DEVELOPMENT AUTHORITY, J & K TOURISM

Pre Feasibility Report of Proposed Integrated Municipal Solid Waste Processing, Disposal & Management Facility for Sonamarg Town & Amarnath at Village Sarbal, Sonamarg, District: , & .

FEBRUARY 2016

Kadam Environmental Consultants www.kadamenviro.com

Environmentf or Development INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

M/S. SONMARG DEVELOPMENT AUTHORITY

Pre-Feasibility Report - Environmental Clearance for Proposed Integrated Municipal Solid Waste Processing and Disposal Facility for Sonamarg Town & Amarnath Yatra at Village Sarbal, Sonamarg, District: Ganderbal, Jammu & Kashmir. © Kadam Environmental Consultants (‘Kadam’), February, 2016

This report is released for the use of the M/s. Sonamarg Development Authority, Regulators and relevant stakeholders solely as part of the subject project’s Environmental Clearance process. Information provided (unless attributed to referenced third parties) is otherwise copyrighted and shall not be used for any other purpose without the written consent of Kadam.

PROJECT DETAILS Pre-Feasibility Report for Environmental Clearance of Proposed Integrated Municipal Solid Name of Waste Processing and Disposal Facility for Sonamarg Town & Amarnath Yatra at Village Publication Sarbal, Sonamarg, District: Ganderbal, Jammu & Kashmir. Project February, 1314363706 Report No. 1 Version 1 Released Number 2016 Prepared & J.A Rathi Ishita Garg Released By Managed By Anand Kunte CONTACT DETAILS Vadodara (Head Office) 871/B/3, GIDC Makarpura, Vadodara, – 390 010. E: [email protected]; T:+91-265-3001000; F: +91-265-3001069 / NCR Spaze IT Park, Unit No. 1124, IIth Floor, Tower B3, Sector 49, Near Omaxe City Centre Mall, Sohna Road, Gurgaon, , INDIA - 122002. E: [email protected]; T: +91-124-4242430 to 436; F:+91-124-4242433 DISCLAIMER Kadam has taken all reasonable precautions in the preparation of this report as per its auditable quality plan. Kadam also believes that the facts presented in the report are accurate as on the date it was written. However, it is impossible to dismiss absolutely, the possibility of errors or omissions. Kadam therefore specifically disclaims any liability resulting from the use or application of the information contained in this report. The information is not intended to serve as legal advice related to the individual situation.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 I

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

CONTENTS

1 EXECUTIVE SUMMARY ...... 1

1.1 PLANT FEATURES ...... 1 1.1.1 Infrastructure ...... 1 1.1.2 Utility ...... 1 1.2 ENVIRONMENT ...... 1 1.3 CONCLUSION ...... 1 2 INTRODUCTION OF THE PROJECT ...... 2

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ...... 2 2.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT: ...... 2 2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR ...... 2 2.4 DEMAND SUPPLY GAP ...... 2 2.5 IMPORTS VS. INDIGENOUS PRODUCTION ...... 2 2.6 EXPORT POSSIBILITY ...... 3 2.7 DOMESTIC/EXPORT MARKETS ...... 3 2.8 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT...... 3 3 PROJECT DESCRIPTION ...... 4

3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY ...... 4 3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION AND PROJECT BOUNDARY & PROJECT LAYOUT) WITH CO-ORDINATES...... 4 3.3 DETAILS OF ALTERNATE SITES CONSIDERED ...... 4 3.4 SIZE OR MAGNITUDE OF THE OPERATIONS ...... 4 3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (SCHEMATIC DIAGRAM/ FLOWCHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF PROJECT ETC. SHOULD BE GIVEN) ...... 4 3.5.1 Waste generation ...... 5 3.5.2 Process Description ...... 8 3.5.3 Leachate Generation ...... 11 3.6 RAW MATERIALS REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT ...... 11 3.7 RESOURCE OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED ...... 12 3.8 AVAILABILITY OF RESOURCES, ENERGY/POWER REQUIREMENT AND SOURCE SHOULD BE GIVEN 12 3.8.1 Power Requirement ...... 12 3.8.2 Fuel Requirement ...... 12 3.8.3 Water Requirement ...... 12 3.9 QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL ...... 13 3.9.1 Leachate Generation and treatment: ...... 13 3.9.2 Hazardous Waste Generation ...... 13 3.10 SCHEMATIC REPRESENTATION OF THE FEASIBILITY DRAWING WHICH GIVE INFORMATION OF EIA PURPOSE. 14 4 SITE ANALYSIS ...... 15

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 II

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

4.1 CONNECTIVITY ...... 15 4.1.1 By Road ...... 15 4.1.2 By Air ...... 15 4.1.3 By Rail ...... 15 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP ...... 15 4.3 TOPOGRAPHY (ALONG WITH MAP) ...... 15 4.4 EXISTING LAND USE PATTERN (, NON-AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FOREST, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE ), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN ...... 15 4.4.1 Water Bodies ...... 15 4.4.2 Forests ...... 15 4.5 EXISTING INFRASTRUCTURE ...... 16 4.5.1 Defense Installation ...... 16 4.5.2 Religious Place ...... 16 4.6 SOIL CLASSIFICATION ...... 16 4.7 CLIMATIC DATA FROM SECONDARY SOURCES ...... 16 4.8 SOCIAL INFRASTRUCTURE ...... 16 4.8.1 Health & Education ...... 16 4.8.2 Fire & Emergency ...... 16 5 PLANNING BRIEF ...... 17

