COMMUNITY INVOLVEMENT PLAN

Cabot Carbon/Koppers Superfund Site Gainesville,

November 2017

's \^J

u. s. environmental protection agency REGION IV

Approved \ss'./ Date: /

II11095397 I The U. S. Environmental Protection Agency’s (EPA)

Superfund Community Involvement Program is committed

TO PROMOTING COMMUNICATION BETWEEN CITIZENS AND THE AGENCY.

Active public involvement is crucial to the success of any public project.

EPA’S COMMUNITY INVOLVEMENT ACTIVITIES AT THE

Cabot Carbon/Koppers Superfund Site

ARE DESIGNED TO

Inform the public of the nature of the environmental issues associated with the site.

Involve the public in the decision-making process that will affect them,

Involve the public in the responses under consideration to remedy these issues, and

Inform the public of the progress being made to implement the remedy. Table of Contents Section Page

1.0 Overview of the CommunityInvolvement Plan...... 4 2.0 Capsule Site Description...... 5 2.1 Site History...... 5 2.2 Site Description Location...... 7 2.3 Site Inspectionsand Cleanup .Activities...... 11 3.0 Community Background...... 15 3.1 Community Profile...... 15 3.2 Histoiy of Community Involvement...... 17 3.3 Key Community Concerns...... 18 3.4 Response to Community Concerns...... 19 3.5 Summaiy of Communication Needs...... 19 4.0 EP.A's Community Involvement Program...... 20 4.1 Tlie Plan...... 20 4.2 Time Frame Summaiy for Community Involvement .Activities...... 25 .Appendices: .A EP.A Regional Contacts...... 26 B Local OlTicials...... 27 C State Officials...... 28 D Federal Elected Officials...... 29 E Potentially Responsible PiU'ties...... 30 F Media Contacts...... 31 G Meeting Locations...... 33 H Repositoiy Locations...... 34 I Other Local Resources ...... 35 J Tlie CTTP Program...... 36 K Fact Sheets ...... 37 L Glossaiy ...... 49 Figures: 1 Site Location Map...... 8 2 Detailed Site Map...... 9 3 Institutional Controls Base Map...... 10 4 State Map...... 11 5 EJ Screen Map...... 16 Tables: .A Identified Site Contamimints of Concern...... 12 B Superfund Cleiinup Process...... 14

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 3 November 20! Section 1.0 Overview of the C'ommunitv Involvement Plan

Tlie Ihiited States Environmental Protection Agency (EPA) developed the Community Involvement Phin (CIP) to serve as a framework for community involvement and outreach etToils associated with the Cabot Carbon Koppers Superfund Site (the Site). Tlie CIP addresses the relationship between the Site, the community, and EPA: provides a background of the community: presents EPA's community involvement program: and provides a listing of resources. Tlie goals of the CIP iu*e to infonn the public of planned and ongoing Site activities: maintain open communication about Site remediation: ensure that concerns are acknowledged and addressed: provide interested pmlies with useful inlbnnation: provide citizens with opportunities to comment on and be involved in technical decisions: iind encourage and assist local citizens in providing input to agency decisions that will have long-tenn elTects on the community. Inlbnnation discussed during community interviews and Site documents are both essential elements in developing the CIP.

Tlie CIP is revised as community concern wiUTiints or at minimum, even three years until Site activities have been concluded. Tlie revision process includes conducting additional community interviews, updating mailing lists, investigating the designated repositon. and updating the contacts iind resources provided in the .Appendices of the CIP. Tlie puipose of the revision process is to ensure that both previous iind cuirent needs and expectations specified by the community are acknowledged.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 4 November 20! Section 2.0 C'apsule Site Description

2.1 Site History

In 1916. a carbon iind wood-treating tacility began operation at the Site. The Site is located at Main Street and 23"^^' Avenue in Gainesville, a town in Alachua County. Florida. Soil and groundwater contamination at the Site was discovered in the mid-1980‘s by the Florida Depiulment of Environmental Protection. .An initial remedial investigation feasibility study was conducted by Cabot Carbon and Beazer East, the Koppers Site responsible party. Tlie initial Record of Decision was issued in 1990.

Tlie Site is made up of two properties, the Cabot CiU'bon property and the Koppers property. Tlie Koppers property includes the area where a wood-treating tacility operated between 1916 and 2009. The Cabot CiU'bon property includes the area where a charcoal and resin production tacility operated. The EP.A placed the Site on the Superfund Program's National Priorities List (NPL) in 1984 because of contaminated soil and groundwater.

In 1990. the EP.A issued a cleanup plan for the Site. Tins phin included digging up and treating contaminated soil from the Koppers area of the Site. It also included placing institutional controls on the Cabot iu*ea of the Site. Lastly, the plan included treating groundwater and sampling groundwater and surtace water.

In 1994. Cabot Carbon dug up and removed contaminated soil and sediment from the Cabot Carbon iu*ea of the Site. Later in 1994. Cabot CiU'bon built a groundwater interceptor trench system on the Cabot Carbon area of the Site on North Main Street and intercepts contiiminated groundwater from the shallow aquifer and discluu'ges it to the local publicly owned treatment plant. This groundwater interceptor trench has removed over 500 million gallons of groundwater since installation. In 2011. Cabot Carbon removed 116 tons of contaminated sediment from Hogtown and Springstead Creeks impacted by waste discharge from operations on the Cabot Carbon area of the Site.

In 1995. Beiizer East constructed and operated a groundwater pump iind treat system that extracted groundwater from the Surficial aquifer initially iind later was upgraded to exiract contaminated groundwater from the l^pper Eloridian aquifer as well. Tliis groundwater pump- and-treat system has pumped and treated 392 million gallons of water from the Surficial and l^pper Eloridian aquifer. .A portion of the treated groundwater is used to iirigate the Site vegetation. Beiizer East installed and sampled two sentinel wells between the Koppers area of the Site and the Gainesville Regional Ihility (GRl^ Muiphee Wellfield. GRl^ sampling of groundwater at the Muiphee Wellfield has shown no detections of Site contaminants there at the Muiphee Wellfield.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 5 November 20! In 2011. PRPs finished tearing down and removing all fonner tacility structures from the Cabot Carbon iu*ea of the Site. Beazer East also completed stonn water system improvements, added crushed rock to roads at the Site and planted grass over a large portion of the Site to control dust. In Februaiy 2011. the EP.A issued the Record of Decision Summaiy of Remedial .Alternative Selection, a second cleiinup phin for the Site. This plan finalized cleiinup activities for both the Koppers and Cabot Carbon areas of the Site and revised requirements in the 1990 ROD.

In May 2011. Beazer East submitted a work plan for cann ing out a full-scale in-place geochemical stabilization (ISGS) demonstration in the fonner Process .Ai*ea in the l^pper Haulhom aquifer. ISGS injections took place in MiU'ch 2014 with promising initial results. The EP.A anticipates submittal of a solidification stabilization pilot test work plan in the neiu* future to address source area contamination in the fonner North Lagoon and Drip Track source areas. Cabot Carbon submitted a work plan for outlining possible Site-related contaminants in groundwater of the Haulhom Group in early 2011. Tlie EP.A approved this work plan. Cabot implemented the plan in September 2011. Results showed contamination of Haulhom Group groundwater with more Site-related contaminants than allowed in the groundwater cleanup standards included in the 2011 ROD. Cabot is required to remediate the contaminated groundwater using in-place treatment technology.

Tlie EP.A iind Beazer East entered into an agreement in July 2013. requiring Beazer East to design and implement the selected remedy at the Koppers portion of the Site. Tliese activities have already begun at both the Koppers and Cabot CiU'bon portions of the Site. Beazer East completed the otfsite soils remediation in November 2014. 103 residential structures and seven commercial buildings, four vacant lots, iind the Genesis Preparatoiy School had contaminated soils removed and replaced with clean soils, as well as new landscaping installed. Tlie treatment of contiiminated groundwater using in-situ geochemical stabilization (ISGS) injections has begun at the Koppers Process .Ai*ea in both the Surficial and Hawthorn aquifers.

Tlie EP.A is basing the groundwater cleanup on EP.A FDEP drinking water Maximum Contaminant Levels (MCLs) iind has selected detault Florida risk-based coirective action soil cleanup levels and detault EP.A FDEP sediment levels adjusted for background for sediment cleanups.

Tlie treatment of contaminated groundwater using in-situ geochemical stabilization (ISGS) injections was completed in September 2015 in the Koppers Process .Ai*ea in both the Surficial and Haulhom aquifers. ISGS injections are scheduled to begin in the Koppers South Lagoon .Ai*ea in 2017 in the same aquifers. Vertical hairier wall installation is also scheduled to tiike place in 2017 as well as sediment removal from a drainage ditch leading to Springstead Creek.

EP.A completed the last Five-Year Review in MiU'ch 2016. EP.A plans to complete the nexi Five- Year Review in 2021.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 6 November 20! 2.2 Site Description/Location

Tlie 136-acre Site is located at Main Street & 23'^^' Avenue. Gainesville. Florida 32601. Gainesville is located within Alachua County. Tlie Site is about one mile east of l^S Highway 441. Tlie Koppers area covers 86 acres on the western side of the Site, and the Cabot Carbon area covers 50 acres on the eastern side of the Site.

Specific by-products detected on the Koppers portion of the Site include creosote, pentachloiphenol. and copper-chromium-arsenic (CC.A). Two wastewater ponds, a former cooling pond process area, and a drip track area were identified in this portion of the Site. Investigations perfonned at Koppers in the 1980s revealed soil and groundwater contamination on-Site.

Single tamily and multiple tamily residential properties are located to the immediate west of the Site and commercial lacilities border the southern and eastern portions of the Site along Northwest 23rd .Avenue and North Main Street. The Stephen Foster Neighborhood is the closest neighborhood to the Site.

Businesses and apartments border the Site to the north and south. Ihideveloped land borders the Site to the east iind single-tamily homes border the Site to the west. The City of Gainesville's Public Works Compound and Springstead Creek are located northwest of the Site. .A shopping mall. Ciu* dealerships and several other businesses also cuirently operate on the Cabot Carbon portion of the Site.

