World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Public Disclosure Authorized Initial Environmental Examination of Hetauda - Dhalkebar- Duhabi 400 kV Transmission Line Project Public Disclosure Authorized Public Disclosure Authorized Vol. I: Main Report --,: -;~. -- -.~. - Submitted to 220 kV Transmission Line Construction Department Nepal Electricity Authority Prepared and Submitted by Nepal Electricity Authority . Environment and Social Studies ~epartment Kharipati, Bhaktapur Phone:6611580.Fax:~11590 Email: [email protected] Public Disclosure Authorized February, 2011 Hetauda- Dhalkebar Duhabi 400 kV TJL Project Draft lEE Report TABLE OF CONTENTS List of Abbreviations and Acronyms ............................................................................................111 List of Tables ................................................................................................................................IV List of Figures and Annexes .........................................................................................................VI List of Photographs ......................................................................................................................VII 1. NAME AND ADDRESS OF THE INDIVIDUAL/INSTITUTION PREPARING THE REPORT .................................................................................................................. 1 1.1 PROPONENT ...........................................................................................................1-1 1.2 SURVEY LICENSE .....................................................................................................1-1 1.3 RATIONALITY FOR CONDUCTING IEE ............................................................................. l-l 1.4 STRUCTURE OF THE REPORT .......................................................................................1-2 2. GENERAL INTRODUCTION OF THE PROJECT ................................................... 2-1 2.1 BACKGROUND ...................................................................................................................2-1 2.2 OBJECTIVES OF THE lEE SllJDY ...................................................................................2-1 2.3 PROJECT DESCRIPTION .............................................................................................2-2 2.4 PROJECT AREA DELINEATION ......................................................................................2-7 3. DATA REQUIREMENT AND STUDY METHODOLOGy .......................................... 3-1 3.1 DESK STUDY AND LITERATURE REVIEW ..........................................................................3-1 3.2 DATA REQUIREMENT COLLECTION METHODS AND ANALYSIS ...............................................3-1 3.3 IMPACT IDENTIFICATION AND PREDICTION .....................................................................3-8 3.4 PUBLIC NOTICE ........... ; ...........................................................................................3-9 3.5 TIME COST AND SPECIALIST ......................................................................................3-9 4. REVIEW OF RELEVANT POUCES, ACTS, RULES, GUIDEUNES &. CONVENTION •••••••••• II II II •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 4-1 4.1 GENERAL ...............................................................................................................4-1 4.2 NATIONAL PLAN, POLICIES ACTS RULES AND GUIDELINES .................................................. .4-1 4.3 WORLD BANK SAFEGUARD POLICIES ...........................................................................4-10 5. DESCRIPTION OF THE EXISTING ENVIRONMNET ............................................ 5-1 5.0 GENERAL ................................................................................................................5-1 5.1 PHYSICAL ENVIRONMENT ...........................................................................................5-1 5.2 BIOLOGICAL ENVIRONMENT ......................................................................................5-10 5.3 SOCIOECONOMIC AND CULTURAL ENVIRONMENT ............................................................ 