Office of The Engineer-in- Chief, M.P.P.W.D (M.P.) Tender Notice NIT No- 02/NDB Road/2018-19 Date 28.05.18

Online Tender for mentioned below are being invited. The Tender have been uploaded on the e-Procurement system of Public Works Department on the Portal www.mpeproc.gov.in Tender details are as below:-

Cost of Physical submission (Original S.N Tender Nature of Call Project District Name of work EMD & Other Document) at o. No. work No. (PAC) the office of as mentioned (Rs. In lack)

1 2 3 4 5 6 7 8

Upgradation And Reconstruction Of Major District Roads In The State Of Under NDB-II (Package-1) Gogapur to Lasodiya Goyal Via Bapaiya-Koyal- Jhutawad-Dongariya-Ghatpipaliay-Ranayarapir Director (NDB Projects) NDB Road O/o The Engineer-in-Chief 1 53932 Arniyadam-Makal-Lasodiya Goyal, length 38.51 km., First 16272.78 Project-II Kanchankhedi- Bhesola- Banjari -Gothda-Barauda P.W.D. M.P. Polt No. 27-28 Road (MP-MDR-26-05), length 19.02 km., Arera Hills Bhopal - Banbana- Borkheda Pitermal -Mandlaparwal- Rudharkheda- Mehdipur road, length 23.33 km., Barnagar-Kesur Road, length 32.625 km., Total Length 113.485 KM Upgradation And Reconstruction Of Major District Roads In The State Of Madhya Pradesh Under NDB-II (Package-2) to Kachhaliyachand via Jharda- Director (NDB Projects) NDB Road O/o The Engineer-in-Chief 2 54006 Ujjain Kundikheda-Naggurdiya-lalagarh Road, length 21.575 First 7330.52 Project-II km. P.W.D. M.P. Polt No. 27-28 Sunera- Khoriya Aima - Badodiya road, length 20.46 Arera Hills Bhopal km. and Amla- road, length 13.66 km. Total Length 55.695 KM,First Call Upgradation And Reconstruction Of Major District Roads In The State Of Madhya Pradesh Under NDB-II Director (NDB Projects) (Package-03) NDB Road O/o The Engineer-in-Chief 3 53933 Ratlam -Morwani- Umar- Raoti- Bajna Road Length- First 8442.56 Project-II P.W.D. M.P. Polt No. 27-28 48.26 km and gunawad-barbodna-rughnathgargh- Arera Hills Bhopal kerwasa- uplai- bhuteda road length 16.275 km. Total Length 64.535 KM,First Call Upgradation And Reconstruction Of Major District Roads In The State Of Madhya Pradesh Under NDB-II (Package-12) Mundela Najirabad road length 22.732 Km., Director (NDB Projects) NDB Road Kulhar via Bhaal Bamora to road O/o The Engineer-in-Chief 4 53951 First 15284.64 Project-II length 21.280 Km., Devpur Mughalsaray road length P.W.D. M.P. Polt No. 27-28 10.70 Km., Udaipur Bamora upto Bina River Arera Hills Bhopal length 28.10 Km. , Berkhedi Shayar Bamora Parasi Khamkheda length 15.994 Km.Total Length 98.806 KM. Upgradation And Reconstruction Of Major District Roads In The State Of Madhya Pradesh Under NDB-II (Package-14) Babai-Sirvada-Furtala-Sangakheda road length 13.60 Director (NDB Projects) km., Semri Harchand To Paladevri Saini Mithta Borna Hoshanga NDB Road O/o The Engineer-in-Chief 5 53981 Ritaal Khapa Telsir Mahuakheda Khapariya Kheri First 14060.48 bad Project-II P.W.D. M.P. Polt No. 27-28 Raniguhaan Dhapada Gajnayi Bridge road length Arera Hills Bhopal 20.00 km., Till Sankala, Shobhapur To Bhatgaon road length 13.60 km. Shobhapur To Rewawankhedi road length 14.70 km., Shobhapur - Macha-Pachlawara road length 18.00 km..Total Length 79.90 KM. Cost of Physical submission (Original S.N Tender Nature of Call Project District Name of work EMD & Other Document) at o. No. work No. (PAC) the office of as mentioned (Rs. In lack)

1 2 3 4 5 6 7 8 Upgradation And Reconstruction Of Major District Roads In The State Of Madhya Pradesh Under NDB-II (Package-15) Director (NDB Projects) Construction of Bankhedi Muraith Lamkana Poundi - NDB Road O/o The Engineer-in-Chief 6 54022 road, length 24-898 km. Jabalpur Purena Road, First 10031.01 1 Project-II P.W.D. M.P. Polt No. 27-28 length 14-486 km. Nahakhedi Bandarkudni Road, Arera Hills Bhopal length 9-099 km. Bhedaghat Udna Road, length 15-181 km. Seoni Tola Ghat Pipariya road,length 7-641 km. total lanth 71.305 k.m. Upgradation And Reconstruction Of Major District Roads In The State Of Madhya Pradesh Under NDB-II (Package-06) Director (NDB Projects) Badi, Multhan, Gogawa Rupkheda road, length 29.675 NDB Road O/o The Engineer-in-Chief 7 54067 Khargone km., Rodiya Multhan, Borawan, Sawada, Bither, First 22491.00 Project-II P.W.D. M.P. Polt No. 27-28 Singun, Maltar, Madaraniya road, length 63.82 km, Arera Hills Bhopal Khargone Thikri road, length 34.40 km., Khargone Kumharkheda, Umarkhali Dhulkot road, length 26.080 km. Total length 153.975 km. Upgradation And Reconstruction of Major District Roads In The State Of Madhya Pradesh Under NDB-II (Package-16) Kelwara -Kharkhri -Hathkhuri-Magardha- Director (NDB Projects) NDB Road Mohas Road Km 37.3 Katni-Chaprwah-Deorihatai O/o The Engineer-in-Chief 8 54474 Katni First 18933.38 Project-II Km 12.1 Jhinjhari Bilhari To Devgaon Km 25.344 P.W.D. M.P. Polt No. 27-28 Piprondh-Niwar-Deorihati--Vijayraghavghar- Arera Hills Bhopal Road Km19.338 Bakal To Pateriya Km12.9slimnabad – Km 21.323 Slimnabad -Padwar -Kunwa Road Km 14.87

Total 112846.37

The document can only be purchased online from the above website after making online payment. The last date & time for purchase of Document on line is Dated 18/06/18 up to (17:30.) Detailed NIT and other details can be viewed on the above mentioned portal. Amendments to NIT, if any, would be published on website only, and not in newspaper.

The Original FDR & Other document will be received on Dated 20/06/18 up to (17.30.) in the office mentioned.