Tlie Suwiinnee River Water Management District listed the Site and nearby suirounding area as a groundwater delineation area. Tins means all wells put in the area need the District's approval. Tlie Site is also located within the .Alachua County Murphee Wellfield Protection Zone, which restricts installation of groundwater wells. .A portion of the Cabot Koppers Site is cuirently in commercial reuse.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 7 November 20! Figure 1: Site Location Map

GiinwiH*, FL

Cabot/Kof^r* Suparfuind Silt

Gain&sviln

. Kopptre SS

Cabot SKa

0 750 1 500 SouiTM. £$n, agita/Gtot«. Gvo£>«. i-cuted, USDA, USGS> AEX, G^imapping, Aatogrid, IGN. HSP. OaLorme. AND. Trrlr ilflin. Frat Afnencan. IffiEP-WCMC and tha GtS ConwnM.

Cabot/Koppers Supeifund Site MORTH Galnesvile.Alactma County, Florida

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 8 November 2017 Figure 2: Detailed Site Map r

North Logooii I' Ctbot SRft

Cabot Lagoons undwtfr roatmont FaclStv

n

375 750 Legend Interceptor Trench SOLKM £an. OgMGtobo. Gecfye, f-cufiocT, USOA, USGS, AEX, t - i Off-arte Soil Remediation Area GefiTUfyMng, Aafognb. JCN. fCR DoLofm^, AND. Teh Aths, Ftrat Souroe Areas Aneiiciv)'. 4MEP-MCMC tfMflTM SrSt/ssr CommiM^ -f— Railroad

Cabot/Koppers Superfund Site Gaine^Ue, Alachua County, Florida V NOATH

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 9 November 2017 Figure 3: Institutional Control Base Map

750 1,500 3.000 Legend HFeet Off'Site Soil Reme<^ation Area Eon. OgitatGiob^ t-cubed, USDA^ f f Speciai Environmental Concern Area uses, AEX. Gebr^pping, A^toghd. IGN. SGP. DcLome, AND. TelBAaas. FratAmenc^n. UNEP-WCMC »ndthe Groundwater Deineabon Area GtS UsBT Conwnundyc.

Cabot/Koppefs Superfund Site ^skeo O ^ NORTH Gainesviie, Alac^ua County. Florida

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 10 November 2017 Figure 4: State Map

®Nashv lle-Dayiastin

Itlemphis

Birmirnghatm® WAtlant

®Jacksqn

K acksionv i e ;■ - - ainefeville, FL

rliami

2.3 Site Inspections and Cleanup Activities

Beazer East, Inc. and Cabot Carbon Corporation are the Site’s potentially responsible parties (PRPs) and are responsible for cleanup activities. The EPA and FDEP provide oversight. Both responsible parties have investigated Site conditions and have taken steps to clean up the Site, in order to protect people and the environment from contamination. Residences and businesses sue connected to the public water supply by a waterline.

Risks and pathways adchessed by the cleanup include health risks from people ingesting or touching contamination in groundwater, soil, and sediment. Contamination resulted from waste handling practices at the Site. The contaminants identified as Site-related include arsenic polycyclic aromatic hy^ocarbons (PAHs), dioxin, and creosote compounds. For a complete list of the contaminants of concern at the Site please see Table A.

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 11 November 2017 Table A: Identified Site Contaminants of Concern

rDF.NTTFlED IDENTIFIED COMA\U>IAM MEi>U CONTAMINANT .\1LDU 1*METHYLNAPHIHALENE GW* COPPER SOSL m DIBENZO(AiT) 2.4-DIMETHYLPHENOL SOIL GW. SOIL. SW** ANTHR.ACENE 2 4-DrNITROTOLUENE SOIL DIBENZOFURAN GW 2 -< ’HI .ORC W APHTHALENE son. E'rHANOI. GW ACENAPHTHENE GW. soils SW ETHYLBENZENE GW

AtT.NAPHTHYI.ENE GTA’ son Fr.t:ORANTHE\E c,\\\ son.

ANTHRACENE GW, SOIL FLUORENE GW. SOIL SW

ARSENIC GW. SOIL INDENE Gw; SW'

BENZENE GW INDEN0(1 a.5.CD)PYRENE SOIL

CENZOCB)FLUORANTHENE GW, SOIL NAPHTHALENE GW. SOIL SW BENZO(GHl)PER.YLEI® FAH

DENZO(K)FLUORANTHENE PAHs (POLYCYCLIC AROMATIC gw; son. HYDROCARBONS) GW. son.

BENZO[A)ANTHRACENE GW, son. PENTACHLOROPHENOL GW. son. BENZO[A]FLUOKAN I HENE GW PHENANH1KL.NE GW. S(.)IL

BENZO[AJPYRENE SOIL PHENOL GW. SOIL SW

DIS(2- GW. SOIL, SW PYRENE 1 n I YLHEX\X)PHTHAL ATE gw; soil tAMPHOR GW. SOIL SW voc GW.SW (.-.ARBAZOLE GW * GW r^ireseiY^ Ground W'^aier CHROMIUM GW. SOIL SW •*SW' rqjiesenis Surface Whaler

CHRYSENE son

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 12 November 2017 Groundwater monitoring by Cabot Carbon iind Beazer East is on-going to address the required remedial design and remedial action in the Surficial. Haulhom. and l^pper Floridian aquifers. Tlie EPA negotiated legal agreements with the Site's PRPs to investigate iind clean up the Site. Tlie PRPs continue to fund Site cleanup, monitoring and oversight activities.

Tlie parties responsible for Site contiimination performed the Site cleanup. Cleanup activities included removal and treatment of contaminated soil, groundwater treatment and removal of contiiminated soil from homes. Tlie EP.A. state and local government, responsible piU'ties and local developers are working together to successfully clean up the Site. This collaboration also led to beneficial reuse of the Site.

Tlie EP.A. FDEP iind PRPs continue to protect people and the environment from Site contamination by treating groundwater, testing soil, conducting cleanup activities and undertaking Five-Year Reviews.

Tlie EP.A is engaging the impacted community to build relationships and to assess concerns of stakeholders. Inlbnnation from the community and stakeholders is required for the development of the Community Involvement Plan (CIP). Tlie EP.A community involvement personnel will establish a timeline for future interactions and coordinate with stakeholders to help build their capacity.

Tlie EP.A has directed the responsible parties Beiizer East (Koppers) and Cabot Carbon to treat contaminated soils, sediments, groundwater, and surtace water through the 1990 Record of Decision (ROD) iind through an updated ROD in 2011. The Site is cuirently undergoing remedial design and remedial action.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 13 November 20! Table B: Superfund Cleanup Process

Event Complete? Description PA/SI Preliminary Assessment/Site Inspection Investigations of site conditions. If the release of hazardous substances requires immediate or short-term response actions, these are addressed under the Emergency Response program of □ Superfund. NPL Listing National Priority List (NPL) Site Listing PrcKess A list of the most serious sites identified for possible long-term □ cleanup. RI/FS 1 j Remedial Investigation/Feasibility Study (RI/FS) Determines the nature and extent of contamination. Assesses the treatability of site contamination and evaluates the potential performance and cost of treatment technologies. ROD ROD Explains which cleanup alternatives will be used at NPL sites. When reniedie.s exceed 25 million, they are reviewed by the m National Remedy Review Board. RD/RA Remedial Design/Remedial Action (RD/RA) 1 Preparation and implementation of plans and specifications for r applying site remedies. The bulk of the cleanup usually occurs during this phase. All new Rmd-financed remedies are reviewed by the National Priorities Panel. Construction Construction Completion Completion Identifies completion of physical cleanup construction, although this does not necessarily indicate whether final cleanup levels have been achieved. Post Post Constniction Completion Construction Ensures that Superfimd response actions provide for the long­ Completion term protection of human health and the environment. Included here are Long-Term Response Actions (LTRA). Operation and Maintenance, Institutional Controls. Five-Year Reviews, Remedy Optimization. NPL Delete NPL Deletion Removes a site from the NPL once all response actions are complete and all cleanup goals have been achieved. Reuse Site Reuse/Redevelopment Information on how the Superfund program is working with communities and other partners to return hazardous waste sites to safe and productive use without adversely affecting the remedv.

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 14 November 2017 Section 3.0 C'ommunitj Background

3.1 C'ommunit\ Profile

Gainesville is the largest city and the county seat of Alachua County. Florida. The Koppers iind Cabot Carbon properties cover approximately 136 acres together. The Site is located in the northern portion of the city of Gainesville.

Gainesville serves as the cultural, educational, and commercial center for the North Central Florida Region. Gainesville is home to Florida's largest and oldest university. Tlie Ihhversity of Florida. Tlie Ihhversity of Florida and Shands Hospital at the Ihiiversity of Florida iu*e the leading employers in Gainesville.

Gainesville has a Council Manager fonn of government which means the Mayor and City Commission make policy decisions: and the stiilT. led by the City Manager, implements these decisions.

Tlie local Site repositoiy is located at the .Alachua County Libraiy . Meeting locations in the area include Stephen Foster ElementiU'y School. Santa Fe College Board Room, and Eastside Community Center.

