Document 4.1.3
Works Plans Section B - Somerset Levels and Moors South
Hinkley Point C Connection Project
Regulation 5(2)(j) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
Application Reference EN020001 May 2014 NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER KEY PLAN FOR WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 1 OF 1
SEDGEMShOiplate OR DISTRICT COUNCIL & NORTH SOMERSET COUNCIL 7
146 SITE MAP
7 6 6 148 8 157 Compton Hill 7 N o Wavering r Crook Down t Loxton G h Peak Batch Sed S Webbington ge om F m er o se E 6 o t C r D oun S istr cil E ict 6 CT Cou 7 IO nc S N Compton il E C Bishop 6 A 37 0 C D T New Sheet 11 - IO Foxes Town N B Hole B/WP/PS/11 Denny's Hole 6 Eastertown C
6
7
6 B
M5 Lympsham 6 H 6 6 7
A
6 6
Wick 6
Lower 6 6 Sheet 10 - Weare Biddisham
6 A 37 0 B/WP/PS/10 Key 6 Edingworth 7 ORDER LIMITS 6 LOCAL AUTHORITY BOUNDARY Tarnock 29 Rooks Bridge SECTION BOUNDARY 6 SHEET INDEX 6 6 6
M 5 6
6
East Brent
7 Ham Brent Sheet 9 - Knoll 61 A3 7 0 Stone Allerton A 38 M5 B/WP/PS/9
6 6 6
139
6 6
6 16
Chapel Allerton
Allerton Moor
Vole
Battleborough 6 Sheet 8 - A38 M5 B/WP/PS/8
Edithmead A3 8
B3 1 40 22 B3 14 0
Burmead
A 38 M5
M5
Northwick
Blackford Moor
B3 1 39
Sheet 7 - Mark B/WP/PS/7
HIGHBRIDGE Mark Causeway
M5
M5
B3 1 39 B3 1 39 Alstone Highbridge and Burnham Watchfield Little Moor
Yarrow B3 1 39 Notes B3 1 41 Westham This drawing is scaled at paper size A1, therefore any
M 5 prints taken at smaller sizes will affect accuracy of the Sheet 5 - measurement units and should not be scaled against. B/WP/PS/5Sheet 6 - B/WP/PS/M6ark Moor
M 5
Bason Bridge Hackness
TealhaCm oordinate System: British National Grid Moor Units: Metre
Huntspill M5 Projection: Transverse Mercator Sheet 3 - Datum: OSGB 1936 B/WP/PS/3 Scale Factor: 0.9996 Sheet 4 - X Centroid Coordina t e : 335956 Liberty East Moor Y Centroid Coordina t e : 148632 Huntspill Cote B/WP/PS/4 0 200 400 600 800 1,000 1,200 1,400 1,600
Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S Huntspill Moor STATIONARY OFFICE. © CROWN COPYRIGHT 8 ORDNANCE SURVEY. OS LICENCE NO. 100048471 8
M5 Sheet 2 -
B/WP/PS/2 B MAY 2014 FOR DCO SUBMISSION JC LD JB Burtle A AUG 2013 S.42/S.47 CONSULTATION ML JB PB
ISSUE DATE COMMENTS DRAW CHK'D APP'D Title
Chilton Moor NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER KEY PLAN FOR WORKS PLANS (REGULATION 5(2)(j)) SECTION B Sheet 1 - SEDGEMOOR DISTRICT COUNCIL & NORTH SOMERSET COUNCIL M 5 B/WP/PS/1
West Edington Heath
17
Down End NG INVESTMENT No. APPLICATION No. 16 Woolavington GIS SE CT 20897 EN020001 Puriton I A1 A3 9 O A 39 23 N SE B NG DRAWING No. DRAWING No. SCALE A3 9 C B3 14 1 TIO 1:20,000 Martland A3 9 N 13/NG/0030 B/WP/KP/1 A ISSUE SHEET 1 OF 1 N/A B Nidons Edington COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc Moor NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 1 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP
11 8 ! COMMENCEMENT OF WORK No. 1C 10 LD2 (TEMPORARY CIRCUIT) CENTRE LINE OF WORK No. 1D
9
%
8 8 J 8 COMMENCEMENT " %8") CENTRE LINE OF WORK No. 1C OF WORK No. 1C (TEMPORARY DIVERSION) ZG043A 8
" (TEMPORARY CIRCUIT)
COMMENCEMENT 7
F
OF WORK No. 1D O
R TERMINATION OF
C CENTRE LINE 5 6
% WORK No.1B
O %
8 8
ZG041 OF WORK No. 1C 8 " 8
N "
8 " J8 ) J8 % "8) T %
I
N 3
% J
)"8 8 U
% ZG043B
" ZG042 4 8 8 8
8 A % " " 8 8 ) J T %
I
. LD1 O
á N
" % 2
8 8
S á . " " 8 . 8 ) á E J . % "á
E
á S . .á ZG043 1
H
! ZGA13 E 8
E
T
TEMPORARY 2 OHL DIVERSION .á
ASSOCIATED Key"
J 8 á 8 á . .% % "
WITH WORK No. 1C )8"8 LATTICE PYLON (NEW) "