5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC) TOWN AND COUNTRY PLANNING/ DEVELOPMENT AUTHORITY CLASSIFICATION ...... 17 5.2 POPULATION PROJECTION ...... 17 5.3 LANDUSE PLANNING (BREAKUP ALONG WITH GREENBELT ETC.) ...... 17 5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) ...... 18 5.5 AMENITIES/FACILITIES ...... 18 6 PROPOSED INFRASTRUCTURE ...... 19

6.1 PROCESSING AREA ...... 19 6.2 NON-PROCESSING AREA ...... 19 6.3 EQUIPMENT LIST ...... 19 6.4 GREEN BELT ...... 20 6.5 SOCIAL INFRASTRUCTURE ...... 20 6.6 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD/ RAIL/METRO/WATER WAYS ETC) ...... 20 6.7 DRINKING WATER MANAGEMENT (SOURCE &SUPPLY OF WATER) ...... 20 6.8 SEWAGE SYSTEM ...... 20 6.9 SOLID & INDUSTRIAL WASTE MANAGEMENT ...... 20 6.10 POWER REQUIREMENT & SUPPLY/ SOURCE ...... 20 7 REHABLITATION & RESETTLEMENT (R & R) PLAN ...... 21

7.1 POLICY TO BE ADAPTED (CENTRAL /STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUTSEE, LAND OUTSEE AND LANDLESS LABOURERS ...... 21 8 PROJECT SCHEDULE AND COST ESTIMATE ...... 22

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 III

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATA OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN) ...... 22 8.2 ESTIMATES PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT ...... 24 9 ANALYSIS OF THE PROPOSAL (FINAL RECOMMENDATIONS) ...... 25

9.1 FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION, IF ANY, IN THE AREA...... 25

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 IV

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

LIST OF FIGURES

Figure 3-2: Flow-diagram for MSW ...... 5 Figure 3-3: Waste Characterization ...... 7 Figure 3-4: Compositing process ...... 9 Figure 3-5: Water balance for Operational Phase (All values in KLD) ...... 13

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 V

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

LIST OF TABLES

Table 3-1: Co-ordinates of Project Boundary ...... 4 Table 3-2: Waste Quantification and Projection ...... 5 Table 3-3: Month Wise Waste Generation for year 2016 ...... 6 Table 3-4: Waste Segregation ...... 7 Table 3-5: Waste Generation summary ...... 7 Table 3-6: Estimated Volume of Landfill ...... 11 Table 3-7: Water balance for operation phase ...... 12 Table 4-1: Distance of religious place from the site ...... 16 Table 5-1: Population projection ...... 17 Table 5-2: Land area breakup ...... 17 Table 6-1: List of Equipments ...... 19 Table 8-1: Project Implementation Schedule ...... 23

Table 8-2: Project Cost ...... 24

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 VI

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. CONTENTS

LIST OF ANNEXURE

Annexure 1: Approval from Forest Department for Use of forest land ………………………………………26 Annexure 2: Google image of the project site location ...... 27 Annexure 3: Project Boundary Map ...... 28 Annexure 4: Site Layout Map ...... 29

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 VII

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT EXECUTIVE DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. SUMMARY

ABBREVIATIONS

EIA : Environmental Impact Assessment EPA : Environmental Protection Act EC : Environment Clearance CPCB : Central Pollution Control Board MoEF : Ministry of Environment and Forest dB : Decibels HSD : High Speed Diesel KEC : Kadam Environmental Consultants OH&EMS : Occupational Health & Environment Management System PPE : Personal Protective Equipment’s ToR : Terms of Reference PUC : Pollution Under Control NH : National Highway NP : National Parks T&CP : Town and Country Planning WLS : Wild Life Sanctuary SOI : Survey of India GOI : GSI : Geological Survey of India

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 VIII

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT EXECUTIVE DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. SUMMARY

1 EXECUTIVE SUMMARY

1.1 Plant Features

M/s Sonamarg Development Authority proposes an Integrated Municipal Solid Waste Processing, Disposal & Management Facility for collection and disposal of solid waste generated from Sonamarg town and on the routé from Sonamarg to holy cave during Amarnath Yatra.

The proposed site is a barren forest land with an area of 9,500 sqm. Approx 2,322 sqm (24%) of total plot area will be covered under green belt. Total cost of the project will be approx. INR 24 Cr based on present rates.

1.1.1 Infrastructure

The project will consist of Compost plant, Recyclable segregation facility, Secured Landfill, Leachate treatment and reuse facility at Village Sarbal, District Ganderbal, Jammu & Kashmir. Additionally, compost plant at base camp is also proposed.

1.1.2 Utility

Power: The expected demand for the proposed project is 1050 KVA which shall be supplied by Power Development Department.

One DG set of 50 kVA will be installed for admin building at site and 1x50 KVA capacity DG set will be installed at base camp for running compost plant during yatra period only.

Water: Total water requirement for the proposed project is 25 KLD and will be sourced from .

1.2 Environment

Environmental issues associated with proposed MSW project includes:

 Air emissions: During Operation Phase, odour, HC’s and generation of methane gas are envisaged.  Wastewater: Domestic sewage will be disposed to soak pit via septic tank. Quantity of leachate generated will be 10 KLD which will be treated in leachate treatment plant.  Hazardous Waste: No hazardous waste generation except used oil from DG sets is envisaged from the project.

