Procurement Plan

I. General

1. Bank’s approval Date of the procurement Plan [Original: November 2015]: Revision Public Disclosure Authorized 1 of Updated Procurement Plan, August 2016] 2. Date of General Procurement Notice: January, 2016 3. Period covered by this procurement plan: The procurement period of project covered from December 2017 to December 2019

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Type of procurement Substantial risk Works (including turnkey, supply & installation of plant and Public Disclosure Authorized 10.000.000USD equipment, and PPP) Goods, information technology and non-consulting services 2.000.000USD

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines Not applicable

4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P147674 issued by PRAPS-BF Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: Not applicable

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7

Ref. Description Estimated Packages Domesti Review Comments No. Cost c by Bank US$ Preferen (Prior / million ce Post) (yes/no) Summary of the NCB 7.6 7 No Post Public Disclosure Authorized (Works) Summary of the NCB 1.6 6 No Post (Goods) Summary of the RfQ 0.2 2 No Post (Works)

January 10, 2018 Summary of the RfQ 0.5 9 No Post (Goods)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Type of procurement Substantial risk Consultants: firms 1.000.000USD Consultants: individuals 300.000USD

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not applicable

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 0.8 8 post number of contracts that will be let under QCBS, FBBS, LCBS Summary of 3 39 Post CQS, number of Individual contracts that consultant will be let under other methods

January 10, 2018 PROCUREMENT Western Africa : Regional Sahel Pastoralism Support Project PLAN General Information Country: Western Africa Banks Approval Date of the Original Procurement Plan: 2018-01-10 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-02-02 Project ID: P147674 GPN Date: Project Name: Regional Sahel Pastoralism Support Project Loan / Credit No: IDA / 56510, IDA / 56520, IDA / D0650, IDA / D0640, IDA / 56490, IDA / 56500, IDA / D0660 Executing Agency(ies):Regional Sahel Pastoralism Support Project - , Regional Sahel Pastoralism Support Project - Chad, Regional Sahel Pastoralism Support Project - Senegal, Inter-State Committee against Drought in the Sahel, Regional Sahel Pastoralism Support Project - Burkina Faso, Regional Sahel Pastoralism Support Project - Mali, Regional Sahel Pastoralism Support Project - Mauritania

WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7788-CW-RFB / Travaux de constructions Single Stage - One Pending IDA / 56510 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-05-15 2017-05-20 2017-07-01 2017-07-31 2017-09-04 2018-03-03 bureaux DGSV & rehabilitation Envelope Implementation batiment UCP

NE-PRAPS-NE-7808-CW-RFQ / Project Management and Request for Single Stage - One Pending Réhabilitation bureau antenne IDA / 56510 Post Limited 0.00 2017-03-25 2017-05-20 2017-07-19 Institutional Support Quotations Envelope Implementation Dosso

NE-PRAPS-NE-7962-CW-RFQ / Project Management and Request for Single Stage - One Pending Rehabilitation bureau antenne IDA / 56510 Post Limited 0.00 2017-04-15 2017-06-10 2017-08-09 Institutional Support Quotations Envelope Implementation Tillaberi

NE-PRAPS-NE-7963-CW-RFQ / Project Management and Request for Single Stage - One Pending Réhabilitation bureau antenne IDA / 56510 Post Limited 0.00 2017-04-15 2017-06-10 2017-08-09 Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7964-CW-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-04-22 2017-06-17 2017-08-16 Réhabilitation bureau d'Agadez Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7966-CW-RFQ / Project Management and Request for Single Stage - One Pending Réhabilitation bureau antenne IDA / 56510 Post Limited 0.00 2017-04-22 2017-06-17 2017-08-16 Institutional Support Quotations Envelope Implementation Maradi

NE-PRAPS-NE-7968-CW-RFQ / Project Management and Request for Single Stage - One Pending Réhabilitation bureau antenne IDA / 56510 Post Limited 0.00 2017-04-17 2017-06-12 2017-08-11 Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7969-CW-RFQ / Project Management and Request for Single Stage - One Pending Réhabilitation bureau antenne IDA / 56510 Post Limited 0.00 2017-04-25 2017-06-20 2017-08-19 Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7970-CW-RFQ / Request for Single Stage - One Pending Construction de 15 postes IDA / 56510 Animal Health Improvement Post Open - National 0.00 2017-05-27 2017-07-22 2018-01-18 Quotations Envelope Implementation départementaux vétérinaires

PRAPS-SN-05-TX / Recrutement d'une entreprise pour la construction et la réhabilitation Natural Resource Management Single Stage - Two Pending des forages pastoraux équipés IDA / 56520 Post Request for Bids Open - National 0.00 2017-10-02 2017-10-07 2017-11-18 2017-12-18 2018-01-22 2018-07-21 Enhancement Envelope Implementation de château d'eau, d'abreuvoirs et de moyens d'exhaure en zone 2 (KF et TC)

TD-PRAPS-TD-9579-CW-RFQ / Natural Resource Management Request for Single Stage - One Pending Réhabilitation des tronçons de IDA / D0650 Post Limited 0.00 2017-03-15 2017-05-10 2017-11-06 Enhancement Quotations Envelope Implementation balises

TD-PRAPS-TD-9637-CW-RFB / Construction de 4 marchés à Single Stage - One Pending IDA / D0650 Market Access Facilitation Post Request for Bids Open - National 0.00 2017-07-17 2017-07-22 2017-09-02 2017-10-02 2017-11-06 2018-05-05 bétail et de 2 postes de sortie Envelope Implementation frontaliers

TD-PRAPS-TD-9638-CW-RFB / Natural Resource Management Single Stage - One Pending IDA / D0650 Post Request for Bids Open - National 0.00 2017-07-20 2017-07-25 2017-09-05 2017-10-05 2017-11-09 2018-05-08 Aménagement de 20 mares Enhancement Envelope Implementation

TD-PRAPS-TD-9641-CW-RFB / Natural Resource Management Single Stage - One Pending Aménagement de 150 kilomètres IDA / D0650 Post Request for Bids Open - National 0.00 2017-07-20 2017-07-25 2017-09-05 2017-10-05 2017-11-09 2018-05-08 Enhancement Envelope Implementation de tronçons balisés

TD-PRAPS-TD-9644-CW-RFQ / Request for Single Stage - One Pending IDA / D0650 Market Access Facilitation Post Limited 0.00 2017-10-07 2017-12-02 2018-05-31 Forage des postes de sortie Quotations Envelope Implementation

TD-PRAPS-TD-9645-CW-RFB / Single Stage - One Pending Construction et réhabilitation des IDA / D0650 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-05-31 2017-06-05 2017-07-17 2017-08-16 2017-09-20 2018-03-19 Envelope Implementation postes de vaccination

TD-PRAPS-TD-9648-CW-RFB / Single Stage - One Pending Construction réhabilitation et IDA / D0650 Market Access Facilitation Post Request for Bids Open - National 0.00 2017-05-15 2017-05-20 2017-07-01 2017-07-31 2017-09-04 2018-03-03 Envelope Implementation équipement de 12 forages

01-T/PRAPS / réhabiliter clôture Project Management and Request for Single Stage - One Under IDA / 56490 Post Limited 0.00 2017-05-03 2017-06-05 2017-06-21 2017-08-20 antenne de Fada Institutional Support Quotations Envelope Implementation

REF 8 / Construction dans la Request for Single Stage - One Pending zone agro-écologique du Mali IDA / 56500 Market Access Facilitation Post Open - National 0.00 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Implementation Nord Est

NE-PRAPS-NE-23108-CW-RFB Project Management and Single Stage - One Pending IDA / 56510 Post Request for Bids Open - National 0.00 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 / Construction des locaux Institutional Support Envelope Implementation

119 / Construction de 15 postes Single Stage - One Pending IDA / 56510 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 départementaux vétérinaires Envelope Implementation

120 / Contruction de 10 postes Single Stage - One Pending IDA / 56510 Animal Health Improvement Post Request for Bids Limited 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 communaux frontaliers Envelope Implementation

121 / Finalisation de 4 puits Natural Resource Management Request for Single Stage - One Pending pastoraux à Dosso IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation (PAAPSSP/CTB)

122 / Fonçage de 4puits Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pastoaraux (PAAPSSP) Enhancement Quotations Envelope Implementation

Page 1 123 / Réhabilitation de 3 puits Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Dosso (PAAPSSP) Enhancement Quotations Envelope Implementation

124 / Rehabilitation batiment Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 DGPIA Enhancement Quotations Envelope Implementation

125 / Constructiondes 2 centres Request for Single Stage - One Pending IDA / 56510 Market Access Facilitation Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 de collecte de lait Quotations Envelope Implementation

126 / Construction/réhabilitation Single Stage - One Pending IDA / 56510 Animal Health Improvement Post Request for Bids Open - National 0.00 2018-02-13 2018-02-18 2018-04-01 2018-05-01 2018-06-05 2018-12-02 des marchés à bétail Envelope Implementation

127 / Réalisation d'une station de pompage dans la commune Natural Resource Management Single Stage - One Pending de N'Guimi dans la région de IDA / 56510 Post Request for Bids Open - National 0.00 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Enhancement Envelope Implementation Diffa dans le cadre de programme d'urgrncr Diffa 2017

128 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Tchinta

129 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

130 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Bermo

131 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

132 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Ollélewa

133 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Tenhiya

134 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

135 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

136 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Bandé

137 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Bouné

138 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Alakos

139 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

140 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Gouré

141 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

142 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Kéllé

143 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Takaya

144 / Réhabilitation des puits Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Quotations Envelope Implementation Gudimouni

145 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Moa

146 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Kanya Wamé

147 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation deTesker

148 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Gueskérou

149 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Chétimari

150 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation N'Guigmi

Page 2 151 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Kablewa

152 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

153 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation N'Guel Beyli

154 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation N'Gourti

155 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Djeladjo

156 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Fillingué

157 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation deTchintaborak

158 / Réhabilitation des puits Natural Resource Management Request for Single Stage - One Pending pastoraux dans la commune de IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Ingall

159 / Réhabilitation des stations Natural Resource Management Request for Single Stage - One Pending de pompage/forages pastoraux IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation dans la commune de Ingall

160 / Réhabilitation des stations Natural Resource Management Request for Single Stage - One Pending de pompage/forages pastoraux IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation dans la commune de Bermo

161 / Réhabilitation des stations Natural Resource Management Request for Single Stage - One Pending de pompage/forages pastoraux IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation dans la commune de Tchinta

162 / Réhabilitation des stations Natural Resource Management Request for Single Stage - One Pending de pompage/forages pastoraux IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation dans la commune de Abala