Demographics and iiifonnation: Gaiiies\ ille, FL \ia 2015 City-Data Census

Population: 128.460

Gainesville median age: 26 years

Florida median age: 41.8 years

Gainesville estimated median household mcoine m 2015: S34.313

Gamesville estunated per capita mcoine m 2015: S19.870

Race/Ethnic Backgromid:

White: 56.6**o | Black: 22.7**o | Hispanic: 9.4**o | .Asian: 8.6**o | Two or more races: 3.7**o | Native .American: 0.4® o

Education:

High school graduate or higher: 91.9®o

Bachelor's degree or higher: 44.6®o

Graduate degree or higher: 21.2®o

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 15 November 20! EJSCREEN Report (Version 2017) 1-mile Ring Centered FLORIDA, EPA Region 4 Approximate Population: 8,617 Input Area (sq. miles): 3.14 Cabot/Koppers Site

Figure 5: EJ Screen Map

' '^|^-£.^niintw«yAi« "33 yv UnrunnffyAM ■» Q ^ wUN'.«i^^Ave ' ?■ . "1-s

“d.. Kl*' ir. » ' 'A

ftfi • f '^.r . .... i •.' i ■ 7 B •> 1“ r rm k T..r-..s '■■ i* i?ii^"" IM- rF^ Saptember 20. 2017 Suf1»r Ares ^ OigiizB'd Point esc <»« 6«esiowne« ■ Supspfund

EPA State Percentile in Percentile in EPA USA Percentile in Selected Variables Value Region Average State Region Average USA Average Demographic Indicators Demographic Index 54% 41% 71 38% 75 36% 76 Minority Population 48% 44% 59 37% 67 38% 66 Low Income Population 59% 38% 83 39% 82 34% 85 Linguistically Isolated Population 5% 7% 61 3% 78 5% 71 Population with Less Than High 5% 13% 24 14% 21 13% 27 School Education Population under Age 5 5% 6% 52 6% 46 6% 43 Population over Age 64 7% 19% 14 15% 15 14% 19

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 16 November 2017 3.2 History of C'ommunitj Involvement

Tlie EPA has led many community involvement activities to engage the community input. The activities also ensure the public remains informed about Site actions tlu'oughout the cleanup process. Outreach etToils have included public notices, community interviews and inlbnnation meetings. (Ongoing) The EP.A initially awarded a Technical .Assistiince Grant (T.AG) to the Protect Gainesville's Citizens (PGC). Inc. organization to help the community participate in the Site decision-making process. The group worked with advisors to inteipret iind help the community understand teclmical inlbnnation about the Site. PGC. Inc. chose not to pursue iin additional T.AG in 2015. EP.A is now working with the Stephen Poster Neighborhood .Association as a Community .Advisoiy Group (C.AG) and awarded a contract to the Water and .Air Research to conduct community involvement, technical evaluations, and outreach elTorts on behalf of the community

Tlie City of Gainesville (COG). Gainesville Regional Ihilities (GRl^- .Alachua County Environmental Protection Depiulment (.ACEPD). iind Water and .Air Research provide teclmical representatives to participate in the Local Intergovernmental Team with EP.A and PDEP in evaluating and making recommendations on the Site remedial design mid action work phms. EP.A conducts monthly conlerence calls with teclmical representatives of GRlk .ACEPD. COG. PDEP. and the Site responsible piU'ties Beazer East imd Cabot Carbon. Below is a list of some of the outreach activities that have been conducted to date:

October 1988: EP.A issued a tact sheet that provided a brief background imd histoiy of the Site and described the Remedial Investigation feasibility Study process. MiU'ch 1989: EP.A issued a Conmuinity Relations Plan. .August 1990: EP.A sent out a fact sheet to the community announcing the Proposed Plan. Tlie tact sheet explained the puipose of the Proposed Phm and it aimounced the .August 14"' public meeting to discuss the Proposed Plan. .April 1994: EP.A issued a tact sheet announcing the completion of the Site Remedial Design. MiU'ch 2001: EP.A completed the first PVR which included notifying the community through a newspaper public notice and community interviews. .April 2001: EP.A issued a Proposed Plan tact sheet announcing a ROD .Amendment. It provided an opportunity for the public to attend a public meeting and to comment on the proposed mnendment. .April 2006: EP.A completed the Second PVR which included notifying the community through a newspaper public notice and community interviews. June 2010: EP.A issued a tact sheet which provided im update on the cleanup of the Site (See attached). September 2010: EP.A issued a Proposed Phm Pollow-up Prefeired Remedy tact sheet. It provided a brief Site summaiy. addressed specific components of the prefeired remedy, discussed community concerns related to remedial activities and announced an upcoming .Availability Session that was held October 2010 (See attached). October 2010: Koppers Community Involvement Phm. MiU'ch 2011: EP.A completed the Third PVR which included notifying the community through a newspaper public notice and community interviews.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 17 November 20! • May 2011: EPA revised the Community Involvement Phin. • July 2015: EPA contractors perfonned community interviews to get their concerns and answer their questions about the Site. • MiU'ch 2016: EPA completed the Eouilh PVR which included notifying the community through a newspaper public notice and community interviews. • Januaiy 2017: EPA representatives attended the Stephen Poster Neighborhood Association public meeting and provided an update of remediation of the Site iind an overview of the College Ihiderserved Community Partnership Progmm (CITP). See Appendix J for a description of Cl^PP.

Tlie community has played an active role in presenting their concerns regarding the remedial action to the public. The local media has played an integral piu1 in educating the community on the Site-related activities.

3.3 Key C'ommunity C'oncerns

In 2015. six .Alachua County residents were interviewed to document any perceived problems or successes with the remedies that have and continue to be implemented at the Site. Tlie results of these interviews are summarized below.

1. Most residents expressed that the Site's remedy in effect was elTicient.

2. Continue to ensure that residents receive more EP.A based infonnation such as monthly phone calls, lace-to-face contact, and PRP-based infonnation. as most residents are still requesting iiilbnnation from the EP.A.

3. Continue to ensure that Koppers and Cabot Carbon have a similar cleiinup process, as residents expressed that the Cabot Carbon cleanup process was slower, and residents expressed that they were not comfortable with the reuse of Cabot Carbon.

4. Ensure that odors emanating from the lift station cease as an industrial hygiene worker was exposed to the odor. .An ambient air quality assessment was perfonned and indicated that the levels were below Occupational Safety and Health .Administration (OSH.A) standards as well as the EP.A ambient air quality stiindards.

5. Continue to allow residents to express interest in participating in strategies to help with redevelopment options for Koppers.

6. Continue to keep residents aware of any remediation during cleanup on the Site.

7. Ensure that the EP.A continues to always include city and county olTicials in discussion and review of documents, and continue to recommend members of the community to become more involved with a focus on the Superfund process.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 18 November 20! 8. Ensure that the percentage of human health and ecological impacts of contamination caused by the Site, regarding dioxins and PAH compounds, remain monitored.

9. Ensure that attention is placed on preventing downward migration of Non Aqueous Phase Liquid (NAPE) and or dissolve phase contamination, since there's a possibility of it leaking into Eloridiiin aquifer.

3.4 Response to C'ommunity C'oncerns

Tlie EP.A is adding a bairierto suiround the Koppers area. Tlie vertical bairier wall will contain the four fonner source areas at the fonner Koppers Site, and is being done with a planned construction date of mid-2018. In-Situ Geochemical Stabilization (ISGS) injections will occur in the fonner South Lagoon during the 2018 timeframe.

3.5 Summary of C'ommunication Needs

Based on the community interviews, most residents would like to receive more infonnation directly from the EP.A via phone calls, tace-to tace contact, and PRP-based inlbnnation.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 19 November 20! Section 4.0 EPA’s C'ommunitj Involvement Program

Tlie overall goal of the EPA's community involvement program is to promote two-way communication between citizens and the EPA and to provide opportunities for meaningful iind active involvement by the community in the cleanup process. The EPA will implement the community involvement activities described below. The following plan is based on the results of the community interviews described earlier. The plan addresses each issue that was identified as important to the community.

4.1 The Plan

Issue 1: Keeping the public infonned and up to date.

Acti\ity lA: Designate an EPA Conuiiuiiity In\ohenient Coordinator (CIC).

• Objective: To provide a primaiy liaison between the community iind the EP.A. iind to ensure prompt, accurate, and consistent responses and information dissemination about the Site. In those instances, where the EP.A's CIC may be unable to provide adequate infonnation (such as on technical issues), inquiries will be directed to the appropriate EP.A contact.

• Method: The EP.A will designate an EP.A CIC to handle Site inquiries and serve as a point of contact for community members. Tlie CIC is appointed by the EP.A Region 4. .Abena .Ajiinaku is the EP.A CIC assigned to the Cabot Carbon Koppers Site. She will work closely with Scott Miller, the EP.A's Remedial Project Manager for the Site.

• Timing: Tlie CIC. .Abena .Ajanaku. became actively involved in 2016.

.Acti\ity IB: Prepare and distribute Site fact sheets and tecluiical suininaries.

• Objective: To provide citizens with cuirent. accurate, easy-to-read, easy-to-understand infonnation about the Site.

• Method: Pact sheets will be mailed to all parties on the Site mailing list. In addition, copies will be available at the inlbnnation repositories (See .Appendix H) and other locations as identified by the community.

• Timing: Tlie EP.A will prepare and distribute fact sheets on an as needed basis.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 2() November 20! Acti\ ity 1C: Pro\ icle a toll-free ‘‘800 number'’' for the coniniuiiity to contact EPA.

• Objective: To enable citizens to obtain the latest information available whenever they want, rather thiin having to wait for a meeting or a tact sheet, and without incuiring any cost.

• Method: The EPA will activate the 800 number and publish the number periodically in the local papers iind in all tact sheets.

• Timing: Tlie toll free number is cuirently operational (1-877-718-3752).

.\cti\ity ID: Maintain a mailing list for the Site.

• Objective: To facilitate the distribution of Site specific infonnation to even one who needs or wants to be kept intbnned about the Site.

• Method: The EP.A will create a mailing list that includes all residences adjacent to the Site, in known or suspected paths of migration, or those otherwise atTected by the Site. Tlie EP.A will also solicit interested parties via tact sheets, newspaper articles, public meetings, public availabilities, etc.

^ Timing: Tlie EP.A has developed a Site Mailing List iind an e-mail list, which will be updated as needed.

.\cti\1ty IE: Establish and inamtam Inforniation Repositories.

• Objective: To provide a convenient location where residents ciin go to read and copy otTicial documents and other pertinent inlbnnation about the Site iind EP.A activities.

• Method: The repositoiy is a reference collection of Site infonnation containing the .Administrative Record file, other Site-specific infonnation. the Community Involvement Plan, infonnation about the Technical .Assistiince Grant program, iind the general Superfund process. Tlie designated repositories are accessible to the physically challenged, will have copier facilities, iind will be available to residents during noinial business hours and at least some evening iind or weekend hours. .Additional repositories may also be established, including one at the EP.A Region 4 otTices located in .Atlanta. Georgia.

• Timing: Tlie EP.A established the local repositories at the .Alachua County Libraiy . 401 E. Ihiiversity .Avenue Gainesville. EL 32601 and the Region 4 EP.A. 61 Eors\lli Street. S\V. .Atlanta. Georgia 30303. The EP.A adds new documents as they become available.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 21 November 20! Activity IF: Provide Site information on the Internet.

• Objective: To provide key resources for searching and listing both general and specific information pertaining to Superfund and hazardous waste issues.

