Crystal Reports Activex Designer

Total Page:16

File Type:pdf, Size:1020Kb

Crystal Reports Activex Designer Registered applications for week ending 04/04/2014 DOVER DISTRICT COUNCIL Alkham 14/00175 Change of use and conversion of Great Everden Farm, Everden, ER two garages into holiday lets Alkham, CT15 7EH 14/00152 Erection of a single storey rear 2 Drellingore Terrace, Alkham VH extension Valley Road , Alkham, CT18 7EP 14/00289 Erection of a single storey rear Apple Tree Cottage, Slip Lane, VH extension (existing conservatory to Alkham, Dover, CT15 7DA be demolished) Ash 14/00188 Certificate of lawfulness (existing) The Lodge, Westmarsh, Ash, CT3 JM for the continued use of building as 2LP a single residential dwelling 14/00260 Erection of a porch extension 6 Castle Cottages, Castle Road, VH Richborough, Sandwich, CT13 9JL Capel-le-Ferne 14/00299 Installation of a 1.8m antenna and Transmitter Station, Winehouse VH associated works Lane, Capel-le-Ferne, CT18 7HU Deal 14/00292 Crown reduce a cherry by 20% and 28 Church Path, Deal, CT14 9TH ML crown thin by 15% 13/00827 Rebuilding of brick work, render and The Silver Lion, 6 New Street, AW painting of dwelling Deal, CT14 6JY 14/00272 Removal of condition 9 of planning Grosvenor Mansions, Queen KB permission DOV/10/00393 relating Street, Deal, CT14 6ET to Level 3 of the Code for Sustainable Homes (Application Under Section 73) 14/00206 Retrospective application for the 6 New Street, Deal, CT14 6JY KB rebuilding of brick work, render and painting of dwelling Page 1 of 4 1 Registered applications for week ending 04/04/2014 DOVER DISTRICT COUNCIL 14/00271 Erection of a single storey rear infill Carers' Support (Canterbury, VH extension Dover & Thanet), 80 Middle Street , Deal, CT14 6HL 14/00277 Fell 2 horse chestnuts Beech Court, 86 Rectory Road, ML Deal, CT14 9NB Dover 14/00301 Erection of four town houses with 3 Land at corner of Beaconsfield BY integral garages and creation of one Road and Millais Road, Dover, car parking space (existing building CT16 2LL to be demolished) 14/00129 Internal and external alterations Old Harbour Station, Elizabeth DJW Street, Dover, CT17 9BZ 14/00193 Erection of an attached dwelling Land rear of, 17 London Road & ER adjacent to 1 Matthews Place, Dover, CT16 2LA 14/00283 Change of use of first floor to a First Floor, 4-5 Waterloo Crescent, BY members club Dover, CT16 1LA Eastry 13/01092 Outline application for the erection Land adjacent to Sagana Lodge, KE of a detached dwelling and garage Gore Lane, Eastry, CT13 0ED and construction of a vehicular access Great Mongeham 14/00294 Erection of rear extension with a Minimus, Cherry Lane, Great VH conservatory and garage (existing Mongeham, CT14 0HG garage to be demolished) Lydden 14/00307 Erection of a detached dwelling, Land Between 34 & 36 Canterbury ER construction of a vehicular access Road, Lydden, CT15 7ER and parking (existing outbuildings to be demolished) Multiple Parishes Page 2 of 4 2 Registered applications for week ending 04/04/2014 DOVER DISTRICT COUNCIL 14/00282 Erection of a two storey side Woodstock, Little Mongeham, MH extension Deal, CT14 0HS Nonington 14/00286 Fell 19 sycamores Beech Grove, Sandwich Road, ML Nonington, CT15 4HH Ringwould with Kingsdown 14/00261 Erection of a first floor rear Nutwood, Dover Road, Ringwould, SP extension, a single storey rear Deal, CT14 8HF extension, new pitched roof