163 / Réhabilitation des stations Natural Resource Management Request for Single Stage - One Pending de pompage/forages pastoraux IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation dans la commune deTenhiya

164 / Réhabilitation des stations de pompage/forages pastoraux Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 dans la commune deTesker (site Enhancement Quotations Envelope Implementation de et Aborak)

REF 1 / Réhabilitation de 19 Natural Resource Management Single Stage - One Pending IDA / 56500 Post Request for Bids Open - National 0.00 2017-11-22 2017-11-27 2018-01-08 2018-02-07 2018-03-14 2018-09-10 batiments Enhancement Envelope Implementation

ML-PRAPS-ML-33832-CW-RFQ / Travaux d'aménagement et de gestion des pistes et des gîtes Natural Resource Management Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-10-30 2017-12-25 2018-06-23 d'étapes dans les cercles de Enhancement Quotations Envelope Implementation

Koutiala et Yorosso (région de Sikasso)

ML-PRAPS-ML-33835-CW-RFQ Natural Resource Management Request for Single Stage - One Pending / Travaux d'aménagement de 3 IDA / 56500 Post Limited 0.00 2017-11-14 2018-01-09 2018-07-08 Enhancement Quotations Envelope Implementation périmètres pastoraux

ML-PRAPS-ML-34689-CW-RFB Single Stage - One Pending / Réhabilitation dans la zone IDA / 56500 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-03-31 2018-04-05 2018-05-17 2018-06-16 2018-07-21 2019-01-17 Envelope Implementation Delta central

ML-PRAPS-ML-34760-CW-RFQ / Construction dans la zone agro- Request for Single Stage - One Pending IDA / 56500 Market Access Facilitation Post Limited 0.00 2017-11-13 2018-01-08 2018-07-07 écologique du Delta central de 7 Quotations Envelope Implementation magasins

MR-PRAPS-MR -35029-CW- RFB / construction en 2 lots de 7 Single Stage - One Pending IDA / D0660 Market Access Facilitation Post Request for Bids Open - National 0.00 2017-12-28 2018-01-02 2018-02-13 2018-03-15 2018-04-19 2018-10-16 marchés a bétail dans plusieurs Envelope Implementation wilayas

MR-PRAPS-MR -35030-CW- RFQ / réalisation d un puit Natural Resource Management Request for Single Stage - One Pending pastoral dans la localité de IDA / D0660 Post Open - National 0.00 2018-01-01 2018-02-26 2018-08-25 Enhancement Quotations Envelope Implementation teguelwezza commune de Kankossa

02-T/MOD1 / Réalisation de 111 forages pastoraux solaires et Natural Resource Management Single Stage - One Pending IDA / 56490 Post Request for Bids Open - National 0.00 2017-12-04 2017-12-18 2018-01-17 2018-02-16 2018-04-01 2018-07-30 manuels dans les 6 régions du Enhancement Envelope Implementation

PRAPS

03-T/MOD1 / Réhabilitation de Single Stage - One Pending IDA / 56490 Animal Health Improvement Post Request for Bids Open - National 0.00 2018-05-01 2018-05-15 2018-06-14 2018-07-14 2018-08-27 2018-12-25 25 postes vétérinaires Envelope Implementation

04-T/MOD1 / Construction/réhabilitation 15 Single Stage - One Pending IDA / 56490 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-07-02 2018-07-16 2018-08-15 2018-09-14 2018-10-28 2019-03-27 marchés à bétail et 10 aires Envelope Implementation d'abattage

05-T/MOD1 / Réalisation de 30 Natural Resource Management Single Stage - One Pending boulis et surcreusement de 5 IDA / 56490 Post Request for Bids Open - National 0.00 2018-09-28 2018-10-12 2018-11-11 2018-12-11 2019-01-24 2019-07-23 Enhancement Envelope Implementation mares

Page 3 08-T/MOD2 / Sécurisation de 25 aires de pâture intervilageoise, de délimitation/balisage de 60 aires de repôs, d'aménagement de 1 Natural Resource Management Single Stage - One Pending IDA / 56490 Post Request for Bids Open - National 0.00 2018-10-31 2018-11-14 2018-12-14 2019-01-13 2019-02-26 2019-07-26 000 km de pistes à bétail, et de Enhancement Envelope Implementation récupération de 10 000 ha de terres dégradées par ONG/association spécialisées

07-T/MOD1 / Construction de 9 Request for Single Stage - One Pending IDA / 56490 Animal Health Improvement Post Limited 0.00 2019-02-10 2019-04-16 2019-08-14 cabinets vétérinaires Quotations Envelope Implementation

09-T/MOD1 / Travaux de construction de 6 postes Single Stage - One Pending vétérinaires et 30 parcs de IDA / 56490 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-12-04 2017-12-18 2018-01-17 2018-02-16 2018-04-01 2018-07-30 Envelope Implementation vaccination dans les 6 régions du PRAPS-BF

06-T/MOD1 / Single Stage - One Pending construction/réhabilitation et IDA / 56490 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-10-31 2018-11-14 2018-12-14 2019-01-13 2019-02-26 2019-07-26 Envelope Implementation équipement d'UTL et CCL

PRAPS-SN-01-TX / Réalisation Single Stage - Two Pending des travaux de construction de IDA / 56520 Animal Health Improvement Post Request for Bids Open - National 0.00 2018-03-02 2018-03-07 2018-04-18 2018-05-03 2018-06-17 2018-09-15 Envelope Implementation 15 parcs a vaccination

PRAPS-SN-02-TX-2018 / Réalisation des travaux de Request for Single Stage - One Pending IDA / 56520 Animal Health Improvement Post Limited 0.00 2018-05-02 2018-06-27 2018-12-24 construction d'incinérateurs au Quotations Envelope Implementation niveau des 8 SDEL

PRAPS-SN-03-TX-2018 / Réalisation des travaux de confection et de pose de bornes Natural Resource Management Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2018-05-16 2018-07-11 2019-01-07 pour la matérialisation des Enhancement Quotations Envelope Implementation couloirs de transhumance Payar - Kahène

PRAPS-SN-04-TX-2018 / Réalisation des travaux de construction et la réhabilitation Natural Resource Management Single Stage - Two Pending des forages pastoraux équipés IDA / 56520 Post Request for Bids Open - National 0.00 2018-01-17 2018-01-22 2018-03-05 2018-04-04 2018-05-09 2019-01-04 Enhancement Envelope Implementation de château d'eau, d'abreuvoirs et de moyens d'exhaure en zone 1 (SL, MT, LG)

PRAPS-SN-05-TX-2018 / Réalisation des travaux Natural Resource Management Single Stage - Two Pending IDA / 56520 Post Request for Bids Open - National 0.00 2018-05-25 2018-05-30 2018-07-11 2018-08-10 2018-09-14 2019-01-12 d'aménagement de mares Enhancement Envelope Implementation pastorales

PRAPS-SN-06-TX-2018 / Réalisation des travaux de Single Stage - Two Pending IDA / 56520 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-05-11 2018-05-16 2018-06-27 2018-07-27 2018-08-31 2018-12-29 réhabilitation de 85 km de pistes Envelope Implementation rurales

PRAPS-SN-07-TX-2018 / Réalisation des travaux de Single Stage - Two Pending IDA / 56520 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-02-09 2018-02-14 2018-03-28 2018-04-27 2018-06-01 2018-09-29 construction de huit (08) Envelope Implementation marchés à bétail

PRAPS-SN-08-TX-2018 / Single Stage - Two Pending Réalisation des travaux de IDA / 56520 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-01-26 2018-01-31 2018-03-14 2018-04-13 2018-05-18 2018-11-14 Envelope Implementation construction des unités laitières

PRAPS-SN-09-TX-2018 / Project Management and Request for Single Stage - One Pending Travaux de réaménagement des IDA / 56520 Post Limited 0.00 2018-01-22 2018-03-19 2018-04-03 Institutional Support Quotations Envelope Implementation bureaux du PRAPS

BF-PRAPS-BF-45749-CW-RFB Project Management and Single Stage - One Pending / Construction du siège du IDA / 56490 Post Request for Bids Open - National 0.00 2017-06-19 2017-06-24 2017-07-24 2017-08-23 2017-09-27 2018-09-22 Institutional Support Envelope Implementation PRAPS-BF

PRAPS-SN-02-TX / Recrutement d'une entreprise pour les travaux Natural Resource Management Request for Single Stage - One Pending de construction de clôtures de IDA / 56520 Post Limited 0.00 2018-02-12 2018-04-09 2018-05-24 Enhancement Quotations Envelope Implementation pépinières communautaires (10 pépinières de 1/4 ha)

PRAPS-SN-12-TX-2018 / Recrutement d'une entreprise pour la réalisation de clôture de Natural Resource Management Single Stage - One Pending IDA / 56520 Post Request for Bids Open - National 0.00 2018-02-12 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-12-01 mise en défens sur 200 ha (Dept Enhancement Envelope Implementation

Linguère, Kanel, Bakel, Koumpentoum et Koungheul)

PRAPS-SN-10-TX-2018 / Recrutement d'une entreprise Single Stage - Two Pending pour la construction et ou la IDA / 56520 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-02-12 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2019-01-30 Envelope Implementation réhabilitation de mise aux normes d'aires d'abattage

PRAPS-SN-11-TX-2018 / Recrutement d'une entreprise pour la réalisation des travaux de Single Stage - Two Pending construction de Magasins de IDA / 56520 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-02-12 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-10-02 Envelope Implementation Stockage et de Vente d'Aliment de Bétail (4 de 100T et 5 de 50 tonnes)

GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7631-GO-RFB / Project Management and Single Stage - One Pending IDA / 56510 Post Request for Bids Open - National 0.00 2017-02-23 2017-02-28 2017-04-11 2017-05-11 2017-06-15 2017-12-12 Acquisition matériel informatique Institutional Support Envelope Implementation

NE-PRAPS-NE-7652-GO-RFQ / Production de certificat Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-03-05 2017-04-30 2017-05-10 international de transhumance de Quotations Envelope Implementation la CEDEAO

Page 4 NE-PRAPS-NE-7653-GO-RFQ / Request for Single Stage - One Pending Fourniture et installation de IDA / 56510 Market Access Facilitation Post Limited 0.00 2017-03-10 2017-05-05 2017-07-04 Quotations Envelope Implementation Panneau Solaire pour la DGPIA

NE-PRAPS-NE-7654-GO-RFQ / Project Management and Request for Single Stage - One Pending Confection des Panneaux et IDA / 56510 Post Limited 0.00 2017-03-25 2017-05-20 2017-07-19 Institutional Support Quotations Envelope Implementation totems lumineux à

NE-PRAPS-NE-7655-GO-RFQ / Productions des outils de collecte de données sur les Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-03-10 2017-05-05 2017-06-04 statistiques d'élevage ( Institutional Support Quotations Envelope Implementation commercialisation de bétail etc ....)