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES . "á .á .á TEMPORARY MAST EXISTING ZG044 TO BE REMOVED CENTRE LINE ORDER LIMITS OF WORK No. 1B LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY CENTRE LINE
COMMENCEMENT OF WORK OF WORK No. 4B ! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS
8 TEMPORARY OHL DIVERSION ! ZGA12 NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE FOR CONTINUATION SEE SHEET 2 " " REMOVED SITE COMPOUND WORK
8 ! ZGA11
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
8 ! ZGA10
Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 334144 Y Centroid Coordina t e : 142362 F CENTRE LINE
OF WORK No. 1B 0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471 CENTRE LINE OF WORK No. 4B
8 ! ZGA9 C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB
A AUG 2013 S.42/S.47 CONSULTATION OA JB PB
ISSUE DATE COMMENTS DRAW CHK'D APP'D Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SEDGEMOOR DISTRICT COUNCIL SECTION B
SECTION A
NG INVESTMENT No. APPLICATION No. ZGA88 GIS ! 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/1 1:2,500 ISSUE SHEET 1 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
CENTRE LINE OF WORK No. 1B NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS
(REGULATION 5(2)(j)) CENTRE LINE SECTION B OF WORK No. 1D SHEET 2 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
10 CENTRE LINE OF WORK No. 4B 9
8
7
5 6 8 FOR CONTINUATION ! LD6 SEE SHEET 3 3 " " 4
" 2 1 F O R
C Key
O J 8 8 % " % 8 N )8" LATTICE PYLON (NEW)
T
J 8 8 I % " % N )8"8 LATTICE PYLON (REMOVED) U
A 8 T ! T PYLON I O
N 8! !
S WOOD POLES
E . E á
" S
CENTRE LINE LD5 H .á .á TEMPORARY MAST
E 8
OF WORK No. 1D ! E T
4 ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY COMMENCEMENT OF WORK
" ! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK
LD4 8 !
LD3 8 !
CENTRE LINE OF WORK No. 4B
Notes "
" This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the FOR CONTINUATION SEE SHEET 1
measurement units and should not be scaled against. 8 ! COMMENCEMENT OF WORK No. 1C LD2 (TEMPORARY CIRCUIT) CENTRE LINE
OF WORK No. 1D
%
8 8 J 8 " Coordinate System: British National Grid %8") CENTRE LINE Units: Metre ZG043A OF WORK No. 1C Projection: Transverse Mercator (TEMPORARY CIRCUIT) Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 334669 COMMENCEMENT " Y Centroid Coordina t e : 143569 OF WORK No. 1D F TERMINATION OF CENTRE LINE
WORK No.1B 0 40 80 120 160 200
% OF WORK No. 1C 8
J8 " 8 Metres
"8) %
% J )"8 8
" ZG042% ZG043B REPRODUCED FROM ORDNANCE SURVEY MAPS, 8
8 8 8 % " " 8 J8 ) BY PERMISSION OF THE ORDNANCE SURVEY ON % TERMINATION OF LD1 BEHALF OF THE CONTROLLER OF HER MAJESTY'S
WORKS Nos.1C STATIONARY OFFICE. © CROWN COPYRIGHT
F % 8 8 O ORDNANCE SURVEY. OS LICENCE NO. 100048471 . " " 8 8 )
J R "á %
C (
á á !
. . ZG043 O
% J ! 8 N ZGA13 )8" "
T 8 8 8 % (!
I ! ( N U
A ZG045 C MAY 2014 FOR DCO SUBMISSION TC LD JB
T ( . ! I
O "á B MAY 2014 FOR DCO SUBMISSION TC LD JB N .á .á
S A AUG 2013 S.42/S.47 CONSULTATION OA JB PB E E
ISSUE DATE COMMENTS DRAW CHK'D APP'D S H
E Title E T
1 NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) EXISTING ZG044 TEMPORARY SECTION B TO BE REMOVED CENTRE LINE OHL DIVERSION SEDGEMOOR DISTRICT COUNCIL OF WORK No. 1B ASSOCIATED WITH WORK No. 1C CENTRE LINE OF WORK No. 4B "
NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 8 A1 ! ZGA12 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/2 1:2,500 ISSUE SHEET 2 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 3 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
10
9
8
7
5 6
3 4
2 1 "
Key
J 8 8 " % % "
8 8 F )" LATTICE PYLON (NEW)
F
O
J 8 8 O % " R % )8"8 R LATTICE PYLON (REMOVED)
S C
C
E O 8
O !
