVADO RD TO AT POWER LINE EASEMENT FROM 3 TO 4 LANES SAN 4A07365 LOCAL 0 SENECA RD 2360' E/O US-395 AT POWER LINE EASEMENT WIDEN SENECA RD FROM 2360' E/O 2020 $165 BERNARDINO HIGHWAY US-395 TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4A07384 LOCAL 0 SENECA RD 650' W/O EMERALD AT POWER LINE EASEMENT WIDEN SENECA RD FROM 650' W/O 2020 $83 BERNARDINO HIGHWAY RD EMERALD RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES SAN 4120083 LOCAL 0 SENECA RD ASTER RICHARDSON WIDEN SENECA RD FROM ASTER TO 2030 $4,373 BERNARDINO HIGHWAY RICHARDSON SAN 4A07113 LOCAL 0 SENECA RD EMERALD RD AMETHYST RD WIDEN SENECA RD FROM EMERALD RD 2020 $3,375 BERNARDINO HIGHWAY TO AMETHYST RD FROM 2 TO 4 LANES SAN 4A07378 LOCAL 0 SENECA RD HESPERIA RD .2 M E/O HESPERIA RD WIDEN SENECA RD FROM HESPERIA RD 2020 $141 BERNARDINO HIGHWAY TO 0.2 M E/O HESPERIA RD FROM 0 TO 4 LANES SAN 4120084 LOCAL 0 SENECA RD RICHARDSON RD CAUGHLIN RD WIDEN SENECA RD FROM RICHARDSON 2030 $3,028 BERNARDINO HIGHWAY TO CAUGHLIN SAN 4120082 LOCAL 0 SENECA RD US-395 DAISY WIDEN SENECA RD FROM US-395 TO 2030 $3,202 BERNARDINO HIGHWAY DAISY SAN 4A01354 LOCAL 0 SENECA RD US-395 TOPAZ WIDEN SENECA RD FROM US-395 TO 2030 $625 BERNARDINO HIGHWAY TOPAZ FROM 0 TO 4 LANES SAN 4A04420 LOCAL 0 SH 247 ABERDEEN LINN WIDEN WITHIN ROW TO ACCOMMODATE 2018 $9,500 BERNARDINO HIGHWAY PASSING LANES SAN 4G0167 LOCAL 0 SHADOW MT HELENDALE RD NTH GRADE SEPARATION BRIDGE OVER 2018 $14,934 BERNARDINO HIGHWAY MOJAVE WIDEN TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 384 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01284A LOCAL 0 SIERRA AV I-15 LYTLE CREEK RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $679 BERNARDINO HIGHWAY SAN 4A04122 LOCAL 0 SIERRA AV SAN BERNARDINO AV FOOTHILL BLVD WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $19,600 BERNARDINO HIGHWAY SAN 4A04123 LOCAL 0 SIERRA AV SLOVER AV VALLEY BL WIDEN FROM 3 TO 4 LANES EACH DIR 2018 $1,120 BERNARDINO HIGHWAY SAN 4A04125 LOCAL 0 SIERRA AV SUMMIT AV I-15 WIDEN FROM 1 TO 3 LANES EACH DIR 2014 $7,000 BERNARDINO HIGHWAY SAN 4A01284B LOCAL 0 SIERRA AVE I-15 LYTLE CREEK RD WIDEN SIERRA AVE FROM I-15 TO LYTLE 2030 $526 BERNARDINO HIGHWAY CREED RD FROM 3 TO 4 LANES SAN 4A07034 LOCAL 0 SIERRA LAKES CHERRY ALMERIA SIERRA LAKES PKWY FROM CHERRY AVE 2018 $8,960 BERNARDINO HIGHWAY PKWY TO ALMERIA AVE WIDEN FROM 2 TO 4 LANES SAN 4120137 LOCAL 0 SIERRA LAKES CHERRY AVE BEECH AVE WIDEN SIERRA LAKES PKWY FROM 2035 $9,843 BERNARDINO HIGHWAY PKWY CHERRY AVE TO BEECH AVE FROM 2 TO 4 LANES SAN 4A07026 LOCAL 0 SITTING BULL RD APPLE VALLEY RD NAVAJO RD WIDEN SITTING BULL RD FROM APPLE 2023 $10,800 BERNARDINO HIGHWAY VALLEY RD TO NAVAJO RD FROM 2 TO 4 LANES SAN 4120121 LOCAL 0 SLOVER PEPPER AVE RIVERSIDE AVE WIDEN SLOVER FROM PEPPER AVE TO 2030 $3,024 BERNARDINO HIGHWAY RIVERSIDE AVE FROM 2 TO 4 LANES SAN 4A01285 LOCAL 0 SLOVER AV ALDER AV CACTUS AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,420 BERNARDINO HIGHWAY SAN 4A01260 LOCAL 0 SLOVER AV CACTUS AV RIVERSIDE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,348 BERNARDINO HIGHWAY SAN 4A07259 LOCAL 0 SLOVER AV TAMARIND E. CITY LIMITS SLOVER AV FROM TAMARIND AV TO E. 2018 $840 BERNARDINO HIGHWAY CITY LIMITS WIDEN FROM 4 TO 6 LANES SAN 4A07075 LOCAL 0 SMOKETREE RD TOPAZ RD AMARGOSA RD WIDEN SMOKETREE RD FROM TOPAZ RD 2020 $4,532 BERNARDINO HIGHWAY TO AMARGOSA RD FROM 0 TO 4 LANES (INCLUDES WASH CROSSING) SAN 4A07103 LOCAL 0 SO. HIGHLAND AV BASELINE CHERRY SO. HIGHLAND FROM BASELINE RD TO 2020 $3,500 BERNARDINO HIGHWAY CHERRY AV WIDEN FROM 0 LANES TO 4 LANES.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 385

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07166 LOCAL 0 SO. HIGHLAND AV SIERRA PALMETTO SO. HIGHLAND AVE FROM SIERRA AVE 2018 $2,100 BERNARDINO HIGHWAY TO PALMETTO AVE WIDEN FROM 2 TO 4 LANES SAN 4FR04 LOCAL 0 SOUTHERN AT SCLA AIRPORT TRACK AND INTERMODAL YARD 2030 $673,305 BERNARDINO HIGHWAY CALIFORNIA IMPROVEMENTS (PHASES 1 THROUGH 4) LOGISTICS AIRPORT RAIL PROJECT SAN 4A07043 LOCAL 0 SPRING VALLEY HUERTA RD DRIFTWOOD DR WIDEN SPRING VALLEY PKWY FROM 2020 $7,425 BERNARDINO HIGHWAY PKWY HUERTA RD TO DRIFTWOOD DR FROM 2 TO 4 LANES SAN 4A07031 LOCAL 0 STATE ST FOOTHILL BLVD I-215 WIDEN STATE ST FROM FOOTHILL BLVD 2035 $11,492 BERNARDINO HIGHWAY TO I-215 FROM 2 TO 4 LANES SAN 4120191 LOCAL 0 STATE ST HIGHLAND AVE N/O CAJON BLVD WIDEN STATE ST FROM HIGHLAND AVE 2035 $6,000 BERNARDINO HIGHWAY TO N/O CAJON BLVD FROM 2 LANES TO 4 LANES SAN 4A07050 LOCAL 0 STATE STREET IN SAN BERNARDINO WIDEN TO ULTIMATE 2020 $6,000 BERNARDINO HIGHWAY COUNTY SAN 4A07359 LOCAL 0 STODDARD WELLS DANTE ST I-15 WIDEN STODDARD WELLS FROM DANTE 2020 $187 BERNARDINO HIGHWAY ST TO OSBORNE RD, 0.56 MI. S/O I-15, FROM 2 TO 4 LANES SAN 4A07171 LOCAL 0 STODDARD WELLS LOS PADRES I-15 WIDEN STODDARD WELLS RD FROM LOS 2020 $2,025 BERNARDINO HIGHWAY RD PADRES RD TO I-15 FROM 2 TO 4 LANES SAN 4A07167 LOCAL 0 SUMMIT AV CHERRY AV SAN SEVAINE SUMMIT AV FROM CHERRY AV TO SAN 2018 $2,100 BERNARDINO HIGHWAY SEVAINE WIDEN FROM 2 LANES TO 4 LANES. SAN 4A07053 LOCAL 0 SUMMIT VALLEY RD 1.88M N/O SH-138 N/O SH-138 2.18M WIDEN SUMMIT VALLEY RD FROM 1.88M 2018 $5,886 BERNARDINO HIGHWAY N, SR-138 N 2.18M (HSP CL) SAN 4A07095 LOCAL 0 SUMMIT VALLEY RD 4.31M N/O SH-138 N/O SH-138 1.20M WIDEN SUMMIT VALLEY RD FROM 4.31M 2030 $4,173 BERNARDINO HIGHWAY N, SR-138 (HSP CL) N 1.20M (HSP CL) SAN 4A07117 LOCAL 0 SUMMIT VALLEY RD 4.31M N/O SH-138 N/O SH-138 1.20M WIDEN SUMMIT VALLEY RD FROM 4.31M 2018 $3,240 BERNARDINO HIGHWAY N, SR-138 (HSP CL) N 1.20M (HSP CL) SAN 4A07097 LOCAL 0 SUMMIT VALLEY RD SH 138 N1.88 MILES TO RANCHERO RD WIDEN SUMMIT VALLEY RD FROM 2035 $3,808 BERNARDINO HIGHWAY SR-138 TO RANCHERO RD FROM 2 TO 4 LANES *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 386 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07013 LOCAL 0 SUNBURST AVENUE SH62,N CRESTVIEW WIDEN EXISTING TRAFFIC LANES: 2020 $15,000 BERNARDINO HIGHWAY ADJUST VERTICAL PROFILE SAFETY SAN 4120226 LOCAL 0 THIRD AVE 0.25 M S/O NISQUALLI RD WIDEN THIRD AVE FROM .25 M S/O 2035 $2,012 BERNARDINO HIGHWAY NISQUALLI RD NISQUALLI RD TO NISQUALLI RD FROM 2 TO 4 LANES SAN 4120227 LOCAL 0 THIRD AVE 575' S/O NISQUALLI SILICA DR WIDEN THIRD AVE FROM 575' S/O 2035 $220 BERNARDINO HIGHWAY RD NISQUALLI RD TO SILICA DR FROM 0 TO 4 LANES SAN 4120228 LOCAL 0 THIRD AVE 600' N/O BEAR BEAR VALLEY RD WIDEN THIRD AVE FROM 600' N/O BEAR 2035 $82 BERNARDINO HIGHWAY VALLEY RD VALLEY RD TO BEAR VALLEY RD FROM 0 TO 4 LANES SAN 4A01018 LOCAL 0 THUNDERBIRD RD RANCHERIAS RD CENTRAL RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,200 BERNARDINO HIGHWAY SAN 4A07152 LOCAL 0 TIPPECANOE MILL ST HARRIMAN WIDEN TIPPECANOE FROM MILL ST TO 2012 $2,622 BERNARDINO HIGHWAY HARRIMAN FROM 4 TO 6 LANES SAN 4A07005 LOCAL 0 TIPPECANOE AVE SAN BERNARDINO SANTA ANA RIVER WIDEN BRIDGE FROM 4 TO 6 LANES 2020 $21,600 BERNARDINO HIGHWAY AVE SAN 4C01002 LOCAL 0 TONNER CANYON GRAND SR-57 NEW ARTERIAL CORRIDOR CONNECTING 2030 $288,030 BERNARDINO HIGHWAY (FOUR CORNERS) CHINO HILLS WITH SR-57 (LA/OR CO.) WITH 2 LANES EACH DIR, ACCESS TO SR-57 AT BREA CYN RD OR TONNER CYN RD, CONNECTION TO GRAND AVE AND EUCALYPTUS AVE, NO CONNECTION TO VALENCIA AVE SAN 4A07379 LOCAL 0 TOPAZ RD 360' N/O SENECA RD AT POWER LINE EASEMENT WIDEN TOPAZ RD FROM 360' N/O 2020 $138 BERNARDINO HIGHWAY SENECA RD TO AT POWERLINE EASEMENT FROM 0 TO 4 LANES SAN 4A07283 LOCAL 0 TOPAZ RD EUCALYPTUS SMOKETREE RD WIDEN TOPAZ RD FROM EUCALYPTUS RD 2020 $636 BERNARDINO HIGHWAY TO SMOKETREE RD FROM 0 TO 4 LANES SAN 4A07164 LOCAL 0 TOPAZ RD HOPLAND LUNA RD WIDEN TOPAZ RD FROM HOPLAND ST TO 2020 $2,228 BERNARDINO HIGHWAY LUNA ROAD FROM 0 TO 4 LANES SAN 4A01361 LOCAL 0 TOPAZ RD SENECA RD PALMDALE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,315 BERNARDINO HIGHWAY

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 387

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A07228 LOCAL 0 UNIVERSITY PKWY HALLMARK PKWY BNSF GRADE SEPARATION WIDEN UNIVERSITY PKWY FROM 2012 $1,200 BERNARDINO HIGHWAY HALLMARK PKWY TO BNSF GRADE SEPARATION FROM 2 TO 4 LANES SAN 4A07272 LOCAL 0 VALLEY BLVD ALMOND CHERRY VALLEY BLVD FROM ALMOND AVE TO 2018 $700 BERNARDINO HIGHWAY CHERRY AVE WIDEN FROM 4 TO 6 LANES SAN 4A07284 LOCAL 0 VALLEY BLVD CHERRY AVE HEMLOCK WIDEN VALLEY BLVD FROM CHERRY AVE 2020 $633 BERNARDINO HIGHWAY TO HEMLOCK AVE FROM 5 TO 6 LANES SAN 4A07201 LOCAL 0 VALLEY BLVD ETIWANDA AVE COMMERCE DR WIDEN VALLEY BLVD FROM ETIWANDA 2020 $1,519 BERNARDINO HIGHWAY AVE TO COMMERCE DR FROM 5 TO 6 LANES SAN 4120138 LOCAL 0 VALLEY BLVD POPLAR AVE ALDER AVE WIDEN VALLEY BLVD FROM SIERRA AVE 2035 $2,419 BERNARDINO HIGHWAY TO ALDER AVE FROM 4 TO 6 LANES SAN 4A01261 LOCAL 0 VALLEY BLVD SPRUCE AV SYCAMORE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,509 BERNARDINO HIGHWAY SAN 4A01082 LOCAL 0 VALLEY BLVD SYCAMORE AV MT. VERNON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $4,015 BERNARDINO HIGHWAY SAN 4120192 LOCAL 0 VARIOUS VARIOUS ITS PROJECTS THROUGHOUT 2035 $471,291 BERNARDINO HIGHWAY LOCATIONS SAN BERNARDINO COUNTY SAN 4120193 LOCAL 0 VARIOUS VARIOUS TRAFFIC SIGNAL PROJECTS 2035 $51,992 BERNARDINO HIGHWAY LOCATIONS THROUGHOUT SAN BERNARDINO COUNTY SAN 4120086 LOCAL 0 VERBENA AIR EXPRESSWAY EL MIRAGE RD WIDEN VERBENA FROM AIR EXPRESSWAY 2035 $2,479 BERNARDINO HIGHWAY TO EL MIRAGE SAN 4120085 LOCAL 0 VERBENA CACTUS AIR EXPRESSWAY WIDEN VERBENA FROM CACTUS TO AIR 2035 $3,140 BERNARDINO HIGHWAY EXPRESSWAY SAN 4120087 LOCAL 0 VERBENA EL MIRAGE RD CALLEJA WIDEN VERBENA FROM EL MIRAGE TO 2035 $2,167 BERNARDINO HIGHWAY CALLEJA SAN 4120151 LOCAL 0 VICTORIA AVE EHS I-15 WIDEN VICTORIA AVE FROM EHS TO I-15 2014 $280 BERNARDINO HIGHWAY SAN 4G0105 LOCAL 0 VINEYARD AV IN ONTARIO (ALHAMBRA) SAFETY UPGRADE (LOW OPTION), GRADE 2018 $55,633 BERNARDINO HIGHWAY SEPARATION (HIGH OPTION) WIDEN 4-6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 388 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A01222 LOCAL 0 VINEYARD AVE 4TH ST I-10 WIDEN VINEYARD AVE FROM 4TH ST TO 2030 $1,205 BERNARDINO HIGHWAY FROM 4TH ST TO I-10 FROM 4 TO 6 LANES I-10 FROM 4 TO 6 LANES SAN 4A04223 LOCAL 0 VINEYARD AVE RIVERSIDE DR. EDISON AVE WIDEN VINEYARD AVE FROM RIVERSIDE 2030 $5,850 BERNARDINO HIGHWAY FROM RIVERSIDE DR TO EDISON AVE FROM 2 TO 6 LANES DR TO EDISON AVE FROM 2 TO 6 LANES SAN 4120088 LOCAL 0 VINTON AIR EXPRESSWAY EL MIRAGE RD WIDEN VINTON FROM AIR EXPRESSWAY 2020 $3,182 BERNARDINO HIGHWAY TO EL MIRAGE SAN 4120089 LOCAL 0 VINTON DESERT FLOWER OLEANDER WIDEN VINTON FROM DESERT FLOWER 2020 $2,488 BERNARDINO HIGHWAY TO OLEANDER SAN 4120091 LOCAL 0 VINTON EL MIRAGE RD COLUSA RD WIDEN VINTON FROM EL MIRAGE TO 2020 $2,488 BERNARDINO HIGHWAY COLLUSA SAN 4120092 LOCAL 0 VINTON MOJAVE DR AIR EXPRESSWAY WIDEN VINTON FROM MOJAVE TO AIR 2020 $3,855 BERNARDINO HIGHWAY EXPRESSWAY SAN 4120090 LOCAL 0 VINTON PALMDALE RD VICTOR WIDEN VINTON FROM PALMDALE TO 2020 $1,199 BERNARDINO HIGHWAY VICTOR SAN 4A07196 LOCAL 0 W. VAN LEUVEN ST. EVANS ST. ORANGE GROVE ST. NEW ROAD, 1 LANES EACH DIR 2012 $1,600 BERNARDINO HIGHWAY SAN 4A07029 LOCAL 0 WAALEW RD CORWIN RD CENTRAL WIDEN WAALEW RD FROM CORWIN RD 2018 $10,000 BERNARDINO HIGHWAY TO CENTRAL RD FROM 2 TO 4 LANES SAN 4A07235 LOCAL 0 WABASH AV .30 M S/O SEVENTH .13M N/O SEVENTH ST WIDEN WABASH AV FROM .30 M S/O 2020 $1,138 BERNARDINO HIGHWAY ST SEVENTH ST TO .13M N/O SEVENTH ST FROM 2 TO 4 LANES SAN 4A07321 LOCAL 0 WABASH AV 6TH AV TO 5TH AV 5TH AV WIDEN WABASH AV FROM 6TH AV TO 5TH 2020 $734 BERNARDINO HIGHWAY FROM AV FROM 2 TO 4 LANES SAN 4A07253 LOCAL 0 WABASH AV COLTON AV SR 38 WIDEN WABASH AV FROM COLTON AV TO 2020 $844 BERNARDINO HIGHWAY SR 38 FROM 2 TO 4 LANES SAN 4A07381 LOCAL 0 WABASH AV REDLANDS CITY I-10 WIDEN WABASH AV FROM REDLANDS 2020 $101 BERNARDINO HIGHWAY LIMITS CITY LIMITS TO I-10 FROM 2 TO 4 LANES SAN 4A07254 LOCAL 0 WABASH AV SR-38 TO SAN SAN BERNARDINO WIDEN WABASH AV FROM SR-38 TO SAN 2020 $1,224 BERNARDINO HIGHWAY BERNARDINO BERNARDINO AVE FROM 2 TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 389

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04224 LOCAL 0 WALKER AVE FROM RIVERSIDE S. CITY LIMITS WIDEN WALKER AVE FROM RIVERSIDE TO 2030 $4,346 BERNARDINO HIGHWAY RIVERSIDE TO S. S. CITY LIMIT CITY LIMIT SAN 4A07077 LOCAL 0 WALNUT I-15 SAN SERVAINE WALNUT AVE FROM I-15 TO SAN 2018 $4,480 BERNARDINO HIGHWAY SERVAINE FROM 2 TO 4 LANES SAN 4A04137 LOCAL 0 WALNUT AV ALMERIA SIERRA WIDEN FROM 1 TO 2 LANES EACH DIR 2014 $5,880 BERNARDINO HIGHWAY SAN 4A07194 LOCAL 0 WASHINGTON ST BARTON RD I-215 WIDEN WASHINGTON FROM BARTON RD 2018 $1,610 BERNARDINO HIGHWAY TO I-215 FROM 4 TO 6 LANES SAN 4120123 LOCAL 0 WASHINGTON ST AQUEDUCT LA CADENA DR WIDEN WASHINGTON ST TO FROM 2030 $4,136 BERNARDINO HIGHWAY AQUEDUCT TO LA CADENA DR FROM 0 TO 2 LANES SAN 4120122 LOCAL 0 WASHINGTON ST WATERMAN I-215 WIDEN WASHINGTON ST FROM 2030 $5,640 BERNARDINO HIGHWAY WATERMAN TO I-215 FROM 4 TO 6 LANES SAN 4A01292 LOCAL 0 WATERMAN AV 5TH ST BASELINE AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $6,912 BERNARDINO HIGHWAY SAN 4A07003 LOCAL 0 WATERMAN AV/I-10 HOSPITALITY LANE REDLANDS BLVD REPLACE I-10 BRIDGE TO WIDEN 2030 $30,000 BERNARDINO HIGHWAY WATERMAN AVE FROM 4 TO 6 LANES SAN 4A01376A LOCAL 0 WILDWOOD CALIMESA BL COLORADO ST WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,359 BERNARDINO HIGHWAY CANYON RD SAN 4A01376B LOCAL 0 WILDWOOD COLORADO ST CANYON DR WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,785 BERNARDINO HIGHWAY CANYON RD SAN 4A07022 LOCAL 0 WILDWOOD CYN RD OUTER I-10 CALIMESA BLVD NEW RD WIDEN WILDWOOD CYN RD FROMOUTER 2020 $11,905 BERNARDINO HIGHWAY I-10 ST TO CALIMESA BLVD FROM 2 LANES TO 4 LANES. SAN 4120170 LOCAL 0 WILSON AVE EAST AVE WARDMAN/BULLOCH WIDEN WILSON AVE FROM EAST AVE 2030 $4,532 BERNARDINO HIGHWAY TO WARDMAN/BULLOCH FROM 0 TO 4 LANES SAN 4120171 LOCAL 0 WILSON AVE MILLIKEN DAY CREEK BLVD WIDEN WILSON AVE FROM MILLIKEN TO 2030 $5,747 BERNARDINO HIGHWAY DAY CREEK BLVD FROM 0 TO 4 LANES SAN 4A07051 LOCAL 0 WILSON RANCH DUNCAN ROAD PALMDALE PAVE DIRT ROAD, 1 LANE EACH DIR 2020 $6,000 BERNARDINO HIGHWAY ROAD

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 390 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4120097 LOCAL 0 YUCA LOMA RD WEST TOWN LIMITS SR-18 WIDEN YUCA LOMA RD FROM WEST 2030 $8,108 BERNARDINO HIGHWAY TOWN LIMITS TO SR-18 FROM 2 TO 4 LANES SAN 4A04418 LOCAL 0 YUCAIPA BL I-10 BRYANT ST WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $15,642 BERNARDINO HIGHWAY SAN 4120098 LOCAL 0 YUCCA LOMA RD YATES RD W. TOWN LIMITS WIDEN YUCCA LOMA RD (MOJAVE BR) 2030 $43,095 BERNARDINO HIGHWAY (MOJAVE BR) FROM YATES RD TO W TOWN LIMITS FROM 0 TO 4 LANES SAN 4A07106 LOCAL 0 .WASHINGTON ST. FROM .90 MILES 2018 $28,000 BERNARDINO HIGHWAY WEST OF WASHINGTON ST. TO LA CADENA MT. VERNON CONSTRUCT NEW 4 LANE ROADWAY (FOR PA & ED ONLY) SAN SBD031422 LOCAL 0 3RD AVENUE NISQUALLI ROAD TO GREEN 2014 $750 BERNARDINO HIGHWAY TREE BOULEVARD WIDEN FROM 2 LANES TO 4 LANES SAN 4OM0701- LOCAL 0 3RD STREET FROM TIPPECANOE AVENUE 2015 $3,200 BERNARDINO 201181 HIGHWAY TO LELAND/NORTON WAY AND FROM LELAND/NORTON WAY TO VICTORIA AVENUE SHOULDER WIDENING AND MEDIANS- 1.25 MILES)(NO THROUGH LANE WIDENING) TOTAL LENGTH 1.95 MILES FORMERLY PART OF PROJECT ID 200852 SAN SBD59019 LOCAL 0 40TH ST. FROM ACRE LANE TO ELECTRIC 2018 $3,264 BERNARDINO HIGHWAY AVENUE; ACQUIRE ROW AND WIDEN ROAD FROM 2 TO 4 LANES (1,200 FT.) SAN 4A07119 LOCAL 0 5TH STREET FROM STERLING AVE TO 2018 $5,800 BERNARDINO HIGHWAY VICTORIA AVE WIDEN FROM 2-4 LANES. SAN SBD55031 LOCAL 0 ALABAMA STREET FROM 3RD STREET TO 2018 $1,078 BERNARDINO HIGHWAY SOUTH CITY LIMITS – WIDEN FROM 2 TO 3 S/B LANES (0.25 MILES) SAN 200419 LOCAL 0 ALABAMA STREET WIDENING – WIDEN 2014 $7,200 BERNARDINO HIGHWAY FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 391

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD031218 LOCAL 0 ALDER AVENUE BASELINE TO FOOTHILL 2014 $2,624 BERNARDINO HIGHWAY BOULEVARD WIDEN 2 LANES TO 4 LANES W/TURN LANES SAN SBD41427 LOCAL 0 AMBOY ROAD – LEAR AVE TO ADOBE RD. 2014 $550 BERNARDINO HIGHWAY (5.5 MILES) CONSTRUCT NEW 2 LANE ROAD (ONE LANE IN EACH DIRECTION) SAN SBD031418 LOCAL 0 AMETHYST ROAD PALMDALE ROAD TO 2012 $4,000 BERNARDINO HIGHWAY HOPLAND STREET WIDEN EXISTING ROAD FROM 2 LANES TO 4 LANES SAN SBD031233 LOCAL 0 ARROW BOULEVARD ALDER TO MAPLE 2014 $2,008 BERNARDINO HIGHWAY AVENUE WIDEN 2 LANES TO 4 LANES SAN SBD031235 LOCAL 0 ARROW HIGHWAY ALMERIA TO CITRUS 2018 $1,265 BERNARDINO HIGHWAY AVENUE WIDEN 2 LANES TO 4 LANES SAN 200630 LOCAL 0 ARROW ROUTE WIDENING FROM 2 TO 4 2012 $3,420 BERNARDINO HIGHWAY LANES. BRIDGE AND STREET WIDENING FOR ARROW ROUTE, FROM MONTE VISTA AVENUE TO BENSON AVENUE (PROJECT WAS 200630 IN 2008 RTIP) SAN 200157 LOCAL 0 AT MAIN STREET AND IOWA AVENUE AND 2010 $369 BERNARDINO HIGHWAY APPROX. 300' NORTH AND 300' EAST OF EACH SIDE OF STREET-INTERSECTION IMPROVEMENTS, CURB & GUTTER, REMOVE BILLBOARD AND TRAFFIC SIGNAL SAN SBD031361 LOCAL 0 AYALA DRIVE BASELINE ROAD TO SR210 2012 $2,703 BERNARDINO HIGHWAY WIDEN FROM 2 LANES TO 4 LANES SAN 200810 LOCAL 0 BAKER BLVD. BRIDGE – OVER MOJAVE 2018 $2,910 BERNARDINO HIGHWAY RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANE BRIDGE (BRIDGE NO 54C0127) SAN SBD031295 LOCAL 0 BARTON ROAD EAST CITY LIMITS TO 2020 $690 BERNARDINO HIGHWAY WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SPOT WIDENINGS SAN 4OM0701- LOCAL 0 BASE LINE FROM SEINE AVENUE TO 2018 $583 BERNARDINO 201191 HIGHWAY STONEY CREEK DRIVE – WIDEN FROM 4-6 LANES (0.2 MILES) *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 392 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200019 LOCAL 0 BASELINE ACROSS CITY CREEK – FROM 2015 $22,810 BERNARDINO HIGHWAY 600' W TO 600' EAST OF CITY CREEK RECONSTRUCT EXISTING BRIDGE TO INCREASE HYDRAULIC CAPACITY (NO ADDTL LANES – STILL 4) REPLACING LOW WATER XING(54C0035) SAN SBD031217 LOCAL 0 BEECH AVENUE FOOTHILL TO MILLER 2014 $4,630 BERNARDINO HIGHWAY AVE WIDEN FROM 2 LANES TO 4 LANES SAN 200018 LOCAL 0 BOULDER AV ACROSS CITY CREEK S/O 2012 $21,898 BERNARDINO HIGHWAY BASELINE – RECONSTRUCT EXISTING BRIDGE FROM 2 TO 4 LANES; ALSO WIDEN BOULDER AVE FROM 190' NORTH TO 1,430' SOUTH OF BRIDGE FROM 2-4 LANES (54C0648) SAN SBD55033 LOCAL 0 BOULDER AVE. FROM GREENSPOT TO 2018 $2,350 BERNARDINO HIGHWAY SOUTH CITY LIMITS – WIDEN FROM 2-4 LANES (0.60 MILES) SAN 4OM0701- LOCAL 0 BRYANT STREET IMPROVEMENTS, OAK 2010 $720 BERNARDINO 2011158 HIGHWAY GLEN RD. TO DATE AVE. EMBANKMENT/ SLOPE PROTECTION SAN 4A01256 LOCAL 0 CACTUS WIDENING – WIDEN CACTUS 2014 $2,235 BERNARDINO HIGHWAY FROM VALLEY TO WALNUT AVENUES FROM 2-4 LANES SAN SBD31876 LOCAL 0 CALIFORNIA STREET BARTON ROAD TO 2018 $1,090 BERNARDINO HIGHWAY REDLANDS BOULEVARD WIDEN FROM 2 TO 4 LANES SAN SBD59023 LOCAL 0 CAMPUS PKWY-PEPPER/LINDEN DRIVE 2020 $22,000 BERNARDINO HIGHWAY EXTENSION FROM KENDALL TO I-215 FWY – CONSTRUCT (4) LANE ROADWAY – BETWEEN KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT) SAN 4A04084 LOCAL 0 CASA GRANDE AVENUE FROM LYTLE 2018 $10,500 BERNARDINO HIGHWAY CREEK ROAD TO MANGO AVENUE CONSTRUCT 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 393

