Cooks River Valley Association Inc. PO Box H150, Hurlstone Park NSW 2193 E: [email protected] W: www.crva.org.au ABN 14 390 158 512 8 August 2018 To: Ian Naylor Manager, Civic and Executive Support Leichhardt Service Centre Inner West Council 7-15 Wetherill Street Leichhardt NSW 2040 Dear Ian Re: Petition on proposal to establish a Pemulwuy Cooks River Trail The Cooks River Valley Association (CRVA) would like to submit the attached petition to establish a Pemulwuy Cooks River Trail to the Inner West Council. The signatures on the petition were mainly collected at two events that were held in Marrickville during April and May 2018. These events were the Anzac Day Reflection held on 25 April 2018 in Richardson’s Lookout – Marrickville Peace Park and the National Sorry Day Walk along the Cooks River via a number of Indigenous Interpretive Sites on 26 May 2018. The purpose of the petition is to creatively showcase the history and culture of the local Aboriginal community along the Cooks River and to publicly acknowledge the role of Pemulwuy as “father of local Aboriginal resistance”. The action petitioned for was expressed in the following terms: “We, the undersigned, are concerned citizens who urge Inner West Council in conjunction with Council’s Aboriginal and Torres Strait Islander Reference Group (A&TSIRG) to designate the walk between the Aboriginal Interpretive Sites along the Cooks River parks in Marrickville as the Pemulwuy Trail and produce an information leaflet to explain the sites and the Aboriginal connection to the Cooks River (River of Goolay’yari).” A total of 60 signatures have been collected on the petition attached. -
109. M4-M5 EIS Vol 2I App T Groundwater Part 1
M4-M5 Link Environmental Impact Statement August 2017 Appendix T Volume 2I Since finalisation of the Environmental Impact Statement, the project has been declared by Ministerial Order to be State significant infrastructure and critical State significant infrastructure under sections 115U (4) and 115V of the Environmental Planning and Assessment Act 1979. The Ministerial Order also amended Schedule 5 of State Environmental Planning Policy (State and Regional Development) 2011. The project remains subject to assessment under Part 5.1 of the Environmental Planning and Assessment Act 1979 and requires the approval of the Minister for Planning. WestConnex speaks your language Greek Learn more by visiting µ www.westconnex.com.au/yourlanguage www.westconnex.com.au/yourlanguage to watch project videos in your language and read more about WestConnex. If you need an interpreter, call the Translating WestConnex. µ , µ 131 450. and Interpreting Service on 131 450. Italian Arabic Per saperne di più visiti il sito www.westconnex.com.au/yourlanguage www.westconnex.com.au/yourlanguage, dove potrà guardare i video del progetto in lingua italiana e trovare maggiori informazioni su WestConnex. Se ha bisogno di un interprete, contatti il Servizio di Traduzione ed Interpretariato (Translating ł ł .131 450 and Interpreting Service) al numero 131 450. Chinese Korean 了解詳情請上網 www.westconnex.com.au/yourlanguage 를 방문하여한국어로 www.westconnex.com.au/yourlanguage觀看(普通話) 된 프로젝트 비디오를 보고 WestConnex 에 관해 읽고 배우세요. 視頻, 並 查閱有關WestConnex的更多訊息。如需要傳譯員請 통역이 필요하시면 번역 및 통역 서비스 131 450 (TIS) 으로 전화 。。 撥電話傳譯服務 131 450 하십시오. Hindi Vietnamese : Hãy tìm hi u thêm và vi ng trang m ng www.westconnex.com.au/yourlanguage ( ) www.westconnex.com.au/yourlanguage xem phim nh b ng Vi t ng v công trình này và c thêm v WestConnex. -
2010 RTA Annual Report
Appendices Contents Appendix 1. Major works 189 Appendix 2. Threatened Species Recovery Plan 193 Appendix 3. Committees and signifi cant advisory groups 196 Appendix 4. Senior Executive Service (SES) performance statements 200 Appendix 5. Industrial relations 211 Appendix 6. Equal Employment Opportunity 212 Appendix 7. Multicultural Policies and Services Program 215 Appendix 8. Disability Action Plan 216 Appendix 9. Overseas travel by RTA Offi cers 217 Appendix 10. Freedom of Information 219 Appendix 11. Ombudsman complaints 226 Appendix 12. Consumer response 229 Appendix 13. Legal change 230 Appendix 14. Land disposal 234 Appendix 15. Publications 235 Appendix 16. Payments to consultants 242 Appendix 17. Reporting of RTA contracts with third parties 243 Appendix 18. Accounts Payment Performance 2010 243 Appendix 19. Funds granted to non-government community organisations 244 Appendix 20. Privacy Management Plan 245 Appendix 21. Research and development 249 Appendix 22. Driver and vehicle statistics 251 Appendix 23. Insurance 253 Section cover image: Photo of Seacliff Bridge taken by RTA staff member Ben Beattie. 