18039-01-002

Proposed Residential Development at Lands at Capdoo & Abbeylands, , Co.

ROAD SAFETY AUDIT STAGE 1 / 2

October 2019

7, Ormonde Road Kilkenny. R95 N4FE

Tel: 056 7795800 [email protected]

Westar Investments Ltd. Residential Development at Clane , Co. Kildare Roadplan

1. INTRODUCTION

1.1 This report describes a Stage 1 /2 Road Safety Audit carried out on the proposed residential development at Lands at Capdoo & Abbeylands, Clane, Co. Kildare on behalf of Westar Investments Limited. The audit was carried out on the 04th of October 2019 in the offices of Roadplan Consulting, Kilkenny.

1.2 The audit team members were as follows:-

George Frisby, BE CEng MIEI;

Richard Frisby, BSc AEng MIEI;

1.3 Both audit team members visited the site. The audit comprised an examination of the drawings relating to the scheme supplied by Brian Connolly Associates and an examination of the site.

1.4 This Stage 1 / 2 Audit has been carried out in accordance with the relevant sections of TII GE-STY-01024 . The team has examined only those issues within the design relating to the road safety implications of the scheme, and has therefore not examined or verified the compliance of the design to any other criteria.

1.5 All of the problems described in this report are considered by the audit team to require action in order to improve the safety of the scheme and minimise accident occurrence.

1.6 Appendix A describes the audited drawings.

1.7 The brief of the audit covers the proposed access to the residential development and crèche block from Brooklands Housing Estate access road, the proposed access to the residential development from Alexandra Walk and the proposed internal layouts of the residential and crèche developments.

180 39-02-00 3 RSA 1/2 October 20 19 1

Westar Investments Ltd. Residential Development at Clane , Co. Kildare Roadplan

2. STAGE 1/2 AUDIT

2.1 Problem Adequate pedestrian crossing facilities are not shown to be provided at pedestrian crossing locations within the proposed development. This may result in an increase in pedestrians being struck by a passing vehicle due to inadequate crossing facilities at pedestrian crossing locations.

Recommendation Provide adequate pedestrian facilities such as dropped kerbs and tactile paving at all crossing points to cater for the pedestrian desired lines within the proposed development.

2.2 Problem There is no adequate footpath link provided to cater for pedestrians accessing apartment block B from the proposed car parking facilities.

Recommendation Provide an adequate footpath link to cater for pedestrian accessing apartment block B from the proposed car park.

2.3 Problem Low radius bends are proposed on the access road to apartment blocks A – C adjacent to parking bay 20 and parking bay 49. Two vehicles may have difficulty in passing one another on these bends which may lead to a side swipe collision. Stopping sight distance at the bends may also be restricted by the proposed parking on the inside of the bends.

Recommendation Revise the layout at the bends to ensure that two vehicles can safely pass one another and that adequate stopping sight distance is provided.

2.4 Problem Road markings and signage are not shown to be provided at the proposed residential access onto Brooklands, the proposed crèche access onto Brooklands and all the internal junctions. This may lead to collisions at the junctions as priority at the junctions may be unclear.

Recommendation Provide adequate junction control to clearly define vehicular priority at all junctions.

180 39-02-00 3 RSA 1/2 October 20 19 2

Westar Investments Ltd. Residential Development at Clane , Co. Kildare Roadplan

2.5 Problem A low radius bend is proposed along the access road connecting to Alexandra Walk. Two vehicles may have difficulty in passing one another on this bend which may lead to a side swipe collision.

Recommendation Revise the layout at the bend to ensure that two vehicles can safely pass one another.

180 39-02-00 3 RSA 1/2 October 20 19 3

Westar Investments Ltd. Residential Development at Clane , Co. Kildare Roadplan

3. Comments and Observations

3.1 Comment It is assumed that street lighting will be provided at the proposed access to the residential development, at the access to the crèche and in all areas within the proposed development.

