EUROPEAN COMMISSION

Brussels, 14.8.2020 C(2020) 5508 final

ANNEX

ANNEX

to the

COMMISSION IMPLEMENTING DECISION

establishing the list of proposals selected for receiving EU financial assistance under the Connecting Europe Facility (CEF) – Transport sector following the calls for proposals launched on 16 October 2019, based on the Multi-Annual Work Programme pursuant to Commission Implementing Decision C(2014)1921

EN EN

ANNEX PART I List of proposals selected for receiving EU financial assistance under the Connecting Europe Facility (CEF) – Transport sector following the calls for proposals launched on 16 October 2019, based on the Multi-Annual Work Programme 2014-2020 pursuant to Commission Implementing Decision C(2014)1921

A) Funding allocation under the General envelope calls

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€) A. Bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections A.1. Pre-identified projects on the Corridors of the Core Network

Bundesministerium für Studies for a new double-track railway line Klimaschutz, Umwelt, 2019-AT-TM- between Salzburg and Neumarkt- AT Energie, Mobilität, Studies Railway 28,223,322 14,111,661 50.00% 0074-S Köstendorf Innovation und Technologie

Bundesministerium für Klimaschutz, Umwelt, 2019-AT-TM- Planning of a new four-track railway line AT Energie, Mobilität, Studies Railway 21,696,438 10,848,219 50.00% 0100-S between Linz and Wels Innovation und Technologie

2019-AT-TM- Construction of a port gate at Port of Inland AT Hafen Wien GmbH Works 18,848,944 3,769,789 20.00% 0183-W Vienna waterways

2019-AT-TM- Inland Modernisation of transhipment facilities AT Danubia Speicherei GmbH Works 5,250,000 1,050,000 20.00% 0250-W** waterways

BARGE-AG: Increasing inland waterway 2019-BE-TM- Inland transportation by modernising Antwerp BE Antwerp Gateway NV Works 48,366,798 9,673,360 20.00% 0086-W** waterways Gateway’s infrastructure capacity

2019-BE-TM- Building a waiting dock for Inland Inland BE De Vlaamse Waterweg nv Works 22,697,000 9,078,800 40.00% 0087-W** Navigation at Noordlandbridge waterways

EN 1 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-BE-TM- The Albert Canal: advanced automation Inland BE De Vlaamse Waterweg nv Works 11,573,000 4,629,200 40.00% 0088-W** and remote lock operation waterways

Public service of Wallonia - 2019-BE-TM- Towards more Efficient and Resilient IWW Mobility and infrastructures Inland BE Studies 4,665,444 2,332,722 50.00% 0120-S in Wallonia - Studies part one / SPW-MI Mobilité et waterways Infrastructures

Increasing performance on 4 freight 2019-BE-TM- sections on all Core network Corridors in BE Infrabel sa de droit public Works Railway 64,300,000 19,290,000 30.00% 0316-W Belgium

Increasing the capacity on CNC Rhine- 2019-BE-TM- Alpine and North Sea Med by adding a 3rd BE Infrabel sa de droit public Works Railway 105,490,000 31,647,000 30.00% 0320-W** and 4th track between Bruges and Ghent

Logport VI: Investing in the expansion of 2019-DE-TM- Hafen Duisburg Inland inland waterway infrastructure at the inland DE Works 13,730,275 2,746,055 20.00% 0085-W** Rheinhausen GmbH waterways port Duisburg on the river Rhine

Bundesministerium für 2019-DE-TM- ABS Grenze D/NL - Emmerich - DE Verkehr und digitale Works Railway 55,926,000 22,370,400 40.00% 0109-W** Oberhausen Baustufe 4 Infrastruktur

Preliminary Design "Heidenau-D/CR Bundesministerium für 2019-DE-TM- national border", new-build line Dresden- DE Verkehr und digitale Studies Railway 6,750,000 3,375,000 50.00% 0198-S Prague Infrastruktur

Upgrade and new build of Stuttgart- Bundesministerium für 2019-DE-TM- Wendlingen line, including Stuttgart 21 - DE Verkehr und digitale Works Railway 214,846,294 64,453,888 30.00% 0202-W** Action PFA 1.3a und PFA 1.4 Infrastruktur

Construction and operation of a medium- 2019-DE-TM- scale multimodal LNG terminal in the DE Rostock LNG GmbH Works Maritime 96,754,218 19,393,115 20.04% 0247-W** seaport of Rostock

Bundesministerium für 2019-DE-TM- Improvement of the cross-border railway DE Verkehr und digitale Works Railway 40,770,300 8,154,060 20.00% 0275-W line between Czech Republic and Germany Infrastruktur

EN 2 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

Supplementary and updated studies for 2019-DK-TM- Banedanmark (Rail Net upgrading the Danish Fehmarnbelt tunnel DK Studies Railway 7,774,490 3,887,245 50.00% 0146-S Denmark) railway access line (Phase 2)

2019-DK-TM- Establishment of the New Storstrøm Bridge DK Danish Road Directorate Works Railway 141,798,100 42,539,430 30.00% 0153-W** - works

2019-EL-TM- ALFION - Alternative Fuel Implementation Igoumenitsa Port Authority EL Studies Maritime 1,080,000 540,000 50.00% 0227-S in IgOumenitsa Port S.A. (OLIG)

Fundación de la Comunidad Valenciana EALING Works Valencia port: Preparation 2019-ES-TM- para la investigación, of the electrical grid of the Port of Valencia ES Works Maritime 8,593,050 1,754,910 20.42% 0182-W** promoción y estudios for Onshore Power Supply comerciales de Valencia Port

Upgrading infrastructure at Seville Port to 2019-ES-TM- Autoridad portuaria de Inland improve interconnection between the ES Works 9,423,106 1,884,621 20.00% 0194-W** Sevilla waterways waterway and rail and maritime transport

Mediterranean Corridor. Section Valencia- 2019-ES-TM- Sagunto-Castellón. Implementation of UIC ES ADIF Alta Velocidad Works Railway 103,760,000 41,504,000 40.00% 0235-W** gauge. Phase 2.

2019-ES-TM- LNGHIVE2 Barcelona- An efficient LNG ES ENAGAS, S.A. Works Maritime 45,788,500 9,157,700 20.00% 0283-W** bunker barge in the port of Barcelona

LNGHIVE2 Algeciras - A Flex LNG 2019-ES-TM- bunkering facility in the port of Algeciras ES ENAGAS S.A. Works Maritime 56,464,000 11,292,800 20.00% 0308-W** Bay

Bundesministerium für Studies for the Northern Access Line to the Klimaschutz, Umwelt, 2019-EU-TM- Brenner Base Tunnel between Munich AT | DE Energie, Mobilität, Studies Railway 28,638,200 14,319,100 50.00% 0098-S (Germany) and Radfeld (Austria) Innovation und Technologie

EN 3 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-EU-TM- Inland RH2INE Kick-start Study DE | NL Provincie Zuid-Holland Studies 1,049,000 524,500 50.00% 0102-S waterways

2019-EU-TM- Coordinated supply of onshore power in DE | DK | FI | Copenhagen Malmö Port Works Maritime 76,389,600 15,307,920 20.04% 0125-W** Baltic seaports SE AB

Ministero delle 2019-EU-TM- Brenner Base Tunnel - STUDIES AT | IT Infrastrutture e dei Studies Railway 56,000,000 28,000,000 50.00% 0147-S Trasporti

Bundesministerium für Klimaschutz, Umwelt, 2019-EU-TM- FAIRway works! in the Rhine-Danube Inland AT | RS Energie, Mobilität, Works 42,576,144 17,030,458 40.00% 0187-W Corridor waterways Innovation und Technologie

Bundesministerium für Klimaschutz, Umwelt, 2019-EU-TM- Preparing FAIRway 2 works in the Rhine- Inland AT | RS Energie, Mobilität, Studies 1,908,000 954,000 50.00% 0262-S Danube Corridor waterways Innovation und Technologie

2019-FI-TM- KOKOHA - Upgrade of Kouvola-Kotka- Ministry of Transport and FI Studies Railway 3,360,000 1,680,000 50.00% 0246-S Hamina rail connection Communications

2019-FI-TM- The development of the Helsinki- Ministry of Transport and FI Studies Railway 75,000,000 37,500,000 50.00% 0256-S railway connection Communications

