Gateway

THE GATEWAY TO SMARTER, GREENER LOGISTICS AND TRADE

LOGISTICS OPPORTUNITIES FROM 100,000 TO 1.6 MILLION SQ FT EPC SECURE WELL MANAGED GREEN 24/7/365 ESTATE BUILD OPERATIONS RATING A SITE ‘OUTSTANDING’ 24 HOUR ROAMING SECURITY PATROLS OPTIONS

DEEP SEA Your bespoke space. In the very best place.

DP WORLD LONDON GATEWAY is a logistics FUTURE EXPANSION development perfectly positioned to serve local, national and international markets. RAIL TERMINAL

BORDER INSPECTION FACILITY EXCELLENT EXCEPTIONAL LABOUR QUALITY BREEAM OUTSTANDING CATCHMENT AND EPC ‘A’RATING AND THAMES THE ABILITY TO OPTIMISE A LARGE, YOUNG, ENGAGED & SKILLED WORKFORCE AVAILABLE, BUILDING OPERATIONS FREEPORT – CONNECTED VIA ESTABLISHED PUBLIC TRANSPORT LINKS A GAME CHANGER DP World London Gateway is part of the Thames Freeport meaning that there CONSTRUCTION OF BUILDING PLANET MARK CERTIFIED, WITH could be substantial tax incentives and CONSTRUCTION AND EMBODIED customs facilitation available to new HGV TRUCK PARK CUSTOMERS: CO2e EMISSIONS AND SAVINGS FREEPORT CALCULATED. occupiers. These include, but are not STATUS • Stamp Duty Land Tax • Duty deferral while • Suspended VAT on Relief on commercial goods remain on site goods entering the leases until March 2026 Freeport • Tariff inversion available • Business Rates Relief if the finished goods for 5 years entering UK from the Freeport attracts a Direct savings of SUPERB TRANSPORT • Enhanced Capital lower tariff than their ENHANCE YOUR Allowances available up component parts nearly £3.3 million CONNECTIVITY to Sept 2026 SUPPLY CHAIN (Business rates and NIC JUST 10 MILES FROM JUNCTION 30 OFF THE • Inward Processing, relief M25 & 28 MILES FROM CENTRAL LONDON DIRECTLY LINKED TO THE UK’S MOST ADVANCED DEEP SEA PORT & RAIL NETWORK • Employer National from duty and VAT on relief) per annum could be Insurance Contributions goods imported into achieved on a 50,000 sq m rate relief for up to 9 years the Freeport which are facility with 700 personnel then processed and employed. re-exported 9.25 million sq ft: delivering flexible, well connected space

Equivalent in area to 400 football pitches, DP WORLD LONDON GATEWAY is the largest logistics development opportunity in Western Europe.

World class builds Fast delivery Proven location

Build-to-suit opportunities up to Under our Local Development Current occupiers include: 1.6 million sq ft Order, full planning consent can Dixons Carphone be achieved within 28 days for a Class-leading quality and CEVA Logistics warehouse of any size between specifications tailored to the Lidl 100,000 and 1.6 million sq ft individual needs of your business SH Pratt Group Fast track delivery from UPS Chilled store options nine months Made.com Sustainability built in, with Compagnie Fruitiere We have a rolling speculative BREEAM outstanding and Planet Ziegler development programme. Mark certification on all new P&O Ferrymasters Contact us for latest availability builds, plus a range of green DHL options On site amenities include a café located in No.1 London Gateway, and Marlon’s Bistro. Flexible, scalable, BuildBuild optionsoptions toto suitsuit youyou built around you. TheThe DP DP WorldWorld LonLondondon GaGatewayteway Superb specification indicativeindicative masterplan masterplan offoffersers fl flexibleexible aaccommodation.ccommodation. as standard

