GOVERNMENT OF TAMILNADU

HIGHWAYS AND MINOR PORTS DEPARTMENT

COMPREHENSIVE ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME 2012-13

G.O. Ms No. 161/ Highways and Minor Ports (HN2) Department, Dated 01.10. 2012 COMPREHENSIVE ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME 2012 - 13

G.O. Ms No. 161/ Highways and Minor Ports (HN2) Department / Dated 01. 10. 2012

INDEX

Page Sl. No. Category No 1 State Highways 1-50

2 Major District Road 51-105

3 Other District Road 106-140

Other District Road - Special 4 141-185 Component Plan COMPREHENSIVE ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME 2012-13

ABSTRACT

Length in km, Amount in Lakhs

Culverts / Roads LA / DPR Others Total Classificat Bridges ion Nos Length Cost Nos Cost Nos Cost Nos Cost Nos Cost

SH 346 1305.49 86278.00 27 1608.00 6 1129.50 18 1365.00 397 90380.50

MDR 396 1587.99 79139.50 22 1571.50 15 1161.00 433 81872.00

ODR 309 763.31 19962.00 36 1742.00 2 78.00 20 620.00 367 22402.00

ODR SCP 441 1286.12 29940.50 29 1100.00 13 555.00 483 31595.50

Grand 1492 4942.91 215320.00 114 6021.50 8 1207.50 66 3701.00 1680 226250.00 Total

SECTION OFFICER 1/ 185

Annexure to G.O. Ms No. 161/ Highways and Minor Ports (HN2) Department / Dated 01. 10. 2012 CRIDP 2012-13 LIST OF WORKS - STATE HIGHWAYS Rs. in Lakhs Cost ID Job Code Division Constituency Name of work (Eng) Length required 1 01-CRIDP-12- City Tambaram Widening from Km 26/3- 26/7 (RS) 1.50 500.00 13-S-0001 Roads and 27/0 -27/8 (LS & RS) and Improvements to Km 26/3- 27/8 (both Side) of GST Road (SU-88)

Other Widening Total 1.50 500.00 2 01-CRIDP-12- Chennai City Tambaram Improvements to Marmalong bridge 3.00 570.00 13-S-0002 Roads - Irumbuliyur - Vandalur- Mudichur- Oragadam- Road km 13/4 - 16/4 (SH-48)

3 01-CRIDP-12- Chennai City Tambaram Improvements to Marmalong bridge 2.80 540.00 13-S-0003 Roads - Irumbuliyur - Vandalur- Mudichur- Oragadam- Walajabad Road km 16/4 - 19/2 (SH-48)

4 01-CRIDP-12- Chennai City Perambur Providing and laying thin white 0.85 100.00 13-S-0004 Roads topping including Construction of drain and platform in Km.4/750-5/2 & 11/0-11/4 (LS) of GNT Road (SU- 87) 5 01-CRIDP-12- Chennai City Kolathur Strengthening of Riding Surface in 2.10 310.00 13-S-0005 Roads Km 15/0- 17/1 (LS &RS) of Inner Ring Road (SH-2) 6 01-CRIDP-12- Chennai City Saidapet Forming World class standard 1650.00 13-S-0006 Roads Arterial Roads in chennai - Inner Ring Road - Phase - I Strengthening Total 8.75 3170.00 7 01-CRIDP-12- Chennai City Pallavaram Improvements to Airport and Padi 100.00 13-S-0007 Roads flyovers and providing greeneries and land scaping at Km.16/9- 18/7 of G.S.T Road (SU-88)

8 01-CRIDP-12- Chennai City Annanagar Improvements to Koyambedu 100.00 13-S-0008 Roads flyover and providing greeneries and land scaping at Km 8/4- 8/6 of Inner Ring Road (SH-2)

9 01-CRIDP-12- Chennai City Saidapet Improvements to Kathipara flyover 150.00 13-S-0009 Roads and providing greeneries and land scaping at Km.12/0-12/1 of GST Road (SU-88)

SH-1of 50 SECTION OFFICER 2/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 10 01-CRIDP-12- Chennai City Thousand Beautification of Anna subway at km 36.00 13-S-0010 Roads lights 1/8 and Subways near Shanthi theatre at km 2/1 and Thousand Lights at km 4/1 of GST Road (SU-88)

Others Total 4 Nos 386.00 Chennai City Roads Total 10.25 4056.00 11 01-CRIDP-12- Thiruporur Widening of Rajiv Gandhi Salai 1.30 90.00 13-S-0011 (Chennai - Mamallapuram Road (via) Thiruporur) Km.42/2 - 43/500 (SH-49A)

12 01-CRIDP-12- Chengalpattu Cheyyur Widening From Single lane to Double 1.80 145.00 13-S-0012 lane and Strengthening the Cheyyur - Wandavasi - Polur Road Km.0/0 - 1/8 (SH-115) Other Widening Total 3.10 235.00 13 01-CRIDP-12- Chengalpattu Thiruporur Strengthening of Sadras - Chengal 2.80 130.00 13-S-0013 pattu - Kancheepuram - Arakonam - Thiruthani Road Km.1/2 - 1/8, 13/0 - 13/6 & 14/0-15/6 (SH-58)

14 01-CRIDP-12- Chengalpattu Chengalpattu Strengthening of Sadras - 1.40 75.00 13-S-0014 Chengalpattu - Kancheepuram - Arakonam - Thiruthani Road Km.25/0 - 26/4 (SH-58) 15 01-CRIDP-12- Chengalpattu Uthiramerur Strengthening of Sadras - 2.20 100.00 13-S-0015 Chengalpattu - Kancheepuram - Arakonam - Thiruthani Road Km.39/4 - 40/6 &42/8-43/8 (SH-58)

16 01-CRIDP-12- Chengalpattu Thiruporur Strengthening of Rajiv Gandhi Salai 4.40 350.00 13-S-0016 (Chennai - Mamallapuram Road (via) Thiruporur) Km.30/0 - 32/8 & 33/2-34/8 (SH-49A) 17 01-CRIDP-12- Chengalpattu Thiruporur White Topping to Rajiv Gandhi Salai 0.40 50.00 13-S-0017 (Chennai - Mamallapuram Road (via) Thiruporur) Km.32/8 - 33/2 (SH-49A)

18 01-CRIDP-12- Chengalpattu Sriperumbudur Strengthening of Kodambakkam - 6.00 350.00 13-S-0018 Sriperumbudur Road Km.5/0 - 11/0 (SH-113) 19 01-CRIDP-12- Chengalpattu Sriperumbudur Strengthening of Singaperumal koil - 10.93 570.00 13-S-0019 Sriperumbudur - Thiruvallur - Redhills Road Km.32/0 - 40/325 (SH-57)

SH-2of 50 SECTION OFFICER 3/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 20 01-CRIDP-12- Chengalpattu Maduranthagam Strengthening of Chennai - Trichy - 1.80 75.00 13-S-0020 Dindugal Road Km.80/4 - 82/2 (SU-7)

21 01-CRIDP-12- Chengalpattu Maduranthagam Strengthening of Maduranthagam - 1.40 65.00 13-S-0021 Vennagupattu Road Km.10/0 - 11/4 (SH-117) 22 01-CRIDP-12- Chengalpattu Maduranthagam Strengthening of Bukkathurai - 10.00 500.00 13-S-0022 Uthiramerur Road Km.3/6 - 13/6 (SH-118) 23 01-CRIDP-12- Chengalpattu Uthiramerur Strengthening of Bukkathurai - 5.40 265.00 13-S-0023 Uthiramerur Road Km.14/6-17/1, 17/6-18/7 & 19/2-21/0 (SH-118)

24 01-CRIDP-12- Chengalpattu Uthiramerur White Topping to Bukkathurai - 0.50 50.00 13-S-0024 Uthiramerur Road Km.18/700 - 19/200 (SH-118) 25 01-CRIDP-12- Chengalpattu Uthiramerur Strengthening of Sadras - 9.40 450.00 13-S-0025 Chengalpattu - Kancheepuram - Arakonam - Thiruthani Road Km.51/6-61/0 (SH-58) 26 01-CRIDP-12- Chengalpattu Sriperumbudur Strengthening of Walajabad- 3.20 120.00 13-S-0026 Sunguvarchathiram-Keelachery Road Km.11/2 - 12/8 and 13/2 - 14/8 (SH-120) 27 01-CRIDP-12- Chengalpattu Sriperumbudur Strengthening of Chennai - Chittoor 2.10 150.00 13-S-0027 - Bangalore Road (Sunguvarchathiram Urban Limit)(Abanded stretch NH 4) Km.48/8 - 50/900 including construction of storm water drain at Walajabad-Sunguvarchathiram- Keelachery Road Junction (SU-3)

28 01-CRIDP-12- Chengalpattu Maduranthagam Strengthening the Cheyyur - 4.20 200.00 13-S-0028 Wandavasi - Polur Road Km.23/8 - 28/0 (SH-115) 29 01-CRIDP-12- Chengalpattu Uthiramerur Strengthening of Uthiramerur - 1.60 80.00 13-S-0029 Kancheepuram Road Km.2/0 - 3/6 (SH-118A) 30 01-CRIDP-12- Chengalpattu Uthiramerur Strengthening of Uthiramerur - 7.00 350.00 13-S-0030 Kancheepuram Road Km.18/0 - 25/0 (SH-118A) 31 01-CRIDP-12- Chengalpattu Strengthening of Kanchipuram- 5.90 220.00 13-S-0031 Vandavasi Road Km.0/0 - 5/9 (SH- 116) Strengthening Total 80.63 4150.00

SH-3of 50 SECTION OFFICER 4/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 32 01-CRIDP-12- Chengalpattu Uthiramerur Widening the existing narrow 50.00 13-S-0032 bridge at Km.16/4 of Uthiramerur - Kancheepuram Road (SH- 118A) 33 01-CRIDP-12- Chengalpattu Sriperumbudur Widening the existing narrow Box 150.00 13-S-0033 Type culvert in Tambaram - Mudichur - Sriperumbudur Road Km.7/5 - 23/5 (km.7/10, 8/2 (i), (ii), 8/4, 8/6 (i) (ii) (iii) (iv), 8/8 (i) (ii) (iii), 8/10 (i) (ii), 9/8 (i) (ii), 9/10, 10/4, 10/6, 10/8, 11/6, 11/8 (i) (ii), 12/8, 12/10 (i) (ii), 13/2 (i) (ii), 13/4, 13/8, 13/10, 14/6, 14/8, 14/10, 15/4, 15/6, 15/8 (i) (ii). 15/10, 16/4 (i) (ii), 16/8, 16/10, 17/10, 18/4, 18/6, 18/8, 21/6, 22/4, 22/0)( 50 Nos) (SH-110)

Culverts/Bridges Total 2 Nos 200.00 Chengalpattu Total 83.73 4585.00 34 01-CRIDP-12- Thiruvallur Thiruvottiyur widening and strengthening at Km 0.90 125.00 13-S-0034 17/3-18/2 of Chennai Ennore road (SH-114) 35 01-CRIDP-12- Thiruvallur Gummidipoo Widening from double lane to multi 2.00 230.00 13-S-0035 ndi lane of Korathalaiyar Bridge to Puthur road Km.21/0-23/0 (SH-51)

Other Widening Total 2.90 355.00 36 01-CRIDP-12- Thiruvallur Gummidipoondi Strengthening the Korathaliyar 3.00 200.00 13-S-0036 Bridge Puthur Road Km 28/0 - 31/0 (SH-51) 37 01-CRIDP-12- Thiruvallur Maduravoyal Improvements to Km 13/6-14/5 of 0.90 115.00 13-S-0037 Vanagaram Ambathur Puzhal road (SH-205) 38 01-CRIDP-12- Thiruvallur Thiruvottiyur Improvements to Km 14/8-16/0 of 1.20 70.00 13-S-0038 Chennai Ennore Expressway road (SH-1) 39 01-CRIDP-12- Thiruvallur Maduravoyal Improvements to Mount - 2.00 265.00 13-S-0039 Poonamallee Avadi road in Km 7/4- 9/4 (SH-55) 40 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Mount - 1.40 185.00 13-S-0040 Poonamallee Avadi road in Km 9/4- 10/8 (SH-55) 41 01-CRIDP-12- Thiruvallur Avadi White topping to Mount 1.60 96.00 13-S-0041 Poonamallee Avadi road km. 3/8- 5/4 (SH-55)

SH-4of 50 SECTION OFFICER 5/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 42 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Korattur- 6.40 410.00 13-S-0042 Thinnanur-Periyapalayam road Km. 0/0-6/4 (SH-50A) 43 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Korattur- 3.60 165.00 13-S-0043 Thinnanur-Periyapalayam road Km. 20/2-23/8 (SH-50A) 44 01-CRIDP-12- Thiruvallur Gummidipoondi Improvements to Korattur- 4.93 225.00 13-S-0044 Thinnanur-Periyapalayam road Km. 23/8-28/2+530m (SH-50A) 45 01-CRIDP-12- Thiruvallur Gummidipoondi Improvements the Grand Northern 1.60 200.00 13-S-0045 Trunk Road Km 43/0-43/8 & 45/0- 45/8 Center median 800 m (SU-17)

46 01-CRIDP-12- Thiruvallur Thiruttani Improvements to R.K.Pettai – 5.00 216.00 13-S-0046 Pallipet Road Km. 0/0-0/6, 2/8-3/2, 8/0-10/0 & 12/0-14/0 (SH-108)

47 01-CRIDP-12- Thiruvallur Thiruvallur Rebuilding the Thirumazhisai- 2.20 330.00 13-S-0047 Uthukkottai Road km:27/8-30/0 (SH- 50) 48 01-CRIDP-12- Thiruvallur Madhavaram Improvement to Mount - 1.70 190.00 13-S-0048 Poonamallee - Avadi road Km.15/3- 17/0.(SH-55) 49 01-CRIDP-12- Thiruvallur Ponneri Improvements to Chennai Pulicat 3.00 188.00 13-S-0049 road km 13/0 - 16/0 (SH-104)

50 01-CRIDP-12- Thiruvallur Gummidipoondi Forming approaches to bridges at 0.80 80.00 13-S-0050 km 18/8 ,18/10, 12/6&13/2 in Kavarapettai - Sathyavedu road (SH-52) 51 01-CRIDP-12- Thiruvallur Gummidipoondi Impeovements to km 10/6-12/6 of 2.00 135.00 13-S-0051 Kavaraipettai - Sathiyavedu Road (SH-52) Strengthening Total 41.33 3070.00

52 01-CRIDP-12- Thiruvallur Gummidipoondi Reconstruction of culvert at km 80.00 13-S-0052 3/2, 7/2, 11/2 & 12/8 of Kavaraipettai - Sathiyavedu Road (SH-52) Culverts/Bridges Total 1 Nos 80.00 53 01-CRIDP-12- Thiruvallur Madhavaram Construction of strom water drain at 75.00 13-S-0053 GNT road Km. 24/8-25/6 (SU-15)

Others Total 1 Nos 75.00 Thiruvallur Total 44.23 3580.00

SH-5of 50 SECTION OFFICER 6/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 54 01-CRIDP-12- Widening from IL to DL of 14.95 547.00 13-S-0054 Sholinghur Road (SH128) Km 14/4 - 27/0 and 27/650 - 30/0 including construction of culverts, Side Drain and Retaining wall. (SH-128)

55 01-CRIDP-12- Vellore Kilvaithinan Widening from IL to DL 5.00 200.00 13-S-0055 kuppam Panamadangi Poosarivalasai Paratharami Road (SH125) Km 5/0 - 10/0 including widening the Culvert (SH-125) IL to DL Total 19.95 747.00 56 01-CRIDP-12- Vellore Arcot Widening from DL to ML of 0.90 200.00 13-S-0056 Krishnagiri Ranipet Road at Km 140/500 - 141/400 and Includiing Construction of Drain (SU-24) (Abandoned NH46 Stretch)

57 01-CRIDP-12- Vellore Ranipet Widening from DL to FL and 1.20 279.00 13-S-0057 Improvements to Krishnagiri Ranipet Road Km 144/2 - 145/4 (Abandoned NH46 Stretch) Other Widening Total 2.10 479.00 58 01-CRIDP-12- Vellore Arakonam Improvements to Walajah 8.40 560.00 13-S-0058 Sholinghur Road (SH- 61) Km 31/6 - 38/0 and 39/0 - 41/0

59 01-CRIDP-12- Vellore Katpadi Improvements to Ranipet Ponnai 6.00 265.00 13-S-0059 Road (SH124A) Km 2/4 - 7/0 and 13/6 - 15/0 60 01-CRIDP-12- Vellore Arcot Improvements to Arcot Tindivanam 3.50 160.00 13-S-0060 Road (SH5) Km 8/5 - 11/0 and 19/8 - 20/8 61 01-CRIDP-12- Vellore Improvements to Abdullapuram 3.00 156.00 13-S-0061 Asanampattu Thirupathur Road Km 7/0-10/0 (SH122) 62 01-CRIDP-12- Vellore Arcot Improvements to Arcot 2.88 130.00 13-S-0062 Kannamangalam RoadKm 10/725 - 13/0 and 24/8 - 25/4 (SH129)

63 01-CRIDP-12- Vellore Vellore Improvements to Krishnagiri 1.40 105.00 13-S-0063 Ranipet Road Km 119/0 -120/4 (SH-24) 64 01-CRIDP-12- Vellore Katpadi Improvements to Ponnai 3.60 200.00 13-S-0064 Road Km 12/8 - 16/4 (SH-124)

SH-6of 50 SECTION OFFICER 7/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 65 01-CRIDP-12- Vellore Ranipet Improvements to Walajah - 1.20 85.00 13-S-0065 Sholinghur - Arakonam Road Km 0/0-1/2 (SH-61) 66 01-CRIDP-12- Vellore Arcot Improvements to Arcot 1.10 50.00 13-S-0066 Kannamangalam Road Km 8/9 - 10/0 (SH-129) 67 01-CRIDP-12- Vellore Arakonam Improvements to Walajah 6.60 440.00 13-S-0067 Sholinghur Arakkonam Road Km 42/0 - 48/6. (SH-61) Strengthening Total 37.68 2151.00 Vellore Total 59.73 3377.00 68 01-CRIDP-12- Vaniyambadi Kilvaithinan Widening from Intermediate lane to 6.00 230.00 13-S-0068 kuppam Double lane of - Palamaneri Road Km 22/0 - 27/0 and Including providing Cement Concrete Pavement at km 9/4 -9/8 & Improvements to KM.7/4 - 8/0 (SH- - 127)

69 01-CRIDP-12- Vaniyambadi Kilvaithinan Widening from Intermediate lane to 7.60 180.00 13-S-0069 kuppam Double lane of Panamadangi - Poojarivalasai - Road Km 12/0 - 19/6 (SH- - 125)

IL to DL Total 13.60 410.00 70 01-CRIDP-12- Vaniyambadi Vaniyambadi Improvements to Abdullapuram - 8.60 415.00 13-S-0070 Asanampattu - Alangayam - Tirupattur Road. Km 26/0 -26/4, 26/8, 27/4,28/2, 48/4 -55/0 & 64/0 - 65/0 and Construction of Protective wall (SH- -122) 71 01-CRIDP-12- Vaniyambadi Improvements to - Sathgur 0.60 30.00 13-S-0071 Road. Km 7/4 - 8/0 (SH-130A)

72 01-CRIDP-12- Vaniyambadi Vaniyambadi Improvements to Krishnagiri - 1.60 137.00 13-S-0072 Ranipet Road Km 51/4 - 53/0 and including providing paved shoulders (SU-144) 73 01-CRIDP-12- Vaniyambadi Thirupattur Improvements to Abdullapuram – 7.90 380.00 13-S-0073 Aasanampattu - Alangayam - Tirupattur Road KM 71/6 – 79/5 (SH- 122)

SH-7of 50 SECTION OFFICER 8/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 74 01-CRIDP-12- Vaniyambadi Thirupattur Improvements to Hogenakkal - 2.20 206.00 13-S-0074 Pennagaram - Dharumapuri - Tirupattur Road Km 99/0 - 99/9, 105/3 - 106/4 , 107/0 - 107/2 and including providing paved shoulders km 107/2 -108/2 (SH- 60) 75 01-CRIDP-12- Vaniyambadi Thirupattur Improvements to Bargur - 3.80 183.00 13-S-0075 Tirupattur road Km 11/4 - 13/4, 15/4 - 16/0 and 23/0 - 24/2 (SH- 131) 76 01-CRIDP-12- Vaniyambadi Thirupattur Improvements to Tirupattur - 10.90 524.00 13-S-0076 Singarapet Road Km 5/5 - 16/4 (SH- 18A)

77 01-CRIDP-12- Vaniyambadi Kilvaithinan Improvemets to Chittoor 9.50 495.00 13-S-0077 kuppam Gudiyattam Road KM 3/6 - 8/1, 11/6 - 16/6, & Construction of Drain and Retaining wall (SH- 88) 78 01-CRIDP-12- Vaniyambadi Thirupattur Improvements to Tirupattur - 4.50 200.00 13-S-0078 Singarapet Road km 1/0 - 5/5 (SH- 18A) 79 01-CRIDP-12- Vaniyambadi Jolarpet Improvements to Salem - Tirupattur- 1.80 135.00 13-S-0079 Vaniyambadi Road in builtup Areas km 106/4 - 108/2 (SH-18)

80 01-CRIDP-12- Vaniyambadi Jolarpet Improvements to Salem - Tirupattur- 2.20 165.00 13-S-0080 Vaniyambadi Road in builtup Areas km 111/8 - 114/0 (SH-18)

Strengthening Total 53.60 2870.00 Vaniyambadi Total 67.20 3280.00 81 01-CRIDP-12- Tiruvannamalai Tiruvannamalai Widening from DL to ML in km 63/6 0.25 50.00 13-S-0081 of Kallakuruchi -Tiruvannamalai road (Multi Lane) with median (SH- 6) Other Widening Total 0.25 50.00 82 01-CRIDP-12- Tiruvannamalai Polur Improvements to Sanipoondi - 2.10 130.00 13-S-0082 Pennathur - Avalurpet - Chetpet Road Km 40/3 - 42/4 including Widening Culverts 5 Nos (SH-4A)

83 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Arcot - 1.00 45.00 13-S-0083 Thindivanam road km 33/0 - 34/0 (SH-5)

SH-8of 50 SECTION OFFICER 9/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 84 01-CRIDP-12- Tiruvannamalai Vandawasi Improvements to Arcot-Tindivanam 3.00 185.00 13-S-0084 Road Km.76/4 -79/4 (SH-5)

85 01-CRIDP-12- Tiruvannamalai Tiruvannamalai Geometric Improvements to 3.40 180.00 13-S-0085 Tiruvannamalai - Arur Road (via) Thanipadi Km.2/6-4/0 & 5/0 - 7/0 Including Bus Lay Bye, Drain and Retaining Wall (SH-6A)

86 01-CRIDP-12- Tiruvannamalai Chengam Improvements to Tiruvannamalai 2.00 80.00 13-S-0086 Arur Road (via) Thanipadi Km.12/0- 14/0 (SH-6A)

87 01-CRIDP-12- Tiruvannamalai Chengam Improvements to Thandarampattu - 1.80 85.00 13-S-0087 Kottakulam Road Km.6/0 - 7/8 (SH- 6) 88 01-CRIDP-12- Tiruvannamalai Vandawasi Improvements to Cheyyur - 4.80 240.00 13-S-0088 Vandavasi - Polur Road Km 34/0 - 36/0, 60/0 - 61/0, 68/2 - 70/0 (SH- 115) 89 01-CRIDP-12- Tiruvannamalai Polur Improvements to Cheyyur - 4.00 357.00 13-S-0089 Vandavasi - Polur Road at Km 79/8,10, 80/4 - 81/2, 84/0 - 85/0, 87/8 - 89/0 & 95/6,8,10 includng Widening & Reconstrucion of Culverts 13 Nos. (SH-115)

90 01-CRIDP-12- Tiruvannamalai Arani Improvements to Kannamangalam 2.40 120.00 13-S-0090 Arni road Km 0/0 - 2/4 (SH-132)

91 01-CRIDP-12- Tiruvannamalai Polur Improvements to Cheyyur - 1.00 50.00 13-S-0091 Vandavasi - Polur Road at Km 74/6 - 75/6 (SH-115) 92 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Kancheepuram - 7.10 485.00 13-S-0092 Vandavasi road km 5/9 - 13/0 including Widening & Reconstruction of existing Culvert works 25Nos.(SH-116)

Strengthening Total 32.60 1957.00 93 01-CRIDP-12- Tiruvannamalai Arani Reconstruction of Culvert at Km 30.00 13-S-0093 30/6 of Arcot Villupuram road (SH- 4) Culverts/Bridges Total 1 Nos 30.00 94 01-CRIDP-12- Tiruvannamalai Tiruvannamalai Construction of Drainage structure 100.00 13-S-0094 with Foot path km 109/1-109/8 of Cuddalore-Chittor road (SH-9)

SH-9of 50 SECTION OFFICER 10/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 95 01-CRIDP-12- Tiruvannamalai Kalasapakkam Construction of Drainage and 215.00 13-S-0095 improvements in Km 35/8 - 37/5 of Polur Chengam road (SH-133)

Others Total 2 Nos 315.00 Tiruvannamalai Total 32.85 2352.00 Chennai Total 297.99 21230.00 96 01-CRIDP-12- Villupuram Gingee Widening from IL to DL Km.23/3- 0.70 41.00 13-S-0096 24/0 & Impts Km.23/800-24/00. in Sanipoondy-Keezhpennathur- Avalurpet-Chetpet road (SH-4 A)

IL to DL Total 0.70 41.00 97 01-CRIDP-12- Villupuram Villupuram Widening DL to ML of Old NH-45 1.85 387.00 13-S-0097 passing through Villupuram Town Km.162/6-164/450 (SU 138)

98 01-CRIDP-12- Villupuram Vanur Widening DL to ML and 4.76 450.00 13-S-0098 Strengthening to Thiruvanmiyur- Mahabalaipuram-Marakkanam- Pondicherry road Km.130/040- 134/8(SH-49) Other Widening Total 6.61 837.00 99 01-CRIDP-12- Villupuram Gingee Improvements Arcot - Villupuram 6.80 275.00 13-S-0099 road Km.58/0-61/6, 67/4-67/8 84/2- 85/2, 87/0-88/8 (SH-4)

100 01-CRIDP-12- Villupuram Villupuram Improvements to Arcot-Villupuram 10.60 490.00 13-S-0100 road Km.93/0-98/0, 100/0- 101/0,102/0-104/0, 107/4-110/0 (SH-4 ) 101 01-CRIDP-12- Villupuram Vanur Improvements to Mailam-Pondy 3.70 180.00 13-S-0101 road Km.7/3-7/9, 16/5-18/0 & 24/0- 25/6(SH-136) 102 01-CRIDP-12- Villupuram Mailam Improvements to Arcot - 5.50 275.00 13-S-0102 Tindivanam road km. 86/5-92/0 (SH- 5) 103 01-CRIDP-12- Villupuram Tindivanam Improvements to Tindivanam - 10.40 500.00 13-S-0103 Marakkanam road km. 4/0- 6/0, 9/4-11/4, 15/6-16/0,16/2-16/8, 18/8-20/0 21/0-22/0, 25/0-28/2 (SH- 134) 104 01-CRIDP-12- Villupuram Gingee Impts. to Sanipoondy- 2.10 109.00 13-S-0104 Keezhpennathur-Avalurpet-Chetpet road Km.31/4-33/5 (SH-4 A)

Strengthening Total 39.10 1829.00

SH-10of 50 SECTION OFFICER 11/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 105 01-CRIDP-12- Villupuram Vikravandi Reconstruction of minor bridge at 50.00 13-S-0105 Km.107/6 of Arcot-Villupuram road(SH-4) 106 01-CRIDP-12- Villupuram Villupuram Widening culverts at Km.45/6, 46/2, 15.00 13-S-0106 47/6,53/4 of Villupuram- Mambalapattu-Tirukoilur road(SH- 7) Culverts/Bridges Total 2 Nos 65.00 Villupuram Total 46.41 2772.00 107 01-CRIDP-12- Kallakurichi Sankarapuram Strengthening Kallakurichi - 4.00 220.00 13-S-0107 Tiruvannamalai Road km 8/0- 12/0(SH-6) 108 01-CRIDP-12- Kallakurichi Tirukkoyilur Strengthening Cuddalore - Chittoor 14.80 820.00 13-S-0108 road km.55/0-56/0, 57/0-59/0, 62/0- 71/8, 74/4-76/0 and Easing the steep gradient of the approaches of bed level cause way at km 71/10 & 72/6(SH-9)

109 01-CRIDP-12- Kallakurichi Tirukkoyilur Strengthening Vridhachalam - 1.80 130.00 13-S-0109 Ulundurpet - Viluppuram Road km 42/0-43/8 (SH-69) 110 01-CRIDP-12- Kallakurichi Ulundurpettai Strengthening Cuddalore - Chittoor 5.50 300.00 13-S-0110 Road in Km.46/5-52/0(SH-9)

111 01-CRIDP-12- Kallakurichi Tirukkoyilur Strengthening Cuddalore - 1.40 100.00 13-S-0111 Thirukoilur - Sankarapuram Road Km.58/0 - 59/4(SH-68) Strengthening Total 27.50 1570.00 Kallakurichi Total 27.50 1570.00 112 01-CRIDP-12- Cuddalore Cuddalore Widening from DL to ML at km 3/0- 2.60 148.00 13-S-0112 5/6 of Cuddalore-Chittoor road Including CD Works (3 Nos) (SH- 9) Other Widening Total 2.60 148.00 Cuddalore Total 2.60 148.00 113 01-CRIDP-12- Ariyalur Perambalur Improvements to Thuraiyur- 5.00 270.00 13-S-0113 Perambalur road km 17/6 - 21/6 & 31/0 - 32/0 (SH-142) " 114 01-CRIDP-12- Ariyalur Jayankonada Improvements to Virudhchalam - 2.30 127.00 13-S-0114 m Jayankondam - Madanathur Road Km 36/7 - 39/0 (SH-140) Strengthening Total 7.30 397.00 Ariyalur Total 7.30 397.00 Villupuram Total 83.81 4887.00

SH-11of 50 SECTION OFFICER 12/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 115 01-CRIDP-12- Trichy Manapparai Widening fromDouble lane to Multi 2.00 200.00 13-S-0115 lane of Musiri - Kulithalai - Pudukottai - Alangudi - Paeravorani - Sethubavachathiram Road Km42/0-44/0 including construction of centre median (SH- 71)

116 01-CRIDP-12- Trichy Manapparai Widening from Double lane to Multi 2.00 200.00 13-S-0116 lane of Manapparai - Thuvarankuruchi road Km 0/0-2/0 including construction of centre median (SH-71 A) 117 01-CRIDP-12- Trichy Trichyeast Widening From Double lane to 1.30 200.00 13-S-0117 Multi lane & Improvements at Km 136/6 - 137/4, 137/500-138/0 of Nagai - Gudalur - Mysore road.(SH- 89) 118 01-CRIDP-12- Trichy Thuraiyur Widening from Double lane to Multi 5.92 465.00 13-S-0118 lane Km 26/8-28/2 and improvements at km 32/0- 32/650, 45/0-45/670, 49/2-49/4, 52/0-55/0 of Musiri - Thuraiyur - Athur road (SH-30) 119 01-CRIDP-12- Trichy Srirangam Widening From Double lane to 2.30 222.00 13-S-0119 Multi lane & Improvements at Km 313/2 - 314/0 and improvements at km 311/500-311/900 of Chennai - Trichy - Dindugal road (Road A) & Improvements at km 316/600- 317/0 , 320/300-321/0 of Chennai - Trichy - Dindugal road.(Road B ) (SH-9)

120 01-CRIDP-12- Trichy Trichyeast Widening From Double lane to 0.68 100.00 13-S-0120 Multi lane & Improvements at Km 0/725-1/4 of Chinthamani Bypass road (SH-11) 121 01-CRIDP-12- Trichy Trichywest Widening From Double lane to 0.90 170.00 13-S-0121 Multi lane & Improvements at Km 1/900 - 2/800 of Trichy Urban limit road including Construction of Centre median.(SH-132)

Other Widening Total 15.10 1557.00

SH-12of 50 SECTION OFFICER 13/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 122 01-CRIDP-12- Trichy Musiri Improvements to Musiri - Thuraiyur - 4.60 262.00 13-S-0122 Athur Road Km. 1/4-2/0, 5 /0 - 6/0, 9/0- 12/0 , (SH-30)

123 01-CRIDP-12- Trichy Thuraiyur Improvements toTrichy- Thuraiyur 3.00 200.00 13-S-0123 Road Km 12/0-13/2, 21/2-23/0 including construction of protective wall (SH-62) 124 01-CRIDP-12- Trichy Manapparai Improvements to Vaiyampatty - 6.00 305.00 13-S-0124 Karur road (via) Mylampatty Uppidamangalam Km 0/0 - 5/0 , 8/0-9/0 (SH-199) 125 01-CRIDP-12- Trichy Manachanallur Improvements to Trichy- 3.60 236.00 13-S-0125 Namakkal road at Km 11/8-13/0, 14/6-17/0 (SH-25) 126 01-CRIDP-12- Trichy Musiri Improvements in Km.46/0- 47/6 , 4.65 360.00 13-S-0126 51/0-52/4, 55/0-56/0, 60/0-60/650 including Reconstruction of Bridge at Km. 43/10 & 44/8 of Trichy - Namakkal Road (SH-25)

127 01-CRIDP-12- Trichy Musiri Improvements to Km 0/0-0/350 of 0.35 25.00 13-S-0127 Musiri - Kulithalai - Pudukottai - Alangudi - Paeravorani - Sethubavachathiram Road (SH-71)

128 01-CRIDP-12- Trichy Manachanallur Improvements to Trichy- Thuraiyur 5.60 253.00 13-S-0128 Road Km 3/0-6/6 , 8/0-10/0 (SH- 62)

129 01-CRIDP-12- Trichy Thuraiyur Improvements to Km 42/6-44/0 of 1.40 75.00 13-S-0129 Namakkal -Kannanur Road (SH- 161) Strengthening Total 29.20 1716.00 Trichy Total 44.30 3273.00 130 01-CRIDP-12- Pudukottai Alangudi widening from IL to DL in KM 69/4- 8.35 178.00 13-S-0130 70/7, 71/6-73/4, 75/2-75/8, 76/950- 81/6 of Thanjavur - Pattukkottai - Aranthangi - Karaikudi - Kallal - Kalaiyarkoil - Maravamangalam - illayangudi - Paramakudi - Muthukulathur - Sayalkudi road ( SH-29 )

SH-13of 50 SECTION OFFICER 14/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 131 01-CRIDP-12- Pudukottai Aranthangi Widening IL to DL in KM 14/0-16/8, 8.50 474.00 13-S-0131 17/0-22/5 and Improvements in KM 14/0-22/5 of Aranthangi - Kattumavadi road ( SH-145 )

IL to DL Total 16.85 652.00 132 01-CRIDP-12- Pudukottai Thirumayam Improvements in KM 106/0-109/0 3.00 146.00 13-S-0132 of Thanjavur - Pattukkottai - Aranthangi - Karaikudi - Kallal - Kalaiyarkoil - Maravamangalam - Illayangudi - Paramakudi - Muthukulathur - Sayalkudi road ( SH-29) 133 01-CRIDP-12- Pudukottai Gandharvakottai Improvements in KM 23/2-27/0, 6.20 284.00 13-S-0133 38/6-39/0, 41/8-42/6, 50/0-51/2 of Thirukkattuppalli - Sengipatti - Pattukkottai road ( SH-99 ) 134 01-CRIDP-12- Pudukottai Thirumayam Improvements in KM 24/0-26/0, 6.00 296.00 13-S-0134 34/0-38/0 of Namanasamudram - Ponnamaravathy road including culvert at KM 35/6(i), 35/6(ii) ( SH- 201 ) 135 01-CRIDP-12- Pudukottai Viralimalai Improvements in KM 56/2-59/0, 6.60 335.00 13-S-0135 61/4-61/8, 62/6-66/0 of Musiri - Kulithalai - Pudukkottai - Alangudi - Peravurani - Sethubavachathiram road ( SH-71 )

136 01-CRIDP-12- Pudukottai Alangudi Improvement in KM 120/9-122/0, 3.10 150.00 13-S-0136 133/6-135/0, 136/6-137/2 of Musiri - Kulithalai - Pudukkottai - Alangudi - Peravurani - Sethubavachathiram road ( SH-71 )

Strengthening Total 24.90 1211.00 Pudukottai Total 41.75 1863.00 137 01-CRIDP-12- Tanjavur Thanjavur Widening from IL - DL and 0.78 70.00 13-S-0137 improvement in Km 77/400-77/900 and improvements at Km 89/0 - 89/275 of Nagai - Gudalure - Mysore road (SU 89)

SH-14of 50 SECTION OFFICER 15/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 138 01-CRIDP-12- Tanjavur Peravurani Widening from Intermediate lane to 3.80 340.00 13-S-0138 Double lane and Improvements to Thanjavur-Pattukkottai-Aranthangi- Karaikkudi-Kallal-Kalaiyarkoil- Maravanmangalam-Elaiyankudi- Paramakkudi-Muthukulathur- Sayalkudi road Km 64/0-66/6 & 68/0-69/2 including Reconstruction of culvert 4 nos. and Dip raising. (SH29)

139 01-CRIDP-12- Tanjavur Orathanadu Widening IL to DL and 0.24 19.00 13-S-0139 Improvements to Mannargudy- Sethubavachathiram Road Km 17/765-18/0 (SH-146) 140 01-CRIDP-12- Tanjavur Pattukottai Widening IL to DL and 8.80 810.00 13-S-0140 Improvements to Mannargudy- Sethubavachathiram Road Km 20/4 - 28/0 & 29/8 - 31/0 including Reconstruction of culvert 7 nos, Construction of retaining wall and dip raising (SH146)

141 01-CRIDP-12- Tanjavur Peravurani Widening from Intermediate lane to 2.40 115.00 13-S-0141 Double lane to Mannargudi - Sethubavachatram Road K.M.38/4- 40/8 including Reconstruction of culvert 8 nos. (SH-146)

142 01-CRIDP-12- Tanjavur Thiruvaiyaru Widening from IL to DL & 6.00 490.00 13-S-0142 Improvements to Thirukattupalli - Sengipatti - Pattukottai road km 17/2-23/2 including Reconstruction of culvert 3nos. and Drain (SH-99 )

143 01-CRIDP-12- Tanjavur Orathanadu Widening from IL to DL & 1.80 181.00 13-S-0143 Improvements to Thirukattupalli - Sengipatti - Pattukottai road km 60/0-61/8 & Construction of Retaining wall (SH-99)

SH-15of 50 SECTION OFFICER 16/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 144 01-CRIDP-12- Tanjavur Thiruvaiyaru Widening from IL to DL to Grand 12.20 739.00 13-S-0144 Anaicut - Cauveripattinam road km 15/4 - 27/6 including Reconstruction of culvert 11 nos, Geometric Improvements, Widening of Narrow culverts 4 Nos and Retaining wall (SH-22)

145 01-CRIDP-12- Tanjavur Kumbakonam Widening from IL to DL to Grand 8.40 565.00 13-S-0145 Anaicut - Cauveripattinam road km 68/0-70/0 and Improvements at Km 59/0-59/2, 59/8-62/6& 64/6-68/0 including Reconstruction of culverts 8 nos., retaining wall and Dip raising (SH-22)

146 01-CRIDP-12- Tanjavur Thiruvidai Widening from IL to DL to Grand 12.09 593.00 13-S-0146 maruthur Anaicut - Cauveripattinam road km 75/6-76/285, 80/255-89/6 and Improvements at Km 76/945-79/0 inclduing Reconstruction of culverts 9 Nos (SH-22)

IL to DL Total 56.50 3922.00 147 01-CRIDP-12- Tanjavur Papanasam Strengthening to Grandanaicut- 6.86 670.00 13-S-0147 Cauverypattinam road KM 37/8- 42/110 & 42/650-43/6 & 44/0-45/6, Geometric Improvements and Widening of Narrow culvert 2 nos. (SH-22)

148 01-CRIDP-12- Tanjavur Thanjavur Improvements to Km 72/2 - 73/6 1.40 160.00 13-S-0148 Perambalur - Manamadurai Road (Four lane) (SH-27)

149 01-CRIDP-12- Tanjavur Thanjavur Improvements to Thanjavur - 1.75 170.00 13-S-0149 Vallam Road Km 0/850 -2/0 & Km 10/0 - 10/6 (Four lane) (SH-99 A)

SH-16of 50 SECTION OFFICER 17/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 150 01-CRIDP-12- Tanjavur Orathanadu Improvements to Thanjavur- 3.40 260.00 13-S-0150 Pattukkottai-Aranthangi-Karaikkudi- Kallal-Kalaiyarkoil- Maravanmangalam-Elaiyankudi- Paramakkudi-Muthukulathur- Sayalkudi road Km 31/2-33/100 & 35/3-36/8 including providing Drain, Reconstruction of culvert 1no, dip raising & including bus lay by. (SH29) 151 01-CRIDP-12- Tanjavur Pattukottai Improvements to Thanjavur- 5.60 331.00 13-S-0151 Pattukkottai-Aranthangi-Karaikkudi- Kallal-Kalaiyarkoil- Maravanmangalam-Elaiyankudi- Paramakkudi-Muthukulathur- Sayalkudi road Km 36/8-40/0 & 41/0-43/4 including Reconstruction of culvert 1 no. (SH29)

152 01-CRIDP-12- Tanjavur Thiruvidai Improvements to Kumbakonam - 3.80 226.00 13-S-0152 maruthur Sirkali Road Km 9/2-11/0 & 14/0- 16/0 (SH-64) 153 01-CRIDP-12- Tanjavur Thiruvidai Improvements to 2.00 118.00 13-S-0153 maruthur Vaitheeswarankovil - Lower Anaicut Road Km 25/0-27/0 (SH- 150) 154 01-CRIDP-12- Tanjavur Orathanadu Geometric Improvements to curve 1.40 200.00 13-S-0154 at Km 6/4, 6, 8/2, 4, 6 & 9/2, 4 of Thanjavur-Pattukkottai-Aranthangi- Karaikkudi-Kallal-Kalaiyarkoil- Maravanmangalam-Elaiyankudi- Paramakkudi-Muthukulathur- Sayalkudi road (SH29)

Strengthening Total 26.21 2135.00 155 01-CRIDP-12- Tanjavur Orathanadu Reconstruction of Slab culvert at 45.00 13-S-0155 Km 15/8 of Thanjavur - Mannarugudi - Thiruthuraipoondi - Vedaranyam - Kodiyakkarai Road (SH-63)

Culverts/Bridges Total 1 Nos 45.00

SH-17of 50 SECTION OFFICER 18/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 156 01-CRIDP-12- Tanjavur Thiruvidai DPR for the Reconstruction of High 3.00 13-S-0156 maruthur level bridge at Km 13/8 of Kumbakonam - Sirkali Road including bund protection and Junction Improvements on both sides (SH64) LA/DPR Total 1 Nos 3.00 Tanjavur Total 82.71 6105.00 157 01-CRIDP-12- Nagapattina Nagapattinam Widening from IL - DL to Nagore- 11.20 866.00 13-S-0157 m Nannilam-Nachiyarkoil Road Km 16/0 - 17/4 and Widening from IL - DL & Improvements in KM 17/4- 20/0 & 21/0-21/4 & Improvements in KM 4/0-4/6,9/0-14/0, & 22/0-23/2 Including ReConstruction of Culvert 1 No & Protective works [SH67]

158 01-CRIDP-12- Nagapattina Mayiladuthurai Widening from IL to DL & 2.61 190.00 13-S-0158 m Improvements in KM 4/0 -5/560 and Widening from IL - DL in KM 6/4-7/450 Vaitheeswarankoil - Loweranaicut Road [SH150]

159 01-CRIDP-12- Nagapattina Mayiladuthurai Widening from IL- DL & 3.20 300.00 13-S-0159 m Improvements in KM 13/450- 16/450 & Improvements in19/850- 20/050 Vaitheeswarankoil - Loweranaicut Road [SH150]

160 01-CRIDP-12- Nagapattina Mayiladuthurai Widening from IL - DL of 5.60 240.00 13-S-0160 m Grandanaicut - Cauveripattinam Road Km 101/4-105/0 & Improvements (5.5m width) in KM 97/4-99/4 [SH22] 161 01-CRIDP-12- Nagapattina Poompuhar Widening from IL - DL of 4.00 140.00 13-S-0161 m Grandanaicut - Cauveripattinam Road Km 121/0-125/0 [SH22] IL to DL Total 26.61 1736.00 162 01-CRIDP-12- Nagapattina Vedaranyam Improvements to Thanjavur- 3.00 186.00 13-S-0162 m Mannarkudy-Thiruthuraipoondi - Vedaranyam-Kodiakkarai Road KM 79/0-82/0 [SH63]

SH-18of 50 SECTION OFFICER 19/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 163 01-CRIDP-12- Nagapattina Mayiladuthurai Improvements to Mayiladuthurai- 1.60 100.00 13-S-0163 m ThiruthuraiPoondi Road Km 2/6-3/0 and 3/8-5/0 [SH23]

Strengthening Total 4.60 286.00 164 01-CRIDP-12- Nagapattina Nagapattinam Junction Improvements of Nagore - 80.00 13-S-0164 m Nagapattinam -Ramanathapuram - Tuticorn Road KM 7/10 [SH200]

165 01-CRIDP-12- Nagapattina Sirkazhi Junction Improvements at KM 40.00 13-S-0165 m 127/4 of Abandoned NH-45A with KM 0/2 of Sirkali Bye Pass road [SH210] Others Total 2 Nos 120.00 Nagapattinam Total 31.21 2142.00 166 01-CRIDP-12- Tiruvarur Mannargudi Widening from IL to DL in Km.28/0 - 6.40 496.00 13-S-0166 30/0 and Improvements to Km.19/6 -22/6, 28/0-30/0 & 40/6 - 42/0 of Thiruvarur -Mannargudi-Muthupet road (SH202)

IL to DL Total 6.40 496.00 167 01-CRIDP-12- Tiruvarur Tiruvarur Improvements to Tiruvarur - 6.60 412.00 13-S-0167 Mannargudi - Muthupet road Km.0/4 - 1/4, 9/4 - 13/6, 13/10, 14/0 - 15/2 including Construction of Retaining wall and Reconstruction of Culvert (4 Nos.) (SH202)

168 01-CRIDP-12- Tiruvarur Nannilam Improvements to Mayiladuthurai - 10.08 610.00 13-S-0168 Thiruthuraipoondi road Km.10/4 - 12/0, 13/0 - 14/0 & 14/920 - 17/0, 21/0 - 23/2, 23/4 - 26/6 (SH23)

169 01-CRIDP-12- Tiruvarur Mannargudi Improvements to Thanjavur - 2.20 172.00 13-S-0169 Mannargudi - Thiruduraipoondi - Vedaranyam - Kodiyakkarai road Km.15/8 - 18/0 and including Reconstruction of Culvert at Km.38/8 (1 No.) (SH63)

SH-19of 50 SECTION OFFICER 20/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 170 01-CRIDP-12- Tiruvarur Tiruvarur Improvements to Mayiladuthurai - 1.20 75.00 13-S-0170 Thiruthuraipoondi road Km.36/2- 37/0, 37/4,37/6 including Construction of Retaining wall (SH23)

Strengthening Total 20.08 1269.00 Tiruvarur Total 26.48 1765.00 Trichy Total 226.44 15148.00 171 01-CRIDP-12- Salem Salemwest Widening and Improvements from 0.80 55.00 13-S-0171 IL to DL in Km 10/2-11/0 of Collector Bungalow Adivaram Road including widening of pipe culvert at km.10/8 (SU 13)

IL to DL Total 0.80 55.00 172 01-CRIDP-12- Salem Veerapandi Improvements to Km.23/0-24/4 and 5.00 250.00 13-S-0172 28/8-32/4 of Thiruchengode Ariyanur Road (SH-86 A)

173 01-CRIDP-12- Salem Sankari Improvements to km.22/6-24/0 of 1.40 70.00 13-S-0173 Old Salem - Cochin road.(SU 78)

174 01-CRIDP-12- Salem Yercaud Improvements in Km.11/0- 3.20 315.00 13-S-0174 12/0,19/0-20/0 & 21/0-22/2 and providing paved Shoulders using paver blocks in Km.30/0-30/6 of Salem Junction - Yercaud Road including Protective works and CD Works 6 Nos. (SH-188)

175 01-CRIDP-12- Salem Attur Improvements from Km.67/0-67/6, 4.80 245.00 13-S-0175 68/6-69/6, 77/0-78/0, 78/6-80/2, 82/2-82/4 & 86/2-86/6 of Musiri - Thuraiyur - Attur Road (SH-30)

176 01-CRIDP-12- Salem Mettur Improvements in Km.18/6-19/0, 7.50 335.00 13-S-0176 20/0-20/4, 25/0-26/0, 31/10, 32/2, 32/4, 32/10, 33/2, 33/4, 33/8, 33/10, 34/0-37/4, 37/6, 37/8, 39/0-39/6 & 39/8-40/0 of Thoppur - Mettur - Bhavani - road (SH-20)

177 01-CRIDP-12- Salem Attur Improvements to Malliyakarai - 1.00 55.00 13-S-0177 Rasipuram - Thiruchengode - Erode road Km.0/0-1/0 (SH-79)

SH-20of 50 SECTION OFFICER 21/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 178 01-CRIDP-12- Salem Gangavalli Rebuilding in Km.0/0-1/0 & 14/2- 3.80 300.00 13-S-0178 17/0 of Attur - Perambalur road (SH- 157) 179 01-CRIDP-12- Salem Gangavalli Improvements in Km.61/0-63/6 of 2.60 130.00 13-S-0179 Musiri- Thuraiyur - Attur road (SH- 30) Strengthening Total 29.30 1700.00 180 01-CRIDP-12- Salem Salemwest Construction of Culvert at Km.199/6 45.00 13-S-0180 and construction of storm water drain in Km.199/450-700 of VCC road (SU 80)

Culverts/Bridges Total 1 Nos 45.00 181 01-CRIDP-12- Salem Sankari Forming Tharamangalam bye pass 110.00 13-S-0181 (L.A Only) LA/DPR Total 1 Nos 110.00 182 01-CRIDP-12- Salem Salemwest Providing Centre Median in Km.0/4- 158.00 13-S-0182 2/4 and 3/7-5/2 of Salem Junction Yercaud Road and Reconstruction of pipe culvert at Km.1/10 and Construction of culvert at Km.3/6 and Strom water drain in Km.1/8- 2/4 of Salem Junction Yercaud Road (SH-88)

Others Total 1 Nos 158.00 Salem Total 30.10 2068.00 183 01-CRIDP-12- Namakkal Paramathivelur Widening & Improvements from 5.30 330.00 13-S-0183 Intermediate Lane to Double lane from Km.34/7-35/0, 44/8-45/0, 49/0- 49/100 and Widening from Intermediate Lane to Double lane from Km 35/0-35/3,36/300- 38/0,45/0-46/700 and Dip raising from IL to DL at km 48/0-49/0 including construction of culvert 1 No. and widening of culvert 1 No. of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road (SH-198)

SH-21of 50 SECTION OFFICER 22/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 184 01-CRIDP-12- Namakkal Paramathivelur Widening & Improvements from 8.25 280.00 13-S-0184 Intermediate Lane to Double lane from Km. 49/700-50/700&55/929- 56/100 and Widening from Intermediate Lane to Double lane from Km. 49/100-49/700, 50/700- 55/929 & 56/100-56/900 and Improvements from km 56/900- 57/350 and including widening of culvert 1 No. of Komarapalayam - Pallipalayam - Jedarpalayam - Pandamangalam - Velur road (SH- 198)

IL to DL Total 13.55 610.00 185 01-CRIDP-12- Namakkal Namakkal Widening from DL to ML from 5.20 350.00 13-S-0185 Km.256/0-259/2 and Improvements to Km 251/6-253/0 & 256/4-257/0 of VCC Road (SU-121)