Espoo Rail Line: Development of the 2019-FI-TM- Ministry of Transport and Helsinki-Turku railway connection (1st FI Studies Railway 22,000,000 11,000,000 50.00% 0267-S Communications phase)

2019-FR-TM- DOCKSIDE PROJECT Canal Seine-Nord Inland FR Région Hauts-de-France Studies 15,454,093 7,727,047 50.00% 0110-S Europe inland ports studies waterways

New RoRo ramp at Port of Dunkirk: 2019-FR-TM- securing & improving environmental Grand port maritime de FR Works Maritime 36,500,000 7,300,000 20.00% 0124-W** performance of the traffic on the NS-Med Dunkerque corridor

EN 4 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

Syndicat Mixte pour la 2019-FR-TM- Port development of the Ports of Inland FR gestion des Ports du Sud Works 12,200,000 2,440,000 20.00% 0148-W** Mulhouse-Rhine waterways Alsace

2019-FR-TM- H2Bordeaux FR Storengy Studies Maritime 750,000 375,000 50.00% 0184-S

Ministry for Ecological and 2019-FR-TM- Studies on the capacity improvement of the FR Inclusive Transition – Studies Railway 3,982,246 1,991,123 50.00% 0212-S cross-border rail section Metz-Luxembourg Transport Ministry

Works on the handling of the Mulhouse rail Ministry for Ecological and 2019-FR-TM- node to improve the North Sea - FR Inclusive Transition – Works Railway 43,960,984 13,188,295 30.00% 0243-W Mediterranean Corridor Transport Ministry

Studies for the improvements required to Ministry of Ecological and 2019-FR-TM- desaturate and enhance capacity in the FR Inclusive Transition - Studies Railway 8,400,000 4,200,000 50.00% 0254-S Lyon Railway Node Ministry of Transport

Studies into phasing for the realisation of Ministry for Ecological and 2019-FR-TM- the French accesses to the Lyon-Torino FR Inclusive Transition – Studies Railway 4,000,000 2,000,000 50.00% 0255-S** tunnel Transport Ministry

Ministry for Ecological and 2019-FR-TM- Upgrading and developing of the Paris FR Inclusive Transition – Studies Railway 6,053,035 3,026,518 50.00% 0269-S Southern bypass Transport Minister

Upgrade of Gambsheim locksite : Provide 2019-FR-TM- Voies Navigables de Inland an efficient and sustainable transport CH | DE | FR Works 21,872,500 8,749,000 40.00% 0317-W France waterways system on the Rhine

2019-IE-TM- TEN-T Upgrade DART Expansion, Kildare Department of Transport, IE Studies Railway 17,783,245 8,891,623 50.00% 0127-S Line, Engineering Design Tourism and Sport

2019-IT-TM- Port of Trieste: Railway Terminal And LNG Piattaforma Logistica IT Studies Maritime 6,388,500 3,194,250 50.00% 0101-S** Facility (studies) Trieste S.r.l.

EN 5 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-IT-TM- Kuwait Petroleum Italia Naples LNG Coastal Depot IT Studies Maritime 1,339,065 669,533 50.00% 0112-S S.p.A.

2019-IT-TM- MXP-NLINE IT FERROVIENORD S.p.A. Works Railway 211,340,000 63,402,000 30.00% 0167-W

EuroCap-Rail. Construction of a new 2019-LU-TM- section providing a direct link between Ministère de la Mobilité et LU Works Railway 56,500,000 16,950,000 30.00% 0219-W** Luxembourg Station and Bettembourg des Travaux publics Station.

2019-NL-TM- Connection of 3rd railway cross-border DE | NL ProRail B.V. Studies Railway 2,392,806 1,196,403 50.00% 0091-S track Zevenaar - Emmerich / Oberhausen

Study for the removal of the railway 2019-NL-TM- Havenbedrijf Rotterdam bottleneck to the Maasvlakte II railway NL Studies Railway 7,107,000 3,553,500 50.00% 0160-S N.V. terminals in the Port of Rotterdam

2019-NL-TM- Bio2Bunker: BLNG as the solution for BE | DE | NL Titan LNG B.V. Works Maritime 55,000,000 11,000,000 20.00% 0196-W** decarbonising the maritime industry.

2019-NL-TM- Rotterdam and EU hinterland connection: Havenbedrijf Rotterdam NL Works Railway 28,960,000 8,688,000 30.00% 0284-W** Theemsweg railway section superstructure. N.V.

The Rhombus system: upgrading of 2019-NL-TM- Inland waterborne operations infrastructure along BE | NL Provincie Limburg Works 52,006,274 10,401,255 20.00% 0287-W** waterways the Meuse and Albert Canal

Ministerie van 2019-NL-TM- Overnight mooring facility Spijk on the Inland NL Infrastructuur en Works 56,765,929 11,353,186 20.00% 0295-W** German - Dutch border - Rhein waterways Waterstaat

Upgrading Amersfoort East side rail yard 2019-NL-TM- on the pre-identified core North Sea Baltic NL ProRail B.V. Works Railway 26,536,000 7,960,800 30.00% 0321-W section

EN 6 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

Removal of a major bottleneck between 2019-SE-TM- Trafikverket (Swedish Flackarp and Arlöv on the Swedish SE Works Railway 78,800,000 23,640,000 30.00% 0106-W Transport Administration) Southern Main Line.

2019-SE-TM- Trafikverket (Swedish The West Link - Kvarnberget railway tunnel SE Works Railway 73,693,680 22,108,104 30.00% 0229-W** Transport Administration)

A.2 Pre-identified projects on the other sections of the Core Network

Sociedad de Gestión de 2019-ES-TM- LNGHIVE2 power supply & LNG bunkering ES Bienes de Equipos Works Maritime 31,900,000 6,380,000 20.00% 0093-W** Eléctricos, S.L.

2019-FI-TM- The development of the main railway Ministry of Transport and FI Studies Railway 13,000,000 6,500,000 50.00% 0151-S section Helsinki-Riihimäki (2nd phase) Communications

2019-FI-TM- Ministry of Transport and Development of the Bothnian Rail Corridor FI Studies Railway 3,200,000 1,600,000 50.00% 0257-S Communications

2019-FR-TM- Electrification of the Seine Axis: onshore Inland FR HAROPA GIE Works 9,240,000 1,848,000 20.00% 0159-W** power and water supply for fluvial units waterways

North Adriatic Sea Port 2019-IT-TM- Channeling the Green Deal for Venice IT Auhtority - ports of Venice Studies Maritime 1,699,000 849,500 50.00% 0096-S** and Chioggia

Facilitating sustainability of the hinterland 2019-PL-TM- Panstwowe Gospodarstwo connection with core port in Szczecin: PL Works Maritime 35,524,809 7,104,962 20.00% 0244-W** Wodne Wody Polskie railway bridge over Regalica River

New East-Cost Line ,a railway study for a 2019-SE-TM- 40 km long section of double track between SE Trafikverket Studies Railway 7,100,000 3,550,000 50.00% 0103-S Gävle-Kringlan

A.3 ERTMS on-board prototypes

Development of prototypes for the upgrade NMBS/SNCB (NV van 2019-BE-TM- of vehicles with ETCS SRS2.3.0d on-board BE publiek recht / SA de droit Works Railway 6,732,000 2,400,000 35.65% 0142-W equipment to ETCS SRS 3.6.0 - Level 2 public)

EN 7 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-CZ-TM- Deployment of on-board ETCS in selected CZ Ceské dráhy, a.s. Works Railway 18,733,000 6,300,000 33.63% 0238-W prototypes

Investing in the ETCS on-board 2019-DE-TM- deployment for interoperable freight traffic DE DB Cargo AG Works Railway 5,018,000 1,800,000 35.87% 0084-W along the Scan-Med Corridor

2019-DE-TM- ERTMS prototyping for TRAXX MS2 and Bombardier Transportation DE Works Railway 7,558,000 2,700,000 35.72% 0107-W TRAXX AC3 locomotives GmbH

AT | BE | BG | CH | CZ | DE | On-board deployment of ETCS Baseline 3 2019-DE-TM- HR | HU | IT | for Siemens locomotives operating on the Siemens Mobility GmbH Works Railway 32,636,000 11,550,000 35.39% 0161-W NL | NO | PL | TEN-T RO | RS | SE | SI | SK