1.3 Conclusion

The proposed project will provide a scientific management and disposal of solid waste thus maintaining the environment and aesthetic beauty of the place.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 1

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. INTRODUCTION

2 INTRODUCTION OF THE PROJECT

2.1 Identification of Project and project Proponent

As per the EIA notification dated 14th September, 2006, as amended till date, the proposed Integrated MSW project falls under category 7(i), Common Municipal Solid Waste Management Facility (CMSWMF), under Category B” but it is to be assessed as Category “A” due to applicability of General Conditions (Project falls within 10 kms of protected area notified under Wild life Protection Act, 1972).

The proposed project will be developed by Sonamarg Development Authority (SDA).

2.2 Brief description of nature of the project:

Sonamarg, a world famous tourist destination, has remained center of tourist attraction since ages. It has also attained a significant importance over last six years due to Holy Amarnath Yatra where large numbers of yatris go via Sonamarg in month of June, July &August. During these three months, solid waste contribution from tourism activity increases significantly.

The proposed project is an Integrated Municipal Solid Waste Processing, Disposal & Management Facility for collection and disposal of solid waste generated from Sonamarg town and on the routé from Sonamarg to holy cave during Amarnath Yatra. The project will consist of Compost plant, Recyclable segregation facility, Secured Landfill, Leachate treatment and reuse facility at Village Sarbal, District Ganderbal, Jammu & Kashmir. Additionally, one compost plant at Panchtarni base camps is also proposed.

2.3 Need for the Project and its Importance to the Country and or Region

 The existing solid waste management facility practices unscientific dumping of mixed waste (biodegradable, recyclable, inert) in a pit without liners. This may lead to land pollution and leaching of contaminated water may lead to ground water pollution.  The Supreme Court vide Suo Motu writ petition (civil) No. 284 of 2012 has constituted a special high powered committee (SHPC) and directed to identify the sites for landfill facility as per the Municipal Solid Waste Rules, in consultation with the SPCB.  This project will help in improvising present solid waste collection mechanism and will provide systematically SWM facility leading to proper disposal of waste.  The proposed project will help in maintaining the aesthetic beauty of the place.

2.4 Demand Supply Gap

Due to increase in tourist number and Amaranth Yatra, generation of solid waste in Sonamarg town has increased tremendously. At present, there is no proper solid waste management facility available resulting in littering of wastes all over. Hence, to preserve environment & esthetic beauty of the place, well managed solid waste segregation and disposal facility is need of the hour.

2.5 Imports vs. Indigenous Production

Not applicable

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 2

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. INTRODUCTION

2.6 Export Possibility

Not applicable

2.7 Domestic/Export Markets

Not applicable

2.8 Employment Generation (Direct and Indirect) due to the project

During construction phase around 50 unskilled labourers (male & female) will be involved. In operation phase around 25 skilled and semiskilled persons are expected to get direct employment at the project site and around 100 unskilled workers will get indirect employment for collection and segregation of the solid waste.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 3

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

3 PROJECT DESCRIPTION

3.1 Type of Project including interlinked and interdependent projects, if any

Proposed project is an Integrated Municipal Solid Waste Processing, Disposal & Management Facility. The project will consist of secured landfill facility, compost plant, leachate treatment plant at site and in-vessel compost plant at Panchatarni base camp.

3.2 Location (map showing general location, specific location and project boundary & project layout) with co-ordinates

The proposed project is located at Village Sarbal, Sonamarg Town, District Ganderbal, Jammu & Kashmir.

Location map showing general & specific location of proposed project is given in Annexure 2 and project boundary map is given in Annexure 3. The co-ordinates of the project site are given in Table 3-1.

Table 3-1: Co-ordinates of Project Boundary Code Latitude Longitude 1 34°16'30.96"N 75°21'9.97"E 2 34°16'27.84"N 75°21'11.75"E 3 34°16'26.68"N 75°21'9.36"E 4 34°16'28.27"N 75°21'8.27"E 5 34°16'27.85"N 75°21'7.37"E 6 34°16'29.25"N 75°21'6.44"E

3.3 Details of Alternate Sites Considered

Due to hilly terrain, there is paucity of flat land in the area. The selected site is comparatively flat and is already being used for disposal of solid waste. Hence, no alternate site was considered.

3.4 Size or Magnitude of the Operations

The proposed project will be designed over a land of 9,500 sqm.

The landfill will be designed for a period of 10 years on an area of 2,455 sqm. The design capacity of landfill is 1100 ton/year.

Area required for compost plant (10 TPD capacity) at site is 1,813 sqm. Capacity of Compost plant at base camp will be 3 TPD.

3.5 Project Description with process details (Schematic diagram/ flowchart showing the project layout, components of project etc. should be given)

Sonamarg is famous tourist spot, well known for Amarnath Yatra which takes place during the month of Sawan i.e. June to August. During this period, huge number yatris reach this place to visit the holy shrine. The population of pilgrim tourist goes above 5 and is concentrated mainly on the 29km long track from Sonamarg to Holy cave. Therefore, the project will be focused to design integrated waste management facility for following two types of waste:

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 4

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

 Type A: Waste from Sonamarg Town  Type B: Waste from road between Sonamarg and Holy cave along with intermediate camps

The proposed project will involve collection, transportation, storage, treatment and disposal of type B waste considering 2 months operation period (July and August) per year since the road remains closed for remaining year. SWM plan for Type A waste shall be designed for eight months operation in a year and will include non pilgrim tourist and local residents.

The waste from base camp will be collected and treated in organic waste composter of 3 TPD capacity. All other waste will be taken to landfill site.

Flow diagram of different source of waste generation and their collection is presented Figure 3-1.

