Chelmsford City Growth Package
Public Consultation Document Volume 1 North Chelmsford
July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 1 - North Chelmsford Contents
Introduction 5 Broomfield Road Corridor 7 Great Waltham to City Centre Cycle Route 10 Essex Regiment Way Crossing 12 Chelmer Valley Road 14 Lawn Lane Cycle Route 18 New Nabbotts Way Cycle Route (North) 20 New Nabbotts Way Cycle Route (South) 22 Springfield Road (near Pump Lane) Toucan Crossing 24 Oliver Way Cycle Route 26 Pump Lane Cycle Route 28 Patching Hall Lane Cycle Route 30
2 3 Chelmsford City Growth Package Public Consultation Document - Volume 1 - North Chelmsford Introduction
This volume presents proposals for the northern part of Chelmsford as part of the Chelmsford City Growth Package, covering areas such as Broomfield and Springfield. There are 11 schemes in total in this volume, which propose changes and improvements to junctions and road layouts, footways and cycle routes, crossings, and cycling connectivity, to name a few.
1. Broomfield Road Corridor 2. Great Waltham to City Centre Cycle Route 3. Essex Regiment Way Crossing 4. Chelmer Valley Road 5. Lawn Lane Cycle Route 6. New Nabbotts Way Cycle Route (North) 7. New Nabbotts Way Cycle Route (South) 8. Springfield Road (near Pump Lane) Toucan Crossing 9. Oliver Way Cycle Route 10. Pump Lane Cycle Route 11. Patching Hall Lane Cycle Route
4 5 Chelmsford City Growth Package Public Consultation Document - Volume 1 - North Chelmsford Broomfield Road Corridor
Where is the scheme? What is being proposed? information and raised kerbs. However We would look to provide a high with the number of bus stops and waiting quality, flagship cycle route through the Broomfield Road connects large Broomfield Road regularly suffers from school buses, traffic can often be held installation of hybrid cycle tracks. residential areas with Chelmsford City congestion with many of the junctions up for significant periods of time so we Centre and Broomfield Hospital. unable to operate effectively. This Hybrid cycle tracks are at a slightly would look to reduce the number of bus scheme will see the redesign of the different level to both the footway and stops along the road to ensure they are Corporation Road junction to improve the road to provide defined segregation better used and more evenly distributed. traffic flow. This will create a single for people who cycle from traffic and lane northbound on Broomfield Road We will also review school bus pick-up pedestrians. These cycle tracks are and make Corporation Road one-way and drop-off points on Broomfield Road proposed for Broomfield Road between towards the junction. This would simplify to see if these could be better placed on Skerry Rise in the north and the the junction operation, improve traffic side roads away from the main road to gyratory with Parkway at the southern flows and improve safety for all users. keep traffic moving. end and will provide links to the existing cycle network across the city. The road is also a popular route for Cycle lanes are also in need of buses so a key part of this scheme will improvement along Broomfield Road look to improve the bus stops along due to substantial use throughout the the road by installing shelters, footway day with very high volumes during improvements, real-time passenger morning and evening peaks.
Hybrid Cycle Tracks