IndicativeIndicative GIA GIA of of SQ FT SQ M availableavailable plots plots

LG106LG106 106,391 9,884 LG121 LG121LG121 121,008 11,242 PLOT 4040 LG146LG146 145,637 13,530

LG106 LGLG387387 387,064387,059 35,959 106,390 SQ FT LG577LG577 577,489576,51553,650 53,560

LG784LG715 783,781714,551 66,38472,815

LG715LG784 714,550783,774 66,38472,815 LG577 LG1021LG778 1,021,450576,515 53,560 94,895 LG146 PLOT 3020 LG715 145,640 SQ FT PLOT 1060 PLOT 5010 LG1509LG873 1,509,436872,738 81,080032,041 PLOT 1040 LG1301 1,301,370 120,935 Looking for bespoke options? Whatever your business, DP World London Looking for bespoke options? Whatever Gateway can facilitate your needs. your business, DP World London LG784 Gateway can facilitate your needs. LG387 PLOT 3030 PLOT 1010 FUTURE COMMON USER RAIL TERMINAL

PLOT 5020

LG1301 PLOT 2050

LG873 PLOT 2030 HGV TRUCK PARK RAIL TERMINAL

FUTURE RAIL TERMINAL DEEP SEA PORT

FUTURE EXPANSION

Build-to-suit Spec build programme from 100,000 Contact us for to 1.6 million sq ft latest availability 9,290 TO 148,645 SQ M

GREEN UP WELL MANAGED CROSS DOCK TRIMODAL TO 24/7/365 POTENTIAL BUILD 36M ‘OUTSTANDING’ ESTATE OPERATIONS LOGISTICS OPTIONS CLEAR HEIGHT ON ALL NEW BUILDS 24 HOUR ROAMING SECURITY PATROLS Environmental Initiatives 35% recycled Dual flush WCs provided including Target BREEAM ‘Outstanding’ rating Working Construction of building Planet designed to help your business, aluminium in glazing is presence detection water shut-off system including reduced CO2e emissions and 95% of Mark Certified, with construction included in the spec. to all WCs to prevent water wastage. waste materials generated recycled on site. and embodied CO2e emissions staff and the planet. Sustainability and savings calculated.

At London Gateway we are continually This commitment extends outside working to reduce our carbon the Park in the local community, LED floodlights illuminate the truck yard footprint. One of the ways we do this where we have worked with a local and loading bay areas; the rest of the is by working with Planet Mark - a Primary School to deliver a workshop plot is illuminated by means of column/ certification programme recognising on reducing our carbon footprint. building mounted downlights with zero- An energy monitoring system commitment to continuous upwards illuminance to reduce sky glow is provided to monitor the improvement in sustainability. This inclusion within the local community, combined with real and light spill to all external areas. energy usage of the building - via Trend Energy manager. During the construction stage, carbon reductions in carbon emissions on reduction measures include making site, can combat climate change, the use of sand dredged from the River support biodiversity and contribute The lighting to all office, welfare and Improved thermal Thames during the pre-construction to the society that it serves. reception areas is provided with presence performance and building of the port to raise ground level by two detection and daylight dimming to Typical Building air tightness, which can be metres on park developments, using reduce energy usage. monitored by BMS. steel instead of concrete for ground beams and installing flooring made from 20-44% recycled content. SH The office and welfare areas are heated Enhanced landscape Pratt’s Halo handing facility (108,555 and have hot water provided by means of boundaries, providing wildlife sf) was the first warehouse to receive an air source heat pump system. habitat. Planet Mark accreditation in 2018. The projected achieved a 16% reduction carbon during the build. The office and reception areas have comfort cooling systems - Ventilation to Foul water treated by on-site We have committed to certifying the Office and Welfare Areas includes Effluent Treatment Plant. every new building on our Logistics Heat Recovery. Park. By using less carbon emissions in construction across the Logistics Park 15% minimum rooflight and by reducing the amount of carbon coverage to provide natural we use in operations, we can make a light within the warehouse. vital contribution to facilitate trade in the greenest, most efficient ways. INCLUDED IN BASE SPECIFICATION PV’s are provided as part of an overall LED red and green light A rain water harvesting process to provide 20% predicated traffic lights provided on system is used to supply all energy requirements from renewable all dock doors. the WCs in the building. or low source energy sources. Promoting a healthier work/life balance