188 APPENDICES Appendix 1. Major works Announced Estimated 2009–10 Previous completion total cost exp years exp Project Description Location Status date ($,000) ($’000) ($’000) Sydney Alfords Point Bridge Northern Approach, Padstow Heights 2011 44,000 10,716 6,210 widen to four lanes Bangor Bypass Stage 2, Marsden Road to Barden Ridge 2010 35,000 9,589 4,241 New Illawarra Road Camden Valley Way, Bernera Road to Edmondson Park -
Sewage Treatment System Impact Monitoring Program
Sewage Treatment System Impact Monitoring Program Volume 1 Data Report 2019-20 Commercial-in-Confidence Sydney Water 1 Smith Street, Parramatta, NSW Australia 2150 PO Box 399 Parramatta NSW 2124 Report version: STSIMP Data Report 2019-20 Volume 1 final © Sydney Water 2020 This work is copyright. It may be reproduced for study, research or training purposes subject to the inclusion of an acknowledgement of the source and no commercial usage or sale. Reproduction for purposes other than those listed requires permission from Sydney Water. Sewage Treatment System Impact Monitoring Program | Vol 1 Data Report 2019-20 Page | i Executive summary Background Sydney Water operates 23 wastewater treatment systems and each system has an Environment Protection Licence (EPL) regulated by the NSW Environment Protection Authority (EPA). Each EPL specifies the minimum performance standards and monitoring that is required. The Sewage Treatment System Impact Monitoring Program (STSIMP) commenced in 2008 to satisfy condition M5.1a of our EPLs. The results are reported to the NSW EPA every year. The STSIMP aims to monitor the environment within Sydney Water’s area of operations to determine general trends in water quality over time, monitor Sydney Water’s performance and to determine where Sydney Water’s contribution to water quality may pose a risk to environmental ecosystems and human health. The format and content of 2019-20 Data Report predominantly follows four earlier reports (2015-16 to 2018-19). Sydney Water’s overall approach to monitoring (design and method) is consistent with the Australian and New Zealand Environment and Conservation Council (ANZECC 2000 and ANZG 2018) guidelines. -
ENVIRONMENTAL HEALTH - up the Heat On
TurningENVIRONMENTAL HEALTH - Up The Heat On... Environmental Health Australia (New South Wales) Incorporated EHA (NSW) INC in partnership with NSW Food Authority present the ANNUAL STATE CONFERENCE AND FRP WORKSHOP 2019 Quarantine Station 1 North Head Scenic Drive, Manly Monday 19 to Friday 23 August 2019 Hosted by Northern Beaches Council in Partnership with the NSW Food Authority PROUDLY SUPPORTED BY EHA (NSW) INC in partnership with NSW Food Authority present the Wednesday 21 August 2019 ANNUAL STATE CONFERENCE AND FRP WORKSHOP 2019 8.00 am Tea/Coffee and trade exhibition Quarantine Station Keynote Speaker: Professor Anthony Capon, Professor of Planetary Health, University of Sydney 8.30 am 1 North Head Scenic Drive, Manly Environmental impacts on human health Turning up the Heat on... Hazardous waste Turning up the Heat on... Regulation (Clan Labs) • Turning up the Heat on investigating offences – Mark Monday 19 August 2019 • Impacts and risks of second-hand exposure to Cottom, Pikes and Verekers Lawyers methamphetamine - Dr Jackie Wright, Environmental • Turning up the Heat on regulating equitable access 12.00 - 5.00pm Clan Labs Workshop Risk Sciences Pty Ltd to NSW’s natural water resources – Sarah Flowers & 5.30 pm Welcome function 9.00 am • The problem with clandestine drug laboratories. A Nicole Power – Natural Resources Access Regulator Council’s Perspective – Sharon O’Regan, Wollondilly • Investigating oxidation reduction potential in public 7.00 pm Close Shire Council swimming pools - Nick Ives, Northern Sydney Local • Turning up the Heat on Clandestine Cooking – Juliet Health District Duffy, Regional EnviroScience Panel discussion Tuesday 20 August 2019 Panel discussion 10.30 am Morning Tea - Trade exhibition 8.30 am Registration and trade exhibition Turning up the Heat on.. -