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200608 LOCAL 0 CENTRAL AVENUE WIDENING PROJECT 2012 $5,600 BERNARDINO HIGHWAY BETWEEN WATERMAN AND MT.VIEW AVE.(2 MI) -WIDEN FROM 2-4 LANES BETWEEN TIPPECANOE AND MT.VIEW, ADDING CURBS, SIDEWALKS AND LIGHTING SAN 200023 LOCAL 0 CHERRY AV FROM SOUTH CITY LIMITS TO 2016 $470 BERNARDINO HIGHWAY WILSON AV – WIDEN FROM 2 TO 4 LANES SAN 200409 LOCAL 0 CHERRY AVE. AT SCRRA RR CROSSING 2018 $8,829 BERNARDINO HIGHWAY – WIDEN BRIDGE FROM 4-6 LANES ON CHERRY OVER RR CROSSING (FROM MERRILL TO WHITTRAM) SAN 200410 LOCAL 0 CHERRY AVE. WIDENING FROM 2012 $7,291 BERNARDINO HIGHWAY WHITTRAM TO FOOTHILL BLVD. -WIDEN 4-6 LANES SAN 4A04087 LOCAL 0 CHERRY AVENUE FROM SOUTH 2018 $2,625 BERNARDINO HIGHWAY HIGHLAND TO I-15 WIDEN (2-6 LANES) SAN SBD58044 LOCAL 0 CITRUS AVENUE AUBURN CT. TO WABASH 2014 $525 BERNARDINO HIGHWAY AVENUE WIDEN FROM 2 TO 4 LANES SAN 200006 LOCAL 0 CITRUS AVENUE FROM JURUPA TO 2012 $5,830 BERNARDINO HIGHWAY SLOVER – WIDEN FROM 2-4 LANES W/ LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA AVE. & JURUPA-3 INTERSECTIONS) SAN 4A01093 LOCAL 0 CITRUS AVENUE FROM SUMMIT AVENUE 2018 $2,625 BERNARDINO HIGHWAY TO I-15 WIDEN FROM 2 TO 4 LANES SAN 4G0154 LOCAL 0 CONSTRUCT NEW RAILROAD GRADE- 2014 $53,995 BERNARDINO HIGHWAY SEPARATED CROSSING BETWEEN LAUREL STREET AND THE BNSF RAILROAD IN THE CITY OF COLTON. WORK ALONG LAUREL STREET BEGINS APPROXIMATELY 420 FT EAST OF PENNSYLVANIA AVE AND 195FT WEST OF 9TH ST. NO ADDITIONAL LANES ARE PROPOSED.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 394 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4OM0701- LOCAL 0 COUNTY LINE ROAD IMPROVEMENTS 2012 $480 BERNARDINO 2011159 HIGHWAY FROM I-10 TO CALIMESA – INSTALL LEFT TURN LANE AND SIGNAL AT CALIMESA AND COUNTY LINE RD. SAN 200408 LOCAL 0 CUMBERLAND DRIVE EXTENSION – SH 18 2018 $3,000 BERNARDINO HIGHWAY NORTH TO CUMBERLAND DRIVE -PAVE NEW ROAD – 1 LANE IN EACH DIRECTION SAN 4A1005 LOCAL 0 CYPRESS AVENUE FROM DUNCAN 2018 $3,200 BERNARDINO HIGHWAY CANYON ROAD TO FRONTAGE ROAD (I-15)-CONSTRUCT NEW 2 LANE ROAD SAN 4A07214 LOCAL 0 DEL ROSA DRIVE FROM 5TH STREET 2018 $673 BERNARDINO HIGHWAY TO 6TH STREET-WIDEN FROM 2 TO 4 LANES (0.2 MILES) FORMERLY PART OF PROJECT ID 200852 SAN 4A01099 LOCAL 0 DUNCAN CANYON ROAD FROM CITRUS 2018 $5,251 BERNARDINO HIGHWAY AVENUE TO SIERRA AVENUE CONSTRUCT 4 LANES. SAN 4A1006 LOCAL 0 DUNCAN CANYON ROAD FROM I-15 2014 $1,312 BERNARDINO HIGHWAY TO CITRUS AVENUE-WIDEN FROM 2-4 LANES SAN SBD031118 LOCAL 0 EDISON AVENUE RAMONA TO CENTRAL 2014 $2,000 BERNARDINO HIGHWAY WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING) SAN SBD031419 LOCAL 0 EL EVADO ROAD, PALMDALE RD TO AIR 2012 $4,000 BERNARDINO HIGHWAY BASE ROAD PALMDALE TO HOPLAND (12/98) HOPLAND TO AIR BASE (12/96), WIDEN FROM 2 TO 4 WITH LEFT TURN LANES SAN 200151 LOCAL 0 EL MIRAGE RD. FROM RICHARDSON 2014 $5,295 BERNARDINO HIGHWAY RD. (CITY LIMITS) TO SR 395 – PAVE EXISTING 2 LANE DIRT ROAD AND RESURFACE SAN SBD031228 LOCAL 0 ETIWANDA AVENUE RIVERSIDE COUNTY 2014 $2,635 BERNARDINO HIGHWAY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 395

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A1003 LOCAL 0 EUCALYPTUS FROM PEYTON DR. 2014 $3,542 BERNARDINO HIGHWAY TO CHINO HILLS COMMUNITY PARK ENTRANCE – CONSTRUCT 2 LANE RD. (PHASE 1 FROM PEYTON DRIVE TO GALLOPING HILLS RD. COMPLETED IN 2/2007) SAN SBD88086 LOCAL 0 EUCLID AVENUE FROM D ST TO FOOTHILL 2013 $1,414 BERNARDINO HIGHWAY BOULEVARD – STORM DRAIN EXTENSION SAN 200403 LOCAL 0 EVANS/WEST STREET FROM REDLANDS 2018 $9,153 BERNARDINO HIGHWAY BLVD TO BARTON -CONSTRUCT 4 NEW LANES, A N/S ARTERIAL ROADWAY FROM REDLANS BLVD TO BARTON, WEST OF ANDERSON ST. SAN 200401 LOCAL 0 FAIRFIELD RANCH EXT.-EXTEND 2014 $6,990 BERNARDINO HIGHWAY FAIRFIELD RANCH RD. FROM 950 FT. S/O INTERSECTION OF FFRANCH RD TO 5000 FT. PARALLEL TO SR71 TO PINE INTERSECTION-CONSTRUCT NEW 2 LANE RD. W/BIKE LANES SAN 200407 LOCAL 0 FLAMINGO HEIGHTS LANDERS ROAD 2012 $2,826 BERNARDINO HIGHWAY IMPROVEMTS-SH 247 PIPES WASH TO JOHNSON VALLEY-WIDEN TO ACCOMMODATE PASSING LANES WITH TURN POCKETS (SAME AS 20061705) SAN SBD031248 LOCAL 0 FONTANA AVENUE VALLEY BOULEVARD 2018 $5,250 BERNARDINO HIGHWAY TO MERRILL AVENUE WIDEN FROM 2-4 LANES SAN 4A07098 LOCAL 0 FOOTHILL BLVD. FROM 500' W/O MONTE 2018 $2,270 BERNARDINO HIGHWAY VISTA TO CENTRAL AVE. -WIDEN TO ULTIMATE WIDTH TO PROVIDE DUAL LEFT TURN LANES . SAN SBD31903 LOCAL 0 FOOTHILL BOULEVARD (STATE ROUTE 2011 $1,137 BERNARDINO HIGHWAY 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL, INTERSECTION IMPROVEMENTS/REALIGN INTERSECTION (0.11 MILE)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 396 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD031335 LOCAL 0 FOOTHILL BOULEVARD AT ARCHIBALD 2012 $640 BERNARDINO HIGHWAY AVENUE INTERSECTION IMPROVEMENTS (ADD RIGHT TURN LANE) SAN 4OM0701- LOCAL 0 FOOTHILL BOULEVARD BOTTLENECK 2015 $5,300 BERNARDINO 201103 HIGHWAY AND SAFETY IMPROVEMENTS- FROM CENTRAL TO GROVE AVE.INSTALL RIGHT TURN LANES AT MAJOR INTERSECTIONS, ELONGATE LEFT TURNS FOR SAFE TURNING, CURB, GUTTER DRAINAGE, ROADWAY REHAB. SAN SBD031246 LOCAL 0 FOOTHILL BOULEVARD CITRUS AVENUE 2018 $7,218 BERNARDINO HIGHWAY TO MAPLE AVENUE WIDEN TO STATE STANDARDS FROM 4 TO 6 LANES SAN SBD59004 LOCAL 0 FRANCIS ST. FROM BON VIEW AVE TO 2018 $12,300 BERNARDINO HIGHWAY GROVE WIDENING 2 TO 4 LANES (STORM DRAIN FROM BON VIEW TO PARCO) SAN 200619 LOCAL 0 GLEN HELEN PARKWAY – FROM 0.2 2014 $19,858 BERNARDINO HIGHWAY MILES WEST OF CAJON CREEK TO 0.2 MILES EAST OF CAJON CREEK-REPLACE 36' WIDE 48' LONG 2 LN BRIDGE OVER CAJON CREEK W/ 102', 526'LONG 4 LN BRIDGE (54C0025)(HBRRL FUNDS IN 2016/17 FOR LOCAL A/C PAYBACK- COMPLETION DATE REMAINS THE SAME) SAN 20040826 LOCAL 0 GLEN HELEN PARKWAY AT UPRR AND 2012 $29,000 BERNARDINO HIGHWAY BNSF- GRADE SEPARATION SAN SBD97147 LOCAL 0 GREEN TREE BLVD AT AT&SF RAILROAD 2014 $30,850 BERNARDINO HIGHWAY CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD SAN 200853 LOCAL 0 GREENSPOT FROM BOULDER AVE. TO 2012 $15,700 BERNARDINO HIGHWAY SR210 – WIDEN FROM 4-6 LANES (0.80) SAN 20061014 LOCAL 0 GREENSPOT RD. FROM SANTA PAULA 2018 $22,530 BERNARDINO HIGHWAY ST. TO 2,600' S/O SANTA ANA RIVER – WIDEN FROM 2-4 LANES WITH MEDIAN (2.2 MILES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 397

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 20061015 LOCAL 0 GREENSPOT ROAD BRIDGE AT 2012 $10,907 BERNARDINO HIGHWAY SANTA ANA RIVER – GREENSPOT RD.CONSTRUCT NEW 4 LANE BRIDGE (STRIPING FOR 2 LANES) AT SAR W/ CHANNEL IMPROVMENTS-REALIGN APPROX 2400' OF 2 LANE RD.(54C0368) SAN 200074 LOCAL 0 GROUPED PROJECTS FOR 2011 $4,071 BERNARDINO HIGHWAY TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS FOR SAN BERNARDINO COUNTY-BIKE/PED PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126,127,128, EXEMPT TABLE 2 & 3). SAN SBDLS08 LOCAL 0 GROUPED PROJECTS FOR BRIDGE 2015 $39,238 BERNARDINO HIGHWAY REHABILITATION AND RECONSTRUCTION – HBP PROGRAM -PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127, 128 EXEMPT TABLES 2 & 3 SAN SBD031505 LOCAL 0 GROUPED PROJECTS FOR LTF ARTICLE 2010 $7,900 BERNARDINO HIGHWAY 3 PROJECTS LTF, ARTICLE 3 BICYCLE/ PEDESTRIAN PROJECTS AT VARIOUS LOCATIONS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128, EXEMPT TABLES 2 & 3) SAN 20040830 LOCAL 0 GROUPED PROJECTS FOR 2016 $14,668 BERNARDINO HIGHWAY TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 398 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4OM0701- LOCAL 0 GROUPED PROJECTS FOR 2011 $3,271 BERNARDINO 200075 HIGHWAY TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS – LANDSCAPE, ETC. FOR SAN BERNARDINO CNTY – PROJECTS CONSISTENT WITH 40 CFR PART93.126,127,128, EXEMPT TABLES 2 & 3) SAN SBD59006 LOCAL 0 GROVE AVENUE FROM STATE ST. TO 350' 2018 $8,400 BERNARDINO HIGHWAY NORTH OF HOLT BLVD. WIDENING FROM 4 TO 6 LANES WIDENING RAILROAD BRIDGE ALSO (1,450'),LANDSCAPE RESTORATION, LEFT TURN LANES AT HOLT SAN 4A07263 LOCAL 0 H STREET FROM KENDALL DRIVE TO 2018 $918 BERNARDINO HIGHWAY 40TH STREET WIDENING FROM 2-4 LANES SAN 4A01210 LOCAL 0 HOLT BLVD CORRIDOR WIDENING FROM 2018 $42,320 BERNARDINO HIGHWAY BENSON AVE. TO VINEYARD AVE. WIDEN ROAD FROM 4-6 LANES INCLUDING TRAFFIC SIGNAL MODIFICATIONS AND RESTRIPING SAN SBD031284 LOCAL 0 I AVENUE FROM RANCHERO RD TO MAIN 2014 $6,870 BERNARDINO HIGHWAY ST. WIDEN FROM 2 LANES TO 4 LANES SAN 4A0801- LOCAL 0 I-40 NEEDLES CONNECTOR: ROADWAY/ 2015 $5,521 BERNARDINO 20112007 HIGHWAY SIDEWALK IMPROVEMENTS ALONG 6,300FT: J ST FROM I-40 OFF-RAMPS TO W BROADWAY; W BROADWAY FROM J ST TO NEEDLES HWY; NEEDLES HWY FROM W BROADWAY TO N K ST; N K ST TO SOUTH ABUTMENT OF CO RIVER BRIDGE. INTERSECTION IMPROVEMENTS AT J ST/W BROADWAY, W BROADWAY/ NEEDLES HWY, NEEDLES HWY/N K ST WILL INCLUDE TRAFFIC SIGNALS, TURN LANES, STRIPING/SIGNAGE & SIDEWALK

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 399

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A0801- LOCAL 0 I-40/AZ95 CONNECTOR- J ST. FROM I-40 2012 $24,817 BERNARDINO 20040804 HIGHWAY OFFRAMPS TO W. BROADWY;NEEDLES HGWY FROM W. BROADWY TO N.K ST; N.K ST FROM NEEDLES TO AZ 95-WIDEN 2-4 LNS-INTERSCTN& CORRIDOR IMPRVT. SAN 200201 LOCAL 0 IN ADELANTO, EL MIRAGE RD. FROM 2012 $560 BERNARDINO HIGHWAY SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM EL MIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD. SAN 20111810 LOCAL 0 IN BARSTOW, N. 1ST AVE. OVER BNSF 2018 $40,780 BERNARDINO HIGHWAY RAILWAY UP RR AMTRAK 0.2 MI N MAIN ST. (BRIDGE NO 54C0088) REPLACE EXISTING 2 LANE BRIDGE WITH 4 LANE BRIDGE, EXISTING BRIDGE TO BE REMOVED SAN 200202 LOCAL 0 IN CHINO – ON CHINO AVENUE FROM 2014 $584 BERNARDINO HIGHWAY MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES AND INSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA SAN 200207 LOCAL 0 IN CHINO – ON PINE AVE EXTENSION 2018 $25,000 BERNARDINO HIGHWAY FROM SR 71 TO EUCLID IN THE CITY OF CHINO – WIDEN BRIDGE FROM 2-4 LANES SAN 200209 LOCAL 0 IN HESPERIA – PAVE ESCONDIDO ROAD 2012 $5,900 BERNARDINO HIGHWAY FROM RANCHERO TO CEDAR (2.0 MILES). PAVE 4 LANES OF ROADWAY 2 IN EACH DIRECTION. SAN 200211 LOCAL 0 IN HESPERIA ON I STREET FROM MAIN 2014 $7,700 BERNARDINO HIGHWAY ST. TO BEAR VALLEY RD. APPROX. 4.4 MILES – WIDEN FROM 2-4 LANES SAN 4G0106 LOCAL 0 IN ONTARIO: ON MILLIKEN AT 2012 $73,983 BERNARDINO HIGHWAY UNION PACIFIC RAILROAD – GRADE SEPARATION – PART OF ALAMEDA CORRIDOR STUDY – TCRP #55.2 *For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 400 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 20020134 LOCAL 0 IN RANCHO CUCAMONGA – ON ARROW 2014 $1,100 BERNARDINO HIGHWAY RTE. FROM ETIWANDA AVENUE TO EAST STREET – WIDEN FROM 2-4 LANES (3,200 FEET) SAN 200431 LOCAL 0 INLAND PACIFIC ELECTRIC TRAIL – ON 2011 $3,054 BERNARDINO HIGHWAY OLD SP ABANDONED RR BETWEEN I-15 TO MAPLE AVE.-CONSTRUCT CLASS 1 BIKE LANE (APPROX. 7 MILES LONG) SAN 4OM0701- LOCAL 0 INSTALLATION OF VARIOUS TRAFFIC 2012 $1,200 BERNARDINO 201110 HIGHWAY SIGNALS (3) ALONG LA MESA ROAD SAN SBD031227 LOCAL 0 JURUPA AVENUE ETIWANDA TO SIERRA 2014 $24,463 BERNARDINO HIGHWAY AVENUE CONSTRUCT 6 LANE ROAD SAN 4A04108 LOCAL 0 JURUPA AVENUE FROM TAMARIND 2018 $958 BERNARDINO HIGHWAY AVENUE TO ALDER AVENUE WIDEN FROM 2 TO 4 LANES SAN 200607 LOCAL 0 LENA ROAD EXENSION PROJECT – 2012 $6,300 BERNARDINO HIGHWAY EXTENSION OF LENA RD. FROM MILL ST. TO ORANGE SHOW RD.-NEW 4 LANE ROAD (CO-OP PROJECT WITH IVDA) SAFETEA-LU -#1701 SAN 200622 LOCAL 0 LENWOOD GRADE SEPARATION – NORTH 2014 $31,732 BERNARDINO HIGHWAY OF WEST MAIN ST; APPROX.400 FT. N/O TO 600 FT. S/O BNSF AND SANTA FE RR RIGHT-OF-WAY-4 TRAVEL LANE GRADE SEPARATION (CA627) SAN SBD55025 LOCAL 0 MAIN STREET FROM I-15 TO MAPLE 2012 $14,500 BERNARDINO HIGHWAY (PHASE 1) FROM MAPLE TO 11TH (PHASE 2) – I-15 TO SR 395 (PHASE 3); WIDEN AND RECONSTRUCT FROM 4 – 6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75 MILES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 401

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200807 LOCAL 0 MAIN STREET GRADE SEPARATION 2014 $20,435 BERNARDINO HIGHWAY WIDENING – BNSF TO WEST CITY LIMITS-WIDENING FROM 1-2 LANES IN THE E/B & W/B DIRECTION-(BRIDGE WIDENING AND APPROACHES OF ABOUT 100' IN EACH DIRECTION" SAN 200013 LOCAL 0 MAPLE AVENUE FROM MAIN ST. TO 2010 $1,975 BERNARDINO HIGHWAY 650' SOUTH OF CROMDALE STREET – REHABILITATION – RESURFACE 2 LANE RD. (NO NEW LANES) SAN 200012 LOCAL 0 MAPLE AVENUE FROM MARIPOSA TD. 2011 $2,310 BERNARDINO HIGHWAY TO MAIN STREET – ROAD REHAB. – RESURFACING 2 EXISTING LANES (NO NEW LANES) SAN SBD031254 LOCAL 0 MERRILL AVENUE ALDER TO MAPLE 2018 $2,065 BERNARDINO HIGHWAY AVENUE WIDEN FROM 2 TO 4 LANES SAN 4A07268 LOCAL 0 MICHIGAN AVENUE WIDENING (2-4 2018 $1,205 BERNARDINO HIGHWAY LANES) FROM COMMERCE WAY TO MAIN STREET SAN SBD55034 LOCAL 0 MISSION BLVD. FROM LA COUNTY 2010 $8,560 BERNARDINO HIGHWAY LINE TO BENSON AVE (2.2 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60) SAN SBD031315 LOCAL 0 MISSION BOULEVARD GROVE TO 2018 $50,000 BERNARDINO HIGHWAY HAVEN WIDEN FROM 4 LANES TO 6 LANES ,LANDSCAPED MEDIAN AND STORM DRAIN(3.3 MI) (T21-#60) SEG.1 ARCHIBALD TO HAVEN AND SEG.2- GROVE TO ARCHIBALD

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 402 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200049 LOCAL 0 MOJAVE RIVER BRIDGE CROSSING 2014 $32,550 BERNARDINO HIGHWAY FROM TERMINUS OF YUCCA LOMA RD TO TERMINUS OF GREEN TREE BLVD – PRE. ENVIRONMENTAL REVIEW FOR CONSTRUCTION OF NEW 4 LANE BRIDGE-INCLUDES A BRIDGE OVER THE BNSF RR TO HESPERIA ROAD (PROJECT 97147 ENVIRONMENTAL DOC IS BEING INCLUDED IN THIS PROJECT. THE PROJECTS CONNECT AND ENVIRON. DOC IS REQUIRING THAT THE WHOLE PROJECT BE INCLUDED ON BOTH SBD97147 AND 200049) SAN 200857 LOCAL 0 MONTE VISTA AVE. FROM PHILLIPS BLVD. 2018 $5,450 BERNARDINO HIGHWAY TO MISSION BLVD (0.5 MILES)-WIDENING FROM 2-4 LANES SAN 200808 LOCAL 0 MT. VERNON AVEN. WIDENING – WIDEN 2012 $543 BERNARDINO HIGHWAY FROM 1-2 LANES NORTHBOUND FROM RAVEN WAY TO PICO ST.. SAN SBD31905 LOCAL 0 MT. VERNON AVENUE BRIDGE 2015 $40,112 BERNARDINO HIGHWAY (OVERHEAD) AT BNSF REPLACE GRADE SEPARATION, REPLACE 4 LANE BRIDGE WITH 4 LANE BRIDGE FROM 2ND TO 5TH STREETS (0.2 MILES SOUTH OF RTE. 66) (BRIDGE NO 54C0066)(HBRRL IS PAID BACK IN 2016/17 TO COVER LOCAL A/C PROJECT STILL ON SCHEDULE) SAN 200856 LOCAL 0 MT. VERNON BRIDGE OVER UPRR -ON 2018 $10,877 BERNARDINO HIGHWAY MT. VERNON AVE. FROM "M" ST. TO I-10 ON RAMP. WIDENING BRIDGE FROM 2-4 LANES (CA338)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 403

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD41317 LOCAL 0 MT. VIEW AVE. BRIDGE AT MISSION 2018 $1,655 BERNARDINO HIGHWAY CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTING BRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS TO MAKE A TOTAL OF 4 LANES ( 2 IN EACH DIRECTION) SAN 4OM0701- LOCAL 0 MT. VIEW AVE. BRIDGE OVER SANTA 2014 $12,500 BERNARDINO 2011160 HIGHWAY ANA RIVER. CONSTRUCT NEW 4 LANE BRIDGE. MT. VIEW CURRENTLY TERMINATES AT SOUTH EDGE OF SANTA ANA RIVER. PROJECT WOULD EXTEND BY MEANS OF BRIDGE ACROSS RIVER. SAN SBD41316 LOCAL 0 MT. VIEW AVE. RAILWAY GRADE 2014 $1,724 BERNARDINO HIGHWAY CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1 LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES (0.75 MILES) SAN 200609 LOCAL 0 MT.VIEW WIDENING/EXTENSION 2014 $7,500 BERNARDINO HIGHWAY PROJECT- WIDEN S/B FROM 2-4LNS- FROM COULSTON TO RIVERVIEW (SOUTH OF SANTA ANA RIVER) (PROJECT IS SPLIT INTO 2 SEPARATE PROJECTS AS OF THE 2011 ENTRY) SAN 4OM0701- LOCAL 0 NATIONAL TRAILS HIGHWAY AND 2012 $1,375 BERNARDINO 201111 HIGHWAY MOJAVE RIVER – BRIDGE REHAB. REPLACE EXISTING RAILING TO MEET CURRENT STANDARDS SAN 0A6410 LOCAL 0 NATIONAL TRAILS HIGHWAY REPAVING 2013 $10,000 BERNARDINO HIGHWAY – OVERLAY BETWEEN VICTORVILLE CITY LIMITS AND BARSTOW CITY LIMITS SAN SBD88140 LOCAL 0 NATIONAL TRAILS ROAD BETWEEN 2012 $2,600 BERNARDINO HIGHWAY INTERSTATE 15 & AIRBASE RD. WIDEN FROM 2 LANES TO 4 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 404 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 20040209 LOCAL 0 NATL TRAILS HIWAY FROM BRYMAN RD 2014 $2,154 BERNARDINO HIGHWAY S/O MORNING GLORY ST. TO BRYMAN TO N O MARIGOLD- WIDEN EXISTG 2 LN RD FOR PASSING LNS – 1 IN EA DIRECT., INCL TRANSITIONS Y (CO W/#200106) SAN SBD031426 LOCAL 0 NEEDLES HIGHWAY FROM 'N' STREET 2012 $65,500 BERNARDINO HIGHWAY TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL. (CURRENTLY PROGRAMMED FOR PSE ONLY) SAN SBD031412 LOCAL 0 NISQUALLI RD FROM BALSAM RD TO 2012 $3,750 BERNARDINO HIGHWAY HESPERIA RD – WIDEN FROM 2 LANES TO 4 LANES, DRAINAGE IMPROVEMENTS, AND VERTICAL REALIGNMENT SAN 200213 LOCAL 0 ON 3RD ST. FROM PALM AVE. TO 5TH ST. 2014 $1,571 BERNARDINO HIGHWAY WIDEN 3RD ST. E/O PALM AVE. FROM 2 TO 3 LANES AND EXTEND 3RD ST. EASTERLY TO CONNECT 5TH ST. SAN 200414 LOCAL 0 ON DUNCAN ROAD FROM OASIS EAST TO 2012 $22,000 BERNARDINO HIGHWAY BALDY MESA PAVE DIRT ROADS 1 LANE IN EACH DIRECTION INCLUDING STOP SIGNS AT RR CROSSING SAN 200420 LOCAL 0 ORANGE STREET WIDENING – FROM 2018 $540 BERNARDINO HIGHWAY NORTH CITY LIMITS TO RIVERVIEW DRIVE – WIDEN STREET FROM 2-4 LANES SAN 4OM0701- LOCAL 0 PALM AVE. FROM 3RD ST. TO 5TH 2013 $818 BERNARDINO 2011105 HIGHWAY ST. – SHOULDER IMPROVEMENTS (NO WIDENING)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 405