and installation of a flue 14/00265 Removal of condition 13 if planning Colona, Chalk Hill Road, VH permission DOV/10/00111 relating to Kingsdown, Deal, CT14 8DP level 3 of code for sustainable homes Sandwich 14/00285 Erection of a side link extension and 9 St Georges Road, Sandwich VH front porch extension CT13 9JT 14/00288 Fell 14 Leyland Cypresses 31 Stonar Close, Sandwich, CT13 ML 9LH Sholden 14/00262 Erection of a visitor centre, re-siting Fowlmead Country Park, Sandwich NSC of existing play equipment and Road, Sholden, Deal, CT14 0BF alterations to internal access road and parking (existing visitor centre to be demolished) Sutton 14/00281 Erection of first floor and Cloverdale, Willow Road, MH conservatory extensions Mongeham, CT14 0HP Temple Ewell 14/00278 Installation of new flat roof and 1 Lower Road, Temple Ewell, CT 16 VH windows (Existing conservatory to 3DX be partially demolished) Page 3 of 4 3 Registered applications for week ending 04/04/2014 DOVER DISTRICT COUNCIL Tilmanstone 14/00284 Fell one cherry tree The Studio Dane Court Mews, ML School Road, Tilmanstone, CT14 0JL Walmer 14/00279 Reduce 3 sycamores back to 30 Blake Close, Walmer, Deal, ML previous cutting points and selective CT14 7UB branch thinning 14/00276 Variation of condition 8 of planning Land R/O 112-118, Blenheim BY permission DOV/13/00361 to Road, Deal, CT14 7EU change the level of the code for sustainable homes from level 4 to Level 3 Whitfield 14/00269 Display of various illuminated and Tesco Stores Ltd., Honeywood MH non-illuminated signs Parkwark, Whitfield, CT16 3EH 14/00213 Erection of a detached stable block. Land at Roman Road, Whitfield, VH CT15 5HB 14/00274 Erection of a single storey side 16 The Drove, Whitfield, CT16 KB extension (existing garage to be 3JB demolished) 14/00268 Installation of ATM pod, replacement Tesco Stores Ltd., Honeywood MH trolley bays and timber cladding Parkway, Whitfield, CT16 3EH Page 4 of 4 4.
Recommended publications
  • Authority Monitoring Report 2019-20
    Authority Monitoring Report 2019 -20 Dover District Local Plan Supporting document DOVER DISTRICT COUNCIL LOCAL PLAN REVIEW AMR 2019-20 Contents Executive Summary 3 1 Introduction 6 2 Local Plan Progress 9 New Dover District Local Plan 9 Evidence Base Update 10 3 Monitoring of Current Policies 14 Adopted Planning Policies 14 Effectiveness of Development Management Policies 28 4 Five Year Housing Land Supply 34 Five Year Housing Land Supply Calculation 34 5 Strategic Sites 37 Dover Waterfont 37 Dover Mid Town 37 Connaught Barracks 38 Whitfield Urban Expansion 38 White Cliffs Business Park 39 6 Infrastructure 42 Community Infrastructure Levy 42 Monitoring S106 Agreements 42 7 Duty to Co-operate 49 The Duty to Co-operate in Practice 49 Community Consultation 64 8 Neighbourhood Planning 67 9 Conclusion 69 Appendices 1 Monitoring Indicators 71 2 Housing Information Audit 2019/20 78 3 Infrastructure Delivery Table 96 4 Appendix 4 Parish Services and Facilities 106 DOVER DISTRICT COUNCIL LOCAL PLAN REVIEW AMR 2019-20 Executive Summary 2 DOVER DISTRICT COUNCIL LOCAL PLAN REVIEW AMR 2019-20 Executive Summary 3 Executive Summary DOVER DISTRICT COUNCIL LOCAL PLAN REVIEW 4 Executive Summary Executive Summary 2019/20 HOMES DELIVERED TYPES OF HOMES SHOWING WHERE MOST HOMES PERMITTED 2019/20 WERE DELIVERED IN 2019/20 IN DESCENDING ORDER IN DESCENDING ORDER Dover 3-BED 1,109 = Aylesham PLANNING = Rural 2-BED APPLICATIONS DETERMINED 4-BED Deal 1-BED PLANNING APPLICATIONS 442 HOMES DELIVERED 2019/20 92%OF PLANNING APPLICATIONS 442442 APPROVED S106 CONTRIBUTIONS
