Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,

APPENDIX I

(See paragraph – 6)

F O R M - 1

(I) Basic Information

S. Item Details No. 1 Name of the Project “Florencia” 2 S. No. in the Schedule 8 (a)

3 Proposed Total Plot Area = 21400.00 m2 2 capacity/area/length/tonnage to Total Built up Area (FSI) = 56137.63 m 2 be handled/ command area/ Total Built up Area(NON FSI) = 27134.61 m 2 lease area/ number of wells to Total Construction Area = 29003.02 m be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. Total Plot Area = 21400.00 m2 Total Built up Area (FSI) = 56137.63 m2 Total Built up Area(NON FSI) = 27134.61 m2 Total Construction Area = 29003.02 m2 6 Category of Project i.e. ‘A’ or Category ‘B’ ‘B’ 7 Does it attract the general No condition? If yes, please specify. 8 Does it attract the specific No condition? If yes, please specify. 9 Location of Project Kaspatewasti, Wakad, Pune Plot/Survey/Khasra No. S. No..257/1/2, 258/4A Village Wakad Tehsil District Pune

State 10 Nearest railway station/airport Railway Station – 6.00 Km along with distance in Kms. Pune Airport – 16.00 Km 11 Nearest Town, city, District Pune – 11.0 Km Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Headquarters along with distance in Kms. 12 Village Panchayats, Zilla Chinchwad Municipal Corporation (PCMC) Parishad, Municipal Corporation, Local body (Complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/s Shubham Associates 14 Registered Address S.No 257/1/2, 258/4A, Wakad, Pune 15 Address for correspondence: 01-Ajay Apartments,DP Road, Near Parihar Chowk, Aundh, Pune-411007 Name Mr. Sohanlal Vishnoi Designation Partner (Owner/Partner/CEO) Address 01-Ajay Apartments,DP Road, Near Parihar Chowk, Aundh, Pune-411007 Pin code 411 007 E- mail [email protected] /[email protected] Telephone No. 020 – 25897299, 020-64101567 Fax No. 020 - 25897299 16 Details of Alternative Sites No examined, if any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves Not Applicable approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wild life (Protection) Act 1972? Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

(c) The C.R.Z. Notification, 1991?

22 Whether there is any Not Applicable Government Order / Policy relevant/ relating to the site? 23 Forest Land involves (hectares) Not Applicable 24 Whether there is any litigation Not Applicable pending against the project and/ or land in which the project is proposal to be set up? a) Name of the Court b) Case No. c) Orders / directions of the Court, if any and its relevance with the proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, changes in water bodies, etc.)

Details thereof (with approximate quantities Sr. Yes/ /rates, wherever possible) with source of No. Information/Checklist confirmation No information data 1.1 Permanent or temporary change in No Basically land is barren land as on date land use, land cover or topography 35522.63 m2 constructions is complete. The including increase in intensity of proposed project site is designated for the land use (with respect to local land intended purpose and the necessary change in use plan) the land use of the plot area measuring 21400.00 m2 has already been affected by converting it for residential use. ANNEXURE II- SITE LOCATION PLAN 1.2 Clearance of existing land, vegetation No Not Applicable and buildings? Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approximate quantities Sr. Yes/ /rates, wherever possible) with source of No. Information/Checklist confirmation No information data 1.3 Creation of new land uses? No Not Applicable 1.4 Pre-construction investigations e.g. No Not Applicable bore houses, soil testing? 1.5 Construction works? Yes 68936.21 m2 (37532.43 m 2 FSI + 31403.78 m 2 NON FSI) will be total built up area. ANNEXURE IV- MASTER PLAN 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for construction Yes During construction total 60 Nos. of workers works or housing of construction will be on site. workers? 1.8 Above ground buildings, structures or Yes Initially plot is barren land. Total 56137.63 m2 Earth works including linear (FSI – 29003.02 m2 + Non - FSI – 27134.61 structures, cut and fill or excavations m2) will be built up area for Residential purpose. Excavated material during construction will be used for leveling of land. 1.9 Underground works including mining No Not Applicable or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods or Yes Temporary shed will be constructed for the materials? storage of the construction material. Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approximate quantities Sr. Yes/ /rates, wherever possible) with source of No. Information/Checklist confirmation No information data 1.15 Facilities for treatment or disposal of Yes A) SOLID WASTE MANAGEMENT solid waste or liquid effluents? a) During Construction phase –

Excavated material will be used for backfilling and landscape. DURING OPERATION PHASE – Total population of the residential & Commercial scheme is – 2673 Nos. 1) Quantity of the - 1162.00 Kg/Day solid waste 2) Quantity of the - 662.30 Kg/Day wet waste 3) Quantity of the - 499.70 Kg/Day dry waste

Biodegradable and non biodegradable waste will be segregated. Dry waste will be sold out. Wet waste will be treated by ‘ Organic Waste Convertor’ for composting.