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200850 LOCAL 0 PALM AVE. GRADE SEPARATION , PALM 2014 $30,077 BERNARDINO HIGHWAY AVE. APPROX. 530' S/O I-215 PALM AVE. INTERCHANGE TO APPROX. 1450' S/O CAJON BLVD.-CONSTRUCT AT GRADE RR SEPARATION – BUILD BRIDGE OVERCROSSING SEPARATING TRAFFIC FROM RR CROSSING (NO ADDITIONAL LANES) 2-2 LANES (CA615) SAN 2002170 LOCAL 0 PEPPER AVE: FOOTHILL BLVD TO SR 210 2012 $15,000 BERNARDINO HIGHWAY – WIDEN EXISTING 2 LANES TO 4 LANES (2 EACH DIR) SAN 4A1001 LOCAL 0 PEYTON DRIVE FROM ENGLISH RD. TO 2012 $3,951 BERNARDINO HIGHWAY EUCALYPTUS; WIDEN PEYTON FROM 4-6 LANES WITH MARKED BIKE LANES IN EACH DIRECTION (PHASE 2) OF SBD41242 SAN 4A1002 LOCAL 0 PEYTON DRIVE FROM EUCALYPTUS TO 2014 $7,119 BERNARDINO HIGHWAY SR 142; WIDEN PEYTON TO 2-4 LANES WITH MARKED BIKE LANES IN EACH DIRECTION SAN 200021 LOCAL 0 RAMONA AV AT STATE ST – RAILROAD 2010 $22,408 BERNARDINO HIGHWAY CROSSING GRADE SEPARATION- FUNDED WITH TCRP (PART OF ALAMEDA CORRIDOR STUDY) (CA505) SAN SBD55028 LOCAL 0 RANCHERO RD. FROM DANBURY TO 2014 $11,000 BERNARDINO HIGHWAY ARROWHEAD LAKE RD. – WIDEN FROM 2 TO 4 LANES (3 MILES) SAN SBD55030 LOCAL 0 RANCHERO RD. FROM I-15 TO 7TH ST. – 2012 $11,000 BERNARDINO HIGHWAY WIDEN FROM 2 TO 4 LANES (5.50 MILES) SAN SBD031276 LOCAL 0 RANCHERO ROAD 7TH AVENUE TO 2012 $30,058 BERNARDINO HIGHWAY DANBURY REALIGN ROAD AND WIDEN FROM 2-4 LANES AND CONSTRUCT RAILROAD UNDERCROSSING

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 406 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200815 LOCAL 0 RANCHERO ST. FROM .3 M E/O 2014 $11,025 BERNARDINO HIGHWAY MARIPOSA TO HESPERIA CL (3 MILES)- WIDEN 2-4 LANES SAN SBD41289 LOCAL 0 RANCHO LAS FLORES PARKWAY -NO 2014 $10,000 BERNARDINO HIGHWAY LANES CURRENTLY EXIST. DEVELOPER TO CONST RUCT HIGHWY 138 TO RANCHERO RD. 2 LANES IN EACH DIRECTION. SAN 4A07225 LOCAL 0 RANDALL AVENUE ALDER AVENUE TO 2014 $1,715 BERNARDINO HIGHWAY MAPLE AVENUE WIDEN FROM 2 TO 4 LANES SAN 200843 LOCAL 0 RECHE CANYON RD. FROM 1.20 MILES OF 2014 $5,650 BERNARDINO HIGHWAY S. BARTON ROAD TO 0.42 MILES SOUTH OF BARTON RD (.078 MILES)-WIDEN FROM 2-4 LANES SAN SBD031294 LOCAL 0 REDLANDS BOULEVARD AT CALIFORNIA 2014 $6,000 BERNARDINO HIGHWAY STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE AND CURB AND GUTTERS SAN SBD031296 LOCAL 0 REDLANDS BOULEVARD EAST CITY 2014 $6,850 BERNARDINO HIGHWAY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SAN 20020202 LOCAL 0 REDLANDS PARK ONCE PROGRAM – NEW 2014 $6,290 BERNARDINO HIGHWAY PARKING STRUCTURE BETWEEN EUREKA AND 3RD ST. S/O STUART AND N/O RR APPROX. 200 SPACES (NOT PNR) (THIS PROJECT REPLACES 200421) SAN 200603 LOCAL 0 RIVERSIDE AVE. OVER METROLINK AND 2018 $37,575 BERNARDINO HIGHWAY BNSF RY, 0.1 MI S OF I-10 REMOVE AND REPLACE EXISTING 5 LANE BRIDGE WITH 7 LANE BRIDGE (PA&ED ONLY) SCOPING FOR PORJECT. HIGH COST PROJECT AGREEMENT REQUIRED PRIOR TO PE AUTHORIZATION.(#54C0062)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 407

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD031360 LOCAL 0 RIVERSIDE AVENUE SANTA ANA TO 2014 $2,200 BERNARDINO HIGHWAY AGUA MANSA CONTINUOUS LEFT TURN LANE;WIDEN WEST SIDE(FOR LEFT TURN LANE AND ADDING CURB AND GUTTER SAN SBD031152 LOCAL 0 RIVERSIDE DRIVE AT SAN ANTONIO 2012 $1,120 BERNARDINO HIGHWAY FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES SAN 200816-200816 LOCAL 0 ROCK SPRINGS RD. FROM 0.25 MI. E/O 2014 $20,000 BERNARDINO HIGHWAY GLENDALE AVE. TO KIOWA (1.86 MILES) WIDEN FROM 2-4 LANES SAN 200816- LOCAL 0 ROCK SPRINGS ROAD OVER MOJAVE 2015 $18,533 BERNARDINO 20110603 HIGHWAY RIVER, .9 MILES E ARROWHEAD LK RD. REPLACE TWO LANE LOW WATER CROSSING WITH NEW 4 LANE BRIDGE SAN 200405 LOCAL 0 S. MILLIKEN AVE. GRADE SEPARATION 2014 $80,468 BERNARDINO HIGHWAY – ON MILLIKEN FROM UPR TO NORTH OF MISSION BLVD. RR GRADE SEP-CONSTRUCT O/C/U/C AT RR-REALIGNMENT OF STS TO MEET O/ CROSSING & INTERSTN IMPROVMTS SAN 200835 LOCAL 0 SAN BERNARDINO AVE. FROM CHERRY 2012 $3,665 BERNARDINO HIGHWAY AVE. TO FONTANA CITY LIMITS (LIME AVE.) (1.25 MILES)-WIDEN 2-4 LANES SAN 4ITS04- LOCAL 0 SAN BERNARDINO VALLEY COORDINATED 2010 $7,948 BERNARDINO 20061502 HIGHWAY TRAFFIC SIGNAL SYSTEM – TIERS 3 & 4 – UPGRADE AND SYNCHRONIZE APPROX. 500 SIGNALS LOCATED ALONG ARTERIAL ROADEWAYS IN SAN BERNARDINO VALLEY SAN SBD031266 LOCAL 0 SIERRA AVENUE FOOTHILL BOULEVARD 2018 $8,129 BERNARDINO HIGHWAY TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES SAN 4A04126 LOCAL 0 SIERRA AVENUE FROM VALLEY 2012 $2,823 BERNARDINO HIGHWAY BOULEVARD TO SAN BERNARDINO AVENUE WIDEN FROM 4 TO 6 LANES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 408 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 4A04127 LOCAL 0 SIERRA LAKES PARKWAY FROM BEECH 2018 $4,290 BERNARDINO HIGHWAY AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES. SAN 4A01132 LOCAL 0 SLOVER AVENUE FROM ETIWANDA 2014 $2,095 BERNARDINO HIGHWAY AVENUE TO 800 FEET EAST OF ETIWANDA AVENUE WIDEN FROM 2-4 LANES SAN SBD41241 LOCAL 0 SOQUEL CANYON PARKWAY EXTENSNION 2018 $4,000 BERNARDINO HIGHWAY CONSTRUCT NEW 2 LANE_ROAD W BIKE LANES FROM EXISTING TERMINUS OF SOQUEL CANYON PARKWAY AT PIPELINE AVE. TO WOODVIEW ROAD AT MEDLARINCLUDED ARE BICYCLE LANES MARKED IN EACH DIRECTION SAN 200804 LOCAL 0 SOUTH ARCHIBALD AVE. GRADE 2014 $57,932 BERNARDINO HIGHWAY SEPARATION (AT MISSION BLVD) CONSTRUCT A HIGHWAY AND RR GRADE SEPARTION AT EXISTING AT-GRADE CROSSING SOUTH OF ARCHIBALD AND THE UPPR LA LINE-PROJECT TO BUILD NEW FLY-OVER BRIDGE FOR RR – WIDENING FROM 2-6 LANES 3 LANES IN EACH DIRECTION AND LEFT AND RIGHT TURN LANES;DRAINAGE IMPROVMENTS SAN 4A07056 LOCAL 0 SOUTH HIGHLAND AVENUE FROM 2014 $5,250 BERNARDINO HIGHWAY CHERRY AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES SAN SBD94177 LOCAL 0 STATE ROUTE 62 AT LARREA AVENUE 2014 $196 BERNARDINO HIGHWAY & HATCH ROAD RECONFIGURE AND SIGNALIZATION (NO SYNCHRONIZATION) SAN SBD94174 LOCAL 0 STATE ROUTE 62 CANYON TO SUNRISE 2012 $323 BERNARDINO HIGHWAY WIDEN FROM 4 TO 5 LANES FOR CONINUOUS LEFT TURN LANE SAN SBD94173 LOCAL 0 STATE ROUTE 62 LEE DRIVE TO LUPINE 2012 $300 BERNARDINO HIGHWAY DRIVE WIDEN FROM 4 TO 5 LANES FOR CONTINUOUS LEFT TURN LANE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 409

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD59021 LOCAL 0 STATE STREET FROM 16TH STREET 2018 $22,290 BERNARDINO HIGHWAY TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (4) LANES OF ROADWAY (1.5 MILES) TO CONNECT STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT SAN 200824 LOCAL 0 STATE STREET FROM ADAMS NORTH TO 2012 $6,300 BERNARDINO HIGHWAY NOLAN/SHORT ST. (1.44 MILES) WIDEN FROM 2-4 LANES – GRADE SEPARATION SAN 4OM0701- LOCAL 0 STERLING AVE FROM 3RD STREET TO 2018 $400 BERNARDINO 201184 HIGHWAY 5TH STREET – WIDEN FROM 2-4 LANES (0.13 MILES) FORMERLY PART OF PROJECT ID 200852 SAN 200801 LOCAL 0 STEWART STREET WIDENING WIDEN 2014 $650 BERNARDINO HIGHWAY FROM 2-4 LANES FROM ANDERSON TO CAMPUS ST. SAN 20040210 LOCAL 0 SUMMIT VALLEY ROAD – FROM SH138 2018 $21,000 BERNARDINO HIGHWAY TO RANCHERO ROAD-WIDEN FROM 2-4 LANES SAN 4A0802 LOCAL 0 THE CHINO-CORONA ROAD EAST/WEST 2018 $6,659 BERNARDINO HIGHWAY IMPROVMTS NEWLY ANNEXED AREA IN CHINO. MILL CREEK/CHINO CORONA N/S TO HELLMAN. CHINO/CORONA N/S EXTENDS FROM PINE AV TO S/OF CHINO- CORONA E/W. IMPROVMTS INCL CONST OF NEW BRIDGE XING OVER MILL CREEK (BOX CULVERT W/ RD OVER DRAINAGE), NAT DRAINAGE SYS MAINTAINED BY US ARMY CORPS ALONG CHINO-CORONA RD.(BRDG TO BE 1 IN EACH DIRECTION) EXISTG RD.IMPROVMTS NON-CAPACITY SAN 4A07142 LOCAL 0 TIPPECANOE AVENUE FROM 3RD STREET 2018 $798 BERNARDINO HIGHWAY TO 5TH STREET – WIDEN FROM 2-4 LANES (0.3 MILES) FORMERLY PART OF PROJECT ID 200852

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 410 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200610 LOCAL 0 TIPPECANOE WIDENING PROJECT – 2012 $2,978 BERNARDINO HIGHWAY BETWEEN MILL AND SANTA ANA RIVER BRIDGE ST. (1.4 MI)-WIDEN FROM 4-6 LANES INCLUD.MEDIAN LANDSCAPE SAN 4A07274 LOCAL 0 VALLEY BOULEVARD FROM BEECH 2018 $2,418 BERNARDINO HIGHWAY AVENUE TO CITRUS AVENUE WIDEN FROM 4-6 LANES SAN 4A07273- LOCAL 0 VALLEY BOULEVARD FROM CHERRY 2018 $2,418 BERNARDINO 201149 HIGHWAY AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES SAN 4A1007 LOCAL 0 VALLEY BOULEVARD FROM CITRUS 2018 $2,418 BERNARDINO HIGHWAY AVENUE TO SIERRA AVENUE WIDEN FROM 4-6 LANES SAN 4A07273- LOCAL 0 VALLEY BOULEVARD FROM HEMLOCK 2014 $604 BERNARDINO 201165 HIGHWAY AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES SAN 4A07140 LOCAL 0 VALLEY BOULEVARD FROM SIERRA 2018 $724 BERNARDINO HIGHWAY AVENUE TO ALDER AVENUE WIDEN FROM 4-6 LANES SAN 200111 LOCAL 0 VICTOR VALLEY COLLEGE TRANSFER 2010 $823 BERNARDINO HIGHWAY POINT FACILITY – LOCATED 18422 BEAR VALLEY RD. IN VICTORVILLE SAN 4OM0701- LOCAL 0 VICTORIA AVE FROM 3RD ST. TO 6TH 2015 $3,195 BERNARDINO 2011104 HIGHWAY ST. – SHOULDER IMPROVEMENTS (NO WIDENING) SAN 200837 LOCAL 0 VISTA ROAD GRADE SEPARATION-WIDEN 2014 $23,000 BERNARDINO HIGHWAY 2-4 LANES AND CONSTRUCT GRADE SEPARATION SAN 200035 LOCAL 0 WABASH AV FROM 5TH ST TO I-10 – 2014 $950 BERNARDINO HIGHWAY CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS- CONSTRUCT MISSING LINK (2 LANE IN EACH DIRECTION)-1 MILE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 411

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN 200064 LOCAL 0 WASHINGTON ST FROM RECHE CANYON 2012 $570 BERNARDINO HIGHWAY TO HUNTS LN – ELIMINATE BOTTLENECK ADD NB TURN POCKET;WIDEN 2- 4 LNS ON WASHINGTON FROM RECHE CYN. TO HUNTS LN. USING EXISTING WIDTH;MODIFY SIGNALS SAN 4A01387 LOCAL 0 WIDEN 5TH STREET FROM 2 TO 4 2014 $13,587 BERNARDINO HIGHWAY LANES BETWEEN DEL ROSA DR AND PALM AVENUE; CONSTRUCT NEW TRAFFIC SIGNAL AT 5TH/CENTRAL INTERSECTION; WIDEN 5TH ST AT SR210 FREEWAY UNDERCROSSING FROM 4 TO 5 LANES; ADD TURN LANE, MODIFY RAMP TERMINI; SHOULDER IMPROVEMENTS ON DEL ROSA DR BETWEEN 3RD ST AND 5TH ST (NO ADDITIONAL LANES); SAN 20010133- LOCAL 0 WIDEN FOOTHILL BOULEVARD (OLD 2012 $10,632 BERNARDINO 201136 HIGHWAY STATE ROUTE 66) BETWEEN SAN BERNARDINO ROAD AND VINEYARD AVENUE. REMOVE THE EAST UPLAND UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RAILROAD BRIDGE, CONSTRCT A NEW PUBLIC TRAIL BRIDGE ALONG THE RAILROAD ALIGNMENT AND ADD A RAISED MEDIAN, STREET LIGHTING, SIDEWALKS AND LANDSCAPING. SAN 4A07089 LOCAL 0 YATES RD. FROM .24 MILE NORTH OF 2014 $4,325 BERNARDINO HIGHWAY CHINQUAPIN TO .02 MILES SOUTH OF FORTUNA (1.5 MILES) -WIDEN 2-4 LANES SAN SBD55012 LOCAL 0 YUCCA LOMA RD. AT SR 18 CONNECTION 2018 $2,772 BERNARDINO HIGHWAY NEW CONNECTION – CONNECTING YUCCA LOMA RD. AND SR 18 – NEW INTER- SECTION

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 412 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* SAN SBD55011 LOCAL 0 YUCCA LOMA RD. FROM APPLE VALLEY 2014 $6,500 BERNARDINO HIGHWAY RD. TO NAVAJO RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) (3 MILES) SAN 4A01382 LOCAL 38 SR-38 W. CITY LIMITS E. CITY LIMITS WIDEN SR-38 FROM W. CITY LIMITS TO 2030 $8,967 BERNARDINO HIGHWAY E. CITY LIMITS FROM 2 TO 4 LANES SAN 4120093 LOCAL 395 HIGHWAY 395 PALMDALE RD AIR EXPRESSWAY WIDEN HIGHWAY 395 FROM PALMDALE 2035 $31,308 BERNARDINO HIGHWAY TO AIR EXPRESSWAY SAN 4120094 LOCAL 395 HIGHWAY 395 AIR EXPRESSWAY CALLEJA WIDEN HIGHWAY 395 FROM AIR 2035 $23,001 BERNARDINO HIGHWAY EXPRESSWAY TO CALLEJA VENTURA 5TL0703 TRANSIT 0 BUS EXPANSIONS COUNTYWIDE BUS EXPANSIONS (INCLUDES 2035 $41,571 (INCLUDES PARATRANSIT) PARATRANSIT) VENTURA 5TR0701 TRANSIT 0 BUS TRANSIT MULTI-AGENCY TRANSPORTATION 2018 $3,500 FACILITY. A LOCATION HAS NOT BEEN DETERMINED. THE FACILITY WILL HAVE PARKING FOR UP TO 40 BUSES AND PARKING FOR 30 EMPLOYEES; LPG, CNG, DIESEL AND GASOLINE FUELING FACILITIES; ADMINISTRATIVE OFFICES INCLUDING TRAINING ROOMS; CREW BUILDING AND/OR BREAK ROOM; AND A FIVE-BAY MAINTENANCE FACILITY. NO PUBLIC PARKING. VENTURA 5TL0706 TRANSIT 0 FACILITY COUNTYWIDE NEW TRANSIT FACILITIES & 2035 $27,714 IMPROVEMENTS IMPROVEMENTS VENTURA 5CR104 TRANSIT 0 METROLINK IN VENTURA COUNTY METROLINK COMMUTER RAIL SERVICE 2035 $32,677 COMMUTER RAIL EXPANSION VENTURA 5TL0707 TRANSIT 0 MISC. ITEMS COUNTYWIDE MISC. TRANSIT ITEMS 2035 $12,500 AND AMENITIES, ENHANCEMENTS VENTURA 5TC0701 TRANSIT 0 MULTIMODAL IN DOWNTOWN SERVICE CENTER, PARKING, LAYOVER, 2014 $50,000 TRANSPORTATION VENTURA AND RETAIL SPACE FOR RAIL, BUS, AND CENTER BICYCLE COMMUTERS.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 413

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5TL0702 TRANSIT 0 PLANNING & TRANSIT PLANNING & ADMINISTRATION 2035 $41,667 ADMINISTRATION VENTURA 5TL04 TRANSIT 0 TRANSIT SERVICE COUNTYWIDE COUNTYWIDE TRANSIT SERVICE 2035 $27,231 EXPANSION EXPANSION VENTURA VEN030612 TRANSIT 0 ADA SERVICE – CAPITAL LEASE & 2014 $1,303 OPERATING COST VENTURA VEN061006 TRANSIT 0 BUS BENCH REPLACEMENT 2011 $10 VENTURA VEN011219 TRANSIT 0 BUS WASHER REPLACEMENT 2011 $484 VENTURA VEN070203 TRANSIT 0 CAMARILLO METROLINK STATION 2012 $4,424 IMPROVEMENTS INCLUDING PLATFORM AND PEDESTRIAN CIRCULATION, PASSENGER STATION BUILDING/ RESTROOMS, PLUS RELATED CONSTRUCTION OF NEW SIDING BETWEEN CAMARILLO AND OXNARD. VENTURA VEN011214 TRANSIT 0 DBE GOAL EVALUATION/SETTING 2014 $58 CONSULTING SERVICE VENTURA VEN090107 TRANSIT 0 EIGHT (8) CNG-FUELED 25-FOOT TO 2012 $3,608 40-FOOT BUSES FOR EXPANSION. BUSES WILL BE USED ON ALL GOLD COAST LINES TO REDUCE SPARE RATIO AND INCREASE FREQUENCY WHERE WARRANTED BY DEMAND. VENTURA VEN055401 TRANSIT 0 EXPAND TRANSIT MAINTENANCE 2011 $2,019 FACILITY TO ACCOMMODATE SYSTEM EXPANSION VENTURA VEN020902 TRANSIT 0 FINANCIAL MANAGEMENT SYSTEM 2014 $64 VENTURA VEN020901 TRANSIT 0 FUEL TANK REMEDIATION – MTBE 2011 $96 PROJECT VENTURA VEN031246 TRANSIT 0 GFI FAREBOX REPLACEMENT 2010 $288

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 414 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN030608 TRANSIT 0 GROUPED PROJ FOR RECONSTR OR 2016 $1,264 RENOVATION TRANSIT BUILDNGS/ STRUCTURES & REHAB TRANSIT VEH – MOORPARK BUSES & TRANSIT CENTER SCOPE: PROJ ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT – TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON- CAPACITY INCREASING) VENTURA VEN051005 TRANSIT 0 GROUPED PROJECTS FOR OPER ASST, 2014 $2,434 PLNG, PUR OF REPL VEH OR MIN EXP – ELDERLY & DISABLED NEW FREEDOMS INITIATIVE (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC) VENTURA VEN54095 TRANSIT 0 GROUPED PROJECTS FOR OPERATING 2014 $7,633 ASSISTANCE TO PARATRANSIT AGENCIES – ADA PARATRANSIT CAPITAL SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA VEN050401 TRANSIT 0 GROUPED PROJECTS FOR OPERATING 2014 $5,300 ASSISTANCE TO TRANSIT AGENCIES – CAMARILLO AREA TRANSIT SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 415

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN010409 TRANSIT 0 GROUPED PROJECTS FOR OPERATING 2014 $1,169 ASSISTANCE TO TRANSIT AGENCIES – EAST COUNTY ADA PARATRANSIT SERVICE SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA VEN34206 TRANSIT 0 GROUPED PROJECTS FOR OPERATING 2012 $14,046 ASSISTANCE TO TRANSIT AGENCIES – FIXED ROUTE SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA VEN34253 TRANSIT 0 GROUPED PROJECTS FOR OPERATING 2014 $4,118 ASSISTANCE TO TRANSIT AGENCIES – OJAI TROLLEY SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES VENTURA VEN981107 TRANSIT 0 GROUPED PROJECTS FOR OPERATING 2012 $5,103 ASSISTANCE TO TRANSIT AGENCIES ADA SERVICE – PARATRANSIT CAPITAL SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 416 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN057404 TRANSIT 0 GROUPED PROJECTS FOR PURCHASE 2015 $505 OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES – REPLACE MAINTENANCE EQUIPMENT SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES VENTURA VEN061000 TRANSIT 0 GROUPED PROJECTS FOR 2014 $600 RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS AND STRUCTURES – CAMARILLO RAIL STATION MAINT SCOPE: PROJECTS CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 & TABLE 3 CATEGORIES – RECONSTR OR RENOVATION OF TRANSIT BUILDINGS & STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINTENANCE FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON- CAPACITY INCREASING) VENTURA VEN030611 TRANSIT 0 GROUPED PROJECTS FOR 2014 $2,378 RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS/STRUCTURES & REHABILIATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT – TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON- CAPACITY INCREASING)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 417

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN64003 TRANSIT 0 GROUPED PROJECTS FOR 2014 $14,609 REHABILITATION OF TRANSIT VEHICLES – FIXED ROUTE & ADA SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN) VENTURA VEN981118 TRANSIT 0 GROUPED PROJECTS FOR 2012 $3,077 REHABILITATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN) VENTURA VEN059401 TRANSIT 0 GROUPED PROJECTS LISTING FOR 2014 $3,542 PURCHASE/REHAB OF OPERATING EQUIP – VENTURA COUNTY SMARTCARD SYSTEM MAINTENANCE, REHABILITATION & UPGRADE INCLUDING BUS FLEET CHANGES (DEINSTALLS AND INSTALLS) SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE/REHAB OF OPERATING EQUIPMENT FOR VEHICLES (E.G., RADIOS, FAREBOXES, LIFTS, ETC.)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 418 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN990609 TRANSIT 0 GRPD PROJ REHAB/RECON TRACK 2016 $47,947 STRUCT, TRACK, TRACKBED IN EXT ROW; RECON/RENOV TRANS BLGS/STRUCT;VEH;POWER/SIGNAL COMM EQ SCOPE: PROJ CONS W 40 CFR PART 93.126 EXMPT TABLES 2&3 CAT- RECON/RENOV TRANS BLDINGS/STRUCT;VEH;PWR/SGIN/ COMM SYS;REHAB/RENOV TRK STRUC,TRK,TRKBED IN EXT ROW (EG, RAIL/BUS BLDNGS,STORE/ MAIN FAC, STATIONS, TERMINALS, & ANCILL STRUCT).NON-CAP INCR. TDCRED=$1,991 10/11, $1,384 11/12 VENTURA VEN54036 TRANSIT 0 IN VENTURA COUNTY VENTURA 2014 $29,551 INTERCITY SERVICE TRANSIT AUTHORITY (VISTA) CAPITAL LEASE (INCLUDES PURCHASE OF 40 PARTICULATE TRAPS) VENTURA VEN991203 TRANSIT 0 INSTALLATION OF ABOVE GROUND HOIST 2010 $175 SYSTEM VENTURA VEN090201 TRANSIT 0 MARKET/VALENTINE INDUSTRIAL PARK 2012 $866 SHUTTLE SERVICE ON MARKET STREET, VALENTINE ROAD, AND TELEPHONE ROAD VENTURA VEN54057 TRANSIT 0 MARKETING & PASSENGER AWARENESS 2014 $2,041 ACTIVITIES (PLANNING: PROGRAM SUPPORT & ADM) VENTURA VEN030609 TRANSIT 0 METROLINK STATION SECURITY WALL 2011 $79 (TRANSIT ENHANCEMENT) VENTURA VEN061007 TRANSIT 0 MILLS ROAD AT MAPLE ADJACENT TO 2011 $359 PACIFIC VIEW MALL – BUS TURNOUTS WITH BUS SHELTERS, AND OTHER BUS STOP AMENITIES VENTURA VEN057414 TRANSIT 0 MIS EQUIPMENT REPLACE/UPGRADE 2014 $114