Development of 12 ERTMS Baseline 3 2019-FR-TM- prototypes for the improvement of rail FR AKIEM SAS Works Railway 20,855,000 7,350,000 35.24% 0115-W interoperability on 9 TEN-T Corridors

Prototype for retrofit Drielandentrein 2019-NL-TM- Arriva Personenvervoer (through-train Liège-Maastricht-Aachen) NL Works Railway 2,509,000 900,000 35.87% 0108-W Nederland B.V. with ERTMS (B3)on-board equipment

2019-SE-TM- ERTMS On-board prototyping in Sweden SE Trafikverket Works Railway 27,489,000 9,700,000 35.29% 0111-W 2020-2023 B. Ensuring sustainable and efficient transport systems in the long run, as well as enabling all modes of transport to be decarbonised B.1. Safe and Secure infrastructure, including safe and secure parking on the road Core Network

BIDEGI Gipuzkoako 2019-ES-TM- Setting up two safe and secure parking Azpiegituren Agentzia / ES Works Roads 15,164,368 2,759,915 18.20% 0121-W areas in the Spanish-French border region Agencia Guipuzcoana de lnfraestructuras S.A.

PASS4CORE-ITA - Parking Areas 2019-IT-TM- implementing Safety and Security FOR (4) IT A4 Trading Works Roads 27,529,220 5,505,844 20.00% 0337-W CORE network corridors in ITALY

EN 8 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-NL-TM- SecureNL 2.0 NL Provincie Noord-Brabant Works Roads 32,280,530 6,456,106 20.00% 0113-W

C. Optimising the integration and interconnection of transport modes and enhancing the interoperability of transport services, while ensuring the accessibility of transport infrastructures C.1. Intelligent Transport Services for road (ITS)

Agentschap Wegen en 2019-BE-TM- MobiliData BE Verkeer (Flemish Works Roads 5,190,429 1,038,086 20.00% 0258-W Government)

Ministero delle Infrastrutture e dei Trasporti - Direzione 2019-IT-TM- C-ROADS ITALY 3 IT generale per lo sviluppo Works Roads 6,005,000 1,201,000 20.00% 0114-W del territorio, la programmazione e i progetti internazionali

C.2. SESAR

AT | BE | DE | DK | ES | FR | SESAR Deployment 2019-EU-TM- SESAR Deployment Programme HR | HU | IE | Alliance Association Works Airports 40,000,000 20,000,000 50.00% 0185-W implementation 2019 - IOP Foundation IT | LT | NL | Internationale Sans But PL | PT | RO | Lucratif SE | UK

C.3. Motorways of the Sea (MOS) 2019-EU-TM- Sea Li-ion DE | SE Stena Rederi AB Studies Maritime 3,010,000 1,505,000 50.00% 0097-S 2019-EU-TM- TWIN-PORT 4 EE | FI Port of Tallinn Works Maritime 33,610,000 10,083,000 30.00% 0192-W

International fast and secure trade lane 2019-EU-TM- Improving the Dublin - Cherbourg MoS FR | IE Marine Institute Studies Maritime 773,000 386,500 50.00% 0193-S route

EN 9 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

FUNDACIÓN DE LA COMUNIDAD VALENCIANA PARA LA BG | DE | EL | 2019-EU-TM- EALING - European flagship Action for INVESTIGACIÓN, ES | IE | IT | Studies Maritime 6,960,240 3,480,120 50.00% 0234-S coLd ironING in ports PROMOCIÓN Y PT | RO | SI ESTUDIOS COMERCIALES DE VALENCIAPORT

2019-EU-TM- Upgrade of the Baltic sea bridge FI | SE Kapellskärs Hamn AB Works Maritime 11,451,576 3,445,473 30.09% 0245-W Kapellskär-Naantali (MoS Finnlink)

Upgrade of the core Baltic maritime link 2019-EU-TM- Lübecker Hafen- Helsinki-Lübeck - phase 2 (MoS Hansalink DE | FI Works Maritime 11,448,240 3,444,472 30.09% 0270-W Gesellschaft mbH 2)

C.4. Actions implementing transport infrastructure in nodes of the Core Network, including urban nodes

Freie und Hansestadt 2019-DE-TM- Final planning of the new urban railway line Hamburg Behörde für DE Studies Railway 16,908,000 8,454,000 50.00% 0155-S S4 Wirtschaft, Verkehr und Innovation

Senatsverwaltung für 2019-DE-TM- i2030 Rail Expansion in Berlin and DE Umwelt, Verkehr und Studies Railway 14,600,000 7,300,000 50.00% 0188-S Brandenburg: Western Gateway Klimaschutz Berlin

2019-DE-TM- Final planning of the Regionaltangente RTW Planungsgesellschaft DE Studies Railway 40,000,000 20,000,000 50.00% 0242-S West (RTW) in Frankfurt am Main mbH

Atlantic Corridor.HS line Sines/Lisboa- Administrador De 2019-ES-TM- Madrid. Madrid urban node.Study of the ES Infraestructuras Studies Railway 12,000,000 6,000,000 50.00% 0252-S Railway Complex of Atocha Station (Phase Ferroviarias (ADIF) 3)

2019-FR-TM- ** Line for Airport And Research Area (LARA) FR Societe du Grand Paris Works Railway 319,485,277 63,897,055 20.00% 0253-W

EN 10 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

Widening and modernisation of the Ministry for Ecological and 2019-FR-TM- northern underpass at Toulouse Matabiau FR Inclusive Transition – Works Railway 17,722,956 3,670,660 20.71% 0327-W railway station Transport Ministry

2019-IT-TM- ** Milan East Gate Hub IT Comune di Milano Studies Railway 2,501,000 1,250,500 50.00% 0171-S

RAIL-TO-AIR - Enhancing the RAIL 2019-IT-TM- interconnection between TOrino urban IT Regione Piemonte Works Railway 73,238,908 14,647,782 20.00% 0338-W node, AIRport and related hinterland

Analysis of integrated transport 2019-PL-TM- development options in Warsaw based on Miasto Stoleczne PL Studies Railway 4,171,897 2,085,949 50.00% 0215-S the underground and multimodal transfer Warszawa nodes

2019-PT-TM- RESTART - Masterplan for Lisbon’s Câmara Municipal de PT Studies Roads 864,533 432,267 50.00% 0313-S Multimodal Mobility Hubs Lisboa

Total for the General envelope calls 3,187,384,563 967,381,776

EN 11 EN

B) Funding allocation under the Cohesion envelope call

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€) A. Bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections A.1. Pre-identified projects on the Corridors of the Core Network

Access from OEM Corridor to Burgas State Enterprise “National 2019-BG- Airport. Studies for connection between BG Railway Infrastructure Studies Railway 2,050,000 1,742,500 85.00% TMC-0158-S railway infrastructure and Burgas Airport Company”

"Modernization of Traction Substations 2019-BG- National Railway Vratsa and Pernik located on the BG Works Railway 14,341,139 12,189,968 85.00% TMC-0199-W Infrastructure Company Orient/East-Med Core Network Corridor"

ТА for the project “Doubling of sections State Enterprise “National 2019-BG- along the railway line Plovdiv-Svilengrad- BG Railway Infrastructure Studies Railway 10,496,663 8,922,164 85.00% TMC-0207-S border with the Republic of Turkey” Company” (NRIC)

Technical assistance for preparation of State Enterprise "National 2019-BG- project "Modernization Mezdra-Medkovets BG Railway Infrastructure Studies Railway 5,773,110 4,907,144 85.00% TMC-0211-S railway section" Company"

Public Works Department. 2019-CY- Construction of the Lefkosia South Orbital Ministry of Transport, CY Works Roads 23,636,862 20,091,333 85.00% TMC-0314-W Motorway - Phase B3 Communications and Works

Správa železnicní dopravní 2019-CZ- cesty, státní organizace Junction Prerov, 2nd construction - TMC-0070- CZ (SŽDC, s.o.) / Railway Works Railway 68,675,891 57,323,766 83.47% Technologies and selected infrastructure W** Infrastructure Administration (RIA)

Správa železnic, státní 2019-CZ- Modernization of the Pardubice Railway organizace / Railway TMC-0095- CZ Works Railway 148,153,290 125,930,297 85.00% Junction Infrastructure W** Administration (RIA)