    [Show full text]
  • International Passenger Survey, 2008
    UK Data Archive Study Number 5993 - International Passenger Survey, 2008 Airline code Airline name Code 2L 2L Helvetic Airways 26099 2M 2M Moldavian Airlines (Dump 31999 2R 2R Star Airlines (Dump) 07099 2T 2T Canada 3000 Airln (Dump) 80099 3D 3D Denim Air (Dump) 11099 3M 3M Gulf Stream Interntnal (Dump) 81099 3W 3W Euro Manx 01699 4L 4L Air Astana 31599 4P 4P Polonia 30699 4R 4R Hamburg International 08099 4U 4U German Wings 08011 5A 5A Air Atlanta 01099 5D 5D Vbird 11099 5E 5E Base Airlines (Dump) 11099 5G 5G Skyservice Airlines 80099 5P 5P SkyEurope Airlines Hungary 30599 5Q 5Q EuroCeltic Airways 01099 5R 5R Karthago Airlines 35499 5W 5W Astraeus 01062 6B 6B Britannia Airways 20099 6H 6H Israir (Airlines and Tourism ltd) 57099 6N 6N Trans Travel Airlines (Dump) 11099 6Q 6Q Slovak Airlines 30499 6U 6U Air Ukraine 32201 7B 7B Kras Air (Dump) 30999 7G 7G MK Airlines (Dump) 01099 7L 7L Sun d'Or International 57099 7W 7W Air Sask 80099 7Y 7Y EAE European Air Express 08099 8A 8A Atlas Blue 35299 8F 8F Fischer Air 30399 8L 8L Newair (Dump) 12099 8Q 8Q Onur Air (Dump) 16099 8U 8U Afriqiyah Airways 35199 9C 9C Gill Aviation (Dump) 01099 9G 9G Galaxy Airways (Dump) 22099 9L 9L Colgan Air (Dump) 81099 9P 9P Pelangi Air (Dump) 60599 9R 9R Phuket Airlines 66499 9S 9S Blue Panorama Airlines 10099 9U 9U Air Moldova (Dump) 31999 9W 9W Jet Airways (Dump) 61099 9Y 9Y Air Kazakstan (Dump) 31599 A3 A3 Aegean Airlines 22099 A7 A7 Air Plus Comet 25099 AA AA American Airlines 81028 AAA1 AAA Ansett Air Australia (Dump) 50099 AAA2 AAA Ansett New Zealand (Dump)
    [Show full text]
  • DOVER UNITARIAN CHURCH ______- a Description______S.S.G.HALE S Ince 1940 at Least Eleven Dover Doorway Half Way up the Wall
    THE DOVER SOCIETY FOUNDED IN 1988 Registered with the Civic trust, Affiliated to the Kent Federation of Amenity Societies Registered Charity No. 299954 PRESIDENT: Brigadier Maurice Atherton VICE-PRESIDENTS: A. F. Adams, Mrs Silvia Corral, Ivan Green, Jack Ind Peter Johnson, Miss Lillian Kay, Miss Philomena Kennedy, Peter Marsh The Rt. Hon. The Lord Rees, Jonathan Sloggett, Tferry Sutton Miss Christine Waterman and Martin Wright THE COMMITTEE ~ CHAIRMAN: Jack Woolford ( j 1066 Green Lane, Tfemple Ewell, Dover CT16 3AR Tfel: 01304 822871 VICE-CHAIRMAN: (1): John Gerrard ' 77 Castle Avenue, Dover CT16 1EZ Tfel: 01304 206579 VICE-CHAIRMAN (2): Jerem y Cope , 53 Park Avenue, Dover CT16 1HD Tfel: 01304 211348 HON. SECRETARY: Leo Wright "Beechwood”, Green Lane, Tfemple Ewell, Dover CT16 3A Tfel: 01304 823048 HON. TREASURER: Jennifer Gerrard 77 Castle Avenue, Dover CT16 1EZ Tfel: 01304 206579 MEMBERSHIP SECRETARY: Sheila Cope 53 Park Avenue, Dover CT16 1HD Tfel: 01304 211348 SOCIAL SECRETARY: Joan Liggett 19 Castle Avenue, Dover CT16 1HA Tfel: 01304 214886 EDITOR: Merril Lilley 5 East Cliff, Dover CT16 1LX Tfel: 01304 205254 CHAIRMAN OF PLANNING SUB-COMMITTEE: Jerem y Cope 53 Park Avenue, Dover CT16 1HD Tfel: 01304 211348 CHAIRMAN OF PROJECTS SUB-COMMITTEE: John Owen 83 Castle Avenue, Dover CT16 1EZ Tfel: 01304 202207 PRESS SECRETARY: Tferry Sutton 17 Bewsbury Cross Lane, Whitfield, Dover CT16 3HB Tfel: 01304 820122 A. E Adams, Adrian Galley, Mike McFarnell, Margaret Robson, Sybil Standing and Mike Weston Content 2 EDITORIAL 4 PLANNING Jeremy