Reducing the Impact of Weirs on Aquatic Habitat
REDUCING THE IMPACT OF WEIRS ON AQUATIC HABITAT NSW DETAILED WEIR REVIEW REPORT TO THE NEW SOUTH WALES ENVIRONMENTAL TRUST SYDNEY METROPOLITAN CMA REGION Published by NSW Department of Primary Industries. © State of New South Wales 2006. This publication is copyright. You may download, display, print and reproduce this material in an unaltered form only (retaining this notice) for your personal use or for non-commercial use within your organisation provided due credit is given to the author and publisher. To copy, adapt, publish, distribute or commercialise any of this publication you will need to seek permission from the Manager Publishing, NSW Department of Primary Industries, Orange, NSW. DISCLAIMER The information contained in this publication is based on knowledge and understanding at the time of writing (July 2006). However, because of advances in knowledge, users are reminded of the need to ensure that information upon which they rely is up to date and to check the currency of the information with the appropriate officer of NSW Department of Primary Industries or the user‘s independent adviser. This report should be cited as: NSW Department of Primary Industries (2006). Reducing the Impact of Weirs on Aquatic Habitat - New South Wales Detailed Weir Review. Sydney Metropolitan CMA region. Report to the New South Wales Environmental Trust. NSW Department of Primary Industries, Flemington, NSW. ISBN: 0 7347 1753 9 (New South Wales Detailed Weir Review) ISBN: 978 0 7347 1833 4 (Sydney Metropolitan CMA region) Cover photos: Cob-o-corn Weir, Cob-o-corn Creek, Northern Rivers CMA (upper left); Stroud Weir, Karuah River, Hunter/Central Rivers CMA (upper right); Mollee Weir, Namoi River, Namoi CMA (lower left); and Hartwood Weir, Billabong Creek, Murray CMA (lower right). -
Surface Water and Flooding
Chapter 18 – Surface Water and Flooding 18 Surface water and flooding This chapter describes the potential surface water and flooding impacts associated with the project. The chapter has been informed by surface water and flooding assessments provided in Appendix L (Surface water technical report) and Appendix M (Flooding technical report). Table 18-1 sets out the SEARs relevant to surface water and flooding and identifies where the requirements have been addressed in this EIS. Table 18-1 SEARs - Surface water and flooding Assessment requirements Where addressed in this EIS Water - Hydrology 1. The Proponent must describe (and map) the existing hydrological regime for Section 18.2 discusses and maps any surface and groundwater resource (including reliance by users e.g. bore the existing surface water water for domestic use and irrigation, and for ecological purposes and hydrological regime groundwater dependent ecosystems) likely to be impacted by the project, Chapter 17 (Groundwater and including rivers, streams, wetlands and estuaries as described in Appendix 2 of geology) the Framework for Biodiversity Assessment – NSW Biodiversity Offsets Policy for Major Projects (OEH, 2014). Chapter 12 (Biodiversity) 2. The Proponent must prepare a detailed water balance for ground and surface Section 18.3.1 and Section 18.4.1 water including the proposed intake and discharge locations (including mapping discuss surface water balance of these locations), volume, frequency and duration for both the construction and Chapter 17 (Groundwater and operational -
September 2010