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 419

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5TL0701 TRANSIT 0 MULTI-AGENCY TRANSPORTATION / 2012 $312 VEHICLE FACILITY (INCLUDING OJAI TROLLEY MAINTENANCE FACILITY) VENTURA VEN040405 TRANSIT 0 NEXT BUS UPGRADE FOR REAL- 2014 $868 TIME BUS STOP SIGNAGE (TRANSIT ENHANCEMENTS) VENTURA VEN031203 TRANSIT 0 ONE (1) CNG PARATRANSIT VAN FOR 2012 $100 EXPANSION VENTURA VEN055410 TRANSIT 0 ONE EXPANSION PARATRANSIT VAN 2012 $121 VENTURA VEN055413 TRANSIT 0 ONE EXPANSION PARATRANSIT VAN 2013 $128 VENTURA VEN011221 TRANSIT 0 PAINT 4 CNG BUSES 2011 $35 VENTURA VEN54056 TRANSIT 0 PLANNING/IMPLEMENTATION OF 2014 $786 COORDINATED PARATRANSIT VENTURA VEN031218 TRANSIT 0 REALIGN MOORPARK RAIL STATION 2014 $932 SOUTH PARKING LOT ENTRANCE VENTURA VEN031242 TRANSIT 0 REPLACE GARAGE CNG BUS HOISTS 2012 $113 (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDITS OF $13.) VENTURA VEN061008 TRANSIT 0 REPLACE MAINTENANCE MIS 2011 $500 EQUIPMENT VENTURA VEN051207 TRANSIT 0 REPLACE TWENTY-EIGHT (28) 2015 $63 COMPUTERS VENTURA VEN031241 TRANSIT 0 SAFETY AND SECURITY PLANNING AND 2011 $10 TRAINING VENTURA VEN010406 TRANSIT 0 SMART CARD DATA MANAGEMENT 2014 $1,666 VENTURA VEN055412 TRANSIT 0 THREE (3) REPLACEMENT 2012 $317 PARATRANSIT VANS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $36 IN FY 10/11.) VENTURA VEN011223 TRANSIT 0 THREE (3) REPLACEMENT UTILITY VANS 2011 $105 VENTURA VEN055409 TRANSIT 0 THREE REPLACEMENT PARATRANSIT 2010 $302 VANS – CARRYOVER FROM PRIOR YEAR

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 420 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN051203 TRANSIT 0 TITLE VI SURVEYS 2013 $50 VENTURA VEN54069 TRANSIT 0 TRANSIT INFORMATION CENTER 2014 $1,581 VENTURA VEN031244 TRANSIT 0 TRANSIT MARKETING 2011 $30 VENTURA VEN54070 TRANSIT 0 TRANSIT MARKETING (CMAQ INCLUDES 2014 $3,309 TRANSP DEVEL CREDITS OF $57 IN 10/11, $92 IN 11/12.) VENTURA VEN990602 TRANSIT 0 TRANSIT PLANNING & PROGRAMMING 2014 $1,935 (PLANNING: PROGRAM SUPPORT & ADM) VENTURA VEN34348 TRANSIT 0 TRANSIT PROGRAMMING & PLANNING 2014 $2,241 VENTURA VEN54149 TRANSIT 0 TWO-WAY RADIO SYSTEM REPLACEMENT 2010 $125 VENTURA VEN54115 TRANSIT 0 VISTA BUS SYSTEM PLANNING 2014 $1,679 VENTURA 5ITS04 STATE 0 ITS COUNTYWIDE MISC. ITS PROJECT IMPLEMENTATION 2035 $73,905 HIGHWAY VENTURA 5O0702 STATE 0 RETROFIT COUNTYWIDE RETROFIT SOUNDWALL PROGRAM 2035 $13,857 HIGHWAY SOUNDWALL PROGRAM VENTURA VEN051213 STATE 23 IN MOORPARK RTE 23 MOORPARK AVE 2014 $2,095 HIGHWAY FROM THIRD ST TO CASEY RD WIDEN FROM 1 LANE IN EACH DIRECTION TO 1 LANE NB AND 2 LANES SB. REALIGN FIRST ST/POINDEXTER INTERSECTION AND UPGRADE RAIL CROSSING. VENTURA 5A0706 STATE 33 SR 33 SR 33 CUYAMA RD ROUNDABOUT 2014 $460 HIGHWAY VENTURA 5A0705 STATE 33 SR 33 SR 33 SR 150 AT "Y" ROUNDABOUT 2020 $851 HIGHWAY VENTURA 5A0701 STATE 33 SR-33 AT STANLEY AVENUE NEW TWO-LANE FREEWAY BRIDGE FOR 2012 $9,000 HIGHWAY SB TRAFFIC VENTURA 5A0704 STATE 33 SR33/SR150 VARIOUS LOCATIONS VARIOUS MINOR SPOT IMPROVEMENTS 2025 $19,000 HIGHWAY TO REDUCE CONGESTION ON SR 33 AND 150 IN OJAI VALLEY AND NEAR OJAI VENTURA VEN040401 STATE 34 IN OXNARD AT RICE AVE. RAILROAD 2017 $12,327 HIGHWAY GRADE SEPARATION

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 421

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5M0104 STATE 101 SR-101 AT LA CONCHITA EXTEND ACCELERATION AND 2014 $12,000 HIGHWAY DECELERATION LANES; AND CLOSE THREE MEDIAN CROSSINGS NEAR LA CONCHITA. VENTURA VEN050404 STATE 101 AT CENTRAL AVENUE – LANDSCAPING 2014 $600 HIGHWAY ENHANCEMENTS VENTURA VEN54020 STATE 101 IN CAMARILLO CONSTRUCT AIRPORT 2012 $40,000 HIGHWAY NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & PONDEROSA DR) INTERSECTING US 101 VENTURA VEN051210 STATE 101 IN CAMARILLO RECONFIGURE CENTRAL 2018 $37,861 HIGHWAY AVENUE / ROUTE 101 INTERCHANGE (INCLUDES CENTRAL AVE BRIDGE WIDENING FROM 1 TO 2 LANES EACH DIRECTION) VENTURA VEN031226 STATE 101 IN CAMARILLO ROUTE 101 AT PLEASANT 2018 $1,053 HIGHWAY VALLEY ROAD IMPROVE INTERSECTION WITH SOUTHBOUND RAMPS – WIDEN ONRAMP ENTRANCE FROM 1 TO 2 LANES AND ADD TURN LANES VENTURA VEN051006 STATE 101 IN OXNARD AT DEL NORTE BOULEVARD 2018 $56,706 HIGHWAY – IMPROVE INTERCHANGE, WIDEN DEL NORTE BRIDGE OVER 101 (FROM VENTURA BLVD TO RTE 101 SB RAMPS) FROM 2 TO 4 LANES PLUS LEFT-TURN LANE. ADD NB LOOP ONRAMPS AND REALIGN AND IMPROVE OTHER RAMPS. VENTURA 343 STATE 101 IN OXNARD AT RICE AVE (SANTA 2012 $83,977 HIGHWAY CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) (SAFETEA-LU #2639 AND 'TIP') (TCSP – 2010 APPROP EARMARK)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 422 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN053402 STATE 101 IN OXNARD LANDSCAPING/IRRIGATION 2014 $694 HIGHWAY ENHANCEMENTS SOUTH SIDE OF ROUTE 101 AT DEL NORTE – REGIONAL STP INCLUDES $9 OF TOLL CREDITS FOR FY 10/11 PE VENTURA VEN011205 STATE 101 IN THOUSAND OAKS – IMPROVEMENTS 2018 $60,342 HIGHWAY AT VAR LOCATIONS LA CNTY LINE- MOORPARK RD: CONV AUX LANES TO MF LANES, ADD 1 LANE EACH DIRECTION BY SHIFTING CL NORTHWARDS & WIDENING ON NB SIDE, REALIGN & WIDEN RAMPS, CONSTR SOUNDWALLS (EA 19521, 19522), WIDEN 3 BRIDGES ON NORTHSIDE (HAMPSHIRE UC, CONEJO SCHOOL UC, & MOORPARK UC); IMPROVE 101/23 CONNECTORS.(STP=FY 2010 APPROPS EARMARK)(INCL RT 23 PM 3.3/3.8) VENTURA VEN070201 STATE 101 NEAR MUSSEL SHOALS ADD 1 HOV LANE 2014 $87,760 HIGHWAY EACH DIR FROM MOBIL PIER ROAD UC TO S/O CASITAS PASS RD IN SANTA BARBARA CO. (PM R 39.8 TO 2.2). HOV LANES ARE PROPOSED TO BE PART-TIME (AM & PM PEAK PERIODS) ONLY. EXTEND ON/OFF-LANES AT MUSSEL SHOALS & LA CONCHITA FOR BETTER ACCEL AND DECEL; KEEP AS SINGLE LANES. CLOSE EXISTING 3 MEDIAN OPENINGS LOCATED NEAR LA CONCHITA AND MUSSEL SHOALS AND TANK FARM. VENTURA VEN010202 STATE 101 RECONFIGURE N/B CALIFORNIA ST 2014 $24,720 HIGHWAY OFFRAMP (RECONFIGURE RAMP TO TERMINATE AT OAKS ST INSTEAD OF THE CURRENT CALIFORNIA ST LOCATION)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 423

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN056406- STATE 101 ROUTE 101 AT WENDY INTERCHANGE 2014 $6,300 VEN110301 HIGHWAY IMPROVEMENTS PH 2 INCLUDING WENDY DRIVE BRIDGE SOUTHBOUND WIDENING ACROSS ROUTE 101; SB OFF-RAMP IMPROVEMENT TO WIDEN FROM 1 TO 2 LANES AT WENDY DRIVE INTERSECTION TO PROVIDE TURN LANE (RAMP TO REMAIN 1 LANE EXITING FREEWAY) TOLL CREDIT = $88 FOR CON SPLIT FROM VEN056406 VENTURA VEN056406- STATE 101 ROUTE 101 AT WENDY INTERCHANGE 2014 $3,587 VEN110302 HIGHWAY IMPROVEMENTS PH 3 IMPROVE SB ONRAMP (SPLIT FROM VEN056406) VENTURA VEN056406- STATE 101 ROUTE 101 AT WENDY INTERCHANGE 2014 $6,271 VEN056406 HIGHWAY IMPROVEMENTS PHASE I INCLUDING WENDY DRIV BRIDGE NB WIDENING ACROSS ROUTE 101; NB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD (OTHER PHASES SPLIT TO VEN110301 & VEN110302.) TOLL CREDIT = $77 FOR CON VENTURA 5120001 STATE 118 RT 23 (NEW LA TAPO CYN RD ADD ONE LANE EA DIR FROM RT 23 (NEW 2018 $506,285 HIGHWAY AVE) LA AVE) TO TAPO CYN RD (PENDING ENVIRONMENTAL CLEARANCE) (EA 22550, PPNO 3002) VENTURA 5A0703 STATE 118 SR-118 AT COLLINS DRIVE INTERCHANGE AND SIGNAL 2015 $1,800 HIGHWAY IMPROVEMENT. WIDEN W/B OFF-RAMP TO ADD A FREE RIGHT- TURN LANE AND SIGNAL MODIFICATION. VENTURA 5OM0701 STATE 118 SR-118 JCN 23 & 34 IN CONSTRUCT NEW WEIGH STATION 2014 $19,800 HIGHWAY MOORPARK

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 424 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5M0801 STATE 118 VEN-118 & VEN-34 "10.72 "11.80 WIDEN INTERSENTION, ADD TURN 2012 $4,300 HIGHWAY 16.80" 17.66" LANES, REALIGN DONLON RD (COUNTY PORTION ONLY) OR CONSTRUCT A NEW ALIGNMENT SOMIS BYPASS (PE FUNDING ONLY) VENTURA VEN34089 STATE 118 IN MOORPARK L.A. AVE FROM ROUTE 2012 $1,158 HIGHWAY 23 (MOORPARK AVE) TO E/O SPRING CONSTRUCT SIDEWALKS, REALIGN ROADWAY AND WIDEN FROM 4 TO 6 LANES VENTURA 12020 STATE 118 IN MOORPARK LOS ANGELES AVE WIDEN 2012 $950 HIGHWAY FROM 4 TO 6 LANES BETWEEN MAUREEN AND LETA YANCY VENTURA VEN071106 STATE 118 IN SIM VLY WIDEN RTE 118 WB LA CONTY 2012 $29,717 HIGHWAY LN TO TAPO CYN FR 3 TO 4 LANES (TAPO CYN TO KUEHNER) AND FR 4 TO 5 LANES (KUEHNER TO COUNTY LN); WIDEN EB TAPO CYN TO TAPO FR 3 TO 4 LANES; WIDEN EB KUEHNER TO LA CNTY LINE FR 4 TO 5 LAN VENTURA VEN051003 STATE 118 IN SIMI VALLEY LANDSCAPE 2011 $1,400 HIGHWAY ENHANCEMENTS FROM WESTERN CITY LIMIT TO EASTERN CITY LIMIT. VENTURA 6566 STATE 118 NEAR SIMI VALLEY AT ALAMOS CYN RD 2018 $2,560 HIGHWAY ADD RAMPS VENTURA VEN54187 STATE 999 2% FOR PLANNING, PROGRAMMING, & 2015 $2,395 HIGHWAY MONITORING VENTURA 5N011 LOCAL 0 ALONG SP BRANCH MONTALVO LOS ANGELES COUNTY LINE SANTA PAULA BRANCH RECREATIONAL 2020 $47,917 HIGHWAY RAIL LINE TRAIL VENTURA 5AL07 LOCAL 0 ARTERIAL COUNTYWIDE ARTERIAL IMPROVEMENTS LUMP SUM 2035 $399,509 HIGHWAY IMPROVEMENTS VENTURA 5A0725 LOCAL 0 CENTRAL AVENUE SANTA CLARA AVE. CAMARILLO CITY LIMITS WIDEN FROM TWO LANES TO FOUR 2020 $7,900 HIGHWAY WIDENING LANES IMPROVEMENT

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 425

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5G0405 LOCAL 0 GONZALES RD SR-1 (OXNARD BLVD) UPRR TRACKS CONSTRUCT 6 LANE GRADE SEPARATION 2014 $20,000 HIGHWAY AT SR-1 (OXNARD BLVD) AND UPRR TRACKS WITH LEFT TURN POCKETS VENTURA 5GL04 LOCAL 0 GRADE COUNTYWIDE GRADE SEPARATION IMPROVEMENTS 2019 $143,000 HIGHWAY SEPARATION VENTURA 5A0707 LOCAL 0 GRIMES CANYON AT SR118 REALIGN HITCH BLVD WITH GRIMES 2020 $2,600 HIGHWAY ROAD AND CANYON RD AND INTERSECTION HITCH BLVD IMPROVEMENTS REALIGNMENT VENTURA 5A0708 LOCAL 0 HARBOR BLVD AT GOZALES ROAD ADD 2ND SOUTHBOUND THROUGH LANE 2022 $1,219 HIGHWAY AND 2ND NORTHBOUND THROUGH LANE VENTURA 5A0720 LOCAL 0 HARBOR OXNARD CITY LIMITS VENTURA CITY LIMITS WIDEN FROM TWO LANES TO FOUR 2030 $24,020 HIGHWAY BOULEVARD LANES, INCLUDING REPLACEMENT OR WIDENING WIDENING OF EXISTING BRIDGE IMPROVEMENT VENTURA 5A0715 LOCAL 0 HERMOSA RD AT SR 150 INTERSECTION IMPROVEMENTS 2015 $300 HIGHWAY VENTURA 5A0735 LOCAL 0 LOS ANGELES APPROXIMATELY APPROXIMATELY 1000' E/O WIDEN TAPO CHANNEL BRIDGE AT LOS 2012 $1,100 HIGHWAY AVENUE 1250' E/O SYCAMORE DRIVE ANGELES AVENUE (15' ON THE NORTH SYCAMORE DRIVE SIDE & 20' ON THE SOUTH SIDE). THIS INCLUDES ADDITION OF ONE LANE IN EACH DIRECTION (FROM 4 TO 6 LANES), RELOCATION OF THE EXISITING UTILITIES & MODIFICATIONS TO UPSTREAM & DOWNSTREAM OF THE CHANNEL. VENTURA 5A0730 LOCAL 0 LOS ANGELES "SEGMENT 1: 200' "SEGMENT 1: 100' W/O SYCAMORE WIDEN SOUTH SIDE OF LOS ANGELES 2018 $2,750 HIGHWAY AVENUE E/O ORCHID AVENUE DRIVE AVENUE BY ADDING A LANE (FROM 4 TO SEGMENT 2: 200' SEMENT 2: 100' W/O OF DARRAH 5 LANES) E/O OF SEQUOIA AVENUE" AVENUE" VENTURA 5AL04 LOCAL 0 MISC. ARTERIAL COUNTYWIDE MISC. ARTERIAL IMPROVEMENTS 2035 $122,540 HIGHWAY IMPROVEMENTS (NON-CAPACITY) (NON-CAPACITY)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 426 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5O0703 LOCAL 0 MISC. COUNTYWIDE TRANSPORTATION ENHANCEMENT 2035 $13,857 HIGHWAY TRANSPORTATION ENHANCEMENTS VENTURA 5A0742 LOCAL 0 NORTHHILLS W/B SR-118 OFF- CITY WESTERLY LIMITS AT SR-118 CONSTRUCT 4-LANE FREEWAY 2023 $10,653 HIGHWAY PARKWAY RAMP AT PRINCETON CONNECTION ON NEW ALIGNMENT VENTURA 5A0723 LOCAL 0 OLIVAS PARK DRIVE PERKIN AVE AUTO CENTER DRIVE CONSTRUCT 4-LANE EXTENSION 2012 $10,000 HIGHWAY VENTURA 5A0746 LOCAL 0 PEARL ST FOX ST BALD ST GAP CLOSURE EXTENSION 2014 $1,515 HIGHWAY VENTURA 5O0701 LOCAL 0 PLANTING/ COUNTYWIDE MISC. PLANTING AND LANDSCAPING 2035 $27,714 HIGHWAY LANDSCAPING VENTURA 5A0709 LOCAL 0 PLEASANT VALLEY AT E. 5TH STREET ADD 2ND SOUTHBOUND THROUGH LANE 2017 $1,700 HIGHWAY ROAD AND 2ND NORTHBOUND THROUGH LANE VENTURA 5A0721 LOCAL 0 PLEASANT VALLEY DODGE RD LAS POSAS ROAD WIDEN FROM TWO TO FOUR LANES 2030 $19,600 HIGHWAY ROAD WIDENING IMPROVEMENT VENTURA 5A0743 LOCAL 0 PRINCETON SR-118 OFFRAMP AT SPRING ROAD WIDEN, REALIGN AND RECONSTRUCT 2018 $8,000 HIGHWAY AVENUE PRINCETON AVE FROM 2 TO FOUR LANES VENTURA 5A0711 LOCAL 0 RICE AVENUE AT CHANNEL ADD 3RD NORTHBOUND THROUGH LANE 2015 $950 HIGHWAY ISLANDS BLVD AND 3RD SOUTHBOUND THROUGH LANE AND SOUTHBOUND RIGHT-TURN LANE VENTURA 5A0710 LOCAL 0 RICE AVENUE AT WOOLEY ROAD ADD 3RD NORTHBOUND THROUGH LANE 2015 $1,400 HIGHWAY AND 3RD SOUTHBOUND THROUGH LANE VENTURA 5A0402 LOCAL 0 ROSE AVE AT GONZALEZ RD CONSTRUCT 4 LANE FLYOVER WITH LEFT 2018 $20,000 HIGHWAY TURN POCKETS VENTURA 5G0404 LOCAL 0 ROSE AVE AT SR-34 (E. FIFTH CONSTRUCT 4 LANE GRADE SEPARATION 2014 $20,000 HIGHWAY ST) WITH LEFT TURN POCKETS VENTURA 5A0719 LOCAL 0 SANTA CLARA N/O OXNARD CITY SR 118 WIDEN FROM TWO TO FOUR LANES 2018 $22,000 HIGHWAY AVENUE WIDENING LIMITS IMPROVEMENT VENTURA 5A0734 LOCAL 0 STEARNS STREET COCHRAN STREET LEEDS STREET WIDENING OF STEARNS STREET TO ADD 2018 $1,500 HIGHWAY A LANE IN EACH DIRECTION (FROM 2 TO 4 LANES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 427

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5A0728 LOCAL 0 TAPO CANYON RD WALNUT STREET LOST CANYON RD. WIDEN TAPO CANYON ROAD TO ADD AN 2018 $4,500 HIGHWAY ADDITIONAL LANE IN EACH DIRECTION (FROM 2 TO 4 LANES) AND A DIVIDED CENTER MEDIAN. VENTURA 5A0738 LOCAL 0 TAPO STREET WALNUT STREET PRESIDIO DR. WIDENING OF TAPO STREET TO ADD A 2018 $650 HIGHWAY LANE IN EACH DIRECTION (FROM 2 TO 4 LANES) VENTURA 5A0736 LOCAL 0 TBD BETWEEN AND EVENING SKY DR. PROVIDES THE MISSING LINK (A 60' 2018 $800 HIGHWAY FLANAGAN DRIVE ROAD WITH TWO LANES) BETWEEN TWO STREETS (FLANAGAN DR. & EVENING SKY DR.). FROM 0 TO 2 LANES. VENTURA 5TDL04 LOCAL 0 TDM COUNTYWIDE MISC. TDM (NON-MOTORIZED, 2035 $27,714 HIGHWAY TELECOMMUTE, ETC.) VENTURA 5A0713 LOCAL 0 TOPA TOPA ST FOX ST MONTGOMERY ST GAP CLOSURE EXTENSION 2015 $780 HIGHWAY VENTURA 5A0401 LOCAL 0 VICTORIA AVE AT GONZALES RD CONSTRUCT 4 LANE FLYOVER WITH LEFT 2018 $20,000 HIGHWAY TURN POCKETS VENTURA 5A0712 LOCAL 0 VICTORIA AVENUE AT GONZALES ROAD CONVERT SOUTHBOUND RIGHT-TURN 2020 $900 HIGHWAY LANE TO SHARED 3RD SOUTHBOUND THROUGH LANE/SOUTHBOUND RIGHT TURN LANE, ADD 2ND SOUTHBOUND LEFT-TURN LANE AND NORTHBOUND RIGHT-TURN LANE AND CONVERT DUAL WESTBOUND THROUGH LANE TO WESTBOUND RIGHT-TURN LANE AND SHARED WESTBOUND THROUGH LANE/2ND WESTBOUND RIGHT-TURN LANE VENTURA 5A0714 LOCAL 0 VICTORIA AVENUE AT OLIVAS PARK ADD ADDITIONAL EB-WB THROUGH 2009 $450 HIGHWAY DRIVE LANES AND NB LEFT TURN LANES VENTURA 5A0722 LOCAL 0 VICTORIA AVENUE GONZALES ROAD VENTURA CITY LIMITS WIDEN FROM FOUR LANES TO SIX LANES 2030 $16,500 HIGHWAY WIDENING (INCLUDING BRIDGE) IMPROVEMENT – A

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 428 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5A0726 LOCAL 0 VICTORIA AVENUE GONZALES ROAD OXNARD CITY LIMITS WIDEN FROM FOUR LANES TO SIX LANES 2030 $8,421 HIGHWAY WIDENING IMPROVEMENT – B VENTURA 5A0732 LOCAL 0 WENDY DRIVE BORCHARD ROAD THOUSAND OAKS CITY LIMITS RE-STRIPE FROM TWO TO FOUR LANES; 2018 $1,600 HIGHWAY WIDENING INLCUDES REPLACEMENT OR WIDENING IMPROVEMENTS OF EXISTING BRIDGE VENTURA VEN990310 LOCAL 0 1000' E. OF RTE 126/CTR ST/RANCHO 2012 $6,000 HIGHWAY CAMULOS PIRU CRK BRIDGE (PHASE I & IV) FENCING RE-LAY TRK, INSTALL PLATFRM @ RANCHO CAMULOS (VEN070101) , BIKE/PED PATH FROM 0.75 MILE WEST OF RANCHO CAMULOS TO RANCHO CAMULOS. (BIKE/PED PATH ALSO IN VEN090504.) VENTURA VEN050402 LOCAL 0 ADOLFO ROAD EASTBOUND AT SANTA 2011 $1,177 HIGHWAY ROSA ROAD – ADD DUAL LEFT AND RIGHT TURN LANES (TOLL CREDITS = $135 FOR FY 10/11 CON) VENTURA VEN54164 LOCAL 0 BICYCLE & PEDESTRIAN TRAIL 2011 $148 HIGHWAY EXTENSION: FOX CYN BARRANCA FROM RT 150 TO OJAI VALLEY TRAIL VENTURA VEN990319 LOCAL 0 CALIFORNIA ST BRIDGE OVER RT 101 2012 $1,525 HIGHWAY PEDESTRIAN ENHANCEMENTS VENTURA VEN050403 LOCAL 0 CALLEGUAS BIKE PATH – CONSTRUCT 2011 $2,083 HIGHWAY CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II). (CMAQ INCLUDES $191 IN TOLL CREDITS FOR 11/12 CONSTRUCTION.) VENTURA VEN054605 LOCAL 0 CONEJO CREEK PARK BIKE PATH – 2010 $1,601 HIGHWAY CLASS I BIKE PATH FOR 1.4 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD AND PAIGE LANE

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 429

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN071104 LOCAL 0 CONSTRUCT PONDEROSA EXTENSION 2014 $5,114 HIGHWAY FROM EARL JOSEPH TO VENTURA BLVD INCLUDING BIKE LANES (SPLIT FROM PROJECT 07-VEN990305) VENTURA VEN053403 LOCAL 0 EAST VENTURA BOULEVARD FROM 2013 $4,246 HIGHWAY NYLAND AVENUE TO EAST OF ALMOND DRIVE – LANDSCAPE ENHANCEMENT, PEDESTRIAN AND BICYCLE FACILITIES, DRAINAGE IMPROVEMENT AND PAVEMENT REHABILITATION VENTURA VEN031212 LOCAL 0 EXPAND TRAFFIC SIGNAL COORDINATION 2010 $450 HIGHWAY SYSTEM VENTURA VEN54168 LOCAL 0 FACILITY INCL BIKEWAY/WALKWAY 2011 $4,094 HIGHWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC ACCESS POINTS/ SAFETY ITEMS VENTURA VENLS07 LOCAL 0 GROUPED PROJECTS FOR BRIDGE 2016 $6,742 HIGHWAY REHABILITATION AND RECONSTRUCTION – HBP PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 430 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN54032 LOCAL 0 GROUPED PROJECTS FOR PAVEMNT 2014 $34,427 HIGHWAY RESURFACING AND/OR REHABILITATION – LOCAL STREETS & ROADS SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADD TRAV LANES) TOLL CRED FOR CON FY11=$578, FY 12=$80. VENTURA VEN056407 LOCAL 0 HILLCREST DRIVE FROM TELLER ROAD 2011 $284 HIGHWAY TO CONEJO BLVD – CLASS II BIKE LANES VENTURA VEN011202 LOCAL 0 HUENEME RD FROM OXNARD CITY 2018 $6,953 HIGHWAY LIMITS TO RICE RD – WIDEN FROM 2 TO 4 LANES VENTURA VEN54019 LOCAL 0 IN CAMARILLO ADOLFO RD EXTENSION 2018 $11,358 HIGHWAY EXTEND ROAD EASTERLY TO CAMARILLO SPRINGS RD/US 101 (TWO-LANE UNDIVIDED ROAD) VENTURA VEN34095 LOCAL 0 IN OXNARD COLONIA RD/CAMINO DEL 2014 $10,269 HIGHWAY SOL RT 1 TO ENTRADA DR CONSTRUCT 4 LANES VENTURA VEN34094 LOCAL 0 IN OXNARD HUENEME RD SAVIERS TO 2012 $3,616 HIGHWAY ARCTURUS WIDEN AND CONSTRUCT FROM 2 TO 4 LANES (SAFETEA-LU PROJECT #2639 & 'TIP') VENTURA VEN053401 LOCAL 0 INSTALL INTERCONNECT CABLE TO 2015 $500 HIGHWAY CONNECT SIGNALIZED INTERSECTIONS AT VARIOUS LOCATIONS THROUGHOUT THE CITY VENTURA VEN031216 LOCAL 0 INSTALL NEW SIGNALS AT 2010 $558 HIGHWAY INTERSECTION OF PALM AVENUE AND ROUTE 126 EB OFF-RAMP, AND TENTH STREET AND ROUTE 126 EB OFF-RAMP

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 431

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN051211 LOCAL 0 LAS POSAS ROAD FROM VENTURA BLVD 2018 $4,417 HIGHWAY TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES VENTURA VEN056403 LOCAL 0 LYNN ROAD FROM ROUTE 101 TO 2011 $460 HIGHWAY AVENIDA DE LAS FLORES SIGNAL SYNCHRONIZATION IMPROVEMENT (PHASE III) VENTURA VEN040501 LOCAL 0 NEAR CAMARILLO LEWIS RD WIDEN 2012 $50,265 HIGHWAY FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS – CON PHASE (PE & ROW IN 07-VEN54122) – INCL FINANCE COST VENTURA VEN54122 LOCAL 0 NEAR CAMARILLO LEWIS RD WIDEN 2010 $3,362 HIGHWAY FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS – PE AND ROW PHASES (CON IN 07-VEN040501) – PHASE I VENTURA VEN010203 LOCAL 0 OJAI VALLEY BIKE TRAIL EXTENSION/ 2011 $611 HIGHWAY FULTON ST EXTENSION (STP INCLUDES TOLL CREDITS OF $54 FOR FY 2010/11 CON.) VENTURA VEN051002 LOCAL 0 OLSON ROAD WIDENING FROM FOUR TO 2012 $2,984 HIGHWAY SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET VENTURA VEN990317 LOCAL 0 OXNARD BLVD 5TH/VINEYARD & ON 2012 $4,589 HIGHWAY 5TH ST (RT 34) OXNARD BLVD/ROSE AVE CONSTRUCT NEW BICYCLE & PEDESTRIAN FACILITIES 1.5 MILES IN LENGTH VENTURA VEN051004 LOCAL 0 RECONSTRUCT AND DEEP LIFT ASPHALT 2010 $6,000 HIGHWAY ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 432 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA VEN93017 LOCAL 0 REGIONAL RIDESHARE PROGRAM FOR 2015 $4,465 HIGHWAY 10/11, 11/12, 12/13, 13/14, 14/15, & 15/16 VENTURA VEN051401 LOCAL 0 ROUTE 126 AND SANTA PAULA BRANCH 2012 $1,395 HIGHWAY RAILROAD AT POLE CREEK – CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH (CMAQ INCLUDES $8 TOLL CREDITS FOR PE.) VENTURA VEN031229 LOCAL 0 ROUTE 126 BIKE PATH – PHASE II BIKE 2011 $1,930 HIGHWAY PATH (CLASS I) CROSSING THE HARMON BARRANCA -(INCLUDES $221 OF CMAQ PROVIDING MATCH THROUGH TOLL CREDITS) VENTURA VEN040502 LOCAL 0 SANTA ROSA ROAD FROM UPLAND ROAD 2012 $2,113 HIGHWAY TO WOODCREEK ROAD WIDEN FROM TWO TO FOUR LANES AND ADD BIKE LANES VENTURA 5TPL04 LOCAL 0 SIMI VALLEY BIKE PATH CLASS I 1400- 2011 $254 HIGHWAY FOOT CONNECTION FROM METROLINK STATION TO STEARNS STREET. (CMAQ INCLUDES TOLL CREDITS OF $23 FOR 2010/11 CON.) VENTURA VEN990341 LOCAL 0 SURFERS' POINT BIKE PATH 2011 $2,214 HIGHWAY RESTORATION RESTORE 0.8 KM BIKEWAY SEGMENT DESTROYED BY STORMS ENVIRONMENTAL VENTURA VEN110112 LOCAL 0 VICTORIA AVENUE FROM GUM TREE 2012 $1,100 HIGHWAY ST TO GONZALES RD SIDEWALK AND DRAINAGE IMPROVEMENTS, RESTRIPING TO PROVIDE THREE NB THROUGH LANES AND BIKE LANE VENTURA VEN051201 LOCAL 0 WEST LOS ANGELES AVENUE FROM 2012 $1,986 HIGHWAY WEST CITY LIMIT TO EASY STREET 0.4 MILE CLASS II BIKE LANES – CMAQ INCLUDES $228 OF TOLL CREDITS FOR 10/11 CON.

