POINT HOPE

Alaska Airport Pavement Inspection Report

Published October 2020

Andrew Pavey Project Manager Pavement Management, DOT&PF 5800 E. Tudor Road Phone: (907) 269-6213 Email: [email protected] 9/9/2020 Branch Condition Report Page 1 of 2 Pavement Database: MainPaverDB2020

Standard Weighted Number of Sum Section Avg Section True Area Average Branch ID Use Deviation Average Sections Length (Ft) Width (Ft) (SqFt) PCI PCI PCI 0100 1 210.00 65.00 21,450.00 TAXIWAY 25.00 0.00 25.00 4100 2 450.00 225.00 118,750.00 APRON 39.50 6.50 39.98 6100 5 4,580.00 90.00 348,400.00 43.00 6.29 42.78

Pavement Management System PAVER 7.0 ™ 9/9/2020 Branch Condition Report Page 2 of 2 Pavement Database: MainPaverDB2020

Number of Arithmetic Average STD Weighted Use Category Total Area (SqFt) Sections Average PCI PCI Average PCI APRON 2 118,750.00 39.50 6.50 39.98 RUNWAY 5 348,400.00 43.00 6.29 42.78 TAXIWAY 1 21,450.00 25.00 0.00 25.00 ALL 8 488,600.00 39.88 8.31 41.32

Pavement Management System PAVER 7.0 ™ 9/9/2020 Section Condition Report Page 1 of 2

Pavement Database: MainPaverDB2020 NetworkId: Point Hope Last Age At Last Const. True Area Branch ID Section ID Surface Use Rank Lanes Inspection Inspec PCI Date (SqFt) Date tion 0100 0100-01 9/16/1993 AAC TAXIWAY P 0 21,450.00 6/30/2020 27 25 4100 4100-01 9/19/1993 AAC APRON P 0 55,000.00 6/30/2020 27 33 4100 4100-02 9/16/1993 AC APRON P 0 63,750.00 6/30/2020 27 46 6100 6100-01 9/16/1993 AAC RUNWAY P 0 75,000.00 6/30/2020 27 35 6100 6100-02 9/16/1993 AAC RUNWAY P 0 150,000.00 6/30/2020 27 44 6100 6100-03 9/16/1993 AAC RUNWAY P 0 75,000.00 6/30/2020 27 47 6100 6100-04 9/19/1993 AAC RUNWAY P 0 24,200.00 6/30/2020 27 52 6100 6100-05 9/16/1993 AAC RUNWAY P 0 24,200.00 6/30/2020 27 37

Pavement Management System PAVER 7.0 ™ 9/9/2020 Section Condition Report (Summary) Page 2 of 2 Pavement Database: MainPaverDB2020

Average Age at Number of Arithmetic Standard Weighted Age Category Total Area (SqFt) Inspection Sections Average PCI Deviation PCI Average PCI 26-30 27 488,600.00 8 39.88 8.31 41.32 ALL 27 488,600.00 8 39.88 8.31 41.32

Pavement Management System PAVER 7.0 ™ ]

05 - 9

00 1 1 [6 05 37 5 04 5 02 03 5 5 01 Map Created by 5

0 1 50 7 Airport Code: PHO AK DOT&PF 5 Site Number: 50601.*A October 2020

1 ] 7 03 0 0- 47 10 2020 Pavement Inspection Results [6

1 0 300 600 6 « 5 Feet

1 6 0

1 5 5

1 5 0

1 4 5

9 -1 1 y 1 a 4 w 0 un 0] 44 R 10 [6 ) ] et 02 e 0- f 1 0 5 3 61 x 7 5 [ 0 00 (4

1 3 0 Pavement Condition Index (PCI)

1 Target PCI Range for Runways: 70 to 100 2 5

E Target PCI Range for Taxiways and Aprons: 60 to 100 U R T A ay PCI Values General Pavement Recommendations xiw 1 a 2 1 T 1] 0 10 -0 00 25 [1 3 85 - 100 Preventative Maintenance 10 4 10 1] 1 -0 1 5 0 5 10 10 70 - 84 Preventative / Corrective Maintenance [4 33 2 10 55 - 69 Rehabilitation 1 ] 1 1 2 0 -0 0 35 00 2 61 2 [ 30 40 - 54 Reconstruct 00 1 2 40 0 1 20 46 0 5 25 - 39 Reconstruct 0 30 0 52 40 ] ] 0 02 2 0 10 - 24 Reconstruct 4 -0 00 1 1 0 5 1 0 0 [4

0 4 5 1 n

0 40 [4 o 1 0 r 40 04 p 4 A 03 0 - 9 Reconstruct 4 ] 04 0- 10 [6 Sections labeled with PCI values ]

05 - 9

00 1 1 [6 05 27 5 04 5 02 Point Hope Airport 03 5 5 01 Map Created by 5

0 1 50 7 Airport Code: PHO AK DOT&PF 5 Site Number: 50601.*A October 2020

1 ] 7 03 0 0- 27 10 2020 Pavement Inspection Results [6

1 0 300 600 6 « 5 Feet

1 6 0

1 5 5

1 5 0

1 4 5

9 -1 1 y 1 a 4 w 0 un 0] 27 R 10 [6 ) ] et 02 e 0- f 1 0 5 3 61 x 7 5 [ 0 00 (4

1 3 0

1 2 5

E U R T A ay xiw Age at Inspection 1 a 2 1 T 1] 0 10 -0 00 27 [1 3 10 0 - 4 4 10 1] 1 -0 1 5 0 5 10 10 5 - 9 [4 27 2 10 10 - 14 1 ] 1 1 2 0 -0 0 27 00 2 61 2 [ 30 15 - 19 00 1 2 40 0 1 20 27 0 5 0 20 - 24 30 0 27 40 ] ] 0 02 2 0 4 -0 00 1 25 - 29 1 0 5 1 0 0 [4

0 4 5 1 n

0 40 [4 o 1 0 r 40 04 p 4 A 03 30 - 100 4 ] 04 0- 10 [6 Sections labeled with age