DP World London Gateway benefits All buildings on the Park are surrounded by green from a good public transport network, landscaping, dedicated walking and cycle paths throughout, ideal for a spot of lunchtime exercise landscaped cycle and walking paths, or walking meeting. and on-site cycle parking, all geared towards promoting healthier and more Two eateries are located on site, Marlon’s Bistro and environmentally friendly journeys. café at No.1 London Gateway, whilst other local shops, supermarkets, parks and recreational areas are just minutes away. Making their mark at London Gateway

DHL Supply Chain are the world’s DHL’s significant investment in automation Halo Handling is a new Halo handles soft fruits arriving into the UK from the MADE.COM is a leading Increasingly, the retailer is utilising the on-site deep- leading contract logistics provider. underpins its commitment to this strategic location. business venture of SH Mediterranean, South America, Southern Europe and European design brand and sea port, with goods inbound to the UK arriving at this centre to save on miles travelled inland by containers. They will benefit from the right location, the right Pratt Group one of the the Caribbean. It packages and labels the products fast growing e-commerce Their 482,000 sq ft, 42m high bay warehouse infrastructure and the right technology to serve before taking them to depots for major retailers. retailer. Two years on and Made are doubling their on-site will be a state-of-the-art, using high levels of Greater London and the South East over the long UK’s largest importers of Having this operation located at the port and closer capacity with an additional 400,000 sq ft of new automation, with 36m clear internal eaves term. The perfect choice to save time and instil a fruit – particularly bananas, of which it brings It has chosen to locate at DP World London Gateway to a densely-populated area of consumption means warehousing over two phases, to help meet customer height and boasting an internal volume equivalent level of resilience within their supply chain - offering between 23 and 30 million per week into for its proximity to market – enabling two-man Halo is reducing its truck movements, its fruit miles and demand for online retail and further optimize its to 645 Olympic swimming pools. direct access to the ’s most deliveries to home and business addresses. the country. therefore its carbon emissions by thousands of tonnes supply chain. connected trade hub. The decision to come to London Gateway One of the key reasons Halo is located at DP World each week. MADE’s addition of increased capacity in the UK represents a major milestone in their strategy to This decision has been made possible by DP World’s London Gateway is because of its proximity to a deep- follows a sustained period of growth which saw the unique offering and main USP - for its customers combine value-added and management services sea port linked to markets exporting vast amounts of company post a 37% increase in revenue in 2019. with traditional fulfilment and distribution. to easily scale up their physical distribution fresh fruit to the UK. The new site forms part of MADE.COM’s growing infrastructure and grow their business within London European wide warehousing portfolio. Gateway Logistics Park. GLASGOW

NORTH CHANNEL

BELFAST

IRISH SEA

DUBLIN

BRISTOL CHANNEL

COASTAL SHIPPING RAIL FREIGHT NETWORK

GLASGOW EDINBURGH

NORTH CHANNEL

NORTH SEA

BELFAST M6 TEESPORT

WCML LEEDS HULL

IRISH SEA M62 WAKEFIELD MANCHESTER DONCASTER Glasgow LIVERPOOL

DUBLIN SHEFFIELD ECML

M6 MML M1

HAMS HALL BIRMINGHAM DAVENTRY FELIXSTOWE M5 M11 M1 STANSTED

M40 SOUTHEND

CARDIFF LONDON M4 HEATHROW BRISTOL M25 BRISTOL CHANNEL M3 GATWICK

SOUTHAMPTON

STRAIT OF DOVER Leeds M62 M6 M62 M18 Immingham Liverpool ENGLISH CHANNEL To find a better location, you’ll Manchesterhave to A1(M)go a long way.