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 433

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VENTURA 5A0716 LOCAL 118 SOMIS RD/SR118/ WIDEN INTERSECTION, ADD TURN 2020 $4,000 HIGHWAY DONLON DR LANES, RALIGN DONLON ROAD (COUNTY INTERSECTION PORTION ONLY) (REALIGNMENT PORTION IMPROVEMENTS COMPLETE IN 2013) VENTURA 5G0102 LOCAL 118 SR118 NEAR GRIMES CROSOOVER ON SR118 NEAR GRIMES 2011 $50,000 HIGHWAY CANYON CANYON VENTURA 5G0403 LOCAL 232 SR-232 (VINEYARD OXNARD BLVD SAINT MARY'S DRIVE CONSTRUCT 6 LANE GRADE SEPARATION 2014 $20,000 HIGHWAY AVE) OVER UPRR TRACKS VENTURA 5G0701 LOCAL 0 LOS ANGELES LA STREET GRADE SEPARATION. 2019 $93,000 HIGHWAY AVENUE GRADE-SEPARATE LA AVENUE (MP 437.0) IN SIMI VALLEY. REALIGN 0.30-MILE- LONG CURVE SOUTH OF LOS ANGELES STREET, CONSTRUCT LOS ANGELES AVENUE OVERPASS, CONSTRUCT 0.48 MILE OF NEW TRACK TO FRA CLASS 5 STANDARDS. VARIOUS 7120010 TRANSIT 0 CALIFORNIA HIGH- REGIONWIDE CALIFORNIA HIGH-SPEED RAIL – PHASE 2035 $47,715,746 SPEED RAIL 1 (INCLUDES METROLINK AND LOSSAN CORRIDOR SPEED UPGRADES) VARIOUS 1TR1013 TRANSIT 0 CALIFORNIA HIGH- CALIFORNIA HIGH-SPEED RAIL PHASE 2012 $85,000 SPEED RAIL 2 – ENV/PE VARIOUS 7120012 TRANSIT 0 CLEAN BUSES REGIONWIDE CARB ZERO EMISSION BUS 2020 $78,289 ACCELERATION VARIOUS 7120009 TRANSIT 0 EXPAND BUS REGIONWIDE EXPAND BUS SERVICE: BRT 2035 $600,000 SERVICE VARIOUS 7120008 TRANSIT 0 EXPAND BUS REGIONWIDE EXPAND BUS SERVICE: POINT-TO-POINT 2035 $900,000 SERVICE VARIOUS 7120007 TRANSIT 0 EXPAND BUS REGIONWIDE EXPAND BUS SERVICE: PRODUCTIVE 2035 $1,500,000 SERVICE CORRIDORS VARIOUS 7120011 TRANSIT 0 HIGH-SPEED RAIL REGIONWIDE CALIFORNIA NEVADA HIGH-SPEED 2016 $50,166 RAIL PLANNING AND ENVIRONMENTAL REVIEW

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 434 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VARIOUS 7120002 TRANSIT 0 TRANSIT REGIONWIDE ADDITIONAL O&M AND PRESERVATION 2035 $15,000,000 OPERATIONS & – TRANSIT MAINTENANCE VARIOUS 3C01MA03 STATE 0 CETAP – RIVERSIDE WESTERN RIVERSIDE ORANGE COUNTY CETAP – RIVERSIDE COUNTY TO 2035 $2,720,000 HIGHWAY COUNTY TO COUNTY ORANGE COUNTY – CONSTRUCT NEW ORANGE COUNTY INTERCOUNTY TRANSPORTATION CORRIDOR A – 2 TOLL EACH DIR ON NEW FACILITY PARALLEL TO SR-91, FROM SR- 241 TO I-15, WITH IC AT SR-241, SR-71, I-15 VARIOUS 7120003 STATE 0 HIGHWAY REGIONWIDE ADDITIONAL O&M AND PRESERVATION 2035 $40,000,000 HIGHWAY OPERATIONS & – HIGHWAYS MAINTENANCE VARIOUS 7120013 STATE 0 REGIONAL REGIONWIDE REGIONAL EXPRESS/HOT LANE 2035 $9,500,000 HIGHWAY EXPRESS/HOT NETWORK LANE NETWORK VARIOUS 7120005 STATE 0 TRANSPORTATION REGIONWIDE ADDITIONAL TSM INVESTMENTS 2035 $3,000,000 HIGHWAY SYSTEMS (INCLUDES CSMP IMPROVEMENTS) MANAGEMENT VARIOUS 1C0404 STATE 0 HIGH DESERT I-5 US-395 HIGH DESERT CORRIDOR, CONSTRUCT 2020 $6,925,029 HIGHWAY CORRIDOR NEW 4-6 LANE FACILITY: E-W I-14 TO US-395 (CONNECTING AT SB CO #20020144), E-W I-5 TO SR-14, N-S SR-14 TO SR-138. VARIOUS 7120004 OTHER 0 ACTIVE REGIONWIDE ADDITIONAL ACTIVE TRANSPORTATION 2035 $5,000,000 TRANSPORTATION INVESTMENTS VARIOUS 7120014 OTHER 0 EAST-WEST I-710 JUST WEST OF I-605 EAST-WEST FREIGHT CORRIDOR 2035 $2,413,086 FREIGHT CORRIDOR SEGMENT 1 (UPRR ADJACENT) VARIOUS 7120015 OTHER 0 EAST-WEST JUST WEST OF I-605 JUST EAST OF SR-57 EAST-WEST FREIGHT CORRIDOR 2035 $9,102,359 FREIGHT CORRIDOR SEGMENT 2 (SR-60 ADJACENT) VARIOUS 7120016 OTHER 60 EAST-WEST JUST EAST OF SR-57 I-15 EAST-WEST FREIGHT CORRIDOR 2035 $3,777,816 FREIGHT CORRIDOR SEGMENT 3 (SR-60 ADJACENT) VARIOUS 7120017 OTHER 15 I-15 FREIGHT SR-60 I-10 I-15 FREIGHT CORRIDOR (INITIAL 2035 $856,570 CORRIDOR SEGMENT)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 435

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VARIOUS 7120018 OTHER 0 GOODS MOVEMENT REGIONWIDE GOODS MOVEMENT – BOTTLENECK 2035 $5,000,000 BOTTLENECK RELIEF STRATEGY RELIEF STRATEGY VARIOUS 7120006 OTHER 0 TRANSPORTATION REGIONWIDE ADDITIONAL TDM INVESTMENTS 2035 $3,500,000 DEMAND MANAGEMENT VARIOUS REG0703 OTHER 0 ARTERIAL REGIONWIDE ARTERIAL PRESERVATION/MAINTENANCE 2035 SEE FINANCIAL OPERATIONS & AND OPERATIONS PROJECTS PLAN LOCAL MAINTENANCE STREETS AND ROADS OPERATIONS AND MAINTENANCE COST VARIOUS RRC0703 OTHER 0 GOODS MOVEMENT REGIONWIDE NEAR-TERM ZERO-EMISSION TRUCK 2021 $35,000 TECHNOLOGY TECHNOLOGY DEMONSTRATION AND DEMONSTRATION INITIAL DEPLOYMENT. DEMONSTRATION AND INITIAL BY 2013; INITIAL DEPLOYMENT BY 2015. DEPLOYMENT VARIOUS REG0701 OTHER 0 HIGHWAY REGIONWIDE STATE HIGHWAY PRESERVATION/ 2035 SEE FINANCIAL OPERATIONS & MAINTENANCE AND OPERATIONS PLAN HIGHWAY MAINTENANCE PROJECTS (INCLUDES SHOPP, HIGHWAY OPERATIONS AND BRIDGE PROGRAM, EMERGENCY MAINTENANCE RELIEF, PUBLIC LAND HIGHWAYS, COST HAZARD ELIMINATION AND SAFETY, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, AND SECTION 130 STP RAILROAD PROGRAM PROJECTS) VARIOUS 1O0705 OTHER 0 INTERMODAL INTERMODAL FACILITIES (SCIG & ICTF) 2016 $1,000,000 FACILITIES VARIOUS REG0704 OTHER 0 OTHER PROGRAMS REGIONWIDE RECREATIONAL TRAILS, SCENIC 2035 SEE FINANCIAL BYWAYS, TRANSPORTATION COMMUNITY PLAN OTHER AND SYSTEM PRESERVATION PROGRAM COST PROJECTS VARIOUS RRC0702 OTHER 0 REGIONAL REGIONWIDE RAIL PACKAGE – GRADE SEPARATIONS 2015 $5,600,000 RAIL CAPACITY PROGRAM

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis 436 Project List

Financially-Constrained RTP Projects Project Route Project Cost County RTP ID System Route Name From To Description Completion # ($1,000’s) By* VARIOUS RRC0701 OTHER 0 REGIONAL REGIONWIDE RAIL PACKAGE – RAIL CAPACITY 2015 $3,222,341 RAIL CAPACITY EXPANSION PROGRAM VARIOUS REG0702 OTHER 0 TRANSIT REGIONWIDE TRANSIT PRESERVATION/MAINTENANCE, 2035 SEE FINANCIAL OPERATIONS & REHABILITATION/REPLACEMENT AND PLAN TRANSIT MAINTENANCE OPERATIONS PROJECTS OPERATIONS AND MAINTENANCE COST VARIOUS 7120001 LOCAL 0 ARTERIAL REGIONWIDE ADDITIONAL O&M AND PRESERVATION – 2035 $15,000,000 HIGHWAY OPERATIONS & LOCAL STREETS & ROADS MAINTENANCE VARIOUS 6OM0701- LOCAL 0 IMPROVE BUS TURN-OUT ON MCBEAN 2012 $250 SC3711 HIGHWAY PARKWAY AT AVENIDA NAVARRE AND DEVELOPMENT OF NORTHBOUND LEFT- TURN POCKET AT MCBEAN PARKWAY AND ORCHARD VILLAGE ROAD AT HENRY MAYO NEWHALL MEMORIAL CENTER (THE CITY OF SANTA CLARITA IS THE LEAD AGENCY) VARIOUS 10M0702 LOCAL 0 STUDY – EXPRESS TRAVEL CHOICES 2013 $4,000 HIGHWAY (PHASE II) – (CALTRANS IS THE LEAD AGENCY)

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis Project List 437

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005)

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005) County System Category Route Name From To Description LOS ANGELES LOCAL HIGHWAY ITS GATEWAY CITIES FORUM ITS GATEWAY CITIES FORUM ITS LOS ANGELES LOCAL HIGHWAY ITS SAN FERNANDO VALLEY SAN FERNANDO VALLEY FORUM ITS FORUM ITS LOS ANGELES LOCAL HIGHWAY ITS SAN GABRIEL VALLEY SAN GABRIEL VALLEY FORUM ITS FORUM ITS LOS ANGELES LOCAL HIGHWAY ITS SOUTH BAY FORUM ITS SOUTH BAY FORUM ITS LOS ANGELES LOCAL HIGHWAY ITS 1ST ST INDIANA ST MEDNIK AVE 1ST ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ALAMEDA ST SLAUSON AVE NADEAU ST ALAMEDA ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS AMAR RD/TEMPLE AVE NOGALES ST GOLDEN SPRINGS DR AMAR RD/TEMPLE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ANZA AVE 190TH ST PACIFIC COAST HWY ANZA AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ARROYO PKWY COLORADO BL GLENARM ST ARROYO PKWY SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ATLANTIC BL/ATLANTIC AVE PINE ST PACIFIC COAST HWY ATLANTIC BL/ATLANTIC AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS BALDWIN AVE FOOTHILL BL I-10 BALDWIN AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS BARRANCA AVE/BARRANCA SIERRA MADRE AVE CAMERON AVE BARRANCA AVE/BARRANCA ST SIGNAL SYNCHRONIZATION ST LOS ANGELES LOCAL HIGHWAY ITS BASE LINE ST FOOTHILL BL COUNTY LINE BASE LINE ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS BEVERLY BL POMONA ST PAINTER AVE BEVERLY BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS BLOOMFIELD AVE ROSECRANS AVE DEL AMO BL BLOOMFIELD AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS BOUQUET CANYON RD PLUM CANYON RD SOLEDAD CANYON RD BOUQUET CANYON RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS BROADWAY 124TH ST 157TH ST BROADWAY SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS CITRUS AVE FOOTHILL BL ARROW HWY CITRUS AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS CITY TERRACE DR INDIANA ST EASTERN AVE CITY TERRACE DR SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS COLORADO BL ORANGE GROVE BL MICHILLINDA AVE COLORADO BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS COLORADO ST MICHILLINDA AVE COLORADO PL COLORADO ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS COMPTON AVE SLAUSON AVE 92ND ST COMPTON AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS COMPTON AVE IMPERIAL HWY EL SEGUNDO BL COMPTON AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS DEL AMO BL AVALON BL BLOOMFIELD AVE DEL AMO BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS DIAMOND BAR BL/MISSION BREA CANYON RD COUNTY LINE DIAMOND BAR BL/MISSION BL SIGNAL SYNCHRONIZATION BL LOS ANGELES LOCAL HIGHWAY ITS DUARTE RD SAN GABRIEL BL HIGHLAND AVE DUARTE RD SIGNAL SYNCHRONIZATION 438 Project List

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005) County System Category Route Name From To Description LOS ANGELES LOCAL HIGHWAY ITS E VICTORIA ST SANTA FE AVE SUSANA RD E VICTORIA ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS EL SEGUNDO BL BROADWAY N CENTRAL AVE EL SEGUNDO BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS FLORAL AVE EASTERN AVE MEDNIK AVE FLORAL AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS FOOTHILL AVE LOWELL AVE BRIGGS AVE FOOTHILL AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS FREMONT AVE COLUMBIA ST GARVEY AVE FREMONT AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS GAREY AVE COLLEGE WY SR-60 GAREY AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS GARFIELD AVE PINE ST OLYMPIC BL GARFIELD AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS GARVEY AVE ROSEMEAD BL DURFEE AVE GARVEY AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS GRAND AVE ROWLAND ST LONGVIEW DR GRAND AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS HASLEY CANYON RD/ BURLWOOD DR I-5 HASLEY CANYON RD/COMMERCE CENTER SIGNAL COMMERCE CENTER SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS HAWTHORNE BL 104TH ST MANHATTAN BEACH BL HAWTHORNE BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS HAWTHORNE BL 244TH ST PALOSVERDES DR WEST HAWTHORNE BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS HOOPER AVE SLAUSON AVE 92ND ST HOOPER AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS HUNTINGTON DR/FOOTHILL FAIR OAKS AVE COUNTY LINE HUNTINGTON DR/FOOTHILL BL/ALOSTA AVE SIGNAL BL/ALOSTA AVE SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS IMPERIAL HWY MONA BL 1ST AVE IMPERIAL HWY SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS INDIAN HILL BL AMERICAN AVE HOLT AVE INDIAN HILL BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS INGLEWOOD AVE 104TH ST 111TH PL INGLEWOOD AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS IRWINDALE AVE FOOTHILL BL ARROW HWY IRWINDALE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS IRWINDALE AVE BADILLO ST CAMERON AVE IRWINDALE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LA BREA AVE CENTINELA AVE CENTURY BL LA BREA AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LA CRESCENTA AVE ORANGE AVE I-210 LA CRESCENTA AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LAMBERT RD WASHINGTON BL GRAYLING AVE LAMBERT RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LAUREL PARK RD E VICTORIA ST ALAMEDA ST LAUREL PARK RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LEFFINGWELL RD IMPERIAL HWY VALLEY VIEW AVE LEFFINGWELL RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LENNOX BL INGLEWOOD AVE FREEMAN AVE LENNOX BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LONE HILL AVE ROUTE 66 COVINA BL LONE HILL AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS LYONS AVE WILEY CANYON RD NEWHALL AVE LYONS AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MAIN ST EL SEGUNDO BL REDONDO BEACH BL MAIN ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MANCHESTER AVE HOOPER AVE IVY ST MANCHESTER AVE SIGNAL SYNCHRONIZATION Project List 439

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005) County System Category Route Name From To Description LOS ANGELES LOCAL HIGHWAY ITS MANHATTAN BEACH BL MANHATTAN AVE VAN NESS AVE MANHATTAN BEACH BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MCBEAN PKWY/STEVENSON COPPER HILL DR THE OLD ROAD MCBEAN PKWY/STEVENSON RANCH PKWY SIGNAL RANCH PKWY SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MIRAMONTE BL 76TH ST 83RD ST MIRAMONTE BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MISSION RD WINCHESTER AVE SANTA ANITA ST MISSION RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MONTEBELLO BL/ PARAMOUNT BL UNION ST MONTEBELLO BL/GREENWOOD AVE SIGNAL GREENWOOD AVE SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MONTROSE AVE FLORENCITA AVE DEL MAR RD MONTROSE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MOUNTAIN AVE FOOTHILL BL DUARTE RD MOUNTAIN AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS MYRTLE AVE/PECK RD/ HUNTINGTON DR CARSON ST MYRTLE AVE/PECK RD/WORKMAN MILL RD/NORWALK BL/ WORKMAN MILL RD/ SAN ANTONIO BL/PIONEER BL SIGNAL SYNCHRONIZATION NORWALK BL/SAN ANTONIO BL/PIONEER BL LOS ANGELES LOCAL HIGHWAY ITS NADEAU ST HOOPER AVE SANTA FE AVE NADEAU ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS NORMANDIE AVE 89TH ST EL SEGUNDO BL NORMANDIE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS NORWALK AVE ROSECRANS AVE CARSON ST/WARDLOW RD NORWALK AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS OCEANVIEW BL FOOTHILL FWY FLORENCITA AVE OCEANVIEW BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS OLYMPIC BL INDIANA ST CONCOURSE AVE OLYMPIC BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS PACIFIC BL LIVE OAK ST BROADWAY PACIFIC BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS PENNSYLVANIA AVE ORANGE AVE I-210 PENNSYLVANIA AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS PICO CANYON RD DEAD HORSE CYN I-5 PICO CANYON RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS PRAIRIE AVE 118TH ST REDONDO BEACH BL PRAIRIE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS RAMONA BL/BADILLO ST/ SANTA ANITA AVE I-210 RAMONA BL/BADILLO ST/COVINA BL SIGNAL COVINA BL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS RAMSDELL AVE ORANGE AVE MONTROSE AVE RAMSDELL AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS REDONDO BEACH BL/ FREEMAN AVE WOODRUFF AVE REDONDO BEACH BL/COMPTON BL/SOMERSET BL SIGNAL COMPTON BL/SOMERSET BL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ROSECRANS AVE BROADWAY MERCADO AVE ROSECRANS AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ROSEMEAD BL SAN GABRIEL BL HUNTINGTON DR ROSEMEAD BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ROSEMEAD BL RUSH ST TELEGRAPH RD ROSEMEAD BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS ROSEMONT AVE FOOTHILL BL MONTROSE AVE ROSEMONT AVE SIGNAL SYNCHRONIZATION 440 Project List

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005) County System Category Route Name From To Description LOS ANGELES LOCAL HIGHWAY ITS RYE CANYON RD/COPPER THE OLD ROAD MCBEAN PKWY RYE CANYON RD/COPPER HILL RD SIGNAL HILL RD SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SAN DIMAS AVE FOOTHILL BL VIA VERDE SAN DIMAS AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SAN PEDRO ST EL SEGUNDO BL 157TH ST SAN PEDRO ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SANTA ANITA AVE FOOTHILL BL DURFEE AVE SANTA ANITA AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SANTA FE SPRINGS RD/ WHITTIER BL FIRESTONE BL SANTA FE SPRINGS RD/BLOOMFIELD AVE SIGNAL BLOOMFIELD AVE SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SEVILLE AVE GRAND AVE BROADWAY SEVILLE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SLAUSON AVE COMPTON AVE STAMY RD SLAUSON AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SOLEDAD CANYON RD GOLDEN OAK RD GATETON RD SOLEDAD CANYON RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SOUTH ST ATLANTIC AVE CARMENITA RD SOUTH ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS STEVENSON RANCH PKWY PICO CYN I-5 STEVENSON RANCH PKWY SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS SUSANA RD VICTORIA ST DEL AMO BL SUSANA RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS TELEGRAPH RD EASTERN AVE SPRINGVIEW DR TELEGRAPH RD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS TEMPLE CITY BL DUARTE RD I-10 TEMPLE CITY BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS THE OLD ROAD HASLEY CYN PICO CYN THE OLD ROAD SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS TOWNE AVE BASE LINE RD SR-60 TOWNE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS UNION PACIFIC AVE INDIANA ST MARIANNA AVE UNION PACIFIC AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS VALLEY BL TEMPLE CITY BL DURFEE AVE VALLEY BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS VALLEY VIEW AVE LEFFINGWELL RD FIRESTONE BL SOUTH VALLEY VIEW AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS WASHINGTON BL GRAND VISTA AVE SORENSEN AVE WASHINGTON BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS WESTERN AVE 104TH ST 111TH ST WESTERN AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS WHITE AVE FOOTHILL BL LEXINGTON AVE WHITE AVE SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS WHITTIER BL INDIANA ST PARAMOUNT BL WHITTIER BL SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS WILLOW ST I-710 I-605 WILLOW ST SIGNAL SYNCHRONIZATION LOS ANGELES LOCAL HIGHWAY ITS WILLOWBROOK AVE 124TH ST STOCKWELL ST WILLOWBROOK AVE SIGNAL SYNCHRONIZATION ORANGE LOCAL HIGHWAY ARTERIAL CENTRAL COUNTY ADDITIONAL ARTERIAL AND INTERSECTION OPTIMIZATION OPERATIONAL ARTERIALS – ADDITIONAL TURN LANES, ADVANCED TRAFFIC MANAGE- IMPROVEMENTS, MENT SYSTEMS, COMMUNICATIONS, IMPROVED LIGHTING ITS AND SAFETY TREATMENTS ON 9 ARTERIALS AND AT 60 INTERSECTIONS IDENTIFIED IN CENTRAL COUNTY MIS Project List 441

