IPC Inception Meeting with the Local Authorities Preston, 2 November 2010 Summary

• Introduction to DONG Energy • Project details • Consents strategy • Programme for application • Key milestones for the EIA • Progress of project DONG Energy is an integrated energy company with a strong presence across the energy value chains in Northern Europe

3 Strategy for transforming the production of power and heat in DONG Energy

15 /85 50 / 50 85 / 15

VISION 638 1 • To provide reliable g CO2 /kWh

energy without CO2

STRATEGY 320

g CO2 /kWh • Eliminate 50% of CO2- emission per kWh before 2020

• Eliminate 85% of CO2- emission per kWh 100 before 2040 g CO2 /kWh

2006 2020 2040

1) 2006 total heat and power production 28,5 TWh eleq/ CO2- emissions 18,2 mt = 638 g CO2/kWh

4 Overview of operational offshore wind farms developed and constructed by DONG Energy

DONG Energy has pioneered offshore wind and has more than 30 years of experience within , and more than 15 years of experience in developing, constructing and operating offshore wind farms

By the end of 2009, DONG Energy had constructed ~ 1,000 MW offshore wind capacity including Horns Rev 2 the world’s largest offshore wind farm to date and operated ~ 750 MW offshore capacity Figures represent DONG Energy's share of the projects Source: DONG Energy Power

5 DONG Energy is the worldwide market leader within offshore wind

Market participants within European offshore wind

Operational assets Assets under construction

Centrica RWE SSE E.ON DONG RWE DONG Energy Energy SSE

Vattenfall Vattenfal E.ON 1,402

DONG Energy is class leading within offshore wind, as the energy 658 911 company having developed, constructed 665 an operated the most 450 offshore wind projects

394 349 744 545 277

461 276 344 135

120 118 5 142

Operational assets (MW) Assets under construction (MW)

Source: Companies' annual accounts 2009, Emerging Energy Research Offshore Wind Farms in the UK

Operational

Construction

Wigtown Bay Development 280 MW Extension Walney Extension 750 MW DONG 100% H! Offices Walney I + II H! Barrow-in-Furness 367 MW – 2012 Barrow DONG 75%, SSE 25% 90 MW - 2007 Westermost Rough West of Duddon Sands DONG & CENTRICA 245 MW 500 MW Liverpool SCOTTISH POWER 67%, DONG 33% H! Burbo Bank Lincs Burbo Bank Extension 250 MW – 2012 90 MW - 2007 CENTRICA 50%, DONG 25%, 234 MW DONG SIEMENS PV 25% DONG 100%

Brightlingsea Gunfleet Sands I + II H! 172 MW - 2010 H! DONG London H! London Array 630 + 370 MW – Phase I - 2012/2013 DONG 50%, E.ON 25%, MASDAR 25% Walney and Burbo Bank Extensions

•Total Area: 185.9 km2 •Capacity: 984 MW

•Irish Sea cluster project area •Barrow: 45 (90) MW •Walney: 275 (367) MW •WDS: 166 (500) MW •Burbo Bank: 90 MW •Wigtown Bay: 280 MW •Total: 856 MW

Status: May 2010 Walney Extension – Final Site awarded by TCE (April 2010)

• Total Area: 149 km2 • Capacity: 750 MW (indicative)

• Key Constraints: • Shipping lanes • Fisheries • Birds (migratory) • Gas Platforms • Cumulative with Irish Sea Zone Walney Extension – Key constraints Project details, indicative layout and cable corridor

Project components

• Wind turbines – range 3 MW- 6 MW (t. h up to

170 m)

• Foundations – steel monopiles, jackets

• Inter array cables – potentially 33kV

• Offshore substation – min. one – high voltage

equipment

• Onshore export cable – underground cables 3

single core

• Onshore substation

Indicative cable route, subject to modification • Anemometry mast Planning consents and EIA approach

ƒ Planning Act 2008, >100MW – Nationally Significant Infrastructure Project (NSIP) ƒ Development Consent Order (DCO) ƒ Offshore and onshore part of project (onshore works "associated development")*

ƒ Environmental Impact Assessment (EIA) – EC Directive 85/337/EEC – as amended by Directive 97/11/EC (EIA Directive), Annex II ƒ Infrastructure Planning (Environmental Impact Assessment) Regulations (2009) – statutory process and min requirements for adequate environmental information ƒ EIA process include assessment of EU bird and habitat regulations etc.