NE-PRAPS-NE-7658-GO-RFQ / Realisation, conception d'un Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-04-08 2017-06-03 2017-07-03 compendium sur deux ans de Institutional Support Quotations Envelope Implementation mise en RN en Suvre du PRAPS

NE-PRAPS-NE-7659-GO-RFQ / impression d'un compendium sur Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-04-22 2017-06-17 2017-07-07 deux ans de mise en RN en Institutional Support Quotations Envelope Implementation

Suvre du PRAPS

NE-PRAPS-NE-7660-GO-RFQ / Edition et diffusion des outils et Project Management and Request for Single Stage - One Pending manuels de sensibilisation sur IDA / 56510 Post Limited 0.00 2017-05-02 2017-06-27 2017-07-27 Institutional Support Quotations Envelope Implementation les maladies prioritaires et les maladies emergentes du betail

NE-PRAPS-NE-7662-GO-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-02-24 2017-04-21 2018-04-16 Telephone et flotte PRAPS Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7663-GO-RFQ / Project Management and Request for Single Stage - One Pending Fonctionnement véhicules et IDA / 56510 Post Limited 0.00 2017-02-24 2017-04-21 2017-10-18 Institutional Support Quotations Envelope Implementation motos (carburant,entretien,...)

NE-PRAPS-NE-7664-GO-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2017-02-24 2017-04-21 2018-04-16 Fourniture et produit d'entretien Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7667-GO-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-02-24 2017-04-21 2018-04-16 Consommable bureau, journaux Institutional Support Quotations Envelope Implementation

NE-PRAPS-NE-7670-GO-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-02-24 2017-04-21 2017-06-20 Edition journal du PRAPS Institutional Support Quotations Envelope Implementation

TD-PRAPS-TD-8494-GO-RFB / Project Management and Single Stage - One Pending Acquisition d'un groupe IDA / D0650 Prior Request for Bids Limited 0.00 2017-07-01 2017-07-06 2017-08-17 2017-09-16 2017-10-21 2018-04-19 Institutional Support Envelope Implementation électrogène pour l'UCP

TD-PRAPS-TD-8497-GO-RFB / Single Stage - One Pending Acquisition de 4 000 000 de IDA / D0650 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-07-01 2017-07-06 2017-08-17 2017-09-16 2017-10-21 2018-04-19 Envelope Implementation doses de vaccin PPR

PRAPS-SN-01-F / Acquisition Single Stage - Two Pending IDA / 56520 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-03-13 2017-03-18 2017-04-29 2017-05-14 2017-06-13 2017-07-13 de Vaccins PPCB, PPR et FVR Envelope Implementation

BF-CILSS-8938-GO-RFQ / Impression de divers documents Project Management and Request for Single Stage - One Pending (notes des ETP-2, fiches IDA / D0640 Post Limited 0.00 2017-06-20 2017-08-15 2017-09-14 Institutional Support Quotations Envelope Implementation techniques, notes de plaidoyer, guide routier, plaquettes)

PRAPS-SN-02-F / Acquisition de kit de diagnostic de Single Stage - Two Pending IDA / 56520 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-03-06 2017-03-11 2017-04-15 2017-05-15 2017-06-19 2017-08-03 laboratoire (PPR et FVR) et de Envelope Implementation matériel d'intervention

PRAPS-SN-03-F / Recrutement d'un prestataire pour la confection de supports Animal Health Improvement Request for Single Stage - One Pending promotionnels (agendas, polos, IDA / 56520 Project Management and Post Limited 0.00 2017-03-11 2017-04-28 2017-05-28 Quotations Envelope Implementation pagnes, etc.) et Support de Institutional Support Communication (JML, JNE, autre com)

PRAPS-SN-04-F / Acquisition Natural Resource Management Request for Single Stage - One Pending de 8 motos pour l'animation des IDA / 56520 Post Limited 0.00 2017-03-18 2017-05-07 2017-06-21 Enhancement Quotations Envelope Implementation UP

PRAPS-SN-05-F / Acquisition de matériel de lutte contre les Natural Resource Management Request for Single Stage - One Pending feux de brousse en vue de IDA / 56520 Post Limited 0.00 2017-07-29 2017-09-17 2017-11-01 Enhancement Quotations Envelope Implementation l'équipement de 30 comités de lutte contre les feux de brousse

PRAPS-SN-06-F / Acquisition Natural Resource Management Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2017-06-17 2017-08-12 2017-11-10 de motofaucheuses Enhancement Quotations Envelope Implementation

PRAPS-SN-07-F / Acquisition de fournitures de bureau, de consommables informatiques et Project Management and Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2017-03-11 2017-04-30 2018-04-30 de Produits d'entretien de locaux Institutional Support Quotations Envelope Implementation administratifs et de petits matériels et outillages

PRAPS-SN-09-F / Services de Project Management and Request for Single Stage - One Pending confection d'habillement pour le IDA / 56520 Post Limited 0.00 2017-03-25 2017-05-14 2017-06-14 Institutional Support Quotations Envelope Implementation personnel de service

PRAPS-SN-11-F / Acquisition Project Management and Request for Single Stage - One Pending d'équipements de IDA / 56520 Post Limited 0.00 2017-03-11 2017-04-30 2017-06-15 Institutional Support Quotations Envelope Implementation Communication

BF-CILSS-9090-GO-RFQ / Produire des éditions de fin Project Management and Request for Single Stage - One IDA / D0640 Post Limited 7,364.49 Signed 2017-12-01 2017-10-12 2017-12-30 2017-12-01 2018-01-13 d'année (calendriers, Institutional Support Quotations Envelope plannings...)

BF-CILSS-9091-GO-RFQ / Project Management and Request for Single Stage - One Under Acquisition de deux IDA / D0640 Post Limited 0.00 2018-03-05 2018-01-25 2018-04-09 2018-04-19 Institutional Support Quotations Envelope Implementation rétroprojecteurs

Page 5 BF-CILSS-9092-GO-DIR / Project Management and Request for Single Stage - One Pending Acquisition de matériel de bureau IDA / D0640 Post Limited 0.00 2018-03-09 2018-04-09 2018-04-19 Institutional Support Quotations Envelope Implementation complémentaire

BF-CILSS-9093-GO-RFQ / Project Management and Request for Single Stage - One Pending Acquisition de fournitures de IDA / D0640 Post Limited 0.00 2018-04-07 2018-05-12 2018-05-22 Institutional Support Quotations Envelope Implementation bureau

PRAPS-SN-12-F / Achat de Mobilier (archivage et salon pour Project Management and Request for Single Stage - One Pending bureau coordonnateur et bureau IDA / 56520 Post Limited 0.00 2017-04-08 2017-05-28 2017-06-27 Institutional Support Quotations Envelope Implementation assistant sauvegarde environnemental et social)

PRAPS-SN-13-F / Acquisition Project Management and Request for Single Stage - One Pending de Groupes Electrogènes UCP et IDA / 56520 Post Limited 0.00 2017-03-18 2017-05-07 2017-08-05 Institutional Support Quotations Envelope Implementation antennes

PRAPS-SN-14-F / Acquisition Single Stage - One Pending de céréales en cas de crise IDA / 56520 Pastoral Crisis Management Prior Request for Bids Open - National 0.00 2017-11-06 2017-11-11 2017-12-23 2018-01-22 2018-02-26 2018-03-28 Envelope Implementation pastorale

TD-PRAPS-TD-9182-GO-RFQ / Equipement de la salle des Project Management and Request for Single Stage - One Pending réunions du Ministère de IDA / D0650 Post Limited 0.00 2017-04-19 2017-06-14 2017-12-11 Institutional Support Quotations Envelope Implementation l'Elevage et des Productions Animales

TD-PRAPS-TD-9999-GO-RFB / Project Management and Single Stage - One Pending Acquistion de 17 véhicules Tout IDA / D0650 Prior Request for Bids Open - International 0.00 2016-07-04 2016-07-09 2016-08-20 2016-09-19 2016-10-24 2017-04-22 Institutional Support Envelope Implementation Terrain et de 176 motocyclettes

TD-PRAPS-TD-9998-GO-RFB / Project Management and Single Stage - One Pending Acqusitions des matériels IDA / D0650 Post Request for Bids Open - National 0.00 2016-07-21 2016-07-26 2016-09-06 2016-10-06 2016-11-10 2017-05-09 Institutional Support Envelope Implementation informatiques

TD-PRAPS-TD-9990-GO-RFB / Single Stage - One Pending Acquistion de 3 000 000 de IDA / D0650 Animal Health Improvement Post Request for Bids Limited 0.00 2016-07-21 2016-07-26 2016-09-06 2016-10-06 2016-11-10 2017-05-09 Envelope Implementation doses de vaccins PPCB

03-F/PRAPS / Acquérir 3 Single Stage - One Pending groupes électrogènes au profit IDA / 56490 Animal Health Improvement Post Request for Bids Open - National 0.00 2017-04-03 2017-04-08 2017-05-08 2017-05-29 2017-07-03 2017-09-01 Envelope Implementation des antennes du PRAPS-BF

02-F/PRAPS / Duplication en Project Management and Request for Single Stage - One Pending 1000 exemplaires la version IDA / 56490 Post Limited 0.00 2018-01-31 2018-03-28 2018-04-27 Institutional Support Quotations Envelope Implementation adaptée du guide genre

Natural Resource Management 14-F/PRAPS / Fournitures et Enhancement Request for Single Stage - One Pending consommables de bureau et IDA / 56490 Post Limited 0.00 2018-01-20 2018-02-24 2018-03-26 Project Management and Quotations Envelope Implementation informatiques Institutional Support

15-F/PRAPS / Mobilier de Project Management and Request for Single Stage - One Pending IDA / 56490 Post Limited 0.00 2018-10-22 2018-12-10 2019-02-08 bureau Institutional Support Quotations Envelope Implementation

13-F/PRAPS / Dispositif de Project Management and Request for Single Stage - One Under vidéoconférence au profit de IDA / 56490 Post Limited 0.00 2018-05-30 2017-12-18 2018-07-18 2018-09-16 Institutional Support Quotations Envelope Implementation l'UCP