B) WATER MANAGEMENT –

I) DURING CONSTRUCTION PHASE :

Water Requirement – 30 m 3/day source – Open Well/Tankers

II) DURING OPERATION PHASES :

Source – Pimpri Chinchwad Municipal Corporation (PCMC)

WATER DEMAND :

Total Water demand is 314.895 m3/day. • Domestic Water for Residential & Commercial: 168.47 m3/day • Flushing Water for Residential & Commercial: 109.815 m3/day. • Landscaping is 16.86 m 3/day

1.16 Facilities for long term housing of No Not Applicable Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approximate quantities Sr. Yes/ /rates, wherever possible) with source of No. Information/Checklist confirmation No information data operational workers? 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air waterborne or No Not Applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not Applicable pipelines? 1.21 Impoundment, damming, culverting, No Not Applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of water from Yes During Construction phase open well/Tanker ground or surface waters? water will be used for the construction purpose. 1.24 Changes in water bodies or the land No Not Applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes Approx. 8 trucks per day for Material for construction, operation or transport. Workers through public transport decommissioning? 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes INFLUX DURING CONSTRUCTION : temporarily or permanently? During construction approximately 60 nos. workers will be on site. INFLUX DURING OPERATION : During operation influx of approximately 2673 Nos. Of persons are going to reside in the Residential & Commercial complex Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approximate quantities Sr. Yes/ /rates, wherever possible) with source of No. Information/Checklist confirmation No information data 1.29 Introduction of alien species? No Not Applicable

1.30 Loss of native species or genetic No Not Applicable diversity? 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Yes/ Details thereof (with approximate quantities Sr. Information/checklist /rates, wherever possible) with source of No. confirmation No information data 2.1 Land especially undeveloped or Yes Undeveloped land of about 31067.88 m2 agricultural land (ha) The proposed development has been planned on Non Agriculture land. 2.2 Water (expected source & Yes WATER MANAGEMENT – competing users) unit: KLD I) DURING CONSTRUCTION PHASE :

Water Requirement – 30 m3/day source – open well/Tankers

II) DURING OPERATION PHASES : Source – Pimpri Chinchwad Municipal Corporation (PCMC)

WATER DEMAND :

Total Water demand is 314.895 m3/day. • Domestic Water for Residential & Commercial: 168.47 m3/day • Flushing Water for Residential & Commercial: 109.815 m3/day. • Landscaping is 16.86 m 3/day 2.3 Minerals (MT) No Not Applicable 2.4 Construction material - Stone, Yes Companies authorized approved local vendors. Aggregates, Sand/Soil (expected source-MT) 2.5 Forests and timber (source – MT) No Not Applicable Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Yes/ Details thereof (with approximate quantities Sr. Information/checklist /rates, wherever possible) with source of No. confirmation No information data 2.6 Energy including electricity and Yes SOURCE – Maharashtra State Electricity fuels (source, competing users) Distribution Company Limited (MSEDCL) Unit: fuel (MT), energy (MW) DURING CONSTRUCTION PHASE: Total Demanded load – 30 KW DG Set - 40 KVA – 1 No.

DURING OPERATION PHASE: Total Demanded load – 3307 KW Transformer Suggested – a) For Plot (A) – 4 Nos. (22KV/630KVA – 4 Nos.) D.G. Set Suggested – 1) For Plot (A) – 2 Nos. a) Exiting DG. Set - 125 KVA – 1 No. b) Proposed DG. Set - 82.5 KVA – 1 No.

2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approx. quantities/

Yes/ rates, wherever possible) with source of Sr. Information/Checklist No information data No. confirmation

3.1 Use of substances or materials, No Not Applicable which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not Applicable or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. No It can help in improving the living standards of by changing living conditions? that area. Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approx. quantities/

Yes/ rates, wherever possible) with source of Sr. Information/Checklist No information data No. confirmation

3.4 Vulnerable groups of people who No Not Applicable could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or Decommissioning (MT/month) Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 4.1 Soil, overburden or mine wastes Yes Excavated material during construction will be used for leveling of land. 4.2 Municipal waste (domestic Yes A) SOLID WASTE MANAGEMENT and/or commercial wastes) a) During Construction phase –