Figure 3-1: Flow-diagram for MSW

3.5.1 Waste generation

Waste generation has been calculated for year 2016 and similar projection is made for year 2026 and 2036 in this section.

Type A waste will comprise of waste from residential, commercial, institutional, park, hotels, street sweeping, STP sludge and pony waste.

Type B waste will include waste from pilgrims, street sweeping and additional pony waste.

Details of quantification of waste and projection are given in Table 3-2 .

Table 3-2: Waste Quantification and Projection 2016 2026 2036 S. Source of Waste Waste Waste No Waste No Generation No Generation No Generation (TPD) (TPD) (TPD) Type A waste Residential 1. 5,673 2.27 6,915 2.77 8,430 3.37 Area Commercial 2. 100 0.15 180 0.27 326 0.49 Area

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 5

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

2016 2026 2036 S. Source of Waste Waste Waste No Waste No Generation No Generation No Generation (TPD) (TPD) (TPD) Institutional 3. 100 0.02 122 0.02 149 0.03 Area Recreational 4. - 0.14 0.17 0.20 Area (park) 5. Hotels 7,37,581 4.97 9,36,822 6.31 11,89,985 8.05 Street 6. 5,673 0.71 6,915 0.86 8,430 1.05 Sweeping 7. STP Sludge 0.05 0.07 0.08 Pony waste 8. (for 12 1,000 5 1,270 6.35 1,613 8.1 months) Type B waste 9. Pigrims 7,800 4.59 7,800 4.59 7,800 4.59 Street 10. - 0.4 0.4 0.4 Sweeping Pony waste (additional 11. ponies 1,000 5 1,000 5 1,000 5 during yatra period)

Quantity of waste generation will differ monthly. Month wise generation of waste is provided in Table 3-3 considering following assumptions:  Residential population- 2% of total population in month of Nov-Feb and 100% in remaining months.  Tourist population- 70% in month of Jun-Aug, 26% in Apr, May & Sep, 2% in Oct-March.  Pilgrim population- For 2 months (Jul & Aug).  Pony- Varies as per tourist population. Additional 1000 ponies during Yatra period.

Table 3-3: Month Wise Waste Generation for year 2016 Type A Waste (TPD) Type B Waste (TPD) Total Waste Month Residential Tourist Pony Pilgrim Pony (TPD) Jan 0.1 0.40 0.1 - - 0.6 Feb 0.1 0.40 0.1 - - 0.6 Mar 3.3 0.40 0.1 - - 3.8 Apr 3.3 5.18 5.0 - - 13.5 May 3.3 5.18 5.0 - - 13.5 Jun 3.3 13.81 5.0 - - 22.1 Jul 3.3 13.81 5.0 5.0 5.0 32.1 Aug 3.3 13.81 5.0 5.0 5.0 32.1 Sep 3.3 5.18 5.0 - - 13.5 Oct 3.3 0.39 0.1 - - 3.8 Nov 0.1 0.39 0.1 - - 0.6 Dec 0.1 0.39 0.1 - - 0.6 Average 2.25 4.94 2.55 0.83 0.83 11.40

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 6

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

The waste generated will be segregated as given in Figure 3-2 and quantification is given in Table 3-4.

Figure 3-2: Waste Characterization

Table 3-4: Waste Segregation S. No Description Quantity (MT/Annum) 1. Total waste generation 4,212 2. Biodegradable waste for compositing (45%) 2,577.8 3. Reject from processing (15%) 386.7 4. Recycle waste (35%) 1,039.9 5. Inerts (20%) 594.2 6. Waste to Landfill (3+5) 980.9

Summary of waste generation is given below Table 3-5.

Table 3-5: Waste Generation summary S. No Particulars Details 1. Total area 9500 sqm 2. Waste for compositing 10 tons/day 3. Waste disposed to landfill 1100 tons/yr 4. Total waste disposed at landfill (upto year 2026) 11000 tons 5. Life span of landfill 10 years

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 7

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

3.5.2 Process Description

From the waste characterization diagram, type B waste will consist of biodegradable waste, recycled waste and inert waste.

The recycled waste will be segregated before composting and will be given to the recycler. The organic waste will be composted through in-vessel composting system while, inert waste will be disposed directly to landfill site.

There are numerous technologies available for treatment of organic waste, however due to cold climate; in-vessel composting system will be adopted.

Composting Process

Composting is an organized method of producing compost manure by adopting natural phenomenon. It is a biological treatment method involving micro-organisms which decompose the biodegradable components of waste. Compost is particularly useful as organic manure because it contains plant nutrients (Nitrogen, Phosphorus and Potassium) as well as micro nutrients which can be utilized for the growth of plants.

Composting can be carried out in two ways i.e. aerobically and anaerobically. In aerobic composting, the aerobic micro-organisms oxidize organic compounds to Carbon dioxide, Nitrite and Nitrate. Carbon from organic compounds is used as a source of energy while nitrogen is recycled. Due to exothermic reaction, temperature of the composting mass increases. The temperature of compost heap will reach 70°C within 6 to10 days, and slowly cool off back to ambient temperatures as the biological decomposition is completed. In anaerobic process, the anaerobic micro-organisms, while metabolizing the nutrients, break down the organic compounds through a process of reduction. A very small amount of energy is released during the process and the temperature of composting mass does not rise too much.

