Shelter NFI Cluster ShelterSouthSudan.org Shelter & NFI Operational Timeline Coordinating Humanitarian Shelter 1 - 31 May 2020

Concern ADA Need Analysis Operational Map IOM S/NFI Analysis Shelter Reinforcement Response Shelter Construction NFI Response Static Team Mobile Team Evaluation Mobile Team IOM CWW Shelter Construction Cash Response DRC Mobile Team Static Team Need Analysis NFI Response Static Team SSUDA NFI Response Static Team WVI, AMA NFI Response ADA, TADO,CAO IOM Melut Shelter Response Static Team PDM Static team Upper Static Team Nile Abyei Town Bentiu PoC TADO,RAO, Oxfam, PAH NFI Response Abuthok Malakal PoC PDM WVI, ACKAP Static & Mobile Team NFI Response Bentiu Town Static Team Mankien Warrap Longuchuk Northern NRC WVI, NH Western LAWANCI, DRDP S/NFI Response Barh el Ghazal Need Analysis Maker Need Analysis Static Team Barh el Ghazal Static Team Unity NFI Response Pultruk, Chuil Ulang Jikmir Thaker, Adok, Mobile Team Pading ADRA, UNHCR NFI Response LAWANCI, DRDP Thonyor TADO Need Analysis LWF PDM Static Team Static Team CVA IOM Static Team PAH, ADA Static Team CIDO Construction of Case Management Tonj Need Analysis NFI Response Static team Wau PoC East Static Team Wechjol PDM Muktaah PHCC Ganyiel Static Team HRSS, UNHCR ADA, PAH, HDC HDC Duk NFI Response Wau South Mapel Tonj NFI Response PDM Masna Jonglei Otalla Mobile Team UNHCR, WDG South Static Team LWF CVA for returnees LWF CVA Arkilla Static team SSGID CVA Static Team Medair IOM Need Analysis Static Team Twic East HDC NFI Response Shelter Response Static Team PDM Mobile Team Static team IOM HDC, ACTED Anyidi Static team Medair NFI Response Lakes Need Analysis Jalle CIDO, PAH Static team S/NFI Analysis Static team Pariak Manyabol PDM Mobile team Bor PoC Lekuangole Static team PAH, ADA PDM YEDA Static team S/NFI Analysis Tali Medair, HDC Western YEDA, ERADA, NP NFI response NRC Static team NFI Response S/NFI Analysis Terekeka MSNA Equatoria Static team Mobile team PDM Mobile team HDC S/NFI Analysis Legend Maridi Shelter response Eastern Equatoria Mahad Juba PoC Static team Organization Central HDC Nyori Shelter response Activity Static team IOM Tore Equatoria Response Mechanism S/NFI Analysis Mobile team CWW NFI Response Yei Town Ongoing Static team Magwi Kajo-keji Completed CIDO CWW,Titi DRC Need Analysis Shelter Response Distribution Static Team Static Team Planned Static team SPEDP IRNA NRC Shelter Response Pending/on hold MSNA Static Team Mobile team

Operational Timeline PDM to be conducted in Pariak, Bor South Need analysis completed PDM to be conducted in in Terekeka County Anyidi, Bor South PDM to be conducted in NFI response to be conducted Manyibol, Pibor County in Chuil, IRNA completed in Liwolo, Shelter response to be conducted IOM OIM IOM OIM Kajo-Keji County in Juba PoC 1&3 and Mahad Shelter construction completed Shelter construction in Abyei Town is ongoing in Abuthok Ongoing shelter response in Yei Town

February 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

IOM OIM Need analysis completed in Shelter construction completed Ongoing need analysis in IOM OIM Need analysis to be UN House PoC 1&3 in Muktaah PHCC, Wau Bor PoC Shelter response to be PDM to be conducted in PDM to be conducted in Jalle conducted in Tonj South conducted in Hai Masna Likuangole, Pibor County and Baidit, Bor South County

Ongoing need analysis in Malakal PoC NFI response completed Ongoing PDM in Ulang and PDM to be conducted in in Otalla, Pochalla County Luakpiny/Nasir Counties Mangkien, Mayom County Need analysis to be conducted in Waat, Nyirol CVA programming to be conducted in Twic East and Bor South Ongoing shelter response Completed Ongoing Planned in Bentiu PoC PDM to be conducted in Wechjol,

For more information please contact : [email protected]