Excavated material will be used for backfilling and landscape. DURING OPERATION PHASE – Total population of the residential & Commercial scheme is – 2673 Nos. 1) Quantity of the - 1162.00 Kg/Day solid waste 2) Quantity of the - 662.30 Kg/Day wet waste 3) Quantity of the - 499.70 Kg/Day dry waste

Biodegradable and non biodegradable waste will be segregated. Dry waste will be sold out. Wet waste will be treated by ‘ Organic Waste Convertor for composting. ANNEXURE – X SOLID WASTE MANAGEMENT

4.3 Hazardous wastes (as per No Not Applicable Hazardous Waste Management Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Rules)

4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes Sewage Treatment Plant will be provided for from effluent treatment treatment of domestic effluent. STP details are enclosed. REFER ANNEXURE – IX SEWAGE TREATMENT PLANT. 4.7 Construction or demolition Yes Construction debris will be used for leveling / wastes backfilling etc. for landscapes, Internal roads etc. 4.8 Redundant machinery or No Not Applicable equipment 4.9 Contaminated soils or other No Not Applicable materials 4.10 Agricultural waste No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 5.1 Emissions from combustion of No Not Applicable fossil fuels from stationary or mobile sources 5.2 Emissions from production No Not Applicable processes 5.3 Emissions from materials No Not Applicable handling including storage or transport 5.4 Emissions from construction Yes There will be temporary emission from activities including plant and construction equipments (mobile Source) equipment 5.5 Dust or odors from handling of Yes As per Environment Management Plan refer materials including construction ANNEXURE XVI materials, sewage and waste 5.6 Emissions from incineration of No Not Applicable Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data waste 5.7 Emissions from burning of waste No Not Applicable in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data with source of information data 6.1 From operation of equipment e.g. Yes Sources of noise Pollution during construction engines, ventilation plant, phase are machinery like compressor, crushers Compactors, Concrete Plant, Cranes and transportation materials. During operation phase DG sets will be provided with Canopy to reduce noise. 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or demolition Yes As per Environment Management Plan 6.4 From blasting or piling No Not Applicable 6.5 From construction or operational Yes As per Environment Management Plan traffic 6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 7.1 From handling, storage, use or No Not Applicable spillage of hazardous materials Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

7.2 From discharge of sewage or No Sewage will be treated and reused for flushing other effluents to water or the & gardening. land (expected mode and place of Hence there is no risk of contamination due to discharge) release of sewage 7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build No Not Applicable up of pollutants in the environment from these sources?

8.Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 8.1 From explosions, spillages, fires No Not Applicable etc from storage, handling, use or production of hazardous substances 8.2 From any other causes Yes There is a risk of accident during construction however proper construction safety measures will be taken

8.3 Could the project be affected by Yes Floods and landslides are not expected in the natural disasters causing area. Earthquake proneness: the area falls environmental damage (e.g. under Zone II as per IS 1893-2002. Hence floods, earthquakes, landslides, relevant design parameters as per zone III have cloudburst etc)? been considered for RCC design of the building. Adequate earthquake proof RCC design is adapted.

ANNEXURE VII - SEISMIC ZONING MAP OF & EQ CERTIFICATE

9.Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality]

Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 9.1 Lead to development of Yes 1) Power supply is available. supporting . 2) Sewage Treatment Plant will be provided Facilities, ancillary development hence there will not additional load on or development stimulated by the Municipal Sewage treatment. project which could have impact 3) Solid Waste Management facility will be on the environment e.g.: provided. • Supporting infrastructure 4) Adequate parking facility available within (roads, power supply, waste or campus. waste water treatment, etc.) • Housing development Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after-use of the site, No Not Applicable which could have an impact on the environment 9.3 Set a precedent for later No Not Applicable developments 9.4 Have cumulative effects due to No Not Applicable proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

Aerial distance (within 15 Sr. Name/ Areas km.)Proposed project location No Identity boundary 1 Areas protected under international No Not Applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for No Not Applicable ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or No Not Applicable sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters No Not Applicable 5 State, National boundaries No Not Applicable Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune

Aerial distance (within 15 Sr. Name/ Areas km.)Proposed project location No Identity boundary 6 Routes or facilities used by the public for No Not Applicable access to recreation or other tourist, pilgrim areas 7 Defense installations No Not Applicable 8 Densely populated or built-up area No Not Applicable

9 Areas occupied by sensitive man-made land No Not Applicable uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or No Not Applicable scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No Not Applicable environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which No Not Applicable could cause the project to present environmental problems(Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV) Proposed Terms of Reference for EIA studies. EIA not required as project is under B-2 Category

Form 1 & 1A for project “Florencia” by M/s. Shubham Associates at S. No 257/1/2,258/4A Kaspatewasti, Wakad,Pune