    [Show full text]
  • Crystal Reports Activex Designer
    Registered applications for week ending 28/12/2018 DOVER DISTRICT COUNCIL Alkham 18/01278 Change of use and conversion of Drellingore Barn, Stombers Lane, MH farm building to a dwelling, erection Drellingore, Alkham, CT18 7ER of a building for holiday let and erection of a car barn and associated car parking (existing buildings to be demolished) Deal 18/01287 Erection of a single storey rear 22 William Pitt Avenue, Deal, CT14 VH extension (retrospective) 9QF 18/01214 Erection of a detached dwelling, Land Fronting Bevan Close & r/o, KEV formation of car parking and 223 Telegraph Road, Deal, CT14 construction of a vehicular access 9DU 18/01323 Erection of single storey and first 14 King Edward Road, Deal, CT14 AW floor side extensions (existing side 6QL extension to be demolished) 18/01326 Fell three sycamores 6 Tormore Park, Deal, CT14 9UY DB Re-pollard one lime tree Re-pollard one horse chestnut Crown reduce one oak by 2 metres Dover 17/01523 Outline application for the erection Former Buckland Hospital, DBR of up to 188 dwellings (with all Coombe Valley Road, Dover, CT17 matters reserved) (new and 0HD amended drawings) 18/01106 Installation of illuminated handrail to Prince of Wales Pier, Western GS south edge of masonry pier Docks, Dover, CT17 9BX 18/00970 Change of use from A1 retail to A5 29A London Road, Dover, CT17 AW hot food takeaway (additional 0SS drawings) 18/01314 Removal of 1no. ATM from the front Natwest, 25 Market Square, Dover, RAM elevation and reinstate aperture to CT16 1NG match existing elevation 18/01318 Replacement
    [Show full text]
  • Alkham Parish Council Agenda
    Alkham Parish Council Agenda To All Members of the Council, Press and Public Members are hereby summoned, and notice is given that the Meeting of the Parish Council will be held on Monday 7th January 2019 in Alkham Village Hall commencing at 7.30 pm Legislation allows for meetings to be recorded by anyone attending. Persons intending to record or who have concerns about being recorded should please speak to the Clerk. 7.00pm PRIOR TO THE START OF THE MAIN MEETING: PLANNING : 1.1 To table planning applications received for consideration 1.1.1 DOV/18/01278 Drellingore Barn, Stombers Lane, Drellingore, Alkham, CT18 7ER Change of use and conversion of farm building to a dwelling, erection of a building for holiday let and erection of a car barn and associated car parking (existing buildings to be demolished) 1.2 To table planning applications dealt with since last meeting 1.3 To table decisions by the Planning Authority since the last meeting 1.3.1 DOV/18/00976 Workshop, Everden, Alkham, CT15 7EH Change of use of workshop area to provide an additional 3no. holiday lets Approved 1.3.2 DOV/16/01450 Land adjacent to Fernfield Lane, Hawkinge, CT18 7AW Outline application for the erection of 19 dwellings with some matters reserved Approved Main Meeting: 1. Venue: Alkham Village Hall at 7:30pm 2. Present: 3. Apologies and absences: Members who cannot attend a meeting shall tender their apologies to the Parish Clerk prior to the meetings, under Section 85(1) of the Local Government Act 1972, the members present must decide whether the reason(s) for a member’s absence shall be accepted.
