Mr Tom Shiels Planning Manager (South) National Park Authority Aldern House Baslow Road Bakewell DE45 1AE 22 March 2019

Dear Tom

Bleaklow Quarry – Reserved Matters 2019

Please find enclosed a revised Reserved Matters application to satisfy condition 2 of outline permission NP/DDD/0315/0239.

In this case, the Reserved Matters are:

 The layout of the proposed development (including parking and manoeuvring areas)  The design and external appearance of the proposed development (including materials and external finishes)  Landscaping treatment of the site including the retention of existing trees, boundary treatments and precise details of any planting schemes and surfacing materials

Submitted plans P-E201 Rev H, P-E202 Rev G and P-P102 Rev C relate to the design and external appearance of the proposed buildings.

Plan P-S002 Rev M shows the proposed layout and landscaping of the development.

The main differences from the Reserved Matters approved on 22 February 2018 are that the ridge and eaves heights of the building have been reduced to 11m and 7.5m respectively, and the building has been relocated 12m to the south west. It is proposed that the building’s roof and walls are finished in dark grey (RAL 7015). Native species understorey planting as well as tree planting to the Hassop Road boundary is still proposed.

A condition discharge application will be submitted in parallel for the re-discharge of condition 3 attached to outline permission NP/DDD/0315/0239.

Do not hesitate to contact me if you require any further information at this stage.

Yours sincerely

Sarah Foster

Projects Manager

HEAD OFFICE  INDUSTRIES LTD, MANSFIELD ROAD  BRAMLEY VALE CHESTERFIELD  S44 5GA Registered in 01005619 TEL: 01246 858250  FAX: 01246 858255