• Method: A Site Status Summary for this https://www.epa.gov/superfund/cabot-koppers ■ EPA Headquarters: http://www.epa.gov ■ EPA Region 4: https://www.epa.gov/abouteDa/about-epa-region-4-southeast ■ EPA Region 4: 61 Forsyth Street Atlanta, GA 30303

• Timing: Site Status summaries are periodically updated.

Activity IG: Provide Technical Assistance Grant (TAG) information.

• Objective: To provide resources for community groups to hire technical advisors to assist them in interpreting technical information about the Site

• Method: The EPA will provide information about the TAG program at public meetings and in fact sheets. The EPA will also provide briefing sessions to interested groups if requested. The EPA will provide TAG applications to qualified groups.

• EPA awarded TAG to Protect Gainesville’s Citizens, Incorporated in June 2010. It is presently inactive.

Activity IH: Establish and maintain the Administrative Record.

• Objective: To provide residents with a paper trail of all documents, resources, etc. used by the Remedial Project Manager and Site Team to make decisions about the Site and its cleanup.

• Method: The EPA will provide at least two sets of the Administrative Record for the Site; one in the EPA Region 4 offices located at 61 Forsyth Street SW Atlanta, GA 30303 and one located in the local Information Repository, the Alachua County Library.

• Timing: After the last ROD has been signed. It was signed in 2011.

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 22 November 2017 Issue 2: Pro\ ide adequate and nieanuigful oppoi*tuiiities for coniinuiiity ui\oh eiiieiit.

Acti\ity 2A: Hold public ineetuigs.

• Objective: To update the community on Site developments and address community questions, concerns, ideas and comments.

• Method: Refer to Appendix G for suggested meeting locations. Tlie EP.A will schedule, prepare for. and attend all announced meetings. Tlie EP.A will provide at least two weeks' prior notice of the scheduled meeting. Tlie Regional Project Manager. Community Involvement Coordinator, iind other appropriate EP.A statT will attend.

• Timing: EP.A will hold public meetings as appropriate.

.\cti\ ity 2B: Encourage forination of a Coniinuiiity .\d\ison Group (C.\G).

• Objective: To provide citizens with a meaningful way to become actively involved, and to provide the Site Team with a viable means of learning citizen concerns and attitudes.

• Method: The EP.A will encourage the fonnation of a C.AG and provide support as appropriate to facilitate its fonnation. If a C.AG is fonned. the EP.A will provide administrative support but will not be an active member.

• Timing: Tlie Stephen Poster Neighborhood .Association is a C.AG.

.Acti\ity 2C: Make mforinal \ isits to coniinuiiity.

• Objective: To help keep community members infonned about the Site, while providing the EP.A with feedback about Site activities and the community's opinions.

• Method: The EP.A will establish a presence in the community tlu'ough inlbnnal. often unscheduled visits to talk spontaneously with local residents.

• Timing: Tliroughout the entire cleiinup process.

.Acti\ ity 2D: Solicit coininents during a Public Conunent Period.

• Objective: To give community members an opportunity to review and comment on viu'ious EP.A documents. Tins provides the citizens with meaningful involvement in the process and also provides the Site Temn with valuable inlbnnation for use in making decisions.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 23 November 20! • Method: The EPA will announce each comment period separately. .Announcements will appear in local newspapers and EP.A tact sheets: they will include piu'ticulars on duration, how to make comments, where to submit comments, etc. The EP.A may solicit comments pertaining to public documents such as the CIP. preliminaiy findings, etc.

• Timing: Comment periods will be announced as appropriate.

.\cti\ ity 2E: Re\ ise the Coiiuiiuiiity Iii\ oh eiiieiit Plan (CIP).

• Objective: To identify iind address community needs, issues, or concerns regarding the Site or the cleanup remedy that are not cuirently addressed in this CIP.

• Method: The Revised CIP will update the infonnation presented in the previous version of the CIP.

• Timing: Tlie EP.A will revise the CIP as community concern wiUTiints or at least even three years until the Site is closed out. It has been decided that this CIP will be reviewed and considered for revision even six months from the release date(s).

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 24 November 20! 4.2 Time Frame Summary for Community Involvement Activities

ACTIVITY TIME FRAME

Designate an EPA Community Involvement Designated; Abena Ajanaku Coordinator (CIC) Prepare and distribute Site fact sheets and As needed technical summaries Provide a toll-free "800 number" for the community to contact EPA Currently in operation Maintain a mailing list for the Site Ongoing

Establish and maintain Information Repositories Established, update as needed

Provide Site information on the Internet Currently available; update as needed Provide Technical Assistance Grant (TAG) As needed information Establish and maintain the Administrative Record Established, update as needed

Hold public meetings As needed Encourage formation of a Community Advisory Group (CAG) Ongoing Make informal visits to community As needed Solicit comments during a Public Comment As needed and required Period Revise the Community Involvement Plan (CIP) As needed, at least every 3 years

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 25 November 2017 Appendix A EPA Regional Contacts

Scott Miller Abena Ajanaku Remedial Project Manager Community Involvement Coordinator U.S. EPA, Region 4 U.S. EPA, Region 4 61 Forsyth Street SW 61 Forsyth Street SW Atlanta, GA 30303 Atlanta, GA 30303 (404) 562-8819 (404) 562-8819 Miller. scott@epa. gov [email protected]

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 26 November 2017 Appendix B Local Officials

Mayor Lauren Poe Harvey Ward (District II) 200 East University Avenue 200 East University Avenue Gainesville, FL 32601 Gainesville, FL 32601 (352) 334-5000 (352) 334-5000 [email protected] [email protected]

City Commissioners David Arreola (District III) Helen Warren (Commissioner at-large) 200 East University Avenue 200 East University Avenue Gainesville, FL 32601 Gainesville, FL 32601 (352) 334-5000 (352) 334-5000 [email protected] [email protected] Adrian Hayes-Santos (District IV) Harvey Budd (Commissioner at-large) 200 East University Avenue 200 East University Avenue Gainesville, FL 32601 Gainesville, FL 32601 (352) 334-5000 (352) 334-5000 [email protected] [email protected]

Charles Goston (District I) 200 East University Avenue Gainesville, FL 32601 (352) 334-5000 [email protected]

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 27 November 2017 Appendix C State Officials

State Governor State Senators Rick Scott District 8 400 South Monroe Street Keith Perry Tallahassee, FL 32399 4650 NW 39^ Plaee (850) 488-7146 Suite C http://www.flgov.com/ Gainesville, FL 32606 (352) 264-4040 Lieutenant Governor [email protected] Carlos Lopez-Cantera 400 South Monroe Street Tallahassee, FL 32399 (805) 717-9331 http://www.flgov.com/

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 28 November 2017 Appendix D Federal Elected Officials

U.S. Senate U.S. House of Representatives

Mr. Bill Nelson Clovis Watson Jr. United States Senate 200 House Office Building 716 Senate H^t Office Building 402 South Monroe Street Washington, DC 20510 Tallahassee, FL 32399 (202) 224-5274 (850) 717-5020 https://www.billnelson.senate.gov/ http://www.mvfloridahouse.gov/Sections/Re presentatives/details.aspx?MemberId=4541 Broward Office 3416 South University Drive Elizabeth Porter Fort Lauderdale, FL 33328 313 House Office Building (954) 693-3041 402 South Monroe Street Tallahassee, FL 32399 Mr. Marco Rubio (850) 717-5010 284 Russell Senate Office Building http://www.mvfloridahouse.gov/Sections/Re Washington, DC 20510 presentatives/details.aspx?MemberId=4494 (202) 224-3041 &LegislativeTermId=86 http ://www.rubio.senate, gov/public/ Charles Wesley Clemons Orlando Office 1301 The Capitol 201 South Orange Avenue 402 South Monroe Street Suite 350 Tallahassee, FL 32399 Orlando, FL 32801 (850)717-5021 (407) 254-2573 https://www.mvfloridahouse.gOv/Sections/R epresentatives/details.aspx?MemberId=4655 Ted Yoho &LegislativeTermId=87 511 Canon House Office Building Washington, DC 20515 (202) 22-5744 https://voho.house.gov/

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 29 November 2017 Appendix E Potentially Responsible Parties

Beazer East, Inc. (Location HQ) 1 Oxford Center Pittsburg, PA 15201 (412) 208-8801 https://www.bloomberg.com/research/stocks /private/snapshot.asp?privcapid=7938672

Cabot Corporation (Location HQ) 4400 North Point Parkway Suite 200 Alph^'etta, GA 30022 (678) 297-1300 http://www.cabotcorp.com/

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 30 November 2017 Appendix F Media Contacts

Television Stations; WMBT 90.1 FM: Hip-Hop WCJB TV20 S Main Street 6220 NW43^*^ Street Gainesville, FL 32601 Gainesville, FL 32653 (352)331-9600 (352) 377-2020 http ://wmbt901 .com/ http://www.wcib.com/ WIND-FM 92.5: Classic Rock MyCBS4 3602 NE 20* Place 1703 NW 80* Boulevard Ocala, FL 34470 Gainesville, FL 32606 (352) 622-9500 (352) 332-1128 http://www.windfm.com/the-station/contact- http://mvcbs4.com/news/local us/

First Coast News WMFQ 92 FM: Top 40 1070 E. Adams Street 3357 SW 7* Street Jacksonville, FL 32202 Ocala, FL 34474 (228) 832-2525 (352) 732-9877 http ://www.firstcoastnews.com/ http ://radio92q .com/contact/station-info

News 4 JAX WOGK 93.7 FM: Country 4 Broadcast Place 3602 N.E.20* Place Jacksonville, FL 32207 Ocala, FL 34470 (904) 393-9844 (352) 622-5600 https://www.news4iax.com/ http://www.937kcountrv.com/

FOX 51 WRUF 98.1 FM: Sports WOGX-FOX 51 1200 Weimer Hall 4727 NW 53^*^ Avenue, Ste A P.O. Box 118405 Gainesville, FL 32653 Gainesville, FL 32611 1 (866) 553-6935 (352) 392-5551 http ://www.wogx.com// http ://www.wruf.com/

Radio Stations; WSKY97.3 FM: Talk 3600 N.W. 43^'* Street, Building B WUFT 89.1 FM: Public Radio Gainesville, FL 32606 P.O. Box 118405 (352) 377-0985 Gainesville, FL 32611 http ://www.theskv973. com/sky-insiders- (352) 392-5551 club#/ https://www.wuft.org/