5-23 Environment and Social Studies Department NEA Hetauda- Dhalkebar Duhabi 400 kV TIL Project Draft lEE Report 6. ENVIRONMENTAL IMPACTS .............................................................................. 6-1 6.1 BENEFICIAL IMPACTS ................................................................................................6-1 6.2 ADVERSE IMPACTS ...................................................................................................6-3 7. ALTERNATIVE ANALySIS ................................................................................... 7-1 7.1 GENERAL ...............................................................................................................7-1 7.2 ROUTE ALTERNATIVE ................................................................................................7-1 7.3 LOCATION ALTERNATIVE ...........................................................................................7-1 7.4 DESIGN ALTERNATIVE ...............................................................................................7-3 7.5 CONSTRUCTION METHOD ALTERNATIVE .........................................................................7-4 7.6 CONSTRUCTION MATERIALS .......................................................................................7-4 7.7 CONSTRUCTION SCHEDULE ........................................................................................7-5 7.8 OPERATION PROCEDURE ............................................................................................7-5 7.9 NO ACTION ALTERNATNES ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 7-6 8. MITIGAnON AND ENHANCEMENT MEASURES ................................................. 8-1 8.1 ENHANCEMENT MEASURESE AND SOCIAL SUPPORT PROGRAMME ••••••••••••••••••••••••••••••••••••••••• 8-1 8.2 MmGATION MEASURES .............................................................................................8-2 8.3 MmGATION AND ENHANCEMENT MEASURES COST ......................................................... 8-19 9. ENVIRONMENT MANAGEMENT PLAN ............................................................... 9-1 9.1 ENVIRONMENT MANAGEMENT .....................................................................................9-1 9.2 ENVIRONMENTAL MONITORING ...................................................................................9-6 9.3 IVlONITORING PARAMffiRS, SCHEDULE AND AGENCIES TO BE CONSULSTED ............................ 9-7 10. CONCLUSION ................................................................................................... 10-1 10.1 CONCLUSION ....................................................................................................... 10-1 Environment and Sodal Studies Department II NEA Hetauda- Dhalkebar Duhabi 400 kV TIL Project Draft lEE Report LIST OF ABBREVIATIONS AND ACRONYMS MPA Aquatic Animal Protection Act AIDS Acquired Immune Deficiency Syndrome B.s. Bikram Sam bat CBS Central Bureau of Statistics CBOs Community Based Organizations CITES Convention on International Trade in Endangered Species of Wild Flora and Fauna CFC Compensation Fixation Committee CFT Cubic feet DDC District Development Committee DoED Department of Electricity Development EIA Environmental Impact Assessment HS EMU Environnent and Social Management Unit EMU Environnent Monitoring Unit EPR Environnent Protection Rule GoN Government of Nepal Ha Hectare INPS Integrated Nepal Power System lEE Initial Environmental Examination IUCN The World Conservation Union Km Kilometer Kwh Kilowatt hour LP Gas Liquid Petroleum Gas m3 Cubic meter MOWR Ministry of Water Resources MoE Ministry of Energy Il.1oEn Ministry of Environment MW Mega Watt NGOs Non Governmental Organizations NEA Nepal Electricity Authority NWP National Water Plan PAF Project Affected Families TOR Terms of Reference STD Sexually Transmitted Disease USAID United States Agency for International Development VDC Village Development Committee Environment and Social Studies Department III NEA Hetauda- Dhalkebar Duhabi 400 kV TIL Project Draft lEE Report LIST OF TABLES Table- 2.1: Project features Table-3.1: Sample plots in different stage of transmission line Table 3.2: Details of Socioeconomic survey Table -5.1: List of critical angle points Table -5.2: Land use along the proposed alignment Table -5.3: Climatological data of the project affected area Table -5.4: Crossing of river road