186 01-CRIDP-12- Namakkal Kumarapalayam Widening from DL to ML km 0/0- 2.30 185.00 13-S-0186 1/5, 1/8 & Improvements from Km. 0/0-1/0, 2/4-3/0 of Komarapalayam- Bhavani Road (SU-22)

187 01-CRIDP-12- Namakkal Namakkal Widening and Improvements from 0.80 100.00 13-S-0187 Double Lane to Multilane from KM.20/0-20/6 and Improvements at KM.21/6-21/8 including reconstruction of slab culvert 1 No, widening of slab culvert 1 No. & construction of retaining wall 1 No. of Mohanur-Namakkal- Sendamangalam-Rasipuram road (SH-95). Other Widening Total 8.30 635.00 188 01-CRIDP-12- Namakkal Kumarapalayam Improvements from km 0/2-0/6 and 5.40 358.00 13-S-0188 km 23/0-28/0 of Komarapalayam- Pallipalayam-Jedarpalayam- Pandamangalam-Velur Road Including Reconstruction of RCC Culvert in lieu of cut stone culvert 2 Nos. and Widening the pipe cuvlert 6 Nos. (SH-198)

SH-22of 50 SECTION OFFICER 23/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 189 01-CRIDP-12- Namakkal Tiruchengodu Improvements from Km 28/0-32/0, 4.80 380.00 13-S-0189 33/900-34/700 of Komarapalayam- Pallipalayam-Jedarpalayam- Pandamangalam-Velur Road Including Retaining Wall and raising the road level in Km. 33/970- 34/360 and widening the Pipe Culvert 1 No, Reconstruction of RCC Culvert in lieu of cut stone culvert 3 Nos and Reconstruction of RCC Slab Culvert in lieu of pipe culvert 1 No. (SH-198)

190 01-CRIDP-12- Namakkal Namakkal Improvements to Km 2/0-2/4 & 5/0- 1.00 60.00 13-S-0190 5/6 of Mohanur-Namakkal- Sendamangalam-Rasipuram road (SH-95) 191 01-CRIDP-12- Namakkal Namakkal Improvements to the road from Km 5.30 324.00 13-S-0191 61/800-62/900, 63/4-65/2, 66/8- 67/0, 67/2-68/0, 70/0-71/0 & 73/2- 73/6 including Buslay bye at Km. 76/4 & 76/6 of Trichy-Namakkal Road (SH-25) 192 01-CRIDP-12- Namakkal Namakkal Improvements to the road from Km 1.20 72.00 13-S-0192 0/0-0/6, 1/2-1/6 & 2/10 of Namakkal- Kannanur road (SH-161)

193 01-CRIDP-12- Namakkal Sentha Improvements to the road from Km 1.00 64.00 13-S-0193 mangalam 6/0-7/0 of Namakkal-Kannanur road including Reconstruction of RCC Slab Culvert in lieu of Cut stone culvert 1 No. (SH-161)

194 01-CRIDP-12- Namakkal Sentha Improvements to the road from Km 5.20 295.00 13-S-0194 mangalam 25/8-26/7 , 30/2-31/3 , 34/2-34/6 , 35/9-38/0, 44/2-44/9 including Construction of slab culvert 1 No., Reconstruction of Pipe culvert 1 No. and Widening of slab culvert 1 No. of Mohanur -Namakkal- Sendamangalam-Rasipuram road .(SH-95)

SH-23of 50 SECTION OFFICER 24/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 195 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 48/4-51/2 of 2.80 180.00 13-S-0195 Mohanur - Namakkal - Sendamangalam - Rasipuram Road, including widening of RCC Slab culvert 1 No. and Widening of Inner Curve at Km. 48/8. (SH-95)

196 01-CRIDP-12- Namakkal Tiruchengodu Improvements to the Road from 1.20 80.00 13-S-0196 Km2/0-2/8, 3/6-4/0 of Trichengode - Ariyanur Road including Reconstruction of culvert 2 Nos. (SH-86A) 197 01-CRIDP-12- Namakkal Kumarapalayam Improvements to the Road from Km 1.10 94.00 13-S-0197 45/6-46/7 of Pallakapalayam Bypass Road (SU-126)

198 01-CRIDP-12- Namakkal Tiruchengodu Dip Improvements at Km. 6/8-7/10 0.30 35.00 13-S-0198 of Trichengode - Namakkal Road (SH-94) 199 01-CRIDP-12- Namakkal Kumarapalayam Junction Improvements at Km 15/2 113.00 13-S-0199 of Sankari-Pallipalayam Road(SH- 79A) & Km 11/4 of Komarapalayam- Pallipalayam-Jedarpalayam- Pandamangalam-Velur Road (SH- 198) and Widening the culvert (Both sides) 1 No. of Sankari- Pallipalayam road (SH-79A)

200 01-CRIDP-12- Namakkal Kumarapalayam Improvements from km 17/4-20/8 of 3.40 200.00 13-S-0200 Komarapalayam-Pallipalayam- Jedarpalayam-Pamdamangalam- Velur Road (SH-198)

201 01-CRIDP-12- Namakkal Rasipuram Improvements to Km. 12/0-13/0 & 2.00 125.00 13-S-0201 13/4-14/4 of Malliakkarai - Rasipuram - Trichengode - Erode Road (SH.79) 202 01-CRIDP-12- Namakkal Tiruchengodu Improvements to the Road from 2.60 152.00 13-S-0202 Km56/8, 57/4-58/6, 59/8-60/2 & 64/4-65/2 of Mallikarai - Rasipuram - Trichengode - Erode Road (SH-79)

203 01-CRIDP-12- Namakkal Tiruchengodu Improvements to the Road from 2.00 115.00 13-S-0203 Km70/0-72/0 of Mallikarai - Rasipuram - Trichengode - Erode Road (SH-79)

SH-24of 50 SECTION OFFICER 25/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 204 01-CRIDP-12- Namakkal Tiruchengodu Improvements to the Road from 2.20 137.00 13-S-0204 Km51/8-54/0 of Mallikarai - Rasipuram - Trichengode - Erode Road (SH-79) Strengthening Total 41.50 2784.00 Namakkal Total 63.35 4029.00 205 01-CRIDP-12- Dharmapuri Harur Widening IL to DL in KM 40/0 - 24.00 546.00 13-S-0205 43/0, 47/0 - 59/0 & 63/0 - 72/0 of Thiruvannamalai - Harur (Via) Thanipadi Road (SH-6A) IL to DL Total 24.00 546.00 206 01-CRIDP-12- Dharmapuri Dharmapuri Widening and Improvements from 7.75 945.00 13-S-0206 Four lane in KM 133/800 - 135/400, 141/600 - 143/0, 144/600 - 147/0 and Widening Four lane in KM 132/600 - 133/800, 147/0-148/150 Including CD Works 11 Nos & Construction of Protective wall & drain of Dharmapuri State Highways road (Old National Highways -7) (SU-129)

Other Widening Total 7.75 945.00 207 01-CRIDP-12- Dharmapuri Pappireddipatti Improvements to KM 12/4 - 12/9, 2.70 160.00 13-S-0207 13/8-14/0, 14/4-16/4 of Dharmapuri - Harur (via) Morappur road (SH- 60A) 208 01-CRIDP-12- Dharmapuri Pappireddipatti Improvements to KM 2/2 - 4/8, 5/4 - 3.40 145.00 13-S-0208 6/2 of Dharmapuri - Harur (via) Morappur road (SH-60A) 209 01-CRIDP-12- Dharmapuri Pappireddipatti Improvements to KM 30/0 - 30/4, 4.80 200.00 13-S-0209 30/8 - 32/4, 55/0 - 55/4, 57/0 - 57/6, 60/10, 62/10, 66/4 - 67/2, 67/6 - 68/2 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road (SH- 60) 210 01-CRIDP-12- Dharmapuri Pennagaram Improvements to Km 12/4 - 12/8, 1.40 150.00 13-S-0210 15/2 - 15/8, 23/2 - 23/6 including Widening Double lane to End to End at chainage 16/480 - 16/680 near Pennagaram Bus stand including CD works 5 Nos of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road. (SH- 60)

SH-25of 50 SECTION OFFICER 26/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 211 01-CRIDP-12- Dharmapuri Palacodu Improvements to KM 114/930 - 0.77 45.00 13-S-0211 115/700 of Karimangalam state Highways road (SU-20) 212 01-CRIDP-12- Dharmapuri Palacodu Improvements to KM 62/2 - 63/0, 4.95 390.00 13-S-0212 81/0 - 82/6, 87/850 - 88/0, 89/8 - 90/3, 91/3 - 92/6 and Improvements to curve at KM 66/4 & Providing paved shoulders using paver block in KM 76/4,77/0- 77/4 including CD works 9 Nos & construction of Drain 2 Nos of Malur - Hosur - Adhiyamankottai road (SH-17) 213 01-CRIDP-12- Dharmapuri Harur Improvements to KM 16/6 - 18/6 of 2.00 100.00 13-S-0213 Dharmapuri - Harur (via) Morappur road (SH-60A) Strengthening Total 20.02 1190.00

214 01-CRIDP-12- Dharmapuri Harur Preparation of Detailed Project 4.00 13-S-0214 Report for Reconstruction of a bridge at Km 43/6 of Salem - Thirupathur - Vaniyambadi road in lieu of Existing Weak and Narrow Bridge (DPR) (SH-18) 215 01-CRIDP-12- Dharmapuri Dharmapuri Preparation of Detailed Project 2.50 13-S-0215 Report for Widening of bridge at KM 134/2 of Dharmapuri State Highways road ( Old National Highways -7) SU-129 LA/DPR Total 2 Nos 6.50 Dharmapuri Total 51.77 2687.50 216 01-CRIDP-12- Krishnagiri Thalli Widening & Improvements in Km 6.40 640.00 13-S-0216 25/8-26/4(SL- DL) (Tank Bund Portion), Km 26/4 - 26/8, 29/6 -35/0 (IL -DL) and Reconstruction of Culverts (13 Nos) Including Retaining Wall of Hosur- Denkanikottai Road (via) Thally (SH-17B) 217 01-CRIDP-12- Krishnagiri Thalli Widening & Improvements from IL - 6.60 660.00 13-S-0217 DL in Km 35/0-41/6 and Reconstruction of Culverts (11 Nos) including Retaining wall of Hosur- Denkanikottai Road (via) Thally (SH-17B) IL to DL Total 13.00 1300.00

SH-26of 50 SECTION OFFICER 27/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 218 01-CRIDP-12- Krishnagiri Bargur Improvements to Bargur - 2.40 240.00 13-S-0218 Thirupathur road km 0/0-2/4 and Raising the dip @ km 0/4 Construction of 6 Nos. of Culverts and Widening of 3 Nos. of Culverts. (SH-131) 219 01-CRIDP-12- Krishnagiri Hosur Improvements in Km 16/0-17/8, 4.60 300.00 13-S-0219 25/0-26/0, 28/0-28/8 and 30/0-31/0 including widening of culverts (8Nos) of Malur -Hosur - Adhiyamankottai road (SH-17) 220 01-CRIDP-12- Krishnagiri Hosur Providing Paved Shoulder using 50.00 13-S-0220 Paver Block at km 39/4-40/6 of Hosur State Highways road (SU19)

221 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Hogennakkal - 2.30 140.00 13-S-0221 Pennagaram - Dharamapuri - Thirupathur road Km 80/8-81/2, 85/0-86/5, 88/2-88/6 (SH-60) Strengthening Total 9.30 730.00

222 01-CRIDP-12- Krishnagiri Thalli Reconstruction of culverts Km 24/2, 95.00 13-S-0222 24/4, 24/10 of Rayakottai-Athipalli road (SH-85)

Culverts/Bridges Total 1 Nos 95.00 Krishnagiri Total 22.30 2125.00 Salem Total 167.52 10909.50 223 01-CRIDP-12- Tiruppur Tiruppurnorth Widening from DL to ML in km 5/2 - 3.40 295.00 13-S-0223 6/0 and strengthining in km 2/6 - 6/0 of Tirupur - Vijayamangalam road including 3 culverts and drain (SH-19A) 224 01-CRIDP-12- Tiruppur Kangeyam Widening from DL to ML & 2.00 300.00 13-S-0224 Improvements in km 23/6 -25/6 of Tirupur - Kangayam road and including construction of drain (SH- 172) Other Widening Total 5.40 595.00 225 01-CRIDP-12- Tiruppur Avinashi Improvements in km 4/0 - 4/7, 5/1- 3.20 195.00 13-S-0225 5/8, 6/8-7/4 8/6-9/4 & 11/2-11/6 of Avinashi - Mettupalayam road including protective works (SH-- 80)

SH-27of 50 SECTION OFFICER 28/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 226 01-CRIDP-12- Tiruppur Avinashi Improvements in km 4/0 - 4/6, 5/0 - 3.80 198.00 13-S-0226 6/0, 6/2-7/2 & 9/8-11/0 of Cheyur - Erode - Sathy road (SH-- 15A)

227 01-CRIDP-12- Tiruppur Tiruppurnorth Improvements to km.6/5-6/9,7/1-9/0 3.30 332.00 13-S-0227 & 18/0-19/0 of Tirupur - Perumanallur - Kunnathur - road including 2 culvert works in km 0/8,8/4 (SH196). 228 01-CRIDP-12- Tiruppur Palladam Improvements to Km.8/6-9/0 of 0.40 90.00 13-S-0228 Tirupur - Somanur road including junction improvements & 1 culvert and Construction of drain in Km.2/4- 3/0 . (SH-169)

229 01-CRIDP-12- Tiruppur Perundhurai Strengthening at km 36/6-39/4 of 2.80 198.00 13-S-0229 Gobi - Uthukuli - Padiyur road including 1 culvert work. (SH-81).

230 01-CRIDP-12- Tiruppur Palladam Strengthening in km 30/8-31/6, 6.00 410.00 13-S-0230 32/0-35/8 & 37/8-39/2 of Avinashi - Tirupur - Palladam - Pollachi - Cochin road (Via) Mennkarai including productive wall (SH19)

231 01-CRIDP-12- Tiruppur Kangeyam Improvements in km 39/0 - 43/0, 7.36 400.00 13-S-0231 45/0 - 45/4 & 48/6 - 51/560 of Erode - Perundurai - Kangayam road including CD works (SH- 96)3nos 232 01-CRIDP-12- Tiruppur Palladam Strengthening in km 2/0 - 7/0, 7/6 - 10.20 590.00 13-S-0232 10/0 & 10/2 - 13/0 of Palladam - Dharapuram road (SH-174)

Strengthening Total 37.06 2413.00 Tiruppur Total 42.46 3008.00 233 01-CRIDP-12- Dharapuram Udumalapet Widening from DL to ML in Km 0/0- 1.00 85.00 13-S-0233 1/0 of Uduamlpet - Dharapuram road (SH-97)

SH-28of 50 SECTION OFFICER 29/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 234 01-CRIDP-12- Dharapuram Kangeyam Improvements to km 3.60 396.00 13-S-0234 35/0 - 37/0 & Widening from DL to ML and Improvements to km 42/0 - 43/6 and Construction of drain on both sides at km 42/0 - 43/6 of Erode - Mulanur road (via) Muthur & Vellakovil (SH-84A)

Other Widening Total 4.60 481.00 235 01-CRIDP-12- Dharapuram Dharapuram Improvements to km 65/6 - 3.70 235.00 13-S-0235 66/0, 68/4 - 69/5 & 91/8 - 93/0 & Providing Concrete Centre Median at Junctions km 76/4, 77/6, 77/8, 78/4 & 82/2 of Mettur - Palakkanuthu - Oddanchatram - Dharapuram - Tirupur road. (SH- 37) 236 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 56/4- 1.50 100.00 13-S-0236 57/2 & 62/5-63/2 of Pollachi - Dharapuram - Karur road (SH-21)

237 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 12/0-13/0 of 1.00 55.00 13-S-0237 Kangayam - road (SH- 189) 238 01-CRIDP-12- Dharapuram Kangeyam Improvements to km 62/6 - 1.40 90.00 13-S-0238 64/0 of Erode - Dharapuram road. (SH-83A) Strengthening Total 7.60 480.00 239 01-CRIDP-12- Dharapuram Dharapuram Reconstruction of the damaged 35.00 13-S-0239 culvert at Km 57/2 of Pollachi - Dharapuram - Karur road (SH-21)

Culverts/Bridges Total 1 Nos 35.00 Dharapuram Total 12.20 996.00 240 01-CRIDP-12- Erode Erode East Improvements to km 157/0-160/660 4.49 382.00 13-S-0240 and 160/8-161/626 of Ooty- Kothagiri-Mettupalayam-Sathy- Gobi-Erode road (SH.15) 241 01-CRIDP-12- Erode Modakkurichi Improvements to Km 5/8-7/0 and 2.60 171.00 13-S-0241 14/4 - 15/8 of Erode -Dharapuram Road (SH-83A) 242 01-CRIDP-12- Erode Modakkurichi Geomentrical improvement at km 3.60 226.00 13-S-0242 18/8 - 19/0 and 19/4 - 19/6 and Improvements to Km 19/6- 21/0, 22/8-23/4 and 25/0-26/2 of Erode - Karur Road (SH-84)

SH-29of 50 SECTION OFFICER 30/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 243 01-CRIDP-12- Erode Bhavani Improvements to Km 36/4-37/2 and 1.60 93.00 13-S-0243 39/2-40/0 of Sathy -Athani - Bhavani road (SH-82) 244 01-CRIDP-12- Erode Modakkurichi Improvements to Km 25/8 -28/2 of 2.40 142.00 13-S-0244 Erode - Dharapuram Road (SH- 83A) 245 01-CRIDP-12- Erode Perundhurai Improvements to km 20/4- 21/2 , 5.00 306.00 13-S-0245 23/0-24/6, 27/0-28/6,29/0-29/4 and 33/0-33/6 of Erode-Perundurai- Kangayam road( SH-96)

246 01-CRIDP-12- Erode Modakkurichi Improvements to Km 12/0-12/6, 1.20 73.00 13-S-0246 12/8-13/4 of Erode - Karur Road (SH-84) 247 01-CRIDP-12- Erode Bhavani Improvements to Km 9/4-10/2 of 0.80 48.00 13-S-0247 Bhavani - - Chellampalayam road (SH-175) 248 01-CRIDP-12- Erode Modakkurichi Improvements to km 5/700-6/300, 2.85 177.00 13-S-0248 6/6-7/350, 9/300 - 10/0, 10/6 - 11/4 of Erode - Mulanur Road (via) Muthur- Vellakoil (SH84A)

249 01-CRIDP-12- Erode Modakkurichi Improvements to Km 15/0 - 15/2 0.20 33.00 13-S-0249 and Junction Improvements at Km. 17/4 of Karumandampalayam - Salaipudur Road (Via) Malayam palayam, Thamaraipalayam (SH190)

250 01-CRIDP-12- Erode Erode west Improvements to km 0/0 - 2/4of 2.40 183.00 13-S-0250 Nasiyanur town road including Juntion improvement at Km 0/10 and Recostruction of 1 culvert .(SU- 112) 251 01-CRIDP-12- Erode Modakkurichi Improvements to Km 22/300 - 3.10 180.00 13-S-0251 23/900 and 24/8-26/300 of Erode - Mulanur Road (via) Muthur, Vellakoil (SH-84A) 252 01-CRIDP-12- Erode Erodewest Improvements to km 4/6-6/0 of 1.40 182.00 13-S-0252 Erode-Perundurai-Kangayam road (SH-96) 253 01-CRIDP-12- Erode Perundhurai Improvements to km 29/0 - 30/0 2.40 150.00 13-S-0253 and 35/4 - 36/8 of Tiruppur - Perumanallur - Kunnathur - Perundurai road Including Dip Raising at Km 36/2 and construction of 1 culvert (SH--196)

SH-30of 50 SECTION OFFICER 31/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 254 01-CRIDP-12- Erode Perundhurai Improvements to km 0/0-0/420 of 0.42 38.00 13-S-0254 Vijayamangalam town link road including junction improvements at km 0/2& 0/420 and construction of 1 culvert (SU-114)

255 01-CRIDP-12- Erode Perundhurai Improvements to km 0/0 - 1/6 of 1.60 104.00 13-S-0255 Perundurai town road including dip raising at km 1/6 and construction of 1 culvert (SU-111)

256 01-CRIDP-12- Erode Bhavani Improvements to km 49/8 - 54/0 9.50 745.00 13-S-0256 ,59/2 - 61/0, 62/0-63/0, 64/0-65/0, 68/5-70/0 of Thoppur Mettur Bhavani Erode road (SH-20)

257 01-CRIDP-12- Erode Bhavani Improvements in km 70/0 - 74/3, 9.40 763.00 13-S-0257 77/0 - 82/100 of Thoppur-Mettur- Bhavani-Erode road and construction of 1 culvert (SH-20)

258 01-CRIDP-12- Erode Erodeeast Improvements in km 87/4- 90/0 & 3.58 465.00 13-S-0258 93/0 - 93/984 of Thoppur-Mettur- Bhavani-Erode road. (SH-20)

Strengthening Total 58.54 4461.00 259 01-CRIDP-12- Erode Modakkurichi Construction of Strom Water Drain 11.00 13-S-0259 at Km.10/8 of Erode Dharapuram Road (SH-83A) 260 01-CRIDP-12- Erode Erode west Providing Centre Median from km 38.00 13-S-0260 5/0-6/0 of Erode-Perundurai- Kangayam road (SH-96)

Others Total 2 Nos 49.00 Erode Total 58.54 4510.00 261 01-CRIDP-12- Karur Karur Improvements to Km. 44/2-45/2, 2.10 100.00 13-S-0261 45/4-45/8 and Widening from DL to ML in Km 57/8 - 58/5 including 1 culvert of Erode - Karur Road (SH- 84) Other Widening Total 2.10 100.00 262 01-CRIDP-12- Karur Aravakurichi Improvements to Km 31/0 - 32/0 1.20 55.00 13-S-0262 and 42/2 of Thadicombu - Pallapatty - Aravakurichy Road (SH- 193)

SH-31of 50 SECTION OFFICER 32/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 263 01-CRIDP-12- Karur Karur Improvements to the service road 0.80 53.00 13-S-0263 at Km 297/6 - 298/4 of Old NH 7 ROB at Vengamedu (SU-41)

264 01-CRIDP-12- Karur Kulithalai Improvements to Km.28/6-30/2 of 1.60 72.00 13-S-0264 Musiri-Kulithalai-Pudukkotaai- Alangudi-Peravoorani- Sethubavachathiram Road (SH-71)

Strengthening Total 3.60 180.00 Karur Total 5.70 280.00 Tiruppur Total 118.90 8794.00 265 01-CRIDP-12- Coimbatore Thondamuthur Widening to Four Lane in Km 3.80 495.00 13-S-0265 162/0 - 165/8 of Salem - Cochin road including Providing Centre median (SU 52) Other Widening Total 3.80 495.00 266 01-CRIDP-12- Coimbatore Mettupalayam Improvements to Km 15/4 -17/6 2.20 110.00 13-S-0266 Neelipalayam Sirumugai Road (SH- 170) 267 01-CRIDP-12- Coimbatore Mettupalayam Improvements to km 47/4 - 47/6 13.00 645.00 13-S-0267 ,49/6 - 52/0, 58/2-60/4 & 63/8- 72/0 of Ooty-Kothagiri-Mettupalayam- Sathy-Gobi-Erode road (SH-15)

268 01-CRIDP-12- Coimbatore Avinashi Improvements to Km16/2-17/4 of 1.20 65.00 13-S-0268 Avinashi - Mettupalayam road (SH- 80) 269 01-CRIDP-12- Coimbatore Coimbatore Improvements in Km 0/0-0/5 of 0.50 70.00 13-S-0269 north Coimbatore - Anaikatti Road (SH- 164) 270 01-CRIDP-12- Coimbatore Kinathukadavu Improvements to Km 12/6 - 14/0 & 1.90 95.00 13-S-0270 14/8 - 15/3 of North Coimbatore - Ramanathapuram - Chettipalayam road (SH-162) 271 01-CRIDP-12- Coimbatore Avinashi Improvements in Km 33/200 - 5.42 270.00 13-S-0271 38/620 including Dip Improvements at Km 34/6,8 and junction Improvement at Km 38/6 of Kamanaickenpalayam - Annur road. ( SH-165)

272 01-CRIDP-12- Coimbatore Coimbatore Improvements to Approaches of 0.20 42.00 13-S-0272 south Flyover Bridge at Km 0/2 of North Coimbatore - Ramanathapuram - Chettipalayam road (SH-162)

SH-32of 50 SECTION OFFICER 33/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 273 01-CRIDP-12- Coimbatore Avinashi Improvements to Km 8/6-9/0, Km 2.40 156.00 13-S-0273 12/2 - 13/6, 14/0 - 14/6 of Karamadai-Kariyampalayam road (SH-168) Strengthening Total 26.82 1453.00 274 01-CRIDP-12- Coimbatore Mettupalayam Construction of High Level Bridge 120.00 13-S-0274 at Km 57/4 of Ooty-Kothagiri- Mettupalayam-Sathy-Gobi-Erode road (SH-15) 275 01-CRIDP-12- Coimbatore Coimbatore Construction of Culvert at Km 154/8 25.00 13-S-0275 south of Salem - Cochin road (SU-52)

276 01-CRIDP-12- Coimbatore Coimbatore Widening the Bridge at Km 4/10 of 160.00 13-S-0276 north North Coimbatore - Maruthamalai Road (SH-167) 277 01-CRIDP-12- Coimbatore Coimbatore Construction of Culvert at Km 6/6 75.00 13-S-0277 south of North Coimbatore - Ramanathapuram - Chettipalayam road ( SH-162) Culverts/Bridges Total 4 Nos 380.00 278 01-CRIDP-12- Coimbatore Thondamuthur Land Acquisition for Widening from 980.00 13-S-0278 Double Lane to Four Lane in Km 6/5-9/2 of North Coimbatore - Maruthamalai Road (SH-167)

LA/DPR Total 1 Nos 980.00 279 01-CRIDP-12- Coimbatore Coimbatore Providing Centre median in Km 1/4 - 100.00 13-S-0279 north 5/0 of North Coimbatore - Maruthamalai Road (SH-167) Others Total 1 Nos 100.00 Coimbatore Total 30.62 3408.00 280 01-CRIDP-12- Pollachi Pollachi Widening from Double lane to 1.00 182.00 13-S-0280 Multilane in km 0/6- 1/6 & construction of slab culvert at km 0/2 & 0/6 of Pollachi - Palaghat road (SH-78A) 281 01-CRIDP-12- Pollachi Udumalapet Widening from Double lane to 5.20 200.00 13-S-0281 Multilane in km 2/2 - 7/4 of Pollachi - Valparai road (SH-78) Other Widening Total 6.20 382.00 282 01-CRIDP-12- Pollachi Kinathukadavu Rebuilding in km 46/0 - 54/4 & 8.40 968.00 13-S-0282 construction of 3 Nos pipe culvert 1 No Retaining wall of Palladam - Cochin frontier road (SH-163)

SH-33of 50 SECTION OFFICER 34/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 283 01-CRIDP-12- Pollachi Sulur Rebuilding in km 15/6 - 17/2, 21/2 - 8.80 700.00 13-S-0283 23/4 & 44/4 - 46/0 & improvements in km 12/8 - 13/8, 17/2 - 19/0 & 20/2 - 21/2 construction of 2 Nos pipe culvert of Palladam - Cochin frontier road.(SH-163)

284 01-CRIDP-12- Pollachi Pollachi Strengthening in km 8/8-11/0 & 5.00 425.00 13-S-0284 12/0 -14/8 of Pollachi - Palaghat road (SH-78 A) 285 01-CRIDP-12- Pollachi Pollachi Strengthening in km 4/0 - 8/8 of 4.80 415.00 13-S-0285 Pollachi - Palaghat road (SH-78 A)

286 01-CRIDP-12- Pollachi Valparai Improvements to km 19/0 - 20/4 & 3.40 175.00 13-S-0286 22/0 - 24/0 of Pollachi - Valparai road (SH-78) 287 01-CRIDP-12- Pollachi Pollachi Improvements and providing hard 1.40 190.00 13-S-0287 shoulders at km 80/8 - 82/2 & improvements to dip at km 81/4 & 81/6 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenkarai (SH-19)

Strengthening Total 31.80 2873.00 288 01-CRIDP-12- Pollachi Udumalapet Reconstruction of Culverts at km 30.00 13-S-0288 0/6,2/8(i),(ii) & 3/6 of Pollachi - Valparai road (SH-78) Culverts/Bridges Total 1 Nos 30.00 289 01-CRIDP-12- Pollachi Valparai Providing bus lay bye at km 26/10 20.00 13-S-0289 of Pollachi - Valparai road (At Monkey falls) (SH-78) 290 01-CRIDP-12- Pollachi Valparai Providing foot path at km 57/6 - 15.00 13-S-0290 58/0 of Pollachi - Valparai road (At Rottikadai) (SH-78) 291 01-CRIDP-12- Pollachi Valparai Construction of Retaining wall at 10.00 13-S-0291 km 40/6 of Pollachi - Valparai road (SH-78) 292 01-CRIDP-12- Pollachi Pollachi Providing bus lay bye at km 80/10 65.00 13-S-0292 & 99/6 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenkarai (SH-19)

Others Total 4 Nos 110.00 Pollachi Total 38.00 3395.00

SH-34of 50 SECTION OFFICER 35/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 293 01-CRIDP-12- Gobi Bhavani Widening and Improvements to Km 1.40 160.00 13-S-0293 141/8-142/2 and improvements to km 139/0-140/0 including junction improvements at Km 142/2 and widening of One culvert in Ooty - Kothagiri - Metupalayam - Sathy - Gobi - Erode Road. (SH-15)

294 01-CRIDP-12- Gobi Gobichetty Widening the built up area in Km 1.20 80.00 13-S-0294 palayam 16/6-17/8 and Improvements to Junction at Km 17/8, 22/4 including construction of drain in Cheyur to Erode - Sathy Road.(SH-15A)

295 01-CRIDP-12- Gobi Gobichetty Widening DL to ML and 4.80 360.00 13-S-0295 palayam Improvements in Km 13/6-14/2 including construction of drain and Improvements in Km 2/0-3/100,9/5- 10/2,11/2-13/6 including curve improvements & Junction improvement at Km 4/2, Improvements to dips (3 places) including construction of missing drain in Gobi - Uthukuli - Padiyur Road.(SH-81) 296 01-CRIDP-12- Gobi Gobichetty Widening end to end in built up 7.40 545.00 13-S-0296 palayam area Km 123/8 - 125/2, including construction of culverts (2 Nos) and raising the dip , Widening and Improvements in Km 115/0-116/0 and Improvements in Km 111/4 - 113/0, 118/0 - 120/8 & 121/8-123/0 including curve improvements and providing side drains and bus lay byes in km124/0-128/8 of Ooty- Kothagiri-Mettupalayam-Sathy- Gobi-Erode Road (SH-15)

SH-35of 50 SECTION OFFICER 36/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 297 01-CRIDP-12- Gobi Anthiyur Widening DL to ML in Km 18/0 - 5.80 370.00 13-S-0297 19/6 and juncition improvements in Km 18/4 and rebuilding in Km 17/0- 19/0 21/2-22/2and 26/6-28/8 and Construction of drain and widening the bridges ( 2Nos) in Sathy - Athani - Bhavani Road .(SH-82)

298 01-CRIDP-12- Gobi Bhavanisagar Widening DL to ML in Km 101/6- 4.00 410.00 13-S-0298 103/0 and rebuilding in Km 106/2- 107/0, Improvements to Km 108/2 - 108/7, 110/6-111/4 including Construction of culverts retaining wall and providing drain and junction improvements at Km 109/4 of Ooty - Kothagiri - Mettupalayam - Sathy - Gobi - Erode Road.(SH-15)

Other Widening Total 24.60 1925.00 299 01-CRIDP-12- Gobi Anthiyur Improvements to km 8/0-11/0 and 3.00 200.00 13-S-0299 widening of three culverts in Sathy- Athani-Bhavani Road.(SH-82)

300 01-CRIDP-12- Gobi Bhavanisagar Improvements to Km 86/0- 4.80 265.00 13-S-0300 88/0,89/0-91/8 including raising Two dips and curve improvements in Ooty - Kothagiri - Mettupalayam - Sathy - Gobi - Erode Road. (SH-15)

Strengthening Total 7.80 465.00 301 01-CRIDP-12- Gobi Erodewest Construction of One culvert at Km 40.00 13-S-0301 62/8 of Salem-cochin - Kanniakumari road( Abanded NH- 47) Chithodu(SU-110) 302 01-CRIDP-12- Gobi Gobichetty Widening the bridge at km 118/4 170.00 13-S-0302 palayam and improvements to km 118/0- 118/6 and curve improvements of Ooty-Kothagiri-Mettupalayam- Sathy-Gobi-Erode road and construction of retaining wall. (SH- 15)

SH-36of 50 SECTION OFFICER 37/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 303 01-CRIDP-12- Gobi Anthiyur Widening the PWD canal Bridge 45.00 13-S-0303 and Geometric Improvements including providing approach for bridge at km 24/4 of Sathy-Athani- Bhavani road (SH-82)

Culverts/Bridges Total 3 Nos 255.00 Gobi Total 32.40 2645.00 304 01-CRIDP-12- Udhagai Uthaga Improvements to Km 0/0 - 2/0 of 2.00 99.00 13-S-0304 mandalam Udhagai Kotagiri Mettupalayam Sathy Gobi Erode Road (SH-15)

305 01-CRIDP-12- Udhagai Gudalur Improvements to Km 98/4 - 100/0, 5.80 390.00 13-S-0305 113/0-114/4, 115/0-115/4, 116/0- 117/0 & 117/4-118/0 and widening the Culvert approach and construction of Protective wall at Km 131/2 of Calicut Vyithiri Gudalur road (SH-12)

306 01-CRIDP-12- Udhagai Gudalur Improvements to Km 12/0 - 16/0 of 4.00 200.00 13-S-0306 Gudalur Sulthan Bathery Road (SH- 98) 307 01-CRIDP-12- Udhagai Gudalur Rebuilding the road at Km 106/4 - 0.20 110.00 13-S-0307 106/6 of Calicut Nilambur Gudalur Road and providing breast wall including CC Drain at Km 103/6 - 109/0 (SH-11)

308 01-CRIDP-12- Udhagai Coonoor Improvements to Km 20/2-21/100, 7.50 499.00 13-S-0308 21/300-26/0 and 26/100-27/0 , 30/0- 31/0 and 34/0-35/0 including CC drain and construction of protective works in Udhagai Kotagiri Mettupalayam Sathi Gobi Erode road (SH-15).

Strengthening Total 19.50 1298.00 Udhagai Total 19.50 1298.00 Coimbatore Total 120.52 10746.00 309 01-CRIDP-12- Madurai Thirumangalam Strengthening to Vathalakundu- 2.70 175.00 13-S-0309 Peraiyur-Kariyapatti Road at Km 72/700-74/450,74/550-75/0, Providing Paver Block at Km 72/6- 72/700, 74/450-74/550 , 79/100- 79/200,82/950-83/150 including construction of Side Drian (SH-154)

SH-37of 50 SECTION OFFICER 38/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 310 01-CRIDP-12- Madurai Usilampatti Providing cement Paver Block in 0.60 75.00 13-S-0310 the shoulders of road in the town of Usilampatti in Vathalakundu Peraiyur Kariyapatti Road at Km 24/8-25/4 (SH-154)

311 01-CRIDP-12- Madurai Madurai east Strengthening Madurai - Alagarkoil - 2.00 90.00 13-S-0311 Melur road in km 9/4-11/4 (SH-72A)

312 01-CRIDP-12- Madurai Melur Strengthening Madurai - Alagarkoil - 8.34 960.00 13-S-0312 Melur road in km 25/0-33/2 + 135M (SH-72A) 313 01-CRIDP-12- Madurai Melur Strengthening Dindigul- Natham - 1.00 60.00 13-S-0313 Singampunari- Thiruppathur- Karaikudi road in km 53/0-54/0 (SH-35) 314 01-CRIDP-12- Madurai Melur Strengthening and Raising the Low 3.00 175.00 13-S-0314 lying area of Ramanathapuram- Nainarkoil-Andakudi-Ilaiyankudi- Sivagangai- Melur road in km 100/0- 103/0 (excluding 101/4) including Construction of side drain (SH-34)

315 01-CRIDP-12- Madurai Sholavandan Providing Paver Block in lieu of 0.60 81.00 13-S-0315 flexible pavement km 24/0 - 24/6 in Thirumangalam - Pallapatti - Silukkuvarpatti road and including CD works 1 No and Km 32/10 (SH- 73) 316 01-CRIDP-12- Madurai Maduraieast Strengthening to Madurai-Natham 3.20 190.00 13-S-0316 road km 17/0-20/2 including Reconstruction of culvert at km 12/2 (SH-72) 317 01-CRIDP-12- Madurai Thiruparan Strengthening Madurai - Tuticourin 2.00 175.00 13-S-0317 kundram Road Km 5/0-7/0 (SH-32)

318 01-CRIDP-12- Madurai Usilampatti Raising the low lying area in the 0.40 45.00 13-S-0318 Existing flexible pavement by providing Paver block including Drain in Thirumangalam Usilampatti Road at Km 16/8-17/2 (SH-73A) Strengthening Total 23.84 2026.00 Madurai Total 23.84 2026.00

SH-38of 50 SECTION OFFICER 39/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 319 01-CRIDP-12- Theni Cumbam Widening from D.L to M.L in km 3.38 265.00 13-S-0319 7/0-8/0 & in km 9/425-11/8 of Palayam - Bodi road.including Construction of a culvert @ km 16/8, Reconstruction of culvert @ km 14/6 , widening the culvert @ km 9/10,11/2, 18/4 and widening the minor Bridge @ km 22/2 (SH- 100).

320 01-CRIDP-12- Theni Andipatti Widening from DL to ML in 10.00 500.00 13-S-0320 Km.13/6 - 23/0 & IL to DL in km 45/2-45/8, by providing CC pavement in built up area , km 45/0- 45/2 and 45/8-46/6 providing cement concrete shoulders in buitup area of Devadanapatti - Varusanadu road including construction of retaining wall.(SH- 101) Other Widening Total 13.38 765.00 321 01-CRIDP-12- Theni Andipatti Improvements to Uthamapalayam- 1.40 83.00 13-S-0321 Surulipatty Road km 14/6-16/0 including Construction of Protective wall at Km 3/6, 3/8 ,5/10,6/6,6/8,6/10 7/8,7/10 for road side wells ( SH-102)

Strengthening Total 1.40 83.00 322 01-CRIDP-12- Theni Periyakulam Construction of culvert at Km.3/2 , 48.00 13-S-0322 including constructiuon of retaining wall at Km 5/4 of Devadanapatty- Varusanadu road (SH-101)

Culverts/Bridges Total 1 Nos 48.00 Theni Total 14.78 896.00 323 01-CRIDP-12- Dindigul Nilakottai Widening Intermediate Lane to 6.70 360.00 13-S-0323 Double Lane by providing concrete pavement in km 10/0-15/0 and strengthening in km 1/3-3/0,12/0- 13/4 of Kodai Ghat Road (SH-156)

SH-39of 50 SECTION OFFICER 40/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 324 01-CRIDP-12- Dindigul Palani Widening the road from 9.60 794.00 13-S-0324 Intermediate Lane to Double Lane by Providing Concrete pavement including side drain in Km. 15/0- 19/0 including strengthening in km 17/0-18/0&44/0-49/0 and Providing paving blocks in km 23/2(100 M), 23/4(50M), 32/6(40M), 32/8(40M), 38/10(40M), 39/2 (40M) 42/6(40M), 42/8(20M), 42/10(100M), 43/8(70M), 43/10(60M) and Reconstruction Culverts (6 Nos) and Retaining walls in Kodai - Ghat Road (SH-156)

IL to DL Total 16.30 1154.00 325 01-CRIDP-12- Dindigul Dindigul Widening from Double lane to 2.79 382.00 13-S-0325 Multilane in km 0/725-1/760 and 2/450-3/6 and strengthening in km 1/545-1/960, 2/350-4/0 including Reconstruction of culverts(2 nos) & Providing centre median at chiange 1/0-1/8& Retaining walls in Dindigul - Natham - Singampunari - Thirupathur - Devakottai Rastha Road (SH-35)

326 01-CRIDP-12- Dindigul Natham Widening Double Lane to Multi 2.70 660.00 13-S-0326 Lane in KM.33/6-35/8 including raising the low lying area in km 35/0-35/550 and strengthening in km 42/0-42/500 and Widening & Reconstruction of culverts 20/2, 22/4, 22/10, 23/4, 26/6,28/6, 32/8,34/4,35/6,35/8& Widening the minor bridge at km 17/10 with realignment and reconstruction of drain at km 20/8-21/4,34/2-35/6(up to disposal point) and Providing paving block on berms in km 21/4,34/3-35/4 in builtup area of Dindigul - Natham - Singampunari - Thiruppathur - Devakkottai rastha road (SH-35)

SH-40of 50 SECTION OFFICER 41/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 327 01-CRIDP-12- Dindigul Dindigul Widening from Single lane to 0.43 57.00 13-S-0327 Intermediate lane and strengthening in Km.1/725 - 2/150 of service roads for Railway Over Bridge at km 2/4 of Dindigul - Natham - Singampunari - Thirupathur - Devakottai Rastha Road (SU-56)

Other Widening Total 5.91 1099.00 328 01-CRIDP-12- Dindigul Vedachandur Strengthening in Km.2/0-2/6, 2/8- 4.10 455.00 13-S-0328 3/0,7/5 - 8/0, 13/8-16/6 and Elevating the low lying area at km 7/6, 7/8, 14/2,15/0-15/3 and construction of culverts(2nos) in Dindigul - Gujiliyamparai - Karur Road (SH-74). 329 01-CRIDP-12- Dindigul Vedachandur Strengthening in Km.18/4- 2.00 148.00 13-S-0329 19/4,45/0-46/0 including providing CC pavement of Dindigul – Gujiliamparai – Karur road (SH-74)

330 01-CRIDP-12- Dindigul Oddan Strengthening in Km 28/6 - 29/6, 4.80 288.00 13-S-0330 chathiram 30/6-32/0, 34/0-35/0, 36/2-37/6 of Vadamadurai - Oddanchatram road (SH-152) 331 01-CRIDP-12- Dindigul Oddan Strengthening in km 2/0-2/6,4/9- 5.75 348.00 13-S-0331 chathiram 7/2, 19/0-21/850 of Palani - Dharapuram road (via) Alangiam (SH-153) 332 01-CRIDP-12- Dindigul Athoor Strengthening in km 24/0-24/2, 1.60 160.00 13-S-0332 27/8-29/2 and Providing Bus lay- bye at km 11/10, 13/2, 13/10, 15/4, 24/4, 27/8,29/10 of Mettur - Palakkanuthu - Oddanchatram - Dharapuram - Tiruppur Road (SH- 37) 333 01-CRIDP-12- Dindigul Nilakottai Strengthening in Km 6/0-7/0, 8/0- 5.40 368.00 13-S-0333 9/0, 10/0-12/4,16/0-17/0 of Ammayanaickanur - Vathalagundu road(SH-155) 334 01-CRIDP-12- Dindigul Vedachandur Strengthening in km 0/0-1/2, 3/0- 3.80 200.00 13-S-0334 4/2, 6/6-8/0, of Vadamadurai - Oddanchatram road (SH-152)

SH-41of 50 SECTION OFFICER 42/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 335 01-CRIDP-12- Dindigul Oddan Strengthening in km 49/0-49/5 of 0.50 30.00 13-S-0335 chathiram Mettur- Palakkanuthu - Oddanchatram - Dharapuram - Tirupur road (SH-37) Strengthening Total 27.95 1997.00 336 01-CRIDP-12- Dindigul Oddan Construction of culvert at km 14/4 15.00 13-S-0336 chathiram of Thalaiyuthu - Kallimandayam - Edayakottai road (SH-192)

337 01-CRIDP-12- Dindigul Nilakottai Construction of culvert at km 401/4 15.00 13-S-0337 of Abodoned NH 7 at Kodai road (SU-42) Culverts/Bridges Total 2 Nos 30.00 338 01-CRIDP-12- Dindigul Natham Geometrical improvements to 52.00 13-S-0338 curves in km 21/300-22/100 and Construction of Retaining wall in Madurai - Natham road (SH-72)

Others Total 1 Nos 52.00 Dindigul Total 50.16 4332.00 339 01-CRIDP-12- Sivagangai Manamadurai Improvements to Ramanathapuram 6.60 344.00 13-S-0339 - Nainarkoil - Andakudi - Elayangudi - Sivaganga - melur road Km.37/4-39/2,54/2-58/0, 73/2- 74/2(SH- 34)

340 01-CRIDP-12- Sivagangai Tirupattur Improvements to Melur - 3.20 150.00 13-S-0340 Thiruppathur Road Km 15/0 - 17/0, 24/4 - 25/0, 27/0 - 27/6 including Reconstruction of culvert (2Nos) (S H 191) 341 01-CRIDP-12- Sivagangai Manamadurai Improvements to Madurai - 1.60 83.00 13-S-0341 Dhanushkodi Road Km 45/6 - 47/2(SH-25) 342 01-CRIDP-12- Sivagangai Tirupattur Improvements at Dindigul - 5.40 370.00 13-S-0342 Natham - Singampunari - Thiruppathur - Devakottai Rastha Road at Km 61/0-61/4,75/0 - 75/4, 76/4 - 76/8, 77/0-78/0,80/6 - 81/8, 85/6 - 86/6, Rebuilding the Stretches @ Km 65/0 - 65/8 & Providing Paved Block in Km 59/6, 81/6,81/8and Reconstruction of culvert (7Nos)(SH-35)

SH-42of 50 SECTION OFFICER 43/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 343 01-CRIDP-12- Sivagangai Sivaganga Providing Paver Block @ Km 174/0- 0.80 70.00 13-S-0343 174/6 and 190/2 of Thanjavur- Pattukottai - Aranthangi - Karaikudi - Kallal - Maravamangalam - Elayangudi -Paramakudi- Mudukulathur - Sayalkudi road (SH- 29) 344 01-CRIDP-12- Sivagangai Karaikudi Improvements at Dindigul - Natham 4.10 200.00 13-S-0344 - Singampunari - Thiruppathur - Devakottai Rastha Road at Km 89/4-90/0,91/0-94/5(SH-35)

Strengthening Total 21.70 1217.00 Sivagangai Total 21.70 1217.00 345 01-CRIDP-12- Ramnad Tiruvadanai Widening and Improvements from 2.92 270.00 13-S-0345 IL to DL Km.6/0-8/920 of Uppoor - Kottaiyur Road (SH-34A)

346 01-CRIDP-12- Ramnad Paramakudi Widening IL to DL Km.25/100 - 2.40 165.00 13-S-0346 27/297and Improvements Km.18/2 and retaining wall of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivaganga- Melur Road (SH-34)

IL to DL Total 5.32 435.00 347 01-CRIDP-12- Ramnad Paramakudi Providing detail project report 30.00 13-S-0347 (DPR) for forming Bye-pass to Paramakudi, Parthibanur & Kamuthi Town. LA/DPR Total 1 Nos 30.00 Ramnad Total 5.32 465.00 Madurai Total 115.79 8936.00 348 01-CRIDP-12- Tirunelveli Amba Strengthening to Tiruchendur - 9.00 410.00 13-S-0348 samudram Palayamkottai - Ambasamduram - Tenkasi - Courtallam - Shencottai Road Km 65/0 - 67/2, 72/8 - 76/0 , 89/0 - 90/0 ,98/0 -99/6 & 106/8 - 107/8. (SH-40)

349 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Cheranmahadevi - 4.20 190.00 13-S-0349 Panakudi Road Km 2/0 - 4/4 & 8/6 - 10/4. (SH-177)

350 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Tirunelveli - 6.60 300.00 13-S-0350 Pottalpudur Road Km 13/6 - 15/8, 18/8 - 22/2 & 23/2 - 24/2.(SH-41A)

SH-43of 50 SECTION OFFICER 44/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 351 01-CRIDP-12- Tirunelveli Palayamkottai Strengthening to Tirunelveli Bye 3.60 180.00 13-S-0351 Pass Road Km 4/0 - 7/6 (SH-75A)

352 01-CRIDP-12- Tirunelveli Tirunelveli Strengthening to Tirunelveli - 7.40 284.00 13-S-0352 Shencottai - Kollam road km 6/0 - 7/4, 10/6 - 13/0 & 13/4 - 14/0, 23/0 - 25/0 & 26/0 - 27/0. (SH-39)

353 01-CRIDP-12- Tirunelveli Tirunelveli Strengthening to Tirunelveli - 1.60 67.00 13-S-0353 Pottalpudur Road Km 12/0 - 13/6. (SH-41A) 354 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to Alwarthirunagari - 2.11 72.00 13-S-0354 Nazarath - Sathankulam - Ittamozhi - Valliyoor road Km 29/895 - 32/0 (SH-93)

355 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to Cheranmahadevi - 2.00 72.00 13-S-0355 Panagudi Road Km 28/0 - 30/0. (SH-177) Strengthening Total 36.51 1575.00 Tirunelveli Total 36.51 1575.00 356 01-CRIDP-12- Tenkasi Alangulam Improvements in km 34/6-38/0, 7.30 425.00 13-S-0356 40/6-41/2, 41/7-43/0 & 43/8-45/4 & raising the road in km 43/4-43/8 including Construction of drain at km 43/0-43/6 (Both sides of Pavoorchatram built up area) including culvert 1 no. of Tirunelveli- Shencottai-Kollam road (SH-39)

357 01-CRIDP-12- Tenkasi Kadaianallur Improvements in Km 11/4 - 12/4 & 2.00 95.00 13-S-0357 13/0 - 14/0 of Shencottai - Pavoorchatram road (Via) Surandai (SH-39A) 358 01-CRIDP-12- Tenkasi Tenkasi Improvements in km 118/0-119/0 1.00 45.00 13-S-0358 of Tiruchendur-Palayamkottai- Ambasamuduram-Tenkasi- Courtallam-Shencottai road (SH- 40)

359 01-CRIDP-12- Tenkasi Sankarankoil Improvements in Km 11/2 - 11/8 & 2.53 125.00 13-S-0359 14/0 - 15/925 of Puliangudi - Sankarankovil - Kalugumalai - Nalatinpudur Road (SH-76)

Strengthening Total 12.83 690.00

SH-44of 50 SECTION OFFICER 45/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 360 01-CRIDP-12- Tenkasi Sankarankoil Reconstruction of Culverts 5 nos 50.00 13-S-0360 and Minor Bridges 2 nos in km 37/8 - 51/4 of Rajapalayam - Sankarankovil - Tirunelveli Road.(SH-41) Culverts/Bridges Total 1 Nos 50.00 Tenkasi Total 12.83 740.00 361 01-CRIDP-12- Virudhunagar Sattur Widening IL to DL Km 25/0 - 29/6 4.60 110.00 13-S-0361 Rajapalayam - Vembakkottai Road including 7 Nos of reconstruction of culvert (SH-186)

362 01-CRIDP-12- Virudhunagar Sattur Widening and Improvements IL to 0.09 5.00 13-S-0362 DL Km 14/6-14/690 of Sivakasi - Alangulam Road (SH-183)

363 01-CRIDP-12- Virudhunagar Thiruchuli Widening from IL - DL of 29.26 726.00 13-S-0363 Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - tiruchuli - Narikudi - Parthibanoor Road (SH-42) Km 73/6 - 102/860 including 2 nos of Reconstruction of culvert (SH-42)