    [Show full text]
  • Drellingore Pumping Station
    Water Treatment & Supply Folkestone & Dover Water-Drellingore PS new micro-filtration membrane system & plant upgrade olkestone and Dover Water has approximately 72,000 customers, with the main sources of supply coming from a large number of small borehole sources sited throughout the company area. The largest single source of treated Fwater supply is from Drellingore Pumping Station, in the Alkham valley, which treats water from a well source within the main site building and also from a nearby satellite well at Lower Standen. The site is located some 4kms northeast of Folkestone and is currently pumped by submersible pumps producing up to 15 Mld via a trunk main to the Hills reservoir - main source of supply for the Folkestone area. The source is subject to turbidity spikes during heavy rain which presents a threat of Cryptosporidium contamination and a temporary loss of the main water source for the area. Dover & Folkestone Water Company Area, showing treatment plants etc. courtesy: Dover & Folkestone Water Original treatment at the site was sterilisation by Ultra-Violet radiation setting and surroundings. The new works at the site were to include followed by marginal chlorination using chlorine gas, injecting an extension equal in size to the original building that required chlorine into the raw water main before it leaves the Drellingore site. negotiation and approvals from the local planning authority. It was agreed that the new structure to house the new membrane and Membrane barrier pumping plant would be constructed and finished in similar Scope of the project plant works is to install a Membrane barrier for materials, dimensions, detail and layout to the original.
    [Show full text]
  • Shepway District Growth Options Study
    Town Planning Submitted to Submitted by Shepway District Council AECOM Aldgate Tower 2 Leman Street London E1 8FA EB 04.10 High Level Options Report Shepway District Growth Options Study December 2016 Final Report AECOM 1-1 Contents 1 Introduction ......................................................................................................................................................................... 1-4 1.1 Project context .............................................................................................................................................................. 1-4 1.2 Project objectives and structure ................................................................................................................................... 1-5 2 Approach ............................................................................................................................................................................. 2-8 2.1 Summary of methodology............................................................................................................................................. 2-8 2.2 Key spatial planning principles ..................................................................................................................................... 2-9 3 Evidence base review ....................................................................................................................................................... 3-14 3.1 Introduction ................................................................................................................................................................