EN 12 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-EU- Rail Baltica - 1435 mm standard gauge TMC-0280- railway line development in Estonia, Latvia EE | LT | LV (RBR) RB Rail AS Works Railway 128,119,171 108,901,295 85.00% W** and Lithuania (Part V)

Rail Baltica - 1435 mm standard gauge 2019-EU- railway line development in Estonia, Latvia EE | LT | LV (RBR) RB Rail AS Studies Railway 88,099,177 74,884,300 85.00% TMC-0282-S and Lithuania (Part IV)

2019-HR- Preparation of project documentation for Inland TMC-0233- the construction of the vertical quay in the HR Lucka uprava Vukovar Studies 1,677,851 1,426,173 85.00% waterways S** Port of Vukovar

2019-HR- Ministry of the Sea, Preparing FAIRway 2 works in the Rhine- Inland TMC-0263- HR Transport and Studies 1,384,000 1,176,400 85.00% Danube Corridor waterways S** Infrastructure

Improvement of railway infrastructure- HŽ Infrastruktura d.o.o. 2019-HR- establishment of monitoring systems for HR (Croatian Railways Works Railway 17,069,696 14,509,242 85.00% TMC-0342-W safety, security and technical controls Infrastructure Ltd.)

Elimination of bottlenecks and improving 2019-HU- Ministry for Innovation and cross-border interoperability between HU Works Railway 55,413,796 47,101,727 85.00% TMC-0134-W Technology Budapest and Hegyeshalom (- Vienna)

The High Voltage Shore Connection Authority for Transport 2019-MT- (HVSC) for the TEN-T Core Grand Harbour MT Malta (known as Transport Works Maritime 25,771,035 21,905,380 85.00% TMC-0089-W Port, Malta - Action A Malta)

Works on the E 75 railway line, Elk - 2019-PL- PKP Polskie Linie Trakiszki (state border) section - design PL Studies Railway 43,150,701 36,678,096 85.00% TMC-0302-S Kolejowe S.A. documentation

2019-PL- Works on the E75 railway line, Czyzew- PKP Polskie Linie TMC-0322- PL Works Railway 453,786,841 385,718,815 85.00% Bialystok section (phase II) Kolejowe S.A. W**

EN 13 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

Compania Nationala Administratia Porturilor Feasibility study for development of the Dunarii Fluviale S.A. 2019-RO- Inland TEN-T Core port Drobeta Turnu Severin by RO Giurgiu(National Company Studies 600,000 510,000 85.00% TMC-0137-S waterways constructing a trimodal terminal “Administration of Danube River Ports” J.S. Co., Giurgiu)

Romanian National 2019-RO- Feasibility Study for the modernization of RO Railways Company “CFR” Studies Railway 20,425,573 17,361,737 85.00% TMC-0163-S the Bucuresti - Craiova Railway Line S.A.

Feasibility study for the modernization of Romanian National 2019-RO- the railway lines and installations from the RO Railways Company “CFR” Studies Railway 5,030,428 4,275,864 85.00% TMC-0232-S Railway Complex Bucuresti Nord S.A.

2019-RO- Modernization of the railway line Bucuresti Romanian National TMC-0300- Nord - International Airport Henri Coanda RO Railways Company “CFR” Works Railway 59,208,233 48,367,206 81.69% W** Bucuresti S.A.

Ljubljana Hub: preparation of design 2019-SI-TMC- documentation for the upgrading of railway SI Ministry of Infrastructure Studies Railway 9,957,000 8,463,450 85.00% 0311-S sections and railway stations in Ljubljana

2019-SK- Feasibility study for the public port Inland TMC-0116- SK Verejné prístavy, a.s. Studies 1,576,470 1,340,000 85.00% Bratislava waterways S**

2019-SK- ŽSR, Modernisation of the corridor, state Železnice Slovenskej TMC-0143- border CZ/SK - Čadca - Krásno nad SK Works Railway 46,921,455 39,883,237 85.00% republiky W** Kysucou (outside), railway line, stage

A.2 Pre-identified projects on the other sections of the Core Network

EN 14 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

TA for preparation of project State Enterprise "National 2019-BG- "Modernization of Dragoman - Border with BG Railway Infrastructure Studies Railway 2,833,774 2,408,708 85.00% TMC-0201-S the Republic of Serbia railway section" Company"

2019-EL- Studies for upgrading and duplicating the ministry of development EL Studies Railway 6,000,000 5,100,000 85.00% TMC-0210-S railway line from Alexandroupoli to Pithio and investments

New single railway line connecting 2019-EL- Ministry of Development Thessaloniki-Amphipolis-Nea Karvali - EL Studies Railway 18,000,000 15,300,000 85.00% TMC-0221-S and Investments Final Phase (B) of studies

Romanian National 2019-RO- Feasibility Study for the modernization of RO Railways Company “CFR” Studies Railway 11,078,031 9,416,326 85.00% TMC-0162-S the Coslariu - Cluj-Napoca Railway Line S.A.

Romanian National 2019-RO- Feasibility Study for the modernization of RO Railways Company “CFR” Studies Railway 31,436,920 26,721,382 85.00% TMC-0228-S the Apahida - Suceava Railway S.A.

B. Ensuring sustainable and efficient transport systems in the long run, as well as enabling all modes of transport to be decarbonised B.1. Safe and Secure infrastructure, including safe and secure parking on the road Core Network

2019-EL- Development of Safe and Secure Truck Ministry of Infrastructure TMC-0264- Parking Areas at the TEN-T Core Network EL Works Roads 10,353,232 8,023,755 77.50% and Transport W** in Greece (SSTPAs in Greece)

2019-EU- Creating a network of connected safe and IDE Ingatlanhasznosító és TMC-0323- secure parking areas in Hungary and HU | RO Works Roads 17,817,522 15,073,624 84.60% Befektető Kft. W** Romania (SecureNetwork)

2019-HR- TMC-0152- Zagreb safe and secure parking Žitnjak HR Zagrebacki holding d.o.o. Works Roads 3,174,757 2,698,543 85.00% W**

EN 15 EN

Estimated Maximum EU Percentage of Member State Transport Total Eligible Code Title Type Financial EU Financial Concerned Applicant ⃰ Mode Costs of the Contribution (€) Contribution Action (€)

2019-HU- Setting up the first safe and secure truck TMC-0191- HU Transz-Depar Kft. Works Roads 6,174,330 5,149,391 83.40% parking area in Southern Hungary W**

2019-LT- Setup of a modern safe and secure parking LT Elektriniai matavimai Works Roads 1,247,652 1,039,294 83.30% TMC-0197-W area in Lithuania

Deploying an SSTP in Latvia and 2019-LV- upgrading an existing one along the North LV SIA VISSA Works Roads 5,206,303 3,607,968 69.30% TMC-0195-W Sea-Baltic Corridor

2019-RO- CASPY EUROPARKING TMC-0223- Europarking Secure Parking RO Works Roads 4,175,990 3,436,840 82.30% SRL W**

2019-SI-TMC- TIR TRUCK PARK SERMIN SI TRUCK TERMINAL d.o.o. Works Roads 4,929,224 2,513,904 51.00% 0213-W

Total for the Cohesion envelope call 1,353,746,117 1,144,099,827

Grand Total (General + Cohesion envelopes) 4,541,130,680 2,111,481,603

( ⃰ ) For multi-applicant proposals only the coordinating applicant is listed. (**) The signature of the grant agreement is subject to compliance with EU environmental legislation and other specific conditions set out in the evaluation.