IL to DL Total 33.95 841.00 364 01-CRIDP-12- Virudhunagar Sattur Widening Double lane - Multi lane 2.56 270.00 13-S-0364 in Madurai - Kannyakumari road (with in Sattur Municipal limit) Km 69/700 - 71/160 and improvements to Km 69/7-70/8 including widening of 1 narrow pipe culvert & Construction of protective wall (SU- 32) 365 01-CRIDP-12- Virudhunagar Virudhunagar Widening Double lane to Multi lane 1.31 187.00 13-S-0365 and construction of Drainage at Km 42/687 - 44/0 of Madurai - Kanniyakumari Road (Within Virudhunagar Municipal Limit) (SU- 33) 366 01-CRIDP-12- Virudhunagar Virudhunagar Widening from DL- ML of 1.60 185.00 13-S-0366 Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - tiruchuli - Narikudi - Parthibanoor Road (SH-42) Km 45/4 - 47/0 (SH- 42)

SH-45of 50 SECTION OFFICER 46/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 367 01-CRIDP-12- Virudhunagar Sivakasi Widening DL to ML in Km 14/4-15/2 0.80 65.00 13-S-0367 of Sattur - Sivakasi - Kalugumalai Road including Providing paver black on both sides of the road(Sivakasi Bus Stand) (SH-187)

368 01-CRIDP-12- Virudhunagar Sivakasi Widening from DL to ML at Km 1.50 105.00 13-S-0368 23/3-23/9, 24/1 - 24/6 (Thiruthangal built up area), 19/4- 19/8 (Sivakasi built up area) of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - Thiruchuli - Narikudi -Parthibanoor Road (SH-42) 369 01-CRIDP-12- Virudhunagar Aruppukottai Widening from DL to ML in Km 4.85 398.00 13-S-0369 43/8-46/650, 48/6-49/0 & 47/2-49/8 of Madurai-Tuticorin road (within Aruppukottai Municipal limit) (SU- 36) Other Widening Total 12.62 1210.00 370 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Tenkasi - 0.83 30.00 13-S-0370 Tirumangalam road (with in Srivilliputtur Municipal Limit) km 80/0-80/230, 80/8-80/10 & 81/4- 81/8.(SU-63) 371 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Tenkasi - 0.23 10.00 13-S-0371 Tirumangalam road (within Alagapuri Village Limit) km 0/0 - 0/230 (SU-62) 372 01-CRIDP-12- Virudhunagar Sattur Junction Improvements at Km 0/2 0.10 10.00 13-S-0372 of Sattur-Sivakasi-Kalugumalai road (SH-187) 373 01-CRIDP-12- Virudhunagar Virudhunagar Construction of Bus lay bye at Km 6.00 13-S-0373 31/4,35/0,45/6, of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai -Thiruchuli- Narikudi - Parthibanoor Road (SH-42)

374 01-CRIDP-12- Virudhunagar Sivakasi Dip raising at 3/4,3/6 & 3/8 of 28.00 13-S-0374 Sivakasi - Alangulam road including construction of new culvert at Km 3/4 (SH-183)

SH-46of 50 SECTION OFFICER 47/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 375 01-CRIDP-12- Virudhunagar Sattur Improvements to Sattur - Sivakasi - 3.20 159.00 13-S-0375 Kalugumalai Road in Km 8/0-10/0 and 10/8 - 12/0 including Construction of Bus lay bye at Km 19/4 & Junction Improvements at Km 14/4 , 16/7 (SH-187)

376 01-CRIDP-12- Virudhunagar Sivakasi (i) Junction Improvements at Km 70.00 13-S-0376 16/4 & 19/4 (ii) Construction of Bus lay bye at Km 17/2 (Reserve line) & 17/10 (Satchiyapuram) & 23/10 (Thiruthangal) of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - Thiruchuli - Narikudi - Parthibanoor Road Including Rising the Dip & Construction of culvert (SH-42)

377 01-CRIDP-12- Virudhunagar Sattur Improvements to Rajapalayam - 3.00 140.00 13-S-0377 Vembakottai road Km 6/6 - 8/0, 9/0- 9/2, 10/2-10/4, 11/4-12/0, 13/0- 13/2, & 14/2-14/6 including culvert (SH-186) Strengthening Total 7.36 453.00 378 01-CRIDP-12- Virudhunagar Sivakasi Reconstruction of Narrow culvert at 85.00 13-S-0378 Km 18/10(i)&(ii) of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - Thiruchuli - Narikudi - Parthibanoor Road including 1 Nos of widening of culvert (SH-42)

379 01-CRIDP-12- Virudhunagar Aruppukottai Widening of culvert at km 48.00 13-S-0379 51/6,53/10,62/6,67/8,68/2,68/4 of Sriviliputhur-Sivakasi-Virudhunagar- Aruppukottai-Thiruchuli-Narikudi- Parthibanoor road (SH-42)

380 01-CRIDP-12- Virudhunagar Aruppukottai Reconstruction Culvert at KM.3/8 17.00 13-S-0380 and Retaining wall at Km.4/4 of Virudhunagar-Krishnapuram road (SH-184) Culverts/Bridges Total 3 Nos 150.00 Virudhunagar Total 53.93 2654.00

SH-47of 50 SECTION OFFICER 48/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 381 01-CRIDP-12- Tuticorin Ottapidaram Widening from IL to DL in km 5.09 305.00 13-S-0381 16/910-21/0 & 30/0-31/0 of Palayamcottai - Kurukkuchalai - Kulathur - Vilalthikulam - Nagalapuram - Pandhalkudi - Aruppukottai Road including Rebuilding in km 18/0-21/0 (SH- 75) 382 01-CRIDP-12- Tuticorin Vilathikulam Widening from IL to DL in Km 8.50 375.00 13-S-0382 56/100-57/0,75/0-80/0 and 89/0- 91/6 of Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar road including Rebuilding in km 75/0-76/0 and Improvments in km 76/0-76/8, 89/8-91/6 including CD works 16 Nos (SH- 44) 383 01-CRIDP-12- Tuticorin Vilathikulam Widening IL to DL in km 83/0-91/0 12.80 775.00 13-S-0383 & 94/0-98/8 of Palayamcottai - Kurukkuchalai - Kulathur - Vilalthikulam - Nagalapuram - Pandhalkudi - Aruppukottai Road including CD works 14 Nos (SH- 75) 384 01-CRIDP-12- Tuticorin Vilathikulam Widening from IL to DL in km 100/0- 7.78 490.00 13-S-0384 107/780 of Palayamcottai - Kurukkuchalai - Kulathur - Vilalthikulam - Nagalapuram - Pandhalkudi - Aruppukottai Road (SH-75) including CD works 14 Nos

385 01-CRIDP-12- Tuticorin Srivaikundam Widening and Improvements from 0.70 55.00 13-S-0385 IL to DL in km 0/5-1/2 of Alwarthirunageri - Nazareth - Sathankulam - Ittamozhi - Valliyoor Road (SH-93) IL to DL Total 34.87 2000.00 386 01-CRIDP-12- Tuticorin Vilathikulam Improvements Paruvakudi - 3.00 150.00 13-S-0386 Kovilpatti - Ettayapuram - Vilathikulam - Vembar Road in km 48/0-50/0 & 54/0-55 including CD Works at Km.47/4 (SH-44)

387 01-CRIDP-12- Tuticorin Srivaikundam Impts to Alwarthirunagari - 5.30 250.00 13-S-0387 Nazareth - Sathankulam - Ittamozhi - Valliyoor Road Km 18/6-19/8 & 25/8-29/895 (SH-93)

SH-48of 50 SECTION OFFICER 49/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 388 01-CRIDP-12- Tuticorin Thiruchendur Impts to Thoothukudi- Tiruchendur- 9.80 460.00 13-S-0388 Kanniyakumari Road Km 21/2-29/0 & 31/0-33/0 (SH-176)

389 01-CRIDP-12- Tuticorin Vilathikulam Rebuilding in km 63/2-63/5 of 0.30 50.00 13-S-0389 Palayamcottai - Kurukkuchalai - Kulathur - Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH-75) 390 01-CRIDP-12- Tuticorin Kovilpatti Construction of CC Pavements for 0.80 35.00 13-S-0390 the service road of ROB at km 94/0 of Madurai-Kanyakumari road (SU- 26) 391 01-CRIDP-12- Tuticorin Thoothukudi Improvements to Thoothukudi - 0.40 36.00 13-S-0391 Quilon Road in km 6/0-6/4(SU-92)

392 01-CRIDP-12- Tuticorin Thiruchendur Improvements to Tiruchendur - 1.80 90.00 13-S-0392 Palayamcottai - Ambasamuduram - Tenkasi - Courtallam - Shenkottai Road in km 12/0-13/8 (SH-40)

393 01-CRIDP-12- Tuticorin Vilathikulam Rebuilding in km 57/0-59/6, 63/0- 6.40 620.00 13-S-0393 64/2, 65/0-66/6 & 71/8-72/8 of Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar Road including CD Works (SH-44) Strengthening Total 27.80 1691.00 394 01-CRIDP-12- Tuticorin Kovilpatti ReConstriction of Culvert at Km 20.00 13-S-0394 41/2 of Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar Road (SH-44) 395 01-CRIDP-12- Tuticorin Kovilpatti ReConstriction of Culvert at Km 50.00 13-S-0395 45/2, 46/8 of Puliyankudi - Sankarankovil - Kalugumalai - Nallattinputhur Road (SH-76) Culverts/Bridges Total 2 Nos 70.00 Tuticorin Total 62.67 3761.00 396 01-CRIDP-12- Nagercoil Vilavancode Rebuilding Aralvoimozhi - 6.90 900.00 13-S-0396 Nedumangadu road Km 41/0 - 44/0 and 45/0 - 48/9 including reconstruction of pipe culvert - 3 Nos and slab culvert -1No. (SH- 45).

SH-49of 50 SECTION OFFICER 50/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 397 01-CRIDP-12- Nagercoil Kanniyakumari Improvements to Aralvoimozhi - 2.00 100.00 13-S-0397 Nedumangadu road Km.4/0 - 5/2 and 17/0 - 17/8 (SH-45). Strengthening Total 8.90 1000.00 Nagercoil Total 8.90 1000.00 Thirunelveli Total 174.83 9730.00 Grand Total 1305.79 90380.50

SH-50of 50 SECTION OFFICER 51/ 185

Annexure to G.O. Ms No. 161/ Highways and Minor Ports (HN2) Department / Dated 01. 10. 2012 CRIDP 2012-13 LIST OF WORKS - MAJOR DISTRICT ROADS Rs. in Lakhs Cost ID Job Code Division Constituency Name of work (Eng) Length required 398 01-CRIDP-12- Chennai City Shozhinga Widening and Improving from two 0.80 200.00 13-M-0398 Roads nallur lane to four lane in km. 1/9 - 2/7 of Medavakkam - Mambakkam - Sembakkam road including construction of Crash barrier type centre Median and strom water drain (MD--633).

399 01-CRIDP-12- Chennai City Shozhinga Widening & Improving from Double 0.70 200.00 13-M-0399 Roads nallur Lane to Four Lane in Km2/7 - 3/4 of Medavakkam - Mambakkam - Sembakkam Road including construction of Storm water drain and crash barrier type center median (MD--633)

400 01-CRIDP-12- Chennai City Shozhinga Widening and Improving from two 2.00 600.00 13-M-0400 Roads nallur lane to available full width at Km0/0- 1/3 & 1/7-3/1 of Madipakkam- Velachery Road and construction of strom water drain (MD--622)

Other Widening Total 3.50 1000.00 401 01-CRIDP-12- Chennai City Tambaram Improvements to Agarenthen - 2.20 145.00 13-M-0401 Roads Kovilancherry Road in Km4/9 - 7/1 (MD--566) 402 01-CRIDP-12- Chennai City Pallavaram Improvements to Pallavaram 3.50 100.00 13-M-0402 Roads Kundrathur Road Km.4/2-7/7 (MD-- 319) Strengthening Total 5.70 245.00 403 01-CRIDP-12- Chennai City Shozhinga Construction of Crash barrier type 55.00 13-M-0403 Roads nallur center median at Km0/950 - 2/0 of Taramani - Perungudi Road (MD-- 452). Others Total 1 Nos 55.00 Chennai City Roads Total 9.20 1300.00 404 01-CRIDP-12- Chengalpattu Maduranthagam Widening from SL to IL and 1.00 50.00 13-M-0404 Strengthening of Thirumukkudal- Nelvoy-Thirukalukundram Road Km.35/8 - 36/8 (MD--789)

MDR- 1 of 55 SECTION OFFICER 52/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 405 01-CRIDP-12- Chengalpattu Maduranthagam Widening from SL to IL and 1.10 50.00 13-M-0405 Strengthening of GST Road to Cheyyur (v) Padalam Km.13/9- 15/0. (MD--596) 406 01-CRIDP-12- Chengalpattu Cheyyur Widening from SL to IL and 11.80 560.00 13-M-0406 Strengthening of GST Road to Cheyyur (v) Padalam Km.19/6 - 31/4. (MD--596) 407 01-CRIDP-12- Chengalpattu Maduranthagam Widening from SL to IL and 6.40 310.00 13-M-0407 Strengthening of Thirumukkudal- Nelvoy-Thirukalukundram Road Km.21/0 - 27/4. (MD--789) 408 01-CRIDP-12- Chengalpattu Maduranthagam Widening from SL to IL and 3.00 142.00 13-M-0408 Strengthening of Uthiramerur - Kammalampoondi - Acharapakkam Cheyyur - Wandawasi Road Km.8/0 - 11/0. (MD--518)

409 01-CRIDP-12- Chengalpattu Sriperumbudur Widening from SL to IL and 6.80 320.00 13-M-0409 Strengthening of Pallur-Sogandi Road Km.12/8 - 19/6. (MD--651)

410 01-CRIDP-12- Chengalpattu Kanchipuram Widening from SL to IL of 2.80 65.00 13-M-0410 Kancheepuram-Rajakulam Road Km.0/0 - 2/8. (MD--791) 411 01-CRIDP-12- Chengalpattu Kanchipuram Widening from SL to IL and 12.80 610.00 13-M-0411 Strengthening of Pallur-Sogandy Road Km.0/0 - 12/8 (MD--651)

SL to IL Total 45.70 2107.00 412 01-CRIDP-12- Chengalpattu Sriperumbudur Widening the existing two lane 3.00 625.00 13-M-0412 road to four lane and Strengthening of Poonamallee - Kundrathur Road Km.2/2 - 5/2. (MD--369)

Other Widening Total 3.00 625.00 413 01-CRIDP-12- Chengalpattu Thiruporur Strengthening of Vandalore - 6.20 250.00 13-M-0413 Kelambakkam Road to Sirucheri H/C Road (via) Pudupakkam & Pudupakkam H/C Km.0/0 - 6/2. (MD--1027) 414 01-CRIDP-12- Chengalpattu Thiruporur Strengthening of Chennai- 2.00 90.00 13-M-0414 Mamallapuram Road (via) - Kelambakkam-Kovalam Km.38/0 - 40/0. (MD--65)

MDR- 2 of 55 SECTION OFFICER 53/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 415 01-CRIDP-12- Chengalpattu Maduranthagam Providing cement concrete 2.00 250.00 13-M-0415 pavement in km.33/8-35/8 of Thirumukkudal Nelvoy Thirukalukundram road. (MD--789)

416 01-CRIDP-12- Chengalpattu Maduranthagam Strengthening of GST Road to 1.30 90.00 13-M-0416 Cheyyur (via) Padalam Road Km.3/2 - 4/5 (MD--596) Strengthening Total 11.50 680.00 Chengalpattu Total 60.20 3412.00 417 01-CRIDP-12- Thiruvallur Gummidipoondi Widening and Strengthening of 4.32 280.00 13-M-0417 Single lane to Intermediate lane Vengal - Seethancheri - Kannigaiper road km:10/0-14/320 (MD--740) 418 01-CRIDP-12- Thiruvallur Ponneri Widening from single lane to 1.80 100.00 13-M-0418 intermediate lane and Improvements to Kodungaiyur - Vazhugaimadu Road Km.0/0- 1/8.(MD--610) 419 01-CRIDP-12- Thiruvallur Ponneri Widening from single lane to 4.40 230.00 13-M-0419 intermediate lane and Improvements to Medur - Gummidipoondi Road Km13/0 - 17/4 (MD--634) 420 01-CRIDP-12- Thiruvallur Thiruvallur Widening from single lane to 7.05 175.00 13-M-0420 intermediate lane of Kanakammachattiram - road Km. 11/500-18/550 (MD-- 1049) 421 01-CRIDP-12- Thiruvallur Thiruttani Widening from single lane to 11.60 305.00 13-M-0421 intermediate lane of C.T Road to Magankaligapuram Road (via) Veeramangalam Road Km. 0/0- 11/6) (MD--580) 422 01-CRIDP-12- Thiruvallur Thiruttani Widening from single lane to 6.80 225.00 13-M-0422 intermediate lane of Athimaanjeri – Pothatturpet Nagari R.S. Road Km. 8/0-14/8 (MD--788)

SL to IL Total 35.97 1315.00 423 01-CRIDP-12- Thiruvallur Maduravoyal Improvements to Km0/0-1/7 of 1.70 80.00 13-M-0423 Valasaravakkam-Ramapuram (via) Valluvar nagar(MD--1020)

MDR- 3 of 55 SECTION OFFICER 54/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 424 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Km1/6-2/2 of 0.60 72.00 13-M-0424 Poonamallee Kundrathur road (MD--369) 425 01-CRIDP-12- Thiruvallur Maduravoyal Improvements to Km0/0-2/9 of 2.90 200.00 13-M-0425 Maduravoyal - Valasaravakkam road (MD--1021) 426 01-CRIDP-12- Thiruvallur Avadi Improvements to Km. 4/6-12/0 of 7.40 350.00 13-M-0426 Avadi-Vaniyamchathiram road (MD- -575) 427 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to Thiruvallur - 2.20 135.00 13-M-0427 Arakkonam road km:0/0-2/2 (MD-- 32) 428 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to Thirupachur- 4.40 170.00 13-M-0428 Kadambathur-Kondancheri Road km:1/0-5/4 (MD--468) 429 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to 4.00 265.00 13-M-0429 Kanakammachattiram - Thakkolam road Km. 0/0-4/0 (MD--1049)

430 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Nasarathpettai 1.40 62.00 13-M-0430 Road Km0/0-1/4 (MD--168)

Strengthening Total 24.60 1334.00 431 01-CRIDP-12- Thiruvallur Gummidipoondi Widening the narrow causeway 30.00 13-M-0431 @Km2/8 of Gummidipoondi - Madarpakkam Road (MD--599)

432 01-CRIDP-12- Thiruvallur Gummidipoondi ReConstruction of culvert @ 25.00 13-M-0432 Km18/4 of Medur Gummidipoondi Road (MD--634)

Culverts/Bridges Total 2 Nos 55.00 Thiruvallur Total 60.57 2704.00 433 01-CRIDP-12- Vellore Arakonam Widening from SL to IL to 8.20 250.00 13-M-0433 Banavaram Senthamangalam Ganapathipuram Road Km2/0 - 2/2, 8/6 - 10/6 and 12/0 - 18/0 and Construction of Culvert, Drain and Retaining Wall. (MD--577)

MDR- 4 of 55 SECTION OFFICER 55/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 434 01-CRIDP-12- Vellore Sholinghur Widening from SL to IL to 16.20 579.00 13-M-0434 Killveedhi Minnal Ameerpet Road Km0/0 - 7/0, 10/8 - 14/0 and 19/0 - 25/0 and Improvements to Km0/0 - 2/8, 3/4 - 7/0 and 11/4 - 12/6. (MD-- 792)

435 01-CRIDP-12- Vellore Arcot Widening from SL to IL of 2.60 60.00 13-M-0435 Muppaduvetti Kaniyanur Road Km6/0 - 8/61 (MD--795) SL to IL Total 27.00 889.00 436 01-CRIDP-12- Vellore Ranipet Improvements to BHEL Feeder 3.13 170.00 13-M-0436 Road Km1/270 - 4/4 (ML 11.00m wide) (MD--797) 437 01-CRIDP-12- Vellore Anaicut Improvements to Nellvoy 3.20 112.00 13-M-0437 Pallikonda road Km.5/0 - 6/2, 9/4 - 10/4 and 11/0 - 12/0 (MD--1028)

438 01-CRIDP-12- Vellore Kilvaithinan Improvements to Thiruvalam 4.40 195.00 13-M-0438 kuppam Katpadi Venkatagirikotta Road to Seduvalai (via) Viringipuram Road Km0/0 - 4/4 (MD--1030) 439 01-CRIDP-12- Vellore Ranipet Providing White Topping to Ranipet 1.20 140.00 13-M-0439 Sholinghur Road Km6/0 - 6/6 & 7/8 - 8/4 (MD--401)

440 01-CRIDP-12- Vellore Arcot Improvements to Pudupadi Illuppai 7.60 270.00 13-M-0440 Vadailluppai Perumbakkam Vishar Kancheepuram Road Km0/0 - 7/6. (MD--666)

441 01-CRIDP-12- Vellore Arcot Improvements to Kalavai 1.40 65.00 13-M-0441 Road Km0/0 - 1/4 (MD--714) Strengthening Total 20.93 952.00 442 01-CRIDP-12- Vellore Kilvaithinan Reconstruction of Damaged Arch 75.00 13-M-0442 kuppam Bridge at Km.1/8 and Reconstruction of causeway at Km2/8 of Thiruvalam Katpadi Venkattagirikotta Road to Sethuvalai (Via) virunchipuram (MD- -1030) Culverts/Bridges Total 1 Nos 75.00 Vellore Total 47.93 1916.00

MDR- 5 of 55 SECTION OFFICER 56/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 443 01-CRIDP-12- Vaniyambadi Jolarpet Widening and Improvements from 6.80 326.00 13-M-0443 IL to DL of Tirupattur - road Km6/8 - 7/650 , 8/5 -8/6 and Improvements to 0/0 -5/0 & 7/650 - 8/5 (MD---716)

Other Widening Total 6.80 326.00 444 01-CRIDP-12- Vaniyambadi Thirupattur Improvements to Gowdampet 0.56 30.00 13-M-0444 Road 0/437 - 1/0 (MD---120) 445 01-CRIDP-12- Vaniyambadi Vaniyambadi Improvements to Polur - 8.30 257.00 13-M-0445 Jamunamarathur - Alangayam - Vaniyambadi Road Km54/6 - 62/0, 76/2 - 76/6, 76/8 -77/0, 77/7 - 78/0 and providing paved shoulders Km80/0 - 80/6 (MD---659)

446 01-CRIDP-12- Vaniyambadi Anaicut Improvements to Tiruvalam - 1.40 75.00 13-M-0446 Katpadi - Vengatagirikotta Road to Virinjipuram Road (via) Seduvalai Km4/4 - 5/8 (MD---1030)

Strengthening Total 10.26 362.00 Vaniyambadi Total 17.06 688.00 447 01-CRIDP-12- Tiruvannamalai Vandawasi Widening from SL to IL & 15.20 900.00 13-M-0447 improvements to Vilangadu road Km.0/0 - 15/2 (MD--743) 448 01-CRIDP-12- Tiruvannamalai Polur Widening from SL to IL in Km3/0 - 6.90 216.00 13-M-0448 9/9 & Improvements in Km9/0 - 9/9 in Kozhapalur Avaniapuram road (MD--804) SL to IL Total 22.10 1116.00 449 01-CRIDP-12- Tiruvannamal Arani Improvements to Arni Devigapuram 3.00 120.00 13-M-0449 ai road Km9/0 - 12/0 (MD--40)

450 01-CRIDP-12- Tiruvannamalai Polur Improvements to Arni Devigapuram 6.00 240.00 13-M-0450 road Km12/0 - 18/0 (MD--40)

451 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Thiruvathipuram - 4.20 210.00 13-M-0451 Arani road Km3/4 - 7/2 & 8/8 - 9/2 and Reconstruction of Slab Culvert at Km5/10 (MD--505)

452 01-CRIDP-12- Tiruvannamalai Arani Improvements to Thiruvathipuram 4.00 140.00 13-M-0452 Arni road Km22/0 - 26/0 (MD--505)

MDR- 6 of 55 SECTION OFFICER 57/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 453 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Cheyyar - Anaicut 2.80 130.00 13-M-0453 road Km6/2-9/0 including Reconstruction of culverts works 3 Nos, (MD--562)

454 01-CRIDP-12- Tiruvannamalai Kalasapakkam Improvements to N.C.Veeralore 6.60 185.00 13-M-0454 road Km0/0 - 4/8 & 10/6 - 12/4 including Culvert at Km0/10 (MD-- 642) 455 01-CRIDP-12- Tiruvannamalai Polur Improvements to Polur - 3.00 120.00 13-M-0455 Jamunamarathur - Alangayam - Vaniyambadi Road Km2/0 - 5/0 including Reconstruction of Culverts 4 Nos. (MD--659) 456 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Kancheepuram - 6.00 365.00 13-M-0456 Thiruvathipuram road Km17/0 - 21/8 & 26/6 - 27/8 and Reconstruction of Slab Culvert at Km23/2 (MD--770)

457 01-CRIDP-12- Tiruvannamalai Tiruvannamalai Improvements to Radhapuram - 3.80 95.00 13-M-0457 Vanapuram Road Km.0/0 - 2/2 & 3/4 - 5/0 (MD--805) 458 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Thavasi Vallam 1.80 65.00 13-M-0458 road Km0/0 - 0/6, 6/0 - 7/2 (MD-- 709) 459 01-CRIDP-12- Tiruvannamalai Vandawasi Improvements to Thavasi Vallam 7.40 280.00 13-M-0459 road Km12/0 - 19/4 including Reconstruciton of Pipe Culverts 4 Nos. (MD--709) 460 01-CRIDP-12- Tiruvannamalai Arani Improvements to Cheyyar - Anaicut 2.20 145.00 13-M-0460 road Km17/0 -19/2 including Reconstruction of culverts works 3 Nos, (MD--562)

Strengthening Total 50.80 2095.00 461 01-CRIDP-12- Tiruvannamalai Arani Reconstruction of Culvert Arni 20.00 13-M-0461 Vandavasi road Km7/4 & 7/6 (MD-- 43) 462 01-CRIDP-12- Tiruvannamalai Arani Reconstruction of Culvert 20.00 13-M-0462 Thiruvathipuram Arni road Km12/2 (MD--505)

MDR- 7 of 55 SECTION OFFICER 58/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 463 01-CRIDP-12- Tiruvannamalai Kalasapakkam Reconstruction of Culvert at Km6/8 95.00 13-M-0463 & 8/4 of N.C.Veeralore road (2 Spans of 5 mts.) (MD--642)

Culverts/Bridges Total 3 Nos 135.00 Tiruvannamalai Total 72.90 3346.00 Chennai Total 267.86 13366.00 464 01-CRIDP-12- Villupuram Gingee Widening from SL to IL & Impts. in 3.60 187.00 13-M-0464 Soorapattu-Ottapattu (via) Athiyur- Anandapuram road Km.21/7- 25/3(MD-- 807) 465 01-CRIDP-12- Villupuram Gingee Widening from SL to IL in 2.00 65.00 13-M-0465 Azhampoondy-Mazhavanthangal road Km.16/0-18/0(MD--576)

SL to IL Total 5.60 252.00 Villupuram Total 5.60 252.00 466 01-CRIDP-12- Kallakurichi Kallakurichi Widening from SL to IL and 18.20 775.00 13-M-0466 Strengthening Thiyagadurgam - Adari Road of Km2/0-20/2 (MD-- 811) 467 01-CRIDP-12- Kallakurichi Sankarapuram Widening from SL to IL and 13.80 640.00 13-M-0467 Strengthening of Kallakurichi Sankarapuram Road (via) Kachirapalayam Km.17/0-17/4 & 21/4-34/8 (MD--135) 468 01-CRIDP-12- Kallakurichi Ulundurpettai Widening from SL to IL and 4.40 200.00 13-M-0468 Strengthening of Parikkal Periyasevalai Road in Km.8/0-12/4 (MD--336) 469 01-CRIDP-12- Kallakurichi Ulundurpettai Widening from SL to IL and 14.00 640.00 13-M-0469 Strengthening of M.Kunnathur- Naripalayam Road in Km.0/0-14/0 (MD--620) SL to IL Total 50.40 2255.00 470 01-CRIDP-12- Kallakurichi Kallakurichi Widening from IL to DL and 3.00 180.00 13-M-0470 Strengthening of Chinnasalem Kachirapalayam Road Km0/0-3/0 (MD--1013) Other Widening Total 3.00 180.00 471 01-CRIDP-12- Kallakurichi Rishivandhiyam Strengthening Rishivanthiyam - 0.80 10.00 13-M-0471 Nemil road (via) Eraiyurpalayam Km.2/4-3/2(MD--672)

MDR- 8 of 55 SECTION OFFICER 59/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 472 01-CRIDP-12- Kallakurichi Rishivandhiyam Strengthening Thirukoilur - 4.00 210.00 13-M-0472 Thiyagadurgam road Km.21/0- 25/0(MD--784) 473 01-CRIDP-12- Kallakurichi Rishivandhiyam Strengthening Tirukoilur - 2.00 80.00 13-M-0473 Manalurpet road Km. 6/0-7/4 & 10/2-10/8(MD--1014) 474 01-CRIDP-12- Kallakurichi Tirukkoyilur Strengthening Tirukoilur Railway 1.00 50.00 13-M-0474 feeder road Km.0/0-1/0(MD--499)

Strengthening Total 7.80 350.00 Kallakurichi Total 61.20 2785.00 475 01-CRIDP-12- Cuddalore Kurinjipadi Widening from Single lane to 1.40 50.00 13-M-0475 Intermediate lane of Karaikadu Cross Road Km0/0-1/4 Including CD Work (1 No) (MD--147)

476 01-CRIDP-12- Cuddalore Vridhachalam Widening from SL to IL of 9.00 290.00 13-M-0476 Vridhachalam - Palakollai Road Km10/5 - 19/5 Including culverts (9 Nos) (MD--746) 477 01-CRIDP-12- Cuddalore Vridhachalam Widening from SL to IL at Km0/0- 12.60 510.00 13-M-0477 3/0 & 10/0-19/6 and Improvements to Km11/2-16/0 of Vridhachalam - Kattukudalore Road (MD--815)

478 01-CRIDP-12- Cuddalore Panruti Widening SL to IL and 4.90 244.00 13-M-0478 Improvements Sitharasur Road Km0/0-4/9 Including CD Works (8 Nos) (MD--585) 479 01-CRIDP-12- Cuddalore Neyveli Widening from SL-IL and 8.00 390.00 13-M-0479 Improvements to Kadampuliyur - Ulundurpettai Road (Via) Perperiyankuppam,Sendanadu Km0/0-8/0 (MD--602) 480 01-CRIDP-12- Cuddalore Bhuvanagiri Widening from SL to IL and 6.00 485.00 13-M-0480 Improvements to Chidambaram - Veeranam Tank Bund Road(via) Keelnatham Km4/4 -10/4 including CD Works (2 Nos) (MD-- 583) 481 01-CRIDP-12- Cuddalore Tittakudi Widening from SL-IL and 4.00 305.00 13-M-0481 Improvements to Veppur-Eraiyur road (via) Tholar Km9/0-13/0 In cluding CD Works (12Nos) (MD-- 741)

MDR- 9 of 55 SECTION OFFICER 60/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 482 01-CRIDP-12- Cuddalore Tittakudi Widening from SL to IL at Km9/0- 12.20 619.00 13-M-0482 15/2, 26/4-28/0 and 29/4-31/0 and Widening from SL to IL and Improvements to Km8/0-9/0, 28/0- 29/4, and 31/0-31/4 of Thittagudi - Sirupakkam road (via) Avatti, Ma.Pudaiyur Including CD works (15 Nos) (MD--814)

483 01-CRIDP-12- Cuddalore Kurinjipadi Widening fromSL to IL at Km29/0- 7.60 227.00 13-M-0483 31/2 and Improvements to Km16/6- 22/0 of Perumal tank bund road (MD--355)

SL to IL Total 65.70 3120.00 484 01-CRIDP-12- Cuddalore Cuddalore Improvements to Kammiyampettai- 1.75 75.00 13-M-0484 Gundusalai road (via) Semmandalam Km 0/0-1/750 (MD-- 1017) 485 01-CRIDP-12- Cuddalore Kurinjipadi Improvements to Kurinjipadi - 8.00 200.00 13-M-0485 road Km 0/8-8/8 (MD--619)

486 01-CRIDP-12- Cuddalore Bhuvanagiri Improvements to Kerapalaym- 5.00 175.00 13-M-0486 Sethiyathope road Km 0/0-5/0 (MD- -161) 487 01-CRIDP-12- Cuddalore Kattumannar Improvements to Veeranam Tank 3.00 110.00 13-M-0487 koil Bund Road Km 6/260-6/7, 7/0-9/4 and 10/0-10/160 (MD--542)

Strengthening Total 17.75 560.00 488 01-CRIDP-12- Cuddalore Cuddalore Reconstruction Minor Bridge 100.00 13-M-0488 across Bahoor Vaikal at Km10/4 of Cuddalore-Pallinelliyanur road (MD- -89) Culverts/Bridges Total 1 Nos 100.00 Cuddalore Total 83.45 3780.00 489 01-CRIDP-12- Ariyalur Jayankonadam Widening SL to IL and 8.60 460.00 13-M-0489 improvements in in Km23/0-24/4 , 28/8 - 36/0 of Sendurai- Udayarpalayam-Anaikarai road including culvert and drainage in Km30/10 - 31/4 (MD--684)

MDR- 10 of 55 SECTION OFFICER 61/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 490 01-CRIDP-12- Ariyalur Jayankonadam Widening SL to IL and 4.60 290.00 13-M-0490 Improvements in Km13/4-15/4 & 22/6 - 25/2 of Vilangudy- Annakaranpettai road (via) T. Palur including cuvlert (M-744) 491 01-CRIDP-12- Ariyalur Kunnam Widening SL to IL and 2.00 222.00 13-M-0491 Improvements in Km12/0 -14/0 of Alathur - Ariyalur Road including Construction of Retaining Wall at Km7/0 - 7/6, 8/2 - 9/0, 10/2 - 10/8 (MD--818) 492 01-CRIDP-12- Ariyalur Kunnam Widening SL to IL in Km24/0 -27/0 3.00 135.00 13-M-0492 and Improvements in Km25/0 - 27/0 of Alathur - Ariyalur Road (MD- -818) 493 01-CRIDP-12- Ariyalur Perambalur Widening from SL to IL in Km 23/0 4.00 195.00 13-M-0493 -27/0 and improvements in Km23/0 - 25/0 of Manachanallur - Edumalai -Elanathalaipatti Road including CD works (MD--244)

494 01-CRIDP-12- Ariyalur Perambalur Widening SL to IL and 8.80 450.00 13-M-0494 Improvements in Km3/0 - 6/2 & 10/0 - 15/6 of Veppanthattai - Neikuppai -GST Road (MD--820)

495 01-CRIDP-12- Ariyalur Perambalur Widening SL to IL and 6.40 300.00 13-M-0495 Improvements in Km9/0 - 11/6, 13/2 - 15/4 and widening SL to IL in Km11/6 - 13/2 of Krishnapuram - Poolambadi - Kallapatti Road Including Drainage and Retaining Wall at Km5/8 - 6/8 (MD--819) SL to IL Total 37.40 2052.00 496 01-CRIDP-12- Ariyalur Ariyalur Improvements to Keelapalur - 2.00 95.00 13-M-0496 Pullambadi (Via) Thirumalapadi Km5/0 - 7/0 (MD--608) Strengthening Total 2.00 95.00 Ariyalur Total 39.40 2147.00 Villupuram Total 189.65 8964.00

MDR- 11 of 55 SECTION OFFICER 62/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 497 01-CRIDP-12- Trichy Musiri Widening from SL to IL In Km. 7/0- 2.80 123.00 13-M-0497 8/0, 12/0-13/8 of Thottiyam - Kattuputhur - Road including Reconstruction of Culvert at Km. 7/10 (MD--487) 498 01-CRIDP-12- Trichy Manapparai Widening from Single Lane to 10.00 350.00 13-M-0498 Intermediate Lane in Km4/0-14/0 including Construction of RCC Slab Culvert @ Km2/6 , construction of drainage at Km29/8 of Vaiyampatty -Konnaiyur Road.(MD--729)

499 01-CRIDP-12- Trichy Musiri Widening from SL to IL at Km. 1/0- 4.00 200.00 13-M-0499 3/0 and Improvements at Km1/0- 3/0 & 5/0-7/0 of Seeplaputhur - Kattuputhur - Namakkal Road (MD-- 416) 500 01-CRIDP-12- Trichy Lalgudi Widening From Single lane to 6.00 420.00 13-M-0500 Intermediatelane and improvements in Km 12/0-15/4, 16/6-18/6, 23/0-23/6 of Pullambady -Sirugalapur -Padalur Road (MD--380) 501 01-CRIDP-12- Trichy Srirangam Widening From Single lane to 0.40 400.00 13-M-0501 Intermediate lane & Improvements at Km12/700 - 13/100 including Reconstruction of Culvert Cum sluices 18 Nos. Reconstruction of Culvert 4 Nos. & construction of sluices 16 Nos. and protective wall of Trichy - Kulumani - Jeeyapuram road.(MD--461)

502 01-CRIDP-12- Trichy Srirangam Widening From Single lane to 1.20 64.00 13-M-0502 Intermediate lane at Km2/0 - 3/0 and 5/8 - 6/0 and Improvements at Km2/0-2/6 & 5/8-6/0 of Kulathur - Viralimalai road.(MD--197)

503 01-CRIDP-12- Trichy Manachanallur Widening From Single lane to 2.20 98.00 13-M-0503 Intermediate lane & Improvements at Km 17/8-20/0 of Poovalur- Siruganur- Thiruppattur road ( MD- 371)

MDR- 12 of 55 SECTION OFFICER 63/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 504 01-CRIDP-12- Trichy Manachanallur Widening From Single lane to 5.00 214.00 13-M-0504 Intermediate lane in Km 12/0- 15/0, 19/0-20/0, 23/0-24/0 including Improvements in Km12/0-14/0, 19/0-20/0 of Musiri - Pulivalam road (MD--276)

SL to IL Total 31.60 1869.00 505 01-CRIDP-12- Trichy Musiri Widening from SL to DL in 5.65 325.00 13-M-0505 Km19/280-20/0 , Widening from IL to DL in Km18/690 -19/280, Improvements in Km13/0-14/0 , 15/0-18/0,19/664-20/0 of Musiri - T.Pet - Murugur/ Eragudy road (MD--277)

506 01-CRIDP-12- Trichy Thuraiyur Widening From Single lane to 0.73 70.00 13-M-0506 Double lane and improvements at Km27/470-28/200 of Musiri- T.Pet - Murugur- Eragudy road (MD--277)

Other Widening Total 6.38 395.00 507 01-CRIDP-12- Trichy Manapparai Improvements to Kovilpatty - 2.00 74.00 13-M-0507 Manapparai road Km2/0-3/0 & 7/0- 8/0 (MD--177) 508 01-CRIDP-12- Trichy Manapparai Improvements to Thuvaran 1.00 37.00 13-M-0508 kuruchi - Kosukurchi Road Km0/0- 1/0 (MD--899) 509 01-CRIDP-12- Trichy Manachanallur Improvements to Mannachanallur- 3.00 100.00 13-M-0509 Edumalal- Elanthalaipatty road Km11/6-14/6 (MD--380)

Strengthening Total 6.00 211.00 Trichy Total 43.98 2475.00 510 01-CRIDP-12- Pudukottai Gandharva Widening SL to IL in Km18/0-27/0 9.00 390.00 13-M-0510 kottai and Improvements in Km18/0-18/6, 19/0-19/6, 21/0-24/4, 24/9-25/8 of Thanjavur - Karambakudi - Seethambalpuram road including culvert at Km21/2, 21/6, 23/8 ( MD- 705 )

MDR- 13 of 55 SECTION OFFICER 64/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 511 01-CRIDP-12- Pudukottai Gandharva Widening SL to IL and 1.10 55.00 13-M-0511 kottai Improvement in Km38/7-39/8 of Thanjavur - Karambakudi - Seethambalpuram road ( MD-705 )

512 01-CRIDP-12- Pudukottai Viralimalai Widening SL to IL in Km10/0-20/0 10.00 456.00 13-M-0512 and Improvement in Km10/0-14/0, 14/6-19/0 of Illuppur - Mathur road including culvert at Km13/4, 17/2, 17/6, 17/8, 18/8 (MD--826 )

513 01-CRIDP-12- Pudukottai Gandharva Widening SL to IL and 9.80 490.00 13-M-0513 kottai Improvement in Km3/0-12/8 of Kunnanadarkoil - Sengipatti road including culvert at Km11/6, 12/2 ( MD-833 ) 514 01-CRIDP-12- Pudukottai Viralimalai Widening SL to IL and 8.00 387.00 13-M-0514 Improvements in Km42/8-50/8 of Pudukkottai - Southkulathur road including culvert at Km43/2, 46/6(i), 46/6(ii), 46/8, 48/8, 50/4(i), 50/4(ii), 50/6 ( MD-375 )

SL to IL Total 37.90 1778.00 515 01-CRIDP-12- Pudukottai Viralimalai Improvements in Km4/6-6/0 of 1.40 54.00 13-M-0515 Pudukkottai - Manapparai road ( MD-665 ) 516 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km10/0-11/0, 4.00 160.00 13-M-0516 12/0-15/0 of Perumanadu - Konnaiyur road ( MD-827 ) 517 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km9/0-10/8 of 1.80 70.00 13-M-0517 Arimalam - Thirumayam road ( MD- 1005 ) 518 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km17/8-18/8, 2.40 96.00 13-M-0518 19/6-21/0 of Pudukkottai - Embal road including culvert at Km18/4, 20/2 ( MD-663 ) 519 01-CRIDP-12- Pudukottai Gandharva Improvements in Km5/0-7/0 of 2.00 76.00 13-M-0519 kottai Keeranur - Adhanakottai road ( MD-825 ) Strengthening Total 11.60 456.00

MDR- 14 of 55 SECTION OFFICER 65/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 520 01-CRIDP-12- Pudukottai Viralimalai Reconstruction of bridge across 100.00 13-M-0520 PWD surplus channel ( with shutters ) at KM10/4 of Viralimalai - Kalamavur road. (MD--745 ) Culverts/Bridges Total 1 Nos 100.00 Pudukottai Total 49.50 2334.00 521 01-CRIDP-12- Tanjavur Orathanadu Widening SL to IL and 3.00 255.00 13-M-0521 Improvements to Orathanadu- Neivasal Road Km7/0-10/0 including Reconstruction of culverts 8 nos & construction of retaining wall (MD--834) 522 01-CRIDP-12- Tanjavur Kumbakonam Widening and strengthening from 7.15 750.00 13-M-0522 single lane to intermediate lane to kumbakonam - coleroon bank road in Km1/3-8/450 including reconstruction of Minor bridge 1 No.( MD-205)

523 01-CRIDP-12- Tanjavur Kumbakonam Widening from Single lane to 2.60 200.00 13-M-0523 Intermediate lane & Improvements to Swamimalai - Patteeswaram Road Km1/6-4/2 including Reconstruction of culvert 1 No and Construction of Retaining wall (MD-- 441) 524 01-CRIDP-12- Tanjavur Thiruvaiyaru Widening from SL to IL & 2.70 240.00 13-M-0524 Strengthening to Pudukottai - Killukottai - Manayeripatti road Km39/0 - 41/7 including Reconstruction of culvert 6 Nos. (MD--664) 525 01-CRIDP-12- Tanjavur Orathanadu Widening SL to IL and 3.50 400.00 13-M-0525 Improvements to Mannargudi - Orathanadu - Thiruvonam Road Km29/0-32/500 including Reconstruction of Minor Bridge 1 No., Reconstruction of culvert 4 Nos. & Construction of Retaining wall. (MD--248)

MDR- 15 of 55 SECTION OFFICER 66/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 526 01-CRIDP-12- Tanjavur Papanasam Widening from SL to IL and 2.80 250.00 13-M-0526 Improvements to Thittai - Dharasuram Road Km9/4-12/2 Reconstruction of culvert 1 no and Bus lay by. (MD--720) 527 01-CRIDP-12- Tanjavur Thiruvidai Widening from Single Lane to 1.20 94.00 13-M-0527 maruthur Intermediate lane and Improvements to Thiruppanandal - Aduthurai Road in KM.7/2-8/4 including Reconstruction of culverts 4 nos., and Retaining wall (MD-- 472)

528 01-CRIDP-12- Tanjavur Thiruvidai Widening from Single Lane to 2.20 170.00 13-M-0528 maruthur Intermediate lane and Improvements to Tranquebar - Manganallur - Aduthurai Road Km 40/0-42/2 including Construction of retaining wall (MD--708)

529 01-CRIDP-12- Tanjavur Peravurani Widening Single lane to 6.00 370.00 13-M-0529 Intermediate lane & Improvements to Km 0/0-3/8, 4/8-6/0 & only Widening Single lane to Intermediate lane to Thiruchitrambalam - Andikkadu Road Km3/8-4/8 including Reconstruction of culvert 3 nos & Dip raising. (MD--828) 530 01-CRIDP-12- Tanjavur Peravurani Widening Single lane to 2.60 190.00 13-M-0530 Intermediate lane & Improvements to Thiruchitrambalam - Mavadukuruchi Road Km0/0-2/6 including Reconstruction of culvert 3 nos and Dip raising. (MD--829)

SL to IL Total 33.75 2919.00 531 01-CRIDP-12- Tanjavur Orathanadu Improvements to Km 3/0-7/8, 4.80 320.00 13-M-0531 Junction Improvements at Km9/6 of Vallam-Orathanadu Road (MD-- 705)

MDR- 16 of 55 SECTION OFFICER 67/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 532 01-CRIDP-12- Tanjavur Thiruvidai Raising the dip portion in Km25/4 0.20 10.00 13-M-0532 maruthur of Poonthottam - Nachiyarkovil Road (MD--370) Strengthening Total 5.00 330.00

533 01-CRIDP-12- Tanjavur Peravurani Reconstruction of culvert at 35.00 13-M-0533 Km18/10 of Pattukkottai - Peravurani - Aranthangi Road (MD-- 653)

534 01-CRIDP-12- Tanjavur Peravurani Reconstruction of Minor Bridge at 45.00 13-M-0534 Km49/4 of Thanjavur - Karambakudy - Seethambalpuram Road (MD--705)

Culverts/Bridges Total 2 Nos 80.00 Tanjavur Total 38.75 3329.00 535 01-CRIDP-12- Nagapattinam Vedaranyam Widening from SL - IL & 4.00 330.00 13-M-0535 Improvements of Kuravappulam - Karupampulam - Kadinalvayal Road Km0/8-4/8 (MD--837)

536 01-CRIDP-12- Nagapattinam Vedaranyam Widening from SL - IL & 2.00 250.00 13-M-0536 Improvements of Moolakkarai - Piranthiyankarai - Kariyapattinam Road Km5/0-7/0 including protective works (MD--838)

537 01-CRIDP-12- Nagapattinam Vedaranyam Widening from SL - IL & 0.80 70.00 13-M-0537 Improvements of Sembodai - Chettipulam-Kariapattinam Road Km12/0-12/8 (MD--835) 538 01-CRIDP-12- Nagapattinam Poompuhar Widening from SL - IL to 8.40 640.00 13-M-0538 Tharangambady - Manganallur- Aduthurai Road Km20/8-22/4 & Widening from SL - IL & Improvements in Km17/6-20/8, 22/4-26/0 Including Construction of Retaining wall (MD--708)

MDR- 17 of 55 SECTION OFFICER 68/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 539 01-CRIDP-12- Nagapattinam Sirkazhi Widening from SL to IL in 3.00 185.00 13-M-0539 Anaickaranchatiram - Mahendirapalli Road Km5/0 - 8/0 (MD--836) 540 01-CRIDP-12- Nagapattinam Sirkazhi Widening from SL to IL & 4.25 290.00 13-M-0540 Improvements in Puthur - Pudupattinam -Palayar Road Km3/0- 6/250 & Widening from SL- IL in Km6/4-7/4 (MD--670) SL to IL Total 22.45 1765.00 541 01-CRIDP-12- Nagapattinam Kilvelur Improvements to Kilvelur - 6.00 250.00 13-M-0541 Katchanam Road Km6/0-8/0 and 15/0-19/0 (MD--148) 542 01-CRIDP-12- Nagapattinam Vedaranyam Improvements to Velanganni - 1.20 60.00 13-M-0542 Vedaranyam Road Km 17/0- 18/2 (MD--737) 543 01-CRIDP-12- Nagapattinam Sirkazhi Improvements to Sirkali - 4.20 180.00 13-M-0543 Thirumullaivasal Road Km0/6- 1/0,1/4-2/0,2/6-3/0 & 9/0-11/8 (MD-- 426) 544 01-CRIDP-12- Nagapattinam Sirkazhi Improvements to Sattanathapuram- 2.20 95.00 13-M-0544 Thiruvenkadu-Melayur Road Km8/0- 10/2 (MD--680)

Strengthening Total 13.60 585.00 Nagapattinam Total 36.05 2350.00 545 01-CRIDP-12- Tiruvarur Tiruvarur Widening and Improvements from 1.60 182.00 13-M-0545 Single lane to Intermediate lane of Thirunellikaval -Kolappadu - Karunganni road Km.18/0 - 19/6 including Reconstruction of culverts (3 Nos) and Construction of Retaining wall (MD-467)

546 01-CRIDP-12- Tiruvarur Nannilam Widening from single lane to 3.00 233.00 13-M-0546 Intermediate lane and Improvements in Km.3/6 - 6/6 of Kodavasal - Koradachery - Lakshmangudi - Mavoor road (MD- 609)

MDR- 18 of 55 SECTION OFFICER 69/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 547 01-CRIDP-12- Tiruvarur Mannargudi Widening from SL to IL and 2.40 197.00 13-M-0547 Improvements to Kodavasal - Koradachery -Lakshmangudi - Mavoor Road Km.12/6-15/0 (MD- 609) 548 01-CRIDP-12- Tiruvarur Tiruvarur Widening from Single lane to 3.00 300.00 13-M-0548 Intermediate lane in Km.32/6 - 35/6 and Improvements in Km.33/4 - 35/6 of Kodavasal -Koradacheri - Lakshmangudi - Mavoor Road and including Reconstruction of culverts (7 Nos) (MD-609)

549 01-CRIDP-12- Tiruvarur Mannargudi Widening from single lane to 3.60 239.00 13-M-0549 Intermediat lane Mannargudi - Thirumakkottai - Chokkanavur Road Km.6/4 - 10/0 (MD-840) 550 01-CRIDP-12- Tiruvarur Mannargudi Widening from SL to IL and 3.00 245.00 13-M-0550 Improvements to Ammapettai- Vaduvoor Road Km.7/0 -10/0 (MD- 21) 551 01-CRIDP-12- Tiruvarur Tiruvarur Widening from Single lane to 4.00 299.00 13-M-0551 Intermediate lane of Mavoor - Sattiyakkudi road Km.0/0-4/0 and Improvements to Km.2/8 -4/0 including Reconstruction of culverts (1 No.) and Construction of Retaining wall (MD-255)

552 01-CRIDP-12- Tiruvarur Thiruthurai Widening from single lane to 1.65 100.00 13-M-0552 poondi Intermediate lane Pappanadu - Madukkur - Perugavalthan road Km.24/8 - 26/450 (MD-778) 553 01-CRIDP-12- Tiruvarur Thiruthurai Widening from single lane to 4.20 262.00 13-M-0553 poondi Intermediate lane Kottur - Meenamanallur - Senganthi road Km.10/0 - 14/2 (MD-773) SL to IL Total 26.45 2057.00 554 01-CRIDP-12- Tiruvarur Nannilam Improvements to Kodavasal - 2.60 150.00 13-M-0554 Valangaiman - Papanasam road Km.9/6-12/2 and including Reconstruction of Culvert (1 No) (MD-753)

MDR- 19 of 55 SECTION OFFICER 70/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 555 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Mayiladuthurai- 1.00 125.00 13-M-0555 poondi Muthupet Road Km.71/6-72/6 and including Junction improvements at Km.94/4-6 (MD-256)

556 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Koothanallur – 1.70 55.00 13-M-0556 poondi Athichapuram – Kandamangalam – Vadapuram - Kalapal – Thiruthuraipoondi Km.26/300- 28/0 (MD-839) 557 01-CRIDP-12- Tiruvarur Nannilam Improvements to Poonthottam - 3.40 198.00 13-M-0557 Karaikkal road Km.0/0 - 3/4 (MD- 1008)