NAREMBURN PROGRESS ASSOCIATION Founded 1901; Incorporated 2004 PO Box 393 St Leonards NSW 1590 www.naremburnprogress.org.au – [email protected] David Lendrum Kevin FitzPatrick Frances O'Brien Barry Shaw Secretary President Vice President Treasurer 9439 3372 9439 8119 9436 1536 9438 3439 MINUTES OF THE GENERAL MEETING OF 9 SEPTEMBER 2010 Meeting commenced at 7.35 pm. Naremburn Community Centre 7 Central Street Naremburn 1. OPEN FORUM (a) Trisha FitzPatrick (Central Street) – Pedestrian access to clear footpaths is being compromised by vehicles parking in driveways and obstructing footpaths. The apartment block on Willoughby Road with rear access close to the intersection of Claire Street and Garland Road is an example. Also noted that a trailer is parked on the nature strip in Central Street outside the studio at number 31. NPA to write to WCC. (b) Martha Follent (Garland Road) – The Bridgeview Precinct Committee of North Sydney Council has ceased operations through lack of support and locals no longer have a community voice. Martha stated that it is important our local community support the Naremburn Progress Association so we do not lose our community voice. (c) Stewart Scott and Oliver McGeachie (Greengate Developments) – This company developed St Peter’s Green, Independent Living Apartments and community facilities, corner of Mowbray Road and Felton Avenue, Lane Cove North. They have acquired the property at 96 Chandos Street, corner of Martin Street. Proposal is for mixed use, commercial on the ground floor, residential above. The site is fairly small with significant trees that may need to be retained. Proposal is for a 5-storey development with an ‘art gallery’ coffee shop on the Chandos Street ground floor frontage and 26 ‘low cost’ studios and single bedroom units above to be rented at $350 - $450 pw for the 25- 35 year old market in need of local accommodation; 21 car spaces will be provided. -
4.2 TURRELLA to ALEXANDRA CANAL - REVIEW 2002 February - M5 East Cycleways Description Would Be Constructed As Part of the Future Development
WESTCONNEX NEW M5 PEDESTRIAN & BICYCLE TRANSPORT NETWORK REVIEW 4.2 TURRELLA TO ALEXANDRA CANAL - REVIEW 2002 February - M5 East Cycleways Description would be constructed as part of the future development. This section did not get completed as part of the re-development hence the gap that still remains in An update on the progress on the M5 East Cycle way states the following: the present route. – A new shared 3 meter wide pedestrian and cycle path has been constructed – A shared path along Tempe Recreational Reserve included a cycle bridge over along both sides of the M5 East between King Georges Road and Bexley Road. the canal. This was not constructed. – The section of path along Alexandra Canal from Coward Street to Giovanni – The section between Princes Highway bridge and Turrella station was not Burnetti Bridge was constructed constructed due to the significant amount of redevelopment occuring. It was – The connection from Turrella Station to Giovanni Burnetti Bridge and Alexandra understood that the route from Princes Highway bridge and Turrella station Canal was not further planned due to the significant development proposed at would be constructed by future development. This did not occur. Wolli Creek Station and Turrella Station. It was considered that the cycleway Legend St Peters Station Proposed Route (not constructed) Completed Cycleway Sydney Park Princes Hwy Campbell Rd Sydenham Station Bourke Rd Canal Rd Unwins Bridge Rd Illawarra Rd Carrington Rd Cooks River IKEA Coward St Mascot Station Princes Hwy Tempe Bayview Ave Station -
Draft South District Plan
Draft South District Plan co-creating a greater sydney November 2016 How to be involved This draft District Plan sets You can read the entire Before making a submission, out aspirations and proposals draft District Plan at please read our privacy for Greater Sydney’s South www.greater.sydney and send statement at District, which includes the feedback: www.greater.sydney/privacy local government areas of • via www.greater.sydney For more information Canterbury-Bankstown, visit www.greater.sydney Georges River and Sutherland. • by email: call us on 1800 617 681 It has been developed by the [email protected] Greater Sydney Commission. • by post: or email: Greater Sydney Commission [email protected] This draft District Plan is on Draft South District Plan formal public exhibition until PO Box 257, the end of March 2017, and will Parramatta NSW 2124 be finalised towards the end of 2017 to allow as many people as possible to provide input. This document was updated on 21 December 2016 to address typographical errors and production faults. A