Strategic Projects

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency IMPERIAL STATE HIGHWAY CAPACITY S6120001 8 INTERSTATE 8 AUSTIN ROAD AUSTIN ROAD CONSTRUCT FULL INTERCHANGE CALTRANS IMPERIAL STATE HIGHWAY CAPACITY S6120002 8 INTERSTATE 8 BOWKER ROAD BOWKER ROAD IMPROVE INTERCHANGE CALTRANS IMPERIAL STATE HIGHWAY CAPACITY S6120003 111 STATE ROUTE 111 INTERSTATE 8 STATE ROUTE 78 WIDEN AND IMPROVE TO SIX LANE CALTRANS FREEWAY; ADD INTERCHANGES AT ATEN ROAD, WORTHINGTON ROAD, KEYSTONE ROAD, AND SR-78 IMPERIAL STATE HIGHWAY CAPACITY S6120004 111 STATE ROUTE 111 SHANK ROAD STATE ROUTE 115 WIDEN AND IMPROVE TO FOUR LANE CALTRANS CONVENTIONAL HIGHWAY IMPERIAL STATE HIGHWAY CAPACITY S6120005 111 STATE ROUTE 111 YOUNG ROAD RIVERSIDE COUNTY WIDEN AND IMPROVE TO FOUR LANE CALTRANS LINE CONVENTIONAL HIGHWAY IMPERIAL STATE HIGHWAY CAPACITY S6120006 115 STATE ROUTE 115 STATE ROUTE 111 STATE ROUTE 78 WIDEN AND IMPROVE TO FOUR LANE CALTRANS EXPRESSWAY IMPERIAL STATE HIGHWAY CAPACITY, GOODS S6120007 7 STATE ROUTE 7 MCCABE ROAD MCCABE ROAD CONSTRUCT NEW INTERCHANGE TO CALTRANS MOVEMENT ACCOMMODATE FUTURE AIRPORT ACCESS IMPERIAL STATE HIGHWAY CAPACITY, GOODS S6120008 8 INTERSTATE 8 FORRESTER ROAD STATE ROUTE 111 WIDEN AND IMPROVE TO SIX LANE CALTRANS MOVEMENT FREEWAY IMPERIAL STATE HIGHWAY CAPACITY, GOODS S6120009 115 STATE ROUTE 115 EVAN HEWES STATE ROUTE 78 WIDEN AND IMPROVE TO FOUR LANE CALTRANS MOVEMENT HIGHWAY EXPRESSWAY IMPERIAL STATE HIGHWAY CAPACITY, GOODS S6120010 78/86 STATE ROUTE 78/ BRAWLEY BYPASS STATE ROUTE 78 CONSTRUCT NEW FOUR CALTRANS MOVEMENT, STATE ROUTE 86 LANE EXPRESSWAY BYPASS OPERATIONAL (DUAL SIGNED) ROUTE AROUND THE CITY OF WESTMORLAND IMPERIAL STATE HIGHWAY CAPACITY, S6120011 98 STATE ROUTE 98 DOGWOOD ROAD STATE ROUTE 111 CONSTRUCT GRADE SEPARATED CALTRANS OPERATIONAL, RAILROAD CROSSINGS, SAFETY NEW ROADWAY SEGMENTS, SIGNALIZATION, CHANNELIZATION, AND ROADWAY GEOMETRIC IMPROVEMENTS, IMPERIAL STATE HIGHWAY CAPACITY, S6120012 78/115 STATE ROUTE 78/ BRAWLEY BYPASS STATE ROUTE 115 WIDEN AND IMPROVE TO FOUR LANE CALTRANS SAFETY STATE ROUTE 115 CONVENTIONAL HIGHWAY (JUNCTION) 442 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency IMPERIAL STATE HIGHWAY OPERATIONAL, S6120013 78 STATE ROUTE 78 STATE ROUTE 115 RIVERSIDE COUNTY PROVIDE OPERATIONAL AND SAFETY CALTRANS SAFETY LINE IMPROVEMENTS; INTERSECTION IMPROVEMENTS AND ROADWAY GEOMETRIC IMPROVEMENTS IMPERIAL LOCAL HIGHWAY CAPACITY S6120014 AUSTIN ROAD MCCABE ROAD STATE ROUTE 86 WIDEN AND IMPROVE TO SIX LANE IMPERIAL COUNTY PRIME ARTERIAL IMPERIAL LOCAL HIGHWAY CAPACITY S6120015 DOGWOOD ROAD STATE ROUTE 98 MEAD ROAD WIDEN AND IMPROVE TO FOUR LANE EL CENTRO PRIME ARTERIAL IMPERIAL LOCAL HIGHWAY CAPACITY S6120016 EIGHTH STREET INTERSTATE 8 INTERSTATE 8 WIDEN AND IMPROVE OVERCROSSING EL CENTRO IMPERIAL LOCAL HIGHWAY CAPACITY S6120017 EIGHTH STREET WAKE AVENUE CENTINELA WIDEN AND IMPROVE TO FOUR LANE EL CENTRO PRIME ARTERIAL IMPERIAL LOCAL HIGHWAY CAPACITY S6120018 IMPERIAL AVENUE INTERSTATE 8 ATEN ROAD WIDEN AND IMPROVE TO SIX LANE EL CENTRO PRIME ARTERIAL IMPERIAL LOCAL HIGHWAY CAPACITY S6120019 IMPERIAL AVENUE MCCABE ROAD INTERSTATE 8 CONSTRUCT SIX LANE PRIME EL CENTRO ARTERIAL IMPERIAL LOCAL HIGHWAY CAPACITY S6120020 KEYSTONE ROAD FORRESTER ROAD STATE ROUTE 115 CONSTRUCT NEW SIX LANE PRIME IMPERIAL COUNTY ARTERIAL ON THE KEYSTONE ROAD CURRENT ALIGNMENT IMPERIAL LOCAL HIGHWAY CAPACITY S6120021 MCCABE ROAD AUSTIN ROAD STATE ROUTE 111 WIDEN AND IMPROVE TO SIX LANE IMPERIAL COUNTY PRIME ARTERIAL IMPERIAL LOCAL HIGHWAY GRADE S6120027 ATEN ROAD CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (IMPERIAL) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120029 DOGWOOD ROAD CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (IMPERIAL COUNTY) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120028 EVAN HEWES CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION HIGHWAY (IMPERIAL SEPARATIONS TRANSPORTATION COUNTY) COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120030 HEBER AVENUE CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (IMPERIAL COUNTY) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120026 KEYSTONE ROAD CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (IMPERIAL COUNTY) SEPARATIONS TRANSPORTATION COMMISSION Project List 443

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency IMPERIAL LOCAL HIGHWAY GRADE S6120024 MALAN STREET CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (BRAWLEY) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120025 MEAD ROAD CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (BRAWLEY) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120023 SR-78/SR-111 CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (BRAWLEY) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120022 WARD ROAD CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (IMPERIAL COUNTY) SEPARATIONS TRANSPORTATION COMMISSION IMPERIAL LOCAL HIGHWAY GRADE S6120031 WEST COLE ROAD CONSTRUCT ROADWAY/RAIL GRADE IMPERIAL COUNTY SEPARATION (CALEXICO) SEPARATIONS TRANSPORTATION COMMISSION LOS ANGELES TRANSIT BRT S1120001 METRO ORANGE METRO ORANGE LINE EXTENSION TO LOS ANGELES LINE BOB HOPE AIRPORT COUNTY MTA LOS ANGELES TRANSIT BRT S1120002 METRO RAPID METRO RAPID BUS EXPANSION LOS ANGELES BUS EXPANSION CORRIDORS BEYOND FUNDED PLAN COUNTY MTA CORRIDORS LOS ANGELES TRANSIT BRT S1120003 VARIEL AVENUE OXNARD ST CONSTRUCTION OF A 4TH ORANGE LOS ANGELES CITY LINE STATION IN WARNER CENTER AREA LOS ANGELES TRANSIT BRT S1120004 SR-134 TRANSIT CORRIDOR BRT LOS ANGELES PROJECT COUNTY MTA LOS ANGELES TRANSIT BUS S1120005 CANOGA AVENUE VENTURA BLVD CANOGA ORANGE PURCHASE 20 NEW BUSES TO LOS ANGELES CITY LINE STATION ADD TO A LOCAL CIRCULATOR BUS SYSTEM BETWEEN VENTURA BOULEVARD AND CANOGA ORANGE LINE STATION. INSTALL NEW BUS SHELTERS AND/OR ENHANCE THE EXISTING BUS SHELTERS ALONG THE ROUTE AS REQUIRED. 444 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES TRANSIT BUS S1120006 VICTORY OWENSMOUTH AVE VARIEL AVE TO PURCHASE 20 NEW BUSES TO ADD LOS ANGELES CITY BOULEVARD TO OXNARD ST VICTORY BLVD TO A LOCAL CIRCULATOR BUS SYSTEM TO OPERATE FROM VICTORY TO OWENSMOUTH TO OXNARD TO VARIEL AND BACK TO VICTORY. INSTALL NEW BUS SHELTERS AND/ OR ENHANCE THE EXISTING BUS SHELTERS ALONG THE ROUTE AS REQUIRED LOS ANGELES TRANSIT COMMUTER RAIL S1120007 ADDITIONAL ADDITIONAL METROLINK EXPANSION METROLINK METROLINK BEYOND FUNDED PLAN EXPANSION LOS ANGELES TRANSIT COMMUTER RAIL S1120008 ANTELOPE VALLEY STATION ON NORTHERN BOUNDARY METROLINK LINE OF BOB HOPE AIRPORT ADJACENT TO OR CO-TERMINUS WITH HIGH-SPEED RAIL STATION LOS ANGELES TRANSIT HEAVY RAIL S1120009 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION LOS ANGELES (BEYOND SEGMENTS IN THE COUNTY MTA CONSTRAINED PLAN) LOS ANGELES TRANSIT HEAVY RAIL S1120010 WESTSIDE SUBWAY HEAVY RAIL EXTENSION LOS ANGELES EXTENSION COUNTY MTA LOS ANGELES TRANSIT HIGH-SPEED RAIL S1120011 ORANGELINE ORANGELINE HIGH SPEED TRANSIT LOS ANGELES SYSTEM--EXTENSION OF WEST COUNTY MTA SANTA ANA BRANCH FROM UNION STATION TO SANTA CLARITA LOS ANGELES TRANSIT LIGHT RAIL S1120012 "SILVER" LINE LRT RED LINE VERMONT/ CITY OF LA PUENTE LIGHT RAIL EXTENSION LOS ANGELES SANTA MONICA COUNTY MTA STATION LOS ANGELES TRANSIT LIGHT RAIL S1120013 "YELLOW" LINE LRT RED LINE NORTH REGIONAL "YELLOW" LINE LRT LOS ANGELES HOLLYWOOD CONNECTOR COUNTY MTA STATION LOS ANGELES TRANSIT LIGHT RAIL S1120014 BURBANK/ L.A. UNION STATION BURBANK NEW LIGHT RAIL LOS ANGELES GLENDALE LRT METROLINK COUNTY MTA STATION LOS ANGELES TRANSIT LIGHT RAIL S1120015 CRENSHAW CRENSHAW LIGHT RAIL TRANSIT LOS ANGELES NORTH FROM EXPOSITION BL COUNTY MTA Project List 445

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES TRANSIT LIGHT RAIL S1120016 CRENSHAW LIGHT RAIL EXTENSION LOS ANGELES BLVD CORRIDOR COUNTY MTA EXTENSION LOS ANGELES TRANSIT LIGHT RAIL S1120017 GREEN LINE LAX SANTA MONICA GREEN LINE EXTENSION FROM LAX LOS ANGELES TO SANTA MONICA COUNTY MTA LOS ANGELES TRANSIT LIGHT RAIL S1120018 METRO BLUE LINE BLUE LINE EXTENSION TO LOS ANGELES CALIFORNIA STATE UNIVERSITY LONG COUNTY MTA BEACH LOS ANGELES TRANSIT LIGHT RAIL S1120019 METRO GOLD LINE METRO GOLD LINE EASTSIDE LOS ANGELES EXTENSION BEYOND PHASE II COUNTY MTA TERMINUS LOS ANGELES TRANSIT LIGHT RAIL S1120020 METRO GOLD LINE LIGHT RAIL EXTENSION LOS ANGELES EASTSIDE TRANSIT COUNTY MTA CORRIDOR PHASE 2 BRANCH LOS ANGELES TRANSIT LIGHT RAIL S1120021 METRO GREEN LINE GREEN LINE SOUTH SAN PEDRO, LONG GREEN LINE FROM GREEN LINE LOS ANGELES TERMINUS AT BEACH, AND LOS SOUTH TERMINUS AT TORRANCE TO COUNTY MTA TORRANCE ANGELES/ORANGE SAN PEDRO, LONG BEACH, AND LOS COUNTY LINE ANGELES/ORANGE COUNTY LINE LOS ANGELES TRANSIT LIGHT RAIL S1120022 METRO GREEN LINE LAX EXPO SANTA LIGHT RAIL EXTENSION LOS ANGELES LRT EXTENSION MONICA STATION COUNTY MTA LOS ANGELES TRANSIT LIGHT RAIL S1120023 SOUTH BAY METRO LIGHT RAIL EXTENSION LOS ANGELES GREEN LINE COUNTY MTA EXTENSION LOS ANGELES TRANSIT OTHER TRANSIT S1120024 ADDITIONAL ADDITIONAL METRO AND OTHER LOS ANGELES METRO AND OTHER BUS AND RAIL CAPITAL SYSTEM COUNTY MTA BUS AND RAIL IMPROVEMENTS (RAIL CARS, YARDS, CAPITAL SYSTEM BUSES) IMPROVEMENTS LOS ANGELES TRANSIT OTHER TRANSIT S1120025 METRO RED LINE RED LINE NORTH HOLLYWOOD LOS ANGELES STATION TO SYLMAR METROLINK COUNTY MTA STATION CONNECTION LOS ANGELES TRANSIT OTHER TRANSIT S1120026 REGIONAL REGIONAL INTERMODAL CENTER LOS ANGELES INTERMODAL NEAR BOB HOPE AIRPORT COUNTY MTA CENTER LOS ANGELES TRANSIT OTHER TRANSIT S1120027 SR-134 TRANSIT RED LINE NORTH GOLD LINE DEL SR-134 TRANSIT CORRIDOR LOS ANGELES CORRIDOR HOLLYWOOD MAR STATION COUNTY MTA STATION 446 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES TRANSIT OTHER TRANSIT S1120028 STREETCAR STREETCAR CIRCULATOR SYSTEMS LOS ANGELES CIRCULATOR (FOR EXAMPLE, DOWNTOWN LOS COUNTY MTA SYSTEMS ANGELES STREETCAR, SAN PEDRO, AND OTHERS) LOS ANGELES TRANSIT OTHER TRANSIT S1120029 GLENDALE DOWNTOWN LOS GLENDALE – DOWNTOWN LOS LOS ANGELES ANGELES ANGELES CORRIDOR COUNTY MTA LOS ANGELES TRANSIT OTHER TRANSIT S1120030 NORTH HOLLYWOOD PASADENA SR-134 EAST-WEST CORRIDOR LOS ANGELES CONNECTING NORTH HOLLYWOOD, COUNTY MTA BURBANK, GLENDALE AND PASADENA LOS ANGELES TRANSIT OTHER TRANSIT S1120031 PORT COMMUNITIES ARROYO VERDUGO NORTH-SOUTH RAIL CORRIDOR LOS ANGELES OF LOS ANGELES/ SUBREGION BETWEEN PORT COMMUNITIES OF COUNTY MTA LONG BEACH LOS ANGELES/LONG BEACH AND ARROYO VERDUGO SUBREGION– SR-710 TRANSPORTATION IMPROVEMENT OPTIONS LOS ANGELES TRANSIT OTHER TRANSIT S1120032 SAN GABRIEL LOS ANGELES/ I-605 NORTH-SOUTH CORRIDOR LOS ANGELES VALLEY ORANGE COUNTY COUNTY MTA LINE LOS ANGELES TRANSIT OTHER TRANSIT S1120033 UCLA/WESTWOOD LAX I-405 CORRIDOR SOUTH LOS ANGELES COUNTY MTA LOS ANGELES TRANSIT OTHER TRANSIT S1120034 VENTURA BL/ NORTH-EAST I-405 CORRIDOR NORTH LOS ANGELES ORANGE LINE SAN FERNANDO COUNTY MTA VALLEY/SYLMAR METROLINK STATION LOS ANGELES TRANSIT OTHER TRANSIT S1120035 WEST SAN WEST LOS WEST LOS ANGELES COUNTY/WEST LOS ANGELES FERNANDO VALLEY ANGELES SAN FERNANDO VALLEY TO WEST COUNTY MTA LOS ANGELES DIRECT CONNECTION LOS ANGELES TRANSIT OTHER TRANSIT S1120036 CITY OF LONG BEACH EASTERN LOS ANGELES TRANSIT CORRIDOR CONNECTION-- COUNTY MTA DOWNTOWN TO METRO BLUE LINE LOS ANGELES STATE HIGHWAY ARTERIAL S1120037 126 SR-126 COMMERCE CTR DR COUNTY LINE SR-126 COMMERCE CORRIDOR LOS ANGELES IMPROVEMENT PROJECT – COUNTY MTA INTERSECTION IMPROVEMENTS AND WIDENING LOS ANGELES STATE HIGHWAY CAPACITY S1120038 5 I-5 NORTH CAPACITY N/A N/A I-5 NORTH CAPACITY LOS ANGELES ENHANCEMENTS ENHANCEMENTS COUNTY MTA Project List 447

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES STATE HIGHWAY HIGHWAY S1120039 ADDITIONAL ADDITIONAL CALTRANS CORRIDORS LOS ANGELES CALTRANS NOT INCLUDED IN METRO’S COUNTY MTA CORRIDORS PERFORMANCE EVALUATION LOS ANGELES STATE HIGHWAY HOV S1120040 5 I-5 CARPOOL AND I-605 I-710 I-5 CARPOOL AND MIXED-FLOW LOS ANGELES MIXED-FLOW LANES LANES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120041 10 I-10 LINCOLN BLVD I-5 CARPOOL LANES LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120042 57 SR-57 I-60 I-210 SR-57 HOV LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120043 57 SR-57 SR-60 I-210 CARPOOL LANES LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120044 60 SR-60 US-101 I-605 CARPOOL LANES LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120045 60 SR-60 US-101 I-605 SR-60 HOV LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120046 101 US-101 ROUTE 23 TOPANGA CANYON ADD HOV LANE ON US-101 LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120047 101 US-101 SR-27 VENTURA COUNTY ADD CARPOOL LANE IN EACH LOS ANGELES LINE DIRECTION COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120048 110 I-110 ADAMS BL UNION STATION I-110 HIGH OCCUPANCY VEHICLE LOS ANGELES (HOV) VIADUCT COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120049 605 I-605 I-10 I-210 I-605 HOV LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120050 605 I-605 I-210 I-10 CARPOOL LANES LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY HOV S1120051 10, 605 I-10/I-605 PARTIAL HOV CONNECTOR (FROM LOS ANGELES EAST TO SOUTH AND FROM WEST TO COUNTY MTA SOUTH) LOS ANGELES STATE HIGHWAY HOV S1120052 60, 105 SR-60/I-105 PARTIAL HOV CONNECTOR (FROM LOS ANGELES EAST TO SOUTH AND FROM EAST TO COUNTY MTA NORTH) LOS ANGELES STATE HIGHWAY HOV S1120053 91, 110 SR-91/I-110 PARTIAL HOV CONNECTOR (FROM LOS ANGELES EAST TO SOUTH AND FROM EAST TO COUNTY MTA NORTH) LOS ANGELES STATE HIGHWAY HOV, IC/RAMPS S1120054 405 I-405 I-405 LAX I-405 DIRECT HOV CONNECTOR TO LOS ANGELES LAX COUNTY MTA 448 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES STATE HIGHWAY HOV, IC/RAMPS S1120055 10, 605 I-10/I-605 I-10/I-605 PARTIAL HOV LOS ANGELES INTERCHANGE COUNTY MTA LOS ANGELES STATE HIGHWAY HOV, IC/RAMPS S1120056 60, 605 SR-60/I-605 SR-60/I-605 PARTIAL HOV LOS ANGELES INTERCHANGE COUNTY MTA LOS ANGELES STATE HIGHWAY HOV, MIXED FLOW S1120057 101 US-101 CORRIDOR ADD CARPOOL LANE IN EACH LOS ANGELES DIRECTION BETWEEN SR-27 COUNTY MTA (TOPANGA CANYON BL) AND SR-2 IN DOWNTOWN LOS ANGELES AND RESTRIPE FOR MIXED-FLOW LANE IN EACH DIRECTION BETWEEN SR-27 AND VENTURA COUNTY LINE LOS ANGELES STATE HIGHWAY IC/RAMPS S1120058 101, 170 US-101/SR-170 US-101/SR-170 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120059 101, 170, US-101/ COMPLETE TWO CONNECTORS LOS ANGELES 134 SR-170/SR-134 COUNTY MTA INTERCHANGE LOS ANGELES STATE HIGHWAY IC/RAMPS S1120060 405, 101 I-405/US-101 I-405/US-101 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120061 5, 10 I-5/I-10 I-5/I-10 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120062 5, 134 I-5/SR-134 I-5/SR-134 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120063 5, 14 I-5/SR-14 I-5/SR-14 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120064 5, 2 I-5/SR-2 I-5/SR-2 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120065 5, 405 I-5/I-405 I-5/I-405 INTERCHANGE LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120066 60, 605 SR-60/I-605 SR-60/I-605 INTERCHANGE LOS ANGELES IMPROVEMENTS COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS S1120067 605, 10 I-605/I-10 I-10/605 INTERCHANGE UPGRADE – LOS ANGELES NB I-605 TO WB I-10 CONNECTOR COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS, MIXED S1120068 134, 210 SR-134/I-210 SR-134/I-210 INTERCHANGE LOS ANGELES FLOW IMPROVEMENTS COUNTY MTA LOS ANGELES STATE HIGHWAY IC/RAMPS, MIXED S1120069 39, 2 ROUTE 39/ROUTE 2 ROUTE 39 TO ROUTE 2 CONNECTION LOS ANGELES FLOW COUNTY MTA Project List 449

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES STATE HIGHWAY IC/RAMPS, TRUCK S1120070 10, 57 I-10/SR-57 I-10 TO SR-57 WB CONNECTOR LOS ANGELES CLIMBING LANES TRUCK CLIMBING LANE AND COUNTY MTA OFF-RAMP LOS ANGELES STATE HIGHWAY MIXED FLOW S1120071 14 SR-14 MIXED FLOW I-5 KERN COUNTY LINE SR-14 MIXED FLOW IMPROVEMENTS LOS ANGELES IMPROVEMENTS COUNTY MTA LOS ANGELES STATE HIGHWAY MIXED FLOW S1120072 138 SR-138 I-5 SR-14 ADD 2 MIXED-?OW LANES IN EACH LOS ANGELES DIRECTION COUNTY MTA LOS ANGELES STATE HIGHWAY OTHER S1120073 210 I-210 BERKSHIRE AV OCEAN VIEW BL I-210 SOUNDWALLS LOS ANGELES NON-EXPANSION COUNTY MTA LOS ANGELES STATE HIGHWAY OTHER S1120074 ADDITIONAL ADDITIONAL SOUNDWALLS BEYOND LOS ANGELES NON-EXPANSION SOUNDWALLS FUNDED PLAN COUNTY MTA LOS ANGELES STATE HIGHWAY S1120075 5 I-5 I-605 I-710 I-5 CORRIDOR LOS ANGELES COUNTY MTA LOS ANGELES STATE HIGHWAY S1120076 5 I-710 I-710 FREIGHT MOVEMENT CORRIDOR LOS ANGELES (BEYOND I-5) COUNTY MTA LOS ANGELES STATE HIGHWAY S1120077 10 I-10 I-10/ROBERTSON/NATIONAL AREA LOS ANGELES CIRCULATION IMPROVEMENT – COUNTY MTA IMPROVE BOTTLENECK TRA;C ON I-10 AND AROUND FUTURE EXPO VENICE/ ROBERTSON STATION LOS ANGELES STATE HIGHWAY S1120078 91, 605, SR-91/I-605/I-405 ADDITIONAL SR-91/I-605/I-405 LOS ANGELES 405 SOLUTIONS (BEYOND IDENTIFIED HOT COUNTY MTA SPOTS) LOS ANGELES STATE HIGHWAY S1120082 SR-710 TRANSPORTATION LOS ANGELES IMPROVEMENT OPTIONS COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120083 50TH ST EAST E-220 TO SR-138/PALMDALE BL LOS ANGELES CONNECTOR ROUNDABOUT COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120084 ALAMEDA ST ALAMEDA ST LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120085 ALONDRA BL ALONDRA BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120086 ARTESIA BL ARTESIA BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120087 ATLANTIC BL ATLANTIC BL LOS ANGELES COUNTY MTA 450 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120088 AVENUE G SR-14 25TH ST AVENUE G CORRIDOR LOS ANGELES IMPROVEMENTS – INTERCHANGE COUNTY MTA IMPROVEMENTS FOR ACCESS TO WILLIAM J. FOX AIRPORT LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120089 AVIATION BL/ AVIATION BL/ROSECRANS AV GRADE LOS ANGELES ROSECRANS AV SEPARATION - GRADE SEPARATE COUNTY MTA AVIATION BL UNDER ROSECRANS AV FOR FREE-FLOW NORTH-SOUTH MOVEMENTS VIA TUNNEL AND AT-GRADE EAST-WEST MOVEMENTS AT SIGNALIZED INTERSECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120090 BELLFLOWER BL BELLFLOWER BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120091 COLUMBIA WY/ COLUMBIA WY/AVENUE M CORRIDOR LOS ANGELES AVENUE M IMPROVEMENTS – CAPACITY AND COUNTY MTA INTERCHANGE IMPROVEMENTS AT SR-14 FROM 10TH ST W TO 15TH ST W, SERVING MAJOR INDUSTRIAL CENTERS AND COURTHOUSE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120092 DEL AMO BL DEL AMO BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120093 FIRESTONE BL FIRESTONE BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120094 GARFIELD BL GARFIELD BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120095 IMPERIAL HWY IMPERIAL HWY LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120096 LAKEWOOD BL/ LAKEWOOD BL/ROSEMEAD BL LOS ANGELES ROSEMEAD BL COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120097 LONG BEACH BL LONG BEACH BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120098 NORWALK BL NORWALK BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120099 PACIFIC COAST HWY PACIFIC COAST HWY LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120100 PARAMOUNT BL PARAMOUNT BL LOS ANGELES COUNTY MTA Project List 451

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120101 PEARBLOSSOM HWY SR-14 SR-138 PEARBLOSSOM HWY IMPROVEMENT LOS ANGELES PROJECT – CORRIDOR COUNTY MTA IMPROVEMENTS BETWEEN SR-14 AND SR-138 TO COMMUTER/ TRUCKING ROUTE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120102 RANCHO VISTA BL RANCHO VISTA BL GRADE LOS ANGELES SEPARATION – PROVIDES ACCESS TO COUNTY MTA PALMDALE REGIONAL AIRPORT AND CONNECTION TO E-220 LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120103 ROSECRANS BL ROSECRANS BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120104 TIERRA SUBIDA SR-14/10TH ST W SR-14/AV S TIERRA SUBIDA AV/10TH ST W LOS ANGELES AV/10TH ST W IMPROVEMENT PROJECT - CAPACITY COUNTY MTA IMPROVEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120105 WASHINGTON BL WASHINGTON BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120106 WHITTIER BL WHITTIER BL LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120107 SOUTH BAY PACIFIC COAST HWY LOS ANGELES INTERSECTION & OPERATIONAL COUNTY MTA IMPROVEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120108 27 TOPANGA CANYON MULHOLLAND DR WIDENING TOADD A SOUTHBOUND LOS ANGELES CITY CAPACITY BOULEVARD RIGHT-TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL TO INCLUDE SOUTHBOUND RIGHT-TURN OVERLAP PHASE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120109 27 TOPANGA CANYON ROSCOES BVD WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY BOULEVARD LEFT-TURN AND SOUTHBOUND ENHANCEMENTS RIGHT-TURN LANES AND TRAFFIC SIGNAL UPGRADE. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120110 27 TOPANGA CANYON VANOWEN ST VENTURA BLVD INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY BOULEVARD THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. INSTALL NEW SIGNAL AT TOPANGA CANYON BLVD. AND CALIFA ST. 452 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120111 90 SR-90 LINCOLN BL ADMIRALTY WY EXTENSION LOS ANGELES CAPACITY COUNTY MTA ENHANCEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120112 213 WESTERN AVENUE EXPOSITION BLVD WIDEN WESTERN BLVD. TO ADD LOS ANGELES CITY CAPACITY NORTHBOUND AND SOUTHBOUND ENHANCEMENTS LEFT-TURN LANES AT EXPOSITION BLVD. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120113 213 WESTERN AVENUE FLORENCE AVE 80TH ST/ WIDEN EAST SIDE OF WESTERN AVE. LOS ANGELES CITY CAPACITY MANCHESTER AVE TO ACCOMODATE LEFT-TURN LANES ENHANCEMENTS AT VARIOUS INTERSECTIONS WITHIN THE PROJECT LIMITS. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120114 11TH STREET AVIATION BLVD LA CIENEGA BLVD WIDEN AND RESTRIPE TO LOS ANGELES CITY CAPACITY ACCOMMODATE TWO THROUGH ENHANCEMENTS LANES IN EACH DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120115 ALAMEDA STREET I-10 FWY 7TH ST ALAMEDA ST. FROM I-10 TO LOS ANGELES CITY CAPACITY SEVENTH ST. – PROJECT INCLUDES ENHANCEMENTS REHABILITATION OF THE ROADWAY, REMOVING ENBEDDED RAILS AND TIES, INSTALLING LEFT TURN CHANNELIZATION, SPOT WIDENING WHERE NEEDED TO ACCOMMODATE TRUCK TRAFFIC LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120116 ALAMEDA STREET US-101 FWY I-10 FWY WIDEN TO 70 FT AND REMOVE LOS ANGELES CITY CAPACITY EMBEDDED RAILS AND TIES, INSTALL ENHANCEMENTS LEFT TURN CHANNELIZATION AND WIDEN CURB RETURNS TO REDUCE CONGESTION AND IMPROVE TRUCK MOVEMENT LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120117 ALHAMBRA AVENUE LOWELL AVE CITY OF REALIGN ALHAMBRA AVE. BETWEEN LOS ANGELES CITY CAPACITY ALHAMBRA CITY LOWELL AVE. AND THE CITY OF ENHANCEMENTS LIMITS ALHAMBRA CITY LIMITS TO SMOOTH OUT AN EXISTING SHARP S-CURVE AND TO ENHANCE TRAFFIC AND CAPACITY. Project List 453

