Cable Propelled E-Mobility above our heads

Doppelmayr Urban Solutions | [email protected] | Slide 1 Source and Photo: Doppelmayr Doppelmayr Urban Solutions | [email protected] | Slide 2

14.500 88 35 installations export countries have a worldwide countries subsidiary / representation 1892 2.378 795 a family-owned employees million euro company worldwide turnover

*by 2013

Doppelmayr Urban Solutions | [email protected] | Slide 3

Competition about the rights to use ground level

wikimedia

Doppelmayr Urban Solutions | [email protected] | Slide 4

Solution for smart city concepts

Why not using the third level up in the air? no emissions, no noise, no traffic jams, no accidents, timesaving, low footprint, fast realization from planning to completion

Ground level roads, rails, busses, etc…

Underground level MRT, subway

Doppelmayr Urban Solutions | [email protected] | Slide 5

The desire to use the third dimension The future as we imagined it in the past: Urban transport by flying saucers and other vehicles in the air

tumblr.com

Klaus Bürgle retrofuturism.com

Doppelmayr Urban Solutions | [email protected] | Slide 6

What is an Urban ?

Doppelmayr Urban Solutions | [email protected] | Slide 7

What is an Urban Cable Car?

Doppelmayr Urban Solutions | [email protected] | Slide 8

Ropeway systems - Monocable detachable

MGD small cabins detachable cabins high frequency system capacity up to 3600 pphpd

Source and Photo : Doppelmayr 1 rope

circulating continuously detachable grip

up to 15 passengers

max. 22 km/h

Doppelmayr Urban Solutions | [email protected] | Slide 9

Ropeway systems - Aerial tramway

ATW large cabins large spans between towers wind stability up to 100 kph system capacity up to 2000 pphpd

Source: Flickr . Phot o : C.M . Keiner 1 haul rope 2 track ropes shuttling back and forth fixed grip

up to 200 passengers

max. 45 km/h

Doppelmayr Urban Solutions | [email protected] | Slide 10

Aerial tramway

Doppelmayr Urban Solutions | [email protected] | Slide 11

Ropeway systems - Tricable gondola detachable

TGD detachable cabins high frequency and large cabins system capacity up to 6000 pphpd large spans between towers wind stability up to 100 kph

Source: Flickr . Phot o : C.M . Keiner 1 haul rope 2 track ropes circulating continuously 2 detachable grips

up to 38 passengers

max. 31km/h

Doppelmayr Urban Solutions | [email protected] | Slide 12

Tricable Gondola Detachable (TGD)

Doppelmayr Urban Solutions | [email protected] | Slide 13

This is what it takes to move 10.000 people in one hour…

Doppelmayr Urban Solutions | [email protected] | Slide 14

Independent transport level

Doppelmayr Urban Solutions | [email protected] | Slide 15

Applications for Cable Transit

Metro

Bus

Doppelmayr Urban Solutions | [email protected] | Slide 16

Station concept: minimal footprint in the city

Ropeway

Building

Ropeway ropeway

Public area

This solution reduces the footprint of the ropeway in urban areas.

Doppelmayr Urban Solutions | [email protected] | Slide 17

Station concept : easy connection to a Assumption Ropeway Ropeway 7,80m clearance

Public area elevator ropeway

escalator

Doppelmayr Urban Solutions | [email protected] | Slide 18

Where are Urban Cable Cars?

78-ATW Marquam Hill, USA 35-TGD Seilbahn Koblenz, DEU 8-MGD Mariche – Tramo Expreso, VEN 20-ATW Bozen Kohlern, ITA 8-MGD Jewel Cable Car Ride, SGP 8-MGD Rio Chama, VEN 15-MGD Constantine, DZA 8-MGD Mileniumski Krst, MKD 8-MGD Batumi Transit, GEO 15-MGD Tlemcen, DZA 8-MGD Teleférico de Gaia, PRT 10 MGD La Paz BOL 15-MGD Skikda, DZA 10-MGD Emirates Air Line, GBR 8-MGD San Agustin, VEN 10-MGD Providencia, BRA

Doppelmayr Urban Solutions | [email protected] | Slide 19

Communication and safety features

Doppelmayr Urban Solutions | [email protected] | Slide 20

Interior concepts

Doppelmayr Urban Solutions | [email protected] | Slide 21

Interior concepts

entspricht entspricht 408.000lDiesel

Steven Dale

Doppelmayr Urban Solutions | [email protected] | Slide 22

Interior concepts

entspricht entspricht 408.000lDiesel

Zooey Braun

Doppelmayr Urban Solutions | [email protected] | Slide 23

Accessibility for everyone: full DDA compliance

entspricht entspricht 408.000lDiesel

Doppelmayr Urban Solutions | [email protected] | Slide 24

15-ATW Polinka Wrocław PL

Doppelmayr Urban Solutions | [email protected] | Slide 25

15-ATW Polinka Wrocław PL

Length 371 m Vertical Rise 1 m Speed 5,0 m/s Capacity 366 pphpd Time 2 min

Doppelmayr Urban Solutions | [email protected] | Slide 26

15-ATW Polinka Wrocław PL

Doppelmayr Urban Solutions | [email protected] | Slide 27

Portland: seamless integration

Doppelmayr Urban Solutions | [email protected] Source| Slide: Flickr .28 Phot o : Sekkle