A421 A422 M1 511,200 SAT NAV: SS17M6 9DY workers aged 16-64 within A4421 M1 A10 M11 A131 A12 No ingham COASTAL SHIPPING NATIONAL MOTORWAYS MILTON London A 30-MINUTE DRIVE TIME KEYNES A1(M) Stansted RAIL FREIGHT NETWORK PRINCIPLE ROADS LUTON Airpo A44 M40 A120 A418 A120 COLCHESTER A5 A602 M6 Toll

A41 A1

A414 CHELMSFORD M6 A14 OXFORD M1 A12 Birmingham A414 28% NORTHAMPTON A14 M5 of workers within the catchment are A4010 Southend A1 A420 M11 A130 Airpo M1 employed in LOGISTICS AND DISTRIBUTION M40 WATFORD A127 FELIXSTOWE M25 M1 SOUTHEND-ON-SEA M11 A13 MILTON KEYNES A1(M) A128 A34 STANSTED SLOUGH LUTON London City LONDON M40 READING M4 Airpo SOUTHEND London TILBURY M4 Heathrow Airpo M4 Ebbsfleet A329(M) International Po of M3 Tilbury M4 LONDON 43% A299 M4 HEATHROW Bristol M20 Kent of workers within the catchment have WOKING M2 M2 A28 International M3 M25 LEVEL 1 & 2 NVQ QUALIFICATIONS Airpo M3 M20 M25 MAIDSTONE M20 GATWICK DOVER A34 A3 London A26 A28 GUILDFORD M23 M5 Gatwick HGV A303 Airpo A22 A229 A260 SOUTHAMPTON DRIVE PORTSMOUTH TIMES CRAWLEY A3 1 hour FOLKESTONE 30,000 A26 2 hours new homes UNDER CONSTRUCTION M3 3 hours

to meet GROWING WORKFORCE DEMAND A272 A21 A36 A272 Southampton A24 Airpo A22 A259 A23

A3(M) M27 A27 LESS THAN A27 SOUTHAMPTON Ready to work FROM THE A13 with short links to the 13% PORTSMOUTH 2 miles A127, A128 AND A130 - all major A roads of the local population have SKILLS 28 miles 45+ Rail RELEVANT TO TRANSPORT AND DP WORLD LONDON GATEWAY benefits from a STORAGE (3x the national average) from the CENTRE OF LONDON young, logistics-focused workforce on the doorstep. and on the doorstep of the densely Services 10 miles 8 miles populated home counties and per week TO ALL CORNERS OF THE UK. Trains to Source: Regeneris report – 2018 FROM THE M25 FROM THE LONDON CONSUMER MARKET mainland Europe can be run via the GLASGOW EDINBURGH

GLASGOW EDINBURGH NORTH CHANNEL

NORTH CHANNEL

NORTH SEA

BELFAST M6 NORTH SEA TEESPORT

BELFAST M6 TEESPORT

WCML LEEDS HULL

IRISH SEA M62 WCML LEEDS WAKEFIELD HULLMANCHESTER DONCASTER LIVERPOOL IRISH SEA M62 WAKEFIELD DUBLIN SHEFFIELD MANCHESTER DONCASTER ECML LIVERPOOL

DUBLIN SHEFFIELD ECML M6 MML M1 M6 MML HAMS HALL BIRMINGHAM M1 DAVENTRY HAMS HALL M11 FELIXSTOWE BIRMINGHAM M5 M1 STANSTED DAVENTRY FELIXSTOWE M5 M11 M1 STANSTED M40 SOUTHEND

CARDIFF LONDON M4 HEATHROW M40 SOUTHEND BRISTOL CARDIFF M25 BRISTOL CHANNEL HEATHROW LONDON M3 M4 GATWICK BRISTOL SOUTHAMPTONM25 BRISTOL CHANNEL M3 GATWICK STRAIT OF DOVER

