3Rd Street & Broadway Streetscape Project About the Project
Total Page:16
File Type:pdf, Size:1020Kb
About the 3rd Street & Project Broadway Streetscape Exciting improvements are coming to 3rd Street and Broadway! Westbound Project 3rd Street and Eastbound Broadway will be resurfaced and reconfigured from Golden Avenue to Alamitos BETWEEN GOLDEN AVENUE Avenue to create a more pedestrian & ALAMITOS AVENUE and bike-friendly streetscape. Examples of improvements include relocation of protected bike lanes Long Beach Public Works to right side of the street to allow 333 W. Ocean Blvd., 9th Floor for better connections to existing Long Beach, CA 90802 and future bicycle facilities, as well (562) 463-4465 as increased safety. The project www.longbeach.gov/pw also includes construction of new @LBPublicWorks bus islands and ADA upgrades to WE’RE OPEN WE’RE sidewalks and curb ramps. OPEN For questions and concerns relating to this project, please contact us at: (562) 463-4465 Follow us on social media for project updates: @LBPublicWorks Text construction to 99000 for project updates Improvements SEGMENT 1 Include: Golden Ave to Pacific Ave OCTOBER 2018 - DECEMBER 2018 • Street Resurfacing • ADA Upgrades • Protected Bike Lanes • Bus Stop Islands • Enhanced Pedestrian Features SEGMENT 2 • Continental Crosswalks Pacific Ave to Long Beach Blvd • Tree Trimming COMING SOON - DATES TBD • Sidewalk, Curb, and Gutter Repairs Protected Bike Lane, Continental Crosswalk 3rd St 3rd St Elm Ave Pine Ave Lime Ave Daisy Ave Cedar Ave Pacific Ave Maine Ave Atlantic Ave Linden Ave Chestnut Ave Alamitos Ave Magnolia Ave Golden Ave Long Beach Blvd Broadway Promenade North Broadway SEGMENT 3 Long Beach Blvd to Atlantic Ave COMING SOON - DATES TBD SEGMENT 4 Atlantic Ave to Alamitos Ave COMING SOON - DATES TBD Enhanced Pedestrian Features, Tree Trimming Bus Stop Island, Street Resurfacing.