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 31 November 2017 Newspapers;

The Gainesville Sun 2700 SW 13**" Street Gainesville, FL 32608 (352)378-1411 http://www.gainesville.com/

Alachua Today 14804 Main Street Alachua, FL 32615 (386) 462-3355 http ://www.alachuatodav.com/

The Alligator 2700 SW 13**" Street Gainesville, FL 32608 (352) 376-4458 http://www.alligator.org/

Digital Media:

Gainesville City Website http ://m. citvofgainesville.org/

City of Gainesville Facebook https://www.facebook.com/places/Things- to-do-in-Gainesville- Florida/105630226138026/

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 32 November 2017 Appendix G Meeting Locations

Stephen Foster Elemental School 3800 N\V 6"'Street Gainesville. FL 32609 (352) 955-6706

Siinta Fe College Board Room 3000 N\V 83''^' Street Gainesville. FL 32606 (352) 395-5000

Alachua County Libraiy District Headquarters 401 E. Ihhversity Avenue Gainesville. FL 32601 (352) 334-3900

Eastside Community Center 2841 East Ihhversity Avenue Gainesville. FL 32601 (352) 334-2714

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 33 November 20! Appendix H Repository Locations

Local Repository: EPA Region 4 Repository:

Alachua County Library U.S. Environmental Protection Agency 401 East University Avenue 61 Forsyth Street, SW Gainesville, FL 32601 Sam Nunn Atlanta Federal Center, 9* Floor (352) 334-3900 Atlanta, GA 30303 https://www.aclib.us/ (404) 562-8190 [email protected] 8:00AM-4:30PM Monday-Friday

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 34 November 2017 Appendix I Other Local Resources

Florida Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399 (850) 245-2128 http://www.dep.state.fl.us/mainpage/default.htm

The City of Gainesville (COG) 200 East University Ave Gainesville, FL 32601 (352) 334-5000 http://m.citvofgainesville.org/

Gainesville Regional Utilities (GRU) 301 E SE 4*“^ Avenue Gainesville, FL 32601 (352) 334-3434 https://www.gru.com/

Alachua County EPD (ACEPD) Suite 106 Gainesville, FL 32601 (352) 374-5275 http://www.alachuacoimtv.us/Depts/EPD/Pages/EPD.aspx

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 35 November 2017 Appendix J The College Underserved Community Partnership Program

The College Underserved Community Partnership Program (CUPP) was started at EPA to help address community concerns that fall outside the scope of Superfund cleanup efforts but are very real barriers to the sustained health and growth of surrounding neighborhoods.

CUPP provides assistance to these communities to help improve their economic viability, health, and overall quality of life. CUPP enlists colleges and universities to provide vital technical support through student internships and capstone projects. Communities benefit from the schools’ investment of technical assistance and innovative approaches; students gain practical experience in their areas of academic study and the opportunity to make meaningful contributions to nearby communities.

CUPP projects have addressed issues ranging from economic development to Site planning to improve community health. CUPP helps build relationships that endure long after the initial projects are finished, contributing to stable and sustainable community growth. CUPP works with communities on self-identified issues by meeting and listening to elected officials’ and residents’ concerns. Together they develop a list of possible projects and prioritize them according to community needs. CUPP identifies nearby academic institutions with appropriate areas of study who are willing to help. The schools assign academic leads who oversee the projects and guide the students; CUPP facilitates meetings and, if needed, engages other federal agencies and non-govemmental organizations to support the project. CUPP has over 70 colleges currently committed to the program and is actively adding new schools and partners. There is no cost to the community to participate in CUPP. To engage CUPP, contact your Community Involvement Coordinator or Remedial Project Manager. http://www2.epa.gov/communitvhealth/collegeunderserved-communitv-partnership-program

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 36 November 2017 Appendix K Fact Sheets

U.8. ENVIRONMENTAL PROTECTION AGENCY

PROPOSED PLAN FOLLOW-UP

^1 PREFERRED REMEDY FACT SHEET September 2010

Cabot CarboruKoppars Suparfund Site GairMavilla, Alachua County, Florida

Introduction This Jttci blK\n, issued by ihc U S. Availability SaasliMi Envimrirtcrital Prsitcctkin Aijicncv {KPA» Da^-OefobOT 6, 2010 provides claiii'icabon and additional mrormatton Time: 6:00 PM to 0:00 PM about ihc prererred remedv in the Proposed Plan tor the Cabot Carbon' Koppers; Supcrt'ur>d Site Locabofr Easfs'de Community Cenisr (SitcK GaJnesville, Alachua County, Klorida. 2941 East Unh/arsity Avanua HPA prcsenicd the pTcIcrrcd remedy lor Ihu Site ©aineswWe. Pfonda 92001 durinu a public mectmjj hdd un Aujjusi 2010. nie HPA determined ihai it shinild The eonunnnity inviied 1o a public nvnitgibility provide more dciail$ and clirification of iHe ausktua rcgiinljns ihe Cubut CariKSL’Kcippiita Site. preferred remedy in response to questions and Repreieouhves fWMti HP A. ihe Marida l^|iaiimeitt ooncemfi voiced by ihc awimuriiy diinnj; that of Health ITDOH). and the Ataduin County mccling. A separate fact sheet for olTSitc soil kavituflmi;ii|al Pruttiutiun t>cp(aLnieiiE cteunup itetivUicH us being ptepated will be available lu provide iiifomiauun and answer quesdons about upcoming acii vities at the She. Tbis tKt sheet provides a briet'She summary, addresses specif c components of the pref^red The Adminlsiratm Recordfletor the Cebot CarbortfKoppers SKe ^ available at the remedy^ and discusses community concerns roHowiog tocjMion relating to lemcdiaJ activities. Olf-SEte soil deanup concerns arc addressed in a separate tact AischuB Ccunty Library sheet 401 E umverany Ave Gaioesville. FL 32601 Silt Surmnary (3SQ) 334-390Q WWW ■chD.uap’iocaticns^heBdaiBrm The Cubut Carbun'Koppurs Supurfund Site b located in ti commerrial and residential area of iIk northurn putt of the Gainnyilk city liinics. Alachua County, 1 kinda Ihis ^ite wis continue to collect sompling data for (Miginally iwci Sites Cabot Carbon in the g/oundwa^r, soil, sediment, and surface water to southeast ponioti of the Site, artd Koppen on the evaluate ibe effectiveness of the remedy over western portion of the Site i I'igure IJ Cabot lime. Caition was a pioc uir and churcool generation facility, but is now comnicrclal property. From this point forward, the word “Site" will Koppers was an active wxiod-treatiD{! facility refer to the Koppers pom cm of the Cabot until December Althoutdt lemedial Carboni'Koppers Superfund Site, unkas investigations at the Cabot Carboa'Koppers Site otherwise iipedikd. The Site rcrrusdial action began in and are now completed. CKA wilt will also address olT-Sitc areas contaniiiutcd

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 37 November 2017 " ' i, .israi-issT

^^ssmmi

‘J: T— fllWBlIl CAW ewMi . ______“• ..» ^' , * -* * •mi aouNOMFr

Ptgure 1, BCJU.EHFEET <o MBp Cabal CaMlBnflteHMn ^awifUab Ma. OMaanaa. Reiiaa

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 38 November 2017 Sit»-related activhi«s including resideuluU sit« soil cleanup cmtcenis arc addrensed in * uid iiidiiiTtrial areas surrsA» Soil and Qroundwater Claanup iv'ith the hinorical URe ot'creosote tor wood The public has expressed concern about the trailing and mclutk moNIc arkior residual dense proposed oti>silc remedy. KP.A is aware of the non>ar|UCOiK>, phase liquids (DSAI’Ia). I>N APla puhlie'.s concerns and in an en'ort to pnividc are oi ganic substances that do not mix w ith and additioital inrotinaiioci has prefiai'ed the are heavier than w ater. Site contaaninants aUn following community indude arsenic, polycv'clic arvtnulic ciiiestioiu hydroeMhoiis (P.Ali«). and dioxin«/l\iraitri in soil aedrmciil and gjviundwider Ihe moal Why not dig up al DNAPL^mpacted soil? predominaiil coniamitiani in j^oundwater is Excavation of source area soils containing PAIis. The Feasibility'Study CFS) and Proposed DKAPI. WiLs evalutUed in coitipanson with other Plan provide tor additional dcuils. options during the KS pcoeevs. Tlie prefcticd uti* xitc reiiKdy, xuniinarized on Table 1, w ax Preferred Remedy Description delenniiKd lu be the opthmil allemaliw bused on Ihe veteeled uhemotive h the r<»ult ot'vvnrs of key cnioria including remedy protectivencsa. coHahoTAtivc etibrt and thorough revKW c environmefil. Rctiudy selection in Ihc linal step f. Exeai-atiM A^itks sitd hu^ nod roiumt in the Kiiperfund process before cleanup design The two source area vxvuvutiun ultcsuulivcs and action considered during the remedy xelecl ion process (removal of soil wniiin llle SurtioinJ Aquifor or ■|h« pTcrcrrcd remedy will proicci human health removal of soil lo the Kuw thorn Group middle and Ibc envininment by containing, treating, and clay imit) would prescnl Bignifionni oluiIlongM eontroUmgcontammalion associated with the due to tJic excavation dcpllix aiKl lltc large Rite. IhiN rctnedy was selected over other HiiHuinl.v of soil thni v^ould he ieiiHive<1 The options evaluated became as a whole ii was Surficial Aquifea soil rctiioval would loquirc determined to provide the optimal solution based di^iig lu ;ui iit^irv.vimiile deptli uf25 feol on Comprehensive Lnviruiuiieatal Respon»c. below ground iim) removing ^ppmximnlcly CurnpensaLiun and l.iuliiLily .Act (ChKCl.A) h'S 28M.OOO ciibk v nrds (42<).000 tons) of soil. ITie evTilualion erilexia. Ihe selected remedy is Hawthorn Group middle cloy soil Is deeper ar>d compatihk with Uic anticipated liiture use of the removal would require digging to an property, ax described in more detail Iwlow. approximate depth of 65 foel ImIow' ground and removing apt>mxinude1y i,800,bfln cubic yartb Ihc scleelcd remedy has three pnrU lhal addrcNS (2.700.00(1 Inns) of Mill, nwavaliiig .voil to these three dwiiiiet medci groups on-sile medin (soil depths w ould require xhoring to keep the and groiaidivutei above the t'ppcr h'li.nidai A[|uifcr |T-'K.\1). grouiKlwalcr in tbc luid ofT-bile media (