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120118 ANAHEIM STREET FARRAGUT AVE DOMINGUEZ WIDEN ANAHEIM ST. FROM 78' TO 84' LOS ANGELES CITY CAPACITY CHANNEL AND RESTRIPE TO ACCOMMODATE ENHANCEMENTS AN ADDITIONAL LANE IN EACH DIRECTION; THIS WOULD IMPROVE THE ROADWAY FROM 4 LANES TO 6 LANES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120119 AVIATION ARBOR VITAE ST IMPERIAL HWY WIDEN AND RESTRIPE TO LOS ANGELES CITY CAPACITY BOULEVARD ACCOMMODATE THREE THROUGH ENHANCEMENTS LANES IN EACH DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120120 BALBOA BOULEVARD DEVONSHIRE ST WIDEN EAST SIDE OF BALBOA LOS ANGELES CITY CAPACITY BLVD. SOUTH OF DEVONSHIRE ST. ENHANCEMENTS FOR APPROXIMATELY 500 FT., AND RESTRIPE THE INTERSECTION TO PROVIDE DUAL LEFT-TURN LANES FOR THE NORTHBOUND AND SOUTHBOUND APPROACHES. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120121 BARHAM CORAL DR WIDEN WEST SIDE OF BARHAM LOS ANGELES CITY CAPACITY BOULEVARD BLVD. TO PROVIDE A SOUTHBOUND ENHANCEMENTS RIGHT-TURN ONLY LANE ON BARHAM BLVD. AND TO IMPROVE ACCESS TO UNIVERSAL STUDIOS AND TO THE 101 NB ON-RAMP. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120122 BARHAM US-101 FWY BRIDGE REPLACE THE EXISTING BRIDGE TO LOS ANGELES CITY CAPACITY BOULEVARD INCREASE TRAFFIC CAPACITY AND ENHANCEMENTS WIDEN/RESTRIPE SOUTHBOUND US-101 OFF-RAMP AT BARHAM BLVD TO PROVIDE SOUTHBOUND DOUBLE LEFT TURN LANES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120123 BEVERLY GLEN MULHOLLAND DR WIDEN SOUTH LEG OF BEVERLY GLEN LOS ANGELES CITY CAPACITY BOULEVARD BLVD TO CREATE A RIGHT TURN ONLY ENHANCEMENTS LANE; ROW ACQUISITION NEEDED LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120124 BRANDFORD STREET LAUREL CANYON AMBOY AVE WIDEN NORTH SIDE OF BRANDFORD LOS ANGELES CITY CAPACITY BLVD ST. TO PROVIDE AN ADDITIONAL ENHANCEMENTS WESTBOUND LANE. 454 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120125 BROAD AVENUE HARRY BRIDGES WATER ST BUILD GRADE-SEPARATED ACCESS LOS ANGELES CITY CAPACITY BLVD TO WATERFRONT AREA FROM RAIL ENHANCEMENTS LINES, EXTEND BROAD AVE TO WATER STREET, AND INSTALL BIKE LANES AND SIDEWALKS ON BOTH SIDE OF BROAD AVE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120126 BUNDY DRIVE I-10 FWY RAMPS REDUCE CONGESTION ON BUNDY LOS ANGELES CITY CAPACITY BY RECONFIGURING THE I-10 WB ENHANCEMENTS RAMPS (CONSOLIDATE TO ONE RAMP LOCATION ACCOMMODATING BOTH THE ON AND OFF RAMPS WITH NEW SIGNAL) LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120127 BURBANK CLYBOURNE AVE VINELAND AVE WIDEN BURBANK BLVD. TO A MAJOR LOS ANGELES CITY CAPACITY BOULEVARD HIGHWAY STANDARD (80-FOOT ENHANCEMENTS ROADWAY WIDTH) ON BOTH SIDES OF STREET TO IMPROVE ROADWAY CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120128 BURBANK US-101 FWY WB WIDENING TO ADD SECOND LOS ANGELES CITY CAPACITY BOULEVARD WESTBOUND THROUGH LANE AND ENHANCEMENTS UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120129 CANOGA AVENUE BURBANK BLVD WIDENING TO ADD A SECOND LOS ANGELES CITY CAPACITY WESTBOUND LEFT-TURN LANE AND A ENHANCEMENTS DEDICATED NORTHBOUND RIGHT- TURN LANE AND UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120130 CANOGA AVENUE SATICOY ST WIDENING TO ADD SOUTHBOUND LOS ANGELES CITY CAPACITY THROUGH LANE. CHANGE ENHANCEMENTS SORTHBOUND AND EASTBOUND PHASING FROM LEFT-TURN PERMITTED TO PROTECTED. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120131 CANOGA AVENUE US-101 WB WIDEN WESTBOUND OFF-RAMP TO LOS ANGELES CITY CAPACITY OFF-RAMP PROVE A RIGHT TURN ONLY LANE TO ENHANCEMENTS CANOGA AVE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120132 CASTAIC CUTOFF NEW ROAD (LAKE HUGHES RD/SAN LOS ANGELES CAPACITY FRANCISQUITO CANYON RD) COUNTY MTA ENHANCEMENTS Project List 455

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120133 COLDWATER VENTURA BLVD MAGNOLIA BLVD REMOVE JUT-OUTS TO ADD ONE LOS ANGELES CITY CAPACITY CANYON BOULEVARD THROUGH LANE IN EACH DIRECTION ENHANCEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120134 CORBIN AVENUE VICTORY BLVD WIDENING TO ADD EASTBOUND AND LOS ANGELES CITY CAPACITY WESTBOUND THROUGH LANES AND ENHANCEMENTS UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120135 CRENSHAW I-10 WB ON-RAMP WIDEN SB CRENSHAW BLVD TO LOS ANGELES CITY CAPACITY BOULEVARD PROVIDE A SB RIGHT-TURN ONLY ENHANCEMENTS LANE AND REDESIGN THE WB OFF- RAMP TO REDUCE CONGESTION AND IMPROVE INTERSECTION OPERATION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120136 CULVER BOULEVARD CENTINELA AVE I-405 FWY IMPROVE TRAFFIC FLOW ALONG LOS ANGELES CITY CAPACITY CULVER BLVD BETWEEN CENTINELA ENHANCEMENTS AVE AND I-405 FREEWAY INCLUDING PROVIDING LEFT-TURN LANES AT KEY SIGNALIZED INTERSECTIONS (INCLUDING INGLEWOOD BLVD) LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120137 DE SOTO AVEUE SATICOY ST WIDENING TO ADD EASTBOUND AND LOS ANGELES CITY CAPACITY WESTBOUND RIGHT TURN LANES ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120138 DE SOTO AVEUE VENTURA BLVD CLARK ST INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120139 DE SOTO STREET CALIFA ST WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY AND WESTBOUND RIGHT-TURN ENHANCEMENTS LANES AND INSTALL NEW TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120140 DE SOTO STREET PARTHENIA ST WIDENING TO ADD DEDICATED LOS ANGELES CITY CAPACITY EASTBOUND WESTBOUND RIGHT ENHANCEMENTS TURN LANE AND NORTHBOUND PHASING FROM LEFT-TURN PERMITTED TO PROTECTED. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120141 DEL AMO BL NORMANDIE AV VERMONT AV CONSTRUCTION OF A ROADWAY TO LOS ANGELES CAPACITY CLOSE THE GAP ON DEL AMO BL COUNTY MTA ENHANCEMENTS 456 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120142 ENTERPRISE STREET MATEO ST (NEAR WB WIDEN ENTERPRISE ST AT MATEO LOS ANGELES CITY CAPACITY I-10 OFF-RAMP) ST (NEAR WB-10 OFF-RAMP) TO ENHANCEMENTS IMPROVE TRUCK MOVEMENT AT CURB RETURNS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120143 FALLBROOK AVENUE VICTORY BLVD WIDENING TO ADD WESTBOUND LOS ANGELES CITY CAPACITY RIGHT TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120144 FIGUEROA STREET 146TH ST REDONDO BEACH WIDEN FIGUEROA ST TO MAJOR LOS ANGELES CITY CAPACITY BLVD HIGHWAY STANDARD FROM 62 FT TO ENHANCEMENTS 80 FT TO PROVIDE THREE LANES IN EACH DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120145 FLETCHER STREET LA RIVER WIDEN TO INCREASE CAPACITY AND LOS ANGELES CITY CAPACITY BRIDGE IMPROVE ACCESS TO I-5 FWY; ADD ENHANCEMENTS BIKE LANES AND SIDEWALKS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120146 FOOTHILL BALBOA BLVD WIDEN NORTH OF BALBOA BLVD LOS ANGELES CITY CAPACITY BOULEVARD OVER CULVERT AND WIDEN WEST ENHANCEMENTS LEG OF FOOTHILL BLVD AT BALBOA BLVD. UPGRADE TRAFFIC SIGNAL TO IMPROVE INTERSECTION CAPACITY LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120147 FOREST LAWN DRIVE NEAR SR-134 /LA RIVER CONSTRUCT A NEW BRIDGE WITH LOS ANGELES CITY CAPACITY BRIDGE BIKE PATH (INCLUDING EQUESTRIAN ENHANCEMENTS TRAIL) OVER LA RIVER AT LAEC. RE-ALIGH THE SR-134 FREEWAY ON/ OFF RAMPS AT FOREST LAWN DR. TO IMPROVE FLOW AND CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120148 FOUNTAIN AVENUE SUNSET BLVD WESTERN AVE WIDEN FOUNTAIN AVE TO ADD LOS ANGELES CITY CAPACITY A LEFT-TURN LANE AT EACH ENHANCEMENTS INTERSECTION-ROW ACQUISITION NEEDED LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120149 GLENOAKS SUNLAND BLVD WIDEN GLENOAKS BLVD TO PROVIDE LOS ANGELES CITY CAPACITY BOULEVARD AN EASTBOUND RIGHT-TURN LANE ENHANCEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120150 GRAND AVENUE CESAR CHAVEZ AVE TEMPLE ST WIDEN BRIDGE OVER US-101 FWY TO LOS ANGELES CITY CAPACITY BRIDGE IMPROVE ACCESS TO US-101, SR-110, ENHANCEMENTS FUTURE SCHOOL AND GRAND AVE. Project List 457

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120151 GRAND AVENUE OVER US 101 FWY WIDEN THE EXISTING BRIDGE TO LOS ANGELES CITY CAPACITY BRIDGE PROVIDE DUAL LEFT-TURN LANE ENHANCEMENTS ONTO THE 101 AND 110 FREEWAYS ON-RAMPS, INCLUDES, AND ADD THROUGH LANE AND RIGHT-TURN LANE, AND WIDEN SIDEWALK. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120152 IMPERIAL HIGHWAY SEPULVEDA BLVD PERSHING DR WIDEN TO PROVIDE CONTINUOUS LOS ANGELES CITY CAPACITY THREE THROUGH LANES IN EACH ENHANCEMENTS DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120153 IRWIN STREET OWENSMOUTH AVE DE SOTO ST INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120154 LA CIENEGA ARBOR VITAE ST 111TH ST WIDEN AND RESTRIPE TO LOS ANGELES CITY CAPACITY BOULEVARD ACCOMMODATE THREE THROUGH ENHANCEMENTS LANES IN EACH DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120155 LA TIJERA AIRPORT BLVD LA CIENEGA BLVD WIDEN AND RESTRIPE TO PROVIDE LOS ANGELES CITY CAPACITY BOULEVARD CONTINUOUS THREE THROUGH ENHANCEMENTS LANES IN EACH DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120156 LAUREL CANYON MULHOLLAND DR WIDEN THE WEST SIDE OF LOS ANGELES CITY CAPACITY BOULEVARD LAUREL CANYON BLVD SOUTH OF ENHANCEMENTS MULHOLLAND DR TO CARRY TWO SOUTHBOUND LANES THROUGH THE INTERSECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120157 LINCOLN JEFFERSON BLVD FIJI WAY PARTNERING WITH CALTRANS & LOS ANGELES CITY CAPACITY BOULEVARD LA COUNTY, IMPROVE LINCOLN ENHANCEMENTS BLVD BETWEEN JEFFERSON BLVD & FIJI WAY INCLUDING REMOVING THE EXISTING BOTTLENECK BY REPLACING/WIDENING THE EXISTING BRIDGE TO PROVIDE AN ADD'L LANE IN EACH DIRECTION & ON-STREET BIKE LANES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120158 MACLAY STREET GLADSTONE AVE REMOVE JUT-OUTS ON MACLAY AT LOS ANGELES CITY CAPACITY GLADSTONE AND INSTALL A NEW ENHANCEMENTS TRAFFIC SIGNAL 458 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120159 MAGNOLIA CAHUENGA BLVD VINELAND AVE WIDEN THE NORTH SIDE OF LOS ANGELES CITY CAPACITY BOULEVARD (NORTH SIDE) MAGNOLIA BLVD. TO PROVIDE ENHANCEMENTS AN ADDITIONAL LANE IN THE WESTBOUND DIRECTION. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120160 MASON AVENUE SATICOY ST WIDENING TO ADD EXCLUSIVE RIGHT- LOS ANGELES CITY CAPACITY TURN LANES FOR ALL APPROACHES ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120161 MISSION ROAD GRIFFIN AVE MARENGO ST WIDEN MISSION ROAD TO PROVIDE LOS ANGELES CITY CAPACITY AN ADDITIONAL THROUGH LANE ENHANCEMENTS IN EACH DIRECTION, AND INSTALL NEW PEDESTRIAN SIGNAL AT SICHEL STREET LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120162 MOORPARK AVENUE WOODMAN AVE MAMMOTH AVE WIDEN MOORPARK AVE. TO LOS ANGELES CITY CAPACITY INCREASE CAPACITY AND INSTALL ENHANCEMENTS STREET LIGHTS, CURB, AND GUTTER. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120163 NORTH MAIN ALBION ST GRADE SEPERATE NORTH MAIN LOS ANGELES CITY CAPACITY STREET STREET OVER THE EXITING ENHANCEMENTS METROLINK AND FREIGHT TRACKS; REDUCES DELAYS FOR VEHICLES AND TRANSIT RIDERS TRAVELING ON MAIN STREET LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120164 NORTH SPRING ROUNDOUT ST BAKER ST WIDEN N. SPRING ST. BETWEEN LOS ANGELES CITY CAPACITY STREET ROUNDOUT ST. TO BAKER ST. FROM ENHANCEMENTS 44 FT. TO AN 80' ROADWAY WIDTH AND INSTALL LANDSCAPED MEDIANS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120165 OLYMPIC ALAMEDA ST WIDEN TO IMPROVE TRUCK LOS ANGELES CITY CAPACITY BOULEVARD MOVEMENT (RIGHT-OF-WAY ENHANCEMENTS REQUIRED) LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120166 OLYMPIC SANTA FE AVE WIDENING CURB RETRUN TO LOS ANGELES CITY CAPACITY BOULEVARD IMPROVE TRUCK MOVEMENT ENHANCEMENTS THROUGH THE INTERSECTION. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120167 OLYMPIC SOTO ST IMPROVEMENTS TO THE LOS ANGELES CITY CAPACITY BOULEVARD INTERSECTION BY INCREASING ENHANCEMENTS THE CURB RETURN RADIUS OF ALL FOUR CORNERS AND OLYMPIC BLVD APPROACHES. ROW REQUIRED Project List 459

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120168 OWENSMOUTH CANYON CREEK DR WIDENING TO ADD SOUTHBOUND LOS ANGELES CITY CAPACITY AVENUE (PRIVATE) AND EASTBOUND RIGHT-TURN ENHANCEMENTS LANES, ADD A NORTHBOUND LEFT- TURN LANE, AND UPGRADE TRAFFIC SIGNAL. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120169 OWENSMOUTH SATICOY ST WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY AVENUE LEFT-TURN AND UPGRADE TRAFFIC ENHANCEMENTS SIGNAL. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120170 OXNARD STREET AMC DWY DE SOTO ST INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120171 OXNARD STREET WHITE OAK AVE LINDLEY AVE OXNARD STREET WIDENING FROM LOS ANGELES CITY CAPACITY 75 FT. EXITING ROW TO 100 FT. ENHANCEMENTS (REQUIRE ADDITIONAL ROW) TO ALLOW THROUGH LANE IN EACH DIRECTION LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120172 RESEDA BOULEVARD BURBANK BLVD US-101 FWY WB INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY RAMPS THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120173 RIVERSIDE DRIVE SR-134 FWY WIDEN THE BRIDGE TO IMPROVE THE LOS ANGELES CITY CAPACITY CAPACITY AND TO ADD THE BIKE ENHANCEMENTS LANE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120174 ROBERTSON AVENUE NATIONAL BLVD /I-10 FWY RECONFIGURE EXISTING RAMPS LOS ANGELES CITY CAPACITY INTERCHANGE AND CONSTRUCT NEW RAMPS TO ENHANCEMENTS IMPROVE CAPACITY LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120175 ROXFORD STREET SEPULVEDA BLVD REALIGN ROXFORD ST. AT LOS ANGELES CITY CAPACITY SEPULVEDA BLVD. BY WIDENING ENHANCEMENTS CURB RADIUS TO ENHANCE TRAFFIC FLOW. 460 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120176 SAN FERNANDO SIERRA HWY ROXFORD ST INSTALL A CENTER-REVERSIBLE LOS ANGELES CITY CAPACITY ROAD LANE ON THE OLD ROAD TO PROVIDE ENHANCEMENTS EXTRA CAPACITY DURING PEAK HOURS ALONG AN APPROXIMATELY 3 MILE SEGMENT. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120177 SANTA FE AVENUE PORTER ST WIDENING CURB RETRUN TO LOS ANGELES CITY CAPACITY IMPROVE TRUCK MOVEMENT ENHANCEMENTS THROUGH THE INTERSECTION. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120178 SATICOY STREET VAN NUYS BLVD WOODMAN AVE CONSTRUCT GRADE SEPERATION LOS ANGELES CITY CAPACITY AND EXTEND ROADWAY WESTERLY ENHANCEMENTS FROM WOODMAN AVE TO VAN NUYS BLVD LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120179 SEPULVEDA NATIONAL BLVD OLYMPIC BLVD WIDEN TO MAJOR HIGHWAY LOS ANGELES CITY CAPACITY BOULEVARD STANDARD AND INCREASE NUMBER ENHANCEMENTS OF THROUGH LANES FROM TWO TO THREE LANES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120180 SEPULVEDA WILSHIRE BLVD LAX PARTNERING WITH CULVER CITY & LA LOS ANGELES CITY CAPACITY BOULEVARD COUNTY, IDENTIFY AND IMPLEMENT ENHANCEMENTS CORRIDOR WAYS OF IMPROVING TRAFFIC FLOW, CARRYING CAPACITY, AND EFFICIENCY IN THE UTILIZATION OF THE SEPULVEDA CORRIDOR FROM WILSHIRE TO LAX. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120181 SEPULVEDA TUNNEL MULHOLLAND WIDEN EXISTING TUNNEL TO LOS ANGELES CITY CAPACITY BRIDGE PROVIDE ADDITIONAL TRAFFIC ENHANCEMENTS LANES AND BIKE LANES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120182 SHERMAN WAY JORDAN AVE DE SOTO ST INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY AVENUE THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120183 SHOUP AVENUE IRWIN AVE WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY RIGHT TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL TO INCLUDE NORTHBOUND PROTECTED LEFT- TURN PHASING Project List 461

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120184 SHOUP AVENUE OXNARD ST WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY RIGHT TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL TO INCLUDE WESTBOUND AND NORTHBOUND PROTECTED LEFT-TURN PHASINGS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120185 SHOUP AVENUE SHERMAN WAY WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY RIGHT TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120186 SHOUP AVENUE VANOWEN ST WIDENING TO ADD EASTBOUND LOS ANGELES CITY CAPACITY RIGHT TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120187 SLAUSON AVENUE ALAMEDA ST CRENSHAW BLVD DESIGN AND CONSTRUCTION OF LOS ANGELES CITY CAPACITY STREET IMPROVEMENTS AND ENHANCEMENTS SIGNAGE FOR COMMERCIAL VEHICLES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120188 VAIEL AVENUE KITTRIDGE ST WIDENING TO ADD EASTBOUND AND LOS ANGELES CITY CAPACITY WESTBOUND THROUGH LANES AND ENHANCEMENTS UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120189 VALLEY BOULEVARD SAN PABLO ST BOCA AVE IMPROVE CAPACITY AND ENHANCE LOS ANGELES CITY CAPACITY TRAFFIC FLOW AT RAILROAD ENHANCEMENTS CROSSING BY WIDENING TO ADD LANES, TO IMPROVE CURB, AND TO UPGRADE SIGNAL SYSTEMS AND RAIL ROAD EQUIPMENT ALONG VALLEY BLVD. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120190 VAN NESS AVENUE US-101 FWY SB SUNSET BLVD WIDEN BOTH SIDES OF VAN NESS LOS ANGELES CITY CAPACITY OFF-RAMP AVE. TO ACCOMMODATE ONE ENHANCEMENTS ADDITIONAL SOUTHBOUND LANE. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120191 VANALDEN AVENUE US-101 FWY EB /VENTURA BLVD WIDENING TO ADD WESTBOUND LOS ANGELES CITY CAPACITY RAMPS THROUGH LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120192 VANOWEN AVENUE OWENSMOUTH AVE MASON AVE INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. 462 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120193 VENTURA SHOUP AVE US-101 SB RAMPS WIDEN BETWEEN SHOUP AVE AND LOS ANGELES CITY CAPACITY BOULEVARD US-101 FREEWAY SOUTHBOUND ENHANCEMENTS RAMPS TO PROVIDE DOUBLE LEFT- TURN LANES LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120194 VERMONT AVENUE WASHINGTON BLVD I-10 FWY WB WIDEN 10 FT. OF EAST-SIDE OF LOS ANGELES CITY CAPACITY OFF-RAMP VERMONT AVE TO PROVIDE LEFT- ENHANCEMENTS TURN LANE LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120195 VICTORY OWENSMOUTH AVE WINNETKA AVE INTERSECTION WIDENING TO ADD LOS ANGELES CITY CAPACITY BOULEVARD THROUGH AND/OR TURN LANES, ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL TO INCLUDE NEW PHASING AS NEEDED TO IMPROVE INTERSECTION CAPACITY. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120196 WILSHIRE SAN VICENTE BLVD CENTINELA AVE ARTERIAL WIDENING TO PROVIDE LOS ANGELES CITY CAPACITY BOULEVARD AN ADDITIONAL LANE IN EACH ENHANCEMENTS DIRECTION. LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120197 WINNETKA AVENUE OXNARD ST WIDENING TO ADD WESTBOUND LOS ANGELES CITY CAPACITY RIGHT TURN LANE AND UPGRADE ENHANCEMENTS TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120198 WINNETKA AVENUE VANOWEN ST WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY AND SOUTHBOUND RIGHT-TURN ENHANCEMENTS LANES AND UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120199 WINNETKA AVENUE VENTURA BLVD CHANGE WESTBOUND RIGHT-TURN LOS ANGELES CITY CAPACITY LANE TO A SHARED THROUGH-RIGHT ENHANCEMENTS TURN LANE, ADD AN EASTBOUND LEFT-TURN LANE, AND UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120200 WOODLAKE AVENUE VICTORY BLVD WIDENING TO ADD NORTHBOUND LOS ANGELES CITY CAPACITY SHARED-THROUGH RIGHT TURN LANE ENHANCEMENTS AND UPGRADE TRAFFIC SIGNAL LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120201 COLIMA RD INTERSECTION IMPROVEMENTS AT LOS ANGELES OPERATIONAL FULLERTON RD COUNTY MTA IMPROVEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120202 HACIENDA BL INTERSECTION IMPROVEMENTS AT LOS ANGELES OPERATIONAL GALE AV COUNTY MTA IMPROVEMENTS Project List 463

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120203 MALIBU/KANAN DUME TUNNEL LOS ANGELES OPERATIONAL LINING PROJECTS COUNTY MTA IMPROVEMENTS LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120204 5 I-5 INTERSECTION IMPROVEMENTS AND LOS ANGELES OPERATIONAL WIDENING TO PROVIDE ADDITIONAL COUNTY MTA IMPROVEMENTS, LANES ON EAST BOUND AND WEST ARTERIAL BOUND APPROACHES AT LAKE WIDENING HIGHES RD LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120205 5 I-5 INTERSECTION IMPROVEMENTS LOS ANGELES OPERATIONAL INCLUDING BRIDGE WIDENING AND COUNTY MTA IMPROVEMENTS, LANE ADDITIONS AT PARKER RD ARTERIAL WIDENING LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120206 ADMIRALTY WY VIA MARINA FIJI WY WIDENING LOS ANGELES WIDENING WIDENING COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120207 AVENUE L & K ET AL. 40TH ST 50TH ST WIDENING LOS ANGELES WIDENING COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120208 AVIATION BL IMPERIAL HIGHWAY ROSECRANS AV WIDENING LOS ANGELES WIDENING COUNTY MTA LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120209 COLIMA RD ROAD WIDENING (HALLIBURTON LOS ANGELES WIDENING RD/CITY OF DIAMOND BAR CITY COUNTY MTA BOUNDARY) LOS ANGELES LOCAL HIGHWAY GRADE S1120079 EL SEGUNDO BL EL SEGUNDO BL OVER UPRR AND LOS ANGELES SEPARATION METRO AT WILLOWBROOK AV COUNTY MTA LOS ANGELES LOCAL HIGHWAY GRADE S1120215 LEMON AVE (LA CONSTRUCT ROADWAY/RAIL GRADE ALAMEDA SEPARATION SUBDIVISION) SEPARATIONS CORRIDOR-EAST CONSTRUCTION AUTHORITY LOS ANGELES LOCAL HIGHWAY GRADE S1120214 SAN ANTONIO AVE CONSTRUCT ROADWAY/RAIL GRADE ALAMEDA SEPARATION (POMONA) SEPARATIONS CORRIDOR-EAST CONSTRUCTION AUTHORITY LOS ANGELES LOCAL HIGHWAY GRADE S1120080 SIERRA HWY/ SIERRA HWY/BARREL SPRINGS RD LOS ANGELES SEPARATION BARREL SPRINGS RD UNDER SCRRA COUNTY MTA LOS ANGELES LOCAL HIGHWAY GRADE S1120081 SR-126/COMMERCE SR-126/COMMERCE CENTER DR LOS ANGELES SEPARATION CENTER DR COUNTY MTA 464 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency LOS ANGELES LOCAL HIGHWAY S1120210 FULLERTON RD INTERSECTION IMPROVEMENTS AT LOS ANGELES PATHFINDER RD COUNTY MTA LOS ANGELES LOCAL HIGHWAY S1120211 GALE AV FULLERTON RD NOGALES ST WIDEN FROM FOUR TO SIX LANES LOS ANGELES COUNTY MTA LOS ANGELES LOCAL HIGHWAY S1120212 THE OLD ROAD HILLCREST PKWY LAKE HIGHES RD THE OLD ROAD LOS ANGELES COUNTY MTA ORANGE TRANSIT BRT S2120001 BEACH BOULEVARD NEW BRT SERVICE BETWEEN ORANGE COUNTY BRT HUNTINGTON BEACH AND LA HABRA TRANS AUTHORITY ORANGE TRANSIT BRT S2120002 EDINGER AVENUE NEW BRT SERVICE BETWEEN ORANGE COUNTY BRT HUNTINGTON BEACH AND TUSTIN TRANS AUTHORITY ORANGE TRANSIT BRT S2120003 ENHANCE BRT IMPLEMENT BY PASS LANES ORANGE COUNTY ROUTES AT INTERSECTIONS REAL-TIME TRANS AUTHORITY PASSENGER INFORMATION, TRANSIT SIGNAL PRIORITY, AND STATION IMPROVEMENTS ORANGE TRANSIT BRT S2120004 KATELLA AVENUE NEW BRT SERVICE BETWEEN LONG ORANGE COUNTY BRT BEACH AND ORANGE TRANS AUTHORITY ORANGE TRANSIT BRT S2120005 LA PALMA AVENUE NEW BRT SERVICE BETWEEN BUENA ORANGE COUNTY BRT PARK AND ANAHEIM TRANS AUTHORITY ORANGE TRANSIT BRT S2120006 NEW EXPRESS ANAHEIM METROLINK/LAGUNA HILLS ORANGE COUNTY BUS SERVICE TRANSIT CENTER EXPRESS BUS TRANS AUTHORITY FROM ANAHEIM TO SERVICE EXPANSION LAGUNA HILLS ORANGE TRANSIT BRT S2120007 NEW EXPRESS HARBOR BOULEVARD/MANCHESTER ORANGE COUNTY BUS SERVICE AVENUE/LAGUNA HILLS TRANSIT TRANS AUTHORITY FROM ANAHEIM TO CENTER EXPRESS BUS SERVICE LAGUNA HILLS EXPANSION ORANGE TRANSIT BRT S2120008 NEW EXPRESS BUS INDUSTRY METROLINK/ANAHEIM ORANGE COUNTY SERVICE FROM RESORT EXPRESS BUS SERVICE TRANS AUTHORITY INDUSTRY TO EXPANSION ANAHEIM ORANGE TRANSIT BRT S2120009 NEW EXPRESS BUS ALTON PARKWAY/YALE LOOP TO ORANGE COUNTY SERVICE FROM GOLDENWEST TRANSPORTATION TRANS AUTHORITY IRVINE TO NORWALK CENTER/GREEN LINE EXPRESS BUS SERVICE EXPANSION Project List 465