EN 16 EN

PART II List of proposals not selected for receiving EU financial assistance under the Connecting Europe Facility (CEF) – Transport sector following the calls for proposals launched on 16 October 2019, based on the Multi-Annual Work Programme 2014-2020 pursuant to Commission Implementing Decision C(2014)1921

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given 2019-AT-TM- Ennshafen towards sustainable & smart Inland that it was considered as having a AT Ennshafen OÖ GmbH Studies 0094-S mobility waterways relatively lower EU added value in comparison to other proposals submitted under the call

Bundesministerium für The proposal scored below threshold in 2019-AT-TM- Klimaschutz, Umwelt, Energie, one or more blocks of award criteria Upgrade of the Northern Railway Line AT Studies Railway 0099-S Mobilität, Innovation und Technologie

Bundesministerium für The proposal scored below threshold in Planning of interconnection railway and 2019-AT-TM- Klimaschutz, Umwelt, Energie, one or more blocks of award criteria underground U2 - urban node Vienna AT Studies Railway 0271-S Mobilität, Innovation und Matzleinsdorfer Platz Technologie

Bundesministerium für The proposal scored below threshold in Construction of interconnection railway 2019-AT-TM- Klimaschutz, Umwelt, Energie, one or more blocks of award criteria and underground U2 - urban node Vienna AT Works Railway 0272-W Mobilität, Innovation und Matzleinsdorfer Platz Technologie

The proposed Action was not selected due to budgetary constraints and given 2019-BE-TM- Study to implement an integrated multi- NMBS/SNCB (NV van publiek that it was considered as having a BE Studies Railway 0168-S modal solution for the Kortrijk Station recht / SA de droit public) relatively lower EU added value in comparison to other proposals submitted under the call

EN 17 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given 2019-BE-TM- Study to implement an integrated multi- NMBS/SNCB (NV van publiek that it was considered as having a BE Studies Railway 0186-S modal solution for the Etterbeek Station recht / SA de droit public) relatively lower EU added value in comparison to other proposals submitted under the call

2019-BE-TM- Optimizing highway parking areas The proposal scored below threshold in BE Agentschap Wegen en Verkeer Works Roads 0222-W according to a strategic network plan one or more blocks of award criteria

2019-BE-TM- Connecting Brussels Airport to Brussels The proposal scored below threshold in BE De Werkvennootschap Works Roads 0304-W Expo one or more blocks of award criteria

2019-BG-TM- ERTMS Upgrade: Interoperable The proposal scored below threshold in BG IP TRANS AD Works Railway 0288-W freight traffic across Bulgaria one or more blocks of award criteria

Access from OEM Corridor to Plovdiv The proposal scored below threshold in 2019-BG- State Enterprise “National Railway Airport. Studies for connection between BG Studies Railway one or more blocks of award criteria TMC-0157-S Infrastructure Company” railway infrastructure and Plovdiv Airport

The proposed Action was not selected due to budgetary constraints and given 2019-BG- From East2West 2. Access to the OEM that it was considered as having a BG BMF PORT BURGAS EAD Works Maritime TMC-0169-W Corridor through the core port of Burgas. relatively lower EU added value in comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Studies for connection of Sofia-West 2019-BG- that it was considered as having a Freight terminal to the Core TEN-T BG Transexpress EOOD Studies Railway TMC-0181-S relatively lower EU added value in Network along OEM corridor comparison to other proposals submitted under the call

2019-BG- Rehabilitation of the Breakwater of Port of Bulgarian Ports Infrastructure The proposal scored below threshold in BG Works Maritime TMC-0285-W Burgas Company one or more blocks of award criteria

EN 18 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given Public Works Department. Ministry 2019-CY- Construction of the Lefkosia South Orbital that it was considered as having a CY of Transport, Communications and Works Roads TMC-0296-W Motorway - Phase C relatively lower EU added value in Works comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Správa železnic, státní organizace 2019-CZ- that it was considered as having a Upgrade of the Vsetín Railway Station CZ / Railway Infrastructure Works Railway TMC-0217-W relatively lower EU added value in Administration (RIA) comparison to other proposals submitted under the call

Extension of rest area Šlovice on The proposal scored below threshold in 2019-CZ- Road and Motorway Directorate of Motorway D5 at km 83,2 right side and km CZ Works Roads one or more blocks of award criteria TMC-0335-W the Czech Republic 83,8 left side

Planning of the railway infrastructure The proposal scored below threshold in 2019-DE-TM- Bundesministerium für Verkehr components for the new station Hamburg DE Studies Railway one or more blocks of award criteria 0200-S und digitale Infrastruktur Altona

Upgraded Line Oldenb. - Wilhelmshav. The proposal scored below threshold in 2019-DE-TM- with electrification, track and subsurf. Bundesministerium für Verkehr one or more blocks of award criteria DE Works Railway 0218-W strengthening, and construction of new und digitale Infrastruktur subsections

2019-DE-TM- The proposal scored below threshold in Erdinger Ringschluss Stage II DE Flughafen München GmbH Works Railway 0248-W one or more blocks of award criteria

2019-DK-TM- Dredging at new container terminal in Copenhagen Malmö Port filial af The proposal scored below threshold in DK Works Maritime 0136-W Copenhagen Copenhagen Malmö Port AB one or more blocks of award criteria

EN 19 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given 2019-DK-TM- Expansion of Traction Power along the that it was considered as having a DK Banedanmark Works Railway 0138-W Scan-Med Corridor relatively lower EU added value in comparison to other proposals submitted under the call

Sustainable Masterplan 2050 : expansion The proposal scored below threshold in 2019-DK-TM- of the port and connecting infrastructure in DK Port of Aarhus Studies Maritime one or more blocks of award criteria 0140-S the Core Port of Aarhus, Denmark

Sustainable Masterplan 2050: new ferry The proposal scored below threshold in 2019-DK-TM- ramps and new passenger gangway in the DK Port of Aarhus Works Maritime one or more blocks of award criteria 0141-W Core Port of Aarhus, Denmark

Copenhagen-Ny Ellebjerg as an The proposal scored below threshold in 2019-DK-TM- Metroselskabet I/S (The accessible node on the Scan-Med DK Works Railway one or more blocks of award criteria 0261-W Copenhagen Metro) Corridor

2019-EE- The proposal scored below threshold in E67-E263 Truck Park Estonia EE Estonian Road Administration Works Roads TMC-0092-W one or more blocks of award criteria

The proposed Action was not selected due to budgetary constraints and given Expansion of quay 26 of pier 6 in 2019-EL- that it was considered as having a Thessaloniki port - basic port EL Thessaloniki Port Authority S.A. Works Maritime TMC-0132-W relatively lower EU added value in infrastructure comparison to other proposals submitted under the call

2019-EL-TM- Ministry of Infrastructure and Ineligible proposal NAPex EL Studies Multimodal 0231-S Transport (MIT)

EN 20 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given 2019-ES-TM- that it was considered as having a LNGHIVE2 - BILBAO ES Repsol LNG Holding S.A. Works Maritime 0128-W relatively lower EU added value in comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Improvement of the railway connection 2019-ES-TM- Autoridad Portuaria de la Bahía de that it was considered as having a with the port facilities located in Algeciras ES Studies Railway 0135-S Algeciras relatively lower EU added value in Bay comparison to other proposals submitted under the call

2019-ES-TM- Huelva Área Logística Integral, The proposal scored below threshold in Huelva Integral Logistics Area (HALI) ES Works Roads 0150-W S.L. one or more blocks of award criteria

The proposed Action was not selected due to budgetary constraints and given Upgrading of Kukularra Junction to 2019-ES-TM- that it was considered as having a decongest the road access to other ES Diputación Foral de Bizkaia Works Roads 0164-W relatively lower EU added value in transport modes in Bilbao Urban Node comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Study of a multimodal underwater tunnel 2019-ES-TM- that it was considered as having a for the urban connection of the riverbanks ES Diputación Foral de Bizkaia Studies Roads 0165-S relatively lower EU added value in of Bilbao comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given 2019-ES-TM- Further Development Intermodal Platform that it was considered as having a ES Autoridad Portuaria de Huelva Works Maritime 0172-W of the Port of Huelva relatively lower EU added value in comparison to other proposals submitted under the call

EN 21 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected Development of Majarabique Railway due to budgetary constraints and given 2019-ES-TM- Terminal and its connections that it was considered as having a ES Autoridad Portuaria de Huelva Works Railway 0173-W Mediterranean and Atlantic Corridors and relatively lower EU added value in Port of Huelva comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Advanced Studies for the Future 2019-ES-TM- that it was considered as having a Development and Modernisation of the ES Autoridad Portuaria de Huelva Studies Maritime 0174-S relatively lower EU added value in Intermodal Platform of the Port of Huelva comparison to other proposals submitted under the call

Bilbao’s road link to the Atlantic Corridor The proposal scored below threshold in 2019-ES-TM- to overcome traffic bottlenecks with the ES Diputación Foral de Bizkaia Works Roads one or more blocks of award criteria 0209-W Port and Airport