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 39 November 2017 «-■»,■»• St! -■--J M V ■: -r\

'* '..'•''jBRSISip. ^ :?//\. <>— am MUNMv ■»■■«««>

> MiWTMIB «LL nun MEi •* ^Jttali „ , ‘ -f * *i*l-* tmti ctnMTCtt ■ Fit *>■ ™?te «39DCUn9 >V1ND «K-PKS T1«OC]- ■ umWMC usgcum

— n«rwL I—I1 flEOME/envCR

PontiUM K-Oll

«PPB FkMBM • Muvn am cmtcMH vtu

FIgiRl. On-Sn» Prefcnve Asmwiy Min vmr CM CabenWc^fM SupwTund Stoi Cainwv Ml FMHi

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 40 November 2017 Table 1: Preferred Remedial Alternative Summary

(k-ateVeit Pfl-J Gfcurdhvttr • Fduhlalmaitit'iran'KieimlcceKjiditEnifiuttiiimcI'jda « 'h'^lKcndiinnBirl'D3TeiaviaBlgnuulvaterdiiii{^airiDiMB r Aiii^ie frMiminzt^ctl haniern'.^ll'>prK't'mn»ielrr>^f(elije(f) and mahnen in aR»«iiere chonuli i^cca«n! 'CVIf\} tmnd emmli^all fwnnrecaR»Jrail«(J’mrfaci;i''IN'A) it ka where coseitiaiieas &}« fJffJHir.Wiat (iie imutir.uif me aSn’c the meri^) and in the ^'dal .^^ider FnrsoiUixmiiutMB. a rvgeflfrptifWfiare ;n:(insedr1nni» ra indiviiiial (k» ♦kW fw b (M'ncrs uefining mieeiMi n<'c\4iai4i»l8abt!izjT^cheniu3'3 imuihe grAtviuirl^ • E»^'tUwii)dti:A?salofuifeidaJ$oi1div«medsidari9go(ilake«d TlmircitraLieMiijeaLoacofptiiibpcn'tfimnwdemiitnidijailiiiDS onprcseaKeortiKitid EKar3)edsi>itwilltr^ Fiv surfise water and aedimeil ii Hcitcwii aid SpracMd Creiki, {rapKeil o»ubfalii« irc]:plKenMniIkDiDiiitvmorilk;$urlia»i WKauraunm reach ihrohcilil«H(oteuiniruni .‘iqiiriTeiTtKii'n adaeaimenn'eEmufKsfad ti i:mtim|ide«nial nnKonralm afcmc dice l«c^ e nal d ath'!Re1r d%ct a j4uit IT migrVHoarsrauniiiiHf cnmaminUai i.ln'caiiiccmr:!}. inin^j orbidiptHEilleicb • F.fannrmcriivli

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 41 November 2017 excavalicHi Irctrn Tailing in on worliers, and 3. On-site cotisirnction of above ground dewMering to rcmo^'« groundwater tiui would dudleoftes ilow into the excsvaiion area during oxoavalkm, If tlie exciwatod Aoil is placed in an on-site eonstrueted landllll inNiead of being returned U> (iroundwalcroolloolcd from (he excavation area the excavation or trenaported ofT-Site. the would require ire.'Ktneiil and disposal. resulting mound would he much larger tlum the Conatrucliini ol'a .‘Uaging temporary' Klnragc mound conKidered lor the gently sloped area ma>' be rcqtiired, txca^'ated soil would consolidation area, litis would have senoiB require management m listed hazardous waste. technical and permitting dtallenges. would limit All of tlioo ehallciigca. in turn, result in sliorl* rcdcvdopmeiit i^pportunitteii. and would mit he term health nnd safely risks lo remedial woriera a welcome Night for the eominunity. and ti>e nearby community and signdlcant additionnl costs to the retnedial etldrt. 5- ifarjl' reduction not d^erenr nilh viaurutioa 2. OJf-Site tiispmal diailenga Actual long-term hiniaii health and Finding ortc or more disposal faciliiicAtliat will envirwmicntal risk reduction resulting from accept the large quantities of contaminated soil source area excavation w ould not he ssould preacnl a ehalienge. Land Disposal sigiiiiicaiiily dillcreiil than iit-situ tnmmeiiL Reatriclion (LDR) and Bes.t Denionstralod Siiofl-lerm rniks would be sigiiificiuilly liigber Available Teehiuilogy (BDAT) nilcs for soil excavation Soilremnval will not establidting treatment standarda for land signilicantly reduce groundwater coiteentrafionB di.spo«aj may re<|»ire that oontainuiaied soils at potential r^epiors. ineliuling the Mui^hree Ifom the Site he Kent to one n('lhe few Well Field. A long-lenn groundwater remedy hazardous waste iiiL'ineialors that 4ieeepl wood- would still he miuired. There is also a risk that irealmeiit lifted w^uae It may also he n«»eessaty residual DNAPL will move through die lo treat soils mt-sile prior lo oR-Site disposal, groundwater during excavatitm activiiies- Tfan.spiwting the coniaminnied ’soih to an olT- Site facility would require either at>out 15.(XHli Why consolidate excavated sols on­ (iiurtieial Aquifer e.scav alum) or 9^.000 site? (Ilawlhom Croup middle clay excavation) truck n«eaiiae of Ihe issiKK described above, loadh. More than IOCi dump truck loads day containing xnilK ort-site i< the i>ptiiiial »n.duiioii of conlaminated soil could he driven through the for the eormnunity's needv [he soil areas surrounding Ihe Site resulting in coosolidatiou area will be deigned to coixaia sigiiiticant ironspoa-relau-d safety and the aoil cotdamiiiation and prevent human environnKnlul rbkii. as well » a sij^ii'icaitt contact ami migration in gruiaidwalcr ulT-Site, nuisance to the surrounding urew for over 2.5 The 6oil conivelidation area is concepTualK yeitni. shown on Figure 2 ai>d Figure Tlie moxi coniaminatecJ soil (priiKtpal Ihreal 3. On-site lreami0ir d!ia//ejjjtf0 waste [? nv J) will be treated within the IT the material is treated oiwalte (by luiy method) consolidation area. Ihere will be a gentle slope ar»d returned lo ll»e excavation, the risk on the eontainmcnl area lo prevent surface water reduction and volume treated ix very' similar Co from accumulating Other siratn water the iu-siiu treatm^t optioits, but with itianagemeni controls sudt os rerouting and stibslantially greater short-tenn ri$^ cagine<3riiig detention basins wj|] bo used to rcdvice the challenges, elfort, tiiiie, and cost. likelilKX>d of surface water contact w Kli potenlially conlaminaled soil.

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 42 November 2017 ■a. mnuMnn Attil iMiiWBcnai niwrs DLivirm aSDIML DtMfl I

wwwiWMiiTBrw- I------mwgiwaw

FguraS. won. OivSito Pnfenw] AAgmatm EIEWKJUS jUI£ MW^HHATE CaR> C(niw'vK(ift>ir>B Sutwhi-i] 3>ia Gonn»le fliW»

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 43 November 2017 Is Die soil consoidalHMi area in violatkin ground) FWcaiue the Hawthorn Omup middle of Florida laws? clay lover does not toudtly lnms>mit water due to The soil conKolidalion area heing crealed im>8he ha low pefmeahilily and tlie surface cover/oap at Uk Kuppcr» pitiperty is iwl ccmsiikTcd a mininuzes water froui entenng below the landfill ihuil is has tn med land dispusal surface, the vertical bameruBtl cmilesn (LDK»). llu; soil svill be subsurface conlainment area detuned to comotidjiied wilhiii an ofCvnljimination completely surruuiid the comamhiated soil «cid (AOC) IheNaliMiAlConuii^eiicv Plan(NCP) graundw aicr in die surticial aquitbr uid Upper policy 05 FR S758-87W)J alRwi* hPA lo Hawtlioni iuMtiments. designate an AOC as an evicting area of coulinuoLis CMilBiniiiali^Mi of varying amuunbi 2. /,0ii’tMrifhNiAc£rt' fftmcAoni mufdle and lypes. I.DKawtH not apply il matenal is Ihe Hawthorn (iirmp middle clay unit transmits movvd wiihin »n .\OC\ Irenlcd in plucv. or vwy little groundvvrrter as vviderwed by pressure ccmnlidalcd wirliln on AOC. F.sUhlishnwnl of mons.Liroiiienla ab-.vvc and hetow this; clay unit an .ACX.' tacilixulc* r«ncdiali«i of comanwnalcd Wuriving together, the vertical harrier wall Hitd sitffli- the niieklieeldv layer will limit downward moveinenl of conlajiiination. How Will groundwater be protected? Olxyn that digging up all ih< wi1 in sixirce area* S. Loh- is im(if jclkablc and indTcclivc as detailed 11k consolidation area will be vowred with ■ ahtn'e, cttnlairment ol'siaireir area materuiU is lovv-permsihilily cap onvo' ibal is a minimum required fur piMLocLion of |ipv)unJvvuicr. Source of two feet Ihiei. imd ia constrecud of clean area tnatrriah within cm-site soil material. Iliis cover cap will bo gently sloped oofKcilid4ilion area wtll bo cemtained (FigiFC to promote siurm water ntnuff and prevem P'l'W within Hie area will be treated by in-situ pooling, '['be intent of the c.ip w il I be to prevent meihuds and a mbicl cotilainmcnl system will surfave e.'cpusiurv to conUminuted soil uid limit be ptd in place lo prevent migration away liom mialhlJ Irom eiilenng iJie subsurface w ilhui the the area. Thi* Mialegy ha* been used consolidation area. succcnfnlly at many otlwr Superfund Shea. .At the Kopprr* Site. t1ie ooiriaminuiiu w in be 4. IteSint Treatment ccaliutwd by the foiJowiiig methods: In-situ treulmcnl of contaminated soil uid graundwnler within the consolidation area f. VimImmHtr ivrTiar/ harrier ivall shove lhe I lavcihtim t iroiip middle day w ill Theetuire con^Dlicluion Jirea will be tiutouiidod rediKe vnlunie and toxicity of contaminated by a contiminua vertical sidisufTaco barrier wall media and the potential for contaminant coiKtriieled i>i'a ceinenl bentmiile nliirry (Figure mijjjialion. 3). Slurry walls often are used in environmental remediation where coniaminunts that move 5. GVtfKfu/swmr monHering ihrotigli groundwater tna> pose a potential Uueat Hie LPA will monitor the groundwater in and to a source ol drmking water. Ittcy have been around the Miil consolidation area. Although it used fur decades as lui^-temi solutions for is unlikely, irincrVitNiiigconUumiunion eonirolling seepage. .Slurry wafts are ivpieally ccinceihratioiB are otHicrved outside of the constructed of a soil, beiitoiiite (clay), and water coiitaiiuiu.uA area, additional remedial actions mixture. However, a cement bentonite (such a* may he evaluated fer implementation. pcoposed lit (lie Kuppci's Site) or otbot mixture may be used for greater atruclurEl stren^h and & OlwMi^swirer pump mtl rreor rrnwM to ivduce Jegntdalion due to ctiemieal Oiuundwotci pump and treat sysleins will be intcractioTUi. The barrier wall will be joined lo operated in the fiurTicial .Aquifer and tlic l.’F.A U> the top of the low permeability tlawthorn Group prevent conlaminalcd on-siic groundwater frara midtfle cloy unit (approximalely d5 feet below moving ofi-Site.