Turning of the material mixes the different components and aerates the mixture and a proper carbon/nitrogen ratio (C/N ratio of 26-31) in the organic matter leads to complete and rapid composting. The composting process generally takes 17 to 180 days period to complete. Composting can be carried out by the following techniques:

 Open or Windrow composting - This done out of doors in areas where higher ambient temperatures are available. This type of composting is done with simple equipment and is a slower process;  Enclosed system composting, where the composting is performed in some enclosure (e.g., a tank, a box, a container or a vessel).

In-Vessel Compositing In-vessel composting vessel is a double-walled tunnel (stainless steel interior, burnished steel exterior) insulated to control the heat produced when organic materials decompose. Oxygen in the vessel is maintained at 17%. In the mixing zones, specially designed spinners throw the waste forward to ensure it is well mixed and aerated. Air is continuously drawn out of the composter in order to maintain a negative pressure. This prevents air from escaping from the vessel and ensures that all exhausted air is passed through a bio filter to remove contaminants and odour. After retention time of 14-28 days in the vessel, the finished compost is removed from the vessel and filtered on a shaker screen. One compositing plant of 10 TPD capacity for 10 yrs will be installed at site. The process is described in Figure 3-3.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 8

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

Figure 3-3: Compositing process

During Yatra period, waste generated from Baltal base camp will be collected and transported to proposed landfill facility for further treatment, while waste from Panchatarni base camp will be segregated at source and further will be processed into the small organic waste converter of capacity of 3 TPD.

Organic Waste Composter

The waste is chopped, cut, fluidized and homogenized with appropriate bio-culture and organic media like shredded dried horticulture waste, saw dust, ready manure or any other similar type of organic media to absorb excess moisture and make it free flow. The excess moisture is controlled during homogenization process in OWC machine with the use of organic media. The treated waste does not have bad odour and does not attract birds and animals. The OWC operation is a 15 - 30 minutes batch cycle. The output from OWC machine is called “Raw Compost” having uniform coloured and soil structured coarse powder, free of bad odour. The microbial culture and the homogenizing action in OWC machine accelerates the composting cycle.

The raw compost is collected in aerated crates and kept in curing rack. Due to thermophylic composting process the temperature of the raw compost rises above 60・ C. In order to maintain the temperature around 60・ C the moisture is sprayed through fogging system on the material during the curing cycle. 1st day no moisture is provided. Next 7 days 4 to 5 times a day moisture is given with an interval of 3 to 4 hours (with a spraying duration of 40 to 50 seconds at a time) depending upon the climatic conditions of particular location. After seven days, manure is left for drying for 2 days.

After 10 days, manure is partly used again as an absorbent for the process. Repeated operations are to be followed. Remaining manure is to be kept in storage area to reduce moisture percentage upto 25-30% for first 20 days. Then can be used in garden/landscaping/agriculture etc.

The OWC System can offer several advantages viz.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 9

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

 Clean and Eco Friendly treatment of Organic Waste at the Decentralized Community Level.  Homogenized Odour Free output in 10 to 15 minutes of processing in OWC machine.  Matured Compost in just 10 to 15 days using Excel’s Curing System.  Easy to handle.  Do not attract flies, mosquitoes, rats, animals and birds.  Reduce long distance transportation of Organic fraction of MSW.

Land fill

Landfill is the last process for the safe disposal of inorganic waste generate from the town. The ‘life’ of a sanitary landfill (SLF) will comprise of an ‘active’ period and a ‘closure and post closure’ period. The ‘active’ period may typically range from 20 to 25 years depending on the availability of land area. The ‘closure and post-closure’ period for which a sanitary landfill will be monitored and maintained will be 25 years. In the proposed project, the life of sanitary landfill site is considered as 10 years having area of landfill structure is 2450 sqm.

The layout of landfill will comprise of following layers:

Bottom liner

 90 cm thick compacted clay or compacted amended soil (to be laid in 3 layers of thickness 30 cm each), above compacted sub-base.  HDPE1 Geo-membrane of minimum thickness 1.5 mm would be laid above compacted clay liner  Geo-textile layer above HDPE layer.

Drainage Layer

 30 cm thick Leachate drainage to be laid on entire bottom surface above geo textile layer in 3 layers as: o 10 cm thick layer of gravels of size 22 to 32 mm o 10 cm thick layer of stone chips of size 16 – 22 mm o 10 cm thick layer of coarse sand of size 0-5 mm  Geo-textile layer above drainage layers.

Leachate Drain

 Cushion layer of suitable thickness & consisting of sand, cement & bentonite mixture (94 : 3 : 3 respectively) may be provided, if required.  300 mm HDPE pipe  10 mm diameter holes would be made @ 50 mm c/c staggered spacing in the top 2/3rd of perimeter of leachate collection pipe.  The 200 GSM geo-textile has to be laid over HDPE pipe and extended by 1 m in both directions (perpendicular to length of pipe) to prevent clogging of slots by drainage material / other solids.  Over HDPE pipe covered with geo-textile, gravels in size of 16 mm to 32 mm to be laid uniformly.

Top Liner System (At the time of closure of landfill)

 15 cm thick gas collection layer has to be provided, above the waste body, in the form of stone chips of size 16 – 22 mm.  Passive Vents of 1.5 m height above top surface of vegetative cover.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 10

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

 60 cm thick compacted clay or compacted amended soil (to be laid in 2 layers of thickness 30 cm each), above compacted sub-base.  1.5mm thick HDPE membrane to be provided and if required additional 200 GSM geotextile to be provided.  30 cm thick drainage layer consisting of stone chips & coarse sand.  60 cm fertile soil cover for vegetation to be laid in two layers, the bottom layer to be compacted mildly and the top layer to be kept loose for growing vegetation.  Vegetation cover with grass, shrubs etc. having root length less than 30 cm.