detailed list of the errata can be found at www.greater.sydney/content/publications Draft South District Plan Exhibition THIS SEPARATE DOCUMENT DOCUMENT Overview Draft District Maps Background Website Plan Material Dashboard Our vision — Towards our Greater Sydney 2056 Summary The requirements A compilation of Data and Reports How the A draft brochure of the legislative maps and spatial used to inform the draft District Plan is amendment to of the draft framework information used draft District Plan to be monitored update A Plan for District Plan to inform the draft Growing Sydney District Plan You can view these supporting components, as well as Our vision — Towards our Greater Sydney 2056, SOUTH DISTRICT our proposed 40-year vision for Greater Sydney, at www.greater.sydney. -
Chapter 16 Surface Water
Transport for NSW/Sydney Airport Corporation Limited Sydney Gateway Road Project Environmental Impact Statement/ Major Development Plan Chapter 16 Surface water 2020 Environmental Impact Statement / Major Development Plan Contents 16. Surface water .................................................................................................................................... 16.1 16.1 Assessment approach ............................................................................................................. 16.1 16.2 Existing environment ............................................................................................................... 16.5 16.3 Assessment of construction impacts ..................................................................................... 16.12 16.4 Assessment of operation impacts .......................................................................................... 16.19 16.5 Cumulative impacts ............................................................................................................... 16.23 16.6 Management of impacts ........................................................................................................ 16.24 Tables Table 16.1 Pollutant reduction targets for Botany Bay catchment ........................................................ 16.5 Table 16.2 Existing annual pollutant loads ............................................................................................ 16.9 Table 16.3 Comparison of baseline water quality and default trigger values -
FINAL-REPORT-Review-Of-Alligator-Weed-Priorities-In-The-Sydney
Review of Priorities for the Control of Alligator Weed in the Sydney Region JANUARY 2015 Review of priorities for the control of Alligator Weed in the Sydney Region – January 2015 Background Alligator weed (Alternanthera philoxeroides) is a potentially devastating weed that grows in water and on land, affecting both waterways and floodplain areas. It is listed as a Weed of National Significance (WoNS). It is a native of South America and a major problem in south-eastern United States, China, New Zealand, Burma, Thailand, Indonesia and India. Alligator weed has not reached its potential distribution in Australia or within NSW, but has the ability to devastate the environment and agriculture if left unchecked. Alligator weed has extremely vigorous growth and great tolerance of normal control measures, which makes it a major threat to wetlands, rivers and irrigation systems. It is declared a noxious weed throughout NSW and is one of the highest priority weeds for detection and management in NSW. Alligator Weed Primefact: NSW DPI (2012) Alligator weed infestations are well established in the Sydney Region and if unmanaged pose high risks for further spread and/or ecological impact. The document entitled Priorities for the control of Alligator Weed in the Sydney Region was produced by the Sydney Weeds Committees in February 2010, and was the result of collaboration with the NSW Department of Primary Industries and weeds professionals throughout the Sydney Basin. The document identifies priority areas for the control of alligator weed and uses risks assessments to rank each area. The Sydney Region Weeds Action Project is a partnership between the NSW Government, local government and the Sydney Weeds Committees to reduce the impact of weeds across Sydney.