and other utilities Table -5.5: Forest status in the project district Table -5.6: Vegetation types in the RoW Table -5.7: Vegetation communities in the RoW Table -5.8: Distribution of existing vegetation type in different stretch of transmission line Table -5.9: SpeCies of conservation significance in the RoW Table -5.10: Plant species uses by the residents along the transmission line route Table- 5.11: Distribution of Household and Population of PAFs Table- 5.12: Distribution of Surveyed and Population by Board Age Groups Table- 5.13: Family Types of PAFS Table- 5.14: Castel Ethnicity Table- 5.15: Distribution of PAFs by Religion Table- 5.16: Distribution of PAFs by Language Table- 5.17: Literacy Status-6 Years above of the PAFs Table- 5.18: Educational Attainment among the Literate Population of the PAFs Table- 5.19: Occupation Composition of the PAFs (14 to 59 Years) of the Project Area Table- 5.20: Landholding of the
Recommended publications
  • Code Under Name Girls Boys Total Girls Boys Total 010290001
    P|D|LL|S G8 G10 Code Under Name Girls Boys Total Girls Boys Total 010290001 Maiwakhola Gaunpalika Patidanda Ma Vi 15 22 37 25 17 42 010360002 Meringden Gaunpalika Singha Devi Adharbhut Vidyalaya 8 2 10 0 0 0 010370001 Mikwakhola Gaunpalika Sanwa Ma V 27 26 53 50 19 69 010160009 Phaktanglung Rural Municipality Saraswati Chyaribook Ma V 28 10 38 33 22 55 010060001 Phungling Nagarpalika Siddhakali Ma V 11 14 25 23 8 31 010320004 Phungling Nagarpalika Bhanu Jana Ma V 88 77 165 120 130 250 010320012 Phungling Nagarpalika Birendra Ma V 19 18 37 18 30 48 010020003 Sidingba Gaunpalika Angepa Adharbhut Vidyalaya 5 6 11 0 0 0 030410009 Deumai Nagarpalika Janta Adharbhut Vidyalaya 19 13 32 0 0 0 030100003 Phakphokthum Gaunpalika Janaki Ma V 13 5 18 23 9 32 030230002 Phakphokthum Gaunpalika Singhadevi Adharbhut Vidyalaya 7 7 14 0 0 0 030230004 Phakphokthum Gaunpalika Jalpa Ma V 17 25 42 25 23 48 030330008 Phakphokthum Gaunpalika Khambang Ma V 5 4 9 1 2 3 030030001 Ilam Municipality Amar Secondary School 26 14 40 62 48 110 030030005 Ilam Municipality Barbote Basic School 9 9 18 0 0 0 030030011 Ilam Municipality Shree Saptamai Gurukul Sanskrit Vidyashram Secondary School 0 17 17 1 12 13 030130001 Ilam Municipality Purna Smarak Secondary School 16 15 31 22 20 42 030150001 Ilam Municipality Adarsha Secondary School 50 60 110 57 41 98 030460003 Ilam Municipality Bal Kanya Ma V 30 20 50 23 17 40 030460006 Ilam Municipality Maheshwor Adharbhut Vidyalaya 12 15 27 0 0 0 030070014 Mai Nagarpalika Kankai Ma V 50 44 94 99 67 166 030190004 Maijogmai Gaunpalika
    [Show full text]
  • Madan Bhandari Highway
    Report on Environmental, Social and Economic Impacts of Madan Bhandari Highway DECEMBER 17, 2019 NEFEJ Lalitpur Executive Summary The report of the eastern section of Madan Bhandari Highway was prepared on the basis of Hetauda-Sindhuli-Gaighat-Basaha-Chatara 371 km field study, discussion with the locals and the opinion of experts and reports. •During 2050's,Udaypur, Sindhuli and MakwanpurVillage Coordination Committee opened track and constructed 3 meters width road in their respective districts with an aim of linking inner Madhesh with their respective headquarters. In the background of the first Madhesh Movement, the road department started work on the concept of alternative roads. Initially, the double lane road was planned for an alternative highway of about 7 meters width. The construction of the four-lane highway under the plan of national pride began after the formation of a new government of the federal Nepal on the backdrop of the 2072 blockade and the Madhesh movement. The Construction of Highway was enunciated without the preparation of an Environmental Impact Assessment Report despite the fact that it required EIA before the implementation of the big physical plan of long-term importance. Only the paper works were done on the study and design of the alternative highway concept. The required reports and construction laws were abolished from the psychology that strong reporting like EIA could be a hindrance to the roads being constructed through sensitive terrain like Chure (Siwalik). • During the widening of the roads, 8 thousand 2 hundred and 55 different trees of community forest of Makwanpur, Sindhuli and Udaypur districtsare cut.
