– MAKUTUPORA STANDARD GAUGE RAILWAY (SGR) LINE PROJECT

TANZANIA RAILWAYS CORPORATION (TRC) STANDARD GAUGE RAILWAY LOT. 01

Standard Gauge Railway (DAR ES SALAAM to MOROGORO)

190-205km 130-135km 76,25km 51,5km 20km 0km

Morogoro st. Ngerengere st. Ruvu st. Soga st. Pugu st. Dar Es Salaam st. M i i i i M

f f f f FREIGHT STATION FREIGHT STATION FREIGHT STATION FREIGHT STATION

• Storage Shed • Storage Shed • Storage Shed • Storage Shed

• Office Building • Office Building • Office Building • Office Building

SGR / Major Station Concept Design / SENER / Design Concept Station Major / SGR

Morogoro

Salaam Salaam

es

Dar Dar

/ / November 2017 November

03

INTRODUCTION

Central Railway Line is part of the exiting Railways Corporation network with total length of 2,707 Km; Central Line comprises of the following segments; DSM – - (840km), Tabora – (411km ) and Tabora – – (379km); kaliua – Mpanda (km 210)

Phase I of the construction of Central line starts from Dar es Salaam to Mwanza.  The first phase of Central line construction has 1,219Km, It will be executed in five lots as follows:- Lot 1: Dar es salaam- Morogoro This segment has length of 205 main line route Kilometers, crossing loops and station sidings of 95Km, Which makes a total of 300 track Kilometers.

Lot 2: Morogoro- makutupora This segment has length of 336 main line route Kilometers, crossing loops and station sidings of 86Km Which makes a total of 422 track Kilometers.

Lot 3: Makutupora-Tabora This segment has length a total of 376.5 track Kilometers (Main line route Kilometers are 294 Crossing/ siding loops of length 73.5 Km) Lot 4: Tabora- Total track Kilometers are 165.5 (Main line route Kilometers are 133 crossing/siding loops of 32.5 Kilometers)

Lot 5: Isaka – Mwanza The last lot in phase I has total of 311.25 track kilometers (main line route 249Km and crossing/siding Loops length of 62.25Km) PROJECT PROGRESS Lot 1: Dar es salaam - Morogoro.

The actual construction started in May, 2017 with contract duration of 30 months (02.05.17 to 01.11.2019).

Upto this May, 2018 total time lapse is 12 months and overall progress is (11%). INAENDELEA

Lot 2: Morogoro-Makutupora, The Contract for this lot was signed on 29th September, 2017 and the work started on 26th February, 2018. The project was officiated by H.E Dr. John Joseph Pombe Joseph Magufuli, the President of the United Republic of Tanzania on 14.03.2018 at Ihumwa, to mark start of its implementation that will span 36 months intil 25.02. 2021. FEATURES OF THE NEW RAILWAY The railway line is constructed standard adopting AREMA standards  Gauge is 1,435mm  Axle load 35T  Train length 2,000  Annual line capacity 17 million Tons  Passenger train speed 160 Kph  Freight train speed 120 Kph  Longest viaduct length 2.50 Km within Dar es salaam INAENDELEA

 Construction of three major stations Dar es salaam, Morogoro, Dodoma and two marshalling yards at Kwala (Pwani) and Ihumwa (Dodoma).

 Construction of 11 intermediate stations (Pugu, Soga, Ruvu, Ngerengere, Mkata, Kilosa, Kidete, Gulwe, Igandu, Bahi and makutupora)

 Electric train with ERTMS Level 2 na GSM-R signalling system  Fenced railway line with under/over passes and grade separated with major roads

 Concrete sleepers each weighing 280Kg

 Rail section of 120 LB/yd (UIC 60 = 60Kg/m) AVAILABLE OPPORTUNITIES

Employment in the ratio 80:20 Local:Foreign Direct 2,865 local employments recorded in number out of 3,167 in total equivalent to 90% Industries:- During the production of concrete sleepers, steel and cement industries will benefit etc Sub-contractors:- Construction and supply subcontractors have been availed opportunities to supply and hire equipments, earthworks and human necessities. CONT.,

 New 150 permanent employments are estimated for the first lot alone during commissioning in 2019.  New areas where the railway line will traverse will open up human development activities and settlements  Road maintenance efforts will decrease as heavy, bulky and long distance cargo will shift to the reliable and faster railway.  Prices of commodities in destination market will lower as 40% currently is due to transport.  The new railway will be even more environmental friendly as it will predominantly use electricity and conserve forex for importation of diesel. CONT.,