180 39-02-00 3 RSA 1/2 October 20 19 4

Westar Investments Ltd. Residential Development at Clane , Co. Kildare Roadplan

3. AUDIT TEAM STATEMENT

3.1 We certify that we have examined the drawing listed in Appendix A and have inspected the site. This examination has been carried out with the sole purpose of identifying any features of the design that could be removed or modified to improve the safety of the scheme.

Signed……… ……… George Frisby

Date ...... 04 th October 2019………

Signed……………………………….……….. Richard Frisby

Date ...... 04 th October 2019…….… .

180 39-02-00 3 RSA 1/2 October 20 19 5

Westar Investments Ltd. Residential Development at Clane , Co. Kildare Roadplan

APPENDIX A

List of Drawings Examined: Drawing numbered 308D and entitled ‘Swept Path Analysis – Road Signage’ provided electronically in PDF format by Brian Connolly Associates.

180 39-02-00 3 RSA 1/2 October 20 19 6

20 30

13

65-80

41-64 41-64 41-64 41-64

BROOKLANDS Abbey Park Park Park Park Park Park Park Park Abbey Abbey Abbey Abbey Abbey Abbey Abbey Abbey ACCESS FROM ACCESS

22 BICYCLE STANDS

98 98 98 21 98 Palisade Fence

BLOCK C

STORES BIN 45 Palisade Fence 44 10 BICYCLE STANDS 40 Palisade Fence

34 33

APTS 19 - 34 20 BICYCLE Abbey Park Glen Glen Glen Glen Glen Glen Glen Park Park Park Park Park Park Park Abbey Abbey Abbey Abbey Abbey Abbey Abbey Abbey Park Glen Park Abbey BLOCK C 46 STANDS 29 0.5% UND 49 27 25

14 20 BICYCLE STANDS

21 50

11 20 BICYCLE 01 STANDS

51 Palisade Fence Palisade

750Ø EP

08 Drain

15 DUPLEX BLOCK B 38 20 APTS 35-43BLOCK D 20 BICYCLE DUPLEX BLOCK A STANDS & CRECHE APTS 09 -18 20 BICYCLE STANDS 18 APTS 01BLOCK -08-16 A

0.5% 52

20 BICYCLE 10 STANDS UND 01

22

13 40 12 30

27 110 110 110 110 24

BLOCK D

STORES BIN

Drain

1.7% 0.5% 20 BICYCLE 44

STANDS 1.25% 0.83%

0.83%

46 46 46

46 45

FUTURE ACCESS TO ACCESS FUTURE 135 135 135 135 LANDS ADJOINING

DUPLEX BLOCK E 46 105

114

APTS 106 - 113

140 140 140 140 0.6%

47 104

115 1.7% 20 BICYCLE 116 STANDS

48 103

VP 53 VP 52 117

49 1.5% 0.7% 16 102

118

101 10 50 5 Abbey Park Grove 1 6 119 2.1%

100 CF CF CF CF 51 VP 50 VP 51 120

65 64 99

52 0.8%

67 66 121 151 151 151 151 69

68 0.9%

EP

98

53 122

VP 49 VP

Palisade Fence Palisade 0.8% 123

0.7%

97 48 VP

54

141 141 141 141 VP 47 VP 96 Drain 55 124 74 75

72 73 70 71 46 VP

125 95

56 0.5%

126

152 152 152 152 94

57 0.5%

127

VP 45 VP 44 1.4% 0.5% 0.6% 128 1 59 58

12 11 10 Drain 9 8 7 6 2

1

3 2 5 4 164 164 164 164 3 129

61 4 2 1 UND 60 6 5 4 3 5

130 80 134 6 82

167 131 62 89 88 87 90 91 166 86 85 92 84 93

81 83 78 79 77 0.9% 132 76

UND 169 63 133 CF 170 168

Drain Drain Drain CF

171 134 172 1

EP VP 31 VP 30 0.8% 135

173 0.9%

136 6 0.8% 141 140 143 142 144 VP 28 145 139 147 146 138 VP 29 148 1 149 2 3 150 151 6 5 4 0.5% 152 137 0.5% 153 VP 27 174 VP 26 154