    [Show full text]
  • Anthropogenic Impacts on Koshi Tappu Wetland, a Ramsar Site Of
    Journal of Entomology and Zoology Studies 2019; 7(6): 655-662 E-ISSN: 2320-7078 P-ISSN: 2349-6800 Anthropogenic impacts on Koshi Tappu Wetland, JEZS 2019; 7(6): 655-662 © 2019 JEZS a Ramsar site of Nepal Received: 06-09-2019 Accepted: 10-10-2019 Ram Chandra Adhikari Ram Chandra Adhikari Lecturer, Department of Zoology, Tribhuvan University, Abstract Post Graduate Campus Biratnagar, Province 1, Nepal Koshi Tappu Wetland/Wildlife Reserve is the first Ramsar site and only the Wildlife Reserve of Nepal. This study of one year long was launched to find out major anthropogenic impacts to wetland/reserve. Field visit, direct observation, questionnaire and interview methods were applied. 60% houses' roof, 76% walls were made by Kans. 89% people belong to agriculture, 98% people of the settlements go to the wetland for some purposes - 90% for fire wood, 89% for grass and fodder, Niguro picking 43%, fishing 48.1%, Kans collection 97.83%, for farming 17%, Typha harvesting 55.83%, mud collection 62.67% and shoot collection 33.5%. Each household had kept 5.2 number of cows and 5.1 buffaloes 84% of which let free in the wetland. The main source of energy was firewood, 87%. For the livelihood 98% of local people depended on the wetland. Only 3.11% fisherman used hooks. The farmer used maximum amount of inorganic fertilizers and pesticides. 412 picnic groups /yr arrived. 89% of events of wildlife people conflict were from the side of human. 71% of the owners of domestic buffalo had purposed to the made cross with the wild water buffaloes to improve meat quality in the breed.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Of Hetauda-Dhalkebar-Duhabi 400 Kv TL
    Updated Resettlement Action Plan (RAP) of Hetauda-Dhalkebar-Duhabi 400 kV TL Submitted To: Nepal India Electricity Transmission and Trade Project Hetauda-Dhalkebar-Duhabi 400 kV Transmission Line Nepal Electricity Authority Kharipati, Bhaktapur Prepared And Submitted By: Environment and Social Studies Department Engineering Services Directorate Nepal Electricity Authority Kharipati, Bhaktapur May, 2017 Updated Resettlemention Action Plan i ABBREVIATIONS CBO Community Based Organization CDO Chief District Officer CDC Compensation Determination Committee CFUG Community Forest User Group DADO District Agriculture Development Office DDC District Development Committee DFO District Forest Office DHO District Health Office EIA Environmental Impact Assessment EMF Electromagnetic Fields ESMF Environmental and Social Management Framework ESSD Environment and Social Studies Department FGD Focus Group Discussion GON Government of Nepal HEP Hydro Electric Project HH Household HDD-ESMU Hetauda-Dhalkebar-Duhabi Environnent & Social Mgmt. Unit INPS Integrated Nepal Power System IPP Independent Power Producers IRPA International Radiation Protection Association KIIs Key Informant Interviews km Kilometer kV Kilovolt LCF Local Consultative Forum LDO Local Development Officer LARU Land Acquisition and Rehabilitation Unit NEA Nepal Electricity Authority NRs. Nepalese Rupees NGO Non Governmental Organization PAF Project Affected Family PAP Project Affected Person PCU Program Coordination Unit PRA Participatory Rapid Appraisal RAP Resettlement Action Plan ROW
    [Show full text]
  • Government of Nepal Ministry of Forests and Environment Nepal
    Government of Nepal Ministry of Forests and Environment Nepal Forests for Prosperity Project Environmental and Social Management Framework (ESMF) March 8, 2020 Executive Summary 1. This Environment and Social Management Framework (ESMF) has been prepared for the Forests for Prosperity (FFP) Project. The Project is implemented by the Ministry of Forest and Environment and funded by the World Bank as part of the Nepal’s Forest Investment Plan under the Forest Investment Program. The purpose of the Environmental and Social Management Framework is to provide guidance and procedures for screening and identification of expected environmental and social risks and impacts, developing management and monitoring plans to address the risks and to formulate institutional arrangements for managing these environmental and social risks under the project. 2. The Project Development Objective (PDO) is to improve sustainable forest management1; increase benefits from forests and contribute to net Greenhouse Gas Emission (GHG) reductions in selected municipalities in provinces 2 and 5 in Nepal. The short-to medium-term outcomes are expected to increase overall forest productivity and the forest sector’s contribution to Nepal’s economic growth and sustainable development including improved incomes and job creation in rural areas and lead to reduced Greenhouse Gas (GHG) emissions and increased climate resilience. This will directly benefit the communities, including women and disadvantaged groups participating in Community Based Forest Management (CBFM) as well and small and medium sized entrepreneurs (and their employees) involved in forest product harvesting, sale, transport and processing. Indirect benefits are improved forest cover, environmental services and carbon capture and storage 3. The FFP Project will increase the forest area under sustainable, community-based and productive forest management and under private smallholder plantations (mainly in the Terai), resulting in increased production of wood and non-wood forest products.
