UNHCR Emergency Response 28 November 2016

Planning Figures: Camp/Site Plots Tents Shelter Kits NFI Kits Winter Kits Heaters Camps & Shelter Shelter Alternatives For Tents - Alternatives Cluster planning for Cluster planning for 74,400 90,000 90,000 140,000 winter is separate winter is separate Cluster Capacity 1.2 - 1.5 million 20,000 people impacted UNHCR Contribution 50,000 50,000 50,000 50,000 95,000 up to 1 million Occupied Distributed 2,897 250 2,863 900 displaced 3,043 9,828 4,595 4,585 5,735 18,559 UNHCR Response Available 87% In stock 14,920 700,000 in need 11,736 25,000 & Gaps: Undeveloped Pipeline 7,860 4,502 30,782 34,830 15,172 41,402 75,541 73,566 displaced Gap 10,133 Under procurement since 17 October Also, 7,500 tents are pre-positioned Identified Constructed in , Salah Al-Din and Anbar.

Chamishku Berseve 1 Planned Capacity (plots) TURKEY Khabat Berseve 2 2.800 Dawadia Plots in UNHCR Constructed Camps 2,000 Zakho 1,000 Rwanga 500 Amedi 200 Community Dahuk Office 0 Bajet Soran Occupied Plots Available Plots Undeveloped Plots Kandala Mergasur Barzan Ü DAHUK Dahuk B Amalla 3,032 SYRIAN ARAB Al Walid REPUBLIC Sumel Mahmudia Dahuk B Qaymawa (Zelikan) 1,017 12 Shariya Kabarto 1 Khanke Shikhan Kabarto 2 Rabiah Domiz 1 Essian Erbil Office Domiz 2 ISLAMIC Amalla Mamilian Janbur Sheikhan Choman Mamrashan Soran Choman REPUBLIC Garmawa B Debaga 3 3,000 B Zumar Qaymawa (Zelikan) Akre OF IRAN Nargizlia(x2) B B Chamakor (Tel Aswad) 2,400 Telafar Tilkaif Piran (Nargizlia 3) B Basirma Aski Mosul Bardarash Darashakran B Hasansham U3 1,936 Ba'Shiqa Hasansham U3 Shaqlawa B Hasansham U2 1,560 Hasansham K Kawergosk Al Hol Talafar Gawilan Rania camp B Baharka Total 16,957 plots Khazer(x3)BB Pshdar Mosul Kalak Kirkuk Office Sinjar Qarah Qosh Hasansham U2 Rania Sinjar BB Khabat Harshm Capacity 101,742 IDPs St. Elijah Church Ankawa 2 B Hamdaniya Chamakor (Tel Aswad)Erbil 1,600 As Salamiyah Wardak Mosul Sananik B B Al Bweyer Erbil Laylan 2 1,000 B Gwer ERBIL Koisnjaq Qushtapa Baghdad Office 10,000 1 Family per plot and Ba'Aj 5,000 Shura Dokan 3,000 6 Individuals per family Debaga 3 2,000 B Olympic Stadium 900 1,000 NINEWA 400 Debaga Debaga (Extension)BB Debaga 2 Surdash Qayyarah-Jad’ah B B Al-Alam 42 458 Qayyarah AirstripB Haj Ali B Hasiyah Al Qaiyara Wadi Murr Makhmur Dawajin B Another 2,994 plots are also available in Qoratu (UNHCR)(647 plots), Alwand2 (UNHCR)(101 plots), B Dibs Ijhala Dabes Surdash (MoDM)(400 plots), Tazade (MoDM)( 396 plots), Alwand1 (MoDM)(750 plots) and Debaga Bazyan Chamchamal1 Extension (Emirates Red Crescent)(700 plots) IDP camps. Ba'aj BChamchamal SULAYMANIYAH UNHCR Camps/Plots Construction Khazir Shirqat Bustan Al Sheuokh Sulaymaniya Arbat B Kirkuk Ashti Barzan Kirkuk Nazrawa Arbat Completed (6)(9,097 plots) Camp B Tulul Baq UNHCR Protection Monitoring for Mosul Response Yahyawa Shirqat Laylan Hawiga KIRKUK Bawa (Baidawa) B Under construction (3)(4,860 plots) Daquq Chamchamal 3,848 HHs Assessed Hawiga Darbandihkan HHs missing documents B Laylan 2 52% B Planned (1)(3,000 plots) B 21,002 Individuals

B Existing camp with spare capacity Kalar HHs with unaccompanied B Emergency site or camp by partners 5,838 5,995 4,735 4,434 2% Al Alam or separated children B Tooz Al Alam/Rubeida B Tazade Camps and emergency sites include locations SALAH Al Sh'hamah B SABKHAT B ALBU AL-DIN Olympic Stadium withinGHARZ the broader Mosul corridor: 294,737 IDPs Kelar Ru'ua Qoratu from Erbil, Ninewa, Salah al-Din and Kirkuk Gover- Tekrit B norates due to hostilities since April 2016. UNHCR Funding Requirements ANBAR IDP Camp Ka'im DIYALA Alwand1 USD 196.2 million required Al-ObRefugeeaidi Camp Alyawa UNK Camp Daur BB Main Road Al-Wand 2 57% Samaraa' Road Samarra Cent. USD 111.9 million committed Heet Al-Hwesh Al Adheam City Ana Khalis Committed Thethar Mansouriya Town Balad 20km Muqdadiya Baladrooz The plan includes a small return component of 10,000 IDP families. The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations. Sources: Registration Unit, UNOCHA, CCCM Cluster, Shelter/NFI CLuster, IOM DTM. Geographic Coordinate System: GCS_WGS