Scheme/Estimate for “Construction of Road from Tapin South OCP Weigh Bridge to Charhi Goods Shed including bridge on Bokaro River and Railway Under bridge in Area”.

1. Background: The proposed road is to construct an alternative road for transportation of coal from different unit of to Charhi Goods Shed via Crusher of Tapin south OCP which includes the Construction of bridge on Bokaro river and construction of 2 nos of RUB near 1.7 KM from Charhi Railway Station.

2. Name of the work: Scheme/Estimate for “Construction of Coal Transportation road from proposed crusher at Tapin south to Charhi Goods Shed including bridge on Bokaro River and Railway Under bridge in Hazaribagh Area”.

3. Reason for the carrying out the work and Justification: To avoid the coal transportation through populated Area and to reduce the lead of transporting (by 4.5 KM), the instant Road is proposed.

4. Availability of land: Diversion of 3.88 Ha. Forest Land (3.23 Ha. Notified Forest Land and 0.65 Ha. GMJJ Land) is required.

5. Coal / Non coal bearing Area : No any proposal for mining till 20 years.

6. Life of the work covered in the scheme: 20 years (Approx), Road can be used beyond the life of the mine.

7. Proposed method of work: Contract basis. 8. Capital requirement vis-à-vis budget provision/projection:

Estimated value Rs 20,90,00,000.00 (Twenty crore) only including escalation and GST under capital head. .Budget provision of Rs. 1 crore in CB 2018-19.(copy enclosed)

9. Techno Economic Justification:

The estimate is prepared based on approved CPWD schedule of rates 2014 and SOR 2015 . The breakup of cost is as below: 1. Construction of Coal Transportation road from proposed crusher at Tapin south to Charhi Goods Shed - ₹ 3,90,00,000.00(Approx) 2. Construction of 2 Nos RUB by railway - ` 8,50,00,000 (Approx). 3. Construction of RCC bridge (70 meter) on Bokaro river – ₹ 8,00,00,000.00 (Eight crore)

4. Forest clearance of 4.10 Ha land – ₹ 50,00,000 (Approx) Total cost comes to ₹ 20,90,00,000.00 including Escalation and GST. Profit from the above project in three years will be ₹ 25,20,25,200.00 which is more than the cost. However, life of the project is ,more than 20 years. 10.Any other specific reason/information: As per instruction of government, coal transportation is not to be done through populated Area/ public road.

11.BOQ: Prepared on the basis of CPWD 2014 and Jharkhand SOR 2015 is enclosed.

12.Drawings:Attached

13:Location Plan:Enclosed

14.Mineable Reserve:NA

15:Production Capacity:NA

85°26'20"E 85°26'30"E 85°26'40"E 85°26'50"E 85°27'0"E 85°27'10"E 85°27'20"E 85°27'30"E 85°27'40"E 85°27'50"E 85°28'0"E 85°28'10"E N " 0 5 ' 0 N 5 " ° 0 3 5 ' 2 0 5 ° 3

µ 2

H A Z A R IB A G N " 0 4 ' 0 N 5 " ° 0 3 4 ' 2 0 5 ° 3 2

NH33 STATION BUILDING (CHARHI) N " 0 3 ' 0 N 5 " ° C 0 3

H 3 ' 2 A R 0 5

H ° I G 3 O 2 OD S SH INDRA ED BAHERA

WEIGH BRIDGE (PROPOSED CRUSHER,TS OCP) N " 0 2 ' 0 N 5 " ° 0 3 2 ' 2 0 5 ° 3 2

PHUSRI

RA ILW AY L AN

N D " 0 1 ' 0 N 5 " ° 0 3 1 ' 2

PROPOSED BRIDGE 0 5 ° 3 2

PROPOSED UNDERPASS N " 0 ' 0 5 N ° " 3 0 ' 2 0 5 ° 3 2 Legend

Leasehold_Line Underpass Copyright in the drawing is vested in CMPDI. Unauthorised copying or use is not permitted. Notified_Forest Customer Railway_Land Central Coalfields Limited Project

N Job No.

" Preparation of Geo-Referenced Forest Boundary Map (in Shape File)

0 Proposed Bridge R

5 of Road from Tapin South OCP ( Weigh Bridge) to '

A 9 N 4

Charhi Goods Shed, Hazaribagh Area, CCL " N ° GMJJ_Land 0 3 C Subject Signature Date 5 Name '

2 Activity Designation

H 9 4 I Surveyor(C) °

Infrastructure S.Dutta 3 Surveyed / 2 Chari_Railway_Station Processed S.Prasad Sr. Surveyor(C) by Site Layout Plan Road S.K.Dixit Sr. Manager(M) Checked M.Rastogi Ch.Manager(C) River by Approved R.Kumar by HOD (Geomatics) Sheet Scale - 1:4000 1 of 1

Drg No. Q REV. No. - 0 H S & D N 1 8 1 15B 0

85°26'20"E 85°26'30"E 85°26'40"E 85°26'50"E 85°27'0"E 85°27'10"E 85°27'20"E 85°27'30"E 85°27'40"E 85°27'50"E 85°28'0"E 85°28'10"E