Cable Propelled Transport E-Mobility above our heads
Doppelmayr Urban Solutions | [email protected] | Slide 1 Source and Photo: Doppelmayr Doppelmayr Urban Solutions | [email protected] | Slide 2
14.500 88 35 installations export countries have a worldwide countries subsidiary / representation 1892 2.378 795 a family-owned employees million euro company worldwide turnover
*by 2013
Doppelmayr Urban Solutions | [email protected] | Slide 3
Competition about the rights to use ground level
wikimedia
Doppelmayr Urban Solutions | [email protected] | Slide 4
Solution for smart city concepts
Why not using the third level up in the air? no emissions, no noise, no traffic jams, no accidents, timesaving, low footprint, fast realization from planning to completion
Ground level roads, rails, busses, etc…
Underground level MRT, subway
Doppelmayr Urban Solutions | [email protected] | Slide 5
The desire to use the third dimension The future as we imagined it in the past: Urban transport by flying saucers and other vehicles in the air
tumblr.com
Klaus Bürgle retrofuturism.com
Doppelmayr Urban Solutions | [email protected] | Slide 6
What is an Urban Cable Car?
Doppelmayr Urban Solutions | [email protected] | Slide 7
What is an Urban Cable Car?
Doppelmayr Urban Solutions | [email protected] | Slide 8
Ropeway systems - Monocable gondola detachable
MGD small cabins detachable cabins high frequency system capacity up to 3600 pphpd
Source and Photo : Doppelmayr 1 rope
circulating continuously detachable grip
up to 15 passengers
max. 22 km/h
Doppelmayr Urban Solutions | [email protected] | Slide 9
Ropeway systems - Aerial tramway
ATW large cabins large spans between towers wind stability up to 100 kph system capacity up to 2000 pphpd
Source: Flickr . Phot o : C.M . Keiner 1 haul rope 2 track ropes shuttling back and forth fixed grip
up to 200 passengers
max. 45 km/h
Doppelmayr Urban Solutions | [email protected] | Slide 10
Aerial tramway
Doppelmayr Urban Solutions | [email protected] | Slide 11
Ropeway systems - Tricable gondola detachable
TGD detachable cabins high frequency and large cabins system capacity up to 6000 pphpd large spans between towers wind stability up to 100 kph
Source: Flickr . Phot o : C.M . Keiner 1 haul rope 2 track ropes circulating continuously 2 detachable grips
up to 38 passengers
max. 31km/h
Doppelmayr Urban Solutions | [email protected] | Slide 12
Tricable Gondola Detachable (TGD)
Doppelmayr Urban Solutions | [email protected] | Slide 13
This is what it takes to move 10.000 people in one hour…
Doppelmayr Urban Solutions | [email protected] | Slide 14
Independent transport level
Doppelmayr Urban Solutions | [email protected] | Slide 15
Applications for Cable Transit
Metro
Bus
Doppelmayr Urban Solutions | [email protected] | Slide 16
Station concept: minimal footprint in the city
Ropeway
Building
Ropeway elevator ropeway
Public area
This solution reduces the footprint of the ropeway in urban areas. escalator
Doppelmayr Urban Solutions | [email protected] | Slide 17
Station concept : easy connection to a train station Assumption Ropeway Ropeway 7,80m clearance Building
Public area elevator ropeway
escalator
Doppelmayr Urban Solutions | [email protected] | Slide 18
Where are Urban Cable Cars?