Design of Landfill

The volume of the landfill has been estimated based on the topography of the site. Maximum height that can be achieved is estimated as 4.5m. The details are provided in Table 3-6.

Table 3-6: Estimated Volume of Landfill 2017 – 2026 S. No Description (10 years) Average Tonnage of waste disposed off at Landfill Site (Tonnes per year) in 1. 1100 cu.m 2. Total Tonnage of waste disposed off at landfill site in cu.m 11000 3. Density of waste considered 0.85 Tonnes per cu.m 0.85 4. Total Volume of waste to be disposed in cum 12941 5. Volume of Daily Cover - 5% in cu.m 647 6. Volume of Liner and Cover System - 12.5% in cu.m 1618

7. Volume likely to become available due to settlement - 10% in cu.m 1294

8. First Estimate of landfill Volume required in cu.m 13912 9. Providing Surface area in Sq.m 2455 10. Considering 44% waste dumped below G.L. in MT 6121 11. Required Depth below G.L. in m 2.5 12. Required Slope below G.L. in m 2.5 13. Considering 56% of waste dumped above G.L. 7784

14. Considering Height of Landfill in m (Height of retaining wall above GL) 3.5

15. Number of Phases 10

3.5.3 Leachate Generation

Quantity of leachate generated will be 10.0KLD from the proposed facility which will be treated in leachate treatment plant.

3.6 Raw Materials required along with estimated quantity, likely source, marketing area of final products, mode of transport of raw material and finished product

Not applicable as the proposed project is a Municipal Landfill site.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 11

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined

Not applicable as the proposed project is a Municipal Landfill site.

3.8 Availability of water resources, Energy/Power requirement and source should be given

3.8.1 Power Requirement

The expected demand for the proposed project is 1050 KVA which shall be supplied by Power Development Department.

Details of DG sets: 1x50 KVA at site for admin building + 1x50 kVA at base camp (during yatra period only).

3.8.2 Fuel Requirement

Low sulphur diesel (10 lit/hr) for DG set.

3.8.3 Water Requirement

The source of water supply will be Sind River near to site. During construction phase, freshwater requirement will be 6.0 KLD. During operation phase, fresh water requirement will be 25 KLD as given in Table 3-7 and water balance is shown in

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 12

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

Figure 3-4.

Table 3-7: Water balance for operation phase Fresh Water Total Water Waste water S. No. Description Requirement Requirement generation (KLD) (KLD) (KLD) 1 Employee -25 (45 LPCD) 1.13 1.13 0.9 2 Tyre washing 3 3 3 3 Dust suppression 4.5 4.5 - 4 Horticulture-2322 m2 (@2.8 lit/sqm) 6.5 6.5 - 5 Composting 10.0 10.0 - Total 25 25 4.0

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 13

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

Figure 3-4: Water balance for Operational Phase (All values in KLD)

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their Management/disposal

3.9.1 Leachate Generation and treatment:

Quantity of leachate generated from vehicle washing area, domestic wastewater and landfill will be 10 KLD which will be treated in leachate treatment plant. The treatment includes primary, biological and tertiary treatment. In primary treatment, lime and alum with or without poly dosing is added to remove suspended and colloidal solids. The secondary or biological treatment includes removal of organic matter i.e. COD, BOD by using MBBR/MBR/surface aerator or diffuser system. Biological sludge will be settled into tube settler or clarifier and will be re-circulated again into the aeration system. The treated effluent from biological system will further require NaOCl dosing for removal of residual matter. The Pressure sand filter or activated carbon filter will be used to remove solids and finally water can be disposed as per disposal norms. The sludge will be dewatered into the drying bed or filter press and will be disposed to landfill facility. The treated leachate will either be used for gardening or sent to nearest STP plant for further treatment and disposal.

3.9.2 Hazardous Waste Generation

Used oil (category 5.1) generated from DG sets will be collected & sent to authorized recyclers.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 14

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. DESCRIPTION

3.10 Schematic representation of the feasibility drawing which give information of EIA Purpose.

Odour, HC,

Methane Gas

Solid Waste Landfill Site

Leachate

Leachate Treatment Plant

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 15

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. SITE ANALYSIS

4 SITE ANALYSIS

4.1 Connectivity

4.1.1 By Road

Approach road is 75 m in S direction and - highway (NH-1D) is 250 m from site in N direction.

4.1.2 By Air

Nearest airport from project site is Srinagar International Airport located at an aerial distance of~63 km in SW direction.

4.1.3 By Rail

Nearest Railway Station is at an aerial distance of ~55 km in SW direction.

4.2 Land Form, Land Use and Land ownership

The land currently is a barren land and belongs to the forest department, Jammu & Kashmir.

Sonamarg Development Authority (SDA) has obtained approval from forest department for development of landfill site on forest land. The letter of approval is attached at Annexure 1.

4.3 Topography (along with map)

The area represents Himalayan characteristics of topography and geomorphology. The area is high hills and river streams flowing through valleys. The site is located at the toe of the hill. The slope above the site is a valley filled bordered by steep inward dipping rocks (slates).

Toposheet of the area is not available due to security reasons.

4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette Notification should be given

The proposed site is a forest land and is currently barren.

4.4.1 Water Bodies

Sindh River is ~ 80 m from site in South direction.

4.4.2 Forests

The project site falls within Thajiwas (Baltal) Wildlife Sanctuary.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 16

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. SITE ANALYSIS

4.5 Existing Infrastructure

The proposed site is barren with no infrastructure. The site is currently used for dumping of solid waste.