SOUTHAMPTON

Supply chain STRAIT OF DOVER DP WORLD London enhancement with ENGLISH CHANNEL Gateway Logistics Park DP WORLD in the UK ENGLISH CHANNEL A industrial location offering flexibility, scalability and connectivity: The perfect place for business growth. DP WORLD harnesses its infrastructure, COASTAL SHIPPING NATIONAL MOTORWAYS DP World London Gateway Logistics Park is a 9.25million sq ft site for the expertise and customer service to RAIL FREIGHT NETWORK PRINCIPLE ROADS development of distribution, logistics and manufacturing facilities. deliver smarter trade solutions in COASTAL SHIPPING NATIONAL MOTORWAYS Buildings can be developed on a build-to-suit basis, from 100,000 sq ft, to 1.6 million sq RAIL FREIGHT NETWORK PRINCIPLE ROADS GLASGOW the UK, that create a better future EDINBURGH ft. Planning consent can be obtained in under 28 days. It has a track record of delivering for everyone. high quality buildings on time and to budget. NORTH CHANNEL Lease terms are available from five years. During that time with us, occupiers get access to In an unpredictable and ever-challenging marketplace, the Logistics Park’s estates team aftercare service and the opportunity to tap into its in-house DP World’s UK set up enables occupiers to serve key UK supply chain expertise. and European markets seamlessly. NORTH SEA

BELFAST M6 It enjoys an unmatched location adjacent to DP World London Gateway Port, one of the UK’s most Whether an organisation is seeking to reduce the carbon TEESPORT efficient and best located gateways – complete with customs inspection facility. The site is linked by footprint generated by its supply chain, whether it’s rail, road and water to all of the UK’s key freight destinations. looking to reduce its cost-to-serve or simply looking WCML LEEDS for greater certainty and reliability through its logistics HULL And it’s not just within the UK that DP World is delivering world class logistics sites like this. It offers

operations, DP World is a leading supply chain partner IRISH SEA M62 WAKEFIELD smarter trade solutions in more than 80 countries around the world and is the organisation behind the MANCHESTER DONCASTER and trade enabler that can deliver bespoke solutions. LIVERPOOL hugely successful Jebel Ali Free Zone in Dubai, home to over 7,000 businesses.

DUBLIN SHEFFIELD ECML

M6 TO FIND OUT MORE SCAN MML DP World London Gateway uses state-of-the-art technology to deliver efficient, reliable trade solutions TO FIND OUT MORE SCAN M1

HAMS HALL BIRMINGHAM DAVENTRY FELIXSTOWE M5 M11 M1 STANSTED CURRENT OCCUPIERS INCLUDE:

M40 SOUTHEND

CARDIFF LONDON M4 HEATHROW BRISTOL M25 BRISTOL CHANNEL M3 GATWICK

SOUTHAMPTON

STRAIT OF DOVER

ENGLISH CHANNEL

COASTAL SHIPPING NATIONAL MOTORWAYS RAIL FREIGHT NETWORK PRINCIPLE ROADS 33 Margaret Street London W1G 0JD

0207 409 8817

Jeremy Cracknell Bonnie Minshull Senior Development Manager +44 (0) 207 409 8088 +44 (0) 1375 648 305 [email protected] [email protected] Toby Green +44 (0) 207 409 9903 [email protected] Kofi Ofosu-Asare John Madocks Wright Development Surveyor +44 (0) 207 409 8151 +44 (0) 1375 648 301 [email protected] [email protected]

Jim O’Connell +44 (0) 7768 070 248 J.O’[email protected]

Daniel Wink +44 (0) 7717 545 532 www.londongateway.com/logisticspark [email protected]

Conditions under which particulars are issued: Savills for themselves and for the vendors or lessors of this property whose agents they are give notice that: (i) the particulars are set out as a general outline only for the guidance of intended purchasers or lessees, and do not constitute, nor constitute part of, an offer or contract; (ii) all descriptions, dimensions, reference to condition and necessary permissions for use and occupation, and other details are given without responsibility and any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves by inspection or otherwise as to the correctness of each of them; (iii) no person in the employment of Savills has any authority to make or give any representation or warranty whatever in relation to this property. 13730 06.21 tasselldesign.co.uk