12-F/PRAPS / 200 kits outils Request for Single Stage - One Pending pour observatoire par les relais IDA / 56490 Pastoral Crisis Management Post Limited 0.00 2019-06-24 2019-08-19 2019-10-18 Quotations Envelope Implementation de veille

10-F/PRAPS / Support de Single Stage - One Pending communication/formation adapté IDA / 56490 Animal Health Improvement Post Request for Bids Open - National 0.00 2019-10-30 2019-11-04 2019-12-04 2020-01-03 2020-02-07 2020-04-07 Envelope Implementation aux éleveurs

09-F/PRAPS / 1 véhicule 4x4 Project Management and Request for Single Stage - One Pending station wagon et 2 véhicules 4x4 IDA / 56490 Post Limited 0.00 2019-10-28 2019-12-23 2020-02-21 Institutional Support Quotations Envelope Implementation pick-up double cabine

05-F/PRAPS / Equiper Single Stage - One l'opérateur spécialisé (VSF-B) en IDA / 56490 Animal Health Improvement Post Request for Bids Open - National 65,012.05 Completed 2016-01-08 2016-12-14 2016-01-22 2016-02-21 2017-01-24 2016-03-22 2017-02-13 2016-04-26 2017-06-23 2016-06-25 2017-08-25 Envelope véhicule

06-F/PRAPS / Production des Affiches et, dépliants (conception de 2 maquettes et impression de 2500 affiches et dépliants), Request for Single Stage - One IDA / 56490 Animal Health Improvement Post Limited 9,123.65 Completed 2017-05-26 2017-06-15 2017-07-21 2017-07-20 2017-08-20 2017-10-03 concevoir et produire des Quotations Envelope supports 'boites à images sur la santé animale et sur la conduite du troupeau

REF 11 / Equipements et Project Management and Request for Single Stage - One Pending mobiliers de bureau pour les IDA / 56500 Post Limited 0.00 2017-04-09 2017-06-04 2017-12-01 Institutional Support Quotations Envelope Implementation antennes régionales du Projet

REF 12 / Achat d'un véhicule Request for Single Stage - One Pending spécialement équipé pour les IDA / 56500 Animal Health Improvement Post Limited 0.00 2017-02-28 2017-04-25 2017-10-22 Quotations Envelope Implementation interventions d'urgence

REF 13 / Moquettes, rideaux et Project Management and Request for Single Stage - One Pending accessoires pour l'Unité de IDA / 56500 Post Limited 0.00 2017-05-21 2017-07-16 2018-01-12 Institutional Support Quotations Envelope Implementation Coordination du Projet

REF 14 / Matériels Project Management and Request for Single Stage - One Pending informatiques pour les antennes IDA / 56500 Post Open - National 0.00 2017-04-09 2017-06-04 2017-12-01 Institutional Support Quotations Envelope Implementation régionales

REF 16 / Acquisition de 80 Project Management and Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-03-22 2017-05-17 2017-11-13 smartphones Institutional Support Quotations Envelope Implementation

REF 17 / Equipements de travail Request for Single Stage - One Pending pour les enquêteurs et les IDA / 56500 Market Access Facilitation Post Limited 0.00 2017-03-14 2017-05-09 2017-11-05 Quotations Envelope Implementation contrôleurs

REF 19 / kit de semences Request for Single Stage - One Pending IDA / 56500 Market Access Facilitation Post Limited 0.00 2017-03-25 2017-05-20 2017-11-16 fourragères et petits équipements Quotations Envelope Implementation

Page 6 Request for Single Stage - One Pending REF 22 / Trousses vétérinaires IDA / 56500 Animal Health Improvement Post Limited 0.00 2017-03-30 2017-05-25 2017-11-21 Quotations Envelope Implementation

REF 23 / 40 ordinateurs Project Management and Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-04-14 2017-06-09 2017-12-06 portables et disques externes Institutional Support Quotations Envelope Implementation

REF 25 / Ordinateur portable et accessoires, imprimante Project Management and Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-05-16 2017-07-11 2018-01-07 multifonction, photocopieuse et Institutional Support Quotations Envelope Implementation onduleur du PADEL-M

NE-PRAPS-NE-23097-GO-RFQ Request for Single Stage - One Pending / Acquisition des kits de IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-09-01 2017-10-27 2018-04-25 Quotations Envelope Implementation vaccination

NE-PRAPS-NE-23100-GO-RFQ Request for Single Stage - One Pending / Equipements des 2 centres de IDA / 56510 Market Access Facilitation Post Limited 0.00 2017-10-20 2017-12-15 2018-06-13 Quotations Envelope Implementation collecte de lait

NE-PRAPS-NE-23249-GO-RFQ Request for Single Stage - One Pending / Son de blé (1100 tonnes) région IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation de Tahoua avec depot sur site

NE-PRAPS-NE-7610-GO-RFB / Project Management and Single Stage - One Pending Acquisition matériel roulant ( 26 IDA / 56510 Post Request for Bids Open - International 0.00 2017-02-27 2017-03-04 2017-04-15 2017-05-15 2017-06-19 2017-09-02 Institutional Support Envelope Implementation véhicules et 42 Moto)

NE-PRAPS-NE-7640-GO-RFQ / Request for Single Stage - One Pending Equipement Vétérinaire IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-02-28 2017-04-25 2017-06-24 Quotations Envelope Implementation (matériels froid)

NE-PRAPS-NE-7641-GO-RFQ / Equipements Vétérinaires Request for Single Stage - One Pending IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-03-05 2017-04-30 2017-06-29 (Matériels de Prélèvement et Kits Quotations Envelope Implementation de diagnostic )

NE-PRAPS-NE-23326-GO-RFQ / Tourteaux de graine (300 Request for Single Stage - One Pending tonnes) région de Tahoua ( IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation tonnes)de coton avec depot sur site

NE-PRAPS-NE-23347-GO-RFQ / Fourniture des produits Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 vétérinaires et complexes Quotations Envelope Implementation minéraux pour la DGPIA

NE-PRAPS-NE-23327-GO-RFQ Request for Single Stage - One Pending / Son de blé région (1100 t) de IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation Zinder avec depot sur site

NE-PRAPS-NE-23328-GO-RFQ / Tourteaux de graine de coton Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 (300t) région de Zinder avec Quotations Envelope Implementation depot sur site

NE-PRAPS-NE-23330-GO-RFQ Request for Single Stage - One Pending / Son de blé région deDiffa (600) IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation avec depot sur site

NE-PRAPS-NE-23333-GO-RFQ / Tourteaux de graine région de Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Diffa ( 200 tonnes)de coton avec Quotations Envelope Implementation depot sur site

NE-PRAPS-NE-23335-GO-RFQ Request for Single Stage - One Pending / Son de blé région de Maradi IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation (1000 tonnes) avec depot sur site

NE-PRAPS-NE-23336-GO-RFQ / Tourteaux de graine région Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 deMaradi ( 200 tonnes)de coton Quotations Envelope Implementation avec depot sur site

NE-PRAPS-NE-23337-GO-RFQ Request for Single Stage - One Pending / Son de blé région de Tillaberi IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation (1000 tonnes) avec depot sur site

NE-PRAPS-NE-23338-GO-RFQ / Tourteaux de graine région de Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Tillaberi ( 250 tonnes)de coton Quotations Envelope Implementation avec depot sur site

NE-PRAPS-NE-23339-GO-RFQ Request for Single Stage - One Pending / Son de blé région de Dosso IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation (800 tonnes) avec depot sur site

NE-PRAPS-NE-23340-GO-RFQ / Tourteaux de graine région de Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Dosso ( 150 tonnes)de coton Quotations Envelope Implementation avec depot sur site

NE-PRAPS-NE-23341-GO-RFQ Request for Single Stage - One Pending / Son de blé région de Niamey IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope Implementation (400 tonnes) avec depot sur site

NE-PRAPS-NE-23343-GO-RFQ / Tourteaux de graine région de Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 Niamey ( 250 tonnes)de coton Quotations Envelope Implementation avec depot sur site

NE-PRAPS-NE-23344-GO-RFQ / Son de blé région de Agadez ( Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 1000 tonnes)de coton avec depot Quotations Envelope Implementation sur site

NE-PRAPS-NE-23345-GO-RFQ / Tourteau de graine de coton Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-08-06 2017-10-01 2018-03-30 région d'Agadez (300 tonnes) Quotations Envelope Implementation avec depot sur site

Page 7 NE-PRAPS-NE-23045-GO-RFB Project Management and Single Stage - One Pending / Aquisition materiel informatique IDA / 56510 Post Request for Bids Open - National 0.00 2017-07-31 2017-08-05 2017-09-16 2017-10-16 2017-11-20 2018-05-19 Institutional Support Envelope Implementation et de communication

1 / Acquisition materiel roulant Project Management and Single Stage - One Pending IDA / 56510 Prior Request for Bids Open - International 0.00 2016-12-02 2016-12-07 2017-01-18 2017-02-17 2017-03-24 2017-09-20 (26véhicules et 50 Motos) Institutional Support Envelope Implementation

5 / Acquisition de vaccins et Request for Single Stage - One Pending diluants PPCB et diluants (6000 IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-11-06 2018-01-01 2018-06-30 Quotations Envelope Implementation 000 doses)

6 / Edition guide ingénierie Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 sociale Enhancement Quotations Envelope Implementation

7 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Tanout Enhancement Quotations Envelope Implementation

8 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending pour les sites de Belbedji IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Gangara

9 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Enhancement Quotations Envelope Implementation

10 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Takaya Enhancement Quotations Envelope Implementation

11 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending pour les sites de Magaria IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Doungas

12 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Gouré Enhancement Quotations Envelope Implementation

13 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Boune Enhancement Quotations Envelope Implementation

14 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Tesker Enhancement Quotations Envelope Implementation

15 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending pour les sites de Agadez IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Aderbissanet

16 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de INGAL Enhancement Quotations Envelope Implementation

17 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Tchiro- Enhancement Quotations Envelope Implementation

18 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Iférouane Enhancement Quotations Envelope Implementation

19 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Enhancement Quotations Envelope Implementation

20 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de say Enhancement Quotations Envelope Implementation

21 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Téra Enhancement Quotations Envelope Implementation

22 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Enhancement Quotations Envelope Implementation

23 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Filingué Enhancement Quotations Envelope Implementation

24 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Enhancement Quotations Envelope Implementation

25 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending pour les sites de Guidan IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation Roumdji Madaroumfa

26 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Mayayi Enhancement Quotations Envelope Implementation

27 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Bermo Enhancement Quotations Envelope Implementation

28 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Tchinta-Konni Enhancement Quotations Envelope Implementation