The proposed Action was not selected due to budgetary constraints and given Mediterranean Corridor. Detailed design 2019-ES-TM- Administrador de Infraestructuras that it was considered as having a for the sidings extensions up to 750 m. ES Studies Railway 0220-S Ferroviarias relatively lower EU added value in Section Zaragoza-Barcelona comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Atlantic & Mediterranean Corridors Acustic 2019-ES-TM- Administrador de Infraestructuras that it was considered as having a Protections in Madrid and the Conexion ES Works Railway 0237-W Ferroviarias Alta Velocidad relatively lower EU added value in Between North-East and East HSRL comparison to other proposals submitted under the call

Atlantic Corridor. Works for gauge Ineligible proposal 2019-ES-TM- adaptation & replacement of services Administrador de Infraestructuras ES Works Railway 0249-W Salamanca-F Oñoro rail line & technical Ferroviarias services

EN 22 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected Bilbao ICON - Improving Clean due to budgetary constraints and given 2019-ES-TM- Operations in the core Network: Extension Port of Bilbao Authority / Autoridad that it was considered as having a ES Works Maritime 0259-W of Quay AZ1 in Port of Bilbao's Outer Abra Portuaria de Bilbao relatively lower EU added value in Basin comparison to other proposals submitted under the call

2019-ES-TM- Atlantic Corridor. Projects. Section Vitoria- Administrador de Infraestructuras The proposal scored below threshold in ES Studies Railway 0260-S Bilbao-San Sebastián Ferroviarias Alta Velocidad one or more blocks of award criteria

The proposed Action was not selected due to budgetary constraints and given Madrid-Galicia HSRL. Section Lubian- 2019-ES-TM- Administrador de Infraestructuras that it was considered as having a Taboadela. Track assembly, electrification ES Works Railway 0276-W Ferroviarias Alta Velocidad relatively lower EU added value in and signalling works comparison to other proposals submitted under the call

Development and certification of a safe The proposal scored below threshold in 2019-ES-TM- and secure parking network along ES G.P. LIMITE ANDAMUR S.L. Works Roads one or more blocks of award criteria 0277-W Mediterranean Corridor in Spain

Bilbao-Pamplona-Zaragoza-Sagunto Rail The proposal scored below threshold in 2019-ES-TM- Administrador de Infraestructuras Line. Section Zaragoza-Teruel-Sagunto. ES Works Railway one or more blocks of award criteria 0279-W Ferroviarias Current railway upgrade actions. Phase I

Connection to the Core Network of a new The proposal scored below threshold in 2019-ES-TM- COMBI TERMINAL CATALONIA, intermodal terminal at BASF ESPAÑOLA, ES Works Railway one or more blocks of award criteria 0298-W SL S.L. in Tarragona, Spain for modal shift.

Connection to the TEN-T rail core network The proposal scored below threshold in 2019-ES-TM- PORT RAIL ALMANZORA of the intermodal terminal for rolling ES Studies Railway one or more blocks of award criteria 0331-S LEVANTE, S.L. highway and combined transport of Pulpi

EN 23 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given Infrastructure, tracks and facilities detailed 2019-ES-TM- Administrador de Infraestructuras that it was considered as having a design in the section A Coruña -Vigo - ES Studies Railway 0334-S Ferroviarias relatively lower EU added value in Orense Monforte de Lemos - León comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given 2019-EU-TM- Capacity and quality upgrade of the North that it was considered as having a NL | UK DFDS Seaways B.V. Works Maritime 0175-W Sea MoS Rotterdam - Immingham relatively lower EU added value in comparison to other proposals submitted under the call

Intermodal integration of Rhine-Danube The proposal scored below threshold in 2019-EU- and Mediterranean corridors through CZ | HR | University of Rijeka - Faculty of one or more blocks of award criteria Studies Railway TMC-0299-S Croatian maritime and inland ports RS | SK Engineering connection

The proposed Action was not selected due to budgetary constraints and given 2019-FI-TM- Vantaa in the Urban Node of that it was considered as having a FI City of Vantaa Studies Railway 0190-S TEN-T Networks relatively lower EU added value in comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given 2019-FI-TM- The development of the Helsinki- Ministry of Transport and that it was considered as having a FI Studies Railway 0251-S railway connection Communications relatively lower EU added value in comparison to other proposals submitted under the call

2019-FR-TM- Safe and secure truck parking area of A26 Ineligible proposal FR Sanef Works Roads 0119-W Saint Hilaire by Sanef

EN 24 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

Electrification of the Seine Axis : Shore The proposal scored below threshold in 2019-FR-TM- Power supply for Port of Le Havre Cruise FR Grand port maritime du Havre Works Maritime one or more blocks of award criteria 0130-W terminal

The proposed Action was not selected due to budgetary constraints and given that it was considered as having a 2019-FR-TM- Completion of Port 2000 terminal : relatively lower EU added value in FR Grand port maritime du Havre Works Maritime 0131-W extension of Port 2000 terminal (phase 3) comparison to other proposals submitted under the call, in conjunction with concerns regarding its conformity with EU environmental policy and legislation

The proposed Action was not selected CAP2020: Studies regarding a new due to budgetary constraints and given 2019-FR-TM- container platform in the port of Dunkirk that it was considered as having a FR Grand port maritime de Dunkerque Studies Maritime 0139-S and interconnections to the NS-Med relatively lower EU added value in corridor comparison to other proposals submitted under the call

Île-de-France deals with Green The proposal scored below threshold in 2019-FR-TM- Régie Autonome des transports :studies of 4 depots’ electric FR Studies Roads one or more blocks of award criteria 0166-S Parisiens (RATP) transformation in a European urban node

The proposed Action was not selected due to budgetary constraints and given Elimination of bottlenecks on Marseille- Ministry for Ecological and 2019-FR-TM- that it was considered as having a Vintimiglia axis - Design and detailed FR Inclusive Transition - Transport Studies Railway 0170-S relatively lower EU added value in studies Minsitry comparison to other proposals submitted under the call

2019-FR-TM- Safe and Secure Parking Areas for trucks The proposal scored below threshold in FR COFIROUTE Works Roads 0177-W on Cofiroute network one or more blocks of award criteria

2019-FR-TM- Safe and Secure Parking Areas for trucks Autoroutes du Sud de la France The proposal scored below threshold in FR Works Roads 0178-W on ASF network (ASF) one or more blocks of award criteria

EN 25 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

Works on the lengthening of the railway Ministry for Ecological and The proposal scored below threshold in 2019-FR-TM- platforms of the cross-border rail section FR Inclusive Transition – Transport Works Railway one or more blocks of award criteria 0224-W Metz-Luxembourg Ministry

The proposed Action was not selected due to budgetary constraints and given 2019-FR-TM- Multi-modal connection from city-centre to that it was considered as having a FR Bordeaux Métropole Works Roads 0225-W airport in the Bordeaux Urban Node relatively lower EU added value in comparison to other proposals submitted under the call

2019-FR-TM- Studies of Redevelopment of brownfields Inland The proposal scored below threshold in FR HAROPA Port of Rouen Studies 0230-S in Petit Couronne waterways one or more blocks of award criteria

The proposed Action was not selected due to budgetary constraints and given Creation of a new walkway and new Ministry for Ecological and 2019-FR-TM- that it was considered as having a access ways to the platforms at the Lyon- FR Inclusive Transition – Transport Works Railway 0268-W relatively lower EU added value in Part-Dieu station Ministry comparison to other proposals submitted under the call

2019-FR-TM- Inadmissible proposal BlueMEDLINE (Studies) FR ELENGY Studies Multimodal 0274-S

The proposed Action was not selected due to budgetary constraints and given Ministry for Ecological and 2019-FR-TM- Studies on the Strasbourg metropolitan that it was considered as having a FR Inclusive Transition – Transport Studies Railway 0281-S rail network relatively lower EU added value in Ministry comparison to other proposals submitted under the call

2019-FR-TM- OSS-Port of Calais / Optimised Safety & The proposal scored below threshold in FR Hauts-de-France Region Works Maritime 0306-W Security - Port of Calais one or more blocks of award criteria