E
N T PYLON
N
T
S
T
I
H
N I 8! !
N
E
U WOOD POLES
U
E A .
T
A
T
T á
I 4 "
O
I
O N .á .á TEMPORARY MAST
N
S
E " E ORDER LIMITS
S
H LOCAL AUTHORITY
E
E BOUNDARY
T
5 SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK " LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK
CENTRE LINE OF WORK No. 4B "
F
O
R
S
C
E
O
E
N
S
T
H
I Notes
N
E
U
E
T This drawing is scaled at paper size A1, therefore any
A
T
4 prints taken at smaller sizes will affect accuracy of the
I O measurement units and should not be scaled against.
N
"
Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 334936 Y Centroid Coordina t e : 145205 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471
CENTRE LINE OF WORK No. 1D
LD8 7 C MAY 2014 FOR DCO SUBMISSION TC LD JB ! B MAY 2014 FOR DCO SUBMISSION TC LD JB
" " A AUG 2013 S.42/S.47 CONSULTATION OA JB PB FOR CONTINUATION ISSUE DATE COMMENTS DRAW CHK'D APP'D SEE SHEET 2 Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) CENTRE LINE SECTION B OF WORK No. 4B SEDGEMOOR DISTRICT COUNCIL
NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 1:2,500 8 13/NG/0031 B/WP/PS/3 ! LD6 ISSUE SHEET 3 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B CENTRE LINE OF WORK No. 1D SHEET 4 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP
" 11
10
F
O
R
C
" 9
O
N 8
T ! F I LD11
N O
U R
A S
8 C
T E
I E O
O
N
N S T H
S I E N
E E U
E 7 T A
S
T 6
H I O
E N
E
T 5 6
5 "
N 3 O " I 4 3 T
A "T U E N E I
H 2 T S N
O E E C
S CENTRE LINE 1 R
O OF WORK No. 1D F "
8
! Key
J 8 LD10 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES CENTRE LINE . "á OF WORK No. 4B .á .á TEMPORARY MAST
ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE 8 ! LD9 NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK
8 ! LD8 " 3
T E E
H Notes S
E This drawing is scaled at paper size A1, therefore any E prints taken at smaller sizes will affect accuracy of the S
N measurement units and should not be scaled against. O I T A
CENTRE LINE U N OF WORK No. 1D I T
LD8 7 N ! O C
R O F
Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator " Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 335684 Y Centroid Coordina t e : 144888 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471 "
8 ! LD6 C MAY 2014 FOR DCO SUBMISSION TC LD JB 2 B MAY 2014 FOR DCO SUBMISSION TC LD JB T
E A AUG 2013 S.42/S.47 CONSULTATION OA JB PB E H
S ISSUE DATE COMMENTS DRAW CHK'D APP'D
E
E Title S
N
O NATIONAL GRID (HINKLEY POINT C I
T CONNECTION PROJECT) ORDER A
U WORKS PLANS N I
T (REGULATION 5(2)(j)) N
O SECTION B C SEDGEMOOR DISTRICT COUNCIL R O F "
LD5 8 ! NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/4 1:2,500 ISSUE SHEET 4 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B
SHEET 5 OF 11 LD17 SEDGEMOOR DISTRICT COUNCIL 8!
SITE MAP 11
10
9
8
7
5 6
3 4
2 1
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES . "á FOR CONTINUATION .á .á TEMPORARY MAST SEE SHEET 7 " " ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK CENTRE LINE OF WORK No. 1D
CENTRE LINE OF WORK No. 4B
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 Scale Factor: 0.9996
" X Centroid Coordina t e : 335976 Y Centroid Coordina t e : 146508 F
N 0 40 80 120 160 200 O I 3 T Metres
A T U E N E
I REPRODUCED FROM ORDNANCE SURVEY MAPS, H T BY PERMISSION OF THE ORDNANCE SURVEY ON S N BEHALF OF THE CONTROLLER OF HER MAJESTY'S O E
8 E
C STATIONARY OFFICE. © CROWN COPYRIGHT
S ! ORDNANCE SURVEY. OS LICENCE NO. 100048471 R LD12 O F CENTRE LINE OF WORK No. 1D "
C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB
A AUG 2013 S.42/S.47 CONSULTATION OA JB PB
ISSUE DATE COMMENTS DRAW CHK'D APP'D Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SEDGEMOOR DISTRICT COUNCIL "
8 !
