PARK & RIDE CLOSURE NOTICE

DECEMBER 2019 LONG-TERM CLOSURE OF NORTH PARK & RIDE STARTING JANUARY 9, 2020 The North Seattle Park & Ride will be Northgate Ped/Bike Bridge Project Area closed until fall 2021 for construction NE Northgate Way of the Northgate Ped/Bike Bridge project. 5 WHY IS THE PARK & RIDE CLOSING? Mineral The State Department of Transportation Springs ve N and King Country Metro are partnering with Seattle Park

ve NE Department of Transportation during the construction of the Northgate Ped/Bike Bridge Project. The lot 1st A Meridian A will be used to stage equipment and materials for construction zone 4 5 N 103rd St the duration of the closure.

Bartonwood 3 ve NE 2 ve NE WHERE ELSE CAN I PARK? 5th A N 100th St 3rd A There are several alternative parking areas less NE 100th St than half a mile away, including: 1

ay N ■ Northgate Transit Center, .1 mile away Olympic View ■ Northgate Station Garage, .1 mile away North Seattle

College W College ■ Thornton Place Garage, .3 mile away N 95th St NE 95th St (6 AM–8 PM, Monday–Friday) ■ Northgate Mall Garage, .4 mile away (5 AM–12 AM, Monday–Friday)

NE 92nd St

L 1 North Seattle 3 Thornton Place Garage Northgate Ped/Bike Link station Park & Ride (closed) 4 Northgate Station Garage Bridge Elevated route Northgate Transit 2 5 Northgate Mall Garage Multi-use path Tunnel route Center Park & Ride

PROJECT INFORMATION & CONTACT Construction hotline: (206) 905-3620 [email protected] www.seattle.gov/transportation/NorthgatePedBridge PROJECT BACKGROUND LEARN MORE ABOUT THE PROJECT is partnering with Seattle Department of Transportation during the construction Join us at a construction drop-in session and of the Northgate Ped/Bike Bridge project. The bridge get your questions answered in person: will span I-5, landing at 1st Ave NE and NE 100th St Tuesday, January 7 on the east side, near the future light rail station, 12–1:30 PM and at on the west side. North Seattle College (The Grove) 9600 College Way N PROJECT BENEFITS The Northgate Ped/Bike bridge will be an accessible, Wednesday, January 8 all-ages-and-abilities bridge over I-5 in north Seattle. 8–9:30 AM Once complete, the bridge will help connect the Aljoya Thornton Place neighborhood’s thriving job and retail centers with 450 NE 100th St the rest of the city and the region by providing access Thursday, January 9 to the major transit hub, services, and communities. It 5–6:30 PM will also decrease travel times for people walking and Olympic View Elementary School biking between the two sides of the freeway. Project 504 NE 95th St elements include: Venues are ADA-accessible. Direct connection to the Link ■ Visit tripplanner.kingcounty.gov to plan your trip. light rail station ■ A protected bike lane along 1st Ave NE between To request accommodations for persons NE 103rd St and NE 92nd St with disabilities, or to request an interpreter, ■ A multi-use path between NE 103rd St and NE please contact (206) 905-3620 at least 5 working Northgate Way days prior to the event. ■ Handrail lighting and emergency call boxes for people using the bridge STAY CONNECTED ■ ADA-compliant ramps ■ Art elements that move with the wind's Sign up for email updates on our website: kinetic energy seattle.gov/transportation/NorthgatePedBridge ■ Resting spots for people moving across the bridge Questions? Call our construction hotline at (206) 905-3620 or email us at [email protected]

If you need this information translated, please call Nếu quý vị cần thông tin này chuyển ngữ sang tiếng (206) 905-3620. Việt xin gọi (206)905-3620.

Si necesita traducir esta información al español, 당신이 번역이 정보를 필요로하는 경우에, (206) 905-3620 llame al (206) 905-3620. 로 전화 해주십시오.

PROJECT INFORMATION & CONTACT Construction hotline: (206) 905-3620 [email protected] www.seattle.gov/transportation/NorthgatePedBridge