Strengthening Total 8.70 528.00 Tiruvarur Total 35.15 2585.00 Trichy Total 203.43 13073.00 558 01-CRIDP-12- Salem Omalur Widening From SL to IL Km.11/2- 7.90 478.00 13-M-0558 14/3 and improvements in Km.8/250-9/050, 10/0-14/3, 14/8- 15/4 and 15/8-18/0 of Deevattipatty - Danishpet- Bommidi road including reconstruction of culvert - 6Nos. (MD--851)

559 01-CRIDP-12- Salem Yercaud Widening from SL to IL in Km. 3.20 198.00 13-M-0559 15/10, 22/0-23/0 and Improvements in Km0/0-2/0,22/0- 23/0 and Junction Improvements in Km0/2 of Yercaud Loop Road including protective works , CD works 6Nos. (MD--563)

560 01-CRIDP-12- Salem Yercaud Widening from SL to IL in Km0/0- 9.00 365.00 13-M-0560 1/8, 2/8-3/8 and improvements in Km.0/3-1/0 ,4/8-8/4,8/6-9/4, 13/2, 14/8, 15/0-16/0, 17/2, 17/10 of Kuppanur - Kottachedu - Valavanthi Road including Protective Works and CD Works 6 Nos. (MD--845)

MDR- 20 of 55 SECTION OFFICER 71/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 561 01-CRIDP-12- Salem Attur Widening from SL to IL inKm.5/6- 4.00 198.00 13-M-0561 9/6 and Improvements from Km.6/6-7/6, 8/6-9/6 including widening of culvert 9 Nos. of Puthiragoundam palayam - Edapatty (via) Panamadal road (MD--669)

562 01-CRIDP-12- Salem Yercaud Widening and improvements from 6.80 325.00 13-M-0562 SL to IL Km.21/0-23/0 and widening from SL to IL Km.31/0- 34/0 and Improvements from km.2/0-3/0 & 51/0-51/8 and including widening of culvert 7 Nos. and construction of culvert 1 No. of Ayothiyapattinam - Belur - Kilakkadu Road. (MD--1044)

563 01-CRIDP-12- Salem Yercaud Widening from SL to IL and 5.60 365.00 13-M-0563 improvements from Km.26/8- 31/4 & 34/0-35/0 and including widening of cause way 1 No. and widening of culvert 2 Nos. of Gajalnaickentpatty - Panamarathpatty - Sechansavadi Road. (MD--594) 564 01-CRIDP-12- Salem Gangavalli Widening from SL to IL and 3.00 180.00 13-M-0564 Improvements at Km.18/8-21/8 of Krishnapuram- Poolampady- Kallapatty - Veeraganur road (MD-- 819) 565 01-CRIDP-12- Salem Gangavalli Widening from SL to IL in Km.0/0- 8.60 480.00 13-M-0565 2/0, Widening from SL to IL and Improvements to KM.2/0-5/0 , 7/4 - 10/0 & 13/0-14/0 of Kattukottai - Sadasivpuram - Thidavoor Road Including Construction of a culvert 1 No. Reconstruciton of a culvert 9 Nos. Widening of culvert at 2 Nos. (MD--841)

MDR- 21 of 55 SECTION OFFICER 72/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 566 01-CRIDP-12- Salem Salemwest Widening From SL to IL and 4.90 200.00 13-M-0566 Improvements Km.8/0-9/0 and Improvements to km.6/8-8/0 and Km.10/3-13/0 and reconstruction of cut stone slab culvert at Km.8/10 of Suramangalam Tharamangalam Road(MD--439)

SL to IL Total 53.00 2789.00 567 01-CRIDP-12- Salem Edappadi Widening from DL - ML in km. 0/0- 3.60 195.00 13-M-0567 0/4 and Improvements toKm2/2- 3/4&8/2-10/2 of Edappady - Magudanchavadi road inculding construction of Storm water Drain (Built up area) (MD-103)

568 01-CRIDP-12- Salem Sankari Widening from DL - ML in km.0/0- 0.80 95.00 13-M-0568 0/8 of Sankari - Edappady including construction of Drain and reconstruction of Culverts 2 Nos. and Widening of Culvert 1 No. (MD- -677)

569 01-CRIDP-12- Salem Mettur Improvements in Km.34/4-36/500, 8.58 230.00 13-M-0569 43/0-43/480 and Widening from IL to DL in Km.36/5-42/5 of Pennagaram - Mecheri road (via) Perumbalai (MD--347)

570 01-CRIDP-12- Salem Mettur Improvements to Mettur - Palar 6.80 230.00 13-M-0570 road Km.13/4-15/0 and 16/0-17/0 and Widening from IL to DL in Km.19/8-24/0 (MD--268) 571 01-CRIDP-12- Salem Omalur Widening from IL to DL in Km.3/6- 4.00 310.00 13-M-0571 5/0 and 9/0-10/6 and Improvements to Km.9/0-11/6 and Reconstruction of bridge 1 no. and construction of culvert 1 no. and construction of retaining wall at Km.11/0-11/2 of Tharamangalam - Nangavalli - Kunchandiyur road. (MD--707)

MDR- 22 of 55 SECTION OFFICER 73/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 572 01-CRIDP-12- Salem Edappadi Widening SL to DL in km.22/490- 5.21 225.00 13-M-0572 23/0 and IL to DL in Km.27/8- 31/410 and Improvements in Km21/400-23/0 including construction of drainage works in Km31/0 - 31/410 of Edappady - Jalagandapuram - Mecheri road (MD--767)

Other Widening Total 28.99 1285.00 573 01-CRIDP-12- Salem Sankari Improvements to Kakkapalayam - 1.60 80.00 13-M-0573 Chinnappampatty road Km.8/0-9/6 (MD-134)

574 01-CRIDP-12- Salem Veerapandi Improvements to km.0/0-3/4 of 3.40 180.00 13-M-0574 Gajalnaickanpatty Panamarathupatty Seshanchavadi Road (MD--594 )

575 01-CRIDP-12- Salem Salemwest Improvements to km.1/4-2/0 of 0.60 70.00 13-M-0575 Suramangalam Tharamangalam road leading to Salem Steel Plant Project area connecting NH7 (MD-- 674) 576 01-CRIDP-12- Salem Veerapandi Improvements to km.8/0-10/0 and 4.00 270.00 13-M-0576 13/0-15/0 and Reconstruction of Minor bridge at Km.13/10 & Construction of storm water drain in Km.3/050-4/4 (L/S) of Shevapet Elampillai Road (MD--421 )

577 01-CRIDP-12- Salem Veerapandi Improvements to km.0/0-1/0 of 1.00 77.00 13-M-0577 Kakkapalayam Chinnappampatty Road including Reconstruction of cut ston slab culvert at km.0/4 and 0/6 (MD--134 )

578 01-CRIDP-12- Salem Veerapandi Improvements to km.4/0-5/2 of 1.20 70.00 13-M-0578 Kakkapalayam Attayampatty Road (MD--133 ) 579 01-CRIDP-12- Salem Sankari Improvements to km. 2/150-2/900 0.95 70.00 13-M-0579 & 3/0-3/2 of Erode Pirivu road - Sankari R.S. Road including construction of storm water drain (MD--997)

MDR- 23 of 55 SECTION OFFICER 74/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 580 01-CRIDP-12- Salem Sankari Improvements to km.13/0-13/6 , 2.80 150.00 13-M-0580 17/0-17/8 & 19/6-21/0 of Komarapalayam - Edappadi road (MD-182) 581 01-CRIDP-12- Salem Edappadi Improvements to km.9/0-10/6 of 1.60 85.00 13-M-0581 Edappadi - Jalagandapuram- Mecheri road (MD-767) 582 01-CRIDP-12- Salem Edappadi Improvements to km.11/2-12/6 of 1.40 76.00 13-M-0582 Sankari - Edappadi road (MD--677)

583 01-CRIDP-12- Salem Edappadi Improvements to Km.11/6-13/0 and 3.00 150.00 13-M-0583 Km.18/0-19/6 of Tharamangalam - Nangavalli - Kunchandiyur road (MD--707) 584 01-CRIDP-12- Salem Edappadi Improvements in km.0/1-0/2, & 9/3- 0.80 97.00 13-M-0584 10/0 and Construction of Minor Bridge at Km.5/8, 8/6 and construction of strom water drain of Tharamangalam - Jalagandapuram road (MD--451)

585 01-CRIDP-12- Salem Yercaud Improvements from Km 0/2, 0/6- 2.90 155.00 13-M-0585 1/100,4/10, 5/4-6/0, 6/8-7/4,7/6- 8/0 & 8/8-9/2 of Valapady- Thimmanaickenpatty road.(MD-- 530) 586 01-CRIDP-12- Salem Gangavalli Improvements to Km.2/4 -5/0 of 2.60 100.00 13-M-0586 Thalaivasal -Govindamaplayam Road Including Reconstruction of a culvert at KM.4/10 (MD--848)

587 01-CRIDP-12- Salem Salem west Improvements in Km.4/6-5/6 & 10/0- 2.00 110.00 13-M-0587 11/0 of Shevapet - Elampillai road (MD--421) 588 01-CRIDP-12- Salem Edappadi Improvements to Km.24/6-25/6 of 1.00 65.00 13-M-0588 Komarapalayam - Edapaddi road.(MD-182) 589 01-CRIDP-12- Salem Gangavalli Rebuilding from Km.10/0-11/4 of 1.40 100.00 13-M-0589 Thalaivasal- Veeraganur road (MD-- 701) Strengthening Total 32.25 1905.00 590 01-CRIDP-12- Salem Salem north Reconstruction of pipe culvert at 15.00 13-M-0590 Km.0/4 of Hasthampatty - Kannankurichi road (MD--842)

MDR- 24 of 55 SECTION OFFICER 75/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 591 01-CRIDP-12- Salem Edappadi Construction of High level bridge at 100.00 13-M-0591 Km.3/4 of Edappadi- Magudanchavadi road (MD--103)

Culverts/Bridges Total 2 Nos 115.00 592 01-CRIDP-12- Salem Veerapandi Construction of Retaining wall and 220.00 13-M-0592 Improvements to curves at Km.1/300-1/825 of Attayampatty - Masakalipatty road(Papparapatty Tank bund portion) (MD--46)

593 01-CRIDP-12- Salem Salem west Construction of storm water drain in 15.00 13-M-0593 Km.0/4-0/8 of Suramangalam - Omalur road (via) Muthunaickanpatty. (MD--696)

Others Total 2 Nos 235.00 Salem Total 114.24 6329.00 594 01-CRIDP-12- Namakkal Namakkal Widening from IL to DL Km. 7/2-7/4 1.65 95.00 13-M-0594 and Improvement from Km0/0- 0/550, 3/4-4/1, 7/0-7/2 including reconstruction of RCC Slab culvert in lieu of cutstone culvert 1 No. of Nainamalai- Sendamangalam Road (MD--285)

Other Widening Total 1.65 95.00 595 01-CRIDP-12- Namakkal Senthamangala Improvements from Km 0/6-8/0 7.40 420.00 13-M-0595 m including Construction of Storm Water Drain 1 No. and Construction of Slab Culvert 1 No. of Nanjundapuram-Naducombai Road (MD--293) 596 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 9/6 - 10/8 of 1.20 57.00 13-M-0596 Mettala - Mullukuruchi - Periyacombai Road (MD--853) 597 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 0/0-1/0 and 2.35 115.00 13-M-0597 3/0-4/350 of Malayalapatty - Thammampatty (via) Ulipuram Road including widening of pipe culvert 1 No. and Widening of Cut stone Slab Culvert 2 Nos. (MD-- 852)

MDR- 25 of 55 SECTION OFFICER 76/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 598 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 11/4-14/0 of 2.60 125.00 13-M-0598 Rasipuram - Pattanam - Pudupatty Road including widening of RCC Slab culvert 1 No. (MD--856)

599 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 1/4 -2/0 & 3/0- 1.25 75.00 13-M-0599 3/650 of Rasipuram - Attur Road (MD--402) 600 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 6/6-8/0, 11/8- 2.40 155.00 13-M-0600 12/8 of Attayampatty - Masakalipatty Road and Widening the slab culvert 1 No., Construction of RCC Slab culvert 1 No. and construction of Storm Water Drain 2 Nos. (MD--46)

601 01-CRIDP-12- Namakkal Kumarapalayam Improvements from Km 0/8-2/6 1.80 108.00 13-M-0601 Komarapalayam-Edapady Road (MD--182) 602 01-CRIDP-12- Namakkal Paramathivelur Improvements to the Road from 4.25 199.00 13-M-0602 Km0/0-2/0, 7/0-8/0 & 9/0-10/250 of Vaiyappamalai - Velagoundampatti Road including well protective wall 1 No. (MD--857)

603 01-CRIDP-12- Namakkal Sentha Improvements from Km 4/0-7/0 of 3.00 141.00 13-M-0603 mangalam Solakkadu – Semmedu – Vilaram – Arapleswarar koil – Semmedu road (MD--690) Strengthening Total 26.25 1395.00 Namakkal Total 27.90 1490.00 604 01-CRIDP-12- Dharmapuri Harur Widening SL to IL to Km 22/4 to 1.20 30.00 13-M-0604 23/6 of Mookanur - Harur Road (MD--- 777) 605 01-CRIDP-12- Dharmapuri Pappireddipatti Widening from SL to IL Km 5/6 - 16.80 400.00 13-M-0605 22/4 & improvements to Km15/0 - 16/0 including CD works (20 Nos) of Bommidi Rs to Thoppaiyar road (MD--860) SL to IL Total 18.00 430.00

MDR- 26 of 55 SECTION OFFICER 77/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 606 01-CRIDP-12- Dharmapuri Pappireddipatti Widening from Intermediate lane to 10.60 340.00 13-M-0606 double lane to Km 2/060 - 12/4, Improvements to Km 0/0 - 0/260 Including CD works 12 Nos of Mallapuram - Mookanur road (MD-- 237) Other Widening Total 10.60 340.00 607 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km13/10, 17/0- 1.80 100.00 13-M-0607 18/2,19/0-19/4 & Construction of slab culvert at Km10/2 in lieu of weak bed level causeway of Kaveripattinam - Palacode road (MD--861)

608 01-CRIDP-12- Dharmapuri Pappireddipatti Improvements to Km1/6 - 2/4, 2/8 - 2.00 180.00 13-M-0608 4/0 and Providing Bus lay byes (16 Nos) of Pappireddipatti - Mallapuram road (MD--328)

609 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km41/0 - 41/6, 1.20 150.00 13-M-0609 45/0 - 45/6 and including CD works (16 Nos) and Junction improvement at Km41/2 of Morappur - Marandahalli road (MD-- 271) 610 01-CRIDP-12- Dharmapuri Pennagaram Improvements in Km0/0 - 1/4, 14/0 - 6.40 240.00 13-M-0610 16/6, 17/2 - 19/6 Including improvements to the curve at Km14/10 including Protective wall (1 No) of Pennagaram - Perumbalai road. (MD--348).

611 01-CRIDP-12- Dharmapuri Pennagaram Improvements to Km3/0 - 4/6 & 8/0 2.00 120.00 13-M-0611 - 8/4 and Improvements to curve at Km0/4 of Palacode - Nagadasampatti road (MD--- 308)

612 01-CRIDP-12- Dharmapuri Pennagaram Improvements in Km8/0-9/2, 13/2- 5.04 65.00 13-M-0612 16/2, 23/2-24/04 including CD Works (2 Nos) of Pennagaram - Mudugampatty - malaiyanur road (MD--859) 613 01-CRIDP-12- Dharmapuri Harur Improvements to Km16/0-19/0 of 3.00 110.00 13-M-0613 Morappur - Marandahalli road (MD- 271)

MDR- 27 of 55 SECTION OFFICER 78/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 614 01-CRIDP-12- Dharmapuri Pennagaram Improvements to Km19/4 - 20/6, 2.00 78.50 13-M-0614 21/2 - 22/0 of Pennagaram - Nagamarai road (MD-654)

615 01-CRIDP-12- Dharmapuri Pennagaram Improvements to Km16/4 - 17/6 1.20 43.00 13-M-0615 including 1 CD work of Palacode - Nagadasampatti road (MD-308)

616 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km19/0-20/0, 2.90 200.00 13-M-0616 21/0-22/6, 23/4-23/7 & including curve improvements at Km19/2, 19/8, 19/10, 23/8 and CD works (2 Nos) of Morappur - Marandahalli road (MD-271) Strengthening Total 27.54 1286.50 617 01-CRIDP-12- Dharmapuri Pappireddipatti Widening of Narrow bridge at 100.00 13-M-0617 Km0/6 of Pappireddipatti - Mallapuram road (MD--328) 618 01-CRIDP-12- Dharmapuri Pennagaram Construction of CD Works 4 Nos & 180.00 13-M-0618 dip raising 3 Nos including drain in Builtup area (4 Nos) of Pennagaram - Nagamarai road.(MD--654). 619 01-CRIDP-12- Dharmapuri Pappireddipatti Widening of Narrow bridge at 100.00 13-M-0619 Km11/8 of Mallapuram - Mookanur road (MD--237) Culverts/Bridges Total 3 Nos 380.00 Dharmapuri Total 56.14 2436.50 620 01-CRIDP-12- Krishnagiri Krishnagiri Widening & Improvements from SL 9.00 820.00 13-M-0620 to IL in Km0/0-6/150, 7/150-10/0 including Widening of 2 Nos. of Culverts, Reconstruction of 6 Nos. of Culverts and Construction of Retaining wall of Kaveripattinam - Pochampalli road (MD--862)

SL to IL Total 9.00 820.00 621 01-CRIDP-12- Krishnagiri Krishnagiri Improvements to Krishnagiri- 4.40 260.00 13-M-0621 Rayakottai road Km0/6-2/0 ,5/0- 6/0, 12/8-14/8 including Widening of Culvert.(1 No) MD-192

622 01-CRIDP-12- Krishnagiri Veppanahalli Improvements to Kundarapalli- 3.20 175.00 13-M-0622 Veppanapalli road Km8/6-10/6, 10/8-12/0 (MD--754)

MDR- 28 of 55 SECTION OFFICER 79/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 623 01-CRIDP-12- Krishnagiri Veppanahalli Improvements to Veppanpalli- 1.20 80.00 13-M-0623 Theertham road Km7/6-8/2 & 9/2- 9/8 & including reconstruction of culvert (1No).(MD--1000)

624 01-CRIDP-12- Krishnagiri Thalli Improvements to Denkanikottai- 1.40 91.00 13-M-0624 Kelamangalam Road at Km5/6-6/0, 8/0-9/0 (MD--91) 625 01-CRIDP-12- Krishnagiri Bargur Improvements to Kaveripattinam- 0.70 70.00 13-M-0625 Pochampalli road Km16/4-16/8 and 17/0-17/3 and construction culvert (1 No.) with drain (MD--862)

626 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Uthangarai 1.20 55.00 13-M-0626 Byepass road Km0/0-1/2 (MD-- 517) 627 01-CRIDP-12- Krishnagiri Uthangarai Improvements in Km16/4 - 18/0, 2.60 150.00 13-M-0627 28/0-29/0 of Singarapet - Thirupathur Road including reconstruction of Culvert (4 Nos) (MD--424) 628 01-CRIDP-12- Krishnagiri Krishnagiri Improvements in Km6/0-8/0 of 2.00 120.00 13-M-0628 Kaveripattinam - Kakkangarai road (MD--157) 629 01-CRIDP-12- Krishnagiri Hosur Improvements in Km0/4-1/4, 2/2- 5.80 320.00 13-M-0629 3/0, 2/8-4/0, 4/8, 5/0-6/0, 8/4-10/0 of Bagalur - Berigai road (MD--53)

Strengthening Total 22.50 1321.00 Krishnagiri Total 31.50 2141.00 Salem Total 229.78 12396.50 630 01-CRIDP-12- Tiruppur Palladam Widening from SL to IL in Km1/4 - 3.74 199.00 13-M-0630 3/100 & 3/900-5/490 and improvements in Km0/950 - 3/100 & 3/900-5/490 of Andipalayam - Attaiyampalayam road including curve improvements in Km0/4 - 0/8 and 6 culverts (MD-1103)

MDR- 29 of 55 SECTION OFFICER 80/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 631 01-CRIDP-12- Tiruppur Palladam Widening from SL to IL and 5.80 260.00 13-M-0631 improvements in Km15/2-17/2 and improvements in Km0/0-3/8 of Koduvai -Nachipalayam road including 3 pipe culverts (MD-611)

632 01-CRIDP-12- Tiruppur Kangeyam Widening from SL to IL in Km0/0 - 8.00 290.00 13-M-0632 8/0 and improvements in Km0/0 - 1/0, 3/0 - 4/0 & 5/0 - 8/0 of Uthiyur - Dhasanaickenpatty road including 3 culvert works (MD-993)

633 01-CRIDP-12- Tiruppur Palladam Widening from SL to DL and 12.60 465.00 13-M-0633 improvements in Km0/0 - 1/6 and widening from SL to IL and improvements in Km1/6 - 12/6 of Palladam -Boomalur road including 12 Nos of culverts (MD-882).

SL to IL Total 30.14 1214.00 634 01-CRIDP-12- Tiruppur Avinashi Improvements in Km2/0 - 2/6 & 3/0 - 1.60 83.00 13-M-0634 4/0 of Avinashi - Puliyampatti road. (MD-- 764) 635 01-CRIDP-12- Tiruppur Palladam Improvements in Km24/0-25/6 of 1.60 75.00 13-M-0635 Tirupur ring road (Via) Tirumuruganpoondi, Nallur,15 Velampalayam including Drain.(MD-1038) 636 01-CRIDP-12- Tiruppur Palladam Improvements in Km4/0-7/2 of 3.20 108.00 13-M-0636 Kuppandampalayam -Singanur road including 1 pipe culvert (MD- 983) 637 01-CRIDP-12- Tiruppur Kangeyam Improvements in Km4/0-8/0 of 4.00 158.00 13-M-0637 Uthiyur -Kundadam road including 2 pipe culverts (MD-520)

638 01-CRIDP-12- Tiruppur Kangeyam Improvements in Km2/0-4/0 of 2.00 90.00 13-M-0638 Uthiyur -Kundadam road including CD works 2nos (MD-520)

MDR- 30 of 55 SECTION OFFICER 81/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 639 01-CRIDP-12- Tiruppur Kangeyam Improvements in Km11/9 - 15/6 & 3.90 165.00 13-M-0639 18/2 Sivagiri - Nathakadaiyur - Muthur road including CD work 1 No (MD-688) Strengthening Total 16.30 679.00 Tiruppur Total 46.44 1893.00 640 01-CRIDP-12- Dharapuram Dharapuram Widening from SL to IL and 10.40 615.00 13-M-0640 Improvements to Km12/6 - 23/0 of Dharapuram - Poolavadi road and Construction of 7 Nos of culvert and retaining wall (MD-- 884) 641 01-CRIDP-12- Dharapuram Udumalapet Widening from SL to IL at Km2/5- 14.50 435.00 13-M-0641 6/6 & 11/0-21/4 of Udumalpet - SenjeriHills road and Reconstruction of 8 Nos of culvert (MD--511) 642 01-CRIDP-12- Dharapuram Madathukulam Widening from SL to IL and 2.00 95.00 13-M-0642 Improvements to Km16/2- 17/4,26/4-27/0 & 27/2-27/4 of Anaimalai - Poolankinar road (MD-- 22) 643 01-CRIDP-12- Dharapuram Kangeyam Improvements to Km13/6 - 16/0 6.40 305.00 13-M-0643 and Widening from SL to IL and Improvements to Km21/2-25/2 of Nathakadaiyur - Uthamapalayam road and Construction of 2 Nos of culvert and retaining wall (MD-- 886) 644 01-CRIDP-12- Dharapuram Madathukulam Widening from SL to IL and 2.66 85.00 13-M-0644 Improvements to Km7/2 & 10/5 - 13/100 of Karatholuvu - Komaralingam road and Construction of 9 Nos of culvert and retaining wall (MD-- 149) 645 01-CRIDP-12- Dharapuram Madathukulam Widening from SL to IL and 5.00 190.00 13-M-0645 Improvements to Km3/0 - 8/0 of Dhali - Komaralingam road including Construction of 5 Nos of culverts and retaining wall (MD-- 94) SL to IL Total 40.96 1725.00

MDR- 31 of 55 SECTION OFFICER 82/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 646 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km8/4-12/8 of 4.40 190.00 13-M-0646 Mulanur - Chinniyagoundenvalasu road (via) Kilangundal, Moolakkadai. (MD--896)

647 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km2/0-5/6 of 3.60 190.00 13-M-0647 Chinnadharapuram - Pallapatty road (MD--766) 648 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km0/0-3/0 & 3/4- 3.60 152.00 13-M-0648 4/0 of Akkaraipalayam - Karaiyur road (MD--989) 649 01-CRIDP-12- Dharapuram Kangeyam Improvements to Km8/4 - 11/100 2.70 114.00 13-M-0649 of Uthiyur - Dasanaickenpatty road and including Construction of 2 Nos of culvert (MD--993)

650 01-CRIDP-12- Dharapuram Madathukulam Improvements to Km.5/0 - 5/2 3.00 150.00 13-M-0650 &,9/2-12/0 of Udumalpet - Chinnar road (MD--509) 651 01-CRIDP-12- Dharapuram Madathukulam Improvements to Km7/8-8/6 & 1.45 63.00 13-M-0651 13/950 - 14/6 of Udumalpet - Thirumoorthi Hills road and Construction of single row pipe culvert . (MD--512) 652 01-CRIDP-12- Dharapuram Madathukulam Improvements at Km14/0 - 14/8 1.00 69.00 13-M-0652 and Improvements to junctions at Km 14/4 & 14/6 of Udumalpet - Komaralingam road and Construction of drain (MD--510)

Strengthening Total 19.75 928.00 653 01-CRIDP-12- Dharapuram Madathukulam Reconstruction of a Minor Bridge at 30.00 13-M-0653 Km10/4 of Udumalpet - Thirumoorthi Hills road (MD--512)

Culverts/Bridges Total 1 Nos 30.00 654 01-CRIDP-12- Dharapuram Madathukulam Construction of retaining wall at Km 40.00 13-M-0654 4/4 and widening of culverts at Km 4/2, 5/6 and 5/8 of Karatholuvu - Komaralingam road (MD--149)

Others Total 1 Nos 40.00 Dharapuram Total 60.71 2723.00

MDR- 32 of 55 SECTION OFFICER 83/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 655 01-CRIDP-12- Erode Modakkurichi Widening from SL to IL and 0.60 32.00 13-M-0655 improvements Km 0/0-0/4 and improvements in Km0/6 of Pasur R.S - Vellode road (MD-885)

SL to IL Total 0.60 32.00 656 01-CRIDP-12- Erode Modakkurichi Improvements to Km6/4-8/4 ,Dip 2.00 126.00 13-M-0656 improvement at Km7/4 and construction of 1 culvert in - Arachalur - Kodumudi Road (MD--70) 657 01-CRIDP-12- Erode Anthiyur Improvements to Km30/4-32/6, 9.40 296.00 13-M-0657 38/6-45/8 of Chellamapalayam - Burgur -Kollegal road (MD--1045)

658 01-CRIDP-12- Erode Perundhurai Improvements to Km7/0 - 8/0 & 9/6 1.20 71.00 13-M-0658 -9/8 of Perundurai - Maccanancombai road (MD--357)

659 01-CRIDP-12- Erode Bhavani Improvements to Km6/6-9/0 and 3.40 178.00 13-M-0659 10/0-11/0 of Anthiyur -Ammapet road (MD--28) Strengthening Total 16.00 671.00 660 01-CRIDP-12- Erode Modakkurichi Construction of retaining wall in 50.00 13-M-0660 Km0/0-0/8, 1/8, 2/4 of Arachalur - Thamaraipalayam Road and construction of 1 culvert (MD--30)

Others Total 1 Nos 50.00 Erode Total 16.60 753.00 661 01-CRIDP-12- Karur Aravakurichi Widening SL to IL & Improvements 13.00 570.00 13-M-0661 to Km0/0 - 4/0 ,Km6/4-13/0 and Widening SL to IL to Km4/0 - 6/4 of Soundrapuram - Anangur - Kannivadi Road including 4 culverts (MD-691)

662 01-CRIDP-12- Karur Aravakurichi Widening SL to IL & Improvements 4.20 180.00 13-M-0662 to Km13/0 - 15/0 and Improvement in Km4/8-7/0 of Pallapatty - Aravakurichy - Esanatham - Gujiliamparai Road including 1 culvert (MD-650)

MDR- 33 of 55 SECTION OFFICER 84/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 663 01-CRIDP-12- Karur Aravakurichi Widening SL to IL and 2.00 107.00 13-M-0663 Improvements to Km 11/0 - 13/0 Aru road - Pungambadi road (via) Venjamangudular Road including 4 culverts (M 574)

664 01-CRIDP-12- Karur Karur Widening from SL to IL and 1.60 80.00 13-M-0664 Improvements to Km.1/0-2/0, 3/6- 4/0 & 5/6-5/8 of Manmangalam - Vangal Road including 4 culverts (MD-867) 665 01-CRIDP-12- Karur Aravakurichi Widening from SL to IL and 3.13 150.00 13-M-0665 Improvements to Km. 21/2 - 24/330 of Vairamadai - Thoppampatty - Kuppam Road (MD-728)

666 01-CRIDP-12- Karur Krishnaraya Widening SL to IL & Improvements 8.00 310.00 13-M-0666 puram to Km3/0-8/0 and Widening from SL to IL in Km10/0-13/0 of Mahadhanapuram - Mylampaty road (via) Palayajayankondam (MD- 625)

667 01-CRIDP-12- Karur Krishnaraya Widening SL to IL & Improvements 6.55 250.00 13-M-0667 puram to Km18/450 - 21/0 & 24/0-25/0 and Widening SL to IL in Km21/0 - 24/0 including 1 culvert of Manapparai - Gujiliyamparai Road (MD-628)

668 01-CRIDP-12- Karur Krishnaraya Widening SL to IL & Improvements 4.80 178.00 13-M-0668 puram to Km4/2 - 5/0 & 10/0 - 12/0 and Widening SL to IL in Km7/0-9/0 of Palaviduthi - Kadavur - Ayyalur Road (MD-648)

669 01-CRIDP-12- Karur Krishnaraya Widening SL to IL & Improvements 2.00 96.00 13-M-0669 puram to Km1/0 - 3/0 of Mayanur - Sengal - Panchapatty road (MD-632)

SL to IL Total 45.28 1921.00

MDR- 34 of 55 SECTION OFFICER 85/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 670 01-CRIDP-12- Karur Karur Widening from IL to DL in Km.3/0 - 8.40 240.00 13-M-0670 10/0 and Widening from SL to IL and Improvements to Km.10/0 - 11/4 of Karur - Vangal Road including 4 culverts and 1 Retaining wall (MD-772)

671 01-CRIDP-12- Karur Karur Widening from IL to DL in Km.2/4 - 2.20 45.00 13-M-0671 4/6 of Karur - Esanatham - Koombur - Viriyampatty Road (MD- 606) Other Widening Total 10.60 285.00 672 01-CRIDP-12- Karur Aravakurichi Improvements to Km.20/6 - 21/6 & 2.00 94.00 13-M-0672 Km23/0-24/0 of Velayuthampalayam - Noyyal Road ( MD-545 ) 673 01-CRIDP-12- Karur Aravakurichi Improvements to Km.3/8-4/6 & 1.80 92.00 13-M-0673 Km6/0-7/0 of Punnam - Pugalur Road including 1 culvert & Gementric Improvements at Km.4/6 ( MD-668 ) 674 01-CRIDP-12- Karur Kulithalai Improvements to Ayyarmalai- 5.00 190.00 13-M-0674 Kumaramangalam road (via) Valayapatty Km0/0 - 5/0 ( MD- 1002 ) 675 01-CRIDP-12- Karur Kulithalai Improvements to Pettavaithalai - 7.00 270.00 13-M-0675 Nangavaram - Kavalkaran patty Road Km2/0 - 5/4 ,Km7/4-9/0 and Km21/0-23/0 Including 3 culverts (MD-658 ) 676 01-CRIDP-12- Karur Kulithalai Improvements to Allithurai- 2.60 123.00 13-M-0676 Thogamalai road Km31/0 -33/6 (MD-12 ) 677 01-CRIDP-12- Karur Krishnaraya Improvements to Km1/6-3/0,3/4- 3.90 185.00 13-M-0677 puram 5/0,5/5-6/4 of Mylampatty - Palayam road (MD--280) Strengthening Total 22.30 954.00 678 01-CRIDP-12- Karur Karur Shifting of service utilities from the 20.00 13-M-0678 proposed bridge site at Km2/2 and at Km2/4 of Karur - Vangal Road (MD-772) Others Total 1 Nos 20.00 Karur Total 78.18 3180.00 Tiruppur Total 201.93 8549.00

MDR- 35 of 55 SECTION OFFICER 86/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 679 01-CRIDP-12- Coimbatore Kavundam Widening from SL to IL and 1.20 65.00 13-M-0679 palayam Improvements in Km9/0-10/2 of Thudiyalur - Maruthamalai road (Via) Sulthaniapuram (MD--984) SL to IL Total 1.20 65.00 680 01-CRIDP-12- Coimbatore Thondamuthur Widening from IL to DL in Km5/0- 3.40 165.00 13-M-0680 7/0 & Improvements in Km3/6 -6/1 of Coimbatore -Thondamuthur - Naraseepuram Road (MD--1040)

681 01-CRIDP-12- Coimbatore Kavundam Widening from IL to DL in Km14/0- 4.00 235.00 13-M-0681 palayam 14/4 & Improvements in Km7/0-8/8 & 13/2 - 15/4 of Thudialur- Kovilpalayam road (MD--489)

Other Widening Total 7.40 400.00 682 01-CRIDP-12- Coimbatore Mettupalayam Improvements to Karamadai - 1.40 72.00 13-M-0682 Tholampalayam Road in Km1/2- 1/4, 1/6-2/2, 2/4-3/0 (MD--605) 683 01-CRIDP-12- Coimbatore Thondamuthur Improvements in Km0/0-5/4 of 5.40 250.00 13-M-0683 Iruttupallam - Poondi road (MD-- 876) 684 01-CRIDP-12- Coimbatore Thondamuthur Improvements in Km.17/5-19/6 of 2.10 106.00 13-M-0684 Coimbatore - Siruvani Road (MD-- 81) 685 01-CRIDP-12- Coimbatore Kinathukadavu Improvements to Podanur junction 2.60 150.00 13-M-0685 road Km0/0 – 2/6 (MD--361)

686 01-CRIDP-12- Coimbatore Sulur Improvements to Km7/6-9/0 , 10/0- 2.60 150.00 13-M-0686 10/8 &11/0 - 11/4 and improvements to dip at Km8/8 including Junction Improvements at Km7/8 & 11/4 of Thennampalayam Annur road (via) Vagarayamapalayam (MD--713)

687 01-CRIDP-12- Coimbatore Sulur Improvements in Km5/2 - 6/6 of 1.40 70.00 13-M-0687 Sulur - Seleckarachal road (MD-- 437) 688 01-CRIDP-12- Coimbatore Kavundam Improvements in Km2/4-4/4 of 2.00 80.00 13-M-0688 palayam Ganapathi - Kanuvai road (Via) Maniyakarampalayam, K.N.G.Pudur (MD--977) Strengthening Total 17.50 878.00

MDR- 36 of 55 SECTION OFFICER 87/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 689 01-CRIDP-12- Coimbatore Coimbatores Construction of Pedestrian subway 150.00 13-M-0689 outh @ Km0/2 of Imperial Bank Road (MD--125) 690 01-CRIDP-12- Coimbatore Sulur Reconstruction of Culvert at 40.00 13-M-0690 Km18/8 of Chinniyamapalayam - Somanur road (via) Ravuthur (MD- 879) Culverts/Bridges Total 2 Nos 190.00 Coimbatore Total 26.10 1533.00 691 01-CRIDP-12- Pollachi Sulur Widening from single lane to 1.48 40.00 13-M-0691 intermediate lane in Km24/712 - 25/0, 25/6 - 26/0 & 26/2 - 27/0 of Udumalpet - Senjerihills road (MD- 511) 692 01-CRIDP-12- Pollachi Sulur Widening from single lane to 3.40 80.00 13-M-0692 intermediate lane in Km4/0 -7/4 of Senjerihills - Vadachitoor (via) Mettulakshminaickenpalayam road (MD-881)

693 01-CRIDP-12- Pollachi Valparai Widening from Single lane to 12.00 328.00 13-M-0693 intermediate lane in Km0/0 - 12/0 of Permanent Diversion Road from Old Valparai to State border connecting Pollachi main road.(MD- 354) 694 01-CRIDP-12- Pollachi Valparai Widening from Single lane to 2.80 77.00 13-M-0694 intermediate lane in Km5/0 - 7/8 of Anaimalai Loop road (MD-23)

SL to IL Total 19.68 525.00 695 01-CRIDP-12- Pollachi Udumalapet Widening from intermediate lane to 1.85 110.00 13-M-0695 Double lane in Km0/250 - 0/850 & 1/350 - 2/6 & improvements in Km1/4 - 2/6 of Pollachi Byepass road (MD-362)

696 01-CRIDP-12- Pollachi Kinathukadavu Widening from intermediate lane to 0.42 40.00 13-M-0696 Multi lane & improvements in Km0/0 - 0/420of Kinathukadavu - Kattamaptty road (Built up area) (MD-165)

Other Widening Total 2.27 150.00

MDR- 37 of 55 SECTION OFFICER 88/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 697 01-CRIDP-12- Pollachi Valparai Improvements to Km1/0 - 3/6 & 3.00 113.00 13-M-0697 13/0 - 13/4 of Ambarampalayam - Sethumadai road (MD-13)

698 01-CRIDP-12- Pollachi Valparai Improvements to Km.5/0-6/6 of 1.60 85.00 13-M-0698 Anaimalai Poolankinar road. (Including drain) (MD-22) 699 01-CRIDP-12- Pollachi Valparai Providing concrete paver block & 0.60 65.00 13-M-0699 including construction of 2 No retaining wall at Km2/0 - 2/6 of Anaimalai - Poolankinar road. (MD-22) 700 01-CRIDP-12- Pollachi Pollachi Improvements to Km.4/0-6/4 of 2.40 115.00 13-M-0700 Km.122/0 of Dindugal Bangalore road to Nadupuni road. (MD-166)

Strengthening Total 7.60 378.00 701 01-CRIDP-12- Pollachi Valparai Widening the culvert at Km3/6 & 34.50 13-M-0701 reconstruction of damaged culvert at Km6/4 of Ambarampalayam - Sethumadai road (MD-13)

Culverts/Bridges Total 1 Nos 34.50 Pollachi Total 29.55 1087.50 702 01-CRIDP-12- Gobi Gobichetty Widening and Improvements to 1.20 85.00 13-M-0702 palayam Km16/6-17/2 & 18/0-18/6 of Perundurai-Maccanamcombai Road.(MD-357) 703 01-CRIDP-12- Gobi Bhavanisagar Widening and Improvements to 3.80 180.00 13-M-0703 Junction at Km0/2 and improvements to Km1/2-2/8,6/0-8/0 of Sathy-Kothamangalam Road (MD-890) 704 01-CRIDP-12- Gobi Anthiyur Widening IL to DL in Km1/8-2/4 of 0.60 50.00 13-M-0704 Karattadipalayam-Bungalowpudur road, including Reconstruction of culverts (MD-150)

Other Widening Total 5.60 315.00

MDR- 38 of 55 SECTION OFFICER 89/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 705 01-CRIDP-12- Gobi Anthiyur Improvements to Km1/4-2/4,19/0- 3.10 150.00 13-M-0705 19/6,20/100-21/6 including Reconstruction of One culvert & drain and Improvements to junction at Km21/6 of Perundhalaiyur - Kavandapady - Getticheyur Road.(MD-657)

706 01-CRIDP-12- Gobi Bhavani Improvements to Km3/4-5/0 1.60 115.00 13-M-0706 including reconstruction of One culvert and drain in Bhavani- Kavandapady Road. (MD-57) 707 01-CRIDP-12- Gobi Gobichetty Improvements to Km8/0-9/2,10/2- 1.80 80.00 13-M-0707 palayam 10/8 widening of One culvert and construction of retaining wall in Sathy-Ukkaram-Puliyampatty Road.(MD-888) 708 01-CRIDP-12- Gobi Bhavanisagar Improvements to km0/4-1/2 & 2/4- 1.40 80.00 13-M-0708 3/0 of Sathy - Periyakodivery - Kadambur Road. (MD-679)

Strengthening Total 7.90 425.00 Gobi Total 13.50 740.00 709 01-CRIDP-12- Udhagai Uthaga Improvements to Km3/0-5/0 , 8/0- 6.00 440.00 13-M-0709 mandalam 12/0 of Doddabetta Iduhatty Kattabettu Road including widening to Km8/0-12/0 (MD--994)

710 01-CRIDP-12- Udhagai Uthaga Improvements to Km5/0 - 7/0 of 2.00 135.00 13-M-0710 mandalam Thalaikundah Kallatty Theppakadu Road including protective works at Km0/2 and surface drain in Km2/6- 3/2 ( MD-700 )

711 01-CRIDP-12- Udhagai Uthaga Improvements to Km12/8-15/6 of 2.80 199.00 13-M-0711 mandalam Udhagai Avalanchi Kundah Thaishola road including protective works and Surface drain in Km17/2,4,6 and 18/6,8 ( MD-1071 )

MDR- 39 of 55 SECTION OFFICER 90/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 712 01-CRIDP-12- Udhagai Coonoor Improvements to Km6/0 - 12/0 & 8.00 495.00 13-M-0712 13/0 - 15/0 of Coonoor Kundah Road including CC Drain and protective works ( MD-86 )

713 01-CRIDP-12- Udhagai Uthaga Improvements to Km18/8-20/0 of 1.20 100.00 13-M-0713 mandalam Coonoor Kundha Road including CC drain and Protective works ( MD-86 ) 714 01-CRIDP-12- Udhagai Gudalur Improvements to Km21/8-23/0 of 1.20 70.00 13-M-0714 Thalaikundha Kallatty Theppakadu road ( MD-700 ) Strengthening Total 21.20 1439.00 715 01-CRIDP-12- Udhagai Coonoor Providing Cement Concrete drain 50.00 13-M-0715 from Km3/6 - 5/0 of Coonoor Kattabettu road.Including Protective works ( MD-1073 )

716 01-CRIDP-12- Udhagai Coonoor Construction of retaining wall and 175.00 13-M-0716 interlocking paverblock in Km1/8- 1/10 and construction of CC drain and protective works at Km2/0-6/4 of Kotagiri - Kodanadu view point road ( via ) Kodanadu including CC drain ( MD-995 ).

Others Total 2 Nos 225.00 Udhagai Total 21.20 1664.00 Coimbatore Total 90.35 5024.50 717 01-CRIDP-12- Madurai Madurai east Widening from Single Lane to 4.66 250.00 13-M-0717 Intermediate Lane of Kallanthiri- Panaikulam road Km8/745-13/4 and strengthening in Km8/745- 12/050 including CD Works 20 Nos (MD--957) 718 01-CRIDP-12- Madurai Usilampatti Widening from Single lane to 10.62 360.00 13-M-0718 Intermediate lane of Thummakundu - Olaipatti Road Km8/312 - 18/927 including CD Works 12 Nos and Retaining Wall (MD--721)

MDR- 40 of 55 SECTION OFFICER 91/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 719 01-CRIDP-12- Madurai Sholavandan Widening from single Lane to 9.60 300.00 13-M-0719 Intermediate lane of Sholavandan - Valayapatti (Via) Andipatti Road Km15/0 - 18/2, 23/6-30/0 and including CD works 10 Nos (MD-- 568) 720 01-CRIDP-12- Madurai Thirumangalam Widening of Single lane to 8.31 445.00 13-M-0720 Intermediate Lane of Sengapadai - Sivarakottai Road from km. 0/0 - 8/310 and strengthening in Km0/0- 6/0, 8/200-8/310 including CD works 31 Nos (MD--963)

721 01-CRIDP-12- Madurai Thirumangalam Widening of Single lane to 2.00 115.00 13-M-0721 Intermediate Lane and Strengthening in Avalsooranpatti - Sennampatti road Km0/0 - 2/0 including CD works 6 Nos and Paver Blocks in the built up area (MD--960)

SL to IL Total 35.18 1470.00 722 01-CRIDP-12- Madurai Madurai west Widening from Double lane to 2.20 330.00 13-M-0722 Multilane to Madurai-Melakkal road Km4/0-6/2 including Construction of Drainage (MD--234)

723 01-CRIDP-12- Madurai Thirumangalam Widening of Intermediate Lane to 6.80 580.00 13-M-0723 Double lane and Strengthening from Km0/0-6/8 of Peraiyur- Melapatti road including CD works 9 Nos (MD--951)

724 01-CRIDP-12- Madurai Thirumangalam Widening of Single lane to Double 1.60 180.00 13-M-0724 lane and Strengthening in Km5/8- 7/4 of Peraiyur-Watrap road including CD works 5 Nos and Providing Paver Blocks (MD--962)

Other Widening Total 10.60 1090.00

MDR- 41 of 55 SECTION OFFICER 92/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 725 01-CRIDP-12- Madurai Madurai east Raising the Low lying area to 0.60 68.00 13-M-0725 Kadachanendal-Thiruvathavour road by providing Paver Blocks Km 5/8-6/2 & 7/2 (MD--893)

726 01-CRIDP-12- Madurai Melur Strengthening Kadachanendal- 4.09 175.00 13-M-0726 Thiruvathavour road at Km11/8- 15/0 & 17/0-17/8+85m(MD-R-893)

727 01-CRIDP-12- Madurai Madurai west Strengthening to Madurai - 3.20 180.00 13-M-0727 Palamedu Road Km6/2-9/4 (MD-- 227) 728 01-CRIDP-12- Madurai Sholavandan Strengthening Madurai - Palamedu 3.20 150.00 13-M-0728 Road Km12/8-16/0 (MD--227)

729 01-CRIDP-12- Madurai Madurai east Strengthening Madurai - Thondi 2.00 90.00 13-M-0729 Road Km15/8-17/8 (MD-232) 730 01-CRIDP-12- Madurai Madurai east Strengthening Othakadai - 3.20 175.00 13-M-0730 B.Muthupatti Road Km0/0-0/6,0/10, 1/2-1/6, 1/10, 3/2-3/6, 4/2, 5/6, 6/4- 6/10 and raising the low level area by providing Paver Block at Km2/6- 3/2 (MD-946)

731 01-CRIDP-12- Madurai Sholavandan Strengthening Othakadai - 1.95 136.00 13-M-0731 B.Muthupatti Road Km7/10,8/10,9/0-9/8,10/2 and raising the low level area by providing Paver Block at Km7/6,7/8,8/4,8/8 (MD-946) Strengthening Total 18.24 974.00 732 01-CRIDP-12- Madurai Sholavandan Construction of Minor Bridge at 80.00 13-M-0732 Km4/10 of Palamedu - Vembarali road (MD--1095) Culverts/Bridges Total 1 Nos 80.00 733 01-CRIDP-12- Madurai Usilampatti Construction of Retaining Wall and 70.00 13-M-0733 Widening the Shoulders at Km8/0- 8/4 of Elumalai Road (MD--104)

734 01-CRIDP-12- Madurai Usilampatti Construction of Retaining Wall at 35.00 13-M-0734 Km8/6 and 8/8-9/2 of Kokkulam - Uthappanaickanur Road (MD--613)

MDR- 42 of 55 SECTION OFFICER 93/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 735 01-CRIDP-12- Madurai Melur Construction of Protective Wall at 50.00 13-M-0735 Km6/2,6/4,6/6 & 7/6-8/0 of Thumbaipatti - Jeyankondanilai Road (M959) Others Total 3 Nos 155.00 Madurai Total 64.02 3769.00 736 01-CRIDP-12- Theni Andipatti Widening from SL to IL in Km5/6- 1.40 80.00 13-M-0736 5/8,7/4-7/6,and 12/4-12/6 by providing CC pavement in the builtup area and improvements in km.10/8-11/6 of Andipatty - Velapparkovil road,and Reconstruction of culvert at Km 2/2 , 2/4 including Construction of Retaining wall (MD-570)

SL to IL Total 1.40 80.00 737 01-CRIDP-12- Theni Bodinayakanur Widening from IL to DL in Km0/0- 4.80 170.00 13-M-0737 4/8 of Veerapandi - Seepalakottai road including reconstruction of culvert -1 No and widening the existing culvert 6 Nos including construction of retaining wall (MD- 735)

738 01-CRIDP-12- Theni Cumbam Widening from IL-DL in Km16/4 - 0.20 30.00 13-M-0738 16/6 of Palayam-Uppukottai road including widening the culvert at Km14/4,14/10,15/10,16/4 (MD-649)

739 01-CRIDP-12- Theni Bodinayakanur Widening from IL to DL in Km11/0 - 12.00 520.00 13-M-0739 23/0 of Koduvilarpatti - Seealayampatti (via) S.Alagapuri road including construction of retaining wall , reconstruction of culvert 2 Nos, construction of protective wall at Km16/6, 17/2 (well Portion)( MD-612)

MDR- 43 of 55 SECTION OFFICER 94/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 740 01-CRIDP-12- Theni Cumbam Widening IL to DL in Km13/2- 3.32 125.00 13-M-0740 16/100 and SL to DL in Km16/100- 16/520 and Improvements in Km13/2 - 13/8 Veerapandi- Seepalakottai Road including Construction of culvert 1No Widening culvert 1No (MD-735)

Other Widening Total 20.32 845.00 741 01-CRIDP-12- Theni Periyakulam Regradation to Theni Bye Pass 0.80 195.00 13-M-0741 road in km.3/6-4/4 (MD-712)

742 01-CRIDP-12- Theni Bodinayakanur Improvements to Sankarapuram- 1.90 110.00 13-M-0742 Chinnamanur Road Km8/3-9/0,9/6- 10/8 including Reconstruction of culvert 2 Nos (MD- 676)

743 01-CRIDP-12- Theni Cumbam Improvements to Palayam- 0.40 50.00 13-M-0743 Uppukottai road Km0/0-0/4 including construction of culvert at Km0/10&10/6 , Reconstruvtion of culvert at Km0/4, 6/2 (MD-649)

744 01-CRIDP-12- Theni Bodinayakanur Construction of culvert @ Km5/2 155.00 13-M-0744 Widening the culvert @ Km4/4,4/6, 7/2, 7/8,8/4, 8/6, 8/10, 13/4,13/6,13/8,14/6 and widening the minor bridge at Km15/2 and Construction of Retaining wall @ Km3/2, 7/10,8/2,10/4,10/6,10/8, 10/10 & 14/8 including construction of Drainage @ Km10/4-11/0 of Veerapandi - Nagalapuram road. (MD-734)

745 01-CRIDP-12- Theni Bodinayakanur Providing Paver blocks at km3/8 of 0.20 19.00 13-M-0745 Pannaipuram - Pulikuthi road. (MD- 965) Strengthening Total 3.30 529.00 746 01-CRIDP-12- Theni Cumbam Providing concrete side drain in 120.00 13-M-0746 Berms . including improvements of Shoulders at Km5/0-12/8 of Cumbum-Cumbummettu Road (MD-90)

MDR- 44 of 55 SECTION OFFICER 95/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 747 01-CRIDP-12- Theni Periyakulam Construction of Retaining wall at 190.00 13-M-0747 Km.2/8 and 3/0-3/4 of Jeyamangalam-Eluvanampatti road (MD-600) Others Total 2 Nos 310.00 Theni Total 25.02 1764.00 748 01-CRIDP-12- Dindigul Vedachandur Widening from Single Lane to 4.75 240.00 13-M-0748 Intermediate Lane in Km.16/054- 18/8,22/8-24/8 and strengthening in Km 22/8-24/8 including Reconstruction of culverts (8 Nos) in Palaviduthi – Kadavur – Ayyalure road (MD--648)