F LD11 O R S
C E E O
N S T H I E N E U T A NG INVESTMENT No. APPLICATION No.
T 6 GIS I O N 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/5 1:2,500
" ISSUE SHEET 5 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
CENTRE LINE OF WORK No. 1D NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 6 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
10
9
8 LD16 8! 7
5 6
3 4
2
FOR CONTINUATION SEE SHEET 7 1 " "
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES . "á .á .á TEMPORARY MAST
ORDER LIMITS 8LD15 LOCAL AUTHORITY ! BOUNDARY SECTION BOUNDARY
COMMENCEMENT OF WORK CENTRE LINE ! ! TERMINATION OF WORK OF WORK No. 1D LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK
8 ! LD14
8 ! LD13
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
8 Coordinate System: British National Grid ! LD12 Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 CENTRE LINE Scale Factor: 0.9996 OF WORK No. 1D X Centroid Coordina t e : 336765 Y Centroid Coordina t e : 146343 F "
0 40 80 120 160 200
F Metres
O R
REPRODUCED FROM ORDNANCE SURVEY MAPS, C
O BY PERMISSION OF THE ORDNANCE SURVEY ON
N BEHALF OF THE CONTROLLER OF HER MAJESTY'S
T STATIONARY OFFICE. © CROWN COPYRIGHT I
N ORDNANCE SURVEY. OS LICENCE NO. 100048471
U
A
T
I
O
N
S
E
E
8 S C MAY 2014 FOR DCO SUBMISSION TC LD JB
! H
LD11 E B MAY 2014 FOR DCO SUBMISSION TC LD JB E
T A OA JB PB
AUG 2013 S.42/S.47 CONSULTATION 4
ISSUE DATE COMMENTS DRAW CHK'D APP'D
" Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SEDGEMOOR DISTRICT COUNCIL
NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/6 1:2,500 ISSUE SHEET 6 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 7 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
10
9
8 8 ! LD21 FOR CONTINUATION SEE SHEET 8 " " 7
5 6
3 4
2 1
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! LD20 8 ! ! WOOD POLES . "á .á .á TEMPORARY MAST
ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK LD19 8!
CENTRE LINE CENTRE LINE OF WORK No. 4B OF WORK No. 1D
LD18 8!
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
Coordinate System: British National Grid LD17 Units: Metre
8! Projection: Transverse Mercator
" " Datum: OSGB 1936 Scale Factor: 0.9996 FOR CONTINUATION SEE SHEET 5 X Centroid Coordina t e : 336437 Y Centroid Coordina t e : 147907 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471
" "
FOR CONTINUATION SEE SHEET 6
C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB
A AUG 2013 S.42/S.47 CONSULTATION OA JB PB
ISSUE DATE COMMENTS DRAW CHK'D APP'D Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SEDGEMOOR DISTRICT COUNCIL LD16 8!
NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/7 1:2,500 ISSUE SHEET 7 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 8 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
10 FOR CONTINUATION SEE SHEET 9 " " 9
8 LD26 8! 7
5 6
3 4
2 1
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES . "á .á .á TEMPORARY MAST
ORDER LIMITS LOCAL AUTHORITY LD25 BOUNDARY 8! SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND
CENTRE LINE WORK OF WORK No. 1D
CENTRE LINE OF WORK No. 4B
LD24 8!
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
8 ! LD23
Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 337033 Y Centroid Coordina t e : 149622 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471
8 ! LD22 C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB
A AUG 2013 S.42/S.47 CONSULTATION OA JB PB
ISSUE DATE COMMENTS DRAW CHK'D APP'D Title NATIONAL GRID (HINKLEY POINT C
CONNECTION PROJECT) ORDER
" " WORKS PLANS FOR CONTINUATION SEE SHEET 7 (REGULATION 5(2)(j)) SECTION B SEDGEMOOR DISTRICT COUNCIL
NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 8 1:2,500 ! LD21 13/NG/0031 B/WP/PS/8 ISSUE SHEET 8 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 9 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
FOR CONTINUATION SEE SHEET 10 " " 10
8 LD31 ! 9
8
7
5 6
3 4
2 1
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES 8 LD30 . ! "á .á .á TEMPORARY MAST
ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND CENTRE LINE WORK OF WORK No. 4B
LD29 8!
CENTRE LINE OF WORK No. 1D
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
LD28 8!
Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 337257 Y Centroid Coordina t e : 151440 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471
C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB 8 LD27 ! A AUG 2013 S.42/S.47 CONSULTATION OA JB PB
ISSUE DATE COMMENTS DRAW CHK'D APP'D Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B
SEDGEMOOR DISTRICT COUNCIL
" "
FOR CONTINUATION SEE SHEET 8 NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/9 1:2,500 ISSUE SHEET 9 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
LD26 NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) LD37 8! SECTION B SHEET 10 OF 11 SEDGEMOOR DISTRICT COUNCIL
SITE MAP 11
COMPOUND ASSOCIATED WITH WORK No. 2B 10
9
8
7 FOR CONTINUATION SEE SHEET 11 " " 5 6 LD36 8! 3 4
2 1
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES . "á .á .á TEMPORARY MAST
ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY LD35 8! COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK
LD34 8!
CENTRE LINE OF WORK No. 4B
CENTRE LINE OF WORK No. 1D
COMPOUND ASSOCIATED WITH WORK No. 1D
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against.
LD33 8!
WORK No. 2D Coordinate System: British National Grid Units: Metre Projection: Transverse Mercator Datum: OSGB 1936 Scale Factor: 0.9996
X Centroid Coordina t e : 337568 Y Centroid Coordina t e : 153296 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471
C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB
A AUG 2013 S.42/S.47 CONSULTATION OA JB PB 8 LD32 ! ISSUE DATE COMMENTS DRAW CHK'D APP'D Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B
SEDGEMOOR DISTRICT COUNCIL
" " NG INVESTMENT No. APPLICATION No. GIS FOR CONTINUATION SEE SHEET 9 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/10 1:2,500 ISSUE SHEET 10 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc
8! LD31 NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B SHEET 11 OF 11 SEDGEMOOR DISTRICT COUNCIL & NORTH SOMERSET COUNCIL
SITE MAP 11
10
CENTRE LINE OF WORK No. 4B 9
8
7
5 6
3 4
2 1
Key
J 8 8 % " %
)8"8 LATTICE PYLON (NEW)
J 8 8 % " % )8"8 LATTICE PYLON (REMOVED)
8! 8 T PYLON ! ! WOOD POLES . CENTRE LINE "á OF WORK No. 2B .á .á TEMPORARY MAST
ORDER LIMITS LOCAL AUTHORITY BOUNDARY SECTION BOUNDARY COMMENCEMENT OF WORK
! ! TERMINATION OF WORK LIMIT OF DEVIATION LIMIT OF DEVIATION & ORDER LIMITS TEMPORARY OHL DIVERSION NEW UNDERGROUND CABLE NEW OVERHEAD LINE OVERHEAD LINE TO BE REMOVED SITE COMPOUND WORK
No rth S ome rset Cou ncil
Se dge moo r Dis trict Cou ncil
BRIDGE OVER OR HDD UNDER RIVER AXE
Notes This drawing is scaled at paper size A1, therefore any prints taken at smaller sizes will affect accuracy of the measurement units and should not be scaled against. ADDITIONAL LANDSCAPING MITIGATION ASSOCIATED WORK No. 2C WITH WORK No. 2C
TERMINATION CENTRE LINE OF WORK No. 1D OF WORK No. 2B
OUTLINE OF MENDIPS CENTRE LINE Coordinate System: British National Grid CSE COMPOUND OF WORK No. 4B Units: Metre Projection: Transverse Mercator Datum: OSGB 1936
Scale Factor: 0.9996 (
! (! COMMENCEMENT X Centroid Coordina t e : 337695 LD38A LD38B OF WORK No. 2B Y Centroid Coordina t e : 154981 F
0 40 80 120 160 200 Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO. 100048471
C MAY 2014 FOR DCO SUBMISSION TC LD JB
B MAY 2014 FOR DCO SUBMISSION TC LD JB
LD37 A AUG 2013 S.42/S.47 CONSULTATION OA JB PB 8! ISSUE DATE COMMENTS DRAW CHK'D APP'D
Title "
" NATIONAL GRID (HINKLEY POINT C FOR CONTINUATION SEE SHEET 10 CONNECTION PROJECT) ORDER WORKS PLANS (REGULATION 5(2)(j)) SECTION B COMPOUND ASSOCIATED SEDGEMOOR DISTRICT COUNCIL & WITH WORK No. 2B NORTH SOMERSET COUNCIL
NG INVESTMENT No. APPLICATION No. GIS 20897 EN020001 A1 NG DRAWING No. DRAWING No. SCALE 13/NG/0031 B/WP/PS/11 1:2,500 ISSUE SHEET 11 OF 11 N/A C COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION Plc LD36 8!