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 44 November 2017 7. Soils removal What tnstttultonal controls will bo Soils outside the containment area wfth applied at the Site? concentrations high enough to pose a InsitUilitHial controls xviil he a|>|died at the Situ concern due to leach^g to groi^dwater w>l to |>revei]t exposure to suhe^urfaee soil and be removed and placed within the groundwater contnininalion. llie uisliltaiocal contanment^consotldation area. During die cnntmls are controlled by local uithorities and r«m<;di«l cksigii o*l(Uliona] IvJichubility xitidia w ill beeonw part of the property deed. Tlicy will be dune U> bsscsk orcds fur soil removal. w ill pfcxval diggiag willsiul Ibimul pliuu lo mitigate eicposnre to eontamtiunls (xia pennits, How will cleanup goals be met for soil etc} outside of the soil consolidation area? ITk (rtvcn ar^a im Fi^'.iitv 2 ouls-idi; ol'lhi; W1I In-sttu stabilization ba effecllva? vuu»<>lidiiljim anr«i dial will b<: resided inn) ln-situstiibilizattil will be moved SDrllaal Aquifer lii-Kitu chemical nxidiition or Ui (he consolidation area (blue area)of Fi^c 2. l&BS IS proposed to treat ccntaitiuiation oi the The clean ciner with insaitutiuinl coutrolK will lowei Hawthorn Oioi^ at source areas and prevent ooniiui tvsh soils lhat may comtom a along the oasieLii propcity boundiffy'os on low lc\'cl of coniaminaniB. additional treatriKil method for groundwater migrating oP'-Siie. Why aren^ resdential cleanup goals selected fof on-sIte soil? 1£PA liJM deinoiistralcd Ihc clTcctivouess of in- bPA IS required to Ic-ok at a'asoiinbtv silu slabiluRlion at other wood irealment silen anltcipaled luliire land uses m delennining whal wiih wil conlammaled by DNAPI-and mixed cleanup criUiia to appK' at a Supcrtund.Sitc. w a.'tliK. IXiHng ftic remedial design of Ihisi bPA hns detefTnined Ihsit immKtrivled peKidenUal remedy. Ireidabihly Kludies will be cttmiueled lu use is not a likely or pioctkal future land use for detemiine Uie op]MX}priutc type aid quantity of the Site. However, a remedy'that in effect in-Ritu Rtahilirertl'iat will hind the contiminaied meets I'lorida re^ideiilie] default cleanup soil and meet Kqtnremenl^ Ibrdfective ■rlandards has been selected. The remedy catla einbilization. Treatability testing will tsc for ckiin soil to be piacod over almost the entire contaminated sotb tfom the site to detennioe Site FP,\ Iniv made its reaKonably anticipated the type ami amount of stahdi/er needed land UBC dctcrminalion bx>iod on several laclorB including property uwrtcr Bca/cr KastV planned A pilot test of ISHS has beat conducted it the retention of Site owiwiship and its indicated Site future use of the Site as commercial, recreational or mixed use with a reMdenlial Oft-Slia CuMfc Cfaanup component, 'nicrclorc. the hPA h« determined Comniitniiy euncems and details regarding ofT- lhat the reasonably inilicipaited futuiv land use of Site cleanup of nearby crocks uro addnuaed the Kopi>ers puitien of the Site is likely to be below. OfT-siie xdl cleanup aeliviljes are cumnterciaL rocreulional or inixMl-use with a detailed in a separate fact sheet. lesidential com|KiftaiL

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 45 November 2017 How are Hogtown and Springstead Koppern She generated during the remedial Creek& being addressed? design phase M’the project, will he signed and I1ic :wk-^.li:d r^iitL-dv ;*dilf cxn i:fUyvii c-ontiirnB scaled hv a [vnircssiotial engineer regisLerod in with tl)c cioi»ht> ill two di.^tijict First, to die Stole of Florida. Ute reinodial design of the jddfe!i!i pre\ ioLix oontiuninaiimi oi'lhc scdimMits acleeted remedy will occur aAer die Record of in cflch ctvidi. scdimimix tlwi hn^v coiilHmtnwM Deeixioti (KOli)is xignod- vofKvianili(.q» usMXp'iuWd 'I'rilli vidivrfuniicr CaM C'Hrhon or Koppim thtf llie Whan will th« Community ImrolvBnienl ihfviihuM tfllnls xviiwnlrulicfiii (i.«. Plan be updated? •rontniniiianl corK’ «n«vl oiiinuil liT«> •ue Plan (CTP) lo serve jin ,i franiewo;k for rvqoirMl to b« ongoing. To utldriAb possible SupetiiiiKl Silo, 'flic CIP uddieiibcs (be ftitufc hnpacfts on sedimirfiix. die fonner relationship heiwocn The Stic, tlic ciimiminity, Koppers ritcilh> U rciiuircd lo construct and and EPA. provides a background of tlic operate a deientioo. retention pond(s> to capture commumtyi presents FP.A's community Monti water from tltc Ibmwr Kopper* Site prior nvolvemcM programi and prov idesi a listing of lu allowing it lo he drscharged to the tril>uuir>' tv rcaoureoa. TTw gkinenlativn uf Site suirucc vviera and luid »>isl local vitucib in providing in|Hit lo consolidation of contaminated materials beneath agency decisions that will have long-term a lo«-pemieahilii>- covercap, worm waler effeets on the community. Informalion captwe will allow' puteiilially cwntamiiiiiled discu»edduringconirmiiiils iiilervieWK » scdimorit lo nettle mi that it will not he reicnaed e»enrial in developing the CIP. The CTP update to ibc creeks. b capoded lu be complete In U|e September 2U1U Otlior Community Concema Geuaul cvmniuiihy vunccmb net covered in the Horw will EPA eviluala tha clean up previous sections of th is fact sheet relating to procass and what happana if It ia the Koppers remedial action are addressed unsuccessful? belov,. EP.A will esMliiiiie the progress of the cleanup Uirmu^i confiniiatiun saunplingofsoib and Why was th« FS nol carlifiud by a sodiitieitU uiwe a remedy lias been proressional engineer? implemented. GmurMluatcriainplingwin Tlic NCP rcgiilaliom rvucid iit 40 Code of coniiniie after reniedi implenwitlaliMi h«« laken federal Regiit.niiirin(Cr'R) Pan IIW. contait* ploicv. OrouudwaUT data will be cvjiluuled to the EPA Fcguhiciuiiis fur impUiincntiug emure i hat conumin.ini levels are redticerf nx'er t'l !,K(.T-.A. as well an; goi'emnnoe on dneumeniR tuik* utilil turget ckariup levels are met. Surface to be Kiibmillcd tv lh< it^ncy. P«r EP.A FS water discharges will also be sampled and guidanw. the t'S is u concvpliud doaiment ihil onalyrcd on a quarterly brirhi lo eiKUTe that supports ibe design of selected remedies. Tlie pcniiilled Icvck ore iiicL bi additiMi, EP.A ia N'CP TV(|utR.*s conirioiiuun of engineering desi^ reciuired to evaluate remedial action documenis: therelore. design dociments for (he effevtivaKiw once mm' five yeuia in a Fivo-

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 46 November 2017 Year revievk lo dcEcrmiac if ibe remedy u EFA prorides mTormalion lo ibe community ftmclJAiung AS intended. If tiie remedy doM not negmKng Site dcanup through fact shceLa. ruaelitifi a« inlemied. LrAuill update (he ptdtiic meelingH. [iKai Site infonnation Tcmedy lo uicliide eddilinruil measures m> that repository , hih] Ihe Adminlslriilive Rec«rd die. Ihc ii])dnU:d remedy » cHecLive. Copies of dale laid reports genenilcd during Site invesligations for use in (he remedy selection What is being dona to anaura no CMitaminatton ha« been missed at the process arc lociUcd in the /\dminislrativ« Site? Record file 'IliR l^t sheet will become pan of Ihe .\dmmistraiiiv Record file for the cleanup A wofi: plan is being developed for (he remedial design |)hjse ol'die proieei to identil)' if there dccisiou for tlic Cabot Carbon'Ko^^icrs are possible buried drums or other primary Superi'und Site. The public may review lliix lile source areas on (be 2ilile. In addition, soil. ol (be Alaebua County Ubian. gluunJuAlci. uiid scdititetil siuiipliiig and analyses will eonlinuc as die footprint for EP.A Viill be providing an oddrtionil opportunity installatloii of all llic rcnrcdial teehnokigica U for Ibe community to addresa any ivniaining rdVied. Alier Hddilinnal saniplinf, and anatysea questions Uiey naiy Imw about Site eleiimip Occur und the jvrtKdiul action is implemented, during lut ttvitiiabilily xeKston dial will be lieM ihc proposed on-site sctioie uill ensure liom PM until M OO PM on (Xlobcr 6. evpiMure at the surface lu-s hteen miligaled 2010. at the Eustsidc Communily Center. 2841 East Cnivcniily .Avenue. Guinesville. Elurida How are vapor intrusion possIbltHies .)2iSOI. being addressed? Hic Site groundtvsiter conuiniinunl pkinie does not eonsisa of significant concenlrations of highly volatile eoinponenls xucli ox Milvents or BTLA compounds, '[he primary coneem in Site grounihs alter n km eoneciitrBlions, of imphihalene whidi are only partially volalile Vapor irtnisicMi is un1 ikely at wood-treatment sh