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency ORANGE TRANSIT BRT S2120010 NEW EXPRESS BUS LAGUNA NIGUEL/ALISO VIEJO/IRVINE ORANGE COUNTY SERVICE FROM BUSINESS COMPLEX/UCI EXPRESS TRANS AUTHORITY LAGUNA NIGUEL/ BUS SERVICE EXPANSION ALISO VIEJO TO IRVINE ORANGE TRANSIT BRT S2120011 NEW EXPRESS BUS THE BLOCK AT ORANGE/LONG ORANGE COUNTY SERVICE FROM BEACH TRANSIT MALL EXPRESS BUS TRANS AUTHORITY ORANGE TO LONG SERVICE EXPANSION BEACH ORANGE TRANSIT BRT S2120012 NEW EXPRESS BUS RANCHO SANTA MARGARITA/IRVINE ORANGE COUNTY SERVICE FROM SPECTRUM EXPRESS BUS SERVICE TRANS AUTHORITY RANCHO SANTA EXPANSION MARGARITA TO IRVINE ORANGE TRANSIT BRT S2120013 NEW EXPRESS BUS TYLER GALLERIA/ANAHEIM RESORT ORANGE COUNTY SERVICE FROM EXPRESS BUS SERVICE EXPANSION TRANS AUTHORITY RIVERSIDE TO ANAHEIM ORANGE TRANSIT BRT S2120014 NEW EXPRESS BUS TYLER GALLERIA/YORBA LINDA/ ORANGE COUNTY SERVICE FROM BREA EXPRESS BUS SERVICE TRANS AUTHORITY RIVERSIDE TO BREA EXPANSION ORANGE TRANSIT BRT S2120015 NEW EXPRESS BUS TYLER GALLERIA/IRVINE BUSINESS ORANGE COUNTY SERVICE FROM COMPLEX/UCI EXPRESS BUS SERVICE TRANS AUTHORITY RIVERSIDE TO IRVINE EXPANSION ORANGE TRANSIT BRT S2120016 NEW EXPRESS BUS SAN CLEMENTE/UCI/SOUTH COAST ORANGE COUNTY SERVICE FROM METRO EXPRESS BUS SERVICE TRANS AUTHORITY SAN CLEMENTE EXPANSION TO SOUTH COAST METRO ORANGE TRANSIT BRT S2120017 NEW EXPRESS BUS SOUTH COAST METRO/WARDLOW ORANGE COUNTY SERVICE FROM METRO BLUE LINE STATION EXPRESS TRANS AUTHORITY SOUTH COAST BUS SERVICE EXPANSION METRO TO LONG BEACH ORANGE TRANSIT BRT S2120018 SERVICE INCREASE CENTRAL COUNTY EXPRESS BUS ORANGE COUNTY TO EXPRESS BUS SERVICE EXPANSION TRANS AUTHORITY ROUTES IN CENTRAL COUNTY 466 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency ORANGE TRANSIT BRT S2120019 SOUTH COUNTY BRT NEW BRT SERVICE BETWEEN ORANGE COUNTY CENTRAL ORANGE COUNTY AND TRANS AUTHORITY SOUTH ORANGE COUNTY (VIA IRVINE CENTER DRIVE/MOULTON PARKWAY / GOLDEN LANTERN) ORANGE TRANSIT BUS S2120020 SYSTEMWIDE DESIGN, IMPLEMENTATION, AND ORANGE COUNTY LOCAL BUS SERVICE OPERATION OF LOCAL FIXED ROUTE TRANS AUTHORITY EXPANSION SERVICE ORANGE TRANSIT COMMUTER RAIL S2120021 LOSSAN CAPACITY EXTEND DOUBLE TRACK IN TUNNEL ORANGE COUNTY INCREASE TO SAN SOUTH OF SAN JUAN CAPISTRANO TRANS AUTHORITY DIEGO BORDER TO SAN DIEGO COUNTY LINE ORANGE TRANSIT COMMUTER RAIL S2120022 METROLINK SERVICE FREQUENCY INCREASE TO ORANGE COUNTY SERVICE EXPANSION ALL STATIONS SOUTH OF LAGUNA TRANS AUTHORITY PROGRAM NIGUEL/MISSION VIEJO ORANGE TRANSIT EXPRESS BUS S2120023 NEW EXPRESS BUS ARTIC JOHN WAYNE NEW EXPRESS BUS SERVICE FROM TBD SERVICE FROM ARTIC TO JOHN WAYNE AIRPORT ARTIC TO JOHN WAYNE AIRPORT ORANGE TRANSIT OTHER TRANSIT S2120024 FULLERTON TRANSIT STATION IMPROVEMENTS ORANGE COUNTY TRANSPORTATION TRANS AUTHORITY CENTER ORANGE TRANSIT OTHER TRANSIT S2120025 INTERMODAL NEW INTERMODAL STATIONS IN ORANGE COUNTY STATIONS FOUNTAIN VALLEY, SANTA ANA, TRANS AUTHORITY WESTMINSTER/GARDEN GROVE AND ANAHEIM ORANGE TRANSIT OTHER TRANSIT S2120026 IRVINE STATION IRVINE STATION MASTER PLAN - ORANGE COUNTY TRANSIT STATION IMPROVEMENTS TRANS AUTHORITY ORANGE TRANSIT OTHER TRANSIT S2120027 PACIFIC ELECTRIC SPECIFIC IMPROVEMENTS AND ORANGE COUNTY RIGHT-OF-WAY DESIGN ALTERNATIVES TO BE TRANS AUTHORITY (PEROW) DEFINED THROUGH ONGOING INTERCOUNTY STUDIES Project List 467

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency ORANGE TRANSIT OTHER TRANSIT S2120028 SANTA ANA EXPAND TO INCLUDE FIXED- ORANGE COUNTY REGIONAL GUIDEWAY STATION AND TRANS AUTHORITY TRANSPORTATION MAINTENANCE/STORAGE FACILITY; CENTER BRT STATION; RECONSTRUCTED AND ADDITIONAL PARKING; PEDESTRIAN BRIDGES; CIRCULATION IMPROVEMENTS; AND SANTA ANA BOULEVARD GRADE SEPARATION ORANGE TRANSIT PARK-N-RIDE S2120029 PARK AND RIDES INCREASE ACCESS TO PARK AND ORANGE COUNTY RIDES AND INCREASE PARKING TRANS AUTHORITY CAPACITY ORANGE STATE HIGHWAY HIGHWAY S2120030 55 SR-55 SR-91 SR-22 OPERATIONAL IMPROVEMENTS ORANGE COUNTY OPERATIONAL TRANS AUTHORITY IMPROVEMENT ORANGE STATE HIGHWAY HIGHWAY S2120031 74 SR-74 IMPLEMENT OPERATIONAL ORANGE COUNTY OPERATIONAL IMPROVEMENTS ON STATE ROUTE 74 TRANS AUTHORITY IMPROVEMENT ORANGE STATE HIGHWAY HOV S2120032 5 I-5 ADD ONE HOV LANE EACH DIRECTION ORANGE COUNTY FROM SAN DIEGO COUNTY LINE TO TRANS AUTHORITY AVENIDA PICO ORANGE STATE HIGHWAY HOV S2120033 55 SR-55 I-405 19TH STREET EXTEND HOV LANES ORANGE COUNTY TRANS AUTHORITY ORANGE STATE HIGHWAY HOV, IC/RAMPS S2120034 55 SR-55 ADD HOV RAMPS AT ALTON PARKWAY ORANGE COUNTY TRANS AUTHORITY ORANGE STATE HIGHWAY HOV, IC/RAMPS S2120035 405 I-405 ADD HOV RAMPS AT BEAR STREET ORANGE COUNTY TRANS AUTHORITY ORANGE STATE HIGHWAY HOV, IC/RAMPS S2120036 405 I-405 ADD HOV RAMPS AT VON KARMAN ORANGE COUNTY AVENUE TRANS AUTHORITY ORANGE STATE HIGHWAY IC/RAMPS S2120037 5 I-5 IMPROVE INTERCHANGE OF ORANGE COUNTY INTERSTATE 5 WITH STATE ROUTE 57 TRANS AUTHORITY AND STATE ROUTE 22 ORANGE STATE HIGHWAY IC/RAMPS S2120038 5 I-5 MODIFY INTERCHANGE OF ORANGE COUNTY INTERSTATE 5 WITH EL CAMINO REAL TRANS AUTHORITY ORANGE STATE HIGHWAY IC/RAMPS S2120039 5 I-5 MODIFY INTERCHANGE OF ORANGE COUNTY INTERSTATE 5 WITH PACIFIC COAST TRANS AUTHORITY HIGHWAY 468 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency ORANGE STATE HIGHWAY IC/RAMPS S2120040 22 SR-22 CONNECT STATE ROUTE 22 TO THE ORANGE COUNTY PACIFIC ELECTRIC RIGHT-OF-WAY TRANS AUTHORITY ORANGE STATE HIGHWAY IC/RAMPS S2120041 73 SR-73 IMPROVE INTERCHANGE OF STATE ORANGE COUNTY ROUTE 73 WITH EL TORO ROAD AND TRANS AUTHORITY LAGUNA CANYON ROAD ORANGE STATE HIGHWAY IC/RAMPS S2120042 241 SR-241 ADD NEW INTERCHANGE ON STATE ORANGE COUNTY ROUTE 241 AT CROWN VALLEY TRANS AUTHORITY PARKWAY ORANGE STATE HIGHWAY IC/RAMPS S2120043 241 SR-241 ADD NEW INTERCHANGE ON STATE ORANGE COUNTY ROUTE 241 AT WEIR CANYON ROAD TRANS AUTHORITY ORANGE STATE HIGHWAY IC/RAMPS S2120044 241 SR-241 IMPROVE INTERCHANGE OF STATE ORANGE COUNTY ROUTE 241 NORTHBOUND AND STATE TRANS AUTHORITY ROUTE 261 SOUTHBOUND AND STATE ROUTE 261 NORTHBOUND AND STATE ROUTE 241 SOUTHBOUND ORANGE STATE HIGHWAY IC/RAMPS S2120045 405 I-405 IMPROVE INTERCHANGE OF ORANGE COUNTY INTERSTATE 405 SOUTHBOUND WITH TRANS AUTHORITY STATE ROUTE 133 NORTHBOUND ORANGE STATE HIGHWAY IC/RAMPS S2120046 JAMBOREE ROAD TUSTIN METROLINK STATION ORANGE COUNTY DIRECT ACCESS - ADD RAMP TRANS AUTHORITY FROM JAMBOREE ROAD TO TUSTIN METROLINK STATION ORANGE STATE HIGHWAY IC/RAMPS S2120047 MACARTHUR MACARTHUR SR-55 STATE ROUTE 55 RAMP ORANGE COUNTY BOULEVARD BOULEVARD IMPROVEMENT - IMPROVE TRANS AUTHORITY EASTBOUND ON AND OFF-RAMPS ORANGE STATE HIGHWAY MIXED FLOW S2120048 5 I-5 AVENIDA PICO SR-74 ADD ONE MIXED-FLOW LANE IN EACH ORANGE COUNTY DIRECTION TRANS AUTHORITY ORANGE STATE HIGHWAY MIXED FLOW S2120049 55 SR-55 19TH STREET INDUSTRIAL WAY EXTEND THE FREEWAY ORANGE COUNTY TRANS AUTHORITY ORANGE STATE HIGHWAY MIXED FLOW S2120050 405 I-405 CULVER DRIVE SR-133 ADD ONE MIXED-FLOW LANE IN EACH ORANGE COUNTY DIRECTION TRANS AUTHORITY ORANGE STATE HIGHWAY TOLL S2120051 TOLL ROADS FUNDS TO COMPENSATE THE ORANGE COUNTY TRANSPORTATION CORRIDOR TRANS AUTHORITY AGENCIES FOR LOWER TOLLS AND ADDITION OF ONE MIXED-FLOW LANE ON STATE ROUTE 73, STATE ROUTE 133 AND STATE ROUTE 241 Project List 469

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency ORANGE STATE HIGHWAY TOLL S2120052 TOLL ROADS TRANSPORTATION CORRIDOR ORANGE COUNTY AGENCIES – BUILD-OUT OF TOLL TRANS AUTHORITY CORRIDORS ORANGE STATE HIGHWAY TRUCK CLIMBING S2120053 5 I-5 ADD ONE NORTHBOUND TRUCK ORANGE COUNTY LANE CLIMBING LANE FROM AVENIDA PICO TRANS AUTHORITY TO AVENIDA VAQUERO ORANGE LOCAL HIGHWAY ARTERIAL S2120054 BEACH BOULEVARD CORRIDOR FEASIBILITY STUDY – ORANGE COUNTY AND HARBOR CONDUCT CORRIDOR FEASIBILITY TRANS AUTHORITY BOULEVARD STUDIES FOR BEACH BOULEVARD AND HARBOR BOULEVARD ORANGE LOCAL HIGHWAY ARTERIAL S2120055 73, 241 SR-73/SR-241 STATE ROUTE 73/STATE ROUTE 241 ORANGE COUNTY CAPACITY ROADWAY CONNECTOR – FOUR LANE TRANS AUTHORITY ENHANCEMENTS LIMITED ACCESS ROAD CONNECTING INTERSTATE 5 AND STATE ROUTE 73 TO ANTONIO PARKWAY AND COW CAMP ROAD ORANGE LOCAL HIGHWAY ARTERIAL S2120056 HARBOR BOULEVARD CONSTRUCT GRADE SEPARATED ORANGE COUNTY OPERATIONAL INTERSECTION AT HARBOR TRANS AUTHORITY IMPROVEMENTS BOULEVARD AND BALL ROAD ORANGE LOCAL HIGHWAY ARTERIAL S2120057 PAULARINO AVENUE TRAFFIC EFFICIENCY IMPROVEMENTS ORANGE COUNTY OPERATIONAL AND BAKER AVENUE – IMPROVEMENTS AT OR NEAR TRANS AUTHORITY IMPROVEMENTS AT SR-55 FREEWAY INTERCHANGES TO IMPROVE EFFICIENCY ORANGE LOCAL HIGHWAY ARTERIAL S2120058 HARBOR BOULEVARD WARNER AVENUE 17TH STREET ADD ONE LANE IN EACH DIRECTION ORANGE COUNTY WIDENING TRANS AUTHORITY ORANGE LOCAL HIGHWAY GRADE S2120068 JEFFERSON ST CONSTRUCT ROADWAY/RAIL GRADE OCTA SEPARATION (ANAHEIM) SEPARATIONS ORANGE LOCAL HIGHWAY GRADE S2120071 KELLOGG DRIVE CONSTRUCT ROADWAY/RAIL GRADE OCTA SEPARATION UNDERCROSSING SEPARATIONS (ANAHEIM) ORANGE LOCAL HIGHWAY GRADE S2120061 LOSSAN NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION CORRIDOR/17TH LOSSAN CORRIDOR (SANTA ANA) TRANS AUTHORITY STREET ORANGE LOCAL HIGHWAY GRADE S2120062 LOSSAN CORRIDOR/ NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION BALL ROAD LOSSAN CORRIDOR (ANAHEIM) TRANS AUTHORITY ORANGE LOCAL HIGHWAY GRADE S2120063 LOSSAN CORRIDOR/ NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION GRAND AVENUE LOSSAN CORRIDOR (SANTA ANA) TRANS AUTHORITY 470 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency ORANGE LOCAL HIGHWAY GRADE S2120064 LOSSAN CORRIDOR/ NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION MAIN STREET LOSSAN CORRIDOR (ORANGE) TRANS AUTHORITY ORANGE LOCAL HIGHWAY GRADE S2120065 LOSSAN CORRIDOR/ NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION ORANGETHORPE LOSSAN CORRIDOR (ANAHEIM) TRANS AUTHORITY AVENUE ORANGE LOCAL HIGHWAY GRADE S2120066 LOSSAN CORRIDOR/ NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION SANTA ANA LOSSAN CORRIDOR (SANTA ANA) TRANS AUTHORITY BOULEVARD ORANGE LOCAL HIGHWAY GRADE S2120067 LOSSAN CORRIDOR/ NEW RAIL GRADE SEPARATION ON ORANGE COUNTY SEPARATION STATE COLLEGE LOSSAN CORRIDOR(ANAHEIM) TRANS AUTHORITY BOULEVARD ORANGE LOCAL HIGHWAY GRADE S2120070 RICHFIELD RD CONSTRUCT ROADWAY/RAIL GRADE OCTA SEPARATION (PLACENTIA) SEPARATIONS ORANGE LOCAL HIGHWAY GRADE S2120069 VAN BUREN AVE CONSTRUCT ROADWAY/RAIL GRADE OCTA SEPARATION (PLACENTIA) SEPARATIONS RIVERSIDE TRANSIT INTERCITY RAIL S3120001 COACHELLA VALLEY L.A. UNION STATION INDIO ESTABLISH DAILY RAIL SERVICE LOS ANGELES RAIL SERVICE BETWEEN DOWNTOWN LOS ANGELES COUNTY MTA AND THE COACHELLA VALLEY RIVERSIDE LOCAL HIGHWAY GRADE S3120024 7TH ST (RIVERSIDE) CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120015 APACHE TRAIL CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE COUNTY) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120027 AVENUE 54 CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (COACHELLA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120028 AVENUE 58 CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE COUNTY) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120025 BROADWAY CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE COUNTY) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120014 BROCKTON AVE CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION Project List 471

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency RIVERSIDE LOCAL HIGHWAY GRADE S3120006 BUCHANAN ST CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120019 CENTER ST CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE COUNTY) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120004 COTA STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (CORONA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120017 CRIDGE STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120009 GIBSON STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120008 HARRISON STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120010 JACKSON STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120011 JEFFERSON STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120020 MAIN STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE COUNTY) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120012 PALM AVE CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120018 PALMYRITA AVE CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120016 PANORAMA ROAD CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION 472 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency RIVERSIDE LOCAL HIGHWAY GRADE S3120023 PENNSYLVANIA CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION AVENUE SEPARATIONS TRANSPORTATION (BEAUMONT) COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120005 RADIO ROAD CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (CORONA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120003 RAILROAD ST CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (CORONA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120007 RUTILE STREET CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (JURUPA VALLEY) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120021 SAN TIMOTEO CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION CANYON (CALIMESA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120022 SHERIDAN ST CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (CORONA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120002 SMITH AVE CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION (CORONA) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120026 TIPTON ROAD (PALM CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION SPRINGS) SEPARATIONS TRANSPORTATION COMMISSION RIVERSIDE LOCAL HIGHWAY GRADE S3120013 WASHINGTON CONSTRUCT ROADWAY/RAIL GRADE RIVERSIDE COUNTY SEPARATION STREET (RIVERSIDE) SEPARATIONS TRANSPORTATION COMMISSION SAN TRANSIT COMMUTER RAIL S4120001 REDLANDS RAIL REDLANDS RAIL PHASE III SAN BERNARDINO BERNARDINO PHASE III ASSOCIATED GOVERNMENTS SAN TRANSIT EXPRESS BUS S4120002 NEW EXPRESS ONTARIO TBD NEW EXPRESS BUS SERVICE FROM TBD BERNARDINO BUS SERVICE INTERNATIONAL ONTARIO INTERNATIONAL AIRPORT FROM ONTARIO AIRPORT HEADING EAST ON I-10/I-215 INTERNATIONAL AIRPORT HEADING EAST ON I-10/I-215 Project List 473

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency SAN TRANSIT OTHER S4120003 SAN BERNARDINO SAN BERNARDINO/ BIG BEAR LAKE SAN BERNARDINO MOUNTAIN- SAN BERNARDINO BERNARDINO MOUNTAIN-VALLEY HIGHLAND VALLEY RAILWAY SYSTEM ASSOCIATED RAILWAY SYSTEM GOVERNMENTS SAN LOCAL HIGHWAY GRADE S4120015 ALESSANDRO RD CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (REDLANDS) SEPARATIONS BERNARDINO SAN LOCAL HIGHWAY GRADE S4120007 ARCHIBALD CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION AVE (RANCHO SEPARATIONS BERNARDINO CUCAMONGA) SAN LOCAL HIGHWAY GRADE S4120014 BEAUMONT AVE CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (SAN BERNARDINO SEPARATIONS BERNARDINO COUNTY) SAN LOCAL HIGHWAY GRADE S4120011 BON VIEW AVE CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (ONTARIO) SEPARATIONS BERNARDINO SAN LOCAL HIGHWAY GRADE S4120008 CENTRAL AVE CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (MONTCLAIR) SEPARATIONS BERNARDINO SAN LOCAL HIGHWAY GRADE S4120004 HINCKLEY AVE CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (SAN BERNARDINO SEPARATIONS BERNARDINO COUNTY) SAN LOCAL HIGHWAY GRADE S4120013 OLIVE ST (SAN CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION BERNARDINO) SEPARATIONS BERNARDINO SAN LOCAL HIGHWAY GRADE S4120006 PHELAN RD (SAN CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION BERNARDINO SEPARATIONS BERNARDINO COUNTY) SAN LOCAL HIGHWAY GRADE S4120005 SHADOW CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION MOUNTAIN RD SEPARATIONS BERNARDINO (SAN BERNARDINO COUNTY) SAN LOCAL HIGHWAY GRADE S4120010 SULTANA AVE CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (ONTARIO) SEPARATIONS BERNARDINO SAN LOCAL HIGHWAY GRADE S4120009 VINE AVE (ONTARIO) CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION SEPARATIONS BERNARDINO SAN LOCAL HIGHWAY GRADE S4120012 VINEYARD AVE CONSTRUCT ROADWAY/RAIL GRADE COUNTY OF SAN BERNARDINO SEPARATION (ONTARIO) SEPARATIONS BERNARDINO VENTURA TRANSIT OTHER S5120002 SANTA PAULA MONTALVO L.A. COUNTY LINE RAIL IMPROVEMENTS VENTURA COUNTY BRANCH LINE TRANSPORTATION COMMISSION 474 Project List

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency VENTURA LOCAL HIGHWAY GRADE S5120001 ROUTE 118 CONSTRUCT ROADWAY/RAIL GRADE VENTURA COUNTY SEPARATION (VENTURA COUNTY) SEPARATIONS TRANSPORTATION COMMISSION VARIOUS TRANSIT EXPRESS BUS S7120001 NEW EXPRESS BUS ARTIC LAX NEW EXPRESS BUS SERVICE FROM TBD SERVICE FROM ARTIC TO LAX ARTIC TO LAX VARIOUS TRANSIT EXPRESS BUS S7120002 NEW EXPRESS BUS ARTIC ONTARIO NEW EXPRESS BUS SERVICE FROM TBD SERVICE FROM INTERNATIONAL ARTIC TO ONTARIO INTERNATIONAL ARTIC TO ONTARIO AIRPORT (ONT) AIRPORT INTERNATIONAL AIRPORT VARIOUS TRANSIT EXPRESS BUS S7120003 NEW EXPRESS ONTARIO TBD NEW EXPRESS BUS SERVICE FROM TBD BUS SERVICE INTERNATIONAL ONTARIO INTERNATIONAL AIRPORT FROM ONTARIO AIRPORT HEADING WEST ON I-10/SR-57 INTERNATIONAL AIRPORT HEADING WEST ON I-10/SR-57 VARIOUS TRANSIT HIGH-SPEED RAIL S7120004 CALIFORNIA L.A. UNION STATION SAN DIEGO HIGH-SPEED TRAIN SERVICE FROM CALIFORNIA HIGH-SPEED TRAIN LINDBERGH FIELD L.A. UNION STATION TO SAN DIEGO HIGH-SPEED RAIL SYSTEM PHASE II THROUGH THE INLAND EMPIRE AUTHORITY VARIOUS TRANSIT HIGH-SPEED RAIL S7120005 DESERTXPRESS LAS VEGAS PALMDALE HIGH-SPEED RAIL SERVICE FROM VARIOUS AGENCIES LAS VEGAS TO PALMDALE WITH INTERMEDIATE STOP IN VICTORVILLE VARIOUS TRANSIT HIGH-SPEED S7120006 CALIFORNIA/NEVADA ANAHEIM LAS VEGAS NEW SERVICE FROM ANAHEIM TO CALIFORNIA/ TRANSIT SUPER SPEED TRAIN LAS VEGAS NEVADA SUPER SYSTEM SPEED TRAIN COMMISSION VARIOUS TRANSIT LIGHT RAIL S7120007 METRO GOLD LINE MONTCLAIR ONTARIO GOLD LINE FOOTHILL EXTENSION LOS ANGELES INTERNATIONAL COUNTY MTA AIRPORT (ONT) VARIOUS STATE HIGHWAY HIGHWAY S7120008 IRVINE-CORONA SR-133/SR-241 IN I-15 IN RIVERSIDE TUNNEL (CORRIDOR B) VARIOUS AGENCIES EXPRESSWAY ORANGE COUNTY VARIOUS STATE HIGHWAY HOT/EXPRESS/ S7120009 EXPANDED EXPRESS/HOT LANE VARIOUS AGENCIES MANAGED LANES NETWORK (BEYOND CONSTRAINED PLAN) VARIOUS LOCAL HIGHWAY TOLL S7120010 CORDON PRICING DEMONSTRATION VARIOUS AGENCIES PROJECTS (LOCATIONS TO BE DETERMINED) Project List 475

Strategic Projects County System Category RTP ID Route # Route Name From To Description Lead Agency VARIOUS LOCAL HIGHWAY TOLL S7120011 MILEAGE-BASED USER FEE VARIOUS AGENCIES DEMONSTRATION PROJECTS AND IMPLEMENTATION STRATEGY VARIOUS OTHER GOODS S7120012 LONG-TERM GOODS MOVEMENT VARIOUS AGENCIES MOVEMENT EMISSION REDUCTION STRATEGIES FOR RAIL AND TRUCKS; DEMONSTRATION PROJECTS AND IMPLEMENTATION STRATEGY 818 West 7th Street, 12th Floor Los Angeles, CA 90017 Phone: (213) 236-1800 Fax: (213) 236-1825 www.scag.ca.gov

REGIONAL OFFICES Imperial County Orange County Riverside County San Bernardino County Ventura County 1405 North Imperial Avenue OCTA Building 3403 10th Street Santa Fe Depot 950 County Square Drive Suite 1 600 South Main Street Suite 805 1170 West 3rd Street Suite 101 El Centro, CA 92243 Suite 906 Riverside, CA 92501 Suite 140 Ventura, CA 93003 Phone: (760) 353-7800 Orange, CA 92863 Phone: (951) 784-1513 San Bernardino, CA 92410 Phone: (805) 642-2800 Fax: (760) 353-1877 Phone: (714) 542-3687 Fax: (951) 784-3925 Phone: (909) 806-3556 Fax: (805) 642-2260 Fax: (714) 560-5089 Fax: (909) 806-3572

please recycle 2347 2012.04.03