29 / Acquisition matériel aratoire Request for Single Stage - One Pending IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Quotations Envelope Implementation

30 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Enhancement Quotations Envelope Implementation

31 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Tassara Enhancement Quotations Envelope Implementation

32 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Enhancement Quotations Envelope Implementation

33 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending pour les sites de Dogon kirya IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation

34 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de -Boboy Enhancement Quotations Envelope Implementation

35 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Diffa Enhancement Quotations Envelope Implementation

Page 8 36 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 pour les sites de Mainé Enhancement Quotations Envelope Implementation

37 / Acquisition matériel aratoire Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 pour les sites de Enhancement Quotations Envelope Implementation

38 / Achat semence espèce 1 et Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 2 pour la région D'Agagez Enhancement Quotations Envelope Implementation

39 / Achat semence espèce 1 et Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-07 2018-03-04 2018-08-31 2 pour la région De Diffa Enhancement Quotations Envelope Implementation

40 / Achat semence espèce 1 et Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 2 pour la région De Dosso Enhancement Quotations Envelope Implementation

41 / Achat semence espèce 1 et Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 2 pour la région De Maradi Enhancement Quotations Envelope Implementation

42 / Achat semence espèce 1 et Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 2 pour la région De Tahoua Enhancement Quotations Envelope Implementation

43 / Achat semence espèce 1 et Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 2 pour la région De Tillaberi Enhancement Quotations Envelope Implementation

44 / Achat semence espèce 1,2 Natural Resource Management Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2018-01-04 2018-03-01 2018-08-28 et 3 pour la région De Zinder Enhancement Quotations Envelope Implementation

46 / Acquisition et installation du Natural Resource Management Request for Single Stage - One Pending système de securité ( alarme IDA / 56510 Post Limited 0.00 2017-10-04 2017-11-29 2018-05-28 Enhancement Quotations Envelope Implementation incendie et vidéo surveillance)

47 / Achat matériel de collecte Request for Single Stage - One Pending IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-10-25 2017-12-20 2018-06-18 pour la DGSV Quotations Envelope Implementation

48 / Acquisition materiels Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-27 2017-12-22 2018-06-20 d'archivage electronique Institutional Support Quotations Envelope Implementation

49 / Acquisition de logiciel pour Request for Single Stage - One Pending 5 postes ( Arc Gis logicel R et IDA / 56510 Pastoral Crisis Management Post Limited 0.00 2017-10-27 2017-12-22 2018-06-20 Quotations Envelope Implementation SPSS)

50 / Acquisition matériel Natural Resource Management Request for Single Stage - One Pending informatique et mobilier de IDA / 56510 Post Limited 0.00 2017-10-27 2017-12-22 2018-06-20 Enhancement Quotations Envelope Implementation bureau pour les 5 postes OSV

NE-PRAPS-NE-30649-GO-RFQ Request for Single Stage - One Pending / Acquisition des kits de IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-10-22 2017-12-17 2018-06-15 Quotations Envelope Implementation vaccination

NE-PRAPS-NE-30651-GO-RFQ / Réalisation de film sur la place Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-10-15 2017-12-10 2018-06-08 des femmes et des jeune dans le Institutional Support Quotations Envelope Implementation pastoralisme

REF 20 / Un ordinateur, 1 imprimante et photocopieur, 2 Project Management and Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-03-24 2017-03-24 2017-03-24 bureaux, une armoire, fournitures Institutional Support Quotations Envelope Implementation de bureau

ML-PRAPS-ML-31420-GO-RFB Single Stage - One Pending / Acquisition et Transport IDA / 56500 Pastoral Crisis Management Post Request for Bids Open - National 0.00 2017-10-10 2017-10-15 2017-11-26 2017-12-26 2018-01-30 2018-07-29 Envelope Implementation d'aliment bétail

NE-PRAPS-NE-30638-GO-DIR / Pending Acquisition de vaccins et diluants IDA / 56510 Animal Health Improvement Prior Direct Selection Direct 0.00 2017-11-09 2017-11-14 2017-12-16 2018-06-14 Implementation PPR (15 000 000 doses)

NE-PRAPS-NE-34367-GO-RFQ Request for Single Stage - One Pending / Mise en place des incinérateurs IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-12-05 2018-01-30 2018-07-29 Quotations Envelope Implementation pour la gestion des déchets

NE-PRAPS-NE-34385-GO-RFQ Request for Single Stage - One Pending / Acquisition /construction des IDA / 56510 Animal Health Improvement Post Limited 0.00 2017-11-11 2018-01-06 2018-07-05 Quotations Envelope Implementation parcs mobiles pour bovins

01-F/MOD1 / Equipement 111 Natural Resource Management Single Stage - One Pending forages solaires et manuels dans IDA / 56490 Post Request for Bids Open - National 0.00 2018-09-28 2018-10-19 2018-11-18 2018-12-09 2019-01-22 2019-05-22 Enhancement Envelope Implementation les régions du PRAPS-BF

17-F/PRAPS / Edition des manuels par compilation des Natural Resource Management Request for Single Stage - One Pending différentes règlementations IDA / 56490 Post Limited 0.00 2018-10-01 2018-11-26 2019-01-25 Enhancement Quotations Envelope Implementation existantes dans le domaine du pastoralisme

MR-PRAPS-MR -43177-GO-DIR / Acquisition de médicaments Pending IDA / D0660 Pastoral Crisis Management Prior Direct Selection Direct 0.00 2018-01-29 2018-02-03 2018-03-10 2018-09-06 vétérinaires pour le plan Implementation d'urgence.

Animal Health Improvement 04-F/PRAPS / Acquisition de Natural Resource Management Request for Single Stage - One IDA / 56490 Post Limited 59,620.75 Completed 2017-04-07 2017-05-22 2017-06-18 2017-07-21 2017-08-02 2017-10-27 165 tablettes Enhancement Quotations Envelope

Market Access Facilitation

PRAPS-SN-01-F-2018 / Acquisition de matériel de froid Request for Single Stage - One Pending IDA / 56520 Animal Health Improvement Post Limited 0.00 2018-02-21 2018-04-18 2018-06-02 complémentaire pour les services Quotations Envelope Implementation vétérinaires

PRAPS-SN-02-F-2018 / Single Stage - Two Pending Acquisition de vaccins (PPCB, IDA / 56520 Animal Health Improvement Post Request for Bids Open - National 0.00 2018-02-02 2018-02-07 2018-03-21 2018-07-08 2018-10-06 Envelope Implementation PPR et FVR)

PRAPS-SN-03-F-2018 / Recrutement d'un prestataire Animal Health Improvement Request for Single Stage - One Pending pour la confection de supports IDA / 56520 Project Management and Post Limited 0.00 2018-04-12 2018-06-07 2018-09-05 Quotations Envelope Implementation promotionnels (agendas, polos, Institutional Support etc.)

Page 9 PRAPS-SN-05-F-2018 / Fourniture et Installation Single Stage - Two Pending IDA / 56520 Market Access Facilitation Post Request for Bids Open - National 0.00 2018-02-24 2018-03-01 2018-04-12 2018-07-30 2018-10-28 d'équipements des centres de Envelope Implementation collectes, laiteries et fromagerie

PRAPS-SN-07-F-2018 / Acquisition de groupes Project Management and Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2018-02-14 2018-04-11 2018-07-10 électrogènes pour les antennes Institutional Support Quotations Envelope Implementation du PRAPS

PRAPS-SN-08-F-2018 / Project Management and Request for Single Stage - One Pending Acquisition de mobilier IDA / 56520 Post Limited 0.00 2018-03-08 2018-05-03 2018-07-02 Institutional Support Quotations Envelope Implementation d'archivage

PRAPS-SN-09-F-2018 / Acquisition de matériel Project Management and Request for Single Stage - One Pending informatique pour CONACILSS et IDA / 56520 Post Limited 0.00 2018-01-29 2018-03-26 2018-05-25 Institutional Support Quotations Envelope Implementation PRAPS ainsi que d'un kit de suivi environnement

BF-CILSS-44411-GO-RFQ / Renouvellement de licence de la Project Management and Request for Single Stage - One Under IDA / D0640 Post Limited 0.00 2018-01-28 2018-01-23 2018-03-11 2018-03-21 passerelle du système visio Institutional Support Quotations Envelope Implementation conférence

BF-CILSS-44413-GO-RFQ / Project Management and Request for Single Stage - One Pending Mise à jour de l'autocommutateur IDA / D0640 Post Limited 0.00 2018-01-29 2018-03-05 2018-03-15 Institutional Support Quotations Envelope Implementation du CILSS

BF-PRAPS-BF-44618-GO-RFB / Aliments de bétail pour approvisionner des magasins en stocks durgence (30 000 tonnes Single Stage - One Pending IDA / 56490 Pastoral Crisis Management Prior Request for Bids Open - International 0.00 2018-02-15 2018-03-01 2018-04-12 2018-04-26 2018-06-09 2018-08-08 aliment bétail) pour distribution Envelope Implementation

SECNSA et SP-CVEL, DGEAP pour réponse à la contingence sécheresse

BF-PRAPS-BF-44630-GO-RFB / Acquisition et transport sur sites de vivres pour distribution pour vente à prix modéré/Boutiques Single Stage - One Pending témoins SP CVEL pour IDA / 56490 Pastoral Crisis Management Prior Request for Bids Limited 0.00 2018-02-15 2018-02-20 2018-04-03 2018-04-17 2018-05-31 2018-07-30 Envelope Implementation assistance aux sinistrés en réponse à la contingence conflits entre exploitants /scénaris de pire cas/DGEAP

07-F/PRAPS / Equipement Animal Health Improvement informatique, ordinateurs, 31 kits Project Management and solaires, 31 refrigérateurs ,31 Institutional Support Single Stage - One Pending congelateur ,62 glacière, IDA / 56490 Pastoral Crisis Management Post Request for Bids Open - National 0.00 2017-04-19 2017-04-24 2017-06-05 2017-07-05 2017-08-09 2017-11-07 Envelope Implementation 124bouteilles de gaz, 35 Natural Resource Management smatphones, 35 power Bank, 50 Enhancement copteurs, équip. communicaion Market Access Facilitation

11-F/PRAPS / 100 Kits outils Request for Single Stage - One Under pour observatoire par les relais IDA / 56490 Pastoral Crisis Management Post Limited 0.00 2017-06-20 2017-05-22 2017-08-15 2017-10-14 Quotations Envelope Implementation de veille