78-ATW Marquam Hill, USA 35-TGD Seilbahn Koblenz, DEU 8-MGD Mariche – Tramo Expreso, VEN 20-ATW Bozen Kohlern, ITA 8-MGD Jewel Cable Car Ride, SGP 8-MGD Rio Chama, VEN 15-MGD Constantine, DZA 8-MGD Mileniumski Krst, MKD 8-MGD Batumi Transit, GEO 15-MGD Tlemcen, DZA 8-MGD Teleférico de Gaia, PRT 10 MGD La Paz BOL 15-MGD Skikda, DZA 10-MGD Emirates Air Line, GBR 8-MGD San Agustin, VEN 10-MGD Providencia, BRA
Doppelmayr Urban Solutions | [email protected] | Slide 19
Communication and safety features
Doppelmayr Urban Solutions | [email protected] | Slide 20
Interior concepts
Doppelmayr Urban Solutions | [email protected] | Slide 21
Interior concepts
entspricht entspricht 408.000lDiesel
Steven Dale
Doppelmayr Urban Solutions | [email protected] | Slide 22
Interior concepts
entspricht entspricht 408.000lDiesel
Zooey Braun
Doppelmayr Urban Solutions | [email protected] | Slide 23
Accessibility for everyone: full DDA compliance
entspricht entspricht 408.000lDiesel
Doppelmayr Urban Solutions | [email protected] | Slide 24
15-ATW Polinka Wrocław PL
Doppelmayr Urban Solutions | [email protected] | Slide 25
15-ATW Polinka Wrocław PL
Length 371 m Vertical Rise 1 m Speed 5,0 m/s Capacity 366 pphpd Travel Time 2 min
Doppelmayr Urban Solutions | [email protected] | Slide 26
15-ATW Polinka Wrocław PL
Doppelmayr Urban Solutions | [email protected] | Slide 27
Portland: seamless integration
Doppelmayr Urban Solutions | [email protected] Source| Slide: Flickr .28 Phot o : Sekkle
Portland: seamless integration
Source: Flickr . Phot o : cleverdame107
Doppelmayr Urban Solutions | [email protected] | Slide 29
35-TGD Seilbahn Koblenz DE
Doppelmayr Urban Solutions | [email protected] | Slide 30
35-TGD Seilbahn Koblenz DE
Length 948 m Vertical Rise 114 m Speed 4,5 m/s Capacity 3600 pphpd Travel Time 5 min
Source and Photo : Dopp e lm ay r
Source and Photo : Dopp e lm ay r Source and Photo : Dopp e lm ay r
Doppelmayr Urban Solutions | [email protected] | Slide 31
35-TGD Seilbahn Koblenz DE
Bus
Cable Car
5 min 25 min
Doppelmayr Urban Solutions | [email protected] | Slide 32
London: a cable car for the city growth
Doppelmayr Urban Solutions | [email protected] | Slide and Photo 33: Dopp e lm ay r
London: a cable car integrated in TFL´s network
Doppelmayr Urban Solutions | [email protected] | Slide 34
Doppelmayr Urban Solutions | [email protected] | Slide 35
Doppelmayr Urban Solutions | [email protected] | Slide 36
La Paz: the largest cable car network
Doppelmayr Urban Solutions | [email protected] | Slide and Photo 37: Dopp e lm ay r
La Paz: The world’s largest cable car network
Three lines directly built within the city able to overcome terrain challenges
Doppelmayr Urban Solutions | [email protected] | Slide 38
La Paz: The world’s largest cable car network
Stations Cabins Length [m]
Red line 3 109 2348
Yellow line 4 169 3736
Green line 4 165 3704
443 9788
Doppelmayr Urban Solutions | [email protected] | Slide 39
La Paz: intermodal transport hubs
Doppelmayr Urban Solutions | [email protected] | Slide 40
La Paz: The world’s largest cable car network
Contract: 10 Sep 2012 Less than 2 years of construction time 1 million passengers, each month, each line December 18th, 10 Million Passengers
Doppelmayr Urban Solutions | [email protected] | Slide 41
Caracas: catalyst for development
Doppelmayr Urban Solutions | [email protected] | Slide 42
Caracas: catalyst for development
Doppelmayr Urban Solutions | [email protected] | Slide 43
Caracas: catalyst for development
initial proposalstatus to improve quo access
Doppelmayr Urban Solutions | [email protected] | Slide 44
Caracas: catalyst for development
Doppelmayr Urban Solutions | [email protected] | Slide 45
8-MGD Singapore
Doppelmayr Urban Solutions | [email protected] | Slide 46 Source: Flickr . Phot o : Carl James
8-MGD Singapore
An intermediate station integrated in a shopping centre
Source and Photo : Dopp e lm ay r
Length 1800m Vertical Rise 2 m Speed 5,0 m/s Capacity 2800 pphpd Travel Time 10 min
Source and Photo : Dopp e lm ay r
Doppelmayr Urban Solutions | [email protected] | Slide 47
The future of urban mobility is above our heads! The future of urban mobility is above our heads!
Doppelmayr Urban Solutions | [email protected] | Slide and Photo 48: Dopp e lm ay r
Operations Services throughout the lifecycle
1 2 3 4 5 6 Tender Design Manufacture Construction Commission Public Operation
Transition of Experience
Operations Readiness/ Mobilisation Operations Services Operations Services Contract Concept
Set-up Training Consulting Training Audits Consulting Organisation
Doppelmayr Urban Solutions | [email protected] | Slide 49
London
Doppelmayr Urban Solutions | [email protected] | Slide 50
10 steps to an urban cable propelled transit system (CPT) Develop a vision Identify stakeholders Partnership between stakeholders (LOI) Archive political commitment Identify and reserve the sites for stations, towers and line Contract relevant stakeholders Marketing and PR to create positive public perception Detail planning and designing the ropeway Building permit, operational permit Construction phase and Opening
Doppelmayr Urban Solutions | [email protected] | Slide 51
The stations
grip opening decelerator curve incoming area line conveyor
carrier outgoing area grip closing accelerator spacing line
Doppelmayr Urban Solutions | [email protected] | Slide 52
Urban station: Technical parts not visible to passengers
Doppelmayr Urban Solutions | [email protected] | Slide 53