    [Show full text]
  • Resettlement Action Plan (RAP) of Hetauda-Dhalkebar-Duhabi 400 Kv and Dhalkebar-Bhittamod 400 Kv TL Project
    Resettlement Action Plan (RAP) of Hetauda-Dhalkebar-Duhabi 400 Public Disclosure Authorized kV And Dhalkebar-Bhittamod 400 kV TL Project (Angle Tower, Sub-stations and Structures) Public Disclosure Authorized Prepared And Submitted By: Public Disclosure Authorized Environment And Social Studies Department Engineering Services Nepal Electricity Authority Kharipati, Bhaktapur February, 2011 Public Disclosure Authorized Resettlemention Action Plan ABBREVIATIONS CBO Community Based Organization CDO Chief District Officer CDC Compensation Determination Committee CFUG Community Forest User Group DADO District Agriculture Development Office DDC District Development Committee DFO District Forest Office DHO District Health Office EIA Environmental Impact Assessment EMF Electromagnetic Fields ESMF Environmental and Social Management Framework ESSD Environment and Social Studies Department FGD Focus Group Discussion GON Government of Nepal HEP Hydro Electric Project HH Household HDD~ESMU Hetauda-D.halkebar-Duhabi Environnent & Social Mgmt. Unit INPS Integrated Nepal Power System IPP Independent Power Producers IRPA International Radiation Protection Association KlIs Key Informant Interviews km Kilometer kV Kilovolt LCF Local Consultative Forum LDO Local Development Officer LARU Land Acquisition and Rehabilitation Unit NEA Nepal Electricity Authority NRs. Nepalese Rupees NGO Non Governmental Organization PAF Project Affected Family PAP Project Affected Person PCU Program Coordination Unit PRA Participatory Rapid Appraisal RAP Resettlement Action
    [Show full text]
  • ZSL National Red List of Nepal's Birds Volume 5
    The Status of Nepal's Birds: The National Red List Series Volume 5 Published by: The Zoological Society of London, Regent’s Park, London, NW1 4RY, UK Copyright: ©Zoological Society of London and Contributors 2016. All Rights reserved. The use and reproduction of any part of this publication is welcomed for non-commercial purposes only, provided that the source is acknowledged. ISBN: 978-0-900881-75-6 Citation: Inskipp C., Baral H. S., Phuyal S., Bhatt T. R., Khatiwada M., Inskipp, T, Khatiwada A., Gurung S., Singh P. B., Murray L., Poudyal L. and Amin R. (2016) The status of Nepal's Birds: The national red list series. Zoological Society of London, UK. Keywords: Nepal, biodiversity, threatened species, conservation, birds, Red List. Front Cover Back Cover Otus bakkamoena Aceros nipalensis A pair of Collared Scops Owls; owls are A pair of Rufous-necked Hornbills; species highly threatened especially by persecution Hodgson first described for science Raj Man Singh / Brian Hodgson and sadly now extinct in Nepal. Raj Man Singh / Brian Hodgson The designation of geographical entities in this book, and the presentation of the material, do not imply the expression of any opinion whatsoever on the part of participating organizations concerning the legal status of any country, territory, or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. The views expressed in this publication do not necessarily reflect those of any participating organizations. Notes on front and back cover design: The watercolours reproduced on the covers and within this book are taken from the notebooks of Brian Houghton Hodgson (1800-1894).