749 01-CRIDP-12- Dindigul Vedachandur Widening from Single Lane to 8.20 495.00 13-M-0749 Intermediate Lane and Strengthening in Km39/8-48/0 including Reconstruction of culverts(9 Nos) in Karur – Esanatham- Koombur – Vedasandur Road (MD--606) 750 01-CRIDP-12- Dindigul Vedachandur Widening from Single Lane to 4.00 255.00 13-M-0750 Intermediate Lane and Strengthening in Km.30/0-34/0, including providing CC pavement & Reconstruction of culverts (7 Nos) in Manaparai – Gujiliamparai road (MD--628) 751 01-CRIDP-12- Dindigul Nilakottai Widening from Single Lane to 2.00 225.00 13-M-0751 Intermediate Lane and Strengthening in Km4/0 - 5/0,9/0- 10/0 including construction of Retaining wall at Km4/0 - 5/0.and re-construction of culverts( 8 Nos) in Natchikulam - Sempatty road (MD--643)

752 01-CRIDP-12- Dindigul Palani Widening the road from Single 6.00 199.00 13-M-0752 Lane to Intermediate Lane by Providing Concrete pavement including side drain in Km48/0 - 54/0 of Goshen Road (MD--117)

SL to IL Total 24.95 1414.00

MDR- 45 of 55 SECTION OFFICER 96/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 753 01-CRIDP-12- Dindigul Palani Strengthening in Km0/0-2/8 and 2.80 200.00 13-M-0753 including Construction of Drain, Reconstruction of culverts(2 Nos) and Retaining walls in Kodai - Pallangi road (MD--897) 754 01-CRIDP-12- Dindigul Palani Strengthening in Km2/0-7/0 of 5.00 180.00 13-M-0754 Palayaayakudi - Porulur road (MD-- 900) 755 01-CRIDP-12- Dindigul Palani Strengthening by Paving blocks in 0.40 45.00 13-M-0755 Km0/2(30M), 0/4(20M), 1/6(110M), 1/8 (200M), 1/10 (40M)of Lakebridge - Observatory road (MD- -217)

756 01-CRIDP-12- Dindigul Nilakottai Strengthening in Km 0/0 - 1/8 of 1.80 63.00 13-M-0756 Vathalagundu - Thandigudi road (MD--733) 757 01-CRIDP-12- Dindigul Athoor Strengthening in Km 2/0- 6/4 of 4.40 160.00 13-M-0757 Dharumathupatti - Adalur - Thandikudi Road (MD--589) 758 01-CRIDP-12- Dindigul Athoor Improvements by Paving blocks in 0.25 50.00 13-M-0758 Km 19/6 - 20/0(250M) and construction of Retaining wall in Sitharevu - Chinnalapatty road (MD--687) Strengthening Total 14.65 698.00 759 01-CRIDP-12- Dindigul Natham Reconstruction of culvert with 67.00 13-M-0759 approaches in Km.0/2&21/6, Construction of Drain at Km21/4 including Paving block on berms at Km21/0-21/4 of Natham - Pillaiyarnatham road (MD--644)

Culverts/Bridges Total 1 Nos 67.00 Dindigul Total 39.60 2179.00 760 01-CRIDP-12- Sivagangai Sivaganga Widening SL to IL in 12.30 470.00 13-M-0760 Nattarasankottai - Chockanathapuram road km. 0/0- 9/6,&12/9-15/6 and including reconstruction of culverts(19 Nos)and Retaining wall (MD--912)

MDR- 46 of 55 SECTION OFFICER 97/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 761 01-CRIDP-12- Sivagangai Manamadurai Widening SL To IL in 3.70 135.00 13-M-0761 Thirppuvanam-Pulvaikkarai - Narikkudi Road Km0/8-2/0 & 5/0- 7/500 including reconstruction of culverts(18 Nos) (MD--718)

762 01-CRIDP-12- Sivagangai Karaikudi Widening from SL to IL and 1.60 110.00 13-M-0762 Improvements to Madurai - Thondi Bye Pass Road Km0/0 - 1/6 and including Reconstructuion of culverts (5 Nos) (MD--231)

763 01-CRIDP-12- Sivagangai Karaikudi Widening from SL to IL in 4.47 330.00 13-M-0763 Devakottai-Pudukottai Dist. Border (via) Kannagudi road Km0/100 - 0/200, 21/235-24/2 and Improvements to Km10/2 - 10/6, 13/2 - 13/6, 14/4-14/10 and Providing and Laying Paved Blocks in Km6/8 - 7/100 of and including Reconstructuion of culverts(10 Nos) (MD--973)

764 01-CRIDP-12- Sivagangai Manamadurai Widening SL to IL in Branching at 2.16 115.00 13-M-0764 KmNH49 to Kattanoor Road Km11/7 - 12/563 and Improvements in Km1/4 - 2/6, Providing CC Paver Block Km6/6 & 6/8.including Reconstruction of culverts ( 5Nos(MD--579)

765 01-CRIDP-12- Sivagangai Sivaganga Widening SL to IL and 3.30 195.00 13-M-0765 improvement to Nattarasankottai - Chockanathapuram road km. 9/6- 12/9 and including reconstruction of culverts(4 Nos) (MD--912)

MDR- 47 of 55 SECTION OFFICER 98/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 766 01-CRIDP-12- Sivagangai Manamadurai Widening SL To IL in 9.80 500.00 13-M-0766 Manamadurai - Paramakudi (via) T.Pudukottai Road Km 0/0-3/0, 18/0-24/8, Improvements at km19/0 - 20/4 and construcstion of Revetment including Providing paved block and Reconstruction of culverts (22 Nos) (MD--627)

SL to IL 37.33 1855.00 Total 767 01-CRIDP-12- Sivagangai Manamadurai Improvements to Elayangudi - 1.00 37.00 13-M-0767 Vandal - Sukkirapatti road in Km2/0-3/0 and including reconstruction of culvert (1 Nos)(MD--593) 768 01-CRIDP-12- Sivagangai Karaikudi Improvements to Kottaiyur - 2.60 115.00 13-M-0768 Aranthangi road Km. 6/6-7/0,14/0- 16/2 & including reconstruction of culverts (6 Nos) (MD--185)

769 01-CRIDP-12- Sivagangai Karaikudi Improvements to Karaikudi 1.20 60.00 13-M-0769 colleges campus road to railway station road km.0/0-1/2(MD--- 83)

770 01-CRIDP-12- Sivagangai Karaikudi Improvements to Sarugani - 2.00 92.00 13-M-0770 Devakottai Road Km1/8 - 2/6, 2/10 - 4/2.(MD--413) 771 01-CRIDP-12- Sivagangai Manamadurai Providing Paved Block @ Km3/6- 0.20 16.00 13-M-0771 3/8- of Thayamangalam road.(MD- -975) 772 01-CRIDP-12- Sivagangai Tirupattur Providing Paved Block @ Km3/10 0.03 15.00 13-M-0772 of Koilapatti Junction to Pudukottai Frontier Road (MD--- 176)

Strengthening Total 7.03 335.00 Sivagangai Total 44.36 2190.00 773 01-CRIDP-12- Ramnad Mudhukulathur Widening and Improvement from 5.60 410.00 13-M-0773 SL to IL Km21/0-26/6 of Paramakudi - Keerandai Road (MD-652) 774 01-CRIDP-12- Ramnad Mudhukulathur Widening and Improvements from 0.09 6.00 13-M-0774 SL to IL Km.16/4-16/6 of Mudukulathur-Kamuthi Road(MD- 237) (Missing length)

MDR- 48 of 55 SECTION OFFICER 99/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 775 01-CRIDP-12- Ramnad Mudhukulathur Widening and Improvements from 3.70 230.00 13-M-0775 SL to IL Km.78/3-82/0 of Kallikudi- Karaiappatti-Thiruchulli-kamuthi- Sayalkudi Road (MD-768)

776 01-CRIDP-12- Ramnad Ramanatha Widening from SL to IL Km.0/0-8/0 10.40 600.00 13-M-0776 puram and Km.11/8-14/2 and Improvements to in Km.0/0-2/0, 4/0- 6/0 and 11/8-14/2 of Thiruppullani- Pirappanvalasai road (MD-717)

777 01-CRIDP-12- Ramnad Tiruvadanai Widening and Improvemenst from 4.00 370.00 13-M-0777 SL to IL Km.16/0-20/0 of NH210 to Vattanam road and construction of drain (MD-917)

778 01-CRIDP-12- Ramnad Tiruvadanai Widening and Improvements from 2.00 150.00 13-M-0778 SL to IL Km.18/0-20/0 of Tiruvadanai - S.P.Pattinam Road (MD-916) 779 01-CRIDP-12- Ramnad Paramakudi Widening and Improvements from 2.60 200.00 13-M-0779 SL to IL Km.0/0-2/6 of Paramakudi - Mudukulathur road to Vilathur Road (MD-329) 780 01-CRIDP-12- Ramnad Paramakudi Widening and Improvements from 3.40 280.00 13-M-0780 SL to IL Km.0/0-3/4 of NH 49 Km.87/8- Manjoor- Keelakottai Road (MD-1097) 781 01-CRIDP-12- Ramnad Paramakudi Widening from SL to IL Km.0/0-3/2 3.20 140.00 13-M-0781 of Vilathur - Nallukurichi road(MD- 548) SL to IL Total 34.99 2386.00 782 01-CRIDP-12- Ramnad Paramakudi Improvements to Ramanathapuram- 2.00 100.00 13-M-0782 Emaneswaram (via) Nainarkoil road km.32/0-34/0 (MD-390)

783 01-CRIDP-12- Ramnad Paramakudi Improvements to Devipattinam- 2.00 80.00 13-M-0783 Nainarkoil Road (Via) Pottagavayal km.27/0-28/0 and 29/0-30/0(MD- 93)

MDR- 49 of 55 SECTION OFFICER 100/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 784 01-CRIDP-12- Ramnad Mudhukulathur Improvements to Mudukulathur - 3.80 160.00 13-M-0784 Veerasolam Road Joining at km.99/4 of SH 42 in Km.1/0- 1/800,6/2-8/2 and 8/8-9/8(MD-638)

Strengthening Total 7.80 340.00 Ramnad Total 42.79 2726.00 Madurai Total 215.78 12628.00 785 01-CRIDP-12- Tirunelveli Tirunelveli Widening from SL to IL in Km0/0 - 5.60 250.00 13-M-0785 2/0, 13/0 - 16/6 of Udayarpatti - Sivalaperi Road. (MD--508)

786 01-CRIDP-12- Tirunelveli Nanguneri Widening from SL to IL in Km0/0 - 6.00 250.00 13-M-0786 6/0 and Strengthening in Km3/0 - 4/0 & 5/0 - 6/0 of Nanguneri - Moolaikaraipatti road including construction of Culverts 10Nos.(MD- 292) 787 01-CRIDP-12- Tirunelveli Nanguneri Widening from SL to IL in Km9/6 - 14.40 650.00 13-M-0787 17/8, 18/4 - 23/6 & 36/0 - 37/0 and Strengthening in Km11/0 - 17/8, 18/4 - 23/6 & 36/0 - 37/0 of Reddiyarpatti - Vijayanarayanam road including construction 14 No's of single row pipe culverts and Construction of Minor bridge at km.12/8.(MD-403)

788 01-CRIDP-12- Tirunelveli Nanguneri Widening from SL to IL Km22/0 - 0.80 22.00 13-M-0788 22/8 of Karungadal - Munanchipatti road.(MD-151) SL to IL Total 26.80 1172.00 789 01-CRIDP-12- Tirunelveli Tenkasi Strengthening in Km20/0 - 24/2 of 4.20 190.00 13-M-0789 VK Pudur - Shanmuganallur Road.(MD-541) 790 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Ambasamudram - 4.40 195.00 13-M-0790 Alangulam Road Km15/0 - 19/4 (MD-14) Strengthening Total 8.60 385.00 Tirunelveli Total 35.40 1557.00

MDR- 50 of 55 SECTION OFFICER 101/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 791 01-CRIDP-12- Tenkasi Sankarankoil Widening SL to IL in Km4/8 - 5/4, 2.77 142.00 13-M-0791 5/830 - 8/0 and Improvements in Km4/8 - 5/4, 5/830 - 6/0 and 7/0 - 8/0 of Sankarankovil - Thiruvenkadam Road including 3 nos CD works, (MD--408)

792 01-CRIDP-12- Tenkasi Sankarankoil Widening SL to IL in Km0/0 - 13/0 13.00 390.00 13-M-0792 of Alangulam - Kuruvikulam - Thiruvengadam Road including 12 nos. CD works. (MD--925)

SL to IL Total 15.77 532.00 793 01-CRIDP-12- Tenkasi Tenkasi Widening IL to DL in Km 12/0-13/4 4.40 200.00 13-M-0793 and Improvements to Km12/0- 16/4 of Surandai-Sendamaram road. (MD--440) Other Widening Total 4.40 200.00 794 01-CRIDP-12- Tenkasi Kadaianallur Improvements in Km 0/0 - 2/4, 5/0- 6.10 168.00 13-M-0794 5/6, 6/3-7/0 and 8/6 - 11/0 of Sivaramapettai - Panpozhi - Shencottai road. (MD--431) 795 01-CRIDP-12- Tenkasi Kadaianallur Improvements in Km 1/0-5/4 of 4.40 150.00 13-M-0795 Ayikudi Tenkasi road (MD--923) 796 01-CRIDP-12- Tenkasi Sankarankoil Improvements in Km 24/2 - 25/2 of 1.00 45.00 13-M-0796 V.K.Pudur - Shunmuganallur Road (MD--541)

797 01-CRIDP-12- Tenkasi Tenkasi Improvements in Km 8/6-9/4 of 0.80 27.00 13-M-0797 Kadayam - Pavoorchatram road (MD--934) 798 01-CRIDP-12- Tenkasi Sankarankoil Improvements in Km 21/0-22/0 of 1.00 35.00 13-M-0798 Surandai-Sendamaram road. (MD-- 440) Strengthening Total 13.30 425.00 Tenkasi Total 33.47 1157.00 799 01-CRIDP-12- Virudhunagar Srivilliputhur Widening from SL to IL in Km8/0- 1.20 40.00 13-M-0799 9/2 of Tenkasi - Tirumangalam road to Keelarajakularaman road (MD-697)

MDR- 51 of 55 SECTION OFFICER 102/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 800 01-CRIDP-12- Virudhunagar Sattur Widening SL - IL in Km12/6-16/125 3.53 100.00 13-M-0800 of Viswanatham - Venkadachalapuram road including construction 5 nos of Retaining wall (MD-1048) 801 01-CRIDP-12- Virudhunagar Sattur Widening SL - IL and 0.20 8.00 13-M-0801 improvements in Km9/8 - 10/0 of Viswanatham - Venkadachalapuram road (MD- 1048) 802 01-CRIDP-12- Virudhunagar Virudhunagar Widening from SL to IL in Km 18/0 3.29 80.00 13-M-0802 - 21/290 of Kallupatti - Virudhunagar road including 3 nos of reconstruction of culverts (MD- 956) 803 01-CRIDP-12- Virudhunagar Virudhunagar Widening from SL to IL in Km8/8 - 11.00 275.00 13-M-0803 19/8 of Sivakasi - Erichanatham road including 15 Nos of reconstruciton of culvert (MD-689)

804 01-CRIDP-12- Virudhunagar Sivakasi Widening from SL to IL 0/0-8/8 in 8.80 250.00 13-M-0804 Sivakasi - Erichanatham Road including 10 nos of reconstrution of culvert and 1 no of Construction of Culvert (MD-689)

805 01-CRIDP-12- Virudhunagar Thiruchuli Widening from SL- IL in Km29/0 - 13.00 331.00 13-M-0805 33/0, 39/0 - 48/0 of kallikudi - Kariyapatti (Via) Thiruchuli, Kamuthi Road (MD-768)

806 01-CRIDP-12- Virudhunagar Thiruchuli Widening from Single lane to 6.15 225.00 13-M-0806 Intermediate lane of Kallikudi- Kariapatti(via)Thiruchuli-Kamuthi road Km.22/0-25/6, 26/450-29/0 including 4 Nos of reconstruction of culverts.(MD-768)

MDR- 52 of 55 SECTION OFFICER 103/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 807 01-CRIDP-12- Virudhunagar Thiruchuli Widening from Single lane to 18.00 850.00 13-M-0807 Intermediate lane in Km0/0 - 18/0 and improvements in Km2/6 - 12/6, 13/6-14/6 of Kariapatti - Narikudi road including 22 Nos of reconstruction of culvets (MD-926)

808 01-CRIDP-12- Virudhunagar Rajapalayam Widening SL- IL and Strengthening 0.15 10.00 13-M-0808 in Km12/550-12/700 of Rajapalayam - Ayyanarkovil road (MD-387) SL to IL Total 65.32 2169.00 809 01-CRIDP-12- Virudhunagar Sattur Widening from DL to ML in Km0/0 - 0.30 30.00 13-M-0809 0/3 of Sattur - Thiruvenkadapuram road and including Widening of culvert (MD-683)

Other Widening Total 0.30 30.00 810 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Krishnankoil - 2.20 75.00 13-M-0810 Koomapatti road Km9/0-10/0 and 12/0 - 13/2 (MD-194) 811 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Srivilliputtur South 0.42 25.00 13-M-0811 Car Street Km 0/0-0/420 (MD-693).

812 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Srivilliputtur - 1.30 80.00 13-M-0812 Thiruvannamalai road Km 0/0-1/0 and 2/7 - 3/0 (MD-1031) 813 01-CRIDP-12- Virudhunagar Aruppukottai Improvements in Sattur - Nenmeni 0.40 14.00 13-M-0813 road Km 7/870 - 8/270 (M682)

814 01-CRIDP-12- Virudhunagar Virudhunagar Improvements in Km 14/490 - 0.88 20.00 13-M-0814 15/168 and 15/650-15/850 of Kallupatti - Virudhunagar road (MD- 956) 815 01-CRIDP-12- Virudhunagar Virudhunagar Construction of Bus lay bye at 8.00 13-M-0815 Km0/2, 3/6, 8/8, 8/10 of Kanniseri - Mathiyasenai road (MD-604)

816 01-CRIDP-12- Virudhunagar Sivakasi Junction improvements at 0.10 40.00 13-M-0816 Km1/2,3/2 of Thiruthangal - Sengamalanachiyarpuram Road (Thiruthangal built up area) including providing paver black (MD-938)

MDR- 53 of 55 SECTION OFFICER 104/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 817 01-CRIDP-12- Virudhunagar Rajapalayam Improvements to Rajapalayam - 12.85 590.00 13-M-0817 Ayyanarkovil road Km0/0 - 12/550 & 12/700 - 13/0 inculding 7 nos of recostruction of culvert (MD-387)

Strengthening Total 18.15 852.00 818 01-CRIDP-12- Virudhunagar Aruppukottai Construction of Minor Bridge @ 130.00 13-M-0818 Km18/2 & 22/8 of Melamadai - Palavanatham road (MD-937)

Culverts/Bridges Total 1 Nos 130.00 819 01-CRIDP-12- Virudhunagar Sattur Construction of Protective wall at 66.00 13-M-0819 Km0/10,1/2,1/4, 1/10,2/2 of Sattur - Nenmeni road (Ventankulam Kanmai) (MD-682)

820 01-CRIDP-12- Virudhunagar Sattur Construction of protective wall for 5.00 13-M-0820 road side well at Km10/6 & 10/8 of Sattur - Elayirampannai - Guganparai road (MD-681) Others Total 2 Nos 71.00 Virudhunagar Total 83.76 3252.00 821 01-CRIDP-12- Tuticorin Kovilpatti Widening from SL To IL in Km9/6- 10.20 420.00 13-M-0821 11/0 & 14/0-22/8 and Improvments in Km15/0-21/800 of Kovilpatti - Ottapidaram - Puducottai - Eral - Mukkani Road including CD Works (MD-1047)

822 01-CRIDP-12- Tuticorin Srivaikundam Widening from SL to IL and 4.50 350.00 13-M-0822 Rebuilding in Km18/3-22/8 of Meignanapuram-Munanjipatti Road (MD-261) 823 01-CRIDP-12- Tuticorin Kovilpatti Widening and Improvments from 3.80 150.00 13-M-0823 SL To IL in Km8/0-11/6 & 12/0-12/2 of Kayathar - Kadambur Road (MD- 159) SL to IL Total 18.50 920.00 824 01-CRIDP-12- Tuticorin Thoothukudi Improvements South Beach road in 0.53 25.00 13-M-0824 Km0/0-0/530 (MD-434) 825 01-CRIDP-12- Tuticorin Ottapidaram Rebuilding in Km42/2-43/4 of 1.20 45.00 13-M-0825 Kovilpatti - Ottapidaram - Puducottai - Eral - Mukkani Road (MD-1047)

MDR- 54 of 55 SECTION OFFICER 105/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 826 01-CRIDP-12- Tuticorin Srivaikundam Rebuilding in Km0/4-1/4 of 1.00 90.00 13-M-0826 Sillanatham - Puthiyamputhur Road.(MD-935) Strengthening Total 2.73 160.00 Tuticorin Total 21.23 1080.00 827 01-CRIDP-12- Nagercoil Vilavancode Widening and Improvements to 9.05 500.00 13-M-0827 Kuzhithurai - Alancholai - Arukani road Km.15/650 - 15/900, 20/4 - 29/2 (MD-941). 828 01-CRIDP-12- Nagercoil Nagercoil Widening and Improvements Kottar 0.70 30.00 13-M-0828 - Manakudy road Km. 10/2 - 10/9(MD-188). 829 01-CRIDP-12- Nagercoil Colachal Widening and Improvements 2.00 100.00 13-M-0829 Eraniel - Muttom road Km, 3/0 - 5/0 (MD-105). SL to IL Total 11.75 630.00 830 01-CRIDP-12- Nagercoil Kanniyakumari Improvements to Balamore road 3.60 195.00 13-M-0830 Km. 17/2 - 20/8 including Reconstruction of culvert (5 Nos) and retaining wall.(MD-54).

Strengthening Total 3.60 195.00 Nagercoil Total 15.35 825.00 Thirunelveli Total 189.21 7871.00 Grand Total 1587.99 81872.00

MDR- 55 of 55 SECTION OFFICER 106/ 185

Annexure to G.O. Ms No. 161/ Highways and Minor Ports (HN2) Department / Dated 01. 10. 2012 CRIDP 2012-13 LIST OF WORKS - OTHER DISTRICT ROADS Rs. in Lakhs

Cost ID Job Code Division Constituency Name of work (Eng) Length required 831 01-CRIDP-12- Chennai City Alandur Widening and Improving from two 1.30 200.00 13-O-0831 Roads lane to available full width in Km.1/0 - 2/3 of Nanganallur road .

832 01-CRIDP-12- Chennai City Tambaram Widening and Improving from 1.00 80.00 13-O-0832 Roads Single lane to Double Lane 0/0- 1/0 of Km 28/10 of GST road to Peerkankaranai road Widening Total 2.30 280.00 833 01-CRIDP-12- Chennai City Shozhinga Construction of Centre median at 2.10 740.00 13-O-0833 Roads nallur Km.0/0-2/4 of and raising the low lying portion of at Km 2/4 - 4/5 Medavakkam- Sholinganallur Road

834 01-CRIDP-12- Chennai City Shozhinga Improvements to 30th Mile V.K. 2.40 160.00 13-O-0834 Roads nallur Road to Medavakkam- Mambakkam- Sembakkam Road at Km 11/2- 13/6 835 01-CRIDP-12- Chennai City Pallavaram Improvements to Pammal - 1.95 100.00 13-O-0835 Roads Thiruneermalai Road Km.0/0- 1/950 Strengthening Total 6.45 1000.00 Chennai City Roads Total 8.75 1280.00 836 01-CRIDP-12- Chengalpatt Uthiramerur Strengthening of Vengachery - 4.20 126.00 13-O-0836 u Thirumukkudal Road Km.5/0 - 9/2 Strengthening Total 4.20 126.00 Chengalpattu Total 4.20 126.00 837 01-CRIDP-12- Thiruvallur Madhavaram Widening from single lane to 1.36 45.00 13-O-0837 intermediate lane of Ellaiammanpettai Lakshmipuram Road Km 0/0 - 1/360

Widening Total 1.36 45.00 838 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to Elambakkam 0.60 25.00 13-O-0838 Koovam Road Km 4/4-5/0

839 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to Thirupandhiyur 0.60 13.00 13-O-0839 Road Km 1/8-2/4.

ODR- 1of 35 SECTION OFFICER 107/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 840 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to Satharai - 2.00 40.00 13-O-0840 road Km 1/0-3/0

841 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to T.R.T.C (NH 1.76 35.00 13-O-0841 205) to Mettupalayam (via) Thomur - Ramancheri road Km 0/0-1/630 & 1/870-2/0 842 01-CRIDP-12- Thiruvallur Gummidi Improvements to Bondavakkam- 2.10 46.00 13-O-0842 poondi Mambakkam-Velagapuram road Km. 8/0-10/0 & 10/4-10/5+100

843 01-CRIDP-12- Thiruvallur Thiruvallur White tapping toVellathukottai- 1.77 99.00 13-O-0843 Goonipalayam road Km. 0/550- 1/050, Km. 3/680-4/300 & 7/400- 8/050

844 01-CRIDP-12- Thiruvallur Madhavaram Rebuilding theAVP road - Manali - 2.00 191.00 13-O-0844 Mathur road (via) Kossappur Km. 0/0-2/0 845 01-CRIDP-12- Thiruvallur Ponneri Rebuilding the road Km 25/6 of 2.21 155.00 13-O-0845 TPP Road Km 4/7 of CP Road (via) Thadaperumbakkam Km, 0/0-2/210

846 01-CRIDP-12- Thiruvallur Madhavaram Improvements to GNT road - 1.00 27.00 13-O-0846 Padiyanallur road Km. 0/0-1/0 847 01-CRIDP-12- Thiruvallur Gummidi Rebuilding to GNT Road - 1.00 150.00 13-O-0847 poondi Siddaraja kandigai Road Km 0/0 - 1/0 848 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to Maddur road 2.40 52.00 13-O-0848 Km. 0/0-2/4 849 01-CRIDP-12- Thiruvallur Thiruvallur Improvements to CTR road - 2.40 30.00 13-O-0849 Konalam road Km. 6/0-8/4 850 01-CRIDP-12- Thiruvallur Thiruttani Improvements to AT Road 2.45 28.00 13-O-0850 toMinnal Road Km. 0/0-2/450 851 01-CRIDP-12- Thiruvallur Thiruttani Improvements to Thiruthani 0.54 35.00 13-O-0851 Subway Approach Road Km. 0/0-0/540 852 01-CRIDP-12- Thiruvallur Gummidi Improvements to GNT road to 2.60 140.00 13-O-0852 poondi Ayyanallur road Km.3/0-5/6 853 01-CRIDP-12- Thiruvallur Gummidi Improvements to Km 5/0 - 8/0 of 3.00 70.00 13-O-0853 poondi Arambakkam - Madharpakkam road. 854 01-CRIDP-12- Thiruvallur Madhavaram Rebuilding the AVP road - Manali - 1.40 134.00 13-O-0854 Mathur road (via) Kossappur Km. 2/0-3/4

ODR- 2of 35 SECTION OFFICER 108/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 855 01-CRIDP-12- Thiruvallur Gummidi Rebuilding to GNT Road - 1.40 170.00 13-O-0855 poondi Siddaraja kandigai Road Km 1/0 - 2/4 Strengthening Total 31.23 1440.00 856 01-CRIDP-12- Thiruvallur Gummidi Reconstruction of culvert at Km 49.00 13-O-0856 poondi 5/4 & 6/6 of Kolladam - Madarpakkam Road 857 01-CRIDP-12- Thiruvallur Gummidi ReConstruction of culvert @ Km 45.00 13-O-0857 poondi 1/6 of GNT Road - Ayyanallur Road Culverts/Bridges Total 2 Nos 94.00 Thiruvallur Total 32.59 1579.00 858 01-CRIDP-12- Vellore Arcot Widening from SL to IL to 4.60 144.00 13-O-0858 Arunkundram Road Km 0/0 - 4/6 including construction of retaining wall 859 01-CRIDP-12- Vellore Arakonam Widening from SL to IL of 4.00 115.00 13-O-0859 Panapakkam Damal Road Km 0/6 - 4/6 including providing protective works Widening Total 8.60 259.00 860 01-CRIDP-12- Vellore Arakonam Improvements to Km 85/6 of 1.40 18.00 13-O-0860 Arakkonam Kancheepuram Road to Illuppai Thandalam Road Km 0/0 - 1/4 861 01-CRIDP-12- Vellore Arakonam Improvements to Km 8/6 of 1.40 15.00 13-O-0861 Arakkonam Ocheri Road to Kilandurai H.C. Road Km 2/0 - 3/4

862 01-CRIDP-12- Vellore Arakonam Improvements to Kattukandigai 3.80 35.00 13-O-0862 Asanallikuppam Kilvenkatapuram Road Km 0/0 - 3/8

863 01-CRIDP-12- Vellore Arakonam Improvements to Km 3/6 of 2.00 22.00 13-O-0863 Itchiputhur Valarpuram road to Palliyankuppam Road Km 0/0 - 2/0

864 01-CRIDP-12- Vellore Arakonam Improvements to Renigunda Road 2.70 25.00 13-O-0864 to Km 9/6 of Arakkonam Thiruthani Road (via) Kilandur Road Km 0/0 - 2/7 865 01-CRIDP-12- Vellore Sholinghur Improvements to Km 94/2 of 3.00 27.00 13-O-0865 Chennai Chittoor Bangalore Road to Vegamangalam Road (via) Sirukarumbur Km 0/0 - 3/0

ODR- 3of 35 SECTION OFFICER 109/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 866 01-CRIDP-12- Vellore Sholinghur Improvements to Km 13/8 of 3.40 35.00 13-O-0866 Banavaram Sendamangalam Road to Manamadurai Road Km 0/0 - 3/4 867 01-CRIDP-12- Vellore Sholinghur Improvements to Chengalnatham 1.25 50.00 13-O-0867 Kodakal Road with Cement Concrete pavement and drain both sides Km 8/550 - 9/0, 9/6 - 9/900, 11/4-11/700 and 12/4 - 12/6

868 01-CRIDP-12- Vellore Katpadi Improvements to 4.20 56.00 13-O-0868 Ekambaranallore Thakkampalayam Road Km 2/0 - 6/2 including Drain 869 01-CRIDP-12- Vellore Katpadi Improvements to Km 6/0 of 1.60 20.00 13-O-0869 Ponnai Thiruvalam Road to Kottanatham Road Km 0/0-1/6.

870 01-CRIDP-12- Vellore Katpadi Improvements to Km 132/6 of 0.80 9.00 13-O-0870 CCB Road to Mutharasikuppam Km 0/0-0/8 871 01-CRIDP-12- Vellore Katpadi Improvements to Km 121/8 of 1.20 13.00 13-O-0871 CCB Road to Namakulamottur Road (Via) Mottur Road Km 2/4-3/6. 872 01-CRIDP-12- Vellore Sholinghur Improvements to Marudalam 2.00 30.00 13-O-0872 Olugur Road Km 0/0 - 2/0 873 01-CRIDP-12- Vellore Arcot Improvements to Valayathur Road 3.20 45.00 13-O-0873 Road Km 0/0 - 3/2. 874 01-CRIDP-12- Vellore Arcot Improvements to Mazhaiyur 7.20 83.00 13-O-0874 Kalavai Road (via) Nambithangal, Kalavaipudur Road Km 0/0 - 7/2.

875 01-CRIDP-12- Vellore Arcot Improvements to Kullavimedu 2.00 22.00 13-O-0875 A.Kattupudi Road Km.0/0-2/0.

876 01-CRIDP-12- Vellore Anaicut Improvements to Km 4/2 of 1.00 13.00 13-O-0876 Thellai Kaniyambadi Road to Palambakkam Road Km 0/0-1/0

877 01-CRIDP-12- Vellore Arcot Improvements to Arcot - 0.80 11.00 13-O-0877 Kannamangalam Road Km 12/6 to Vellakulam (via) Elasikudisai road Km.0/8-1/6 878 01-CRIDP-12- Vellore Anaicut Improvements to Central Jail 1.00 14.00 13-O-0878 Amirthi Road Km.13/4 - 14/4

ODR- 4of 35 SECTION OFFICER 110/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 879 01-CRIDP-12- Vellore Anaicut Improvements to Singirikoil 0.80 11.00 13-O-0879 Kattukanallur Road Km.0/0 - 0/8

880 01-CRIDP-12- Vellore Anaicut Improvements to Singirikoil to 1.60 24.00 13-O-0880 Central Jail Amirthi Road(via) Kathalampattu Road Km 1/2 - 2/8

881 01-CRIDP-12- Vellore Katpadi Improvements to Jaffrabath Road 3.00 100.00 13-O-0881 Km 1/0 - 4/0 882 01-CRIDP-12- Vellore Katpadi Improvements to Thiruvalam 2.80 50.00 13-O-0882 Branch Road Km 2/4 - 5/2 and Reconstruction of culvert at Km4/10 883 01-CRIDP-12- Vellore Katpadi Improvements to Senur 2.80 40.00 13-O-0883 Unnamalaisamudram Road Km 0/0 - 2/8 884 01-CRIDP-12- Vellore Katpadi Improvements to Vinnampalli 1.00 10.00 13-O-0884 Mittoor Magimandalam Road Km 7/8 - 8/8 885 01-CRIDP-12- Vellore Arcot Improvements to Arur Soraiyur 3.40 30.00 13-O-0885 Road Km 0/0 - 3/4 886 01-CRIDP-12- Vellore Arcot Improvements to Soraiyur Road 2.00 20.00 13-O-0886 Km 0/0 - 2/0 887 01-CRIDP-12- Vellore Arcot Improvements to Kalavai - 4.00 44.00 13-O-0887 Valapandal road to Pali road (via) Kodali, Km 2/0 - 6/0 Strengthening Total 65.35 872.00

Vellore Total 73.95 1131.00 888 01-CRIDP-12- Vaniyambadi Jolarpet Improvements to 2.00 80.00 13-O-0888 Dhamalerimuthur Road Km 4/4 - 6/4

889 01-CRIDP-12- Vaniyambadi Jolarpet Improvements to Mookanur - 1.80 18.00 13-O-0889 Pudupet Road Km 2/2 -4/0

Strengthening Total 3.80 98.00 Vaniyambadi Total 3.80 98.00 890 01-CRIDP-12- Tiruvannama Chengam Widening from SL to IL & 0.50 25.00 13-O-0890 lai Improvements to Kilsirupakkam - Krishnapuram Road (Via) Tharadapattu Km.13/0-13/5, Including Retaining Wall, Drain and Culverts

ODR- 5of 35 SECTION OFFICER 111/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 891 01-CRIDP-12- Tiruvannama Kalasapakkam Widening from SL to IL in Km 7/0 - 6.00 190.00 13-O-0891 lai 13/0 & Improvements in Km 9/0 - 10/0 in Kannamanalam - Padavedu Road including Widening Culverts 2 Nos and Reconstruction of Culverts 8 Nos.

Widening Total 6.50 215.00 892 01-CRIDP-12- Tiruvanna Vandawasi Providing cement Concrete to 100.00 13-O-0892 malai Kancheepuram Byepass road Km.0/0-0/5 893 01-CRIDP-12- Tiruvanna Kilpennathur Improvements to Cuddalore- 3.40 50.00 13-O-0893 malai Chittor road to Viruduvilanginan road Km0/0-3/4 including Drainage 894 01-CRIDP-12- Tiruvanna Kilpennathur Improvements to Villupuram - 2.20 48.00 13-O-0894 malai Tiruvannamalai road to Olaipadi road Km 0/0-2/2 including Reconstruction of Culvert 1 No, with Drainage 895 01-CRIDP-12- Tiruvanna Kilpennathur Improvements to Vettavalam 2.80 45.00 13-O-0895 malai Pazhavalam road Km 0/0-2/8 including Reconstruction of Culvert 1 No, 896 01-CRIDP-12- Tiruvanna Kilpennathur Improvements to Karikilampadi- 2.80 48.00 13-O-0896 malai Manavaram road Km0/0-2/8 including Reconstruction of Culvert 1 No,

897 01-CRIDP-12- Tiruvanna Polur Improvements to Km 97/2 of 1.80 42.00 13-O-0897 malai Cheyyur - Vandavasi - Polur Road to Mandakolathur Road Km 0/0 - 1/8 including Widening Culverts 10 Nos and Reconstruction of Culverts 2 Nos

898 01-CRIDP-12- Tiruvanna Polur Improvements to Km 80/8 of 1.60 33.00 13-O-0898 malai Cheyyur Vandavasi Polur Road to Kannanur Road Km 0/0 - 1/6 including Reconstruction of Culverts 5 Nos, 899 01-CRIDP-12- Tiruvanna Arani Improvements to Sevoor 3.10 35.00 13-O-0899 malai Vedhajipuram road Km 13/4 -16/5

ODR- 6of 35 SECTION OFFICER 112/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 900 01-CRIDP-12- Tiruvanna Cheyyar Improvements to Natteri road Km 1.60 25.00 13-O-0900 malai 0/0 - 1/6 Strengthening Total 19.30 426.00 901 01-CRIDP-12- Tiruvanna Chengam Reconstruction of Culvert at Km 50.00 13-O-0901 malai 11/8 of Arattavadi Ilangunni road (2 Spans of 5mts)

902 01-CRIDP-12- Tiruvanna Arani Reconstruction of Culvert at Km 15.00 13-O-0902 malai 4/2 of Agrapalayam S.U.Vanam road (Via) Sirumoor

Culverts/Bridges Total 2 Nos 65.00 903 01-CRIDP-12- Tiruvanna Kilpennathur Construction of Retaining wall 28.00 13-O-0903 malai with culvert at 6/2 - 6/8 & 9/6 - 9/8 of Vedandavadi durgam road

Others Total 1 Nos 28.00 Tiruvannamalai Total 25.80 734.00 Chennai Total 149.09 4948.00 904 01-CRIDP-12- Villupuram Mailam Widening from SL to IL & Impts of 3.80 200.00 13-O-0904 Chendur - Mailam road Km. 0/0- 3/8 905 01-CRIDP-12- Villupuram Mailam Widening from SL to IL & Impts. of 5.40 260.00 13-O-0905 Vallam - GST road Km. 0/0-5/4

906 01-CRIDP-12- Villupuram Vanur Widening SL to IL & Impts.to 9.00 460.00 13-O-0906 Morattandy-Bommiyarpalayam road Km.0/0-9/0

907 01-CRIDP-12- Villupuram Villupuram Widening SL to IL Panchamadevi- 6.20 160.00 13-O-0907 Madukkarai road Km.0/0-6/2

908 01-CRIDP-12- Villupuram Tindivanam Widening SL to IL & Impts. To 3.20 190.00 13-O-0908 Alankuppam-Munnur road Km.0/0- 3/2 (CC Pavement 600m)

909 01-CRIDP-12- Villupuram Vikravandi Widening SL to IL of 2.60 80.00 13-O-0909 Kalyanampoondy-Anandapuram road Km.8/2-10/8

Widening Total 30.20 1350.00 910 01-CRIDP-12- Villupuram Gingee Improvements to Pondy – 4.20 100.00 13-O-0910 Krishnagiri road to So-Kuppam (via) Sathiyamangalam Km 0/0- 4/2 (670m CC Pavement)

ODR- 7of 35 SECTION OFFICER 113/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 911 01-CRIDP-12- Villupuram Tindivanam Improvements to Gidangal Tank 0.40 50.00 13-O-0911 Bund road Km.0/0-0/4 (CC Pavement) 912 01-CRIDP-12- Villupuram Mailam Improvements to Km.21/0 of 3.60 100.00 13-O-0912 Vellimedupettai-Mailam road (via)Alagamam-Thenputhur road Km.2/4-6/0 913 01-CRIDP-12- Villupuram Mailam Improvements to Rettanai - 2.40 50.00 13-O-0913 Marur road Km. 0/0-2/4 914 01-CRIDP-12- Villupuram Villupuram Improvements to Villupuram- 8.00 100.00 13-O-0914 Mambalapattu-Tirukoilur road to Villupuram-Tiruvannamalai (via) Ariyur, Vengandur road Km.0/0- 8/0 915 01-CRIDP-12- Villupuram Villupuram Improvements to Sithathur- 0.55 30.00 13-O-0915 Thirukkai road Km.1/850-2/4 including retaining wall 916 01-CRIDP-12- Villupuram Villupuram Improvements to Sendanur- 1.00 18.00 13-O-0916 Railway feeder road Km.3/6-4/6

917 01-CRIDP-12- Villupuram Villupuram Improvements to Melpathy- 1.60 16.00 13-O-0917 Kurumbankottai road Km.0/0-1/6

918 01-CRIDP-12- Villupuram Mailam Improvements to Veedur- 2.40 30.00 13-O-0918 Vikkravandy road Km.0/0-2/4 919 01-CRIDP-12- Villupuram Mailam Improvements to S. 2.20 29.00 13-O-0919 Kothamangalam – Aniladi road (via) Keelvailamur Km 1/8-4/0

920 01-CRIDP-12- Villupuram Tindivanam Improvements to Neikuppi road 3.05 50.00 13-O-0920 Km. 1/0-4/050 Strengthening Total 29.40 573.00 921 01-CRIDP-12- Villupuram Gingee Reconstruction of bridge at 96.00 13-O-0921 Km.1/6 of Palapadi-Nallanpillai petrol road Culverts/Bridges Total 1 Nos 96.00 Villupuram Total 59.60 2019.00 922 01-CRIDP-12- Kallakurichi Rishivandhiy Improvements to Athiyur 5.00 55.00 13-O-0922 am Jambadai Road Km.0/0-5/0 923 01-CRIDP-12- Kallakurichi Tirukkoyilur Improvements to Perangiyur 5.00 125.00 13-O-0923 Enathimangalam road Km.0/0-5/0

924 01-CRIDP-12- Kallakurichi Rishivandhiy Improvements to Tirukoilur - 8.00 140.00 13-O-0924 am Lalapet road (Via) Po.Meiyur Km.0/0-4/0, 5/0-6/0, 9/0-11/0 & 13/0-14/0

ODR- 8of 35 SECTION OFFICER 114/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 925 01-CRIDP-12- Kallakurichi Tirukkoyilur Improvements to Kolapakkam 4.80 115.00 13-O-0925 road Km.0/0-4/8 926 01-CRIDP-12- Kallakurichi Sankara Improvements to Somandarkudi 1.40 68.00 13-O-0926 puram road Km.0/0-1/4 and Reconstruction of Minor Bridge at Km 0/6 927 01-CRIDP-12- Kallakurichi Rishivandhiy Easing the steep gradient in 0.40 32.00 13-O-0927 am Km.7/2-7/6 of the road from Km.44/6 of Kallakurichi Thiruvannamalai Road to Jambai

928 01-CRIDP-12- Kallakurichi Rishivandhiy Easing the steep gradient in Km 0.40 32.00 13-O-0928 am 5/6, 5/10 of Vengur Nathamur Road Strengthening Total 25.00 567.00 929 01-CRIDP-12- Kallakurichi Sankara Reconstruction of Minor Bridge at 45.00 13-O-0929 puram Km.3/6 of Kachirapalayam - Thavadipattu Road

930 01-CRIDP-12- Kallakurichi Kallakurichi Reconstruction of Minor Bridge at 30.00 13-O-0930 Km.2/6 of Ka.Mamanandhal Road

931 01-CRIDP-12- Kallakurichi Rishivandhiy Reconstruction of Minor Bridge at 25.00 13-O-0931 am Km.3/8 of Arudhangudi - Karayampalayam Road

932 01-CRIDP-12- Kallakurichi Rishivandhiy Reconstruction of Minor Bridge at 40.00 13-O-0932 am Km.1/10 Elayanarkuppam - Maniyandal H/C Road (via) Seerpanandhal Culverts/Bridges Total 4 Nos 140.00 Kallakurichi Total 25.00 707.00 933 01-CRIDP-12- Cuddalore Cuddalore Widening from DL-ML and 0.75 46.00 13-O-0933 Improvements to Bodi Chetty Street Km 0/0-0/750 934 01-CRIDP-12- Cuddalore Cuddalore Widening from DL-ML and 0.33 19.00 13-O-0934 Improvements to Sangeevi Naidu Street Km 0/0-0/330 935 01-CRIDP-12- Cuddalore Kurinjipadi Widening from SL-IL of Karunguzhi- 4.00 130.00 13-O-0935 Mettukuppam road Km 0/0-4/0 Including CD works (11 Nos)

ODR- 9of 35 SECTION OFFICER 115/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 936 01-CRIDP-12- Cuddalore Panruti Widening from SL-IL and 3.80 180.00 13-O-0936 Improvements to Road branching at Km 1/2 of Sitharasur road and joining at Km 0/8 of Nellikuppam West diversion road Km 0/0-3/8

937 01-CRIDP-12- Cuddalore Panruti Widening from SL-IL and 4.00 190.00 13-O-0937 Improvements to Pudupettai- Oraiyutr-Karumbur-Paithampadi road Km 0/0-4/0 938 01-CRIDP-12- Cuddalore Neyveli Widening from SL-IL to 2.60 80.00 13-O-0938 Vadakkumelur-Keelur- Pacharapalayam including CD Works Km 0/0 - 2/6 (8 Nos) Widening Total 15.48 645.00 939 01-CRIDP-12- Cuddalore Vridha Improvements to Mangalampettai 6.00 190.00 13-O-0939 chalam - Manalur Road (via) Mugasaparur Km 0/0 - 6/0

940 01-CRIDP-12- Cuddalore Cuddalore Improvements to Car Street Km 0.33 24.00 13-O-0940 0/0-0/330 941 01-CRIDP-12- Cuddalore Panruti Improvements to Pagandai- 1.00 16.00 13-O-0941 Melkumaramangalam road Km 0/0-1/0 942 01-CRIDP-12- Cuddalore Kurinjipadi Improvements to Alapakkam - 1.20 45.00 13-O-0942 Periyakuppam (via) Thiruchopuram road Km 0/0-1/2

943 01-CRIDP-12- Cuddalore Chidambaram Improvements to Lalpuram - 2.60 46.00 13-O-0943 Mandapam Road Km 0/0 - 2/6 Strengthening Total 11.13 321.00 Cuddalore Total 26.61 966.00 944 01-CRIDP-12- Ariyalur Ariyalur Widening SL to IL in Km 0/0 - 1/0 3.00 197.00 13-O-0944 and Widening and Improvements to Km 1/0 - 3/0 of Keelapalur - Pullambady Road to Aranmanaikurichi Road (Via) Elanthaikoodam including 4 culverts & Retaining wall at Km 2/2, 4 945 01-CRIDP-12- Ariyalur Kunnam Widening SL to IL in Km 6/0 - 9/0 3.00 99.00 13-O-0945 .of.Irumbulikurichi - Palayakudi - Managathy Road "

Widening Total 6.00 296.00

ODR- 10of 35 SECTION OFFICER 116/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 946 01-CRIDP-12- Ariyalur Ariyalur Improvements to Thirumanur - 1.40 20.00 13-O-0946 Elakkurichi - Thoothur Road to Kamarasavalli Road Km 0/0 - 1/4

947 01-CRIDP-12- Ariyalur Ariyalur Improvements to Ariyalur - 1.40 19.00 13-O-0947 Sendurai Road to Sennivanam Road Km 0/0 - 1/4 948 01-CRIDP-12- Ariyalur Ariyalur Improvements to Kallagam gate - 1.40 15.00 13-O-0948 Angiyanoor road Km 0/0 - 1/4

949 01-CRIDP-12- Ariyalur Jayankondam Improvements to Andimadam - 4.00 40.00 13-O-0949 Devanur - Variyankaval Road Km 0/0 - 4/0 950 01-CRIDP-12- Ariyalur Jayankondam Improvements to Koovathur - 2.00 20.00 13-O-0950 Anikuthichan Road Km 2/0 - 3/0 & 4/0 - 5/0" 951 01-CRIDP-12- Ariyalur Jayankondam Improvements to V.K.T road to 1.00 10.00 13-O-0951 Kakkaneri road at Km 2/0-3/0

952 01-CRIDP-12- Ariyalur Perambalur Improvements to Kolakkanatham - 2.00 32.00 13-O-0952 S. Kudikadu road in Km 2/0 - 4/0

953 01-CRIDP-12- Ariyalur Kunnam Improvements to Km 33/2 of 1.00 16.00 13-O-0953 Perambalur - Manamadurai road to Jamin Athur road Km 2/0 - 3/0

954 01-CRIDP-12- Ariyalur Kunnam Improvements to Allinagaram - 2.00 30.00 13-O-0954 Koothur road Km 3/0 - 5/0 955 01-CRIDP-12- Ariyalur Kunnam Improvements to Km 256/4 of NH- 2.60 30.00 13-O-0955 45 to Keelapuliyur road Km 2/0- 4/6 Strengthening Total 18.80 232.00 Ariyalur Total 24.80 528.00 Villupuram Total 136.01 4220.00 956 01-CRIDP-12- Trichy Manapparai Widening from Double lane to 0.40 60.00 13-O-0956 Multi lane of Old GST road in Km0/2-0/6 including construction of centre median Widening Total 0.40 60.00 957 01-CRIDP-12- Trichy Srirangam Improvements to Palaiyurmedu - 1.80 30.00 13-O-0957 Palancauvery road Km 0/0 - 1/8.including reconstruction of culvert at Km 0/6

ODR- 11of 35 SECTION OFFICER 117/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 958 01-CRIDP-12- Trichy Lalgudi Improvements to Pullambady- 3.40 214.00 13-O-0958 Sengaraiyur road at Km 1/6-3/4 ,4/2-5/0, 6/0-6/8 Strengthening Total 5.20 244.00 Trichy Total 5.60 304.00 959 01-CRIDP-12- Pudukottai Alangudi Improvements in Km 0/0-1/0, 2/0- 7.40 74.00 13-O-0959 8/4 of Avanathankottai - Maramadakki road 960 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 2/0-3/8 of 1.80 18.00 13-O-0960 Alapiranthan - Edayar road 961 01-CRIDP-12- Pudukottai Alangudi Improvements in Km 4/0-5/2 of 1.20 12.00 13-O-0961 Mookudi - Aliyanilai road 962 01-CRIDP-12- Pudukottai Alangudi Improvement in Km 0/0-3/0, 5/0- 4.80 48.00 13-O-0962 6/8 of Vijayapuram - Amarasimendrapuram road 963 01-CRIDP-12- Pudukottai Alangudi Improvements in Km 0/0-2/0 of 2.00 20.00 13-O-0963 Silattur - Thanthoni - Paravakottai road 964 01-CRIDP-12- Pudukottai Alangudi Improvements in Km 0/0-3/6 of 3.60 37.00 13-O-0964 Vallavari - Aranthangi road to Ayingudi south road including culvert at Km 0/6 965 01-CRIDP-12- Pudukottai Alangudi Improvements in Km 2/0-3/6 of 1.60 16.00 13-O-0965 Arasarkulam road 966 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 8/0-9/0 of 1.00 10.00 13-O-0966 Kanur - Thiruppunavasal road

967 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 0/0-4/0, 8/0- 5.20 67.00 13-O-0967 9/2 of Aranthangi - Kammangadu road to Perunavalur via Veeramangalam road including culvert at Km 1/8, 2/10

968 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 0/0-1/0 of 1.00 20.00 13-O-0968 Kanur - Thiruppunavasal road to Sethurastha via Arasankarai road including culvert at Km 0/2, 0/4(i), 0/4(ii), 0/6

969 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 4/0-5/0, 6/0- 2.00 30.00 13-O-0969 7/0 of Senganam - Peyadikottai road including culvert at Km 6/4, 6/6

ODR- 12of 35 SECTION OFFICER 118/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 970 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 6/0-10/0 of 4.00 60.00 13-O-0970 the road from Aranthangi - Mimisal road to meet Okkur - Theeyathur road via Velvari, Ponpethi, Vilankattur including culvert at Km 6/10, 7/4(i), 7/4(ii), 7/8, 8/2, 9/2 971 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 0/0-1/9 of 1.90 35.00 13-O-0971 Okkur - Embal road including retaining wall in Km 1/6

972 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 0/0-3/4 of 3.40 72.00 13-O-0972 Embal - Okkur road including culvert at Km 2/6 973 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 0/0-3/2 of 3.20 32.00 13-O-0973 Kokkumuttai village road 974 01-CRIDP-12- Pudukottai Aranthangi Improvement in Km 1/0-3/0 of the 2.00 20.00 13-O-0974 road from Km 1/4 of Ambalavananendal road to meet Aranthangi - Mimisal road via Alingiyendal, Kolendram, Purasakudi 975 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 2/0-4/8 of 2.80 30.00 13-O-0975 Muthuvalarkudi - Pattamudayan road including culvert at Km 2/4

976 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 0/0-2/0 of 2.00 20.00 13-O-0976 Kattumavadi - Mimisal road to Karakottai road 977 01-CRIDP-12- Pudukottai Aranthangi Improvements in Km 1/0-2/4 of 1.40 17.00 13-O-0977 Muthupettai - Mimisal road to Velivayal road including culvert at Km 1/8 978 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km 0/0-2/6 of 2.60 26.00 13-O-0978 the road from Km 12/4 of Namanasamudram - Ponnamaravathy raod to Peraiyur road 979 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km 20/0-21/0 of 1.00 15.00 13-O-0979 Pulivalam - Virachilai road including culvert at Km 20/2, 20/4, 20/6

ODR- 13of 35 SECTION OFFICER 119/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 980 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km 0/0-2/490 of 2.50 28.00 13-O-0980 the road from Km 0/8 of Vairavanpatti road to Nallavanpatti road via Vedathalampatti including culvert at Km 0/2, 0/6, 0/8 981 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km 2/0-5/0 of 3.00 32.00 13-O-0981 Alavayal - Maravamadurai road including culvert at Km 6/8

982 01-CRIDP-12- Pudukottai Thirumayam Improvement in Km 0/0-2/0 of 2.00 21.00 13-O-0982 Kulamangalam - Rarapuram road including culvert at Km 0/4

983 01-CRIDP-12- Pudukottai Thirumayam Improvements in Km 0/0-2/0 of 2.00 20.00 13-O-0983 the road from Km 20/2 of Namanasamudram - Ponnamaravathy road to Kulamangalam road 984 01-CRIDP-12- Pudukottai Viralimalai Improvements in Km 0/0-2/6 of 2.60 30.00 13-O-0984 the road from NH 210 to Mandaiyur road 985 01-CRIDP-12- Pudukottai Gandharva Improvements in Km 0/0-2/0 of 2.00 20.00 13-O-0985 kottai Cauverynagar - Muthukadu road

Strengthening Total 70.00 830.00 Pudukottai Total 70.00 830.00 986 01-CRIDP-12- Nagapattina Poompuhar Widening from SL to IL and 3.40 185.00 13-O-0986 m Improvements to Mannampandal - Vadakarai Road Km 0/0-3/4

Widening Total 3.40 185.00 987 01-CRIDP-12- Nagapattina Vedaranyam Improvements to Ayakkaranpulam 3.70 70.00 13-O-0987 m IIIrd sethi Road Km 0/0-3/7.