ƒ Complex development and flexibility is required (site specific surveys during the development process)

ƒ "Rochdale Envelope"

ƒ *Section 37 of the Planning Act 2008 12 Consents & Consenting Authorities

Consenting Offshore Wind Farm Elements Consents Authorities Site IPC (with MMO) Turbines IPC (with MMO) DCO Inter array Cable IPC (with MMO) Offshore Substation IPC (with MMO)

Offshore Export DCO + deemed Integral Cable IPC (with MMO) FEPA/Marine (in English Waters) Part of the Licence Development

Onshore Cable IPC (with Local DCO Planning Authority(ies)) Onshore Substation

13 Consents strategy – from Scoping to Application WE: Walney Extension

1 Submission of Scoping Report to request Scoping Opinion end Sep 2010

IPC provides Scoping Opinion in 42 days, after consultation with consultees (28 days), and publishes on IPC website Statutory Instrument 2263, 8(1)

2 Formal Notification to IPC about Proposed Application

a) notification *; b) provide copies of consultation end 2010/ materials to be used in S42 Planning Act 2008, S46 early 2011

* letter + any preliminary environmental info sent to S42 Consultees, chart and general description of the project and draft SOCC

3 Early Consultation* + Technical Input** July-end 2010 Local Authorities* + Expert Bodies** DCLG Guidance 72 + 34

Discuss SoCC Process

4 Formal Consultation (S 42) Local Authorities*, Statutory Consultees**, Early 2011 Landowners Planning Act 2008, S42 * Planning Act 2008, S43 DCLG Guidance 74 (preferred **Statutory Instrument 2264, Schedule 1, page 9 options) + 81 (consultation info) 5 Statement of Community Consultation (SoCC) state whether the proposal is EIA development and how Early 2011 the preliminary environmental information is to be Planning Act 2008, S47 (7) consulted upon* * Statutory Instrument 2264, 10

3 Discuss Process

Local Authorities DCLG Guidance 42 Consult on Contents Planning Act 2008, S47 (2) Local Authorities IPC Advice Note 24-27 DCLG Guidance 29 + Communities 53-59 (vicinity), 60-64 (methods), 82 (information)

6 Publish SoCC Q1 2011 Planning Act 2008, S47 (6) to be published in local area DCLG Consultation Guidance 49-54 BE: Burbo Bank Extension: WE: Walney Extension

7 Publicise the Application Q1 2011 Planning Act 2008, S48 Statutory Instrument 2264, 10 DCLG Guidance 65

8 Consultation Report Q4 2012 collect *prepare and publish the responses from the consultation activities as of S42 and S47 Planning Act 2008, S49

* Applicant to set deadline for responses of at least 28 days EIA Surveys & Studies

Draft Environmental Statement (ES)

Material on Significant Effect on European Site IPC Guidance Note Consultation on Draft ES #1

9 Submit ES & DCO Application Q1 2013 Planning Act 2008, S47

16 Programme for application Walney Extension Offshore Wind Farm

17 Key Milestones in EIA

18 Progress up to today

• Scoping report submitted

• Technical consultation input to scope of works for EIA surveys

• Procurement of EIA surveys

• Survey commenced

• Upcoming activities:

• Review scoping opinion

• Preparation of SoCC

• Consultation of local authorities other key stakeholders 19 pre-S42 Consultation with Technical/Statutory and Non Consultees

22/06/2010

18/11/2010

3/11/2010

15/07/2010

12/08/2010 pre-S42 Consultation with Technical/Statutory and Non Consultees

25/06/2010 01/08/2010

01/09/2010

15/09/2010

• Pre-S42, S47 consultation with Local Authorties is planned for December 2010-January 2011