    [Show full text]
  • Environmental Assessment Document Initial Environmental Examination
    Environmental Assessment Document Initial Environmental Examination Loan Number: 2102 NEP August 2009 Nepal: Community-Managed Irrigated Agricultural Sector Project Mainawati Irrigation Sub-Project, Siraha Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Appendix J : Initial Environmental Examination (IEE) INITIAL ENVIRONMENTAL EXAMINATION MAINAWATI IRRIGATION SUB-PROJECT, SIRAHA DISTRICT I. EXECUTIVE SUMMARY 1. This initial environmental examination (IEE) was undertaken for the Mainawati Irrigation Subproject under Community Managed Irrigated Agriculture Sector Project under ADB Loan 2102 NEP to meet the Asian Development Bank’s (ADB) requirements for environmental assessment process and documentation prior to Subproject approval, following the procedures in ADB’s Environmental Assessment Guidelines (2003), and the Project’s Environmental Assessment and Review Procedures. 2. The subproject does not pass through any environmentally sensitive ecological area. It is the rehabilitation of the existing irrigation scheme where the system is already in operation since many years. Apart from some construction related impacts, the subproject will have minimal impact on the environment. Hence the subproject has been categorized under Category B as per the Environment Assessment Policy, 2002. 3. This Initial Environmental Examination (IEE) was based on data collected during the Joint Walkthrough Survey. The objective of the IEE is to analyze the adverse environmental impacts arising from site selection, design, construction and operation of the subproject. The mitigation of any such effect to acceptable levels was sought through implementation of a set of clearly defined and costed mitigation measures which have been included in the cost estimates.
    [Show full text]
  • Discovering Through Livelihood
    NORWEGIAN MINISTRY OF FOREIGN AFFFAIRS Empowered lives. Resilient nations. PeaceDiscovering through Livelihood Human Stories from the Field NORRWEGIAN MINISTRRY OF FOREIGN AFFFAIRS Empowered lives. Resilient nations. Human Stories from the Field Discovering Peace through Livelihood November 2011 Empowered lives. Resilient nations. UNDP is the UN’s global development network, advocating for change and connecting countries to knowledge, experience and resources to help people build a better life. Copyright © UNDP 2011 All rights reserved United Nations Development Programme UN House, Pulchowk, G.P.O. Box: 107 Kathmandu Nepal Tel: + (977 - 1) 5523200 Fax: + (977 - 1) 5523991, 5523986 www.undp.org.np Design: Flying Colors Advertising Pvt. Ltd. Bhotahity, Kathmandu Tel.: +977 1 4219537 E-mail: [email protected] Printing: Pioneer Concept & Printers Tripureshowr, Kathmandu Tel.: +977 1 4263742 E-mail: [email protected] NORRWEGIAN MINISTRRY OF FOREIGN AFFFAIRS Empowered lives. Resilient nations. PeaceDiscovering through Livelihood Human Stories from the Field v Foreword vi Acknowledgements viii Acronyms xi Introduction 1 From Nobody to Somebody 7 Empowering Communities 12 Little Smiles that Tell a Story 15 When Small Means Big for Jipsi 18 Fat Cash Income for Displaced Family 20 Joy of Bina and Bishnu 22 Nasira’s Coins and Confidence 24 Income through Delicacy 26 Way to Say No to Foreign Employment 28 Lighting Homes And Hopes 30 Empowerment through Information 32 Judging Social Changes 34 Good Water for Good Life 37 Innovative Ideas for Peace 40 Declaration of Free Zone on UN Day 42 Message Behind a Cup of Tea 44 Tribute to my Brother 46 Changing the Past 50 Building Synergies for Peace 53 Delight of Representation 56 Transformations of Doms 59 From Catching Mice to Making Money 62 Courage Not Seen Before 64 Song for Social Change DISCOVERING PEACE THROUGH LIVELIHOOD iv Foreword Recovery from conflict is essential to sustain peace in a country like Nepal that is passing through a historical transition.