988 01-CRIDP-12- Nagapattina Vedaranyam Improvements to Aymoor- 1.70 40.00 13-O-0988 m Perumalai Road Km 0/0- 1/7. 989 01-CRIDP-12- Nagapattina Poompuhar Improvements to Karuppur Union 1.20 25.00 13-O-0989 m Road Km 0/0-1/2 990 01-CRIDP-12- Nagapattina Poompuhar Improvements to Peravur Union 1.20 25.00 13-O-0990 m Road Km 0/0-1/2 991 01-CRIDP-12- Nagapattina Sirkazhi Improvements to 3.00 60.00 13-O-0991 m Konayampattinam - Keelamoovarkarai Road Km 0/0- 3/0 Strengthening Total 10.80 220.00

ODR- 14of 35 SECTION OFFICER 120/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 992 01-CRIDP-12- Nagapattina Kilvelur Reconstruction of Culvert 3 Nos of 15.00 13-O-0992 m Sattiakudy-Thirukkuvalai - Esanur Road Culverts/Bridges Total 1 Nos 15.00 993 01-CRIDP-12- Nagapattina Mayiladu LA Amount Required for 75.00 13-O-0993 m thurai Formation of Approach road to the Mudikondanallur Bridge across Kollidam River to Km 15/2 of Vaitheeswarankoil - Lowerananicut Road SH-150 (Unclassified Road)

LA/DPR Total 1 Nos 75.00 994 01-CRIDP-12- Nagapattina Kilvelur Construction of Retaining wall at 12.00 13-O-0994 m Km 11/8 & 14/3 of Pappakoil - Karunganni Road Others Total 1 Nos 12.00 Nagapattinam Total 14.20 507.00 995 01-CRIDP-12- Tiruvarur Nannilam Improvements to 2.80 36.00 13-O-0995 Uthamathanapuram - Moovalvanchery road Km.4/4 -7/2

996 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to 1.00 18.00 13-O-0996 poondi Karpaganatharkulam – Thondiyakkadu Road Km.0/0- 1/0

997 01-CRIDP-12- Tiruvarur Mannargudi Improvements to 4.00 70.00 13-O-0997 Adanoormandabam - Vaduvoor Road Km 2/0 -4/0, 6/0-8/0

Strengthening Total 7.80 124.00 998 01-CRIDP-12- Tiruvarur Mannargudi Reconstruction of Culvert at 15.00 13-O-0998 Km.5/2 of Melavasal - Karikottai road Culverts/Bridges Total 1 Nos 15.00 Tiruvarur Total 7.80 139.00 Trichy Total 97.60 1780.00 999 01-CRIDP-12- Salem Edappadi Widening from SL-IL and 3.00 170.00 13-O-0999 Improvements to Km.0/0-3/0 of Koneripatty- Poolampatty road (via) Thampagoundanur- Karattupudur road including Junction improvements at Km.2/10 Widening Total 3.00 170.00

ODR- 15of 35 SECTION OFFICER 121/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1000 01-CRIDP-12- Salem Veerapandi Improvements to Km.1/2-5/6 of 4.40 90.00 13-O-1000 Nethimedu Thammanaickanpatty Kolingipatty road

1001 01-CRIDP-12- Salem Sankari Improvements to Km.0/0-4/8 of 4.80 58.00 13-O-1001 Thottipalayam - Manjupalayam road 1002 01-CRIDP-12- Salem Sankari Improvements to Km.3/2-4/6 & 1.60 19.00 13-O-1002 4/10 of Kalvadangam Village Road

1003 01-CRIDP-12- Salem Sankari Improvements to Km. 0/0-3/0 of 3.00 36.00 13-O-1003 Anchettipatti - Unjanoor Road

1004 01-CRIDP-12- Salem Sankari Improvements to Km. 1/8 - 3/6 of 1.80 22.00 13-O-1004 Km. 42/4 of Salem - Cochin road to Mothaiyanur road

1005 01-CRIDP-12- Salem Sankari Improvement to Km. 4/0-6/6 of 2.60 31.00 13-O-1005 Kachupalli - Allagappampalayam - Elampillai road

1006 01-CRIDP-12- Salem Sankari Improvements to Km. 0/0-1/8 of 1.80 22.00 13-O-1006 Vadugapatty - Karumapuram Road

1007 01-CRIDP-12- Salem Edappadi Improvements to Km. 3/6-4/6 of 1.00 12.00 13-O-1007 Ettikuttai Medu - Egapuram - Madathur Road 1008 01-CRIDP-12- Salem Edappadi Improvements to Km.9/0-14/0 of 5.00 60.00 13-O-1008 Moolapathai- Erupali (via) Chittoor road 1009 01-CRIDP-12- Salem Edappadi Improvements to Km. 4/6-6/0 of 1.40 17.00 13-O-1009 Malaiyanur Road 1010 01-CRIDP-12- Salem Edappadi Improvements to Km. 1/0-5/0 of 4.00 49.00 13-O-1010 Edappadi Dhathapuram road- Katchupalli pudupalayam Road

1011 01-CRIDP-12- Salem Mettur Improvements to 4.50 65.00 13-O-1011 Karuppureddiyur road Km.0/0-4/5

1012 01-CRIDP-12- Salem Mettur Improvements to 3.00 40.00 13-O-1012 Karumalaikoodal - Pudukadu odai road Km.0/0-3/0 1013 01-CRIDP-12- Salem Mettur Improvements to Raman Nagar- 1.53 20.00 13-O-1013 Koonandiyur road Km.10/0- 11/530

ODR- 16of 35 SECTION OFFICER 122/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1014 01-CRIDP-12- Salem Edappadi Improvements in Km.0/0-3/0 of 3.00 61.00 13-O-1014 Periyasooragai - Vanavasi road

1015 01-CRIDP-12- Salem Omalur Improvements in Km 0/0 -3/6 of 3.60 50.00 13-O-1015 Tholasamptty – Elavamarathur road. 1016 01-CRIDP-12- Salem Omalur Improvements in Km 0/0 -1/0 & 1.20 23.00 13-O-1016 Km 3/2 - 3/4 of Vattakadu road.

1017 01-CRIDP-12- Salem Omalur Improvements in Km 6/0 - 8/290 2.29 49.00 13-O-1017 of Pottipuram – Thumbipady- Mattukkaranpudur road.

1018 01-CRIDP-12- Salem Omalur Improvements in Km 3/0 -6/590 3.59 49.00 13-O-1018 of M. Chettypatty – Palikkadai road 1019 01-CRIDP-12- Salem Omalur Improvements in Km 3/0-6/0 of 3.00 48.00 13-O-1019 Semmandapatty - Periyapatty - Semmanur road 1020 01-CRIDP-12- Salem Omalur Improvements in Km 0/0 - 0/6 of 0.60 17.00 13-O-1020 Poosaripatty road. 1021 01-CRIDP-12- Salem Omalur Improvements in Km 5/0-6/0 & 1.20 18.00 13-O-1021 8/0-8/2 of Elavamarathur - Tharamangalam (via) Reddipatty and vedapatty road

1022 01-CRIDP-12- Salem Omalur Improvements in Km 0/0-2/2 of 2.20 33.00 13-O-1022 - Karatantypatty road

1023 01-CRIDP-12- Salem Attur Improvements to Keeripatty Road 2.30 35.00 13-O-1023 Km.0/0-2/3 1024 01-CRIDP-12- Salem Attur Improvements to Gandhipuram - 1.00 15.00 13-O-1024 Manjini Road Km.0/0-1/0

1025 01-CRIDP-12- Salem Gangavalli Improvements to Kattukottai - 2.00 32.00 13-O-1025 Manivilundan Road Km.0/0-2/0

1026 01-CRIDP-12- Salem Edappadi Improvements in Km.3/0-5/0 of 2.00 22.00 13-O-1026 Pakkanadu - Mettutheru - Anaipallam road Strengthening Total 68.41 993.00

ODR- 17of 35 SECTION OFFICER 123/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1027 01-CRIDP-12- Salem Yercaud Construction of minor Bridge at 35.00 13-O-1027 Km.6/4 of the road branching from Km.4/10 of Salem Veeranam road to join at Km.8/10 of the same road (via) Japthi Veeranam,Vedapatty and D.Perumapalayam road in lieu of existing hard bed

1028 01-CRIDP-12- Salem Mettur Reconstruction of weak bridge at 25.00 13-O-1028 Km.10/10 of Raman Nagar- Koonandiyur road Culverts/Bridges Total 2 Nos 60.00 1029 01-CRIDP-12- Salem Omalur Construction of storm water drain 44.00 13-O-1029 in Km.0/0-1/0 of Karuppur - Vellalapatty - Thathaingarpettai road Others Total 1 Nos 44.00 Salem Total 71.41 1267.00 1030 01-CRIDP-12- Namakkal Kumara Junction Improvements and 80.00 13-O-1030 palayam construction of storm water drain 1 No. of Sankari- Pallipalayam Road. 1031 01-CRIDP-12- Namakkal Kumara Improvements from Km 2/2-3/2 1.00 10.00 13-O-1031 palayam of Padaiveedu Road Strengthening Total 1.00 90.00 Namakkal Total 1.00 90.00 1032 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km 4/4-5/0,5/4- 2.40 27.00 13-O-1032 6/0, Improvements to center portion in Km 6/0 - 7/2 of Ekkandahalli - Theertharapatti road 1033 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km 7/0-8/8, 9/0- 3.43 40.00 13-O-1033 9/6, 9/8-10/6,11/0-11/225 of Matlampatti-Murukkampatti road

1034 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km 3/8-5/6 of 1.80 22.00 13-O-1034 Marandahalli - Mallapuram to Sastramutlu (Via) Chandrapuram road 1035 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km 0/0-0/6 0.60 30.00 13-O-1035 including junction improvement at Km 0/2 of Kadamadai - Begaharahalli road

ODR- 18of 35 SECTION OFFICER 124/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1036 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km 2/0-4/100 of 2.10 22.00 13-O-1036 Karagur - Seeriyampatti (Via) Kottur road

1037 01-CRIDP-12- Dharmapuri Palacodu Improvements to Km 3/0-4/0 of 1.00 11.00 13-O-1037 Karimangalam - Santhanur road

Strengthening Total 11.33 152.00 1038 01-CRIDP-12- Dharmapuri Pennagaram Construction of Protective wall at 60.00 13-O-1038 Km 7/4-7/8 & 8/350 - 9/0 of Biliyanur - Agaraharam road

1039 01-CRIDP-12- Dharmapuri Pennagaram Construction of Protective wall at 18.00 13-O-1039 Km 3/750 - 3/780 of Pennagaram - Dasampatti road

Others Total 2 Nos 78.00 Dharmapuri Total 11.33 230.00 1040 01-CRIDP-12- Krishnagiri Hosur Widening from Single lane to 9.30 195.00 13-O-1040 Intermediate lane in Km 0/7- 10/0 of VCC road to Bagalur -Berigai road (via) Muthali and Palavanapalli including Reconstruction of culvert (1No.) and widening of culverts (19 Nos)

Widening Total 9.30 195.00 1041 01-CRIDP-12- Krishnagiri Hosur Rebuilding the road from Km 5/2- 5.20 400.00 13-O-1041 7/0, 7/6-10/6 including CC Pavement from Km 11/2-11/6 of Athimugam - Perandapalli - Thorapalli - Kelamangalm road

1042 01-CRIDP-12- Krishnagiri Thalli Improvements to Denkanikottai - 1.00 20.00 13-O-1042 Jawalagiri - Karnataka State Border Road Km 16/8-17/8

1043 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Upparapatti - 2.80 27.00 13-O-1043 Govindapuram road Km 0/0- 2/8

1044 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Anandur - 5.20 48.00 13-O-1044 Agraharam road Km 0/0 - 5/2 including construction of culvert (2 Nos) 1045 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Kallavi - 1.20 11.00 13-O-1045 Anandur road Km 1/0-2/2

ODR- 19of 35 SECTION OFFICER 125/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1046 01-CRIDP-12- Krishnagiri Bargur Improvements to Mathur - 3.00 28.00 13-O-1046 Kullampatti road Km 0/0-3/0 1047 01-CRIDP-12- Krishnagiri Bargur Improvements to Koochur - 2.60 28.00 13-O-1047 Ampalli road Km 2/0-4/6

1048 01-CRIDP-12- Krishnagiri Bargur Improvements to Anandhur - 2.60 26.00 13-O-1048 Ranganoor road Km 0/0-2/6 1049 01-CRIDP-12- Krishnagiri Krishnagiri Improvements to Krishnagiri - 4.00 220.00 13-O-1049 Kandhikuppam road Km 10/4- 12/4, 21/0-23/0 including Reconstruction of Culvert (1No,)

Strengthening Total 27.60 808.00 Krishnagiri Total 36.90 1003.00 Salem Total 120.64 2590.00 1050 01-CRIDP-12- Dharapuram Madathu Reconstruction of Pipe Culvert at 3.00 13-O-1050 kulam Km 2/4 of Poolankinar - Dhali road Culverts/Bridges Total 1 Nos 3.00 1051 01-CRIDP-12- Dharapuram Madathu Preparing DPR for Reconstruction 3.00 13-O-1051 kulam of High Level Bridge in lieu of existing causeway at Km 0/6 of Km 17/8 of Anaimalai - Poolankinar road to Andiyur road (via) Paruthiyur

LA/DPR Total 1 Nos 3.00 Dharapuram Total 2 Nos 6.00 1052 01-CRIDP-12- Erode Erodewest Improvements to Km 1/0-2/6 of 1.60 16.00 13-O-1052 Erode-Sathy road to Periyavalasu road (via) Manickam palayam

1053 01-CRIDP-12- Erode Bhavani Improvements to Km 0/0-0/1 0.10 4.00 13-O-1053 Bhavani Travellers Bungalow approach road Strengthening Total 1.70 20.00 1054 01-CRIDP-12- Erode Moda Improvements to the dip in Km 60.00 13-O-1054 kkurichi 7/0-7/4 including construction of drain, construction of slab culvert at Km 7/4 and widening of pipe culvert at Km 7/2 of Avalpoondurai - Anandampalayam road

ODR- 20of 35 SECTION OFFICER 126/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1055 01-CRIDP-12- Erode Bhavani Reconstruction of damaged RCC 5.00 13-O-1055 Slab culvert at Km 0/4 of Old Bustand to Anthiyur and Pavadi street Culverts/Bridges Total 2 Nos 65.00 Erode Total 1.70 85.00 Tiruppur Total 1.70 91.00 1056 01-CRIDP-12- Coimbatore Kavundam Widening from SL to IL and 5.10 275.00 13-O-1056 palayam Improvements in Km 0/0- 5/1 of road from Km 171/4 of DB road to Keeranatham 1057 01-CRIDP-12- Coimbatore Thonda Widening from SL to IL and 5.20 280.00 13-O-1057 muthur Improvements in Km 0/0- 5/2 of Perur - Vedapatti road Widening Total 10.30 555.00 1058 01-CRIDP-12- Coimbatore Kavundam Improvements to Km 364/4 of 1.20 45.00 13-O-1058 palayam NGM Road to Samichettipalayam road in Km 0/2-0/5, 0/7-1/0, 1/2- 1/4, 2/0-2/4

1059 01-CRIDP-12- Coimbatore Avinashi Improvements in Km 1/0-3/0 of 2.00 35.00 13-O-1059 Ellapalayam-Kembanaickan palayam road Strengthening Total 3.20 80.00 Coimbatore Total 13.50 635.00 1060 01-CRIDP-12- Pollachi Kinathu Improvements to Km 3/2 - 7/8 & 4.60 50.00 13-O-1060 kadavu construction of retaining wall 1 No of the road from Km 140/8 of Dindigul - Banaglore road to Kanjikonampalayam (via) Vellalore

1061 01-CRIDP-12- Pollachi Udumalapet Improvements to Km.0/0-1/0 & 3.60 35.00 13-O-1061 2/4-5/0 o Lakshmapuram Mamarathupatty road. 1062 01-CRIDP-12- Pollachi Udumalapet Improvements to Km.0/0-1/8 of 1.80 17.00 13-O-1062 Kolarpatty Thippampatty Sellappampalayam road (Via) Nambiyamuthur. 1063 01-CRIDP-12- Pollachi Udumalapet Improvements to Km.1/4-2/2 off 0.80 8.00 13-O-1063 Km.114/4 Dindugal Bangalore road to Unjavelampatty Sellappampalayam (Via) Chandrapuram.

ODR- 21of 35 SECTION OFFICER 127/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1064 01-CRIDP-12- Pollachi Udumalapet Improvements to Km.0/0-1/4 of 1.40 14.00 13-O-1064 Rangasamuthiram Makkinampatti road to Balama Nallur.

1065 01-CRIDP-12- Pollachi Kinathu Improvements Km.0/0-4/6 of the 4.60 40.00 13-O-1065 kadavu road from Km.0/8 off Kinathukadavu Cochin Frontier road to Kallapuram. Strengthening Total 16.80 164.00 1066 01-CRIDP-12- Pollachi Sulur Construction of minor bridge at 45.00 13-O-1066 Km.3/8 of Kamanaickenpalayam Sulthanpet (Via) Vadambaseri Odakalpalayam road,

Culverts/Bridges Total 1 Nos 45.00 Pollachi Total 16.80 209.00 1067 01-CRIDP-12- Gobi Gobichetty Widening SL to DL and 0.20 30.00 13-O-1067 palayam Improvements to Km 0/0-0/2 of Approach road to Traveller's Bungalow at Gobi 1068 01-CRIDP-12- Gobi Gobichetty Widening and Improvements to 3.60 90.00 13-O-1068 palayam Km 3/0-6/6 of Pariyur- Vellapalayam-Kullampalayam- Gangampalayam Road. Widening Total 3.80 120.00 1069 01-CRIDP-12- Gobi Anthiyur Improvements to Km 4/6-5/0,6/0- 2.60 55.00 13-O-1069 7/0,7/4-8/0,9/0-9/6 including construction of One culvert in Perunthalaiyur to join @ Km 138/8 of Ooty – Kothagiri - Mettupalayam – Sathy – Gobi – Erode Road.

1070 01-CRIDP-12- Gobi Gobichetty Improvements to Km 0/0-1/8 of 1.80 18.00 13-O-1070 palayam Getticheyur- road to Mamarathupalayam Road.

Strengthening Total 4.40 73.00 Gobi Total 8.20 193.00 1071 01-CRIDP-12- Udhagai Coonoor Widening from SL to IL from Km 7.40 390.00 13-O-1071 5/0 - 10/4 and improvements from Km 3/0 - 5/0 of Ketti Palada Selas Road including Construction of Protective wall and CC Drain. Widening Total 7.40 390.00

ODR- 22of 35 SECTION OFFICER 128/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1072 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0-1/8 of 1.80 46.00 13-O-1072 Dhimpatty road including CC drain and Protective works Strengthening Total 1.80 46.00 1073 01-CRIDP-12- Udhagai Uthaga Providing Interlocking Pavement 25.00 13-O-1073 mandalam at shaded swamp portion in Km 0/8 - 0/10 of Fernhill Road

1074 01-CRIDP-12- Udhagai Uthaga Providing Protective works and CC 22.00 13-O-1074 mandalam drain in Km 0/8 and 1/2 of Ebbanadu Koranoor road 1075 01-CRIDP-12- Udhagai Uthaga Improvements to Junction at Km 15.00 13-O-1075 mandalam 0/8 of Palada Kallakorai road

1076 01-CRIDP-12- Udhagai Uthaga Providing surface drain and 15.00 13-O-1076 mandalam Protective Works at Km 0/4, 0/6 of Kilkundah road 1077 01-CRIDP-12- Udhagai Uthaga Construction of Retaining wall and 20.00 13-O-1077 mandalam CC drain at Km 1/4 of Belithala road 1078 01-CRIDP-12- Udhagai Uthaga Improvements to Junction at Km 47.00 13-O-1078 mandalam 0/8.,2/2,2/4 & 4/4 of M. Palada B. Manihatty (Via) Kallakoraihada Gandhinagar road

1079 01-CRIDP-12- Udhagai Uthaga Improvements to Hair pin bend 15.00 13-O-1079 mandalam and Narrow Curves at Km 1/2, 1/10 of Ithalar Nanjanadu Road

1080 01-CRIDP-12- Udhagai Coonoor Providing Interlocking Paver Block 55.00 13-O-1080 at Km 3/10,4/8,4/10 & 5/2 of Ketti Aruvangadu Hubathalai road.

1081 01-CRIDP-12- Udhagai Gudalur Providing Bus Lay bye at Km 8/10 10.00 13-O-1081 of Pandalur Ponnai Mukkatty Road. 1082 01-CRIDP-12- Udhagai Coonoor Providing interlocking paver block 10.00 13-O-1082 to Swamp portion at Km 0/6 of Corsely road 1083 01-CRIDP-12- Udhagai Coonoor Providing interlocking paver block 35.00 13-O-1083 to Swamp portion including Construction of retaining wall at Km 5/4 of Nihung - Pudiyangi road . Others Total 11 Nos 269.00 Udhagai Total 9.20 705.00 Coimbatore Total 47.70 1742.00

ODR- 23of 35 SECTION OFFICER 129/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1084 01-CRIDP-12- Madurai Maduraieast Widening of Single Lane to 0.80 50.00 13-O-1084 Intermediate lane and Strengthening of Thiruppalai road Km 0/0-0/8 including CD works 1 Nos 1085 01-CRIDP-12- Madurai Maduraieast Widening of Single Lane to 0.80 62.00 13-O-1085 Intermediate lane and Strengthening of Anaiyur road Km 0/0-0/8 including CD works 2 Nos

Widening Total 1.60 112.00 1086 01-CRIDP-12- Madurai Sholavandan Strengthening of Kottaimedu Road 1.60 30.00 13-O-1086 Branching from Km 15/2 of Madurai - Palamedu Road Km 0/0 - 1/6 1087 01-CRIDP-12- Madurai Sholavandan Strengthening in Km 0/0 - 1/2 of 1.20 20.00 13-O-1087 Karupatti Raliway Feeder Road

1088 01-CRIDP-12- Madurai Sholavandan Strengthening in Km 0/0-2/4 of 2.40 40.00 13-O-1088 Thiruvedagam - Nedungulam Road

1089 01-CRIDP-12- Madurai Usilampatti Strengthening to Jothilnaickanur 1.00 23.00 13-O-1089 road branching from Km 6/6 of Elumalai Road at Km 0/0-1/0 including construction of Drain at Km 0/8

1090 01-CRIDP-12- Madurai Usilampatti Strengthening to Allikundam - 1.00 20.00 13-O-1090 Rajakkapatti road Branching from Km 34/6 of Vathalakundu Peraiyur Kariapatti Road in Km 0/0-1/0

1091 01-CRIDP-12- Madurai Madurai Strengthening to Vandiyur- 2.27 160.00 13-O-1091 north Melamadai road Km 1/510-3/2 and providing Paver Block to Km 0/415-0/645 & 0/915-1/265 Strengthening Total 9.47 293.00 1092 01-CRIDP-12- Madurai Melur Reconstruction of Slab Culvert at 45.00 13-O-1092 Km1/4 of Trichy - Madurai Road to Kadampatti Road 1093 01-CRIDP-12- Madurai Melur Construction of Pipe culvert at 25.00 13-O-1093 Km 6/2 and construction of Protective wall at Km 4/2 & 4/8 of Karungalakudi-Kambur road

ODR- 24of 35 SECTION OFFICER 130/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1094 01-CRIDP-12- Madurai Melur Construction of Minor bridge at 70.00 13-O-1094 Km 5/6 of Narasingampatti- Pulipatti road Culverts/Bridges Total 3 Nos 140.00 Madurai Total 11.07 545.00 1095 01-CRIDP-12- Theni Bodi Widening from S.L to I.L in Km 0/0- 2.80 55.00 13-O-1095 nayakanur 2/8 of Rasingapuram - Mallingapuram road Including Reconstruction of culvert 1 No.

1096 01-CRIDP-12- Theni Andipatti Widening from SL to IL in 0.60 18.00 13-O-1096 Km.13/0-13/6 of G.Usilampatty road including construction of culvert 1 No. 1097 01-CRIDP-12- Theni Andipatti Widening from SL to IL in Km.0/0- 3.60 48.00 13-O-1097 3/6 of Kammankallu -Kombaitholu road. Including construction of Retaining wall 1098 01-CRIDP-12- Theni Andipatti Widening from SL to IL in Km 0/0- 8.84 185.00 13-O-1098 8/840 of Karunagamuthanpatty Villakku-Vannathiparai road including Reconstruction of culvert 6 Nos.

1099 01-CRIDP-12- Theni Periyakulam Widening from SL to IL in Km 2/2- 3.80 105.00 13-O-1099 6/0 of Km 46/4 of Dindigul- Kumuli road to Bomminaickan patty road. and Reconstruction of culvert 3 Nos. including construction of retaining wall

1100 01-CRIDP-12- Theni Cumbam Widening from SL to IL in Km 0/0- 6.40 192.00 13-O-1100 6/4 and Improvements to Kombai - Ramakkalmettu Road, Reconstruction of culvert 4 Nos. including Construction of Retaining wall.

1101 01-CRIDP-12- Theni Bodi Widening from S.L to I.L in Km 0/0 - 3.60 120.00 13-O-1101 nayakanur 3/6 of Sillamarathupatty - Melachokkanathapuram (via) Ammapatty road and construction of culvert 1 No. including Construction of Retaining wall

Widening Total 29.64 723.00

ODR- 25of 35 SECTION OFFICER 131/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1102 01-CRIDP-12- Theni Bodi Improvements to Kuchanur - 2.00 22.00 13-O-1102 nayakanur Ayyampatty road Km 0/0-2/0 Strengthening Total 2.00 22.00 1103 01-CRIDP-12- Theni Bodi Reconstruction of culvert @ Km 12.00 13-O-1103 nayakanur 1/2 of Sankarapuram-Kuchanur road 1104 01-CRIDP-12- Theni Andipatti Construction of Minor Bridge at 80.00 13-O-1104 Km.0/10 of Madurai -Theni road to T.Bomminaickan patti road including retaining wall. 1105 01-CRIDP-12- Theni Periyakulam Construction of minor bridge at 25.00 13-O-1105 Km.1/10 of Dindigul-Kumuli road to Nagampatty (via) Nallakaruppanpatty road 1106 01-CRIDP-12- Theni Cumbam Reconstruction of culvert at Km 20.00 13-O-1106 1/2 of Odaipatti -Thenpalani Road. 1107 01-CRIDP-12- Theni Bodi Reconstruction of culvert @ Km 103.00 13-O-1107 nayakanur 0/2(i), 0/2(ii), 0/4(i),(ii),0/6,0/8,0/10, 1/2(i),(ii),(iii), 1/4(i),(ii),(iii),1/6, 1/8, 1/10 and construction of Retaining wall at Km 0/4,1/4,1/6,1/8 of Theni - Bodi road to Rediapatty (via) Anaikaraipatty road

1108 01-CRIDP-12- Theni Bodi Construction of culvert @ Km 23.00 13-O-1108 nayakanur 0/10 and construction of Retaining wall at Km 0/4,0/10 of Melachokkanathapuram road .

1109 01-CRIDP-12- Theni Bodi Reconstruction of culvert @ Km 26.00 13-O-1109 nayakanur 0/6(i),(ii) , 0/8 and Construction of Retaining wall @ Km 0/2,0/8 of Km 28/8 of Palayam - Bodi road to Melachokkanathapuram road.

1110 01-CRIDP-12- Theni Bodi Reconstruction of culvert at Km 25.00 13-O-1110 nayakanur 0/2,0/6 of Sankarapuram - Kutchanur road to Duraisamypuram road. 1111 01-CRIDP-12- Theni Periyakulam Reconstruction of culvert at 10.00 13-O-1111 Km.2/6 of Dindigul-Kumuli road to Ammapuram (via) Alagapuri road

ODR- 26of 35 SECTION OFFICER 132/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1112 01-CRIDP-12- Theni Periyakulam Construction of High level bridge 410.00 13-O-1112 at Km 5/6 of Jeyamangalam - Andipatty road

1113 01-CRIDP-12- Theni Periyakulam Reconstruction of Minor Bridge at 30.00 13-O-1113 Km 2/4 of Periyakulam - Sothuparai road.

Culverts/Bridges Total 11 Nos 764.00 1114 01-CRIDP-12- Theni Bodi Construcion of Retaining wall @ 30.00 13-O-1114 nayakanur Km 1/4,1/6 of Thirumalapuram - Meenatchipuram road.

Others Total 1 Nos 30.00 Theni Total 31.64 1539.00 1115 01-CRIDP-12- Dindigul Vedachandur Widening Single lane to Double 0.60 44.00 13-O-1115 Lane and Strengthening in Km. 0/0 - 0/6 of Vadamadurai - Siluvathur road to meet Vattanam road

1116 01-CRIDP-12- Dindigul Natham Widening Single Lane to 3.00 253.00 13-O-1116 Intermediate Lane and Strengthening in Km. 0/0 - 3/0 including Reconstruction of culverts(10Nos) of Mulaiyur Road

1117 01-CRIDP-12- Dindigul Natham Widening Single Lane to 4.00 250.00 13-O-1117 Intermediate Lane and strengthening in Km 0/0-4/0 including reconstruction of culverts(3 Nos) of Mulaiyur - Alanganallur road d 1118 01-CRIDP-12- Dindigul Natham Widening Single Lane to 4.51 299.00 13-O-1118 Intermediate Lane and Strengthening in Km.0/0-4/510 and Providing paving blocks at Km 2/8 for berms including construction of culverts (3 Nos) of Parali - Reddiapatti road

ODR- 27of 35 SECTION OFFICER 133/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1119 01-CRIDP-12- Dindigul Natham Widening Single Lane to 1.80 131.00 13-O-1119 Intermediate Lane and Strengthening in Km 6/0-7/8 of Aravangkuruchi - Kottaiyur road including construction of culvert(4 Nos) and Providing CC Pavement in Km 6/10(150m)

1120 01-CRIDP-12- Dindigul Natham Widening Single Lane to 3.00 200.00 13-O-1120 Intermediate Lane and Strengthening in Km 0/0-3/0 including Reconstruction of culverts (2 Nos) & Construction of Drains in Lingavadi - Pondugampatti road

Widening Total 16.91 1177.00 1121 01-CRIDP-12- Dindigul Natham Improvements by Providing 0.30 33.50 13-O-1121 Cement Concrete Pavement in Km 1/900- 2/200 of Natham - Sendurai Road to Sirugudi road

1122 01-CRIDP-12- Dindigul Oddan Improvements in Km 0/0-3/0 & 4.38 49.00 13-O-1122 chathiram 6/0-7/375 of Manjanaickanpatti - Kallimandayam road to Ambilikai (via) Kappalpatti

1123 01-CRIDP-12- Dindigul Oddan Improvements in Km 1/0-3/4 of 2.40 27.50 13-O-1123 chathiram Edayakottai - Valayapatti road

1124 01-CRIDP-12- Dindigul Nilakottai Improvements in Km 2/4 - 4/4 2.20 22.00 13-O-1124 and Providing CC Pavement in Km 1/8(200m) of Dindigul - Vathalagundu road to Thoppupatty road Strengthening Total 9.28 132.00 1125 01-CRIDP-12- Dindigul Natham Reconstruction of culverts at 30.00 13-O-1125 Km.0/2(i),(ii) & 1/8 including Providing Paving block in Km 0/2 of Sendurai - Periyurpatti road

1126 01-CRIDP-12- Dindigul Oddan Construction of culvert at Km 0/8 15.00 13-O-1126 chathiram of Vayalur - Kadathur road Culverts/Bridges Total 2 Nos 45.00

ODR- 28of 35 SECTION OFFICER 134/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1127 01-CRIDP-12- Dindigul Natham Re construction of Drain at Km 80.00 13-O-1127 0/160-1/0 and Providing Paving blocks on berms in Km 0/0-0/2 of Vembarpatti village road

1128 01-CRIDP-12- Dindigul Natham Construction of culvert at Km 0/2 49.00 13-O-1128 and Construction of Drain in Km 0/0-0/250 including Providing Paving blocks on berms in Km 0/0- 0/2 of Gopalpatti - Silvarpatti road

Others Total 2 Nos 129.00 Dindigul Total 26.19 1483.00 1129 01-CRIDP-12- Sivagangai Tirupattur Strengthening to S.V.Mangalam - 4.00 165.00 13-O-1129 Melapatti Road Km 8/0 - 12/0 including Construction of culverts (3Nos) and Breast wall

1130 01-CRIDP-12- Sivagangai Tirupattur Improvements to Sevoor - 4.60 55.00 13-O-1130 Kandavarayanpatti Road Km 0/0 - 4/6 including Reconstruction of culverts(5Nos)

1131 01-CRIDP-12- Sivagangai Tirupattur Improvements to Viramathi - 3.00 52.00 13-O-1131 Sevoor road Km 8/0 - 11/0 including Reconstruction of culverts (6Nos) 1132 01-CRIDP-12- Sivagangai Tirupattur Improvments to Usilampatti - 1.40 40.00 13-O-1132 Mithilaipatti Road Km 2/8,2/10, 4/4, 9/0 - 10/0 including Reconstruction of RCC slab culvert (1No) 1133 01-CRIDP-12- Sivagangai Karaikudi Providing paver Block in 0.22 30.00 13-O-1133 kilaoorani allround road Km.0/0- 0/221 1134 01-CRIDP-12- Sivagangai Karaikudi Improvements toSakkottai 1.59 15.00 13-O-1134 Mithravayal road to pethanendal (via) Ambakudi road Km.2/0- 3/585 1135 01-CRIDP-12- Sivagangai Sivaganga Improvements to Sivaganga - 1.00 10.00 13-O-1135 Panangadi road (Via) Allur road Km. 2/0-3/0 1136 01-CRIDP-12- Sivagangai Sivaganga Improvements to Sivaganga - 1.40 15.00 13-O-1136 Railway station road to Soorakulam road Km. 2/0-3/2,3/7- 3/9

ODR- 29of 35 SECTION OFFICER 135/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1137 01-CRIDP-12- Sivagangai Sivaganga Improvements to Madurai - 1.60 20.00 13-O-1137 Thondi road to Kovanoor - Pillur - Alupillaithangi road Km. 0/0- 0/6,1/0-2/0 1138 01-CRIDP-12- Sivagangai Tirupattur Provide Paver Block @ Km 1/2 - 0.60 70.00 13-O-1138 1/8 Keelasivalpatti Village road including Reconstruction of culvert (1No) 1139 01-CRIDP-12- Sivagangai Mana Providing paver block @ 0.20 17.00 13-O-1139 madurai piramanoor road Km.0/10,1/10

1140 01-CRIDP-12- Sivagangai Mana Providing paver block @ 0.30 17.00 13-O-1140 madurai Sundaranadappu - pacheri vilakku road Km.10/6, 10/10, 12/2

Strengthening Total 19.91 506.00 Sivagangai Total 19.91 506.00 1141 01-CRIDP-12- Ramnad Mudhu Widening and Improvements from 3.40 281.00 13-O-1141 kulathur SL to IL Km.0/0-3/4of Neeravi - Keelamudimannarkottai Road

1142 01-CRIDP-12- Ramnad Mudhu Widening and Improvements from 3.00 226.00 13-O-1142 kulathur SL to IL Km.0/0-3/0 of Keelamudimannarkottai Road 1143 01-CRIDP-12- Ramnad Ramanatha Widening from SL to IL in Km,9/0- 3.20 98.00 13-O-1143 puram 9/6 and Improvements at Km.0/0- 2/0 and 9/0-10/2 of Valudur - Periyapattinam Road

Widening Total 9.60 605.00 1144 01-CRIDP-12- Ramnad Paramakudi Improvement to NH 49 to 2.80 55.00 13-O-1144 Keelambal (Via) Keelakottai Road Km.0/0-2/800 1145 01-CRIDP-12- Ramnad Ramanatha Improvement to Uchipuli- 4.00 70.00 13-O-1145 puram Pudumadam road Km.0/0-4/0 Strengthening Total 6.80 125.00 Ramnad Total 16.40 730.00 Madurai Total 105.21 4803.00 1146 01-CRIDP-12- Tirunelveli Palayam Widening and Improvements to 0.45 30.00 13-O-1146 kottai Maharajanagar West Side Housing Board Colony Road Km 0/0 - 0/450 Widening Total 0.45 30.00 1147 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Laxmiyur - 1.40 25.00 13-O-1147 Mariyathaipuram Road Km 0/0 - 1/4 including CC Pavements

ODR- 30of 35 SECTION OFFICER 136/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1148 01-CRIDP-12- Tirunelveli Tirunelveli Strengthening to Vadakku 2.00 18.00 13-O-1148 Chezhianallur - Mettu prancheri Road Km 7/2 - 9/2. 1149 01-CRIDP-12- Tirunelveli Amba Strengthening to Melathidiyur - 1.55 62.00 13-O-1149 samudram Suthamalli Road Km 3/0 - 4/550 and Construction of culvert Two Nos and drain. 1150 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Kasitharmam 1.80 20.00 13-O-1150 Road Km 0/0 - 1/8.

1151 01-CRIDP-12- Tirunelveli Amba Strengthening to Kandapatti Road 1.00 15.00 13-O-1151 samudram Km 0/0 - 1/0. 1152 01-CRIDP-12- Tirunelveli Amba Strengthening to Ambasamudram - 1.60 18.00 13-O-1152 samudram Karumpuliyuthu Road Km 6/4 - 8/0.

1153 01-CRIDP-12- Tirunelveli Alangulam Strengthening to 3.40 23.00 13-O-1153 Packialakshmipuram - Naalaankattalai Road Km 0/0 -3/4

1154 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Mylappapuram - 2.85 33.00 13-O-1154 Vaikkalipatti Road Km 0/0 - 2/850

1155 01-CRIDP-12- Tirunelveli Palayam Strengtheing to Palayamkottai - 1.67 45.00 13-O-1155 kottai Kakkan Nagar - Harijan Colony Road Km 0/0 - 1/668 1156 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Maranthai - 2.40 25.00 13-O-1156 Nalan kurichi Road Km 0/0 - 2/4

1157 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Oothumalai - 4.80 40.00 13-O-1157 Venkateshapuram Road Km 0/0 - 0/8, 2/0 - 5/0 & 7/0 - 8/0 1158 01-CRIDP-12- Tirunelveli Nanguneri Improvements to Eruvadi - Mavadi 1.00 40.00 13-O-1158 Road Km 5/8 - 6/8 including pipe culvert at Km 3/8

1159 01-CRIDP-12- Tirunelveli Radhapuram Strengthening to Levanchipuram - 2.00 30.00 13-O-1159 Rajakrishnapuram Road Km 0/0 - 2/0

1160 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Thenkalam - 1.00 25.00 13-O-1160 Therkku Cheliyanallur Km 7/4 - 8/4 including CC pavement 1161 01-CRIDP-12- Tirunelveli Alangulam Strengthening to Mukkudal - 1.80 30.00 13-O-1161 Singamparai Road Km 0/0 - 1/8 including CC Pavement

ODR- 31of 35 SECTION OFFICER 137/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1162 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to Ilayarkulam - 6.19 60.00 13-O-1162 Subramaniyapuram Road Km 3/0 - 4/6 and 5/4 - 9/985 1163 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to Parappadi - 2.00 30.00 13-O-1163 Pappankulam Road in Km 4/8 - 6/8 1164 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to Karandhaneri - 2.19 20.00 13-O-1164 Subramaniapuram Road Km 11/0 - 13/185

1165 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to 2.80 30.00 13-O-1165 Vijayanarayanam - Ittamozhi Road in Km 0/0 - 2/8 1166 01-CRIDP-12- Tirunelveli Nanguneri Strengthening to Kothaiseri Road 1.40 14.00 13-O-1166 in Km 0/0 - 1/4 1167 01-CRIDP-12- Tirunelveli Alangulam Strengthening in Km.2/0 - 5/0 of 3.25 55.00 13-O-1167 V.K.pudur - Shunmuganallur road to Achankundram (via) Karuvantha. Including CC pavement in Km.1/4 - 1/650, 3/6 - 3/9, 4/6 - 4/8.

Strengthening Total 48.09 658.00 1168 01-CRIDP-12- Tirunelveli Nanguneri Construction of Retaining wall in 30.00 13-O-1168 Km.1/280 - 1/715, 1/755 - 1/970, 1/985 - 2/585, 2/800 - 3/250, 3/428 - 3/451 of Moondradaippu - Pudukurichi road.

Others Total 1 Nos 30.00 Tirunelveli Total 48.54 718.00 1169 01-CRIDP-12- Tenkasi Kadaianallur Widening SL to DL in Km 6/4-7/6 3.20 200.00 13-O-1169 and Improvements in Km 4/4 - 7/6 of Kadayanallur - Kasitharmam - Achampudur road including 2 Nos.CD work. 1170 01-CRIDP-12- Tenkasi Tenkasi Widening SL to IL by providing 0.50 50.00 13-O-1170 cement concrete pavement in Km 0/0-0/5 of Palace road including construction of drain.

1171 01-CRIDP-12- Tenkasi Alangulam Widening SL to IL and 2.00 100.00 13-O-1171 Improvements in Km 0/0-2/0 of road branching at Km 41/6 of Tirunelveli-Shencottai-Kollam road to Keezhapavoor road.

ODR- 32of 35 SECTION OFFICER 138/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1172 01-CRIDP-12- Tenkasi Vasudeva Widening SL to IL in Km 17/0 - 1.12 60.00 13-O-1172 nallur 17/650 & 18/0 - 18/121 and Improvements in Km 17/0 - 18/121 of Sankarankoil- Vasudevanallur Road Widening Total 6.82 410.00 1173 01-CRIDP-12- Tenkasi Alangulam Improvements in Km 0/0-4/0 of 4.00 50.00 13-O-1173 Poolangulam-Andipatti road

1174 01-CRIDP-12- Tenkasi Sankarankoil Improvements in Km 1/8-5/0 of 3.20 40.00 13-O-1174 road branching from Rajapalayam- Sankarankovil-Thirunelveli road to Ko.Maruthappapuram road.

1175 01-CRIDP-12- Tenkasi Tenkasi Improvements in Km 0/0-2/8 of 2.80 30.00 13-O-1175 Karuppasamykoil road 1176 01-CRIDP-12- Tenkasi Kadaianallur Improvements in Km 0/0-0/8 of 0.80 15.00 13-O-1176 Chockampatti-Karuppanathi road

1177 01-CRIDP-12- Tenkasi Kadaianallur Improvements in Km 16/2-19/2 3.00 30.00 13-O-1177 of Surandai-Sendamaram road (via) Anaikulam 1178 01-CRIDP-12- Tenkasi Tenkasi Improvements in Km 4/0-6/0 2.00 25.00 13-O-1178 Pavoorchatram- Sundarapandiapuram road 1179 01-CRIDP-12- Tenkasi Tenkasi Improvements in Km 0/0-3/0 of 3.00 40.00 13-O-1179 Ilanji-Vallam Pallivasal road 1180 01-CRIDP-12- Tenkasi Tenkasi Improvements in Km 0/0-3/0 of 3.00 45.00 13-O-1180 Ramachandrapattinam- Pullukkattuvalasai road. 1181 01-CRIDP-12- Tenkasi Tenkasi Improvements in Km 0/0-1/4 of 1.40 23.00 13-O-1181 Poigai-Sendamaram road to Chinnathambinadanoor road Strengthening Total 23.20 298.00 1182 01-CRIDP-12- Tenkasi Kadaianallur Reconstruction of Weak & 75.00 13-O-1182 Narrow Minor Bridge at Km 0/4 of road branching from Km 6/0 of Shencottai - Sambavarvadakarai road to Achampudur road including Shifting of PWD sluice

Culverts/Bridges Total 1 Nos 75.00 Tenkasi Total 30.02 783.00 1183 01-CRIDP-12- Virudhunagar Aruppukottai Improvements to Trichy - 0.80 14.00 13-O-1183 Tuticorin road to Veluthapuram road Km.0/0-0/8

ODR- 33of 35 SECTION OFFICER 139/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1184 01-CRIDP-12- Virudhunagar Aruppukottai Improvements to Srivilliputhur- 1.40 28.00 13-O-1184 Parthibanoor road to Kanjanaickenpatti road Km.0/0- 1/4 1185 01-CRIDP-12- Virudhunagar Sattur Improvements to Elayirampannai - 1.20 17.00 13-O-1185 E.L.Reddiyapatti Road Km 0/0 - 1/2

1186 01-CRIDP-12- Virudhunagar Sattur Improvements to E.L.Reddiyapatti 2.60 35.00 13-O-1186 Dist. Limit road Km 0/0 - 2/6

1187 01-CRIDP-12- Virudhunagar Sattur Improvements to Eravarpatti - 1.00 17.00 13-O-1187 Rengappanaickenpatti Road in Km 0/0-1/0 1188 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to 1.43 30.00 13-O-1188 Ramalingapuram -Nathikudi road Km 1/4-2/825. 1189 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to North Car Street 0.41 25.00 13-O-1189 Km 0/0-0/410 Strengthening Total 8.84 166.00 1190 01-CRIDP-12- Virudhunagar Sattur Reconstruction of minor bidge at 60.00 13-O-1190 Km 4/2 of Sattur - Thayilpatti road - Gopalapuram road

Culverts/Bridges Total 1 Nos 60.00 Virudhunagar Total 8.84 226.00 1191 01-CRIDP-12- Tuticorin Thiruchendur Widening from SL to IL in Km 0/0- 0.80 90.00 13-O-1191 0/8 of Road from Tiruchendur- Kulasai-Udangudi road Km 17/6 to Udangudi-Meignanapuram road by Providing CC Pavement

1192 01-CRIDP-12- Tuticorin Thiruchendur Widening from SL to IL in Km 11/0 - 0.87 90.00 13-O-1192 11/870 of Kulasai – Udangudy Road (Via) Thandavankadu Road by Providing CC Pavement

Widening Total 1.67 180.00 1193 01-CRIDP-12- Tuticorin Srivaikundam Construction Of Minor Bridge @ 60.00 13-O-1193 Km: 0/4 of Thirupanichettikulam Road Culverts/Bridges Total 1 Nos 60.00 Tuticorin Total 1.67 240.00 1194 01-CRIDP-12- Nagercoil Killiyoor Improvements to Vattakottai - 5.70 86.00 13-O-1194 Amsi road Km 0/0 - 4/0 & 6/0 - 7/7.

