SFO – MILLBRAE STATION
City of Millbrae City Council February 14, 2017 Millbrae, California CITY COUNCIL STUDY SESSION
• California High-Speed Rail Program Update
• SFO - Millbrae Station Planning
• Project Schedule
• Next Steps
2 Program Update
3 HIGH-SPEED RAIL: Connecting California
4 2016 BUSINESS PLAN: Key Highlights • Capital Cost Reduction: » $67.6 Billion (2014) to $64.2 Billion
• Silicon Valley to Central Valley Line » Operational by 2025 » San Jose-North of Bakersfield » $20.7 Billion – Fully Fundable
• Burbank to Anaheim Corridor Improvements » Together with our Partners » Invest $4 Billion
• Extension to San Francisco, Merced & Bakersfield » Additional $2.9 Billion – Seek Federal Funds » Operational by 2025
• Phase 1 (San Francisco-LA/Anaheim)
» Operational by 2029 5 CONNECTING CALIFORNIA: Northern California
• Improves Mobility & Upgrades Bay Area Transportation Infrastructure
• Connects Bay Area to Central Valley
• Blended System Along Peninsula
• Multi-Model Transportation Hubs » Transbay Transit Center » SFO-Millbrae » San Jose Diridon Station » Gilroy Station
6 SAN FRANCISCO TO SAN JOSE SECTION
• 51-Mile Corridor
• Two alternatives along the blended service alignment
• Key Project Elements: » Alignment Operations » Brisbane Light Maintenance Facility » Passing Tracks » Stations • San Francisco (4 th and King) • Millbrae (SFO) • San Jose (Diridon) MILESTONE SCHEDULE*
Winter 2017 Fall 2017 2018 Design & Summer 2017 Release Draft Technical Final Environmental Spring 2016 Analysis Identify Environmental Preferred Document Document/ Project Station Alternative Outreach Record of Definition Footprint Public Hearing Decision Outreach
*Preliminary/Subject to Change SFO - Millbrae Station Planning
9 SFO-MILLBRAE STATION : Coordinated Planning
Information exchange
City Authority • 1998 Specific Plan • 2010 Preliminary Alternatives • 2014 TOD 1 and 2 • 2012 SB 1029 – Blended System • 2016 Specific Plan update • 2015 Caltrain Electrification • 2016-17 Engineering/Environmental
Intermodal Working Group • 2015 Specific Plan Access Policy • 2016 Shared Goals • 2017 Comprehensive Access Study 2010 PRELIMINARY ENGINEERING: Station Site Plan
1998 Specific Plan
1,400-foot HSR Platform
California Drive
Mixed-Use TOD Mixed-Use TOD 2010 PRELIMINARY ENGINEERING: Station Cross Section
Caltrain High Speed Rail
BART
Caltrain
Cross Section - 2010 Four Track Dedicated System
NOT FOR DISTRIBUTION 2016 MILLBRAE STATION AREA SPECIFIC PLAN: Station Concepts
California Drive
LAND USE PLAN
Illustrative Plan 2017 SFO – MILLBRAE STATION: Comprehensive Access Plan Partners • SFO • Caltrain • BART • City of Millbrae • City of San Francisco • SamTrans
Goals • Exceptional, seamless multi- modal transportation services
• World-class airport/HSR/regional rail station
• Station integration into the City HSR STATION DELIVERY PROCESS
15 HSR: Changes California’s Economic Geography
Gilroy to San Jose 18 minutes
San Jose to Fresno 60 Minutes
Bakersfield to Los Angeles 60 Minutes
16 HIGH-SPEED RAIL STATIONS: Economic Benefits
- Statewide and global connectivity - Sustainable growth: residential and commercial - A high quality, well designed station improves the image of the location it serves, making it more attractive as a place to live, work and invest - Stations encourage development at or adjacent to the station - A community focus and a destination in its own right *Source: the value of station investment: research on regenerative impacts. Steer Davies Gleave
17 SFO-MILLBRAE STATION: Study Area SFO-MILLBRAE STATION: Preliminary Track & Platform Layout SFO-MILLBRAE STATION: Station Concept & Footprint SFO-MILLBRAE STATION: Track and Platform Configuration
BART Caltrain HSR Caltrain
NOT FOR DISTRIBUTION Cross Section – 2017 Blended System
BART Caltrain HSR
Caltrain
Cross Section - 2010 Dedicated Four Track System SFO-MILLBRAE STATION: Track and Platform Comparison
BART Caltrain HSR Caltrain
NOT FOR DISTRIBUTION Cross Section – 2017 Blended System
BART Caltrain HSR
Caltrain
Cross Section - 2010 Dedicated Four Track System STATION ACCESS STUDY
SCOPE OF WORK • Comprehensively view how services interconnect at the Station • Identify Station opportunities and constraints • Incorporate station area and Downtown Millbrae • Support agency coordination and community outreach • Develop a parking resources management plan NEXT STEPS
1. Station Area Planning Agreement
2. Consultant Start-up
3. Initiate Comprehensive Station Access Study
24 THANK YOU & STAY INVOLVED
Website: www.hsr.ca.gov Helpline: 1-800-435-8670 Email: [email protected]
instagram.com/cahsra
Northern California Regional Office facebook.com/CaliforniaHighSpeedRail California High-Speed Rail Authority 100 Paseo De San Antonio, Suite 206 twitter.com/cahsra San Jose, CA 95113 www.hsr.ca.gov youtube.com/user/CAHighSpeedRail