4.5.1 Defense Installation

Army Camp at Baltal is ~6.0 km in SE direction and Army camp at Sonamarg is ~6.0 km in NW direction.

4.5.2 Religious Place

Table 4-1: Distance of religious place from the site S.No. Area Location Dist. In KM Dir. 1 Amarnath ~ 20 km E 2 Jamia Masjid, Sonamarg Sonamarg ~5.7 KM NW

4.6 Soil Classification

In the of the soils are loamy and there is little clay content in them. Poor in lime but with a high content of magnesia, the soil is treated with chemical fertilisers and enriched with green manure and legume before cultivation. There is sufficient organic matter and nitrogen content in the alluvium of the as a result of plant residue, crops stubble, natural vegetation and animal excretion. has many types of soils like: Gurti (clay), Bahil (Loam), Sekil (Sandy), Nambaal (Peats), Surzamin, Lemb, Floating garden soils and Karewa soils.

4.7 Climatic Data from Secondary Sources

Based on the available long-term climatological tables (1961 – 1990) published by India Meteorological Department (IMD) of , temperature ranges from -7.5°C to 35.3, relative humidity is noted to be 82%. 1st Pre-dominant wind direction is noted from SE to NW (13%). 2nd pre-dominant wind direction is from NW to SE (8%). Calm conditions are found to be 60%.

Above mentioned climatic conditions will be considered during designing stage.

4.8 Social Infrastructure

4.8.1 Health & Education

Sonamarg is served by one Primary Health Centre, having of 5 beds at a distance of 6.0 km in NW direction from project site.

One Middle school is available at a distance of 6.0 km in NW direction in sonamarg town.

4.8.2 Fire & Emergency

There is no fire station at the Sonamarg Town. However Master plan envisages one fire station in planning sub zone A1, for which land measuring 0.50 ha has been earmarked.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 17

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. PLANNING BRIEF

5 PLANNING BRIEF

5.1 Planning concept (type of industries, facilities, transportation etc) Town and Country Planning/ Development Authority Classification

Basic facilities of infrastructure like admin building, processing area, laboratory, leachate treatment system, Landfill vehicle parking, weigh bridge, internal roads etc. will be developed on the project site .Transportation of Solid waste will be carried out through approach road.

5.2 Population Projection

Detail of population project is given in Table 5-1.

Table 5-1: Population projection S. No Population description 2016 2026 2036 1. Residential 5,673 6,915 8,430 2. Tourist/Non-pilgrims 7,37,581 9,36,822 11,89,885 3. Pilgrims 4,68,000 4,68,000 4,68,000

5.3 Landuse Planning (breakup along with greenbelt etc.)

The current land will be developed as Municipal Landfill site. Site layout of the proposed project is shown at Annexure 4 and area breakup details are given in Table 5-2.

Table 5-2: Land area breakup Sr. No Description Area (m2) a. Compost Plant 1813 b. Landfill Facility 2450 Common infrastructure i. Weighbridge office 12 ii. Security cabin 12 iii. Staff Parking Area 16 iv. Admin/ Lab office 50 v. Temporary Storage Area/ Yard 225 vi. Workshop 100 vii. Leachate Treatment Facility 200 viii. Leachate Holding Tank 100 ix. DG set Room 16 x. MCC Panel 9 xi. Storm water drain 107 xii. Retaining Wall 254 xiii. Road 1814 c. Total area for common infrastructure 2915 d. Greenbelt 2322

Total Area (a+b+c+d) 9500

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 18

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT DEVELOPMENT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. PLANNING BRIEF

5.4 Assessment of Infrastructure Demand (Physical & Social)

Key infrastructure such as hospitals, schools, bank, places of worship and social/ community facilities such as park, market, and playground etc. education, health care and community development will be developed as per Master Plan 2005-2025.

5.5 Amenities/Facilities

Basic Amenities like public transport, water supply, telecommunications, educational institutions, hospitals etc. will be developed as per Master plan 2005-2025.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 19

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROPOSED AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. INFRASTRUCTURE

6 PROPOSED INFRASTRUCTURE

6.1 Processing Area

The Processing area shall comprise of following sections:

 Leachate Treatment Facility  Leachate Holding Tank  Compositing Plant  Landfill facility  DG set Room  MCC Panel  Panel room  Temporary Storage Area/ Yard

6.2 Non-Processing Area

Requirement of residential area will be developed as shown below:

 Administration building  Truck parking area  Security cabin  Utility area  Laboratory  Canteen

6.3 Equipment List

List of equipments to be used for the project is provided in Table 6-1.

Table 6-1: List of Equipments S. No Equipment Number 1. Bins of 10 lit 2369 2. Bins of 50 lit 340 3. Bins of 100 lit 24 4. Bins of 120 lit 339 5. Bins of 200 lit 60 6. Bins of 240 lit 187 7. Hand Carts 81 8. Brooms 118 9. Shovels 118 10. Tractor 3 11. Tipper 7 12. Bulldozer 1 13. Landfill compactor 1 14. Tractor for internal movement 1 15. Overhead water tank 1

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 20

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROPOSED AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. INFRASTRUCTURE

6.4 Green Belt

Around 2,322 m2 (~ 24%) of total area will be developed as greenbelt as shown in Annexure 4.

6.5 Social Infrastructure

Described in Chapter 4, Section 4.8

6.6 Connectivity (Traffic and transportation road/ rail/metro/water ways etc)

Described in Chapter 4, Section 4.1

6.7 Drinking Water Management (Source &Supply of Water)

Domestic water requirement will be met from Sind River.