156 158 15 1 2 159 3 155 18 14 11 16 4 16 1 6 5 15 12 19 157 11 175 160 10 21 96 7 161 20 BICYCLE 22 STANDS 10 7 1 9 VP 40 VP 38 VP 39 VP 41 23 9 7 VP 42 VP 37 10 162 7 VP 36 VP 43 176 VP 34 VP 35 17 4 9 10 164 VP 33 20 BICYCLE 6 163 VP 32 STANDS 5 73 4 165 20

177 20 BICYCLE 24 STANDS 20 BICYCLE 5 STANDS 20 BICYCLE STANDS 21 10 BLOCK L 0.7% DUPLEX BLOCK J CF STORES BIN 25 178 20 BICYCLE STANDS DUPLEX BLOCK I APTS 250-257 DUPLEX BLOCK K 9

8 APTS 242-249 27 APTS 258-265 24

BLOCK L 20 BICYCLE STANDS STORES BIN DUPLEX BLOCK H 25 179 APTS 184-223 32 28 BLOCK F APTS 234-241

DUPLEX BLOCK G

180 30 28

APTS 224-233 0.5%

600Ø Conc. pipe Conc. 600Ø 31

29 VP 12 VP 11 24 BICYCLE 36 STANDS 32 30 APTS 266-305 6 4 BLOCK L 181 3 1 VP 19 VP 17 2 VP 18 6 1 4 3 2 3 VP 20 1 4

32 VP 10 35 6 VP 09 0.6% 9 8 0.5% 182 6 0.7% 4 VP 36 VP VP 13 VP 14 10 15 9 1 16 0.5% 80 meters from river bank line 1.5% VP 24 BICYCLE STANDS 33 7 8 0.6% 183 10 39 VP 35 5 VP 7 4 21 VP VP 36 UND 0.7% 22 VP 6 40 43 1 23 VP 38 44 46 5 47 11 VP 39 25 40

VP 12 24 42

450Ø Conc. pipe 13 0.8% 43

48 46

50

47

115 50

VP

4

VP

3

VP

2

VP

1

FUTURE ACCESS TO ACCESS FUTURE ADJOINING LANDS ADJOINING

1.0% 1.0%

ALEXANDRA WALK ALEXANDRA ACCESS FROM ACCESS

ALEXANDRA WALK

UND CR

UND 13-02-19 - B Updated boundary treatments 31-01-19 - A Revised to accommodate updated site 03-10-19 - D Updated car parking arrangements 25-09-19 - C Revised blocks & L bin store parking Client: Job: Location : C O N S U L T I G E R Swept Path Analysis & Road Signage Capdoo & Abbeylands, Road, Clane, Co. Kildare Housing Areas" Dept. of Environment. Regulations in respect of all trades involved the BCA of any intended deviations from these plans purpose of planning only. Dimensions to blockwork prior to commencement of development. before commencing any work. No working GENERAL NOTES: Drawing Title: Contractors must verify all dimensions at the job "Recommendations for Site Development Works construction of this development. comply where applicable with the 2010 Building accordance with only. dimensions to be scaled. This drawing is for the The Developer/Contractor/Builder should notify The Developer/Contractor/Builder is to ensure that the building under construction/alteration is to All Site Development works to be carried out in Date Revision The Studio, "Wood's Way", Clane, Co. Kildare. t. 045 892211 f. 892420 e: [email protected] Planning - SHD 02a Clane KDA1 SHD Westar Investments Ltd. Rev. BSc Eng. MSc, DIC, C.Eng, MIEI drawing no. planning ref no drawn by scale cad ref no date fire ref no job no Brian Connolly 308D AS SHOWN 02.11.18 18002 300