ODR- 34of 35 SECTION OFFICER 140/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1195 01-CRIDP-12- Nagercoil Colachal Improvements to Vellamadi - 1.20 20.00 13-O-1195 Esanthangu road Km 0/0 - 1/2. 1196 01-CRIDP-12- Nagercoil Kanniya Improvements to 5.40 90.00 13-O-1196 kumari Kulasekaramputhoor - Marungoor road Km 0/0 - 5/4. 1197 01-CRIDP-12- Nagercoil Padmanabha Improvements to Karimani estate 4.00 65.00 13-O-1197 puram road Km 0/0 - 4/0. Strengthening Total 16.30 261.00 Nagercoil Total 16.30 261.00 Thirunelveli Total 105.36 2228.00 Grand Total 763.31 22402.00

ODR- 35of 35 SECTION OFFICER 141/ 185

Annexure to G.O. Ms No. 161/ Highways and Minor Ports (HN2) Department / Dated 01. 10. 2012 CRIDP 2012-13 LIST OF WORKS - OTHER DISTRICT ROADS - SCP Rs. in Lakhs Cost ID Job Code Division Constituency Name of work (Eng) Length required 1198 01-CRIDP-12- Chengalpattu Sriperumbudur Widening from SL to DL and 3.80 230.00 13-P-1198 Strengthening of Mangadu - Pattu - Mugalivakkam Road Km.0/0 - 3/8 including resurfacing of existing Road 1199 01-CRIDP-12- Chengalpattu Thiruporur Widening from SL to IL and 4.00 180.00 13-P-1199 Strengthening of Echur - Thiruporur Road Km.0/0 - 4/0 1200 01-CRIDP-12- Chengalpattu Thiruporur Widening from SL to IL and 2.00 80.00 13-P-1200 Strengthening of Thaiyur Road km.0/0-2/0 1201 01-CRIDP-12- Chengalpattu Thiruporur Widening from SL to IL and 5.40 250.00 13-P-1201 Strengthening of branching from km.1/8 of Kayar road to Thaiyur (via) Koma Nagar km.0/0-5/4

1202 01-CRIDP-12- Chengalpattu Chengalpattu Widening from SL to IL and 3.10 175.00 13-P-1202 Strengthening of Adhanoor H/C road to Madambakkam (via) TTC Staff Quarters Km.0/0-3/1 Widening Total 18.30 915.00 1203 01-CRIDP-12- Chengalpattu Kanchipuram Strengthening of Ponnerikarai 2.40 60.00 13-P-1203 Parandur Road and Siruvakkam Km.0/0-2/4 1204 01-CRIDP-12- Chengalpattu Kanchipuram Strengthening of MCB road to 4.60 152.00 13-P-1204 Neervallur Kallipattu road km.1/0- 5/6 Strengthening Total 7.00 212.00 1205 01-CRIDP-12- Chengalpattu Thiruporur Construction of bridge @ km.0/2, 100.00 13-P-1205 0/10 & 1/2 of Thaiyur road

Culverts/Bridges Total 1 Nos 100.00 Chengalpattu Total 25.30 1227.00 1206 01-CRIDP-12- Thiruvallur Ponneri Widening From single lane to 3.00 125.00 13-P-1206 intermediate lane to GNT Road to Chinnambedu (via) Chinnambedu Colony Km 0/0 - 3/0

ODR SCP- 1of 45 SECTION OFFICER 142/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1207 01-CRIDP-12- Thiruvallur Ponneri Wpdening From single lane to 1.80 75.00 13-P-1207 intermediate lane to PP Road to Pettai (via) Agaram Road Km 0/0 - 1/8 Widening Total 4.80 200.00 1208 01-CRIDP-12- Thiruvallur Ponneri Improvements to Km 1/4 of MKT 1.00 30.00 13-P-1208 Road to Devathanam (via) Kalpakkam Road Km 2/8 - 3/8 1209 01-CRIDP-12- Thiruvallur Madhavaram Improvements to Orakkadu - 3.40 200.00 13-P-1209 Arumandhai Road to Budhur - Redhills Road (via) Kummanur Km 0/0 - 3/4 1210 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Melpakkam - 2.70 123.00 13-P-1210 Kannampalayam Road km.4/5-7/2

1211 01-CRIDP-12- Thiruvallur Gummidi Rebuilding to Km : 0/2-4/0 of 3.80 150.00 13-P-1211 poondi K.S.Road to Thervoy road 1212 01-CRIDP-12- Thiruvallur Maduravoyal Improvements to Noombal Road 3.60 160.00 13-P-1212 Km :0/0-3/6 1213 01-CRIDP-12- Thiruvallur Ponneri Rebuilding the Chinnakavanam - 7.40 250.00 13-P-1213 Perumbedu Road Km 0/0 - 7/4 1214 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Chettipedu - 4.00 190.00 13-P-1214 Kuthambakkam road Km. 0/0- 4/0 1215 01-CRIDP-12- Thiruvallur Poonamallee Improvements to Km :0/0-1/6 of 1.60 75.00 13-P-1215 Nemem Road Strengthening Total 27.50 1178.00 Thiruvallur Total 32.30 1378.00 1216 01-CRIDP-12- Vaniyambadi Vaniyambadi Widening and Improvements from 0.45 30.00 13-P-1216 Single Lane to Double Lane of Km 0/0 - 0/450 of Jaffrabad - Velathigamanibenda Road

1217 01-CRIDP-12- Vaniyambadi Vaniyambadi Widening and Improvements from 1.66 65.00 13-P-1217 Single Lane to Intermediate Lane of Km 77/0 of Polur - Jamunamarathur - Alangayam - Vaniyambadi Road to Vallipattu Road Km 0/0 - 1/660

ODR SCP- 2of 45 SECTION OFFICER 143/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1218 01-CRIDP-12- Vaniyambadi Vaniyambadi Widening and Improvements from 5.20 214.00 13-P-1218 Single Lane to Intermediate Lane and Improvements to Vellakuttai Road km 0/0 -5/2

Widening Total 7.31 309.00 1219 01-CRIDP-12- Vaniyambadi Gudiyatham Improvements to Perumbadi - 3.60 45.00 13-P-1219 Sempalli - Jittapalli Road KM 6/0 -9/6 1220 01-CRIDP-12- Vaniyambadi Jolarpet Providing cement concrete 0.30 36.00 13-P-1220 pavement Jolarpet - Natrampalli Road km 9/3 -9/6 1221 01-CRIDP-12- Vaniyambadi Anaicut Improvements to Krishnagiri - 1.60 18.00 13-P-1221 Ranipet road branching at km 100/2 Kalanipakkam (via) Thanjanaickenpatti road km 0/0 - 1/4 and join Thanjanaickenpatti road km 0/0 -0/2 1222 01-CRIDP-12- Vaniyambadi Anaicut Improvements to Madanur - Ulli 2.40 50.00 13-P-1222 Road Km. 0/0 - 2/4 1223 01-CRIDP-12- Vaniyambadi Ambur Improvements to Arangaldurgam 5.00 55.00 13-P-1223 Road. Km 0/0 - 3/0 & 12/0 - 14/0

1224 01-CRIDP-12- Vaniyambadi Anaicut Improvements to Anaicut - 4.00 44.00 13-P-1224 Forest Road Km 9/6 - 13/6 1225 01-CRIDP-12- Vaniyambadi Anaicut Improvements to Thangal - 5.00 55.00 13-P-1225 Varadhalampattu Road. Km 0/0 - 5/0 1226 01-CRIDP-12- Vaniyambadi Jolarpet Improvements to Athanavoor (H) 3.80 60.00 13-P-1226 TB to Nilavoor raod km 0/0 - 0/7, 1/0 -1/9, 2/0 -3/6 & 4/0 - 4/6

1227 01-CRIDP-12- Vaniyambadi Jolarpet Improvements to Athanavoor - 2.00 20.00 13-P-1227 Nilavoor road to Mangalam via Thayaloor road km 2/0 -4/0 Strengthening Total 27.70 383.00 Vaniyambadi Total 35.01 692.00 1228 01-CRIDP-12- Tiruvannamalai Arani Providing Cement Concrete in 25.00 13-P-1228 Kaduganoor - Korugathur road (via) Melnagarambedu km 2/8 - 3/2 (Builtup area)

ODR SCP- 3of 45 SECTION OFFICER 144/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1229 01-CRIDP-12- Tiruvannamalai Cheyyar Providing Cement Concrete in 70.00 13-P-1229 Brammadesam road Km 9/440 - 9/800 1230 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Sanipoondi- 3.00 47.00 13-P-1230 Kilpenathur-Avalurpet-Chetpet road to Keekalore road (via) Savarapoondi Km0/0-2/0 & 2/8-3/8

1231 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Cuddalore 1.80 25.00 13-P-1231 Chittoor road to Mallavadi HC road to Mallavadi Km 1/4 - 3/2 1232 01-CRIDP-12- Tiruvannamalai Chengam Improvements to Kilsirupakkam - 2.20 85.00 13-P-1232 Krishnapuram Road (Via) Tharadapattu Km.9/8-11/10 Including Retaining Wall and Centre Portion Km.11/10 Only. 1233 01-CRIDP-12- Tiruvannamalai Chengam Improvements to Thandarampattu - 2.40 45.00 13-P-1233 Kottakulam Road to Tharadapattu Km.0/0-2/4

1234 01-CRIDP-12- Tiruvannamalai Chengam Improvements to Thandarampattu - 2.20 40.00 13-P-1234 Kottakulam Road to Melkarippur Km.1/4 - 3/6

1235 01-CRIDP-12- Tiruvannamalai Arani Improvements to Kannamangalam 2.60 30.00 13-P-1235 Arni road to Arni Padavedu road (via) Kunnathur Km 0/0 - 2/6

1236 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Vembakkam - 1.00 18.00 13-P-1236 Bokkasamuthiram road 9/0 - 10/0

1237 01-CRIDP-12- Tiruvannamalai Tiruvannamalai Improvements to Tiruvannamalai 3.60 64.00 13-P-1237 Thiyagadurgam road to Periyakallapadi road Km 0/0 - 3/6 including Culvert at Km 2/8 & Drainage 1238 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Villupuram - 2.40 98.00 13-P-1238 Tiruvannamalai road to Isukazikatteri (via) Kilkaripur Km 0/0-2/4 including Culvert at Km 1/4

ODR SCP- 4of 45 SECTION OFFICER 145/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1239 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Tiruvannamalai- 1.80 35.00 13-P-1239 Thiyagadurgam road to Pannaiyur road Km 0/0-1/8 including Reconstruction of culvert 1 no,

1240 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Pondy-Krishnakiri 6.40 98.00 13-P-1240 road to Karikilampadi road (via) Vedanatham Km 0/0-6/4 including Reconstruction of Culvert 1 No with Drainage

1241 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Avoor-Aungunam 3.40 64.00 13-P-1241 road km4/6-8/0 including Reconstruction of Culvert 1 No, with Drainage 1242 01-CRIDP-12- Tiruvannamalai Kilpennathur Improvements to Veriyur-Thandarai 1.60 25.00 13-P-1242 road to Isukazikattri roadkm0/0-1/6

1243 01-CRIDP-12- Tiruvannamalai Chengam Improvements to Pakkiripalayam 5.10 95.00 13-P-1243 Elangunni road (via) Neepathurai Km 20/0 - 21/6 & 22/6 - 26/1

1244 01-CRIDP-12- Tiruvannamalai Kalasapakkam Improvements to Pondy Krishnagiri 4.40 70.00 13-P-1244 road to Thorapadi road (via) Eraiyur Km 0/0 - 4/4 1245 01-CRIDP-12- Tiruvannamalai Polur Improvements to Koralpakkam to 3.00 54.00 13-P-1245 join Km 4/4 of polur, Pilasur – Padagam Mansurabad road (via) Sanikavadi ADC. Km 2/0 - 5/0 including Widening Culverts 6 Nos and Reconstruction of Culverts 4 Nos.

1246 01-CRIDP-12- Tiruvannamalai Polur Improvements to Km 144/10 of 3.20 55.00 13-P-1246 Cuddalore - Chittoor Road Branching to Murugapadi - Oghur Road Km 0/0 - 3/2 including Reconstruction of Culverts 6 Nos,

1247 01-CRIDP-12- Tiruvannamalai Arani Improvements to Cuddalore - 4.20 40.00 13-P-1247 Chittor Road to Iyyampalayam - Kunnathur Road (Via) Palaya Ekambaranallur Km 0/0 - 4/2

ODR SCP- 5of 45 SECTION OFFICER 146/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1248 01-CRIDP-12- Tiruvannamalai Cheyyar Improvements to Perungalathur - 3.00 45.00 13-P-1248 Papanthangal road km 0/0 - 3/0

Strengthening Total 57.30 1128.00 Tiruvannamalai Total 57.30 1128.00 Chennai Total 149.91 4425.00 1249 01-CRIDP-12- Villupuram Vikravandi Widening from SL to IL and Impts. 4.10 200.00 13-P-1249 To Mundiyampakkam-Orathur road Km.0/0-4/1 1250 01-CRIDP-12- Villupuram Vanur Widening from SL to IL and 2.50 130.00 13-P-1250 improvements of Road from Km 15/4 of C.C road (Melpattampakkam) to Sornavur road Km.2/4-4/9 1251 01-CRIDP-12- Villupuram Villupuram Widening from SL to IL and 2.70 175.00 13-P-1251 Improvements to Villupuram- Pondy road to Ka.kuppam (via) Poyyapakkam road Km.2/4-5/1 (including 500m C.C) 1252 01-CRIDP-12- Villupuram Vanur Widening from SL to IL to Sornavur- 2.30 70.00 13-P-1252 Rampakkam road Km.0/0-2/3

1253 01-CRIDP-12- Villupuram Villupuram Widening from SL to IL & Impt. to 7.40 192.00 13-P-1253 Km.0/0-3/4 & Impts.Km.3/4-7/4 of Thiruvamathur road 1254 01-CRIDP-12- Villupuram Vanur Widening from SL to IL and Impts 2.38 130.00 13-P-1254 to Road from km 18/6 of CC road (Kozhipakkam) to Madagadipattu road road Km.5/2-5/6 & 6/325-8/3

Widening Total 21.38 897.00 1255 01-CRIDP-12- Villupuram Vanur Improvements to Rampakkam- 0.43 40.00 13-P-1255 Thulukkanatham road Km. 3/925- 4/35 (CC pavement) 1256 01-CRIDP-12- Villupuram Villupuram Improvements to Kandampakkam- 1.18 60.00 13-P-1256 Maragathapuram road Km.3/2- 4/380

1257 01-CRIDP-12- Villupuram Vanur Improvements to Thailapuram road 2.40 60.00 13-P-1257 Km.0/0-2/4 Strengthening Total 4.01 160.00 Villupuram Total 25.38 1057.00 1258 01-CRIDP-12- Cuddalore Cuddalore Improvements to Maruthadu- 3.45 120.00 13-P-1258 Irandayirvilagam road Km.0/0- 3/450

ODR SCP- 6of 45 SECTION OFFICER 147/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1259 01-CRIDP-12- Cuddalore Panruti Improvements to Sitharasur- 3.40 51.00 13-P-1259 Arungunam-Natham Road Km 0/0- 3/4 1260 01-CRIDP-12- Cuddalore Cuddalore Improvements to Thotti- 2.10 25.00 13-P-1260 Vellapakkam Road Km 3/0-5/1 1261 01-CRIDP-12- Cuddalore Chidamabaram Improvements to Chidambaram - 4.20 80.00 13-P-1261 Sivapuri - Gavarapattu Road Km 3/6 - 7/8 1262 01-CRIDP-12- Cuddalore Chidamabaram Improvements to B.Udayur- 6.00 125.00 13-P-1262 Vadathalaikulam road km 0/0-6/0

1263 01-CRIDP-12- Cuddalore Chidamabaram Improvements to Puduchathiram - 8.60 180.00 13-P-1263 Poovalai road km 0/0-8/6

1264 01-CRIDP-12- Cuddalore Kurinjipadi Improvements to Thiruchopuram - 4.80 180.00 13-P-1264 Thiyagavalli - Naduthittu raod km 0/0-4/8 1265 01-CRIDP-12- Cuddalore Kattumannar Imporvements to Mannarkudi - 2.00 70.00 13-P-1265 koil Omampuliyur road km 4/0 -6/0 1266 01-CRIDP-12- Cuddalore Kattumannar Imporvements to the road from 2/4 3.00 45.00 13-P-1266 koil of Karuvepillankurichi - Rajendrapattinam to Gunamanglam Road Km 0/0 -3/0

1267 01-CRIDP-12- Cuddalore Kattumannar Imporvements to Thirunaraiyur 3.20 45.00 13-P-1267 koil road km 4/0-7/2 1268 01-CRIDP-12- Cuddalore Kattumannar Imporvements to Solatharam- 2.80 40.00 13-P-1268 koil Srimushnam road to Ramapuram road km 1/0-3/8 1269 01-CRIDP-12- Cuddalore Kattumannar Improvements to Kumaratchi - 6.40 110.00 13-P-1269 koil Vallambadugai Road Km 0/0 - 6/4

1270 01-CRIDP-12- Cuddalore Kattumannar Improvements to Eyyalur- 6.00 110.00 13-P-1270 koil Omampuliyur road km.0/0-6/0 1271 01-CRIDP-12- Cuddalore Vridhachalam Improvements to Pennadam- 0.90 25.00 13-P-1271 Vridhachalam road km.16/10, 18/0- 18/7 Strengthening Total 56.85 1206.00 Cuddalore Total 56.85 1206.00 1272 01-CRIDP-12- Ariyalur Perambalur Providing Bye- Pass road to 3.83 1100.00 13-P-1272 Perambalur Town in Perambalur District, Km 5/250-9/075 (Phase- II) Strengthening Total 3.83 1100.00

ODR SCP- 7of 45 SECTION OFFICER 148/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1273 01-CRIDP-12- Ariyalur Perambalur Widening the Box type Culvert at 28.00 13-P-1273 Km 0/2 of Perambalur Bye Pass Road joining with Km 264/10 of NH- 45 Culverts/Bridges Total 1 Nos 28.00 Ariyalur Total 3.83 1128.00 Villupuram Total 86.06 3391.00 1274 01-CRIDP-12- Trichy Trichyeast Widening From Intermediate lane 1.60 100.00 13-P-1274 to Double lane and Improvements at Km 0/0 - 0/6 & 2/6 - 3/6 of Kajamalai - Olaiyur road.

1275 01-CRIDP-12- Trichy Musiri Widening from SL to IL at Km 7/0- 1.98 40.00 13-P-1275 8/735 and 11/385-11/630of Manamedu - Kolakkudy - Soorampatty Road 1276 01-CRIDP-12- Trichy Thuraiyur Widening from Single lane to 5.60 150.00 13-P-1276 Intermediate lane in Km 0/0- 5/6 of Kannanur - Kaliyampatty - Pagalavady road

1277 01-CRIDP-12- Trichy Musiri Widening from SL to IL land 2.00 80.00 13-P-1277 improvements at Km 6/0-8/0 of Eragudy - Mahadevi road Widening Total 11.18 370.00 1278 01-CRIDP-12- Trichy Lalgudi Improvements at Km 0/0-6/0 of 6.00 496.00 13-P-1278 Siruthaiyur-Sengaraiyur Road 1279 01-CRIDP-12- Trichy Manachanallur Improvements to M.P.Kovil - 1.00 13.00 13-P-1279 Alagiamanavalam- Theerampalayam road Km 6/0-7/0

1280 01-CRIDP-12- Trichy Thuraiyur Improvements to Kilakuvady - 4.00 40.00 13-P-1280 Naduvalur - Abinimangalam road Km 2/0-5/0, 6/2-6/8, 10/0-10/4

1281 01-CRIDP-12- Trichy Thuraiyur Improvements to Viswambal 3.60 45.00 13-P-1281 Samuthiram - Puliyancholai (via) Balakrishnampatty road Km 5/0-8/6

1282 01-CRIDP-12- Trichy Thuraiyur Improvements to Top 7.61 98.00 13-P-1282 Sengattupatty - Boothakkal road Km 0/0-7/610 1283 01-CRIDP-12- Trichy Thuraiyur Improvements to Pudur - 2.40 30.00 13-P-1283 Pudupatty road Km 3/0-5/4

ODR SCP- 8of 45 SECTION OFFICER 149/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1284 01-CRIDP-12- Trichy Thuraiyur Improvements to Sirunatham - 1.40 17.00 13-P-1284 Narasingapuram road Km 4/0-5/4

1285 01-CRIDP-12- Trichy Thuraiyur Improvements to Top- 1.00 20.00 13-P-1285 sengattupatty - Thonur road Km 9/0-10/0 1286 01-CRIDP-12- Trichy Thuraiyur Improvements to Kannanur - 2.80 35.00 13-P-1286 Kattukaruppankottam - Thiruthalaiyur road Km 1/0-3/8 1287 01-CRIDP-12- Trichy Musiri Improvements to Konappampatty - 1.40 15.00 13-P-1287 Neliyampatty Road Km 0/0-1/4

1288 01-CRIDP-12- Trichy Musiri Improvements to Karikali - 2.40 45.00 13-P-1288 Alathudayanpatty road Km 0/0-2/4 including Construction of Protection wall Strengthening Total 33.61 854.00 1289 01-CRIDP-12- Trichy Thuraiyur Construction of culvert at Km 2/10 25.00 13-P-1289 of Kannanur- Kattanampatty road

1290 01-CRIDP-12- Trichy Musiri Reconstuction Minor Bridge at km 45.00 13-P-1290 10/6 of Mettupalayam - Nallamanayakkanpatty (Via) Pillapalayam Road Culverts/Bridges Total 2 Nos 70.00 Trichy Total 44.79 1294.00 1291 01-CRIDP-12- Pudukottai Thirumayam Improvements in KM 2/0-4/0, 6/0- 3.60 36.00 13-P-1291 7/6 of the road from Virachilai road to meet KM 26/6 of Panayapatti - Rangiyum road via neikonam, Kannanaur harizan colony

Strengthening Total 3.60 36.00 Pudukottai Total 3.60 36.00 1292 01-CRIDP-12- Tanjavur Papanasam Widening from SL to IL and 2.60 440.00 13-P-1292 Rebuilding .to Manalur- Veeramangudy-Someswarapuram Road KM.0/0-2/6 including Reconstruction of culvert 6 nos and Junction Improvements

Widening Total 2.60 440.00

ODR SCP- 9of 45 SECTION OFFICER 150/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1293 01-CRIDP-12- Tanjavur Peravurani Improvements to Seruvaviduthi - 1.20 14.00 13-P-1293 Nadankadu - Kalathur Road Km 3/0-4/2 1294 01-CRIDP-12- Tanjavur Orathanadu Strengthening to Pinnaiyur Enathi 7.00 252.00 13-P-1294 Road KM 0/0-7/0 Including Construction of Retaining wall.

1295 01-CRIDP-12- Tanjavur Thanjavur Improvements to Road branching 1.00 15.00 13-P-1295 from Km 3/10 of Vallam - Kallaperambur Road to Singaperumalkulam Municipal Limit Road Km 5/0-6/0

1296 01-CRIDP-12- Tanjavur Orathanadu Improvements to Road branching 2.40 35.00 13-P-1296 from Km 77/2 of Nagai - Gudalore - Mysore Road to Mariammankovil - Kulichappattu - Kattur Road Km 2/2- 4/6

1297 01-CRIDP-12- Tanjavur Thiruvaiyaru Improvements to Left Bank of 3.00 60.00 13-P-1297 Vennar Vettar to Ammanpettai - (via) Nagathi, Thenperambur - Allur Road Km 0/0- 3/0 1298 01-CRIDP-12- Tanjavur Thiruvaiyaru Improvements to Road Branching 1.20 15.00 13-P-1298 from Km 18/2 of GAC Road to Vittalapuram Road Km 1/0-2/2

1299 01-CRIDP-12- Tanjavur Thiruvaiyaru Improvements to Poondimathakoil - 1.20 18.00 13-P-1299 Nagatchi Road Km 2/0-3/2

1300 01-CRIDP-12- Tanjavur Thiruvaiyaru Improvements to Road branching 2.00 40.00 13-P-1300 from Km 5/10 of Thirukkattupalli - Sengipatti - Pattukkottai Road to Orathur Road Km 4/6-5/0, 5/4-7/0

1301 01-CRIDP-12- Tanjavur Thiruvaiyaru Improvements to Senthalai- 0.60 12.00 13-P-1301 Varagur - Kalumangalam Road Km 0/0-0/6 1302 01-CRIDP-12- Tanjavur Papanasam Improvements to Koonanchery - 1.00 47.00 13-P-1302 Maruthuvakudy Road Km 1/0-2/0

1303 01-CRIDP-12- Tanjavur Papanasam Improvements to Poondi - 1.40 20.00 13-P-1303 Vandaiyarirupu Road Km 4/0-4/4 and 5/0-6/0

ODR SCP- 10of 45 SECTION OFFICER 151/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1304 01-CRIDP-12- Tanjavur Papanasam Improvements to Ayyampettai - 2.20 30.00 13-P-1304 Agaramankudy Road Km 3/0-5/2

1305 01-CRIDP-12- Tanjavur Kumbakonam Improvements to Eraharam Road 1.40 25.00 13-P-1305 in Km 4/0 -5/4 1306 01-CRIDP-12- Tanjavur Kumbakonam Improvements toMaruthanallur - 1.60 25.00 13-P-1306 Karuvilarcheri Road in Km 0/0 - 1/6

1307 01-CRIDP-12- Tanjavur Thiruvidai Improvements to Vannakudy 1.00 10.00 13-P-1307 maruthur Village Road Km 1/6-2/6 1308 01-CRIDP-12- Tanjavur Orathanadu Improvements to Chellampatti - 3.80 50.00 13-P-1308 Cholapuram Road Km 0/0-3/8 1309 01-CRIDP-12- Tanjavur Pattukottai Improrvements to Thamarankkottai - 3.00 50.00 13-P-1309 Vickramam Road Km 2/0-4/0 & 5/0- 6/0 1310 01-CRIDP-12- Tanjavur Peravurani Improvements to Chithathikkadu - 3.00 36.00 13-P-1310 Keeramangalam Road Km 0/0-3/0

Strengthening Total 38.00 754.00 1311 01-CRIDP-12- Tanjavur Orathanadu Reconstruction of Slab Culvert at 20.00 13-P-1311 km 0/2 of Ambalapattu - Sendankadu road. 1312 01-CRIDP-12- Tanjavur Orathanadu Reconstruction of minor Bridge at 45.00 13-P-1312 km 2/4 of Duraiyundarkottai - Keelaulur road. 1313 01-CRIDP-12- Tanjavur Orathanadu Reconstruction of Slab culvert at 10.00 13-P-1313 km 0/10 of Thuvarankuruchi - Maravakadu Road 1314 01-CRIDP-12- Tanjavur Pattukottai Reconstruction of Slab culvert at 22.00 13-P-1314 km 5/10 of Palayam - Palamuthi Road 1315 01-CRIDP-12- Tanjavur Peravurani Reconstruction of Slab culvert at 10.00 13-P-1315 km 3/6 of Pookollai - Marakkavalasai Road Culverts/Bridges Total 5 Nos 107.00 1316 01-CRIDP-12- Tanjavur Orathanadu Construction of Retaining wall at 10.00 13-P-1316 km 0/8 & 1/10 of Pachur Road

1317 01-CRIDP-12- Tanjavur Orathanadu Construction of Retaining wall at 25.00 13-P-1317 km 1/4,1/8,1/10 & 2/6 of Pinnaiyur Village Road

ODR SCP- 11of 45 SECTION OFFICER 152/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1318 01-CRIDP-12- Tanjavur Thiruvaiyaru Construction of Retaining wall at 30.00 13-P-1318 km 1/10, 2/6,8,10, 3/8,10 of Left Bank of Vennar Palliagraharam - Kalancheri Road

Others Total 3 Nos 65.00 Tanjavur Total 40.60 1366.00 1319 01-CRIDP-12- Nagapattinam Nagapattinam Improvements to Manjakollai - 1.20 15.00 13-P-1319 Ivanallur Road KM 0/6-1/8 1320 01-CRIDP-12- Nagapattinam Kilvelur Improvements to Keezhaiyur- 2.21 90.00 13-P-1320 Meenamanallur Road KM 0/0- 2/214 1321 01-CRIDP-12- Nagapattinam Kilvelur Improvements to Kodiyalathur 2.00 40.00 13-P-1321 Village Road Km 0/0-2/0 1322 01-CRIDP-12- Nagapattinam Kilvelur Improvements to Ayyadimangalam- 5.00 200.00 13-P-1322 Needur Road Km 2/0-7/0

1323 01-CRIDP-12- Nagapattinam Vedaranyam Improvements to Alangudy- 2.40 138.00 13-P-1323 Thalainayar- Thalanthiruvasal Road Km 32/0- 33/4 & 37/0-38/0

1324 01-CRIDP-12- Nagapattinam Mayiladuthurai Improvements to Mariyur - 0.92 18.00 13-P-1324 Kovankudy Road KM 0/0-0/920 1325 01-CRIDP-12- Nagapattinam Mayiladuthurai Improvements to Asikkadu- 1.50 30.00 13-P-1325 Kovankudy Road KM 0/0-1/5 1326 01-CRIDP-12- Nagapattinam Mayiladuthurai Improvements to Mappadugai - 5.00 100.00 13-P-1326 Kadalangudi Road KM 1/8-6/8 1327 01-CRIDP-12- Nagapattinam Mayiladuthurai Improvements to 1.45 28.00 13-P-1327 Thiruchitrampalam Road KM 0/0- 1/450 1328 01-CRIDP-12- Nagapattinam Poompuhar Improvements to Anaimutam 1.60 32.00 13-P-1328 Village Road KM 0/0 - 1/6 1329 01-CRIDP-12- Nagapattinam Poompuhar Improvements to Kadali 2.00 40.00 13-P-1329 Narasinganatham Road Km 0/0 - 2/0 1330 01-CRIDP-12- Nagapattinam Poompuhar Improvements to Komal - 2.00 40.00 13-P-1330 Keelasethi Road KM 0/0-2/0 1331 01-CRIDP-12- Nagapattinam Sirkazhi Improvements to Edamanal - 3.00 90.00 13-P-1331 Nallur Road KM 0/0-3/0 Strengthening Total 30.28 861.00 Nagapattinam Total 30.28 861.00 1332 01-CRIDP-12- Tiruvarur Mannargudi Widening from Single lane to 6.00 290.00 13-P-1332 Intermediate lane in Km.0/0 - 6/0 of Mannargudi - Moovanallur - Vaduvur road

ODR SCP- 12of 45 SECTION OFFICER 153/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1333 01-CRIDP-12- Tiruvarur Mannargudi Widening from Single lane to 3.00 150.00 13-P-1333 Intermediate lane in Km.6/0 - 9/0 of Mannargudi - Moovanallur - Vaduvur road Widening Total 9.00 440.00 1334 01-CRIDP-12- Tiruvarur Nannilam Improvements to Perungudi - 5.00 96.00 13-P-1334 Haridwaramangalam road Km.0/0 - 5/0 inculding Reconstruction of culverts (3 Nos)

1335 01-CRIDP-12- Tiruvarur Nannilam Improvements to 0.60 12.00 13-P-1335 Manickamangalam - Vedambur road Km.0/0 -0/6 1336 01-CRIDP-12- Tiruvarur Tiruvarur Improvements to Palaiyanur - 3.18 54.00 13-P-1336 Velugudi road Km.0/0 - 3/175 1337 01-CRIDP-12- Tiruvarur Mannargudi Improvements to Thenparai Village 2.60 44.00 13-P-1337 Road Km.2/0 - 4/6 1338 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Ovarur Adi- 3.27 66.00 13-P-1338 poondi dravidar colony road Km.0/0-3/265

1339 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Vilakkudi – 4.80 63.00 13-P-1339 poondi Manali Road KM.4/0-8/8 1340 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Vadasenganti – 5.00 70.00 13-P-1340 poondi Ariyalur - Kulamanickam Road Km.0/0-5/0 1341 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Pandi- 4.00 52.00 13-P-1341 poondi Karpakanathuarkulam Road KM 0/0-4/0 1342 01-CRIDP-12- Tiruvarur Thiruthurai Improvements to Nedumbalam - 3.00 39.00 13-P-1342 poondi Maruthavanam road Km.4/6 -7/6

1343 01-CRIDP-12- Tiruvarur Tiruvarur Improvements to Tiruvarur - 1.80 37.00 13-P-1343 Alivalam- Vadugachery road Km.7/0 -8/9 including Reconstruction of culverts (2 Nos.)

1344 01-CRIDP-12- Tiruvarur Tiruvarur Improvements to Andipalayam - 2.00 40.00 13-P-1344 Kakkalani road Km.0/0 - 2/0 1345 01-CRIDP-12- Tiruvarur Nannilam Improvements to Kodavasal - 4.60 69.00 13-P-1345 Nannilam road Km 30/0 - 34/6 1346 01-CRIDP-12- Tiruvarur Nannilam Improvements to Mugundhanur- 4.20 63.00 13-P-1346 Engan road Km 0/0 - 4/2 including Reconstruction of culvert (1 No.)

ODR SCP- 13of 45 SECTION OFFICER 154/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1347 01-CRIDP-12- Tiruvarur Nannilam Improvements to Velangudi - 1.40 21.00 13-P-1347 Orugalpadagam road Km.0/0 -1/4

1348 01-CRIDP-12- Tiruvarur Tiruvarur Improvements to 0.90 13.00 13-P-1348 Vadapathimangalam - Kottur road Road km 5/100 - 6/0 1349 01-CRIDP-12- Tiruvarur Mannargudi Improvements to Senthangudi - 3.32 67.00 13-P-1349 Seruvamani Road km 0/0 - 3/320

1350 01-CRIDP-12- Tiruvarur Mannargudi Improvements to Poovanaur - 7.60 140.00 13-P-1350 Kalachery -Munnavalkottai Road km 0/0 - 7/6 Strengthening Total 57.26 946.00 1351 01-CRIDP-12- Tiruvarur Nannilam Reconstruction of culvert at Km.1/2 25.00 13-P-1351 of Perumpannaiyur -Engan Road

Culverts/Bridges Total 1 Nos 25.00 Tiruvarur Total 66.26 1411.00 Trichy Total 185.53 4968.00 1352 01-CRIDP-12- Salem Edappadi Widening from SL-IL and 10.40 490.00 13-P-1352 Improvements to km. 1/2-3/0,4/4- 6/4,7/7-8/0&9/2-10/4 and Improvements to km. 0/0-1/2,3/0- 4/4,6/4-7/7&8/0-9/2 of Edappadi - Nedungulam Ferry road

1353 01-CRIDP-12- Salem Omalur Widening from SL to IL and 1.60 45.00 13-P-1353 improvements in km 0/0-1/6 of Omalur - Mecheri road to Thindamangalam road 1354 01-CRIDP-12- Salem Omalur Widening from SL to IL and 1.90 88.00 13-P-1354 improvements in Km 16/8 - 18/7 of Kamalapuram - Chinnathirupathi - Jodukuli road 1355 01-CRIDP-12- Salem Salemwest Widening SL to IL in Km.0/0-2/6 of 2.60 60.00 13-P-1355 P.Mannarpalayam road 1356 01-CRIDP-12- Salem Edappadi Widening from SL to IL in Km.0/0- 10.00 200.00 13-P-1356 3/0 and Improvements to Km.2/0- 10/0 of Kalvadangam - Poolampatty road Widening Total 26.50 883.00 1357 01-CRIDP-12- Salem Sankari Improvements to km. 0/0-2/0 of 2.00 24.00 13-P-1357 Palmadai - Vengipalayam - Thanneerpandal palayam Road

ODR SCP- 14of 45 SECTION OFFICER 155/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1358 01-CRIDP-12- Salem Sankari Improvements to km. 0/0-4/4 of 4.40 53.00 13-P-1358 Thiruvantipati - Road 1359 01-CRIDP-12- Salem Sankari Improvements to km. 0/0-2/4 of 2.40 29.00 13-P-1359 Irugalur - Uthupalayam Road 1360 01-CRIDP-12- Salem Edappadi Improvements to Nangavalli - 3.60 42.00 13-P-1360 Kunchandiyur road to Kuppanur road Km.0/0-3/6 1361 01-CRIDP-12- Salem Salemwest Improvements in km 2/8 -6/4 and 3.60 70.00 13-P-1361 Reconstruction of damaged pipe culvert and construction of retaining wall at km.0/8 of Omalur – Muthunaickanpatty- Alagusamuthiram road

1362 01-CRIDP-12- Salem Omalur Improvements in km 0/0-3/0 & 5/0 - 3.80 61.00 13-P-1362 5/8 of Nadupatty – Bommiampatty road 1363 01-CRIDP-12- Salem Salemwest Improvements in km 0/0-2/8 of 2.80 35.00 13-P-1363 Boominaickanpatty road. 1364 01-CRIDP-12- Salem Omalur Improvements in km 0/0-4/4 of 4.40 54.00 13-P-1364 Danishpet -Palapalli kombi road.

1365 01-CRIDP-12- Salem Attur Improvements to Km.3/0-5/6of 2.60 40.00 13-P-1365 Pothakattupudur -Rasinagar road

1366 01-CRIDP-12- Salem Attur Improvements to Valaiyamadevi- 1.00 18.00 13-P-1366 Sadasivapuram road Km.0/0-1/0

1367 01-CRIDP-12- Salem Attur Improvements to Pungavadi - 2.00 30.00 13-P-1367 Paithur Pudur road Km.0/0-2/0 1368 01-CRIDP-12- Salem Attur Improvements to Keeripatty - 4.20 67.00 13-P-1368 Kelthombai Road KM.0/0 -4/2 1369 01-CRIDP-12- Salem Mettur Improvements to Soolapady - 2.80 42.00 13-P-1369 Kamanaickenpatty road Km.0/0-2/8

1370 01-CRIDP-12- Salem Mettur Improvements to Kolathur- Thanda 0.80 15.00 13-P-1370 road Km.12/0-12/8 1371 01-CRIDP-12- Salem Mettur Improvements to Karungallur - 5.46 69.00 13-P-1371 Govindapady road KM.1/0-6/455

1372 01-CRIDP-12- Salem Yercaud Improvements from Km.2/0-4/0 of 2.00 30.00 13-P-1372 Karumandurai-Soolankurchi road

ODR SCP- 15of 45 SECTION OFFICER 156/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1373 01-CRIDP-12- Salem Attur Improvements from Km 0/0-1/2 of 1.20 18.00 13-P-1373 Thumbal-Puthiragoundampalayam road to Padayachiyur road

1374 01-CRIDP-12- Salem Attur Improvements from Km.2/2-4/2 of 2.00 30.00 13-P-1374 Palaniapuri to Km 32/8 of salem- ulundurpet road (via) Thalavaipatty, Thennampillaiyur Ariyapalayam, E.Karadipatty, West Rajapalayam and Thamayanur

1375 01-CRIDP-12- Salem Yercaud Improvements from Km.0/0- 2/6, 3.60 55.00 13-P-1375 7/2-8/2 of Belur - Ethapur road

1376 01-CRIDP-12- Salem Attur Improvements from Km. 0/0-1/0 of 1.00 15.00 13-P-1376 Belur-Ethapur road to Abhinavam.

1377 01-CRIDP-12- Salem Gangavalli Improvements to Nagiyampatty - 3.81 65.00 13-P-1377 Ulipuram Road KM.0/0-3/805

1378 01-CRIDP-12- Salem Attur Improvements to Thammapatty - 3.66 63.00 13-P-1378 Palakadu Road KM.4/6- 7/660 1379 01-CRIDP-12- Salem Attur Improvements to Periyakalrayan 2.40 38.00 13-P-1379 Hills road at Km.4/0-6/4

1380 01-CRIDP-12- Salem Attur Improvements to Paithur - 1.00 40.00 13-P-1380 Kanavaikadu Road KM.2/0-3/0 including construction of minor bridge at Km.2/6 1381 01-CRIDP-12- Salem Attur Improvements to Attur Paithur 1.29 20.00 13-P-1381 Road KM.8/0-9/285

1382 01-CRIDP-12- Salem Attur Improvements to Manjini - 2.00 30.00 13-P-1382 Pungavadi - Kadambur road Km.0/0-2/0 Strengthening Total 69.81 1053.00 1383 01-CRIDP-12- Salem Yercaud Construction of Shoulders with 65.00 13-P-1383 Paver Blocks for both sides in Km.0/0-1/2 of Bedford Road and Construction of Drain at Km.0/2 and Protective works in Km.0/6-1/2

Others Total 1 Nos 65.00 Salem Total 96.31 2001.00

ODR SCP- 16of 45 SECTION OFFICER 157/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1384 01-CRIDP-12- Namakkal Kumara Widening from SL to DL in Km 10/0- 4.40 102.00 13-P-1384 palayam 11/4 & 12/0-13/0 and Widening from IL to DL Km 11/4-12/0 & 13/0- 13/4 improvements Km 9/7-10/7 Construction of pipe culvert 2 Nos. of Tiruchengode - Kokkarayanpet road

Widening Total 4.40 102.00 1385 01-CRIDP-12- Namakkal Namakkal Improvements from Km 0/0-2/0 of 2.00 20.00 13-P-1385 Trichy - Salem Road to Karaikurichipudur Road 1386 01-CRIDP-12- Namakkal Namakkal Improvements from Km 3/0- 8/8 5.80 71.00 13-P-1386 Ammapalayam to Musiri Thatharipuram Road (via) S.Nattamangalam, Lakkapuram, Thottipatty Road including construction of pipe culvert in lieu of bed level causeway 3 Nos.

1387 01-CRIDP-12- Namakkal Namakkal Improvements from Km 1/0-2/0 1.00 14.00 13-P-1387 including construction of pipe culvert 1 No. and construction of Retainingwall 1 No. of Km 5/4 Pachal -Singalanthapuram road to Kathiranallur Road 1388 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 0/0-1/2 of 1.20 20.00 13-P-1388 Rasipuram - Attur Road to Oilpatty Road including construction of Pipe culvert 1 No. and construction of strom water drain 1 No. (200m)

1389 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 4/0-7/0 of 3.00 32.00 13-P-1389 Naraikinar Road including Construction of RCC pipe culvert 1 No. 1390 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 3/6-6/510 of 2.91 36.00 13-P-1390 R.Pudupatty - Moolapallipatty - Mettala Road including construction of pipe culvert and retaining wall 1 No. 1391 01-CRIDP-12- Namakkal Rasipuram Improvements to Km 0/0-4/0 of 4.00 60.00 13-P-1391 VCC Road to Singalandapuram (via) Patchal Road

ODR SCP- 17of 45 SECTION OFFICER 158/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1392 01-CRIDP-12- Namakkal Tiruchengodu Improvements from km 3/6-5/6 of 2.00 26.00 13-P-1392 Pullipalayam-Molasi- Kokkarayanepet Road (via)Velliyampalayam Road and Reconstruction of RCC Slab Culvert in lieu of Damaged Pipe culvert 1 No. 1393 01-CRIDP-12- Namakkal Tiruchengodu Improvements from km 6/6-7/6 of 1.00 13.00 13-P-1393 Suriyagoundampalayam - Paruthipalli - Ramapuram Road and Construction of New Culvert 1 No. 1394 01-CRIDP-12- Namakkal Tiruchengodu Improvements to the Road from 1.80 18.00 13-P-1394 Km.1/6-3/4 of Ramapuram Road

1395 01-CRIDP-12- Namakkal Kumara Improvements from km 3.25 35.00 13-P-1395 palayam Kallankattuvalasu- Uppukulam Road km 0/0-3/250 Strengthening Total 27.96 345.00 Namakkal Total 32.36 447.00 1396 01-CRIDP-12- Dharmapuri Palacodu Improvements to KM 0/4-1/2, 2/0- 2.20 25.00 13-P-1396 2/8, 5/6 - 6/2 of Gooliganur - Udayandahalli road 1397 01-CRIDP-12- Dharmapuri Harur Improvements to Km 2/4 - 4/6 of 2.20 22.00 13-P-1397 Harur - Sitheri Road 1398 01-CRIDP-12- Dharmapuri Harur Improvements to KM 0/0- 6/800 of 6.80 70.00 13-P-1398 Sekandahalli - Kathirnaickenhalli (via) D.Puliyampatty road.

1399 01-CRIDP-12- Dharmapuri Harur Improvements to KM 0/0-4/6 of 4.60 53.00 13-P-1399 Navalai - Peramandapatti road 1400 01-CRIDP-12- Dharmapuri Harur Improvements to KM 0/0 - 7/4 of 7.40 75.00 13-P-1400 Ettiyampatty - Palayam Road (Via) Gopalapatti Goodaloore road.

1401 01-CRIDP-12- Dharmapuri Harur Improvements to Km 0/0 - 5/0 of 5.00 50.00 13-P-1401 Eachambadi - Dhottampatty (via) Nainagoundan pudur road. 1402 01-CRIDP-12- Dharmapuri Harur Improvements to Km 3/0 - 6/4 of 3.40 45.00 13-P-1402 Thetheri - North Arcot District border Road 1403 01-CRIDP-12- Dharmapuri Harur Improvements to Km 33/1 - 34/0 of 0.90 13.00 13-P-1403 Harur - Kottapatti Road

ODR SCP- 18of 45 SECTION OFFICER 159/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1404 01-CRIDP-12- Dharmapuri Harur Improvements to KM 1/0 - 1/4, 5/2 - 0.80 9.00 13-P-1404 5/6 of Kambainallur - Irumathur Road 1405 01-CRIDP-12- Dharmapuri Pappireddi Improvements to Km 5/0-6/2 of 1.20 15.00 13-P-1405 patti Semmanahalli - Ariyakulam road

1406 01-CRIDP-12- Dharmapuri Harur Improvements to KM 0/0 - 2/0 of 2.00 22.00 13-P-1406 Kattarasampatti Road Strengthening Total 36.50 399.00 1407 01-CRIDP-12- Dharmapuri Palacodu Construction of bridge at KM 0/10 150.00 13-P-1407 of Mallasamuthiram - Hanumanthapuram road in lieu of the existing weak cause way.

Culverts/Bridges Total 1 Nos 150.00 Dharmapuri Total 36.50 549.00 1408 01-CRIDP-12- Krishnagiri Thalli Improvements to Denkanikottai - 8.00 90.00 13-P-1408 Madhagondapalli Road Km 0/0-8/0

1409 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Singarapet - 9.40 90.00 13-P-1409 Pallathur road Km 0/0 - 9/4 including Reconstruction culverts (8 Nos) and construction culvert (1 No.) 1410 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Singarapet - 5.60 52.00 13-P-1410 Thirupathur road Km 19/8 to Salem - Thirupathur - Vaniyambadi road (via) Musilikuttai road Km 0/0 - 3/0 & 4/8 - 7/4

1411 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Singarapet - 1.20 70.00 13-P-1411 Thirupathur road Km 26/4 to Chinnathallapadi road Km 0/0 - 1/2 including construction of retaining wall and construction of Culvert (1 No.) 1412 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Jandamedu - 3.00 27.00 13-P-1412 Puliyur road to Murukkampatty road Km 0/0 - 3/0 1413 01-CRIDP-12- Krishnagiri Uthangarai Improvements to 1.80 18.00 13-P-1413 Bommadasampatti AD Colony (via) Bommadasampatti road Km 0/0 - 1/8

ODR SCP- 19of 45 SECTION OFFICER 160/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1414 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Keelkuppam - 9.00 95.00 13-P-1414 Kallavi road (Via) Moongileri, Manadipatti, Panamarathupatti Km 0/0 - 9/0 including reconstruction culvert (2 Nos) 1415 01-CRIDP-12- Krishnagiri Uthangarai Improvements to 5.90 80.00 13-P-1415 Hanumantheertham - Nochipatti road Km 0/0 - 2/2, 11/6 - 15/3 & Construction of drain in builtup area 1416 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Kallavi - 2.00 18.00 13-P-1416 Hanumantheertham road Km 1/0- 2/0 & 10/0-11/0 1417 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Thippampati 7.20 65.00 13-P-1417 cross road to vellavalli AD Colony road km 0/0-7/2 1418 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Upparapatti - 2.40 22.00 13-P-1418 Kunnathur road Km 3/4 - 5/8 1419 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Morappur - 3.88 35.00 13-P-1419 Kallavi road 11/0 - 14/880 1420 01-CRIDP-12- Krishnagiri Uthangarai Improvements to Badapalli A.D 2.49 23.00 13-P-1420 Colony road 0/6 - 3/086 1421 01-CRIDP-12- Krishnagiri Bargur Improvements to Kandhikuppam 4.00 53.00 13-P-1421 R.S to Bagimanoor road Km 5/3- 7/0 & 12/0-14/3 including Reconctruction of Culvert (1 Nos)

1422 01-CRIDP-12- Krishnagiri Bargur Improvements to Thoppadikuppam 3.80 35.00 13-P-1422 A.D.Colony road Km 0/0-3/8

1423 01-CRIDP-12- Krishnagiri Bargur Improvements to Hogennakkal - 3.00 29.00 13-P-1423 Pennagaram - Dharamapuri - Thirupathur road to oddapatti (via) Angampatti road Km 0/0-3/0

Strengthening Total 72.67 802.00 Krishnagiri Total 72.67 802.00 Salem Total 237.84 3799.00

ODR SCP- 20of 45 SECTION OFFICER 161/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1424 01-CRIDP-12- Tiruppur Tiruppur Widening from SL to DL and 1.60 167.00 13-P-1424 north improvements in km 0/0-1/6 of the road from km 7/4 of Avinahsi - Tirupur - Palladam - Pollachi - Cochin (via) Meenkarai road to Avinasigoundampalayam road including 2 culverts and drain work.

1425 01-CRIDP-12- Tiruppur Avinashi Widening from SL to IL and 4.80 175.00 13-P-1425 improvements in km 0/0 - 4/8 Thandukkaranpalayam - Pasur road including CD works- 8 nos 1426 01-CRIDP-12- Tiruppur Avinashi Widening from SL to IL and 1.60 70.00 13-P-1426 improvements in km 0/0 - 1/6 of Avinashi - Puliyampatti road to Alathur including CD Works 4 nos

1427 01-CRIDP-12- Tiruppur Palladam Widening from SL to IL and 0.80 30.00 13-P-1427 improvements in km 0/0 - 0/8 of the road from km 13/6 of Tirupur - Somanur road to Malaikovil road including CD works 1 no.

1428 01-CRIDP-12- Tiruppur Tiruppur Widening from SL to IL & 4.40 136.00 13-P-1428 north improvements in km 0/0 - 0/4 and improvements in km 0/4 - 1/4 & 4/4 - 7/4 of Anupparpalayam Paramasivampalayam road including 2 culvert and drain works ..

1429 01-CRIDP-12- Tiruppur Palladam Widening from SL to IL and 2.40 90.00 13-P-1429 improvements in km 3/0-5/4 of the road from km 6/4 of Tirupur - Somanur road to Iduvai including 2 culverts 1430 01-CRIDP-12- Tiruppur Palladam Widening from SL to ILin km 0/0 - 2.00 66.00 13-P-1430 2/0 and improvements in km 0/0 - 1/2 of the road from km 18/4 of Kamanaickenpalayam -Annur road to Sendevipalayam

Widening Total 17.60 734.00

ODR SCP- 21of 45 SECTION OFFICER 162/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1431 01-CRIDP-12- Tiruppur Palladam Improvements in km 3/0-4/0, 5/0- 3.70 45.00 13-P-1431 6/0, 7/2-8/9 of Pongalur - Pollikalipalayam road including protective wall 1432 01-CRIDP-12- Tiruppur Kangeyam Improvements in km 0/0 - 2/0 & 3/0 4.20 47.00 13-P-1432 - 5/2 of Gobi - Dharapuram road to Kadaiyur (via)Pothiyapalayam road including CD works 2nos.

1433 01-CRIDP-12- Tiruppur Palladam improvements in km 0/0-2/6 of 2.60 27.00 13-P-1433 Tirupur - Ugayanur road (Via) Vadugapalayam road to A.D. Colony including protective wall.