    [Show full text]
  • Dover District Housing Supply Technical Paper 2020
    Dover District Housing Supply Technical Paper 2020 October 2020 DOVER DISTRICT COUNCIL HOUSING SUPPLY TECHNICAL PAPER 2019/20 Contents 1 Executive Summary 3 2 Introduction 4 3 Housing Requirement 5 4 Methodology 6 Past under-delivery 6 Appropriate buffer 6 5 Components of the Housing Supply 8 Deliverability 8 Common considerations and assumptions 9 Non-major sites with planning permission 12 Major sites with detailed planning consent 13 Major sites without detailed planning consent 13 Allocations 13 Other sites 14 Windfalls 14 Summary of supply assessment 16 6 Five Year Housing Supply Assessment 18 7 Future Actions 20 Appendix 1 Local Housing Need Calculation 22 2 Phasing of Non-Major Sites 25 3 Phasing of Major Sites with detailed consent 34 4 Phasing of Major sites without detailed consent 38 5 Phasing of Allocations 41 6 Phasing of sites awaiting S106 50 7 Historic Windfalls 53 DOVER DISTRICT COUNCIL HOUSING SUPPLY TECHNICAL PAPER 2019/20 one Executive Summary 2 DOVER DISTRICT COUNCIL HOUSING SUPPLY TECHNICAL PAPER 2019/20 one Executive Summary 3 1 Executive Summary The National Planning Policy Framework (NPPF) was updated in 2018 and early 2019. The update places an onus on Local Planning Authorities (LPAs) to demonstrate the deliverability of major sites of 10+ dwellings without detailed planning consent for their inclusion within a 5 year housing supply calculation. At 1 April 2020 Dover District Council (the Council) has a Local Housing Need of 596 dwellings per annum, which means a requirement of 2,980 dwellings over the five year period (2020-2025). The Council at 1 April 2020 can demonstrate 6.16 years worth of housing supply measured against the governments housing land supply calculation.
    [Show full text]
  • 4 Site Survey
    Site Survey 4 Site Survey The current condition of the parks, and their features, is a key experience of the water, while lake islands enhance the visual However, the house and garden are now in split ownership and consideration in restoration planning. The following presents a range of experience and provide valuable protected habitat. restoration that fully acknowledges and reinstates Mawson’s original site surveys undertaken by various consultants during Spring 2105. ideals by completely reuniting house and grounds is simply not possible. Within Russell Gardens, by contrast, the River Dour has been contained and constrained within a formal canal setting, which flows into a more Notwithstanding this situation, the publicly accessible areas of the 4.1 Landscape and Visual Appraisal naturalistic channel at the eastern end of the park. The channel passing gardens are in need of restoration work, and have the potential to A landscape and visual appraisal of the parks was undertaken by HEA. from Russell Gardens under the road and into Kearsney Abbey grounds provide a beautiful and special testament to Mawson’s vision. Key provides a physical water link in the landscape, connecting the two landscape elements include the formal pond framed by its covered The River Dour parks. bridges; the low, planted terraces; the meandering river; and the lily The River Dour has a place at the heart of the project, linking Russell pond centred between adjacent recreation courts. Careful restoration of Downstream of the lake, the river weaves and braids as it approaches Gardens and Kearsney Abbey grounds, and is central to the rich the built structures and the water channel needs to be complemented the site of the old mill; the banks of the old mill pond are eroded and are heritage of these complementary parks.
    [Show full text]
  • 2 Context the Alkham Valley Is Steep Sided, Rising to Over 130M to the North at the Or Historic Interest
    Site Description 2 Context The Alkham valley is steep sided, rising to over 130m to the north at The or Historic Interest. Unlike the historic parks and gardens register, listed 2.1 General Description Minnis, and a similar height to the south where the land rises to a buildings have statutory protection and therefore a listed building may Kearsney Parks are situated in the Dour valley near to River and Temple plateau on which St Radigund’s Abbey was sited. not be demolished, extended, or altered without special permission from Ewell, some five miles north west of Dover, Kent. The site comprises the local planning authority. The soils in the park are generally shallow and lime-rich throughout; two parks either side of the Alkham Road, which is the main inland road adjacent to the river they are overlain with a thin alluvium. These thin In Russell Gardens there are three listings: between Dover and Folkestone. To the north of the Alkham Road is the alkaline soils restrict the range of species that can thrive in the parks; the terraced Russell Gardens, which is noted for its formal canal; to the 2 Bridge Pavilions Grade II native species that survive such alkalinity make up the habitat we know south is Kearsney Abbey with its café overlooking a large lake. as chalk grassland. Boathouse Pavilion Grade II A general plan of the site and the names used throughout the report are In Kearsney Abbey, the following are listed: shown in Figure 2.1. 2.4 Designations and Planning Policy Bridge in the grounds of Kearsney Abbey Grade II context 2.2 Ownership Ruin in the grounds of Kearsney Abbey Grade II Dover District Council owns all the land shown in Figure 2.2.