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 47 November 2017 AvmlBbffltv_S«aiufi An availabilily lusKion fhrthe Cabot CarfMri/ Anvone wishing lo be plai-rd on the mailing list Kopp«r>. isiupcrfmid Site will be held fruni 6;QQ Ibrlhis Site fduxildaciul hbi 'hcr request to Sfs. PM until 9:00 PM on Ocloberd. 2010, at Iho La Tojiya Spencer, bPA C'ommunriy Pasuidc Community ConU'r. 2841 Eaal luvolvement Coordinator, at the abote address. I'liivenily Av«nue, Oainesville. Flu ids 32601. You may also cat1 \ts. Spencer with your request at (800) 43>9234 or (4WJ 562-8463

InfoiTHaltoii Rennsltorlw Information ip-uiii,vniiiig tlw Cubol Carbon^’ Koppers Superflind Site may be toiiod at the following location:

Alai^ua County f/ihiwy 401 E. University Ave. Gniiiesvilie. FL 32601 (332) 334-3860 www.adib.us‘k>cationabeacU|uart

Cabot Carbon/Koppers Superfund Site Community Involvement Plan Page 48 November 2017 Appendix L Glossary

Adniiiiistrati\ e Order on Consent (Adiiiiiiistr’ati\ e Order): A legal agreement between the Ihhted States Environmental Protection Agency (EPA) and potentially responsible piulies (PRPs) whereby PRPs agree to conduct or pay the cost of a Site investigation and or cleanup. In contrast to a consent decree, an administrative order by consent does not need to be approved by a judge.

.Adniiiiistnitive ReconI File: .A file that is maintained for the public iind contains infonnation used to nuike a decision about a Site under the Comprehensive Environmental Response. Compensation, iind Liability .Act (CERCL.A). Tlie file is available for public review, and a copy is usually placed in the same location as the Site information repositoiy. .A duplicate file is held at a central location, such as the EP.A Regional otTice.

.Agency for Toxic Substances and Disease Registiy (.ATSDR): Superfund created .ATSDR within the federal Public Health Service to work with other government agencies to initiate and implement a variety of health-related responsibilities. .ATSDR develops toxicological profiles, prepiu'es Site-specific health assessments, establishes fonnal registries of persons exposed to hazardous substances, develops and disseminates health education inlbnnation. establishes and maintains literature inventories on hazardous substances, helps prepare health and safety programs for workers at Superfund Sites and workers responding to emergency releases, and provides health-related support in public health emergencies.

.Availability Session: .An "open house" event hosted by EP.A to meet informally with citizens about Site activities.

Cleanup: .Actions taken to deal with a release or tlu'eatened release of haziu'dous substances that could atTect public health or the environment. The tenn is often used broadly to describe viu'ious response actions or phases of remedial responses, such as the Remedial Investigation feasibility Study (RI ES).

Cleanup Remedy: .A prescribed teclmical approach to reducing the concentrations of contamimints at a Site. EP.A selects a cleanup remedy from alternatives identified in the feasibility study after applying a set of balancing criteria and considering public comments.

Conipreliensi\e En\iroiunental Response, Coinpensation, and Liability .Act (CERCL.A): federal Law. commonly known as Superfund, passed in 1980 and modified in 1986 by the Superfund .Amendments and Reauthorization .Act (S.AR.A)to investigate and cleanup abandoned or uncontrolled hazardous waste Sites (CERCL.A is commonly known as Superfund, because the .Act created a special tax that goes into a Trust fund). EP.A either

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 49 November 20! Koppers Superfund Site pays for the Site cleanup when the responsible parties cannot be located or are unwilling or unable to perfonn the remedial actions, or takes legal action to force responsible parties to clean up the Site or reimburse EPA for the cost of the cleanup.

Coniinuiiity Iii\ oheiiieiit Plan (CIP): Tlie goals of the CIP are to infonn the public of planned and ongoing Site activities: maintain open communication about Site remediation: ensure concerns are acknowledged and addressed provide interested parties with useful infonnation: provide citizens with opportunities to comment on and be involved in technical decisions: iind encourage and assist local citizens in providing input to agency decisions that will have long-tenn etTects on their community.

Feasibility Study (FS): Tlie second part of a two-part study called a remedial investigation feasibility study. The feasibility study involves identifying and evaluating the most appropriate technical approaches to addressing contamination problems at a Site. .Alternatives are evaluated for their etTectiveness in protecting humiin health and the environment.

Florida Depai*tiiieiit of Eii\ ironniental Protection (FDEP): .An agency in Florida's government cluu'ged with most functions relating to environmental quality in the state.

Groundwater: Water found underground that fills pores between materials such as mud. soil, or gravel. In aquifers, groundwater often occurs in qualities where it can be used for drinking water, iirigation. iind other puiposes.

Hazard Ranking System (HRS): .A numerical screening system used by EP.A to evaluate the relative potential risks to public health iind the environment from releases or threatened releases of hazardous substiinces from contaminated Sites. Data from prelimimuy Site investigations is used to develop a Site score from 0 to 100 indicating the potential for substances released in groundwater, air. surftice water, or soil to aftect people on or near the Site. Tlie HRS ranking is the principal tact or used to detennine if a Site qualifies for the National Priorities List.

Health Consultation: .A review of available data by the .ATSDR at EP.A's request to determine if existing levels of contaminants and conditions at a Site iu*e creating a public health luizard that requires immediate action.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 5() November 20! Inforniation Repositon : Tlie inforniation repositon is usually located in a public building that is convenient for local residents, such as a public school, city hall, or libraiy . and contains cuirent inforniation. teclmical reports, reference documents, and other inlbmiation regarding a Superfund Site. As the Site proceeds tlu'ough the remedial process, the file at the inforniation repositoiy is contractually updated.

National Priorities List (NPL): .A list generated by EP.A depicting the uncontrolled or abandoned hazardous waste Sites that are priorities for long-temi remedial investigation (RI) iind response. The list is based primarily on the score a Site receives on the Hazard Ranking System. .A nonfederal site must be on the NPL to receive money from the Trust Fund for Remedial .Action. Federal properties listed on the NPL do not receive money from the Trust Fund, but EP.A takes a more fomial role in the cleiuiup process. EP.A is required to update the NPL at least once a year.

Potentially Responsible Party (PRP): .An individual, company, or group of companies that may have contributed to the hiizardous conditions at a Site. Tliese parties may be held liable for costs of the remedial activities by EP.A through CERCL.A laws.

Preliininaiy .Assessnient: Tlie process of collecting and reviewing available inlbmiation about a known or suspected hiizardous wa.ste Site or release status.

Proposed Plan: .A public participation requirement of CERCL.A in which EP.A iind or the PRP sumniiu'ize for the public the prefeired cleanup strategy, rationale for the preference, and alternatives presented in the detailed analysis of the RI FS. The proposed plan may be prepared as a tact sheet or a separate document. In either case, it must actively solicit public review iind comment on all alternatives under consideration.

Public Coininent Period: Tlie time in which the public can review and comment on various documents. .A 30-day minimum comment period is held to allow the community to review iind comment on the document.

Record of Decision (ROD): .A ROD provides the justification for the cleanup remedial action (treatment) chosen at a Superfund Site. It also contains Site histoiy . Site description. Site characteristics, community participation, enforcement activities, past and present activities, contaminated media, the contaminants present, scope iind role of response action, and the remedy selected for cleanup.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 51 November 20! Remedial Action: Tlie actual construction or implementation phase that follows the remedial design of the selected cleiinup alternative at a CERCLA Site.

Remedial Design: .An engineering phase that follows the ROD when technical drawings and specifications are developed for subsequent remedial action at a CERCL.A Site.

Remedial Investigation (RI): .A study designed to collect the data necessaiy to detennine the nature iind extent of contamination at a Site.

Responsi\eness Suinman: .A summaiT of oral and written comments received by EP.A during a public comment period on key Site-related documents, with EP.A's responses to those comments. Tlie responsiveness sumniiii'y highlights community concerns to be taken into account by EP.A in making decisions on a Site and is a key piu1 of the ROD.

Risk .Assessment: .An evaluation of the likelihood of exposure and potential magnitude of future health or environmental etTects that could occur if no cleanup action is taken on a Site. Risk assessment may include both qualitative (non-numerical) evaluation and quantitative (numerical) calculations based on specific assumptions about long-tenn exposure risks. Ecological risk assessment applies to animals, fish, vegetation, and other environmental receptors. Human health risk assessment estimates the potential etTects on people. Risk assessment results are used to identify Site cleiinup requirements.

Superfund: Tlie trust fund established under CERCL.A to pay for cleanup of abandoned haziu'dous waste Sites if PRPs ciinnot be identified. Superfund is the common name for CERCL.A and is often used as an adjective for haziU'dous wa.ste Sites and the investigation and cleanup process directed by EP.A.

Superfund .Aniendments and Reauthorization .Act of 1986 (S.AR.A): S.AR.A established standards for cleanup activities and stipulates the conditions for otT- Site disposal of wastes. Tlie amendments also chu'ified niiiny public piulicipation questions and made federal fticilities accountable under the statute.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 52 November 20! Teclulical Assistance Grant (TAG) Tlie puipose of the Technical Assistance Gmnt is to increase the level of understanding and participation in the Superfiind process among community members and provide independent technical review of Site documents. As part of the Administrative Order by Consent, a grant in the amount of S50.000 is awarded to a community group (that is directly atTected by the Superfund Site) that is responsible for hiring and managing a Technical Advisor, to assist the atTected community. Tlie community group is also responsible for disseminating information to additional stiikeholders or other atTected communities.

IhiitecI States Eii\ iroiunental Protection .\geiicy (EP.\): Established in 1970 to bring together piu1s of viu'ious government agencies involved with the control of pollution.

Cabot Carbon Koppers Supeifund Site Community Involvement Plan Page 53 November 20!