08-F/PRAPS / 31 kits solaires - Request for Single Stage - One Pending acquisition, pose et installation IDA / 56490 Animal Health Improvement Post Limited 0.00 2017-11-15 2018-01-26 2018-03-12 Quotations Envelope Implementation de

MOF-REF-1 / Acquisition de 43 Request for Single Stage - One motos au profit de la DGSV et de IDA / 56490 Animal Health Improvement Post Limited 94,702.76 Completed 2017-09-10 2017-09-05 2017-11-14 2017-10-30 2017-12-29 2017-12-28 Quotations Envelope VSF-B

BF-PRAPS-BF-45936-GO-RFQ / 43 motos au profit des structures déconcentrées de collectes de Request for Single Stage - One Pending IDA / 56490 Pastoral Crisis Management Post Limited 0.00 2018-05-19 2018-07-23 2018-09-21 données dans le cadre de la Quotations Envelope Implementation composante 4 (gestion des crises)

BF-PRAPS-BF-45948-GO-RFB / 375 kits pour insertion socio- Single Stage - One Pending IDA / 56490 Pastoral Crisis Management Post Request for Bids Open - National 0.00 2018-04-18 2018-04-23 2018-05-23 2018-06-13 2018-07-27 2018-09-25 professionnelle de la 1ère Envelope Implementation cohorte (C4)

BF-PRAPS-BF-45979-GO-RFQ / Request for Single Stage - One Pending IDA / 56490 Animal Health Improvement Post Limited 0.00 2018-03-26 2018-05-21 2018-07-20 Matériel de vaccination Quotations Envelope Implementation

BF-PRAPS-BF-45989-GO-RFB / Single Stage - One Pending IDA / 56490 Animal Health Improvement Post Request for Bids Open - National 0.00 2018-03-14 2018-04-04 2018-05-04 2018-05-25 2018-07-08 2018-09-06 Vaccins contre la PPR Envelope Implementation

BF-PRAPS-BF-46005-GO-RFQ / Project Management and Request for Single Stage - One Pending Confection de goodies (publicité IDA / 56490 Post Limited 0.00 2018-02-26 2018-04-02 2018-05-02 Institutional Support Quotations Envelope Implementation par l'objet)

BF-PRAPS-BF-46009-GO-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56490 Post Limited 0.00 2018-06-17 2018-08-12 2019-02-08 Activité hors médias Institutional Support Quotations Envelope Implementation

PRAPS-SN-04-F-2018 / Natural Resource Management Pending Acquisition de 4 motos pour IDA / 56520 Post Direct Selection Direct 0.00 2018-03-03 2018-03-08 2018-04-12 2018-06-11 Enhancement Implementation l'animation des UP

PRAPS-SN-10-F-2018 / Acquisition de divers fournitures sous fore de contrats-cadres en Single Stage - One Pending trois lots separes Lot 1 produits IDA / 56520 Pastoral Crisis Management Post Request for Bids Open - National 0.00 2018-02-07 2018-02-12 2018-03-26 2018-04-25 2018-05-30 2019-05-30 Envelope Implementation veterinaires Lot 2 aliment de betail et Lot 3 betail ovins et caprins

NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7661-NC-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-02-24 2017-04-21 2018-04-16 Internet Institutional Support Quotations Envelope Implementation

Page 10 NE-PRAPS-NE-7665-NC-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56510 Post Limited 0.00 2017-02-25 2017-04-22 2018-04-17 Assurance véhicule Institutional Support Quotations Envelope Implementation

PRAPS-SN-10-F / Acquisition Project Management and Pending du logiciel MS Project et IDA / 56520 Prior Direct Selection Direct 0.00 2017-03-13 2017-03-18 2017-04-22 2017-05-22 Institutional Support Implementation formation des utilisateurs

PRAPS-SN-08-F / Services d'entretiens et de maintenance Project Management and Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2016-12-30 2017-01-17 2018-01-17 du matériel informatique, du site Institutional Support Quotations Envelope Implementation web du PRAPS

03-S/PRAPS / Assurance Project Management and Request for Single Stage - One Pending IDA / 56490 Post Limited 0.00 2017-04-22 2017-06-10 2017-07-16 maladie Institutional Support Quotations Envelope Implementation

REF 27 / Production des Project Management and Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-05-15 2017-07-10 2018-01-06 supports de vulgarisation Institutional Support Quotations Envelope Implementation

REF 28 / Appui à la production Natural Resource Management Request for Single Stage - One Pending des cartes des couloirs de IDA / 56500 Post Limited 0.00 2017-04-16 2017-06-11 2017-12-08 Enhancement Quotations Envelope Implementation transhumance

REF 29 / Développement dune Project Management and Request for Single Stage - One Pending page Facebook et dune page IDA / 56500 Post Limited 0.00 2017-06-17 2017-08-12 2018-02-08 Institutional Support Quotations Envelope Implementation YouTube

REF 30 / Conception et Project Management and Request for Single Stage - One Pending réalisation dun clip vidéo pour le IDA / 56500 Post Limited 0.00 2017-04-15 2017-06-10 2017-12-07 Institutional Support Quotations Envelope Implementation PRAPS

NE-PRAPS-NE-7669-NC-DIR / Project Management and Pending IDA / 56510 Post Direct Selection Direct 0.00 2017-02-19 2017-02-24 2017-03-31 2018-03-26 Location Bureaux UCP/PRAPS Institutional Support Implementation

NE-PRAPS-NE-7642-NC-DIR / Etablissement de 7 conventions Project Management and Pending IDA / 56510 Post Direct Selection Direct 0.00 2017-02-28 2017-03-05 2017-04-09 2017-10-06 avec les média locaux pour la Institutional Support Implementation vulgarisation des textes

ML-PRAPS-ML-34772-NC-RFQ / Project Management and Request for Single Stage - One Pending IDA / 56500 Post Limited 0.00 2017-11-05 2017-12-31 2018-06-29 Diffusion de messages Institutional Support Quotations Envelope Implementation

PRAPS-SN-06-F-2018 / Recrutement d'un prestataire Project Management and Request for Single Stage - One Pending IDA / 56520 Post Limited 0.00 2018-03-19 2018-05-14 2019-05-14 pour la police d'assurance santé Institutional Support Quotations Envelope Implementation des agents du PRAPS

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7700-CS-CQS / Multiples Conventions avec les opérateurs privés pour l'organisation des usagers de Consultant parcours(ingénerie sociale, Project Management and Pending IDA / 56510 Prior Qualification Open - National 0.00 2017-02-20 2017-03-13 2017-04-26 2017-05-26 2017-06-30 2018-06-25 aménagements pastoraux et Institutional Support Implementation Selection hydraulique pastorale ds les 7 régions avec une vingtaine d' ONG au niveau de Vingt sept zones

NE-PRAPS-NE-7766-CS-CQS / Appui à la mise en place d'un Consultant disposititif adapté Pending IDA / 56510 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-03-13 2017-04-03 2017-05-17 2017-06-16 2017-07-21 2017-09-19 d'approvisionnement et de Implementation Selection distribution d'aliments bétail en cas de crise pastorale

NE-PRAPS-NE-7769-CS-CQS / Consultant Elaboration d'un document Pending IDA / 56510 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-03-23 2017-04-13 2017-05-27 2017-06-26 2017-07-31 2017-08-30 d'evaluation d'une activité en Implementation Selection situation de crises pastorales

PRAPS-SN-12-PI / Sélection d'un consultant individuel pour Consultant Pending l'étude de capitalisation des IDA / 56520 Pastoral Crisis Management Post Qualification Open - National 0.00 2016-11-29 2017-02-09 2017-03-26 2017-04-25 2017-06-09 2017-10-07 Implementation activités de la cellule de lutte Selection contre le vol de bétail

PRAPS-SN-04-PI / Sélection d'un cabinet pour l'étude sur les Consultant initiatives en cours pour la mise Natural Resource Management Pending IDA / 56520 Post Qualification Open - National 0.00 2017-03-27 2017-04-17 2017-05-31 2017-06-30 2017-08-04 2018-01-01 en place de pares feux dans le Enhancement Implementation Selection cadre de la lutte contre les feux de brousses

PRAPS-SN-06-PI / Sélection d'un cabinet pour les études Consultant Pending techniques en vue de la IDA / 56520 Market Access Facilitation Post Qualification Open - National 0.00 2017-05-02 2017-05-23 2017-07-06 2017-08-05 2017-09-09 2017-12-08 Implementation réhabilitation de 50 km de pistes Selection rurales

PRAPS-SN-10-PI / Sélection Consultant Pending d'un cabinet pour les services IDA / 56520 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-08-28 2017-09-18 2017-11-01 2017-12-01 2018-01-05 2018-05-05 Implementation d'évaluation d'impact OSB Selection

TD-PRAPS-TD-9404-CS-QBS / Recrutement d'un consultant Project Management and Quality Based Pending IDA / D0650 Post Open - National 0.00 2017-03-23 2017-04-13 2017-05-27 2017-06-24 2017-07-24 2017-08-23 2017-09-27 2018-09-27 pour les travaux de réhabilitation Institutional Support Selection Implementation des locaux de l'UCP

19-C/MODSIEGE / MOD pour la Consultant Project Management and Pending construction du siège de l'UCP IDA / 56490 Post Qualification Open - National 0.00 2017-03-09 2017-03-30 2017-04-27 2017-05-11 2017-06-08 2018-09-01 Institutional Support Implementation PRAPS Selection

43-C/PRAPS / Capitalisation Consultant des connaissances endogènes Pending IDA / 56490 Pastoral Crisis Management Post Qualification Open - National 0.00 2019-11-28 2019-12-12 2020-01-09 2020-01-23 2020-02-20 2020-03-21 sur les indicateurs de crise en Implementation Selection pastoralisme

Page 11 07-C/PRAPS / Evaluation de Consultant l'intégration du pastoralisme dans Pending IDA / 56490 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-06-23 2017-07-14 2017-08-11 2017-08-25 2017-09-22 2017-10-22 les instruments de gestion des Implementation Selection crises au Burkina Faso

37-C/PRAPS / Etude offre de formation professionnelle en lien avec le pastoralisme au profit des jeunes et capitalisation des Consultant Under activités connexes autour des IDA / 56490 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-06-16 2017-05-26 2017-07-07 2017-08-04 2017-06-17 2017-08-18 2017-07-21 2017-09-22 2017-09-22 Implementation infrastructures d'élevage, des Selection AGR éligibles dans le PRAPS en relation avec le genre et les technologies adapté

46-C/PRAPS / Elaboration Consultant Natural Resource Management Pending référentiel technique des IDA / 56490 Post Qualification Open - National 0.00 2019-11-29 2019-12-20 2020-01-17 2020-01-31 2020-02-28 2020-03-29 Enhancement Implementation infrastructures pastorales Selection