Strengthening Total 10.50 119.00 Tiruppur Total 28.10 853.00 1434 01-CRIDP-12- Dharapuram Kangeyam Improvements to km 18/2-20/4 of 2.20 22.00 13-P-1434 Mullipuram - Bhagavathipalayam - Silambagoundanvalasu road

1435 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 1/8-4/0 of 2.20 23.00 13-P-1435 Puthukkottai pirivu - Kambaliyampatty road (via) Vellinagar 1436 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 1/8-5/850 of 4.05 43.00 13-P-1436 Mallipatty pirivu - Kottai Mulanur road 1437 01-CRIDP-12- Dharapuram Kangeyam Improvements to km 2/500 - 4/8 & 4.10 40.50 13-P-1437 7/2 -9/0 of Othakadai - Velapanaickenvalasu - Vellathankaraipudur road 1438 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 3/0-5/0 of 2.00 20.00 13-P-1438 Periyapatti - Negamam road (via) Ammapatti. 1439 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 2/0 - 4/0 of 2.00 20.00 13-P-1439 km 28/8 of Pollachi - Dharapuram - Karur road to Poolavadi road

1440 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 0/0 - 2/0 of 2.00 20.00 13-P-1440 Athukinathupatti Village road

1441 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 0/0 - 3/6 of 3.60 36.00 13-P-1441 Udumalpet - Dharapuram road to Join Chinnaveerampatti road

ODR SCP- 22of 45 SECTION OFFICER 163/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1442 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 0/0-3/4 3.40 34.00 13-P-1442 of Rangasamutiram - Poolavadi road (via) Mettupalayam road

1443 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 2/2 - 3/0, 3.20 32.00 13-P-1443 6/6 - 7/0, & 10/4 - 12/6 of Udumalpet - Elayamuthur road 1444 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 9/6 - 10/4 & 1.40 14.00 13-P-1444 10/6 - 11/2 of Kolumam - Kallapuram road 1445 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 1/0 - 3/0 & 2.40 26.00 13-P-1445 6/2 - 6/6 of Sungaramadaku- Ammapatti Road 1446 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 6/0-7/4 & 1.60 18.00 13-P-1446 17/2 of Mulanur - Bethampatty - Neelangalivalasu road

1447 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 2/8-3/8 & 4.30 45.00 13-P-1447 6/4-9/7 of Kasilingampalayam pirivu - Bhagavankovil road (via) Uchannavalasu 1448 01-CRIDP-12- Dharapuram Dharapuram Improvements to Km 2/4-4/6 of 2.20 23.50 13-P-1448 Mulanur - Nathapalayam road (via) Kottaimulanur. 1449 01-CRIDP-12- Dharapuram Udumalapet Improvements to km 0/0 - 1/8 of 1.80 20.00 13-P-1449 km 6/2 of Udumalpet-Palladam road branching Sundakampalayam road 1450 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 0/0 - 5/2 of 5.20 65.00 13-P-1450 Kolumam - Athur road 1451 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 2/4 -4/0 of 1.60 17.00 13-P-1451 Malaandigoundanur - Kiluvankattur road 1452 01-CRIDP-12- Dharapuram Udumalapet Improvements to Km 1/0-3/6 of 2.60 28.00 13-P-1452 Thottampatti Loop road. 1453 01-CRIDP-12- Dharapuram Udumalapet Improvements to Km 0/0-0/4 & 0/8- 1.20 13.00 13-P-1453 1/6 of the road branching at Km 19/0 of Udumalpet-Senjerihills road to Chikkanuthu

1454 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 0/0-2/2 of km 2.20 40.50 13-P-1454 83/2 of Dindugal - Bangalore road to Myvadi road

ODR SCP- 23of 45 SECTION OFFICER 164/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1455 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 1/4-3/0 & 2.60 26.00 13-P-1455 7/0 - 8/0 of Thungavi - Poolavadi road 1456 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 0/0-3/0 of 3.00 57.50 13-P-1456 Thungavi - Madathukulam road

1457 01-CRIDP-12- Dharapuram Kangeyam Improvements to km 0/0-2/8 of 2.80 28.00 13-P-1457 Muthur Kamaraj Nagar to Sengodampalayam Milk society (via) Kalleri 1458 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 0/0-2/8 of 2.80 28.00 13-P-1458 Chellappampalayam - Chinnapomman road 1459 01-CRIDP-12- Dharapuram Madathukulam Improvements to km 0/0- 2/2of 2.20 22.00 13-P-1459 Negamam-Erisanampatti road branching at Km 26/8 of Anaimalai- Poolankinar road (Via) Vilamarathupatti

1460 01-CRIDP-12- Dharapuram Udumalapet Improvements to Km 5/0-5/8 of 0.80 8.00 13-P-1460 Periyapatti - Negamam road (via) Amanthakadavu. Strengthening Total 69.45 770.00 1461 01-CRIDP-12- Dharapuram Dharapuram Construction of protective wall for 30.00 13-P-1461 the Amaravathi Canal at Km 0/2 & 1/630 of New Bye pass road at Dharapuram Town (Phase I)

Others Total 1 Nos 30.00 Dharapuram Total 69.45 800.00 1462 01-CRIDP-12- Erode Modakkurichi Improvements to Km.6/0-7/0, 7/4- 1.60 20.00 13-P-1462 8/0 of Avalpoondurai - Anandampalayam road 1463 01-CRIDP-12- Erode Modakkurichi Improvements to Km 0/0 - 0/6, 5/6 - 1.40 12.00 13-P-1463 6/0. 6/6-7/0 of Palliyuthu - Ayaparappu Road (Via) Mankaradu

1464 01-CRIDP-12- Erode Anthiyur Improvements to Km 0/0-1/0 of 1.00 9.00 13-P-1464 Anthiyur -Adhireddiyur - Maravapalayam road 1465 01-CRIDP-12- Erode Modakkurichi Improvements to km 4/2 - 5/4 of 1.20 13.00 13-P-1465 Elumathur - Kandikkattuvalasu Road

ODR SCP- 24of 45 SECTION OFFICER 165/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1466 01-CRIDP-12- Erode Modakkurichi Improvements to Km 3/0-5/8 of 2.80 35.00 13-P-1466 Kolanalli RS - Vallipuram Road 1467 01-CRIDP-12- Erode Modakkurichi Improvements to km 0/0-7/0 of 7.00 72.00 13-P-1467 Mullamparappu - Kandayeekuttai Road (via) Poolapalayam

1468 01-CRIDP-12- Erode Modakkurichi Improvements to km 7/0 - 9/302 of 2.30 25.00 13-P-1468 Rattaisutripalayam - Anjurampalayam Road (Via) Anumanpalli 1469 01-CRIDP-12- Erode Modakkurichi Improvements from Km 0/0-2/4 of 2.40 23.00 13-P-1469 vadugapatti-kandasamypalayam road 1470 01-CRIDP-12- Erode Modakkurichi Improvements to Km 0/0 - 4/8 of 4.80 50.00 13-P-1470 Arachalur - Kodumudi Road to Jayaramapuram and construction of 4 culverts. 1471 01-CRIDP-12- Erode Bhavani Improvements to km 0/0 - 1/8 of 1.80 145.00 13-P-1471 the road from km 64/2 of Thoppur- Mettur- Bhavani-Erode road to Anandampalayam to Soodamuthan patty 1472 01-CRIDP-12- Erode Perundhurai Improvements to Km14/6 - 15/0 & 2.80 40.00 13-P-1472 22/8 -25/2 of Nasiyanur - Kambiliampatti road and construction of 4 culverts. 1473 01-CRIDP-12- Erode Gobichetty Improvements to Km.0/0- 3/0 of 3.00 35.00 13-P-1473 palayam Goundampalayam - Veppampalayam - Sottaiyankadu road 1474 01-CRIDP-12- Erode Anthiyur Improvements to Km 0/0-1/2 of 1.20 20.00 13-P-1474 Vellithiruppur -Thottikinar road 1475 01-CRIDP-12- Erode Perundhurai Improvements to Km 0/0- 5/0 of 5.00 50.00 13-P-1475 Pasuvapatty - Poochankattuvalasu Noyyal road and construction of 1 culvert.

1476 01-CRIDP-12- Erode Perundhurai Improvements to km1/4 -2/4 1.00 13.00 13-P-1476 ofThalavumalai - Noyyal road and construction of 1 culvert. 1477 01-CRIDP-12- Erode Erodewest Improvements to km 0/0 -1/8 of 1.80 22.00 13-P-1477 Moolakarai road

ODR SCP- 25of 45 SECTION OFFICER 166/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1478 01-CRIDP-12- Erode Anthiyur Improvements to Km 2/0-3/4 of 1.40 15.00 13-P-1478 Thavittupalayam -Appakudal road to Koothampoondi (via) Vellalapalayam road and construction of 1 culvert. 1479 01-CRIDP-12- Erode Anthiyur Improvements to Km 0/0-0/4, 1/0- 1.20 12.00 13-P-1479 1/4, 1/8-2/2 of the road from km 1/0 of Anthiyur -Athani road to Annamarpalayam road 1480 01-CRIDP-12- Erode Anthiyur Improvements to Km 0/0-2/0 of 2.00 18.00 13-P-1480 Patlur - Poosariyur road 1481 01-CRIDP-12- Erode Anthiyur Improvements to Km 1/4-2/0 of 0.60 7.00 13-P-1481 Vellithiruppur -Alamapalaym road to Ennamangalam road 1482 01-CRIDP-12- Erode Anthiyur Improvements to Km 0/0-1/4 of 1.40 14.00 13-P-1482 Anthiyur -Athani road to Brammadesam road 1483 01-CRIDP-12- Erode Anthiyur Improvements to Km 1/4-2/8 of 1.40 14.00 13-P-1483 Chinnathambipalayam - Michelpalayam road (via) Thangapalayam. 1484 01-CRIDP-12- Erode Bhavani Improvements to Km 0/0-1/2 of 1.20 11.00 13-P-1484 Ettikuttai -Koonakka palayam road

1485 01-CRIDP-12- Erode Bhavani Improvements to Km.1/6-2/6 of 1.00 9.00 13-P-1485 Guruvareddiyur-Sanisanthai Road.

1486 01-CRIDP-12- Erode Anthiyur Improvements to Km.1/0-2/8 of 1.80 18.00 13-P-1486 Murali-Jarathal Road. Strengthening Total 53.10 702.00 1487 01-CRIDP-12- Erode Modakkurichi Reconstruction of Culvert and 22.00 13-P-1487 Reconstruction of Retaining Wall at Km.0/8 of Rattaisutripalayam - Anjurampalayam Road (Via) Anumanpalli Road.

1488 01-CRIDP-12- Erode Bhavani Construction of RCC slab culvert at 5.00 13-P-1488 km 1/10 of Periyavadamalaipalayam- Chinnavadamalai palayam road

ODR SCP- 26of 45 SECTION OFFICER 167/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1489 01-CRIDP-12- Erode Anthiyur Improvements to the dip in Km 0/4 23.00 13-P-1489 and including construction of the pipe culvert of the road from km 31/2 of Sathy Athani Bhavani road to Kuppandampalayam.

1490 01-CRIDP-12- Erode Modakkurichi Construction ofminor bridge at Km 50.00 13-P-1490 0/4 of Arachalur - Kodumudi Road to Jayaramapuram

Culverts/Bridges Total 4 Nos 100.00 Erode Total 53.10 802.00 1491 01-CRIDP-12- Karur Karur Widening SL to IL and 0.70 42.00 13-P-1491 Improvements to Km 3/7 - 4/4 of Manmangalam - Nanniyur road including 1 culvert Widening Total 0.70 42.00 1492 01-CRIDP-12- Karur Karur Improvments to Km. 6/0-9/4 & 13/6- 7.20 243.00 13-P-1492 17/4 of Nerur - Thalavapalayam C.C. Road 1493 01-CRIDP-12- Karur Aravakurichi Improvements to Km 0/0-1/0 of 1.00 10.00 13-P-1493 Kasipalayam - Nimittampatty Road

1494 01-CRIDP-12- Karur Aravakurichi Improvements to Pungodai 3.00 27.00 13-P-1494 Kulathupalayam to Vadugapatty (via) Sadayappankoil Vettamangalam road Km 0/0 - 3/0

1495 01-CRIDP-12- Karur Aravakurichi Improvements to Kundanipalayam 1.75 16.00 13-P-1495 to Noyyal Paramathy road upto Mettukadai Km 0/0 - 1/750

1496 01-CRIDP-12- Karur Aravakurichi Improvements to Km 9/0 of 1.00 10.00 13-P-1496 Paramathy Noyyal road to Athipalayam Km 1/0 - 2/0 1497 01-CRIDP-12- Karur Kulithalai Improvements to Nangavaram- 0.80 13.00 13-P-1497 Nachalur road km 4/0 - 4/6 & 5/8 - 6/0 1498 01-CRIDP-12- Karur Kulithalai Improvements to Vadaseri road km 2.40 25.00 13-P-1498 0/0 - 2/4 1499 01-CRIDP-12- Karur Krishnaraya Improvements to Km 0/0 - 4/4 of 4.40 62.00 13-P-1499 puram Manavasi - Karuppur road to Nathamedu link road.

ODR SCP- 27of 45 SECTION OFFICER 168/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1500 01-CRIDP-12- Karur Kulithalai Improvements to Km 0/0 - 4/6 of 4.60 43.00 13-P-1500 Kottamedu - Vengampatty (via) Thaliyampatty Road 1501 01-CRIDP-12- Karur Krishnaraya Improvements to Km 0/0 - 2/0 of 2.00 20.00 13-P-1501 puram Keeranur - Puduvady Road 1502 01-CRIDP-12- Karur Krishnaraya Improvements to Km 3/0 - 4/6 of 1.60 18.00 13-P-1502 puram Karur - Esanatham Road to Karumparappu Road 1503 01-CRIDP-12- Karur Krishnaraya Improvements to Km7/2 - 9/6 of 2.40 27.00 13-P-1503 puram Koravapatty - Kullampatty Road 1504 01-CRIDP-12- Karur Aravakurichi Improvements to Paramathy 4.00 42.00 13-P-1504 Noyyal road to Panjapitchakuttai Km 0/0 - 4/0 1505 01-CRIDP-12- Karur Aravakurichi Improvements to Km 6/0 - 8/0 of 2.00 22.00 13-P-1505 Km 58/6 of Erode - Karur road to Branching from Old NH road to Km 282/6 to Link road from (via) Athur - Moorthipalayam - Nanaparappu road

1506 01-CRIDP-12- Karur Aravakurichi Improvements to km 4/0 - 8/9 of 4.90 50.00 13-P-1506 Nanjakalakurichi Road 1507 01-CRIDP-12- Karur Aravakurichi Improvements to km 4/6 - 8/562 of 3.96 40.00 13-P-1507 Malaikovilur (NH-7 Branching Km 318/6 ) - Nandanur Road

1508 01-CRIDP-12- Karur Kulithalai Improvements to km 0/2 - 4/2 of 4.00 50.00 13-P-1508 Komateri - Panjapatty Road 1509 01-CRIDP-12- Karur Aravakurichi Improvements to km 0/0 - 2/0 of 2.00 20.00 13-P-1509 Thennilai - Mayilrangam Road

1510 01-CRIDP-12- Karur Aravakurichi Improvements to km 1/0 - 3/0 of 2.00 20.00 13-P-1510 Pavithram - Chatram Road (Via) Nadupalayam Strengthening Total 55.01 758.00 Karur Total 55.71 800.00 Tiruppur Total 206.36 3255.00 1511 01-CRIDP-12- Coimbatore Avinashi Widening from SL to IL and 1.20 75.00 13-P-1511 Improvements in km 9/0-10/2 of Thandukaranpalayam-Pasur road

1512 01-CRIDP-12- Coimbatore Avinashi Widening from SL to IL and 2.00 100.00 13-P-1512 Improvements in km 2/0-4/0 of Kurumbapalayam Karichipalayam Road

ODR SCP- 28of 45 SECTION OFFICER 169/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1513 01-CRIDP-12- Coimbatore Kinathukadavu Widening & improvements from SL 3.60 180.00 13-P-1513 to IL in Km 5/4 of Podanur – Chettipalayam road to Km 149/8 of Dindugal Bangalore road (via) Echanari km 0/0 – 3/6

1514 01-CRIDP-12- Coimbatore Sulur Widening from SL to IL and 3.80 200.00 13-P-1514 improvements in Km 7/2 - 11/0 including junction improvement at Km 7/2 of Karuvalur-Kovilpalayam road 1515 01-CRIDP-12- Coimbatore Kavundam Widening from SL to IL and 2.00 100.00 13-P-1515 palayam improvements in Km 0/0 - 2/0 of Devampalayam - Pethanaickenpalayam road 1516 01-CRIDP-12- Coimbatore Avinashi Widening from SL to IL and 3.40 174.00 13-P-1516 Improvements in km 6/8- 10/2 of Kurumbapalayam Karichipalayam Road including Junction Improvements at Km 7/10

Widening Total 16.00 829.00 1517 01-CRIDP-12- Coimbatore Mettupalayam Improvements to Mettupalayam - 3.25 85.00 13-P-1517 Kitchagathur (via) Moolathurai Road in Km 9/0 - 11/0, 11/6-12/2, 12/6 - 13/250 1518 01-CRIDP-12- Coimbatore Kinathukadavu Improvements in Km 2/8 – 6/8 of 4.00 120.00 13-P-1518 Km 1/8 of Palathurai to Ettimadai Cochin frontier road Strengthening Total 7.25 205.00 Coimbatore Total 23.25 1034.00 1519 01-CRIDP-12- Pollachi Pollachi Widening Single lane to 4.40 80.00 13-P-1519 Intermediate lane in Km,0/0-4.4 and Improvements in Km.0/0-1/0 of Km.3/2 of Pollachi Nadupuni road to Thalakarai. 1520 01-CRIDP-12- Pollachi Pollachi Widening Single lane to 3.20 50.00 13-P-1520 Intermediate lane in Km.0/0-3/2of Muthur Ramapattinam road.

Widening Total 7.60 130.00 1521 01-CRIDP-12- Pollachi Valparai Improvements to km 0/6 - 2/0 of 1.40 50.00 13-P-1521 Angalakuruchi - Sangampalayam road

ODR SCP- 29of 45 SECTION OFFICER 170/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1522 01-CRIDP-12- Pollachi Udumalapet Improvements to Km.0/0-1/8 off 1.80 17.00 13-P-1522 Km.9/6 of Pollachi Dharapuram Karur road to A.Nagoor. 1523 01-CRIDP-12- Pollachi Valparai Improvements to km 2/0-3/0 of 1.00 10.00 13-P-1523 Km.22/4 of Pollachi - Valparai road to Nellithurai - Mannam road

1524 01-CRIDP-12- Pollachi Valparai Improvements to km 6/0 - 8/850 of 2.85 28.50 13-P-1524 the road from km 5/4 of Kottur - Thengaparai road to Vettaikaranpudur Strengthening Total 7.05 105.50 Pollachi Total 14.65 235.50 1525 01-CRIDP-12- Gobi Gobichetty Widening and Improvements to km 1.40 80.00 13-P-1525 palayam 0/6-2/0 of Gobi town - bank Road. 1526 01-CRIDP-12- Gobi Bhavanisagar Widening SL to IL in km 0/0-4/5 of 4.50 170.00 13-P-1526 Moolakinaru -Shenbagapudur road including construction of retaining wall and side drains and widening of culverts & curves

1527 01-CRIDP-12- Gobi Bhavanisagar Widening SL to IL in km 0/0-1/0 2.60 55.00 13-P-1527 and improvements to km 0/0-2/6 of Thalavady-Bharathipuram Road .

1528 01-CRIDP-12- Gobi Bhavanisagar Widening SL to IL in km 1/6-4/0 4.00 120.00 13-P-1528 and Improvements to Km 0/0-4/0 of Ikkarai - Thathapalli - Velliyampalyam Road. Widening Total 12.50 425.00 1529 01-CRIDP-12- Gobi Anthiyur Improvements to km0/0-2/3 of 2.30 45.00 13-P-1529 Vellalapalayam-Thottipalayam Road. 1530 01-CRIDP-12- Gobi Gobichetty Improvements to km 6/4-8/2 of 1.80 27.00 13-P-1530 palayam Nagadevampalayam Road. 1531 01-CRIDP-12- Gobi Gobichetty Improvements to km0/0-1/5 of 1.50 20.00 13-P-1531 palayam Nagadevampalayam-Mettuvalavu Road.

ODR SCP- 30of 45 SECTION OFFICER 171/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1532 01-CRIDP-12- Gobi Bhavani Improvements to km 0/0-1/0, 1/4- 1.80 25.00 13-P-1532 2/0 ,5/2-5/4 of Road from km 137/4 of Ooty -Mettupalayam - Sathy - Gobi - Erode road to join at km 40/2 of Sathy - Athani - Bhavani Road.

1533 01-CRIDP-12- Gobi Bhavani Improvements to km 9/8-11/8 2.00 40.00 13-P-1533 including construction of One culvert in Perunthalaiyur Kalingarayam Palayam Road. 1534 01-CRIDP-12- Gobi Perundhurai Improvements to km 7/0-12/0 of 5.00 54.00 13-P-1534 Thingalore-Moolakadai road (via) Broughnagar, Periyagoundenvalasu 1535 01-CRIDP-12- Gobi Perundhurai Improvements to km0/0-5/2 of 5.20 60.00 13-P-1535 Kanjikoil-Nasiyanur Road. 1536 01-CRIDP-12- Gobi Perundhurai Improvements to km 9/2 - 12/0 , 3.80 45.00 13-P-1536 13/0 - 14/0 of Thudupathi - Chittampalayam Road. 1537 01-CRIDP-12- Gobi Perundhurai Improvements to km 0/4- 2/0 of 1.60 20.00 13-P-1537 Kanjikoil road to Thambikalai ayyan kovil road (via) Thangamedu (H) Colony 1538 01-CRIDP-12- Gobi Perundhurai Improvements to km 0/0-5/5 of 5.50 85.00 13-P-1538 Nasiyanur-Attaiyampalayam Road.

1539 01-CRIDP-12- Gobi Gobichetty Improvements to km1/0-1/4 & 4/0- 0.80 12.00 13-P-1539 palayam 4/4 of Nallagoundenpalayam- Kurumandur market Road.

1540 01-CRIDP-12- Gobi Gobichetty Improvements to km 0/0-1/0 of 1.00 15.00 13-P-1540 palayam Palangarai-Nambiyur road to Kunnathur Road . 1541 01-CRIDP-12- Gobi Gobichetty Improvements to km 2/0-6/0 and 4.00 170.00 13-P-1541 palayam Construction of One culvert in Puliyampatty-Nambiyur Road.

1542 01-CRIDP-12- Gobi Gobichetty Improvements to km 2/8-7/6 of 4.80 46.00 13-P-1542 palayam Irugalur-Sundakkampalayam Road.

1543 01-CRIDP-12- Gobi Gobichetty Improvements to km0/0-4/2 of 4.20 42.00 13-P-1543 palayam Arakkankottai-Kongarpalayam Road.

ODR SCP- 31of 45 SECTION OFFICER 172/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1544 01-CRIDP-12- Gobi Bhavanisagar Improvements to km0/0-5/6 5.60 58.00 13-P-1544 Kenjanur-Chickkarasampalayam road to Puduvadavalli road (via) Ikkarai Negamampudur A.D.Colony

1545 01-CRIDP-12- Gobi Bhavanisagar Improvements to km0/0-3/0 of 3.00 36.00 13-P-1545 Road from Km 2/2 of Thalavady- Bharathipuram road to join Sathy- Mysore Road. 1546 01-CRIDP-12- Gobi Bhavanisagar Improvements to km 6/0-7/6 & 3.80 45.00 13-P-1546 11/6-13/8 Palayam-Sothanpuram Road. 1547 01-CRIDP-12- Gobi Bhavanisagar Improvements to km0/0-1/0 of 1.00 12.00 13-P-1547 Road from Km 0/8 of Eraganahally- Kalmandipuram road to join Km 1/4 of Eraganahally-Belathur Road .

Strengthening Total 58.70 857.00 1548 01-CRIDP-12- Gobi Anthiyur Construction of Bridge in liew of 90.00 13-P-1548 vented causeway at km 1/2 of Kallipatty-Valayapalayam road

1549 01-CRIDP-12- Gobi Gobichetty Construction of culverts and 35.00 13-P-1549 palayam approaches at km 0/4, 0/6 of Kongarpalayam - Kongarpalayam AD colony via Kunnankaradu

Culverts/Bridges Total 2 Nos 125.00 Gobi Total 71.20 1407.00 1550 01-CRIDP-12- Udhagai Gudalur Widening the road from SL to IL 2.20 142.00 13-P-1550 and Improvements to Km 5/0 - 7/2 of Silver Jubilee Road Widening Total 2.20 142.00 1551 01-CRIDP-12- Udhagai Uthaga Improvements to km 2/0-4/8 of 2.80 94.00 13-P-1551 mandalam Athikkal Kadashola road including CC Drain 1552 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0 - 2/0 of 2.00 55.00 13-P-1552 Kattery Selas Road (Via) Hullical NonSuch road.Including Protective wall and CC drain.

1553 01-CRIDP-12- Udhagai Gudalur Improvements to Km 6/0 - 7/0 & 4.60 145.00 13-P-1553 8/0 - 8/8 and 13/0-15/8 of Singara Masinagudi Moyar

ODR SCP- 32of 45 SECTION OFFICER 173/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1554 01-CRIDP-12- Udhagai Gudalur Improvements to Km 0/0-2/4 of 2.40 70.00 13-P-1554 Kozhibazaar Manvayal road 1555 01-CRIDP-12- Udhagai Coonoor Improvements to Km 1/0 - 2/2 of 1.20 35.00 13-P-1555 Jakkanarai road including CC drain , Protective works and Providing interlocking Paver block

1556 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0-2/4 of 2.40 42.00 13-P-1556 Gettikambai - Battakorai road including CC drain and Protective works 1557 01-CRIDP-12- Udhagai Uthaga Improvements to Km 0/0-2/1 of 2.10 96.00 13-P-1557 mandalam new Avalanchi Duck Bungalow road 1558 01-CRIDP-12- Udhagai Uthaga Improvements to Km 0/0-3/6 of 3.60 100.00 13-P-1558 mandalam Theetukkal Kuruthukuli Nanjanadu Road including protective works and CC drain 1559 01-CRIDP-12- Udhagai Uthaga Improvements to Km 0/0-3/6 of 3.60 97.00 13-P-1559 mandalam B.Manihatty road including protective works 1560 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0 - 1/2 of 1.20 30.00 13-P-1560 Mallikorai Sanitorium Road.Including Cement Concrete Drain. 1561 01-CRIDP-12- Udhagai Coonoor Improvements to Km 2/0 - 4/0 of 2.00 65.00 13-P-1561 Ketti Palada Ornally Road (Via) Kollimalai road.Including Paver Block and Cement Concrete Drain work. 1562 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0 - 2/0 of 2.00 70.00 13-P-1562 Glendale Bengam road including cement concrete drain and protective work 1563 01-CRIDP-12- Udhagai Gudalur Improvements to Km 0/0 - 2/4 of 2.40 63.00 13-P-1563 Puthurvayal - Nambalakotta Road

1564 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0-1/2 of the 1.20 35.00 13-P-1564 road road from km 11/2 of Coonoor - Kattabettu road to Naduhatty including CC drain and protective works.

ODR SCP- 33of 45 SECTION OFFICER 174/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1565 01-CRIDP-12- Udhagai Coonoor Improvements to Km 0/0-1/0 of 1.00 25.00 13-P-1565 Beptise colony - Murugan colony road including CC drain and Protective works. Strengthening Total 34.50 1022.00 1566 01-CRIDP-12- Udhagai Coonoor Providing interlocking paver block 30.00 13-P-1566 to Shadow portion and CC drain at km 1/10 & 2/2 of Cockburn road .

1567 01-CRIDP-12- Udhagai Coonoor Providing CC drain in km 4/4 -5/0 35.00 13-P-1567 and interlocking Paver block at Km 4/4 of Kotagiri - Milithane - Beragany road 1568 01-CRIDP-12- Udhagai Coonoor Providing Cement Concrete Drain 86.00 13-P-1568 and Cross Drainage works from Km 1/6 - 4/0 of Hallakarai Road.

1569 01-CRIDP-12- Udhagai Coonoor Providing interlocking block 42.00 13-P-1569 pavement to swamp portion at km 6/4,6/6,7/4, 7/6 and 1/6 of Sholurmattam road . 1570 01-CRIDP-12- Udhagai Coonoor Providing interlocking block 66.00 13-P-1570 pavement to swamp portion at km 0/2 , 0/4, 0/6 and Construction of Pipe culvert at km 0/2 including retaining wall at Km 0/2, 0/4, 0/6, 0/8 of Kengarai road

Others Total 5 Nos 259.00 Udhagai Total 36.70 1423.00 Coimbatore Total 145.80 4099.50 1571 01-CRIDP-12- Theni Bodi Widening from S.L to I.L in km 0/0 - 2.40 55.00 13-P-1571 nayakanur 2/4 of Boothipuram - valayapatty road.including Reconstruction of Pipe culvert 02 Nos

ODR SCP- 34of 45 SECTION OFFICER 175/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1572 01-CRIDP-12- Theni Andipatti Widening fromSL to IL in km 0/0- 9.00 210.00 13-P-1572 3/8 and 4/2-9/0 ,Widening from SL to IL in km 3/8-4/2 by providing CC Pavement in built up area and improvements in km 1/0 - 3/6 and 6/2-9/0 of Andipatty -Theppampatty road to Gandamanur - Myladumparai road (via) Banduvarpatty - Balasamuthiram and Reconstruction of culvert 2 Nos. including construction of Retaining wall

1573 01-CRIDP-12- Theni Bodi Widening from SL to IL in Km 0/0- 7.60 245.00 13-P-1573 nayakanur 7/6 ,and Improvements in km 1/2- 7/6 of Kottur - Kamatchipuram road and reconstruction of culvert 01-No including construction of retaining wall and providing paver block at km. 4/2-4/8 and 6/2-6/8

1574 01-CRIDP-12- Theni Bodi Widening from SL to IL in km 0/0- 0.80 11.00 13-P-1574 nayakanur 0/8 Poomalaigundu village road

1575 01-CRIDP-12- Theni Periyakulam Widening from SL to IL in km.0/0- 2.80 90.00 13-P-1575 2/8 and improvements in km 0/0- 1/0 of Periyakulam - Devathanapatty road to Bomminaickanpatty road (via) Erumalainaickan patty Including reconstruction of culvert at 5 Nos.

1576 01-CRIDP-12- Theni Cumbam Widening from SL to IL in Km 0/0- 4.20 110.00 13-P-1576 4/2 of Chinnamanur-A.Alagapuri Road including Recontruction of culvert 5 Nos.

Widening Total 26.80 721.00 1577 01-CRIDP-12- Theni Bodi Reconstruction of culvert at km.1/4 15.00 13-P-1577 nayakanur of Aranmanaipudur - Ayyanarpuram road Culverts/Bridges Total 1 Nos 15.00

ODR SCP- 35of 45 SECTION OFFICER 176/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1578 01-CRIDP-12- Theni Andipatti Construction of Protective wall at 65.00 13-P-1578 Km 0/2-0/4 of Ammachiyapuram road Others Total 1 Nos 65.00 Theni Total 26.80 801.00 1579 01-CRIDP-12- Dindigul Natham Widening from Single lane to 13.40 670.00 13-P-1579 Intermediate lane in Km.5/6 - 19/0 and Strengthening in km 5/6-9/0, 10/0-11/0, 14/0-19/0 and Rebuilding in km 6/6,6/8(300M) including construction of Retaining walls & culverts(23 Nos) in Sirumalai Ghat Road

1580 01-CRIDP-12- Dindigul Natham Widening Single Lane to 13.40 920.00 13-P-1580 Intermediate Lane in KM 0/4 -13/4 and Strengthening in km 0/0-13/4 including Reconstruction of culverts(16 Nos) & Construction of Retaining walls in Samuthrapatti - Kottaiyur Road

Widening Total 26.80 1590.00 1581 01-CRIDP-12- Dindigul Palani Improvements in km 4/0-7/0 and 3.00 48.00 13-P-1581 construction of protective wall to open wells in Kombaipatti - Karumbuvayal road

1582 01-CRIDP-12- Dindigul Oddan Improvements in km 1/6-3/2 of 1.60 18.00 13-P-1582 chathiram Kodangipatti - Navaloothu road Strengthening Total 4.60 66.00 Dindigul Total 31.40 1656.00 1583 01-CRIDP-12- Sivagangai Karaikudi Widening From SL-DL and 2.00 199.00 13-P-1583 Improvements to Kottaiyur Diversion road Km. 5/8-7/774 & including reconstruction of culverts(10 Nos) Widening Total 2.00 199.00 1584 01-CRIDP-12- Sivagangai Karaikudi Improvements to Sakkottai Embal 2.00 75.00 13-P-1584 Road km.5/0-6/0,9/0-10/0

1585 01-CRIDP-12- Sivagangai Karaikudi Improvements to Sakkottai 6.00 65.00 13-P-1585 Paravayal road km.0/900-2/0,4/0- 8/900

ODR SCP- 36of 45 SECTION OFFICER 177/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1586 01-CRIDP-12- Sivagangai Karaikudi Improvements to Thirupanakudi to 2.55 30.00 13-P-1586 meet at km.13/0 of Kottaiyur- Aranthaki road km.8/0-10/550 1587 01-CRIDP-12- Sivagangai Karaikudi Improvements to sirugavayal - 4.80 59.00 13-P-1587 Thalaiyur road km.0/0-1/0,5/0- 8/800 1588 01-CRIDP-12- Sivagangai Sivaganga Improvements to K.Pudupati to 3.00 40.00 13-P-1588 Meet Madurai - thondi road (via) Sakkanthi -, Mudikandam road km. 2/0-5/0 and reconstruction culvert (3Nos) 1589 01-CRIDP-12- Sivagangai Manamadurai Improvements to Silaiman - 2.80 50.00 13-P-1589 Pottapalayam Road Km 4/0-6/8

1590 01-CRIDP-12- Sivagangai Manamadurai Improvements Alampacheri - 5.00 64.00 13-P-1590 Thiruvengadam Road Km 0/0 - 1/0, 2/0 - 3/0, 6/0 - 9/0 including Reconstruction of culvert( 2 Nos)

1591 01-CRIDP-12- Sivagangai Karaikudi Improvements to Kallal - Devakottai 6.71 80.00 13-P-1591 road in Km 9/0 - 12/0, 16/0 - 19/710 & including reconstruction of culverts ( 5 Nos)

1592 01-CRIDP-12- Sivagangai Karaikudi Improvements to Salaigramam - 6.70 80.00 13-P-1592 Sarugani Road Km 19/3 - 22/0, 24/0 - 28/0. & including reconstruction of culverts ( 5 Nos)

1593 01-CRIDP-12- Sivagangai Manamadurai Improvements to Sengudi - 4.80 54.00 13-P-1593 Vadavaneri road Km. 3/0-6/0,7/2- 9/0 1594 01-CRIDP-12- Sivagangai Manamadurai Improvements toSalaigramam - 3.40 35.00 13-P-1594 Pudukottai road KM. 2/2-5/6 1595 01-CRIDP-12- Sivagangai Karaikudi Improvements to Km 6/0-6/8, and 1.43 120.00 13-P-1595 Providing and Laying Paver Blocks of Devakottai - A.Pudur Road in Km 6/8 - 7/425

1596 01-CRIDP-12- Sivagangai Manamadurai Providing Paver Block @ Km 0/4- 0.10 7.00 13-P-1596 of Salaigramam -Kilanjunai road.

1597 01-CRIDP-12- Sivagangai Manamadurai Providing paver block @ 0.20 6.00 13-P-1597 Madapuram road km.0/8, 1/2

ODR SCP- 37of 45 SECTION OFFICER 178/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1598 01-CRIDP-12- Sivagangai Tirupattur Provide Paver Block @ Km 0/2 of 0.10 12.00 13-P-1598 A.Thekkur - Pudur Road including Reconstruction of culvert(1No)

Strengthening Total 49.59 777.00 Sivagangai Total 51.59 976.00 1599 01-CRIDP-12- Ramnad Paramakudi Improvements to NH 49 to 1.40 24.00 13-P-1599 T.Karunkulam Road km.0/0- 1/400

1600 01-CRIDP-12- Ramnad Ramanatha Improvements to High 3.00 70.00 13-P-1600 puram Embankment Thiruppullani- Kuthukal valasai road Km.0/0-2/0 and 8/0-9/0 1601 01-CRIDP-12- Ramnad Paramakudi Improvements to Muthaneri - 5.45 95.00 13-P-1601 Perumalkoil road Km.2/8-3/8 & 5/200-9/650 1602 01-CRIDP-12- Ramnad Paramakudi Improvements to NH 49 to 2.43 68.00 13-P-1602 Vairavanendal Road km.2/0-3/0and 8/0-9/425 and construction of retaining wall 1603 01-CRIDP-12- Ramnad Paramakudi Improvements to N.H.49 to 1.00 67.00 13-P-1603 Theeyanoor road km. 0/0-1/0 and construction of retaining wall

1604 01-CRIDP-12- Ramnad Paramakudi Improvements to Paramakudi- 1.80 31.00 13-P-1604 Keerandai Road to Kalaiyur (Via) Kokkupallam Road Km.0/0-1/800

1605 01-CRIDP-12- Ramnad Paramakudi Improvements to Mudhaloor - 6.30 115.00 13-P-1605 Kamankottai (Via) Sevoor Mennanthi Nagatchi Road km.3/0- 9/300 1606 01-CRIDP-12- Ramnad Paramakudi Improvements to Paramakudi - 1.00 18.00 13-P-1606 Mudukulathur Road km.9/6 to Pambur road Km.0/0-1/0 1607 01-CRIDP-12- Ramnad Paramakudi Improvements to N.H.49 to 2.60 45.00 13-P-1607 Kallikudi Road Km.0/0-2/600

1608 01-CRIDP-12- Ramnad Paramakudi Improvements to NH 49 km.67/2 1.40 24.00 13-P-1608 to Kamuthakudi Road Km.0/0- 1/400

1609 01-CRIDP-12- Ramnad Paramakudi Improvements to NH 49 to 1.80 39.00 13-P-1609 Seyyalur Road km.0/0-1/800

ODR SCP- 38of 45 SECTION OFFICER 179/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1610 01-CRIDP-12- Ramnad Mudhukulathur Improvements to Natham - 7.00 140.00 13-P-1610 Nediyamanickam Road Km.5/6-9/4 ,11/8-12/6 and 23/0-25/4

1611 01-CRIDP-12- Ramnad Ramanatha Improvements to Puthendal - 5.00 90.00 13-P-1611 puram Earwadi Road Km.2/0-3/0 ,10/0- 11/0 and 13/0-16/0

1612 01-CRIDP-12- Ramnad Ramanatha Improvements to 1.50 27.00 13-P-1612 puram Uthiragosamangai - Sevalpatti Road to Ekkakudi Road Km.0/0- 1/500 1613 01-CRIDP-12- Ramnad Tiruvadanai Improvements to N.H.210 to 1.00 20.00 13-P-1613 Vilathur Road Km.2/0-3/0 1614 01-CRIDP-12- Ramnad Tiruvadanai Improvements toNH 210 to 1.60 29.00 13-P-1614 Valamavoor Road Km.3/4-4/0 and 5/0-6/0 1615 01-CRIDP-12- Ramnad Tiruvadanai Improvements toAnjukkottai - 4.58 80.00 13-P-1615 Neerkundram Road Km.7/8-12/380

Strengthening Total 48.855 982.00 Ramnad Total 48.855 982.00 Madurai Total 158.645 4415.00 1616 01-CRIDP-12- Tirunelveli Tirunelveli Strengthening to Service Road Km 0.88 50.00 13-P-1616 0/0 - 0/880 including drainage works. Strengthening Total 0.88 50.00 Tirunelveli Total 0.88 50.00 1617 01-CRIDP-12- Tenkasi Vasudeva Widening SL to IL and 0.60 32.00 13-P-1617 nallur improvements by providing cement concrete pavement in km 0/600- 0/850 including construction of drain and improvements in km 0/850-1/200 of Nagaram - Duraisamiapuram road.

1618 01-CRIDP-12- Tenkasi Sankarankoil Widening SL to IL and 2.70 200.00 13-P-1618 Improvements in Km 0/0 - 2/7 of Sendamaram - Puliangudi Road including construction of retaining wall

ODR SCP- 39of 45 SECTION OFFICER 180/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1619 01-CRIDP-12- Tenkasi Vasudeva Widening SL to IL in km 9/8-11/8 & 3.08 150.00 13-P-1619 nallur 14/8-15/680 and Improvements in km 9/8-11/8 & 14/8-15/880 of Paruvakudi - Sivagiri Road

1620 01-CRIDP-12- Tenkasi Sankarankoil Widening SL to IL and 3.00 174.00 13-P-1620 Strengthening in Km 0/0 - 3/0 of Road Branching @ Km 33/2 of Rajapalayam - Sankarankovil - Tirunelveli Road to Nedunkulam including construction of retaining wall and Reconstruction of Pipe Culvert @ Km 0/6

Widening Total 9.38 556.00 1621 01-CRIDP-12- Tenkasi Vasudeva Improvements in km 2/4 - 9/4 of 7.00 85.00 13-P-1621 nallur Subaiahpuram - Thalayanai Road

1622 01-CRIDP-12- Tenkasi Vasudeva Improvements in km 2/0 - 3/4 of km 1.40 17.00 13-P-1622 nallur 6/4 of Sendamaram - Pambhukoilsandai Road to meet Nagaram - Vadamalapuram Road via Ramasamiapuram

1623 01-CRIDP-12- Tenkasi Vasudeva Improvements in km 0/0-1/8 & 4/0 - 2.40 28.00 13-P-1623 nallur 4/6 of Nagaram - Subramaniapuram Road 1624 01-CRIDP-12- Tenkasi Vasudeva Improvements in km 0/0 - 0/6 of 0.60 9.00 13-P-1624 nallur Malaiyadikurichi Road II including CD work at km 0/2 1625 01-CRIDP-12- Tenkasi Sankarankoil Improvement in Km 0/0 - 2/4 of 2.40 30.00 13-P-1625 Naduvakurichi - Dharumathurani Road 1626 01-CRIDP-12- Tenkasi Sankarankoil Improvement in Km 3/0 - 6/2 of 3.20 33.00 13-P-1626 Naluvasan kottai - Alamanayakkarpatti Road 1627 01-CRIDP-12- Tenkasi Vasudeva Improvement in km 0/0 - 2/6 of 2.60 30.00 13-P-1627 nallur Nelkattumseval - Ammankulam Road to Ramachandrapuram including 3 nos. of CD works. Strengthening Total 19.60 232.00 1628 01-CRIDP-12- Tenkasi Vasudevanall Reconstruction of Culvert in km 0/2 12.00 13-P-1628 ur of Mullikulam - Pambhukoil sandai Road including Junction improvement work.

ODR SCP- 40of 45 SECTION OFFICER 181/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1629 01-CRIDP-12- Tenkasi Sankarankoil Construction of Minor Bridge in Km 50.00 13-P-1629 4/4 & 4/6 of Naluvasankottai - Road.

1630 01-CRIDP-12- Tenkasi Sankarankoil Reconstruction of Minor Bridge in 30.00 13-P-1630 Km 0/4 of Kayathar Panchayat Union limit to Chokkanaicharpuram Road Culverts/Bridges Total 3 Nos 92.00 Tenkasi Total 28.98 880.00 1631 01-CRIDP-12- Virudhunagar Sattur Widening from SL to IL and 0.70 38.00 13-P-1631 improvements in Km 2/0-2/7 of Madurai Kanyakumari road to meet Sattur Sivakasi Srivilliputhur road (via) Muthalanaykkanpatti road including 2 nos of Reconstruction of Culvert

Widening Total 0.70 38.00 1632 01-CRIDP-12- Virudhunagar Aruppukottai Improvements to Meenakshipuram- 2.00 35.00 13-P-1632 Tiruvirundalpuram road Km 0/0-2/0 and inluding culvert @ km 2/8

1633 01-CRIDP-12- Virudhunagar Sattur Improvements to 3.60 35.00 13-P-1633 Keelarajkularaman - Gopalapuram road Km 0/0-3/6 1634 01-CRIDP-12- Virudhunagar Sattur Improvements to Kilavikulam road 3.75 35.00 13-P-1634 Km 0/0 - 3/750. 1635 01-CRIDP-12- Virudhunagar Sattur Improvements to Mudugudi - 1.40 15.00 13-P-1635 Gopalapuram road to Kilavikulam road (Via) Rengapanaickenpatti road Km 0/0 - 1/4.

1636 01-CRIDP-12- Virudhunagar Sattur Improvements to Samsigapuram - 1.10 10.00 13-P-1636 Kalingapatti road to Varakunaramapuram road Km 0/0 - 1/100 1637 01-CRIDP-12- Virudhunagar Sattur Improvements to Jegaveeranpatti - 3.00 45.00 13-P-1637 Union limit (via) Panayadipatti in Km 5/0 - 8/0

1638 01-CRIDP-12- Virudhunagar Sattur Improvements to Kungankulam - 2.00 30.00 13-P-1638 Thiruvenkadapuram Road in Km 0/0- 2/0

ODR SCP- 41of 45 SECTION OFFICER 182/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1639 01-CRIDP-12- Virudhunagar Sivakasi Improvemetns to Sithurajapuram - 1.20 11.00 13-P-1639 Vilampatti Road in km 3/8-5/0

1640 01-CRIDP-12- Virudhunagar Sivakasi Improvements to Sivakasi - 1.40 30.00 13-P-1640 Kanniseri road km 3/6-5/0 including reconstruction of narrow culvert

1641 01-CRIDP-12- Virudhunagar Virudhunagar Improvements to Srivilliputhur - 1.40 14.00 13-P-1641 Parthibanoor Road to Annaikuttam Road in km 0/0-1/4 1642 01-CRIDP-12- Virudhunagar Aruppukottai Improvements to Koskundu - 0.40 8.00 13-P-1642 Karisalkulam union limit road Km 0/0 - 0/400 1643 01-CRIDP-12- Virudhunagar Rajapalayam Improvements to Devathanam - 3.20 35.00 13-P-1643 Sasthakovil road Km 7/0 - 10/2. 1644 01-CRIDP-12- Virudhunagar Rajapalayam Improvements to Sethur - 0.92 46.00 13-P-1644 Ayyankollankondan road Km 4/6- 5/520 1645 01-CRIDP-12- Virudhunagar Sattur Improvements to Sattur T.B road - 2.80 35.00 13-P-1645 Ramalingapuram road Km 0/0 - 2/8 including construction of culvert at Km 1/8

1646 01-CRIDP-12- Virudhunagar Sattur Improvements to Chinnakollapatti - 0.40 6.00 13-P-1646 Ayyampatti roadKm 1/4 - 1/8

1647 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Muthulingapuram 3.40 64.00 13-P-1647 road km 0/0-3/4.

1648 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Sundarapandiam - 3.44 64.00 13-P-1648 Keelapudur road km 1/4-4/842.

1649 01-CRIDP-12- Virudhunagar Srivilliputhur Improvements to Gopalapuram - 0.80 15.00 13-P-1649 Koomapatti road Km 6/2-7/0 1650 01-CRIDP-12- Virudhunagar Virudhunagar Improvements to Thalaipatti - 2.00 27.00 13-P-1650 Thatchakudi Road in Km 0/0-2/0

1651 01-CRIDP-12- Virudhunagar Aruppukottai Improvements to Kottur - 3.60 40.00 13-P-1651 V.Sundralingapuram Road Km 0/0- 3/6 1652 01-CRIDP-12- Virudhunagar Thiruchuli Improvements to Panikarupu - 4.00 58.00 13-P-1652 Esalimadai road Km 0/0-4/0 Strengthening Total 45.812 658.00

ODR SCP- 42of 45 SECTION OFFICER 183/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1653 01-CRIDP-12- Virudhunagar Aruppukottai Construction of Minor Bridge at Km 100.00 13-P-1653 3/2 & 3/4 of Avudaiyapuram - Kottur road 1654 01-CRIDP-12- Virudhunagar Aruppukottai Construction of Culvert at Km 0/2 3.00 13-P-1654 of Sattur - Nenmeni road to Nathathupatti road 1655 01-CRIDP-12- Virudhunagar Aruppukottai Construction of Minor bridge at Km 35.00 13-P-1655 5/2 of Nalli Railway staion - Sinduvampatti road 1656 01-CRIDP-12- Virudhunagar Aruppukottai Reconstruction of Two rows of pipe 3.00 13-P-1656 culvert at km.7/4 of Aruppukottai- Kurunthamadam road

1657 01-CRIDP-12- Virudhunagar Sattur Reconstruction of culvert at Km 2/8 35.00 13-P-1657 and laying of wearing coat to the existing causeway at Km 1/6 of Sattur T.B - Ramalingapuram road to Ammapatti (via) Kathalampatti road

1658 01-CRIDP-12- Virudhunagar Aruppukottai Reconstruction of Minor Bridge at 42.00 13-P-1658 Km 3/4 & Construction of Retaining wall at Km 2/10 of Nalli - Kumarapuram road to Thottilovanpatti road Culverts/Bridges Total 6 Nos 218.00 1659 01-CRIDP-12- Virudhunagar Aruppukottai Construction of retaining wall at Km 11.00 13-P-1659 3/10, 4/10 Madurai - Kannaykuamri road - Neeravipatti road 1660 01-CRIDP-12- Virudhunagar Aruppukottai Consturction of Retaining wall at 60.00 13-P-1660 Km 1/6 - 2/250 of Pothireddiyaptti - Periyakillapatii road

Others Total 2 Nos 71.00 Virudhunagar Total 46.51 985.00 1661 01-CRIDP-12- Tuticorin Ottapidaram Widening SL to DL and Rebuilting 5.20 650.00 13-P-1661 the road in km 0/0-5/2 of Pottalurani - Sekkarakudi - Perurani - Mangalagiri Road. Widening Total 5.20 650.00

ODR SCP- 43of 45 SECTION OFFICER 184/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1662 01-CRIDP-12- Tuticorin Kovilpatti Improvements to Kovilpatti - 2.00 49.00 13-P-1662 Kumarapuram - Gopalapuram - Chettikuruchi Road in km 4/0-5/0 & 6/0-7/0 including Construction of Cement Concrete road with drainage in km 6/040-6/300.

1663 01-CRIDP-12- Tuticorin Ottapidaram Improvements to Maniyatchi - 1.00 45.00 13-P-1663 Ottanatham Road in km 0/0-1/0 1664 01-CRIDP-12- Tuticorin Ottapidaram Improvements to Road branching 1.00 45.00 13-P-1664 from km 46/4 of Palayamcottai- Kurukkuchalai-Kulathur- Vilathikulam-Nagalapuram- Pandalgudi-Aruppukottai road to Panchalankuruchi Road in km 3/0- 4/0

1665 01-CRIDP-12- Tuticorin Ottapidaram Improvements to Seithunganallur - 2.60 40.00 13-P-1665 Vasavappa puram Road in km 0/0- 2/6 1666 01-CRIDP-12- Tuticorin Ottapidaram Improvements to Vallanadu - 1.00 15.00 13-P-1666 Kaliyavur Road in km 3/0-4/0 1667 01-CRIDP-12- Tuticorin Ottapidaram Improvements to Nattarkulam - 1.40 20.00 13-P-1667 Harijancolony Road in km 0/0-1/4

1668 01-CRIDP-12- Tuticorin Vilathikulam Improvements to Nagalapuram - 2.00 40.00 13-P-1668 Melakaranthai - Masarpatti - Rajapatti road in km 7/0-9/0 1669 01-CRIDP-12- Tuticorin Vilathikulam Improvements to Kovilpatti - 2.00 40.00 13-P-1669 Kadalaiyur - Muthalapuram - Perilovanpatti - Pillaiyarnatham Road in km 22/0-24/0 Strengthening Total 13.00 294.00 1670 01-CRIDP-12- Tuticorin Vilathikulam Construction of RCC Slab Culvert 25.00 13-P-1670 at km 9/6 of Vilathikulam - Perunali Road in lieu of existing causeway

1671 01-CRIDP-12- Tuticorin Ottapidaram Construction of minor bridge at km 45.00 13-P-1671 3/6 of Kulasekaranallur - Muramban Road Culverts/Bridges Total 2 Nos 70.00 Tuticorin Total 18.20 1014.00 1672 01-CRIDP-12- Nagercoil Killiyoor Improvements to Midalam road km 4.40 63.00 13-P-1672 0/0 - 4/4.

ODR SCP- 44of 45 SECTION OFFICER 185/ 185

Cost ID Job Code Division Constituency Name of work (Eng) Length required 1673 01-CRIDP-12- Nagercoil Vilavancode Improvements to Arumanai - 4.60 67.00 13-P-1673 Panachamoodu road km 5/0 - 9/6.

1674 01-CRIDP-12- Nagercoil Killiyoor Improvements to Mankarai - 1.00 15.00 13-P-1674 Pootetti road km 0/0 - 1/0. 1675 01-CRIDP-12- Nagercoil Killiyoor Improvements to Thozhicode - 2.40 36.00 13-P-1675 Melmidalam road km 0/0 - 2/4 including reconstruction one culvert. 1676 01-CRIDP-12- Nagercoil Killiyoor Improvements to Vettai Harijan 1.60 24.00 13-P-1676 colony road km 0/0 - 1/6. 1677 01-CRIDP-12- Nagercoil Colachal Improvements to Fridaymarket - 2.60 39.00 13-P-1677 Thirunainarkurichi road km 0/0 - 2/6. 1678 01-CRIDP-12- Nagercoil Colachal Improvements to R.C.Padarnilam - 2.40 35.00 13-P-1678 Mondaikadu road km 0/0 - 2/4

1679 01-CRIDP-12- Nagercoil Killiyoor Improvements to Mulagumoodu - 1.00 15.00 13-P-1679 Karungal road km 1/0 - 2/0.

1680 01-CRIDP-12- Nagercoil Padmanabha Improvements to Kalladimamoodu - 1.40 20.00 13-P-1680 puram Andoor road km 1/0 - 2/4.

Strengthening Total 21.40 314.00 Nagercoil Total 21.40 314.00 Thirunelveli Total 115.972 3243.00 Grand Total for ODR SCP 1286.12 31595.50 Grand Total for CRIDP 226250.00

NIRANJAN MARDI PRINCIPAL SECRETARY TO GOVERNMENT

/True Copy/

ODR SCP- 45of 45 SECTION OFFICER