The Authority Public Works Authority PO Box 22188 State of

August 2018 STATE OF QATAR PREFACE TO TENDER DOCUMENTS ASHGHAL EXECUTIVE SUMMARY

1.1 THE PROJECT The DN099 and Leabaib - Package 05 scheme is located approximately within Zone 70 of Qatar Area Referencing System (QARS), approximately 11.8km North-West of the centre of Doha, on the Eastern side of Al Shamal Road.

The site boundary for Package 05 is defined to the east by Arab League street, to the west by DN099 Al Ebb and Leabaib – Package 01, to the south by street, and to the north by Al Ebb street and DN099 Al Ebb and Leabaib – Package 02. The total area of Package 05 is approximately 161.50 ha.

The total DN099 Al Ebb and Leabaib has been split into 5 packages for tendering as shown in Figure 1 below. The location of Package 05 is shown in Figure 2.

Figure 1: The Project Location and Plan of the entire DN099 Al Ebb and Leabaib

Project ID: IA 2017 C 141 G Volume 1: Part 1: Page 1 Roads and Infrastructure in Al Ebb and Leabaib – Package 05 Revision: 0 (DN099-P05) STATE OF QATAR PREFACE TO TENDER DOCUMENTS ASHGHAL EXECUTIVE SUMMARY

Figure 2: The Project Location and Plan for Package 05

The existing site is approximately 80% developed, with a mix of existing residential villas and compounds, commercial developments, schools, mosques, park land and open space. The existing Project area is shown in Figure 3. The Land Use of the project is shown in Figure 4.

The main scope of this Project is to provide full infrastructure to the project area, including improved roads, surface water network, foul sewer, landscape and TSE, and other required utilities.

Project ID: IA 2017 C 141 G Volume 1: Part 1: Page 2 Roads and Infrastructure in Al Ebb and Leabaib – Package 05 Revision: 0 (DN099-P05) STATE OF QATAR PREFACE TO TENDER DOCUMENTS ASHGHAL EXECUTIVE SUMMARY

Figure 3: Existing Site of Package 05 Project area

Project ID: IA 2017 C 141 G Volume 1: Part 1: Page 3 Roads and Infrastructure in Al Ebb and Leabaib – Package 05 Revision: 0 (DN099-P05) STATE OF QATAR PREFACE TO TENDER DOCUMENTS ASHGHAL EXECUTIVE SUMMARY

Figure 4: The Land Use Plan of Package 05

Project ID: IA 2017 C 141 G Volume 1: Part 1: Page 4 Roads and Infrastructure in Al Ebb and Leabaib – Package 05 Revision: 0 (DN099-P05) STATE OF QATAR PREFACE TO TENDER DOCUMENTS ASHGHAL EXECUTIVE SUMMARY 1.2 TIME FOR COMPLETION

The Contract duration comprises of: • One Thousand Two Hundred and Eighty One (1,281) Days for Completion of the whole of the Works (including mobilisation), and • Four Hundred (400) Days for Maintenance Period.