6.8 Sewage System

Domestic water will be disposed to soak pit via septic tank. Leachate generated will be treated in leachate treatment plant and will be disposed as per norms.

6.9 Solid & Industrial Waste Management

Described in Chapter 3 , Section 3.9

6.10 Power Requirement & Supply/ Source

Described in Chapter 3, Section 3.8.1

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 21

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. R & R PLAN

7 REHABLITATION & RESETTLEMENT (R & R) PLAN

7.1 Policy to be adapted (Central /State) in respect of the project affected persons including home outsee, Land outsee and Landless labourers

Not Applicable as area is a forest land.

KADAM ENVIRONMENTAL CONSULTANTS | FEBRUARY, 2016 22

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT SCHEDULE AND AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. COST ESTIMATE

8 PROJECT SCHEDULE AND COST ESTIMATE

8.1 Likely date of start of construction and likely data of completion (Time Schedule for the project to be given)

The construction is likely to start after getting Environmental Clearance and NOC/CTE from the EAC and SPCB. The EIA studies are likely to get completed in 14-16 months.

Project implementation schedule describing various activities from finalization of site to project commissioning is tabulated in Table 8-1

KADAM ENVIRONMENTAL CONSULTANTS |JANUARY 2016 23

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & DISPOSAL FACILITY FOR SONAMARG TOWN & PROJECT SCHEDULE AND COST M/S. SONAMARG DEVELOPMENT AUTHORITY AMARNATH YATRA AT VILLAGE SARBAL, SONAMARG, J & K. ESTIMATE

Table 8-1: Project Implementation Schedule

Activities Feb,16 Mar,16 Jun,16 Aug,16 Oct,16 Dec,16 Jan,17 Feb,17 Mar,17 Oct,17

Submission of Form 1, PFR & Proposed ToR ToR Presentation at EAC Draft EIA Preparation & Submission to SPCB Public Hearing (PH) Final EIA preparation & submission to MoEF Presentation at MoEF Receipt of EC Application for NOC NOC receipt

Execution & Commissioning

KADAM ENVIRONMENTAL CONSULTANTS |JANUARY 2016 24

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT PROJECT SCHEDULE AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. AND COST ESTIMATE

8.2 Estimates project cost along with analysis in terms of economic viability of the project

The project cost is estimated to be INR 24 Cr. Summary of project cost is shown in Table 8-2.

Table 8-2: Project Cost S. No Particulars Amount (INR in lacs) 1. Land cost 6.6 2. Cost in Collection of waste 1400 3. Cost in landfill design 500 4. Cost of operation Machines at landfill site 520 Total 2426.6 ~ 24 Cr

KADAM ENVIRONMENTAL CONSULTANTS |JANUARY 2016 25

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT ANALYSIS OF THE AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. PROPOSAL

9 ANALYSIS OF THE PROPOSAL (FINAL RECOMMENDATIONS)

9.1 Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.

The project intends to create a socially, economically and environmentally viable integrated solid waste management system to develop an environmentally and aesthetically sound tourist resort.

Social benefits are summarized as under:

 Proper management and disposal of waste in compost plants at base camps during yatra period will prevent environmental damage.  Jobs will be created for local people.  The site can be re-landscaped and built and can be used as parks or farming land on once it has been filled.  The gases given off by the landfill site can be collected and used for heating.  The waste products of landfills can be used as direct fuel for combustion or indirectly they can be processed into another fuel.  Organic material will be separated and composted and can be used for production of natural gas.

KADAM ENVIRONMENTAL CONSULTANTS |JANUARY 2016 26

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. ANNEXURE

Annexure 1: Approval from Forest Department for Use of forest land

KADAM ENVIRONMENTAL CONSULTANTS |JANUARY 2016 27

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & M/S. SONAMARG DEVELOPMENT DISPOSAL FACILITY FOR SONAMARG TOWN & AMARNATH YATRA AT AUTHORITY VILLAGE SARBAL, SONAMARG, J & K. ANNEXURE

Annexure 2: Google image of the project site location

KADAM ENVIRONMENTAL CONSULTANTS | DECEMBER 2015 28

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & DISPOSAL FACILITY FOR SONAMARG TOWN & M/S. SONAMARG DEVELOPMENT AUTHORITY AMARNATH YATRA AT VILLAGE SARBAL, SONAMARG, J & K. ANNEXURE

Annexure 3: Project Boundary Map

KADAM ENVIRONMENTAL CONSULTANTS | DECEMBER 2015 29

INTEGRATED MUNICIPAL SOLID WASTE PROCESSING, DISPOSAL & DISPOSAL FACILITY FOR SONAMARG TOWN & M/S. SONAMARG DEVELOPMENT AUTHORITY AMARNATH YATRA AT VILLAGE SARBAL, SONAMARG, J & K. ANNEXURE

Annexure 4: Site Layout Map

KADAM ENVIRONMENTAL CONSULTANTS | DECEMBER 2015 30

Kadam

Environmental

Consultants

www.kadamenviro.com

Environment for Development

CONTACT DETAILS Vadodara (Head Office) 871/B/3, GIDC Makarpura, Vadodara, India – 390 010. E: [email protected]; T:+91-265-3001000; F: +91-265-3001069 Delhi / NCR Spaze IT Park, Unit No. 1124, 11th Floor, Tower B-3, Sector 49, Sohna Road, Gurgaon, India – 122 002 E: [email protected]; T/F : 0124-424 2430-436