Portland: seamless integration

Source: Flickr . Phot o : cleverdame107

Doppelmayr Urban Solutions | [email protected] | Slide 29

35-TGD Seilbahn Koblenz DE

Doppelmayr Urban Solutions | [email protected] | Slide 30

35-TGD Seilbahn Koblenz DE

Length 948 m Vertical Rise 114 m Speed 4,5 m/s Capacity 3600 pphpd Travel Time 5 min

Source and Photo : Dopp e lm ay r

Source and Photo : Dopp e lm ay r Source and Photo : Dopp e lm ay r

Doppelmayr Urban Solutions | [email protected] | Slide 31

35-TGD Seilbahn Koblenz DE

Bus

Cable Car

5 min 25 min

Doppelmayr Urban Solutions | [email protected] | Slide 32

London: a cable car for the city growth

Doppelmayr Urban Solutions | [email protected] | Slide and Photo 33: Dopp e lm ay r

London: a cable car integrated in TFL´s network

Doppelmayr Urban Solutions | [email protected] | Slide 34

Doppelmayr Urban Solutions | [email protected] | Slide 35

Doppelmayr Urban Solutions | [email protected] | Slide 36

La Paz: the largest cable car network

Doppelmayr Urban Solutions | [email protected] | Slide and Photo 37: Dopp e lm ay r

La Paz: The world’s largest cable car network

Three lines directly built within the city able to overcome terrain challenges

Doppelmayr Urban Solutions | [email protected] | Slide 38

La Paz: The world’s largest cable car network

Stations Cabins Length [m]

Red line 3 109 2348

Yellow line 4 169 3736

Green line 4 165 3704

443 9788

Doppelmayr Urban Solutions | [email protected] | Slide 39

La Paz: intermodal transport hubs

Doppelmayr Urban Solutions | [email protected] | Slide 40

La Paz: The world’s largest cable car network

Contract: 10 Sep 2012 Less than 2 years of construction time 1 million passengers, each month, each line December 18th, 10 Million Passengers

Doppelmayr Urban Solutions | [email protected] | Slide 41

Caracas: catalyst for development

Doppelmayr Urban Solutions | [email protected] | Slide 42

Caracas: catalyst for development

Doppelmayr Urban Solutions | [email protected] | Slide 43

Caracas: catalyst for development

initial proposalstatus to improve quo access

Doppelmayr Urban Solutions | [email protected] | Slide 44

Caracas: catalyst for development

Doppelmayr Urban Solutions | [email protected] | Slide 45

8-MGD Singapore

Doppelmayr Urban Solutions | [email protected] | Slide 46 Source: Flickr . Phot o : Carl James

8-MGD Singapore

An intermediate station integrated in a shopping centre

Source and Photo : Dopp e lm ay r

Length 1800m Vertical Rise 2 m Speed 5,0 m/s Capacity 2800 pphpd Travel Time 10 min

Source and Photo : Dopp e lm ay r

Doppelmayr Urban Solutions | [email protected] | Slide 47

The future of urban mobility is above our heads! The future of urban mobility is above our heads!

[email protected]

Doppelmayr Urban Solutions | [email protected] | Slide and Photo 48: Dopp e lm ay r

Operations Services throughout the lifecycle

1 2 3 4 5 6 Tender Design Manufacture Construction Commission Public Operation

Transition of Experience

Operations Readiness/ Mobilisation Operations Services Operations Services Contract Concept

Set-up Training Consulting Training Audits Consulting Organisation

Doppelmayr Urban Solutions | [email protected] | Slide 49

London

Doppelmayr Urban Solutions | [email protected] | Slide 50

10 steps to an urban cable propelled transit system (CPT) Develop a vision Identify stakeholders Partnership between stakeholders (LOI) Archive political commitment Identify and reserve the sites for stations, towers and line Contract relevant stakeholders Marketing and PR to create positive public perception Detail planning and designing the ropeway Building permit, operational permit Construction phase and Opening

Doppelmayr Urban Solutions | [email protected] | Slide 51

The stations

grip opening decelerator curve incoming area line conveyor

carrier outgoing area grip closing accelerator spacing line

Doppelmayr Urban Solutions | [email protected] | Slide 52

Urban station: Technical parts not visible to passengers

Doppelmayr Urban Solutions | [email protected] | Slide 53