    [Show full text]
  • TSLC PMT Result
    Page 62 of 132 Rank Token No SLC/SEE Reg No Name District Palika WardNo Father Mother Village PMTScore Gender TSLC 1 42060 7574O15075 SOBHA BOHARA BOHARA Darchula Rithachaupata 3 HARI SINGH BOHARA BIMA BOHARA AMKUR 890.1 Female 2 39231 7569013048 Sanju Singh Bajura Gotree 9 Gyanendra Singh Jansara Singh Manikanda 902.7 Male 3 40574 7559004049 LOGAJAN BHANDARI Humla ShreeNagar 1 Hari Bhandari Amani Bhandari Bhandari gau 907 Male 4 40374 6560016016 DHANRAJ TAMATA Mugu Dhainakot 8 Bali Tamata Puni kala Tamata Dalitbada 908.2 Male 5 36515 7569004014 BHUVAN BAHADUR BK Bajura Martadi 3 Karna bahadur bk Dhauli lawar Chaurata 908.5 Male 6 43877 6960005019 NANDA SINGH B K Mugu Kotdanda 9 Jaya bahadur tiruwa Muga tiruwa Luee kotdanda mugu 910.4 Male 7 40945 7535076072 Saroj raut kurmi Rautahat GarudaBairiya 7 biswanath raut pramila devi pipariya dostiya 911.3 Male 8 42712 7569023079 NISHA BUDHa Bajura Sappata 6 GAN BAHADUR BUDHA AABHARI BUDHA CHUDARI 911.4 Female 9 35970 7260012119 RAMU TAMATATA Mugu Seri 5 Padam Bahadur Tamata Manamata Tamata Bamkanda 912.6 Female 10 36673 7375025003 Akbar Od Baitadi Pancheswor 3 Ganesh ram od Kalawati od Kalauti 915.4 Male 11 40529 7335011133 PRAMOD KUMAR PANDIT Rautahat Dharhari 5 MISHRI PANDIT URMILA DEVI 915.8 Male 12 42683 7525055002 BIMALA RAI Nuwakot Madanpur 4 Man Bahadur Rai Gauri Maya Rai Ghodghad 915.9 Female 13 42758 7525055016 SABIN AALE MAGAR Nuwakot Madanpur 4 Raj Kumar Aale Magqar Devi Aale Magar Ghodghad 915.9 Male 14 42459 7217094014 SOBHA DHAKAL Dolakha GhangSukathokar 2 Bishnu Prasad Dhakal
    [Show full text]
  • 33209-013: Community-Managed Irrigated Agriculture Sector Project
    Environmental Assessment Document Initial Environmental Examination Loan Number: 2102 NEP August 2009 Nepal: Community-Managed Irrigated Agricultural Sector Project Parwanipur Kalinjor Irrigation Sub-Project, Sarlahi Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Appendix J : Initial Environmental Examination INITIAL ENVIRONMENTAL EXAMINATION PARWANIPUR KALINJOR IRRIGATION SUB-PROJECT, SARLAHI DISTRICT. I. EXECUTIVE SUMMARY 1. This initial environmental examination (IEE) was undertaken for the Parwanipur Kalinjor Irrigation Subproject under Community Managed Irrigated Agriculture Sector Project under ADB Loan 2102 NEP to meet the Asian Development Bank’s (ADB) requirements for environmental assessment process and documentation prior to Subproject approval, following the procedures in ADB’s Environmental Assessment Guidelines (2003), and the Project’s Environmental Assessment and Review Procedures. 2. The subproject does not pass through any environmentally sensitive ecological area. It is the rehabilitation of the existing irrigation scheme where the system is already in operation since many years. Apart from some construction related impacts, the subproject will have minimal impact on the environment. Hence the subproject has been categorized under Category B as per the Environment Assessment Policy, 2002. 3. This Initial Environmental Examination (IEE) was based on data collected during the Joint Walkthrough Survey. The objective of the IEE is to analyze the adverse environmental impacts arising from site selection, design, construction and operation of the subproject. The mitigation of any such effect to acceptable levels was sought through implementation of a set of clearly defined and costed mitigation measures which have been included in the cost estimates.