2019-FR-TM- Underpinning of the grain terminal quay at Ineligible proposal FR Grand Port Maritime de Rouen Works Maritime 0315-W Canteleu-Dieppedalle (Port of Rouen)

EN 26 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

2019-FR-TM- The proposal scored below threshold in BlueMEDfront (Works) FR ELENGY SA Works Maritime 0332-W one or more blocks of award criteria

Ministry for Ecological and The proposal scored below threshold in 2019-FR-TM- Final studies of railway developments to FR Inclusive Transition – Transport Studies Railway one or more blocks of award criteria 0341-S the north of Toulouse (AFNT) Ministry

2019-HR-TM- The proposal scored below threshold in TERRITORY HR Grad Zagreb (The City of Zagreb) Studies Roads 0324-S one or more blocks of award criteria

2019-HR-TM- The proposal scored below threshold in CONCERN HR Grad Zagreb (The City of Zagreb) Studies Roads 0328-S one or more blocks of award criteria

Upgrade of the Rijeka Port infrastructure - The proposal scored below threshold in 2019-HR- AGCT dredging - Phase II (POR2CORE- HR Port of Rijeka Authority Works Maritime one or more blocks of award criteria TMC-0156-W AGCT dredging Ph2)

PRORT OF RIJEKA Container Terminal The proposal scored below threshold in 2019-HR- Krk - Study Documentation with HR Port of Rijeka Authority Studies Maritime one or more blocks of award criteria TMC-0226-S Conceptual Design

The proposed Action was not selected due to budgetary constraints and given Study and Project Documentation for the 2019-HR- Inland that it was considered as having a Dangerous Cargo Terminal in Port of HR Port Authority Slavonski Brod Studies TMC-0273-S waterways relatively lower EU added value in Slavonski Brod comparison to other proposals submitted under the call

2019-HR- Introduction of safe and secure parking Hrvatske autoceste d.o.o. The proposal scored below threshold in HR Works Roads TMC-0290-W facilities for trucks on A3 Motorway (Croatian Motorways Ltd) one or more blocks of award criteria

2019-HR- Modernisation of railway line section HŽ Infrastruktura d.o.o. (Croatian The proposal scored below threshold in HR Studies Railway TMC-0301-S Zagreb Main Station - Hrvatski Leskovac Railways Infrastructure Ltd.) one or more blocks of award criteria

Removal of the railway bottleneck through The proposal scored below threshold in 2019-HR- the construction of underpass in the City HR The City of Zagreb Works Railway one or more blocks of award criteria TMC-0329-W of Zagreb - Medpotoki street

EN 27 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

Removal of the railway bottleneck through The proposal scored below threshold in 2019-HR- the construction of underpass in the City HR Grad Zagreb (The City of Zagreb) Works Railway one or more blocks of award criteria TMC-0333-W of Zagreb - Gospic street

2019-HU- Digitalisation of rail transportation with The proposal scored below threshold in HU Rail Cargo Hungaria Zrt. Works Railway TMC-0123-W special focus on single-wagon load traffic one or more blocks of award criteria

Developing the parking reservation and The proposal scored below threshold in 2019-HU- Ministry for Innovation and information systems on Hungarian HU Works Roads one or more blocks of award criteria TMC-0176-W Technology motorways

Preparations for upgrading the road link Ineligible proposal 2019-HU- between the OEM/MED Corridor Municipality of the City of HU Studies Roads TMC-0265-S Motorway the RHD Corridor Core inland Budapest / MUNBUD port

The proposed Action was not selected due to budgetary constraints and given Preparation of the Upgrade of Particular 2019-HU- Ministry for Innovation and that it was considered as having a Railway Line Sections between Budapest HU Studies Railway TMC-0286-S Technology relatively lower EU added value in and UA State Border comparison to other proposals submitted under the call

2019-HU- Complex inland port and logistic chain Ministry for Innovation and Inland The proposal scored below threshold in HU Studies TMC-0289-S development project Technology waterways one or more blocks of award criteria

2019-HU- Complex fairway and inland port Ministry for Innovation and Inland The proposal scored below threshold in HU Works TMC-0297-W development implementation project Technology waterways one or more blocks of award criteria

Complex development of intermodal MAHART Container Center The proposal scored below threshold in 2019-HU- Inland transshipment in TEN-T core network port HU Szolgáltató Korlátolt Felelosségű Works one or more blocks of award criteria TMC-0307-W waterways Budapest-Csepel Társaság

2019-IE-TM- Feasibility of the development of a new The proposal scored below threshold in IE Shannon Foynes Port Company Studies Maritime 0129-S deep-water berth at Foynes Island one or more blocks of award criteria

EN 28 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

2019-IE-TM- 8500 Series EMU Passenger Information Department of Transport, Tourism The proposal scored below threshold in IE Works Railway 0133-W System Upgrade and Sport one or more blocks of award criteria

Enhancing Capacity at Dublin Port to The proposal scored below threshold in 2019-IE-TM- reduce Bottlenecks and bridge Missing IE Dublin Port Company Works Maritime one or more blocks of award criteria 0149-W Links to Mainland Europe

Enhancement of National Rail (TEN-T) The proposal scored below threshold in 2019-IE-TM- Department of Transport, Tourism Network - Feasability Study of High/Higher IE Studies Railway one or more blocks of award criteria 0179-S and Sport Speed Rail

Investment in Capacity and Mobility The proposal scored below threshold in 2019-IE-TM- Efficiently Measures for Future IE Port of Cork Company Works Maritime one or more blocks of award criteria 0236-W Sustainability of Port Operations

IRL - Improvement of the Rail connection The proposal scored below threshold in 2019-IT-TM- FERROVIE TOSCANE società the port of Livorno to the TEN-T Core IT Studies Railway one or more blocks of award criteria 0126-S d'ingegneria srl Network

The proposed Action was not selected due to budgetary constraints and given 2019-IT-TM- that it was considered as having a Ravenna Small Scale LNG IT DEPOSITI ITALIANI GNL S.P.A. Works Maritime 0189-W relatively lower EU added value in comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given that it was considered as having a INFluuntPO - Interventions on Po river 2019-IT-TM- AIPo Agenzia Interregionale per il Inland relatively lower EU added value in flow unlocking navigability in northern Italy IT Works 0203-W fiume Po waterways comparison to other proposals submitted inland waterway system under the call, in conjunction with concerns regarding its conformity with EU environmental policy and legislation

2019-IT-TM- Studies for the intermodal redevelopment The proposal scored below threshold in IT Rete Ferroviaria Italiana Studies Railway 0239-S and upgrading of the core node stations one or more blocks of award criteria

EN 29 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

2019-IT-TM- Intermodal redevelopment and upgrading The proposal scored below threshold in IT Rete Ferroviaria Italiana S.p.A. Works Railway 0240-W of Mantua Station one or more blocks of award criteria

2019-IT-TM- Design of the intermodal redevelopment The proposal scored below threshold in IT Rete Ferroviaria Italiana Works Railway 0241-W and upgrading of Novara Station one or more blocks of award criteria

2019-IT-TM- Inland The proposal scored below threshold in Mantova Cross corridor trimodal node IT Provincia di Mantova Studies 0339-S waterways one or more blocks of award criteria

Reconstruction of the breakwaters and the The proposal scored below threshold in 2019-LV- access channel for ships entrance into the LV Freeport of Riga Authority Works Maritime one or more blocks of award criteria TMC-0154-W Freeport of Riga

The proposed Action was not selected due to budgetary constraints and given Enhancement of the TEN-T Core Network 2019-MT- that it was considered as having a in Malta at Dinitrol Junction at WA23 and MT Agency of Infrastructure Malta Works Roads TMC-0090-W relatively lower EU added value in MIA Junction at WA24 - Action A comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given Basic maritime infrastructure upgrade and 2019-NL-TM- that it was considered as having a optimisation of hinterland connection for NL DFDS Seaways B.V. Works Maritime 0180-W relatively lower EU added value in RoRo operations in Rotterdam comparison to other proposals submitted under the call

2019-NL-TM- Ineligible proposal PHS Geldermalsen NL ProRail B.V. Works Railway 0305-W

2019-NL-TM- Improvement and expansion of the Inland The proposal scored below threshold in NL Zaanstad Works 0340-W Amsterdam Harbour Area waterways one or more blocks of award criteria