REF 38 / Etudes pour 15 Consultant Natural Resource Management Pending schémas d'aménagement de IDA / 56500 Post Qualification Open - National 0.00 2017-04-18 2017-05-09 2017-06-22 2017-07-22 2017-08-26 2018-02-22 Enhancement Implementation terroirs Selection

Consultant REF 39 / Contrôle -surveillance Pending IDA / 56500 Market Access Facilitation Post Qualification Open - National 0.00 2017-03-14 2017-04-04 2017-05-18 2017-06-17 2017-07-22 2018-01-18 des travaux daménagement Implementation Selection

REF 40 / Evaluation des Natural Resource Management Quality And Cost- Pending IDA / 56500 Post Open - National 0.00 2017-05-03 2017-05-24 2017-07-07 2017-08-04 2017-09-03 2017-10-08 2017-11-12 2018-11-12 superficies de pâturages Enhancement Based Selection Implementation

Consultant REF 41 / Contrôle -surveillance Pending IDA / 56500 Market Access Facilitation Post Qualification Open - National 0.00 2017-03-16 2017-04-06 2017-05-20 2017-06-19 2017-07-24 2018-01-20 des travaux Implementation Selection

Consultant REF 42 / Réalisation des études Natural Resource Management Pending IDA / 56500 Post Qualification Open - National 0.00 2017-05-10 2017-05-31 2017-07-14 2017-08-13 2017-09-17 2018-03-16 géophysiques Enhancement Implementation Selection

REF 44 / Réalisation des études Natural Resource Management Quality And Cost- Pending IDA / 56500 Post Open - National 0.00 2017-05-04 2017-05-25 2017-07-08 2017-08-05 2017-09-04 2017-10-09 2017-11-13 2018-11-13 techniques Enhancement Based Selection Implementation

REF 45 / Contrôle -surveillance Consultant Pending des travaux et équipements IDA / 56500 Market Access Facilitation Post Qualification Open - National 0.00 2017-04-25 2017-05-16 2017-06-29 2017-07-29 2017-09-02 2018-03-01 Implementation d'abreuvement Selection

Consultant REF 46 / Contrôle des travaux Natural Resource Management Pending IDA / 56500 Post Qualification Open - National 0.00 2017-05-18 2017-06-08 2017-07-22 2017-08-21 2017-09-25 2018-03-24 dans la zone mali NORD- EST Enhancement Implementation Selection

Consultant REF 63 / Mise en place dun Pending IDA / 56500 Animal Health Improvement Post Qualification Open - National 0.00 2017-05-02 2017-05-23 2017-07-06 2017-08-05 2017-09-09 2018-03-08 fonds de roulement vaccins Implementation Selection

Consultant REF 73 / Etudes d'identification Natural Resource Management Pending IDA / 56500 Post Qualification Open - National 0.00 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03 des travaux daménagement Enhancement Implementation Selection

Consultant REF 74 / Aménagement dans Natural Resource Management Pending IDA / 56500 Post Qualification Open - National 0.00 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03 la zone Centre du Mali Enhancement Implementation Selection

REF 75 / Aménagement et Consultant Natural Resource Management Pending gestion durable des IDA / 56500 Post Qualification Open - National 0.00 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03 Enhancement Implementation bourgoutières Selection

REF 76 / Aménagement et gestion durable des Consultant Natural Resource Management Pending bourgoutières dans les régions IDA / 56500 Post Qualification Open - National 0.00 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03 Enhancement Implementation de Tombouctou et de Gao Selection (régions du Nord-Mali)

Consultant REF 78 / Réalisation des pare- Natural Resource Management Pending IDA / 56500 Post Qualification Open - National 0.00 2017-06-22 2017-07-13 2017-08-26 2017-09-25 2017-10-30 2018-04-28 feu de sécurisation Enhancement Implementation Selection

Consultant REF 80 / Mise en place dun Pending IDA / 56500 Animal Health Improvement Post Qualification Open - National 0.00 2017-04-17 2017-05-08 2017-06-21 2017-07-21 2017-08-25 2018-02-21 fonds de roulement vaccins Implementation Selection

NE-PRAPS-NE-7774-CS-CQS / Recrutement d'un bureau d'étude Consultant pour étude, conception et suivi Pending IDA / 56510 Animal Health Improvement Post Qualification Open - National 0.00 2017-03-22 2017-04-12 2017-05-26 2017-06-25 2017-07-30 2019-01-21 de travaux de construction de la Implementation Selection DGSV et Réhabilitation bureau UCP

NE-PRAPS-NE-7779-CS-CQS / Recrutement d'un bureau Consultant d'études pour etude,conception Pending IDA / 56510 Animal Health Improvement Post Qualification Open - National 0.00 2017-02-21 2017-03-14 2017-04-27 2017-05-27 2017-07-01 2018-12-23 et contrôle des 15 postes Implementation Selection départementaux et des 10 postes communauxfrontaliers*

NE-PRAPS-NE-7702-CS-CQS / Consultant Convention de prestation avec un Natural Resource Management Pending IDA / 56510 Post Qualification Open - National 0.00 2017-04-02 2017-04-23 2017-06-06 2017-07-06 2017-08-10 2018-08-05 Bureau pour organisation des Enhancement Implementation Selection usagers de parcours

53 / Recrutemnt d'un bureau Consultant d'étude pour Appui aux initiatives Natural Resource Management Pending IDA / 56510 Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 communautaires à travers les Enhancement Implementation Selection CEP

58 / Identification, accords sociaux, géo référence et Consultant Project Management and Pending préparation des DAO pour les IDA / 56510 Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Institutional Support Implementation travaux de balisage en 2018 des Selection couloirs de passage

65 / Convention de prestation Consultant Project Management and Pending avec un bureau pour organisation IDA / 56510 Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Institutional Support Implementation des usagers de parcours Selection

Page 12 66 / Multiples Conventions avec les opérateurs privés pour l'organisation des usagers de parcours(ingénerie sociale, Consultant Pending aménagements pastoraux et IDA / 56510 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Implementation hydraulique pastorale ds les 7 Selection régions avec une vingtaine d' ONG au niveau de Vingt sept zones

68 / Recrutement d'un consultant firme pour Consultant Pending l'Elaboration d'un document IDA / 56510 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Implementation d'evaluation d'une activité en Selection situation de crises pastorales

80 / Recrutement d'un bureau Consultant d'étude pour étude, conception et Project Management and Under IDA / 56510 Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 suivi et contôle de batiment du Institutional Support Implementation Selection Projet

84 / Recrutement des ONG/OPEL pour le démarrage Consultant Pending du processus des accords partis IDA / 56510 Market Access Facilitation Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Implementation pour la construction/réhabilitation Selection des marchés

85 / Recrutement d'un bureau d'études pour etude,conception Consultant Pending et contrôle des 15 postes IDA / 56510 Animal Health Improvement Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Implementation départementaux et des 10 Selection postes communauxfrontaliers*

Consultant 86 / Etude sur l'institution de Pending IDA / 56510 Pastoral Crisis Management Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 SVPP Implementation Selection

91 / Recrutement dun bureau detude pour Etudes de Consultant Pending faisabilité, préparation DAO, suivi IDA / 56520 Market Access Facilitation Post Qualification Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05 Implementation et contrôle des quatorze centres Selection de collecte de lait

97 / recrutement dun bureau d'études pour la réalisation des etudes techniques et elaboration Quality And Cost- Pending IDA / 56510 Market Access Facilitation Post Open - National 0.00 2017-09-29 2017-10-20 2017-12-03 2017-12-31 2018-01-30 2018-03-06 2018-04-10 2019-04-10 des DAO relatifs a la Based Selection Implementation construction/rehabilitation des 29 marchés à bétail

NE-PRAPS-NE-30657-CS-LCS / Recrutement d'un bureau d'étude pour etudes,suivi et contrôle des Project Management and Pending travaux de Réhabilitation du IDA / 56510 Post Least Cost Selection Open - National 0.00 2017-09-30 2017-10-21 2017-12-04 2018-01-01 2018-01-31 2018-03-07 2018-04-11 2018-10-08 Institutional Support Implementation batiment de la DGPIA et les locaux devant abriter les antennes régionales du PRAPS

REF 47 / Recrutement de consultant chargé des études Consultant Pending techniques pour la réalisation IDA / 56500 Market Access Facilitation Post Qualification Open - National 0.00 2017-05-19 2017-06-09 2017-07-23 2017-08-22 2017-09-26 2018-03-25 Implementation des Travaux dans la zone DELTA Selection CENTRAL

ML-PRAPS-ML-31460-CS-CQS / RECRUTEMENT D'UNE ONG POUR LA CONDUITE DES Consultant Project Management and Pending ACTIVITÉS DE SAUVEGARDES IDA / 56500 Post Qualification Open - National 0.00 2017-10-25 2017-11-15 2017-12-29 2018-01-28 2018-03-04 2018-08-31 Institutional Support Implementation SOCIALES AUTOUR DES Selection INFRASTRUCTURES DU PRAPS

ML-PRAPS-ML-33294-CS-CQS Consultant / Recrutement de consultant pour Natural Resource Management Pending IDA / 56500 Post Qualification Open - National 0.00 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03 la réalisation des Travaux de Enhancement Implementation Selection sécurisation

18-C/PRAPS / Recrutement d'un opérateur en alphabétisation Consultant Under pour la formation des membres IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2017-11-13 2017-10-02 2017-11-27 2017-12-25 2018-01-08 2018-02-21 2018-03-23 Implementation des OP de la région de la Boucle Selection du Mouhoun

17-C/PRAPS / Recrutement d'un Consultant opérateur en alphabétisation Under IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2017-11-13 2017-10-02 2017-11-27 2017-12-25 2018-01-08 2018-02-21 2018-03-23 pour la formation des membres Implementation Selection des OP de la région de l'Est

16-C/PRAPS / Recrutement d'un Consultant opérateur en alphabétisation Pending IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2017-11-13 2017-11-27 2017-12-25 2018-01-08 2018-02-21 2018-03-23 pour la formation des membres Implementation Selection des OP de la région du Nord

03-C/MOD1 / Suivi-contrôle des travaux de construction de 5 Consultant Pending postes vétérinaires et 30 parcs IDA / 56490 Animal Health Improvement Post Qualification Open - National 0.00 2017-12-02 2017-12-16 2018-01-20 2018-02-10 2018-03-17 2018-08-14 Implementation de vaccination dans les 6 régions Selection du PRAPS-BF