    [Show full text]
  • Potential Gypsy and Traveller Sites Dover District Council Final Report
    Potential Gypsy and Traveller Sites Dover District Council Final Report March 2020 Main Contact: Michael Bullock Email: [email protected] Telephone: 0800 612 9133 Website: www.arc4.co.uk © 2020 arc4 Limited (Company No. 06205180) Dover District Council Page | 2 Table of Contents 1. Introduction ................................................................................................................... 4 2. Location A – Land to the rear of the Meadows, Alkham Valley Road, Alkham, CT15 7EW .................................................................................................................... 6 3. Location B – Land at Hay Hill, Ham, Eastry, CT13 0ED ................................................... 7 4. Location C – Land to the North of Snowdown Caravan Site, Aylesham, CT15 4LS ........ 8 5. Location D – Land South of Ash Road, Sandwich, CT13 9JA .......................................... 9 6. Location E – Land at Romany Acres, Belsey Lane, Ewell Minnis, CT15 7DY ................ 10 7. Summary ………………………………………………………………………………………………………….. 11 Appendix A: Further Site Information ...................................................................................... 12 Location A – Land to the rear of the Meadows, Alkham Valley Road, Alkham, CT15 7E ...................................................................................................................................... 12 Location B – Land at Hay Hill, Ham, Eastry, CT13 0ED ................................................. 14 Location C – Land to the
    [Show full text]
  • Environment Agency Rip House, Waterside Drive Aztec West Almondsbury Bristol, BS32 4UD
    En v ir o n m e n t Agency ANNEX TO 'ACHIEVING THE QUALITY ’ Programme of Environmental Obligations Agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for Individual Water Companies As financed by the Periodic Review of Water Company Price Limits 2000*2005 The Environment Agency Rip House, Waterside Drive Aztec West Almondsbury Bristol, BS32 4UD June 2000 ENVl RO N ME NT, AGEN CY 1 ]2 7 0 0 CONTENTS For each water and sewerage company' there are separate lists for continuous, intermittent discharges and water abstraction sites. 1. Anglian Water 2. Welsh Water 3. Northumbrian Water Group Pic 4. North West Water Pic 5. Severn Trent Pic 6. Southern Water Pic 7. South West Water Pic 8. Thames Water Pic 9. Wessex Water Pic 10. Yorkshire Water Pic 11. List of water abstraction sites for water supply only companies National Environment Programme Key E A R e g io n Water Company ID Effluent Type A A n g lia n . A Anglian Water SCE Sewage Crude Effluent M Midlands DC Dwr Cymru Welsh Water SSO Sewage Storm Overflows NE North East N Northumbrian Water STE Sewage Treated Effluent NW North W est NW North West Water CSO Combined Sewer Overflow S Southern ST Severn Trent Water EO Emergency Overflow SW South W est S Southern Water ST Storm Ta n k T Th a m e s sw South West Water . WA W ales T Thames Water Receiving Water Type wx Wessex Water C Coastal Y Yorkshire Water E Estuary G Groundwater D rive rs 1 Inland CM 3 CM 1 Urban Waste Water Treament Directive FF1 - 8 Freshwater Fisheries Directive Consent conditions/proposed requirements **!**!** GW Groundwater Directive Suspended solids/BOD/Ammonia SW 1 -12 Shellfish Water Directive NR Nutrient Removal S W A D 1 - 7 Surface Water Abstraction Directive P Phosphorus (mg/l) H A B 1 - 6 Habitats Directive N Nitrate (mg/i) B A T H 1 -1 3 Bathing Water Directive 2 y Secondary Treatment SSSI SSSI 3 y Tertiary Treatment QO(a) - QO(g) River and Estuarine Quality Objectives LOC Local priority schemes .
    [Show full text]