EN 30 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

AT | BE | BG Ineligible proposal | CZ | DE | DK | EE | ES | FI | FR | 2019-PL-TM- HR | HU | IE Spatsh VALORIS SP ZOO SP.K. Works Roads 0278-W | IT | LT | LU | LV | NL | PL | PT | RO | SE | SI | SK | UK

The proposed Action was not selected Feasibility study with technical due to budgetary constraints and given 2019-PL-TM- documentation of the project: Zarzad Morskiego Portu Gdynia that it was considered as having a PL Studies Maritime 0291-S Reconstruction of Quay areas in Gdynia SA (Port of Gdynia Authority SA) relatively lower EU added value in Port, phase IV comparison to other proposals submitted under the call

The proposed Action was not selected Development of Kartuska Street on the due to budgetary constraints and given 2019-PL-TM- section from Otomińska Street to the city that it was considered as having a PL Gmina Miasta Gdanska Works Roads 0293-W boundary of Gdańsk as part of national relatively lower EU added value in road No. 7 - Stages I A and I B comparison to other proposals submitted under the call

Expansion of the Intermodal Container The proposal scored below threshold in 2019-PL-TM- Terminal in Kąty Wrocławskie - STAGE II - PL Schavemaker Invest Sp. z o.o. Works Railway one or more blocks of award criteria 0294-W modernisation of railway infrastructure

Construction of infrastructure The proposal scored below threshold in accompanying connection of public one or more blocks of award criteria transport with railway infrastructure 2019-PL-TM- created under the project holding the PL Miasto Poznan Studies Railway 0303-S name: “Works on the Poznań rail freight bypass” implemented by PKP Polskie Linie Kolejowe S.A. – stage I – design work

EN 31 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

Study project for the route to The proposal scored below threshold in 2019-PL-TM- Naramowice - Stage III, together with a PL Miasto Poznan Studies Railway one or more blocks of award criteria 0309-S complementary road system

The proposed Action was not selected due to budgetary constraints and given 2019-PL-TM- Zarzad Morskiego Portu Gdansk that it was considered as having a PL Works Maritime 0318-W S.A. relatively lower EU added value in Reconstruction of the Bytomskie Quay in comparison to other proposals submitted the Port of Gdańsk under the call

Designing, installation and homologation The proposal scored below threshold in 2019-PL-TM- Rail Polska private limited of the prototype on-board ETCS system PL Works Railway one or more blocks of award criteria 0319-W company for the locomotive type 207E

2019-PL-TM- Floating LNG Storage Unit in Port of Ineligible proposal PL ENERIS eMAG Sp. z o.o. Works Maritime 0325-W Gdynia

2019-PL-TM- Floating LNG fueled OPS in the Port of Ineligible proposal PL ENERIS eMAG sp. z o. o. Works Maritime 0326-W Gdynia

Enhancing rail intermobility by The proposal scored below threshold in 2019-PL-TM- modernization rail connection of "Euroterminal Slawków" Spólka z one or more blocks of award criteria PL Works Railway 0330-W Euroterminal Slawków to the Baltic- ograniczona odpowiedzialnoscia Adriatic CNC

2019-PL-TM- Rail RMG – stage 2 of expansion of the The proposal scored below threshold in PL DCT Gdansk SA Works Railway 0336-W DCT Gdańsk railway siding one or more blocks of award criteria

2019-PL- The proposal scored below threshold in Works on Poznań freight bypass PL PKP Polskie Linie Kolejowe S.A. Works Railway TMC-0310-W one or more blocks of award criteria

Works on the E20 railway line, Siedlce - The proposal scored below threshold in 2019-PL- Terespol section, stage III - LCS Terespol PL PKP Polskie Linie Kolejowe S.A. Works Railway one or more blocks of award criteria TMC-0312-W - remaining works

EN 32 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

Improvement of the Maritime APDL - Administração dos Portos Ineligible proposal 2019-PT- Accessibilities to the Pole of the Port of PT do Douro, Leixões e Viana do Works Maritime TMC-0216-W Leixões in Viana do Castelo Castelo, S.A.

APDL - Administração dos Portos The proposal scored below threshold in 2019-PT- Inland Douro’s Inland Waterway 2020 - Phase III PT do Douro, Leixões e Viana do Works one or more blocks of award criteria TMC-0266-W waterways Castelo, S.A.

Preparatory study for "implementation of The proposal scored below threshold in 2019-RO- Administratia Porturilor Dunarii Inland integrated port community system for RO Studies one or more blocks of award criteria TMC-0204-S Maritime waterways Romanian inland ports"

Improvement of year-round NAVigation The proposal scored below threshold in 2019-RO- National Company Maritime Ports Inland conditions in the maritime-river Port of RO Works one or more blocks of award criteria TMC-0205-W Administration SA Constanta waterways Constanta (INAV)

2019-RO- Inland port - Safety Integrated Monitoring National Company Maritime Ports The proposal scored below threshold in RO Works Roads TMC-0206-W System (SIMS) Administration SA Constanta one or more blocks of award criteria

Improving navigability on Danube- The proposal scored below threshold in 2019-RO- AFDJ –River Administration of the Inland intelligent signalling in most critical points RO Works one or more blocks of award criteria TMC-0208-W Lower Danube waterways on Calarasi-Braila sector - DANUBE AtoN

The proposed Action was not selected due to budgetary constraints and given 2019-SE-TM- New Slussen- increased accessibility in Exploateringskontoret Stockholms that it was considered as having a SE Works Roads 0104-W the new transport hub Stad relatively lower EU added value in comparison to other proposals submitted under the call

The proposed Action was not selected due to budgetary constraints and given New Main railway lines in Sweden - study 2019-SE-TM- Trafikverket (Swedish Transport that it was considered as having a of two sections, Hässleholm-Lund and SE Studies Railway 0105-S Administration) relatively lower EU added value in Gothenburg-Borås comparison to other proposals submitted under the call

EN 33 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

2019-SE-TM- SAIM CONNEXT - Stockholm Arlanda The proposal scored below threshold in SE Swedavia AB Studies Roads 0117-S Intermodal Connection Station one or more blocks of award criteria

The proposed Action was not selected due to budgetary constraints and given 2019-SE-TM- that it was considered as having a Skandia gateway - study SE Port of Göteborg Studies Maritime 0118-S relatively lower EU added value in comparison to other proposals submitted under the call

NORRBOTNIABANAN, Detailed technical The proposal scored below threshold in 2019-SE-TM- Trafikverket (Swedish Transport studies to rationalize upcoming railway SE Studies Railway one or more blocks of award criteria 0122-S Administation) plans, Phase 2: Skellefteå-Luleå

The proposed Action was not selected due to budgetary constraints and given LARS II: Long-term Achievements - 2019-SE-TM- that it was considered as having a Ready for a Sustainable Core Port in SE Trelleborgs Hamn AB Works Maritime 0144-W relatively lower EU added value in Trelleborg comparison to other proposals submitted under the call

Development of new SSTPA next to the The proposal scored below threshold in 2019-SE-TM- port of Trelleborg and the core road one or more blocks of award criteria SE Trelleborgs Hamn AB Works Roads 0145-W network in the Scan-Med corridor (E6/E22)

The proposed Action was not selected due to budgetary constraints and given 2019-SI-TMC- Luka Koper, pristaniški in logisticni that it was considered as having a LKPIER SI Works Maritime 0214-W sistem, delniška družba relatively lower EU added value in comparison to other proposals submitted under the call

Improving TEN-T Core Network at the The proposal scored below threshold in 2019-SI-TMC- Luka Koper, port and logistic Port of Koper by extending Piers I and II SI Studies Maritime one or more blocks of award criteria 0292-S system, public limited company (ICON LK-STUDIES)

EN 34 EN

Member State Transport Code Title Type Justification Concerned Applicant ⃰ Mode

The proposed Action was not selected due to budgetary constraints and given The Belfast Multimodal Transport Hub on 2019-UK-TM- Department for Infrastructure that it was considered as having a the NS-Med Core Corridor - Enabling UK Works Railway 0071-W (Northern Ireland) relatively lower EU added value in Works comparison to other proposals submitted under the call

( ⃰ ) For multi-applicant proposals only the coordinating applicant is listed.

EN 35 EN

EN 36 EN