04-C/MOD1 / Maîtrise d'Suvre travaux de réalisation de 111 Consultant Natural Resource Management Pending forages pastoraux solaires et IDA / 56490 Post Qualification Open - National 0.00 2017-12-29 2018-01-19 2018-03-04 2018-04-03 2018-05-08 2018-10-05 Enhancement Implementation manuels dans les 6 régions du Selection PRAPS

05-C/MOD1 / Suivi-contrôle Consultant Pending travaux de réhabilitation de 25 IDA / 56490 Animal Health Improvement Post Qualification Open - National 0.00 2018-03-15 2018-04-05 2018-05-19 2018-06-18 2018-07-23 2018-12-20 Implementation postes vétérinaires Selection

06-C/MOD1 / Etude/suivi 15 Pending marchés et 10 aires d'abattage à IDA / 56490 Market Access Facilitation Post Least Cost Selection Open - National 0.00 2018-04-30 2018-05-21 2018-07-04 2018-08-01 2018-08-31 2018-10-05 2018-11-09 2019-04-08 Implementation construire et à réhabiliter

Consultant 02-C/MOD1 / Etude/suivi 30 Natural Resource Management Under IDA / 56490 Post Qualification Open - National 0.00 2018-09-21 2017-12-27 2018-10-12 2018-01-30 2018-11-25 2018-12-25 2019-01-29 2019-07-28 boulis et5 mares Enhancement Implementation Selection

Page 13 08-C/MOD1 / Etude/suivi Quality And Cost- Under UTL/CCL à construire et IDA / 56490 Market Access Facilitation Post Open - National 0.00 2018-08-21 2017-05-29 2018-09-11 2018-10-25 2018-11-22 2017-10-06 2018-12-22 2017-10-06 2019-01-26 2017-10-06 2019-03-02 2019-07-30 Based Selection Implementation réhabiliter

11-C/MOD2 / Etudes s et suivi- contrôle Travaux de sécurisation de 25 aires de pâture inter- villageoise, de délimitation/balisage de 60 aires Natural Resource Management Quality And Cost- Pending IDA / 56490 Post Open - National 0.00 2018-08-22 2018-09-12 2018-10-26 2018-11-23 2018-12-23 2019-01-27 2019-03-03 2019-07-31 de repos, d'aménagement de 1 Enhancement Based Selection Implementation

000 km de pistes à bétail, et de récupération de 10 000 ha de terres dégradées par ONG/associatio

10-C/MOD1 / Etudes environnementales et sociales Quality And Cost- Pending IDA / 56490 Animal Health Improvement Post Open - National 0.00 2018-08-21 2018-09-11 2018-10-25 2018-11-22 2018-12-22 2019-01-26 2019-03-02 2019-06-30 UTL/CCL à construire et à Based Selection Implementation réhabiliter

01-C/MOD1 / Etude Consultant Natural Resource Management Pending environnemental et sociale 30 IDA / 56490 Post Qualification Open - National 0.00 2018-08-21 2018-09-11 2018-10-25 2018-11-24 2018-12-29 2019-05-28 Enhancement Implementation boulis et 5 mares Selection

41-C/MOD1 / Etudes environnementales et sociales 15 Consultant marchés à bétail et 10 aires Pending IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2018-05-14 2018-06-04 2018-07-18 2018-08-17 2018-09-21 2019-03-20 d'abattage à construire et Implementation Selection réhabiliter dans les régions d'intervention du PRAPS-BF

42-C/MOD1 / Etude environnementales et sociales 9 Quality And Cost- Pending cabinets vétérinaires privés à IDA / 56490 Animal Health Improvement Post Open - National 0.00 2018-07-17 2018-08-07 2018-09-20 2018-10-18 2018-11-17 2018-12-22 2019-01-26 2019-07-25 Based Selection Implementation construire dans les régions d'intervention du PRAPS-BF

43-C/MOD1 / Etudes/suivi 9 cabinets vétérinaires privés à Quality And Cost- Pending IDA / 56490 Animal Health Improvement Post Open - National 0.00 2018-05-14 2018-05-28 2018-07-02 2018-07-16 2018-07-30 2018-08-18 2018-09-22 2019-03-21 construire dans les régions Based Selection Implementation d'intervention du PRAPS-BF

PRAPS-SN-09-PI / Sélection de consultant pour le développement Consultant Under de modules sur les crises IDA / 56520 Pastoral Crisis Management Post Qualification Open - National 0.00 2016-12-07 2016-12-07 2017-02-04 2017-03-10 2017-04-10 2017-03-30 2017-05-31 2017-08-29 Implementation pastorales (SIGEL) et formation Selection des utilisateurs

PRAPS-SN-02-PI-2018 / Sélection d'un consultant responsable du processus de Natural Resource Management Fixed Budget Pending suivi évaluation participatif de la IDA / 56520 Post Open - National 0.00 2018-03-06 2018-03-27 2018-05-10 2018-06-07 2018-07-07 2018-08-11 2018-09-15 2019-09-15 Enhancement Selection Implementation mise en Suvre des plans de gestion et organisation des ateliers d'évaluation

21-C/PRAPS / Evaluation des Consultant performances du PRAPS et de la Project Management and Pending IDA / 56490 Post Qualification Open - National 0.00 2017-01-27 2017-02-17 2017-04-02 2017-05-02 2017-06-22 2017-08-03 responsable de la formulation du Institutional Support Implementation Selection PADEL-B

Project Management and Quality And Cost- Pending 35-C/PRAPS / Auditeur externe IDA / 56490 Post Open - National 0.00 2019-04-15 2019-05-06 2019-06-10 2019-06-24 2019-07-15 2019-08-19 2019-10-02 2022-10-01 Institutional Support Based Selection Implementation

Consultant MOF-REF-2 / Réalisation film Project Management and Pending IDA / 56490 Post Qualification Open - National 0.00 2016-06-09 2016-06-30 2016-08-13 2016-09-12 2016-10-17 2017-04-15 documentaire et spots Institutional Support Implementation Selection

BF-PRAPS-BF-45594-CS-CQS / Opérateur en alphabétisation Consultant Pending (Association/ONG) pour la IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2018-03-08 2018-03-29 2018-05-12 2018-06-11 2018-07-16 2018-09-14 Implementation formation des OP et IP dans la Selection région des Cascades

BF-PRAPS-BF-45599-CS-CQS / Opérateur en alphabétisation Consultant Pending (Association/ONG) pour la IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2018-03-08 2018-03-29 2018-05-12 2018-06-11 2018-07-16 2018-09-14 Implementation formation des OP et IP de la Selection région des Hauts Bassins

BF-PRAPS-BF-45604-CS-CQS / Opérateur en Alphabétisation Consultant Pending (Association/ONG) pour la IDA / 56490 Market Access Facilitation Post Qualification Open - National 0.00 2018-03-08 2018-03-29 2018-05-12 2018-06-11 2018-07-16 2018-09-14 Implementation formation des OP et IP de la Selection région du Sahel

MOF-REF-11 / Animal Health Improvement ONG/Association pour réaliser Pastoral Crisis Management Consultant Pending l'ingénierie sociale du PRAPS IDA / 56490 Natural Resource Management Post Qualification Open - National 0.00 2016-08-02 2016-08-23 2016-10-06 2016-11-05 2017-01-03 2017-07-02 Implementation dans l'antenne de Fada Enhancement Selection N'Gourma (Région de l'Est) Market Access Facilitation

MOF-REF-12 / Animal Health Improvement ONG/Association pour réaliser Pastoral Crisis Management Consultant Pending l'ingénierie sociale du PRAPS IDA / 56490 Natural Resource Management Post Qualification Open - National 0.00 2016-08-02 2016-08-23 2016-10-06 2016-11-05 2017-01-03 2017-07-02 Implementation dans l'antenne de Dori (régions Enhancement Selection du Sahel et du Nord) Market Access Facilitation

MOF-REF-13 / ONG/association Animal Health Improvement pour l'ingénierie sociale du Pastoral Crisis Management Consultant PRAPS-BF dans l'antenne de Pending IDA / 56490 Natural Resource Management Post Qualification Open - National 0.00 2016-08-02 2016-08-23 2016-10-06 2016-11-05 2017-01-03 2017-07-02 Bobo-Dioulasso (régions des Implementation Enhancement Selection Hauts-Bassins, de la Boucle du Market Access Facilitation Mouhoun et des Cascades)

32-C/MOD1 / Etudes Quality And Cost- environnementales et sociales 9 IDA / 56490 Animal Health Improvement Post Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-26 2019-08-24 Based Selection cabinets vétérinaires

09-C/MOD1 / Etudes/suivi 9 Quality And Cost- cabinets vétérinaires à IDA / 56490 Animal Health Improvement Post Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-26 2019-08-24 Based Selection construction

Consultant 40-C/PRAPS / Etude sur les Pending IDA / 56490 Animal Health Improvement Post Qualification Open - National 0.00 2017-03-31 2017-04-14 2017-05-05 2017-05-12 2017-06-16 2017-07-16 mandats sanitaires Implementation Selection

Page 14 BF-PRAPS-BF-45926-CS-CQS / Consultant Project Management and Pending Suivi-contrôle de la construction IDA / 56490 Post Qualification Open - National 0.00 2017-06-26 2017-07-17 2017-08-14 2017-08-28 2017-10-02 2018-09-27 Institutional Support Implementation du siège du PRAPS-BF Selection

BF-PRAPS-BF-46011-CS-CQS / Consultant Plan d'aménagement et de Natural Resource Management Pending IDA / 56490 Post Qualification Open - National 0.00 2018-03-30 2018-04-20 2018-06-03 2018-07-03 2018-08-07 2018-10-06 gestion (PAG) de la zone Enhancement Implementation Selection pastorale de Barani (48 924 ha)

BF-PRAPS-BF-46012-CS-CQS / Plan d'aménagement et de Consultant Natural Resource Management Pending gestion (PAG) de la zone IDA / 56490 Post Qualification Open - National 0.00 2018-03-30 2018-04-20 2018-06-03 2018-07-03 2018-08-07 2018-10-06 Enhancement Implementation pastorale de Sondré Est (16 459 Selection ha)

BF-CILSS-46764-CS-CQS / Consultant Etude sur l'utilisation de Pending IDA / D0640 Pastoral Crisis Management Post Qualification Open - International 0.00 2018-03-08 2018-03-29 2018-05-12 2018-05-26 2018-06-16 2018-10-14 l'approche proxy calorique avec Implementation Selection les produits de l'élevage

INDIVIDUAL CONSULTANTS

Page 15