 Reduction in overall travel journeys example it takes 10 hrs between Dar es Salaam and Dodoma that will be reduced to 3 hrs. Has greatly contributed to direct and non- direct employments. 0

1 February 2018 / Dar es Salaam – Morogoro SGR / Intermediate Station Concept Design / SENER Wadau Mradi RELI RELI HOLDING ASSETS COMPANY LTD. wa YAPI YAPI MERKEZI (RAHCO)/TRC Employer: YAPI YAPI MERKEZI Designer: Contractor: COWI MOTAENGIL MOTAENGIL AFRICA EmployerRepresentative: KOREA RAILROAD SENER - JV Km: 1+000 Ilala Camp (Dar es Salaam)

15 Km: 53+000 Soga Camp Site

16 Km: 142+000 Ngerengere Camp Site

17 Piling Works Km: 1+540

18 Viaduct Works Km: 1+660

19 Km: 25+000 Excavation Works

20 Km: 29+000 Culvert Works

21 Km: 39+000 Excavation Works

22 Km: 44+200 Filling Works

23 Km: 47+750 Filling Works

24 Km: 57+000 Filling Works

25 Km: 68+500 Mechanical Wet Mix Plant

26 Km: 59+600 Subballast Laying

27 Km: 137+000 Excavation Works

28 Km: 137+500 Excavation Works

29 Km: 137+000 Ngerengere

30 3D Model of Dar es Salaam Viaduct in Dar es Salaam – Morogoro SGR Line

31 Morogoro – Dodoma – Makutupora SGR Line (Phase 2 | 336 km)

32 Morogoro – Dodoma – Makutupora SGR Line (Phase 2 | 336 km) Alignment

KM 536 BAHI KM 504 KM 439 IGANDU GULWE KM 390 KM 356 KIDETE KM 298 KILOSA KM 268 MKATA KM 230 Km 205 336 km KM 205

33 Morogoro – Dodoma – Makutupora SGR Line (Phase 2 | 336 km) Scope of Works

• Single track SGR line of 336 km , 86 km sidings • Eight stations ( Mkata, Kilosa, Kidete, Gulwe, Igandu, Dodoma, Bahi, Makutupora) • Control rooms • Workshop and Depot (At Km. 423+500, Ihumwa) including Equipments • Bridges, overpass and underpasses • Tunnels • Culverts • Signaling and Telecommunication • Centralized Traffic Control (CTC) Centre • Electrification and Overhead Catenary System

34 Morogoro – Dodoma – Makutupora SGR Line (Phase 2 | 336 km) Status

• The Contract for Phase 2 was signed on 29 September 2017 • Groundbreaking ceremony took place at Ihumwa/Dodoma on 14 March 2018 • Design works are ongoing • Mobilization to the Mobile Camps at Km. 211+000 and Km. 229+000 and the Main Camp at Km. 265+600 (Kilosa) has commenced. The Contractor will be bases in 2 Main Camps at Km. 265+600 (Kilosa) and Km.423+500 (Ihumwa) and will establish 8 Mobile Camps in total in various locations of the alignment • Access Roads works are ongoing • Topographical LIDAR Survey and Geotechnical Investigations works are ongoing

35 Morogoro – Dodoma – Makutupora SGR Line (Phase 2 | 336 km) Status

MANPOWER Local Expat STATUS 68 people 82 people TOTAL: 150 Nos

At Site Shipped on Waiting for 31 EQUIPMENT Board Delivery Construction 220 1116 STATUS Equipment Equipment Equipment Including Service Vehicles TOTAL: 1367 Nos

36 Morogoro – Dodoma – Makutupora SGR Line (Phase 2 | 336 km) Signature Ceremony

37 Km: 137+000 Fence Works

38 Km: 137+000 Earthworks

39 Km: 137+000 Excavation Works

40 Km: 137+000 Drilling Works

41 3D Model of a Tunnel in Morogoro – Dodoma – Makutupora SGR Line

42 3D Model of a Bridge in Dar es Salaam – Morogoro SGR Line

43 Thank You. Asanteni Sana

PROGRESS UP TO APRIL.mp4

Tanzania Railways Corporation (TRC) Thank You. Asanteni Sana

DSM PROGRESS JUNE2018.mp4 Tanzania Railways Corporation (TRC)